Pro Level Installation
Transcription
Pro Level Installation
Pro Level Installation t i l e s h o p. c o m Pro Level Installation 1. SUBFLOOR Clean & sweep the floor. Tape seams and silicone cracks or holes in plywood 4. fill 2. door ways Install pieces of wood in doorways to “damn” the self leveler when it is poured, silicone the edges of the wood to hold them place. 3. Vents 5. Prime Use PRO PRIMER to prime subfloor using roller or brush. Allow at least 1 hour between coats 6. mesh Staple either platic or wire lath to subfloor. Overlap each seem about 3 inches. It is recommended to use two coats of primer. Layout the mesh perpendicular to any seams in the floor. 7. Layout Pour water from premeausred bucket into 6 gallon pail. 8. water Cover and silicone all floor vents. Use plastic when you are also installing in-floor heat. Add PRO LEVEL powder to clean measured water. 9. pro level G et i n spire d at t i l e s h o p. c o m Use a mixer bar to mix PRO LEVEL for 2 minutes. 10. mix 11. Pour Pour your mix into the space. Keep pouring until your entire space is filled and level. 12. continue You have 10 minutes between every pour. OTHER HELPFUL HINTS : -- Do not add heat to speed the cure time. -- Do not use a fan to speed cure time. -- Do not use warm water when mixing. -- Be sure the primer is completely dry before the leveler is poured. 13.dry Allow PRO LEVEL to dry for 24 hours undisturbed. NEXT SET THE TILE : SEE THE HOW TO FLOOR TILE GUIDE FOR MORE INFORMATION Pro Level Installation Checklist 348317 Pro caulk gun 348310 rubber gloves 066860 wire lath 066861 pro plastic lash 347969 mixer bar 043518 pro level 347811 meausring pails 347811 6 gallon pails 347811 pro primer 026011 clear silicone G et i n spire d at t i l e s h o p. c o m