Building to Beat Ebola - Institution of Structural Engineers
Transcription
Building to Beat Ebola - Institution of Structural Engineers
Engineering Design Consultants Building to Beat Ebola Nick Francis MEng MSc CEng MICE MInstRE CMgr MCMI LinkedIn: Twitter: Web: https://uk.linkedin.com/in/nick-francis-30b53911 @NickFEngineer @Eadonnews www.eadonconsulting.co.uk www.eadonconsulting.co.uk Engineering Design Consultants Lower Hatea Bridge – New Zealand www.eadonconsulting.co.uk Engineering Design Consultants Greenwich Reach Swing Bridge www.eadonconsulting.co.uk Engineering Design Consultants Poole Harbour – Twin Sails Bridge www.eadonconsulting.co.uk Engineering Design Consultants Paddington – Merchant Square “Fan” Bridge www.eadonconsulting.co.uk Engineering Design Consultants Movable Structures Humber Bridge Maintenance Gantry www.eadonconsulting.co.uk Engineering Design Consultants Movable Structures Leadenhall Building Automatic Fire Escape www.eadonconsulting.co.uk Engineering Design Consultants High Integrity Design – Nuclear Industry www.eadonconsulting.co.uk Engineering Design Consultants Innovative, Adaptable, Collaborative, Knowledgeable, Reliable www.eadonconsulting.co.uk Building to Beat Ebola The Royal Engineers in Sierra Leone Building Ebola Treatment Units (ETU) Setting the Scene – DfID in Sierra Leone DfID SL Programme (pre-Ebola) • Focussed on: Economic Development, Governance, and the Millennium Development Goals DfID SL’s Infrastructure Portfolio • Water & Sanitation + Energy The Challenge – Ebola Crisis (Aug/Sep 2014) to end August 2014 to end September 2014 The Trajectory – Ebola Crisis (Aug/Sep 2014) 28 Aug 14 Building Ebola Treatment Units (ETU) Makeni Port Loko Goderich Kerrytown Hastings Moyamba Concept Design Concept Design Concept Design Site Selection and Clearance Site Selection and Clearance Detailed Design Clinical Safety Speed Buy-in from International Partners Cost Detailed Design Tender 46 Days 7 Days Kerry Town: Resource / Construct Design MAK, MOY, PL, GOD, HAS: Sep Design 7 Days PQQ 5 Days Resource / Construct Tender 12 Days 39 - 56 Days Oct Nov Organisations Groundworks Buildings In and Out Water Supply Waste Water Waste Water Power 30 Ton Vehicle 5 Ton Vehicle Self-Weight 120 Ton Vehicle Self-Weight Bridge Repair Laboratories Did it Work? LinkedIn: Twitter: Web: https://uk.linkedin.com/in/nick-francis-30b53911 @NickFEngineer @Eadonnews www.eadonconsulting.co.uk