ffi urat - 395 003. RF - Gujarat Pollution Control Board
Transcription
ffi urat - 395 003. RF - Gujarat Pollution Control Board
GUIARAT POLLUTION CONTROL BOARD REGIONAL OFFICE, SUMT urat - 395 ffi 003. RF It- is hereby informed that as per the Ministry of Environmen! Forests & climate change, Government of India, New Delhi vide its notification no. s.0.1533 dated L4/09/2006 and subsequent amendment s.0. soiz (El dated oitti'iio09, pubtic Hearing was fixed jorSrongsed Proiect of M/s. KEIRIWAI INTEGMTED TEXTILE PARK PvT' LTD; for Textile Park with common Lffiuent Treatment plant (cETp) having 2.5 MLD capacity with recycring facirity su-uy No. 328, 333, 340 to 344, 358 village: Kareli, Ta: parsana, Dist. surar, "i GUTARAT 11?^? 30.10.Zors at 04:00 p.m. onwards at project site, sunrey No. g26,gzg;40 ong44,3sz& to 3sg village: Kareli, Ta: parsana, Dist surat (Guiarat), which is covered under Category-' B' of the Schedule. A copy of the Draft Environment Impact Assessment Report and the Executive Summary of Draft Environment Impact Assessment Report were sent to the following authorities or offices to make available for inspection to the public during normal office hours, till the public Hearing is over: 1. 2. 3. 4. 5. The District Collector Office, Surat. District Development Office, SuraL District Industries Centre, Surat. J-"luF Development Office, Ta. palsana, Dist. Surat. The chief conservator of Forests, Ministry of Environment & Forests, Gow. of India, Regional offic9 fwest Zone), Kendriya paryavaran Bhavan, E - s, Area Colony, Link Road - 3, Ravishankar Colony, ghopaf-a6 OtO. Regional office, Gujarat pollution controiBo".d',338, Belgium square, opp. Linear Bus Stand, Ring Road, Surat _ 395 003. i Executive summary of Draft Environment Impact Assessment Report was also circulated in surrounding villages for effective p.iuri.itv. other concerned persons having plausible stake in the environmental aspects were send their responses in writing to rhe concerned regurarory fi?ff:,T3r.. An advertisementin English was published in "Times of and in Gujarati in "Gujarat samaihar" India,,dated 26.09/zo1s dated z6.og.zots. shri P' N' Makwall?, c-es., Resident Additional collector and Additional District Magistrate, surat supervised and presided over the entire public hearing process. A statement showing participants present during the public Hearing is enclosed herewith as Annexure A. Page I of2 GUIARAT POLLUTION CONTROL BOARD SUMT REGIONAL OFFICE, 338, Belgium square, opp.Linear Bus Stand, Ring Road, surat - 39s ffi 003. {F A statement showing the salient points highlighting issues raised by the participants and responded to by the representative of the applicant during the Public Hearing in English Language is enclosed as Annexure B and in Gujarati Language is enclosed herewith as Annexure 81. The representations received in written from the other concerned persons having plausible stake in the environment aspects before and during the public hearing are enclosed as Annexure c-1 to c-6 and replies from the pr:o;ect'propon.nt to the same are enclosed as Annexure D_1 to D-6. \>=- A,A r,4{ a tttttt Place: I(areli, Ta. Palsana, DisL: Surat Date:30.10.2015 t./ ^l*'tl f. K patel Regional Officer, GPCB,Surat As Representative of the Member Secretary, GPCB Encl.: 1. Annexure A, B, 81, C-1 to C-6 and D-1 to 2. Video CDIDVD of public Hearing. P. N. Malrwana c.A.s. Resident Additional Collector and Additional District Magistrate, Surat D_6 as above. Page 2 of2 GUJARAT POLLUTION CONTROL BOARD ffi !l{'llF REGIONAL OFFICE, SURAT 338, Belgiunr Square, Typical 1't Floor, Opp. Lincar Bus Stand, Ring Road, Surat. ANNEXURE _ A A statement showing participants present during the public hearinq As per the Ministry of Environment & Forests, Government of India, New Delhi vide its notification number S.O. 1533 dated 14 September 2006 and subsequent amendment S.O. 3067(E) dated 1't December 2009, Public Hearing was fixed for M/S Kejriwal Integrated Textile Private Limited (KITPPL) for proposed establish integrated textile park and Common Effluent treatment plant (CETP) with 2.5 MLD capacity at Bfock No.328,333,340, 341,342,343,344,357,358, Village: Kareli, Ta: Palsana, Dist-Surat. The statement showing participants present during the public hearing held on 30.10.2015 at 16:00 hrs at projectsite Block No.328,333,340, 341,342,343,344, 357, 358, Village: Kareli, Ta: Palsana, Dist: Surat is as under' q,t r{a uqlq?ql uataa, "tdt [0cdt'tt ttc]tottut 8:-l'i5: ilil.Ul'.1ttg E, dr.ru/oe/?oo9 ?{a R,tr qd[+r UUr?t. sHis r],+t.utL. 3o9o (tl), ctl..ot/e.?/?ooe ?,r{rir{ra il }vfl.tct oRcJ}s }aaroet t{r8 ur. c'{l t}rrtttld[r{lr{lrlctt. +t{ "i. att?cr +ttgt?ou uta 3qC, ctLr|' SttG{1, ctLCJS-I UGt+tl'gl'[, E) r.,ti s-Iu+ tJ5c1?{oe flal."a wtroa tdltldtr{ll e.\t U?d q{ld tl@c)}s )AarOe utt rl{Aet$t &:{cu. rtr} %c}r alsqat+gft"j rrttulv+ ctl..3ole.o/?ot\t 'tt t-I?t ts'oo 5([], ul*ra tu.n q?, l. lvfl.ua oRcJls )aaulct urt ur. c'ft tlurttldtr{tr{trlel. il{ "i. cl'l}t 5t}c'{:|., dtcjs-I qautq[t', u' 3 ?C,333,3YO,3U1,3U?,3U3,3UU,3qO r{a 3qc, 3 ?C,333,3UO,3U1,,38?,3U3,3UU,3\tO q?d Wa ?tl,tqtl{i U{[aCa. ttae al'sq'ttqgft e?]rrtoi cstgf? ?&c.ti c1]4"ft e{rdl Sr. No. Name and Designation Organization / Village Name s{s 'tt{ r*a AEf {Nructt}t :L I '*(f t cL\ oua' ttlf'w'^'t z 6 3 P,osuP62 <h /T/" r I o[ 'j 'ttt+ S-rJ t4a'-,al i gu,€f-A - 6 "ftl {9'ot D' Signature udl ^ rv 4ro(a GUJARAT POLLUTION CONTROL BOARD REGIONAL OFFICE, SURAT 338, Belgiunr Square, Typicat Sr. No. sl{i5 h 5" l" Floor, Opp. Lincar llus Stand, Iling Road' Surat' Name and Designation Organization / Village Name atx rrti. O-lel. +iWryctp+ ut c--\ Q -'r'R n' '\1 1, ^.., 1 -\^\^C\s - <nr.O4/ n tr Mil\*J bf.J.r € 1$-1""o F'C.41' 1 Mqn,"sh B-Pate,t ( n\LlKEsh. m I t_!) J ^r** ildt hn..n,^ €"1a"* 89*01'x-- v2 @ k1*'d4 ... *'fr*e n14p4/L,u.fuL t/.rtL M..7 I pen a1 P ("e'l L$Ll-i (.,+-rt q,1" q)r.*f t?. |/^ $lptr--.-u< Ut-a't^wt -wO *..:fr',J €*).4 /l U \} g>.r r.rga\rli4 Vq )+ 4"'tl, y c,ldna 1{ 16 q" "j atu Signature KoS ,"'''/l Ita]'r, lcx:eJ*{ qnb-dLt A-"^e wr,ffit Aq>r*, Rr dilw Rono.* . B' P'a{(\t ' LluvcLi A, 0 Pqt( C-,)2t- \rn, Q"tl 5 / Ay q. s1l/t/ r\cvt \t{c/7 z oL ( r );dt epy a-r.v' Y. { GUJARAT POLLUTIOI{ CONTROL BOARD REGIONAL OFFICE, SURAT 338, Belgium square, Typical 1"t Floor, Opp. l,ilcar llus Stand, Ring Ro1cl, Surat. {i{rur1{ "j arU bnss {g\*Ja w ,?fl"\r€ ?'td6t0a$r t< 4.o "?2 4.+ O +{^B\ yn 4-3 .?,r krlpr a./ a/t'l- e-a>tr?fJ(r'.1n [t>ta l\t- 6.rlZtze,tn l{: e ----------2--- ,\ td dt 9dc{ A.ot(16\ ufi1t\ (^ q^l'\ n_ aK97v7'< =<= :- 4,t )OlX s) ytr?, [-tq -tS gw*a@-(* &xt+t n \€q;n;xre-Ia\$S ffi $bfi F9r.s\4 t /L+y \e a4zif7T-t Jo 31- Ivw dr\.( 1 {</#/1?/2t- 6(.e n1,u6l Rn- ulftffitg9r'ra I/ \ uffiq6 P. zr l,\^i) s'{\ 4l' r< ,dw4 T{.)*tr1 5et'tt<a.- r{&A 2;f4 La-^n \ 1 iL )a QQ 9r?t''l^\ r,".1 Hr Totft<lo Signature ud[ Organization / Village Name Sr. No. Name and Designation s:{is "ttl{ ?44 6]El rT/^ p)qnrfd ,^hq \<t-C z o[ 6 4f GUJARAT POLLUTION CONTROL BOARD :-:---,-:- REGIONAL OFFICE, SURAT ffi q"q;r l't Floor, Opp. Lincar Bus Stand, Ring Road, Surat. 338, Belgiunr Square, Typical Sr. No. Name and Designation Organization / Village Name slris +tu r4i. elqf ri+Euctru 3L 33 3r Er+ 3t 3e 3( /iI /5t de / | ,u\/ 6t 2e1r,,^ S4ilYh Q^L)rr';,n)-t (-nl gtr a\h. ?pr olfhor'4,.it I\-Dq- ) t ft/? *,Le;l --eritn- oftTnt rL 3m t{ h/ "fi.r*g', qo \-t e^ s L-^1 s,Ln -€\Jc-n Trzrq - ./ I 4a-eL ASh*)o\ / ot otl l"rsl 'rl it\ qn J azr'gqo-1re! of \l.t- t,iU -, *F -_-DA \/'\ - diw,I q.crl n{h^s& rt,Iu)a kt& ,K-hl&^ 4 ,rr e4 YmA &1 t r 6"ir Arry 8"raf - d\"'q C,l^-q arrup c\ ,/1 +I+ yLC ?o ds t\ Cy{L{4 D,n,,e:zE - (t.7 alr+? l'.21fr ?rrele-J--{ Q"1,?- JE s futttt4 D.*+r^ D.tnA, .- , O=a, ,#e,-t / 3( Ug yt^ 'j aru Signature u6[ o[ A GUJARAT POLLUTION CONTROL BOARD REGIONAL OFFICE, SURAT .-:::*:;--i ffi a!.7F 338' Belgiunr square,'Fypical I*t liroor, opp. Linear llus stanr!, Ring Road, surat. Sr. No. Name and Designation st{i5 'tu+ uti elql Organization / Village Name {Nrucrrl+ a3 \hr*Lcfi,n i l<isl,ot bl-; l^kf TD $;VLnuqhafbhqi Qqrnqa ?r( .++4r.^'"1' KA p= oL-*...-..l-k* -4*"r. \.f o ( \v \r "q3 13 w'o rc*-u) 6i.n V--- f/-/L ( Ja^!.er[; .0*-t. tl t tJrl W*Pr,*,t*!'J)s" SlLvrnra nf{tl ' 9r^-^S*l 14 Kaqrl- Atrrr Sl LKru,tB kr4yT", #\hJ-, Nrr'A1+,r [*' =?,f,\(tr \ fu^ru C (,/- {ai64^,8 \( 6@;;a \k @q" P"r,q2q ft4t /tf)^b., o-s$ \ & Jt{cr 22-t<q1 dry'4.rry | ry G \ry-- G{ q1\a. \ ll,l,wnrol l4l-'lJb /, \ 11: 2{g \e eM- l^--,.t0^ Mlj Signature udt w@ VuJ?-^A rllf- \v h-.i.t," \l "j +tu 8'? .n .-5t J^1 5 of 6 ordq t. .. & GUJARAT POLLUTION CONTROL BOARD REGIONAL OFFICE, SURAT 338, Belgiunr Square, Typical l" Floor, Opp. Lincar Bus Stand, Ring l{oad, Surat. Sr. No. Name and Designation 5]{ls +rr+ rrti elqf 3o na/,,4 Organization / Village Name riWructrq (e "j +ru g/TDf? Signature udl fiP/L*- 3r gaRU'rAcr qricl'l i&q St "glIU(tq f-foV c"\ / 5lZ'l sft,fu 5t{€{\ sRv 3s St g\ g3 gs t( gk 9o 9L tvl \^ J(l k{ B. rlqlhurj A".-j+ \J 9^.; x}deJil a"''Je q, "t\crcr*.J S ),.,.-t q. OJ Gt <-^.-S q! 6ti.,{1 .n}.,f; ctiol}"{-, {J*L"4 { a:-. . 11 --_ l, ba*i s,rfu, l f""""'t /tr^^ ^''Ut* WA kr^J-v C^h^f.lt'a^4 6-,.*-r,t krtk 6 oA ( N^,Y -.-1 tu n-{bL G, Annexure -B (ENGLISH) A Statement showing issues raised by the participants and responses given by the representative of the applicant duringthe public Hearing As per the Ministry of Environment, Forests & Climate Change, Government of India, New Delhi vide is notification no. 5.0.1533 dated L4/09/2006 and subsequent amendment S.0. 3067 (EJ dated 0L/L2/2009, Public Hearing was fixed for proposed Project of M/s. KEIRIWAL INTEGRATED TEXTILE PARK pVT. LTD; for proposed to establish Integrated Textile Park along with Common Effluent Treatment plant ICETP) having 2.5 MLD capacity with Recycling facility at Survey No. 328, 333, 340 to 344' 357 & 358 Village: Kareli, Ta: Palsana, Dist. Sura! GUIAMT covered under Category-"B"i Environment Public hearing was fixed at project Site, Survey No. 328, 333, 340 to 344, 357 & 358, Village: Kareli, Ta: palsana, Dist. Surat (GujaratJ on 30.10.2015 at 04:00 p.m. ResidentAdditional Collector and Additional District Magistrate and Chairman of Environment Public Hearing, Shri P. N. Malrwana c.A.s. supervised and presided over the entire Environment public Hearing proceedings. Shri f'K.Patel, Regional officer (Ro)- Gujarat Pollution Control Board (GpcB), surat and Representative of the Member secretary-GPcB sought permission from the Chairman to staft the proceedings. Regional officer-GPCB welcomed all present in the Environment Public Hearing and outlined the various provisions of the EIA Notifications and briefed the process for conducting this public hearing. He stated that during this Public Hearing, Project Proponent will make brief project presentation about their project and then will give the replies to suggestions, objections and questions raised by the affected people, which will be also recorded and forwarded to the competent authority. He added that as per the provision of the Notification only local affected people can represent orally and other interested people who have given their written representations will be considered in the proceedings. Thereafter, Shri Girdharilal Kejriwal, Director, Kejriwal Integrated Textile park pvt. Ltd', gave information for the proposed project and representative of the consultant made presentation in Gujarati covering introduction of the technical information, details of proposed project, Environmental Management system, its impact on the environment along with proposed mitigation measures and industry,s proposed activities regarding corporate social Responsibilities. Thereafter, with the consent of the Additional District Magistrate the forum was made opened for the representations opinions suggestions / of the local affected people. / Page 1 of 10 - During Public Hearing Questions raised by people present and answers given by the representative of the applicant are as under. Sr. 1. proiect Vill: Kareli, proponent He stated that, report of the Company's Representative presentation shown over gave the copy of the here should be given to us, presentation. Ta. Palsana, as we will forget Dist: Surat presentation shown Shri. Mukeshbhai Patel 2. Replies from Points represented Name the over here afterward. Shri. Manishbhai He asked that, whether the Maganbhai Patel, employee of the company Vill: Gangapur can remain present in the Ta. Palsana, Public Hearing? And if they Dist: Surat can then state us the position of employee those attend the Hearing? Because 70 o/o of the people sitting over here employee the who can are Chairman stated that, this is a Public Hearing, any local person can attend this Public Hearing and any number of the affected peoples can attend the Public hearing. There is no question about number of people present. of company. Whether they have come to show number of people present in the Public Hearing? He further asked that, Regional Officer stated that, there any provision of notification is required to be giving the notification of given in the Gujarati and the Public Hearing to the English daily local Panchayat? newspaper before 30 days of the Public Hearing and the same was done. That notification was also given in D.D.O. office, T.D.O. office, District Industries development Center, District Collector Office, District is Panchayat 0ffice, G.P.C.B. Office and to all Page 2 the of 10 Panchayat offices surrounding villages. He further asked that, of Company's Representative which consultant company state that this E.l.A. report is has prepared this E.l.A. prepared by M/s. Detox Report. Corporation PW Ltd. surat. He further asked that, Consultant Representative whether the company who stated that, They have has prepared the E.l.A. obtained accreditation report, have a proper earlier and submitted certificate issued by the renewal application further Central Government for the certificate is uploaded preparing this report? online by the Certificate Agency which one can be seen online. Chairman added at this iuncture that whether the reply given by the authority whatever question raised here is satisfactory or not, that will be decided by competent authority Shri. Manishbhai Patel further added that, there were protest in the Public Hearing held in this area on previous occasion, however no one listen to us afterwards. If only formalities are to be performed then there is no meaning. Chairman added that Public Hearing is conducted as er the provision of the Notification issued by Government of India. The replies given by the project proponent of the questions raised verbally here and written replies to be written representation received would be forwarded to the competent authority. This panel has no jurisdiction to take any decision. 3. Shri. fagdishchandra Patel, Vill: Kareli, Ta. Palsana, Dist: Surat He stated that, for the knowledge of the Public Hearing, notification of the Public Hearing should be kept in the besides villages on the boards. Factories are in the center of the lands of the agricultural land of the villagers. Page 3 of 10 of Company's Representative the nearby company's further stated that, our plant entering into our is of water-jet looms plant. agricultural land we are In this plant we are going to suffering loss. So, survey of separate oil and grease from the same should be done the water and processing it and whether company will be reused. Due to the polluted water give compensation in would any any damage takes place due to there plant. Chairman stated at this juncture tha! one should take into consideration the fact that for which project the Public Hearing is conducted. The proposed project here is about treatment plant of waste water where there is proposal for reusing the waste water after treatment. The representation for other issues raised can be made separately to G.P.C.B. and G.P.C.B. would take necessary action in this regard. 4. Shri. Mukeshbhai He stated thag if this plant Balubhai Patel, is not going to create any Vill: Kareli, pollution then what is the Ta. Palsana, requirement of the Public Dist: Surat Hearing? He further asked that, Company's representative whether any survey has stated that, company has been conducted by your assisted the village for company for the loss which making the road. When the we suffer due to your plant bench was required for the which is running since village school company has 20L2? What steps did you assisted village school. We company has taken for the are assisting the village health of the people? whenever village needs help. He further said that, my Chairman asked to company's representative to for give details of what the company has done for the health of the villagers and what is going to be done in question is not for financial assistance health. but it is Page 4 of 10 future? Company's check-up would be held. He added that we will carry out other health activities as per the suggestions of the villagers. He suggested the company that proper steps should be taken for the health of the villagers and medical check-up should be done on the 3 months of interval. He added that there may be indirect adverse effect which may not be visible and if there are any effects on agriculture that should be studied. Is there any survey conducted in last three years? 5. ^ Shri. Manishbhai He stated that, first of all Maganbhai Patel, certificate should be shown Vill: Gangapur, then after this Public Ta. Palsana, Hearing should proceed Dist: Surat. further. Company's Representative stated that, as per the scheme of the Government of India certificate issued to us is for 3 years. Status is updated online on every 10ttt day of the month. It is to be renewed at every 3 year. Re- accreditation certificate is also issued for 3 years. However as the scheme has been changed so still it is not given to us and it is notified that these agencies can prepare E.l.A. report. And by Dec. 2015 we will get the Official Re-accreditation Page 5 of 10 ceftificate by Q.C.l. Regional Officer stated that his representation has been noted and whether to consider the reply given by consultant valid or not that shall be decided by the competent authority. There is no provision to give any written approval during the Public Hearing. He further stated that, whether this Public Hearing can be considered legal without certificate? further asked that He G.P.C.B.'s officer is present here whether he gives the approval to the letter given by the consultant? He further stated that, after getting the certificate by the consultant Public Hearing be conducted again on any other day. As the survey has the should been carried without certificate, it cannot be considered valid. Therefore, this Public Hearing is not acceptable to us and shall be treated as finished here. He re-iterated that we are not accepting this Public Hearing. Page 6 of 10 Chairman stated that, the p"rti.ip Public Hearing as finished. He further stated that, the points raised by him here are Shri. Mukeshbhai Balubhai Patel, Vill: Kareli, Ta. Palsana, Dist: Surat He stated that, how we will Company's representative I come to know whether the whatever company got the approval decision will be taken in the or not, after sending the Gandhinagar related to this repoft of Public Hearing to project will be published in stated that, the Gandhinagar for the Gujarati and English decision making? daily news paper and will be also uploaded on the website of the G.P.C.B. He further stated that, we should also get the copy of the E.C. which will be given to the company, so that we Company's representative stated tha! we are giving undertaking that one copy of the E.C. will be given to you can know the conditions and if required, company subject to which E.C. is will discuss with the given. villagers about the conditions of the E.C. Shri. Manishbhai He stated tha! survey done Maganbhai Patel, without the certificate is Vill: Gangapur, illegal. So rhis public Ta. Palsana, Dist: Surat. Hearing is illegal and so it is be cancelled and he added that he treats this as cancelled. to While raising other Company's representative questions he asked where stated that, filtered water will be the filtered water be will be stored and then after disposed? water will be given to different companies. He further stated that, you Company's representative stated in your presentation stated tha! water which will that this water will be used be used in the garden will be in the garden. Then it checked in the company,s should be stated that which laboratory and then after it Page 7 of 10 f quantity of water will be used and whether any test would be conducted before using for gardening? He then after giving the specimen of the certificate to the panel and stated that this is the right specimen of the certificate. He further stated that, we have certain demands. They are as follows: If the plant starts working here then, (1)One committee should be formed in the village under the chairmanship of the District Collector in which people can represent their problems and bring out its solutions by discussing it with the company. (2)That comminee should empowered for inspection. (3)Bond of Rupees crore should taken from company as guarantee which be under authority Collector. Page 8 of 10 (4) Committee should be formed under the chairmanship of District Collector consisting of nearby company and the committee should be vigilant to ensure that government subsidies should not be misused. He re-iterated that E.l.A. report should be cancelled and if possible Public Hearing be conducted again after the consultant receives the certificate. should Shri. He stated that, I support the fagdishchandra Patel, Vill: Kareli, demand raised Ta. Palsana, Dist: Surat by Shri Manishbhai. He added that the company employees are present here and they should be asked whether they use any equipment for their health and safety. Shri. Manishbhai He stated that, minutes and Regional Officer stated that, Maganbhai Patel, video recording of the proceedings prepared will Vill: Gangapur, Public Hearing prepared be uploaded on the web-site Ta. Palsana, should be given to us. then additionally the copy Dist: Surat. will be given to us. Page 9 of 10 Regional Officer stated while concluding that all oral and written representations, suggestions have been recorded. Whatever oral and written representations have been made and video graphy of the Public Hearing is also done, will be submitted to the concerned authority. The replies given by the project proponent would also incorporated in the proceedings and will be submitted for further action to the Competent Authority. As no further representations received, Public Hearing was concluded expressing thanks to all present. \ Place: Kareli, Ta. Palsana, Dist.: Surat Date: 3O/IO/2O15 40"^ K Patel f. Regional Officer, GPCB,Surat As Representative of the Member Secretary GPCB Y P. N. Makwana c.A.s. Chairman of the Environmental Public Hearing and Resident Additional Collector and Additional District Magistrate, Surat A. Page 10 of 10 f,i.ae-dlt ctl.s qtqtet.ft u"ttqe0 eaurr+ €tqre e&ct elgf flet etr seqt{'t r,ttile qqtr,il u[iR[Q flat qluqtlr't r,tta,e vqtc qi r{tqretc"tt q't r-tqlqegt, ctot rrti. rcn ctg u{cd't }iatatq, otdl [tcd["tt a{.?ct tt?gt?ott gr+ts:il.il.rrl.. trrg3 qi qn&e'tu+t lar utft't gt{t?t srris A.il.urL.3o9o (tt) cu.. ot-t?-?ooc ou. ?4ccttr lnd lqrflqta tt,{tc)}s }Aattlct qr3 utoa,a (dr{l}s, nd "i. 3?c,333,3xo et 3yu,3\to r,ti 3rtc, cu.r{:3tlc.{1, dt. r{ctutqtt, E). q?d,cJv?tct rrtti. sf{"t rl,qgr,t"e flal'a rtttoa (dltldtr{l), a.q rl.q.ll.ct.$[. a{at r,ri. !4: qr{?te[ c?lct+Et. +t[da i cu.. Ly-oe-?oos ]aaroat ur3 r+r}'[ q.Qa qQqfv"tr q"cril uulcegftu tiv{t ]]cr{ *dl" H[ r,ttqfl dcutre E r,ri 4{t E. r,u 4r} uql.reqftq ctls g+rcqft uftsa uu,a, ud 3?c,333,3yo eII 3uu,3\to ?rti 3rtc, c1.4:5ttc,{1, dt. qg1ilqtt, E). U?ct, cJv?tct, rrtl, at. 3o/\o/?orq +t a'Iv uiqr't[ ov'oo sar] rtucrtr+i. ?4ra.at. Rqtr{l r,t0,s Rc<tt sa.sae r,1i r,tfQs Rc<u [gQaa{l; gea i,ur qerlqeqfiq e1s g+tctqftAt r,ttaAa{l r{l.rl't.:{sAtQu. u.f,.rln. otl tutirrt dert r4t,a{AUqU &gcn r,tt elg q+tcgft r,ttqlga erd ed. s{l'.8. }. u}e, utbGls r,tCI.st{t, cJet?tct uguqt Raiagr otl.S, gaa d€n u(Rr ttRqa{l qu?tct Ugugt Raiagt qfS'u URAQ c{t} t{gl st{.{r6[ er? s?qr r,ttaaa{I"{l tttl 6q(Aa +t1i rnqstql, ir,ilrl 6.?41.6.4. afdt[$]er"r r,iclcta QOt{ frctqttlrril. r,ti al.sgarctgft'ft uBqr ouc,ti. {Rr.tHi l{ttd.{l rrut{I. luql ea3ttql b; utt als g<tctgft eall.ut't Sqdl atat u].tsa qtott lu"]er+ oue rlu?clt<t ueqt'tc[l ct].s g+tcgft:-tt Ul*sa Vul4"e 6t?t ?4tr{crrr+i ?arqel. aEt li tsS s{t {c'tQa ilet{ ilrutlleili ritsctqt{i r{tqel.. t:+q1 GU } m&r'urri"0 frcrqtO utalttl.? rtta i€rt4,8 rlil?r,tu afgf qr r{t etLg g+tcgftu'r flOs ?Vrltct sfl etgel., qrqt} fda tretqat r{oet carBar,t] adt.{l ?3r.tua dCI'ar+i stcr E l"il qr stdqRui ill{ta.er eLs-l+t gu+1, qttnrrtl., uqrctl.+t qrqtql, stqtl+i. rtt.rel' cfteu{atct }v{.uct, srqlgaa, lud }qrflqra 6Jtc)}s }aaule urt utdQa Q{l}s; gtet qQ.a t{ltldtr{l ul*se'ft r3{uc tdel {(d.ft r,rr{l qi etr?orre sottc€oeotl. URAQ 6t?t cJet?tc{l etturl+l lu"]er'r ?V s?cu:+i rrtqj. tti uftsadl bs'ftse rtt[&.ft, UQa q{lqflr'u.[ {f6.ft uulcregt ca{crwuqor qur(a, qRa Rqres dtL?o{.e a{l Page I of10 ile u4tqagt u? elo11? r4u? rli. 6U].ct gtet SeqtUl Qi1 cjlretd ouutr+l Du"]et+ saqtul qtcai. uctctl?rtl, ?'ttctatt? ttt4tRg UqRr'tf d{r?o{e r4Q.s [?c<u luQadl"fl r,r4+[iell teuG.s r4u?clid e]tt"tl ?vr4taz rrr@Utuz+jq.tl, Hr) riu ulc<tl 5sqtr+i rrtcarL. al.s garcrqft ea0.qt.'r €rqr? r8ct t€rrG,s al.s'l 6t?t Utecl}tl r,tta.ct URAQ fl?l r,il\tcttl+i. t,ttde vqtqf. "0tr Svot E. glt rJqf cV sr+te"j +trr cU setla rJetutf ui ne+i udt i{qt r{?qtet?ott u{t?rfrdr+t URRQ 6t?t ?,ttuq,t4t qta.Gr Uqrt? t s{l g}eteutl otejcrutl lxgf qrguc{ }, rrtt I lo"}eta 3u'{l't[ u[iQ[0 gtet qatqqr{ utd E i'tl ut&qre lrr'rlet+'{l arSe ule ctt. ltctttl.gtt, rrt{a, rrtUqtul r4td., Sttgt ], rrtUqtUl rlt S lu"tlet+ cctqqtr+l ?,ttd [t. grc E Q al a{l r-tRltattd {rtaretrt ltrqi b, al.s g+tqgftui r,rtaaa{lrl qrquql }, iu'ft+i r+tgutl. r,ttdl etlZ rrti. ?r{ ctlsg+tcgfl E, fr qrdl etb af sui elgtetrnt r+fdqi s'lrrqqr N{tRs rrrdl etle a r,t{a. vqttqf. r{rqtu r,ttdl et} E i: srtc,{I, ? qD,a i : ctlctge ctl.. : t{C,ttttQtt (t. : {?ct r,tl rrtta.Ct. alctl "6dqi. tr+91 r{dqi Qila citslui€Il r,ti ctl, iac{l oo asr 3u'{l+i utgutl E. {rrqtr+l t+rrG.g alsg+cgftrri etqrfl otcu.c{c{t. r4tt?clm ctfsf rrttdl srrgr 3, er} E. it{i r,tt ctl.sl r,tQ.ct E 3 3:{a sk, {rrart"il Ua efaf 'tell. ctls g+tcgft r,icf uR@ r+t) y?ctt Uq."tf stcttui rrtQ.a E r,ti {r,i[0afi qilqt stqtqi r,ttd,ct D. t{qf cgxl Uoqi ], q+tcgft"{I t uttGts r,tf0gtflr{lrl qn&ara sfl E il ?flquqi 3, 30 [t,qu uu. al,s Page 2 of 10 ri{rqai qtuqpri r,ud. s-lrt trt) lqdat qrtbe ilrrr?{t? ua c1mt.0 rrti I oir1u*i tt&era I r,tuqt"{l efq E qi utqtt+ Er I I L r,ttuqt4i *a.e I a I d[.St.utf, Uc€tt 6tr]ct t_ m&eta E. $[.$LdL I i3"g,, Uc<tt Sa.saa gLfl, Uc<rt ri?{tqc str{, u.{l.dl.o{t. '{l str{ ?4i rrttgc'tt3l'+i ctt{l'ft riqtqal.rri rrftucnq.t uttd B. Ruql cgui ,Jreq 3, d.r4r6.A. flqU sd souete"a iq'0 tr{r?r or+rctcu{ urde Et d vquqL. iq"{l4i lrqrel !, a {qll otou.crcl. n?sr? srar ua{tkr 3 }He 4r} ?,u tt.?,ttt.Q. {tqll gec'{l l. $tafa slqTlet'r u. A. A q{a.at luql cgrrt Utsql !, I iq'{lQ flqlt q'ude E. a 3q'0 qtil uRRQrl E. 3u'["ti qtqttei ], URAQA rrtl. r,tctt6 }"q OCI-runaer"j u{qrua E QIS[]et"t ilcndct E rrti {"grrtCt r4?U seqt{ rltQct E i.Hqt a rricf udt$tla r,il"tetd't i al rril.'tcttt't frtl etSf rrtqels ertar E. tsf. I I Page 3 of 10 r,ttQ 8 uaf 6u(0a s?tl E l r,ic] s"ttc€"arl. riafustes E b br+ aa a otql. iletu u.tttllgt{t Rqtq seel. a{1. r+Rqcuorl 4uql } rrtcuG'ft crl.sq'uqqflHi \tgt lde-Itl slct €af, sltl ttiottncj qeII. fr r{a rrtlu?rt{sat scqt"ft efa{ af i"tf rrtel "tell. r,ttQct qrqror ui4 utunell ] auea u?st?ou. +l.dt8]er"t"{l qtlctqt6?,t1. ?,t{ttt? al.sq+t.tg[ etu trecu{ rltd. E, *ui gutle :iQs uaf'tt 3u"0 *tt I qrqtql. rrttuqt{i rrud R qi dQc e3oral* I dQa qrqtql. r4tuqt{i r,ud E. I ar+t:{'ft "tfhr s{ u.tt[0gt{a{li r,ttaaa{If, qrqttql uroqqtul uttd E rru Q'tea. sfd Rqtq dqt'ft u.tt 'teII. qfllrql ?,tt eLs r{l qrcrdtetriq \tD,ct 3 gatcgft r+D"j qlS r,ugottg+l i: 5rtc.{1, 3, iuql 3q"["ri uRRQtl cgui qrqrql !, cul+l.u[ a1s gat.rgft"ft uR@' rrt{tt-l rlt * ra"a E r+r} {sqi frtlrl. SeII rur+ a ql.aa *a g:a+1 ctl,. UctUtqtt, R. gea ctfsfi a1s q+tctqft"{l qflqt qtq. r^etoe ?Atvotl,V qtll DSal"ft qrr{l.tl E r,ti qzil !ga{t r,ttd,e E. E. utl rr{. r<tt"e{ utq[:{IPII r,il.tla rrti cJlu'tt cttcti. ?4ctct. g{, qrqft uliln s{l s{t 6qql,ct{i d.qt'tl da. r,uyoug'{l 3q"{l4i uqllell ?41u.?t cu{t'ft Qdlqt$ti {5euor ert?{ I sitt i'tf nd srqrl{l rrttd.. ?4t tU+t"tt ,ttt'aell {sertor Elar af ai q(^d? r4rucrrr+i r,ttcrel. } }ur sqr ul.*sa"{l qarcgfl E i tati dqi frorl. rlr uftsa{l ctetutgll4t q(Bsegt qt]'n rcu"a'{l e?qrrt E 8{i ejfGsegr oue urgft {tgcr seqt"{l qtct E, q.el Gtlcla actdl t3rr,ttal U{l{lo{la r,tetcrell s{ etsrer E, *Hl r,ttaaa{lrl r,u aot* qn3uqi u{l{lo{l qac{l sralc{t0 seel.. U s{l 1}ercutt qrgarro qlcr i: sttc.{l ctt. Uctiltq[, }, ], fr ?4r 3q"{1.il rcu.oe sl6 ugqqr i{gl cgul rguqi af ?,u. ctl.s sec{t"tl. +ell gar.tqft'{l q{tata qr er Ht} Page 4 of10 R. gaa ET I iu"ft"ti uRRQtI ll+gf qgqi qtquql b, aut{ stlcft ?or? eII iu"{l rttc{l a&a E. erquql i+eII r+{a. 8 '1sett+ Etq E. cttr+i, iu"{lrl ?trt[ i'tf ct{t?t 6t?t sqttet ud otcttctc{t l{t} it€tq saqtqi, rrttd.ct Ez a{t{ iq"ft stcr E. cuq'ft qctui der Hr) qr?? €dl i{u.r€l?l Ht} sftt ilet4 gt Ez 3, eul qqr 3u"ftrl $€rar slct E. r,t {i r4l. cu:{i cleu q3 qa ett r+ee s?ctt edtfl dtQ. itgl cg vquq{ }, :{tel ua r,ttaaa{lrl 3q"0"ti 'uq[Clel il€te{ l+t} "tdt ui.J UAAQa etqrql 3, 3qdlf, cu{+i els-I"rl +cl.t€t{ {t)'tf E. +cu.rs?r HtD ste D qa qi srd qi seeitt I qrquqf. luqf 3q"{li Uq'r ?,u\i }, iq"{l4i URRQ?I cttq'ti ctlsf'tt +cl.t€t{ {t} qfcq vqrql 3, rrtl. sa{1"0s uctal dcrr frtlQ rrti. ee agt q'ttq.qt+i dA r,ri qrn'ri rrial c[{ afs-l'rl il$lsa it{i tcgct il.s?au {s-r,tq seqf fr64. i4g1 6U s{tqi ui cur+'tt el,sl, 3 tt{l.j +6[ ui.1 qe'Ia {tl s]t, Uq'r rnQ a Urugl. olsettot U.j e1u r+i Q.0 ut o{lqn rrue-Iceri. ecrar r,tnr erdl cfq .it i."rl. ?a(R{tn stuT s{qj. seql f,oA, 2rqr qdul gfo nd sarJ r.{ Er 3q'[l4i ulct lr+Q e4u.?j !, udet udtftla qatcrctt4l rrttd utjl ?,tt ct].s qrqrql i g'tt.rg[ r4tct4 crtrtaqtul qtd' tresra"{l rflr+ Uvor a{l {RqQu.tt {ctorartd : ctlctga, uRhQa 3, a{?cr Page 5 of 10 ?4{a ctt. : r{C,tttl.Qtt [t. : +J?ct (la' e3rr41a1 "} ud[6t]a ?r{.qc{.qi r{tQ 0. I g c{ ut}"j e'lq E. a e? r+6t+t'{l ro dt{Q rril.'tattl't otec{ct ut0 {sclt:{ rnd E. I ea 3 c{{ {"9 srrccr"j e1u E. {tQ}$t+t"t udt$t}a qgr 3 qd {r} r,ttqqtqi rrttQ. E. ui.J +fll+ oteeto Itctt a rrt{4, €g r,ttqqtqi uti qabr rrttQ.A +ell qile E b ?rl. rlqrClrril tJ.?,t1.6.4. flult q.ttdl et} E rli flilrote ?ottt qtll:+i sq.{l.r,ttl. 6t?t r,tqa. uil${lqa {tfl}$tu"t udt{l}a r{rqqrql r*tqel.. utbGls r,tf0nfls{lA lrqrel 3, lugl cgr+i etqrql ?!l-ttta'{l "t]q Qqt,{t !, +tdt$tla I c{ct? ?,u al.s aut{l rrudl E qi q+rcetti srut,ue SottG€oeott I I **l qfc{L utflz qdl Ur{l+tldl'u {t"q atr4ql. } }u, i r,tQst{ €t%? E a sat.a,a<t "t#[ secr"j st,r qaa {t"?tct ut0. E } }:{Z uetl+ r,tQa{t"j E rtqu?r i | I I I I I I utl ?4t arori I I dOar+i r,uuct"{l slo Page 6 of10 I d.crqul +ell. lugl ctgui vrErql 3, al. qdl r,t ctlsq'uctqft iqdli +tdt{t}a lrs{l mq flr?oile s{tell etrrtdl f,tlil strgt ! udtt$ba qcta I nd sqT 0. a l{t"q atu{l etstat +0. a lrt} r,tt al,s g+rcg[l rrtrti. rige 'tell rrti utdt Ugt sflA. +gui' qrqrql ], rlt als gatctgfti r,tl. r{lsteat 'teII. iuql r,ttaa+{lrl qrqrqi }, r4r a1s gatcgfti u&e saqt.tl. r,t[0.ste au]. +ell. iuql eg{ erq[qj ], artret rjgtr,il'ft rrtdl "t]tl seqr{ r,ttd.at E. I s{l 1}eteutl ottgQtttt ir{gl qrq[ql ], ?,1. als iq"{l4i uRRQrl g'ttctg[+1 {tq]t qrqtt erqrql b, cttll"rcrr{i ule ctitll'tcte flseqrxl rruqe]. rti. I g-Itl Relq ?4r i' srlc{l qrqrt r,u uL*sa+]. Rglq d.qrr+t uftga [Qel dcuul ctl.. qctttl.gtl., rrttqel.. af rrrqi srJ {l qnqt r,uqel. R c.lvetc{l ua R. qra Eel. 3 ?,u ul*sai Qgcct r,ic)u tRs ill+t?r.? qar+i qnde seqt:{i r,ttqqtqi ottd.a E ! "tdtZ Uel tti qrqeL .{l dq ur6e 6ua uqr u.{1.{l.o{1. lsctul it+q] cgui erquql 3, cr+i r,uqe].. I 3u"{l"ti uRROrl !, r,tl qGt{fl rrur{lrl dA } O."cttqel."e SG{lqe"U rrttUqp{ erqrql r,uqel., i"{l fls sl.{l ?lr+a. uqt r,ttqqtql tttd. SgII rrtui. ugt rl.rrtqt l."e sc{lara"u tu"{lqi uftsai su "{l ils sfr{I aui etaal.i. uttt{l't ,iV{t r4tqqt{ rlrqqt{i rltcrel, uri rrttda E. v?? erqtrq af a'{l mgr Er?r 3 etral. tiel iu'ft Page 7 of 10 ou.rrcil. ctfsf at{Ia qql o r{l 11Qua116 ulct i : ctlctge, ctl.. : tlC'tl{l.Ql.l. [i. : !?ct rtct,rartd ntE geeL. 3rr"{l uRaQa l,l{ql rgr.ql !, ud[{t}a qcr? iu"{l 6t?r I nd saqrql ?4ract qrquqi B, {[cea era.e E. a cl,rgr?rtue E. a l{t} uu uq[+] rtcte seqt{i efs U'ttc{q[ ?e s?dl frtltl r,ttqel. rrti ,{d[ a rla € aa ?e era.ct ctqi g rltgfti ?rtctct ?rtctc1 lrrql q"?r ueil. eg sat gt4i ! 3u"{lr,tli r{tqqtr+i flcee stat qtqft+], G.sta setl rrttqel.. seq.tul r,tctel.Z i qy13ttqf. il+ql cgr+i 6U }, al iq"0+i uRaQfl l)+bet'u+t q'quei 3 r4r. utq[+], 6u?rfct otcftlrtr+t qrqrqj 3, qcft?urti I qtgft"il 6uql.ct seqtql rltcre].. af f, tqttctf ] geqt{ r,tctel a laet utq['t] 6uql.ct saqt{t iq"tl"{l dqflafl:ri rrucrel. r,ri usrug[l s{ti qstilgfl seqr{i rrttqel. uti cqt?otte "tlutqt{i r,tqef } }t{Z li Gq?ncrlrl a.qtl+l rruqel. lugl crgui Qacti +tdt{}a+l 't{"tf qrqdr vq[gj ], un tudUl]a.tl urul +5it E. ntli udt$tla ut rgror"j elq E. i'l{gl cgr+i qtqttqi r,trjs uictgftr,il E. I !, r,t:{tfl "{Iil ryrr,t E. d. r,t rtttoe eti saqtql qra. cf; (t) r+t't'ftq sdsaas{l4i rrttaflUgtF+i ctu-tltl AS tuRR q'tl'q,t{ r,ud. *l{i crrq'rl ct].sf ufat'tl Uaf Page 8 of l0 ?V 5{ rje}eftr,il qa ?Ttlta 3u"ft iltO qr{ s{ [i..uegr audl etstq. (?) ile? +tQRi R{agt"{l ild[ rltUcttUi rtd.. (3 ) ?,t 3u"{l qtilell' 3Qar rls se-Is"tf oit.s dcttl+l r,uQ. 8'{l ilil sO,saes{l r-ril. e&ef. (U) tttYottg<i cu{'ti afgf r,ti su"{l }tu{li sdsaa ut&q'tr urti{erqgu. &our uQR q'ttcrcrrqt rlrQ. "?t{i uasrfl uo{+{lSt"{l A\ esl.t.tl geualct 't enq i utlR 6r?r etuqtrtl alerfl ?rttd. i:+gl yor 6U } o.?,no.A. flqlti ?€, s{, s"ttc€"ea. udtQla qATPII ersq o]q al gfl ctl.sgatcgft se.{I. c i' srtc{l }, r+'{lltatt6rl t 1gtur1 s8ct E aa uta-I crEr ctl.. qC.till.qtt, ?4{1.?t cttr{qf"tl..tl a{l qrctdterquo u}ct, l{gl erquc?j }Sl E. R. qea ctgr+i 6il{ } 3u"{l s{{{?af r,t). Ctqre E i. i{'rt rrtta-lcar utlott, ilgdl rtt}'tt tutr.tf qtul E3!:{,igtreit. e r{l lrRqeu.tt rtcr..tQr.tt i:{ql eflilei }, rru ctfs qle q'ucgft"{l t td$teil lg-l$[cr Rqra grqrr+l ' ctlctYe, ctt. : t-tC.tttl.Qtl, r^ttQ. I r{l"tlaq a'{l rls rli s-lr{l rrt{a. utbGts r,tfQstfl8{lq eryrej !, r{ cits q+tcg["{l stalqrdt .rft{ U.{1.{l.o{l.dl Page 9 of l0 l4tUcttl{l R. : +J?ct 44. d.quttla 6ut rrtuefs s?c{rl{i ?Atqel' i{ tsal ar+i. l.'ft +sct rrttUqt{ rrttqef. dclri. utbGls r,r[0st{ts{1il verql }, rleue gtllui tdQtr e3rr'tct1, UqA dQarti ?,ti r+l0sui {s{I E l, autrt"{l "tftr saqtr+l r,{Q.a E. r,tl I d0'a r,ti :l0s ?Srltcil Etl E i rli ctls g+tcgtt"tl Q$tu1c114 qqr saqtql r,td.ct E I arttrt [a,cta] {c,i[0ct rrilEf{tdt ilHet e3' SecttUl rrttqel.. Uftsa Uqf't"e Atet I q'c{tot r,ttUqt{ ?Atca[ E, R.t] ugr ur+tdet s{t srdqtdl +]tr ilal+ il.u[0st{s{li. rructrn'0 stdqtdl r,t{ {fsac{t{t rttqel.. dll.?o{.e cg sttl ua 6q(Ad ot Ectt u1+1, rruatte .arsc g{t; als g+tcrgft Ugl Eilet qrt&e saqt{ qtdl. ,f(M n l"- ctt. qctilq|'|', ctl.. 3O/tO/?Otq. cJer?tcr \\ Y 8.3.ula r{.f,."t.r{S cttBtt u.rt.f,n. utbGls rl[0gt{, uarlqtqt a1s g+tcg[+t rrttaa ?9l,st: cttrL 5tlC.0, [3. gca '| uguqr Raiagr oil.s, gea u(lqa[, c.1.U.G,.ot1S, crtdl+cu'u utiRQ ctEt +t(rat aEt F.qrt{[ ot[0.s gO.saa r4Q.s ?4a. ftrcu luQa, Uea Page 10 of10 From: [email protected] [[email protected]] Sent: Monday, October 26,zOtS 2:15 PM To: MINAXI UMESHCHANDM SHAH(GoG-GPCB Dept.) SubJCCT Fwd: PUBLIC HEARING OF KE]RIWAL INTEGMTED TEffILE PARK PW LTD Sent from my iPhone Begin forwarded message: From: ms-gpcb <[email protected]> Date: 25 october 2015 at l1:28:07 AM IST To:"@"<@> SubJECI FW: PUBLIC HEARIT{G OF KE,RIWAL INTEGRATED TEXTILE PARK PVT LTD From : JITENDRA PATEL liitendraoatel [email protected] Sent: Monday, October 26,2075 10:05 AM To: ms-gpcb; [email protected] SubJect: PUBLIC HEARING OF KEIRIWAL INTEGMTED TEXTILE PARK PW LTD Please, find out attached sheet of Kejriwal Integrated Textile Park Private letter in minute of meeting. Limited public hearing related letter. Submit our Thanks With Regards, Jitendra Patel Ankleshwar 9998980s19 Drsrl:air:lgr: Thi5n1eSS.?geancal1yfileska,lsn1ii|eiwitlrilaieccniidsnt;al,pfooriete'ytoGcv3rn)ento 'rth€ertityli.isadd|€sSedialf.y,oua|enotthe|ni€ncec|ec!pientcfinirn']essa!e.you3renoiaJtnsrizedicreed.io^'aId,pIinreiain. rn€s*iag€ ai ary cart of rt. lf ycu rave received lhis eriaii in errcr. please notii/ ihe s€rd€r irnnedlateli/ by return email and delete it from lcrir^ ccrnpuief. The cilrncany arcepts nc iiabiiify icr a,ly canlage cause<i by an./ virus trarsnrilteii by in:s eHir,l This message contains confidential information and 1s intended only for the individual named. If you are not the named addressee you should not disseminate, distribute or copy this e-mail. Please notify the sender immediately by e-mail if you have received this email by mistake and delete this e-mai.1 from your system. E-mail transmission cannot be guaranteed to be secure or error-free as information could be intercepted, corrupted, l-ost, destroyed, arrive l-ate or incomplete, or contain viruses. The sender therefore does not accept liability for any error or omissions in the contents of this message, whj,ch ari-se as a result of e-mai-1 transmission, Drs{ia!nigr: Thrs n:essaEe an! any fiies trarsmiitei witn ri aie canfidential. procietary tc Gcvernmsni cf Gujafat {GOG). pl'riiegec or cther$JisE *rciectec by iaw. Views or spiaions ;)resentet :n this elnarl are ihose of iire authcr and dc rct necessar:y reprRsen! tiose cf rn€ ccrncary. Tha ,nfor$atinn !s sciely inteDded fcf the indiv:iuai qe€R<€qRTffirt st-Y, rrqrfiqrd M, em.fr.q€ Ed+ fr$, *.ennS.S., siq;#q{ Rqrqs-q-*eooR fqt6:q7qo/Rot\ tl;n t&rft, Usrcrd lrswr tr+r"r qtefr;rIn dg qSEq*, r6ffi q,RS rrf+ ffiqre Eai}}s tgarTq qrdc|'{+e dffi il ffi eqfr f{qffi{ pq drt gvre tr qrq ffi €tq +ffid ffir Est R +S tus qqrqr }1 11 qq{ Errfr+ EFFT E{ ffi r) qtat +e ET+ qeit errerd+t vgFunt w+qftfr+l qqrq w<* ffi qm wr ${ffi tr fdniq' eo ef,qfi+ Sqe ffi RFwEn qrtf++' ETdr$ ffi q) Es fdqTr+ t-sreT frat 'rot tr yqi.d{ur fq+d€qn T{ffn€ qteT + tt'**q{ 9998980519 Subject: Attachments: FW: UrgentAttention - VIOLATION OF MANDATORY TOR COMPLIANCE lN RESPECT OF QCI-NABET ACCREDITATION CERTIFICATE AS PER SET PROCEDURE - Urgent Clarification regarding documents to be allowed as proof of accreditation for Environmental Public Hearing (EPH) o Detox - Kejriwal.pdf; Detox - Shanti Integrated.pdf From : GPCB RO Surat [mailto : [email protected]] Sent: Wednesday, October 28,2015 3:02 PM To: Parth Desai Subject Fw: Urgent Attention - VIOLATION OF MANDATORY TOR COMPLIANCE IN RESPECT OF QCI-NABET ACCREDITATION CERTIFICATE AS PER SET PROCEDURE - Urgent Clarification regarding documents to be allowed as proof of accreditation for Environmental Public Hearing (EPH) o Regional Officer GPCB,Surat OnTuesday'27october2o154:51PM,Krishnakant.@>wrote: MOST URGENT BY EMAIL VIOLATION OF MANDATORY TOR COMPLIANCE IN RESPECT OF QCFNABET ACCREDITATION CERTIFICATE AS PER SET PROCEDURE. Date:27 October, 2015 To, The Secretary Ministry of Environment and Forest & Climate Change Prithvi Block,First Floor, lndira Paryavaran Bhawan Jor Bagh Road, Aliganj, New Delhi - 110 003. The Director (Environment) Gujarat State, Gandhinagar The Chairman, Gujarat Pollution Control Board, Paryavaran Bhavan, Sec 10-A, Gandhinagar The Member Secretary, Gujarat Pollution Control Board, Paryavaran Bhavan, Sec 10-A, Gandhinagar Subject : Urgent Clarification regarding documents to be allowed as proof of accreditation for Environmental Public Hearing (EPH) of M/s Kejriwal Integrated Textile Park and M/s Shanti Integrated Textile Park Pvt. Ltd. To be held on 30-10-2015 lN Surat district, Gujarat. Madam/Sir This is with regard to our previous letters written to you at various point of time and also same issue raised during various EPHs held in state of Gujarat since last two years. The EPH are held as per the guidelines of EIA Notification 2006 and amendments there under. As per the guidelines ElAs for a public hearing are to be prepared by Consultants Accreditated by aCl NABET. The QCI-NABET issues accreditation certificates to various consultants after a series of scrutiny. The TORs issued by MOEF or SPCB specifically asks for Accreditation Certificate issued by QCI-NABET. However we have been raising the issue of overlooking of such an important process of accreditation, wherein various consultants have submitted various other documents other than a valid Accreditation Certificate from QCI-NABET as part of mandatory disclosure in the EIA document. We have brought this to notice relevant authorities during many EPH, however no proper reply has been received. Through this representation we seek clarification on what documents are legally allowed in lieu of a valid Accreditation Certificate. The above two public hearings mentioned are to be held on 30th October and according to the provisions of the EIA Notification 2006 no valid Accreditation Certificate is produced with the EIA documents. We are annexing the documents produced by the EIA Consultant M/s Detox Corporation Pvt. Ltd. as part of mandatory disclosure with regard to the EIA Consultant. WE SEEK AN URGENT CLARIFICATION WHETHER THE SAID DOCUMENTS ARE VALID IN LIEU OF AN VALID ACCREDITATION CERTIFICATE ISSUED BY QCI-NABET. Kindly also provide documents and gazettes notifying list of documents to be allowed in lleu of proper Accreditation Certif icate. In absence of any response we would assume that the above mentioned EPH are happening in violation of the Environmental Procedures prescribed. Anticipating an urgent response in this regards in interest of Environment and Sustainable National Development. Sincerely, Krishnakant Paryavaran Suraksha Samiti/ NAPM Ph: +91 -9427849310 Subject: FW: Clarification regarding documents to be allowed as proof of accreditation for Environmental Public Hearing (EPH) of M/s Kejriwal Integrated Textile Park and M/s Shanti lntegrated Textile Park Pvt. Ltd. To be held on 30-10-2015 lN Surat district, G... From : Jayesh Patel loateliavesh 196 1 @oma il.coml Sent: Tuesday, October 27,2OlS 4:15 PM To: Hardik Shah (Director-Env-FED); [email protected]; Dr. K U Mistry(Chairman-GPCB.); ms-gpcb Cc: gpcb-sur Subject: Clarification regarding documents to be allowed as proof of accreditation for Environmental Public Hearing (EPH) of M/s Kejriwal Integrated Textile Park and M/s Shanti Integrated Textile Park hrt. Ltd. To be held on 30-10-2015 IN Surat district, Gujarat. URGENT BY EMAIL Date: 27 October, 2015 To, The Secretary Ministry of Environment and Forest & Climate Change Prithvi Block,First Floor, Indira Paryavaran Bhawan Jor Bagh Road, Aliganj, New Delhi - 110 003. The Director (Environment) Gujarat State, Gandhinagar The Chairman, Gujarat Pollution Control Board, Paryavaran Bhavan, Sec 10-A, Gandhinagar The Member Secretary, Gujarat Pollution Control Board, Paryavaran Bhavan, Sec 10-A, Gandhinagar to be allowed as proof of accreditation for Environmental Public Hearing (EPH) of ltl/s Kejriwal Integrated Textile Park and M/s Shanti Integrated Textile Park hrt. Ltd. To be held on 3O-10-2015 IN Surat district, Gujarat. Subject : Clarification regarding documents Madam/Sir This is with regard to our previous letters written to you at various point of time and also same issue raised during various EPHs held in state of Gujarat since last two years. The EPH are held as per the guidelines of EIA Notification 2006 and amendments there under. As per the guidelines EIAs for a public hearing are to be prepared by Consultants Accreditated by QCI - NABET. The QCI-NABET issues accreditation certificates to various consultants after a series of scrutinys. The TORs issued by MOEF or SPCB specifically asks for Accreditation Certificate issued by QCI-NABET. However we have been raising the issue of overlooking of such an important process of accreditation, wherein various consultants have submitted various other documents other than a valid Accreditation Certificate from QCI-NABET as part of mandatory disclosure in the EIA document. We have brought this to notice relevant authorities during many EPH, however no proper reply has been received. Through this representation we seek clarification on what documents are legally allowed in lieu of a valid Accreditation Certificate. The above two public hearings mentioned are to be held on 30h October and according to the provisions of the EIA Notification 2006 no valid Accreditation Certificate is produced with the EIA documents. We are annexing the documents produced by the EIA Consultant M/s Detox Corporation h^. Ltd. As part of mandatory disclosure with regard to the EIA Consultant. WE SEEK AN URGENT CLARIFICATION WHETHER THE SAID DOCUMENTS ARE VALID IT LIEU OF AN VALID ACCREDITATIOI{ CERTIFICATE ISSUED BY QCI-NABET. Kindly also provide documents and gazettes notifying list of documents to be allowed in lieu of proper Accreditation Certificate. In absence of any response we would assume that the above mentioned EPH are happening in violation of the Environmental Procedures prescribed. Anticipating an urgent response in this regards in interest of Environment and Sustainable National Development. Sincerely, Jayesh Patel Secretary, Khedut Samaj Gujarat Oisclairner: This ,.nessag€ en,i any files transniltted i.,.tti it ars ccniiCen::al. prspri€tary Ir Government cf Guja.ai 1GOG). nr:vilegec, cr otheffi:se Dfc:ectec by rnessaQeoraryparlrir: ltycuravereceiyec fhrsamaii ;nerror.pleasenctif/thesenderinrnrediately!'t'returne;nari icmDery accepts nc irabiiity icr ary ca:nage aansec by an;: virus transnirtted by ihi! enra:l. !ae,,. V:€ws cr anddsiets:ifron-:ysurccmpuier The Mittal Subject: FW: response to EPH of m/s KEJRIWAL integrated textile park , palsana, dist Surat, Gujarat, on 30 October 15 at 16 hrs. From : GPCB RO Surat fmai lto :o ocbrosrt@vahoo. in I Sent: Wednesday, October 28,zOtS 3:05 PM To: Parth Desai Subject: Fw: response to EPH of m/s KEIRIWAL integrated textile park , palsana, dist Surat, Gujarat, on 30 October 15 at 16 hrs. Regional Officer GPCB,Surat onTuesday,27october201511:51PM,quickcommunication<@>wrote: ms-gpcb has asked me to send e mail to Shri RVPatel saheb, pl. forward this mailto ms-gpcb & secy-SLEAC., hope, this attachment is open properly, if not, pl. inform me on my mob 09377958840. , RESPECTED MS-GPCB, REP OF MS.GPCB DlST. MAGISTRATE, As per qci-nabet directive, we understand PROVISIONAL ACCREDITED CoNSULTANT ( NOT HAVING l2',FAE',APPROVED) ARE NOT ELIGIBLE TO PREPARE EIA REPORT, IN CASE ]F RULE IS CHANGED BY QCI-NABET, & IF THIS EIA REPORT IS ACCEPTED FOR ENVIRONMENT PUBLIC HEARING, THEN PL. LET US KNOW, SO THAT WE WILL NOT RAISE ANY SUCH QUERY IN FUTURE, AND IF RULE IS NOT CHANGED, THEN HOW THIS MERE-MISS-ALERT, MISS THE ATTN. OF GPCB's DEPUTY RESPONSIBLE STAFF, lN ANY CASE, AS PER OUR UNDERSTANDING, ToR COMPLIANCE lS NOT IN ORDER & REAL VALID QCI-NABET ACCREDITED CERTIFICATE IS NOT AT DESIRED ANNEXURE / EIA PAGE NO. AND OTHER DOCUMENTS AS SUBM]TTED, IN ANY WAY, IT DOES NOT JUSTIFY AS A VAL]D ACCREDITED CERTIFICATE AS THERE IS NO WORD LIKE A CERTIFICATE. ELIGIBILITY OF CONSULTANT IN PREPARING EIA REPORT IS STILL A BIG QUESTION MARK, ANY WAY, YOU ARE A BEST JUDGE TO DECIDE FURTHER LINE FOR AN APPROPRIATE ACTION. DESIRED EIA PAGES EXTRACTED FROM EIA REPORT, IS REPRODUCED HEREWITH AS SR PAGE NO. 3,4,5,6,7,8,910,11,12,13, Ot 14, HOW EVER I-AST SR. PAGE NO. 14 OF 14 IS A SPECIMEN COPY OF REAL VALID ACCREDITED CERTIFICATE EXTRACTED FROM OTHER EIA REPORT PREPARED BY ANOTHER CONSULTANT, IS ALSO SUBMITTED HEREWITH FOR THE INFORMATION OF GPCB SENIORS AND PROPONENT TO KNOW HOW IT LOOKS LIKE.. SO THAT NEXT TIME GPCB SENIORS CAN CHECK PROPER ACCREDITATION CERTIFICATE WHILE ACCEPTING EIA REPORT. st.l'ft :+t5[ +r?sr?r+l uRq.t't at.tqr'0 r,tqtfl r+ rls G.+cr.tel iIQIqt D steet] ur{t?t ucr.cr u{ldlo{I.{l Qor ntda q? {5tqt qdl qqu iq'ft [email protected] ?aa. q:ri. rllt"ft eist'j tt{tt{tot sa{ .s.j, rr{r+t?t rlaUr'it t\alrl uqt r,rteflr,utf erdl ]rr qtorcrr+i nlfl qcu+t1 sfl eftuL E r{lBert Ral rtt,ett €cu, rrti tsal uet Ur{dloft'tt dl'{lr,ile r,tQ.st{ldl.a Aqi atc'I , } eQ Ufdlo'tct rl}fl}s trt'ft qril flqL€ U{teL r? QcI-NABET APPRovED rne qqt 4eII rL qet tlrruttrl. Rritea ct'ttdl et} D al qtfl rl]t"0 .rta utr{l ,.iltl et} D steqt} statet4t ctg tlqtste Ur{l{lo{l+t dl'0r,ite r,t[Sstflciqtt E 5a+Jc€.'e, , dQa{i s} a]. .rtrt} +ttqdlsteqt prrer *e{l qtql ucu.a]. erQ.\er Hi s-Itt qqt sl 't[i r,ti rrttqt flu].€'tt rttrtr ur ui.1 rr1 rrtt r,tra.i[ gctrul utt'ft ttqt u?rtqee0e{ al.s q"uce0 erta{ } cttl erB rllal uu,cr? }}r i"tl Rqla{ ur{ltfto{lat ?cu,otet? rrtf0.stflctqtn 0. QaeuQ {tqf2ui burrlct adr,iliqr pr{ldlo{l+r tirr"rl? cttdl etflrl tilf,. r,r tlLcti rtet {l"0auqi a.qt A"i.{t, VERSION 02 WITH AS APPLICABLE FURTHER TECHNICAL QUERIES FOLLOWS SOON. thanks, pravinbhai p sheth, senior citizen, technocrat & environmentalist Ankleshwar 393001 mob 09377958840, other detail contact are in my attached letter. VERSION 02 follows with additional technical query as applicable. sauno sath-sauno vikas WE ALL NEED A HELPING HAND. WE WELCOME ALL INDUSTRIES AND ENVIRONMENTAL INFRASTRUCTURE PROJECTS, SUPPORTED BY A GOOD QUALITY EIA REPORT. tol tr GPCB TO NOTE: PL. READ YELLOW ICON REMARK ON PAGES 3+ JUST SEE AT LAST PAGE HOW A REAL CERTIFICATE LQQI(SJJIfF -sR. pliGFol oF 14 save Envtronment: care for next ceneratr-on'Envlronment publlc hearlng of m/s , Kelriwal Integrated textlle park, palsana, dlst. surat, Gularat Date 26 l1O 12A15 FOR MOSTURGENT ATTN VERSION OI From: Pravlnbhal P. Sheth, A-8, KallndlAppartment, Chlkurmdl,Anklestnrar-393001. G,rJarat. Senlor citlzen : Technocrat & envlronmentallst cell no. :09377958840. conlact mall ld - [email protected] lo, fmember secretary, GFCB, Gandhinagar,GuJarat cc rDlst. Hagistrate [email protected] & chalr person, environment publlc hearing, Dlst. Surat. GuJarat rregional AtJarat SLEAC, Giandhinagar, GuFrat 'secrelffy, *ceo.nabat l{ev tblhl r dlrector, impact assessment{oEF ilewDethl officer,$rrat' chairman-GPCB i unithead-cFcq *ToR Gandhinagar srrat collector-surrtsou larat. oov. ln opcbrosrt@ahooln rnsoocbdoularat. oov.ln n$at@qdn,ora [email protected] [email protected] @ 58 compliance, ls not accegable, as, none sf the documcnts aJrererreE in Annexure 14 ls avalld QCFNABETACCREDTED CERTTFTCATE { a speclmen Cory of CERTIFICATE, ls JUST for ref. of GFCBlProponent ls at last page } Sub: envlronment publlc hearlng of mls , KeJrlnlal lntegrated tefiile park, vlll, karell, plot 341+, Palsana, dist. Surat GuJarat, on 30 October 15 file no. EIA-I0-2014-2151-E ToR dt 29.05.2015, ToR lssued bysecretary€LEAC-kcm ProJect actlvlty- 5 (0 7(c), 7(h), study area 10 km radtus, period,l March- 31 lday ( Irear not cleared on page 51t!l But presuming as 2015 ) ? Respected Hardik shah saheb, Werefertothe'public notlce', Invitlng awritten response from publlc, we have revlewed draft REIA report, and ntithout arry blas approach & with all due respect to proponent & consultant, we forward here wtth an ALERT I MERE MISS for an correcflve idton. s 01 u2 Comments On EIA front page, though there is a menflon on@ all mlsleadlng one, as NABET letter as referred on page 232 and list of consultants dt June 2015 ( on page A 239,, lt ls not for June 20is, but August 2014, ten months old) , are Nor rHE vALtD AccREDtrATtoN cERTtFrcCrs. REMARK ON FRONT PAGE IT SELF IS MISLEADING ONE There is a clear dlrectlve on ToR condtfion other optlons are provlded, We understand, as per QCI-NABET scheme, Accreditdlon certlfieate ls issued ?qyg_n g-o:q3.S_e-gfj2 FAE, so the ToR 58 compilance as referred on EtA Fege A 239, lS NOT !f,l ORDER; & ts a tftlSLEADtNG ONE, and as per eCt.NAeeT, PRovlsloNAL accrediled consultant are not eligibh to prepare EIA report, lf not agreeable to proporcnt he can produce such ellglbllfty btter of eCl-lrtABET and submlt to us on our e mall ld. at least 24 hrs before the Oate, start hrs of EpH. Draft REIA Report reviewed by Pravi nbhai Sheth, An kleshwar. cet | 093779F8840 SR. PAGE 02 OF 14 Save Environment: Care for next Generatlon Envlronment Publlc hearlng of mls q! E |s referred where one has NOT SIGNED all 12 FAE for a deslred sec'tor, is directive, to QCFNABET AT ALL,-accorOing requlred to qualify to obtaln Accredltation CERTIFICATE, and then only one can EIA report. be ellolble to nths o]9, ls aletter wlth T & C aPPIY' CERTIFICATE'' IT IS NOT AT ALL 'ACCREDITATION What ls the value of thls docu from SLEAC, to start base llne studies in lUnnbU - MAY ( yeai not cleai on age 51 ) PRIOR to lssuing an sfficial ToR on October 15?. lf so, pl. provlde such d l se llne studles samPle anatysts carrled out, pl. provlde the detalls lllte' a-+ontac't details of aPPrwed labb-how far ls thls from ProJect slte? c-pt. provlde valld appiovbl certlflcde of NABL I MoEF as appllcable. 04 05 06 Pl. provlde desired reply and Incorporate the same in MoM' We request Secretary-SLEAC, to proceed'EC' process In llne.of our'ALERTS' and frfene MISS' , & if any documentli wlll be submltted after slgnlng Mo*|, toJustlfyAccreditalon certtflcate, pl. forward the same to us also for our veriflcation and further comments lf anY. Slnce mandatory ToR 58 compllance ls not ln order, and provlslonal accredlted consultant ls not etlgllle to piepare EIA report, in consideratlon tothls, we request ltlSDlst. crcB, HtS AUTHOnSEO RLpRESEUTATiVE to declde In consultation &wlth a wrong set conducted be stlll can publlc hearlng envlronment whether Maglstrate, CERTIFICATE pre-cedence oR to postpone tlll proponent provides valld 'ACCREDITED Deslred copy of EIA page no€. dffitn loaded from EIA repo{s, 1J Pl?Yllegle1:Ylih' wltn necesiiry yeldwicon, as appllcable FoR NEcESSARY READY REFERENcE CI.ARIFICATION' PL DO CONTACT U6 FOR ANY II/IORE IFORMATION OR FOR ANY Verslon 02, follows soon, with more technlcal querles' thanks, {.r.r"rl>rnr.d qt't"rJ,{^-f ( ' pravlnbhal P sheth ) benlor cltlzen, technocril & env{ronmentdlst EIA report' mJ - Xejrfwat-OetJxiurat3OlOlS - enc- deslred extracted pages from. pl. excuse, for arry type .tyPe setting I spelling / vocabulary mistakes if any. reduce green house gases emission plant more trees save environment care for next generation WEALL NEED A HELPING HAND - Sauno saath LET US PROTECT THE ENVIRONMENT - sauno vikas DraftRE|AReportreviewedbyPravinbhaisheth,Ank|eshwar.ce||09377958840 @ FRONT PAGE, REFER REMARK AT LAST SR. PAGE 03 OF 14 E Assessment Proposed Project Integrated Textile Park & Common Eflluent Treatment Plant (2.5 IILD) At Village: Kareli" Ta Palsana, District Surat, Gujarat Project Proponent IGntuMt Inugratef, te&ib Aar{rtue Ert Prepared By: G DHTOX GROUP DfiP",ffitr 3'd Floor, IC G. Chambers, Opp. Gujarat Samachar Press, Udhns Darwaja, Ring Road, Surat - 395 002. ffi?ffi] I I 44s ...Sf.l 'd&rcp u I N"IBET Accreditation vide letter no. N,IBET/EWRA002/004 and list of QCI approved consultant uplouded on 11h Juue 2015 @ E QCI LETTER IS NOT THE CERTIFICATsE- THAT TOO 22 MONTHSD OLD!!! PROVISIONAL LIST IS NOT THE CERTIFICATE- TAH TOO 4 MONTHS OLD @ ToR coPY SR. PAGE 04 OF 14 STATE LEVEL EXPERT APPRAISAL xErRlrvA.L*,=*oift.= COililITTEE, GUJARATDRAFT ElA REPoRT Affice : Gujarat Poflutlon Control Board, PARKPWLTD, & "Paryavarafi Bhavanu, Sector 10-A, Gandhinagar-38?01 0, GUJARAT **ilJ*t $ccnEttnr stetc l.Gnd Phone : Ql9-23232152, Far Bqstr0ofiuxl c : 079 +3[13278r*' [_ I fr{Ay lilt$ Tor.'"' Pf.Cfdrnrtat Kejriwal Iftjriwel Intryntd Texfile Pmk 70&1, Wcrld Trade Center, , Ring Road Surat" * '" Sub;Environmcnt Cle*nncs und€r the EIA Nstific*tion tr(S6 for your proposcd project st Vill:Ksrs{i, Plot No: 3{fS*IJ42J2&f$JS?;358n Felerna' Suret. ' Dear "r .' . Sir, { This refers to your applicatiorr on the subject mentioned above and the meeting held with the $tse Lcvel Sffihperaisat Cffirmiseq Cdffi dr ?4tt Xdsreh tO'fS:'tftri rcl€*diit inftrnrcion F f, itefeasibitity r€prt ond presentation madE hefore the SEAC was considered , and the sdditional TOR prescribed was communicated to you ry thr SEAC inrmediately after the said preserrtation. Howyver, a copy of the same is anaihed h€rewith for furtlwr necessary action at your snd. You may please frrni$ tlre desircd information / documents to enable us tD process furnished in * , 'l . the application furttter. '*'ithrcgards, * Yot* sincerely, d?-"Mirtry) {K C 3mrttrry, Si"t* f*vut Erpert Apprebnl Comrnitte€ Encl : As above. @ ron coPY * '. OETOX CORPORANOil FVTLTD ruLY at15 REFER ToR 6 66 58 CERTTFTCATE IS REQUIREED SR FAGE ptanied, corrmihnerl @ d the nnnageru{ to parry out the S€g plantatbn aativities outside arpas atld gltaithere, LTO; -. ne prernises a 05 0F I 14 DRAFT €IA REFORT ", Progoeal far soeio-e€onomic 4€r dgaF$rymf,S g$,fuitiee fndudirq conununiry uelfse progffi npsi usefut in the pmiiect area fw ttp ovsEil inrpravament of the environmnt Subm4t a details flan for social eorporfite responsibilities, wilh sppr0tri*fte h{rdgetsrf pouisiona for lk fidld hre years and activiti* Bropssed bl he nani*d o1tq, 9ffi :b. ltlcifi1r.-rr,#nt deffqgraphk a{alua of the araa. trqRftPW ; ,,,,,,,,,,,,,,,ifiC A tahisr chart for the isEiuas rai€Ed and ddr€$B6d dw*rq publh hearirq/cansUfidion and commitsnent of the pr$c't ptrWtlt pn fie $€rne shoulri be provkled. F$ ection plan to address tha iseuEe raised during publh h€s:i{g srrd tha il€cess€ry atluaiion of tunds fCIr the saffe shog{d be prouirled. Phn for cornplimce af CETP gulddl$c t$sued ry rhs CFcg. 5t. Whsther any litigatiofl pending and / or any direction / order passed by any Court of Law ageinst the sompany, if so. detailelhare€f. 53. Oetaile of cch€rre,fur sqrfaee as well ru @ top rain $fiaFr h€rwsting arrd grburd urater rcchsrg€ wilh proper 3ci€nttfic cehulalione coflsidering rainfall in the region. cetchryEnt area, land / soil charectertsics. grcund uater qecharye rate. duration of rein $rater harvesting etc. Deheils of provioons {'f p|e'lreaftEnt of tha railrw$er Le the eate of su'frc run o'lT is ts be hsrsBstsd. Locsfion d rech*ge pcrcdation wello on tha b1nuf dag. (a) Does th€ eompsny hsve a rrell hlj dqurn Environmmt Policy approved by its Board of Diregtors? lf so, it may be d€taihd, in fte EIA tsFert tb). @s the Environment Fdirry pressribe hr Etandard prma / pfoe6d$e8 iow|s j*so @€,any rnfrngenrnt J dqrhr*xr I vbbttorn of tha, "p"$ttE environmental or fsest norms / condMons? ff eo. it msy be dsbfl€d in 0re €lA. 55_ Disciplinery pofuy oil CEIP fpr 56. ljslal iB units. lhs hitwchical Fyabtn,ar flSrninidmtiva order ot the sornpgfly to daal,wilh tha €nyirofirnenhl i&e EC mnditions? Debib of {lrh $ystarn may br gfuen- iseues snd for €nsunng 5f, rirmr*r Does lhe ssnpany Sm@ hwe a ontarn of reportirlg of non comgbrnee / vbbtions of er,rvilryunemla{ nsrns tn ihe Boad ot Direc*ols of the iryFany snd 1 or. shsrehold€fs or stak€hotderx d hrge? This reparting m€qhanism sfrould be d€tafud ln the E[4 Report. 58. Certincate of ffir€difafion bsu€d tncorporaied in lhe EIA RWo{" 59. A tabular chart u,itt irdex fs t)'fie FABET, QCI to the environmental coRsullant slpuE be " poipt-.$ae conrpliance of aborya TORa €{}. Any furthpr darifmarion on cmtiog q.il h€ abow sturfcs ineluding sn{icipded i&pacts due io the poiect and milignrtive nreeerree, proleet proponGnt can rebr to th€ model ToR available on Minbtry rwbeite & CETPs'. Thess addi$oi€l TORI sttouH be oanl4dar€d fdr the rehvant hrformglion fts prsparalion of the dfa* EIA report in addition to all m per ns ganerh sir$ciure of €lA lll A Appsndix ltl A of th€ pdtutisn Guj*ts Gontrol Boarct for giuerr in Appendix EIA Notificationl ?q06" The draft EIA repct shail be submMed to *r* conducling the publh consultation p{oceB$ aa per the provisions of the EIA l',totilicetion, 2006. T}xs proidct shall b€ appraised on rec€id af tE ftal EIA r?port. CERTIFICATE IS REQUIRED AND NOT THE LETTR. LIST. SCOP OF ACCREDITATION, ISSUED BY QCI-NABET . OEfOX CORFORATIOi{ FV? LTD I SR PAGE 06 OF 14 KEIRIWAL I NTEG PARK DRAFT EIA REPORT FOR TEXTILE PARK RATED TEXTILE LTD. F/T. PAGE A 236 IS A LETTER & 3 MORE DOCUMENTS Board of Directors of the company and or stakeholders at / or shareholders large? This reporting mechanism should be detailed in the EIA Report. E 58 Certificate of accreditation issued by the NABET, QCI to the environmental consultant should be incorporated in Refer annexure 10, Page no, 4-236. p the EIA Report 59 A tabular chart with index for point-wise com Refer Chapter 1, Table 1-5, above TORs, page no, 19. 1.10.3 Structrre of EIA Report This report is organized into eight sections: Table 1-6: Structure of EIA Report Sr. 'I ro" lffiffiiittiifs -,:....- cqffif Introduction Purpose of the report :]-':.]' 'l: : .' Identification of project & project proponent Brief description of nature, size, location of the project and its importance to the country, region Scope of the study - details of regulatory scoping carried out (As per Terms of Reference) 2 Depicts the details of the proposed project, auxiliary and Project Description supporting facilities, It includes technology and process description Description 3 Environment of naseline environmental conditions in the vicinity of the project site. Data pertaining to the ambient air quality' surface and ground water quality, soil quality, land-use pattern, flora - fauna study and socioeconomic environment has been Presented 4 Anticipated environmental impacts and mitigation measures DETOX CORPOMTION PVT. LTD. JULY.zO I5 Predicted environmental impacts due to construction and operational phases of the proposed project. Air quality modeling results and minimum required stack heights, 29 SR PAGE 07 OF 14 @ FAE DETAILS" KURIWAL INTEGRATED TEXTILE PARK PW. LTD. ACCREDITATIOI{S e . o ISO gOOt-2OOg certification NABL (National Accreditation Board for Testing & Calibration Laboratories) ilABET (National Accreditation Board for Education & Training) registration from Quality Council of India as EIA Consultant REGISTRATIOT{S r r o Class AA Contractor registration from Surat Municipal Corporation (SMC) Recognized Environmental Auditors from GPCB MoEF Registration for recognized Environmental Lab. LIST OF EC & FAE ITTIVOLVED IN REPORT PREPARATION The list of experts involved in report preparation are as mentioned below EI,A COORDIilATON, Name : Mr. CHETAN CONTMCIOR FUilCTIONALAREAEXPERT @ Sr. no. Name of the Functional ar€a I. AP PUSHPAK SHAH 2. WP PUSHPAK SHAH 3. ,i'*"-t<*A &-.sl',ez PUSHPAK SHAH /' 4'"e/ba- ta'*''gaa NV PUSHPAK SHAH 5. SE DR. DIUP SHAH 5. EB DT. HG N DETOX CORPOMTION PVT, LTD. JULY-2015 Signature r'' 4. -7 expert/r I BHAVM MEHRA LK,ANTH ](AVA I-AN EK.AR w.w 107 oNLy 10 FAE, AND ONE HAS NOT STGNED? sR PAGE 08 oF KE]RIWAL INTEGMTED TEXTILE PARK PW. LTD, E 8. AQ ANKTTA BHAIRAVIYA 9. LU JESSICA KARTA 10. RH ANIL CHAUMAL AD DITTOilAL PERSOTTIT{ l{ame of the exFcrt/s 1. AP, AQ, Noise and RH Ankita Bhairaviya z. RH Mitesh Desai J. SE Ms. Hetal 4. AFAE-AQ, WP, SHW Maitri Contractor 5. AFAE 5. AFAE . - ??? 1-f' ir\u .g ft,b$ry."- EL Functional arer Sr. no- @ AP, AQ DETOX CORPOMTION PVT. LTD, JULY.zO15 Signature :**,*'l ,Y&e ,'Fs Parth Desai Mittal Kyada 108 14 SR PAGE 09 OF 14 ORAFT EIA REPOFT FOR TEXTILE PABK KEJRIWA INTEGRATEO TEXTILE PARK FIT, LTD, @ @ E nmeryre 10: tffi$Et.flcrefrtatim ccnficau of consltt{rt ANNEXURE 10, HAS MANY DOCUMENTS, WHICH IS THE CERTIFICATE??? PAGE A 236 IS NOT THE ACCREDITED CERTIFICATE. IT IS A PAYMENT REMIDER THAT TOO 22 MONTHS OLD. OETOX CORPORATION P\/T, LTD. l-l lrl fl-._- TH|S LETTER tS NOT THE CERT|F|CATE. sR PAGE IdL INTEGRA]ED TEXTILE LTD. ru ati o n a Pffif,tFffiFlffi Bcard for Education and Training Decenter 12,201!l ilABFr/EtA/FAmvOlf The Chairman and MD Detox Corporadon ftivate Limited 3rd Floor K.G Chanbers, Udhna Dantaia, Riq Boad, SuEt- 395002 (Xird Attention: tflt. Chct.n Contractor) DesrSir, Sub: leAcctcdltation reference to your application to QCFNABET for re-accreditation (RAl as EIA Consuhant Organization and th€ asscssment carried for rame in your organization from S€ptembEr 11 - 13' 2013, Ihis has based on tic document and sffrce assesimentr du!'ing RA, the Accreditation Committee har approred renewal ol accreditation given to your orgenization subiect to coverage d hlance Functional areas and spedfic respons€ to NC5/Obs./Alerts is:ued {Refer Annexure lll} we a.e pleased to inform you that with the fqllowing det-alls: 1. Annexure I 2. Anncrurell 3. rAnnexure lll 4. rAnnerure lV 5" Annexure V 5. Anncxure vl 7, Annerufe Vll Result - Scope of accreditation - Observations on Qrnlity lllanagement SYstcm (QMSI Listofexp€rtswithappG€dsectors/functionalareas ilon-Conformanced ObservatlonV Alerts {ltlG/ Obc/ Alerts) Ternrs ald conditions of accreditaton Resultofassessment Guidellnes for addresslng Major Non{onfrmancas/ Observationsl Alcrts of RA includin€ l.lqn-Confonnances/ Observations/ Aletts INCV Obtl Alerts) apPllcable to your oqani?atbn as per RA are also post€d on QCI website vide minutes of the Accrefitaticn Committee meeting dated S€pternb€r 2C, 2013. You arc requested to take necessarY actions to close the NG/ Obs. as _j: per guidellnes and timeframe mentioned ln Annexure Vll of this letter. you atg requir€d{o make all paynentsto iIABET as applicable, within one month from the date sf invoice sent to you. Contingation of this accreditation of your organlzation is subject to the clearance of all dues by your organizatlon, satishctotY corrpliarKe to Annexure lU and V. Whh best rigards, Yours sincerely, PAYMENT REMINDER LETTER!!! ,lfi{1 L&Y*. Mt*tf$$tll eeo InstituSon of Engincers Tef. : +91-11-2337 9321,2337 W57 10 2nd Floor, Bal'radur Shah Zafar Marg, New D€lhi - 110 002, Fax : +91-11-2337 867s €-meil : [email protected] lVebsite : www.qcin.org oF 14 SR PAGE 11 OF THIS IS A SCOPE- AND -NOT THE CERTIFICATE @ W M -' S-""-- -i F i Scooe &-crtJeEE !oOncatg! 1 t" i. ,t 1 {a) rAi EEl '=ffi l$iilffi C:tcsorr llint!6fs.dirr Alt Sel!!!10! 1 ti} rrKrwiilE vFH rvllmnE & 1{b} ffishore rnd Onshore ,all and rEaF "exdotetion, A A dd{db &produqtlbn T?prmal PowerFlants 4. I MetatufsXcel 5. 5tdf, t1l 6, 1{F } 7. /"tdt ,& ?.f*l InStrles "Ig lii.s, {ferrous & no'n fenous} Tq{iffi 6sn61 - both aiiiffirade fibers 3? c9Tr9w disno*al faffil ##. ;r#ffi ictthg Comrnon Muddpii$ erwt ecenomk rones (SEzr!. q! $#*', Htff storage atld ffifu" &" ffiwtrffiHffi OETOX CORPORATION rnla4 furat F/T. LID. A A rttlLt B B ?ffidii#ec +.k.lttig+ a"otSrnert protects B _i, Detoxcorporadon Prlvrtc I A mh- ffi E IEl A A 6compkres/ alws, &sl *fft rr:i;Ii:ii:..- jr: : prtmar*and secq4fuv l1 ,:'.it',ft A minine 4 s I Privata timited rfdl *f,ii 3" ---=-=B Annrrurc !3i', llii DRAFT EIA REPOflT FOR ofAcredftation lsAMt of rH f consutrAf{T oR6A{_ffi 5lo *- *-* .. TEXTIE KE'RIWAL INIEGRAIEO Fage 2 of 18 14 SR PAGE 12 OF 14 THIS IS A PROVISIONAL LIST- 14 MONTHS OLDNO E CERTIFICATE r.rir-t, rwunt- lt&at 6f*fi.t&tdm!ilt il.:81-ll'lllLls [email protected] *ffi ql|Er I o|llEr c ttd rr !.r$Frrrt I *fl!q! 2 r5@ trl Eiltgfl|ffiEud|t|OFl d/Uid.mudlfrr 1 o.|-qtordrH,lra' lf* f Eq. f, G. ffir, OF. a{F hid|f firq Lrfi.l| ttrrh il|| lEd,g!rt- rd.&r a ||.lrl'|H lldurr. t ordr!fo!!5!q4 d.|-Sfrra* l' C nb- t3 lat 46:l- Ultslllt n t!.drffi ConhA!ffiu(frbUrl*l/R.v,tv&|' .t*trfftlE#Gldc ' \ xb-"'t./#iW,t l. r i i ::,--r ;; ; i:f ffiffi lffi q rlEErE{trlbn ficrE d tJh,,,yt l.nt p*tdatid FdGt pdrl ||dorl d|lq|,t i6/ c.fd '.'|rl t-Jtl -En .!a|{lJf t.E$h tI|J lELirlEFlEl cFa.tEt5 tuqt1 - CGr ftl F.rttr,| A rol A eht A 5ldt A 6(r, 0$2Ot{ ramFbd r.|.* q/tl Fl|r*tl l'eFZI Sr..L GdEilL ro|t SEI|L ldl F4 B F5 D 3 3:r r(d0t tu 3t D-FrrC!|rlEihlru' t-3t h.ttrr.|t'ffi-7ut5 L*Effirso A 0 I-:t- :'.:il Cg|r|gr dll.:rt trErana A 7 A rldl l D rGl E !ht qG E r lbl tt$l q ||ftil tEuct! gFl cdUrtmurdi$r -'.il lr i-]il I-.1-l'1F A p*c. Htt dropp|| tdl, rnrluc oarmcrd rfirFlE hadlt rrtrE fcdbrd&r.hqrna HaEi4rc n'ElFilrJt fiU-ldr illrrlm{irv D t_! ?.t!r*t-ttffi ttttd*dll E*oftErr&d cEdEasalEElw a,buua')/ ffi .-iiEi-i- ''r.Tll {c) tt+ 0s.?f71 ;:l ':--: rtdo 3F) SR PAGE 13 OF 14 pc*ntft.difrf nud|l| cortueri A fIE|r nr|rtldr|I sf r riq.p.r r||d ru|fEllr d pw frgrr radv ph rilrtr A 5O a lEdour OrcE (& g phdrl $:tEy tffi ffilncdrrmtdlddt lttotFrfhSlt c 5lDl t-t I (rl E n Fq.Gahdd[dqCt|d+ rrffCE rnn td .!rrlh+ haq .rf, rilstrEnlrw prq.d ilH|| d drr* lop'| d il n*ffitrEffGd- ^ r:l g{i:1, Rrv. 2VA* 05, tO14 "W .Irha" tu tu, hr f5. 14 F?d |tlqr, ror /rqns 4nl squrq Xbdh. lo.4 llgr - Hr*&llrlllfri€o tuomlztl/ril glzt'In'/| eB* I lhmffi I mH SE (Iio Eo., ldr& ?eillq|{. O- hcdr HdrCf<rorfl E4Srt-tEG' Etrdrdt6aYdF.fl E!t- z4ltcll utEuB q&DIIffi ffigptt L*aflEtU GddEe!@c| ffi hdtft (Fm! urrr*c ffi A 9 OrnE|trlri! A tl r-.|a n|f|| ld tse bdrcn*! A I t1,r th)trt tkbd--EacrrlElot-dr - 15 A dLl UrdAEqtr d Conln,OndAorr GstrDrA*I/ fi aJl I t t :6 t ucrt|lH rutttatrt+r(lla ncr llnud - lGar FlrD.rI rd cLr Grimt drib ffitri&in @i e l.l +td 9 A tF) A 3Gt B HdtuHrGtrd F#d. rDd liEm.rb (c.drrft A 5Ft T* - r!6!r rd r!rr* Cb t 5 H-dg A so bnffldii! i3 2t ObbldE|'r/ n r. r1l r[! $noil|c o.|JL drrH 0!, 2O1,r t*r I dn ldl hlrA A-240 SPECIMEN COPY OF CERTIFICATE DOWN LOADED FROM OTHER EIA REPORT JUST AS AN EXAMPLE ,HOW IT LOOKS CERTIFICATE BELONGS TO OTHER CONSULTANT. SR pAGE 14 OF j4 G{'ANAT STATE ETNO$U{ Ur{rED CORrcRATFil Antnnro 6: Ccrfficft of T#ffiHfl:Tiffffiru* ADOMOSAT WEUS TO TANAR'R EPS FI Brco<CB€t$2 Kzdanr Envimmnentd funtultrl b lmm $tilE(nEs QCI / Natlonal Accredlution Board for Education 8c Training Qnlity M& m Council of India thdffi Envlrunmrnal fonrultenu 877/A/3, GIOf Is hereby nABEf Molorym, Wdfro, Guiorot - [email protected] dffotdd ac$adlw{on Conwlt rr+ inq Jr*wqr edirar **ritdtri.t6€# under the QcF$aBtT !tchefe lor AEfdlwtlon ol EA Oryaniratloni fneu 0y. nugust 2017t taF tlte loltot tlng scope: I Rag taE @G d trr t ffi l# :.fr ffi e t( as 5 & D 4, cl i.rrFdttrl&tftrnlari{t^aSdtlotrfisr4tsdffirntf,t *?r*Irhrl''tTt*tttWwfr*rrstFlt&frnbd'.Fn'dff.''(tfrl Aellprrtlrfirfr*rdadrD i* &e rrlt tut ed Mtp8w 16 rtr tcffi 6dCtrdrnotadrE udni'lta G.flffic.tc r{o; NAg€n aAl 13r6t RAo04 ft t'll[BET Varld upbd 18, tu 6 $9. tw eld rR&;fte*.fi.dsb#+t4, &.sSl{Mqfffib, . l*trl&dr..,dttr6ffik r.drrirrdd:taM lcsi{ryffitfrltd|tqd ci lGDl,{ Ellvrnoil{ErrrAr. @ilsurArrsl tur.Y 2015 t0 c5 From: [email protected] [[email protected]] Sent: Tuesday, October 27,2015 5:58 AM To: MINAXI UMESHCHANDRA SHAH(GoG-GPCB Dept.) Subject: Fwd: Environmental Public Hearing of M/s. Kejriwal Integrated Textile Park Private Limited (KnPPL), at Village: Kareli, Ta. Palsana, Dist. Surat to be scheduled on 30th October 2015. Sent from my iPhone Begin forwarded message: From : paryavaran m itra < oarvavaranm [email protected] > Date: 26 October 2015 at 3:52:26 PM IST To: "[email protected]" Cc: Collector Surat <[email protected]>, GPCB Surat <[email protected]> <@> Subjech Environmental Public Hearing of M/s. Kejriwal Integrated Textile Park Private Limited (KITPPL), at Village: Kareli, Ta. Palsana, Dist. Surat to be scheduled on 3oth October 2O15. Reply-To: paryavaran mitra < [email protected] > Ref: PM/MPl263ll20l5 Datez26ll0l20l5 To, Member Secretary Gujarat Pollution Control Board Gandhinagar Sub. : Environmental Public Hearing of M/s. Kejriwal Integrated Textile Park Private Limited (KITPPL), at Village: Kareli, Ta. Palsana, Dist. Surat to be scheduled on 30ft October 2015. Sir, We have studied the draft EIA report of the above-mentioned project. Following are our observation/comments/questions regarding project and draft EIA report. l. What was the previous land use of the land for proposed project? Has Industry obtained NA permission for the land? Please provide the document. 2. How the required land for the project is acquired? Was it a government or private land? 3. When was environmental clearance for this project in Form I applied? 4. What is the status of NOC application to GPCB for this project? 5. What provision will be taken into consideration to tackle the fluctuations in the pollution load and quantities, at individual member industries? 6. Please justifr domestic waster requirement for the proposed project. 7. Why baseline study was started even before issuance of TOR? 8. Please give exact dates of ambient air quality, surface water, ground water, noise monitoring and soil quality monitoring. 9. In Figure 4-l to Figure 4-3 (Isopleths for PM, SOx and NOx), date is mentioned as 1710712016. Please explain. I 10. Why only 7 .46Yo of total land area will be developed for greenbelt rather than guideline of at least 33 %? ll. What will be the impact of temporary housing availed by labors during construction phase on surrounding environment? 12. What will be action plan for socioeconomic development of an area by project proponent? 13. What activities industry will take up as a part of CSR and what will be the budget for it? 14. How many local people will get employment through this proposed project? Please give classification of skilled and unskilled manpower. Yours truly, Mahesh Pandya CC: l. Collector, Surat 2. Regional officer, GPCB, Surat Paryavaran Mitra 5O2, Raj Avenue, Bhaikakanagar road Thaltej, Ahmedabad - 380059 Telefax - 079-2685 L32L email - [email protected] website - www.parfravaranmitra.org.in g!sc!aimer: 'fhis message and any files transnritted wrtn ii are confidential. Vr?netary to Gcvernn'eni af Gujarai {GDG). rfivilegec' cr rrhenrjse srcrectec by iaei. Vi€ws cf cprnrcns cresented in this ertail arc ihose ci tre aulhor and dc nol nec€ssaiiiy represeri ihose af ine .cincany. The infcrn"raticn j€ sciely irtended icr tle ,ndrr;cua: rnessaae or an't Bart of ii. li you tave r€ceived lhrs errari in error. pl€ase nDtrf/ the s€rc€r imrnediately Dy return eora:l anC d€lete cctnaany accepls nc iiabiirty fcr airy camage railsed by an!, virus transmrlled by inis email. :t frorn ycu. ccn:puief The This message contains confidential information and is intended only for the indivldual named. ff you are not the named addressee you should not disseminate, distribute or copy thls e-maiI. PLease notify the sender immediately by e-mail if you have received this email by mistake and deLete this e-nail from your system. E-mail transmission cannot be guaranteed to be secure or error-free as information could be i.ntercepted, corrupted, Iost, destroyed, arrive late or incomplete, o.r contai.n viruses. The sender therefore does not accept liability for any error or omissions in the contents of this rnessage, which arise as a result of e-maif transmission. m/s , Save Environment : Gare for next Generation Environment public hearing of Kejriwal integrated textile park, palsana, dist. surat, Gujarat page 01/04 Date 29 110 12015 FOR MOSTURGENT ATTN VERSION 02 From: Pravinbhai P. Sheth, A-8, KalindiAppartment, Chikuwadi,Ankleshwar-393001. Gujarat. Senior citizen : Technocrat & environmentalist cell no. :09377958840. contact mail id - [email protected] to, member secretary, GPCB, Gandhinagar, cc Dist. Magistrate & chair person, environment public hearing, Dist. Surat. regional officer,Surat' secreta Gujarat ms-qocb@qu Gujarat Gujarat collector-sur@q ia rat.qov. i n u ia rat.gov.in [email protected] Sub: environment public hearing of m/s , Kejriwal integrated textile park, vill, kareli, plot 341+, Palsana, dist. Surat, Gujarat, on 30 Oitober ,|S fife no. EIA-I0-2014'2151'E, ToR dt 29.05.2015, ToR issued by secretary€LEAC-kcm Project activity- S (f) ?, 7(c), 7(h), study area 10 km radius, period,l March- 31 May ( year not cleared on page 5l!!! Bui presuming as 201f ) Respected Hardik shah saheb, we refer to the 'public- notice', inviting a written response from publicr we have reviewed draft REIA report, and without any biis approach & with all due respect to froponent & consultant, we fonvard herewith our response vERSloN 02 probably, it;;t add some , value to improve draft REIA report further for a better presentation at SLEAG. It is summarized under section A,B,C,D, as under, Section R Appreciations Sr no. 01 The propo""O y:11:y,::::l?i:"- 02 03 Y$99Pssljlnd Thi= CE ividual ETp. Gravity fin" member units. Section B EI4 to sma' scate leyite enrrepreneurs, facititate scientific prov ide other infrastructu re fac itities. - Queries extracted from draft RE|A Draft REIA Report reviewed by Pravinbhai sheth, Ankleshwar.ceil 0g377g5gg4o Save Environment : Gare for next Generation Environment public hearing of dist. surat, textile What will be payback period of proiect capital cost of Rs.12l -28 Ot-a"; you will ensure that you will not pollute very nearest canal Water body , which is iust 0.16 km from project site, 02-'Why the direction of canal not mentioned?, pl. provide the level direction of proiect site? Table 2.3, how the color reported as 'not detectable' a-- ls it just bY a 'vision method b-- ORwhich instrumentwas use@ Sec 2.9, we appreciate gravity pipe line will be installed for the member units, whaf will be the highest and lowest slop level ( MsL) of member Table 2-5 GW, a--Why only l8 parameters monitoredn b-how,ma p1-. p64[ AS FlG.2.3 Table 2.3, water balance diagram' What is the reason for 80 kld loss on recycled treated wate Fig 3.1, wind rose diagram 15, so total hr should be pl' check at your end' hrs, one hr less, i.e. should be 22O7 b-what was to!4|-se!l hrs? Table 34 AAQ, pl' a-- are there no industry, in study aiea, using COAL as a fuel' confirm b--why 'GO' not monitored, as it is also a part of AA faUle 3-12, noise quality parameters noi=" teveinOf ueesuneD at high noise area like and "--rrfry nftTSntnty line, as applicable, pl' measure the same incorporate the same in final report and confirm' q.: you have closeO at Zg hrs on 31 May b-.-exceptprojectsite,noise|eve|measuredon|yata||4residentia| site' in sites, why noise ievel NOT MEASURED at other industry area- studY from c--pl. pr6vide list of major industries with their direction site, in studY area. 69,70,71, 71to74 d of each data / table' Pl. proviCelhe same.. t sec'3'7'5 ) 01--What was the source of all these data personally and who o2--OR who FAE has carried out this study period' what villaoer/s Dresence and during Sec 3,8, book whai was the yEAR of census & dist. statistical hand Sec 4.5, memberchip and how Which TSDF site You are referring to obtain far it will be from DraftRE|AReportreviewedbyPravinbhaisheth,Ank|eshwar.ce||09377958840 m/s Save Environment : Care for next Generation Environment public hearing of ntegrated textile park, palsana, dist. surat, Gujarat , 17 93 18 96-97 19 108 Section C Pase 03/04 Sec.5.6. hazardous waste -construction phase You mentioned all such waste will be stored properly, BUT where it will be disposed off ? Green belt, Total green belt area: 15857.58 m2 .i.e works out to be hardly 13.4% on the basis of total plot area as 21248'1.88 m2 ( 52.50 acres, as per page 16). 01--what green belt % norrns you have considered while designing green belt area? 02--you propose to plant in all 1500 trees in two years span, but as per set norns , the tree density is 1000 trees per acreage of total land area, ( unless you have some different norms) so, in consideration with total land as 52.50 acres, you are supposed to plant total 52500 trees, so, it will be short by 51,000 trees, pl. confirm whether this norm is equally applicable to your project also, lF lT lS SO, d---sor how you will make up to plant balance trees in 2 years of span. b-perhaps, your water balance diagram MAy CHANGE, then how you will make up additional water for green belt? c---have you surveyed any land out side to plant trees? d--if so. How you will mange to provide water for that? 03--you propose to use, in all, B0 kld cETp treated water to cover up 15857.58 mr green belt area, it works out to be f lits /m2, a-'pl. provide permitted norms of treated waterfor usage for green belt. b--in case, if treated water does not comply set norms, then what wilr be your pran to obtain dairy water requirement. c--what will you do for rejected treated water. O4--what will be the suryival rate of trees proposed to be planted? O9--what will be the APTI values of trees to be otanrert? a--Why FAE at n ". b-OR was not available during base tine studied c-lf so, who has carried out such Ae studies. ftrloO, General queries Why details of, in which ap analysis like GWSW, AtR, NOISE, SOIL , as applicable, Were carried out, pl. provide details like, a- name of lab. with contact details, b--how far it is from project site? provide copy of status of it's VALID approval as like MoEF, "'-p!r NABL, with valid copy of scope of analysis d--Pl. confirm whether, referred approvediab. has facirity to analyse pm 2.5. f--why name of approved lab. was not disctosed at the end of each table of all analytical result of base line studies have for rain water harvesting? s_ample Draft REIA Report reviewed by Pravinbhai Sheth, Ankleshwar.ce[ 0937795gg40 m/s , Save Environment : Gare for next Generation Environment public hearing of Keiriwal integrated textile park, palsSna, dist. surat, G page 04/04 Section D suggestions to be implemented if found viable acceptable and economica Gomment lift the society weaker class persons of project affected area, like senior citizens, widows, rejected female from society, dumb & deaf, blind, orphans, hlndicapped one etc. environment public hearings, who has @this extended valuable in puts , when you commission the project, to witness vour success. 22 23 [email protected]&kanyake|waniabhiyan''the 24 unique awareness piogramme of Guiarat Govt, for sustaining female child. DI tirnlrar free construction. as applicable. Iworkers , stake holders' for their valuable opinion their to seek in a CSR committee / activities 25 26 iflputs. , = =,medlcal ., , reatment , , ,:;::_-:;::::: ror emProyee pl. provide, under a humanity ground, a full provide full and disease, diagnosed for TB, and /or for any other infectious +-aa*nanr *a fhair claeo familv members who are residinq with him. Pt. set up a female grievance resolving cell' as appllcaDle' lr ye 27 28 ^-lahlialrad pl. enlist some external EHS expert for a regular vlslts to your lranet utrrt at par for future, and a|so for your estab|ished uniUs, so you can remain 29 lELtQt rala*arl iccrrae Pl. declare this decided. 30 report unit as a gutkha / cigarette , tobacco FKEE z\rNE rr v to imProve draft REIA . is' all proponent related major EHS all par with at should set up environmentally sustainable unit, our positive in presenting in where some issues oR pl. draw our aftn. if we are wrong puts. our vision Pl. do contact us for any further technical inputs, since by a good quality We welcome all industries in Gujarat, being supported EIA report thanks, t frr..t.r'r*Lrl q".,l4--f ( pravinbhai P sheth ' ) benior citizen, technocrat & environmentalist nt" - f"ltioal-detox-surat30t015' version 02' pl.excuse,tot"nVtyp"-typesetting/spelling/vocabularymistakesifany' plant more trees - save environment - care for next generation wEALLNEEDAHELP|NGHAND-LETUSPRoTEGTTHEENV|RoNMENT Sauno saath - sauno vikas Ankleshwar'cell 09377958840 Draft REIA Report reviewed by Pravinbhai sheth, KEJRT\MAL Integrated Textile Park Pvt. Ltd. Annexure D1 Date:30.10.2015 To, Shri Jitendrakumar Patel Ankleshwar, Gujarat Subject: Public Hearing of Kejriwal Integrated Textile park pvt. Ltd. Dear Sir, In regard to the above subject, please find herewith the point wise reply: 1. 2' 3. The depth to water level is ranging about 2.60 to 3.10 m below ground level,. There will be provision of emergency storage tanks by the member units to store the effluent in case of any unprecedented circumstances in CETP operation. 24 hour storage capacity will be provided. The mitigation measures to be adopted while working close to the noise generating equipments are as follows: r Noise producing equipment should be placed at distance from each other to reduce the cumulative noise level. o Rotation of workers shall be done based on their exposure to noise level during the working hours as per the Factory Act, td+g and amendments thereof. Entry to the working area wherein the noise generating sources are located ' should be permitted with ppE,s like ear muff, eir plugs Regular test of workers should be done and the medical repofts ' of same audiometric should be maintained. DisplaV should be made clearly indicating noise prone area along with dB level ' All equipment in the plant would be designed/operated to have a totat noise ' level not exceeding 85 to 90 dB (A) as pei the requirement of OSHA (Occupational Safety and Health Administration) standard and the ' Environment (protection) Rules. Develop proper awareness among workers by regular training session. Hope the above reply is in line with your requirement. Thanking You Yours Sincerely Authorized Signature For Kejriwal fntegrate{^T-extile park pvt. Ltd. (,,., Office :7004, World office world Trade Trade centfi'Rifig Road, SURAT - 395 002. Phone : (o) 4flt3it07 Fax : +91-261-2919212 E'mail : [email protected] URL: http://rwvw.kejriwaltextilepark.com CIN : UlTl2OGJ2mgpTCOSOsgg N,KEf RTwAL Nr/ Integrated rextite Park Pvt. Ltd. Annexure D2 Date:30.10.2015 To, Shri Krishnakant Paryavaran Suraksha Samiti/ NAPM Subject: Urgent Clarification regarding documents to be allowed as proof of accreditation for Environmental Public Hearing (EPH) of M/s Kejriwal Integrated Textile Park and M/s Shanti Integrated Textile Park Pvt. Ltd. to be held on 30-10-2015 in Surat district, Gujarat. Dear Sir, In regard to the above subject, we will like to submit our reply that as per EIA notification 2006 and amendment thereof, preparation of EIA report is to be done by NABET approved consultant. The lists of consultants approved by NABET are uploaded online on QCI website every month. We shall like to bring to your notice that M/s Detox Corporation Private Limited is approved consultant and the name of organization is noted at Sr. no. 31 of List of Accredited Consultant Organization uploaded on QCI website (http://nabet.qci.ors.in/environment/pop.asp?file=documents/AnnexureT.pdf) on date 08.10.2015. Hence this is a valid EIA report submitted by NABET accredited consultant. Hope the above is in line with your requirement. Thanking You Yours Sincerely Authorized Signature For Kejriwal Integrated Textile park pvt. Ltd. a r\\t -/ ffi Office :7@4, World Trade Gentrc, Ring Road, SURAT - 3gS 0@. fhone : (O) 4gO03O7 Fax : +91-261-2919212 E-mail : [email protected] URL : CIN : Ul 71 2OGJ2mOPTCGt:fSSil I I Annexure D3 Date:30.10.2015 To, Shri Jayesh Patel Secretary, Khedut Samaj, Gujarat. Subject: Clarification regarding documents Public Hearing (EPH) to be allowed as proof of accreditation for Environmental of M/s Kejriwal Integrated Textile Park and M/s Shanti Integrated Textile Park Pvt. Ltd. to be held on 30-10-2015 in Surat district, Gujarat. Dear Sir, In regard to the above subject, we will like to submit our reply that as per EIA notification 2006 and amendment thereof, preparation of EIA report is to be done by NABET approved consultant. The lists of consultants approved by NABET are uploaded online on QCI website every month. We shall like to bring to your notice that M/s Detox Corporation Private Limited is approved consultant and the name of organization is noted at Sr. no. 3L of List of Accredited Consultant Organization uploaded on QCI website (http://nabet.qci.org.inlenvironment/pop.asp?file=documents/AnnexureT.pdf) on date 08.10.2015. Hence this is a valid EIA report submitted by NABET accredited consultant. Hope the above is in line with your requirement. Thanking You Yours Sincerely Authorized Signature For Kejriwal Integrated Textile Park Pvt, Ltd. Office :70M, World Trade Centre, Ring Road, SURAT - 395 002. . Phone : (O) a0G307 Fax : +91-261-2919212 E-mail : [email protected] URL: hftp://wrvw.kejriwaltextilepark.com CIN : Ul712OGJ2(X)BPTCOS3SS3 I I j {sNP/KEJRTWAL rextite Nr/ Integrated Park Prrt. Ltd. Annexure D4 Date: 30.10.2015 To, Shri Pravin Sheth Senior Citizen, Technocrat & Environmentalist Ankleshwar, Gujarat. Subject: Response to EPH of M/s Kejriwal Integrated Textile Park Pvt. Ltd., Kareli , Palsana, Dist: Surat, Gujarat on 3Oth October 2015 at 11 hours. Dear Sir, In regard to the above subject, please find herewith our point wise response 1. The lists of consultants approved by NABET are uploaded online on QCI website every month. We shall like to bring to your notice that M/s Detox Corporation Private Limited is approved consultant and the name of organization is noted at Sr. no. 31 of List of Accredited Consultant Organization uploaded on QCI (http://nabet.qci.ors.in/environment/poo.asp?file=documents/AnnexureT.pdf) website on date 08.10.2015. The lists of consultants approved by NABET are uploaded online on QCI website every month. We shall like to bring to your notice that M/s Detox Corporation Private Limited is approved consultant and the name of organization is noted at Sr. no. 31 of List of Accredited Consultant Organization uploaded on qcl (http://nabet.qci.ors.in/environment/pop.asp?file=documents/AnnexureT.odf) website on date 08.10.201s. 3. As per the TOR and the requirement of EIA based on the pollutant load due to project, FAE to be involved in preparation of EIA report 4. The same shall be updated in final EIA Report. The lists of consultants approved by NABET are uploaded online on QCI website every month. We shall like to bring to your notice that M/s Detox Corporation Private Limited is approved consultant and the name of organization is noted at Sr. no. 31 of List of Accredited Consultant Organization uploaded on QCI (http://nabet.qci.ore.inlenVironment/pop.asp?file=documents/AnnexureT.pdfl website on date 08.10.2015. Office 7004, World Trade Centre, Rlng Road, SURAT - 395 002. Phone : (O) afl8307 Fax : +91-261-2919212 = E-mail : [email protected] URL: http:/ftvnrw.kejriwaltextilepark.com CIN : Ul7120GJ2(Xt8PTCoS3ttSg I I RTWAL {ssP/KEf Nr/ lntegrated rextite Park Pvt. Ltd. We have applied in October 2Ot4 for approval of TOR and as there is no emission from the proposed project, monitoring for baseline study was initiated for basic parameters like PM10, PM2.5, Sox, NOx 6. (a) Detox Corporation Pvt. Ltd. l"Floor K G Chambers. Udhna Darwaja, Ring Road, Surat - 395002 Phone No. : 0261- 6551058 (b) Approx. 21 km (c) Certificate of NABI/MOEF is attached herewith as Annexure 1. Hope the above is in line with your requirement. Thanking you, Yours Sincerely Authorized Signature, Kejriwal lntegrated Textile Park Private Limited ffi Office =7@4, World Trade Centre, Ring Road, SURAT - 395 002. Phone : (O) {908307 Fax : +91-261-2313212 E-mall : [email protected] URL: http://rvrvw.kejrlwaltextilepark.com CIN : Ul7120GJ2@8PTC053583 l N,KEJRTwAL Nr/ Integrated rextite park pvt. Ltd. Annexure D5 Date:30.10.2015 To, Shri Mahesh Pandya Paryavaran Paryavaran Mitra Ahmedabad Subiect: Environment Public Hearing of M/s Kejriwal Integrated Textile park pvt. Ltd. at Village: Kareli, Ta. Palsana, Dist. Surat to be scheduled on 30th Octobe r 2OlS. Ref: pM/M p/2637/ 2075 dated 26. 10. 2015 Dear Sir, With reference to above referred letter, please find herewith the point wise reply 1' Previous land use of the proposed project was for agricutture purpose. NA has been done for industrial purpose. NA copy has been attached in Draft EIA report as a annexure 2, page no A-1g 2' This is private land and proposed tand is acquired under rules and regulation of registrar of land. No government land has been acquired for the project. 3. Application along with form 4. NOC application 5' Major pollutant parameters are l and pFR was apptied on 9th octob er,2oL4 willbe made after public hearing. TSS and oil & Grease from the industries of similar nature. considering the worst case scenario we have design the prant 6' There will be total 2000 employment due to proposed project. standard water requirement is 45 liter per person per day against which we have provided 45 riter per person per day 7. we have applied in october 2ot4 lor approval of ToR and as there is no emission from the proposed proiect, monitoring for baseline study was initiated for basic parameters like pMlO PM2.5, Sox, NOx Base line monitoring had been conducted from 15th January, 2015 to 15th April, 2015. Exact date as given below (xfice :70(A, World rrade Gentre, Ring Road, suRAT - 395 oo2. phone : (o) a06307 Fax : +91-261-2 g1g212 E-mall : [email protected] unl : nttpynrrvuy.replrrartextiteparr.co# oN : ul712ocJ2oogprcosgssif I ,SNP/KErRlwAL Nr/ Integrated rextite Park Pvt. Ltd. Sr. no Date AQ 1 L 2/3l207s Date AQ 2 Date AQ4 Date AQ 3 4/3/zOLs 4/3/2Or5 213/2OLs 2 s/3/2OLs 7/3/21ts 713l20Ls 3 sl3/zors 1.u31zOLs 4 1-2/3l2O7s 1613/2O7s 74/3/2OLs 7u312ots t4/3l2O7s s/3/207s s/3/20Ls L2/3/2OLs 18/312O7s t8/3/z1ts 1.6/31207s 6 ts/3/20Ls 2U3/20rs 7 22/312O7s 2s/3/zOLs 22/3120Ls 8 2e/3/21ts 9 2613/z}rs tl4/zOLs 2u3/zOLs 2s/3/20Ls 29/3/z0ts 4/4/2OLs 414/207s 10 5/4/z}ts 11 9/412OLs 7/4/207s ttl4/2o1-s rsl4/207s t9/4/2OLs 5 L2 7314/2O7s 13 L7/4/20Ls t9/3/z}rs 26/3/201s Ll4/20t5 s/4l2Ot5 7/4/21ts 77/4/2OLs e/4l2oLs 73/4/zOLs t7l4/2OL5 22/4/207s tsl4/zots 'J.4 2214/2O7s 24/412075 1.9/4/20Ls 24/4l2o7s 15 27/4/2OLs 27/4/20Ls 30/4lzots s/4lzlLs 9/sl2Ot5 3014/20Ls L7 18 19 2s/4120ts 27/4/20ts 3/s/20Ls 7/s/2OLs 71./s/207s s/4/20rs e/s/207s 7/slz}ts L3/51207s L7/51207s 20 ts/sl20ts 13/sl207s 76/sl2OLs 76/sl2OLs 2t 20ls/2o1s 24/sl2O7s t9/sl2o7s L9/s/20ts 22/sl207s 26/sl2cts 2slsl20Ls Lslsl20t5 20/sl2ots 16 22 23 27/s/2}ts 24 30lsl2O7s 22/s/207s 26/sl20ts 2s/sl207s 2s/412OLs 2714/2O7s 3/sl2OLs 24/sl20Ls 27lsl20ts 30/sl2O7s Ground Water oualitv monitorine locations Sr. No. Ground water location location (Borewell) GW1 GW2 GW3 Project Site L 2 3 Date s/s/207s s/s/20Ls s/s/207s Kareli Dastan Surface Water qualitv monitoring locations Sr. No. 7 Surface water location sw1 [ocation Date Project Site s/s/2o7s (Canal) t- Offfce : 7(X[, World Trade Centre, Ring Road, SURAT - 395 002. Phone : (O) a0ffi307 Fax : +91-261-2 g1g212 E-mail: [email protected] URL: http:/^vww.kejriwaltexfibparr.com ctN : u17120GJ2008pTc0535g3 o KETRTWAL Integrated Textile Park Pvt. Ltd. Soil Qualitv monitorine locations SoilQuality location Sr. No. 9. Location Date sls/207s s/s/20Ls L sQ1 Project Site 2 SQZ Kareli Due to compression of file size & resolution of image, "5" is read as '6". We shall submit the high resolution file in final EIA report. 10. Due to compression of file size & resolution of image, "5" is read as 'G". We shall submit the high resolution file in final EIA report. 11. 33% greenbelt is applicable for industry where high fugitive emissions occurs. From our proposed project there is no fugitive/ process emission. Hence not applicable. 12, Septic tank and soak pit shall be constructed for disposal of domestic waste water. Girbage shall be disposed appropriately. 13' Due to lack of employment in the any area, skill up gradation opportunities are negligibte. to the local workers to upgrade their skills and thereby gain sustainable employment. To continuously upgrade the skill of workers, constant up gradation of skill set is required. Company proposed to set up one training center as pre employment job training and safety training. The training facility shall be helpful in Proposed Textile Park would provide opportunities implementing and upgrading such skills. For contributing our part in Prime Ministe/s Swachh Bharat Abhiyan, company is committed to construct toilet blocks in nearby rural area. Needy families will be served on priority basis. In the initial two years, company shatl develop greenbelt within the premises. In the later phase the green belt development will be carried out in the surrounding barren land and both side of approach roads. Textile Park will provide Assistance to Panchayat for development of village, Temple, Approach Road to village Etc 14. csR Activity will be as below, and its budget will be g laces annually Proposed Textile Park would provide opportunities to the local workers to upgrade their skills and thereby gain sustainable employment. To continuously upgrade the skill of workers, constant up gradation of skill set is required, Company proposed to set up one training center as I Office z 7004, World Trade Gentre, Ring Road, suRAT - 3q-s 0021 phpne : (o) a{x}tilO7 Far : +91-261-2 g1g2r2 E-mail : [email protected] URL : http:/lunvuy.kelriwattrexil6park.com ctN : Ul 71 2ocJ2oosprcosgssg o KEJRTWAL Integrated Textile Park Pvt. Ltd. pre employment job training and safety training. The training facility shall be helpful in implementing and upgrading such skills. For contributing our part in Prime Minister's Swachh Bharat Abhiyan, company is committed to construct toilet blocks in nearby rural area. Needy families will be served on priority basis. ln the initial two years, company shall develop greenbelt within the premises. In the later phase the green belt development will be carried out in the surrounding barren land and both side of approach roads. Textile Park will provide Assistance to panchayat for development of village, temple, approach road to village, etc. 15. Total estimated employment generation will be 2000 in proposed project. Company is committed to give priority to local public. Out of total employment generation, approx 600 will be skilled and 1400 will be unskilled. We hope the above reply is in line with your requirement Thanking You, Yours Sincerely Authorized Signature For Kejriwal Integrated Textile park private Limited /? L\'/ ,/ office :7(Jf'i,., world Trade centre, Rlng Road, SURAT - 395 002. phone : (o) a6g0307 Fax : +91-261-2g1g212 E-mail : [email protected] URL : http:/ftvrvrv.kefrlwaltextilepark.com CIN : UlZl2OGJ2(xt8pTCOSgSgg I KEf RT\^/AL lntegrated Textile Park Pvt. Ltd. Annexure DG of M/s Kejriwal Integrated Textile Park Pvt. Ltd on 3oth October 2015 at 11 Date:30.10.2015 To, Shri Pravin Sheth Senior Citizen, Technocrat & Environmentalist Ankleshwar, Gujarat. Subject: Response to EPH hours. Dear Sir, In regard to the above subject, please find herewith our point wise response Point no. 1 to 3 are suggestion/ appreciation for project The pay back period of project capital cost will be approx. 6 years. 01. We have designed the complete close system for treatment of water and waste water. CETP is the integral part of the operation of water jet looms. Beside this CETP will be develop in different modules. So that at the time, portion of CETP will always in operation. We made a sufficient provision of for storage of generated wastewater. These are the precaution taken to ensure we shall maintain always zero liquid discharge state. 02-Direction of the canal is in West direction. O3-Slope level direction is slope of site in two part, N-W Corners South Side 6. Color had been measured by UV-VIS Spectrophotometer 117 instrument and results are reported. 7. We shall decide the plinth level to maintain the slope for gravity collection network. All units' plinth level will be same. COP 2 lowest where ETP location 8. a. We have considered only major parameters. b There are total 43 parameters in different category according to lS 10500. Major parameters were selected for analysi otfice i7w4, world Trade centre, Ring Road, SURAT - 395 002. Phone : (o) 4003307 Fax : +g1-261-2g1g212 E-mall : [email protected] URL : http:/^vrvw.kejriwaltextilepark.com CtN : Ul7t2oGJ2OO8PTCOS3SS3 l N KETRTWAL Integrated Textile Park Pvt. Ltd. 9. lt is not a loss, 80 10. a. Start hour is 00:00 AM on b. Total calm hour is approx 32 hrs. KLD 11. a-- List of industries water it will be utilized in gardening purpose. l't is given in March ,2OL5 and Stop hour is 23:00 PM on 31* May, 2015. the answer of point 11-C b. There is no process emission from the proposed project. Thus only basic NOx, PM10, PM2.5) has been selected for baseline monitoring. MQ parameters (Sox, 12. We have considered your suggestion and same shall be incorporated in Final EIA report b--We have considered your suggestion and same shall be incorporated in Final EIA report c--List of major industries are as below 1. KejriwalGeotech Pvt. ttd. (Within the plant premises) 2. Tulsi Paper Mill Pvt. ttd. (North West direction) 13. We shall incorporate the same in final EIA report 14. Primary data has been collected by FAE 15. The year ofcensus is 2011 15. SEPPL (Saurastra Enviro Proiects Pvt. Ltd.) at Kutch. lt is 500 km away from the project site 17. lt will be generated in minor quantity; it will be stored properly and reused within plant premises. 18. The green belt data is as below O1--This is a no emission industry. Hence the guideline is not applicable 02---Question is not appropriate. a to c --Question is not appropriate. 03 (a to c) 5 liters/m2 norms will be followed for usage of treated waste water in green belt 04-- The same shall be calculated after tree plantation otfice :7004, world Trade centre, Ring Road, SURAT - 395 002. Phone : (o) aflF307 Fax +g1-261-2g1g212 = E-mail : [email protected] URL: http://wrvw.kejriwaltextilepark.com CIN : Ul7t20GJ20OgpTCOOg5g3 o KEf RTWAL Integrated Textile Park Pvt. Ltd. 05--Kindly clarify APTI 19. (a to c) Geology study was not conducted for proposed project impacted due to the proposed proiect 20. (a) M/s Detox Corporation Pvt [td. as the said attributed will not be Lab 3rd Floor, K. G. Chambers, Udhna Darwaja, Ring Road Surat - 395002, Gujarat, lndia b--lt is approx rtO kms away. c-- The same is submitted with your previous reply d-- Yes. e--- lt will be mentioned in Final EIA report. 21. Yes, we proposed to construct ground water recharge percolation wells. Location in the layout is shown in page no A-7. ,6,. ffi Office :7004, World Trade Centre, Ring Road, SURAT - 395 002. Phone : (O) aOffiO0Z Fax : +91-261-2g1g212 E-mail : [email protected] URL: http:/Aruvrv.kejriwaltextilepark.com CIN : UlTl2OGJ2OO8PTCOS3S&| r t G@AnAT SrATE pErRot8 { EWEI.IP AllO RryD HP foR I4oDMc^TIoI oFTARARI CPS MD CoMr&TIor|oF crRpoRArDN ADDmoilAr wElrs ro TARARJR eps Dl 8rofiCB{N2 Anacsm & Ccrfficab ol Kadnt Enyimnmontd CottsulUtb lnm KADA{ EHvtRonr'tElTA ConsurAilrrl Juryzols QCI / ,tABfr 233