1. A calculation of the amount of fill that is being placed on the

Transcription

1. A calculation of the amount of fill that is being placed on the
1. A calculation of the amount of fill that is being placed on the property that is at and below the Base Flood Elevation for that area. Response: The total volume of excavated material proposed from the DNR project is 86,720 cubic yards. The total fill placement is 90,420 cubic yards, of which 79,160 cubic yards of fill material is at or below the Base Flood Elevations, and 11,260 cubic yards of fill material is planned to be placed above the Base Flood Elevations. 2. A statement addressing the three standards in Section 62.860 of the ordinance. 62.860 CONSTRUCTION STANDARDS IN THE FLOOD PRONE DISTRICT The requirements applicable in the Flood Fringe District, as defined in Section 62.840 shall apply in the Flood Prone District and, in addition, in deposition of any fill or spoil from dredging of sand and gravel operations, the construction of any structure, or the grading or paving of any areas shall require certification by a registered professional engineer, or hydrologist that the following conditions have been met: 1) Fill deposited in the Flood Prone area shall be no more than the minimum amount necessary to conduct the use. Response: The fill material being placed is a minimum amount necessary for the development of the property. The fill material is being placed to bring the proposed buildings and parking lots above the base flood elevations. 2) No net loss of capacity for surface storage of flood waters shall result from the activity. Response: The fill material proposed on the Meadow Lakes project is the excess excavated material from the DNR realignment project. The total volume of excavated material proposed from the DNR project is 86,720 cubic yards. The total fill placement is 90,420 cubic yards, of which 79,160 cubic yards of fill material is at or below the Base Flood Elevations, and 11,260 cubic yards of fill material is planned to be placed above the Base Flood Elevations. 3) The effect of such activities in the Flood Prone area shall no result in an increase in erosion potential on the site. Response: Erosion potential will be managed through use of BMP’s which will be in place prior to and during earth moving activities. The site will be restored with seeding following turf establishment and BMP’s will be removed accordingly. 3. An indication of the areas of the DNR project that are being graded and fill removed. Response: Please see attached sheets from the DNR project plan set. 6. PROPOSED CONTOURS ARE TO FINISH SURFACE GRADE. EXISTING AND
PROPOSED CONTOURS ARE SHOWN AT 1 FOOT INTERVALS. ALL FINISHED
CUT OR FILL SLOPES SHALL BE EITHER 3:1 OR FLATTER UNLESS
OTHERWISE NOTED.
OHE UGT
OHE UGT
OHE UGT
OHE UGT
OHE UGT
OHE
1022
1028
1023
10
10
27
50.00'
UGT
1026
UGT
8
101 19
10 20
10
1025
28
1027
99
5.
APP
E
SEM
.10
UGC
EA
T
N
NE PLAN
A
RM TION
PESP-2A
A
E
AT ABILIT
M
I
X
RO R REH
P
P
A
DN
R
E
P
ZONING INFORMATION
CURRENT ZONING:
R3
SITE ADDRESS:
70 45TH AVE SW
ROCHESTER MN, 55902
MEADOW LAKES PRESERVE
UGT
UGT
UGT
95
39.
UGT
UGC
UGC
UGC
APPROXIMATE PERMANENT EASEMENT
PER DNR REHABILITATION PLAN
LIC. NO.44228
SP-2B
UGC
1088.17
SHEET NO.
1032.50
1031.60
1030.80
1080R0034
NT
409
DNR CHANNEL REALIGNMENT
SP-1B
J.T.W
FILL VOLUME (CV) = 90,420 CU. YDS.
.57
SP-1A
18.811 ACRES
0.000 ACRES
0.000 ACRES
JOB NUMBER:
DISTURBED AREA:
EXISTING IMPERVIOUS:
INCREASE IN IMPERVIOUS:
DRAWN BY:
PROJECT AREA
26
CHECKED BY: C.N.B.
102
10
890
DATE: 4-7-2016
3
2
102
AS SHOWN
1:4
SP-3A
**
1023
DENOTES EXISTING CONTOURS
DENOTES PROPOSED CONTOURS
DENOTES PROPERTY BOUNDARY
DENOTES PROPERTY LOT LINES
DENOTES EXISTING RIGHT OF WAY
DENOTES PROPOSED RIGHT OF WAY
DENOTES EASEMENT
26
1025
1024
*
-2.9%
UGT
1030
1030
CRAIG N. BRITTON
NORTH
1028
024
1025 1
UGT
25
26
UGT
*******
1029.50
1028.20
1027.70
1026.50
1025.80
1
FEMA BASE FLOOD ELEVATIONS
J:\1080R-Rochester Architecture\1080R0034-Meadow Lakes Preserve\1080R0034.000-Meadow Lakes Preserve\CADD\Civil\C-GP-1080R0034.000_MASS GRADING.dwg
Plotted by:Joey Weiss 4/14/2016 11:51:33 AM
© 2016 WIDSETH SMITH NOLTING
SITE PLAN
10
1027
1026
UGT
DENOTES DELINEATED WETLAND
FILL OF 0.000 TO 2.000 FT
FILL OF 2.001 TO 4.000 FT
FILL OF 4.001 TO 9.000 FT
PROPOSED GRADING LIMITS
PROPOSED SILT FENCE (CITY OF
ROCHESTER STANDARD PLATE NO. 7-01B)
ROCHESTER, MINNESOTA
10
5
102
*
**
UGT
1025
10
UGT
*
*
*
**
*
*
*
***
*
*
*
****
**
*
*****
*
**
*
*
*
*
*
*
*Y *LIMITS
*
*
A
*
W
*
*
D
*XIM*A*TE* FLOO
**
*
RO
1025
25
102
5
1029
5
-3.
1028
1025
1026
10
UGC
1025
27
10
1028
102
10
***
*
*
*
*
***
*
*
*
***
*
*
*
*
*
*
*
*
*
*
*
* *S* * *
*
*
*
*
*
*
* * * *O*XIM*A*TE FLOODWAY LIMIT
*
*
*
*
*
APPR
*****
1026
1
UGT
1:5
*
29
10
2
10
.86
8
02
1024
5
685
1027
1027
1026
30
26
1029
-3.0%
-1.9%
1028
UGT
* ** ** *
** **** * ****
* * * * * * * * * * * * * * * ** * * * * * * * * * * * * * **
**** ** *
%
6
UGT
5
.5
102
1%
1030
UGT
102
**
UGT
SP-3B
*
1029
901.30
UGT
**
-1.4%
10
3
-3.7%
5
1030
10
2
1031
10
1028
*
1027
0
.0
31
0
.0
31
10
UGT
PROPOSED WATERMAIN
UGT
%
0
1031
UGT
UGT
-3.8
1
1030
.00
31
0
1
**
SP-5B
SP-5A
:4
UGT
UGT
1:5
1:4
** * * *
*
**
*
1032
-2.3%
10
27
1032
6
102
UGT
1:4
1026
10
27
1028
UGT
-2.2%
1:5
1033
%
10
23
*
.00
34
0
1
5
1:
**
UGT
*
7
102
1:5
* ** *
*
1031
1033
103
1
* ** *
1025
-1.5%
UGT
1025
**
-3.7
1025
-2
UGT
UGT
666.76
3
10
0
3.5
1028
1032
GT
COUUN
TRY C
T
LUUG
B RD SW UGT
UGT
** * * * *
UGT
UGC
UGC
26
10
1028
1026
1030
10
26
**
UGC
9
UGT
1:4
1029
102
200
SCALE ( IN FEET )
UGT
L= 4 U
8 9G. T
41
1029
* * * * * ** * * * * * * * *
1025
T
*
UGT
UGC
*******************
UGT
UGC
-2
.8%
*
1025
1028
1026
10
1025
24
1024 1
024
1025
100
UGT
UG
* * * ** * * * * * * * * * *
*
*
*
*
** * * *
****
*
*
*
*
*
* ** *** **
5
**
102
*
*
*
6
1027
*
*
*
*
UGC
27
45TH AVE SW
-1.1%
273.49
*
*
*
UGT
UGC
102
1027
T
T
1:4
*
UGC
10
102526
10
24
1024
1025
1025
0
UG
UG
1:4
32
1030
1:5
T
5.40
-3.3%
UGT
*
*
*
10
UG
-3.9%
UG
T
10
33
U
B R GT
D
SW
-1.9%
SP-4A
LU
T3
6.2
7
*
UGC
45TH AVE SW
UGT
248.44
**
UGC
UG
245.07
UG
TR T
YC
SCALE:
UN
T
1:4
5 UG
ML GROUP I, LLC
CO
3.4
-1.9%
UGT
21
I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT
WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND
THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER
THE LAWS OF THE STATE OF MINNESOTA.
UG
T
BY
UG
T
REVISIONS DESCRIPTION
T
** * *
227.7
3
250.22
T
REV#
UG
UG
DATE
T
1021
06
UG
T
-1.6%
9 3.
UG
*
L= 2
250.99
UGC
UGT
T
**
UGC
T
UG
APRIL, 2016
UG
UGT
DATE:
UGT
*
*
*
*
*
*
* * * * * * * * * * * * * * * **
* * * * * * * * * * * * * ** * * * *
*
*
*
*
*
*
*
*
** * *** *
50.00
PROJECT AREA
PARCEL ID 640512082183
******
*
*
*
*
*
*
*
****
*
*
*
*
*
*
*****
*
*
*
*
*
*
*****
*
*
*
*
*
*
****
*
*
*
**
*
*
**
UGT
10
SCALE ( IN FEET )
OHE
UG
T
UGT
UGT61.80
L = 23 6 . 6 0
SP-4B
1000
11. PERMANENT STABILIZATION - DISTURBED SOIL SHALL BE SEEDED WITH
MnDOT SEED MIXTURE 25-141, APPLIED AT THE RATE OF 59 LBS PER ACRE.
AFTER SEEDING, EACH AREA SHALL BE MULCHED WITH TWO (2) TONS PER
ACRE OF STRAW.
**
*
*
*
248.21
500
T
*
UGT
OHE
UG
50.00'
UGC
OHE
COUNTRY CLUB RD SW
FINAL
0
10. ALL WASH WATER (CONCRETE TRUCKS, VEHICLE CLEANING,
EQUIPMENT CLEANING, ETC.) MUST BE LIMITED TO A DEFINED AREA OF
THE SITE AND SHALL BE CONTAINED AND PROPERLY TREATED OR
DISPOSED. NO ENGINE DEGREASING IS ALLOWED.
**
*
OHE
*
UGT
**
*
OHE
*
*
*
UGT
VICINITY MAP
9. ALL NON-PAVED, PERVIOUS AREAS ARE TO BE SODDED OR SEEDED
TO ESTABLISH PERMANENT VEGETATIVE COVER. MNDOT SEED MIX
25-131 PLANTED AT A RATE OF 220 LBS. PER ACRE. STRAW MULCH
SPREAD AT A RATE OF OF 2 TON PER ACRE SHALL BE DISK ANCHORED.
7. TEMPORARY STABILIZATION - TOPSOIL STOCK PILES AND DISTURBED
SOIL AREAS OF THE SITE WHERE CONSTRUCTION ACTIVITY TEMPORARILY
CEASES FOR AT LEAST 14 DAYS WILL BE STABILIZED WITH TEMPORARY
SEEDING AND MULCH NO LATER THAN 14 DAYS FROM THE LAST
CONSTRUCTION ACTIVITY IN THAT AREA. THE TEMPORARY SEED SHALL BE
MnDOT SEED MIXTURE 21-111, APPLIED AT THE RATE OF 100 LBS PER ACRE.
AFTER SEEDING, EACH AREA SHALL BE MULCHED WITH TWO (2) TONS PER
ACRE OF STRAW. THE STRAW MULCH IS TO BE TACKED INTO PLACE BY A
DISK WITH THE BLADES SET NEARLY STRAIGHT.
4. THE CONTRACTOR SHALL ASSUME COMPLETE RESPONSIBILITY FOR
CONTROLLING ALL SILTATION INCLUDING BUT NOT LIMITED TO ROCK
ENTRANCES AND/OR SILT FENCES. CONTROL SHALL COMMENCE WITH
GRADING AND CONTINUE THROUGHOUT THE PROJECT UNTIL
ACCEPTANCE OF THE WORK BY THE OWNERS.
MEADOW LAKES PRESERVE
Engineering | Architecture | Surveying | Environmental
2. ALL EROSION CONTROL AND SILTATION CONTROL SHALL COMPLY WITH
MINNESOTA POLLUTION CONTROL AGENCY (MPCA) WATER QUALITY IN
URBAN AREAS MANUAL AND THE REGULATIONS OF OLMSTED COUNTY
AND CITY OF ROCHESTER.
3. ANY DEPOSITING OF SILT OR MUD ON EXISTING PAVEMENT, OR IN
EXISTING STORM SEWERS OR SWALES SHALL BE REMOVED AFTER EACH
RAIN AND AFFECTED AREAS CLEANED.
WIDSETH SMITH NOLTING
1. AN NPDES PERMIT SHALL BE APPLIED FOR BY THE OWNER AND
CONTRACTOR IF DISTURBED AREA EXCEEDS 1 ACRE. AN NPDES PERMIT
SHALL BE APPLIED FOR ON THIS PROJECT.
OHE
8. SEDIMENT CONTROL BEST MANAGEMENT PRACTICES (BMP'S), WHICH
PREVENT SEDIMENT FROM ENTERING A WATER OF THE STATE, SHALL BE
ESTABLISHED BEFORE LAND DISTURBING OPERATIONS BEGIN AND SHALL
REMAIN IN PLACE UNTIL FINAL STABILIZATION HAS BEEN ESTABLISHED.
SILT FENCE - CITY OF ROCHESTER STANDARD PLATE NO. 7-01B
INLET PROTECTION - CITY OF ROCHESTER STANDARD PLATE NO. 7-05C
TEMPORARY ROCK CONSTRUCTION ENTRANCE - CITY OF ROCHESTER
STANDARD PLATE NO. 7-06D
CONCRETE WASHOUT AREA - PER MPCA GUIDELINES
5. THE CONTRACTOR SHALL INSPECT THE CONSTRUCTION SITE ONCE
EVERY SEVEN DAYS AND WITHIN 24 HOURS AFTER RAIN EVENTS FOR
DAMAGE TO EROSION CONTROL DEVICES. IF DAMAGED OR INEFFECTIVE
EROSION CONTROL DEVICES ARE DISCOVERED, THEY SHALL BE REPAIRED
OR REPLACED.
NORTH