Public Service Commission of Wisconsin
Transcription
Public Service Commission of Wisconsin
Public Service Commission of Wisconsin Ellen Nowak, Chairperson Phil Montgomery, Commissioner Mike Huebsch, Commissioner 610 North Whitney Way P.O. Box 7854 Madison, WI 53707-7854 July 23, 2015 Re: Application by American Transmission Company, LLC to Build and Place in Service a New 138 kV Transmission Line Between the Spring Valley Substation in Kenosha County and the North Lake Geneva Substation in Walworth County, to Build a New 138/69 kV Substation in Kenosha County and to Build or Rebuild Other Lines and Facilities in the Project Area 137-CE-167 To the Person Addressed: I am sending this notification to landowners whose property may be affected by the proposed Spring Valley-North Lake Geneva Project. I am also sending this letter to public officials in the project area. If you are a county or municipal clerk, I request that you post this announcement publicly. The Public Service Commission of Wisconsin (Commission) is the state agency that regulates utilities. The Commission is investigating the proposed project in your area (see attached maps). This letter briefly describes the project and informs you of ways to obtain more information or to comment on the project. Proposed Project The Commission received an application from American Transmission Company LLC (ATC) requesting approval to build a new single-circuit 138 kilovolt (kV) transmission line, primarily on new right-of-way, from the Spring Valley Substation in Kenosha County to the North Lake Geneva Substation in Walworth County, known as the Spring Valley-North Lake Geneva Project. Both alternatives would uprate the Bain-Spring Valley 138 kV line (Line 63141). The first alternative would construct a new mid-point 138/69 kV substation, to be known as the Balsam Substation, along State Highway (STH) 50 in the town of Wheatland, extend the existing 69 kV line Y102 from the Twin Lakes Substation to the Balsam Substation, and rebuild Y102 between the Katzenberg and Twin Lakes Substations. The second alternative would tie the new 138 kV line into the Richmond Road and Twin Lakes Substations. Instead of constructing a new substation, the Richmond Road Substation would be expanded. This alternative would rebuild Line Y102 between the Katzenberg Substation and the Richmond Road Substation, where the line would be terminated. Between the Richmond Road and Twin Lakes Substations, LineY102 would be removed. The Twin Lakes Substation would be converted to 138 kV. Telephone: (608) 266-5481 Fax: (608) 266-3957 TTY/TextNet: In Wisconsin (800) 251-8345, Elsewhere (608) 267-1479 Home Page: http://psc.wi.gov E-mail: [email protected] To the Person Addressed Docket 137-CE-167 Page 2 Project Need The proposed project is designed to address several existing system deficiencies: (1) load back-up is unreliable for three radially-served distribution substations during summer months; (2) maintenance outages to perform transformer maintenance at the North Lake Geneva and Brick Church Substations are difficult to obtain; (3) Line Y51-ALE experiences thermal overloads under contingency conditions; and (4) Line Y102 is in need of renewal. Project Routes ATC has proposed two route alternatives for the new 138 kV line between the Spring Valley and North Lake Geneva Substations. These two alternatives are shown on the attached maps. Alternative 1, which is approximately 23 miles long, follows STH 50 for much of its length. South of the Village of Paddock Lake, one of two alternative route segments would be used, FA or FB. The new 69 kV line between the Balsam and Twin Lakes Substations, about four miles in length, follows STH 50 and County Trunk Highway (CTH) O. The rebuild of the existing 69 kV line between the Katzenberg, Richmond Road and Twin Lakes Substations follows CTHs B, O, P, and Z for approximately five miles. Alternative 2, which is approximately 32.6 miles long, follows U.S. Highway 12 for roughly a third of its length, and county highways and local roads for much of its remaining length. Some sections are cross-country, not following any existing corridor. The existing 69 kV line that would be rebuilt between the Katzenberg and Richmond Road Substations follows CTHs B, O, and P for approximately 2.6 miles. Project Review Before construction can begin, the applicant’s proposal needs Commission approval in the form of a Certificate of Public Convenience and Necessity for the transmission lines and the substation. Permits from the Wisconsin Department of Natural Resources and the Wisconsin Department of Transportation are also potentially needed. This is a Type II action under Wis. Admin. Code § PSC 4.10(2). It requires the preparation of an environmental assessment (EA) to determine whether an environmental impact statement is necessary under Wis. Stat. § 1.11. Commission staff is reviewing the need for the project, electrical and routing alternatives, costs, and potential environmental and community impacts. The draft EA will be available to the public prior to the public hearing. Public Hearing and Commission Decision The Commission will hold a public hearing in the project area. At least 30 days before the hearing, the Commission will mail a Notice of Hearing to area landowners and interested persons that will include the time, date, and location of the hearing. If you have any concerns about the project, you should attend the hearing to make the Commission aware of your concerns. The Commission will approve, modify, or deny the applicant’s proposal on the basis of the record established at the hearing. To the Person Addressed Docket 137-CE-167 Page 3 Public Comments Commission staff is in the process of identifying environmental and community issues to be considered in the EA. Anyone may comment on the environmental aspects of this project to help us draft an EA that covers all important issues. Send comments by mail to Paul Rahn, Public Service Commission of Wisconsin, P.O. Box 7854, Madison, WI 53707-7854; by e-mail to [email protected]; or via the PSC web site: http://psc.wi.gov/apps40/dockets/comment.aspx. All comments will be posted to the PSC web site on its Electronic Regulatory Filing (ERF) system. Mr. Rahn can be reached by telephone at (608) 267-8967. Public Comments are Due by August 21, 2015 For More Information The project application can be reviewed at the following libraries in your area: Burlington Public Library, 166 E. Jefferson St., Burlington, WI 53105 Genoa City Public Library, 126 Freeman St., Genoa City, WI 53128 Kenosha County Public Library, 24165 89th St., Salem, WI 53168 Kenosha County Public Library, 729 S. Cogswell Dr., Silver Lake, WI 53170 Kenosha County Public Library, 110 S. Lake Ave., Twin Lakes, WI 53181 Lake Geneva Public Library, 918 W. Main St., Lake Geneva, WI 53147 Applications are also available for review at the municipal and township clerks’ offices in the project area. You may also view the application and all other documents filed in this docket, through the ERF system on the PSC web site, http://psc.wi.gov. The docket number 137-CE-167 is required to access all project documents. Contacts for More Information For more information about the applicant’s proposal or the Commission’s process for evaluating this construction application, you can also call the ATC or Commission contacts listed below. American Transmission Company LLC Johanna Sievewright, Senior Environmental Project Manager, W234 N2000 Ridgeview Parkway Court, Waukesha, WI 53188, (262) 832-8699, or [email protected]. Public Service Commission Paul Rahn, docket and environmental coordinator, Public Service Commission of Wisconsin, P.O. Box 7854, Madison, WI 53707-7854, (608) 267-8967, or [email protected]. To the Person Addressed Docket 137-CE-167 Page 4 Akanksha Pachpinde, Engineer, Public Service Commission of Wisconsin, P.O. Box 7854, Madison, WI 53707-7854, (608) 266-3906, or [email protected]. Adam Ingwell, Environmental Affairs Coordinator-Supervisor, Public Service Commission of Wisconsin, P.O. Box 7854, Madison, WI 53707-7854, (608) 267-9197, or [email protected]. Public Service Commission Contact for Media Members of the media are urged to contact Nathan Conrad, PSC Communications Director, before contacting any staff associated with this project. Mr. Conrad can be reached at (608) 266-9600, or [email protected]. Please refer to the Commission docket number 137-CE-167 in any correspondence. Sincerely, Paul R. Rahn Environmental Analyst Gas and Energy Division PRR:jlt:DL: 00977004 Enclosures: Maps cc: Adam Ingwell, PSC North Lake Geneva Substation RACINE COUNTY 2 % B Lake Geneva CTH J 83 ¬ « KENOSHA COUNTY A Proposed Balsam Substation 50 ¬ « D 12 J2 J2 CTH U H ¬ « E 2 % E Katzenberg Substation I Richmond Road Substation 12 Genoa City 50 ¬ « Silver Lake Lakes % Twin 2 Substation E CT H 2 % F E Twin Lakes CTH C P J1 E W 120 E E I G CTH CT H CTH O £ ¤ D CTH P Bloomfield CTH K CTH B CTH NN WA LW O RT H COUNTY 36 ¬ « £ ¤ CTH B S TAT E o f I L L I N O I S Map 1 - Page 1: Spring Valley - Lake Geneva Docket 137-CE-167 0 1 2 3 4 Miles Alternative 1 New 138 kV (Segments A, D, and F) A Rebuild 69 kV (Segments J1 and J2), New 69 kV (Segment I) J1 Alternative 2 New 138 kV (Segments B, E, and G) B J1 Rebuild 69 kV (Segment J1), Remove 69 kV (Segment J2) CTH UE CTH D CTH JB 142 ¬ « CTH S 75 ¬ « £ ¤ 45 Silver Lake C " ) L " ) " ) " ) § ¨ ¦ 94 " ) " ) CTH V " ) " ) " ) " ) H " ) " ) " ) " ) " ) " ) H CT 165 ¬ « " ) Spring Valley Substation " ) " ) ) " ) " " ) " ) " ) CTH ML S TAT E o f I L L I N O I S 1 2 3 4 Miles ) " Alternative 1 New 138 kV (Segments A, D, and F) A H Uprate 138 kV (Segment H) ) " Alternative 2 New 138 kV (Segments B, E, and G) B H Uprate 138 kV (Segment H) ) " ) " Map 1 - Page 2: Spring Valley - Lake Geneva Docket 137-CE-167 0 31 ¬ « " ) M " ) Bain Substation " ) ) " " ) 2 ") % 2 % " ) 83 ¬ « C Pleasant Prairie CTH U FA Bristol FB " ) CT H F H CT CT H 50 ¬ «F ) " Paddock Lake " ) CTH K 158 ¬ « " ) G Kenosha KENOSHA COUNTY CTH NN