Westlock North Schools Consolidation - DocuShare
Transcription
Westlock North Schools Consolidation - DocuShare
Westlock North Schools Consolidation Jarvie School W.R. Frose School Dapp School “United We Achieve Excellence” Westlock North Schools Consolidation Report October 11, 2013 Westlock North Schools Consolidation TABLE OF CONTENTS PAGE Executive Summary......................................................................................................................... 3 Background and Timeline ............................................................................................................... 4 Dapp School - Modular Classroom Addition and Renovations....................................................... 7 Education Case for Consolidation ................................................................................................... 7 Financial Case for Consolidation ................................................................................................... 11 Future of Existing Buildings........................................................................................................... 12 Summary ....................................................................................................................................... 13 APPENDICES Appendix 1 – Westlock North Projected Enrolment Appendix 2 – Participant Table Questions Appendix 3 – Westlock North Task Force Report Appendix 4 – New School Process Appendix 5 – Dapp School Proposed Project Description Appendix 6 – W. R. Frose School Report Appendix 7 – Jarvie School Report 1 Westlock North Schools Consolidation Report October 11, 2013 2 Westlock North Schools Consolidation Report October 11, 2013 Executive Summary Following is the Business Case for the Westlock North Schools Consolidation. The project will result in the consolidation of three existing schools – Dapp, Jarvie, and W.R. Frose School in Fawcett – into one school – Pembina North Community School, located at the existing Dapp School facility. The addition of six (6) modular classrooms onto the existing Dapp School facility, as well as modernization at 44.05%, are required in order to have adequate learning spaces for the students of the Westlock North area. This project is identified as the number one (1) priority for the Three-Year Capital Plan of Pembina Hills Regional Division No. 7 (hereafter referred to as PHRD). The Business Case demonstrates the following merits in support of funding consideration from Alberta Education: - - The project: o is sound both educationally and economically, o is relevant, and o utilizes resources efficiently, and demonstrates the tenets of Inspiring Education. The project aligns with the provincial government’s vision to keep building Alberta and to live within its means; in fact we believe this project exemplifies this statement made by the province. The project scope will serve the educational needs of the students in the Westlock North area for the next 40-50 years. Not only have communities been consulted extensively, the recommendation comes from the communities. Residents recognize the realities of declining student population in their areas and want to be part of the solution versus inevitable school closures, one at a time. A timely response from the province is crucial – we are at a critical juncture and need a response no later than January 1, 2014 in order to have the new school ready to open September 1, 2014. 3 Westlock North Schools Consolidation Report October 11, 2013 Background Enrolment decline has been a concern for the school communities of Westlock North over the past decade. Since 2000, when the combined kindergarten to grade nine population of Dapp, Jarvie, and W.R. Frose Schools was 370 students, enrolment in the Westlock North Schools has consistently declined. As of September 30, 2012, the combined population of the schools had dropped to 216, excluding early entry ECS students. Appendix 1 provides the 5-year projected enrolments for Dapp, Jarvie, and W.R. Frose Schools, both individually and combined. Dapp School is located 26 km north of the Town of Westlock and offers education to students in the Dapp/Jarvie attendance area in kindergarten to grade 6. Jarvie School is located approximately 22 km north of Dapp School and offers education to students in the Dapp-Jarvie attendance area in grades 7 to 9. W.R. Frose School serves students in kindergarten to grade 8 in the Fawcett attendance area, which includes the northern communities of Chisholm, Flatbush, and Fawcett. The school is located approximately 14 km north of the Jarvie School. Enrolment decline at W.R. Frose School led to a grade reconfiguration of kindergarten–grade 9 to kindergarten–grade 8 effective the 2010-2011 school year. As part of the grade reconfiguration process, the Board of Trustees of Pembina Hills Regional Division No. 7 (hereafter referred to as the Board) committed to conducting a community consultation process for Westlock North to explore future options which would address the problem and sustain and maximize educational opportunities for students. In June 2011, and again in November 2011, the Board met with representatives from the School Councils of Dapp-Jarvie and W.R. Frose School, along with municipal councillors from Westlock County and Lesser Slave River. The purpose of these meetings was to discuss the realities of student enrolment decline and to brainstorm ideas for the future success of Westlock North Schools. The ideas were discussed using the following ‘filters for consideration’: - Will it maximize educational opportunities for our children? - Will it be sustainable? - Does it utilize our limited resources in the best possible way for our children? - Is it realistic? On April 18, 2012, the Board hosted two Westlock North Public Consultation sessions at Jarvie Community Hall. This was facilitated by Alberta Community Development with approximately 280 citizens attending and providing feedback and suggestions. A copy of the questions that were provided to the participants are included in Appendix 2. The focussed conversations at the consultation sessions generated 178 pages of feedback, key messages, additional questions, and parking lot items. 4 Westlock North Schools Consolidation Report October 11, 2013 Given the commitment to communicate with the public on this issue and to remain transparent with feedback provided to the Board, PHRD created a Westlock North Area Schools section on the home page of their website (http://www.phrd.ab.ca/Westlock%20North.php). On this site, the reader can access the progress of the journey for Westlock North. Based on the feedback provided, the Board formed a Westlock North Task Force in May of 2012. The mandate of the Task Force was to research the issue (including feedback from the community consultation meetings), seek clarification, and to provide a recommendation to the Board relative to a long range plan. The Westlock North Task Force conducted their research and analysis and presented their report and recommendation to the Board at the January 23, 2013 Regular Board Meeting. A complete copy of the Task Force’s report and recommendation can be found in Appendix 3. The Board invited community feedback on the Task Force’s report and recommendation via written submission from January 24 – February 22, 2013. Throughout this period the Board received 30 comments and provided responses to 101 questions asked by 9 citizens. The Board made a decision at its February 27, 2013 Regular Board Meeting to move forward with a long range plan for educating students in the communities served by Dapp, Jarvie and W.R. Frose Schools, designating Dapp School as an elementary and junior high school effective September 1, 2014, subject to adequate learning spaces to accommodate the students from Westlock North. The Board adopted a school visioning process at their March 20, 2013 Regular Board Meeting and established a Transition Team for the purpose of providing advice to the Board regarding education services for the Westlock North School. A copy of the visioning process is found in Appendix 4. After a process of gathering ideas from students, staff and community for the ‘new school’ name, the Transition Team recommended the name of “Pembina North Community School” to the Board as well as the grade configuration of Kindergarten – Grade 9. 5 Westlock North Schools Consolidation Report October 11, 2013 Timeline Feb 2010 June & Nov 2011 Jan – Mar 2012 Apr 18, 2012 Apr 2012 Board commits to Community Consultation Process Board met with School Council Reps & Municipal Councillors to discuss student enrolment decline & brainstorm ideas Westlock North Schools Background Info Package developed in consultation with School Council Reps Two public consultation sessions held – 280 citizens; 178 pages of feedback, key messages, additional questions & parking lot items Westlock North Area Schools section of PHRD website created for public to access the progress of journey - site is main portal of information May 2012 Jan 2013 Jan – Feb 2013 Feb 27, 2013 Mar 2013 Board formed Task Force to research issue, seek clarification & provide recommendation to Board relative to long-range plan Task Force presented report and recommendation to Board Board invited community feedback – received 30 comments and provided responses to 101 questions Board made a decision to move forward with the long range plan. Dapp school designated as an elementary & junior high school effective Sept 1/14, subject to adequate learning spaces to accommodate students from Westlock North Board adopted a School Visioning Process and established a Transition Team May 2013 Jun 2013 Board identified addition of modular classrooms & modernization at Dapp School as the #1 priority on their 3-Year Capital Plan Board adopted name for new school – “Pembina North Community School”, and established the grade offerings as Kindergarten – Grade 9 as recommended by Transition Team Apr 2013 – Jun 2014 Transition Team continues to meet to lead the planning process – using the information gathered to refine the vision and plan a school program 6 Summer 2013 Aug – Sep 2013 PHRD met with Alberta Education - Capital Planning to discuss the business case Alberta Education – Capital Planning and Alberta Infrastructure conduct a site visit and draft a project description Westlock North Schools Consolidation Report October 11, 2013 Dapp School Modular Classroom Addition and Renovations – Preliminary Design Synopsis Following a series of communications with Alberta Education Capital Planning and Alberta Education, staff from Alberta Education Capital Planning developed a proposed project description, based on eligibility for other school infrastructure projects throughout the province. The proposed project description can be found in Appendix 5. Under the consolidation, neither W.R. Frose nor Jarvie School would be operational for education purposes effective September 1, 2014. The combined space of these two schools is 3,487.91 m2, representing 6.2% of Pembina Hills’ total school building area. Six modular classrooms connecting links would be added to Dapp School, representing approx. 650 m2. At their May 8, 2013 Regular Board Meeting, the Board designated this project as the number one priority of their Three-Year Capital Plan. Education Case for Consolidation In response to the lengthy process of community consultation regarding the demographics, geography and economy of the rural communities north of Westlock, a Board motion was passed to change the structure of the school in Dapp from a K-6 school to a K-9 school. A Transition Team, under the direction of a Co-ordinating Committee, was formed and it began its work. The principles and elements of the Education Program for the new school are being developed by the Transition Team, a committee whose purpose is to match the beliefs and expectations of the communities with the direction and rationale of the education system. The team membership includes: an assistant superintendent to provide system direction and to align the educational agenda with that of the jurisdiction and the province, three school administrators to lead the learning community’s purpose, four teachers to translate innovative thinking into classroom practice, and four community members to define the expectations and beliefs of the communities served by the new school. The team is supported by a process coach who provides guidance relative to relationship and communication management. This team has a definitive purpose and an active communication structure to ensure that the work of creating a new school also inspires the trust and support of the communities it will serve. The communication structure includes uploading the outcomes of the transition team discussion immediately on the website at http://www.phrd.ab.ca/Westlock%20North.php. The Transition Team’s first steps were to define the new school’s ‘identity’ and to do that considerable effort was made to reflect the beliefs and expectations of the communities. A new name came to light after involving the students, staff, parents and community at large, and a purpose statement reflective of the new and innovative possibilities declared a vision for the 7 Westlock North Schools Consolidation Report October 11, 2013 new school. The Pembina North Community School purpose statement, “United We Achieve Excellence”, represents the culture of the existing community and will guide the development of an innovative and collaborative learning environment focused on excellence. The following belief statements were declared to guide and support the purpose statement and the actions of the new community of learners: o At this school we believe: 1. that students, school staff, parents and community must have high expectations for learning and behavior. 2. that community, family, and traditions are essential to our Safe and Caring learning environment. 3. that clear and purposeful communication between students, school staff, parents and community is fundamental and essential to school success. 4. that rich opportunities in academic programming, fine arts, sports and clubs develop the well-rounded character of our children. 5. that technology is an essential tool that can elevate educational experiences for EACH student in preparation for their future. 6. that special events provide positive memorable experiences for students which build a shared history in the community. 7. in recognizing the traditions of the founding school communities: WR Frose School, Jarvie School and Dapp School. 8. that pride and ownership in our school creates our identity, which will be sustained by parental support and community involvement. It is eminently clear that the communities have been and will continue to be a central and critical component of the learning environment of the Pembina North Community School. The integral connection between school and community has become part of the education program being developed by the Transition Team for the new school. The program will continue to be reflective of Alberta Education’s Guide to Education in terms of curriculum. We have an opportunity to demonstrate the tenets of Inspiring Education through the structures we create physically and systemically, and through the collaborative work with our community. While the Transition Team will continue to explore and refine the program over the next 12 months, several key elements are emerging that represent the potential for realizing the provincial vision of an engaged learner and ethical citizen with an entrepreneurial spirit. Central to the new program is a focus on establishing and sustaining Academic Excellence in an environment of Inclusion where Success for Every Student is a priority, • The Elementary Program will focus on Literacy and Numeracy and o Support the development of a musical culture o Support the development of students’ creativity o Align physical education, recess activities and extra-curricular sports by season • The Junior High Program will focus on Core Academics and o Emphasize a music culture 8 Westlock North Schools Consolidation Report October 11, 2013 o Make effective use of community facilities and resources (4-H, local farms and business, skating rinks, curling rinks, ball diamonds, ski hill, golf courses, etc.) o “Options” will be a rotation through a variety of activities and courses • Extra-Curricular Clubs and Groups o Rely on expertise of the staff and collaboration with the community o Align to the sports that can involve competition with neighbouring schools o Possibilities include but are not limited to: Archery, Badminton, Basketball, Curling, Football, Golf, Rugby, Soccer, Softball, Track and Field, Volleyball… An emerging certainty is the expectation of cooperative use of existing community facilities and expertise. Whether that be the local golf course, skating rinks or community halls or interaction with community coaches and local seniors, the potential for community involvement is central to the purpose of the new school; “United We Achieve Excellence”. Discussions in the new year will also describe a “Learning Commons” concept for the library, something we believe is reflective of the future of learning, social interaction, digital research and communication. The area Library Boards will be active participants in this discussion and we already know the community is deeply interested in being a part of the school. A common area has the potential to bring the community into the school. This possibility is heavily reliant on the physical layout of the school and the potential for altering and expanding current space. It will be through the connections with the people of the community that our students learn to become ethical citizens. Active participation and interaction with seniors, community coaches, library patrons, community clubs, and in community events held at the school, will reveal to our students the traditions and beliefs that maintain a strong community. Becoming an ethical citizen is not an event or a course, it occurs over time through healthy community relationships. We believe that the Pembina North Community School can be built to facilitate those relationships. Several other program connections with the community are being discussed. One idea that is being explored connects the physical education curriculum with local culture. An archery program with refinements could produce highly skilled bow-hunters or a local talent pool for the sport of archery. A program such as this, along with the intended variety described by the Transition Team for junior high options promises to be particularly engaging for the youth of a rural Alberta community. The community has clearly expressed a desire to maintain a strong music and fine arts tradition through the new school. Engaging the students of this community in opportunities to express excellence and talent in many ways is a means to achieve success for every student, a key Alberta Education goal and a priority of the Board. Another idea reflects the active Agri-Business in the area. With well-planned space adjacent to and in the school and with an effectively designed classroom ‘lab’ in junior high, students could learn about the science of agriculture while experiencing it in their ‘backyard’. The Transition Team believes that opportunities like these that connect students with their community are truly engaging and in this case could inspire the entrepreneurial spirit sought by Inspiring Education. A well planned ‘lab’ designed for flexibility of programming can continue to be an effective resource well into the future. 9 Westlock North Schools Consolidation Report October 11, 2013 The evolution of learning is certain to include a considerable reliance on technology to connect students and teachers with the global community. While the notion of digital citizenship is being defined for the purpose of guiding all of our PHRD staff and students, the potential of a renovated school structure offers the opportunity for leadership and innovation. Critical to the vision of Inspiring Education is the ethical citizen. We have the opportunity to create a learning environment in Pembina North Community School that demonstrates the value of ethical participation in the global village and in social media. We hope to ensure that the physical requirements exist in this renewed building that supports a strong technology infrastructure, particularly for wireless connectivity and interactive media. Our tours of recently constructed schools in the Edmonton area have revealed some intriguing possibilities for collaborative learning spaces for kids focused around a balance of individual exploration and shared creative expression. Building a technology rich environment will enable us to activate our strategy for engaging every student through Universal Design for Learning. By providing multiple means of action and expression, we provide the opportunity for children to express their learning in meaningful and engaging ways. The rapidly changing learning environment requires a professional staff who are both innovative and creative. It is a challenge in a rural jurisdiction to remain current because many professional learning events have traditionally been located at a major center such as Edmonton; therefore, PHRD has actively cultivated a cooperative culture for the professional staff so that learning is communicated through a collaborative network. In this new school we hope to create a space that facilitates and supports collaboration and professional development. A professional learning / communications center with media tools that connect professionals on site, with others, and to external learning resources will be essential to maintaining a culture of innovation and excellence. Distance delivery of professional learning is necessary to ensure that teacher time is spent teaching or learning rather than travelling to a major center for professional development. A professional learning space designed for digital communication can ensure that the teachers in this new school stay connected to the innovations of educational pedagogy and practice. Indeed, a well-designed professional learning center can promote the distribution of their innovative experiences to other teachers in PHRD or elsewhere. The professional learning space designed as a communications center also has the potential to support instruction over a distance, or for school-to-school collaborations. For instance, a teacher in the Pembina North Community School may be able to present instruction to students in another school, linking their students with the other group(s). The more intimate communication that needs to occur between teacher and student could happen through the communication center in the professional learning space. Students in junior high option programs may be able to use this professional learning / communications center to develop digital entrepreneurship through website design, social media explorations, communications and potentially software design. 10 Westlock North Schools Consolidation Report October 11, 2013 The critical element to all learning is human interaction. As we plan this renovated learning environment, we can design it so that students are engaged in all types of social interaction. Students need to be engaged with the members of their community to learn the ethics of the community and become inspired with the entrepreneurial spirit that brought their families to the area. They need to be engaged in technology in an ethical way to develop themselves as digital citizens in a global community. They can be inspired to participate in the global community as entrepreneurs while living and playing in the Alberta north they call home. The possibilities described above are dependent on physical structure and design. The Transition Team needs some certainty about the structure as they continue planning the Pembina North Community School, “United We Achieve Excellence”. Financial Case for Consolidation 1. Savings to Alberta Education Consolidating the three existing Westlock North Schools into one school will result in Alberta Education saving approximately $440,000 per year in Small Schools by Necessity funding. Under existing funding rules, this savings will be phased in over a four-year period. Consolidation will also result in Alberta Education saving approximately $90,000 in Plant Operations and Maintenance funding. Transportation funding will increase by an estimated $30,000 due to increased distances to the designated school at Dapp. The net annual savings to Alberta Education as a result of the consolidation is $500,000. 2. Savings to Pembina Hills Regional Division No. 7 Preliminary estimates indicate that PHRD’s instructional expenses will be reduced by approximately $320,000 per year as a result of consolidating the three existing Westlock North Schools into one school. In addition, the net annual savings, after factoring the change in funding from Alberta Education, will be $140,000 for facilities and $80,000 for transportation. Conversely, if all three schools remain operational beyond September 1, 2014, major facility work will need to be completed at W.R. Frose School. Please refer to Appendix 6 and Appendix 7 for Condition Analysis Reports for W.R. Frose School and Jarvie School updated to October 18, 2011. 11 Westlock North Schools Consolidation Report October 11, 2013 Future of Existing Buildings It is challenging to have conversations with communities about re-purposing of the Jarvie School and W.R. Frose School until we have secured adequate learning spaces for the Pembina North Community School in Dapp. The Condition Analysis Reports for the schools indicate that major facility work needs to be completed at W.R. Frose School. The following excerpt is from PHRD’s Administrative Procedure 20-9 – Facility Closure – School/Program: 11. Where a decision is made to close an entire school, every effort will be made to return the property to the community, along with any playground and other outside structures. While the buildings that house learning for students of Westlock North may change, the creation of the Pembina North Community School will help ensure the viability of the school community remains – “United We Achieve Excellence”. As noted in the Education Case for Consolidation, our intent is to have program connections with all of the communities that are part of Pembina North Community School. 12 Westlock North Schools Consolidation Report October 11, 2013 Summary The Board is requesting that the Province provide support and funding for the Westlock North Consolidation project. The consolidation provides a viable alternative for providing educational services for the students residing in the communities of Dapp, Jarvie, Fawcett, Flatbush and Chisholm for the foreseeable future. As indicated in the Westlock North Task Force Report and Recommendation, the student population of the new school at Dapp could be seen to be in the “Goldilocks” zone (not too big – not too small) of school size. The new school will provide broader educational opportunities for the students of the Westlock North communities. The project is financially sound, and is relevant for the educational needs of the community in the short and long-term. Not only have communities been consulted extensively, the recommendation comes from the communities. Residents recognize the realities of declining student population in their areas and want to be part of the solution versus inevitable school closures, one at a time. The Westlock North Consolidation project is at a critical juncture - the community consultation process has been ongoing over the past two years (three years for the communities served by W.R. Frose School, given the grade re-configuration in 2010). The Board has made a decision to designate Dapp School as an elementary and junior high school effective September 1, 2014, subject to adequate learning spaces to accommodate the students from Westlock North. Given this, and the fact that student population at the schools have not stabilized and sections of the W.R. Frose school building and roof continue to deteriorate, it is critical that funding be secured no later than January 1, 2014 in order for the project to be operational for students by September 1, 2014. 13 Westlock North Schools Consolidation Report October 11, 2013 Appendix 1 Westlock North Projected Enrollment Westlock North Schools Consolidation Report October 11, 2013 Westlock North Schools Consolidation Report October 11, 2013 Appendix 2 Participant Table Questions Westlock North Schools Consolidation Report October 11, 2013 Pembina Hills School Division April 18, 2012 Participant Table Questions Question #1 What did you find interesting or useful from the presentation today or from the Background Information Package? Was there a key insight or something that stood out for you? (5 minutes) Question #2 What is an important consideration that you would place on making a decision on any of the alternatives presented for the future successful operations of the Westlock North schools? (15 minutes) Question #3 a) What might be some implications of each alternative? b) What might be some key opportunities, challenges, or issues that may inhibit moving forward in the future on any of the alternatives already presented? (15 minutes) Question #4 a) What might be some potential solutions or strategies to address some of these issues/challenges? (10 minutes) b) Do you see other alternatives or solutions that have not been addressed? What does it look like? Who will lead it? What types of resources might be needed? If successful, who will benefit? What would be the timeline for success? (15 minutes) Question #5 a) In summarizing the discussions from this group, what are 3 Key Messages that this group would like to recommend pertaining to the alternatives currently presented or any new alternatives you have developed? (10 minutes) b) Each message (one message per card) needs to be written in felt pen by the recorder on the three GREEN or PINK cardstock pages provided on the table. When your cards are ready please hold in the air for the ACCS facilitator to collect. (5 minutes) Filters • Will it maximize educational opportunities for our children? • Will it be sustainable? • Does it utilize our limited resources in the best possible way for our children? • Is it realistic? Westlock North Schools Consolidation Report October 11, 2013 Appendix 3 Westlock North Task Force Report WESTLOCK NORTH TASK FORCE REPORT This report summarizes the Westlock North Task Force deliberations and presents the background and rationale for its recommendation to the Pembina Hills School Board Recommendation to the Pembina Hills School Board Westlock North Task Force Report Contents 1. Task Force Establishment and Purpose 2. Task Force Composition and Roles 3. Task Force Work Plan 4. Key Observations of the Task Force 5. The Nine Alternatives Considered by the Task Force 6. The Three Task Force “Short listed” Alternatives 7. The Task Force Recommendation to the Board of Trustees 8. Rationale Supporting the Recommendation 9. Consideration of “Necessary Conditions” 10. Conclusion and Next Steps 1|Page Westlock North Task Force Report 1. Task Force Establishment and Purpose The Westlock North Task Force was established pursuant to a May 9, 2012 Board of Trustees motion as a “next step” in the Westlock North community consultation process. 5737/05/12 - Moved by Trustee Watson that the Board establish a Task Force for the purpose of providing advice to the Board regarding a long range plan (3-5 year) for educating students in the communities served by Dapp, Jarvie and W.R. Frose Schools. Carried7-0 Further to this motion, the Board provided the Task Force with the following decision-making “lenses” or filters in reaching its recommendation: - Will the recommendation maximize educational opportunities for our children? - Will it be sustainable? - Does it utilize our limited resources in the best possible way for our children? - Is it realistic? The establishment of such a Task Force is a unique circumstance in Alberta. While Boards are required by statute to consult with parents and communities when a school closure is being considered, few, if any, Alberta school boards have gone to this length to engage parents and community members in planning for the future education of their children. 2|Page Westlock North Task Force Report 2. Task Force Composition and Roles The Westlock North Task Force was established in June 2012 and included the following members: Lisa Gehring (principal of W.R. Frose to the end of the 2011/2012 school year) and Darcie Eamor, principal of W.R. Frose effective the beginning of the 2012/2013 school year. Ms. Gehring served on the Task Force during June and August 2012 and was replaced by Ms. Eamor effective September 2012. Sue Chapotelle –Flatbush Community Member Martin Cairns – Principal, Jarvie School Pat von Loewenstein – Principal, Dapp School Jeremy Seatter – Dapp/Jarvie Community Member Joanne Kaliel – Fawcett Community Member Cristy Paly – Chair, W.R. Frose School Council Cheryl Houle- Vice Chair - Dapp/Jarvie School Council Valerie Montgomery – Chair, Dapp/Jarvie School Council Sig Schmold –facilitator jointly chosen by the members of the Task Force and the Board. Task Force Member’s role At its first meeting on June 11, 2012 the Task Force discussed and articulated an individual member’s role: Members are to represent their constituencies in a fair manner. That is, they are to bring to the Task Force the questions and issues raised by their constituents and are to fairly represent Task Force discussions and decisions back to their constituents. All Task Force members have an equal voice on the Task Force. Facilitator’s role At its June 11, 2012 meeting the Task Force affirmed that the facilitator was a non-voting or non-decision making member of the Task Force. His role was to act as a resource person to the Task Force by providing Task Force leadership, providing meeting agendas and discussion notes, developing a Task Force work plan, acting as media 3|Page Westlock North Task Force Report contact and providing background and information to Task Force questions and issues as requested. Operating Principles The following operating principles were developed by the Task Force at its June 11, 2013 meeting and agreed to by consensus. - Student learning (K-12) comes first, recognizing that learning occurs in the context of families and communities. - Every Task Force member has an equal voice. - Task Force members commit themselves to their roles and the Task Force process. They require time to deal with the complex and interrelated issues involved. - Task Force members commit to listening and respecting opinions and beliefs of other members. - Task Force members commit to asking questions that are of concern to themselves or their communities. - Task Force members commit to being positive about the Task Force process and supporting it to the best of their abilities. Decision Making At its June 11th meeting, the Task Force decided that if possible it would make decisions based on a group consensus. The Task Force observed that consensus decision making also allowed individual Task Force members to declare reservations about a pending decision, step aside (pass) on a pending decision, or block a pending decision. Given the ability of any member to block a decision, the Task Force decided to adopt a consensus minus one (1) decision rule. Simply, this means that consensus will have been achieved when everyone on the Task Force agreed to a decision or everyone except one agreed to a decision. Anyone who had chosen to “step aside” would not be counted in the tally. 4|Page Westlock North Task Force Report 3. Task Force Work Plan After discussion and recognizing that there would be some overlap between stages, the Task Force adopted the following three (3) stage work plan that helped guide its deliberations: Stage One: Seek First to Understand Timeframe: June 26, 2012 – September 11, 2012 This first phase emphasized building Task Force understanding of Provincial and Pembina Hills policies and guidelines that impact on the Westlock North Schools. The Task Force developed a series of questions related to finances, facilities, transportation and instruction that it wanted discussed. These questions and the responses are posted on the Pembina Hills website. Stage Two: Develop Alternatives Timeframe: September 25, 2012 – October 23, 2012 In this phase the Task Force developed and discussed possible alternatives regarding the three Westlock north schools. In total, nine (9) alternatives were discussed with regard to their individual pros and cons and the degree to which each met the four given filters. Results of this discussion are posted on the Pembina Hills website and are summarized in the October 23, 2012 Discussion Notes. Stage Three: Choosing the Preferred Alternative Timeframe: November 13, 2012 – December 4, 2012 Filter questions include: Will it maximize educational opportunities for our children? Will it be sustainable? Does it use our limited resources in the best possible way for children? Is it realistic? 5|Page Westlock North Task Force Report Task Force Meetings – Communication As a way of balancing competing concerns, the Task Force decided: That its meetings would be for Task Force members only. That the three school councils (Dapp, Jarvie and W.R. Frose) would reserve a spot on their meeting agendas to share and discuss the Task Force meeting notes. This would also provide an ongoing opportunity for school councils to offer any advice or suggestions to the Task Force. That Task Force Discussion Notes of each meeting would be posted on the Pembina Hills website. The Task Force met on the following dates in 2012: June 11 – Jarvie June 26 – W.R. Frose August 27 – Dapp September 11 – Flatbush September 25 – Jarvie October 9 – W.R. Frose October 23 – Jarvie November 13 – Flatbush November 27 – Dapp December 4 – W.R. Frose The Task Force Facilitator met with school councils and community members on January 22, 2013 to present the work of the Task Force and the background for its recommendation to the Board. 5:00 pm - W.R. Frose School 7:00 pm - Dapp School 6|Page Westlock North Task Force Report 4. Key Observations of the Task Force The Task Force reviewed a significant amount of background information, much of which was provided by personnel from Pembina Hills and representatives from the Capital Planning Branch of Alberta Education. Some of the key observations of the Task Force include: Student Enrollment Alberta Education funding to school jurisdictions for instruction, operations and maintenance of facilities and student transportation is all based on the number of students enrolled and educated. At its simplest, declining student enrollments mean declining operational funds for school boards which over time can negatively impact the education students receive. Since regionalization to Pembina Hills in 1994/1995, Dapp School has lost 26% of its student population, while both W.R. Frose and Jarvie schools have lost more than 50% of their student population. Enrollment forecasts point to a continued drop in students enrolled in Westlock north schools. School current 13/14 14/15 15/16 16/17 Dapp 111 (3) 102 99 90 80 K=14 K=15 K=10 K=8 K=6 35 41 40 45 48 Jarvie W.R. Frose 70 (7) 68 (6) 62 (5) 62 (5) 58 (3) ()= early entry Total 216 211 201 197 186 Of note is the long term trend of declining number of students starting school. For example, in 2015/2016 above, just 8 students are predicted to begin school in Dapp. This drops to 6 students in 2016/2017. If this trend continues, Dapp will be faced with enrollments of 50 - 65 students in the foreseeable future. These lower numbers will, in turn, see Jarvie school with about 20-30 students. The W.R. Frose student enrollment forecast parallels the trend in Dapp. Beginning in 2013/2014, just 6 students are expected to begin school. Forecasts 7|Page Westlock North Task Force Report indicate about 6 students beginning school thereafter. This would result in 50-60 students in a K-8 school. Both W.R. Frose and Jarvie currently meet the Pembina Hills school closure criteria and Dapp will meet it within the next five years. Census 2011- The Task Force reviewed Census 2011 data. In brief, Westlock Town and Westlock North communities are not growing as fast as the rest of Alberta or Canada is growing. Westlock Town, for example, has declined by 3.7%. Barrhead, on the other hand, has grown by 5% and Athabasca by almost 16%. Key rural trends identified by census 2011 include: - The number of farms are decreasing because of larger farms - Farm operators are getting older (average 54 years) - Families are smaller Economic Development - Westlock County reports that there is no anticipated growth in the Westlock North area although there is a potential expansion of the Peat power plant northwest of Dapp. A key assumption of the Task Force is that enrollment projections will continue to decline as projected. In the view of the Task Force, it is better to deal with this unfortunate reality in a proactive way rather than a reactive way. Simply, the Task Force supports a solution that deals with student enrollment decline and education of students in Westlock North in a way that enhances current education, transportation and facilities services in a cost effective way. Allocation Priorities Despite allegations to the contrary voiced at the Westlock North consultation meetings, per pupil funds allocated by Pembina Hills to jurisdiction schools is weighted to support smaller schools. For example: 8|Page Westlock North Task Force Report Per student $ received by schools in Pembina Hills. Barrhead Composite 6,010.52 BES 6,899.92 Busby 7,755.77 Dapp 7,615.36 Dunstable 8,847.54 Eleanor Hall 7,133.37 Fort Assiniboine 8,859.78 Jarvie 8,927.76 Neerlandia 7,012.44 R.F. Staples 6,015.62 Swan Hills 7,009.08 W.R. Frose 8,813.51 Westlock Elementary 6,919.32 9|Page Westlock North Task Force Report The Task Force also reviewed the Pembina Hills expenditures on instruction, transportation and administration. The comparisons indicate that Pembina Hills’ expenditures compare favourably with its neighbours. For example: School System Instruction Transportation Board and System Administration 2010-2011 K-12 Pembina Hills 75.2% 9.3% 3.8% Aspen View 74.1% 8.9% 4.8% Evergreen 78.7% 10% 4.8% Edmonton Public 75% 3.5% 3.6% Northern Gateway 71.9% 8.1% 4.3% Sturgeon 73.5% 9.2% 4.4% Operations and Maintenance Utilization Rates of PHRD schools range from 100% (Neerlandia, Westlock Elementary) to 35% with an average of 68%. Regarding Westlock North Schools, utilization rates as of Sept 2012 are; - Dapp School = 51% - Jarvie School = 38% - W.R. Frose School = 35% - Combined Westlock North Schools =42% The Task Force recommendation for a regional school in Dapp will result in a facility with a utilization of 84%. The Task Force discussed the cost of maintaining the three Westlock North schools. At present, all three schools cost more to operate and maintain than the revenue available from Alberta Education. The net annual operations and maintenance deficit for all three Westlock North schools is $ 98,087.00 (or approximately $100,000.00) per year or $ 1 million over 10 years. 10 | P a g e Westlock North Task Force Report Alberta Education has recently done facility condition audits of the three Westlock North Schools. These audits estimate the needed repairs to each school over the next 30 years. Based on the three recent infrastructure audits and translating maintenance and repair costs over 30 years –W.R. Frose works out to $39,092.00 per student ($3,010,101/77) , Jarvie works out to $48,067.00 per student ($1,682,358/35) , and Dapp works out to $24,526.00 per student ($2,795,996.00/114). Provincial Capital Priorities The priorities guiding provincial decision making regarding school facilities include health and safety, providing new schools to growing communities and providing suitable program space for students. Last year there were 700 requests from school boards for new school construction or school modernization projects that totalled 400 million dollars. Thirty five (35) out of 700 were approved. All of the approvals were primarily because of student enrollment growth and providing schools to communities that do not have a school. In order to qualify for a new school, a geographic sector of Pembina Hills (e.g. – Westlock North Schools) would need to have a utilization rate of 85% and have enrolment projections that demonstrate student growth. Neither of these two conditions exists at present. Excess School Space Pembina Hills would entertain leasing excess school space to a compatible community group or possibly an individual. It was noted, for example, that a community library or seniors centre would qualify as compatible while a gambling casino would not. The organization leasing the space would need to demonstrate a sustainable ability to fund and operate the leased space. 11 | P a g e Westlock North Task Force Report Observations regarding points put forward during the Westlock North Community Consultations Transportation – Transportation and related issues had approximately 110 comments made in community meetings. Simply, any recommendation presented to the board needs to simplify and improve transportation ride times for students. Related to this, the issue of open/closed boundaries or transportation areas was raised about 30 times. Many of the suggestions were about enforcing attendance areas or making parent choice more difficult. Complicating this issue is the reality of St. Mary’s School in Westlock and the right of catholic parents to attend this school as well as the “free ride” provided to St. Mary’s School. The next most common set of comments (20+) revolved around the notion of creating a “specialized” school in the north. Suggestions included Outdoor Education, French, Music, and Religious Education. Reverse Transportation - A number of comments suggested sending students from Westlock to Westlock North schools (15+). For example, a scenario like this exists in Barrhead with students being bussed from Barrhead to Neerlandia. The Task Force spent some time discussing Neerlandia School and the “reverse” transportation (from Barrhead to Neerlandia) that supports this alternative program school. Some interest was expressed by Task Force members in exploring the concept of an alternative or “lighthouse” school that would attract students from Westlock or surrounding areas to Westlock North Schools. Pursuant to Alberta’s School Act, an alternative program means an education program that “emphasizes a particular language, culture, religion or subject matter or uses a particular teaching philosophy.” Examples noted included a Christian education focused school, a sport focused school (hockey, baseball etc.), an agriculture focused school or a school that had all students wear uniforms. A community would need to come to the School Board with a request for such an alternative program. It would be difficult, for example, for the Board to “impose” such a program on a community and its school. It was also observed that an alternative school might be a two edged sword in that parents who did not 12 | P a g e Westlock North Task Force Report support the school’s alternative approach would, according to the School Act, be provided transportation to a nearby “public” school. Better Financial Support - A number of community comments related to providing more financial support to the Westlock North Schools by adjusting the current allocation formula (6+ comments). Task Force members noted that small schools in Pembina Hills already receive more per student funding than large schools. For example, Jarvie receives $8927 per student while R.F. Staples Secondary School receives $6015 per student, a differential of approximately 30%. New School Act The new School Act affirms parent choice, public funding for Catholic and Francophone education, flexibility and personalization in program delivery, flexible definition of school, the ability to operate an alternative program, affirmation of existing rules regarding enrolling students in a school operated by a board, reduced restrictions regarding student transportation and more emphasis on Board policy. 13 | P a g e Westlock North Task Force Report 5. The Nine Alternatives Considered by the Task Force Task Force members were asked to present proposed revisioning alternatives for Westlock North schools that, in their view, would be reasonable given the background information that had been reviewed in prior meetings. The following alternatives were presented. These are clustered around “one school”, “two school”, and “three school” scenarios. a) One School scenarios Dapp becomes a K-9 school. No schools in Jarvie or Fawcett. Dapp currently has available space and could accommodate all Westlock North students (perhaps with a small addition) New school in Jarvie. b) Two School Scenarios Fawcett K – 8 and “right size” Dapp K – 9 No school in Jarvie - amalgamated with Dapp Jarvie 7 – 9 Dapp K – 6 No school in Fawcett Jarvie K – 3 Dapp 4 – 9 No school in Fawcett Dapp K – 6 Fawcett K – 9 No school in Jarvie. Jarvie 7-9 students bussed to Fawcett School. Flatbush K – 3 (housed in community complex) Dapp K – 9 (Jarvie amalgamated with Dapp) No school in Fawcett 14 | P a g e Westlock North Task Force Report c) Three School Scenarios Status Quo Fawcett K - 6 and “right size” Dapp K - 6 Jarvie 7 - 9 (Fawcett junior high students bussed to Jarvie) A discussion of the pros and cons of each alternative is summarized in the October 23 Discussion Notes posted on the Pembina Hills website. 15 | P a g e Westlock North Task Force Report 6. The Three Task Force “Short listed” Alternatives and Rationale Task Force members support their schools in their current locations but recognize that the history of declining student enrollment in the Westlock North schools and the predicted continuing further drop in student numbers will over time negatively impact programs, funding, facilities and transportation in all three schools. Over the next five years, all of the Westlock North schools will meet one or more of the Pembina Hills school closure criteria. In the words of one Task Force member, the status quo will lead to “death by a thousand small cuts.” While the education provided to students in Westlock North is currently sound, the view of the Task Force is that continuing declining enrollments will eventually undermine this sound education and lead to an unacceptable situation for Westlock North students. As such, the Task Force does not see the status quo as a viable long term option. Similarly, the other three school option simply shifts existing students around and does not deal with the fundamental issue of enrollment decline that could negatively affect the education students receive in Westlock North schools. While the two (2) school options would deal with enrollment decline in the short term by housing all students in two (2) schools rather than three (3), the long term probability is that one of the two would meet school closure criteria in the foreseeable future. Task Force members generally supported the idea of one regional school in Westlock North as providing the best educational opportunities and long term educational stability for Westlock North students. The Task Force discussed a possible new school in Jarvie for Westlock North students but felt that this was not a realistic alternative Alberta Education would fund. It was noted, for example, that Alberta Education puts priority on funding schools in growing communities that do not have a school. It would be highly unlikely that Pembina Hills would receive funding for a new school when the Westlock North region has declining enrollments and already has three schools, with one (Dapp) being in excellent condition and able to house all current and projected students. Given this reality, the Task Force decided to end discussion of a new school in Jarvie. While the Task Force studied and discussed nine (9) possible scenarios, three (3) scenarios were proposed as a possible framework solution. Two of these scenarios involved a phased in transition from three (3) schools to two (2) schools to one (1) school at Dapp over a five (5) year period. The third scenario involved moving from three schools to one school in Dapp within the next three (3) years. The Task Force analyzed and discussed the implications of these scenarios. 16 | P a g e Westlock North Task Force Report Scenario A - Amalgamating Dapp and Jarvie in stage one and W.R. Frose with Dapp/Jarvie students in stage two. Scenario B - amalgamating Dapp and W.R. Frose in stage one (elementary students would go to Dapp and junior high students would go to Jarvie) and Jarvie in stage two (all students would go to a K-9 school in Dapp) and; Scenario C - amalgamating W.R. Frose and Jarvie with Dapp and creating a new regional school within the next three (3) years; 7. The Task Force Recommendation to the Board of Trustees After considerable discussion, the Task Force reached a consensus minus one position (8 for, 1 against) for scenario C. The recommendation that the Task Force presents to the Board is that within three years, all K-9 students in Westlock North be educated and housed in a “revisioned” regional Dapp School. 17 | P a g e Westlock North Task Force Report 8. Rationale Supporting the Recommendation The Task Force sees the following benefits in support of its recommendation to the Board. For Pembina Hills: The recommendation gives Pembina Hills and the Westlock North community time to plan for facilities, school programs, staffing and budget – simply - time to plan and build a model lighthouse school. A time frame of within three years gives the School Board time to plan for and fund the transition to one consolidated school and provides the Jarvie and Fawcett communities time to plan for possible community use of surplus school space. A consolidated regional school at Dapp is a long-term cost effective solution. While there will be some initial start-up/facility adjustment cost, there will be long term cost savings. A consolidated school will improve the school utilization rate and result in cost savings for operations and maintenance, transportation, “rightsizing” schools and reduced administration. Taken together, annual operational cost savings of over $200,000 per year are possible. For Parents: A consolidated school will provide a common school year and day. A number of parents in Westlock North, for example, currently send their children to three different schools, each with its own and different school calendar. Parents and communities are looking for stability rather than wondering annually what the future holds for the education of their children. This solution provides long term educational stability for Westlock North students. While combined grades are supported by many parents, some parents would prefer not to have their children in a combined grade scenario. The Pembina Hills experience, for example, is that some parents start switching schools once double or triple grade combinations are put in place because of low student numbers in each grade. A consolidated school will reduce the need to combine 18 | P a g e Westlock North Task Force Report multiple grades because of low student numbers but leaves the option open for combining for educational benefit. For Students: A consolidated school at Dapp will be designed around a common vision, providing enhanced learning opportunities for all students in Westlock North and sustainability over the long term. In the words of long time educator Werner Frose, “The school at Dapp will be made a model school - a school with a vision to the future, because they can take all of the best from each of the schools, and they have the opportunity to build something educationally-wise that hasn’t been done before… We have the opportunity now to produce a northern school that will use the best teaching methods that are possible. It is not an extension of Dapp School – it is a brand new unit.” (Westlock News interview) While a school of about 200 students in Dapp is certainly larger than each of the current schools in Westlock North, it is still considered “small” by Canadian standards. As such, it could be seen to be in the “Goldilocks” zone (not too big, not too small) of school size. For example, a review of school size research conducted by K. Leithwood (2009) found that: The weight of evidence provided by this research clearly favors smaller schools. Students who traditionally struggle at school and students from disadvantaged social and economic backgrounds are the major benefactors of smaller schools. Elementary schools with large proportions of such students should be limited in size to not more than about 300 students; those serving economically and socially heterogeneous or relatively advantaged students should be limited in size to about 500 students. Secondary schools serving exclusively or largely diverse and/or disadvantaged students should be limited in size to about 600 students or fewer, while those secondary schools serving economically and socially heterogeneous or relatively advantaged students should be limited in size to about 1,000 students. A “revisioned” K-9 school in Dapp, while still small by definition, would be large enough to offer all core subjects and allow the school to specialize in subjects like Fine Arts or second languages or other areas of specialization supported by Westlock North parents. A consolidated school will improve student transportation pick-up and ride times for most students in K-9. If double bussing is implemented in the pm as is recommended by the Task Force, ride time for K-12 students in the Westlock North area will be improved. This is because the transportation system in 19 | P a g e Westlock North Task Force Report Westlock North will be simplified with cross bussing and multiple school transfer points eliminated. The bottom line is that a simplified transportation system with all students heading in the same direction and needing no school transfer points will, on average, equal improved student pick-up and ride times. A consolidated school will, because it eliminates the need for three separate administrations, be able to spend a larger percentage of its budget on classroom instruction. A consolidated school will provide enhanced library services and student resources to all students by combining existing libraries and student resources. 20 | P a g e Westlock North Task Force Report 9. Consideration of “Necessary Conditions” In addition to considering the rationale supporting a consolidated regional school in Dapp, the Task Force also proposed some “necessary conditions” that if implemented would further support its recommendation. These necessary conditions include: Bringing administration, communities and school councils together to shape the vision for the new regional school in Dapp. In the view of the Task Force, joint school planning that involves parents and community members will lead to a lighthouse school supported by all three communities. In this, it will be important to emphasize that this solution is not just an expansion of Dapp School – it is a revisioning and rethinking about what one school that serves all Westlock North students would offer students. Renaming the school will also help with positioning the school as a regional school for all Westlock North students. Pembina Hills needs to design and confirm the new routes to ensure improved transportation times. The Task Force would like Pembina Hills to consider double busing (transporting K-9 and high school students separately) in the afternoons for area students. Facility modifications/renovations/additions to Dapp School will be needed to turn a K-6 school into a K-9 school able to accommodate a new and expanded school program. The plan needs School Board and Community/Parent support. A regional school at Dapp can become a lighthouse school for Westlock parents. If numbers warrant, the Board should consider bussing students to Dapp from south of the current attendance line to the new regional school. 21 | P a g e Westlock North Task Force Report 10. Conclusion and Next Steps The Westlock North Task Force did not come to its decision easily. It had many emotional and heart-felt discussions about the value of schools to their communities and the loss that will be experienced in some communities. The Task Force also recognizes that its recommendation is not without controversy. At the end of the day, however, the Task Force decision is not about community politics or saving jobs for staff. It is about what the Task Force thinks is in the long term best interests of students in Westlock North. Alberta Education has recently gone on record as supporting the Task Force recommendation as an educationally sound and cost effective solution to the challenges currently faced by Westlock North schools. It is prepared to enter into discussions with Pembina Hills about designing and funding a school project that will turn a community K-6 school into a regional K-9 school. The quick response by Alberta Education is heartening and bodes well for the needed funding approvals. The Task Force thanks the Pembina Hills Board for the opportunity given to parents and community members to be an important part of the planning for the future of their children. All too often parents are left out of these important discussions until decisions have been made somewhere else. The work of the Task Force is complete. If the Board supports the Task Force recommendation and is prepared to implement it, the Task Force would encourage the Board to continue to involve parents and community members in the detailed planning for the regional school. For example, the Board might want to consider creating a “Transition Team” composed of representatives from staff, parents and communities. In sum, the education provided to students in Westlock North is at a precarious balancing point. In the view of the Task Force, doing nothing and staunchly defending the status quo will lead to reduced educational opportunities for students over time and increased friction between communities. The Task Force believes that the time has come for the communities of Westlock North to work together, to look beyond the interests of each separate community and to think about what is in the best long term educational interest of all students in the Westlock North region. While this may be painful and difficult, our students deserve nothing less. 22 | P a g e Westlock North Task Force Report Respectfully submitted on behalf of the Westlock North Task Force S. Schmold 23 | P a g e Westlock North Schools Consolidation Report Appendix 4 New School Process October 11, 2013 10/07/2013 High degree of responsibility to make decisions about the learning structures Process: Overview Board Responsibility Coordinating Committee Professional Learning Community Transition Team School Council Advisory capacity regarding decisions about the learning structures Time Process: Responsibilities Purpose: Initiate the planning process RO Admin School Admin Coordinating Committee Staff Parents Students Community Stakeholder Job to do: Gather ‘information’ from staff, students, parents and community to describe the following: Outcomes: 1. List of statements about the school climate that can guide decisions about the social‐ emotional environment of the school 2. List of statements about academic expectations that can guide decisions about instructional delivery (Engaged Learners, Success for All Students) 3. List of ideas describing structures (grade levels, optional programming, extra‐curricular traditions…) Guiding Principles and Resources: School Act, Board Policies and Admin Procedures, PHRD Jurisdiction Education Plan, research reflective of Universal Design for Learning, Inclusive Schools and Assessment for Learning 1 10/07/2013 Step 1: Coordinating Committee will Collect Input from Students, Parents, Staff and Communities • Before April 12: Principals of the three schools will collect Student Voice • Before April 12 : Principals of the three schools will have a pre‐event conversation about the upcoming input sessions… School Councils to solicit support • Before April 12: Messaging will be created for school and PHRD Website, and for Newsletters. • Before April 12 : Principals of the three schools will personally contact families to invite them to the input meeting Step 1: Coordinating Committee will Collect Input from Students, Parents, Staff and Communities • On April 12 (School Based Professional Development Day): – Who: All three schools’ staff and parents will meet at Dapp Gym – PURPOSE: Collecting voice to inform a vision for new school • On April 16 (evening) – Who: Invitation: community members interested in contributing to the creation of vision for a new school…”, – PURPOSE: Collecting voice to inform a vision for new school 2 10/07/2013 Responsibilities Purpose: Lead the Planning Process Job to do: Refine the vision and plan a school program RO Admin Outcomes: 1. Using a PHRD School Education Plan Template: a. b. c. School Admin 2. Request System support structures: Teachers a. Transition Team Define foundation statement. Define the geography, history and demography. Define programming structures as key school strategies b. c. School Business / Finance Student Transportation Facilities 4. Draft school procedure manual to include: a. b. 3. Draft a school handbook c. Administrative responsibilities chart Emergency response plan Comprehensive Counselling Plan Baseline Principles and other Resources: Outcomes 1‐4 from the Coordinating Committee (beliefs, structures and purpose), PHRD Education Plan Template, PHRD Admin Work plan, PHRD Safety officer, other schools’ Admin responsibility charts… Responsibilities Purpose: Lead the Planning Process Job to do: Refine the vision and plan a school program How will Other Parents and Community Members be included? • Request names for Ad Hoc Committee reps from Parents and staff… • A ‘statement of interest’ form will be created to gather names and possible interest areas… RO Admin Membership: • RO Facilitator • 3 School Principals • 4 Teacher Representatives • 4 Parent representatives Selection Process: • Selected by Coordinating Committee • Application process for Teachers and Parents • Standardized criteria School Admin Teachers Transition Team Parents Students Ad Hoc Ad Hoc Ad Hoc Ad Hoc Regional Services Regional Services – information providers to Transition Team and/or Ad Hoc AD Hoc support could include: School Handbook, Playgrounds, Curriculum (music, library, technology…), Extra‐curricular (athletics, field trips…), Student Services, School Artifacts, Transportation, Facilities, and so on. 3 10/07/2013 High degree of responsibility to make decisions about the learning structures Process: Overview Board RO Admin RO Admin School Admin Responsibility School Admin School Admin Coordinating Committee Staff Professional Learning Community Teachers Transition Team School Council Chair Staff School Council Parents Parents Students Community Stakeholder Ad Hoc Ad Hoc Ad Hoc Ad Hoc Parents Students Regional Services Advisory capacity regarding decisions April 2013 about the learning structures April to June 2013 2013 – 2014 School Year Time Role of Trustees • Senior Admin will provide informal progress reports at board meetings • Trustees are invited to observe at April 16th input session Next update: June 12th Board Meeting • Transition Team will present draft documents and plans to date 4 Westlock North Schools Consolidation Report October 11, 2013 Appendix 5 Dapp School Proposed Project Description Dapp School K-6 (Future K-9) August 27th, 2013 Pembina Hills Regional Division No.7 Prepared by Alberta Education Meeting Attendees: Colleen Symyrozum-Watt, Wendy Scinski, Darcie Eamor, Tracy Tyreman Laurel Udell, Kenneth Wong, John Lovell and Mark Latimer The current 2,047 m² Dapp School was constructed in two separate phases (413m² in 1965, and 1634m² in 1989). The current capacity for the 2012/2013 school year is 116. The net capacity of the school is 218 students. The potential consolidation project will see students from Jarvie School and W.R. Frose School combining at the Dapp facility. The 2012-2013 adjusted enrolment for the three schools is 116 (Dapp), 34 (Jarvie) and 83 (W.R. Frose) for a total of 233. There is also the potential to draw students who currently travel to Westlock to attend school if a newly modernized school were in place at Dapp. Based on the adjusted enrolment of 233, it is recommended that a 300 capacity K-9 built-out core school be used as the benchmark for comparison. With one CTS Lab the capacity would be 320 students. This would result in a utilization rate of 72% if built-out to 320 capacity but provide a higher utilization rate with less modular classrooms in place. Below are comparisons of the spaces in a320 capacity K-9 school (as per the School Guidelines) versus the spaces in the existing Dapp School. Instructional Spaces: Existing Space School Classrooms 7 Science Small Ancillary Large Ancillary 320 Capacity School 7 Difference Notes 0 Potential for some permanent core classrooms to be combined to form CTS and/or ancillary spaces. Potential joint lab with CTS. 0 0 1 (Stage) 1 2 1 -1 -2 0 Information Services Gymnasium Gym Storage 0 1 -1 1 1 1 1 0 0 Library 1 1 0 CTS 0 1 -1 Potential for stage to be opened up to create larger area for music/band. (Remove old water treatment space below band area and review adjacent community kitchen). Would have to include acoustical upgrades including new movable partition to separate space from gymnasium. Review adjacent community Kitchen Existing Room 110 is not counted as a classroom. PHRD to comment on adequacy of size of gym storage. Consider learning commons and whether to open it out to entry gathering space (movable partition). Based on the preceding information, the existing school is deficient 5 learning spaces when comparing to a 300 320 capacity school. However, it should be noted that if for example two existing classrooms were combined to form a single CTS space, than the number of additional learning spaces needed would increase to 6. Non-Instructional Spaces: Existing Space School Administration 197m2 and Staff 320 Capacity School 227m2 Difference Notes -30m2 The areas are comparable, note that we have included the computer resource room as part of this area. PHRD indicated it is considering converting rm. 110 (42.6 sq. m. to Wrap-Around space. Current mechanical room is on mezzanine above gymnasium and is tight, but does appear to be working – PHRD to comment. Modernization project would not receive air to air heat exchangers requiring additional space Not required – LEED certification item in new schools Change rooms appear satisfactory from a size perspective. Expected to see more use with junior high students. Corridors/circulation appear to be efficient in existing school. The need for more storage can be expected with the additional students and introduction of junior high students. Need for band equipment storage was emphasized by PHRD. All student and public washrooms must be converted to provide a handicapped stall. One additional toilet is required in the proposed elementary wing (1965 section) girl’s washroom for the additional students (100 elementary girls). There is available space. PHRD indicated that room 108 might be converted when room 110 becomes wrap around space. Small gathering spaces at main entry and at corridor intersection at south end of school appears to be extent of flex space. Wrap-Around 20m2 0m2 -20m2 Mechanical 52m2 108m2 -56m2 Recycle Room 11m2 0m2 -11m2 Phys.Ed. 75m2 75m2 0 Circulation 425m2 TBD TBD Storage 59m2 31m2 -28m2 Washrooms 36m2 37m2 +1m2 Accessible Washrooms 12m2 0m2 -12m2 Flexible Space 72m2 TBD TBD Wiring Network 40m2 TBD TBD From a non-instructional space perspective the areas are primarily deficient with regards to the new interim design standards (wrap-around, recycle, accessible washrooms and larger mechanical space) as well as storage space. For a modernization the wrap-around service space and accessible washrooms should be provided with relation to addressing program needs arising from the Inspriring Education initiative. I believe the intent would be to carve out these spaces within the existing permanent core of the school, which could include classroom spaces and then the classroom spaces could be replaced by modulars as needed. Based on the facility audit, information provided by Workun Garrick and the observations from our August 27th, 2013 tour, it is anticipated that a modernization project would include: • Structural Components o The 2012 facility audit indicates that the crawlspace was wet and that there is no ventilation and recommends repairs with an associated cost of $81,000. • Building Envelope o Exterior walls are considered acceptable with only recaulking identified as a priority in the facility audit. o Windows & Doors The windows are 24 years old. TSB has been asked to comment on the potential to replace the windows as part of the modernization (facility audit recommends replacement in 2029). o Roofing Roof membranes are 24 years old and facility audit recommends replacement in 2016. Roofing has been included as part of the modernization. Skylights (2) to be replaced with clerestories. Potential to add clerestory windows to west wall of stage area to allow for natural lighting to new music/band space. • Interior Components/Finishes – o A portion of the interior finishes will require renewal, including replacement of 1989 carpet. • Mechanical o Plumbing is understood to be acceptable o Heating/Ventilation Generally acceptable, air handling units scheduled for replacement in 2019 and heating boilers in 2024. TSB has been asked to comment on the potential to replace these systems as part of the modernization. Workun Garrick identified need to air condition computer room and server room. o Fire Suppression Building is not sprinklered and it is understood that this would not be required provided that modular installation includes rated link. • Electrical o Main Service/Distribution Informed that main service is adequate although Workun Garrick recommends surge suppressor be installed. Some wiring/receptacles, etc. will require upgrading where functional room changes are taking place. o Lighting (Exterior and Interior) Some interior lighting upgrades are anticipated including gymnasium and computer room. o Fire Alarm Fire alarm and security systems will require upgrading plus extension into new modular classrooms. • Equipment/Millwork appeared acceptable. • Functional Assessment o Programming Upgrades Modify two classrooms to form proper CTS space. Modify stage area into proper music/band space. Other interior modifications to provide required non-instructional space. Addition of modular as required. o Barrier Free Upgrades Required for access to stage. • Site o o o Grading Due to water report in crawlspace, upgrades recommended in facility audit. Parking/Driveways With additional students it is expected that additional parking and bus drop off improvements will be required. Walkways appeared acceptable. Scope Summary • The area of a new 300 capacity K-9 school with 1 CTS lab is 3,186m2 (this would actually represent a 320 capacity with the CTS), while the existing school is 2,047m2, leaving a deficient area of 1,139m2. o It is assumed that the deficient area will be addressed through modular classrooms, and link structures leaving the permanent core area available for modification for CTS and ancillary instructional spaces as well as required non-instructional areas identified previously. o The 1,139m2 would translate to 11 modular classrooms, which may not be practical or required at this time. If we installed 6 modular classrooms plus two boot room links of 80m2 the associated area would be 762 sq. m. and net capacity would be approximately 298 translating to a utilization of 78%. If enrolment numbers increase or decrease modulars could be subtracted or added. Draft project description: • • • • 2,047m2 of permanent space to be modernized at 44.05%. Allow for: o Crawslpace repairs at $81,000. o Partial building envelope upgrade (5.00%). o Roofing replacement (8.74%). o Interior construction for room modifications needed (4.40%) o Partial interior finishes upgrade (2.00%) o Partial HVAC upgrade (4.13%) o Partial electrical upgrade (1.99%). o Site improvements (grading, bus drop off, increased parking) (5.00%). o Barrier free upgrades (1.0%). o General requirements and fee (11.79%) CTS equipment @ $100,000. Addition of 6 modular classrooms plus boot room links. Based on the above, the CPMP template indicates that the project would have an order of magnitude cost of approximately $5.94 million. Westlock North Schools Consolidation Report October 11, 2013 Appendix 6 W. R. Frose School Report W. R. Frose School Fawcett, Alberta Updated Condition Analysis Pembina Hills Regional School Division No. 7 October 18th, 2011 1.0 INTRODUCTION In October of 2011, Pembina Hills Regional School Division No. 7 commissioned The Workun Garrick Partnership, Architecture and Interior Design Inc. to provide an update on the condition of W. R. Frose School. 2.0 BACKGROUND INFORMATION The original W.R. Frose School was constructed in 1948, and has since been demolished. Additions to the original school were constructed in 1956, 1959, 1961, 1966 and 1984. The total gross area of the school is 2,366.4m2. The fixed capacity of the school is 225. The grade structure of this facility was recently revised to K – 8. A total of 72 FTE students enrolled in this school in September of 2011; therefore the school’s current utilization rate is approximately 32%. The building consists of wood framed walls, floor and roof structures in all areas except the 1984 section, and masonry walls and steel joist & deck floor and roof structures in the 1984 section. Crawlspaces exist under all areas of the school. Exterior wall finishes are primarily sand / cement stucco with a stone aggregate finish. Roofing generally consists of modified bituminous membranes and prefinished sloping metal. The entire school received a major modernization in conjunction with the 1984 addition. The Workun Garrick Partnership subsequently commissioned Protostatix Engineering Consultants Inc. to assess the school’s structure, Hemisphere Engineering Inc. to assess the existing mechanical systems, and JO Engineering Inc to assess the existing electrical systems. The results of this review are summarized in the following paragraphs. 3.0 FINDINGS 3.1 Functional Issues The following functional & utilization issues exist at this facility: • • • 3.2 The school’s utilization rate is very low (32%). This has a significant impact on the Division’s ability to operate and maintain this facility, since much of the funding for plant operations and maintenance is granted on a per-student basis. A suitable barrier-free washroom does not exist. A platform lift is required to enable any wheelchair-bound students or teachers to access the stage. Architectural and Structural Physical Plant Conditions A facility audit was performed by the firm of S. Siren Architect Ltd. in 2000, on behalf of Alberta Infrastructure. This audit was used as background information for this review. A site visit was originally made by the consulting team on May 30th, 2005 to update existing conditions at that time; follow-up visits rd th were made on May 3 , 2010 and October 18 , 2011 to re-assess the condition of the building. The following architectural and structural conditions exist at this facility: • • Generally speaking, the building envelope and finishes within the school appear to be in reasonable condition. There is a high water table on this site. The crawlspaces had wet areas at time of review, and rotting of structural floor framing members is a continuing issue. Replacement of some rotted floor framing members has been carried out by the School Division in the recent past. Crawlspace sumps & pumps and circulation fans have been installed by the School Division in an attempt to control humidity; however, moisture is still infiltrating the crawlspaces due to the high water table. These conditions exist primarily at the south and north classroom wings (1959 and 1966 additions). 1 • • • • Some spalling of concrete footings was observed in the crawlspace of the 1956 addition, which may be due to presence of water soluble sulphates. The roof areas over the north and south classroom wings are near the end of their service lives and will require replacement in the near future. Coat hooks are used in the elementary corridors, which is a flame-spread rating issue since the corridors are used as accesses to exit. Some interior finishes (such as carpeting) are worn due to age, and require replacement. In general, commercial and institutional buildings of wood frame construction have an anticipated service life of 25 to 40 years, and masonry and steel buildings can have a life span of 60 to 100 years; therefore parts of the school are at the end of their service lives, and the most recent addition has a significant service life remaining. Since a successful modernization of this facility was carried out in the mid 1980s and a reroofing program has been completed in the recent past, the school should perform reasonably well for the foreseeable future if the groundwater infiltration issue is resolved and thorough review and repair of the 1956 addition floor joists is carried out. 3.3 Mechanical Plant Conditions The following mechanical problems were found to exist at this school: • • • 3.4 The mechanical systems serving the school are in good condition. Crawlspace is wet in some areas with standing water. Provisions for fire fighting do not exist (i.e. a fire-fighting water cistern is required). Electrical Plant Conditions The following electrical conditions and problems exist at this facility: • • • • • • • • • • • • Main power service is underground, 120/208V-3Ø-4W, 600A, maximum demand is 130 amps. There is no surge suppressor device. The existing NW Mechanical Room will be demolished. The existing Main Distribution Panel (MDP) is in this room. The main power distribution will need to be relocated to a new Electrical Room. Recommend a new MDP complere with a surge suppression system be installed. Branch circuit panels are 120/208V-3Ø-4W. Wiring and receptacles will require upgrading in areas of functional change. Existing telephone system is an AlcaTel VoIP Sound and intercommunication system is an analogue, switch type, Rauland MCZ300 system and would need to be upgraded to a microprocessor system. 120 volt and battery clocks will be reused. Lighting is primarily fluorescent and most has been replaced with T8 lamps and electronic ballasts. Recommend computer room fixtures be changed to parabolic louvred type. Broken lenses will require replacement. Security system is a DSC system with passive infrared detectors (PIR) throughout school. The system could be salvaged, checked for operation and PIR’s relocated to suit modernization. Fire alarm system is an Edwards QuickStart, 10 zones active and 6 zones spare. System does not have visual signal appliances. The corridors where there are coat hooks and the infirmary do not have smoke detectors. Exit and emergency lighting is provided throughout school. Data system consists of Category 5 cabling run to classrooms and in staff areas. SuperNet is located in the Server Room. New mechanical equipment and Owner’s supplied equipment would require power and connections. In general, electrical systems are in reasonably good condition. The sound & intercommunication system, and MDP are of old technology and it is recommended these systems be upgraded. Much of the wiring would be disrupted due to modernization work and will require re-feeding. 2 4.0 RECOMMENDATIONS If it is deemed that this school remains viable from educational and financial standpoints, the following is recommended to address functional issues, physical plant deficiencies and negative environmental conditions at this school: • • • • • • 5.0 Demolish the wood-framed 1959 and 1966 additions, to reduce the building footprint and eliminate the primary problem areas for groundwater infiltration. This would result in a more efficient floor plan, increase the utilization rate to approximately 50%, and reduce ongoing plant operations and maintenance costs. Excavate around the remainder of the school and install a foundation drainage system c/w sump and pump-out. Create barrier-free washroom facilities. Provide a platform wheelchair lift to the stage area (will also be a music room). Create a “wet-lab” in the school to replace the science lab that will be eliminated through demolition. Carry out recommended mechanical & electrical upgrading work. ORDER OF MAGNITUDE COST TO RIGHT-SIZE AND UPGRADE THE FACILITY Demolition, backfilling & restoration of grounds: Architectural & structural: Mechanical: Electrical: Sitework: General conditions: Soft Costs: Total Order of Magnitude Cost Estimate: $ 165,000.00 $ 1,100,000.00 $ 138,000.00 $ 132,000.00 $ 90,000.00 $ 292,500.00 $ 402,500.00 $ 2,320,000.00 Prepared by, THE WORKUN GARRICK PARTNERSHIP, ARCHITECTURE AND INTERIOR DESIGN INC. Dave Christie, C. Arch. Tech., AAA LEED® AP Partner 3 Westlock North Schools Consolidation Report Appendix 7 Jarvie School Report October 11, 2013 Jarvie School Updated Condition Analysis Pembina Hills Regional School Division No. 7 October 18th, 2011 1.0 INTRODUCTION AND BACKGROUND In October of 2011, Pembina Hills Regional School Division No. 7 commissioned The Workun Garrick Partnership, Architecture and Interior Design Inc. to provide an update on the condition of Jarvie School. Jarvie School was constructed in 1964, and two detached portable classrooms were added in 1967. The total gross area of the school is 1,121.5m2, including the portable classrooms. The fixed capacity of the school is 98. 49 FTE students were enrolled in this school in September of 2011, in grades 7 through 9; therefore the school’s current utilization rate is 50%. The school consists of masonry and wood framed walls, wood framed floor and roof structures and concrete slab on grade floor in the mechanical room. Crawlspaces exist under all areas of the school except the mechanical room. Exterior finishes consist primarily of sand / cement stucco with a stone aggregate finish, horizontal cedar boards and some brick veneer in isolated locations. Although no records are available, it appears that the school received a modernization of interior and exterior finishes in the early 1980s. There were no records available for the portable classrooms. The Workun Garrick Partnership subsequently commissioned Protostatix Engineering Consultants Inc. to assess the school’s structure, Hemisphere Engineering Inc. to assess the existing mechanical systems, and JO Engineering Inc to assess the existing electrical systems. The results of this review are summarized in the following paragraphs. 2.0 FINDINGS 2.1 Architectural and Structural A facility audit was performed by the firm of Niels P. Gerbitz Architects Ltd. in 1999, on behalf of Alberta Infrastructure. This audit was used as background information for the current review. Site visits were made th th by the consultants on April 29 , 2005 and October 18 , 2011 to assess existing conditions. The following architectural and structural conditions exist at this facility: • • • • • Provisions for fire fighting do not exist (i.e. a cistern and fire pump are required). Although there is some evidence of dampness in the crawlspace, exhaust fans have been installed to dissipate this. Rot was not evident in the floor structure over the crawlspace, upon cursory review. The bus lay-by requires regrading and recompaction. Generally speaking, the school appears to be in very good condition. The portable classrooms have long exceeded their services lives. In general, commercial and institutional buildings of masonry construction have an anticipated life span of 40 to 60 years; therefore, this school has not yet reached the end of its service life. It appears that, since a successful modernization of this facility was carried out in the early 1980s, the school should perform reasonably well for the foreseeable future. 2.2 Mechanical The following mechanical problems were found to exist at this school: • • • • • • Current outside air exchange rates not provided. Inadequate filtration system. No humidification system. No source of water for fire protection. Two air handlers provide air supply to the school; units are in reasonable condition. Two boilers are provided; one 9 years old, one 31 years old is on standby. 1 • • • Controls have been upgraded to a Siemens DDC system. Crawlspace is damp; ventilation is provided by air handler plus four exhaust fans and is still inadequate. Plumbing is in reasonable condition. Our recommendation is to upgrade the existing mechanical systems to meet current outside air rates, filtration quality and humidification. Additional drainage and ventilation is required for the crawlspace. 2.2 Electrical The following electrical conditions and problems exist at this facility: • • • • • • • • • • Main power service is overhead, 120/240V-1Ø-3W, 200A, maximum demand is 80 amps. There is no surge suppressor device. The main distribution centre consists of a splitter with fused disconnect switches. It will require replacement and serviced with underground secondary. Most branch circuit panels are 120/240V-1Ø-3W. They are generally full and require replacement to larger capacity types. Wiring and receptacles will require upgrading in areas of functional change. Battery clocks will be reused. Lighting is primarily fluorescent and has been replaced with T8 lamps and electronic ballasts. The gymnasium will require re-lamping. Broken lenses will require replacement. Security system is a DSC system with passive infrared detectors (PIR) throughout school. The system could be salvaged, checked for operation and PIR’s relocated to suit modernization. Fire alarm system is an Edwards EST, 5 zones active and 3 zones spare. System does not have visual signal appliances. Exit and emergency lighting is provided throughout school. Washrooms require emergency lighting. Data system consists of Category 5 cabling run to classrooms and in staff areas. New mechanical equipment and Owner’s supplied equipment would require power and connections. In general, electrical systems are in reasonably good condition with the exception of the main service and power distribution system; however much of the wiring would be disrupted due to the modernization work. 3.0 ORDER OF MAGNITUDE COST TO MODERNIZE THE FACILITY Disposal of Portables Architectural: Mechanical: Electrical: Soft Costs (21%): Total Order of Magnitude Cost: 4.0 $ 13,000.00 $100,000.00 $130,000.00 $ 70,000.00 $ 66,000.00 $379,000.00 RECOMMENDATION Create provisions for fire fighting. Remove and dispose of the existing portable classrooms to improve the utilization rate of the school, and to reduce ongoing plant operation and maintenance costs. Carry out recommended mechanical & electrical upgrades. Prepared by, THE WORKUN GARRICK PARTNERSHIP, ARCHITECTURE AND INTERIOR DESIGN INC. Dave Christie, C. Arch. Tech., AAA LEED® AP Partner 2