We turn great ideas into real energy.
Transcription
We turn great ideas into real energy.
We turn great ideas into real energy. Excelerate Floating Regasification Solutions September 29, 2015 Copyright Excelerate Energy L.P. Cape Town, South Africa Excelerate Energy makes no representations or warranties, express or implied, of any kind with respect to Information provided in this presentation, including without limitation with respect to the information’s accuracy or completeness. Excelerate Energy will not be liable for any reliance or usage by a third party of any information within this presentation. Any representations or warranties shall be made, if at all, only in definitive written agreements that may be entered into by the Parties. Copyright Excelerate Energy L.P. 2 01 Company Profile Market Leader in Floating LNG Solutions Excelerate Energy is the recognized industry leader and have delivered more floating LNG solutions – on time and on budget – than any other provider Copyright Excelerate Energy L.P. 3 The first FSRU Bringing a new idea to market. Over a decade ago, Excelerate Energy saw the need for a cost-efficient, fast-track solution for the importation of LNG and introduced the concept of onboard regasification of LNG. Since bringing floating regasification to market, our technology has been widely accepted across the globe and has created new markets for LNG. Copyright Excelerate Energy L.P. 4 Who We Are As the industry leader in innovative floating LNG solutions, we: • Develop, own and operate FSRUs, mooring systems, pipelines and related fixed infrastructure tailored to specific customer needs • Provide operating and logistics services to ensure the vessel and related facilities run in an efficient and reliable manner • Deliver comprehensive expertise necessary to take projects from concept to operation, including full Engineering Procurement and Construction (EPC) • Provide support services including LNG sourcing, trading and shipping • Develop, own and operate Floating Liquefaction, Storage and Offloading (FLSO) Units Copyright Excelerate Energy L.P. 5 Existing Assets – Largest FSRU Fleet • Our large fleet offers redundancy, security of service and opportunities for bridging solutions • Access to conventional, offshore and dockside regas terminals Copyright Excelerate Energy L.P. VESSEL DELIVERY DATE CLASS CAPACITY PEAK SENDOUT Excalibur October 2002 LNGC 138,000 m3 – Excelsior January 2005 Excelsior 138,000 m3 690 MMcf/day Excellence May 2005 Excelsior 138,000 m3 690 MMcf/day Excelerate October 2006 Excelsior 138,000 m3 690 MMcf/day Explorer March 2008 Explorer 150,900 m3 725 MMcf/day Express May 2009 Explorer 150,900 m3 690 MMcf/day Exquisite October 2009 Explorer 150,900 m3 745 MMcf/day Expedient April 2010 Explorer 150,900 m3 690 MMcf/day Exemplar September 2010 Explorer 150,900 m3 690 MMcf/day Experience May 2014 Experience 173,400 m3 800 MMcf/day 6 Teesside GasPort® UK — 2007 Northeast Gateway Deepwater Port® USA — 2008 Mina Al-Ahmadi GasPort® Kuwait — 2009 - 2013 Jebel Ali port, Dubai April 2015 Hadera Gateway Israel— 2012 Aguirre Offshore GasPort® Puerto Rico — 2017 Gulf Gateway® USA — 2005 Port Qasim, Pakistan – 2015 Guanabara Bay Brazil — 2014 Bridging Solution, 2012 Aboadze Ghana — 2017 GNL Escobar Argentina — 2011 With more than 10 years of integrated technical, business development, project execution, and operation experience, we are unrivaled in our ability to respond quickly to our partners’ needs Bahía Blanca GasPort® Argentina — 2008 Operational Copyright Excelerate Energy L.P. Proven Experience Development & Construction Advanced Negotiation Decommissioned 7 Gas to Power in Southern Africa Strong growing demand for power • • • Aboadze Severe electricity crisis Load shedding/rolling blackouts Steady economic growth in the region Gas to Power Projects • • • Fast and flexible Gas-fired powered generation Environmentally friendly thermal capacity Complementary role to renewable generation capacity Need for FSRUs (LNG to Power Projects) • • • Fast-to-market LNG Import Terminal Solution Abundant LNG global supply Flexible solution until domestic gas production is developed (South Africa shale gas and Mozambique LNG) Maputo Walvis Bay Saldanha Bay Richards Bay Coega Copyright Excelerate Energy L.P. 8 + 02 LNG SOLUTIONS: + + + + + + + + Trading Activities + STS Transfer LNG Regasification A continuous supply of natural gas. Anywhere. Anytime. We deliver complete LNG solutions the most efficient and safest way possible to the market. That means we solve your energy needs, in any environment, at any time. Copyright Excelerate Energy L.P. 9 Areas of Expertise Excelerate Energy offers flexibility to fit customer needs – from FSRUs to a complete gas delivery solution, Excelerate is the only floating LNG provider offering services across the entire midstream LNG chain FLOATING REGASIFICATION A fast-track LNG import solution tailored to fit most any environment Copyright Excelerate Energy L.P. STS TRANSFER OF LNG Enhances the capabilities of FSRUs by allowing for continuous supply of natural gas for import, and enabling small scale LNG LNG MARKETING & CHARTERING We bring value to both spot- and long-term LNG trading, and create a flexible LNG sourcing solution for regasification projects SHIPPING & OPERATIONS Providing for the safe, efficient flow of energy, our personnel are uniquely qualified to manage regasification vessels FLOATING LIQUEFACTION Effectively monetize both onshore and offshore gas reserves with Excelerate’s Floating Liquefaction Storage and Offloading (FLSO) Vessel 10 FSRU: Overview An FSRU is an LNG carrier with the onboard capability to regasify LNG into natural gas • Mode of operation depends on environmental conditions − Open-loop vaporization uses sea water as the heating medium − Closed-loop uses a recirculating loop for freshwater onboard, heated by ship’s systems • Excelerate’s FSRUs are flexible, allowing for conventional LNG loading with discharge: REGAS KIT − As liquid at a conventional receiving terminal − As gas through a high-pressure gas manifold − As gas through a subsea buoy system Copyright Excelerate Energy L.P. 11 Mooring Options Typically, an FSRU is permanently moored to a docking facility at a location close to a market access point. • Infrastructure is tailored to fit specific project requirements • Excelerate offers two basic solutions, although others (including spread mooring) can be done − Dockside GasPorts − Offshore Gateways • Geography and ocean conditions largely dictate which solution is the right choice for project Copyright Excelerate Energy L.P. 12 Mooring Options: GasPort A GasPort is a dockside regasification configuration either at or near shore. • A range of configurations are available to allow implementation of fast-track solutions in a variety of environmental conditions • Installation time ranges from 9 to 12 months, depending on site complexity and tie-in requirements SEA ISLAND SIDE BY SIDE ACROSS THE DOCK Copyright Excelerate Energy L.P. 13 LNG Delivery: STS Transfer Excelerate pioneered LNG ship-to-ship (STS) transfer, which maximizes the capabilities of FSRUs by allowing for a uninterrupted supply of natural gas to market. • Continuous regasification possible during transfers • Proven technology tested in the oil industry • Excelerate has the most LNG STS experience in the industry − > 800 STS transfers have been completed to date − Equivalent to > 85,000,000 m3 of cargo − Developed the procedures that are now the guidelines for the industry STS - SUMMARY AS OF: ACROSS THE DOCK HARD ARM TRANSFER 10/23/13 OPERATION COUNT TOTAL (CuM) EE Vessels 109 10,342,949 3rd Party Vessels 692 74,711,554 Total 801 85,054,503 Copyright Excelerate Energy L.P. SIDE-BY-SIDE HOSE TRANSFER 14 Gas Delivery Excelerate’s FSRUs discharge high-pressure natural gas to shore via pipeline in one of two manners • GasPort: Gas is discharged via high-pressure gas offloading arm, with no cryogenic piping required on jetty • Gateway: Gas is discharged through a subsea buoy linked to a subsea pipeline • Wide range of throughput available – from as little as 50 mmcfd to over 1.2 bcfd Copyright Excelerate Energy L.P. 15 03 Floating Regasification Projects Copyright Excelerate Energy L.P. 16 Bahía Blanca GasPort® START UP: COUNTRY: PROJECT ROLE: KEY TECHNOLOGY: COUNTERPARTY: BASELOAD CAPACITY: 2008 Argentina Integrated Project Team, Commissioning Operator Training FSRU, HP Gas Arm Control System Repsol-YPF 500 mmscf/d Copyright Excelerate Energy L.P. 17 GNL Escobar START UP: COUNTRY: PROJECT ROLE: KEY TECHNOLOGY: COUNTERPARTY: BASELOAD CAPACITY: 2011 Argentina Strategic Partner, Commissioning, Operator Training FSRU, HP Gas Arm Control System JV Repsol-YPF 500 mmscf/d Copyright Excelerate Energy L.P. 18 Mina Al-Ahmadi GasPort® START UP: COUNTRY: PROJECT ROLE: KEY TECHNOLOGY: COUNTERPARTY: BASELOAD CAPACITY: 2009 Kuwait EPC, Commissioning, 1st Year Operations FSRU, HP Gas Arm, Control System, Cryogenic Transfer System Kuwait National Petroleum Company (KNPC) 500 mmscf/d Copyright Excelerate Energy L.P. 19 Hadera Gateway START UP: COUNTRY: PROJECT ROLE: KEY TECHNOLOGY: COUNTERPARTY: BASELOAD CAPACITY: 2012 Israel Consulting Services FSRU, STL Buoy Israel Electric Corporation Israel Natural Gas Lines 500 mmscf/d Copyright Excelerate Energy L.P. 20 Northeast Gateway ® START UP: COUNTRY: PROJECT ROLE: KEY TECHNOLOGY: COUNTERPARTY: BASELOAD CAPACITY: 2008 USA EPC, Commissioning, Operator FSRU, Buoy Excelerate 600 mmscf/d Copyright Excelerate Energy L.P. 21 Teesside GasPort® START UP: DECOMMISSIONED COUNTRY: PROJECT ROLE: KEY TECHNOLOGY: COUNTERPARTY: BASELOAD CAPACITY: 2007 2013 UK EPC, Commissioning, Operator FSRU, HP Gas Arm, Nitrogen Blending Excelerate 400 mmscf/d Copyright Excelerate Energy L.P. 22 Guanabara Bay START UP: COUNTRY: PROJECT ROLE: KEY TECHNOLOGY: COUNTERPARTY: BASELOAD CAPACITY: 2014 Brazil Strategic Partner, FSRU Construction , Commissioning. Provided bridging FSRU in 2012 173K FSRU Petrobras 800 mmscf/d Copyright Excelerate Energy L.P. 23 Aguirre Offshore GasPort® START UP: COUNTRY: PROJECT ROLE: KEY TECHNOLOGY: 2017 Puerto Rico Owner & Permitting, EPC with Cost Pass-Through, Commissioning HP Gas Arm, Control & Transfer Puerto Rico Power Systems, Sea Island Infrastructure Authority (PREPA) Copyright Excelerate Energy L.P. COUNTERPARTY: BASELOAD CAPACITY: 400 mmscf/d 24 Gulf Gateway® START UP: DECOMMISSIONED: COUNTRY: PROJECT ROLE: KEY TECHNOLOGY: COUNTERPARTY: BASELOAD CAPACITY: 2005 2012 USA EPC, Commissioning, Operator FSRU, Buoy Excelerate 500 mmscf/d Copyright Excelerate Energy L.P. 25 Port Qasim LNG Terminal START UP: COUNTRY: PROJECT ROLE: KEY TECHNOLOGY: COUNTERPARTY: BASELOAD CAPACITY: 2015 Pakistan Strategic Partner, Commissioning, Operator 151K FSRU Engro Corporation 690 mmscf/d Copyright Excelerate Energy L.P. 26 Jebel Ali LNG START UP:`` COUNTRY: PROJECT ROLE: KEY TECHNOLOGY COUNTERPARTY: BASELOAD CAPACITY: 2015 Dubai Strategic Partner, FSRU Upgrade, Commissioning. Provided bridging FSRU in 2015. 151K FSRU DUSUP 800 mmscf/d Copyright Excelerate Energy L.P. 27 FSRU: Advantages COST AND FLEXIBILITY MINIMAL FOOTPRINT • More cost effective than • Requires less land use that traditional land-based solutions, results in smaller environmental and can be moved or removed footprint, and allows placement over its lifetime. in areas where siting is difficult or space is constrained. TIME EFFICIENT EXCELERATE’S EXPERIENCE • More time efficient, with • Excelerate’s experience ensures implementation possible reduced design time, quick within 1 to 3 years versus landidentification of long-lead items, based facility timelines of at rapid identification and mitigation least 4 to 6 years. of project risks, and accurate cost estimates – plus one point of accountability for a project. Copyright Excelerate Energy L.P. 28 Fast Track Project Delivery: GNL Escobar GasPort • Lessons Learned: Greenfield - October 2010 − Proven Modular Design saves time & money − Safe − Reliable − Efficient Commissioned - May 2011 Copyright Excelerate Energy L.P. 29 29 Fast Track Project Delivery: Port Qasim GasPort Existing infrastructure - August 2014 Copyright Excelerate Energy L.P. Commissioned - March 2015 30 30 Bringing Ideas to Reality: Project Execution Roles FULL EPC Management of all Engineering, Procurement, Construction, Commissioning including subcontract work EXCELERATE ENERGY WORKS WITH CUSTOMERS’ TEAMS TO FULFILL SPECIFIC PROJECT NEEDS SUBCONTRACTOR Management of critical components at a facility Copyright Excelerate Energy L.P. OWNER’S ENGINEER Oversight role in EPC activities, hired by client for Excelerate's expertise to oversee and advise FEASIBILITY STUDIES Provides clients with basic design and functionality studies for them to make further decisions 31