Banbury Meadows Homeowners` Association
Transcription
Banbury Meadows Homeowners` Association
RESERVE STUDY Update w/o Site Visit Review Banbury Meadows Homeowners' Association 2012 Update - 2 Published - April 01, 2013 Prepared for the 2013 Fiscal Year Browning Reserve Group / Emmett, ID 83617 Office (208) 365-0977 [email protected] / www.BrowningRG.com © Browning Reserve Group 2013 1646 4/1/2013 12uwo4.4.68-460:nad Version 4/1/2013 9:35:27 AM Banbury Meadows Homeowners' Association 2012 Update - 2 Table of Contents Section Report Page Section I: Summary of Association Reserves 1 30 Year Expense Forecast Detailed Section III: 30 Year Reserve Funding Plan Cash Flow Method {c} 10 Section III-a: 30 Year Reserve Funding Plan Cash Flow Method - Ending Balances Chart 13 Section IV: 30 Year Reserve Funding Plan Fully Funded Balance and % Funded 14 Reserve Fund Balance Forecast Component Method 15 Component Listing Included Components 17 Tabular Component Listing Included Components 23 Expenditures by Year - Next Year 26 Section II: Section V: Section VI: Section VII: Section VII-a: Section IX: Section X: Section X-a: Section XI: 5 Directory of Reserve Study Contractors 27 Auditor Notes 29 Supplementary Information for Auditor Component Method 31 Glossary Reserve Study Terms 33 Addendum: Homeowner Distribution Materials See Page ii for Details 1646 4/1/2013 12uwo4.4.68-460:nad Version 4/1/2013 9:35:27 AM © Browning Reserve Group 2013 TOC - i Banbury Meadows Homeowners' Association 2012 Update - 2 Homeowner Distribution Materials The following Reserve Study sections should be provided to each Homeowner. Section Idaho: 1646 4/1/2013 Report Member Summary 12uwo4.4.68-460:nad Version 4/1/2013 9:35:27 AM © Browning Reserve Group 2013 TOC - ii Section I Update w/o Site Visit Review Banbury Meadows Homeowners' Association 2012 Update - 2 Published - April 01, 2013 Prepared for the 2013 Fiscal Year Reserve Study Summary A Reserve Study was conducted of Banbury Meadows Homeowners' Association (the "Association"). An Update Without Site-Visit Review is an update with no on-site visual observation upon where the following tasks are performed: life and valuation estimates; fund status; and a funding plan. Banbury Meadows Homeowners' Association is a Planned Development with a total of 321 Lots. Summary of Reserves For the first year of the Reserve Study, the reserve contribution is based upon the existing budget unless otherwise noted in “Section III, Reserve Funding Plan.” In addition BRG relied on the Association to provide an accurate Beginning Reserve Balance. The status of the Association's reserves, as reflected in the following Reserve Study, is as follows: 1. 2. The Expenditure Forecast of the following Reserve Study identifies the major components which the Association is obligated to repair, replace, restore or maintain, as determined in accordance with the criteria specified above, and specifies for each such component: a. Its current estimated replacement cost; b. Its estimated useful life; and c. Its estimated remaining useful life. It is estimated that the total cash reserves necessary to repair, replace, restore or maintain such major components (in the aggregate) during and at the end of their first remaining useful life is $31,694. 3. [For purposes of this calculation, “necessary” is defined as the Fully Funded Balance (FFB) (Component Current Cost X Effective Age / Useful Life, including a provision for interest and inflation in future years.)] The current amount of accumulated cash reserves actually set aside to repair, replace, restore, or maintain such major components as of the fiscal year ending December 31, 2013 is estimated to be $73,584, constituting 232.% of the total expenditures anticipated for all such major components through their first end of useful life replacement. / Emmett, ID 83617 Office (208) 365-0977 [email protected] / www.BrowningRG.com 1646 4/1/2013 12uwo4.4.68-460:nad Version 4/1/2013 9:35:27 AM © Browning Reserve Group 2013 2 Reserve Study - Update w/o Site Visit Review Banbury Meadows Homeowners' Association 4. Based upon the schedule of annual reserve contributions necessary to defray the cost of repairing, replacing, restoring or maintaining such major components in the years such expenditures are estimated to be required, it is estimated that annual reserve contributions in the initial amount of $15,575 [$12.13 per Lot per quarter (average)] for the fiscal year ending December 31, 2013 (the first full fiscal year following first distribution of this report) will be necessary in order to meet all such reserve expenditures when they are projected to come due. Funding Assessment Based on the 30 year cash flow projection, the Association's reserves appear adequately funded as the reserve fund ending balances remain positive throughout the replacement of all major components during the next 30 years. Idaho statute imposes no reserve funding level requirements nor does it address funding level adequacy, and although one or more of the reserve fund percentages expressed in this report may be less than one hundred percent, those percentages do not necessarily indicate that the Association's reserves are inadequately funded. Percent Funded Status Based on paragraphs 1 - 3 above, the Association is 232.% funded. The following scale can be used as a measure to determine the association’s financial picture whereas the lower the percentage, the higher the likelihood of the Association requiring a special assessment, or other large increases to the reserve contribution in the future. Percent Funded --------------- Poor --------------- 30% -------------------- Fair --------------------- 70% ----------- Strong ------------ 100% Methodology The above recommended reserve contribution for the next fiscal year (and future fiscal years as outlined in Section III, Reserve Fund Balance Forecast) was developed using the cash flow method. This is a method of developing a reserve funding plan where the contributions to the reserve fund are designed to offset the variable annual expenditures from the reserve fund. Different reserve funding plans are tested against the anticipated schedule of reserve expenses until the desired funding goal is achieved. Funding Goals The funding goal employed for Banbury Meadows Homeowners' Association is Threshold Funding: Establishing a Reserve funding goal of keeping the Reserve balance above a specified dollar or Percent Funded amount. Depending on the threshold, this may be more or less conservative than “Fully Funding.” Reserve Study - Update w/o Site Visit Review Banbury Meadows Homeowners' Association Limitations The intention of the Reserve Study is to forecast the Association's ability to repair or replace major components as they wear out in future years. The Reserve Study is not an engineering report, and no destructive testing was performed. The costs outlined in the study are for budgetary and planning purposes only, and actual bid costs would depend upon the defined scope of work at the time repairs are made. Also, any latent defects are excluded from this report. Statutory Disclosures Compliance The Reserve Study complies with or exceeds all applicable statutes, if any. Supplemental Disclosures General: BRG has no other involvement(s) with the Association which could result in actual or perceived conflicts of interest. Personnel Credentials: N. Anthony Dann graduated from Cal State Northridge with Bachelors & Master of Science degrees in Business Administration, Management and Finance. Diane M. Dann has a Certified Property Manager designation from the Institute of Real Estate Management. Completeness: BRG has found no material issues which, if not disclosed, would cause a distortion of the Association's situation. Reliance on Client Data: Information provided by the official representative of the Association regarding financial, physical, quantity, or historical issues will be deemed reliable by BRG. Scope: This Reserve Study is a reflection of information provided to BRG and assembled for the Association's use, not for the purpose of performing an audit, quality/forensic analysis, health and safety inspection, or background checks of historical records. Reserve Balance: The actual beginning reserve fund balance in this Reserve Study is based upon information provided and was not audited. Reserve Projects: Information provided about reserve projects will be considered reliable. Any on-site inspection should not be considered a project audit, quality inspection, or health and safety review. 3 Reserve Study - Update w/o Site Visit Review Banbury Meadows Homeowners' Association Component Quantities: The Association warrants the previously developed component quantities are accurate and reliable. Browning Reserve Group 4 Section II Banbury Meadows Homeowners' Association 30 Year Expense Forecast - Detailed 2012 Update - 2 Prepared for the 2013 Fiscal Year Current Replacement Reserve Component Life Useful / Cost Remaining 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 02000 - Concrete 200 - Sidewalks, Curbs & Gutters Common Area Total 2,122 02000 - Concrete 5 7 2,122 2,610 3,025 2,610 3,025 03000 - Painting: Exterior 400 - Wrought Iron 160 Lin. Ft. Pump Station Fencing 1,358 6 4 500 - Light Poles Common Area Street Lights 6,435 10 0 6,435 8,648 12,150 10 0 12,150 16,329 1,450 10 0 1,450 1,949 510 - Mailboxes Residential Mailboxes 520 - Fire Hydrants Common Area Total 03000 - Painting: Exterior 21,393 1,528 20,035 1,825 1,528 28,750 04000 - Structural Repairs 910 - Building Maintenance Pump Station #1 Total 530 04000 - Structural Repairs 10 3 530 580 779 580 779 18000 - Landscaping 100 - Irrigation: Misc. Common Area 5,304 5 2 101 - Irrigation: Misc. Wet Wells/Vaults 849 1 1 874 900 927 955 984 1,013 1,044 1,075 1,107 1,141 1,175 1,210 1,246 1,284 340 - Irrigation: Pumps Pump Stations #1 thru #4 6,500 1 1 6,695 6,896 7,103 7,316 7,535 7,761 7,994 8,234 8,481 8,735 8,998 9,267 9,545 9,832 420 - General Repairs/Upgrades Common Area Planters & Shrubs 5,304 5 2 421 - General Repairs/Upgrades Pump House #2 Landscaping Project[nr:1] 3,490 1 0 422 - General Repairs/Upgrades Pump House #4 Landscaping Project[nr:1] 4,500 1 1 4,635 500 - Tree Maintenance Common Area Trees 5,304 5 1 5,464 10,792 11,116 Total 18000 - Landscaping 31,252 5,628 6,524 5,628 7,563 6,524 7,563 3,490 3,490 17,668 6,334 19,051 8,030 8,271 8,519 15,109 7,343 22,086 9,309 9,588 9,876 17,515 25,603 18500 - Lakes / Ponds 330 - Aeration Heads / Diffusers Pump House #2 Aeration System[nr:1] 800 - Reconstruction Stream Bed Renovation[nr:1] Total 18500 - Lakes / Ponds 8,190 1 0 13,976 1 1 22,166 8,190 14,395 8,190 14,395 20000 - Lighting 1646 04/01/2013 12uwo4.4.68-460:nad.uk Version 4/1/2013 9:35:27 AM © Browning Reserve Group 2013 2012 to 2026 5 Banbury Meadows Homeowners' Association 30 Year Expense Forecast - Detailed Current Replacement Life Useful / Reserve Component Cost Remaining 200 - Street Lights 39 Common Area (25%) 2,234 3 2 205 - Street: Poles & Fixtures Common Area 2,122 10 17 Total 20000 - Lighting 2012 Update - 2 Prepared for the 2013 Fiscal Year 2012 2013 4,356 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2,370 2,590 2,830 3,093 3,380 2,370 2,590 2,830 3,093 3,380 30000 - Miscellaneous 230 - Mailboxes 162 Residential Mailboxes (50%)[nr:2] Total 30000 - Miscellaneous 36,178 6 12 51,581 36,178 51,581 31000 - Reserve Study 100 - 3 Year Update with Site Visit Full Reserve Study Total 1,061 31000 - Reserve Study 3 1 1,061 1,093 1,194 1,305 1,426 1,558 1,093 1,194 1,305 1,426 1,558 546 597 652 713 779 32000 - Undesignated 100 - Miscellaneous Miscellaneous Components Total 530 32000 - Undesignated 3 1 530 Total Expenditures Inflated @ 3.00% Total Current Replacement Cost 546 31,715 33,702 597 21,422 8,610 11,591 652 11,109 15,109 26,652 713 12,139 9,588 40,765 779 20,608 80,209 13,908 119,589 1646 04/01/2013 12uwo4.4.68-460:nad.uk Version 4/1/2013 9:35:27 AM 14,495 © Browning Reserve Group 2013 2012 to 2026 6 Banbury Meadows Homeowners' Association 30 Year Expense Forecast - Detailed 2012 Update - 2 Prepared for the 2013 Fiscal Year Reserve Component 2027 2028 2029 2030 2031 2032 2033 2034 2035 2036 2037 2038 2039 2040 2041 02000 - Concrete 200 - Sidewalks, Curbs & Gutters Common Area Total 02000 - Concrete 3,507 4,066 4,713 3,507 4,066 4,713 03000 - Painting: Exterior 400 - Wrought Iron 160 Lin. Ft. Pump Station Fencing 2,179 500 - Light Poles Common Area Street Lights 11,622 510 - Mailboxes Residential Mailboxes 21,944 520 - Fire Hydrants Common Area Total 2,602 3,107 2,602 3,107 2,619 03000 - Painting: Exterior 2,179 36,185 04000 - Structural Repairs 910 - Building Maintenance Pump Station #1 Total 1,047 04000 - Structural Repairs 1,047 18000 - Landscaping 100 - Irrigation: Misc. Common Area 8,768 101 - Irrigation: Misc. Wet Wells/Vaults 340 - Irrigation: Pumps Pump Stations #1 thru #4 10,164 11,783 1,322 1,362 1,403 1,445 1,488 1,533 1,579 1,626 1,675 1,725 1,777 1,830 1,885 1,942 2,000 10,127 10,431 10,744 11,066 11,398 11,740 12,092 12,455 12,828 13,213 13,610 14,018 14,438 14,872 15,318 16,813 17,318 420 - General Repairs/Upgrades Common Area Planters & Shrubs 8,768 10,164 11,783 421 - General Repairs/Upgrades Pump House #2 Landscaping Project[nr:1] 422 - General Repairs/Upgrades Pump House #4 Landscaping Project[nr:1] 500 - Tree Maintenance Common Area Trees Total 8,512 18000 - Landscaping 11,449 20,305 9,868 29,681 12,511 12,886 13,273 23,539 11,440 34,409 14,503 14,938 15,387 27,288 39,889 18500 - Lakes / Ponds 330 - Aeration Heads / Diffusers Pump House #2 Aeration System[nr:1] 800 - Reconstruction Stream Bed Renovation[nr:1] Total 18500 - Lakes / Ponds 20000 - Lighting 200 - Street Lights 39 Common Area (25%) 3,693 205 - Street: Poles & Fixtures Common Area 3,507 Total 20000 - Lighting 7,200 4,035 4,409 4,818 5,265 4,713 4,035 4,409 4,818 4,713 5,265 30000 - Miscellaneous 1646 04/01/2013 12uwo4.4.68-460:nad.uk Version 4/1/2013 9:35:27 AM © Browning Reserve Group 2013 2027 to 2041 7 Banbury Meadows Homeowners' Association 30 Year Expense Forecast - Detailed 2012 Update - 2 Prepared for the 2013 Fiscal Year Reserve Component 2027 2028 2029 230 - Mailboxes 162 Residential Mailboxes (50%)[nr:2] Total 2030 2031 2032 2033 2034 2035 2036 2037 2038 2039 2040 2041 61,590 30000 - Miscellaneous 61,590 31000 - Reserve Study 100 - 3 Year Update with Site Visit Full Reserve Study Total 31000 - Reserve Study 1,702 1,860 2,033 2,221 2,427 1,702 1,860 2,033 2,221 2,427 851 930 1,016 1,111 1,214 32000 - Undesignated 100 - Miscellaneous Miscellaneous Components Total 32000 - Undesignated 851 Total Expenditures Inflated @ 3.00% 11,449 25,037 930 40,388 74,101 15,676 1,016 53,493 23,539 44,126 1,111 19,960 14,938 18,719 1,214 32,106 49,316 23,561 1646 04/01/2013 12uwo4.4.68-460:nad.uk Version 4/1/2013 9:35:27 AM © Browning Reserve Group 2013 2027 to 2041 22,583 8 Banbury Meadows Homeowners' Association 30 Year Expense Forecast - Detailed 2012 Update - 2 Prepared for the 2013 Fiscal Year Reserve Component 2027 2028 2029 2030 2031 2032 2033 2034 2035 2036 2037 2038 2039 2040 1646 04/01/2013 12uwo4.4.68-460:nad.uk Version 4/1/2013 9:35:27 AM © Browning Reserve Group 2013 2027 to 2041 2041 9 Section III Banbury Meadows Homeowners' Association 30 Year Reserve Funding Plan Cash Flow Method 2012 Update - 2 Prepared for the 2013 Fiscal Year *See Important footnotes at end of this Section III. 2012 Beginning Balance Inflated Expenditures @ 3.0% Reserve Contribution Lots/quarter @ 321 2013 2014 2015 2016 2017 2018 2019 2020 2021 83,593 1 66,711 73,584 68,516 77,078 83,519 91,343 96,114 90,336 100,114 31,715 33,702 21,422 8,610 11,591 11,109 15,109 26,652 12,139 9,588 14,833 2 15,575 16,354 17,172 18,031 18,933 19,880 20,874 21,918 23,014 12.13 12.74 13.37 14.04 14.75 15.48 16.26 17.07 17.92 5.0% 5.0% 5.0% 5.0% 5.0% 5.0% 5.0% 5.0% 5.0% 0 11.55 Percentage Increase 25,000 3 Special Assessments / Other 0 0 0 0 0 0 0 0 Interest Pre Tax @ 0.00% 0 0 0 0 0 0 0 0 0 0 Ending Balance 66,711 73,584 68,516 77,078 83,519 91,343 96,114 90,336 100,114 113,540 2) Reserve Contribution provided by Banbury Board of Directors Treasurer. 1) Beginning Balance provided by Banbury Board of Directors Treasurer. 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Beginning Balance 113,540 96,940 101,705 48,137 61,671 75,440 93,103 98,050 88,547 46,258 Inflated Expenditures @ 3.0% 40,765 20,608 80,209 13,908 14,495 11,449 25,037 40,388 74,101 15,676 Reserve Contribution 24,165 25,373 26,642 27,441 28,264 29,112 29,985 30,885 31,812 31,812 Lots/quarter @ 321 18.82 19.76 20.75 21.37 22.01 22.67 23.35 24.05 24.78 24.78 Percentage Increase 5.0% 5.0% 5.0% 3.0% 3.0% 3.0% 3.0% 3.0% 3.0% 0.0% Special Assessments / Other 0 0 0 0 0 0 0 0 0 0 Interest Pre Tax @ 0.00% 0 0 0 0 0 0 0 0 0 0 Ending Balance 96,940 101,705 48,137 61,671 75,440 93,103 98,050 88,547 46,258 62,393 2032 2033 2034 2035 2036 2037 2038 2039 2040 2041 Beginning Balance 62,393 40,712 48,985 36,672 48,524 65,398 78,491 78,197 60,693 68,944 Inflated Expenditures @ 3.0% 53,493 23,539 44,126 19,960 14,938 18,719 32,106 49,316 23,561 22,583 Reserve Contribution 31,812 31,812 31,812 31,812 31,812 31,812 31,812 31,812 31,812 31,812 Lots/quarter @ 321 24.78 24.78 24.78 24.78 24.78 24.78 24.78 24.78 24.78 24.78 Percentage Increase 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% Special Assessments / Other 0 0 0 0 0 0 0 0 0 0 Interest Pre Tax @ 0.00% 0 0 0 0 0 0 0 0 0 0 Ending Balance 40,712 48,985 36,672 48,524 65,398 78,491 78,197 60,693 68,944 78,173 1646 04/01/2013 12uwo4.4.68-460:nad.ukn Version 4/1/2013 9:35:27 AM © Browning Reserve Group 2013 10 Banbury Meadows Homeowners' Association 30 Year Reserve Funding PlanCash Flow Method 2012 Update - 2 Prepared for the 2013 Fiscal Year Reserve Funding Plan - Footnotes Period / Year 3) 01 / 2013 Simple Contribution of $25,000 represents a transfer of excess operating funds to the Reserve Account. 1646 04/01/2013 12uwo4.4.68-460:nad.ukn Version 4/1/2013 9:35:27 AM © Browning Reserve Group 2013 11 Section III-a Banbury Meadows Homeowners' Association 30 Year Reserve Funding Plan Cash Flow Method - Ending Balances 2012 Update - 2 Prepared for the 2013 Fiscal Year $120,000 $100,000 Fund Balance $80,000 $60,000 $40,000 $20,000 41 40 20 39 20 38 20 37 20 36 20 35 20 34 20 33 20 32 20 31 20 30 20 29 20 28 20 27 20 26 20 25 20 24 20 23 20 22 20 21 20 20 20 19 20 18 20 17 20 16 20 15 20 14 20 13 20 20 20 12 $0 Years 1646 04/01/2013 12uwo4.4.68-460:nad.uk Version 4/1/2013 9:35:27 AM © Browning Reserve Group 2013 13 Section IV Banbury Meadows Homeowners' Association 30 Year Reserve Funding Plan Including Fully Funded Balance and % Funded 2012 Update - 2 Prepared for the 2013 Fiscal Year Fully Funded Balance Year Beginning Balance 2012 83,593 61,032 109.3% 31,715 14,833 0 0 66,711 2013 66,711 31,694 232.2% 33,702 15,575 25,000 0 73,584 2014 73,584 32,833 208.7% 21,422 16,354 0 0 68,516 2015 68,516 27,596 279.3% 8,610 17,172 0 0 77,078 2016 77,078 36,355 229.7% 11,591 18,031 0 0 83,519 2017 83,519 42,929 212.8% 11,109 18,933 0 0 91,343 2018 91,343 50,892 188.9% 15,109 19,880 0 0 96,114 2019 96,114 55,786 161.9% 26,652 20,874 0 0 90,336 2020 90,336 56,056 178.6% 12,139 21,918 0 0 100,114 2021 100,114 72,316 157.0% 9,588 23,014 0 0 113,540 2022 113,540 92,503 104.8% 40,765 24,165 0 0 96,940 2023 96,940 82,021 124.0% 20,608 25,373 0 0 101,705 2024 101,705 92,848 51.8% 80,209 26,642 0 0 48,137 2025 48,137 43,498 141.8% 13,908 27,441 0 0 61,671 2026 61,671 61,873 121.9% 14,495 28,264 0 0 75,440 2027 75,440 81,136 114.7% 11,449 29,112 0 0 93,103 2028 93,103 105,084 93.3% 25,037 29,985 0 0 98,050 2029 98,050 116,754 75.8% 40,388 30,885 0 0 88,547 2030 88,547 113,992 40.6% 74,101 31,812 0 0 46,258 2031 46,258 66,910 93.3% 15,676 31,812 0 0 62,393 2032 62,393 79,367 51.3% 53,493 31,812 0 0 40,712 2033 40,712 54,045 90.6% 23,539 31,812 0 0 48,985 2034 48,985 59,638 61.5% 44,126 31,812 0 0 36,672 2035 36,672 45,041 107.7% 19,960 31,812 0 0 48,524 2036 48,524 55,768 117.3% 14,938 31,812 0 0 65,398 2037 65,398 72,888 107.7% 18,719 31,812 0 0 78,491 2038 78,491 87,552 89.3% 32,106 31,812 0 0 78,197 2039 78,197 89,820 67.6% 49,316 31,812 0 0 60,693 2040 60,693 75,412 91.4% 23,561 31,812 0 0 68,944 2041 68,944 88,109 88.7% 22,583 31,812 0 0 78,173 1646 04/01/2013 12uwo4.4.68-460:nad.uk Version 4/1/2013 9:35:27 AM © Browning Reserve Group 2013 Percent Funded Inflated Expenditures @ 3.00% Reserve Contribution Special Assessments & Other Contributions Interest Ending Balance 14 Section V Banbury Meadows Homeowners' Association Reserve Fund Balance Forecast Component Method 2012 Update - 2 Prepared for the 2013 Fiscal Year Current Repl. Cost Reserve Component Useful Remaining Life Life Estimated Future Replacement Costs Per Year 2012 Fully Funded Balance 2013 Fully Funded Balance 2013 Line Item Contribution % Per Year based on Straight Line Cash Flow Method 02000 - Concrete 200 - Sidewalks, Curbs & Gutters Common Area 2,122 5 7 2,610 326 265 312 1.32% 205 1,358 6 4 1,528 255 453 699 1.03% 160 6,435 10 0 6,435 644 6,435 663 2.60% 404 12,150 10 0 12,150 1,215 12,150 1,251 4.90% 764 1,450 10 0 1,450 145 1,450 149 0.59% 91 21,563 2,258 20,488 2,763 9.11% 1,419 03000 - Painting: Exterior 400 - Wrought Iron 160 Lin. Ft. Pump Station Fencing 500 - Light Poles Common Area Street Lights 510 - Mailboxes Residential Mailboxes 520 - Fire Hydrants Common Area Sub-total [03000 - Painting: Exterior] 21,393 04000 - Structural Repairs 910 - Building Maintenance Pump Station #1 530 10 3 580 58 371 437 0.23% 36 5,304 5 2 5,628 1,126 3,183 4,371 4.54% 707 849 1 1 874 437 424 874 1.76% 275 6,500 1 1 6,695 3,348 3,250 6,695 13.51% 2,104 5,304 5 2 5,628 1,126 3,183 4,371 4.54% 707 3,490 1 0 0 0 3,490 0 0.00% 0 4,500 1 1 4,635 2,318 2,250 0 9.35% 1,456 5,304 5 1 5,464 1,093 4,244 5,464 4.41% 687 28,923 9,446 20,023 21,775 38.11% 5,936 18000 - Landscaping 100 - Irrigation: Misc. Common Area 101 - Irrigation: Misc. Wet Wells/Vaults 340 - Irrigation: Pumps Pump Stations #1 thru #4 420 - General Repairs/Upgrades Common Area Planters & Shrubs 421 - General Repairs/Upgrades Pump House #2 Landscaping Project[nr:1] 422 - General Repairs/Upgrades Pump House #4 Landscaping Project[nr:1] 500 - Tree Maintenance Common Area Trees Sub-total [18000 - Landscaping] 1646 04/01/2013 12uwo4.4.68-460:nad.uk Version 4/1/2013 9:35:27 AM © Browning Reserve Group 2013 31,252 15 Banbury Meadows Homeowners' Association Reserve Fund Balance Forecast Component Method 2012 Update - 2 Prepared for the 2013 Fiscal Year Current Repl. Cost Reserve Component Useful Remaining Life Life Estimated Future Replacement Costs Per Year 2012 Fully Funded Balance 2013 Fully Funded Balance 2013 Line Item Contribution % Per Year based on Straight Line Cash Flow Method 18500 - Lakes / Ponds 330 - Aeration Heads / Diffusers Pump House #2 Aeration System[nr:1] 800 - Reconstruction Stream Bed Renovation[nr:1] Sub-total [18500 - Lakes / Ponds] 8,190 1 0 0 0 8,190 0 0.00% 0 13,976 1 1 14,395 7,198 6,988 0 29.04% 4,523 14,395 7,198 15,178 0 29.04% 4,523 22,166 20000 - Lighting 200 - Street Lights 39 Common Area (25%) 205 - Street: Poles & Fixtures Common Area 2,234 3 2 2,370 790 745 1,534 3.19% 497 2,122 10 17 3,507 195 118 129 0.79% 122 5,877 985 863 1,663 3.97% 619 4,356 Sub-total [20000 - Lighting] 30000 - Miscellaneous 230 - Mailboxes 162 Residential Mailboxes (50%)[nr:2] 36,178 6 12 51,581 3,968 2,783 3,105 16.01% 2,493 1,061 3 1 1,093 364 707 1,093 1.47% 229 530 3 1 546 182 354 546 0.73% 114 [A] [B] 127,168 24,785 61,032 31,694 100.00% 15,575 [EndBal] [EndBal] [A] [B] 109% 232% 31000 - Reserve Study 100 - 3 Year Update with Site Visit Full Reserve Study 32000 - Undesignated 100 - Miscellaneous Miscellaneous Components 119,589 Totals Percent Funded 1646 04/01/2013 12uwo4.4.68-460:nad.uk Version 4/1/2013 9:35:27 AM © Browning Reserve Group 2013 16 Section VI Banbury Meadows Homeowners' Association Component Listing Included Components 2012 Update - 2 Prepared for the 2013 Fiscal Year 02000 - Concrete 200 - Sidewalks, Curbs & Gutters Common Area Useful Life 5 Quantity 1 Remaining Life 7 Unit of Measure Lump Sum Cost /LS $2,122 % Included 100.00% Summary Total Cost/Study $2,122 Replacement Year 2019 Future Cost $2,610 This is to repair, replace or grind failed concrete sidewalks, curbs and gutters to remove trip hazards and maintain functionality. Since the concrete useful life exceeds the scope of this study, this provides for repairs only and not full replacement. 03000 - Painting: Exterior 400 - Wrought Iron 160 Lin. Ft. Pump Station Fencing Useful Life 6 Remaining Life 4 Quantity 160 Unit of Measure Linear Feet Cost /l.f. $8.49 % Included 100.00% Summary Total Cost/Study $1,358 Replacement Year 2016 Future Cost $1,528 This is to paint the wrought iron fencing with a direct to metal product. Includes preparation, sanding, scraping and primer as necessary. Linear footage is approximate by BRG measurement. 500 - Light Poles Common Area Street Lights Useful Life 10 Quantity 1 Remaining Life 0 Unit of Measure Lump Sum Cost /LS $6,435 % Included 100.00% Summary Total Cost/Study $6,435 Replacement Year 2012 Future Cost $6,435 This is to prep and paint with a direct to metal product the street lights in the common areas of the association. Count is approximate by BRG. Useful Life 10 Quantity 1 510 - Mailboxes Residential Mailboxes Remaining Life 0 Unit of Measure Lump Sum Cost /LS $12,150 % Included 100.00% Summary Replacement Year 2012 Total Cost/Study $12,150 Future Cost $12,150 This is to prep and paint with a direct to metal product the residential mailboxes in the common area. 31 Singles; 131 Doubles; Count is approximate by BRG. 1646 04/01/2013 12uwo4.4.68-460:nad.uk Version 4/1/2013 9:35:27 AM © Browning Reserve Group 2013 17 Banbury Meadows Homeowners' Association Component Listing Included Components 2012 Update - 2 Prepared for the 2013 Fiscal Year 03000 - Painting: Exterior Useful Life 10 Quantity 1 520 - Fire Hydrants Common Area Remaining Life 0 Unit of Measure Lump Sum Cost /LS $1,450 % Included 100.00% Summary Total Cost/Study $1,450 Replacement Year 2012 Future Cost $1,450 This is to prep and paint with a direct to metal product the fire hydrants located in the common area of the association. Count is approximate by BRG. 04000 - Structural Repairs Useful Life 10 Quantity 1 910 - Building Maintenance Pump Station #1 Remaining Life 3 Unit of Measure Lump Sum Cost /LS $530 % Included 100.00% Summary Total Cost/Study $530 Replacement Year 2015 Future Cost $580 This is to have funds available for on-going repairs such as: Painting; Wood trim replacement/repair; Concrete block maintenance/replacement; Roof repairs/replacement; Door replacement; Drains; 18000 - Landscaping Useful Life 5 Quantity 1 100 - Irrigation: Misc. Common Area Remaining Life 2 Unit of Measure Lump Sum Cost /LS $5,304 % Included 100.00% Summary Total Cost/Study $5,304 Replacement Year 2014 Future Cost $5,628 This is for major repairs to the irrigation components in excess of the operating budget. Includes replacement, as needed, of 2 heavy duty Hunter 18 station controllers, 16 remote timers, approximately 20 gate and other type valves and underground PVC or poly pipe sprinkler lines. Cost estimate and useful life provided by Chaun Stone. Costing provided by Stone Landscaping LLC Useful Life 1 Quantity 1 101 - Irrigation: Misc. Wet Wells/Vaults Remaining Life 1 Unit of Measure Lump Sum Cost /LS $849 % Included 100.00% Summary Replacement Year 2013 Total Cost/Study $849 Future Cost $874 This is for ongoing annual cleaning of the four wet wells/vaults to remove sand and silt and improve operating efficiency. Cost estimate and useful life provided by Frank Englebrecht. Costing provided by Caron Pump Co. 1646 04/01/2013 12uwo4.4.68-460:nad.uk Version 4/1/2013 9:35:27 AM © Browning Reserve Group 2013 18 Banbury Meadows Homeowners' Association Component Listing Included Components 2012 Update - 2 Prepared for the 2013 Fiscal Year 18000 - Landscaping Useful Life 1 Quantity 1 340 - Irrigation: Pumps Pump Stations #1 thru #4 Remaining Life 1 Unit of Measure Lump Sum Cost /LS $6,500 % Included 100.00% Summary Total Cost/Study $6,500 Replacement Year 2013 Future Cost $6,695 This is to repair/replace the mechanical components of the pressurized irrigation system located at the four pump stations. Includes 9 irrigation pumps (7 1/2 to 10 HP), 2 D water pumps (station #1). Pumps are Gould or Crown Brands. Also includes 4 Amiad filtration systems (filter controllers and screens), several control panels, variable frequency devices, pressure transducers and other minor mechanical components such as gauges, valves, etc. Cost estimate and useful life provided by Frank Englebrecht. Costing provided by Caron Pump Co. Useful Life 5 Quantity 1 420 - General Repairs/Upgrades Common Area Planters & Shrubs Remaining Life 2 Unit of Measure Lump Sum Cost /LS $5,304 % Included 100.00% Summary Total Cost/Study $5,304 Replacement Year 2014 Future Cost $5,628 This is to have funds in excess of the operating budget for miscellaneous plantings, removals and other work as directed by the association. Cost estimate and useful life provided by Chaun Stone. Costing provided by Stone Landscaping LLC Useful Life 1 Quantity 1 421 - General Repairs/Upgrades Pump House #2 Landscaping Project Remaining Life Treatment [nr:1] 0 Unit of Measure Lump Sum Cost /LS $3,490 % Included 100.00% Summary Total Cost/Study $3,490 Replacement Year 2012 Future Cost $3,490 This was to improve the landscaping around pump house #2. Costing provided by Stone Landscaping LLC Useful Life 1 Quantity 1 422 - General Repairs/Upgrades Pump House #4 Landscaping Project Remaining Life Treatment [nr:1] 1 Unit of Measure Lump Sum Cost /LS $4,500 % Included 100.00% Summary Total Cost/Study $4,500 Replacement Year 2013 Future Cost $4,635 This is an estimate to improve the landscaping around pump house #4. Costing provided by Stone Landscaping LLC Useful Life 5 Quantity 1 500 - Tree Maintenance Common Area Trees Remaining Life 1 Unit of Measure Lump Sum Cost /LS $5,304 % Included 100.00% Summary Replacement Year 2013 Total Cost/Study $5,304 Future Cost $5,464 This is to prune, remove and replace trees as needed to enhance the association's landscaping and to avoid branch and root damage to nearby objects. This is in excess of the operating budget. Cost estimate and useful life provided by Chaun Stone. Costing provided by Stone Landscaping LLC 1646 04/01/2013 12uwo4.4.68-460:nad.uk Version 4/1/2013 9:35:27 AM © Browning Reserve Group 2013 19 Banbury Meadows Homeowners' Association Component Listing Included Components 2012 Update - 2 Prepared for the 2013 Fiscal Year 18500 - Lakes / Ponds Useful Life 1 Quantity 1 330 - Aeration Heads / Diffusers Pump House #2 Aeration System Remaining Life Treatment [nr:1] 0 Unit of Measure Lump Sum Cost /LS $8,190 % Included 100.00% Summary Total Cost/Study $8,190 Replacement Year 2012 Future Cost $8,190 This was to install a new aeration system at pump house #2. Costing provided by Caron Pump Co. Useful Life 1 Quantity 1 800 - Reconstruction Stream Bed Renovation Remaining Life Treatment [nr:1] 1 Unit of Measure Lump Sum Cost /LS $13,976 % Included 100.00% Summary Total Cost/Study $13,976 Replacement Year 2013 Future Cost $14,395 This is to excavate built up sediment and vegetation within the stream bed to improve water flow and aesthetic appearance. Project will include removal of sediment from grounds, re-grading of the stream bed, clean up and removal of shoreline vegetation. Cost estimate provided by Hans Brandt. Costing provided by Total Maintenance Solutions 20000 - Lighting 200 - Street Lights 39 Common Area (25%) Useful Life 3 Quantity 39 Remaining Life 2 Unit of Measure Items Cost /Itm $229 % Included 25.00% Summary Qty * $/Itm $8,937 Total Cost/Study $2,234 Replacement Year 2014 Future Cost $2,370 This is to replace a percentage of the association street lights. Since the core light standard and fixture useful life exceeds the scope of this study, this component is for partial replacement only. Cost estimates provided by Steve Ragan. Ballast $106; Bulb $27; Photocell $13; Labor $70; Total $216 Street light count is approximate by BRG. Costing provided by Alloway Electric 205 - Street: Poles & Fixtures Common Area Useful Life 10 Quantity 1 Remaining Life 17 Unit of Measure Items Cost /Itm $2,122 % Included 100.00% Summary Replacement Year 2029 Total Cost/Study $2,122 Future Cost $3,507 This is to replace the pole and fixture. The life of the poles and fixtures should exceed the scope of this study. As such, we are projecting to replace 1 pole and fixture every 10 years. Repairs can also be made from this line item. 1646 04/01/2013 12uwo4.4.68-460:nad.uk Version 4/1/2013 9:35:27 AM © Browning Reserve Group 2013 20 Banbury Meadows Homeowners' Association Component Listing Included Components 2012 Update - 2 Prepared for the 2013 Fiscal Year 30000 - Miscellaneous Useful Life 6 Remaining Life Treatment [nr:2] 12 Quantity 162 Unit of Measure Items 230 - Mailboxes 162 Residential Mailboxes (50%) Cost /Itm $447 % Included 50.00% Summary Qty * $/Itm $72,355 Total Cost/Study $36,178 Replacement Year 2024 Future Cost $51,581 This is to replace the mailboxes over a two year period. Cost per item is an average based on the following: 31 Singles @ $300 ea = $9,300; 131 Doubles @ $450 ea = $58,950; Total for 162 items = $68, 250 ($421 average) Item costs are approximate based on information accessed through the internet. Count is approximate by BRG. 31000 - Reserve Study 100 - 3 Year Update with Site Visit Full Reserve Study Useful Life 3 Quantity 1 Remaining Life 1 Unit of Measure Lump Sum Cost /LS $1,061 % Included 100.00% Summary Replacement Year 2013 Total Cost/Study $1,061 Future Cost $1,093 This is for the 3 year full study which includes a visual observation of the accessible reserve components. Costing provided by BRG Northwest, LLC 32000 - Undesignated 100 - Miscellaneous Miscellaneous Components Useful Life 3 Quantity 1 Remaining Life 1 Unit of Measure Lump Sum Cost /LS $530 % Included 100.00% Summary Replacement Year 2013 Total Cost/Study $530 Future Cost $546 This is to have funds available for cost of repairs, replacement and maintenance of smaller reserve components such as: Masonry walls; Common area signage; Landscape lights; Pilasters; 1646 04/01/2013 12uwo4.4.68-460:nad.uk Version 4/1/2013 9:35:27 AM © Browning Reserve Group 2013 21 Banbury Meadows Homeowners' Association Component Listing Included Components 2012 Update - 2 Prepared for the 2013 Fiscal Year 1646 04/01/2013 12uwo4.4.68-460:nad.uk Version 4/1/2013 9:35:27 AM © Browning Reserve Group 2013 22 Section VII Banbury Meadows Homeowners' Association Component Tabular Listing 2012 Update - 2 Prepared for the 2013 Fiscal Year Included Components Current Replacement Cost Component Useful Life Remaining Life Quantity Cost/ U of M Treatment Location 02000 - Concrete 200 - Sidewalks, Curbs & Gutters $2,122 5 7 1 $2,122/LS Common Area 03000 - Painting: Exterior 400 - Wrought Iron $1,358 6 4 160 $8.49/l.f. 500 - Light Poles $6,435 10 0 1 $6,435/LS $12,150 10 0 1 $12,150/LS $1,450 10 0 1 $1,450/LS $530 10 3 1 $530/LS $5,304 5 2 1 $5,304/LS 510 - Mailboxes 520 - Fire Hydrants Pump Station Fencing Common Area Street Lights Residential Mailboxes Common Area 04000 - Structural Repairs 910 - Building Maintenance Pump Station #1 18000 - Landscaping 100 - Irrigation: Misc. 101 - Irrigation: Misc. Common Area $849 1 1 1 $849/LS 340 - Irrigation: Pumps $6,500 1 1 1 $6,500/LS Wet Wells/Vaults Pump Stations #1 thru #4 420 - General Repairs/Upgrades $5,304 5 2 1 $5,304/LS Common Area Planters & Shrubs 421 - General Repairs/Upgrades $3,490 1 0 1 $3,490/LS [nr:1] Pump House #2 Landscaping Project 422 - General Repairs/Upgrades $4,500 1 1 1 $4,500/LS [nr:1] Pump House #4 Landscaping Project 500 - Tree Maintenance $5,304 5 1 1 $5,304/LS Common Area Trees $8,190 1 0 1 $8,190/LS [nr:1] Pump House #2 Aeration System 18500 - Lakes / Ponds 330 - Aeration Heads / Diffusers $13,976 1 1 1 $13,976/LS [nr:1] 800 - Reconstruction 200 - Street Lights $2,234 3 2 39 $229/Itm (25%) 205 - Street: Poles & Fixtures $2,122 10 17 1 $36,178 6 12 162 $1,061 3 1 1 Stream Bed Renovation 20000 - Lighting $2,122/Itm Common Area Common Area 30000 - Miscellaneous 230 - Mailboxes $447/Itm (50%) [nr:2] Residential Mailboxes 31000 - Reserve Study 100 - 3 Year Update with Site Visit 1646 04/01/2013 12uwo4.4.68-460:nad.uk Version 4/1/2013 9:35:27 AM © Browning Reserve Group 2013 $1,061/LS Full Reserve Study 23 Banbury Meadows Homeowners' Association Component Tabular Listing 2012 Update - 2 Prepared for the 2013 Fiscal Year Current Replacement Cost Component Useful Life Remaining Life Quantity Cost/ U of M Included Components Treatment Location 32000 - Undesignated 100 - Miscellaneous $530 1646 04/01/2013 12uwo4.4.68-460:nad.uk Version 4/1/2013 9:35:27 AM © Browning Reserve Group 2013 3 1 1 $530/LS Miscellaneous Components 24 Banbury Meadows Homeowners' Association Component Tabular Listing 2012 Update - 2 Prepared for the 2013 Fiscal Year Current Replacement Cost Component Useful Life 1646 04/01/2013 12uwo4.4.68-460:nad.uk Version 4/1/2013 9:35:27 AM © Browning Reserve Group 2013 Remaining Life Quantity Cost/ U of M Included Components Treatment Location 25 Section VII-a Banbury Meadows Homeowners' Association Expenditures by Year - Next Year 2012 Update - 2 Prepared for the 2013 Fiscal Year Life Useful Reserve Component Current Replacement Cost Forecast Inflated Cost @ 3.00% 2012 03000 - Painting: Exterior 500 - Light Poles Common Area Street Lights 10 6,435 510 - Mailboxes Residential Mailboxes 10 12,150 520 - Fire Hydrants Common Area 10 1,450 03000 - Painting: Exterior: 20,035 1 3,490 1 8,190 Total 20,035 18000 - Landscaping 421 - General Repairs/Upgrades Pump House #2 Landscaping Project[nr:1] 18500 - Lakes / Ponds 330 - Aeration Heads / Diffusers Pump House #2 Aeration System[nr:1] Total 2012: 1646 4/1/2013 12uwo4.4.68-460:nad.uk Version 4/1/2013 9:35:27 AM © Browning Reserve Group 2013 31,715 26 Section IX Banbury Meadows Homeowners' Association Directory of Reserve Study Contractors 2012 Update - 2 Prepared for the 2013 Fiscal Year Alloway Electric Steve Ragan 502 E. 45th Street Boise, ID 83714 Phone: (208) 344-2508 License #: 20000 - Lighting 200 - Street Lights Common Area BRG Northwest, LLC Tony Dann P. O. Box 633 EMMETT, ID 83617 Phone: (208) 365-0977 License #: 31000 - Reserve Study 100 - 3 Year Update with Site Visit Full Reserve Study Caron Pump Co. Frank Engelbrecht P O Box 909 Eagle, ID 83616 Phone: (208) 939-9198 License #: 18000 - Landscaping 101 - Irrigation: Misc. Wet Wells/Vaults 340 - Irrigation: Pumps Pump Stations #1 thru #4 18500 - Lakes / Ponds 330 - Aeration Heads / Diffusers Pump House #2 Aeration System Stone Landscaping LLC Chaun Stone P O Box 4774 Boise, ID 83711 Phone: (208) 412-5344 License #: 18000 - Landscaping 100 - Irrigation: Misc. Common Area 420 - General Repairs/Upgrades Common Area Planters & Shrubs 421 - General Repairs/Upgrades Pump House #2 Landscaping Project 422 - General Repairs/Upgrades Pump House #4 Landscaping Project 500 - Tree Maintenance Common Area Trees Total Maintenance Solutions Hans Brandt 507 E. 45th Street Boise, ID 83714 Phone: (208) 863-5033 1646 04/01/2013 12uwo4.4.68-460:nad.uk Version 4/1/2013 9:35:27 AM © Browning Reserve Group 2013 License #: 27 Banbury Meadows Homeowners' Association Directory of Reserve Study Contractors 2012 Update - 2 Prepared for the 2013 Fiscal Year 18500 - Lakes / Ponds 800 - Reconstruction Stream Bed Renovation 1646 04/01/2013 12uwo4.4.68-460:nad.uk Version 4/1/2013 9:35:27 AM © Browning Reserve Group 2013 28 Section X Banbury Meadows Homeowners' Association Notes to the Auditor 2012 Update - 2 Prepared for the 2013 Fiscal Year This report is intended to assist the auditor while preparing the audit, review or compilation of Banbury Meadows Homeowners' Association’s (the "Association") financial documents. Browning Reserve Group ("BRG") prepared a reserve study for the Association during the 2012 fiscal year. This was done to help determine the Association's reserve contribution for the next fiscal year (2013) and future fiscal years. In addition, BRG prepared the proper statutory disclosures for distribution to the Association members. This reserve study is an Update w/o Site Visit Review. An Update Without Site-Visit Review is an update with no on-site visual observation upon where the following tasks are performed: life and valuation estimates; fund status; and a funding plan. Please note, as this study update did not require a site visit, and relied completely on the information provided, it is possible BRG has never visited Banbury Meadows Homeowners' Association. For BRG reserve studies, the year in which the study is being conducted, is the first year of the study. For example, this study is being prepared during 2012 and is the Association’s first year in the study. This enables BRG to use a starting point which ties to the last audited financial statement, December 31, 2011. You will notice in Section III, Reserve Fund Balance Forecast, a Beginning Reserve Balance of $83,593 is being used which ties to the last completed audit or review of the Association’s financial statements. BRG then re builds the first year of the study, in this case 2012, and estimates an ending reserve fund balance. Again, see Section III and the 2012 ending reserve balance estimate of $66,711. “Re-building” the first year of the study as mentioned above simply means using the 2012 adopted budget for the 2012 reserve contribution. Finally, the 2012 reserve expenses both actual and projected are estimated. We find by using the above method a more accurate reserve study is possible because the beginning reserve fund balance ties directly to the Association’s audited financial statement or, in the absence of an audit or review, the year end balance sheet. There is no need to rely on others for determining mid year reserve balances or estimating current year ending reserve balances. This approach forces all involved, to look at the current year’s reserve fund activities so a more accurate ending reserve fund balance can be estimated. 1646 04/01/2013 12uwo4.4.68-460:nad.ukn Version 4/1/2013 9:35:27 AM © Browning Reserve Group 2013 29 Banbury Meadows Homeowners' Association Notes to the Auditor 2012 Update - 2 Prepared for the 2013 Fiscal Year With respect to the reserve component information on the next page/s, here are the calculations: FFB = Current Cost X Effective Age / Useful Life % Funded = First Year Estimated Ending Reserve Balance / FFB Please see Section V - Reserve Fund Balance Forecast. Browning Reserve Group 1646 04/01/2013 12uwo4.4.68-460:nad.ukn Version 4/1/2013 9:35:27 AM © Browning Reserve Group 2013 30 Banbury Meadows Homeowners' Association Schedule of Supplementary Information for Auditor Component Method 2012 Update - 2 Prepared for the 2013 Fiscal Year Current Repl. Cost Reserve Component Useful Remaining Life Life 2012 Fully Funded Balance 2013 Fully Funded Balance 2013 Line Item Contribution based on Cash Flow Method 02000 - Concrete 200 - Sidewalks, Curbs & Gutters Common Area 2,122 5 7 265 312 205 03000 - Painting: Exterior 400 - Wrought Iron 160 Lin. Ft. Pump Station Fencing 1,358 6 4 453 699 160 6,435 10 0 6,435 663 404 12,150 10 0 12,150 1,251 764 1,450 10 0 1,450 149 91 530 10 3 371 437 36 100 - Irrigation: Misc. Common Area 101 - Irrigation: Misc. Wet Wells/Vaults 5,304 5 2 3,183 4,371 707 849 1 1 424 874 275 340 - Irrigation: Pumps Pump Stations #1 thru #4 420 - General Repairs/Upgrades Common Area Planters & Shrubs 421 - General Repairs/Upgrades Pump House #2 Landscaping Project[nr:1] 6,500 1 1 3,250 6,695 2,104 5,304 5 2 3,183 4,371 707 3,490 1 0 3,490 0 0 422 - General Repairs/Upgrades Pump House #4 Landscaping Project[nr:1] 500 - Tree Maintenance Common Area Trees 18500 - Lakes / Ponds 4,500 1 1 2,250 0 1,456 5,304 5 1 4,244 5,464 687 8,190 1 0 8,190 0 0 13,976 1 1 6,988 0 4,523 2,234 3 2 745 1,534 497 2,122 10 17 118 129 122 36,178 6 12 2,783 3,105 2,493 1,061 3 1 707 1,093 229 530 3 1 354 546 114 500 - Light Poles Common Area Street Lights 510 - Mailboxes Residential Mailboxes 520 - Fire Hydrants Common Area 04000 - Structural Repairs 910 - Building Maintenance Pump Station #1 18000 - Landscaping 330 - Aeration Heads / Diffusers Pump House #2 Aeration System[nr:1] 800 - Reconstruction Stream Bed Renovation[nr:1] 20000 - Lighting 200 - Street Lights 39 Common Area (25%) 205 - Street: Poles & Fixtures Common Area 30000 - Miscellaneous 230 - Mailboxes 162 Residential Mailboxes (50%)[nr:2] 31000 - Reserve Study 100 - 3 Year Update with Site Visit Full Reserve Study 32000 - Undesignated 100 - Miscellaneous Miscellaneous Components 1646 04/01/2013 December 31 Version 4/1/2013 9:35:27 AM © Browning Reserve Group 2013 31 Banbury Meadows Homeowners' Association Schedule of Supplementary Information for AuditorComponent Method 2012 Update - 2 Prepared for the 2013 Fiscal Year Current Repl. Cost Reserve Component Useful Remaining Life Life 2012 Fully Funded Balance [A] 119,589 Totals Percent Funded 1646 04/01/2013 December 31 Version 4/1/2013 9:35:27 AM © Browning Reserve Group 2013 2013 Fully Funded Balance 2013 Line Item Contribution based on Cash Flow Method [B] 61,032 31,694 [EndBal] [EndBal] [A] [B] 109% 232% 15,575 32 Section XI Banbury Meadows Homeowners' Association Glossary of Reserve Study Terms 2012 Update - 2 Prepared for the 2013 Fiscal Year Terms & Definitions CAI CASH FLOW METHOD: A method of developing a Reserve Funding Plan where contributions to the Reserve fund are designed to offset the variable annual expenditures from the Reserve fund. Different Reserve Funding Plans are tested against the anticipated schedule of Reserve expenses until the desired Funding Goal is achieved. COMPONENT INVENTORY: The task of selecting and quantifying Reserve Components. This task can be accomplished through on-site visual observations, review of association design and organizational documents, a review of established association precedents, and discussion with appropriate representative(s) of the association or cooperative. COMPONENT METHOD: A method of developing a Reserve Funding Plan where the total contribution is based on the sum of contributions for individual components. See “Cash Flow Method. COMPONENT: The individual line items in the Reserve Study, developed or updated in the Physical Analysis. These elements form the building blocks for the Reserve Study. Components typically are: 1) Association responsibility, 2) with limited Useful Life expectancies, 3) predictable Remaining Useful Life expectancies, 4) above a minimum threshold cost, and 5) as required by local codes. CONDITION ASSESSMENT: The task of evaluating the current condition of the component based on observed or reported characteristics. CURRENT REPLACEMENT COST: See “Replacement Cost." DEFICIT: An actual (or projected) Reserve Balance less than the Fully Funded Balance. The opposite would be a Surplus. EFFECTIVE AGE: The difference between Useful Life and Remaining Useful Life. Not always equivalent to chronological age, since some components age irregularly. Used primarily in computations. FINANCIAL ANALYSIS: The portion of a Reserve Study where current status of the Reserves (measured as cash or Percent Funded) and a recommended Reserve contribution rate (Reserve Funding Plan) are derived, and the projected Reserve income and expense over time is presented. The Financial Analysis is one of the two parts of a Reserve Study. 1646 04/01/2013 12uwo4.4.68-460:nad.ukn Version 4/1/2013 9:35:27 AM © Browning Reserve Group 2013 33 Banbury Meadows Homeowners' Association Glossaryof Reserve Study Terms 2012 Update - 2 Prepared for the 2013 Fiscal Year FULLY FUNDED BALANCE (FFB): Total Accrued Depreciation. An indicator against which Actual (or projected) Reserve balance can be compared. The Reserve balance that is in direct proportion to the fraction of life “used up” of the current Repair or Replacement cost. This number is calculated for each component, then summed together for an association total. Two formulae can be utilized, depending on the provider’s sensitivity to interest and inflation effects. Note: Both yield identical results when interest and inflation are equivalent. FFB = Current Cost X Effective Age / Useful Life or FFB = (Current Cost X Effective Age / Useful Life) + [(Current Cost X Effective Age / Useful Life) / (1 + Interest Rate) ^ Remaining Life] [(Current Cost X Effective Age / Useful Life) / (1 + Inflation Rate) ^ Remaining Life] FULLY FUNDED: 100% Funded. When the actual (or projected) Reserve balance is equal to the Fully Funded Balance. FUND STATUS: The status of the reserve fund as compared to an established benchmark such as percent funding. FUNDING GOALS: Independent of methodology utilized, the following represent the basic categories of Funding Plan goals: Baseline Funding: Establishing a Reserve funding goal of keeping the Reserve cash balance above zero. Full Funding: Setting a Reserve funding goal of attaining and maintaining Reserves at or near 100% funded. Statutory Funding: Establishing a Reserve funding goal of setting aside the specific minimum amount of Reserves required by local statues. Threshold Funding: Establishing a Reserve funding goal of keeping the Reserve balance above a specified dollar or Percent Funded amount. Depending on the threshold, this may be more or less conservative than “Fully Funding." FUNDING PLAN: An association’s plan to provide income to a Reserve fund to offset anticipated expenditures from that fund. FUNDING PRINCIPLES: Sufficient Funds When Required Stable Contribution Rate over the Years Evenly Distributed Contributions over the Years Fiscally Responsible LIFE AND VALUATION ESTIMATES: The task of estimating Useful Life, Remaining Useful Life, and Repair or Replacement Costs for the Reserve components. PERCENT FUNDED: The ratio, at a particular point of time (typically the beginning of the Fiscal Year), of the actual (or projected) Reserve Balance to the Fully Funded Balance, expressed as a percentage. PHYSICAL ANALYSIS: The portion of the Reserve Study where the Component Inventory, Condition Assessment, and Life and Valuation Estimate tasks are performed. This represents one of the two parts of the Reserve Study. 1646 04/01/2013 12uwo4.4.68-460:nad.ukn Version 4/1/2013 9:35:27 AM © Browning Reserve Group 2013 34 Banbury Meadows Homeowners' Association Glossaryof Reserve Study Terms 2012 Update - 2 Prepared for the 2013 Fiscal Year REMAINING USEFUL LIFE (RUL): Also referred to as “Remaining Life” (RL). The estimated time, in years, that a reserve component can be expected to continue to serve its intended function. Projects anticipated to occur in the initial year have “zero” Remaining Useful Life. REPLACEMENT COST: The cost of replacing, repairing, or restoring a Reserve Component to its original functional condition. The Current Replacement Cost would be the cost to replace, repair, or restore the component during that particular year. RESERVE BALANCE: Actual or projected funds as of a particular point in time that the association has identified for use to defray the future repair or replacement of those major components which the association is obligated to maintain. Also known as Reserves, Reserve Accounts and Cash Reserves. Based upon information provided and not audited. RESERVE PROVIDER: An individual that prepares Reserve Studies. RESERVE STUDY: A budget planning tool which identifies the current status of the Reserve fund and a stable and equitable Funding Plan to offset the anticipated future major common area expenditures. The Reserve Study consists of two parts: the Physical Analysis and the Financial Analysis. RESPONSIBLE CHARGE: A reserve specialist in responsible charge of a reserve study shall render regular and effective supervision to those individuals performing services which directly and materially affect the quality and competence rendered by the reserve specialist. A reserve specialist shall maintain such records as are reasonably necessary to establish that the reserve specialist exercised regular and effective supervision of a reserve study of which he was in responsible charge. A reserve specialist engaged in any of the following acts or practices shall be deemed not to have rendered the regular and effective supervision required herein: 1. The regular and continuous absence from principal office premises from which professional services are rendered; expect for performance of field work or presence in a field office maintained exclusively for a specific project; 2. The failure to personally inspect or review the work of subordinates where necessary and appropriate; 3. The rendering of a limited, cursory or perfunctory review of plans or projects in lieu of an appropriate detailed review; 4. The failure to personally be available on a reasonable basis or with adequate advance notice for consultation and inspection where circumstances require personal availability. SPECIAL ASSESSMENT: An assessment levied on the members of an association in addition to regular assessments. Special Assessments are often regulated by governing documents or local statutes. SURPLUS: An actual (or projected) Reserve Balance greater than the Fully Funded Balance. See “Deficit.” USEFUL LIFE (UL): Total Useful Life or Depreciable Life. The estimated time, in years, that a reserve component can be expected to serve its intended function if properly constructed in its present application or installation. The above terms and definitions are from the Community Associations Institute (CAI) national standards. 1646 04/01/2013 12uwo4.4.68-460:nad.ukn Version 4/1/2013 9:35:27 AM © Browning Reserve Group 2013 35 Banbury Meadows Homeowners' Association Glossaryof Reserve Study Terms 2012 Update - 2 Prepared for the 2013 Fiscal Year Terms & Definitions BRG Browning Reserve Group reserve studies use several terms that are unique to our reports. Our specialized systems have been developed to offer flexibility in many areas of our reporting. Please see below for definitions of abbreviations and symbols used in many of our reserve studies. NR-1 (LIMITED RECURRENCE, 1 TIME): This signifies a major reserve component recurs for only a fixed umber of cycles. Most often used to display a cost in a specific year only, NR-1 signifies the component only occurs one time. An NR -2 means the component will display for two cycles and so on. This makes it easy to enter one -time costs that pop up from time to time, or to display a cost that may be unique at one replacement date only. SE-2 (SPREAD EVENLY OVER 2 YEARS): This signifies the major component, when replaced is spread evenly over 2 or more years. For example if a component will be replaced in year 8 of the study, and there is a SE-2, then the component will be replaced over 2 years, year 8 and year 9. Although the component is split over 2 or more years, each subsequent year will increase by the study’s inflation factor. An SE -3 signifies the component is split over three years and so on. NSE-2 (SPREAD NON-EVENLY OVER 2 YEARS): Similar to above, but the spread is not equal in each year. The spread is entered at a different amount for each year in the spread. The total of the spread will always equal 100% of the total replacement cost, excluding inflation. % (PERCENT TO INCLUDE): This signifies that the component is being replaced at less than 100 percent of its replacement cost or quantity. Perhaps a component is replaced partially at each replacement year. Another example would be to do a small portion of the work at each replacement year. Oftentimes wood fencing is replaced over several cycles, and the study will display a percentage of the fence at each replacement cycle. DELAYED START (REMAINING LIFE GREATER THAN USEFUL): In many instances a component's replacement cycle may not begin immediately, so the replacement cycle start is delayed. Delay is accomplished by setting the remaining life greater than the useful life. ZERO REMAINING LIFE: Zero remaining life signifies that the component is replaced in the year which the study is prepared. All replacements are reflected in their replacement year, and the year in which the study is prepared is no different than any other year. 1646 04/01/2013 12uwo4.4.68-460:nad.ukn Version 4/1/2013 9:35:27 AM © Browning Reserve Group 2013 36 Banbury Meadows Homeowners' Association Idaho Member Summary 2012 Update - 2 Prepared for the 2013 Fiscal Year April 01, 2013 This is a summary of the Reserve Study that has been performed for Banbury Meadows Homeowners' Association, (the "Association"). This study was done in compliance with applicable professional standards and is being provided to you, as a member of the Association, as prescribed under these standards. A complete Reserve Study copy is available (through the Association) for review by members of the Association. The intention of the Reserve Study is to forecast the Association's ability to repair or replace major components as they wear out in future years. This is done utilizing the "Cash Flow Method." This is a method of developing a reserve funding plan where the contributions to the reserve fund are designed to offset the variable annual expenditures from the reserve fund. Browning Reserve Group prepared this Update w/o Site Visit Review for the January 1, 2013 - December 31, 2013 fiscal year. Banbury Meadows Homeowners' Association is a Planned Development with a total of 321 Lots. At the time this summary was prepared, the assumed long-term before-tax interest rate earned on reserve funds was Zero% per year, and the assumed long-term inflation rate to be applied to major component repair and replacement costs was 3.0% per year. The Reserve Study is not an engineering report, and no destructive testing was performed. The costs outlined in the study are for budgetary and planning purposes only, and actual bid costs would depend upon the defined scope of work at the time repairs are made. Also, any latent defects are excluded from this report. Funding Assessment Based on the 30 year cash flow projection, the Association's reserves appear adequately funded as the reserve fund ending balances remain positive throughout the replacement of all major components during the next 30 years. Idaho statute imposes no reserve funding level requirements nor does it address funding level adequacy, and although one or more of the reserve fund percentages expressed in this report may be less than one hundred percent, those percentages do not necessarily indicate that the Association's reserves are inadequately funded. 1646 04/01/2013 12uwo4.4.68-460:n Version 4/1/2013 9:35:27 AM © Browning Reserve Group 2013 1 Banbury Meadows Homeowners' Association Idaho Member Summary 2012 Update - 2 Prepared for the 2013 Fiscal Year Current Replacement Cost Reserve Component 2,122 02000 - Concrete 03000 - Painting: Exterior 04000 - Structural Repairs 21,393 530 18000 - Landscaping 31,252 18500 - Lakes / Ponds 22,166 4,356 20000 - Lighting Useful Life Remaining Life 2012 Fully Funded Balance 2013 Fully Funded Balance 2013 Line Item Contribution based on Cash Flow Method 5-5 7-7 265 312 205 6-10 0-4 20,488 2,763 1,419 10-10 3-3 371 437 36 1-5 0-2 20,023 21,775 5,936 15,178 0 4,523 863 1,663 619 2,783 3,105 2,493 1-1 0-1 3-10 2-17 30000 - Miscellaneous 36,178 6-6 12-12 31000 - Reserve Study 1,061 3-3 1-1 707 1,093 229 530 3-3 1-1 354 546 114 $61,032 $31,694 $15,575 $66,711 $73,584 32000 - Undesignated Totals $119,589 Estimated Ending Balance Percent Funded 1646 04/01/2013 12uwo4.4.68-460:n Version 4/1/2013 9:35:27 AM © Browning Reserve Group 2013 109.3% 232.2% $12.13 /Lot/quarter @ 321 2