mmk-atakas 2.4-mtpy minimill complex for hot and cold
Transcription
mmk-atakas 2.4-mtpy minimill complex for hot and cold
MMK-ATAKAS 2.4-MTPY MINIMILL COMPLEX FOR HOT AND COLD ROLLED, GALVANIZED, AND COATED PRODUCTS 2011 The most modern and flexible minimill complex for flat products in the Mediterranean region Danieli is the sole supplier of technological equipment for this state-of-the-art 2.4-Mtpy minimill complex, that includes an electric arc furnace, a ladle furnace, a vacuum degasser, a thin slab caster, a hot strip mill, a continuous pickling line, a cold rolling mill, a hot dip galvanizing line, and a color coating line. Others 33.4% Danieli 66.6% In the last five years, out of nine orders for new Thin Slab Casters placed worldwide, six have been awarded to Danieli. DANIELI FLEXIBLE VERTICALCURVED THIN SLAB CASTER DANIELI FLEXIBLE THIN SLAB ROLLING LAYOUT > The Original vertical curved for the highest productivity. > Innovative: for the highest flexibility in selecting the steel grade mix. > Front Runner: including all the technical features for the highest surface and internal quality. > Now at the Fourth Generation to maintain the gap with the competition. > Edger: to improve strip edge quality and width control. > Separation of the mill in roughing unit and finishing unit. > Crop shear: to improve rolling stability. > Intermediate cooling: for thermo-mechanical rolling (i.e. API grades). > Water descaler (380 bar): to improve strip quality. A strip thickness below 1.4 mm was already reached after 2 months from plant startup, starting from 70 mm slab thick. The 2.4-Mtpy flat products minimill complex is the first installation of the Thin Slab process route in Turkey and the most powerful electric arc furnace ever built in the world. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 5 Scrap yard Steel meltshop WTP for steelmaking plant Fume dedusting plant Main electrical substation Thin Slab Caster Tunnel furnace Hot Strip Mill WTP for Hot Strip Mill Continuous Pickling Line Cold Reversing Mill Hot Dip Galvanizing Line Colour Coating Line WTP for Cold Mill Complex 3 2 6 14 7 9 4 1 13 8 11 10 12 PROJECT MILESTONES / GROUNDBREAKING CEREMONY On March 15th, 2008, MMK-Atakas, a joint venture between Russian Magnitogorsk Iron & Steel Works (MMK) and Turkish Atakas, officially inaugurated the site of the new 2.4-Mtpy steel complex. According to the contract signed between MMK Atakas A.S. and Danieli, the latter is the main contractor for the supply of technological equipment and engineering, as well as supervision of installation and training of personnel for both production sites in Iskenderun and Istanbul. Amongst the numerous authorities that attended the event, were Mr. Redgep Atakas, Chief Executive Atakas Group, Turkey; Mr. Viktor Filippovich Rashnikov, CEO and major shareholder of MMK, Russia; Mr. Nazim Ekren, Deputy Prime Minister of Turkey; Mr. Gianpietro Benedetti, President and CEO, Danieli; Mr. Ivanovskiy Vladimir Evgenievich, Russian Ambassador; Mr. L. Levante, Italian Consul. The groundbreaking ceremony was opened by Mr. Atakas, who addressed a warm welcome to all authorities and distinguished guests. He emphasized that, with this project, MMK-Atakas is the largest private investor in Turkey with an equal Turkey and Russian capital. PROJECT MILESTONES / OFFICIAL STARTUP Thanks to close cooperation between the Danieli and MMK-Atakas teams, an extraordinary job was successfully accomplished with the production of first coils processed on the continuous pickling line and rolled on the two-stand cold reversing mill in October 2010. Construction of the hot part of the complex (meltshop, Thin Slab Caster and hot strip mill) progresses according to schedule. On January 15, 2010, MMK Atakas has produced its first color-coated coil at its new works in Iskenderun. Flat Products Complex Milestones On April 17, 2010, MMK Atakas successfully produced the first galvanized coil on the new hot dip galvanizing line supplied by Danieli. Startup 0.2-Mtpy CCL January 2010 Startup 0.45 Mtpy HDGL April 2010 Startup 1.2 Mtpy CPL October 2010 Startup 0.75-Mtpy CRM October 2010 Startup 2.4-Mtpy Meltshop March 2011 Startup 2.4-Mtpy TSC April 2011 Startup 2.4-Mtpy HSM May 2011 PROJECT MILESTONES / OFFICIAL OPENING CEREMONY On March 9 2011, MMK Atakas staged the Opening Ceremony of the new 2.4-Mt Electric Arc Furnace steel complex. Attending the solemn ceremony was prime minister of the Turkish Republic, Mr. Recep Tayyip Erdogan; the chairman of board of directors of MMK Mr. Victor Filippovich Rashnikov; the head of Atakas Mr. Recep Atakas; Mr. Gianpietro Benedetti, the President and CEO of Danieli; Mr. Vladimir Evgenievich Ivanovskiy, Russian Ambassador; Mr Igor Di Bernardini, Italian Consul, together with all authorities and distinguished guests. DANIELI YEAR 2011