PLSD Comprehensive Technology Plan 2116
Transcription
PLSD Comprehensive Technology Plan 2116
______________________________________________________________ Pickerington Schools Technology Plan • 101 Special Technology Projects Mobile MIT Fab Lab In January 2014, the District joined a 15-school consortium, known as the Innovation Generation, to add pathways for students in career fields that had a definite need for future applicants. The consortium submitted a Straight A Grant in the amount of $14.4 million and was accepted. Part of the Innovation Generation was the creation of a Mobile MIT Fab Lab. The PLSD Fab Lab is shared between Lakeview and Ridgeview STEM Junior High Schools. The Fab Lab is a 32-foot long trailer with Dodge Ram 2500 Reg Cab. The Fab Lab contains: • • • • • • • • Laser Engraver Techno CNC Wood Route Table Stratsys 3D Printer CNC Mill CNC Lathe Vinyl Printing and Cutting System Small tools workbench Motoman Robotics Workcell All materials and equipment was purchased with a five-year warranty (September 2014 - 2019) and enough usable material for a five year period. For more information about the project: http://innovationgenerationohio.com/ Distance Learning Lab Additionally as part of the Innovation Generation Straight A Grant, the District built onto the existing Biomedical Health pathway with the creation of the Biomedical Health Innovation Lab and the Distance Learning Lab at Pickerington High School North. The goal of the Distance Learning Lab is to allow student in College Credit Plus courses the ability to interact with college/university professors in the courses that are currently being taught in the District. The Distance Learning Lab includes a Polycom RealPresence Group 700 codex and EagleEye Director with three mounted 60” displays. Accessories include ceiling microphones and speakers and Polycom TouchPad Display. There is a five-year warranty on all parts for the Distance Learning Lab (August 2014 - 2019). ______________________________________________________________ Pickerington Schools Technology Plan • 102 PickConnect Partnership Program The PickConnect Partnership program is a a three part community partnership initiative that allows access to devices and the Internet to all students and staff in the district. The goal of the PickConnect Partnership program is to give all students in the District the ability to have digital anytime, anywhere learning regardless of race, disability or socio-economic status. Part One is the device - The District by going to a 1:1 environment will provide all students with a device. Students in grades 5-12 will have a district-owned device that is in their possession throughout the course of the academic calendar. Students in grades K-4 will be at in a 1:1 environment while at school with the ability to check out a device (from the media center) if a device is need for learning at home. This is an extension from the pilot held at Tussing and Fairfield Elementary Schools in the 2015-16 school year. Part Two is the access - The District is supplying the device, but with most of the instructional application being cloud-based, Internet access is also needed. Through a partnership with the Pickerington Chamber of Commerce, we have identified a number of local businesses that will permit students to use their business’s WIFI. Gold Star partners have also been identified to provide financial support for extending the PLSD WIFI to the high school athletic stadiums in return for advertising rights on the PLSD authentication page. Additionally, one outside access point will be added to each of the buildings so students can access the Internet at anytime through the filtered PLSD network. Part Three is additional devices and additional access - A partnership between the District at numerous area apartment complexes and churches to create digital study stations to get more devices and further access into the hands of PLSD students. In the partnership, the District will provide the devices (desktop computers) and the apartment complex or church will provide the space and Internet access for the study station. ______________________________________________________________ Pickerington Schools Technology Plan • 103 page left blank intentionally ______________________________________________________________ Pickerington Schools Technology Plan • 104