Reliable service of transformers throughout the entire lifecycle
Transcription
Reliable service of transformers throughout the entire lifecycle
Reliable service of transformers throughout the entire lifecycle Thomas Schneider, Head Customer Service Transformers Weiz Unrestricted © Siemens AG Österreich 2016. All rights reserved. siemens.at/future-of-energy How to prevent a catastrophe… … it happens … Unrestricted © Siemens AG Österreich 2016. All rights reserved. Page 2 June 16, 2016 Thomas Schneider/ EM TS CS TR STW By the way do you know… the failure rate of transformers? Unrestricted © Siemens AG Österreich 2016. All rights reserved. Page 3 June 16, 2016 Thomas Schneider/ EM TS CS TR STW Why do transformer fail? Statistic based on 126 major failures with fire and explosion Source: S. Tenbohlen, “Diagnostik elektrischer Betriebsmittel 2014”, 6. ETG-Fachtagung, Nov. 25, 2014, Berlin, Germany Unrestricted © Siemens AG Österreich 2016. All rights reserved. Page 4 June 16, 2016 Thomas Schneider/ EM TS CS TR STW Service Portfolio – Comprehensive solutions for all customer requirements LTP – Long Term Program Concepts and solutions for lifetime extension • CAM: Condition Assessment Manager • Diagnostic of customers fleet • Ranking of criticality, health index • Online Monitoring (Alerting Systems) • Sensors, e.g. Gas Sensor, Bushing Monitoring • Systems, SITRAM CM &CM SMART • Consulting & Expertise • Training, Consulting • Maintenance & Lifecycle Extension consisting of TLM - Products • SITRAM-DRY; SITRAM-REG, Conventional Drying Maintenance concepts Unrestricted © Siemens AG Österreich 2016. All rights reserved. Page 5 June 16, 2016 • Spare Parts & Accessories • Spare parts for transformer and peripheral components • Repair & Retrofit • In House at transformer factory • On site at customer substation, power station, etc. • Installation and Commissioning • New transformer assembly or relocation Thomas Schneider/ EM TS CS TR STW Monitoring provides valuable information about the transformer using a variety of sensors and a system Active Part Bushing Cooling Operating parameter Transformer Oil OLTC Unrestricted © Siemens AG Österreich 2016. All rights reserved. Page 6 June 16, 2016 Thomas Schneider/ EM TS CS TR STW SITRAM® Condition Monitoring CM Schematic of a System Top Level Ø Entire transformer feet Optional Substation Level Ø All transformer per substation Ø Remote access if required More than 200 protocols supported Optional Substation SCADA Optional • IEC 60 870 - 5 – 104 • IEC 61850 • Modbus • DNP3, and much more..... Transformer Level Ø 1…n transformer possible … No limitation on type, make and model. All sensors can be implemented by using specific protocols Fully customized solution possible … Cooling (optional) Ø Ø … DAU PD Alarm contacts … OLTC Status signals Bushing Temperatures etc.. DGA Unrestricted © Siemens AG Österreich 2016. All rights reserved. Page 7 June 16, 2016 Thomas Schneider/ EM TS CS TR STW Our Condition Assessments services can easily be tailored acc. to the customer‘s individual needs 0. Test protocols Recommendation + Visual & thermal inspection + Historical & operational data Health Reports „Holistic transformer“ + Electrical measurements § Oil sampling Deliverables Technical Analysis 1. + High Voltage testing Perspective Data Reports 2. Online 3. Offline Condition Assessment Level „Inside Tank“ Unrestricted © Siemens AG Österreich 2016. All rights reserved. Page 8 June 16, 2016 Thomas Schneider/ EM TS CS TR STW Condition Assessment Management in order to identify THE critical 1% of the Customer‘s Fleet Unrestricted © Siemens AG Österreich 2016. All rights reserved. Page 9 June 16, 2016 Thomas Schneider/ EM TS CS TR STW Oil Regeneration Solution for Life Time Extension Challenge: • Improvement of insulation condition • Deceleration of ageing mechanisms • Applied without interrupting transformer's operation Mobile regeneration technology – SITRAM® REG Potential Needs: • Transformers with high aged oil • Corrosive or potentially corrosive oils with corrosive sulphur compounds (e.g. dibenzyl disulphide) • Moderate aged and non inhibited oil • Preventive maintenance strategy Unrestricted © Siemens AG Österreich 2016. All rights reserved. Page 10 June 16, 2016 Thomas Schneider/ EM TS CS TR STW Old Bushings could cause fatal Damage to Power Transformers Lifetime of power transformers on average is about 40-50 years! Lifetime of condenser bushings on average is about 25-30 years! 70% of all bushing failures result in fire damage! Unrestricted © Siemens AG Österreich 2016. All rights reserved. Page 11 June 16, 2016 Thomas Schneider/ EM TS CS TR STW There are Means to limit the Risk of Bushing Failures Service packages for capacitor bushings Condition assessment: • • • • • Visual inspection Thermography Oil analysis (OIP only) Electrical measurements Bushing monitoring On-site retrofit measures: • • • • • Cleaning Sealing Preparation for storage Bushing replacement Conversion to other bushing designs Unrestricted © Siemens AG Österreich 2016. All rights reserved. Page 12 June 16, 2016 Thomas Schneider/ EM TS CS TR STW On Site and in Factory Repairs are considered serious Alternatives to new Investments Unrestricted © Siemens AG Österreich 2016. All rights reserved. Page 13 June 16, 2016 Thomas Schneider/ EM TS CS TR STW Complete customer services for your equipment, substations and network Installation Discontinued Products & Comm Repair, On call support PDSA Spares Refurbishment Maintenance Retrofit & Upgrade Condition Assessmt Asset Managemt Operation and Maint. Network Planning Design Training Multi-brand equipment from various manufacturing locations providing market access worldwide Unrestricted © Siemens AG Österreich 2016. All rights reserved. Page 14 June 16, 2016 Thomas Schneider/ EM TS CS TR STW Contact page Thomas Schneider Head Customer Service Transformers EM TS CS TR STW Elingasse 3 8160 Weiz Mobile:+43 (664) 80117-71530 E-mail: [email protected] Roland Feeberger Head Customer Service RC-AT EM CS Siemensstrasse 90 1210 Wien Mobile:+43 (664) 80117-22065 E-mail: [email protected] siemens.at/future-of-energy Unrestricted © Siemens AG Österreich 2016. All rights reserved. Page 15 June 16, 2016 Thomas Schneider/ EM TS CS TR STW