Peebles Elementary School
Transcription
Peebles Elementary School
Frequently Asked Questions Q Why a grade 3-5 Peebles Elementary School? Q Why not renovate instead? A This option replaces the existing Peebles School with a new facility serving a single intermediate school for students in grades 3 through 5, keeping an elementary school on the Cape side of the canal as part of greater campus with the middle and high school. It relocates the fifth grade into an elementary school setting and provides new educational opportunities at Bourne Middle School. This option creates an equal educational experience among the elementary schools with a focused 3-5 educational program for all students through a more, streamlined curriculum with greater academic resources and additional collaboration opportunities within the school community including the unique opportunity for fifth grade students to take on leadership roles. A The Feasibility Study demonstrated that requirements for meeting the building code and the requirements for reimbursement of the Massachusetts School Building Authority (MSBA) would make a renovation/addition more costly than new construction due to the age and condition of the 62+ year old Peebles Elementary School. Q Why should the 5th grade be returned to the elementary school? A Moving the fifth grade to the 3-5 school further eases student transition to middle school as students will have already integrated as a class and experienced the transition from the elementary school to the intermediate (3-5) school. Fifth grade students will take the school bus with students in their own age groups that will reduce exposure to behaviors of older students. Additionally, much of our curriculum matches the grade bands PK-2, 3-5 (or PreK5) and 6-8 evident in the Massachusetts State Curriculum Frameworks Q How long has the Feasability Study been underway? A The Feasibility Study commenced over 4 years ago in January 2012 with the submission of the Statement of Interest for the Peebles Elementary School to the Massachusetts School Building Authority (MSBA) by the Selectmen and School Committee. The Town and the MSBA executed an agreement for the Feasibility Study in February 2015 which has been overseen by the School Building Committee for the past 1 ½ years. For more information go to: Town Website: http://www.townofbourne.com/school-building-committee www.newpeebles.weebly.com Project Email: [email protected] Fact Sheet The Proposed New Peebles Elementary School Bourne, MA September 14, 2016 Q Will it be longer to travel to school? A There will be approximately 15 additional minutes to the current bus route duration for first and second graders that reside on the cape-side of the Canal and for third and fourth graders that reside off-cape.. Q What are the benefits of grade spans? A While this is a shift from the current school configurations, there are potential benefits for all stakeholders of the Bourne Public Schools system. This option provides districtwide PK-2 at Bournedale, 3-5 at Peebles and 6-8 at BMS. By creating small grade span schools, each school is able to focus on one specific stage of child academic and social/ emotional development. A building-wide concentration of attention to the academic, emotional, physical, and social needs associated with each level of students will positively enhance learning and growth. The new, proposed state-approved 3-5 school will be a modern, state-of-the-art facility that will serve the Town for many years to come and features amenities such as.... n Larger classrooms, new learning commons, and gymnasium that conform to current State guidelines. n Dedicated art, music, innovation studio, special education, and all other required educational spaces. n Convenient community access and use of the gymnasium, cafeteria, and learning commons. n Improved student safety: new building security system, access control system, fire alarm, and fire suppression system. n 21st Century technology infrastructure. n Numerous “green” features that will improve operational efficiency of the school such as occupancy sensors for lighting, an energy efficient displacement air system, and a building-wide energy management system. n Improved air quality, lighting, and heat control. Q Why not delay until the economy improves? A The School District has been approved by the State for reimbursement now at 48.63% of eligible costs. Additionally, the MSBA is reimbursing the Town for 43.84% ($328,800) of the $750,000 cost of the feasability study. If the project is delayed it will be removed from the State funding list with no assurance for any reimbursement in the future. If the MSBA were ever to reconsider a Peebles Elementary School project in the future, another feasability study would be required and the Town would be responsible for paying for the study in totality with no reimbursement. Q Is this the right time to build? A Due to a slowly improving economy, borrowing costs are still at historic lows and, due to a very competitive building climate, construction costs remain low. These costs, however, are currently on the rise and a delay will increase project costs. Building for the Future Deficiencies Solution Site Plan The Peebles Elementary School is an aged facility requiring significant upkeep without long term educational benefits. There is a lack of educational spaces and many existing spaces do not conform to current State guidelines or meet 21st Century educational needs. The Peebles Elementary School is nearing the end of its educational and functional life. As a result of eighteen months of deliberating and planning with the Bourne community and Massachusetts School Building Authority, a vision emerged for the community of Bourne in its entirety, not just Bourne Public Schools. We are excited to present you a building that addresses community needs, as well as, a new vision for educating PreK-12 with grade span re-configuration enhancing the social, emotional and developmental needs of all children. In 2020, we will have the opportunity to strengthen our Bourne community by creating one common educational experience. The proposed new building will be located in front of the existing school and includes many new site amenities. Bourne Residents voted to approve this Feasibility Study and seek a Grant from MSBA to mitigate these conditions at the October 27, 2014 Special Town Meeting. n The antiquated facility impedes teaching and learning. n Music, art, and science labs have inadequate spaces and equipment for the specialized programs taught. Many special education spaces are also too small. n The core facilities (library, gym, and cafeteria) are undersized and require updates to ventilation air system n The schools lack a modern security system, access control system, fire alarm, and fire suppression system. n All of the old building systems (mechanical, electrical, and plumbing) are outdated, unreliable, inefficient, and have outlived their useful life. These systems now require constant repair and attention. n Parking on the sites is limited and disorganized. The parent drop off and bus areas create an unsafe congested condition during pick up and drop off times. n Working with the Town and the Massachusetts School Building Authority (MSBA), the design team developed nine different options ranging from phased renovation of the existing Peebles ES and Bournedale ES schools to a completely new building. n The best long-term solution converts Bournedale to a District-wide PK-2, constructs a new 72,680-sf, two-story building for District-wide grades 3-5 students, and returns the 5th grade to an elementary setting. n New construction avoids the disruption to students inherent with a multi-phased renovation project n The School Building Committee voted unanimously to proceed to the State with the Schematic Design and a total project budget of $39.91 million. n The State will reimburse the Town approximately $15.15 million. The estimated project cost to the Town of Bourne is $24.76 million. KEY: 1 New Peebles Elementary School 2 New Tennis Courts 3 3 Middle School 4 High School 4 1 2 n Increased parking spaces and a safer traffic flow with separate parent and bus loading zones. n A new enclosed play area with new play equipment n New tennis courts with associated parking n Improved handicapped accessibility Project Schedule Sept. 20, 2016 Community Forum No.9 Oct. 17, 2016 Special Town Meeting Nov. 04, 2016 MSBA Board Meeting Dec. 06, 2016 Special Ballot Vote Dec. 07, 2016 Commence Design Drawings October 2017 Commence Bidding November 2017 Commence Construction August 2019 Open New Peebles School “One community, one common educational experience.” SMMA PROJECT MANAGEMENT