P6172 (Ver A3)-DVTA10 -
Transcription
P6172 (Ver A3)-DVTA10 -
Industrial LCD Monitor Series Design Verification Test Report PANEL6172 (Ver. A3) Rev : A1.0 Release Date : 03/Feb/2005 Test Engineer : Ric Lu Reviewed : Jason Wu PREPARE BY: AXIOMTEK CO., LTD 5F. 2, LANE 235, PAO CHIAO ROAD, HSIH TIEN, TAIPEI HSIEN, TAIWAN, R.O.C. TEL : 886-2-29174550 FAX: 886-2-29147454 Table of Contents RELEASE HISTORY..............................................................................................................................1 SUMMARY OF DVT RESULTS ...........................................................................................................2 CHAPTER 1 FUNCTION TESTING ...................................................................................................1 I. II. BASIC FUNCTION......................................................................................................................................1 OSD CONTROL FUNCTION .......................................................................................................................1 CHAPTER 2 VIDEO CHIPSET COMPATIBILITY TESTING .......................................................3 CHAPTER 3 TOUCHSCREEN COMPATIBILITY TESTING .......................................................4 I. II. CPU CARD & MAINBOARD COMPATIBILITY TEST ..................................................................................4 OS(OPERATING SYSTEM) COMPATIBILITY TEST.....................................................................................5 CHAPTER 4 RELIABILITY ................................................................................................................6 I. II. OPERATING TEMPERATURE AND HUMIDITY TEST...................................................................................6 TEMPERATURE/THERMAL PROFILE TEST ..............................................................................................10 CHAPTER 5 VIBRATION TESTING ...............................................................................................12 I. EUT TEST ....................................................................................................................................................13 II. TEST EQUIPMENT .......................................................................................................................................13 III. TEST CONDITION .......................................................................................................................................13 IV. TEST CRITERIA .........................................................................................................................................14 V. TEST RESULT..............................................................................................................................................14 CHAPTER 6 DROP TESTING ...........................................................................................................17 I. EUT TEST ....................................................................................................................................................17 II. TEST EQUIPMENT .......................................................................................................................................17 III. TEST STANDARD & METHOD....................................................................................................................17 IV. PACKING CONDITION ................................................................................................................................17 V. DROPPING CONDITION ...............................................................................................................................17 VI. TEST CRITERIA .........................................................................................................................................18 VII. TEST RESULT ...........................................................................................................................................18 APPENDIX1:APPROVDE PROBLEM SUMMARY .......................................................................1 Release History Report Version : A1.0 1. New product(First Edition) Test Report Summary Of DVT Results Test Item Description Test Result Function testing PASS Video Chipset Compatibility testing PASS TouchScreen Compatibilty testing PASS Reliability Include PASS (1).Temp/Humidity test (2).Temp/Thermal measure Vibration test PASS Drop test PASS Note:Product meeting the DVT requirement should not have any “Fatal” or “Serious” problem remaining opened. 2 P6172 Ver. A3 Test Report CHAPTER 1 Function Testing I. Basic Function NUM Approve Item Test Result PASS FAIL N/A 1 DC-IN CON(+12V) 9 2 VGA-IN(D-Sub 15Pin) 9 3 Power LED 9 4 Power Switch 9 5 Touch Screen (D-Sub 9Pin) 9 Remark II. OSD Control Function A. OSD Control Button NUM Approve Item Test Result PASS FAIL N/A 1 Menu Button 9 2 SEL+Button 9 3 SEL-Button 9 4 Menu Exit 9 Remark B.Monitor Control Function NUM Approve Item Test Result PASS FAIL N/A 1 RRIGHTNESS 9 2 CONTRAST 9 3 PHASE 9 4 CLOCK 9 5 H-POSITION 9 6 V-POSITION 9 7 COLOR TEMPERATURE 9 8 LANGUAGE 9 P6172 Ver. A3 Remark 1 Test Report 9 OSD DURATION 9 10 RESET 9 C.COLOR TEMPERATURE NUM Approve Item Test Result PASS FAIL N/A 1 65000°K 9 2 7500°K 9 3 9300°K 9 4 R:50 9 5 G:50 9 6 B:50 9 Remark D.LANGUAGE NUM 2 Approve Item Test Result PASS FAIL N/A 1 ENGLISH 9 2 FRANCAIS 9 3 DEUTSCH 9 4 ESPANOL 9 5 ITALIANO 9 6 Traditional Chinese 9 7 Simple Chinese 9 8 Japanese 9 Remark P6172 Ver. A3 Test Report CHAPTER 2 Video Chipset Compatibility Testing Vender Chipset Chip part Number Test Result PASS FAIL N/A Remark C&T 69000 9 SBC82630 SMI SM712G4 9 SBC82400 ATI Rage XL 9 SBC81871 MobilityRadeon M6 9 SBC81821 GX1(Integrated) 9 SBC84510 815E(Integrated) 9 SBC8168 845GV 9 SBC81822 855GM 9 SBC83810 855GM 9 SBC81870 865G 9 SBC81826 865G 9 SBC81827 Twister 9 SBC81613 Twister 9 SBC82610 Twister 9 SBC82631 Twister 9 SBC83675 VIA VT8601T 9 SBC81610 NVIDLA Geforce2 MX-400 9 GIGABYTE SIS SIS 651 9 GA-8S1MLH ASUS Intel 815E(Integrated) 9 CUSL2 NS AXIOMTEK Intel S3 ELSA Note:All models are tested under Windows XP pro or DOS (QA+ 5.64) A. Start OS,open windows,move windows,shutdown windows B. Test all Resolution P6172 Ver. A3 3 Test Report CHAPTER 3 Touchscreen Compatibility Testing I. CPU Card & Mainboard Compatibility Test Vender AXIOMTEK ASUS EPX GIGAByte VIA Model Test Result PASS FAIL N/A SBC82630 9 SBC81871 9 SBC81821 9 SBC84510 9 SBC8168 9 SBC81822 9 SBC83810 9 SBC81870 9 SBC81826 9 SBC81827 9 SBC81613 9 SBC82610 9 SBC82631 9 SBC83675 9 SBC81610 9 CUSL2 9 P4S8X 9 P4B-533 9 8RDA+ 9 GA-8SIMLH 9 P4PB 9 Remark Note:All models are tested under Windows XP pro 4 P6172 Ver. A3 Test Report II. OS(Operating System) Compatibility Test O.S Version Result Status MS-Windows98-SE 4.10.2222 PASS Function MS-Windows Me 4.90.300 PASS Function Ms-Windows NT V4.01(SP6A) PASS Function 5.00.2195(SP4) PASS Function PASS Function PASS Function Ms-Windows Professional 2000 Ms-Windows-XP 2002 (SP2) Professional Ms-Windows-Server 2003 2003 Enterprise Red Hat Linux P6172 Ver. A3 V.9.0 N/A 5 Test Report CHAPTER 4 Reliability I. Operating Temperature and Humidity Test System Configuration: Item Description Item Description Model P6172 Ver. A3 System Board SBC83810 Rev. A2 DRAM Transcend 256MB DDR 333 (SAMSUNG K4H560838D-TCB3) System BIOS A12.1F.0 HDD Seagate ST340014A (40GB) Keyboard ACER 101 key Mouse Logitech M-CAA43 Power Seasonic SS-300FS Supply Test Equipment Temperature & Humidity Chamber KING SON INSTRUMENT TECH Co., LTD Model:THS-D4C-150 S/N:2361 Date of Calibration:07/July/2004 Test Ambience Temperature:19℃ ~ 27℃ Humidity:54 ~ 64 % (RH) Test Condition Condition (1): Temperature:-5℃ ~ 45℃ Humidity:40% (RH) Condition (2):Temperature:40℃ Humidity:90% (RH) Run HCT 10.0 under Windows XP pro 6 P6172 Ver. A3 Test Report Humidity 1Hr 40%RH Time // 10%RH No Humidity Temperature 45℃ 11Hr 1 Hr 1Hr 11Hr 25℃ Time -5℃ Condition (1) Humidity 1Hr 90%RH 5Hr 1Hr Time 5Hr 10%RH Temperature 40℃ 1 Hr 11Hr 1Hr 11Hr 25℃ Time Condition (2) Number of Cycle P6172 Ver. A3 7 Test Report P6172 (Ver. A3) with Elo Touch Screen: Condition (1):2 cycles (Total Time:48 hours) Condition (2):2 cycles (Total Time:48 hours) Test Criteria During and after the test: 1. Electrical Function: (1) The system must function normal 2.Appearance and mechanical function: (1)No mold speckle. (2)No unclear letter,broken line. (3)No letters or symbols on cabinet are missing (4)No stiffness or squeak for buttons when pressed (5)No warp or rust for metal parts Test Result ■ PASS Electrical function and appearance&mechanical function were normal.:. □ FAIL : __________________________________________________________ Figure 4-1: P6172 (Ver. A3) Operating Temp/Humidity test 8 P6172 Ver. A3 Test Report Figure 4-2: P6172 (Ver. A3) Operating Temp/Humidity test P6172 Ver. A3 9 Test Report II. Temperature/Thermal profile Test System Configuration Item Description Item Description Model P6172 Ver. A3 System Board SBC83810 Rev. A2 DRAM System BIOS A12.1F.0 HDD Transcend 256MB DDR 333 (SAMSUNG K4H560838DTCB3) Seagate ST340014A (40GB) Keyboard ACER 101 key Mouse Logitech M-CAA43 Power Seasonic SS-300FS Supply Test Equipment: Temperature & Humidity Chamber KING SON INSTRUMENT TECH Co., LTD Model:THS-D4C-150 S/N:2361 Date of Calibration:07/July/2004 Temperature Record YOKOGAWA Model:UR1800 Date of Calibration: 19/Feb/2004 Test Condition: Chamber Temp:40℃ Test program:Speedy under Windos XP pro Time:24 hrs. Dynamic Burn-In Test Criteria The measured temperature for each point must meet the components spec. 10 P6172 Ver. A3 Test Report Test Result: Item Temperature(40℃) Air temp for L1 (A / D board) point # 01 61.8 Tcase for C2 (A / D board) 68.9 Tcase for C3 (A / D board) 63.3 Tcase for U2 (APL1084)(A / D board) 67.0 Tcase for Novatek NT68521EF (A / D board) (Add Heat sink) 78.7 Tcase for Novatek WT68F63L (A / D board) 64.2 Tcase for point # 02 46.0 Tcase for Q4 (Inverter) 71.0 Tcase for Q7 (Inverter) 72.1 Tcase for Adapter 48 Tcase for 2J46 (Touch controller) 48.8 Air temp for point # 03 50.8 Air temp for point # 04 46.4 Tcase for point # 05 61.0 Air temp for point # 06 68.0 Air temp for point #07 42.7 Air temp for point #08 43.7 ■ PASS: The PANEL6172 Ver. A3 meets the profile test P6172 Ver. A3 11 Test Report Point #02 Point #04 Point #05 Point #01 Point #03 Point #06 Point #08 Point #07 Figure 4-3 : P6172 Ver. A3 Interior view & Measure point Figure 4-4 : Temperature / Thermal profile test CHAPTER 5 Vibration Testing 12 P6172 Ver. A3 Test Report I. EUT Test Model: P6172 Ver. A3 with ELO Touch Screen II. Test Equipment Vibration Simulator System KING DESIGN Co., LTD Model: KD-9363EM-300F2K-30N80 S/N: 9Y103059387 Date of Calibration: 19/July/2004 III. Test Condition Vibration Mode: Random Vibration PSD(Power spectral density) break point : Frequency(Hz) PSD Level (G2/Hz) 5 0.016 200 0.016 500 0.00258 Overall Level Grms : 2.25 Grms Direction: X, Y, Z Axis Test Time: 1 hour for each Axis PSD Level(G2/Hz) Overall Level Grms :2.25 Grms 0.016 -6dB/Oct 0.00258 5Hz P6172 Ver. A3 200Hz 500Hz Frequency Herztz 13 Test Report Top Z axis Y axis X axis Front Panel IV. Test Criteria After the test: Electrical Function: Test all function and boot to OS (Windows XP professional) 2. Appearance and mechanical function: (1) The EUT should not suffer permanent deformation or fracture. (2) No fixed part or assembly shall be loosening (3) No moving or movable part of an assembly should become free or sluggish in the testing process (4) No movable part should shift in setting ,position or adjustment. 1. V. Test Result ■PASS: Electrical function and appearance&mechanical function were normal. □FAIL : 14 P6172 Ver. A3 Test Report Figure 5-1: P6172 Ver. A3 Package Vibration test for Y axis Figure 5-2: P6172 Ver. A3 Package Vibration test for X axis P6172 Ver. A3 15 Test Report Figure 5-3: P6172 Ver. A3 Package Vibraiton test for Z axis 16 P6172 Ver. A3 Test Report CHAPTER 6 Drop Testing I. EUT Test Model: P6172 Ver.A3 with ELO Touch Screen II. Test Equipment Drop Simulator System KING DESIGN Co., LTD Model: KD128 S/N: 9V103059487 III. Test Standard & Method Federal Standard 101C Method 5007.1 Testing procedure B&C IV. Packing Condition Weight: 10.93Kg Dimension: 61cm x 56 cm x 21 cm V. Dropping Condition Height: 76cm Dropping direction: 10 directions (1 corner, 3 edges, 6 faces) P6172 Ver. A3 17 Test Report 1: Top 6: Far end 2: Right side 4: Left side 5: Near end 3: Buttom Packaging drop sequence of the total 10 times dropping test: 1. The 2-5-3Corner 6. The Right side face 2. The 2-3 Edge 7. The Bottom face 3. The 2-5 Edge 8. The Top face 4. The 3-5 Edge 9. The Near end face 5. The Left side face 10. The Far end face VI. Test Criteria After the test: 1. Electrical Function:Test all function 2.Appearance and mechanical function: (1) No scratch. (2) No dent (3) No crack (4) No mold speckle. (5) No warp for metal parts (6) No slack(e.g. screw loose (7) No fixed part or assembly shall be loosening (8) No moving or movable part of an assembly should become free or sluggish in the testing process (9) No movable part should shift in setting ,position or adjustment. (10) No severe cracks to cushion (11) No severe damage to carton box VII. Test Result ■PASS: Electrical function and appearance&mechanical function were normal. □FAIL : 18 P6172 Ver. A3 Test Report Figure 6-1: P6172 Ver. A3 Package Dropping Test for the 2-5-3 Corner Figure 6-2: P6172 Ver. A3 Package Dropping Test for the 2-3 Edge P6172 Ver. A3 19 Test Report Figure 6-3: P6172 Ver. A3 Package Droping Test for the buttom face 20 P6172 Ver. A3 Test Report APPENDIX1:Approvde Problem Summary Revised Date:27/Jan/2005 Model Name:P6172 Hardware Revision: BIOS Revision: Test Engineer:Ric Lu Problem Problem Problem ID level Status P6172 Ver. A3 Operating System Problem Description Problem Solution 1