INVITATION FOR BID (“IFB”) FOR UNINTERRUPTED POWER
Transcription
INVITATION FOR BID (“IFB”) FOR UNINTERRUPTED POWER
INVITATION FOR BID (“IFB”) FOR UNINTERRUPTED POWER SUPPLY (“UPS”) MAINTENANCE FOR ALL LOCATIONS CONTRACT NO. 20110030 ISSUE DATE: April 13, 2012 All prospective bidders, the Maryland Transportation Authority (“MDTA”) participates in the e-Maryland Marketplace electronic commerce system administered by the Maryland Department of General Servicers. All information regarding this solicitation including amendments, pre-bid minutes, and changes to bid due dates shall be posted in e-Maryland Marketplace. This means that all such information is immediately available to subscribers of e-Maryland Marketplace. Because of instant access afforded by e-Maryland Marketplace, it is recommended that all vendors interested in doing business with MDTA and other State agencies register on e-Maryland Marketplace. Information about registering, free of charge, on e-Maryland Marketplace can be obtained at the e-Maryland Marketplace website at https://www.ebidmarketplace.com. Vendors must be registered on e-Maryland Marketplace to receive a contract award. Contract No. 20110030 UPS Maintenance TABLE OF CONTENTS Page No. VENDOR COMMENTS .................................................................................................1 KEY INFORMATION SUMMARY SHEET .................................................................2 SECTION 1 - GENERAL INFORMATION...................................................................3 1.1 SUMMARY STATEMENT ......................................................................................3 1.2 ABBREVIATIONS AND DEFINATIONS ..............................................................3 1.3 CONTRACT TYPE ...................................................................................................4 1.4 CONTRACT DURATION ........................................................................................4 1.5 CONTRACT PRICE ADJUSTMENTS ....................................................................4 1.6 CONTRACT ADMINISTRATION ..........................................................................4 1.7 PROCUREMENT METHOD....................................................................................5 1.8 PROCUREMENT OFFICER & CONTRACT MANAGER ....................................5 1.9 PRE-BID CONFERENCE.........................................................................................5 1.10 CLARIFICATION...................................................................................................6 1.11 ADDITIONS & DELETIONS.................................................................................6 1.12 CHANGES...............................................................................................................6 1.13 LIABILITY..............................................................................................................6 1.14 PROPOSAL/ BID & CONTRACT AFFIDAVITS .................................................6 1.15 MINORITY BUSINESS ENTERPRISE NOTICE .................................................7 1.16 PROMPT PAY REQUIREMENTS.........................................................................7 1.17 TOLL FREE PASSAGE..........................................................................................7 1.18 ARREAGES ............................................................................................................7 1.19 BID DOCUMENTS.................................................................................................7 1.20 MANDATORY TERMS & CONDITIONS............................................................8 1.21 INSURANCE...........................................................................................................8 1.22 COMMERICIAL NON-DISCRIMINATION CLAUSE ........................................12 1.23 LIVING WAGE REQUIREMENTS.......................................................................13 1.24 PUBLIC INFORMATION ACT NOTICE..............................................................14 1.25 BIDDER RESPONSIBILITIES...............................................................................14 1.26 PROTESTS/ DISPUTES .........................................................................................14 1.27 MULITPLE OR ALTERNATE BIDS.....................................................................14 1.28 TIE BIDS .................................................................................................................15 1.29 CANCELLATION OF “IFB”..................................................................................15 1.30 BIDS DUE/ CLOSING DATE ................................................................................15 1.31 AWARD BASIS ......................................................................................................15 1.32 AMENDMENTS & ACKNOWLEDGMEENT OF AMENDMENTS ..................15 1.33 COMPENSATION AND METHOD OF PAYMENT ............................................15 1.34 TERMINATION FOR DEFAULT..........................................................................16 1.35 TERMINATION FOR CONVENIENCE................................................................16 1.36 UNATHORIZED ELECTRONIC TRANSACTIONS PROHIBITED...................17 1.37 DURATION OF BID...............................................................................................17 i Contract No. 20110030 UPS Maintenance Page No. SECTION 2 – SCOPE OF SERVICE .............................................................................18 2.1 SCOPE OF CONTRACT ..........................................................................................18 2.2 UPS MODULE LIST.................................................................................................18 2.3 PRE-EXISTING DEFICIENCIES.............................................................................20 2.4 GENERAL MAITNENANCE AND TESTING REQUIREMENTS .......................20 2.5 BATTERY MAINTENANCE TESTING, REPLACEMENT AND REPAIR SERVICES .................................................................................................23 2.6 PREVENTIVE MAINTENANCE.............................................................................25 2.7 GENERAL REQUIREMENTS FOR MAINTENANCE..........................................25 2.8 QUALIFICATIONS OF BIDDERS ..........................................................................26 2.9 LOCATIONS & CONTACT PERSON.....................................................................27 ATTACHMENTS: Attachment A: Attachment B: Attachment C: Attachment D: Attachment E: Attachment F: Attachment G: Attachment H: Attachment I: Attachment J: Pictures & Locations Schedule of Prices Bid/ Proposal Affidavit Living Wage Affidavit Living Wage FAQs Contract Affidavit Prompt Payment Guidelines MDOT Terms & Conditions for Maintenance Signature Guidelines Test Report ii Page No. 30 43 45 50 52 60 64 66 69 97 Advisory 2006-1 STATE OF MARYLAND VENDOR COMMENTS To help us improve the quality of State solicitations and make our procurement process more responsive and business-friendly, we ask that you take a few minutes to complete this form. Thank you for your assistance. Bid/Proposal Number: Entitled: I. 20110030 UPS Maintenance – Authority Wide If you are not bidding, please indicate why: o o o o o o o o o o o o Other commitments preclude our participation at this time. The subject of the contract is not in our business line. We lack experience in the work/commodities required. The scope of work is beyond our current capacity. We cannot be competitive. (Please explain below.) The specifications are either unclear or too restrictive. (Please explain below.) Bid/proposal requirements, other than specifications, are unreasonable or too risky. (Please explain below.) Time for completion is insufficient. Bonding/insurance requirements are prohibitive. (Please explain below.) Doing business with government is simply too complicated. Prior experience with State of Maryland contracts was unprofitable or otherwise unsatisfactory. (Please explain below.) Other: __________________________________________________________ II. Please explain your response further, offer suggestions, or express concerns. (Use the back for additional information.) Remarks:______________________________________________________________________ ______________________________________________________________________________ ______________________________________________________________________________ _____________________________________________________________________________ OPTIONAL: Vendor Name: ________________________________________ Date: ___________ Contact:___________________________________________ Phone: ______________ Address or email: ______________________________________________________ THANK YOU!!! Contract No. 20110030 UPS Maintenance KEY INFORMATION SUMMARY SHEET Invitation For Bid IFB NO.: 20110030 IFB ISSUE DATE: April 13, 2012 IFB ISSUING OFFICE: Maryland Transportation Authority Office of Procurement & Fleet Services PROCUREMENT OFFICER: Harry Johnson Procurement Officer Office of Procurement & Statutory Compliance Program Office Phone: 410-537-7522 E-mail: [email protected] MAIL ADDRESS: Maryland Transportation Authority Office of Procurement & Statutory Compliance Program 303 Authority Drive Baltimore, Maryland 21222 PRE-BID MEETING: May 8, 2012 /10:00 AM FSK Administration Building 2nd Floor Conference Room 303 Authority Drive Baltimore, Maryland 21222 QUESTIONS: Please submit all questions to, Procurement Officer: Harry Johnson via email at: [email protected] Questions will be received until May 24, 2012 at 2:00p.m. Oral questions will not be entertained. IFB DELIVERY ADDRESS: Maryland Transportation Authority Office of Procurement & Statutory Compliance Program 303 Authority Drive – 2nd Floor Bid Box Baltimore, Maryland 21222 (Please use side entrance closet to Key Bridge) CLOSING DATE AND TIME: June 4, 2012 at 12:00 Noon Note: This solicitation is subject to cancellation as provided in COMAR 21.06.02.02 Contract No. 20110030 UPS Maintenance SECTION 1 – GENERAL INFORMATION 1.1 1.2 SUMMARY STATEMENT 1.1.1 The Maryland Transportation Authority (“Authority”) is issuing an Invitation for Bids (“IFB”) to procure a licensed contractor to provide annual maintenance, testing and services for uninterruptible power supplies throughout the Authority. 1.1.2 The Authority intends to make a single contract award as result of this IFB. ABBREVIATIONS AND DEFINITIONS 1.2.1 For the purposes of this IFB, the following abbreviations and terms have the meanings indicated below: a) Authority – The Maryland Transportation Authority. b) BHT - Baltimore Harbor Tunnel c) Bay Bridge – The William Preston Lane Jr. Memorial Bridge. d) Bidder – An entity that submits a bid in response to this IFB. e) BPW - The Maryland Board of Public Works. f) CFMO – Chief Facility Maintenance Officer g) Contractor – The successful bidder that is awarded the Contract. h) COMAR – The Code of Maryland Regulations, which is available online at www.dsd.state.md.us. i) CM or CONTRACT MANAGER – Authority official having daily contract management oversight responsibility j) FORCE MAJEURE – An event or effect that could not be reasonably anticipated or controlled. k) FSK – Francis Scott Key Bridge l) FMT – Fort McHenry Tunnel m) ICC – Intercounty Connector Contract No. 20110030 UPS Maintenance n) IFB – The entire contents of this Invitation For Bids, including any amendments/addenda thereto. o) JFK – John F. Kennedy Memorial Highway (Northern Region Facilities) p) Local Time – Time in the Eastern Time Zone as observed by the State of Maryland. (q) POC – Point of Contact – An Authority Official at each facility that provides the Contractor with appropriate access to the site and approves his/her entry to the facility. (r) MBE – Minority Business Enterprises certified by the Maryland Department of Transportation under COMAR 21.11.03. (s) Procurement Officer – The State representative who is responsible for this IFB and for the determination of contract scope issues; also, the only State representative who can authorize changes to the Contract. (t) UPS – Uninterruptible Power Supply (u) WPL – William Preston Lane Jr. Memorial Bridge. 1.3 CONTRACT TYPE 1.3.1 1.4 CONTRACT DURATION 1.4.1 1.5 The Contract resulting from this IFB shall be for a Base Term of twenty-four (24) months commencing on or about September 1, 2014 with no renewal options. CONTRACT PRICE ADJUSTMENTS 1.5.1 1.6 Any contract resulting from this IFB shall be a firm fixed-price contract. A fixed-price contract is appropriate for use when the extent and type of work necessary to meet State requirements can be reasonable specified and the cost can be reasonably estimated, as is generally the case for construction or standard commercial products. A fixed-price type of contract is the only type of contract that can be used in competitive sealed bidding. COMAR 21.06.03.02 B (1). UNIT BID PRICES SHALL REMAIN FIRM FOR THE TWO (2) YEAR BASE CONTRACT TERM. CONTRACT ADMINISTRATION 1.6.1 All work associated with the Contract shall be at the direction of the Contract Administrator, Procurement Officer, or their designee. Contract No. 20110030 UPS Maintenance 1.7 PROCUREMENT METHOD 1.7.1 1.8 This procurement is being conducted in accordance with the Code of Maryland Regulations (“COMAR”), Title 21, State Procurement Regulations, COMAR 21.05.02, Procurement by Competitive Sealed Bidding. PROCUREMENT OFFICER & CONTRACT MANAGER 1.8.1 The sole point-of-contact in the State for the purpose of this IFB prior to award of the Contract is the Procurement Officer listed below. Harry Johnson, Procurement Officer Maryland Transportation Authority Office of Procurement & Statutory Compliance program 303 Authority Drive Baltimore, Maryland 21222 Telephone No.: 410-537-7522 E-mail address: [email protected] Note: After Contract award, the Contract Manager will be the primary Authority contact. As of this time, the Contract Manager is: Mr. Robert Jordan, P.E. Maryland Transportation Authority 300 Authority Drive Baltimore, Maryland 21222 Telephone No.: 410-537-7851 Fax No.: 410-537-7801 E-mail address: [email protected] 1.9 PRE-BID CONFERENCE 1.9.1 A Pre-Bid Conference will be held on (May 8, 2012) beginning at 10:00 A.M. Local Time, at the following location: Maryland Transportation Authority FSK Administration Building 2nd Floor Conference Room 303 Authority Drive Baltimore, Maryland 21222 1.9.2 Attendance at the Pre-Bid Conference is not mandatory, but all interested bidders are encouraged to attend in order to facilitate better preparation of their bids. In addition, attendance may facilitate the bidder’s understanding of the IFB requirements. Contract No. 20110030 UPS Maintenance 1.9.3 1.10 As promptly as is feasible, subsequent to the Pre-Bid Conference, a summary of the Pre-Bid Conference and all questions and answers known at that time will be posted to https://ebidmarketplace.com. All prospective bidders are encouraged to be registered on eMaryland Marketplace to receive all posted documentation referring to this IFB. CLARIFICATION 1.10.1 It is understood that if there are any omissions and/or unclear requirements, it shall be the responsibility of the bidder to clarify such items with the Authority before submitting a bid. Inquiries must be in writing and directed to Harry Johnson, Procurement Officer via Email: [email protected]. No later than May 24, 2012 at 2:00p.m. Oral questions will not be entertained. 1.11 ADDITIONS & DELETIONS 1.11.1 The Authority's Procurement Officer, upon five (5) days written notice to the Contractor, may add or delete any item covered under this proposal. When a unit is added or deleted, a rate adjustment shall be made proportionately. 1.12 CHANGES 1.12.1 The Procurement Officer may make any change in the work within the general scope of the Contract at any time by written order designated to be a change order. If any change under this clause causes an increase or decrease in the Contractor's cost of, or the time required for, the performance of any part of the work under the Contract, an equitable adjustment shall be made and the Contract shall be modified in writing accordingly. 1.13 LIABILITY 1.13.1 The Contractor agrees to assume full responsibility for any and all damage to the property of the Authority, both real and personal, which results from or arises in connection with, the performance of this Contract. 1.13.2 The Contractor hereby agrees to indemnify and save harmless the Authority against all claims, damages, costs, losses and liabilities whatsoever, for any and all injury to persons and property which may arise out of the performance of this Contract. 1.13.3 The Contractor agrees to maintain adequate insurance coverage as identified in Section 1.21 of the IFB in order to fulfill responsibility under this section. 1.14 PROPOSAL/ BID & CONTRACT AFFIDAVITS Contract No. 20110030 UPS Maintenance 1.14.1 Contractor shall furnish fully executed Bid/Proposal Affidavits and Contract Affidavits on forms supplied by the Authority, which are essential parts of the bid and Contract, respectively. 1.15 MINORITY BUSINESS ENTERPRISE NOTICE 1.15.1 The Authority hereby notifies all bidders that in regard to any contract entered into pursuant to this advertisement, certified minority businesses will be afforded full opportunity to submit bids in response to this notice and will not be subjected to discrimination on the basis of race, color, sex, or national origin in consideration for an award. 1.16 PROMPT PAY REQUIREMENTS 1.16.1 This procurement and the contract to be awarded pursuant to this solicitation are subject to the Prompt Payment Policy Directive issued by the Governor’s Office of Minority Affairs (“GOMA”) and dated August 1, 2008. Promulgated pursuant to Sections 11-201, 13-205(a), and Title 14, Subtitle 3 of the State Finance and Procurement Article (SFP), and Code of Maryland Regulations (COMAR) 21.01.01.03 and 21.11.03.01 et seq., the Directive seeks to ensure the prompt payment of all subcontractors on non-construction procurement contracts. The successful Offeror who is awarded a contract must comply with the prompt payment requirements outlined in the Contract (see Attachment G). Additional information is available on the GOMA website at www.mdminoritybusiness.com. 1.17 TOLL FREE PASSAGE 1.17.1 The Contractor shall not be permitted toll free passage in the performance of this work. 1.18 ARREARAGES 1.18.1 By submitting a response to this solicitation, a vendor shall be deemed to represent that it not in arrears in the payment of any obligation due and owing the State of Maryland, including the payment of taxes and employee benefits, and that it shall not become so in arrears during the term of the contract if selected for contract award. 1.19 BID DOCUMENTS 1.19.1 All Bids must be on the forms prescribed by the Authority. This means no Bid shall contain or be accompanied by any writing purporting to limit or qualify the Authority's right to accept such Bid or purporting to alter such Bid or any Contract which may be executed pursuant thereto. If, notwithstanding the foregoing, any Bidder shall submit such writing, the Authority may, in its discretion, disregard such writing and accept the Bid without the attempted Contract No. 20110030 UPS Maintenance qualification, limitation, or alteration. The Authority also as an alternative, without any implication that it is necessarily the only alternative, may reject any Bid accompanied by or containing any such writing. Bids may also be rejected if they show any alteration of forms, additions not called for, additional or alternate bids, incomplete bids, erasures, or irregularities of any kind. Each entity who obtains a set of bidding documents will be furnished with such number of Bid forms as may reasonably be required. 1.20 MANDATORY TERMS & CONDITIONS 1.20.1 By submitting a bid in response to this IFB, an Offeror, if selected for award, shall be deemed to have agreed to and accepted all Contract terms and conditions set forth in the standard Contract form and the Maryland Department of Transportation (“MDOT”) General Terms and Conditions for Maintenance. 1.21 INSURANCE 1.21.1 Contractor shall, at its own cost and expense, take out and carry in effect, through the term of the Contract a policy or policies of insurance, with a reputable insurance company that is financially sound and authorized to conduct business in the State of Maryland and upon whom process in any suit or action or other proceeding in the courts of the State of Maryland or of the United States may be served, insuring Contractor against all liability for injuries to persons (including wrongful death) and damages to property caused by Contractor’s use and occupancy or otherwise caused by Contractor’s activities and operations at the Authority facilities and property, the policy limits thereof to be in the minimum(s) as set forth below. 1.21.2 COMMERCIAL GENERAL LIABILITY INSURANCE 1.21.2.1 Contractor shall maintain Commercial General Liability (“CGL”) insurance, and, if necessary, commercial umbrella insurance. The insurance shall be kept in full force and effect until all work has been satisfactorily completed and accepted. 1.21.2.2 The CGL insurance and, if necessary, commercial umbrella insurance shall be a limit of not less than Two Million Dollars ($2,000,000.00) for each occurrence. If such CGL insurance contains a general aggregate limit, it shall apply separately to this project. 1.21.2.3 The CGL insurance shall be written on ISO occurrence form CG 00 01 01 96 (or a substitute form providing equivalent coverage) and shall cover, but not be limited to, liability arising from Premises, Operations, Independent Contractors, Products-Completed Operations, Personal Injury and Advertising Injury, and liability assumed under an insured contract. Contract No. 20110030 UPS Maintenance 1.21.2.4 Additional Insured. The State of Maryland, MDOT, the Authority, its authorized officers, directors, agents, employees, volunteers, and representatives shall be included as an additional insured under the CGL, and under the commercial umbrella, if any. 1.21.2.5 The CGL insurance shall apply as primary insurance with respect to any other insurance or self-insurance programs afforded to the Authority. There shall be no endorsement or modification of the CGL to make it excess over other available insurance. If the CGL states that it is excess or pro-rata, the policy shall be endorsed to be primary with respect to the additional insured. 1.21.2.6 Waiver of Subrogation. Contractor waives all rights against the State of Maryland, MDOT, the Authority and its agents, officers, directors, employees, volunteers, and representatives for recovery of damages to the extent these damages are covered by the CGL or umbrella liability insurance obtained by Contractor pursuant to this contract. 1.21.3 COMMERCIAL AUTOMOBILE LIABILITY INSURANCE 1.21.3.1 1.21.3.2 Contractor shall maintain automobile liability insurance and, if necessary, commercial umbrella liability insurance with a limit of not less than One Million Dollars ($1,000,000.00) for each accident. Such insurance shall cover liability arising out of any automobile. 1.21.3.3 Coverage shall be written on ISO form CA 00 01, CA 00 05, CA 00 12, or CA 00 20. If necessary, the policy shall be endorsed to provide contractual liability coverage equivalent to that provided in the 1990 and later editions of CA 00 01. 1.21.3.4 Waiver of Subrogation. Contractor waives all rights against the State of Maryland, MDOT, the Authority and its agents, officers, directors, employees, volunteers, and representatives for recovery of damages to the extent these damages are covered by the business auto liability or commercial umbrella liability insurance obtained by the Contractor as required by this Contract or under any applicable auto physical damage coverage. 1.21.4 WORKERS COMPENSATION AND EMPLOYERS LIABILITY INSURANCE 1.21.4.1 Contractor shall maintain workers compensation and employers liability insurance. 1.21.4.2 Workers Compensation. Coverage shall be at statutory limits as Contract No. 20110030 UPS Maintenance required by the laws of the State of Maryland. 1.21.4.3 Waiver of Subrogation. Contractor waives all rights against the State of Maryland, MDOT, the Authority and its agents, officers, directors, employees, volunteers, and representatives for recovery of damages to the extent these damages are covered by the workers compensation and employers’ liability or commercial umbrella liability insurance obtained by the Contractor pursuant to this contract. Contractor shall obtain an endorsement equivalent to WC 00 03 13 to affect this waiver. 1.21.5 COMMERCIAL PROPERTY INSURANCE 1.21.5.1 Contractor may, at its option, purchase insurance to cover its personal property. In no event shall the Authority be liable for any damage to or loss of personal property sustained by Contractor, even if such loss is caused by the negligence of the State of Maryland, MDOT, the Authority or its agents, officers, directors, employees, volunteers, and representatives. 1.21.5.2 All such policies shall be issued by companies with an A.M. Best’s rating of A- or better and a financial size category of VII or better. 1.21.5.3 Insurance shall be written on an occurrence, not claims made basis. 1.21.5.4 Evidence of Insurance, Cancellation, Material Change or NonRenewal 1.21.5.4.1 The requirement of GP-7.14 (Liability Insurance) to submit Certificate(s) of Insurance prior to starting work is modified for Authority Contracts to require the certificate(s) of insurance to be submitted prior to the execution of the Contract. 1.21.5.4.2 Prior to execution of the Contract and at least annually thereafter unless otherwise specified by the Authority in writing, and at least sixty (60) days before the expiration of any then current policy, the Contractor agrees to furnish the Authority with certificate(s) of insurance and the required endorsement(s) referenced herein, executed by a duly authorized representative of each insurer, showing compliance with the insurance requirements of the Contract. 1.21.5.4.3 Each certificate of insurance shall provide for thirty (30) days advance written notice to the Authority prior to the cancellation, non-renewal, or material change of any insurance referred to herein. Contract No. 20110030 UPS Maintenance 1.21.5.4.4 Certificate(s) of insurance shall indicate at a minimum; the type, kind, and amount of insurance in effect, the period of the policies, the Contract Number of this Contract, and any applicable additional insured statement as referred to herein. 1.21.5.4.5 In no event shall any required insurance be cancelled without prior written consent of the Authority. 1.21.5.4.6 Certificate(s) of insurance shall be issued to: Maryland Transportation Authority Office of Procurement & Statutory Compliance program 303 Authority Drive Baltimore, Maryland 21222 1.21.5.4.7 The Authority reserves the right to obtain relevant endorsements, declaration pages, and/or a complete copy of the insurance policy(s) from the Contractor evidencing the coverage required herein, upon written demand. Contractor shall provide certified copies of all insurance policies required above within ten (10) business days of the Authority’s written request for said copies. 1.21.6 Additional Insured’s Endorsement. All policies, except workers compensation, shall be endorsed to identify the State of Maryland, MDOT, the Authority, and their authorized officers, directors, agents, employees, volunteers, and representatives as additional insured’s, not named insured’s, as their interest may appear in connection with the Contract. 1.21.7 The failure of the Authority, at any time or from time to time, to enforce the insurance provisions, to demand such certificate or other evidence of full compliance with the insurance requirements, or to identify a deficiency from evidence that is provided shall not constitute a waiver of those provisions nor in any respect reduce the obligations of the Contractor to maintain such insurance or to defend and hold the Authority harmless with respect to any items of injury or damage covered by the Contract. 1.21.8 Failure to maintain the insurance required by the Contract shall be the basis for immediate termination of this Contract at the Authority’s sole discretion. 1.21.9 No Representation of Coverage Adequacy. By requiring insurance herein, the Authority does not represent that coverage and limits will necessarily be adequate to protect the Contractor and such coverage and limits shall not be deemed as a limitation on the Contractor’s liability under the indemnities granted to the Authority in the Contract. Contract No. 20110030 UPS Maintenance 1.21.10As indicated above, the Contractor may use commercial umbrella liability insurance so that the Contractor has the flexibility to select the best combination of primary and excess limits to meet the total insurance limits required by the Contract. 1.21.11The Authority reserves the right at any time throughout the term of the Contract to adjust the aforementioned insurance requirements, if, in Authority’s reasonable judgment, the insurance required by the Contract is deemed inadequate to properly protect the Authority’s interest. 1.21.12To the extent of the Contractor’s knowledge, Contractor shall send a written report to the Authority within twenty-four (24) hours of the Contractor’s receipt of any knowledge of any accident or other event arising in any manner from the performance of the Contract which results in or might have resulted in bodily injury, personal injury, property damage, or loss of any kind. A copy of the report shall be sent to: Maryland Transportation Authority Office of Risk Management 303 Authority Drive Baltimore, Maryland 21222 NOTE: The Contractor must submit adequate proof of insurance prior to the execution of the Contract. 1.22 COMMERICIAL NON-DISCRIMINATION CLAUSE 1.22.1 As a condition of entering into this Agreement, Bidder represents and warrants that it will comply with the State's Commercial Nondiscrimination Policy, as described under Title 19 of the State Finance and Procurement Article of the Annotated Code of Maryland. As part of such compliance, Bidder may not discriminate on the basis of race, color, religion, ancestry, national origin, sex, age, marital status, sexual orientation, disability or other unlawful forms of discrimination in the solicitation, selection, hiring, or commercial treatment of subcontractors, vendors, suppliers, or commercial customers, nor shall Contractor retaliate against any person for reporting instances of such discrimination. Contractor shall provide equal opportunity for subcontractors, vendors, and suppliers to participate in all of its public sector and private sector subcontracting and supply opportunities, provided that nothing contained in this clause shall prohibit or limit otherwise lawful efforts to remedy the effects of marketplace discrimination that have occurred or are occurring in the marketplace. Contractor understands and agrees that a material violation of this clause shall be considered a material breach of this Agreement and may result in termination of this Agreement, disqualification of Contractor from participating in State contracts, or other sanctions. This clause is not enforceable by or for the benefit of, and creates no obligation to, any third party. Contract No. 20110030 UPS Maintenance 1.22.2 As a condition of entering into this agreement, upon the request of the Maryland Commission on Human Relations, and only after the filing of a complaint against Contractor under Title 19 of the State Finance and Procurement Article of the Annotated Code of Maryland, as amended from time to time, Contractor agrees to provide within 60 days after the request a truthful and complete list of the names of all subcontractors, vendors, and suppliers that Contractor has used in the past 4 years on any of its contracts that were undertaken within the State of Maryland, including the total dollar amount paid by Contractor on each subcontract or supply contract. Contractor further agrees to cooperate in any investigation conducted by the State pursuant to the State's Commercial Nondiscrimination Policy as set forth under Title 19 of the State Finance and Procurement Article of the Annotated Code of Maryland, and to provide any documents relevant to any investigation that are requested by the State. Contractor understands and agrees that violation of this clause is a material breach of this Agreement and may result in contract termination, disqualification by the State from participating in State contracts, and other sanctions. 1.23 LIVING WAGE REQUIREMENTS 1.23.1 A solicitation for services under a State contract valued at One Hundred Thousand Dollars ($100,000.00) or more may be subject to Title 18 of the State Finance and Procurement Article of the Annotated Code of Maryland. Additional information regarding the State’s Living Wage requirement is contained in this solicitation (see Attachment D entitled Living Wage Requirements for Service Contracts). If the Offeror fails to submit and complete the Affidavit of Agreement, the State may determine an Offeror to be not responsible. 1.23.2 Contractors and Subcontractors subject to the Living Wage Law shall pay each employee covered under Title 18 of the State Finance and Procurement Article of the Annotated Code of Maryland at least $11.72 per hour, if State contract services valued at 50 percent or more of the total value of the Contract are performed in the Tier 1 area. If State contract services valued at 50 percent or more of the total values of the contract are performed in the Tier 2 area, an Offeror shall pay each covered employee at least $8.81 per hour. The specific Living Wage rate is determined by whether a majority of services take place in a Tier 1 area or Tier 2 area of the State. The Tier 1 area includes Montgomery County, Prince George’s County, Howard County, Anne Arundel County, Baltimore County, and Baltimore City. The Tier 2 area includes any county in the State not included in the Tier 1 area. In the event that the employees who perform the services are not located in the State, the head of the unit responsible for a State contract pursuant to Section 18-102(d) of the State Finance and Procurement Article shall assign the tier based upon where the recipients of the services are located. Contract No. 20110030 UPS Maintenance 1.23.3 The contract resulting from this solicitation will be deemed to be a Tier 1 contract or a Tier 2 contract depending on the location(s) from which Contractor provides 50 percent or more of the services. If Contractor provides 50 percent or more of the services from a location(s) in a Tier 1 jurisdiction(s) the contract will be a Tier 1 contract. If Contractor provides 50 percent or more of the services from a location(s) in a Tier 2 jurisdiction(s), the contract will be a Tier 2 contract. If Contractor provides more than 50 percent of the services from an out-of-State location, then the contract will be deemed to be a Tier 1_contract. The Offeror must identify in their Offer the location(s) from which services will be provided. 1.24 PUBLIC INFORMATION ACT NOTICE 1.24.1 A bidder should give specific attention to the clear identification of those portions of its bid that it deems to be confidential, proprietary information or trade secrets, and provide justification why such materials, upon request, should not be disclosed by the State under the Access to Public Records Act, State Government Article, Title 10, Subtitle 6 of the Annotated Code of Maryland. 1.24.2 Bidders are advised that, upon request for this information from a third party, the Procurement Officer is required to make an independent determination whether the information may be disclosed. 1.25 BIDDER RESPONSIBILITIES 1.25.1 The State will enter into a contractual agreement only with the selected bidder. The selected bidder/Contractor shall be responsible for all products and services required by this IFB. Subcontractors, if any, must be identified and a complete description of their role relative to the bid must be included in the bid. If a bidder that seeks to perform or provide the services required by this IFB is a subsidiary of another entity, all information submitted by the bidder, such as, but not limited to, references and financial reports, must pertain exclusively to the bidder, unless the parent organization will provide guarantees for the performance of the subsidiary. 1.26 PROTESTS/ DISPUTES 1.26.1 Any protest or dispute related respectively to this IFB or resulting Contract shall be subject to the provisions of State Finance and Procurement Article, Title 15, Subtitle 2, Annotated Code of Maryland, and COMAR 21.10 “Administrative and Civil Remedies”. Pending resolution of a claim, the Contractor shall proceed diligently with the performance of the Contract in accordance with the Procurement Officer’s decision. 1.27 MULITPLE OR ALTERNATE BIDS Contract No. 20110030 UPS Maintenance 1.27.1 A bidder may not submit more than one bid. Multiple or alternate bids will not be accepted. 1.28 TIE BIDS 1.28.1 If a tie bid should occur; tie bids will be determined in accordance with the provisions set forth under COMAR 21.05.02.14 “Tie Bids”. 1.29 CANCELLATION OF “IFB” 1.29.1 In accordance with COMAR 21.06.02.02, the MDTA reserves the right to cancel this solicitation in whole or in part when it is in the best interest of the State to do so. 1.30 BIDS DUE/ CLOSING DATE 1.30.1 The Bids must be delivered to the 2nd Floor Bid Box, located at 303 Authority Drive, Baltimore, Maryland 21222 by the date specified in the Public Notice. 1.30.2 Bids, requests for withdraws, and modifications not received by the time and at the place indicated are late and may only be considered in accordance with COMAR 21.05.02.10. 1.30.3 All bids must be submitted prior to the bid opening time to be considered “responsive.” All submittals after 12:00 Noon will be considered late and will be returned unopened to bidders. 1.31 AWARD BASIS 1.31.1 The Contract will be awarded to the responsible and responsive bidder submitting the most favorable evaluated bid price. The quantities shown on the Bid Sheet are for evaluation purposes and to establish firm, fixed unit prices for the duration of the Contract. The quantities shown are not guaranteed amounts. Actual usage against the Contract may be more or less that the estimated quantities shown and in no case will the total Contract usage exceed Two Hundred Thousand Dollars ($200,000.00). 1.32 AMENDMENTS & ACKNOWLEDGMEENT OF AMENDMENTS 1.32.1 If it becomes necessary to revise this IFB, amendments will be posted via https://ebidmarketplace.com and through the Authority’s webpage. Acknowledgement of the receipt of all amendments to the IFB must be submitted with bid package by the bidder. Failure to acknowledge receipt does not relieve the bidder from complying with all terms of any such amendment. 1.33 COMPENSATION AND METHOD OF PAYMENT Contract No. 20110030 UPS Maintenance 1.33.1 Payment will be made by check, within thirty (30) days following proper receipt of an approved invoice from the Contractor. 1.33.2 All invoices and/or correspondence pertaining to invoices shall be identified with Contract Number 20110030 and shall be forwarded to: Robert Jordan, P.E. Maryland Transportation Authority 300 Authority Drive Baltimore, Maryland 21222 1.33.3 All services provided under this contract shall be billed within thirty (30) days of completion of the work and in accordance with the bid prices on Attachment B, Bid Price Sheet. 1.33.4 The invoice must also include on its face, the Contractor’s Federal Tax Identification Number. 1.33.5 The invoice must be supported by a job or work ticket created by the technician providing the service and this ticket MUST BE SIGNED BY AN APPROPRIATE AUTHORITY REPRESENTATIVE. An appropriate representative will be either a member of the management team or a member of the Facility’s Maintenance personnel or their delegated alternate. The appropriate Authority personnel will also be announced at the Contract’s pre-start conference. 1.33.6 INVOICES WILL NOT BE PAID WITHOUT AN ATTACHED SIGNED COPY OF THE JOB/WORK TICKET. 1.34 TERMINATION FOR DEFAULT 1.34.1 If the Contractor fails to fulfill its obligation under this contract properly and on time or otherwise violates any provision of the contract, the State may terminate the contract by written notice to the Contractor. The notice shall specify the acts or omissions relied upon as cause for termination. All finished or unfinished work provided by the Contract, shall, at the State’s option, become the State’s property. The State shall pay the Contractor fair and equitable compensation for satisfactory performance prior to receipt of notice of the termination, less the amount of damages caused by Contractor’s breach. If the damages are more than the compensation payable to the Contractor, the Contractor will remain liable after termination and the State can affirmatively collect damages. Termination hereunder, including the determination of the rights and obligations of the parties, shall be governed by the provisions of COMAR 21.07.01.11B. 1.35 TERMINATION FOR CONVENIENCE Contract No. 20110030 UPS Maintenance 1.35.1 The performance of work under this contract may be terminated by the State in accordance with this clause in whole, or from time to time in part, whenever the State shall determine that such termination is in the best interest of the State. The State will pay all reasonable costs associated with this contract that the Contractor has incurred up to the date of termination and all reasonable costs associated with termination of the Contract. However, the Contractor shall not be reimbursed for any anticipatory profits that have not been earned up to the date of termination. Termination hereunder, including the determination of the rights and obligations of the parties, shall be governed by the provisions of COMAR 21.07.01.12A. 1.36 UNAUTHORIZED ELECTRONIC TRANSACTIONS PROHIBITED 1.36.1 An attempt by a bidder or contractor to conduct an electronic procurement transaction may not be considered by the procurement officer unless the solicitation or contract specifically authorizes the electronic means for the specified transaction. 1.36.2 An attempt by a bidder or contractor to conduct a transaction by electronic means, including any acknowledgement, bid, proposal, protest, claim, does not satisfy the requirements of this solicitation unless the solicitation or contract specifically authorizes the use of electronic means for this specified transaction. 1.36.3 The only specified transaction allowed for electronic transaction is for inquiries concerning this specification: emails and/ or facsimile (fax) shall be permitted for clarification only. Any acknowledgement to an e-mail or fax other than in the form of a posted addendum will not be considered a formal response by the Procurement Officer or MDTA representative to an inquiry. 1.37 DURATION OF BID 1.37.1 Bids submitted in response to this IFB are irrevocable for one hundred and twenty (120) days following the closing date of bids. This period may be extended at the Procurement Officer’s request only with the Bidder’s written agreement. Contract No. 20110030 UPS Maintenance SECTION 2 – SCOPE OF SERVICES 2.1 2.2 SCOPE OF CONTRACT 2.1.1 The Authority is requiring a licensed contractor to provide maintenance and testing services for several 3 - phase uninterruptible power supplies used for toll equipment throughout the Authority. 2.1.2 Attachment A provides visual aids and locations of each module. UPS MODULE LIST 2.2.1 The following is a list of all of the UPS modules included in this maintenance contract: 2.2.1.1 Baltimore Harbor Tunnel Administration Building 2.2.1.1.1 This 3 - phase module has a capacity of 50KVA with 208V input and output. It is a Galaxy 4000 manufactured by MGE. Included are a remote battery cabinet and a wall mounted bypass panel. 2.2.1.2 Baltimore Harbor Tunnel Fairfield Building 2.2.1.2.1 This 3 - phase module has a capacity of 15KVA with 208V input and output. It is a Galaxy 3000 manufactured by MGE. Included are integral batteries and floor mounted bypass panel. 2.2.1.3 Fort McHenry Tunnel Administration Building 2.2.1.3.1 This 3 - phase module has a capacity of 50KVA with 208V input and output. It is a Galaxy 4000 manufactured by MGE. Included is a remote battery cabinet and wall mounted bypass panel. 2.2.1.4 Fort McHenry Tunnel East Vent Building 2.2.1.4.1 This 3 - phase module has a capacity of 50KVA with 208V input and output. It is a Galaxy 4000 manufactured by MGE. Included is an adjacent battery cabinet and wall mounted bypass panel. 2.2.1.5 Francis Scott Key Bridge Administration Building 2.2.1.5.1 This 3 - phase module has a capacity of 30KVA with 208V input and output. It is a Galaxy 3000 manufactured by Contract No. 20110030 UPS Maintenance MGE. Included are integral batteries and floor mounted bypass panel. 2.2.1.6 H.W. Nice Bridge Administration Building 2.2.1.6.1 This 3 - phase module has a capacity of 15KVA with 208V input and output. It is a Galaxy 3000 manufactured by MGE. Included are integral batteries and a floor mounted bypass panel. 2.2.1.7 J.F.K. Administration Building 2.2.1.7.1 This 3 - phase module has a capacity of 30KVA with 208V input and output. It is a Galaxy 3000 manufactured by MGE. Included are integral batteries and floor mounted bypass panel. 2.2.1.8 T.J. Hatem Bridge Administration Building 2.2.1.8.1 This 3 - phase module has a capacity of 15KVA with 208V input and output. It is a Galaxy 3000 manufactured by MGE. Included are integral batteries and a floor mounted bypass panel. 2.2.1.9 W.P.L. Bay Bridge Administration Building 2.2.1.9.1 This 3 - phase module has a capacity of 30KVA with 208V input and output. It is a Galaxy 3000 manufactured by MGE. Included are integral batteries and wall mounted bypass panel. 2.2.1.10 W.P.L. Bay Bridge Police Maintenance Building 2.2.1.10.1 This 3 - phase module has a capacity of 50KVA with 480V input and 208V output. It is an EDP 70 MKII manufactured by Chloride. Included is an integral bypass cabinet and adjacent battery cabinet. 2.2.1.11 W.P.L. Bay Bridge Police Building Room (140) 2.2.1.11.1 This 3 - phase module has a capacity of 15KVA with 480V input and 208V output. It is an NXb 15 manufactured by Liebert. Included is an integral bypass cabinet and adjacent battery cabinet. 2.2.1.12 Intercounty Connection (ICC) Deckover Westbound Roadway Contract No. 20110030 UPS Maintenance 2.2.1.12.1 This 3 - phase module has a capacity of 100KVA with 480V input and 208V output. It is a Galaxy 5000 manufactured by MGE. Included is an integral bypass cabinet and adjacent battery cabinet. 2.3 2.4 PRE-EXISTING DEFICIENCIES 2.3.1 Within thirty (30) workdays after the contract start date, the Contractor shall make a complete Inspection of all equipment covered by this contract as part of the first annual maintenance visit as outlined in Section 2.4 and submit an initial deficiency report as part of the first annual maintenance inspection report required for the UPS system as described in Section 2.4.2.7. 2.3.2 The Contractor shall prepare and submit to the MDTA, the annual inspection report which identifies all deficiencies noted during the first annual maintenance inspection. 2.3.3 This report shall identify all corrective actions/repairs needed to resolve each deficiency and shall include a detailed cost proposal for each item. 2.3.4 The MDTA reserves the right to competitively bid all specified repairs. The quoted ‘deficiency’ repair prices contained in the proposal shall remain firm for a period of one hundred twenty (120) calendar days after submission. 2.3.5 The Contractor shall be directed by the MDTA to make those adjustments and/or correct those deficiencies, which can be accomplished through routine preventive maintenance (PM) procedures. 2.3.6 No additional monies will be paid to the contractor when PM procedures are utilized to correct deficiencies. 2.3.7 It is the intent of this contract to allow for all deficiencies to be corrected by the issuance of a modification or extra work order. The decision to do so will be made by the MDTA, based upon the acceptability of the Contractor's proposal. The MDTA reserves the right to have any deficiencies corrected by others. 2.3.8 Any and all deficiencies found after the first annual maintenance inspection which are not noted in the first annual maintenance report will become the responsibility of the Contractor to maintain and repair. 2.3.9 Should the Contractor's inspection disclose any deficiencies which present a hazard, the hazard shall immediately be brought to the attention of the MDTA verbally, with a written confirmation to follow within one (1) workday. GENERAL MAINTENANCE AND TESTING REQUIREMENTS 2.4.1 The testing and maintenance for this equipment shall be performed on a semi Contract No. 20110030 UPS Maintenance annual basis (twice yearly) as is the industry standard for critical standby loads. Inspection and testing shall be conducted such that loads are not impacted through power loss. All inspections and tests shall be scheduled at least one (1) week prior. To be included in the maintenance shall be the main UPS module, batteries and bypass cabinet (if applicable). Specifics are as follows: 2.4.2 First Annual Maintenance Visit: 2.4.2.1 Perform a visual inspection of the system including review of: 2.4.2.1.1 Status panel functionality 2.4.2.1.2 Overall condition of enclosure 2.4.2.1.3 Ambient temperature 2.4.2.1.4 General environmental considerations 2.4.2.1.5 Air filters 2.4.2.1.6 Spare parts kit inventory 2.4.2.2 Perform a mechanical inspection of the system including review of: 2.4.2.2.1 Physical damage or deterioration 2.4.2.2.2 Nonconformance, fit and finish 2.4.2.2.3 Connection integrity 2.4.2.3 Perform an electrical inspection of the system including review of: 2.4.2.3.1 System Voltages 2.4.2.3.2 System Currents 2.4.2.3.3 PC board calibration 2.4.2.3.4 PC board operation 2.4.2.3.5 Sub assembly operation (rectifier, inverter, static switch) 2.4.2.4 Perform an inspection of system operation including review of: 2.4.2.4.1 Forward transfer 2.4.2.4.2 Reverse transfer 2.4.2.4.3 On battery 2.4.2.4.4 Normal Operation 2.4.2.4.5 Emergency Power Off 2.4.2.4.6 Alarm interface 2.4.2.4.7 Maintenance bypass sequence 2.4.2.4.8 Meter reconciliation 2.4.2.4.9 Personalization 2.4.2.5 Perform an inspection of the system batteries including the following: 2.4.2.5.1 2.4.2.5.2 2.4.2.5.3 Check the integrity of the battery rack / cabinet. Check the general appearance and cleanliness of the battery system. Visually inspect cells / units for cracks, leaks, and excessive bulging of containers. Contract No. 20110030 UPS Maintenance 2.4.2.5.4 Check for any evidence of corrosion at the terminals and connectors. 2.4.2.5.5 Check cell / unit tops for cleanliness. 2.4.2.5.6 Spot check torque on 10% of the inner-battery connection. 2.4.2.5.7 Measure and record ambient battery room temperature. 2.4.2.5.8 Measure and record the float voltage of all cells / units. 2.4.2.5.9 Measure and record the total battery float voltage and charging current. 2.4.2.5.10 Measure and record the DC ripple voltage and ripple current being applied to the battery system. 2.4.2.5.11 Measure and record 10% of the inter-cell / unit connection resistance on systems allowing such, using a calibrated digital micro-ohmmeter. 2.4.2.5.12 Re-torque all inter-battery connections to battery manufacturer’s specifications. 2.4.2.5.13 Measure and record all inter-battery load test on all units in the system. 2.4.2.5.14 Perform an individual battery load test on all units in the system. Measure and record hold time of batteries at connected load. 2.4.2.6 Web Interface 2.4.2.6.1 Test web interface and validate voltage, current, and power readings match actual values. 2.4.2.6.2 Test email alerts. 2.4.2.7 Provide detailed written report noting any deficiencies along with corrective action and any necessary recommendations. Documentation will provide necessary data for the manufacturer’s warranty requirements. 2.4.3 Second Annual Maintenance Visit: 2.4.3.1 2.4.3.2 2.4.3.3 2.4.3.4 2.4.3.5 2.4.3.6 Verify adequate cooling in the room Verify the UPS cooling fans are operational Verify the system is on-line and properly supports the load Verify the cleanliness of air filters Verify air intakes and exhaust vents are clear Verify general serviceability of the system and make recommendations as necessary 2.4.3.7 Verify front panel metering and all alarms 2.4.3.8 Ensure unit exterior is clean and free of foreign objects 2.4.3.9 Perform an inspection of the system batteries including the following: 2.4.3.9.1 Check the integrity of the battery rack / cabinet. 2.4.3.9.2 Check the general appearance and cleanliness of the battery system. 2.4.3.9.3 Visually inspect cells / units for cracks, leaks, and excessive bulging of containers. Contract No. 20110030 UPS Maintenance 2.4.3.9.4 Check for any evidence of corrosion at the terminals and connectors. 2.4.3.9.5 Check cell / unit tops for cleanliness. 2.4.3.9.6 Spot check torque on 10% of the inner-battery connection. 2.4.3.9.7 Measure and record ambient battery room temperature. 2.4.3.9.8 Measure and record the float voltage of all cells / units. 2.4.3.9.9 Measure and record the total battery float voltage and charging current. 2.4.3.9.10 Measure and record the DC ripple voltage and ripple current being applied to the battery system. 2.4.3.9.11 Measure and record 10% of the inter-cell / unit connection resistance on systems allowing such, using a calibrated digital micro-ohmmeter. 2.4.3.10 Web Interface 2.4.3.10.1 Test web interface and validate voltage, current, and power readings match actual values. 2.4.3.10.2 Test email alerts. 2.4.3.11 Provide detailed written report noting any deficiencies along with corrective action and any necessary recommendations. Documentation will provide necessary data for the manufacturer’s warranty requirements. 2.5 BATTERY MAINTENANCE TESTING, REPLACEMENT AND REPAIR SERVICES 2.5.1 Battery Maintenance Testing and Replacement shall follow IEEE 1188-2005 (IEEE Recommended Practice for Maintenance, Testing, and Replacement of Valve-Regulated Lead-Acid (VRLA) Batteries for Stationary applications). 2.5.2 If, upon testing it is found that the batteries are in need of replacement or parts are in need of replacement, the Contractor shall report such findings to the procurement officer. If the work involves batteries, the batteries shall be replaced according to the line item bid prices in the contract after approval by the procurement officer. All other parts or service shall be incidental to the preventive maintenance line item. The batteries shall be replaced within thirty (30) calendar days after approval by the procurement officer in writing. The Contractor is also responsible for coordinating and moving the batteries from the source to the location of the UPS and installing the batteries into the UPS. If the batteries are delivered to the site they may be delivered to the store room, which is not always in the same building as the UPS system. The store room is the department that accepts deliveries at each site. 2.5.3 Replacement batteries shall meet or exceed the OEM specifications for the batteries in these units. Replacement batteries for the Libert, Chloride and MGE Galaxy Series UPS shall be a non-spillable valve regulated lead acid type. AmpHour ratings shall meet or exceed the ratings of the existing batteries. Cut sheets Contract No. 20110030 UPS Maintenance shall be submitted for approval prior to ordering batteries. 2.5.4 For the MGE, CHLORIDE, and Libert UPS’s the battery quantities are as follows: Location MODEL SERIAL NUMBER Francis Scott Key Bridge Administration building John F. Kennedy Administration Building T.J. Hatem Bridge Administration Building H.W. Nice Bridge Administration Building W.P.L. Bay Bridge Administration Building Baltimore Harbor Tunnel Fairfield Building Fort McHenry Tunnel East Vent Building Baltimore Harbor Tunnel Administration Building W.P.L. Bay Bridge Police Maintenance Building Fort McHenry Tunnel Administration Building MGE Galaxy 3000 30 KVA MGE Galaxy 3000 30 KVA MGE Galaxy 3000 15 KVA MGE Galaxy 3000 15 KVA MGE Galaxy 3000 30 KVA MGE Galaxy 3000 15 KVA MGE Galaxy 4000 50 KVA MGE Galaxy 4000 50 KVA CHLORIDE EDP70S 50 KVA MGE Galaxy 4000 50 KVA W.P.L. Bay Bridge Police Building, Room (140) Libert NXB15 15KVA 38MB - 1751 MGE Galaxy 5000 100 KVA (G5TUPS100) 1PPL10003 Intercounty Connector (ICC) Deckover, Westbound Roadway QTY. 72-170300-16 Ext. Battery Model No. FIAMM 12FLX300 20 Batteries (Date Codes) Sept - 2011 A07-10544 FIAMM 12FLX300 20 Sept - 2011 A07-10546 YUASA NPX150FR 20 April - 2012 A07-10553 TEMPEST TR45-12 20 Sept - 2011 A08-10124 Sprinter S12V285F 20 Jan – 2008 A07-10550 YUASA NPX150RFR 20 Mar - 2008 P07-10187 Sprinter S12V500F 20 Mar - 2008 P07-10186 Sprinter S12V500F 20 Mar - 2008 B184342 DEKA UNIGY U1HR1500 Technologies Power Solution – Model UPS 12-370 C&D Technologies – UPS12-100MR 40 Sept - 2011 40 April - 2012 24 Aug - 2008 72 Nov - 2010 P07-10090 Energy Storage Technologies – HR12-210 2.5.5 Battery replacements will be paid at the price bid for the appropriate line item for battery replacement for the applicable size and type of unit. 2.5.6 All batteries identified for replacement shall be managed and disposed in accordance with all applicable Federal, State, and local environmental regulations. It is preferred that, wherever feasible, all disposed batteries shall be recycled. 2.5.7 All records documenting the proper transport and disposal of the replacement batteries shall be sent to the following: Paul J. Truntich, Jr., Environmental Manager Maryland Transportation Authority 1200 Frankfurst Avenue Contract No. 20110030 UPS Maintenance Baltimore, Maryland 21226 2.6 2.7 2.5.8 Payment for newly installed batteries will not be approved without submittal and subsequent approval by the MDTA of all documents relating to the proper transport and disposal of the old batteries. 2.5.9 Battery replacement is based on need. There is no guarantee regarding the quantity of battery replacements over the life of this contract and prices shall not be adjusted based on underrun or overrun of the estimated quantities for batteries. Specifically Section 35, Variations in Estimating Quantities in the MDOT General Conditions for Maintenance Contracts shall not apply to battery quantities. PREVENTIVE MAINTENANCE 2.6.1 Wherever the requirements of the preventive maintenance specifically call for the replacement or addition of parts or a specific action (e.g., air filters, desiccant), those parts or actions must be considered inclusive in the unit prices for preventive maintenance as quoted on the SOP. All parts and services except battery replacements required to maintain the UPS in safe and reliable operation shall be incidental to preventive maintenance line items. 2.6.2 Upon completion of the preventive maintenance visit, the Contractor shall submit a written report detailing the preventive maintenance completed and any repairs that have been rendered. The report shall contain a checklist showing that all items in the specifications have been addressed during the preventive maintenance visit. GENERAL REQUIREMENTS FOR MAINTENANCE 2.7.1 The Contractor shall provide 24/7 emergency response support within four (4) hours from contact as often as required. This will require the Contractor to conduct a site visit to the UPS system to investigate, troubleshoot, and resolve the reported issue with the UPS system. This support shall include all materials and labor for emergency service. 2.7.1.1 An emergency service is required whenever: 2.7.1.1.1 An email alert from any UPS covered in the contract indicating a battery fault or that the UPS is not functioning correctly. This shall include loss of communications due to issues within the UPS and loss of accurate reporting through the web interface. 2.7.1.1.2 Any time a UPS goes off-line or is not protecting the load for any cause other than a planned maintenance activity. Contract No. 20110030 UPS Maintenance 2.7.1.2 For an emergency response, the following shall occur when performing an emergency response: 2.7.1.2.1 2.7.1.2.2 2.7.1.2.3 The Contractor shall receive a ticket via email from MDTA operations reporting the nature of the problem and requesting emergency service. The Contractor shall visit the site to trouble shoot and repair the problem. A work ticket shall be generated by the Contractor detailing the findings and repair status of the UPS. 2.7.1.3 All materials shall be provided by the manufacturer of the module in question. 2.7.1.4 Emergency response work shall be coordinated with and reported back to the MDTA. 2.7.1.5 If repairs are required, all emergency repairs shall be completed within four (4) calendar days. 2.8 2.7.2 The Contractor shall also include all labor and materials as required for upgrading the systems to current versions of hardware, software and firmware where such upgrades are necessary to maintain the UPS in reliable working condition. 2.7.3 It shall be the responsibility of the Contractor to coordinate and schedule all maintenance visits with the Authority. These visits shall be on regular dates yearly and semi annually as described above. Visits shall be coordinated at least seven (7) days in advance with the Authority. 2.7.4 The Contractor shall maintain ISO9000 (International Organization of Standard) registration in field service. 2.7.5 The Contractor shall coordinate all instances of switching to Bypass with the Authority. Care shall be taken to eliminate all interruptions of power to critical loads served by modules. During and after maintenance and trouble shooting, the Contractor shall not leave modules in Bypass mode for extended periods of time (longer than one business day). QUALIFICATIONS OF BIDDERS 2.8.1 The following minimum qualifications must be met in order for a bidder to be considered for award. Proof of the qualification shall be required at the time of the bid opening. Failure to provide such proof shall be just cause for rejection of the bid and being deemed not responsive or responsible. Contract No. 20110030 UPS Maintenance 2.8.1.1 The Contractor shall provide testing and maintenance personnel who have been factory trained and certified for each make, model, and manufacturer involved with this contract. Copies of certification shall be provided to the MDTA; or 2.8.1.2 The Contractor must adequately demonstrate to the MDTA’s Project Manager that the Contractor’s technicians are qualified to repair, configure and troubleshoot the UPSs listed in the solicitation without being certified by the manufacturer. 2.8.1.3 The Contractor, as an organization, must have a minimum of five (5) years successful experience maintaining similar UPS systems for multiple clients or Prospective bidders with less than the stated number of years of experience must provide supporting documentation demonstrating their capabilities to perform the type of services outlined in this solicitation. e.g.,) references of comparable, size and scope; financial statement(s) certified by a licensed CPA to demonstrate financial ability; principal experience and education; certification; etc. 2.8.1.4 Contractor must be registered /licensed with the Maryland Department of Labor Licensing and Registration (DLLR) at the time bid submittal. Proof must be provided. 2.8.1.4.1 Documentation must be submitted with the bid package. 2.8.1.4.2 Documentation must meet the approval of the MDTA Project Manager. 2.8.1.5 Contractor must demonstrate and provide documentation to have the ability to provide 24/7 service and have a response time within four (4) hours to any MDTA’s locations. 2.8.2 2.9 The Contractor must submit at least three references for whom the Contractor has performed similar work during the past three years. References must contain a contact individual, telephone number, date when work was performed, and narrative describing services. LOCATIONS & CONTACT PERSON 2.9.1 The following list is where the UPS modules are located and contact information is provided for site visits and as point of contact for service calls: Francis Scott Key Complex 304 Authority Drive Baltimore MD 21222 Attn: Tim Long 410-537-1238 (o) 410-979-4326 (c) Baltimore Harbor Tunnel Complex 1200 Frankfurst Avenue Baltimore MD 21226 Attn: Tim Long 410-537-1238 (o) 410-979-4326 (c) Contract No. 20110030 UPS Maintenance Fort McHenry Tunnel Complex 4000 Leland Avenue Baltimore MD 21224 Attn: Tim Long 410-537-1238 (o) 410-979-4326 (c) JFK Administration Building One Turnpike Highway Perryville, MD, 21903-2219 Attn: Don Crain 410-537-1114 (o) 410-979-5918 (c) Thomas J. Hatem Administration Building 6000 Pulaski Hwy Perryville, MD, 21903 Attn: Don Crain 410-537-1114 (o) 410-979-5918 (c) All Facilities Point of Contact Attn: Dave Dikes 410-537-1096 (o) 443-829-5112 (c) 2.9.2 Bay Bridge Complex 850 Revell Highway Annapolis, MD 21401 Attn: Orlando Angeli 410-537-6663 (o) 410-979-4409 (c) Harry W. Nice Bridge 9665 Orland Park Road Newburg, MD 20664 Attn: Orlando Angeli 410-537-6663 (o) 410-979-4409 (c) Intercounty Connector (ICC) Deckover MD 200 Westbound (Mile Marker 4.4) Near Old Mill Run Redland, MD 20855 Attn: Tim Long 410-537-1238 (o) 410-979-4326 (c) Any failure by the Contractor to become acquainted with the various locations and the available information may not relieve the Contractor from the responsibility for estimating properly the difficulty or cost of successfully performing the work. The Authority assumes no responsibility for any conclusions or interpretations made by the Contractor on the basis of the information made available by the Authority. Contract No. 20110030 UPS Maintenance ATTACHMENTS Attachment A: Attachment B: Attachment C: Attachment D: Attachment E: Attachment F: Attachment G: Attachment H: Attachment I: Attachment J: Pictures & Locations Schedule of Prices Bid/ Proposal Affidavit Living Wage Affidavit Living Wage FAQs Contract Affidavit Prompt Payment Guidelines MDOT Terms & Conditions for Maintenance Signature Guidelines Test Report Notes: Test report shall include the minimum requirements; see Section 2.4 General Maintenance and Testing Requirements. Test report shall be followed by Section 5.4 of the ANSI/NETA - 2011, see attachment J. Contract No. 20110030 UPS Maintenance ATTACHMENT A LOCATIONS & PICTURES Contract No. 20110030 UPS Maintenance J.F.K. Administration Building 1 Turnpike Drive, Perryville, MD 21903 Contract No. 20110030 UPS Maintenance T.J. Hatem Bridge Administration Building 6000 Pulaski Highway, Perryville, MD 21903 Contract No. 20110030 UPS Maintenance W.P.L. Bay Bridge Administration Building 850 Revell Highway, Annapolis MD 21401 Contract No. 20110030 UPS Maintenance W.P.L. Bay Bridge Police Maintenance Building 881 Oceanic Drive, Annapolis, Maryland 21401 Contract No. 20110030 UPS Maintenance W.P.L. Bay Bridge Police Building RM140 881 Oceanic Drive, Annapolis, Maryland 21401 Contract No. 20110030 UPS Maintenance Baltimore Harbor Tunnel Administration Building 1200 Frankfurst Avenue, Baltimore MD 21226 Contract No. 20110030 UPS Maintenance Baltimore Harbor Tunnel Fairfield Building 1700 Frankfurst Avenue, Baltimore MD 21226 Contract No. 20110030 UPS Maintenance Fort McHenry Tunnel Administration Building 3930 Leland Avenue, Baltimore MD 21224 Contract No. 20110030 UPS Maintenance Fort McHenry Tunnel East Vent Building 2301 South Clinton Street, Baltimore MD 21224 Contract No. 20110030 UPS Maintenance Francis Scott Key Bridge Administration Building 303 Authority Drive, Baltimore, MD 21222 Contract No. 20110030 UPS Maintenance H.W. Nice Bridge Administration Building U.S. Route 301 South, Newburg, MD 20664 Contract No. 20110030 UPS Maintenance Intercounty Connector (ICC) Toll Road Westbound/Deckover (Mile Marker 4.4 – Near Olde Mill Run, Redland, MD20855) Contract No. 20110030 UPS Maintenance ATTACHMENT B CONTRACTOR’S SCHEDULE OF PRICES: Company Name & Address | City | State Phone Fax Zip Email Made this _______________day of ______________________________, 2012 Is Company a certified “Maryland Department of Transportation (MDOT)” Minority Business Enterprise? YES NO If YES – Provide MDOT MBE certification number: Is Company qualified in the Small Business Reserve Program (SBR)? YES NO If Yes – Provide qualified SBR number: The undersigned agrees to furnish all necessary labor, parts, materials, equipment, transportation, supervision and insurance necessary to provide maintenance and testing services for several 3 phase uninterruptible power supplies used for toll equipment throughout the Authority in accordance with the attached specifications and other contract documents herein and complete this work for the prices listed below: Contract No. 20110030 UPS Maintenance LINE ITEM UNIT PRICE DESCRIPTION 2 $ (Contingent) Each Replacement Battery for MGE Galaxy 3000 15KVA UPS with (20) YUSAS NPX150FR Batteries or Approved Equal $ 20 $ (Contingent) Each Replacement Battery for MGE Galaxy 3000 30 KVA UPS with (20) Sprinter S12V285F Batteries or Approved Equal $ 20 $ (Contingent) Each Replacement Battery for MGE Galaxy 4000 50KVA UPS with (20) Sprinter S12V500F Batteries or Approved Equal $ 20 $ (Contingent) Each Replacement Battery for MGE Galaxy 4000 50KVA UPS with (40) Model UPS12-370 Batteries or Approved Equal. $ 40 $ (Contingent) Each Replacement Battery for Chloride EDP70S 50KVA UPS with (40) YUASA NP38-121 Batteries or Approved Equal $ 40 $ (Contingent) Each Replacement Battery for Libert NXb 15 15KVA UPS with (24) C&D Technology UPS12-100MR Batteries or Approved Equal $ 24 $ $ 72 $ Per Calendar Year of Preventative Maintenance for All Authority Locations. 2) 4) 5) 6) 7) 8) TOTAL $ 1) 3) ESTIMATED QUANTITY (Contingent) Each Replacement Battery for MGE Galaxy 5000 100KVA UPS with (72) Energy Storage Technologies HR12-210 Batteries or Approved Equal. Note: Batteries are replace on “as-needed basis” only and shall be considered as a contingent item. TOTAL CONTRACT AMOUNT FOR TWO (2) YEARS (Sum of Line Items 1 thru 8) $_____________________ Total Contract Amount Written in Words COMPANY: SIGNATURE Print Name: SOCIAL SECURITY NO. OR FEDERAL TAX ID NO. PHONE: DATE: THIS IS A TWO YEAR CONTRACT WITH NO RENEWAL. THE MARYLAND TRANSPORTATION AUTHORITY RESERVES THE RIGHT TO REJECT ANY AND ALL BIDS IN WHOLE OR IN PART. ATTACHMENT C 21.05.08.07 .07 Bid/Proposal Affidavit. A. Each solicitation shall provide notice that the affidavit in §B of this regulation shall be completed and submitted to the procurement agency with the vendor's bid or offer. B. Mandatory Solicitation Addendum. The solicitation addendum shall be in substantially the same form as follows: BID/PROPOSAL AFFIDAVIT A. AUTHORITY I HEREBY AFFIRM THAT: I, ________________________ (print name), possess the legal authority to make this Affidavit. B. CERTIFICATION REGARDING COMMERCIAL NONDISCRIMINATION The undersigned bidder hereby certifies and agrees that the following information is correct: In preparing its bid on this project, the bidder has considered all proposals submitted from qualified, potential subcontractors and suppliers, and has not engaged in "discrimination" as defined in §19-103 of the State Finance and Procurement Article of the Annotated Code of Maryland. "Discrimination" means any disadvantage, difference, distinction, or preference in the solicitation, selection, hiring, or commercial treatment of a vendor, subcontractor, or commercial customer on the basis of race, color, religion, ancestry, or national origin, sex, age, marital status, sexual orientation, or on the basis of disability or any otherwise unlawful use of characteristics regarding the vendor's, supplier's, or commercial customer's employees or owners. "Discrimination" also includes retaliating against any person or other entity for reporting any incident of "discrimination". Without limiting any other provision of the solicitation on this project, it is understood that, if the certification is false, such false certification constitutes grounds for the State to reject the bid submitted by the bidder on this project, and terminate any contract awarded based on the bid. As part of its bid or proposal, the bidder herewith submits a list of all instances within the past 4 years where there has been a final adjudicated determination in a legal or administrative proceeding in the State of Maryland that the bidder discriminated against subcontractors, vendors, suppliers, or commercial customers, and a description of the status or resolution of that determination, including any remedial action taken. Bidder agrees to comply in all respects with the State's Commercial Nondiscrimination Policy as described under Title 19 of the State Finance and Procurement Article of the Annotated Code of Maryland. B-1. CERTIFICATION REGARDING MINORITY BUSINESS ENTERPRISES. The undersigned bidder hereby certifies and agrees that it has fully complied with the State Minority Business Enterprise Law, State Finance and Procurement Article, §14-308(a)(2), Annotated Code of Maryland, which provides that, except as otherwise provided by law, a contractor may not identify a certified minority business enterprise in a bid or proposal and: (1) Fail to request, receive, or otherwise obtain authorization from the certified minority business enterprise to identify the certified minority proposal; (2) Fail to notify the certified minority business enterprise before execution of the contract of its inclusion in the bid or proposal; Effective 8/8/2011 ATTACHMENT C (3) Fail to use the certified minority business enterprise in the performance of the contract; or (4) Pay the certified minority business enterprise solely for the use of its name in the bid or proposal. Without limiting any other provision of the solicitation on this project, it is understood that if the certification is false, such false certification constitutes grounds for the State to reject the bid submitted by the bidder on this project, and terminate any contract awarded based on the bid. C. AFFIRMATION REGARDING BRIBERY CONVICTIONS I FURTHER AFFIRM THAT: Neither I, nor to the best of my knowledge, information, and belief, the above business (as is defined in Section 16-101(b) of the State Finance and Procurement Article of the Annotated Code of Maryland), or any of its officers, directors, partners, controlling stockholders, or any of its employees directly involved in the business's contracting activities including obtaining or performing contracts with public bodies has been convicted of, or has had probation before judgment imposed pursuant to Criminal Procedure Article, §6-220, Annotated Code of Maryland, or has pleaded nolo contendere to a charge of, bribery, attempted bribery, or conspiracy to bribe in violation of Maryland law, or of the law of any other state or federal law, except as follows (indicate the reasons why the affirmation cannot be given and list any conviction, plea, or imposition of probation before judgment with the date, court, official or administrative body, the sentence or disposition, the name(s) of person(s) involved, and their current positions and responsibilities with the business): ____________________________________________________________ ____________________________________________________________ ___________________________________________________________. D. AFFIRMATION REGARDING OTHER CONVICTIONS I FURTHER AFFIRM THAT: Neither I, nor to the best of my knowledge, information, and belief, the above business, or any of its officers, directors, partners, controlling stockholders, or any of its employees directly involved in the business's contracting activities including obtaining or performing contracts with public bodies, has: (1) Been convicted under state or federal statute of: (a) A criminal offense incident to obtaining, attempting to obtain, or performing a public or private contract; or (b) Fraud, embezzlement, theft, forgery, falsification or destruction of records or receiving stolen property; (2) Been convicted of any criminal violation of a state or federal antitrust statute; (3) Been convicted under the provisions of Title 18 of the United States Code for violation of the Racketeer Influenced and Corrupt Organization Act, 18 U.S.C. §1961 et seq., or the Mail Fraud Act, 18 U.S.C. §1341 et seq., for acts in connection with the submission of bids or proposals for a public or Effective 8/8/2011 ATTACHMENT C private contract; (4) Been convicted of a violation of the State Minority Business Enterprise Law, §14-308 of the State Finance and Procurement Article of the Annotated Code of Maryland; (5) Been convicted of a violation of §11-205.1 of the State Finance and Procurement Article of the Annotated Code of Maryland; (6) Been convicted of conspiracy to commit any act or omission that would constitute grounds for conviction or liability under any law or statute described in subsections (1)—(5) above; (7) Been found civilly liable under a state or federal antitrust statute for acts or omissions in connection with the submission of bids or proposals for a public or private contract; (8) Been found in a final adjudicated decision to have violated the Commercial Nondiscrimination Policy under Title 19 of the State Finance and Procurement Article of the Annotated Code of Maryland with regard to a public or private contract; or (9) Admitted in writing or under oath, during the course of an official investigation or other proceedings, acts or omissions that would constitute grounds for conviction or liability under any law or statute described in §§B and C and subsections D(1)—(8) above, except as follows (indicate reasons why the affirmations cannot be given, and list any conviction, plea, or imposition of probation before judgment with the date, court, official or administrative body, the sentence or disposition, the name(s) of the person(s) involved and their current positions and responsibilities with the business, and the status of any debarment): ____________________________________________________________ ____________________________________________________________ ___________________________________________________________. E. AFFIRMATION REGARDING DEBARMENT I FURTHER AFFIRM THAT: Neither I, nor to the best of my knowledge, information, and belief, the above business, or any of its officers, directors, partners, controlling stockholders, or any of its employees directly involved in the business's contracting activities, including obtaining or performing contracts with public bodies, has ever been suspended or debarred (including being issued a limited denial of participation) by any public entity, except as follows (list each debarment or suspension providing the dates of the suspension or debarment, the name of the public entity and the status of the proceedings, the name(s) of the person(s) involved and their current positions and responsibilities with the business, the grounds of the debarment or suspension, and the details of each person's involvement in any activity that formed the grounds of the debarment or suspension). ____________________________________________________________ ____________________________________________________________ ___________________________________________________________. Effective 8/8/2011 ATTACHMENT C F. AFFIRMATION REGARDING DEBARMENT OF RELATED ENTITIES I FURTHER AFFIRM THAT: (1) The business was not established and it does not operate in a manner designed to evade the application of or defeat the purpose of debarment pursuant to Sections 16-101, et seq., of the State Finance and Procurement Article of the Annotated Code of Maryland; and (2) The business is not a successor, assignee, subsidiary, or affiliate of a suspended or debarred business, except as follows (you must indicate the reasons why the affirmations cannot be given without qualification): ____________________________________________________________ ____________________________________________________________ ___________________________________________________________. G. SUB-CONTRACT AFFIRMATION I FURTHER AFFIRM THAT: Neither I, nor to the best of my knowledge, information, and belief, the above business, has knowingly entered into a contract with a public body under which a person debarred or suspended under Title 16 of the State Finance and Procurement Article of the Annotated Code of Maryland will provide, directly or indirectly, supplies, services, architectural services, construction related services, leases of real property, or construction. H. AFFIRMATION REGARDING COLLUSION I FURTHER AFFIRM THAT: Neither I, nor to the best of my knowledge, information, and belief, the above business has: (1) Agreed, conspired, connived, or colluded to produce a deceptive show of competition in the compilation of the accompanying bid or offer that is being submitted; (2) In any manner, directly or indirectly, entered into any agreement of any kind to fix the bid price or price proposal of the bidder or offeror or of any competitor, or otherwise taken any action in restraint of free competitive bidding in connection with the contract for which the accompanying bid or offer is submitted. I. CERTIFICATION OF TAX PAYMENT I FURTHER AFFIRM THAT: Except as validly contested, the business has paid, or has arranged for payment of, all taxes due the State of Maryland and has filed all required returns and reports with the Comptroller of the Treasury, the State Department of Assessments and Taxation, and the Department of Labor, Licensing, and Regulation, as applicable, and will have paid all withholding taxes due the State of Maryland prior to final settlement. J. CONTINGENT FEES Effective 8/8/2011 ATTACHMENT C I FURTHER AFFIRM THAT: The business has not employed or retained any person, partnership, corporation, or other entity, other than a bona fide employee, bona fide agent, bona fide salesperson, or commercial selling agency working for the business, to solicit or secure the Contract, and that the business has not paid or agreed to pay any person, partnership, corporation, or other entity, other than a bona fide employee, bona fide agent, bona fide salesperson, or commercial selling agency, any fee or any other consideration contingent on the making of the Contract. K. ACKNOWLEDGEMENT I ACKNOWLEDGE THAT this Affidavit is to be furnished to the Procurement Officer and may be distributed to units of: (1) the State of Maryland; (2) counties or other subdivisions of the State of Maryland; (3) other states; and (4) the federal government. I further acknowledge that this Affidavit is subject to applicable laws of the United States and the State of Maryland, both criminal and civil, and that nothing in this Affidavit or any contract resulting from the submission of this bid or proposal shall be construed to supersede, amend, modify or waive, on behalf of the State of Maryland, or any unit of the State of Maryland having jurisdiction, the exercise of any statutory right or remedy conferred by the Constitution and the laws of Maryland with respect to any misrepresentation made or any violation of the obligations, terms and covenants undertaken by the above business with respect to (1) this Affidavit, (2) the contract, and (3) other Affidavits comprising part of the contract. I DO SOLEMNLY DECLARE AND AFFIRM UNDER THE PENALTIES OF PERJURY THAT THE CONTENTS OF THIS AFFIDAVIT ARE TRUE AND CORRECT TO THE BEST OF MY KNOWLEDGE, INFORMATION, AND BELIEF. Date: _______________________ By: __________________________________ (print name of Authorized Representative and Affiant) ___________________________________ (signature of Authorized Representative and Affiant) Effective 8/8/2011 ATTACHMENT D Affidavit of Agreement Maryland Living Wage Requirements-Service Contracts Contract No. ________________________________ Name of Contractor _______________________________________________________ Address_________________________________________________________________ City_________________________________ State________ Zip Code_______________ If the Contract is Exempt from the Living Wage Law The Undersigned, being an authorized representative of the above named Contractor, hereby affirms that the Contract is exempt from Maryland’s Living Wage Law for the following reasons (check all that apply): Bidder/Offeror is a nonprofit organization Biddder/Offeror is a public service company Bidder/Offeror employs 10 or fewer employees and the proposed contract value is less than $500,000 Bidder/Offeror employs more than 10 employees and the proposed contract value is less than $100,000 If the Contract is a Living Wage Contract A. The Undersigned, being an authorized representative of the above named Contractor, hereby affirms our commitment to comply with Title 18, State Finance and Procurement Article, Annotated Code of Maryland and, if required, to submit all payroll reports to the Commissioner of Labor and Industry with regard to the above stated contract. The Bidder/Offeror agrees to pay covered employees who are subject to living wage at least the living wage rate in effect at the time service is provided for hours spent on State contract activities, and to ensure that its subcontractors who are not exempt also pay the required living wage rate to their covered employees who are subject to the living wage for hours spent on a State contract for services. The Contractor agrees to comply with, and ensure its Subcontractors comply with, the rate requirements during the initial term of the contract and all subsequent renewal periods, including any increases in the wage rate established by the Commissioner of Labor and Industry, automatically upon the effective date of the revised wage rate. Advisory 2007-1 Attachment D 12/10/07 ATTACHMENT D Affidavit of Agreement Maryland Living Wage Requirements-Service Contracts B. _____________________(initial here if applicable) The Bidder/Offeror affirms it has no covered employees for the following reasons: (check all that apply): The employee(s) proposed to work on the contract will spend less than one-half of the employee’s time during any work week on the contract The employee(s) proposed to work on the contract is 17 years of age or younger during the duration of the contract; or The employee(s) proposed to work on the contract will work less than 13 consecutive weeks on the State contract. The Commissioner of Labor and Industry reserves the right to request payroll records and other data that the Commissioner deems sufficient to confirm these affirmations at any time. Name of Authorized Representative: _______________________________________ _____________________________________________________________________ Signature of Authorized Representative Date _____________________________________________________________________ Title _____________________________________________________________________ Witness Name (Typed or Printed) ______________________________________________________________________ Witness Signature Date Advisory 2007-1 Attachment D 12/10/07 ATTACHMENT E MARYLAND’S LIVING WAGE FREQUENTLY ASKED QUESTIONS --------------------------------------------------------------------------------------------------------------------1. What is the Living Wage? Governor Martin O’Malley signed a bill into law establishing Maryland’s Living Wage. The new law is effective as of October 1, 2007. The Living Wage Law requires certain contractors and subcontractors to pay minimum wage rates to employees working under certain State services contracts. The Living Wage Law will require the payment of the living wage of either $11.30 per hour or $8.50 per hour, depending upon the jurisdiction where the services are performed. The State Living Wage does not apply to county and municipal contracts although some local governments such as Montgomery County and Baltimore City have their own living wage requirements. This law applies prospectively only to contracts awarded after October 1, 2007. 2. How is a Living Wage different from the current Prevailing Wage Law? The long-established prevailing wage applies to contractors and subcontractors under government public works contracts over $500,000 when State public funds are used to provide 50% or more of the funds for the construction of any project. The Living Wage applies to most services contracts, including maintenance contracts. Like the Living Wage, the Prevailing Wage is set annually by the Commissioner of Labor and Industry. 3. Does the Living Wage apply to all types of State services contracts? No. The Living Wage Law applies to State services contracts and subcontracts for services under Title 21 awarded on or after October 1, 2007. The procurement regulations define a contract for “services” as one for “the rendering of time, effort, or work rather than the furnishing of a specific physical product other than reports incidental to the required performance.” The term “service contract” includes maintenance services, information technology services, but does not include construction, construction-related services, architectural and engineering services, energy performance contracts, supplies (including commodities), real property, or the purchase of goods. 4. What State service contracts are exempt from the Living Wage Law? The Living Wage Law exempts State service contracts that are: under $100,000 in value; under $500,000 in value if the contractor has 10 or fewer employees; for services needed immediately to prevent or respond to imminent threat to health or safety; less than 13 weeks in duration; with a public service company; with a non-profit organization; between units (interagency agreements); or between a unit and a county or Baltimore City. public ATTACHMENT E The Living Wage Law exempts State service contracts where application of the Title would conflict with federal program requirements. Agencies exempt from State procurement law, such as the University System, Morgan State University, and the Stadium Authority, are not required to comply with the Living Wage laws (see State Finance and Procurement Article, §11-203, Maryland Code). Assuming that the contract value and number of employee thresholds are met, contracts subject to the Living Wage include: sole source services contracts; services contracts acquired through competitive sealed proposals, competitive sealed bidding, negotiated award after unsatisfactory competitive sealed bidding, expedited procurements, and non-competitive negotiated procurement of Human, Social or Educational Services; unsolicited proposals for health or human services, educational services, or business and economic development services; and Intergovernmental cooperative purchasing agreements when sponsored by a Maryland agency. 5. Are options that occur on or after October 1, 2007 covered by the Living Wage Law if the original (base) contract was approved prior to October 1, 2007? No. The law applies prospectively and applies to contracts awarded after October 1, 2007. 6. When is a prime contractor covered by the Living Wage Law? A contractor with more than 10 employees is covered when the State contract for services is valued at $100,000 or more. A contractor with 10 or fewer employees is only covered when the State contract for services is valued at $500,000 or more. 7. When is a subcontractor covered by the Living Wage Law? A subcontractor is only covered if the prime contractor for the State contract for services at issue is covered, and: The subcontractor has more than 10 employees and is performing services on a State contract for services valued at $100,000 or more; or A subcontractor has 10 or fewer employees and is performing services on a State contract for services valued at $500,000 or more. 8. How is contract value determined? Contract value is determined by adding the value of the base period plus all option periods. ATTACHMENT E 9. What about a contractor (or subcontractor) that is not initially covered because of the value of the contract, but, due to a modification or change order, the contract value is increased and then exceeds the value thresholds? A contractor or subcontractor that is not initially covered due to value (e.g., a contract of $75,000) remains exempt. An agency may not artificially divide a procurement to avoid application of the Living Wage Law. 10. What about a contractor (or subcontractor) that is not initially covered because the contractor (or subcontractor) has 10 or fewer employees, but that subsequently hires an 11th employee? A contractor/subcontractor that is not initially covered due to number of employees remains exempt on that contract. 11. In determining whether an employer has 10 or fewer employees, are part time employees included? In other words, is an employer with 5 full time and 6 part time employees covered? Part time positions will be added to equate to full time equivalents (FTEs). A 40 hour week will be used as the standard, unless the contractor provides evidence that they define full time by a lower number of hours (e.g., 35 hours). For example, under a 40 hour work week, two individuals working 20 hours each equate to one FTE. 12. Which employees must be paid a living wage? Covered prime contractors and covered subcontractors must pay the living wage to employees who: are 18 years old, or will turn 18 during the contract; work at least 13 consecutive weeks on the contract; and work at least one-half of their time during any week on the State contract. 13. For employees who turn 18 during the contract term, are they to receive a living wage from day one of the contract (before they turn 18) or from the day they turn 18? Living wage applies from the start of the contract or the start of employment (whichever is later) for those covered employees who are under 18 but are anticipated to turn 18 while they are still employed on the contract. 14. For covered employees, must they be paid living wage for those hours they are not working on State contract business? No. Living wage must be paid only for those hours spent on State contract business. 15. What are the wage rates? There are two wage “tiers” established in Maryland - Tier 1 includes Montgomery ATTACHMENT E County, Prince George’s County, Howard County, Baltimore County, Baltimore City, and Anne Arundel County. Tier 2 is comprised of the counties not included in Tier 1. The living wage rate for Tier 1 is $11.30 per hour, and the rate for Tier 2 is $8.50 per hour. 16. What if my business has operations in areas with two different wage tiers? Which rate should I pay? The wage tier is determined by the area where services valued at 50% or more of the total contract value is performed. For example, if 45% of contracted services are performed in a Tier 1 area and 55% of the services are performed in a Tier 2 area, the wage for all eligible employees is Tier 2 because Tier 2 is the region where 50% or more (55%) of the services are performed. 17. What if my business has all of its operations out of state? Am I required to pay the Maryland Living Wage? If the employees who perform the services are not located in either Tier 1 or Tier 2, the procurement officer will assign the tier(s) based upon where the majority of the recipients of the services are located. 18. What are the possible adjustments to the Living Wage? The Commissioner of Labor and Industry is in charge of annually adjusting the living wage rates based upon the consumer price index for the previous calendar year. An employer may commit in its bid or proposal that it will provide health insurance and may reduce the living wage by all or part of the hourly cost of the employer’s share of the premium. An employer may also reduce the living wage by no more than 50 cents of the hourly cost of the employer’s contribution to an employee’s deferred compensation plan. 19. How is the annual rate adjustment calculated? Each year within 90 days of July 1, the Commissioner of Labor and Industry will adjust the Living Wage rate by the annual average increase or decrease, if any, in the consumer price index (CPI) for all urban consumers for the Washington-Baltimore metropolitan area or any successor index for the previous calendar year. In determining the annual average increase or decrease, the Commissioner of Labor and Industry will determine the percentage change in the level of the CPI from one year to the next. 20. What are the contractor and subcontractor obligations when the living wage increases? During the term of the contract contractors and subcontractors must pay the living wage in effect, including any living wage increase, from the date of such increase. 21. If the living wage increases during the term of a contract, can the contractors submit a request for a contract price increase? No. Bidders/Offerors typically have to project inflation costs over the term of multi-year contracts; this is simply another situation of when they will have to do that. Moreover, if a contract includes a provision for price revision based upon changes in the Consumer Price Index (CPI), since changes in the living wage are indexed to changes in the CPI, a CPI adjustment would automatically allow for recouping some/all of the living wage adjustment. ATTACHMENT E 22. How will the Commissioner determine if the employer’s deduction for health insurance is appropriate? The Commissioner of Labor and Industry will require that an employer who deducts the hourly cost of the employer’s share of an employee’s health insurance premium from an employee to submit documentation of the employer’s cost and proof of payment for each employee under the health insurance plan, the methodology that the employer uses to determine the hourly amount of health insurance deduction for each employee, documentation of the employee’s insurance election, and copies of payroll records. From this information, the Commissioner will first determine the cost per employee for health insurance, and then audit the payroll records to verify that the deductions are appropriate. 23. Who is required to report payroll records? Any employer with a State contract for services subject to the Living Wage law is required to submit payroll records for all employees performing work in connection with that State contract for services. Each contractor is responsible for ensuring that the subcontractors’ payroll records are submitted in a timely manner. 24. For which employees is the employer required to submit payroll data? Any employer with a State contract for services subject to the Living Wage law is required to submit payroll records (including the data required by COMAR 21.11.10.05(D)) for all employees who perform work in connection with the State contract for services, even those who are under 18 years old, spend less than one-half of the employee’s time performing work on the contract, may work less than 13 consecutive weeks and full time on the State contract for services, or who are currently being paid more than the living wage rate. 25. When must the employer submit the payroll records? An employer required to submit payroll records must do so within 14 days after the end of each payroll period. 26. What data, other than payroll records, is the employer required to report? Any employer with a State contract for services subject to the Living Wage law who reduces the wages paid to its employees covered by the Living Wage based upon the employer’s share of the health insurance premium must provide documentation to support the deduction as well as documentation reflecting the employee’s authorization of the deduction, as detailed in COMAR 21.11.10.05(A). The employer must also provide a list of the three most commonly used languages at the worksite, a copy of the Commissioner’s “Subcontractor and Employee Information Form” and other information required by the Commissioner. 27. For Task Order Master Contracts awarded on/after October 1, 2007, do the Living Wage Law standards apply to the Master Contract or at the Task Order level? The Living Wage Law applies on a Task Order basis. Each Task Order stands alone. ATTACHMENT E 28. How do Living Wage Law standards apply to multiple award indefinite quantity contracts? For multiple award indefinite quantity contracts, the projected total award amount over the life of the contract may trigger Living Wage standards for contractors and should be disclosed to vendors prior to bid/offer submission. When the projected value of the contract is less than $100,000 then the Living Wage Law does not apply. When the projected value of the contract is $500,000 then the Living Wage applies to all contractors and subcontractors for all services provided. When the projected value of the contract is $100,000 or more, but less than $500,000, then the Living Wage applies to contractors and subcontractors for services with more than 10 employees. 29. What do we do with bids conducted without living wage language and which have been publicly opened but contracts will not be awarded until October 1 or after? A. Allow the low bidder the opportunity to retain the award at the existing low-bid price if it agrees to meet the Living Wage Law requirements within its price. In this case, the agency should amend the contract to include the Living Wage Law language for Sole Source contracts. B. If the low bidder will not meet the Living Wage Law requirements at its existing low-bid price, the agency should: re-bid; if there is no time to re-bid, then the agency may use the Negotiated Award After Unsuccessful Sealed Bidding method. In this case the agency would notify all responsible bidders who submitted responsive bids of the Living Wage Law requirements and allow them to submit a new bid incorporating the Living Wage Law requirements; or In extraordinary circumstances, an agency may even consider making an emergency award. Emergency awards are exempt from the Living Wage Law. 30. What do we do with competitive sealed proposals that have been conducted without the Living Wage Law language and for which proposals have been received? A. If no selection has been made (i.e., no offeror has been notified that it has been recommended for award), the agency should amend the Request for Proposals to include the Living Wage Law requirements and request a Best and Final Offer. B. If an offeror has been notified that it has been selected for award, regardless of whether prices have been disclosed to any offeror, the selected offeror should be provided an opportunity to agree to meet the Living Wage Law requirements at its current financial offer price. If the selected offeror agrees to meet the Living Wage Law requirements within its current financial offer, the contract should be amended to include the Living Wage Law language for Sole Source contracts. If the selected offeror does not agree to meet the Living Wage Law ATTACHMENT E requirements within its current financial offer, the Request for Proposal should be amended to include the Living Wage Law requirements with a Best and Final Offer requested from all offerors. 31. If a bidder does not submit the required Living Wage affidavit with a bid, is it treated as an issue of responsiveness (not curable) or as an issue of responsibility (is curable)? Failure to submit a properly completed Living Wage affidavit should be treated as an issue of responsibility, even for a bid. The bidder or offereor is merely being asked to acknowledge its responsibility to comply with the law. Therefore, an agency may allow a bidder to submit the required affidavit after bid opening as long as it is done within a timely fashion. If a bidder is advised that it omitted the affidavit but still does not provide the affidavit within a reasonable time, as determined by the agency, the bidder may be determined to not be responsible and the agency has the option of collecting on the bid bond. 32. What role do State Agencies have in implementing the Living Wage and how will contractors know whether a State solicitation is subject to the Living Wage Laws? If the procurement officer determines the Living Wage is applicable, the State agency will include Living Wage requirements in the solicitation including which wage tiers apply. The procurement officer for each State Agency subject to the Living Wage will make a determination if more than 50% of the total value of the contract services will be performed in the Tier 1 area or in the Tier 2 area. 33. Who is responsible for enforcement of the Living Wage Law? The Commissioner of Labor and Industry is in charge of enforcement. If there is a violation of the Living Wage Law, the Commissioner can order restitution to each affected employee as well as damages. Employees also have the right to sue to recover wages. 34. How will DLLR be notified that a living wage contract has been awarded? 7 Remember, when the contract value is less than $100,000 the Living Wage Law does not apply. When the contract value is $500,000, then the Living Wage Law applies to all contractors and subcontractors for services. When the contract value is $100,000 or more, but less than $500,000, then the Living Wage Law applies to contractors and subcontractors for services with more than 10 employees. When entering contract information concerning a services contract into eMarylandmarketplace, procurement officers will indicate whether the contract is potentially subject to the Living Wage Law and complete the requested information. 35. Who can I contact for additional information about the Living Wage Law? The Maryland Department of Labor, Licensing, and Regulation is responsible for establishing the wage rates and ensuring compliance with the laws. General information on the Living Wage Law is available on the DLLR website: http://www.dllr.state.md.us/ Richard Avallone, program manager of the Employment Standards Unit, may be reached at (410) 7672358 or [email protected]. Questions regarding the application of the Living Wage Law relating to a particular procurement should be directed to the procurement officer named in the ATTACHMENT E solicitation. General procurement questions may be directed to the Board of Public Works at 410-260-7335 (local) or toll-free number 1-877-591-7320. ATTACHMENT F 21.07.01.25 .25 Contract Affidavit. Mandatory contract addendum. The contract addendum shall be in substantially the same form as follows: A. AUTHORITY I HEREBY AFFIRM THAT: I, ________________________ (print name), possess the legal authority to make this Affidavit. B. CERTIFICATION OF REGISTRATION OR QUALIFICATION WITH THE STATE DEPARTMENT OF ASSESSMENTS AND TAXATION I FURTHER AFFIRM THAT: The business named above is a (check applicable box): (1) Corporation — domestic or foreign; (2) Limited Liability Company — domestic or (3) Partnership — domestic or foreign; (4) Statutory Trust — domestic or foreign; (5) Sole Proprietorship. foreign; and is registered or qualified as required under Maryland Law. I further affirm that the above business is in good standing both in Maryland and (IF APPLICABLE) in the jurisdiction where it is presently organized, and has filed all of its annual reports, together with filing fees, with the Maryland State Department of Assessments and Taxation. The name and address of its resident agent (IF APPLICABLE) filed with the State Department of Assessments and Taxation is: Name and Department ID Number:_____________________________Address:__________________________ and that if it does business under a trade name, it has filed a certificate with the State Department of Assessments and Taxation that correctly identifies that true name and address of the principal or owner as: Name and Department ID Number:_____________________________Address:__________________________ C. FINANCIAL DISCLOSURE AFFIRMATION I FURTHER AFFIRM THAT: I am aware of, and the above business will comply with, the provisions of State Finance and Procurement Article, §13-221, Annotated Code of Maryland, which require that every business Effective 8/8/2011 ATTACHMENT F that enters into contracts, leases, or other agreements with the State of Maryland or its agencies during a calendar year under which the business is to receive in the aggregate $100,000 or more shall, within 30 days of the time when the aggregate value of the contracts, leases, or other agreements reaches $100,000, file with the Secretary of State of Maryland certain specified information to include disclosure of beneficial ownership of the business. D. POLITICAL CONTRIBUTION DISCLOSURE AFFIRMATION I FURTHER AFFIRM THAT: I am aware of, and the above business will comply with, Election Law Article, §§14-101 — 14-108, Annotated Code of Maryland, which requires that every person that enters into contracts, leases, or other agreements with the State of Maryland, including its agencies or a political subdivision of the State, during a calendar year in which the person receives in the aggregate $100,000 or more shall file with the State Board of Elections a statement disclosing contributions in excess of $500 made during the reporting period to a candidate for elective office in any primary or general election. E. DRUG AND ALCOHOL FREE WORKPLACE (Applicable to all contracts unless the contract is for a law enforcement agency and the agency head or the agency head’s designee has determined that application of COMAR 21.11.08 and this certification would be inappropriate in connection with the law enforcement agency’s undercover operations.) I CERTIFY THAT: (1) Terms defined in COMAR 21.11.08 shall have the same meanings when used in this certification. (2) By submission of its bid or offer, the business, if other than an individual, certifies and agrees that, with respect to its employees to be employed under a contract resulting from this solicitation, the business shall: (a) Maintain a workplace free of drug and alcohol abuse during the term of the contract; (b) Publish a statement notifying its employees that the unlawful manufacture, distribution, dispensing, possession, or use of drugs, and the abuse of drugs or alcohol is prohibited in the business' workplace and specifying the actions that will be taken against employees for violation of these prohibitions; (c) Prohibit its employees from working under the influence of drugs or alcohol; (d) Not hire or assign to work on the contract anyone who the business knows, or in the exercise of due diligence should know, currently abuses drugs or alcohol and is not actively engaged in a bona fide drug or alcohol abuse assistance or rehabilitation program; (e) Promptly inform the appropriate law enforcement agency of every drug-related crime that occurs in its workplace if the business has observed the violation or otherwise has reliable information that a violation has occurred; Effective 8/8/2011 ATTACHMENT F (f) Establish drug and alcohol abuse awareness programs to inform its employees about: (i) The dangers of drug and alcohol abuse in the workplace; (ii) The business's policy of maintaining a drug and alcohol free workplace; (iii) Any available drug and alcohol counseling, rehabilitation, and employee assistance programs; and (iv) The penalties that may be imposed upon employees who abuse drugs and alcohol in the workplace; (g) Provide all employees engaged in the performance of the contract with a copy of the statement required by §E(2)(b), above; (h) Notify its employees in the statement required by §E(2)(b), above, that as a condition of continued employment on the contract, the employee shall: (i) Abide by the terms of the statement; and (ii) Notify the employer of any criminal drug or alcohol abuse conviction for an offense occurring in the workplace not later than 5 days after a conviction; (i) Notify the procurement officer within 10 days after receiving notice under §E(2)(h)(ii), above, or otherwise receiving actual notice of a conviction; (j) Within 30 days after receiving notice under §E(2)(h)(ii), above, or otherwise receiving actual notice of a conviction, impose either of the following sanctions or remedial measures on any employee who is convicted of a drug or alcohol abuse offense occurring in the workplace: (i) Take appropriate personnel action against an employee, up to and including termination; or (ii) Require an employee to satisfactorily participate in a bona fide drug or alcohol abuse assistance or rehabilitation program; and (k) Make a good faith effort to maintain a drug and alcohol free workplace through implementation of §E(2)(a)—(j), above. (3) If the business is an individual, the individual shall certify and agree as set forth in §E(4), below, that the individual shall not engage in the unlawful manufacture, distribution, dispensing, possession, or use of drugs or the abuse of drugs or alcohol in the performance of the contract. (4) I acknowledge and agree that: (a) The award of the contract is conditional upon compliance with COMAR 21.11.08 and this certification; (b) The violation of the provisions of COMAR 21.11.08 or this certification shall be cause to suspend payments under, or terminate the contract for default under COMAR 21.07.01.11 or 21.07.03.15, as applicable; and (c) The violation of the provisions of COMAR 21.11.08 or this certification in connection Effective 8/8/2011 ATTACHMENT F with the contract may, in the exercise of the discretion of the Board of Public Works, result in suspension and debarment of the business under COMAR 21.08.03. F. CERTAIN AFFIRMATIONS VALID I FURTHER AFFIRM THAT: To the best of my knowledge, information, and belief, each of the affirmations, certifications, or acknowledgements contained in that certain Bid/Proposal Affidavit dated ________ , 20___ , and executed by me for the purpose of obtaining the contract to which this Exhibit is attached remains true and correct in all respects as if made as of the date of this Contract Affidavit and as if fully set forth herein. I DO SOLEMNLY DECLARE AND AFFIRM UNDER THE PENALTIES OF PERJURY THAT THE CONTENTS OF THIS AFFIDAVIT ARE TRUE AND CORRECT TO THE BEST OF MY KNOWLEDGE, INFORMATION, AND BELIEF. Date: ______________ By: ______________________ (printed name of Authorized Representative and Affiant) ____________________________ (signature of Authorized Representative and Affiant) Effective 8/8/2011 ATTACHMENT G GUIDE TO PROMPT PAYMENT FOR NON-CONSTRUCTION SUBCONTRACTORS August 2008 Prompt payment requirements already exist on State-funded construction contracts. Recently, prompt payment requirements became effective on all State-funded non-construction contracts in excess of $25,000 by agencies that are members of the Governor’s Cabinet. What are my rights as a subcontractor? Subcontractors on contracts greater than $25,000 can expect to receive payment for any undisputed amounts after the prime contractor has received a progress payment. Otherwise, a subcontractor can expect to receive written notice from the contractor as to why payment is being withheld. What are my rights as a Minority Business Enterprise (MBE) or Small Business Reserve (SBR) subcontractor? MBE and SBR subcontractors have the same rights as those described above. In addition, agencies must notify the Governor’s Office of Minority Affairs (GOMA) of any complaint of non-payment of subcontractors with MBE or SBR status. What are the responsibilities of the prime contractor? The prime contractor has the responsibility to: Pay a subcontractor an undisputed amount to which the subcontractor is entitled; OR Notify the subcontractor in writing and state the reason why payment is being withheld. o If payment is withheld, the prime contractor must provide a copy of the notice to the procurement officer. What should I do if I am not being paid by the prime contractor? The subcontractor must notify the procurement officer. GOMA recommends that notice be given in writing. The notice will include: The name of the prime contractor from which payment has not been received; The project under which the dispute exists; The amount in dispute; An itemized description on which the amount is based; and If known, an explanation for any dispute concerning the payment not received. Who should I contact at the agency? Subcontractors who have not received payment of any undisputed amount should contact the agency’s chief procurement officer. Contact information for the Cabinet agencies’ chief procurement officers can be found at the end of this document. I’ve sent my written notice of non-payment to the procurement officer. What happens now? The procurement officer, or another agency representative, must contact the prime contractor to ascertain whether the amount withheld is an undisputed amount. If it is determined that part or the entire amount withheld is undisputed, the agency representative will instruct the prime contractor to pay the subcontractor the undisputed amount. The agency representative is to communicate to the subcontractor the results of the discussion with the prime contractor. ATTACHMENT G GUIDE TO PROMPT PAYMENT FOR NON-CONSTRUCTION SUBCONTRACTORS August 2008 _____________________________________________________________________________________ Page 2 of 2 Are there any penalties to the prime contractor for failure to pay subcontractors undisputed amounts? Yes. The State agency that issued the contract may; Withhold further payments to the prime contractor until payment to the subcontractor is verified; Suspend all or some of the contract work; Pay or otherwise cause payment of the undisputed amount to the subcontractor; Place a payment for an undisputed amount in an interest-bearing escrow account; or Take other or further actions as appropriate to resolve the withheld payment. What is an “undisputed amount”? An “undisputed amount” means an amount owed by a contractor to a subcontractor for which there is no good faith dispute. This includes any retainage withheld, and any amount withheld because of issues arising out of an agreement or occurrence unrelated to the agreement under which the amount is withheld. What agencies are members of the Governor’s Cabinet? The 22 member agencies of the Governor’s Cabinet and their chief procurement officers are: ATTACHMENT H Maryland Depart of Transportation GENERAL CONDITIONS FOR MAINTENANCE CONTRACTS 1 ATTACHMENT H MARYLAND DEPARTMENT OF TRANSPORTATION GENERAL CONDITIONS FOR MAINTENACE CONTRACTS TABLE OF CONTENTS Section Subject 01 02 03 04 05 06 07 08 09 Definitions Preparation of Proposal/ Bid Site Investigation Bid, Performance and Payment Bonds Contingent Fee Prohibition Cost and Price Certification Contract Administration Authority of the Procurement Officer Corporate Registration and Tax Payment Certification Compliance With Laws Initiation of Work Notice to Proceed & Prosecution of Work Conformity With Contract Requirements Inspection of Work Removal of Defective Work Discrepancies in Contract Documents Cooperation By Contractor Cooperation with Utilities Cooperation Between Contractors Administration Furnished Material Contractor’s Insurance Responsibility For Damage Claims Assignment General Guaranty Final Acceptance and Payment Personal Liability of Public Officials Approval Authority Remedies and Termination Delays and Extensions of Time Differing Site Conditions Changes Negotiated Payment Provision Suspension of Work Force Account Work Variations in Estimated Quantities Sanctions Upon Improper Acts Non-Hiring of Employees Conflict of Interest Law 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 Page 4 8 8 8 9 9 9 10 10 10 10 10 11 12 12 13 13 13 13 14 14 14 15 15 15 15 16 16 16 17 17 18 18 19 21 21 22 22 2 ATTACHMENT H Section Subject 39 40 Registration Taxes—Responsibility for Payment, Exemption Forms to be filed, etc. Tax Exemption Specifications Delivery Patent Trade Mark & Copyright Infringements Occupational Safety & Health Act (OSHA) Minority Business Enterprise and Affirmative Action Small Business Procurement Non-Discrimination in Employment Multi- Year Contracts Contingent Upon Appropriations “Buy American Steel” Act Prevailing Wage Contracts for Public Works Disputes Liquidated Damages Contractor’s Invoices Financial Disclosure Political Contribution Disclosure Incorporation by Reference Maryland Law Prevails Bid Award—Resident Business Payment of State Obligation Pre-Existing Regulations Retention of Records General Conditions Controlling Dissemination of Information 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 Page 22 22 23 23 23 23 23 23 24 24 25 25 25 25 25 26 26 26 26 26 26 27 28 28 28 28 3 ATTACHMENT H MARYLAND DEPARTMENT OF TRANSPORTATION GENERAL CONDITIONS MAINTENACE CONTRACTS 1. Definitions A. B. Wherever in these General Provisions or in other contract documents the following terms or abbreviations are used, the meaning shall be as follows: Organizational Structure The Maryland Department of Transportation is composed of the following Administration: i. Maryland Port Administration ii. Mass Transit Administration iii. State Highway Administration iv. State Aviation Administration v. Motor Vehicle Administration vi. State Railroad Administration, and vii. Office of Assistant Secretary, Administration C. Organizational Definitions Administration- the word “Administration” shall mean any one of the Administrations within the Maryland Department of Transportation, as listed in GP-1.02. Administrator- The chief executive officer of an Administration. Department- The word “Department” shall mean the Maryland Department of Transportation. Engineer- Any person designated by the Administrator or the procurement officer, acting directly or through his dully authorized representative, such representative acting within the scope of the particular duties assigned to him or of the authority given him. Inspector- The authorized representative of the procurement officer assigned to make detailed inspections of any or all portions of work, or materials thereof. Procurement Officer- Any person authorized by a State agency in accordance with law or regulations to formulate, enter into, or administer contracts or make written determinations and findings with respect to them. The term also includes an authorized representative acting within the limits of authority. Secretary- The chief executive officer of Maryland Department of Transportation. D. General Definitions 4 ATTACHMENT H Award- The decision by a procurement agency to execute a purchase agreement or contract after all necessary approvals has been obtained. Bid- A statement of price, terms of sale, and description of the supplies, services, or construction offered by a vender to the State. Bid Bond- See Proposal Guaranty Bidder- A person formally submitting a bid for the work contemplated, acting directly or through a dully-authorized representative. Business- A corporation, partnership, individual, sole proprietorship, joint venture, or any other legal entity through which commercial activity is conducted. Calendar Day- Every day shown on the calendar, Saturdays, Sundays and holidays included. Change Order- A written order signed by the responsible procurement officer, directing a Contractor to make changes which changes the clause of a contract authorized by the procurement officer t order with or without the consent of the Contractor. COMAR- Code of Maryland Regulations. Construction- The process of building, adding, alerting, converting, relocating, renovating, replacing, or restoring of real property in which the State has an interest. Contract- Any agreement entered into by a procurement agency for the acquisition of supplies, services, contraction, or any other item and includes: 1. Awards and notices of award; 2. Contracts of a fixed-price, cost-reimbursement, cost –plus-afixed-fee, fixed –price incentive, or cost-plus incentive fee, type; 3. Contract providing for the issuance of job or task orders; 4. Leases; 5. Letter contracts; 6. Purchase orders; 7. Supplemental agreements with respect to any of these; 8. Orders; and 9. Grants. Contract does not include: 1. Collective bargaining agreements with employee organizations; or 2. Medical, Medicare, Judi care, or similar reimbursement contracts for which eligibility and cost are by law or regulation. 5 ATTACHMENT H Contract Documents- The written agreement executed between and Administration and the successful bidder, covering the performance of the work furnishing of labor, equipment and materials, by which the Contractor is bound to perform the work and furnish the labor, equipment and materials, and by which the administration is obligated to compensate him therefore at the mutually established and accepted rate or price. The Contract shall include the invitation for Bids, Notice to Contractors, Instructions to Bidders, Proposal, Contract Forms and Bonds, General Provisions, Specifications, Supplemental Specifications, all Special Provisions, all Technical Provisions, all Plans and Notices to Proceed, also any written Change Orders and Supplemental Agreements that are required to complete the construction of the work in the acceptable manner, including authorized extension thereof. Contract Drawings- See definition of “Plans” Contracts Modification- Any written alteration in the specifications, delivery point, date of delivery, contract period, price, quantity, or other provision of any existing contract, whether accomplished in accordance with a contract provision, or by mutual action of the parties to the contract. It includes change orders, extra work orders, supplemental agreements, contract amendments, or reinstatements. Contractor- Any person having a contract with a procurement agency. Contractor does not include employees with labor contracts (collective bargaining agreements). Contract Time or Completion Date- The number of working or calendar days shown in the contract indicating the time allowed for the completion of the work completed in the contract. In case a calendar date of completion is shown in the contract, in lieu of the number of working or calendar days, such work shall be completed by that date. Day- Calendar day unless otherwise designed. Maintenance- Any work necessary for the continued operation or upkeep of a facility, structure, building, grounds, or building systems, including built-in equipment or an in-ground system. Notice to Proceed- A written notice to the Contractor of the date on or before which he shall begin the prosecution of the work to be done under the contract. Payment Bond- Security as stated in COMAR 21.06.07.01B, as a guarantee that Contractor will pay in full all bills and accounts for materials and labor used in the work, as provided by law. Performances Bond- Security as started in COMAR 21.06.07.01B, guaranteeing complete performance of the contract. Person- Any individual, business, union, committee, club, or other organization. Plans- The official drawings issued by the Administration as part of the contract documents, including those incorporated in the contract documents by reference. 6 ATTACHMENT H Proposal- The response by an offer or to a solicitation of the Department to obtain goods or services. The response may include, but contract, and description of the technical expertise, work experience and other information as requested in the solicitation. As used herein the word “proposal” means “bid”. Proposal Form- The approved form on which an Administration requires proposals to be set forth and submitted. Proposal Guaranty- The security, in the form stated in COMAR 21.06.07.01B, designated in the Proposal, to be furnished by the offer or as a guaranty of good faith to enter into a contract with the State, if the contract is awarded to him. Responsible Bidder of Offer or- a person who has the capability in all respects to perform fully the contract requirements, and the integrity and reliability, which will assure good faith performance. Responsive Bidder- A person who has submitted a bid under procurement by competitive sealed bidding which conforms in all material respects to the requirements contained in the invitation for bids. Specification- A written description of functional characteristics, or the nature of an item to be procured. It may include a statement of any of the user’s requirements and may provide for inspection, testing, or preparation of an item before procurement. State- The State of Maryland acting through its authorized representative. Subcontractor- Any person undertaking the construction of a part of the work under the terms of the contract, by virtue of an agreement with the Constructor, who, prior to such undertaking, revives the (consent of the surely and the) approval of the Administration. Superintendent- The executive representative of the Contractor authorized to receive and execute instructions from the Procurement Officer, and who shall supervise and direct the work. Supplemental Agreement- Any contract modification, which is accomplished by the mutual action of the parties. Supplemental Specification- Additions and revisions to the Standard Specifications. Generally include new or improved procedures, construction items or materials developed subsequent to the publication of Standard Specification. Work- work shall be understood to mean the furnishing of all labor, materials, equipment, and other incidentals necessary to the successful completion of the project and the carrying out of all the duties and obligation imposed by the contract. 2. Preparation of Bid/Proposal 7 ATTACHMENT H Bidder shall submit its bids/ proposal upon the forms furnished by the Administration, Carefully following bid preparation instructions provided. Completed Bid/Proposal Affidavit will be required of successful bidder before issuance of notice to proceed. Offerors should give specific attention to the identification of those proportions of their proposals which they deem to be confidential, proprietary information or trade secrets and provide any justification of why such materials, upon request, should not be disclosed by the State under the Maryland Public Information Act, Section 10-611 et seq. of the State Government Article of the Annotated Code of Maryland. 3. Site Investigation The Contractor acknowledges that he has investigated and satisfied himself as to the conditions affecting the work, including but not restricted to those bearing upon transportation, disposal, handling and storage of materials, availability of labor, water, electric power, roads and uncertainties of weather, river stages, tides or similar physical conditions at the site, the conformation and conditions of the ground, the character of equipment and facilities needed preliminary to and during prosecution of the work. The Contractor further acknowledges that he has satisfied himself as to the character, quality and quantity of surface and substance materials or obstacles to be encountered insofar as this information is reasonably ascertainable from an inspection of the site, including all exploratory work done by the State, as well as form information presented by the drawings and specifications made a part of this contract. Any failure by the Contractor to acquaint himself with the available information may not relieve him from responsibility for estimating properly the difficulty or cost of successfully performing the work. The State assumes no responsibility for any conclusions or interpretation made by the Contractor on the basis of the information made available by the State. 4. Bid, Performance and Payment Bonds A. Bid Bonds If required for a procurement in excess of $50,000, a proposal will not be considered unless accompanied by a guaranty in an amount not less than 5% of the amount bid, and made payable to the State of Maryland. B. Performance Bonds A Performance bond may be required for maintenance contracts in excess of $50,000 in the amount equal to at least 100 percent of the contract price. If required by the Special Provisions of the contract, the performance bond shall be delivered by the Contractor to the State no later than the time the contract is executed. If a Contractor fails to deliver the required performance bond, the Contractor’s bid shall be rejected, its bid security shall be enforced. The contract will be awarded to the next lowest responsible and responsive bid. C. Payment Bonds A payment bond may be required for maintenance contract in excess of $50,000 in the amount equal to at least 100 percent of the contract price. If required by the Special Provision of the contract, the payment bond shall be delivered by the Contractor to the State no later than the time 8 ATTACHMENT H the contract is executed. If a Contractor fails to deliver the required performance bond, the Contractor's bid shall be rejected, its bid security shall be enforced, and award of the contract shall be made to the next lowest responsible and responsive bidder. D. Acceptable Security Acceptable security for bid, performance and payment bonds shall be as set forth in COMAR 21.06.07.01. 5. Contingent Fee Prohibition A. The Contractor warrants that it has not employed or retained any person, partnership, corporation, or other entity, other than a bona fide employee, bona fide agent, bona fide salesman, commercial agreement, and that it has not paid or agreed to pay any person, partnership, corporation, or other entity, other than a bona fide employee, bona fide agent, bona fide salesperson, or commercial selling agency, any fee or any other consideration contingent on the making of this contract. B. For breach or violation of this warranty, the Administration shall have the right to terminate this agreement without liability or, in its discretion, to deduct from the contract price or consideration, or otherwise recover, the full amount of such fee, commission, percentage, brokerage fee, gift or contingent fee. 6. Cost and Price Certification A. The Contractor, by submitting coast or price information, certifies that, to the best of its knowledge, the information submitted is accurate, complete, and current as of a mutually determined specified date prior to the conclusion of any price discussions or negotiations for: (1) A negotiated contract, if the total contract price is excepted to exceed $100,000 or smaller amount set by the procurement officer; or, (2) A change order or contract modification expected to exceed $100,000, or a smaller amount set by the procurement officer. B. The price, including profit or fee, shall be adjusted to exclude any significant price increases occurring because the Contractor furnished cost or price information which, as of the date agreed upon between the parties, was inaccurate, or not current. 7. Contract Administration This contract will be administrated on behalf of the Department Administration as the case may be, by the procurement officer. 8. Authority of the Procurement Officer 9 ATTACHMENT H A. The procurement officer shall decide all questions, which may arise as to the quality and acceptability of work performed and as to the rate of progress of said work; all questions which may arise as to the questions as to the acceptable fulfillment of the contract on the part of the Contractor. B. The procurement officer shall determine the amount of work performed to be paid for under the contract. C. The procurement officer shall have the authority to suspend the work wholly or in part due to the failure of the Contractor to carry out provisions of the contract. D. The procurement officer may authorize progress payments for work satisfactorily completed, subject to such retainage that the procurement officer deems appropriate. 9. Corporate Registration and Tax Payment Certification Corporations are required to execute a Certification of Corporation Registration and Tax Payment. 10. Compliance With Laws The Contractor hereby represents and warrants that: A. It is qualified to do business in the State of Maryland and that it will take such action as, from time to time hereafter, may be necessary to remain so qualified; B. It is not in arrears with respect to payment of any monies due and owing the State of Maryland, or any department or unit thereof, including, but not limited to, the payment of taxes and employee benefits, and that it shall not become so in arrears during the term of this Contract; C. It shall comply with all federal, State and local laws, under this Contract; and D. It shall procure, at its expense, all licenses, permits, insurance, and governmental approval, if any, necessary to the performance of its obligations under this Contract. 11. Initiation of work The Contractor shall not commerce performance of the services until it receives from the Administration a formal written Notice to Proceed. 12. Notice to Proceed and Prosecution of Work After the contract has been executed, the Administration will, within the time limit specified by the Administration elsewhere in the contract documents, issue to the Contractor a Notice to Proceed and this notice will stipulate the date on or before which the Contractor is expected to begin work. The specified contract time shall begin on the day that work (other than the erection 10 ATTACHMENT H of the inspector’s office, construction stakeout, and mobilization) actually starts or on the day stipulated in the notice to proceed, whichever is earlier. Any preliminary work started, or materials ordered, before receipt of the notice to proceed, shall be at the risk of the Contractor. The Contractor shall begin work promptly within the time specified by the procurement officer and shall notify the procurement officer at least 48 hours before starting work. The Contractor shall submit, in writing, to the procurement officer within 10 days from the date of the notice to proceed, a progress schedule. This schedule shall be updated and reserved to reflect all changes affecting the jobs progress. After work has started, it shall be prosecuted continuously on all acceptable working days without stoppage until the entire contract is complete. Should the prosecution of work for any reason be discontinued, the Contractor shall notify the procurement officer of his intention to stop and shall also notify the procurement officer at least 24 hours in advance of resuming operations. Said notification shall be confirmed in writing. 13. Conformity with Contract Requirements A. (1) All work performed and all materials furnished shall be in Conformity with the contract requirements. In the event the procurement officer finds the materials or the finished product in which the materials are used or the work performed do not conform to the contract requirements and have resulted in an inferior or unsatisfactory product, the work or materials shall be removed and replaced or otherwise corrected by and at the expense of the Contractor. (2) In the event the procurement officer finds the materials or the finished product in which the materials are used are not in conformity with the contract requirements but that acceptable work has been produced, he shall then make a determination if the work shall be accepted. In this event, the procurement officer will document the basis of acceptance by a change order which may provide for an equitable adjustment in the contract price. Any action taken pursuant to this paragraph may not result in an increase of the contract price. Equal or Approved Equal: B. (1) when any article is specified by propriety name, trade name, and/or name of manufacturer with or without the addition of such expression as “or equal” or “ or approved equal, “it is to be understood that the article named or the equal thereof is intended, subjected to the approval of the procurement officer as to the quality thereof; and it is distinctly understood: (a) that the procurement officer is to use his own judgment in determining, from time to time, whether or not any article proposed to be substituted is the equal of any article so specified; (b) that the decision of the procurement officer, no claim of any sort shall be made or allowed against the procurement officer, or the Administration, because of such decision. (2) The offer of an article by the Contractor for any article specified will raise the presumption that it is for the purpose of saving money. If, in such a case, the article is approved, the Administration shall be given credit in the amount of difference between the net cost to the Contractor of the article submitted and the price at which he could have obtained the lowest price 11 ATTACHMENT H article specified. For convenience in checking the credit, if any, the Contractor shall submit these figures when the offer is made, and no article will considered without such figures. (3) The word “article” wherever used in this subsection entitled “Equal or Approved Equal,” shall be taken to mean any article, material or thing. 14. Inspection of Work All materials and each part or detail of work shall subject at all times to inspection by the procurement officer, or other appropriate persons from the Administration, and the Contractor will be held strictly to the contract and allowable tolerances and in regard to quality of materials workmanship, and the diligent execution of the contract. Such inspection may include mill, plant or shop inspection. Any material furnished under the contract is subject to inspection. The procurement officer, or other appropriate person from the Administration, shall be allowed access to all parts of the work and shall be furnished with such information and assistance by the Contractor as is required to make a complete and detailed inspection. If the procurement officer request it, the Contractor, at any time before the acceptance of work, shall remove or uncover such portions of finished work as may be directed. After examination, the Contractor shall restore said portions of the work to the work to he standards required by the contract. Should the work thus exposed or examined prove acceptable, adjustments in the contract time and price will be made by change order for uncovering or removing, and the replacing of the covering or making good of the parts removed. Should the work so exposed or examined prove unacceptable, the uncovering, removing and/or replacing, shall be at the Contractor’s expense. When the United States Government or any railroad, corporation or other agency is to pay a portion of the coast of work covered by this contract, their respective representatives shall have the right to inspect the work. 15. Removal of Defective Work All work and materials which do not conform to the requirements of the contract will be considered unacceptable, unless otherwise determined acceptable under the provision in Section 13. Any defective work, whether the result of poor workmanship, use of defective materials, damage through carelessness or any other cause found to exist, shall be removed and replaced by work and materials which shall conform to the specification or shall be remedied otherwise in an acceptable manner authorized by the procurement officer. Upon failures on the part of the Contractor to comply promptly with any order of the procurement officer made under the provisions to this section, the procurement officer shall have the authority to cause defective work to be remedied or removed and to deduct the costs from any monies due or to become due the Contractor under this contract. 16. Discrepancies in Contract Documents 12 ATTACHMENT H In the event the Contractor discovers any discrepancies in the contract document, he shall immediately notify the procurement officer. The procurement officer will then make such corrections and interpretations as may be deemed necessary for fulfilling the intent of the contract. 17. Cooperation by Contractor The Contractor shall give the work the constant attention necessary to facilitate the progress thereof, and shall cooperate with the procurement officer and his inspectors in every way possible. The Contractor shall assign to the contract as his agent, a competent superintendent capable of communicating in English and capable of reading and thoroughly understanding the contract documents and thoroughly experienced in the type of work being performed, who shall receive instructions from the procurement officer or his authorized representatives. The superintendent shall have full authority to execute the orders or directions of the procurement officer without delay, and to promptly supply such materials, equipment, tools, labor and incidentals as may be required. Such superintendents shall be furnished irrespective of the amount of work sublet. 18. Cooperation with Utilities It is understood and agreed that the Contractor has considered this bid all of permanent and temporary utility appurtenances their present or relocated positions and that no additional compensation will be allowed for normal delays, inconvenience, or damage sustained him due to any interference from the said utility appurtenances or the operation of moving them. The Contractor shall have responsibility for notifying all affected utility companies prior to the necessity of performing any work on their utilities and shall cooperate with them in achieving the desired results. All damage to utility facilities caused by the Contractor’s operations shall be the responsibility of the Contractor. In the event of interruption to utility service as a result of accidental breakage or a result of being exposed or unsupported, the Contractor shall promptly notify the proper authority and shall cooperate with said authority in the restoration of service. No work shall be undertaken around fire hydrants until provisions for continued service have been approved by the local fire authority. 19. Cooperation Between Contractors A. Separate contractors on adjoining or overlapping work shall cooperate with each other as necessary. Such cooperation shall include (1) arrangement and conduct of work (2) storage and disposal of materials, etc., by each in such a manner as to not unnecessarily interfere with or hinder the progress of the work being performed by other contractors. Contiguous work shall be joined in an acceptable manner. B. The Administration shall have the right, any time, to contract for and perform other work on, near, over or under the work covered by this contract. In addition, other 13 ATTACHMENT H work may be performed under the jurisdiction of another Administration. The Contractor shall cooperate fully with such other contractors and carefully fit his own work to such other work as may be directed by the procurement officer. C. The Contractor agrees that in the event of dispute as to cooperation, the procurement officer will act as referee and decisions made by the procurement officer will be binding. The Contractor agrees to make no claims against the Administration for any inconvenience, delay or loss experienced by him because of the presence and operations of other contractors. 20. Administration Furnished Material The Contractor shall furnish all materials required to complete the work, except those specified to be furnished by the Administration. Materials furnished by the Administration will be delivered or made available to the Contractor at the point or points specified in the special provisions. The cost of handing and placing all materials, after they are delivered to the Contractor, shall be considered as included in the contract price for the item in connection with which they are used. The Contractor will be held responsible for all materials delivered to him, and deductions will be made from any monies due him to make good any shortages and deficiencies, from any cause whatsoever, and for any damage which may occur after such delivery, and for any demurrage charges. In cases where materials are supplied by the Administration and incorporated in the contract work by the Contractor, materials inspection and acceptance will not be a prerequisite for acceptance indicating that he carries insurance against the risks and in the amounts specified elsewhere in the contract. 21. Contractor’s Insurance Prior to the start of work on any contract, the contractor shall submit to the procurement officer Certificate(s) of Insurance indicating that he carries insurance against the risks and in the amounts specified elsewhere in the contract. 22. Responsibility for Damage Claims A. The Contractor shall indemnify and save harmless the State and all of its representatives from all suits, actions, or claims of any character brought on account of any injuries or damages sustained by any person or property in consequence of any neglect in safeguarding the work or as a result of faulty, inadequate or improper temporary drainage during construction, or on account of the use, misuse, storage or handling of explosives, or on account of any claims or amounts recovered for any infringement of patent, trademark, or copyright, or from any claims or amounts arising or recovered under the Workmen’s Compensation Laws, or any other law, bylaw, ordinance, order of decree or any claims, suits, judgments, expenses, actions, damages and costs arising from or based on the violation of any federal, State or local law, ordinance, regulation, order or decree, whether by himself or his employees or 14 ATTACHMENT H subcontractors. The Contractor shall be responsible for all damage or injury to property of any character during the prosecution of the work resulting from any act, omission, neglect or misconduct, in the manner or method of executing said work satisfactorily or due to the non-executing said work or at any time due to defective work to materials and said responsibility shall continue until the improvement shall have been completed and accepted. B. The Contractor shall not be held responsible for any claims arising from accidents incurred because of any traffic and/or general use permitted during the time the project or any section thereof is open to traffic except from accidents that are attributable to his negligence. 23. Assignment The Contractor shall not assign the whole or any part of this contract, or any monies due or to become due under this contract without the prior, written consent of the Administration. In case the Contractor assigns all or any part of the monies due or to become due under this contract, the instrument of assignment shall contain a clause providing that the right of the assignee in and to any monies due or to become due to the Contractor shall be subject to prior claims of all persons, firms and corporations for services rendered or materials supplied for the performance of the work called for in this contract. 24. General Guaranty Neither the final acceptance of the work or payment therefore nor any provision in the contract documents nor partial or entire use of the work by the Administration shall constitute an acceptance of work not performed in accordance with the contract documents or relieve the Contractor of liability for any express warranties or responsibility for faulty materials or workman ship. The Contractor shall remedy any defects in the work, and pay for any damage to other work resulting from defects in his work which shall appear within a period of one (1) year from the date of final acceptance of work, unless a longer period is specified. The Administration will give notice of observed defects with reasonable promptness. 25. Final Acceptance and Payment Upon completion of all the work under this contract, the procurement officer shall make a final inspection of the entire work and direct the Contractor to take any corrective action to properly complete the work. Once the procurement officer is satisfied that the work is properly completed, he shall certify to the Administration, in writing, the final acceptance of the entire project. The Administration, upon receipt and Contractor, the whole amount of money then due the Contractor under the terms of the contract. 26. Personal Liability of Public Officials In carrying out any of the provisions of the contract, or in exercising any power or authority granted to them by or within the scope of the contract, there shall be no liability upon the 15 ATTACHMENT H Administrator, procurement officer or other authorized representative, either personally or as officials of the State, it being understood that in all such matters they act solely as agents and representatives of the State. 27. Approval Authority This contract is subjected to any change order or amendment thereto, and is subject to the approval requirements established by the Secretary of Transportation and the Board of Public Works of Maryland. The contract shall be considered to bind the parties hereto in accordance with Constitution and Laws of the State of Maryland. 28. Remedies and Termination A. Termination for Default If the Contractor fails to fulfill its obligation under this contract properly and on time, or otherwise violates any provision of the contract, the State may terminate the contract by written notice to the Contractor. The notice shall specify the acts of omission relied on as cause for termination. All finished or unfinished supplies and services provided by the Contractor shall, at the State’s option, become the State’s property. The state shall pay the Contractor fair and equitable compensation for satisfactory performance prior to receipt of notice of termination, less the amount of damages caused by Contractor’s breach. If the damages are more than the compensation payable to the Contractor, the Contractor will remain liable after termination and the State can affirmatively collect damages. B. Termination for Convenience of the State The performance of work under this contract may be terminated by the State in accordance with this clause in whole, or from time in part, when ever the State shall determine that such termination is in the best interest of the State. The State will pay all reasonable costs associated with this contract that the Contractor has incurred up to the date of termination and all reasonable costs associated with termination of the contract. However, the Contractor shall not be reimbursed for any anticipatory profits that have not been eared up to the date of termination. 29. Delays and Extensions of Time The Contractor agrees to prosecute the work continuously and diligently and no charges or claims for damages shall be made by it for any delays or hindrances, from any cause whatsoever, during the progress of any portion of the work specified in this contract. Time extensions will be granted only for excusable delays that arise from unforeseeable causes beyond the control and without the fault or negligence of the Contractor, including but not restricted to, acts of God, acts of the public enemy, acts of the State in either its sovereign or contractual capacity, acts of another contractor in the performance of a contract with the State, fires, floods, epidemics, quarantine suppliers arising from unforeseeable causes beyond the control and without the fault or negligence of either the Contractor or the subcontractors or suppliers. 30. Differing Site Conditions 16 ATTACHMENT H A. The Contractor shall promptly, and before such conditions are disturbed, notify the procurement officer in writing of: (1) subsurface or latent physical conditions at the site differing materially from those indicated in this contract, or (2) unknown physical conditions at the site of an unusual nature, differing materially from those indicated in this contract, or (2) unknown physical conditions at the site of an unusual nature, differing materially from those ordinarily encountered and generally recognized as inherent in work of the character provided for this contract. The procurement officer shall promptly investigate the conditions, and if he finds that such conditions do materially so differ and cause an increase or decrease in the Contractor’s cost of, or the time required for, performance of any part of the work under this contract, whether or not changed as a result of such conditions, an equitable adjustment shall be made and the contract modified in writing accordingly. B. No claim of this Contractor under this clause shall be allowed unless the Contractor has given the notice required in A. above provide, however, the time prescribed therefore may be extended by the State. C. No claim by the Contractor for an equitable adjustment hereunder shall be allowed if asserted after final payment under this contract. 31. Changes A. The procurement officer unilaterally may, at any time, without notice to the sureties, if any, by written order designated or indicated to be a change order, make any changes in the work within the general scope of the contract, including but not limited to changes: 1. In the specifications (including drawing and designs); 2. In the method or manner of performance of the work; 3. In the State-furnished facilities, equipment, materials, services, or site; or 4. Directing acceleration in the performance of the work. B. Any other written order or an oral order including a direction, instruction, interpretation or determination from the procurement officer that causes any such change, shall be treated as a change order under this clause, provided that the Contractor gives the source of the order and that the Contractor regards the order as a change order. C. Expept as herein provided, no order, statement, or conduct of the procurement officer shall be treated as a change under this clause or entitle the Contractor to an equitable adjustment hereunder. D. Subject to subparagraph F. thereof, if any change under this clause causes an increase or decrease in the Contractor’s cost of, or the contract, whether or not changed by any order, an equitable adjustment shall be made in the contract modified in writing accordingly: provided, however, that except for claims based 17 ATTACHMENT H on defective specifications, no claim for any change under B. above shall be allowed for any costs incurred more than twenty (20) days before the Contractor gives written notice as therein require; and provided further, that in the case of defective specifications for which the State is responsible, the equitable adjustment shall include any increased cost reasonably incurred by the Contractor in attempting to comply with such defective specifications. E. If the Contractor intends to assert a claim for an equitable adjustment under this clause, he shall, within thirty (30) days after receipt of a written change order under A. above or the furnishing or written statement setting forth the general nature and monetary extent of such claim hereunder may be included in the notice under B. above. F. Each contract modification or change order that affects contract price shall be subject to the prior written approval of the procurement officer and other appropriate authorities and to prior certification of the modification or change order on the project budget or the total construction cost. If, according to the certification of the fiscal authority, the contract modification or change order will cause an increase in cost that will exceed budgeted and available funds. The modification or change order may not be made unless sufficient additional funds are made available or the scope of the project is adjusted to permit its completion within the project budget. G. No claim by the Contractor for an equitable adjustment hereunder shall be allowed if asserted after final payment under this contract. 32. Negotiated Payment Provision If the Contractor claims an equitable adjustment. The Contractor shall be allowed to add the following maximum percentages for overhead and profit to his costs for labor, materials and equipment: A. B. C. 20% may be added by the Contractor for overhead and profit for work performed by his own forces. 15% may be added by the subcontractor for overhead and profit for work performed by the subcontractor; the Contractor may add an additional 5% of the subcontractor’s costs for labor, materials and equipment. The provisions of Paragraphs A. and B. above apply only to price adjustments negotiated prior to completion of the added or changed work and do not apply to work performed on a force account basis as provided for in Paragraph 34. 33. Suspension of Work A. B. The procurement officer unilaterally may order the Contractor in writing to suspend, delay, or interrupt all or any part of the work for such period of time as he may determine to be appropriate for the convenience of the Administration. If the performance of all or any part of the work is, for an unreasonable period time, suspended, delayed, or interrupted by an act of the procurement officer in 18 ATTACHMENT H C. the administration of this contract or by his failure to act within the time specified in this contract (or if no time is specified, within a reasonable time,) an adjustment shall be made for any increase in the cost of performance of this contract (excluding profit) necessarily caused by such unreasonable suspension, delay, or interruption and the contract modified in writing accordingly. However, no adjustment shall be made under this clause for any suspension, delay, or interruption to the extent: (1) that performance would have been so suspended, delayed, or interrupted by any other cause, including the fault of negligence of the Contractor or (2) for which any equitable adjustment is provided for or excluded under any other provision of this contract. No claim under this clause shall be allowed (1) for any costs incurred more than twenty (20) days before the Contractor shall have notified the procurement officer in writing of act or failure to act involved (but this requirement shall not apply as to a claim resulting from a suspension order), and (2) unless the claim, in an amount started, is asserted in writing as soon as practicable after the termination of such suspension, delay, or interruption, but no later than the date of final payment under the contract. 34. Force Account Work When the Contractor is required to perform work as a result of additions of changes to the contract for which there are no applicable unit prices in the contract, the Administration and Contractor shall make every effort to come to an agreed upon price for the performance of such work. If an agreement cannot be reached, the Administration may require the Contractor to do such work on a force account basis to be compensated in accordance with the following: A. Labor For all labor and for foremen in direct charge of the specific operations, the Contractor shall receive the actual wages for each and every hour that said labor and foremen are actually engaged in such work. B. Materials For materials accepted by the procurement officer and used, the Contractor shall receive the actual cost of such materials delivered on the work, including transportation charges paid by him (exclusive of machinery rentals as hereinafter set Forth). C. Equipment For any machinery or special equipment (other than small tools, whether rented or owed), the use of which has been authorized by the procurement officer, the Contractor shall receive that rates agreed upon in writing before such work is begun, or the Contractor shall receive those rates which may be specified elsewhere in the Special Provisions. For the purpose of definition, equipment with a new cost $500 or less will be considered small tools. 19 ATTACHMENT H D. Materials and Supplies Not Incorporated in the Work For materials and supplies expended in the performance of the work (excluding those required for rented equipment) and approved by the procurement officer, the Contractor shall receive the actual cost of such materials and supplies used. The Contractor shall receive a reasonable allowance for materials used but not extended in the performance of the work. E. Subcontractors The Contractor shall receive the actual cost of work performed by a subcontractor. Subcontractor’s cost is to be determined as in A., B., C. and D. above, plus the fixed fee for overhead and profit allowance computed as in G. F. Superintendence No additional allowance shall be made for general superintendence, the use of small tools, or other costs for which no specific allowance is herein provided. G. Contractor’s Fixed Fee The procurement officer and the Contractor shall negotiate a fixed fee for force account work performed pursuant to this Section 34 by his forces and by his subcontractor (s), as compensation for overhead and profit for the work performed. Failure of the Contractor and the procurement officer to negotiate a fixed fee consistent with applicable cost principles in COMAR21.09.01, shall be treated as ais dispute pursuant to Section 52 and the Contractor shall proceed diligently withthe performance of the force account equal to time sum of 65%, of A. which shall include, but not be limited to, the following: 1. 2. Compensation for all costs paid to, or on behalf of, workmen by reason of subsistence and travel allowances, health and welfare benefits, pension fund benefits or other benefits that may be required by collective bargaining agreement or other employment contracts generally applicable to the classes of labor employed in the work. Bond premiums, property damage, liability and workmen’s compensation insurance premiums, unemployment insurance contributions and Social Security taxes on the force account work. In addition, the Contractor’s fixed fee may include an amount not to exceed 20% of B. and 5% of D. and E. as defined above. H. Compensation The compensation as set forth above shall be received by this Contractor as payment in full for change order work done on a force account basis. At the end of each day, the Contractor’s representative and the procurement officer shall 20 ATTACHMENT H compare records of the cost of work as ordered on a force account basis. I. No payment will be made for work performed on a force account basis until the Contractor furnishes the procurement officer duplicate itemized statements of the cost of such force account work detailed as to the following: 1. 2. 3. 4. 5. Name, classification, date, daily hours, total hours, rental rate, and extension for such laborer, or foreman. Designation, dates, daily hours, total hours, rental rate, and extension for each unit of machinery and equipment. Quantities of materials, prices and extensions. Transportation of materials. Payments of items under 1. shall be accomplished by copies of certified payrolls. Under 2., original receipted fro rentals must be provided if requested by the procurement officer. 3. and 4. shall be accompanied by original receipted invoices for materials used and transportation changes. If, however, the materials used in the force account work are not specifically purchased for such work but are taken form the Contractor’s stock, then in lieu of the original invoices the statements shall contain or be accompanied by an affidavit of the Contractor which shall certify that such materials were taken from the stock, that the quality claimed was actually used and that the price and transportation of the material as claimed represent actual cost. Any request for payment under this Section should be submitted in the order outlined above. 35. Variations in Estimating Quantities Where the quantity of a payment item in this contract is an estimated quantity and where the actual quantity of such pa item varies more than 25% above or below the estimated quantity stared in this contract, an equitable adjustment in the contract price shall be made upon demand of either party. The equitable adjustment shall be based upon any increase or decrease in costs due solely to the variation above 125% or below 75% of the estimated quantity. Battery line items shall not be subject to equitable adjustment based on variations in the quantities. If the quantity variation is such as to cause an increase in the time necessary for completion, the Procurement Officer may grant an extension of time within ten (10) days from the beginning of the delay, or within a further period of time as the Procurement Officer may deem necessary and appropriate to allow for the completion of work. All time extension requests shall be submitted to the Procurement Officer by the Contractor prior to commencement of any delay and the request shall be accompanied by a written thorough justification for the request. 36. Sanctions Upon Improper Acts In the event the Contractor, or any of its officers, partners, principals or employees, is convicted of a crime arising out of, or in connection with, the procurement of work to be done or payment to be made under this contract, the contract may, in the discretion of the Department, be terminated. 21 ATTACHMENT H Section 16-202 of State Finance and Procurement Article of the Annotated Code, and COMAR 21.08.01, which relate to contracts with persons convicted of bribery, attempted bribery or conspiracies to bribe are incorporated into this contract by reference. Section 11-205 of State Finance and Procurement Article and COMAR 21.08.03 relating to collusion for purposes of defrauding the State are incorporated into this contract by reference. COMAR 21.08.01 et seq., “Disqualifications, Suspension, Debarment, Reinstatement and Sanctions”, is incorporated into this contract by reference. 37. Non-Hiring of Employees No employee of the State of Maryland of any unit thereof, whose duties as such employee include matters relating to or affecting the subject matter of this contract, shall, while so employed, become or be an employee of the party or parties herby contracting with the State of Maryland or any unit thereof. 38. Conflict of Interest Law It is unlawful for any State officer, employee or agent to participate personally in his official capacity through decision, approval, disapproval, recommendation, advice or investigation in any contract or other matter in which he, his spouse, parent, minor child, brother or sister, has a financial interest or to which he has a corporation, association or other organization in which he has a financial interest or in which he is serving as an officer, director, trustee, partner or employee is a party, or to which any person or organization with whom he is negotiating or has any arrangement concerning prospective employment, is a party, unless such officer, employee or agent has previously complied with the provisions of Article 40A, Subsection 3-101 et seq. of the Annotated Code of Maryland. 39. Registration Pursuant to subsection 7-021 et seq. of the Corporations and Associations Article of the Annotated Code of Maryland, Corporations not incorporated in the State shall be registered with the State Department of Assessments and Taxation, 301 W. Preston Street, Baltimore, Maryland 21201, before doing any inter-state or foreign business in this State. Before doing any inter-state business in this State, a foreign corporation shall qualify with the Department of Assessments and Taxation. 40. Taxes – Responsibility for Payment, Exemption, Forms to be Filed, etc. The Contractor is responsible for and by submitting a bid agrees to pay all retail sales, income, real estate, sales and use, transportation and special taxes applicable to and assessable against any materials, equipment, processes and operations incident to or involved in the work. The Contractor is responsible for ascertaining and acquainting himself with such taxes and making all necessary arrangements to pay same. The Administrator hereby reserves the right to withhold final payment under this contact until the Contractor and any subcontractor performing any duties under this contract have 22 ATTACHMENT H furnished or caused to be furnished to the Comptroller of the State of Maryland all properly completed forms required by the said Comptroller and until all of said retail sales and/or use taxes due the State of Maryland by the Contractor have been paid and the Contractor exhibits a release or receipt form the Comptroller evidencing such payment. 41. Tax Exemption The State is generally exempt from federal excise taxes, Maryland sales and use taxes, District of Columbia sales taxes and transportation taxes. Exemption certificates shall be completed upon request. Were a contractor is required to furnish and install material in the construction or improvement of real property in performance of a contract, the Contractor shall pay the Maryland sales tax and the exemption does not apply. 42. Specifications All materials, equipment, supplies of services shall conform to federal and State laws and regulations and to the specifications contained in the solicitation. 43. Delivery Delivery shall be made in accordance with the bid specifications. The State reserves the right to test any materials, equipment, supplies or services delivered to determine if the specifications have been met. Any material that is defective or fails to meet the terms of the bid replaced. The State reserves the right to purchase replacement materials in the open market. Contractors failing to promptly replace materials lawfully rejected shall be liable for any excess price paid for the replacement plus applicable expenses, if any. 44. Patent, Trade Mark and Copyright Infringements Contractor agrees to indemnify, protect and save harmless the State, its officers, agents and employees with respect to any claim, action, cost or judgment for patent, trademark and copyright infringements, arising out of purchase or use of materials, supplies, equipment or services covered by this contract. 45. Occupational Safety and Health Act (OSHA) All materials, supplies, equipment of services supplied as a result of this contract shall comply with the applicable U.S. and Maryland Occupational Safety and Health Act standards. 46. Minority Business Enterprise and Affirmative Action A. This contract is subject to Executive Order 01.01.1970.15, December 9, 1970; amended by Order 01. 01. 1976.05, July 9,1976 (Code of Fair Practices), and COMAR 21.11.04 Contractor’s Affirmative Action Plan Review/Approval and Compliance Monitoring Process - - DOT. This contract is also subject to the applicable provisions of Title 14, Subtitle 3 of State Finance and Procurement Article of the Annotated Code of Maryland; COMAR 21.11.03 Minority Business Enterprise Policies; and 23 ATTACHMENT H B. the Provisions of COMAR 11.01.10, which incorporates by reference the current revision of the minority business enterprise program. Copies of the Minority Business Enterprise Program may be obtained from the Department of Transportation Fair Practices Officer, P.O. Box 8755, BWI Airport, Maryland 21240. This contract is also subject to all applicable federal and State laws and regulations pertaining to Minority Business Enterprise and Affirmative Action. To the extent, any of the above or regulations are applicable to this contract and are specifically incorporated herein. 47. Small Business Procurement If the solicitation for bid indicates that this procurement has been designated for a small business preference, the provisions of COMAR 21.11.01.02 pertaining to small business preferences shall apply and are incorporated herein by reference. 48. Non-Discrimination in Employment A. Compliance with State Law and regulations The Contractor agrees: (a) not to discriminate in any manner against an employee or applicant for employment because of race, color, religion, creed, age, sex, martial status, national origin, ancestry, or physical or mental handicap unrelated in nature and extent so as reasonably to preclude the performance of such employment; (b) to include a provision similar to the contained in subsection (a) above, and in any subcontractor expert a subcontract for standard commercial supplies or raw materials; and (c) to post and to cause subcontractors for employment, notices setting forth the substance of this clause. B. Compliance with Federal Law Contractors providing materials, equipment, supplies, or services to the State under this contract herewith assure the State that they are conforming to the provision of the Civil Rights Act of 1964, and Section 202 of Executive Order 11246 of the President of the United States of America as amended by Executive Order 11375, as applicable. The Contractor shall comply with all applicable federal laws pertaining to nondiscrimination in employment. C. Sanctions for Non-Compliance In the event of the Contractor’s non-compliance with the non-discrimination provisions of this Agreement, the Department shall impose such sanctions as it may determine to be appropriate, including but not limited to: (1) Withholding of payment to the Contractor under the Agreement until the Contractor complies, and/or 24 ATTACHMENT H (2) Cancellation, termination or suspension of the Agreement in whole or in part. 49. Multi-Year Contract Contingent Upon Appropriation If the General Assembly fails to appropriate funds or if funds are not otherwise made available for continued performance for any fiscal period of this Contract succeeding the first fiscal period, this Contract shall be canceled automatically as of the beginning of the fiscal year for which funds were not appropriated or otherwise made available; provided, however, that his will not affect either the State’s rights or the Contractor’s right under any termination clause in this Contract. The effect of termination of the Contract hereunder will be to discharge both the Contractor and the State from future performance of the Contract, but not from their rights and obligations existing at the time of termination. The Contractor shall be reimbursed for the reasonable value of any non-recurring costs incurred but not amortized in the price of the Contract. The State shall notify the Contractor as soon as it has knowledge that funds may not be available for the continuation of this Contract for each succeeding fiscal period beyond the first. 50. “Buy American Steel” Act The provisions of COMAR 21.11.02 pertaining to implementation of the “Buy American Steel” Act (State finance and Procurement Article Title 17, subtitle 3 of the Annotated Code of Maryland) are incorporated in this Contract by reference. 51. Prevailing Wage Contracts for Public Work The provisions of State Finance and Procurement Article, Title 17, subtitle 2 of the Annotated Code of Maryland and COMAR 21.11.11 are incorporated in maintenance contracts of $500,000 or more by reference. 52. Disputes This Contract shall be subject to the provisions of State Finance and Procurement Article, Title 15, Subtitle 2 (Dispute Resolution) of the Annotated Code of Maryland and COMAR 21.10 (Administrative and Civil Remedies). Pending resolution of a claim, the Contractor shall proceed diligently with the performance of contract in accordance with the procurement officer’s decision. 53. Liquidated Damages Time is an essential element of the contract and it is important that the work be vigorously prosecuted until completion. For each day that any work shall remain uncompleted beyond the time(s) specified elsewhere in the contract, the Contractor shall be liable for liquidated damages in the amount(s) provided for in the solicitation provided, however, that due account shall be taken of any adjustment of specified completion time(s) for completion of work as granted by approved change orders. 25 ATTACHMENT H 54. Contractor’s Invoices Contractor agrees to include on the face of all invoices billed to the State, his Federal Tax Identification or Social Security Number. 55. Financial Disclosure The Contractor shall Comply with the provisions of Section 13-221 of the State Finance and Procurement Article of the Annotated Code of Maryland, which requires that every business that enters into contracts, leases or other agreements with the State of Maryland or its agencies during a calendar year under which the business is to receive in the aggregate $100,000 or more, shall, within thirty (30) days of the time when the aggregate value of these contracts, leases or other agreements reaches $100,000, file with the Secretary of State of Maryland certain specified information to include disclosure of beneficial ownership of the business. 56. Political Contribution Disclosure The Contractor shall comply with the provisions of Article 33; Sections 30-1 through 304 of the Annotated Code of Maryland certain which requires that every person that enters into contracts, leases, or other agreements with the State of Maryland, including its agencies, or a political subdivision of the State, during a calendar year under which the person receives in the aggregate $10,000 or more, shall, on or before February 1 of the following year, file with the Secretary of State of Maryland certain specified information to include disclosure of political contributions in excess of $100 to candidate for elective office any primary or general election. 57. Incorporation by reference All terms and conditions under the solicitation, and any amendments thereto, are made part of this contract. 58. Maryland Law Prevails The parties hereby agree that: A. B. This contract was made and entered into in Maryland, and under the laws of Maryland. The Law of Maryland shall govern the resolution of any issue arising in connection with this contract including, but not limited to, all questions concerning the validity of this contract the capacity of the parties to enter therein, any modification or amendment thereto and the rights and obligations of the parties hereunder. 59. Bid Award- Resident Business A. Contracts are subject to the applicable provisions of COMAR Title 25.01.01.04, which stipulates that when awarding a contract by competitive bidding, the State may give a preference to the lowest responsive and responsible bid from a Maryland firm over that of a non26 ATTACHMENT H resident firm if the State in which the non-resident firm is located gives a resident business preference. B. The preference given under this Section shall be identical to the preference, through law, policy or practice, given to its residents by the State in which the non-resident firm is located. C. This provision shall not apply if it conflicts with any Federal grant or regulation affecting this Contract. 60. Payment of State Obligations A. Payments to the Contractor pursuant to this Contract shall be made no later than thirty (30) days after the State’s receipt of a proper invoice from the Contractor. Charges for late payment of invoices, other than as prescribed by title 15, Subtitle 1, of the State Finance and Procurement Article, Annotated Code of Maryland or by the Public Service Commission of Maryland with respect to regulated public utilities, as applicable, are prohibited. B. A proper invoice shall include a description of the items or services provided; the date the goods were received or the inclusive dates the services were rendered; the contract price(s) retention, if any; the basis for the billing; the contract or purchase order number; the Contractor’s federal Tax Identification Number of Social Security Number; the name of the address of the proper invoice recipient. C. In order to receive payment of the interest, the Contractor must submit a proper invoice for accrued interest within thirty (30) calendar days after the payment date of the amount on which the interest is claimed to have accrued. Interest may not be claimed for more than one year following the 31st calendar day after the date the date that a proper invoice was received, or on amounts representing unpaid interest, or if claim has been filed under State Finance and Procurement Article, Title 15, Subtitle 2 of the Code. D. For the purpose of this contract, an amount will not be deemed due and payable if: (1) The amount invoiced is inconsistent with the contract (2) The proper invoice has not been received by the party or office specified in the contract. (3) The invoice of performance under the contract is in dispute or the contractor has failed to otherwise comply with the provision of the contract. (4) The item or services have not been accepted. (5) The quantity of items delivered is less than the quantity ordered. 27 ATTACHMENT H (6) The items or services do not meet the quantity requirements of the contract. (7) If the contract provides for progress payments, the proper invoice for the progress payment has not been submitted pursuant to the schedule contained in the agreement. (8) If the contract provides for the retain age and the invoice is for release of the retain age, all stipulated conditions for release of the retain age have not been met. (9) The Contractor has not submitted satisfactory documentation or other evidence reasonably required by the procurement officer or by the procurement officer or by the contract concerning performance under the contract and compliance with its provisions. 61. Pre-Existing Regulations In accordance with the provisions of Section 11-206 of the State Finance and Procurement Article, Annotated Code of Maryland, the regulations set forth in Title 21 of the Code of Maryland Regulations (COMAR Title 21) in effect on the date of this contract are applicable to this contract. 62. Retention of Records The Contractor shall retain and maintain contract for three years after final payment by the limitations, whichever is longer, and shall make authorized representatives of the State, including reasonable times. all records and documents relating to this State hereunder or any applicable Statute of them available for inspection and audit by the Procurement Officer or designee, at all 63. General Conditions Controlling In the event of a conflict between these General Conditions and any other provision of the contract documents, these General Conditions shall prevail unless such other provision expressly provides to the contrary. 64. Dissemination of Information During the term of this contract, the Contractor shall not release any information related to the services or performances of the services under this contract nor publish any final reports or documents without the prior written approval of the Administration. 28 ATTACHMENT H MARYLAND DEPARTMENT OF TRANSPORTAION GENERAL CONDITIONS FOR MAINTANCE CONTRACTS 1989 ADDENDUM NO.1 Add to Section 28, Remedies and Termination, A., Termination for default, the following language: “Termination hereunder, including the determination of the rights and obligations of the parties shall be governed by the provisions of COMAR 21.07.01.11B.” Add to Section 28., Remedies and Termination, B., Termination for Convenience of the State, the following language: “Termination hereunder, including the determination of the rights and obligations of the parties shall be governed by the provisions of COMAR 21.07.01.11B.” Add to Section 52., Disputes, the following Paragraph: “Unless a lesser period is provided by applicable statute, regulation, or this Contract, the Contractor must file a written notice of claim with the procurement Officer within 40 days after the basis for the claim is known or should have been know, whichever is earlier. Contemporaneously with or within thirty (30) days of the filing of a notice of claim, but no later than the date of final payment under the Contract, the Contractor must submit to the Procurement Officer its written claim containing the information specified in COMAR 21.10.04.02.” 29 ATTACHMENT H MARYLAND DEPARTMENT OF TRANSPORTATION GENERAL CONDITIONS FOR MAINTENANCE CONTRACTS 1989 ADDENDUM NO. 2 Replace Section 5, Contingent Fee Prohibition, Page 6, with the following language: (a) “The contractor, architect, or engineer warrants that it has not employed or retained any person, partnership, corporation, or other entity, other than a bona fide employee, bona fide agent, bona fide salesperson, or commercial selling agency working for the contractor, architect, or engineer, to solicit or secure this agreement, and that it has not paid or agreed to pay any person, partnership, corporation, or other than a bona fide employee, bona fide salesperson or commercial selling agency, any fee or other consideration contingent on the making of this agreement.” (b) “ Contingent fees prohibited; exceptions; lobbyists.-(1) (i) Except as provided in subparagraph (ii) of this paragraph, unless a person is bona fide employee, bona fide salesperson, or commercial selling agency working for the contractor, the person may not offer or agree to solicit or secure a procurement contract under this subtitle if the person’s fee is contingent on, or results from, the making of the procurement contract.” (ii) “ A Lobbyist, as defined in Article 40A, Section 1-201 of the Code, may not offer or agree to solicit or secure a procurement contract under this subtitle if the lobbyist’s fee is contingent on, or results from, the making of the procurement contract.” 30 ATTACHMENT I Maryland Transportation Authority OFFICIAL DOCUMENT SIGNATURE GUIDELINES Note: this chart does not cover unincorporated associations. ATTACHMENT J 5. GENERAL 5.4 Test Report 1. The test report shall include the following: 1. Summary of project. 2. Description of equipment tested. 3. Description of tests. 4. Test data. 5. Analysis and recommendations. 2. Test data records shall include the following minimum requirements: 1. Identification of the testing organization. 2. Equipment identification. 3. Humidity, temperature, and other conditions that may affect the results of the tests/calibrations. 4. Date of inspections, tests, maintenance, and/or calibrations. 5. Identification of the testing technician. 6. Indication of inspections, tests, maintenance, and/or calibrations to be performed and recorded. 7. Indication of expected results when calibrations are to be performed. 8. Indication of “as-found” and “as-left” results, as applicable. 9. Sufficient spaces to allow all results and comments to be indicated. 3. The testing organization shall furnish a copy or copies of the complete report as specified in the maintenance testing contract