mmk-atakas 2.4-mtpy minimill complex for hot and cold

Transcription

mmk-atakas 2.4-mtpy minimill complex for hot and cold
MMK-ATAKAS
2.4-MTPY MINIMILL COMPLEX
FOR HOT AND COLD ROLLED,
GALVANIZED, AND COATED PRODUCTS
2011
The most modern
and flexible
minimill complex
for flat products
in the Mediterranean
region
Danieli is the sole supplier of technological equipment
for this state-of-the-art 2.4-Mtpy minimill complex,
that includes an electric arc furnace, a ladle furnace,
a vacuum degasser, a thin slab caster, a hot strip mill,
a continuous pickling line, a cold rolling mill,
a hot dip galvanizing line, and a color coating line.
Others
33.4%
Danieli
66.6%
In the last five years, out of nine orders
for new Thin Slab Casters placed worldwide,
six have been awarded to Danieli.
DANIELI
FLEXIBLE
VERTICALCURVED THIN
SLAB CASTER
DANIELI
FLEXIBLE
THIN SLAB
ROLLING
LAYOUT
> The Original vertical
curved for the highest
productivity.
> Innovative:
for the highest
flexibility in selecting
the steel grade mix.
> Front Runner:
including all the
technical features
for the highest surface
and internal quality.
> Now at the Fourth
Generation
to maintain the gap
with the competition.
> Edger: to improve
strip edge quality
and width control.
> Separation
of the mill in roughing
unit and finishing unit.
> Crop shear: to improve
rolling stability.
> Intermediate cooling:
for thermo-mechanical
rolling (i.e. API grades).
> Water descaler
(380 bar): to improve
strip quality.
A strip thickness below
1.4 mm was already
reached after 2 months
from plant startup,
starting from 70 mm
slab thick.
The 2.4-Mtpy
flat products minimill
complex is the first
installation of the
Thin Slab process route
in Turkey and the most
powerful electric
arc furnace ever built
in the world.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
5
Scrap yard
Steel meltshop
WTP for steelmaking plant
Fume dedusting plant
Main electrical substation
Thin Slab Caster
Tunnel furnace
Hot Strip Mill
WTP for Hot Strip Mill
Continuous Pickling Line
Cold Reversing Mill
Hot Dip Galvanizing Line
Colour Coating Line
WTP for Cold Mill Complex
3
2
6
14
7
9
4
1
13
8
11
10
12
PROJECT MILESTONES / GROUNDBREAKING CEREMONY
On March 15th, 2008, MMK-Atakas,
a joint venture between Russian
Magnitogorsk Iron & Steel Works (MMK)
and Turkish Atakas, officially
inaugurated the site of the new
2.4-Mtpy steel complex.
According to the contract signed
between MMK Atakas A.S. and Danieli,
the latter is the main contractor
for the supply of technological
equipment and engineering,
as well as supervision of installation
and training of personnel for both
production sites in Iskenderun
and Istanbul.
Amongst the numerous authorities
that attended the event, were
Mr. Redgep Atakas, Chief Executive
Atakas Group, Turkey;
Mr. Viktor Filippovich Rashnikov,
CEO and major shareholder
of MMK, Russia; Mr. Nazim Ekren,
Deputy Prime Minister of Turkey;
Mr. Gianpietro Benedetti,
President and CEO, Danieli;
Mr. Ivanovskiy Vladimir Evgenievich,
Russian Ambassador;
Mr. L. Levante, Italian Consul.
The groundbreaking ceremony
was opened by Mr. Atakas,
who addressed a warm welcome
to all authorities and distinguished
guests. He emphasized that,
with this project, MMK-Atakas
is the largest private investor
in Turkey with an equal Turkey
and Russian capital.
PROJECT MILESTONES / OFFICIAL STARTUP
Thanks to close cooperation between the Danieli
and MMK-Atakas teams, an extraordinary job
was successfully accomplished with the production
of first coils processed on the continuous pickling line
and rolled on the two-stand cold reversing mill
in October 2010. Construction of the hot part
of the complex (meltshop, Thin Slab Caster and hot
strip mill) progresses according to schedule.
On January 15, 2010, MMK Atakas has produced
its first color-coated coil at its new works in Iskenderun.
Flat Products Complex Milestones
On April 17, 2010, MMK Atakas successfully produced
the first galvanized coil on the new hot dip galvanizing
line supplied by Danieli.
Startup 0.2-Mtpy CCL
January 2010
Startup 0.45 Mtpy HDGL
April 2010
Startup 1.2 Mtpy CPL
October 2010
Startup 0.75-Mtpy CRM
October 2010
Startup 2.4-Mtpy Meltshop
March 2011
Startup 2.4-Mtpy TSC
April 2011
Startup 2.4-Mtpy HSM
May 2011
PROJECT MILESTONES / OFFICIAL OPENING CEREMONY
On March 9 2011, MMK Atakas staged the Opening
Ceremony of the new 2.4-Mt Electric Arc Furnace
steel complex.
Attending the solemn ceremony was prime minister
of the Turkish Republic, Mr. Recep Tayyip Erdogan;
the chairman of board of directors of MMK
Mr. Victor Filippovich Rashnikov; the head of Atakas
Mr. Recep Atakas; Mr. Gianpietro Benedetti,
the President and CEO of Danieli; Mr. Vladimir
Evgenievich Ivanovskiy, Russian Ambassador;
Mr Igor Di Bernardini, Italian Consul, together with
all authorities and distinguished guests.