PFF Project Portfolio - Plastic Fusion Fabricators, Inc

Transcription

PFF Project Portfolio - Plastic Fusion Fabricators, Inc
800-356-1480
•
256 852-0378
•
256 852-0388 fax
GEOMEMBRANE LINERS, GEOSYNTHETIC SYSTEMS & FLOATING COVERS FOR LAGOONS
Floating covers for odor control.
Floating cover with gas extraction system.
www.plasticfusion.com
1
Your Total Containment Resource™
GEOMEMBRANE LINERS, GEOSYNTHETIC SYSTEMS & FLOATING COVERS FOR LAGOONS
Solid waste liner installation.
Landfill closure with HDPE & other geosynthetics.
Specialized Geomembrane liner installations for secondary containment.
2
800-356-1480
•
256 852-0378
•
256 852-0388 fax
CONCRETE PROTECTIVE LINERS
Concrete protective liner custom fabricated structures.
Pump bases installed with lined trenches.
Pump bases with secondary containment.
Prefabricated double-contained sump liners.
www.plasticfusion.com
3
Your Total Containment Resource™
CONCRETE PROTECTIVE LINERS
INDUSTRIAL WASTEWATER SUMPS
Polypropylene pipe penetration.
Form tie caps welded to liner.
tie caps
Liner system with beam pockets.
4
Field fabrication services.
Project Report
Industrial wastewater neutralization plant
Installation of 5mm HDPE tank concrete protective liners.
2 each Equalization tank liners - 25’w x 25’l x 17.5’d • 2 each neutralization tanks - 10’w x 10’l x 17.5’d
Total - 7,000 square feet
View of project with plastic cover to
maximize welding environment.
Floor slab was poured and internal forms were placed.
Oversized pre-fabricated concrete protective
liner panels were placed on forms.
Internal view of wall. After concrete was poured and
cured, the forms were removed. The liner panels were
then welded together and all tie holes were capped.
Screeds were formed and poured in floor.
Strips of concrete protective liner were
then placed on the screeds.
Concrete was placed and screeded.
Liner was not installed in the floor at this time.
Floor elevation is approx. 3” below finished elevation.
www.plasticfusion.com
5
Project Report Continued
Industrial wastewater neutralization plant
Installation of 5mm HDPE concrete protective liners
2 each Equalization tank liners - 25’w x 25’l x 17.5’d • 2 each neutralization tanks - 10’w x 10’l x 17.5’d
Total - 7,000 square feet
Floor panels were placed between screeds. Plywood
was placed on panels and concrete blocks were used to
keep the panels in place until the concrete cured.
Floor panels were prepared for welding in the areas
where they intersected on top of the screed strips.
Welding of floor panels.
Floor sloped to a sump. This photo shows a
closeup of the wall and floor weld.
3455 Stanwood Blvd.
•
256 852-0378
• Closeup of pipe penetrations • Closeup of welded
seams between panels and wall tie caps.
(All welds are spark tested to ensure the liner system’s integrity.)
6
Huntsville, Alabama 35811
•
256 852-0388 fax
www.plasticfusion.com
Project Report
Tank process area containment – concrete protective liners
Installation of 5mm HDPE non-skid floor, trench and sump liners.
Approximately 2,500 square feet of lined area.
Tank pad fabricated from HDPE plate.
Process area non-skid floor lining.
Lined trench with lined floor and acid brick tie-ins.
www.plasticfusion.com
7
Project Report
Tank process area containment – concrete protective liners
Installation of 5mm HDPE non-skid floor, trench and sump liners.
Approximately 2,500 square feet of lined area.
Lined sump.
Fabricated handrail base plates
Non-skid floor liner
Floor and sump with fabricated HDPE gutter.
Process area with equipment installed.
8
Project Report
Pre-cast concrete pump station
Installation of a double contained embedded HDPE concrete protective liner
6’ 0” diameter x 25’ 4” deep.
Fabricated HDPE manhole liners.
Manhole tops.
The double contained pre-fabricated CPL cylinders are
shown here ready for shipment to the concrete precaster.
Close-up view of structure with HDPE
valve & pipe penetrations connected.
Foam disks were placed in penetration areas to block out concrete when poured.
The secondary liner is extrusion welded and a
2”cap strip is extrusion welded to the primary liner.
View of penetrations from structure interior.
A non-destructive vacuum test was performed on the annular space
between the primary and secondary liners to ensure system integrity.
www.plasticfusion.com
9
Your Total Containment Resource™
DOUBLE CONTAINED TRENCH LINER SYSTEMS
Shop fabricated trench liners.
Leak detection
monitoring pipe.
Formed liner system installation.
10
Liner system cast in place.
Fabric faced
concrete
protective liner
seat for floor
coating tie-in.
Field welding and testing.
800-356-1480
•
256 852-0378
•
256 852-0388 fax
TRENCH LINER INSTALLATION
Pouring grout around formed liner system.
Final grout placement.
Copper
sheathing
for spark
test.
Trench liner joint preparation.
Extrusion welding of trench sections.
Spark testing welded sections.
www.plasticfusion.com
11
Your Total Containment Resource™
CONCRETE PROTECTIVE LINER CUSTOM FABRICATED STRUCTURES
PRE-FABRICATED TRENCHES
Pre-fabrication of sloped trenches with grating seats.
Pre-fabricated trench system layout for quality control.
12
800-356-1480
•
256 852-0378
•
256 852-0388 fax
FABRICATED HDPE MANHOLES
Manhole for acid sewer.
Manhole section with ladder for landfill.
Pre-fabricated manholes for landfill sludge system.
Landfill sludge dewatering system with perforated
piling and perforated HDPE header.
www.plasticfusion.com
13
Your Total Containment Resource™
FABRICATED HDPE MANHOLES
120”x 90” double-contained HDPE pump station.
Leachate collection system.
Custom fabricated HDPE stuctures.
14
CUSTOM FABRICATED HDPE STRUCTURES
HDPE fabricated distribution header box.
HDPE specialized fabrication centrifugal separator.
FABRICATED STRUCTURES
PVC fabricated tanks.
Reinforced free standing polypropylene tank.
POLYPROPYLENE TANKS
www.plasticfusion.com
15
CONTAINMENT PIPE
Pre-fabricated dual containment pipe.
Dual containment pipe assembly with spacer.
Single and dual wall fabricated pipe fittings.
FIELD FUSION SERVICES
Leachate force main.
16
Landfill slope risers.
Your Total Containment Resource™
3455 Stanwood Blvd. • Huntsville, Alabama 35811
800-356-1480 • 256 852-0378 • 256 852-0388 fax
www.plasticfusion.com
www.plasticfusion.com