EIED EIED EIED - Sharif MBA Students Forum

Transcription

EIED EIED EIED - Sharif MBA Students Forum
(
)
EIED
[email protected]
EIED
EIED
.
.
ISO9001:2000
.
.
.
.
2
1
) BSC
(
EIED
.
.
.
:
.
Energy Industry Engineering & Design,
Balanced Score Card
PDF created with pdfFactory trial version www.pdffactory.com
Developing a System for Assessment of Project Management
Processes in the Project-based Organization (Case study)
S.Ghobadia, A.Shakerib, M.Ashtaric,R.Khosravinasrd
a
Ph.D. candidate of Industrial Engineering, M&M Supervisor,EIED
Ph.D. candidate of Industrial Engineering, R&D Supervisor,EIED
c
MSc in Industrial Engineering, QM Manager,EIED
d
BSc Student of Industrial Engineering, AzadUniversity, BONAB branch
b
Abstract:
Performance assessment is the main tool for proofing proper execution of the organization s
strategy and reach to its goals. In the other word, an organization cannot go through its strategy
and reach to its goals, without a strategy-based performance assessment system. This system
will ensure management about effectiveness of implemented procedures by providing
appropriate analysis on fid-backs of operations. Based on ISO 9001:2000, the organization shall
apply suitable methods for monitoring, and where applicable, measurement of the quality
management system processes. These methods shall demonstrate the ability of the processes to
achieve planed results.
In Energy Industries Engineering & Design (EIED) Company, which is a project-based
organization, it is decided to design a system for measurement and assessment of project
management processes performance on the basis of Balanced Sore-card (BSC), then the
designed system is used as a methodology for identification organizational goals and plans.
Based on BSC, organizational goals are categorized in to four categories named financial, client,
processes and learning and growth. After that, we implemented a systematic approach for
measuring of reached goals. A set of techniques have been used to analyze data collected on
operations and identification of weak organizational areas. Finally, improvement projects are
defined based on theses weaknesses.
Keywords:
Balanced Scorecard(BSC), Strategy, Policy, Monitoring & Measurement, Project Management,
Project-based Organization.
PDF created with pdfFactory trial version www.pdffactory.com
.
.
.
.
.
6
5
4
3
.
.
:

.

.
(
)
(

)
.

7
.
.
.
ISO9001:2000
.
.
.
Management Quality
Decision Quality
Processes Performance
Organizational Perception
Performance Measurement Systems (PMS)
PDF created with pdfFactory trial version www.pdffactory.com
.
.
.
80
.
BSC ENAPS SMART
.
.
.
.
.
.
BSC
) 8BSC
(
BSC
.
.
BSC
BSC .
.
.
.
.
BSC .
.

.
.

.
.

.
.
.
...

.
.
Balanced Score Card
PDF created with pdfFactory trial version www.pdffactory.com
/
-
9
:]
.
-1
-2
-3
-4
-5
-6
-7
-8
.
.
.
.
(
).
(
).
(
(
).
).
-9
-
PDF created with pdfFactory trial version www.pdffactory.com
.
BSC
EIED
.
.
.
.
.
[
)
(
(
)
-
PDF created with pdfFactory trial version www.pdffactory.com
(...
)
PDF created with pdfFactory trial version www.pdffactory.com
-
:
BSC
.
(EIED)
.
EIED
.
.
.
:
.1
.
.2
/
.
.3
.
.4
.
.5
.
.
:
-1
-2
(
) 9 AHP
-3
. Analysis Hierarchy Procss
PDF created with pdfFactory trial version www.pdffactory.com
-4
:
.
-5
Target
:
.
.
(
-6
)
:
Milestone
-
"
.
"
.
.
:
"
"
2
.
:
(
(
.1
.2
:
(
( 1-1
( 2-1
( 2-2
(
)
(
:
(SS)
(1
:
"
/
.
(
"
:
2
(
.1
.2
:
(
(
)
PDF created with pdfFactory trial version www.pdffactory.com
( 1-1
( 2-1
( 3-1
( 1-2
( 2-2
(
)
(
:
(1
(2
(3
(4
.
.
.
.
.
.
(MO)
.
11
(ME) 10
.
.
.
.
.
.
.
.
.
.
. Measurement
. Monitoring
PDF created with pdfFactory trial version www.pdffactory.com






:
.
.1
.2
.3
EIED
.1
"
"
.
.2
.
(
12
)
.
.
.
2
.
.1-2
.
.
.2-2
ISO9001:2000
"
14
13
_
"
)
.
(
.
Benchmarking
. Engineering
. Procurement
. Construction
. Site supervision
PDF created with pdfFactory trial version www.pdffactory.com
16
15
.3
(
)
.
6
.
/
/
"
.
"
.
:

.
.

.
.

S
S
.
.

.

.
.
.
/
/
.
.
.
PDF created with pdfFactory trial version www.pdffactory.com
.
1. Robert S. Kaplan & David Norton, The Balanced Scorecard, Translating Strategy into
Action , Harvard Business Scholl Press , 1990
2. Project Management Institute (2004). A Guide to the Project Management Body of
Knowledge (PMBOK Guide) Third Edition. Newtown Square, PA: Project Management
Institute.
3. Project Management Institute (2004). Organizational Project Management Maturity
Model(OPM3) , Newtown Square, PA: Project Management Institute.
4. Bititci , U.S.,Turner , T ., and , Begemann , C .,
Dynamics of Performance
Measurement systems , International Journal of operation & Production Management
, vol , 20 no.6 , 2000 , 692-704.
5. Chennell , F.A ., Dransfield , S.B , Field , J.B ., Fisher, N.I, ounders , I.W ,and , show
, D.E., OPM , A system for Organizational Performance , Measurement Presented at
Performance Measurement Post , Present , and future , University of Cambridge ,
19-21 , July 2000 .
6. Clark , L.A ., JR ., Development, Application, and , evaluation of organizational
Performance measurement system Virginia polytechnique , PH.D. Thesis ,1995
7. Curtright, J.W., Stolp-Smith, S.C., and Edell, E.S.,
Strategic Performance
Management: Development of a Performance Measurement System at the Mayo
clinic , journal of Healthcare Management 45: 1 January February 2000, 58-68.
8. Joanee Ferreiro & Coleen Hunter, Using Strategic Planning to Describe and Achieve Your
Organizations Future , Micaword.com,2001.
9. Anonymous,
Measuring and Rewarding Performance , International Journal of
Retail and Distribution Management , winter 1993 ,
10. Glidewell, Don. The Three Dimensional Matrix An Evolution In Project
Management. Project Management Institute 1996 Proceedings.
11. William E. Skimin . A Process-Based Model for Project Planning and
Management , Integrated Management Systems, Inc, 1997.
12. Alaa M. Ghalayini, James S. Noble*. Thomas J. Crowe
An integrated dynamic
Performance measurement System for improving manufacturing. competitiveness
international journal of Production economics (25July 1996)
13. Mark d. green using gap analysis to meet performance objectives and identify key
strategic initiatives
journal of strategic performance measurement October /
November 1999 v3 n5.
14. Recardo, R., The Strategic Focus: The Context for all Performance measurement ,
Journal of strategic performance measurement August /September 1999, 12-20.
15. Torbett, R., Salter, A.J. Gann, D.M., and, Hobday, M., Design Performance
Measurement in the construction sector: A Pilot study, Electronic Working paper
series submitted to IEEE Transactions of Engineering Management , SPRU, April
2001,1-47.
PDF created with pdfFactory trial version www.pdffactory.com
(
)
PDF created with pdfFactory trial version www.pdffactory.com
-
-
PDF created with pdfFactory trial version www.pdffactory.com
-
PDF created with pdfFactory trial version www.pdffactory.com
PDF created with pdfFactory trial version www.pdffactory.com