Wood Group Mustang – GoM Experience Delivering Best
Transcription
Wood Group Mustang – GoM Experience Delivering Best
Wood Group Mustang – GoM Experience Delivering Best Practices for Other Regions Christopher M. Barton SVP Global Offshore Business Development March 26, 2015 WG Mustang’s Growth Trajectory Angola Offshore Operating Centers WG Mustang Norway WG Mustang Woking, UK Mustang HDP Al Khobar, Saudi Arabia WG Mustang Houston, Texas Energeticos Bogota, Colombia 3 WG Mustang Shanghai, China WG Kianda Luanda, Angola WG Mustang KL, Malaysia We Specialize in Topsides Design 4 How Have We Leveraged Our GOM Success? Tubular Bells First Oil November 2014 Jack/St. Malo First Oil December 2014 Lucius First Oil January 2015 5 Wood Group Mustang designed the topsides for the last 3 GOM Start-ups Know What Matters Right Concept Efficient Execution Where’s the Risk? Most Company standards Industry Standards • • • • • • Understand equipment/system risks Leverage industry standards & solutions (green) Apply “select” company standards for higher risk (yellow) Apply most company standards for highest risks (red) Avoid defaulting to highest risk for entire project Custom design only when risks warrant the effort Where’s the Money? • Spend time on higher cost equipment/systems • Leverage relationships and agreements • Obtain firm pricing for competitive equipment • Consider performance spec for lower risk eqmt/systems (green) • Single source lower cost eqmt from reputable suppliers (right of blue line) • Avoid preparing custom specs for lower cost equipment (right of dashed line) 6 Higher spend More time Bigger prize Lower spend Less Time Capital Efficiency Vision Right Concept Efficient Execution Maximizing the Value of Every $ Spent Aligned Objectives: Ensure project team and stakeholders are aligned and key decisions impacting scope and execution are properly vetted • Understand project objectives, drivers, boundaries, and the most efficient pathway to profitability Right Concept = Minimum Scope + “Justify In” • • Minimum Scope: minimum wells, equipment, infrastructure, organization and execution strategy that delivers a project Justified Adds: incremental scope items that improve the minimum scope project and that are approved based on economics, regulatory, HSE, benchmarking or strategic drivers Efficient Execution = Freeze scope, eliminate late add-ins and changes, and make timely decisions • • • 7 Explore broader range of engineering, procurement and project execution strategies Leverage standardization with vendors & contractors Ensure balance in processes and level of effort are consistent with project scope and risk Best Practices to Ensure Certainty of Outcome • WG Mustang has developed and employs Best Practices that lead to enhanced project performance and results • Best practices are about clearly articulating objectives, explicitly defining the tasks, clarifying expectations, and communicating performance criteria • Best practices are about using approaches and plans that deliver superior results Proper planning is critical to success! Alignment * Benchmarking * Change Management * Constructability * Front End Planning * Lessons Learned * QMS 8 45,600 Best Practice - Baseline Establishes a set of common minimum requirements Proposal to Project Handover PROPOSAL DEVELOPMENT Initiate Proposal Plan Proposal Execute Proposal Ensures not only consistency but also improves: • • • PROJECT DELIVERY Close Proposal transition from proposal to project client expectations and satisfaction alignment in understanding of the scope of the project Initiate Project Plan Project Execute Project Close Project AS-BID BASIS AS-SOLD BASIS CURRENT BASIS Risk, Change Management, Checking Best Practice – Project Information Mgmt (PIM) • PACESETTER™ – communications module for management of Engineering, Vendor and 3rd Party documents • Citadon CW – an internet-based EDMS, serving as a document repository and providing collaboration tools • Autonomy – an Electronic Records Management System with web access which interfaces with PACESETTER™ and Citadon CW • AVEVA NET – a web-enabled engineering data consolidation database which intelligently links and relates project information by equipment tag, document number, PO, etc. 10 PIM System Toolset Best Practice – Project Execution Assurance • Comprehensive project management system to help ensure project success • PACESETTER provides a platform to integrate engineering with procurement and subsequent construction activities Best Practice – Technical Excellence (TechX) • Technical Excellence is consistently and predictably delivering the right technical solution, from anywhere in the world • TechX equips project teams with the framework, guidelines, checklists and tools that facilitate delivering consistent and repeatable project results 12 45,600 Best Practice - Design One, Build Many Keys to success: Take what has been successful and fine tune for specific needs Re-inventing the wheel and starting from scratch should not be an option Design One, Build Two principle was a success for Anadarko’s Lucius & Heidelberg projects Benefits for Heidelberg • • • • • 13 Engineering savings Fabrication savings Procurement savings Project execution efficiency Optimized sparing Best Practice – Lightweight Design Initiative • Designing effective and efficient facilities to minimize weight Activities • A focus on equipment layout to minimize platform size, piping, steel and cable requirements • Use of innovative steel configurations to keep weight down • Fit for purpose engineering and design – process design and equipment Results experienced • 20% to 30% less weight Lightweight design is a group effort with all disciplines - including the client thinking “outside the box” Rethinking the Way We Work • Set the project up right, focus on front end • Improve project efficiency • Challenge cost • Faster on delivery • Fit for Purpose • Think past engineering: • Think Constructability • Think Total Installed Cost Design One, Build Two Lightweight Topsides Optimization and Fit for Purpose Project Information Management 15 - Wood Group Mustang Modularization/Standardization Constructability Reviews TechX Assurance Systems State of the Art Engineering Tools Thank You!