GRUPO COREMAR PALERMO SOCIEDAD PORTUARIA

Transcription

GRUPO COREMAR PALERMO SOCIEDAD PORTUARIA
“Colombia’s Golden Gate for your business”
PALERMO SOCIEDAD
Objectives
PORTUARIA
Backed by Coremar Group with over 50 years experience in the maritime and
portuary industry, with five main divisions; Harbour Towage, Off-shore,
Marine Transportation, Fuel Distribution and Ports & Terminals, Palermo
Port Society has the support of a market leader with a strong growing presence
within Latin-American markets.
Palermo provides an alternative to importers/exporters and distributors who are
willing to set up their production facilities near a port infrastructure and benefit
from the logistic advantages.
LOCATION
Location
Barranquilla, Colombia, South America
Strategic Location for National and International Markets.
LOCATION
Location
East Side Magdalena River
Barranquilla
Area Development
MULTIPURPOSE
PORT
478,396 yd2
Warehouses
42 ft Natural Draft
Free Trade Zone
Industrial and
Petrochemical Park
1,315,589 yd2
PALERMO
PORT
SOCIETY
1,793,985 yd2
Pipelines
Fuel Distribution
Terminal
Truck Parking Lot
Gas Station and Cafeteria
MAGDALENA RIVER
Characteristics
MULTIPURPOSE PORT
Liquid Terminal
300 MTS
2 PROJECT PHASES
1st Phase:
Warehouses
Pipelines
• 119,599 sq. yards ready for patios
and storage
• 3 multipurpose warehouses - 1,500
mts2 each
Berth Line
Bodegas
6000 psi – 750 MTS
2nd Phase:
• Further development of the
remaining 1,674,386 sq. yards for
Free Trade Zone and Industrial Park
PALERMO PORT SOCIETY OFFERS EVERGREEN:
104 tons Shore Crane – Gottwald
80 tons Shore Crane - Gottwald (40 days after agreement has been reached)
Stevedore – Serteport
Same Land Transport Rates to Industrial zones in Barranquilla as from other
terminals in the area
Implement Navis N 4
30 plugs available for Reefers
600 empty container pool
Services offered by Palermo Port Society
Fuel Supply
Ship Chandler Supply
Fresh Water Supply
Vessel Repairing Service
Sludge Removal Service
Fumigation Service
Electrical power supply to refrigerated containers
Electrical power supply for vessels and others
Wi-Fi Internet at docks
Office space available
Equipment Maintenance Space
Warehouse Space
Services offered by Palermo Port Society
1.Loading and unloading of containers / general cargo
2.Shifting of Containers/ general cargo
3.Handling of extra-dimensional cargo
4.Transshipment
5.Inspections
6.Free Storage
7.Container stuffing
8.Container stripping
Services offered by Palermo Port Society
 All personnel necessary for loading and unloading operation.
 Equipment for operation.
 Documentation requirements for the handling of impo/expo cargoes and Mtys
 Container tracking from the moment it has been discharged to the moment it exits
the terminal. Data transfer EIR/EDI
 Export cargo weighing station in case necessary.
 Shore Crane movements minimum 18 boxes
per crane per hour / 2 cranes
 Vessel Crane movements minimum 13 boxes
per crane per hour / depending on number of
vessel cranes
Service Areas
Wide areas available to be tailor made to Evergreen’s needs
 Impo/Expo cargo and MTYs damage inspection service available
 Special area assigned for container repairs
 Free Pool for 600 MTY containers
Infrastructure – 1st Phase
Main Office
Infrastructure – 1st Phase
Entrance
Infrastructure – 1st Phase
Entrance
Infrastructure – 1st Phase
Hoppers
Wharehouse
Scales
Access to Principal Highway
without entering any city
Main highway that connects
with country’s inland.
Magdalena River
Intermodal Network
Located at the river side of Colombia’s main navigable route
Customs Regulations
1. Customs office service 24 hours at the port
2. Logistic International Deposit Support
Advantages:
• Storage without nationalizing for 1 year
• Merchandise Handling:
 Maintenance
 Fitting-out
 Upgrades
 Improve presentation
 Packaging
 Mark and Classify
 Repairs
 Cleaning
3. Connection to Custom informatic services
Security
1. Gated Perimeter Closure
2. CCTV
3. 24 hours security patrol
4. Special agreement with police and
army
5. ISPS approval
6. BASC certification in process – as of May 2009
7. Private Security Company
HSE regulations in PSP
 Management System for Health Safety and Environment
 Identified and evaluated risks derived from all the activities
 Registered with the Colombian Counseling of Security
 Signs throughout the terminal indicating the protection regulations
 Evacuation Plan
 All Palermo Port Society personnel:
1. has been provided with the personal elements
for protection necessary
2. has the knowledge and training of HSE regulations
Socioeconomic Impact
Aqueduct
Socioeconomic Impact
Health
Socioeconomic Impact
Construction of: Church, School, Community Hall & Roads
Equipment
Terminal Activity
Terminal Activity
Terminal Activity
Portuary Activity
Yellow Machinery
Portuary Activity
General Cargo
Portuary Activity
Storage
Portuary Activity
Steel Coils and pipes
Portuary Activity
Steel Plates
Portuary Activity
Pipes – Fiber Glass
Portuary Activity
Pipes – Fiber Glass
Portuary Activity
Coated Pipes
Portuary Activity
Coated Pipes
Portuary Activity
Dragline
Portuary Activity
Dragline
Portuary Activity
Lift on Truck - Heavy Lift
Portuary Activity
Grain Handling
Companies Attended
at PSP