GRUPO COREMAR PALERMO SOCIEDAD PORTUARIA
Transcription
GRUPO COREMAR PALERMO SOCIEDAD PORTUARIA
“Colombia’s Golden Gate for your business” PALERMO SOCIEDAD Objectives PORTUARIA Backed by Coremar Group with over 50 years experience in the maritime and portuary industry, with five main divisions; Harbour Towage, Off-shore, Marine Transportation, Fuel Distribution and Ports & Terminals, Palermo Port Society has the support of a market leader with a strong growing presence within Latin-American markets. Palermo provides an alternative to importers/exporters and distributors who are willing to set up their production facilities near a port infrastructure and benefit from the logistic advantages. LOCATION Location Barranquilla, Colombia, South America Strategic Location for National and International Markets. LOCATION Location East Bank of Magdalena River Barranquilla CARACTERÍSTICAS Characteristics Multipurpose Port 1,793,985 yd2 for expansion 42 feet natural draft at berth line Dock Line constructed with 6000 psi Free Trade Zone, Industrial and Petrochemical Park Area Development MULTIPURPOSE PORT 478,396 yd2 Warehouses 42 ft Natural Draft Free Trade Zone Industrial and Petrochemical Park 1,315,589 yd2 PALERMO PORT SOCIETY 1,793,985 yd2 Pipelines Fuel Distribution Terminal Truck Parking Lot Gas Station and Cafeteria MAGDALENA RIVER Characteristics MULTIPURPOSE PORT Warehouses Liquid Terminal 300 MTS Berth Line 6000 psi – 750 MTS Pipelines Project Phases 1st Phase - 90% Completed • 308 mts of berth line / 3 positions • Parking Lot for trucks with gas station and resting zone to avoid congestion at the port’s entrance • 119,599 yd2 ready for patios and storage • Logistic International Deposit Support (Similar to Free Trade Zone) • Construction of 2 multipurpose warehouses of 1,500 mts2 each with capacity of 6,700 tons each • Construction of 1 warehouse of 1,500 mts2 for general cargo Infrastructure – 1st Phase Main Office Infrastructure – 1st Phase Entrance Infrastructure – 1st Phase Entrance Infrastructure – 1st Phase Infrastructure – 1st Phase Hoppers Berth Warehouse under construction Scales Infrastructure – 1st Phase Warehouse under construction Infrastructure – 1st Phase Patio Project Phases 2nd Phase • 450 mts of berth line / 4 additional positions for berthing • Liquid Terminal with 300 mts of exclusive berth • Further development of the remaining 1,674,386 yd2 Magdalena River Intermodal Network Located at the river side of Colombia’s main navigable route • Option for transporting extra dimensional cargo Access to Principal Highway without entering any city PSP located outside of Barranquilla Reduces accident probabilities Other Terminals Located at Barranquilla Main highway that connects with country’s inland. 110 MILES To main coal mines area Access to Coal Production Area Fuel Distribution • Wholesale marine and inland fuel distributors • Strong growing presence within the Colombian fuel distribution industry • Closest private tanks storage to the main coal industry • 30,000 bls capacity to be upgraded to 450,000 bls capacity • New storage to allow importation of diesel and gasoline Fuel Distribution Highway to Cienaga New Tank Farm 450,000 BLS Liquid Docks to Hold 250 Mtrs LOA vessels 2 X 12” Pipeline System from tanks to docks Customs Regulations 1. Customs office service 24 hours at the port 2. Logistic International Deposit Support Advantages: • Storage without nationalizing for 1 year • Merchandise Handling: Maintenance Fitting-out Upgrades Improve presentation Packaging Mark and Classify Repairs Cleaning 3. Connection to Custom informatic services Security 1. Gated Perimeter Closure 2. CCTV 3. 24 hours security patrol 4. Special agreement with police and army 5. ISPS approval 6. BASC certification in process – as of May 2009 7. Private Security Company HSE regulations in PSP Management System for Health Safety and Environment Identified and evaluated risks derived from all the activities Registered with the Colombian Counseling of Security Signs throughout the terminal indicating the protection regulations Evacuation Plan All Palermo Port Society personnel: 1. has been provided with the personal elements for protection necessary 2. has the knowledge and training of HSE regulations Socioeconomic Impact Aqueduct Socioeconomic Impact Health Socioeconomic Impact Construction of: Church, School, Community Hall & Roads Equipment Portuary Activity Drummond Dragline Storage Drummond Dragline Portuary Activity Lift on Truck - Heavy Lift Portuary Activity Dragline for El Descanso Portuary Activity Yellow Machinery Portuary Activity Pipes – Fiber Glass Portuary Activity Coated Pipes Portuary Activity Coated Pipes Companies Attended at PSP www.palermosociedadportuaria.com [email protected]
Similar documents
Port Operations
Maintenance Fitting-out Upgrades Improve presentation Packaging Mark and Classify Repairs Cleaning 3. Connection to Custom informatic services
More information