TAPLOW RIVERSIDE
Transcription
TAPLOW RIVERSIDE
TAPLOW RIVER SIDE D e s i g n a n d A c c e s s S tat e m e n t A u g u st 2 014 Contents Introduction /// 01 Co n t e x t /// 03 E x i s t i n g Co n s t r a i n t s /// 15 Site Opportunities /// 17 Vision /// 23 M a s t e r p l a n D e v e lo pm e n t /// 25 P r o p o s e d M a s t e r PL a n /// 29 Proposed Building Heights Diagram Proposed Land Use Diagram P l a n n i n g A p p l i c at i o n A - Berkeley Homes (Three Valleys) Ltd B - Listed Bridge C - Footbridge L andscape Proposals Green Infrastructure Landscape Masterplan D e ta i l e d A r e a s Skindles Restaurant, Houses & Gateway Skindles Senior Living Berkeley Boatyard & National Grid Offices Jubilee Meadow Jubilee Riverside South Jubilee Riverside North Thames Riverside Frontage - North Thames Pedestrian Bridge Jubilee Square 31 32 /// 33 33 35 37 /// 39 40 42 /// 43 43 45 47 49 51 57 63 64 65 M at e r i a l s S t r at e g y /// 67 H i s to r i c B u i l d i n g s /// 71 Acc e ss S t r at e g y /// 75 Introduction This design and access statement has been prepared on behalf of our client, Berkeley Homes (Three Valleys) Ltd, in accordance with statutory requirements set out in the Development Management Procedure Order 2010, as amended, in support of this planning application. This application forms part of the planned comprehensive redevelopment of the application site known as Mill Lane, Taplow. This redevelopment is subject to three discrete planning applications, which have been submitted simultaneously. In order to keep the planning process as simple as possible, this design and access statement has been written as a single document which applies to all three planning applications. A copy is submitted with each application. It addresses each set of proposals as a separate section within the document, and facilitates a cumulative assessment of the whole development. This design and access statement should be read as a supporting document to the relevant planning application with reference to the relevant section contained herein. For reference, the planning applications comprise the following: A. Full planning and Conservation Area consent for demolition of existing mill buildings, existing warehouses, associated structures and former Skindles hotel to provide 187 new dwellings and 40 senior living apartments, restaurant, improvements to existing boatyard, new public square, new open space, new pedestrian footway and cycle links, car parking, enhanced biodiversity, flood mitigation measures, removal of TPO trees and re-provision on-site, retention and refurbishment of historic buildings on site into 18 further dwellings, new road junction, landscaping and associated works (Application A); 01 /// TAPLOW RIVERSIDE DESIGN AND ACCESS STATEMENT B. Glen Island Listed Building consent (Application B); C. Full application and Conservation Area consent for construction of a footbridge over the Thames from Mill Island to Ray Mead Island (Application C); D. Full application and Conservation Area consent for demolition of existing gas holder and associated structures and restoration of the land to provide 10,000 sqft of commercial space and 12 no. homes, car parking, landscaping and associated works (Future Application); • Please note Application D will be submitted shortly after A,B and C. In accordance with the Development Management Procedure Order, this design and access statement provides: 1. An explanation of the design principles and concepts that have been applied to the following aspects of the development: (i) Amount; (ii) Layout; (iii) Scale; (iv) Landscaping; and (v) Appearance. 2. Demonstration of how the proposed development’s context has influenced the design, including impacts on openness of the Green Belt; 3. The applicant’s approach to access and how relevant local plan policies on access have been taken into account including an explanation of how any specific issues which might affect access to the proposed development have been addressed. 4. An indication of public pre-application consultation undertaken in relation to access issues, and how the outcome of this consultation has informed the proposed development. The site is located on Green Belt land to the north of the A4 Bath Road. The land extends up to a point between the River Thames to the west and the Jubilee Relief River to the east. The very northern tip of the site is located immediately to the east of Ray Mill Island (which is located within the Royal Borough of Windsor and Maidenhead). Mill Lane passes through the site, linking Bath Road to the south with Taplow village to the north-east. Maidenhead town centre is accessed from Bath Road, via Maidenhead Bridge, located immediately to the south-west of the site. The Mill Lane Opportunity Site currently accommodates a mix of land uses. These include the former St Regis Paper Mill buildings and Skindles hotel, a gas holder (not in active use), operational office accommodation, a number of former gentleman’s residences fronting onto the Thames and large areas of open space. There are also a large number of moored boats/ houseboats along the banks of the Thames. Berkeley Homes (Three Valleys) Ltd (The Applicant) Berkeley Homes (Three Valleys) Ltd are a member of the Berkeley Group. They base their business on creating beautiful, successful places across London and the South of England. They have been ranked Britain’s most sustainable major house builders for the last seven years in a row and most recently have been awarded the UK’s highest accolade for business success - The Queen’s Award for Enterprise for Sustainable Development. This is the second time the Berkeley Group has been recognised, having previously won the award in 2008. The award recognises 5 years of continuous achievement in delivering sustainable development. ‘Sustainable Development is any activity which ensures a better quality of life for everyone, now and for generations to come’. The development team has a wealth of experience sensitively developing sites in this region, providing much needed homes and practical improvements to the local infrastructure. The site is located on Green Belt land to the north of the A4 Bath Road. The land extends up to a point between the River Thames to the west and the Jubilee Relief River to the east. Taplow Riverside Aerial 02 /// TAPLOW RIVERSIDE DESIGN AND ACCESS STATEMENT Contex t Aerial Location Plan 1 Maidenhead Bridge The existing distinctive and varied character of the Taplow Mill Site and the surrounding area plays an important role in establishing a character for the proposed development. Character is often mistakenly referred to as ‘architectural style’ and it is much more than that. Character is also about how buildings relate to each other in terms of scale, massing and grain. Landscape is a further element that will have a significant effect on the character of a place and which is most relevant to the Taplow Mill Site. River Thames Bath Road M ill The adopted SPD identifies four broad areas of distinctive character for the site; In broad terms, we agree with the characterisation and find the general description to be informative. However, in order to develop a concept for the site, it is important to widen the character appraisal and to include the Maidenhead Riverside and Jubilee Relief River frontages. L ane 1. Maidenhead Riverside frontage opposite Skindles. Traditional building forms with pitched roofs and gables. In this opening section, we have presented a series of photographs which have been taken following a specific route. Broadly speaking the route starts at the Maidenhead Bridge takes in the Maidenhead Riverside leading to Boulters Lock and returns to the bridge. It then enters the site passing through all of the character zones identified in the SPD and the eastern side of the Jubilee Relief River. Finally, the route takes in the Bath Road frontage. Each photograph is numbered with the view direction and position along the route and can be located on the adjacent location map. In addition, a short caption is provided for each photograph with a character description. Jubilee Relief River 6. Traditional houses sit side by side with contemporary apartment buildings creating a rich diversity in character. Key Access Routes 2 3 4 03 /// TAPLOW RIVERSIDE DESIGN AND ACCESS STATEMENT 5 1 6 7 8 Rive r Th am es 11. Low rise brick apartment building with punched hole window and door openings. The floor slabs exposed to emphasis the horizontal nature of the building. 9 10 11 12 13 14 15 18 19 20 17 16 Route Detail 1 16. View looking south from the proposed landing point of the pedestrian Bridge 3. Maidenhead Bridge. 4. Corner turning building with gables on both frontages and steeply sloping roof pitches. 5. Contemporary apartment building with large format openings and cantilevered balconies 7.Tree lined street creates a pleasant walking environment along the river’s edge. 8. The trees on the ait provide a strong visual screen to the existing dwellings on the Maidenhead side of the river. 9. House with ornate timber and rendered panel detailing and a strong use of gables. 10. Contemporary apartment building with ribbon windows and a horizontal emphasis created by the brick external walls. This building is six storeys high. 12. View looking north towards Boulters Lock. 13. A recent low rise brick and rendered apartment building using a simple repeated gabled projecting bay to create a rhythm to the street. 14. A classical Regency style house sits adjacent to the contemporary apartment building. 15. Boulters Lock restaurant has a modern vernacular aesthetic with generous glazed external walls and simple pitched roof. 19. View along the Thames River looking south from Boulters Lock 20. Tree lined riverbank to Taplow Millside where the proposed pedestrian bridge is to be located. 17. View looking north towards the public park on Ray Mill Island where potential access will be available from the proposed pedestrian bridge. 18. Classic - contemporary boat house architecture of the Boulters Lock Restaurant and bar. 04 /// TAPLOW RIVERSIDE DESIGN AND ACCESS STATEMENT 2. View looking north from the Grade 1 Listed Maidenhead Bridge. Aerial Location Plan 2 Maidenhead Bridge River Thames Bath Road M ill L ane 21. Four storey apartment building with pitched roofs and casement doors and windows opposite Boulters Lock Restaurant. 22. The sunlight on the left bank is where the opening in the landscape occurs to reveal the Flank Gable of Glen Island House. 27. Jenner’s Café and riverside gardens and children’s play area provide additional recreational space in the locality. 28. The Thames side frontage of the Taplow Investments buildings with ornate timbered framing and white painted walls. The varied roof pitches and spans create a pleasant composition to the boathouse aesthetic. Jubilee Relief River Key Access Routes 34 36 35 37 33 32 31 30 29 05 /// TAPLOW RIVERSIDE DESIGN AND ACCESS STATEMENT 28 27 38 Rive 26 r Th ame s 31. Eclectic mix of houses facing the River Thames with a domestic scale. There is a wide variety in the detailing between the houses. 25 24 23 21 22 Route Detail 2 35. The varied architectural elements to the Skindles riverside frontage as viewed from the open space on the Maidenhead side. 24. The river bank to the south of Glenn Island House has a dense, mature landscape frontage creating a visually impermeable screen. 29. To the south of the Taplow Investments buildings is the existing boatyard where industry is on open view. 30. View looking south towards the Grade 1 Listed Maidenhead Bridge. 32. Skindles river frontage comes into view beyond Bridge Eyot. 33. Open space with to the west of the Bridge 34. The Grade 1 Listed Maidenhead Bridge. 36. The varied architectural elements to the Skindles riverside frontage as viewed from the bridge on the Maidenhead side. 37. The existing boatshed and boat yard adjacent to the bridge with its structure has a resonance with the Taplow Investment Boatyard buildings. 38. White painted Corrugated iron wall panels painted white with a profiled sheet roofing material and exposed structural frame relate to the boat building heritage of the river front. 25. Only the very top of the chimney to the St Regis Paper Mill can be seen above the tree tops. 26. The recreational aspect of the Thames River along the Maidenhead river walk. 06 /// TAPLOW RIVERSIDE DESIGN AND ACCESS STATEMENT 23.The flank wall of Glen Island House as viewed from directly opposite beneath the mature tree canopy. Aerial Location Plan 3 Maidenhead Bridge River Thames Bath Road M ill L ane 39. Windrush car showroom with rainscreen panelling and glazed frontage to the Bath Road 40. White painted rendered external wall with slate pitched and hipped roofs to Skindles on Mill Lane. 45. Boundary to the National Grid riverside site. 46.Mill Lane entrance to the existing boatyard. Jubilee Relief River Key Access Routes 07 /// TAPLOW RIVERSIDE DESIGN AND ACCESS STATEMENT 39 40 41 Rive 42 43 r Th am es 51. The dense tree planting to the land north of Dunloe Lodge. 44 45 46 50 47 48 49 56 51 52 54 53 Route Detail 3 55 57 58 56. Mill Island House with its articulated frontage and varied roof pitches and gables. 42. View looking south towards the junction of Mill Lane with Bath Road. 43. Modern interpretation of the traditional Half-timbered and rendered panel houses on Mill Lane. 44. The leafy semi-rural atmosphere to Mill Lane looking north. 47. Mill Lane side of the Taplow Investment buildings are similar to the riverside but the flank walls are dark stained shiplap boarded. 48.The traditional forms of Driftwood Cottage are emphasised by the ornate upper storey tile hanging. 49. A glimpse of the existing industrial storage shed can be viewed over the gate to the existing access point. 50. The remains of the fire damaged structure to Dunloe Lodge with its distinctive chimneys. 52. The bend in the Road just south of the entrance to Severnside on the right. 53. The imposing structure of the former St Regis Paper Mill with the tree lined edge to the creek to the left. 54. View looking south towards the entrance of the former St Regis Paper Mill 55. The rendered and brick frontage to the Victorian Cottage sitting cheek by jowl with the industrial paper mill. 57. Imposing linear nature of the existing Mill Building creates a barrier between the Jubilee Relief River and the River Thames. 58. Existing footbridge crossing one of the old mill race outlets. 08 /// TAPLOW RIVERSIDE DESIGN AND ACCESS STATEMENT 41. Flank wall to Windrush car showroom and gravelled parking area. Aerial Location Plan 4 Maidenhead Bridge Bath Road River Thames M ill L ane 59.Existing Industrial storage building which could be converted for residential use. 60. View looking north towards the end of the Paper Mill Building. Jubilee Relief River 63. The mass of the former paper Mill is emphasised by the continuous building form which continues along the Jubilee Relief River. Key Access Routes Rive 09 /// TAPLOW RIVERSIDE DESIGN AND ACCESS STATEMENT 63 62 64 59 60 61 67 68. The area to the north of the stables building has a rural feel and is heavily planted with trees and shrubs. 68 69 72 77 76 Route Detail 4 r Th ame s 65 66 75 74 73 64. Maidenhead river frontage viewed from the western façade of Glen Island House. 70 71 J u b i l e e R e li e f R i ve r 73. The tranquil edge of the Jubilee Relief River Frontage with the industrial context of the former Paper Mill buildings and silos. 69. A tranquil space opens out with a tree in the middle. 70.A man made landing ramp is located opposite Boulters Lock Restaurant on the Taplow side and is where the proposed footbridge is to be located. 74.The reflective nature of the water is emphasised in this view looking north along the Jubilee Relief River. 75 The dense tree lined embankment to the left provides an impenetrable visual barrier to the site. 62. The formal frontage to Glen Island House overlooking the garden. 66. View looking south between the Paper Mill and Glen Island House. 67. South facing elevation of the existing stables building with brick external walls and a plain tiled roof covering, and some ornate detailing. 71. View looking south through the open space. 76. Existing buildings encroaching onto the river frontage. 72. The transition between the northern rural edge of the site and the existing developed Paper Mill. 77. The mass of the former paper Mill is emphasised by the continuous building form which continues along the Jubilee Relief River. 10 /// TAPLOW RIVERSIDE DESIGN AND ACCESS STATEMENT 65.The northern, formal entrance to Glen Island House. 61.Eastern façade to the Grade II listed Glen Island House with steeply pitched roofs, gables, buff brick external walls and bath stone window surrounds and dressings. Aerial Location Plan 5 Maidenhead Bridge River Thames Bath Road M ill L ane 78. A view looking back towards the steep bank lined with densely planted trees. 79. The northern side of the weir where the tumbling water is audible. 84. The existing footpath connecting the bridge to the eastern meadowland. 85. This view illustrates how well the Severnside site is screened from view with only the top of the paper mill roof coming into view. Jubilee Relief River Key Access Routes 11 /// TAPLOW RIVERSIDE DESIGN AND ACCESS STATEMENT 93 80 92 82 J u b i l e e R e li e f R i ve r 88 78 87. The openness of the greenbelt is apparent in this view along the footpath and over the Jubilee Relief River Lagoons. 81 83 90 91 79 84 89 85 87 86 Route Detail 5 91. View looking north east towards Taplow Village where the roofscape of Taplow Court peeks above the existing tree line. 80 The municipal nature of the weir switchgear room and car park. 81. The view looking north from the bridge over the weir highlights the continuous building form along the river frontage. 82. View looking south with the heavily screened frontage to Severnside site to the right and the footbridge crossing in the distance. 83. The municipal nature of the road bridge over the Jubilee Relief River detracts from the semi-rural nature of the surrounding area. 88. The Jubilee Relief River. 92. View looking south along the public footpath where the existing landscape completely shrouds the pathway. 89. View along the eastern boundary to Severnside. 93. Panoramic view across the open meadow land from the north eastern corner of the space. 90. The east bank of the Jubilee Relief River showing the tall hedge to the footpath providing additional screening to Severnside. 12 /// TAPLOW RIVERSIDE DESIGN AND ACCESS STATEMENT 86. Panoramic view from the public footpath approximately half way up the hill which emphasises the green outlook from this point. Aerial Location Plan 6 Maidenhead Bridge River Thames Bath Road M ill L ane 93. The existing unused gas holder sits in a flat area of grass. Jubilee Relief River 94. The footpath runs parallel to the National Grid Land to the right. Key Access Routes Rive r Th ame s 13 /// TAPLOW RIVERSIDE DESIGN AND ACCESS STATEMENT 103 102 96. View looking back up the footpath north eastwards with the open meadow to the right. 101 97 98 100 96 95 99 Route Detail 6 94 93 101. Three storey apartment buildings of low architectural merit opposite the Windrush Car Showroom. 97. View taken opposite the proposed entrance to the site looking towards the Windrush Car Showroom with Skindles in the background. 98. View looking east along the Bath Road opposite the proposed site entrance. 102.Vantage point from the north eastern corner of the junction of Mill Lane with Bath Road looking towards the Maidenhead Bridge. 103.View looking through the entrance of the existing boatyard with Maidenhead Bridge in the background. 99. View looking west along the Bath Road with the site frontage on the right. 100. Traditional domestic scale properties on the south side of the Bath Road opposite the proposed site entrance. 14 /// TAPLOW RIVERSIDE DESIGN AND ACCESS STATEMENT 95. Panoramic view from the mid-point of the southern boundary to the open meadow looking northwards. The existing Gas Holder and plant room are visible through the trees. Existing Constraints The site has a number of key constraints which need to be considered in the development of the proposals. • The site sits within a designated area of Green Belt land. • Planning guidance restricts the amount of proposed development to not exceed the footprint of existing buildings. • One of the gentleman’s villas is Grade II listed with other important non listed homes of local historical interest within the wooded banks of the Thames. • Development is restricted within large areas of the site which are in a flood zone with only a limited area in the centre of the site outside the flood zone - this boundary is indicated by the blue line (see fig.2). • There are significant areas of mature woodland and tree belts including a large zone of high ecological value. The gas holder is no longer in use. We are currently in discussion with National Grid to bring forward their land as part of a comprehensive redevelopment of the site. The diagram on page 19 graphically represents these constraints. Planning The Core Strategy identifies the Mill Lane Opportunity Site as an area where comprehensive redevelopment would offer the potential to address existing planning problems. The Mill Lane Taplow SPD identifies the following constraints: • Green Belt • Flood Risk • Conservation/ Heritage; • Archaeology; • Land contamination (gas holder); • Biodiversity; • Trees; 15 /// TAPLOW RIVERSIDE DESIGN AND ACCESS STATEMENT • Bath Road access These form a complex range of site constraints which guide the scale, form and location of future development opportunities. The most influential are expanded on within this section. Some of these constraints can also be seen as opportunities. For example trees act as screening and provide amenity value to residents and visitors. Heritage Much of the site lies within the Taplow Riverside Conservation Area, which was originally designated by South Bucks District Council in 1999 but extended and re-designated in 2006. Glen Island House is statutorily listed at Grade II (list entry no. 1392491). The Taplow Riverside Conservation Area Character Appraisal identifies several buildings on the site – the Power House, Mill Island Cottage, Mill Island House, Dunloe Lodge and the former Hotel (including No. 5 Mill Lane) – as all making a positive contribution to the character of the conservation area. On this basis they might also be considered to be ‘non-designated heritage assets’ in the terms of the National Planning Policy Framework (NPPF, 2012). Immediately adjacent to the site’s southern boundary is the Grade I listed Maidenhead Bridge. Beyond the site on the west side of the Thames, the Maidenhead Riverside Conservation Area occupies the riverside opposite the site. Their settings will therefore need to be considered in any proposals. To the east lies the Taplow Conservation Area, which incorporates a number of listed buildings including the Grade II listed Taplow Court, and the scheduled remains of a Saxon barrow, church and cemeteries. The extensive grounds of Taplow Court are also designated a Grade II Registered Park and Garden, and there are two other Registered Parks and Gardens at Berry Hill to the south east (Grade II), and Cliveden to the north (Grade I). The design of the proposed development has responded to these constraints by adopting different character areas. The industrial area of the former mill will accommodate the apartment buildings, whilst the area around the open common will have a village feel. The vacant historic buildings will be returned to their original residential use, and conserved as appropriate, ensuring their survival and long-term future. In respect of the proposed replacement of Skindles, the approach has been to adopt a restrained, astylar form for the restaurant building and loggia which draws on neoclassical influences. This is intended to allow the Grade I listed bridge to remain the star in river views, while being a polite neighbour to it (as well as to the diverse other styles and forms nearby). The similar building on the other side of Mill Lane will re-establish the historic duality of the old Skindles Hotel, which occupied buildings on both sides of the road. • Inclusion of native species in landscaping, and a variety of trees, shrub and grassland species to promote structural diversity on site benefiting a range of species. Flood Risk The site is bordered by the River Thames on the west and the Jubilee River (Flood Relief Channel) on the east, both flowing from north to south. Bath Road, the A4, forms the southern boundary and provides dry escape to the east. Mill Lane bridges over the Jubilee River and provides a dry escape to the north east. The Environment Agency’s Flood Risk Maps show the majority of the site to be within flood zone 2 (Medium Risk), with some areas to the north and west falling into flood zone 3 (High Risk). The extent of the 1:100 year plus climate change flood plain is shown in Figure 2 which overlays the Environment Agency’s modelled flood levels with the site topographic survey levels. K EY The site has flooded to varying degrees in the past and this is recorded in the historic flooding maps appended to the Flood Risk Assessment. However, since the Jubilee River flood relief channel was brought into use in 2002, the site has not flooded, other than very minor flooding in 2003, when low lying land close to the Mill Races was flooded. 1 in 100 year + climate change/flood event extent 1 in 100 year flood event extent Existing topographical contour KEY : 1 IN 100 YEAR + CLIMATE CHANGE EVENT EXTENT 1 IN 100 YEAR FLOOD EVENT EXTE EXISTING TOPOGRAPHICAL CONTO Ecology The Mill Lane Site is dominated by previously developed land and associated structures, however also supports seminatural habitats of nature conservation value including seminatural broadleaved woodland, semi-improved grassland and connecting shrub, hedgerow and ruderal habitat. The adjacent River Thames and Jubilee River are of particular nature conservation value and measures are designed into the scheme to avoid direct effects upon these watercourses and associated ecology. RIVER THAMES RIVER THAMES A suite of ecological surveys have been completed between approximately 2007-2011, and these were updated in 2014 to provide robust, current baseline information regarding ecology on Site. The Site is used by at least eight bat species for foraging and commuting and three species roost on Site within built structures. Common reptile and amphibian species are also present, including grass snake, common toad and smooth newt within develop-able areas. The assemblage of bird species present includes a variety of species reflecting the range of habitats present, of note is the presence of breeding kingfisher (a species listed under Schedule 1 of the WCA and afforded special protection). JUBILEE RIVER JUBILEE RIVER Glanvil Ecological avoidance and mitigation measures will include: • C reation of alternative bat roosting opportunities to replace those to be removed, and appropriate working methods licensed by Natural England where appropriate to mitigate effects upon bats; • C reation of alternative bird nesting habitat, with areas specifically designed to be suitable for kingfisher, to avoid net loss in bird diversity on Site; Project Engineer : P.W Scale : 1:2 Project Director : H.G Date : AU Status : Flood Boundaries Bath Road Maidenhead Bridge River Thames Mill Lane Jubilee Relief River K EY Taplow Court Existing Trees Existing Buildings River Listed Buildings Area of High Biodiversity Values SSSI Future Phase Constraints Diagram 16 /// TAPLOW RIVERSIDE DESIGN AND ACCESS STATEMENT Boundary Site Opportunities The site constraints inform the potential development areas out of which opportunities will start to shape the general design concept for the redevelopment of the site. In conjunction with the Landscape architects, PRP Architects have developed a landscape led development strategy which will create a sense of place and enhance accessibility and connectivity for existing and new residents and businesses. Our analysis of the existing site and surrounding area has led us to understand it is a collection of places, spaces and routes but they lack cohesion and connectivity both physically and visually. Our concept seeks to address this and to release the site development potential to create a new residential quarter sitting harmoniously with the existing employment and leisure uses, through creating the opportunity for further commercial uses on the site, as well as enhancing the existing landscape to encourage safe routes through and use of the meadow and woodland. 1 The key design opportunities which will define the masterplan are as follows: • Landscape led approach due to the large and attractive areas of open space • Removal and decontamination of the industrial uses • Enhance existing leisure uses and create opportunities for new leisure activities • Protection and enhancement of the existing wildlife habitats and providing more opportunities for people to experience nature • Potential to link in with existing access footpath and road network to create internal and external meeting places that are both attractive and functional • Provision of new links with existing cycle paths and footpaths around the site, including a new bridge across the Thames, to create new recreational routes of varying length and character 17 /// TAPLOW RIVERSIDE DESIGN AND ACCESS STATEMENT • Potential to connect/retain listed and non-listed buildings as attractive features 1. Routes and Connections • Potential to create new apartment building on site of Mill with riverside views • Opportunity to provide improved access to riverside walks • Properties with riverside views These diagrams graphically illustrate our approach to developing a comprehensive masterplan for the site area. • The Bath Road runs east - west and forms the southern edge to the site with a single point of access by Skindles. • Mill Lane leads to the existing bridge crossing the Jubilee Relief River. • Mill Lane also connects with Berry Hill and to Taplow Village on the eastern side of the Jubilee Relief River. • Existing footpath crosses site and connects Mill Lane to Taplow Village. • The plan highlights the opportunity to create a series of circular routes which link into the existing Thames Path and the wider network of pedestrian and cycle networks, thus encouraging the residents to explore Maidenhead and Taplow while also providing an opportunity for leisure and exercise. • The key design principle is to retain and expand the existing network of footpaths which run through the site and connect into the wider network existing of footpaths • It is proposed to retain the public right of way which runs from Bath Road through the site to Taplow • This route will also provide the main cycle route through the site which links into Cycle Route N61 which runs along Bath Road to the south of the site. • As well as the main public routes there will be a network of footpaths within the residential areas which will provide easy access to local amenities and travel networks and discourage the use of cars. 1 1 2 2 • Relocate primary entrance to the site and improve access to the site. • Improve safety by reconfiguring the existing Mill Lane Access • Re-creating the river frontage and marking the entrance to the site. • Incorporate appropriate forms of development close to the Bath Road. • The new properties which will replace the existing Skindles Hotel will be residential properties. • The gardens to the rear of these properties will be open and free from boundaries and will focus on the unique character 3. Thames Side Commercial River Frontage of the Thames which they lead down to; there is also the potential for private moorings and access to the water from these gardens. • The existing entrance to the site from Bath Road will be retained as a one way left turn in only vehicular access to the site. • It will form one of the major gateways into the new development as well as providing access for existing residents. • Potential to link in with existing access footpath and road network to create internal and external meeting places • Carefully located parking areas will be introduced to service the new restaurant and residential properties. • Potential to re-invigorate the river frontage. • Potential to introduce employment opportunities to the site • Improved parking facilities could be created to ease congestion on Mill Lane • Opportunity to provide improved access to riverside walks 18 /// TAPLOW RIVERSIDE DESIGN AND ACCESS STATEMENT 2. Gateway Entrance 3 Site Opportunities 1 1 3 2 3 2 5 4 4 19 /// TAPLOW RIVERSIDE DESIGN AND ACCESS STATEMENT 4. Meadow Land • The existing grassland would be diversified to provide speciesrich meadow. • It is envisaged that this would be a large, informal recreational space which would be primarily managed for nature but could also incorporate low intensity uses such as a grass maze 5. Existing Hardstanding • Remove existing damaged trees to improve views across the meadow and increase visual connectivity to the meadows on the east of Jubilee River. • Improve connectivity to the public right of way to encourage use by new and existing residents • No development is envisaged in this area. • Opportunity to provide improved access to riverside walks • We want to improve and enhance the space and improve pedestrian connectivity. • Potential to create connected areas of habitat and ecological area to the north of the site • Retain and enhance the existing Public Right of Way • Provide functional and attractive meeting places connected by cycle/footpath network within the site • Formerly the Severnside container storage area, this nestles down and is well screened from the surrounding areas. We see this area as an opportunity to create a lower scale of development with an organic grain. This also overlaps with the Meadow land and incorporates the National Grid Gas Holder site area. • A high quality residential landscape treatment will be introduced with tree lined streets and landscaped gardens to the front of the properties. • The existing mature trees to the east of the site boundary will be maintained to provide screening to the key views from the public footpath on the opposite side of the Jubilee River. • Key road junctions will be paved and landscaped and act as informal gateway/squares within the residential area. • Where possible mature trees will be maintained along Mill Lane to further screen the development and provide a mature landscape setting. 1 1 3 3 2 5 6 5 4 4 6. Mill Side Area • The existing large scale industrial nature of the buildings and setting provide a strong clue as to an appropriate form of development to be incorporated here. The Existing bulk and Mass of the Paper Mill currently prohibits visual permeability between the Thames Side and the Jubilee Relief River Side, however, we see this is an area of opportunity to open views up though the site creating higher density taller buildings whilst preserving the openness of the Green Belt. 6 7 7. Wooded Area • We want to improve and enhance the space and improve pedestrian connectivity. • An attractive frontage will be introduced to the edge of the Jubilee River. This will be a 5m wide hard landscaped area which will provide public access to this side of the apartments. • Provide a link to the public footpath to the north and the proposed new pedestrian bridge link at Boulters Lock. • Introduce vehicular access and parking areas. • This provides the very densely tree planted outlook from the Maidenhead Riverside and is rich in ecology and biodiversity. The land is generally at a lower level and at higher risk of flooding and consequently offers little opportunity for new development. However, there are a number of existing buildings that have a significant heritage value and therefore offer a better opportunity in conversion • The character of the Thames side of the site will be retained and largely unchanged due to the retention and refurbishment of the existing buildings and mature landscape setting. • Key to the retention of this character is the selective management of the large mature trees which will screen and enhance the setting for the new apartment blocks located adjacent to the Jubilee River. • Creation of a new board walk which will provide a new pedestrian link to the new footbridge at Boulters Lock • Careful and sympathetic management of the exiting habitat will create a new nature area for the local residents 20 /// TAPLOW RIVERSIDE DESIGN AND ACCESS STATEMENT 2 Site Opportunities 1 1 3 2 5 6 7 5 8 4 4 8. New Routes 21 /// TAPLOW RIVERSIDE DESIGN AND ACCESS STATEMENT 3 2 • One of the stated aims of the adopted SPD is to provide a new river crossing and to enhance pedestrian connectivity with Maidenhead Riverside. There is an opportunity to incorporate a Riverside walk as part of the new development with a new river crossing; this will significantly enhance the connectivity of the whole masterplan area. 9 6 7 8 9. Heart of the Site • Provide functional and attractive meeting places connected by the cycle/footpath network within the site • Potential to create bridge link to the North of Taplow Mill • Potential to link in with existing access network to create internal and external meeting places for new and existing residents • The convergence of the development areas and roads and paths offers an opportunity to create a significant new public space which marks the heart of the development. • The area will provide an opportunity for public art which may take the form of a traditional water wheel alluding to the sites heritage. • The ‘heart of the site’, the square will act as a functional and attractive meeting place connected by the cycle/footpath network within the site. • Vehicular access will be restricted across the bridge in this area and access to the public car park will be maintained via Mill Lane from Taplow Village. • Pedestrian and cycle access will not be restricted in this area. Employment & Leisure Wooded Riverside Frontage Reconnecting the Site • Creating a new gateway into the site • Retain and add new offices • Create new footpath connection • Reviving history of Skindles with a new restaurant • Provide new car parking • Preserve historic buildings • Providing new connections and routes to existing open spaces and footpaths • New leisure uses • Preserve and enhance biodiversity and ecology • Proposed bridge to the north which connects with Boulters lock Meadow Jubilee Riverside South Housing Jubilee Square Jubilee Riverside North Apartments • Open existing meadow to public access • Low-rise homes inspired by river frontage architecture • Providing a new central square at its Heart • Riverview apartments • Location for public art • New riverside walk • Enhance biodiversity and ecology 10. Overall Development • Set behind mature wooded landscape 22 /// TAPLOW RIVERSIDE DESIGN AND ACCESS STATEMENT Gateway Vision The proposed masterplan established through a landscape led design approach that builds on the unique historical character of the site to create a new sustainable community within a rich landscape setting, aims to reconnect the site with its surroundings and re-energises the disused site by bringing new residential, commercial and leisure uses into play. New visual and physical connections, and entrances are established with safe routes through the Jubilee Meadow, a new pedestrian bridge connecting Maidenhead with Boulters Lock. A gateway is created into the site, with the revival of the Skindles restaurant and sister building of 3 flats framing the existing entrance to the site. The river is activated along this edge through residential activity and opening up for pedestrian routes along the frontage and introducing new employment and leisure uses through provision of the new and existing commercial buildings along the river frontage. 23 /// TAPLOW RIVERSIDE DESIGN AND ACCESS STATEMENT A new footpath extending to the wooded riverside footpath helps preserve and enhance biodiversity and ecology whilst activating the area. In addition there is a proposed boardwalk along the Eastern boundary of the site framing Jubilee Meadow. The new Jubilee Square creates a connection between the Jubilee Riverside South and Jubilee Riverside North, acting as a key connection point and heart of the site. 24 /// TAPLOW RIVERSIDE DESIGN AND ACCESS STATEMENT Masterplan Development March 2014 The initial draft masterplan prepared in March illustrates the principles of the development in response to the concept as described in the previous section. This draft of the masterplan was presented to South Bucks District Council Officers at a meeting on 14th March. The principle elements are: 1 New Vehicular and pedestrian access from the Bath Road 2 Redevelopment of Former Skindles Hotel river frontage with a new restaurant and residential accommodation Maidenhead Bridge 3 Development of a Senior Living building wrapping around the Windrush car dealership and creating a gateway entrance to the site with the new Skindles redevelopment. 4 Mill Lane will be closed to traffic improving safety to Bath Road, but this section of road will be retained for existing resident’s access to the properties on Mill Lane. 6 Three Finger blocks of apartments on the site of the former paper mill. These are arranged to provide visual connectivity between the buildings towards the waterfront. Bath Road 5 Residential development of the Jubilee Riverside South area with lower density houses in a traditional street pattern and back to back gardens in general. 2 4 3 M ill L an e Rive 1 7 5 7 The woodland area comprising existing buildings to be retained and converted for residential use. 25 /// TAPLOW RIVERSIDE DESIGN AND ACCESS STATEMENT Jubilee Relief River March 2014 Masterplan 6 r T ha m es Masterplan Development April 2014 The second draft masterplan prepared in April illustrates the development of the design particularly with regard to the urban design and landscape approach. This followed comments raised at the Design Council Workshop held on 24th March. This draft of the masterplan was also presented at the first Stakeholder consultation event held at Maidenhead Rowing Club on 2nd April and Taplow Village Hall on 5th April. The principle elements are: 1 The design of the new junction onto Bath Road has been refined with a stronger, landscape setting. 2 The design of the Skindles frontage begins to illustrate the nature of the proposed form of development with an articulated roof form to reflect the boathouse architecture along the river. Maidenhead Bridge 3 The proposal for the senior living area is similar to the previous masterplan iteration. 4 Bath Road 4 The Future Phase is shown as undeveloped for this draft of the masterplan as discussions were on-going between Berkeley Homes (Three Valleys) Ltd and National Grid to secure these additional areas of land and to deliver a fully comprehensive masterplan as stated in the adopted SPD. Future Phase which has an extant planning permission for 500m² of commercial floor space and parking to be developed as part of the comprehensive masterplan. 2 M ill L 3 an e Rive 1 r T ha m es 4 5 5 Open Meadow land with landscape improvements including a proposed boardwalk and swales. 8 6 6 Further refinement to the urban design and landscape setting incorporated to the houses area on Jubilee Riverside South . Marker buildings at key locations included. 7 9 10 11 26 /// TAPLOW RIVERSIDE DESIGN AND ACCESS STATEMENT Jubilee Relief River 7 Public space informed by the form of development. 8 Landscape and access arrangements to the apartment buildings developed creating green corridors between the buildings. 9 A series of paths are included within the woodland area creating enhanced accessibility to the general area and the footpath connection to the footbridge. 10 Introduction of the Pedestrian Bridge connecting Taplow Mill Island to the landscaped garden area behind Boulters Lock Restaurant. 11 Riverside walkway along the Jubilee Relief River. April 2014 Masterplan Masterplan Development May 2014 Following the feedback from the Stakeholder consultation events and various design team reviews of the project, the third draft of the masterplan was developed in greater detail. This masterplan was presented to Officers at the pre-app meeting held at South Bucks District council on the 14th May. The principle elements area: 1 New Gateway feature with two similar buildings. The riverside restaurant adjacent to the River bank and a pavilion building of apartments. These create a sense of threshold at this important location on the masterplan. Maidenhead Bridge 2 The proposed surface treatment and landscape design is further developed as a shared surface space and the junction with Bath Road is proposed as a left in only junction. 1 Bath Road 3 The senior living accommodation is further developed following the decision to reduce the storey heights from 3 to 2 ½ storeys. Therefore the footprint of the building has increased and the eastern wing slid forward to accommodate the pavilion building to the south. 2 3 M ill L an e Rive 4 Further design development of the proposed houses on Jubilee Riverside South has resulted in a more organic character to the layout. Back to back distances have also influenced where houses are plotted. 6 4 5 The design of the northern tip to Jubilee Riverside South seeks to address the relationship of the proposed public space to the north. 5 6 The apartment buildings along the Jubilee Relief River start to illustrate the articulation of the external balconies. 27 /// TAPLOW RIVERSIDE DESIGN AND ACCESS STATEMENT Jubilee Relief River May 2014 Masterplan r T ha m es Masterplan Development June 2014 Further detailed design work to all of the development opportunity areas has been progressed following further design team meetings and feedback from the pre-app meeting held on the 14th May. In particular, the landscape has been advanced in greater detail. The principle elements are: 1 Left in junction from Bath Road illustrated. 2 Primary access to the site developed and enhanced. 3 Parking provision for senior living refined. Maidenhead Bridge 4 Improvements to Mill Lane incorporating additional visitor and existing resident parking spaces included. 5 Future Phase: Refined parking with landscape screening and the offices. 1 4 6 Public access to the river frontage incorporated. 8 Subtle changes to the layout of the houses on Jubilee Riverside South. 3 Bath Road 7 Future Phase: Alternative arrangement of houses with ‘pavilion’ style houses facing the open space. 6 M ill L 5 an e Rive 10 2 10 7 9 Public Square incorporating waterwheel feature with shared surface treatment and landscape design. 8 10 Plan and access arrangements for the retained structures in the Woodland area are illustrated in greater detail. In particular, the access to Dunloe Lodge from Mill Lane, the access to Mill Island House and the Victorian Cottage from the new estate road and the Grade II listed Glen Island House and Stables building. 9 r T ha m es 10 11 10 28 /// TAPLOW RIVERSIDE DESIGN AND ACCESS STATEMENT Jubilee Relief River 11 The estate road to the west of the apartment buildings shows points of access into the buildings and areas of additional parking that is not contained within the proposed apartment building footprint. June 2014 Masterplan Proposed Masterplan This final iteration of the masterplan incorporates further improvements to the layout following comments raised by The Design Council at the meeting held on 18th June and officers at the public exhibition held on 2nd July 2014. The Design Council were keen to see better use and access to the Meadow and to safeguard variety in the character of the space. They also had some reservations on the nature of the public space which forms the transition between the Jubilee Riverside North and South areas. At the public exhibition, council officers requested a change to the tenure mix in the Senior Living to include a proportion of Shared Ownership. They also raised local residents on Mill Lane about their concerns with regard to their outlook and parking provision. In response, the senior Living building has been completely redesigned to accommodate the change in tenure and to reduce the impact on the existing Mill Lane Residents and the Jubilee Meadow. Additional alterations to the commercial buildings on the Thames River frontage have been made to incorporate better access to the river frontage at that point. On the Jubilee Riverside South housing area, the southern cluster of twelve houses has been redesigned with a more compact plan to reduce the impact on the Jubilee Meadow. Minor improvements to the apartments on the northern tip of the Jubilee Riverside South area create a more appropriate transition to the Jubilee Riverside North area are also incorporated. The key elements of the design are described in the notes opposite. K EY 1 Left in, only junction on to Bath Road. 2 New primary access to the site. 3 2.5 storeys Senior Living. Plan reconfigured to open up the internal courtyard and shared ownership buildings. 4 Car parking provision for senior living and shared ownership. 5 Shared surface treatment to the entrance to Mill Lane, with integrated car parking. 6 Gateway pavilion buildings, marking threshold to the site. Pavilion building facing waterfront is proposed to be a new restaurant. Pavilion building to the East is an apartment building containing 3 no. of flats. 7 New townhouses Inspired by riverfront housing. 8 Open river frontage to encourage leisure activity. 9 Existing houses to be retained. Number 5, Mill Lane to be converted and restored. 10 Future Phase: Proposed commercial development for office use for this site and parking with landscape screening. 11 Rebuilt or converted existing buildings for residential use. 12 Woodland area to be conserved. 13 New Estate Road providing access to new and existing buildings, also providing off street car parking. 14 New proposed pedestrian bridge, providing dawn to dusk secured access from the site to the Western Maidenhead riverfront. 15 Jubilee North Apartment buildings. 16 Views and pedestrian connections between apartment buildings. 29 /// TAPLOW RIVERSIDE DESIGN AND ACCESS STATEMENT 17 Publicly accessible Square incorporating waterwheel and shared surface treatment, opening up to the existing bridge connection to Taplow Village. 18 Vehicular access to Taplow Village terminated, to ensure Estate Road connections are calm and of controlled speed. Mill Lane closed to through traffic west of the entrance to the public parking area. 19 Residential development of the Jubilee Riverside South area, comprising low density housing around an organic plan, with variety in the hierarchy of streets and green lanes. 20 Future Phase shown developed as part of the Jubilee Riverside South Development, providing a congruous masterplan, on the site of the existing gas holder. 21 Jubilee Meadow with landscape improvements and swales. 22 Jubilee Down - Connected to main site via existing pedestrian footbridge Proposed Detailed Masterplan 7 6 1 5 9 8 10 3 11 4 12 2 21 11 11 11 20 8 11 14 13 19 15 17 15 16 15 11 16 22 Current Masterplan 30 /// TAPLOW RIVERSIDE DESIGN AND ACCESS STATEMENT 18 Proposed Masterplan Proposed Building Heights Diagram K EY 1 Storey 1.5 Storey 2 Storey 2.5 Storey 3 Storey 31 /// TAPLOW RIVERSIDE DESIGN AND ACCESS STATEMENT 6 Storey Proposed Masterplan Current and Proposed Land Use Diagram K EY Leisure 4 1 3 1 2 2 1 Current Marlow Boatyard Services 2 BH Boatyard 3 Current Sea Cadets Boatyard Skindles Restaurant 4 Commercial 1 1 Future Offices 2 Current Taplow Investments Offices Current Retail 1 Windrush Dealership Private Sale Affordable Senior Living and Shared Ownership Apartments Existing Houses Proposed Masterplan 32 /// TAPLOW RIVERSIDE DESIGN AND ACCESS STATEMENT Residential Berkeley Application Site Berkeley Homes (Three Valleys) LTD This redevelopment is subject to three discrete planning applications, which have been submitted simultaneously. In order to keep the planning process as simple as possible, this design and access statement has been written as a single document which applies to all three planning applications. A copy is submitted with each application. It addresses each set of proposals as a separate section within the document, and facilitates a cumulative assessment of the whole development. This design and access statement should be read as a supporting document to the relevant planning application with reference to this section. 33 /// TAPLOW RIVERSIDE DESIGN AND ACCESS STATEMENT Full planning and Conservation Area consent for demolition of existing mill buildings, existing warehouses, associated structures and former Skindles hotel to provide 187 new dwellings and 40 senior living apartments, restaurant, improvements to existing boatyard, new public square, new open space, new pedestrian footway and cycle links, car parking, enhanced biodiversity, flood mitigation measures, removal of TPO trees and re-provision on-site, retention and refurbishment of historic buildings on site into 18 further dwellings, new road junction, landscaping and associated works. Riverside Frontage K EY Planning Application Boundary Current Masterplan 34 /// TAPLOW RIVERSIDE DESIGN AND ACCESS STATEMENT Berkeley Application Site - Berkeley Homes (Three Valleys) Ltd Application B Listed Building Application This redevelopment is subject to three discrete planning applications, which have been submitted simultaneously. In order to keep the planning process as simple as possible, this design and access statement has been written as a single document which applies to all three planning applications. A copy is submitted with each application. It addresses each set of proposals as a separate section within the document, and facilitates a cumulative assessment of the whole development. This design and access statement should be read as a supporting document to the relevant planning application with reference to this section. Removal of modern accretions and internal alterations to provide four residential units Glenn Island House and grounds are a Grade II listed building. This section relates to the listed building application submitted in support of the main planning application (Application A).” 35 /// TAPLOW RIVERSIDE DESIGN AND ACCESS STATEMENT Refer to page 74 for details of the proposed restoration and conversion of this building. Glen Island (Listed Building) K EY Planning Application Boundary Current Masterplan 36 /// TAPLOW RIVERSIDE DESIGN AND ACCESS STATEMENT Planning Application B - Listed Building Application Application C Footbridge This redevelopment is subject to three discrete planning applications, which have been submitted simultaneously. In order to keep the planning process as simple as possible, this design and access statement has been written as a single document which applies to all three planning applications. A copy is submitted with each application. It addresses each set of proposals as a separate section within the document, and facilitates a cumulative assessment of the whole development. This design and access statement should be read as a supporting document to the relevant planning application with reference to this section. 37 /// TAPLOW RIVERSIDE DESIGN AND ACCESS STATEMENT Full application and Conservation Area consent for construction of a footbridge over the Thames from Mill Island to Ray Mead Island. Existing Footbridge North of the Site K EY Planning Application Boundary Current Masterplan 38 /// TAPLOW RIVERSIDE DESIGN AND ACCESS STATEMENT Planning Application C - Footbridge Landscape Proposals CONCEPT PLAN Taplow Mill has historically supported a disparate range of industrial, commercial and residential uses which have created contrasting character areas. But around these built developments there remains a network of open spaces, which have been left unmanaged for many years and which provide the key to providing a unifying theme for the site. Our concept is to harness these latent areas of open space so that new, high quality and bespoke buildings will be set within extensive, connected and flowing areas of open space, providing contact with nature, varied recreational opportunities and attractive views to trees and the adjacent rivers. The key design opportunities which will define the masterplan are as follows: • landscape led approach where open space provides a cohesive framework for the different development areas • potential to link in with existing access footpath and cycle network to create internal and external meeting places that are both attractive and functional and link to the wider footpath and cycle way network • enhance existing leisure uses and create opportunities for new leisure activities including informal recreation and play, meeting and seating areas with attractive views, a variety of circular walks and cycle paths of different lengths Concept Plan • protection and enhancement of the existing wildlife habitats to include north damp and dry meadows, woodlands and wetlands • potential to connect/retain listed and non-listed buildings as attractive features • Opportunity to provide improved access to riverside walks 39 /// TAPLOW RIVERSIDE DESIGN AND ACCESS STATEMENT • Ensure that the visibility of buildings from off-site viewpoints does not increase as a result of the proposed development, thus respecting the Green belt functions of the site. Circulation Bath Road Maidenhead Bridge M ill L an e Mill Cottage Jubilee Meadow Jubilee Riverside South 40 /// TAPLOW RIVERSIDE DESIGN AND ACCESS STATEMENT Jubilee Riverside North Green Infrastructure Landscape Proposals LANDSCAPE MASTERPLAN Key objectives of the landscape master plan are set out below: • Creation of a series of interconnected spaces of varying character and formality, which provides a variety of recreational routes and an overarching, cohesive framework for development • Retention of existing views and creation of news views of the River Thames • Retention of existing character areas and creation of new ones which create different experiences within the site for residents • Creation of extensive new habitats • Management of the existing wide open meadow land to provide informal recreational opportunities, a spacious setting for new homes, and the chance to experience informal contact with nature • Creation of a network of cycle and footpath routes to create pleasant routes to encourage residents to enjoy their environment A landscape focused masterplan creates a cohesive approach to the site as a whole. By careful management and retention of existing tree cover a mature landscape setting for the new residential areas will be provided. By retaining the existing mature vegetation we will retain the character of Taplow Mill and further increase the character of the area with the introduction of a high quality public realm and residential areas. The character of the Thames side of the site, to the north of the existing employment uses, is currently defined by the large, often attractive, private residences and their generous garden settings. These elements form attractive focal points in views from the Thames Path on the Maidenhead side of the river, and it is important that they are respected and retained. It is for this reason that the landscape scheme in this locality focuses on the management of existing gardens and trees to retain and enhance existing views. By contrast, the Jubilee River side of the site is currently dominated by previous industrial uses, including the old mill and large areas of hardstanding. This area of industrial disturbance extends southwards, beyond the Jubilee Bridge, to a derelict area of warehousing and the old gas holder site. These areas allow no public access; they are unattractive and anomalous in the context of the attractive river setting to the west and east. There is an opportunity here to create new, attractive residential areas, which better respect the riverine setting and which allow green space to be threaded through the new neighbourhoods, rather than being excluded and pushed to the edges of the peninsula. It is for this reason that the Jubilee Riverside housing area is crossed by broad verges and tree lined avenues, and similarly that the new Millside apartments incorporate extensive areas of landscaping. These areas are thus integrated with their landscape setting, not separated from it. Skindles The overall massing of buildings on the site has also been partially defined by Landscape (and Green Belt) constraints. The existing massing of the mill differs from the much lower buildings and hardstandings to the south. Given the constraints of the Green Belt and visual impact – and therefore the need to respect and not exceed the existing massing, particularly when viewed from external viewpoints – it is important that this existing pattern of massing is respected in the new residential development. It is largely for this reason that the new apartment buildings are located on the mill site, whereas the low density homes are located on the site of the old warehousing and hardstanding. 41 /// TAPLOW RIVERSIDE DESIGN AND ACCESS STATEMENT Key to the success of the public realm is the retention of existing vehicular, cycle and pedestrian routes throughout the development which allow access to the site and encourage residents to explore the surrounding areas of Maidenhead and Taplow. By locating proposed development on areas of previous developed land we have been able to retain the large areas of woodland planting (to the north) and meadow land (to the south and east). The careful management of the existing meadows and mature trees within the site will provide a valuable landscape framework for the amenity space with site. These areas will remain open for use both by local residents and visitors. Millside Apartments The connection between the apartment buildings and the new Jubilee Riverside area will hinge on a new focal point at Jubilee Square, which connects new areas of public realm to the north and south and also allows west-east access along Mill Lane. This will be a space which connects vehicular, cycle and pedestrian routes but which also provide an attractive place to meet and relax. Another key aspect the plan highlights is the opportunity to create a series of circular routes which link into the existing Thames Path and the wider network of pedestrian and cycle networks, thus encouraging the residents to explore Maidenhead and Taplow as well providing an opportunity for leisure and exercise. Key to this is the retention of the existing network of footpaths which run through the site and connect into the wider network of existing footpaths. It is prosed to retain the public right of way which runs from Bath Road through the site to Taplow Village. It is this route that will provide the main pedestrian route through the public open space and connect the residential areas to the wider network of footpaths. This route will also provide the main cycle route through the site which link into Cycle Route N61 which runs along Bath Road to the south of the site. As well as the main public routes there will be a network of footpaths within the public realm and residential areas which will provide easy access to local amenities and travel networks and help to discourage the use of cars. We have proposed a new vehicular access from Bath Road and retained the existing access to access to Mill Lane as a one way road to help elevate problems with traffic congestion. Furthermore as per the SPD we have suggested restricted access across the bridge at the weir to discourage through traffic along Mill Lane. The bridge will be restricted to emergency access only but will remain open to pedestrians and cyclists, and allow access for service vehicles to the EA land and the existing car park. M ill L an e Rive r T ha m es 42 /// TAPLOW RIVERSIDE DESIGN AND ACCESS STATEMENT Bath Road Maidenhead Bridge Landscape Masterplan Detailed areas Skindles Restaurant, Houses & Gateway A new gateway into the site is created by the introduction of two ‘pavilion buildings’, one either side of Mill Lane on the former Skindles Site. On entry to the site, to the left will be a Riverside Restaurant providing a fantastic opportunity for recreation and employment. On the right will be a three storey apartment building. Together, these will create an impressive threshold at the entrance to the site and significantly improving the quality and nature of the existing site access at this point. pedestrian safety, it will also create an appropriate response to the setting of the Grade 1 Listed Bridge. The existing vehicular access to Mill Lane currently sweeps into the site from the Bath Road adjacent to the Grade 1 Listed Maidenhead Bridge and the derelict Skindles Hotel. Historically, this junction has become increasingly congested to the point where egress and access are extremely difficult during peak hours. The proposed new access road junction to Bath Road to the east will help address this problem and at the same time, presents an opportunity to improve the existing junction to Mill Lane by re-configuring it to a left turn in from Bath Road only. This will lead to a newly formed entrance square which is defined by a change in surface and strengthened with a geometric grid of street trees. The square will not only contribute to enhanced The western edge of the square will be defined by a terrace of seven new townhouses also on the site of the former Skindles building. These are set back from number 5 Mill Lane which defines the corner of the square. Each house incorporates an integral garage space entered beneath a terrace with additional parking spaces forming the edge of the square. The north east corner of the square is defined by the western wing of the senior living building. The design of the Gateway buildings is based on a contemporary interpretation of the original Georgian Hotel architecture and respects the setting of the Grade 1 Listed Bridge and the existing Skindles Restaurant Gateway framed boathouse which is located immediately to the south of the proposed restaurant building. The detailing will be crisp with large format rectangular window openings with surrounds and dressings. Each building will have a rolled lead pyramidal roof with a square eaves and recessed cornice detail. The restaurant incorporates a riverside terrace at ground and first floor level providing fabulous views of the river and the bridge. The white rendered façade of the former Skindles Hotel and the gables and balconies of the surrounding riverside boathouses have informed the design of the proposed terrace of houses. The repetition of the steep pitched gables is accentuated by the large expanse of glazing up to the underside of the eaves. Chimneys and balconies help to further articulate the façade which will be visible from Maidenhead Bridge. Each of the houses will have a River Thames River Frontage Housing Concept Location Future Phase y wa e t Ga Mill Lane 43 /// TAPLOW RIVERSIDE DESIGN AND ACCESS STATEMENT Entrance Gateway Concept Bath Road Future Phase Hurlingham Club, Fulham Site Plan modest private terrace contained within a timber balustrade and steps leading down to a shared garden which is reminiscent to the riverside garden of the former Skindles Hotel. The steeply pitched gables are repeated on the Mill Lane façade but the material for the external walls will be a facing stock brick as used on the senior living building opposite. The entrance door and garage door to each of the houses will be framed by the terrace structure which also helps to signify the entrance point to the house. A number of improvements to the existing highway and footpaths are proposed together with the provision of visitor and resident parking to improve safety and access to this area of the site. Landscape Strategy The retained access to Mill Lane and the inclusion of new residential and commercial buildings in this location creates a vibrant attractive gateway from Bath Road. The introduction of a paved road surface will create the feeling of a pedestrianfriendly zone and reduce the dominance of the vehicle traffic. Carefully located parking areas will be introduced to service the new restaurant and residential properties. By providing adequate parking for both the restaurant and residential properties the need for on street parking will be reduced. The public footpath route will be retained in this area and will connect the existing Thames path to the public right of way which crosses the Jubilee Meadow. The gardens to the rear of the new properties will be open and free from boundaries and will focus on the unique character of the Thames which they lead down to; there is also the potential for private moorings and access to the water from these gardens,. Where possible we will retain existing mature trees along Mill Lane and within the grounds of the proposed Senior Living facility, River Frontage Housing Skindles Restaurant, Houses & Gateway Skindles Restaurant Gateway White Painted Rendered Houses on Mill Lane 44 /// TAPLOW RIVERSIDE DESIGN AND ACCESS STATEMENT Historical Context - Skindles Hotel View Towards Skindles West Elevation East Elevation Detailed areas Skindles Senior Living and Shared Ownership Apartments This building completes the entrance space and defines a new frontage to the open meadow and access road leading to Mill Lane. The building is proposed as a 2 ½ storey structure with a double gabled duo-pitched roof to ensure the proportions of the building are at a residential scale. The plan is a ‘U’ shape with wings on the eastern side forming the entrance space and the western wing addressing the open meadow space. The northern façade defines the extent of the landscaped parking court with the access road and open meadow land beyond. The internal arrangement ensures that the majority of apartments will enjoy eastern, western and a southerly aspect and all apartments will have a pleasant outlook onto newly landscaped spaces and existing verdant landscape of the open meadow land. 40 apartments will be delivered as managed senior living for affordable rent and 20 apartments will be delivered for affordable shared ownership. The senior living apartments occupy the eastern wing and the majority of the central section of the building. The shared ownership apartments are located in the western wing and corner. Each tenure will have exclusive access cores. The building form creates an enclosed courtyard which will be landscaped together with the boundary with the Maidenhead Bridge Windrush Car Showroom to create a quiet place where residents can enjoy a protected, quiet environment. The design of the building responds to the traditional form of residential development with pitched roofs, gables and simple fenestration patterns. The mass of the building is further broken down by incorporating recesses to the front façade where the circulation cores are located and creating a sense of articulation and series of linked buildings. The regular pattern of windows, doors and dormers further emphasises the strong rhythm to the street scene. The materials and contemporary detailing will reflect Skindles Houses opposite to ensure a harmonious balance is achieved for this important entrance and frontage to the site. River Thames Concept Location Future Phase 45 /// TAPLOW RIVERSIDE DESIGN AND ACCESS STATEMENT Mill Lane Future Phase Windrush Car Showroom Site Plan Facade Bay Study CGI View of Skindles Senior Living and Shared Ownership Buildings Plan North Elevation 46 /// TAPLOW RIVERSIDE DESIGN AND ACCESS STATEMENT Skindles Senior Living & Shared Ownership East Elevation Detailed areas Berkeley Boatyard & Future Offices The design of the buildings is very much influenced by the existing Taplow Investment buildings immediately adjacent to these two sites. A traditional vernacular which echoes the expressed timber frame and white rendered external walls of the existing buildings helps to create a distinctive riverside frontage and character to this part of the site. National Grid Land Employment Use This building delivers the footprint previously allowed by the extant planning permission. Rectilinear in plan and over two storeys, this building has a brick base with framed and rendered upper storey. The roof is a double pitch with a central valley to ensure the scale and mass is complementary to the existing buildings. Balconies are also incorporated to create articulation on the river frontage. Berkeley Homes (Three Valleys) Ltd Boathouse This building responds to the flood plane designation of the site with the accommodation raised at first floor level. The building is supported on posts with a small entrance lobby and staircase and has a similar treatment to the National Grid Land Offices. In both cases, the roof covering will be a traditional natural slate finish. Landscape Strategy The landscape is focused around the riverside where we have created a picnic area for use by visitors and the employees of the new office building. We have also provided links to the existing meadows and route east/west link for employees arriving from the west by rail. The large car park will provide parking for new and existing businesses and also act as visitor parking on evenings and weekends. The car park will have formal tree and shrub planting which will reduce its visual impact from Mill Lane and the surrounding areas. River Thames Concept Location 47 /// TAPLOW RIVERSIDE DESIGN AND ACCESS STATEMENT Offices Site Photo - Taplow Investment Offices Jubilee Meadow Taplow Investments Site Plan Berkeley Boatyard & Future Offices Future Offices Elevations Ta plo w i n v e stm e n t off i c e s B e r k e l e y H om e s ( T hr e e Va ll e y s ) Lt d B o at ya r d F u t u r e s O ff i c e s 48 /// TAPLOW RIVERSIDE DESIGN AND ACCESS STATEMENT Detailed areas Jubilee Meadow • Retain and enhance the existing meadowland and further enhance the sites biodiversity • Remove existing damaged trees to improve views across the meadow and increase visual connectivity to the meadows on the east of Jubilee River • Improve connectivity to the public right of way to encourage use by new and existing residents • Opportunity to provide improved access to riverside walks • Potential to create connected areas of habitat and ecological area to the north of the site • Retain and enhance the existing Public Right of Way • Provide functional and attractive meeting places connected by cycle/footpath network within the site 49 /// TAPLOW RIVERSIDE DESIGN AND ACCESS STATEMENT Concept Location Site Photo - Path Through Meadow Site Photo - Tree- lined Meadow Site Plan 50 /// TAPLOW RIVERSIDE DESIGN AND ACCESS STATEMENT CGI View of the Jubilee Meadow Jubilee Meadow Detailed areas Jubilee Riverside South The housing along the Jubilee Riverside creates a new environment inspired by the traditional riverside architecture of boathouses that are typical of the character of the wider area. Development Grain and Density The open meadow land to the south flows into loosely arranged 2 storey houses which become more tightly spaced into streets and avenues of 2.5 to 3 storey houses. As you continue north the density increases. 3 storey flats overlook the new focal square at the Jubilee River crossing and build the scale towards the new apartment buildings beyond on the old Mill site. Character This area seeks to create a more domestic scale using simple gable roof forms with projecting eaves over-sailing timber balconies to reflect the characteristics of local boathouse architecture. Although inspired by boathouses these features help to create superb living environments allowing for generous open vaulted internal spaces, with high ceilings and large areas of glazing for open views which are shaded by the overhanging eaves to prevent overheating. Materials reinforce the boathouse architectural approach with solid brick bases below weatherboarded upper floors and tiled roofs. The diagram below highlights key focal points and character areas within the Jubilee South masterplan where entrances and termination of streets are addressed through marker buildings, subtle articulation and the varied use of materials to houses, as well as the green lane treatment proposed for the far Eastern Estate Road, providing a hierarchy in the legibility of the street scenes. Landscape Strategy A high quality residential landscape treatment will be introduced with tree lined streets and landscaped gardens to the front of the properties. The existing mature trees to the east of the site boundary will be maintained to provide screening to the key views from the public footpath on the opposite side of the Jubilee River. Key road junctions will be paved and landscaped and act as informal gateway/squares within the residential area. Where possible mature trees will be maintained along Mill Lane to further screen the development and provide a mature landscape setting. 51 /// TAPLOW RIVERSIDE DESIGN AND ACCESS STATEMENT Jubilee Riverside South Location A. Density concept diagram K EY Focal points and key corners of site Shared surface - Central space Primary access Green lane treatment f River e i l e R e Jubile River frontage visual lines B. Focal points & key are routes and areas Jubilee Riverside South Jubilee Meadow er ief Riv l e R e Jubile Site Plan 52 /// TAPLOW RIVERSIDE DESIGN AND ACCESS STATEMENT Detailed areas Jubilee Riverside South The boathouse architectural approach is translated across various typologies and façade treatments in the Jubilee Riverside South masterplan. The primary material above the brick base shows weatherboarding and in key variations to help tie closely back to the vernacular, the same proportions are presented with the hung façades. Architectural inspiration Density and Street Character The Jubilee Riverside area has been inspired by its riverside location and builds on the local, vernacular architecture of boathouses. Some of the typical characteristics of boathouse architecture are projecting gables roofs and timber balconies with solid brick bases with timber cladding above. The house designs reflect these key characteristics using balconies and projecting gables to create strong and engaging street frontages with activity and animation. The site spans between an area of open meadowland to the south and towards the higher density area of the old Mill site. Consequently the layout of this area has been developed to create a lower density more informal arrangement of detached houses overlooking the meadow land to the south and gradually increase in formality and density towards the Mill Lane with more linear streetscapes and rising to three storey flats next to the Mill Lane river crossing and Central Square. Street View 1 Teal Weatherboarded House Elevation 53 /// TAPLOW RIVERSIDE DESIGN AND ACCESS STATEMENT White Weatherboard House Traditional River Thames Boathouse Houses with Weatherboarded Facade Houses Designs and Character The house designs have been developed to respond to their specific location within the layout. • We have taken maximum advantage of the outlook over the river with generous 4 bedroom houses enjoying two active frontages, one overlooking the street and another overlooking the river. • Along the streets the building mass of the larger houses has been broken down into primary and secondary elements. Typically the primary accommodation sits beneath a gable roof form with a secondary set back element containing a garage and some with first floor accommodation above. The secondary element is set back to ensure visual breaks between buildings along the street scape. This ensures visual breaks between the buildings when viewed • Elsewhere corner plots have active frontage to both front and side elevations to ensure continued activity and outlook. House Elevation Typologies Key Plan E l e vat i o n M at e r i a l s K EY - t r e at m e n t A River Thames Treatment A - Roof cladding Please refer to Palette 4 on page 69 House Elevation 1 E l e vat i o n M at e r i a l s K EY - t r e at m e n t B er ief Riv l e R e Jubile Proposed Layout for Jubilee Riverside South House Elevation E l e vat i o n M at e r i a l s K EY - t r e at m e n t C Treatment C Please refer to Palette 6 on page 69 54 /// TAPLOW RIVERSIDE DESIGN AND ACCESS STATEMENT Treatment B Please refer to Palette 5 on page 69 Detailed areas Jubilee Riverside South Street Elevations Materials A variety of materials has been used to create a sense of location and variety in character. 55 /// TAPLOW RIVERSIDE DESIGN AND ACCESS STATEMENT Street Elevation 5 Street Elevation 6 • On Mill Lane the clay tile clad cottage sets a strong visual marker as you travel north past Taplow Investments and approach the entrance in to this new housing area. This sets the character of Mill lane and has been reinforced by using clay tile cladding to the houses fronting Mill lane. • Within the new housing site a simple light white timber boarding above a brick base creates the normal condition for most of the houses. • This is contrasted by key corner turning buildings and street end buildings being highlighted with a vintage green colour to the timber boarding. This palette of materials will help reinforce the variation in location and character within this area and create a strong, unique character for this part of the scheme reflecting the exclusive characteristics of this area within the overall masterplan. 56 /// TAPLOW RIVERSIDE DESIGN AND ACCESS STATEMENT K EY Street Elevation 7 Street Elevation 8 Detailed areas Jubilee Riverside North Our approach was to preserve and enhance the woodland and natural landscape setting of the historic buildings to the west to locate some bold new contemporary apartments against the Jubilee River in the north edge valley of the site. Location The buildings are located to create open view corridors and visual connections along the old water ways and mill races towards the Jubilee River. The apartment buildings are angled against the Jubilee riverside to create pockets of landscape along this publicly accessible riverside walk and also help to reduce their over shading effect on the river. The location of the buildings, against the eastern boundary is carefully devised to retain the mature woodland and trees scape which act to screen the buildings from views across the River Thames. 57 /// TAPLOW RIVERSIDE DESIGN AND ACCESS STATEMENT Concept Location Jubilee Relief River Precedent 1 Sketch Concept Jubilee Riverside North Site Plan Jubilee Riverside North 58 /// TAPLOW RIVERSIDE DESIGN AND ACCESS STATEMENT 1 View Looking North Along Jubilee Relief River Detailed areas Jubilee Riverside North The Mill buildings (highlighted in red to be demolished) are characterized by large industrial volumes that dominate the Jubilee River frontage but are largely hidden from view from the Thames by the woodland. The new buildings represent Taplow a significantly reduced footprint compared with the existing mill buildings and are located at an angle against the Jubilee A. Footprint Comparison Riverside to create pockets of landscape along this public riverside walk and also help to reduce their over shading effect on the river. The location of the buildings, against the eastern boundary is carefully devised to retain the mature woodland and tree-scape which act to screen the buildings from views from across the River Thames. Landscape Strategy An attractive frontage will be introduced to the edge of the Jubilee River. This will be a 5m wide hard landscaped promenade which will provide public access to this side of the apartments. This route will provide a link to the publicly accessible footpath Millside to the north and the proposed new pedestrian bridge link at B. Opening Up River Views and Connections 59 /// TAPLOW RIVERSIDE DESIGN AND ACCESS STATEMENT Verified Views Summer View - Before Winter View - Before Summer View - After Winter View - After Bolter’s Lock. To the west of the apartments will be the main vehicular access and parking areas. This road will also provide access to the refurbished existing properties by means of private driveways. Block paving will be used on these roads and gravel on the private driveways to the retained properties. In the immediate areas around the apartment blocks soft landscaping will dominate and be encouraged to grow up the lower level of the building. External spaces will be of a smaller more intimate scale than those located elsewhere in the site and these spaces will be connected to the cycle/footpath network within the site and the wider vicinity. C. Access From the New Estate Road K EY Millside Site Section B - Illustrative Image Millside Site Section C - Illustrative Image 60 /// TAPLOW RIVERSIDE DESIGN AND ACCESS STATEMENT Millside Site Section A - Illustrative Image Detailed areas Jubilee Riverside North Elevations 61 /// TAPLOW RIVERSIDE DESIGN AND ACCESS STATEMENT Our design for the riverside apartments is strongly influenced by the industrial heritage of the former Paper Mill and the verdant tree lined banks of the Thames and Jubilee Relief Rivers. The designs of the buildings seek to respond to these key characteristics by incorporating materials and detailing that East Elevation Apartments A.B.C will promote the idea of reflectivity and architectural heritage. The notion of ‘living in the trees’ and the connection with nature and views is supported by the incorporation of spacious balconies where residents can sit and experience their natural surroundings. The orientation of the buildings also ensures that all apartments will have a river view. penthouses to reduce the scale of the building. The ground storey is designed to accommodate the resident parking and service requirements for each block. The exterior is enclosed with a series of walls and screens with climbing plants planted around the whole perimeter of the building to soften the base of the building where it touches the ground. Each apartment building is arranged over six storeys with the living accommodation starting at first floor. A single circulation core incorporates passenger lifts and staircase and is expressed as a glazed element marking the entrance to each block. The living accommodation starts at first floor, rising on a repeating floor plate to the fourth floor and then sets back with rooftop Above this green base the highly glazed façades reflect the surrounding trees and landscape while the faceted bays and balcony’s break up the buildings form. The profiled metal cladding covers the entire exterior, wrapping over the terraces and across the projecting bays, counterbalanced by generous openings while a glazed entrance leads into a full-height reception that is overlooked by the lobbies above. The use of materials and colours make the exterior and interior space blend, almost seamlessly. 62 /// TAPLOW RIVERSIDE DESIGN AND ACCESS STATEMENT K EY North Elevation Apartments A.B.C South Elevation Apartments A.B.C Detailed areas Thames River frontage - North The Thames frontage in the northern part of the site is characterised by historic buildings set amongst lawns and gardens (now much overgrown) forming open spaces along the river that are visible in views from the Maidenhead bank. The appearance of the Thames frontage will be enhanced by the return of these buildings to their original residential use, which will include their restoration as well as the removal of detracting 20th century accretions. It will further benefit from the landscaping of their former gardens to return them closer to their historic character as open lawns fringed by groups of trees, offering partial views to and from the river. 1 Mill Island House will be fully restored and sympathetically extended to provide three dwellings, while retaining the character of the western frontage facing the river. 3 The Power House will be converted to residential use in a way that will conserve its historic appearance and role in wider views. 4 Glen Island House, the listed building, will be carefully restored and converted to apartments, to ensure that its setting and exteriors are enhanced. 5 The Stables will be brought back to life as dwellings, with an expanded and much better landscaped setting. The developments along the Thames frontage will enhance the character and appearance of the Taplow Riverside Conservation Area, as well as views into it, whilst the wider setting of the Maidenhead Riverside Conservation Area to the west will also be improved. 2 Mill Cottage will be extended to ensure it can have a sustainable future as a dwelling, and provided with its own garden. Jubilee Riverside Frontage - North 4 1 Concept Location 2 3 5 63 /// TAPLOW RIVERSIDE DESIGN AND ACCESS STATEMENT Mill Island House Glen Island House Key Landscape Features • Retained mature landscape setting • Refurbished properties with appropriate landscape setting • Connectivity with the Thames River corridor • Access from the river Stables Site Plan Detailed areas Thames pedestrian Bridge One of the key elements of the proposed redevelopment is to improve public access to the river through a new riverside walk and footbridge responding to Core policy 15 of the Mill Lane (Opportunity Site). Although this suggests it is desirable ‘unless demonstrated not feasible or viable’ Berkeley Homes (Three Valleys) Ltd remain committed to delivering a new footbridge between the site and Boulters Lock. The design of the bridge is based upon a simple ‘warren truss’ configuration to be visually attractive but unobtrusive and robust for public use. The dimensions of the bridge above the river level are agreed with the Environment Agency to provide sufficient clearance for river traffic upstream. The deck will be hardwood slats with a metal balustrade and handrail. The landing abutments on both river banks will be constructed to ensure a maximum ramp gradient of 1:12 is not exceeded to safeguard access to people with physical disabilities in accordance with the building regulations. Access to the bridge will be limited to between dawn to dusk and will be closed to the general public during night-time hours. The provision of this new bridge will make a major contribution to the accessibility of the site and will open up access and opportunities for recreation to existing and new residents in Maidenhead and Taplow. Thames Pedestrian Bridge Existing Site Site Plan Bridge Elevation 64 /// TAPLOW RIVERSIDE DESIGN AND ACCESS STATEMENT Concept Location Detailed areas Jubilee Square ‘The heart of the site’, the square will act as a functional and attractive pedestrian meeting place connected by the cycle/ footpath network within the site. The materials will be of a high quality and the area will provide an opportunity for public art which may take the form of a traditional water wheel alluding to the sites heritage. Vehicular access will be restricted across the bridge in this area and access to the public car park will be maintained via Mill Lane from Taplow Village. Pedestrian and cycle access will not be restricted in this area. 65 /// TAPLOW RIVERSIDE DESIGN AND ACCESS STATEMENT Concept Location Planting Precedent Paving Precedent Site Plan 66 /// TAPLOW RIVERSIDE DESIGN AND ACCESS STATEMENT View looking Across Jubilee Square Jubilee Square Materials Strategy Fig 3. Fig 7. Fig 11. External weatherboard cladding. Colour varies as shown in the drawing no 2183 - 2186 Medium bronze metal cladding Lead rolled roof Fig 4. Fig 8. Fig 12. External weatherboard cladding. Colour varies as shown in the drawing no 2183 - 2186 Double glazed windows with white coloured frame Natural Slate Roof Fig 1. Fig 5. Fig 9. Fig 13. Facing brick light multi stock Vertical clay tile hanging Double glazed windows with bronze coloured frame Plain Clay tile roof colour dull red Fig 2. Fig 6. Fig 10. Fig 14. Facing brick medium multi stock Light bronze metal cladding Double glazed windows with light bronze coloured frame Parapet coping metallic PPC finish. Colour: Mid grey The proposed materials strategy is informed by the initial character analysis carried out at the very beginning of the design and seeks to reflect the richness and diversity of the natural landscape and built environment of the immediate area. A variety in colour, textures, and reflectivity are incorporated to respond to each of the key character areas and to deliver a built form that is harmonious to its setting. 67 /// TAPLOW RIVERSIDE DESIGN AND ACCESS STATEMENT The following images are for illustrative purposes which describe the generic material and colour proposed for each element of the buildings and it is envisaged that the exact specification will be determined through clearance of conditions as a later date. Fig 19. Fig 23. ark timber effect D front doors and garage doors Fabricated metal balustrade, metallic white colour to match window frames Light grey metal cladding Fig 16. Fig 20. Fig 24. T imber balcony painted white Timber decking Lead cladding (dormers & roof systems) Fig 17. Fig 21. White render Stone facing to emulate natural Portland stone Fig 18. Fig 22. Fabricated metal balustrade, metallic light bronze colour to match cladding Screen wall with planting 68 /// TAPLOW RIVERSIDE DESIGN AND ACCESS STATEMENT Fig 15. PALETTE 1 Materials Strategy For clarity of application, palettes of materials taken from the materials strategy have been established and applied to create congruous yet differentiated character areas. Fig. 9 Fig. 6 Fig. 11 Fig. 14 Fig. 18 Fig. 1 Fig. 8 Fig. 6 Fig. 12 Fig. 14 Fig. 19 Fig. 1 Fig. 8 Fig. 23 Fig. 12 Fig. 17 Fig. 24 Fig. 14 Fig. 2 Fig. 8 Fig. 3 Fig. 12 Fig. 14 Fig. 16 Fig. 21 Fig. 2 Fig. 8 Fig. 4 Fig. 13 Fig. 14 Fig. 16 Fig. 21 Fig. 2 Fig. 8 Fig. 5 Fig. 13 Fig. 14 Fig. 16 Fig. 21 Fig. 6 Fig. 9 Fig. 18 Fig. 20 Fig. 22 PALETTE 6 PALETTE 7 69 /// TAPLOW RIVERSIDE DESIGN AND ACCESS STATEMENT PALETTE 5 PALETTE 4 PALETTE 3 The chosen materials respond to the context, massing, use and nature across the site. Fig. 1 PALETTE 2 Colour Palettes Skindles Gateway Buildings Skindles Senior Living and Shared Ownership River Frontage Housing Jubilee Riverside South Jubilee Riverside North 70 /// TAPLOW RIVERSIDE DESIGN AND ACCESS STATEMENT Materials Site Plan Historic buildings 1. Skindles Hotel 7 8 6 4 71 /// TAPLOW RIVERSIDE DESIGN AND ACCESS STATEMENT 5 3 2 1 The present Skindles building has its origins in mid 19th century riverside villas, which were remodelled and extended in about 1880 by the then owner of the Orkney Arms Inn on the opposite side of Mill Lane, William Skindles. ‘Skindles Hotel’, as both parts (on each side of the road) were subsequently known, became the most fashionable hotel on the Thames. Various extensions, particularly along the river front, were added over the course of the 20th century. The hotel closed in c.1968, and the buildings on the original Orkney Arms site were demolished in 1971. A restoration of the riverside buildings in the 1970s saw them converted to a nightclub, but decades of abandonment followed, resulting in considerable physical deterioration and partial collapse. The building is now beyond repair. The significance of Skindles now relates primarily to its historical interest; its architectural value has been much compromised by modern alterations and accretions. The secondary contribution made to its significance by its setting is derived primarily from its value as part of a group of historic buildings in this part of the conservation area, including No. 5 Mill Lane to the north. 2. 5 Mill Lane The Proposed Development will result in the demolition of the present Skindles building, which is extremely dilapidated and dangerous to enter, and its replacement with a new restaurant to the south and a separate residential range to the north. A further residential building to the east will mirror the restaurant, re-establishing the historic duality of the old Skindles Hotel. The restrained, classical language adopted for the new ‘gateway’ buildings will enhance the setting of the adjacent Grade I listed bridge without competing with it, whilst the riverside houses to the north will have ‘open’ gables to allude to the boathouse aesthetic, also drawing upon the projecting bays and balconies common to older riverside properties. Originally known as ‘Island View’, No. 5 Mill Lane appears to have been built between 1875 and 1899 as one of a pair of large semidetached riverside properties’, the other being its neighbour to the north, ‘Mallard’s Reach’ (previously known as ‘Causeway House’). Between 1955 and 1970, a remodelling resulted in the loss of its original south-western corner. The significance of No. 5 Mill Lane relates primarily to the architectural interest of its external envelope and the contribution it makes to the character and appearance of this part of the conservation area. The modest interiors have been considerably altered in the past and are now derelict. The contribution made to its significance by its setting is derived primarily from its value as part of a group of historic buildings in this part of the conservation area, including Skindles to the south and Mallard’s Reach to the north. The Proposed Development will result in the restoration of 5 Mill Lane as a 5-bedroom single family dwelling. The historic form of the building will be largely conserved and in some areas enhanced. The works will involve the addition of a balcony to the riverside elevation (west), together with the unblocking of door and window openings, whilst internally there will be some minor reconfiguration of the plan. The return of the building to its original residential use, and the putting of its conservation on a proper footing, represent positive heritage benefits. Dunloe Lodge (originally named ‘Millstream’) comprises a large riverside house, dated 1896, and built for J. W. Benson, Esq. by the Maidenhead practice of Davy & Salter. The house exhibits many of the elaborate features typical of the Victorian/ Edwardian architecture which characterises the conservation area, including tile-hung elevations, ornamental painted bay windows, oriels, dormers, verandahs and prominent brick chimneystacks. However, since a fire in the 1970s and another in 2007, the house has been open to the sky, and is in a rapidlydeteriorating condition. The significance of Dunloe Lodge relates primarily to the architectural interest of its external envelope and the contribution that it makes to the character and appearance of this part of the conservation area as one of the gentlemen’s villas erected along this stretch of the Thames. The contribution made to its significance by its setting is derived primarily from its riverine context, since the grounds are now heavily overgrown and difficult to appreciate. 4. Mill Cottage The Proposed Development will result in the rebuilding of Dunloe Lodge, essentially in facsimile externally but with some minor changes, to provide a single family residence. The existing building is beyond repair from fire damage and neglect. It has been exposed to the weather for many years and is now too dangerous to inspect. The proposed reconstruction will require the rebuilding of all elements including the chimneystacks, as it is impossible to guarantee the structural integrity of the existing remains; if incorporated into the new building with its different foundations and structure, differential settlement and long-term structural problems would occur. The scheme will result in the general reinstatement of its historic appearance and visual role along the riverfront, as well as re-establishing its original single family residential use. Mill Cottage has a datestone of 1876, although a building appears to have existed on its site since the early 19th century. Some time after 1965, the cottage’s eastern end was taken down and rebuilt to provide more clearance for vehicular access. The significance of Mill Cottage relates primarily to the architectural interest of the historic parts of its external envelope and the contribution it makes to the character and appearance of this part of the conservation area. The interiors have little heritage value. The contribution made to its significance by its setting is derived primarily from the historical value of its relationship with the mill complex to the east and Mill House to the south west, but the late 20th century alterations made to the former, including cladding to the upper parts, detract notably. The Proposed Development will result in the conversion of Mill Cottage into a single three-bedroom residence, including the partial rebuilding and extension eastwards of the eastern side of the house, and the replacement of the narrow staircase/corridor element to the rear with a new northern range. The historic form of the more important areas of the external envelope will remain legible although clearly modified. The alterations will ensure that the historic character of the cottage is retained, whilst providing a more coherent, pleasing and appropriate dwelling than at present. The return of the building to its original residential use, and the putting of its conservation on a proper footing, represent positive heritage benefits. 72 /// TAPLOW RIVERSIDE DESIGN AND ACCESS STATEMENT 3. Dunloe Lodge 73 /// TAPLOW RIVERSIDE DESIGN AND ACCESS STATEMENT 5. Mill Island House Mill Island House comprises an early 19th century house, extended in 1869 for Charles Venables, then the operator of Taplow Mills. For much of the 20th century, it was used as offices in connection with the paper mill, and this resulted in the modern additions to the north, and many of the internal alterations. The significance of Mill Island House relates primarily to the architectural interest of its external envelope (together with its early 19th century entrance and staircase), and the contribution it makes to the character and appearance of this part of the conservation area. The contribution made to its significance by its setting is derived primarily from its riverine context, and as one of a number of extant gentlemen’s villas erected along this stretch of the Thames. 6. The Power House The Proposed Development will result in the conversion and extension of Mill Island House to provide three 3-bedroom residences. The works will involve the extension of the southern end of the building, the removal of the single-storey postwar buildings to the north, the provision of a sun room at the northern end, the insertion of a number of new door and window openings, and the reconfiguration/replacement of many of the largely modern existing windows. Internally, there will be some modification of the plan-form through the closing up of a number of openings, and some subdivision. Whilst there will be considerable change to the external envelope, the building is a simple and workmanlike design in stock brick and the alterations have been designed to accord with its existing character and retain the more important interior elements. The interior changes will be targeted at areas of lower significance which are most able to accommodate them. The harm caused to existing fabric should therefore be weighed against the public benefits of the proposal, specifically the benefits of bringing the building back into its optimal residential use. The paper mill’s former Power House was erected between 1931 and 1955, probably in the 1930s, and has an ‘industrial classical’ appearance with pilasters, a prominent rendered cornice and a hipped copper-clad roof. Its significance relates primarily to the architectural interest of its external envelope. The contribution made to its significance by its setting is low, since while the building’s role as part of the mill complex has important historical value, the appearance of the mill buildings is in large part the product of late 20th century alterations including cladding to the upper parts, which detract from its setting. The Proposed Development will result in the conversion of the Power House into four residential loft houses, involving the partial reconfiguration of the existing openings to the south, including the insertion of glazing, together with new door and window openings to the north, west and east. Internally, the building will be subdivided into four separate units, each with a mezzanine level accommodating gallery bedrooms with ensuite bathrooms and dressing rooms. The historic form of the external envelope will remain legible although clearly modified. The existing green faience dado tiling will be retained where practicable. Putting the building to a long-term viable use represents a positive heritage benefit, which will sustain its role within the setting of the other historic buildings. The U-shaped Stable Block was erected by Sir Robert William Henry Palmer in 1880. Its east range was shortened and remodelled sometime after 1965, presumably to allow for the erection of the industrial shed now present to the south. The single-storey shed to the rear is a much more recent intervention. The significance of the Stable Block relates primarily to its fabric, particularly the architectural quality of its external envelope, as well as its historical associations, although 20th century alterations, including demolition of part of the east range, also detract. The contribution made by its setting to its significance is low. The temporary shed and tank immediately to the north, and the huge 20th century industrial structures to the south, notably detract. 8. Glen Island House The Proposed Development will result in the conversion of the former Stable Block into four residential units. Externally, this will involve the southward extension of the range to the east, some minor reconfiguration of the openings to the north and on the stable yard elevations, and the insertion of new door and window openings to the west. Internally, the works will involve the subdivision of the building into four discrete units, including the creation of a new mezzanine level in the range to the west. Changes will be detailed appropriately and concentrated as much as possible in areas of low significance. The insertion of new openings in the external envelope should be weighed against the public benefits of the proposal, specifically the benefits of bringing the building back into use and securing its optimum viable use. The alterations have been designed in a way which would allow the historic fabric, main interior spaces and plan-form to remain legible. Glen Island House was built in 1869 for Lieutenant-General Sir Robert William Henry Palmer, best known for his participation in the Charge of the Light Brigade. It was amongst the first of the gentlemens’ villas erected along this stretch of the Thames that now characterise the Taplow Riverside Conservation Area. The house was subsequently acquired by the paper company, probably in the first quarter of the 20th century, and for many years the house accommodated offices. It is most likely in connection with this use that a single-storey addition was built to the east, and that the upper parts of the curved link range to the south were erected. Alterations were also made internally, including some knocking through and subdivision, and the removal of chimneypieces on the first floor. In the late 20th century, Portacabins were placed immediately to the north of the house to provide ancillary office accommodation. The house became vacant in 2006, following the winding up of the paper-making business. The significance of Glen Island House relates primarily to its fabric, particularly the architectural quality of its external envelope and the character of the principal rooms, as well as its historical associations. The contribution made to its sensitivity by its setting is of secondary importance, and relates predominantly to those parts of its historic setting which remain to the south and west, and to a lesser degree to the north west, as well as the stables to the north east; these are however all somewhat degraded from their late 19th century character. The house’s original context would have comprised ornamental gardens and lawns, and specimen trees, together with the drive around to the entrance front to the north past a lodge (no longer present). To the east were cottages that formed part of the mill complex. Today, however, the Portacabins immediately to the north, the huge industrial mill structures that replaced the mill cottages in the second half of the 20th century, and the large area of hard standing, notably detract. The Proposed Development will result in the conversion of Glen Island House into four dwellings. Externally, the works will involve the removal of the single-storey link range to the south, the removal of the single-storey, late 20th century extension to the east, the removal of the Portacabins to the north, and the insertion of several new doors and windows. Internally, the works will involve some subdivision and the closing up of some openings to facilitate the division of the building into four discrete dwellings. The external envelope will be enhanced by the works. Internally, most of the change will be concentrated in areas of low sensitivity that are most able to accommodate them. Where change to more sensitive areas is required, such as the subdivision of the entrance hall necessary to facilitate the separate entrances to the dwellings. Any harm should be weighed against the public benefits of the proposal, specifically the benefits of bringing the house back into use and securing its optimum viable use. The alterations to the more significant parts of the building have been designed in a way which will allow the historic fabric and plan-form to retain their legibility, and would also allow them to be reversed in the future. 74 /// TAPLOW RIVERSIDE DESIGN AND ACCESS STATEMENT 7. Stables Access The proposed development has been carefully designed to ensure access to all parts of the site can be reached within reason irrespective of age or disability. Currently, there is limited access to various parts of the locality resulting in the site being a series of disconnected spaces and generally unwelcoming to the general public. The applicant seeks to redress the balance and create a comprehensive masterplan opening up the majority of the site where it is desirable to do so, and, to encourage public access where residents and visitors will want to live work and play and can enjoy enhanced areas for recreation and business. The primary areas of improved access are; • New vehicular and pedestrian access routes from the Bath Road connecting into the site. • New footpaths and trails across the open meadow creating enhanced connectivity and access to recreation space • Opening up the river frontage adjacent to the employment area previously inaccessible to the general public. • Well-designed network of streets and places within the proposed residential areas that are welcoming and allow ease of movement for all levels of ability. • New public square creating the public heart to the development which will incorporate public art and a meeting place with a distinctive riverside character. • New riverfront promenade along the Jubilee Relief River leading to;• A new board walk through an area rich in ecology and wildlife and 75 /// TAPLOW RIVERSIDE DESIGN AND ACCESS STATEMENT • Most importantly, the construction of a new footbridge across the River Thames near Boulters lock will provide a permanent pedestrian link between the Taplow riverbank and Maidenhead Riverbank enhancing connectivity and enabling easier access to the locality. In parallel to the strategic improvements to access as outlined above, the design of the development will incorporate practical measures to ensure access to and into buildings comply with The Building Regulations and the Disability Discrimination Act. Way finding will be assisted by appropriate signage; boundary treatments will mark the edge between public and private areas. The design of the communal entrances to the apartment buildings and senior living are distinctive and aid the location of access points into the buildings. Roads, streets and footpaths will be designed and constructed with minimum gradients and materials that do not deter wheelchair access and assist those with sensory impairments. Door thresholds to all buildings will be flush to enable easy access to residents and visitors to the interior of the buildings and DDA compliant lifts will be provided in the apartment, senior living and commercial buildings with ambulant disabled staircases being incorporated in the smaller buildings. The development also includes a number of significant highway improvements for the benefit of the residents and workers within the site as well as local people who may wish to use the site for amenity and leisure purposes. These are described below: • A new vehicular access to the site replaces the existing potentially dangerous Mill Lane access. The new development access provides an all manoeuvres junction, with good visibility, a right turn lane on the A4 and both left and right turn lanes for traffic leaving the development. This provides considerable safety and capacity improvements both for the A4 traffic and traffic leaving the development. As part of these improvements the existing Mill Lane access onto the A4 will be closed to all traffic except traffic turning left in from the A4 eastbound lane and cyclists. • Bollards on Mill Lane at the Jubilee Bridge will prevent rat running traffic from using this route to by-pass parts of Berry Hill and the A4. Mill Lane will become two cul-de-sacs with the new development located on the western side of the bollards. The bollards will be controlled to allow access through the restriction in emergencies only. Turning areas are available / provided on both sides of the bollards. Cyclists will continue to be able to use the route as access will be maintained through the bollards. • A new section of road links the new site access and the existing section of Mill Lane to the north, which is being retained to link the various parts of the site. The new section of Mill Lane is designed with tight radius bends to control vehicle speeds in accordance with a 20mph design speed, which was agreed with Buckinghamshire County Council. The existing section of Mill Lane to the north is improved with speed reducing measures in the form of narrowing’s to the carriageway width, also agreed with Buckinghamshire County Council. Contrasting materials are also proposed in areas such as junctions to further encourage drivers to slow down at areas of greater risk. • The existing section of Mill Lane which passes the former Skindles Hotel will be given a new alignment to improve visibility and safety. The road alignment also changes to create a suitable width of highway for parking in front of the existing Mill Lane cottages. • In the northern part of the site, the existing shared surface access road alongside the Mill is replaced with a new private shared surface residential access road serving the Jubilee Riverside Apartments and existing properties. This road has an attractive winding alignment to control vehicles speeds to a 10mph design speed. • In the central part of the site, the former hardstanding which covered the Severnside site is replaced with a new residential development with private estate roads designed to a 20mph design speed, with separate footways alongside carriageways. The proposed road layout and junctions for the development have been designed to comply with appropriate highway design standards including elements of the DMRB standards and Manual for Streets. Swept path analysis demonstrates the suitability of road widths and turning areas for both large and small vehicles including emergency services and refuse collection. Visibility splays are designed to the appropriate splays set out in Manual for Streets, for the relevant design speeds described above. Parking Strategy Skindles Waste Management The minimum car parking requirements contained in the South Bucks Distrct Council’s guidance are as follows: The principle of on street parking in overlooked pockets near the entrance of the Skindles hotel, senior living and residential buildings provides both resident and visitor parking that is well overlooked whilst not conflicting with the intention of providing an open and inviting entrance to the gateway of the site. All new development on the site will incorporate provision for the storage and collection of waste in accordance with the requirements of South Buck District Council. The provision for each use is illustrated in the Waste Management table below. In general terms the storage of the waste receptacles will be as follows; Residential Use: One Bedroom: 1 space per dwelling Two / Three Bedroom: 2 spaces per dwelling Mill Lane Four or more bedrooms: 3 spaces per dwelling Improvement to the existing provision along Mill Lane through provision of staff car parking during working hours with significant additional visitor parking, to also encourage riverfront visitors to the area. Bars / Restaurant: 1 space per 25m² gross floor area. Jubilee Riverside South Houses Office Use: 1 space per 25m² gross floor area. All dwellings enjoy garage car parking with additional on-plot parking. 10% of the provision across the site includes for DDA compliant wheelchair accessible car parking. Jubilee Riverside North Apartments Overall car parking provision is as per the schedule included below. The principles across the masterplan vary depending upon the nature of the use and scale. Resident parking for the Jubilee Riverside North apartments is located within the ground floor level of each of the three apartment buildings. Access to each building is through a single controlled gate for security purposes and adjacent to the circulation cores. The cars are screened from view by a perimeter wall and landscape to ensure the surrounding streets are not car dominated. Visitor parking is integrated as part of the on street provision. • Skindles Restaurant; Bins are located in a store integral to the building with access for collection from the front of the building to the roadside. • Skindles apartments; Bins are located in a store integral to the building with access for collection from the front of the building to the roadside. • Skindles houses; Bins are located in the integral garage to each house with access for collection from the front of the building to the roadside. • Senior Living; Bins are located in stores integral to the building and also in a free standing store. Collection will be from the adjacent roadside. • Commercial; Bins will be located in a free standing bin store. Collection will be from the adjacent roadside. • Jubilee Riverside South Houses; Bins will be located in the rear gardens. Bins will be pulled to the front of the house to the road side on collection day. • Jubilee Riverside North apartments; Bins are located in a store integral to the building with access for collection from the front of the building to the roadside. • Existing converted buildings; Bins will generally be located in a free standing bin store. Collection will be from the adjacent roadside. Waste Management Strategy Houses Quantity Type Dims Use 2 240L 580x740 Refuse and mixed recycling 1 44L 390x285 Recycling 1 23L 320x285 Food waste 1 240L 580x740 Garden Waste Apartments/Flats Apartment Block Skindles Parking Schedule Car Parking Provision Residents On Plot On garage 45 52 Undercroft 114 Restaurant Total 45 52 114 Off Plot DDA * Total 163 18 392 14 1 15 177 19 407 1 1100L 1380x1090 Refuse 1 1100L 1380x1090 Mixed recycling 1 360L 880x665 Bin for paper 1 140L 555x505 Food waste Apartments Block D & E (each) 1 1100L 1380x1090 Refuse 1 1100L 1380x1090 Mixed recycling 1 240L 740x580 Paper 1 140L 555x505 Food waste Apartments Block A, B, C (each) 7 1100L 1308x1090 Refuse 7 1100L 1380x1090 Mixed recycling 3 360L 880x665 Paper 2 140L 555x505 Food waste Apartments SL & SO 10 1100L 1380x1090 Refuse 7 1100L 1380x1090 Mixed recycling 6 360L 880x665 Paper 2 140L 555x505 Food waste Offices 6 1100L Restaurant 4 1100L 76 /// TAPLOW RIVERSIDE DESIGN AND ACCESS STATEMENT * 6% of total spaces. Appendix 6 - Parking Standard
Similar documents
The proposed accommodation is to be arranged into 3 buildings to
into a 3 bed cottage
More information