Collet Chuck Instruction Manual
Transcription
Collet Chuck Instruction Manual
INSTALLATION AND SERVICE INSTRUCTIONS I.D. AND O.D. GRIP COLLET CHUCKS WWW.FORKARDT.US Main Office 2155 Traversefield Drive Traverse City, Mi. 49686 E-mail: [email protected] 800-544-3823 Toll Free 231-995-8300 Phone 231-995-8361 Fax IL, IA, NE, WI, MN, ND, SD Chris Brown Office: 231-995-8327 Mobile: 231-557-5295 [email protected] Michigan and all other states not listed Forkardt Direct: 231-995-8300 Fax: 231-995-8361 [email protected] IN, TN, KY, OH, WV Jim Farrell Office: 231-995-8334 Mobile: 248-765-9456 [email protected] Ontario, Canada Brian Braden Office: 231-995-8337 Mobile: 248-361-9616 [email protected] KS, MO, AR, TX, LA, OK, NM, AZ, CA Jeremy Michael Office: 231-995-8338 Mobile: 713-306-4619 [email protected] For Quebec, Canada Bob Holtz Mobile: 860-481-1948 [email protected] AL, GA, MS, NC, SC, VA, FL Mark Zimmerman Mobile: 248-361-7443 [email protected] MA, VT, NH, ME, RI, NJ, MD, DE, PA, NY Bob Holtz Mobile: 860-481-1948 [email protected] For Mexico Sergio Echegoyen Dinamarca 209 INT 3 Las Mercedes San Luis Potosi, S.L.P. Mexico 78394 Office: 52 1 444-824-9955 Mobile: 52 1 444-131-4376 Fax: 52 1 444-824-9955 China Kevin Dong 1F, Bldg 2#, 458 Fute Rd. (N.), Shanghai Waigaoqiao F.T.Z. 200131 P.R.C. Office: 86-021-58682809-110 Mobile: 86-15000302788 [email protected] Brazil Andre Silva Kare Tools R-Capitao Rabello, 113 Guarulhos Brazil, 070630 Office: 55-11-2937-9646 Mobile: 55-11-7733-8697 General Safety Instructions Assembling the collet chuck When assembling the chuck to the machine, the following safety requirements must be observed: Do not start the machine spindle until the part has been securely clamped. Do not unclamp the chuck until the machine spindle has completely stopped rotating In the case of loss of power, the workpiece must remain securely clamped until the spindle has completely stopped rotating. Functional Test After assembling the chuck, check for proper functioning before operating. Clamping Force– the specified drawbar force must be achieved to insure proper clamping force. Stroke– the stroke of the drawbar must allow a safety zone at each end of its stroke to insure that the chuck can reach its full travel and not be restricted by the drawbar. Speed If the maximum speed of the lathe is higher than the recommended max RPM of the chuck, the machine must be equipped with a speed limiting device. Maintenance Only operate the chuck when all safety devices are in place. Check the chuck at least once per shift for visible damage. After a collision, the chuck should be thoroughly examined for damage prior to being put back into operation. Please observe safety during the transportation and handling of chucks of considerable weight. Do not make any alterations to this chuck without contacting your sales representative. Alterations, improper repair, or use of incorrect spare parts will result in voidance of warranty. Always make sure spindle has come to a complete stop before removing or changing parts. ID Grip Collet Chucks Installation The chuck assembly must be true on the machine for best concentricity results when machining parts. The following procedures should be used when indicating the chuck assembly on the spindle. 1. Mount machine adapter to spindle with the correct number of spindle mounting screws, making sure all mating surfaces are free of nicks, burrs, dirt, etc. 2. Carefully screw drawbar adapter onto the drawbar and tighten. 3. Put the body on, securing with correct number of screws until snug only. (Do not torque mounting bolts completely yet) 4. With an indicator on the taper of the body or indicating band, adjust the stir screws on the O.D. of the body to run true. This should run at 0.0002” or better. 5. Torque mounting bolts completely and double check run-out. Repeat step 4 if needed. You are now ready to assemble top tooling collet, locator and cover plate. 1. Be sure the collet is free of all nicks, burrs, dirt, etc. Using a liberal amount of lube on the pilot and taper of the collet, line bolt holes in the collet to bolt holes in the body. Place socket head cap screws into the bolt holes and tighten down. 2. When mounting the locator, you must line up the roll-pin, if so equipped, in the body to the hole in the locator to ensure the air sensing holes are in place. Use socket head cap screws to secure the locator in place. OD Grip Collet Chucks Installation The chuck assembly must be true on the machine for best concentricity results when machining parts. The following procedures should be used when indicating the chuck assembly on the spindle. 1. Mount machine adapter to spindle with the correct number of spindle mounting screws, making sure all mating surfaces are free of nicks, burrs, dirt, etc. 2. Carefully screw drawbar adapter onto the drawbar and tighten. 3. Put the body on, securing with correct number of screws until snug only. (Do not torque mounting bolts completely yet) 4. With an indicator on the taper of the body or indicating band, adjust the stir screws on the O.D. of the body to run true. This should run at 0.0002” or better. 5. Torque mounting bolts completely and double check run-out. Repeat step 4 if needed. You are now ready to assemble top tooling collet, locator and cover plate. 1. Be sure the collet is free of all nicks, burrs, dirt, etc. Using a liberal amount of lube on the pilot and taper of the collet, line bolt holes in the collet to bolt holes in the body. Place socket head cap screws into the bolt holes and tighten down. 2. When mounting the locator, you must line up the roll-pin, if so equipped, in the body to the hole in the locator to ensure the air sensing holes are in place. Use socket head cap screws to secure the locator in place. Troubleshooting Problem Possible Cause Solution Workpiece is eccentrically out of tolerance Chuck is not concentric Check concentricity and adjust as necessary Workpiece is out of tolerance Soiled coupling or taper Remove clamping head and clean coupling area Worn Collet Not enough stroke or chuck does not open Soiling between draw mechanism and chuck body Remove clamping head, move drawtube back and clean slot in coupling area Drawtube adapter or draw Check drawtube adapter or draw mechanism is out of tolerance mechanism position and adjust as needed Inadequate drawbar stroke Workpiece out of shape A workpiece is bent during clamping process. After machining it should go back to its original shape Use starting material that is less prone to deformation. Marks on part surface Point or linear work piece clamping The difference between the workpiece diameter and the clamping head ID is too large Wrong clamping head type Change from serrated to smooth bore clamping head Not enough clamping pressure Workpiece is undersize/ oversize Not enough hydraulic pressure at the cylinder Change to clamping head that fits properly Check cylinder inlet pressure on machine Contact machine builder Defective cylinder or blocked drawtube Alterations or improper repair of chuck could void your warranty. Please contact our repair department if you need repair of this chuck. If the chuck is out of warranty, our full service repair department can repair your chuck using original manufacturer parts. NOTES: All rights to this operating manual remain property of Forkardt This manual is intended for fitting, operating and maintenance personnel. It contains regulations and drawings of a technical nature which may be neither wholly nor partially reproduced or distributed to other parties or used for competitive aims without prior written authorization from Forkardt. Furthermore, Forkardt accepts no liability for inaccuracy or incompleteness of this manual which is believed to be complete and comprehensive upon going to press. If in doubt, contact should be made with Forkardt immediately Forkardt 2155 Traversefield Dr Traverse City, MI 49686 231-995-8300 WWW.FORKARDT.US Made in USA © 2012 COPYRIGHT FORKARDT INC. OUR BRANDS FORKARDT MAIN OFFICE 2155 Traversefield Dr Traverse City, MI 49686 Tel: (+1) 800-544-3823 Fax: (+1) 231-995-8361 E-Mail: [email protected] FORKARDT DEUTSCHLAND GMBH Heinrich-Hertz-Str. 7 D-40699 Erkrath Tel: (+49) 211-25 06-0 Fax: (+49) 211-25 06-221 E-Mail: [email protected] FORKARDT FRANCE S.A.R.L. 28 Avenue de Bobigny F-93135 Noisy le Sec Cédex Tel: (+33) 1-4183 1240 Fax: (+33) 1-4840 4759 E-Mail: [email protected] FORKARDT CHINA Building, No.209, Taigu Road Shanghai Waigaoqiao F.T.Z. 200131 P.R.C Tel: 86-021-58683689 E-mail: [email protected] FORKARDT INDIA L.L.P. P No. 39, No. 5-5-35/187 Ayyanna Ind Park IE Prashant Nagar Kukatpally, Hyderabad, AP. 500072 Tel: 040-40020571 Fax: 040-40020576 E-mail: [email protected] WWW.FORKARDT.COM
Similar documents
Forkardt_OmniGrip (2)
providing chucking options that range from the high-end Forkardt and N.A. Woodworth brands to the standard Buck Chuck, Logansport, and S.P. Sheffer lines. This customer base includes metalworking m...
More information