Port Operation
Transcription
Port Operation
“Colombia’s Golden Gate for your business” HSEQ Committed to: Protect Life, Health and Environment Create safe and healthy procedures and practices Provide training to qualify our team High quality and suitable facilities, plants and equipments Environment’s safety Experience and Support COREMAR GROUP, owner of Palermo Port Society is a family owned company founded in 1958, and since then has been dedicated to maritime, logistic and port services. With its five main divisions: •Harbor Towage •Off-shore Support •Marine Transportation •Fuel Distribution •Ports & Terminals LOCATION Location Barranquilla, Colombia, South America Location East Side Magdalena River River Delta Cartagena Magdalena River 68 miles 11 miles to River Delta Barranquilla Access to Principal Highways without entering any city PSP located outside of Barranquilla Reduces accident probabilities Other Terminals Located at Barranquilla Main highway that connects with country’s inland. 110 MILES To main coal mines area Layout Industrial Cluster Portuary Zone Industrial Park (Free Trade Zone) Pipelines 371 Acres Petrochemical Park Parking Lot for Trucks 1st Phase • • • • 308 mts of berth - 40 ft natural draft 10 Hectares for patios and storage 3 multipurpose Warehouses 1.500 each Parking lot for trucks Multipurpose Warehouse Multipurpose Warehouses Berth Line 308 mts Scales 2nd Phase •140 Hec. for development of Free Trade Zone, Industrial and Petrochemical Park •Liquid Terminal with 300 mts of exclusive berth Infrastructure Main Office Infrastructure Main Office Infrastructure Infrastructure Infrastructure Infrastructure Magdalena River Intermodal Network Located on the eastern bank of Colombia’s main navigable route Customs Regulations Customs office service 24 hours at the port Logistic International Deposit Support Advantages: • Storage without nationalizing for 1 year • Merchandise Handling: Maintenance Fitting-out Upgrades Improve presentation Packaging Mark and Classify Repairs Cleaning Security and Certifications Security Gated Perimeter Closure CCTV 24 hours security patrol Special agreement with police and army Private Security Company Certifications ISPS BASC Socioeconomic Impact Aqueduct Before After Socioeconomic Impact Health Socioeconomic Impact Construction of: Church, School, Community Hall, Play Park and Roads Socioeconomic Impact Construction of: Church, School, Community Hall, Roads and Play Park Port Operation Coated Pipes Port Operation Coated Pipes Port Operation Fiber Glass Pipes Port Operation Fiber Glass Pipes Port Operation Fiber Glass Pipes Port Operation Dragline Port Operation Equipment Port Operation Equipment Port Operation Equipment Port Operation Equipment Port Operation General Cargo Port Operation General Cargo Port Operation General Cargo Port Operation Storage Port Operation Storage Port Operation L/T Port Operation L/T Port Operation L/T Port Operations Steel Coils Port Operations Steel Port Operations Steel Port Operations Multimodal Transportation Port Operations Containers Port Operations Port Operations Grain Handling Port Operations Grain Handling Port Operations Grain Handling Port Operations Grain Handling Companies Attended at PSP www.palermoportsociety.com [email protected]
Similar documents
GRUPO COREMAR PALERMO SOCIEDAD PORTUARIA
Management System for Health Safety and Environment Identified and evaluated risks derived from all the activities Registered with the Colombian Counseling of Security Signs throughout the ...
More information