Untitled
Transcription
Untitled
Central Ohio Transit Authority Board of Trustees Appointment City of Columbus City of Columbus City of Columbus City of Reynoldsburg City of Bexley City of Columbus City of Columbus Franklin County City of Columbus City of Westerville City of Whitehall Franklin County City of Columbus Dawn Tyler Lee, Chair J. Cleve Ricksecker, Vice Chair William A. Anthony, Jr. James E. Daley Mabel G. Freeman, Ph.D. James E. Kunk Gina Ormond Harry W. Proctor Jean Carter Ryan Craig P. Treneff Richard R. Zitzke Vacant Vacant Administration President/CEO Vice President, Planning & Service Development Vice President, Human Resources Vice President, Operations Vice President, Legal Affairs/General Counsel Interim Vice President, Finance/CFO Vice President, Communications Prepared by Central Ohio Transit Authority Planning Department Staff Michael L. Bradley, Vice President April 2015 W. Curtis Stitt Michael L. Bradley Kristen M. Treadway Clinton B. Forbes Marchelle E. Moore Jeffrey S.Vosler Robert M. Stutz 2015 – 2019 Short-Range Transit Plan Table of Contents Table of Contents Introduction .................................................................. 1-1 1 1.1 Purpose of the Short-Range Transit Plan.................................................................. 1-1 1.1.1 Goals of the Plan ................................................................................................1-1 1.1.2 Stakeholders .......................................................................................................1-2 1.2 Transit System Review ............................................................................................. 1-2 1.3 The Long-Range Transit Plan and NextGen process ................................................ 1-4 1.4 Transportation Improvement Program (TIP) .............................................................. 1-5 1.4.1 Operating Summary of the SRTP and TIP ..........................................................1-5 1.4.2 Capital Summary of the SRTP and TIP ...............................................................1-7 2 Overview of Public Transit in the Columbus Metropolitan Statistical Area ....................................... 2-1 2.1 COTA Vision, Mission, and Stakeholders.................................................................. 2-1 2.1.1 Vision ..................................................................................................................2-1 2.1.2 Mission ...............................................................................................................2-1 2.2 COTA History............................................................................................................ 2-2 2.3 Organizational Structure ........................................................................................... 2-3 2.4 Historical Ridership Trends and Local Funding Efforts .............................................. 2-3 2.4.1 2.5 3 Current Funding ..................................................................................................2-5 Transit Market in the Columbus Metropolitan Statistical Area ................................... 2-5 Planning Context .......................................................... 3-1 3.1 Changes in Central Ohio ........................................................................................... 3-1 3.2 2012 – 2035 Long-Range Transit Plan (LRTP) ......................................................... 3-4 3.2.1 3.3 4 LRTP Public Input ...............................................................................................3-4 NextGen Plan ........................................................................................................... 3-5 Standards for Service Design ....................................... 4-1 4.1 Current Standards Overview ..................................................................................... 4-1 4.2 Route and Schedule Design Standards .................................................................... 4-2 Central Ohio Transit Authority i 2015 – 2019 Short-Range Transit Plan Table of Contents 4.2.1 Service Categories..............................................................................................4-2 4.2.2 Route Directness Standards ...............................................................................4-3 4.2.3 Route Variations .................................................................................................4-4 4.2.4 Hours of Operation .............................................................................................4-4 4.2.5 Minimum Service Hours Guideline ......................................................................4-4 4.2.6 Service Frequency ..............................................................................................4-5 4.2.7 Load Standards ..................................................................................................4-6 4.2.8 On-time Performance..........................................................................................4-6 4.2.9 Missed Trips .......................................................................................................4-7 4.3 Route Performance and Evaluation .......................................................................... 4-7 4.3.1 Productivity and Economic Standards ...............................................................4-16 4.3.2 Potential Actions ...............................................................................................4-17 4.3.3 Implementation Process ...................................................................................4-23 4.3.4 Other Considerations ........................................................................................4-23 4.4 Data Collection and Service Change Process ......................................................... 4-24 4.5 Transit System Review Recommended Standards ................................................. 4-25 4.5.1 Principles ..........................................................................................................4-25 4.5.2 New Service Types ...........................................................................................4-26 4.5.3 Assigning Categories to Line Segments............................................................4-27 4.5.4 Alignment of Categories with Service Purpose..................................................4-28 4.5.5 Structure of Standards ......................................................................................4-29 4.5.6 Monitoring Service and Addressing Deficiency .................................................4-34 4.5.7 COTA Evaluation of TSR Service Standards Recommendations ......................4-37 4.6 Bus Stop Design Guide ........................................................................................... 4-37 4.6.1 Purpose ............................................................................................................4-37 4.6.2 Goals ................................................................................................................4-38 4.7 Bus Stop Spacing Guidelines .................................................................................. 4-39 4.8 Bus Stop Inventory and ADA Improvements ........................................................... 4-40 4.9 Title VI Adherence and Environmental Justice ........................................................ 4-41 Central Ohio Transit Authority ii 2015 – 2019 Short-Range Transit Plan Table of Contents 5 Current Fixed-Route Service ........................................ 5-1 5.1 Current COTA System .............................................................................................. 5-1 5.1.1 Fixed-Route Service ...........................................................................................5-1 5.2 Key Operating Statistics ............................................................................................ 5-6 5.3 Rider Characteristics................................................................................................. 5-6 6 Planned Fixed-Route System ........................................ 6-1 6.1 Service Investment Strategy ..................................................................................... 6-3 6.2 Developing the Proposed Bus Network ..................................................................... 6-4 6.3 Planned Implementation ........................................................................................... 6-5 6.3.1 Planned Park & Ride Changes ...........................................................................6-6 6.4 CMAX Cleveland Avenue Bus Rapid Transit (2017) ............................................... 6-15 6.5 Short-Range Transit Plan Public Outreach ............................................................. 6-20 6.5.1 7 Public Involvement and Implementation ............................................................6-21 COTA Fixed-Route Bus Fleet ........................................ 7-1 7.1 Active Fleet ............................................................................................................... 7-1 7.2 Fleet Spare Ratio ...................................................................................................... 7-1 7.3 Future Bus Purchases .............................................................................................. 7-1 7.4 Funding of Future Bus Purchases ............................................................................. 7-2 7.5 The COTA Contingency Fleet Plan ........................................................................... 7-5 7.6 Air Quality Improvement Programs and Alternative Fuels ......................................... 7-6 7.6.1 Conversion to Compressed Natural Gas (CNG)..................................................7-7 7.6.2 Hybrid Electric Diesel Buses ...............................................................................7-8 7.7 Fleet Maintenance Objectives ................................................................................... 7-8 7.8 Other Equipment ..................................................................................................... 7-10 7.8.1 8 Non-Revenue Vehicles .....................................................................................7-10 Mobility Services .......................................................... 8-1 8.1 Mainstream Paratransit Services .............................................................................. 8-1 8.2 Functional Ability Assessments ................................................................................. 8-4 8.3 Mainstream Paratransit Fleet .................................................................................... 8-5 Central Ohio Transit Authority iii 2015 – 2019 Short-Range Transit Plan Table of Contents 8.4 Development of Alternative Mobility Service Delivery Options .................................. 8-8 8.4.1 Will Call Program ................................................................................................8-8 8.5 Community Involvement............................................................................................ 8-8 8.6 Mobility Advisory Board ............................................................................................ 8-9 8.7 Future Paratransit Service Activities ......................................................................... 8-9 8.8 Accessible Fixed-Route Services ............................................................................ 8-10 8.9 Mobility Services and Transportation Coordination ................................................. 8-10 8.9.1 Potential Mobility Management Service Options ...............................................8-10 8.9.2 Travel Training ..................................................................................................8-11 9 COTA Transit Service Initiatives .................................. 9-1 9.1 Connecting to Outlying Employment Centers ............................................................ 9-1 9.2 Bus on Shoulder (BOS) Program .............................................................................. 9-1 9.3 Bicycles and Transit .................................................................................................. 9-2 9.4 Academic Pass Programs ......................................................................................... 9-3 9.5 Employer Pass Programs ......................................................................................... 9-4 9.5.1 Future Employer Pass Programs Plans ..............................................................9-4 9.6 Special Events .......................................................................................................... 9-4 9.7 Passenger Information .............................................................................................. 9-5 9.7.1 COTA Customer & Quality Service .....................................................................9-6 9.7.2 cota.com .............................................................................................................9-6 9.7.3 Automatic Vehicle Annunciators..........................................................................9-7 9.7.4 Service Change Public Meetings and other Public Communications...................9-8 9.7.5 Planning and Community Outreach Public Meetings...........................................9-8 10 COTA Facilities ........................................................... 10-1 10.1 Bus Storage, Maintenance and Administrative Office Facilities ............................... 10-1 10.1.1 Administrative Offices and Retail Pass Sales Center ........................................10-1 10.1.2 McKinley Avenue – Bus Storage, Maintenance, and Customer Service Call Center Facility ..........................................................................................................10-2 10.1.3 1333 Fields Avenue – Bus Storage and Maintenance Facility ...........................10-5 Central Ohio Transit Authority iv 2015 – 2019 Short-Range Transit Plan Table of Contents 10.1.4 1330 Fields Avenue – Mainstream and Eligibility Assessment Facility ..............10-5 10.1.5 1325 Essex Avenue – Street and Remote Maintenance Facility .......................10-7 10.2 Transit Center, Bus Layover Facilities ..................................................................... 10-8 10.2.1 Linden Transit Center - 1394 Cleveland Avenue ...............................................10-8 10.2.2 Easton Transit Center – 4260 Stelzer Road ......................................................10-9 10.2.3 Easton Daycare Facility – 4242 Stelzer Road .................................................10-10 10.2.4 Near East Transit Center – 1125 East Main Street .........................................10-10 10.2.5 Proposed Northern Lights Area Transit Center/Park & Ride............................10-11 10.3 Downtown Express Terminals ............................................................................... 10-13 10.3.1 Spring Street Terminal – 33 West Spring Street..............................................10-13 10.3.2 COTA Transit Terminal – 25 East Rich Street .................................................10-13 10.4 Park and Ride Lots ............................................................................................... 10-14 10.4.1 Recent Park and Ride Development ...............................................................10-19 10.4.2 Future Park and Ride Development ................................................................10-20 10.5 Passenger Shelters............................................................................................... 10-21 10.5.1 Shelter Site Selection Process ........................................................................10-21 10.5.2 Downtown Shelters .........................................................................................10-22 10.5.3 Downtown Transit Stations .............................................................................10-23 10.6 11 Bus Stop Signs ..................................................................................................... 10-23 Intelligent Transportation Systems (ITS) ................... 11-1 11.1 Computer Aided Dispatch/Automatic Vehicle Location ............................................ 11-3 11.2 Onboard Automated Stop Announcements ............................................................. 11-4 11.3 Traveler Information Systems ................................................................................. 11-4 11.4 Electronic Fare Collection ....................................................................................... 11-5 11.5 Automated Passenger Counters ............................................................................. 11-7 11.6 Fleet Maintenance .................................................................................................. 11-7 11.7 Safety and Security ................................................................................................. 11-8 11.8 Transit Signal Priority (TSP) .................................................................................... 11-8 12 Security and Emergency Services ............................. 12-1 Central Ohio Transit Authority v 2015 – 2019 Short-Range Transit Plan Table of Contents 12.1 Passenger and Facility Security .............................................................................. 12-1 12.1.1 Special duty officers and unmarked cruisers .....................................................12-2 12.1.2 Homeland Security............................................................................................12-2 12.1.3 Identicard proximity readers ..............................................................................12-3 12.1.4 Closed Circuit Television Cameras (CCTV) ......................................................12-3 12.1.5 Park and Ride Security .....................................................................................12-4 12.1.6 Other security devices ......................................................................................12-4 12.1.7 Contracted security guards ...............................................................................12-5 12.1.8 Evacuation transportation group .......................................................................12-5 12.1.9 Mobile Emergency Operations Center (EOC) ...................................................12-6 12.2 Other Emergency Services Coordination ................................................................ 12-7 12.3 Other Security Initiatives ......................................................................................... 12-7 12.4 Ohio Public Transit Association Security Subcommittee ......................................... 12-7 12.5 Capital Crossroads Special Improvement District (SID) .......................................... 12-8 13 Administrative Support Staff ...................................... 13-1 13.1 Division of Human Resources and Labor Relations ................................................ 13-1 13.1.1 Recruitment/Retention ......................................................................................13-1 13.1.2 Compensation and Class Structure...................................................................13-2 13.1.3 Employee Recognition ......................................................................................13-3 13.1.4 Affirmative Action Plan ......................................................................................13-3 13.1.5 Biometrics Program ..........................................................................................13-4 13.1.6 Benefits/Wellness Initiatives..............................................................................13-5 13.1.7 Safety ...............................................................................................................13-6 13.1.8 Training and Employee Development ...............................................................13-7 13.1.9 Labor Relations.................................................................................................13-9 13.2 Division of Legal ................................................................................................... 13-10 13.3 Department of Supply Management ...................................................................... 13-10 13.3.1 Procurement ...................................................................................................13-10 13.3.2 Disadvantaged Business Enterprise (DBE) Program ......................................13-11 Central Ohio Transit Authority vi 2015 – 2019 Short-Range Transit Plan Table of Contents 13.3.3 Small Business Development Program (BDP) ................................................13-12 13.4 Department of Information Technology ................................................................. 13-13 13.5 Quality Assurance ................................................................................................. 13-13 14 2016-2019 Transportation Improvement Program (TIP) .............................................................. 14-1 14.1 Background............................................................................................................. 14-1 14.2 Operating Plan ........................................................................................................ 14-1 14.3 Local Funding ......................................................................................................... 14-2 14.4 Capital Plan ............................................................................................................ 14-3 14.5 Major Capital Projects ............................................................................................. 14-3 14.5.1 Bus Replacement and Expansion .....................................................................14-4 14.5.2 CMAX Cleveland Avenue BRT .........................................................................14-5 14.5.3 Non-Revenue Vehicles .....................................................................................14-5 14.5.4 Facility Construction Projects ............................................................................14-5 14.5.5 Strategic Investments – Park and Rides and Turnaround Locations .................14-6 14.5.6 Other Strategic Investments..............................................................................14-7 14.5.7 Intelligent Transportation Systems (ITS) ...........................................................14-7 14.5.8 Bus Stop Shelter and Transit Enhancements ....................................................14-8 14.6 Financial Summary ................................................................................................. 14-8 Central Ohio Transit Authority vii 2015 – 2019 Short-Range Transit Plan Table of Contents List of Tables Table 4-1 Major Local Route Productivity (September 2014 Trimester)................................. 4-18 Table 4-2 Local Route Productivity (September 2014 Trimester) .......................................... 4-19 Table 4-3 Crosstown Route Productivity (September 2014 Trimester) .................................. 4-20 Table 4-4 LINK Route Productivity (September 2014 Trimester) ........................................... 4-20 Table 4-5 Express Route Productivity (September 2014 Trimester) ...................................... 4-21 Table 4-6 Reverse-Commute Express Route Productivity (September 2014 Trimester) ....... 4-22 Table 4-7 Potential Actions for Ridership Productivity Ratings .............................................. 4-22 Table 4-8 Service Categories ................................................................................................ 4-26 Table 4-9 Proposed Standards ............................................................................................. 4-29 Table 4-10 Bus Stop Spacing Guidelines .............................................................................. 4-39 Table 5-1 Existing COTA Service as of January 2015 ............................................................. 5-3 Table 5-2 COTA Fare Structure Effective January 1, 2012...................................................... 5-5 Table 6-1 Proposed TSR Frequencies .................................................................................... 6-9 Table 6-2 Existing Park and Ride Locations .......................................................................... 6-13 Table 7-1: Current Roster of Equipment .................................................................................. 7-3 Table 7-2 Active Fleet Bus Replacement Schedule ................................................................. 7-4 Table 7-3 Peak Fleet Utilization 30’/35’/40’ Fixed-Route Buses (Trimester Calendar Year) .... 7-5 Table 7-4: Non-Revenue Vehicle Purchases and Estimated Cost by Year ............................ 7-10 Table 8-1 Mainstream Report for 2013-2014 ........................................................................... 8-3 Table 8-2 Mainstream Fleet Roster as of March 2015 ............................................................. 8-6 Table 8-3 Maninstream Vehicle Replacement Schedule ......................................................... 8-7 Table 10-1: COTA Park & Ride Lots as of March 2015 ....................................................... 10-16 Table 10-2: Average Park & Ride Utilization January 2012 – January 2013 ........................ 10-18 Table 10-3 Planned Park & Rides Locations ....................................................................... 10-21 Table 14-1: Financial Summary ............................................................................................ 14-9 Table 14-2: System Capital Program .................................................................................... 14-9 Central Ohio Transit Authority viii 2015 – 2019 Short-Range Transit Plan Table of Contents List of Figures Figure 1-1 Annualized Service Hours ...................................................................................... 1-6 Figure 2-1 Stakeholder Triangle .............................................................................................. 2-1 Figure 2-2 COTA Organization Table ...................................................................................... 2-3 Figure 2-3 2010 Columbus Metropolitan Statistical Area ......................................................... 2-6 Figure 2-4 COTA Service Area ............................................................................................... 2-1 Figure 3-1 Franklin County and U.S. Unemployment Rates .................................................... 3-2 Figure 3-2 COTA Ridership and Average Ohio Gas Price ....................................................... 3-2 Figure 3-3 Past, Current, and Projected Future Population and Jobs in Central Ohio ............. 3-3 Figure 3-4 NextGen Timeline .................................................................................................. 3-6 Figure 4-1 Major Local Line Productivity ............................................................................... 4-10 Figure 4-2 Local Line Productivity ......................................................................................... 4-11 Figure 4-3 Express Line Productivity ..................................................................................... 4-12 Figure 4-4 Reverse-Commute Express Line Productivity ...................................................... 4-13 Figure 4-5 Crosstown-Line Productivity ................................................................................. 4-14 Figure 4-6 CBUS LINK Line Productivity – 2014 ................................................................... 4-15 Figure 5-1 Fixed-Route Bus .................................................................................................... 5-1 Figure 6-1 SRTP Proposed Network Midday Frequency ......................................................... 6-2 Figure 6-2 TSR Timeline ......................................................................................................... 6-4 Figure 6-3 Current/Proposed High-Frequency Network........................................................... 6-7 Figure 6-4 Proposed Express Network .................................................................................... 6-8 Figure 6-5 Northeast Corridor Study Area ............................................................................. 6-17 Figure 6-6 CMAX Cleveland Avenue ..................................................................................... 6-18 Figure 7-1 CNG-powered fixed route bus ................................................................................ 7-7 Figure 8-1 Assessment Center................................................................................................ 8-4 Figure 9-1 I-70Bus on Shoulder .............................................................................................. 9-1 Figure 9-2 Loading Bicycle on bus .......................................................................................... 9-2 Figure 9-3 Bicycle Racks at COTA Spring Street Terminal ..................................................... 9-2 Figure 10-1 COTA Administrative Offices and Pass Sales Center......................................... 10-1 Central Ohio Transit Authority ix 2015 – 2019 Short-Range Transit Plan Table of Contents Figure 10-2 1600 McKinley Ave. Fixed-Route Bus Storage and Maintenance Facility ........... 10-2 Figure 10-3 COTA’s CNG Fueling Station ............................................................................. 10-4 Figure 10-4 Proposed McKinley Ave. Site Plan ..................................................................... 10-4 Figure 10-5 1333 Fields Avenue COTA Fixed-Route Bus Storage and Maintenance Facility 10-5 Figure 10-6 COTA Mainstream and Eligibility Assessment Facility........................................ 10-6 Figure 10-7 Eligibility Assessment Center ............................................................................. 10-7 Figure 10-8 1325 Essex Avenue Street and Remote Maintenance Facility ........................... 10-8 Figure 10-9 Linden Transit Center......................................................................................... 10-9 Figure 10-10 Easton Transit Center ...................................................................................... 10-9 Figure 10-11 Easton Day Care Center ................................................................................ 10-10 Figure 10-12 Near East Transit Center ............................................................................... 10-10 Figure 10-13 Spring Street Terminal ................................................................................... 10-13 Figure 10-14 COTA Transit Terminal .................................................................................. 10-13 Figure 10-15 COTA Park and Ride Locations as of March 2015 ......................................... 10-15 Figure 10-16 New Albany Park and Ride ............................................................................ 10-19 Figure 10-17 COTA Passenger Shelter and Trash Receptacle ........................................... 10-21 Figure 10-18 Downtown Shelters ........................................................................................ 10-23 Figure 10-19 New Bus Stop Sign ........................................................................................ 10-23 Figure 11-1 Automatic Vehicle Location ................................................................................ 11-1 Figure 11-2 COTA Radio Room ............................................................................................ 11-3 Figure 11-3 Traveler Information ........................................................................................... 11-5 Figure 11-4 Online Trip Planner ............................................................................................ 11-5 Figure 11-5 Electronic Fare Payment .................................................................................... 11-5 Figure 12-1 Police Cruiser .................................................................................................... 12-2 Figure 12-2 Bomb-sniffing Canine Team ............................................................................... 12-2 Figure 12-3 Visible Intermodal Protection Response ............................................................. 12-3 Figure 13-1 Isokinetic Evaluation for the PCE ....................................................................... 13-2 Figure 13-2 Employee being recognized by President/CEO Stitt and VP of Operations, Forbes ............................................................................................................................................. 13-3 Central Ohio Transit Authority x 2015 – 2019 Short-Range Transit Plan Table of Contents Figure 13-3 Biometrics Program ........................................................................................... 13-4 Central Ohio Transit Authority xi 2015 – 2019 Short-Range Transit Plan 1-Introduction 1 Introduction 1.1 Purpose of the Short-Range Transit Plan The Central Ohio Transit Authority (COTA) is the primary provider of public transit services in the central Ohio region. COTA strives to deliver safe, reliable, and cost-effective transportation services to the public. As such, COTA biennially develops a five-year plan known as the Short-Range Transit Plan (SRTP). The SRTP analyzes the transit market in central Ohio and the ability of the current COTA system to serve the market. The SRTP serves as a vital tool to assess COTA’s current operations, describe future transit enhancements, and detail methods for prioritizing expenditures, service, and funding in order to serve the community’s transit needs. As such, this SRTP incorporates COTA’s Transportation Improvement Program (TIP) found in Section 14. The TIP is based on the present and projected four-year service needs of the area and identifies capital needs, cost projections, funding requirements, and programmed service improvements. The service recommendations and policies presented in the SRTP serve to aid in providing a sustainable transportation system for the central Ohio region. The SRTP also fulfills state, federal, and regional reporting requirements, and is an important planning document justifying grant applications to both state and federal governments. 1.1.1 Goals of the Plan Goals for COTA’s planning efforts originated as part of the public engagement process for the 2006 Long-Range Transit Plant (LRTP). The original goals have evolved through public involvement while updating previous SRTPs, as well as the 2012 LRTP. The following goals were established to provide a clear direction for the development of the SRTP: • Provide effective, safe customer-focused transit service; • Provide transportation alternatives to residents with disabilities; • Manage public resources responsibly; • Expand community support for public transportation; and Central Ohio Transit Authority 1-1 2015 – 2019 Short-Range Transit Plan 1-Introduction • Promote environmentally sustainable initiatives. These goals provide direction for COTA when planning future transit service and other initiatives, such as converting the fixed-route bus fleet to compressed natural gas (CNG). 1.1.2 Stakeholders COTA’s commitment to its stakeholders is central to the mission of the agency. COTA’s Mission, below, serves as a guide for agency decision makers to be mindful of how each decision affects COTA’s customers, employees and taxpayers. “The Central Ohio Transit Authority is committed to excellence in serving our stakeholders – customers, employees and taxpayers. We will deliver quality transportation services and conduct business courteously, safely, ethically, and reliably. We will demonstrate leadership that is fiscally responsible and environmentally conscientious.” Through a robust public engagement process the general public, community leaders, local municipalities and other stakeholders directly participate in planning for the future of COTA. 1.2 Transit System Review The backbone of this SRTP’s service plan is derived from the recently conducted Transit System Review’s (TSR) recommendations. Over the last 40 years, the central Ohio region has grown tremendously. This growth is expected to continue; by 2050, the region will add more than 500,000 more residents and 300,000 more jobs 1. COTA recognizes that to better serve the current and nearfuture region its bus network must change and adapt. Since COTA’s formation in 1974, its bus network has grown incrementally, building upon the original network, focusing most of its service on downtown Columbus. However, since the region has changed over the past 40 years, demand for transit has changed. 1 Mid-Ohio Regional Planning Commission. insight2050. www.morpc.org Central Ohio Transit Authority 1-2 2015 – 2019 Short-Range Transit Plan 1-Introduction To meet this evolving demand for transit and ensure that COTA’s resources are being effectively utilized, COTA undertook a strategic review of its system, the TSR, in October of 2013. The TSR analyzed the entire bus system and services, land use changes, the road network, operating budget and the use of technology. The TSR Final Report (November 2014), recommends improvements for positive changes to COTA’s bus service and network over the next three years, taking into consideration the needs of central Ohio residents, riders and businesses. Changes include more weekend service, increased frequencies on crosstown and local lines, seven day a week service to employment centers such as Rickenbacker and Polaris and similar span on most local lines. The service plan and supporting capital plan within this SRTP are based on the recommended changes to COTA’s bus network found within the TSR. A method of allocating service resources between two competing goals, ridership (efficiency) and coverage (service for all), was used to create the proposed bus network. The proposed network allocates 70% of service to high-ridership lines and 30% to coverage lines in areas that are important to connect, such as Rickenbacker and Polaris. In November of 2014, COTA’s board adopted a policy instructing COTA to use the 70/30% split as a guide for implementing and maintaining future service. See Section 6.2 for more details. Operational costs of the proposed bus network plan is estimated to be over the projected amount of service COTA can afford in 2017, after which the total service on the street will be at the highest affordable level. As such, COTA staff is currently modifying the recommendations and will continue modifications during the implementation of the plan to respond to public feedback, operational challenges not fully detailed within the TSR and budget constraints. The service plan, found in Section 6, is the most up to date proposed bus network; however, proposed changes will be brought to the general public and COTA’s stakeholders prior to implementation. Implementation will occur in two phases. The first phase began in January 2015 and will implement changes to service through COTA’s normal service change process every January, May, and September up through January 2017. The second phase, May 2017, will implement changes that include major restructuring of COTA’s network, such as realignments, combining services, and renumbering. Additionally, changes in September 2017 will be reserved for making minor schedule and alignment adjustments to the new network. Central Ohio Transit Authority 1-3 2015 – 2019 Short-Range Transit Plan 1-Introduction The TSR also recommended changes to how COTA operates on streets within downtown Columbus. Currently, COTA staff is evaluating the recommendations and will present a modified plan to the general public and stakeholders in mid-2015. 1.3 The Long-Range Transit Plan and NextGen process As the SRTP prepares for the next five years, COTA’s Long-Range Transit Plan (LRTP) prepares the agency for the next twenty plus years. The LRTP is about vision and long-term goals of the agency; containing less specific details than the SRTP, it allows the SRTP to be flexible as economic and funding conditions change in order to achieve the goals set out in the LRTP. The most recent plan, the 2012 LRTP, created a comprehensive strategy for enhancing public transit in central Ohio through 2035. The 2012 LRTP primarily focuses on enhancing bus service and the CMAX Cleveland Avenue bus rapid transit line, and is constrained by current and projected funding levels. Recognizing that future demand for transit in the region may be greater than what is in the 2012 LRTP, and in conjunction with the Mid-Ohio Regional Planning Commission’s update to the region’s long-range Metropolitan Transportation Plan, COTA has embarked on an initiative to create a community wide vision of the future of public transportation in central Ohio. Named “COTA NextGen”, the effort looks to identify how the aspirations of the public and future growth trends will influence opportunities and demand for public transportation in the next 35 years. The process kicked-off in the fall of 2014 and is being led by a consultant team, Nelson\Nygaard. It will not be limited by mode or restricted by funding, allowing for a visionary and open creative process. A robust public outreach effort will drive the process, leading to a list of potential projects for the region with implementation and creative funding strategies. The final result will be a document for the public highlighting potential projects for the years 2025, 2040, and 2050. The final report is expected to be completed in the second quarter of 2016. These projects will be integrated directly into COTA’s 2016 Long-Range Transit Plan, which is updated every four years. For more information see Section 3.3 or visit www.cota.com/nextgen. Central Ohio Transit Authority 1-4 2015 – 2019 Short-Range Transit Plan 1-Introduction 1.4 Transportation Improvement Program (TIP) With consideration given to the changing economic environment, this SRTP serves as a tool to carefully identify where COTA plans to modify or implement transit resources during 2015-2019. The plan has been updated in response to comments and suggestions received over the past four years from area residents, businesses, government agencies, and other community stakeholders. The 2015-2019 COTA TIP can be found in Section 14. 1.4.1 Operating Summary of the SRTP and TIP Issue 7 was approved by voters in November 2006, and collection of the new tax became effective April 1, 2007. COTA elected to hold its existing, permanent 0.25% tax in abeyance for the remaining nine months of 2007. Actual collection of both COTA levies did not begin until January 1, 2008. Suspending the permanent sales tax was done in order to fulfill a promise to the community to not increase the overall effective sales tax rate in Franklin County. This commitment was made in anticipation of an already planned 0.25% reduction in the sales tax by Franklin County, effective December 31, 2007. Since the passing of the temporary sales tax in 2006, as planned, between 2008 and 2009 COTA expanded service by an additional 60,000 annual hours of service. Following a severe economic recession that began in 2008, in 2010 COTA adjusted the planned annual rate of service expansion from 60,000 hours of operation to approximately 40,000 hours between 2010 and 2012. In 2013, COTA was able to readjust its service expansion in response to unexpected economic growth adding, on average, 60,000 hours annually between 2013 and 2017. As central Ohio continues to grow and develop, COTA will adjust its expansion plan as more service hours become available. Developing areas such as Dublin, the Grandview Yard, Italian Village, and Franklinton generate additional interest in transit and economic growth. In response, additional service hours will be distributed throughout COTA’s service area, which includes Franklin, and small portions of Delaware, Fairfield, Union, and Licking Counties. Central Ohio Transit Authority 1-5 2015 – 2019 Short-Range Transit Plan 1-Introduction Figure 1-1 Annualized Service Hours During 2015-2019, COTA will: • Add 70,000 hours of fixed-route service in 2015. For 2016-2017, COTA will add approximately 58,000 annualized hours of service per year. Due to budget constraints, expansion of service hours will discontinue after 2017. In total, COTA fixed-route service hours will increase by 186,000 hours from 976,000 to 1,162,000 between 2015 and 2017 (19% increase); and • As fixed-route service expansion occurs, COTA will continue to provide “Mainstream” and other alternative mobility related services. Mainstream is estimated to expand on an annual basis by approximately 6% from 2014 service levels. Mainstream is demandresponsive service for persons with disabilities, which limit their ability to use the fixed-route bus system. See Section 8 for more details about mobility services. In 2014, COTA provided approximately 265,000 total trips for persons with disabilities. COTA’s mobility service’s budget is estimated to increase 6% per year between 2015 and 2019. As mentioned in Section 1.2, the TSR proposed changes to the bus network are not finalized. Once COTA staff refines the proposed bus network it will be taken back out to the general public to collect input. See Section 6 for more details. As a result of the proposed service expansion presented in this SRTP, COTA’s projected operating expenses will increase from approximately $117 million in 2014 to $140 million in 2019. Central Ohio Transit Authority 1-6 2015 – 2019 Short-Range Transit Plan 1-Introduction During development of this SRTP, COTA’s initial projections of service hours, conducted in the fall of 2014, were used to plan the service improvements from 2015 to 2019. 1.4.2 Capital Summary of the SRTP and TIP Capital items required for public transit service include vehicles, vehicle maintenance facilities, passenger amenities (such as shelters and benches), transit facilities (e.g., park and rides/transit centers), various hi-tech computer and security related systems, etc. Many capital elements will be required to improve and expand COTA’s transit services over the next five years, including: • Fixed-route buses: The procurement process for ordering and delivery of fixed-route buses takes approximately 12 to 18 months. COTA will purchase 38 buses in 2015, 18 in 2016, 14 in 2017 and 28 per year in 2018 and 2019. Additionally, 14 uniquely branded buses dedicated to the proposed CMAX Cleveland Avenue BRT line will be purchased in 2016. All buses purchased from 2015 to 2019 will be fueled by Compressed Natural Gas (CNG). During this SRTP cycle, the following vehicles will be replaced: • 2015 – Twenty-one 40’ 2001 New Flyers and Four 40’ 2003 New Flyers; • 2016 – Six 40’ 2003 New Flyers, Five 40’ 2004 New Flyers and Ten 35’ 2005 Gilligs; • 2017 – One 35’ 2005 Gillig, Five 40’ 2005 New Flyers, Thirty-two 35’ 2007 Gilligs, Six 30’ 2008 Gilligs; • 2018 – Four 30’ 2008 Gilligs and Twenty-four 40’ 2008 Gilligs; and • 2019 – Five 40’ 2008 Gilligs, Ten 30’ 2009 Gilligs and Thirteen 40’ 2009 Gilligs. In addition to replacement buses, in order to facilitate future growth of COTA’s fixed-route system, COTA’s active fleet will expand each year as follows: • 2015 – Twenty-one to a total of 251 buses in the fleet; and • 2016 – Eleven to a total of 367 buses in the fleet; Central Ohio Transit Authority 1-7 2015 – 2019 Short-Range Transit Plan 1-Introduction • 2017 - Due to the implementation of the TSR, the total active fleet will be reduced from 367 to 332, which includes the CMAX Cleveland Avenue BRT buses. Although the TSR has more service overall, the peak demand is reduced, lowering the total active fleet need. In order to comply with and maintain the federal 20% spare bus ratio limit, COTA will work with Federal Transit Administration (FTA) officials regarding disposal of any vehicles that have not reached the end of their useful life (12 years or 500,000 miles). • COTA will need to replace 92 Mainstream vehicles between 2015 and 2019. An additional eight vehicles will be purchased to support expansion of Mainstream delivery services. • Park and rides/transit centers: COTA will make a significant investment in the design and construction of several park and ride/transit center facilities in order to support express-route service. Locations include: o Winchester Pike and Gender Road to replace the currently leased Park & Ride on Gender Road; o Sawmill Rd. area to replace the Dublin Dale Park & Ride that is being relocated as part of a partnership with the City of Dublin. This site and adjacent sites are part of a plan to redevelop the area; o Northern Lights area park & ride: As part of the proposed CMAX Cleveland Avenue BRT, the current leased Northern Lights Park & Ride site will be relocated to the immediate north of the shopping center; and o Meijer area transit center and park & ride: Also part of the CMAX Cleveland Avenue BRT project, the proposed Meijer area facility will be located near Cleveland Avenue and SR-161. The center is proposed to have an indoor waiting environment with real time bus arrival information. See Section 6.4 for more details. COTA is also proposing the following capital projects: • CMAX Cleveland Avenue Bus Rapid Transit (BRT) - BRT offers a variety of tools to help increase the speed and convenience of transit service and improve mobility, including: o o o o o Traffic signal priority; Fewer stops than traditional local routes; Uniquely branded and designed stations and vehicles; Real-time passenger information; and Improved pedestrian amenities. Central Ohio Transit Authority 1-8 2015 – 2019 Short-Range Transit Plan 1-Introduction Service will operate in mixed traffic primarily along Cleveland Avenue between downtown Columbus and SR-161 (10.3 miles), with local service continuing north to Polaris Parkway (5.3 miles). The preliminary project cost is $47.7 million. $38.1 million from FTA's Section 5309 New Starts program, 80% of the project cost, has been recommended in President Obama's Fiscal Year 2016 budget. Project benefits include: o o o o o o o o Approximately 21% travel times savings; Projected 15-20% increase in ridership in the first five years; More travel options for transit dependent populations; Improved mobility and reliability in a congested corridor; Improved pedestrian access and safety; Unique branding helps ease of use; Provide next bus arrival time information; and Creates opportunities for economic development within the corridor. During the 2015-2017, COTA will conduct Final Design and construction activities, with operations beginning in May 2017. Please see Section 6.4 for additional details regarding this project. • Buses on Freeway Shoulder Program: In September 2015, COTA anticipates implementation of the second Bus on Shoulder (BOS) Corridor. The BOS program is in partnership with MORPC and the Ohio Department of Transportation. Similar to the existing I-70 corridor between Downtown and SR-256, express buses traveling on I-670 between Downtown and I-270 on the east side of Columbus will be able to merge onto the freeway shoulder to avoid congestion delays. Unlike I-70 which uses the outside (or right) berm, express buses will utilize the inside (or left) berm of I-670 corridor. • McKinley Avenue Facility Renovation: This facility has been undergoing renovations to support CNG vehicles. The facility will be renovated to achieve Leadership in Energy and Environmental Design (LEED) Silver certification standards. Improvements to the facility will, among other benefits, improve energy efficiency, reduce greenhouse gas emission, and improve operational flow efficiencies. CNG fueling stations for buses are operational as of May 2013 and small vehicle fueling stations are planned to be installed. COTA will allow other government entities to fuel vehicles at a specific station. The total cost of the project is estimated to be $97.7 million. See Section 10.1.2 for more details. Central Ohio Transit Authority 1-9 2015 – 2019 Short-Range Transit Plan 1-Introduction • Fields Avenue Bus Storage and Maintenance Facility: During 20172018, COTA plans to begin an upgrade to the Fields Avenue Facility to allow for CNG buses and vehicles to be stored and repaired within the garage. • Mainstream and Eligibility Assessment Center: The facility houses all paratransit operations, administrative offices, vehicle maintenance and repair areas, and an eligibility assessment center. During 20172018, COTA plans to upgrade the facility to support CNG vehicles. While funded in part by a 0.25% permanent sales tax, on December 31, 2016, COTA’s additional 10-year renewable 0.25% sales tax is set to expire. The timing and amount of a sales tax levy to be presented to voters has not yet been determined by COTA’s Board of Trustees. It should be noted that the 2015-2019 SRTP assumes continuation of COTA’s current, renewable sales tax. The SRTP provides the community with a performance and service delivery based approach to meet immediate transit needs while proactively mapping out strategies to provide workable and sustainable transit initiatives for the future. Throughout the implementation of this plan, COTA's Board of Trustees and management staff will continue to work vigorously to provide affordable, cost effective public transit services to the citizens of central Ohio. Central Ohio Transit Authority 1-10 2015-2019 Short-Range Transit Plan 2 – Overview 2 Overview of Public Transit in the Columbus Metropolitan Statistical Area 2.1 COTA Vision, Mission, and Stakeholders 2.1.1 Vision The Central Ohio Transit Authority will be the region’s transportation leader. 2.1.2 Mission The Central Ohio Transit Authority is committed to excellence in serving our stakeholders – customers, employees and taxpayers. We will deliver quality transportation services and conduct business courteously, safely, ethically, and reliably. We will demonstrate leadership that is fiscally responsible and environmentally conscientious. Figure 2-1 Stakeholder Triangle Central Ohio Transit Authority 2-1 2015-2019 Short-Range Transit Plan 2 – Overview 2.2 COTA History In 1970, the Columbus and Southern Ohio Electric Company, the parent corporation of the Columbus Transit Company (CTC), announced its decision to dispose of the bus company. In order to preserve transit in the central Ohio region, a group of citizens formed the Advisory Committee on Transit. One of the Committee's first actions was to lobby the State legislature to permit the formation of regional transit authorities. Once enacted, the next step was the creation of COTA. The agreement creating COTA was authorized by the Franklin County Commissioners and the City Councils of Bexley, Columbus, Gahanna, Grandview Heights, Grove City, Hilliard, Reynoldsburg, Upper Arlington, Westerville, Whitehall, and Worthington. A thirteen member Board of Trustees was created for COTA. The Board of Trustees was composed of eleven trustees appointed by the mayors of the eleven member cities, and two trustees selected by the Franklin County Commissioners. On June 29, 1973, an agreement for COTA to purchase the privately owned bus company from CTC and the Columbus and Southern Ohio Electric Company was signed. The acquisition was effective, and COTA began providing transit service on January 1, 1974. Ridership in the last year of CTC ownership (1973) was 12,975,000 rides total for the entire year. Since COTA began operating in 1974, the system has grown into an integral part of central Ohio’s transportation network. During this time, not only has the City of Columbus continued to grow and prosper, but so have its adjoining suburban communities. At the time of the creation of COTA, Dublin was not an incorporated city. While in 1970 a rural village with a population of 681 people, today the City of Dublin stretches into three counties (Franklin, Delaware, and Union), and boasts over 42,000 residents. Having grown to the second largest city in Franklin County behind Columbus, COTA and Dublin recognized the importance of the growing northwest travel corridor and its impact on the region’s transportation system. In 2008, the agreement creating the Central Ohio Transit Authority was modified to include the City of Dublin as a COTA member city. The Board of Trustees currently consists of thirteen members; seven appointed by the City of Columbus, two appointed by the Franklin County Commissioners, and four city appointed slots rotated among the other member cities. COTA’s existing level of transit service is funded through a 0.5% local sales tax, of which 0.25% is temporary, federal, and state assistance and farebox receipts. Central Ohio Transit Authority 2-2 2015-2019 Short-Range Transit Plan 2 – Overview The majority of the funding (72% as of 2015) is generated from the local sales tax. In 1999, central Ohio voters passed a ballot initiative, which established for the first time a permanent, local funding source for COTA. 2.3 Organizational Structure COTA is organized into six divisions, each of which is managed by a vicepresident. Most divisions have multiple departments managed by directors (Figure 2-2). The President/CEO manages the activities of the organizations and reports to the Board of Trustees, who oversee the activities of the organization, as presented in Section 2.2. Figure 2-2 COTA Organization Table 2.4 Historical Ridership Trends and Local Funding Efforts COTA ridership and service began to grow in the first year of public operation. Ridership reached its peak in 1985 with 26,700,334 passenger trips and 822,289 hours of operation. In 1986 and 1987, work stoppages negatively affected the amount of service provided and ridership. In 1988, the downward trend was reversed as both ridership and service increased. During this same year, COTA went to the taxpayers and requested additional funding in the form of a local sales tax. With the defeat of a local sales tax issue in November of 1988, COTA was required to make significant reductions in service in order to stretch its resources to the November 1989 election. As a result, COTA's ridership dropped in 1989. In November 1989, voters passed a temporary ten-year, 0.25% sales tax that provided the essential local funds to restore the productive service eliminated in 1989 and provide for modest growth in the system. Central Ohio Transit Authority 2-3 2015-2019 Short-Range Transit Plan 2 – Overview In order to provide financial support for the implementation of COTA’s 1995 Expanded Bus Plan, COTA placed an additional 0.25% 10-year temporary sales tax issue on the ballot in November 1995. Following the close defeat of this issue, COTA developed a long-term plan (Vision 2020) which included both expansion of COTA’s bus service and the introduction of commuter and light rail service. Facing the expiration of the 1990 ten-year 0.25% sales tax, COTA sought permanent funding for existing levels of service and additional funding to implement Vision 2020. Two separate 0.25% sales tax issues, Issues 20 and 21 were placed on the November 1999 ballot for voter approval. Issue 20 successfully passed and established for the first time in COTA's history a permanent source of funding; however, Issue 21 did not pass. Strategic partnerships aimed to expand transit service and increase ridership have been formed with many local colleges, universities, social service agencies, and businesses. These partnerships have had a positive impact towards improved transit service in the central Ohio area, however, as the national economy began experiencing a downward trend in 2001, public transit systems across the country, including COTA, experienced dwindling local, state, and federal assistance. Over the following several years, COTA’s yearly budgets were negatively impacted by rapidly increasing healthcare insurance, fuel, and utility costs. During the six-year period from 2001 to 2006, COTA was forced to reduce fixed-route service hours by approximately 25%. In January 2006, in an effort to maintain a balanced and fiscally responsible budget, COTA was forced to raise fixed-route and mobility service bus fares by an average of 12%. As a result, COTA’s fixed-route ridership declined to 14,797,951 passengers in 2006. During these difficult times, COTA recognized that as the region was growing, unmet transportation needs were also increasing throughout the community. In the fall of 2005, COTA began soliciting public and community stakeholder input in order to develop the LRTP. In November 2006, COTA placed before voters a 10year, renewable 0.25% sales tax levy (Issue 7). Issue 7 successfully passed, and effective January 1, 2008, has been combined with COTA’s permanent 0.25% local sales tax approved in 1999. Since the passing of the temporary sales tax in 2006, as planned, between 2008 and 2009 COTA expanded service by an additional 60,000 annual hours of service. Following a severe economic recession that began in 2008, in 2010 COTA adjusted the planned annual rate of service expansion from 60,000 hours Central Ohio Transit Authority 2-4 2015-2019 Short-Range Transit Plan 2 – Overview of operation to approximately 40,000 hours between 2010 and 2012. In 2013, COTA was able to readjust its service expansion in response to unexpected economic growth adding, on average, 60,000 hours annually between 2013 and 2017. 2.4.1 Current Funding COTA receives funding from a permanent 0.25% sales tax and the 10-year renewable 0.25% sales tax. Current funding levels are required in order to continue the planned annual rate of service expansion from 2015 to 2017. On December 31, 2016, the current renewable 0.25% sales tax is set to expire. At the time of development of this document, COTA’s Board of Trustees has not yet decided on the timing or amount of a sales tax levy to be presented to voters prior to December 31, 2016. This document assumes continuation of the ½% sales tax rate through 2019. 2.5 Transit Market in the Columbus Metropolitan Statistical Area The Columbus Metropolitan Statistical Area (MSA) consists of eight counties in central Ohio. The counties include: Delaware, Fairfield, Franklin, Licking, Madison, Morrow, Pickaway, and Union. The 2013 5-year American Community Survey population estimate for the MSA is estimated to be 1,926,242 2. Franklin County is estimated to have 1,181,824 3 people, making it the MSA’s largest county in terms of population. A map of the Columbus MSA and COTA Service Area are shown in Figures 2-3 and 2-4, respectively. There are 26 incorporated municipalities in Franklin County. Columbus is the largest city in Franklin County, with a population of 800,594 4. COTA’s service and taxing areas consist of Franklin County and small portions of Delaware, Fairfield, Licking, and Union Counties See Figure 2-3). The areas served outside of Franklin County are within municipalities that are signatories to the COTA agreement. COTA’s service and taxing areas have a combined population of 1,235,615 5. 2 U.S. Census Bureau, 2009-2013 5-year American Community Survey Population Estimates/MORPC U.S. Census Bureau, 2009-2013 5-year American Community Survey Population Estimates/MORPC 4 U.S. Census Bureau, 2009-2013 5-year American Community Survey Population Estimates/MORPC 5 U.S. Census Bureau, 2009-2013 5-year American Community Survey Population Estimates/MORPC, based on COTA service area as of March 16, 2015. 3 Central Ohio Transit Authority 2-5 2015-2019 Short-Range Transit Plan 2 – Overview Figure 2-3 2010 Columbus Metropolitan Statistical Area Central Ohio Transit Authority 2-6 2015-2019 Short-Range Transit Plan 2 – Overview Figure 2-4 COTA Service Area Central Ohio Transit Authority 2-1 2015-2019 Short-Range Transit Plan 3 – Planning Context 3 Planning Context In order to effectively develop the SRTP, it is necessary to consider the context in which the plan is being developed. This includes examining external factors, such as shifts in population and jobs, as well as coordination with COTA’s existing long-range plans. 3.1 Changes in Central Ohio Within the Columbus metropolitan area, much of the growth occurring in both population and employment in the past several decades has occurred around or outside of I-270. This trend has led to a shift in travel patterns by many area residents and workers away from the central city to the outer edges of Columbus and its surrounding suburbs. Before 2006, COTA faced a continuing challenge of stretching operating dollars to provide adequate transportation services for the central Ohio area. In 2006, the passing of Issue 7 provided a 10-year temporary local sales tax of 0.25%. COTA was able to use these additional funds to begin an ambitious service expansion plan. COTA will seek a renewal of the 10-year temporary sales tax; however, a time frame has not yet been determined by the Board of Trustees. The central Ohio region has experienced substantial growth in both population and jobs over the past 40 years, a trend that is expected to continue well into the future. As seen in Figure 3-3, the Mid-Ohio Regional Planning Commission’s (MORPC) projections for central Ohio show an increase in population of 500,000 people, and 300,000 additional jobs by 2050. Between 2010 and 2035, MORPC projects that the population within COTA’s service area will grow by approximately 20%. Slightly over 60% of the total growth is expected to occur outside I-270. Conversely, in terms of job growth, slightly less than 60% of the estimated 29% growth in jobs is expected to occur within I-270. Central Ohio Transit Authority 3-1 2015-2019 Short-Range Transit Plan 3 – Planning Context 20 $4.00 19 $3.50 18 $3.00 17 $2.50 16 $2.00 15 $1.50 14 2004 $1.00 2005 2006 Sources: COTA Farebox Ridership Energy Information Administration 2007 2008 2009 2010 Number of Annual Rides 2011 2012 2013 2014 Average Ohio Gas Price Figure 3-2 COTA Ridership and Average Ohio Gas Price Central Ohio Transit Authority 3-2 Average Ohio Retail Gas Price Total Annual Rides in Millions Figure 3-1 Franklin County and U.S. Unemployment Rates 2015-2019 Short-Range Transit Plan 3 – Planning Context 2,500,000 2,339,000 2,260,800 2,108,700 2,000,000 1,958,750 1,823,600 1,581,050 1,500,000 1,449,000 1,377,400 1,109,000 1,000,000 1,152,050 1,234,650 1,339,500 1,405,250 873,900 500,000 1990 2000 2010 2020 population 2030 2040 2050 Source: MORPC jobs Figure 3-3 Past, Current, and Projected Future Population and Jobs in Central Ohio Greater roadway congestion is expected to contribute to an increased need for mass transit in central Ohio. According to the 2012 Report on Urban Mobility published by the Texas A&M Transportation Institute, Columbus area drivers spent 40 hours stuck in traffic in 2011, more than any other major city in Ohio. By 2035, MORPC projects an increase of nearly 300% in total roadway congestion for the central Ohio region. Changing conditions within central Ohio play a key role in how COTA develops plans for the future. Additional external factors influencing demand for public transit include land use and development patterns, employment levels, fluctuating gas prices (Figure 3-1 and 3-2), and socio-economic factors. These are all elements, which present both challenges and opportunities when planning for the future of public transportation in the region. Integrating short-range initiatives into the Authority’s long-range plans is also critical. A brief description of COTA’s Long-Range Transit Plan and its components follows. Central Ohio Transit Authority 3-3 2015-2019 Short-Range Transit Plan 3 – Planning Context 3.2 2012 – 2035 Long-Range Transit Plan (LRTP) The 2012 LRTP created a comprehensive strategy for significantly enhancing the public transit system in the central Ohio region through 2035. Utilizing a variety of methods to ensure public participation, COTA developed the LRTP in response to the growing transportation needs of the central Ohio region by providing an expanded, reliable, and safe transit system for the future. COTA typically updates the LRTP every four years. The update allows COTA to adjust its plans based upon current demographic, economic, and traffic conditions, as well as federal and State funding changes. In December 2014, COTA began the process to update the LRTP, named the “NextGen”. The plan will be developed throughout 2015, with an expected completion date of April 2016. Section 3.3 describes the Next Gen Plan in greater detail. In response to a changing economy, the 2012 update was created to provide a plan, which reflected COTA’s current and projected ability to provide transit service within the region. The next update will be based on demographic, economic, traffic, and funding conditions in 2016. 3.2.1 LRTP Public Input Public input regarding transit services and facilities in central Ohio for the next 25 years was essential throughout the long-range planning process. From the outset, feedback from the general public, business and community leaders, bus riders, and focus groups shaped each component of the plan. COTA’s public involvement process focused on obtaining input from riders and the general public on the types of new and improved services that they desire in the future. Participants at the various meetings offered many suggestions for service improvement changes, including: • More frequent and convenient service for a broader portion of the community than has been available in the past; • An emphasis on convenient access to jobs, including second- and third-shift employment opportunities; • Improved mobility services and transportation for individuals with disabilities; • Relieving overcrowding on existing bus routes; Central Ohio Transit Authority 3-4 2015-2019 Short-Range Transit Plan 3 – Planning Context 3.3 • Improved neighborhood-to-neighborhood and suburb-to-suburb connections; • Additional park and rides/transit centers in outlying areas, served by faster and more direct service; • More timely and easier access to route and schedule information via the use of current technologies including variable electronic message displays, as well as improved access through a variety of devices including desktop and laptop computers, smart phones, and tablets; • Consideration of fixed-guideway options such as light rail, highoccupancy vehicle (HOV) lanes, etc.; and • Development of alternatives to fluctuating gas prices. NextGen Plan In the fall of 2014, COTA kicked-off COTA NextGen, an initiative to create a community wide vision of the future of public transportation in central Ohio. COTA NextGen looks to identify how the aspirations of the public and growth trends will influence opportunities and demand for public transportation in the next 35 years. Nelson\Nygaard Consulting Associates were chosen to lead this effort. According to insight2050 6, the region will add over 500,000 residents and 300,000 jobs by 2050. To prepare for this growth, the NextGen initiative will evaluate potential transit projects developed through an extensive public engagement process, identifying both potential timelines for implementation and a variety of funding sources. The goals of the plan are to: • Create a community vision for the future of public transportation in central Ohio; • Prepare central Ohio for future growth; • Support local and regional plans with transit investment options; and 6 insight2050 is an initiative headed by the Mid-Ohio Regional Planning Commission, Columbus 2020 and ULI Columbus to proactively plan for development and population growth over the next 30+ years. Visit getinsight2050.org for more information. Central Ohio Transit Authority 3-5 2015-2019 Short-Range Transit Plan 3 – Planning Context • Identify conventional and creative revenue options. • NextGen’s planning process is divided into three phases, shown in Figure 3.4. The first phase identifies the future transit needs and opportunities of the region based on public engagement and data analysis. Alternative projects will be developed at the end of Phase 1. In Phase 2, projects will be evaluated and prioritized using first a conceptual, more qualitative method to rank the projects. Then the top ranked projects will be prioritized through a more rigorous, qualitative process with direct input from stakeholders and the public. Finally, in phase 3, the consultant team will recommend timelines for potential implementation and creative funding options, such as private-public partnerships. Figure 3-4 NextGen Timeline The process will not be limited by mode or restricted by funding. Evaluation and prioritization methods will integrate public values as well as preparing the region to enter into federal funding processes, such as New Starts. The final result will be a document for the public highlighting the top ranked projects for the years 2025, 2040, and 2050. These projects will be integrated directly into COTA’s 2016 Long-Range Transit Plan. Visit www.cota.com/nextgen for more details. Central Ohio Transit Authority 3-6 2015-2019 Short-Range Transit Plan 4 – Standards for Service Design 4 Standards for Service Design COTA maintains a process to evaluate performance of the transit system using Board-adopted standards for productivity and service design. The current standards were developed through a Comprehensive Operations Analysis (COA) completed in 2001. In 2014, as part of the Transit System Review (TSR), a consultant recommended new standards that support the methodology behind the proposed news bus network described in the TSR. Until the implementation of the TSR is completed, in May 2017, COTA will continue to use the current standards. Discussion of the proposed standards in the TSR are found in Section 4.5. 4.1 Current Standards Overview Performance standards are the primary criteria for route evaluation and recommendation processes and are applied to both service changes and the design and monitoring of new routes. Service changes occur every trimester and are designed to improve the productivity of existing and planned services. They include schedule, frequency, and alignment changes; more information can be found in Section 4.4. COTA’s Route and Schedule Design Standards codify good transit planning and operational practices. These guidelines and standards serve several purposes: • To inform decision-makers, who may not have a background in the transit industry, about good transit practices; • To provide an objective basis for planning new services and evaluating existing services; • To serve as a “compass” to both staff and decision-makers who often may be caught up in reactive responses to external factors; and • To support the route performance evaluation process and standards described in the second set of performance monitoring indicators. A second set of indicators, Route Performance Evaluation Measures, are used in an annual evaluation of existing services that generate recommendations for service changes designed to improve the productivity of existing and planned services. Central Ohio Transit Authority 4-1 2015-2019 Short-Range Transit Plan 4 – Standards for Service Design The recommended Route and Schedule Design Standards and Route Performance Evaluation Process are described in the following sections. 4.2 Route and Schedule Design Standards As mentioned above, COTA’s Route and Schedule Design Standards codify good transit planning and serve to guide the planning and operations of COTA’s fixed-route bus system. Current lines that do not meet the design standards should be considered for evaluation and modification while new lines should be designed based on the standards listed below. The following categories are components of COTA’s design standards: • Service Categories; • Route Directness Standards; • Route Variations; • Hours of Operation; • Service Frequency; • Load Standards; • On-time Performance; and • Missed Trips. 4.2.1 Service Categories COTA operates the following types of routes: • Local routes: make all stops and operate between downtown Columbus and various neighborhoods or townships within COTA’s service area (see Figure 2-4). The vast majority of COTA vehicle service hours are operated on local routes; • Express routes: operate to provide fast service between downtown Columbus and suburban areas and park and ride facilities. Service is usually operated during the AM and PM peak travel time periods in the primary direction of travel. However, some routes serve “reverse commute” markets and operate in the non-peak direction of travel (i.e., from downtown to outlying employers in the AM). Between Central Ohio Transit Authority 4-2 2015-2019 Short-Range Transit Plan 4 – Standards for Service Design downtown Columbus and the outlying segments of the route, most buses operate with “closed doors” (i.e., no stops); • Crosstown routes: operate between various neighborhoods or townships within COTA’s service area and do not serve the downtown area; and • LINK routes: are generally short routes operated by smaller vehicles that are intended to serve short, non-work trips or serve as feeders to local and/or express routes, as well as neighborhood activity centers, including COTA transit centers. COTA operates only one LINK route, the CBUS downtown circulator. (See Section 5.1 for more details) 4.2.2 Route Directness Standards COTA bus routes shall be designed to operate as directly as possible, to and from major destinations, in order to minimize passenger travel time. Buses shall operate on major arterial streets as much as possible. However, there may be, situations in which a route deviates from the shortest, most direct alignment. Such situations include a mid-route deviation to serve a particular trip generator or end-of-line terminal loop. LINK routes, which are designed to collect and distribute people in a specified service area, are exempt from this standard. When a deviation exists or is being considered, the gain in convenience to those passengers who are boarding or alighting during the deviation must be balanced against the additional travel time for the passengers traveling through. The following standards shall be applied to all route deviations and/or terminal loops: • To the extent possible, two-way service shall be provided on the same street; • Express service shall be routed in the most direct manner possible; • Deviations from the basic route alignment to serve activity centers will be made only when they have the potential to attract new riders equal to or exceeding the route performance evaluation standard (riders per hour) for the corresponding route category; • Additional time to operate route deviations should not exceed five minutes (one-way) or 10% of the one-way travel time, whichever is less; • No mid-route loops shall be operated; and Central Ohio Transit Authority 4-3 2015-2019 Short-Range Transit Plan 4 – Standards for Service Design • Terminal loops shall not exceed 25% of a route’s total length. 4.2.3 Route Variations It is sometimes more efficient to provide service to a certain area with one route having several branches than to operate several different routes. In addition, some bus trips on a route may not go to the end of the line due to very low ridership in that area at a particular time of day (this is known as a “turnback”). These actions can result, however, in a system that is much more difficult for current as well as potential transit passengers to understand and utilize. Therefore, to provide a userfriendly service and to encourage maximum use of the system by all current and potential riders, the following standards for branches and turnbacks shall apply: • No line shall have more than two (2) distinct branches; • No line shall have more than one (1) turnback; and • When two lines are interlined (e.g., #2 North High, #31 Worthington Express), each line shall be treated as a separate line for the application of this standard. 4.2.4 Hours of Operation Hours of operation refer to the time between the first and last trip operated on a route (also referred to as the “span of service”). In order to maximize the opportunities for passengers to connect with other routes, a consistent span of service is desirable. Although COTA operates most of its network later into the evening, the proposed minimum span of service for each Service Category is: 4.2.5 Minimum Service Hours Guideline Weekday Local ....................5:30 a.m. to 10:30 p.m. Express ................6:00 to 8:30 a.m. and 4:00 to 6:30 p.m. Crosstown ............6:00 a.m. to 8:00 p.m. LINK .....................Will vary by LINK route Saturday Local ....................6:00 a.m. to 10:30 p.m. Express ................Not operated Central Ohio Transit Authority 4-4 2015-2019 Short-Range Transit Plan 4 – Standards for Service Design Crosstown ............6:00 a.m. to 8:00 p.m. LINK .....................Will vary by LINK route Sunday and Holidays Local ....................7:30 a.m. to 9:30 p.m. Express ................Not operated Crosstown ............7:30 a.m. to 7:30 p.m. LINK .....................Will vary by LINK route Due to differences in ridership levels and funding limitations, some variation in days operated and start/end times among routes are expected. For this reason, the proposed spans of service are intended as guidelines rather than standards. 4.2.6 Service Frequency The frequency of service on a particular route, known as the headway or time interval between successive buses, will be based on the existing or projected ridership and load standards (i.e., maximum possible number of passengers onboard a bus). On some routes, however, during certain periods of low ridership, determining frequency based on ridership demand may lead to very infrequent service. So infrequent, in fact, that the service is no longer viewed by passengers as a reliable or convenient means of travel. Therefore, minimum standards of service frequency may be applied to assure that a reliable, attractive level of service is available throughout the day. The following are minimum guidelines for COTA service frequency for each Service Category: Time Period Local Weekday AM/PM peak 30 min. Midday 60 min. Night 60 min. Saturday 60 min. Sunday 60 min. Express Crosstown LINK 60 min. NA NA NA NA 30 min. 60 min. NA 60 min. 60 min. NA NA NA NA NA Clock headways, which are service frequency intervals of 10, 15, 20, 30, and 60 minutes should be maintained whenever possible. This makes the service easier to understand and more predictable to passengers, Central Ohio Transit Authority 4-5 2015-2019 Short-Range Transit Plan 4 – Standards for Service Design which is particularly important during periods when the service is infrequent (i.e., more than 30 minutes). Although clock headways are recommended, current funding levels and vehicle availability make this operating structure difficult to implement on a system-wide basis. 4.2.7 Load Standards The intent of load standards is to balance passenger comfort and safety with operating costs. These standards define maximum passenger loads at different times of day to ensure acceptable levels of rider comfort and safety, while providing COTA good operating efficiencies. The load standards shown below represent the total number of riders as a percent of the number of seats on the bus: Time Period Weekday AM, PM peak Midday Night Saturday Sunday Local Express Crosstown LINK 120% 100% 100% 100% 100% 100% 100% 100% 100% 100% 120% 100% 100% 100% 100% 120% 100% 100% 100% 100% These load standards should be applied to the average ridership and number of seats per bus for a period of 60 minutes. Passenger loading on individual bus trips may exceed the standard. If the load standard is exceeded for any 60-minute period, COTA will evaluate the potential for improving the service frequency. If the standard is exceeded for particular trips, but not for a sustained 60-minute period, COTA will evaluate the possibility of adjusting schedule times to focus more service before and after the overloaded trip(s). The maximum time that an individual passenger should be expected to stand on a given trip is 15 minutes. 4.2.8 On-time Performance To ensure that transit riders have confidence that service will perform reliably in accordance with the public timetables prepared and distributed by COTA, on-time performance standards have been established. A vehicle is considered “on-time” when its arrival is from zero to 4 minutes and 59 seconds after the scheduled time. A vehicle is considered “late” when it arrives five minutes or more after the scheduled time. To Central Ohio Transit Authority 4-6 2015-2019 Short-Range Transit Plan 4 – Standards for Service Design improve the quality of service provided on express lines, in 2010, COTA revised the policy on arriving at stops early. Express buses can arrive at stops up to five minutes early after leaving the last stop outside of Downtown in the morning and after leaving the last stop within Downtown in the evening. Reverse-commute express buses from Downtown to the suburbs are allowed to arrive five minutes early after leaving the last stop within Downtown in the morning and after leaving the last stop outside of Downtown in the evening. It is impossible to achieve and maintain 100% on-time performance due to varying traffic and weather conditions, construction activity, detours, accidents, and other external factors. Nevertheless, every effort will be made to ensure that all COTA buses operate on-time. The following on time performance standards shall apply: • 80 - 90% of all buses should arrive at scheduled time points “on-time.” If a route or individual trip(s) is consistently running late, COTA will review the schedule and take remedial actions—such as schedule and/or travel time modification and improved on-street supervision—at the earliest opportunity. 4.2.9 Missed Trips COTA, like all other transit agencies, misses scheduled trips due to a shortage of drivers, mechanical problems, or accidents. The percentage of trips operated is defined as the ratio of trips actually operated divided by the scheduled number of trips. The annual objective shall be to operate a minimum of 99% of scheduled trips. 4.3 Route Performance and Evaluation COTA continually receives requests from throughout its service area for changes to existing service and for new service in growing areas in and around Franklin County. Additionally, COTA may be operating some routes that are not attracting enough riders to justify continuing those services. In order to be consistent in the evaluation of service proposals, and to ensure that the service being operated represents the most cost-effective use of available resources, the following Route Performance Evaluation Process has been developed. Central Ohio Transit Authority 4-7 2015-2019 Short-Range Transit Plan 4 – Standards for Service Design The Route Performance Evaluation Process relies on the analysis and ranking of existing and proposed routes based on a ridership productivity standard – ridership per revenue hour of service or passengers per revenue trip. The Evaluation Process also uses a ridership economic standard of subsidy per passenger trip for all routes. The process is as follows: 1. 2. 3. 4. 5. 6. 7. Develop productivity standards for each Service Category; Calculate performance measures for all proposed and existing routes; Identify “substandard” services; Evaluate service modifications; Obtain approval from appropriate decision-makers; Implement the modifications; and Monitor route performance. The application of productivity and economic standards to existing routes is a flexible process. The purpose of the standards is to help identify routes that are most in need of service modifications, such as restructuring to eliminate less productive segments or branches, adjusting service frequency to better reflect the demand for service, or providing additional promotion of routes with low ridership. Route elimination is intended as a last resort, when it has been determined that no cost-effective actions are able to improve the productivity of the route. In addition, the evaluation of existing routes is not intended to preclude changes to routes that meet the minimum standards. In many cases, it may be possible to improve the productivity of routes that meet or exceed the standards by making minor changes to service frequency, span of service or trip times. The productivity of existing routes will be reported each trimester. The evaluation of possible service modifications and approval and implementation of recommended modifications will be conducted annually. Additionally, the productivity standards will be reviewed annually, using ridership and other data for the previous 12-month period for which data is available. A 2010 route evaluation process revealed that a select number of lines within COTA’s local routes are carrying nearly half of COTA’s average daily ridership. As a result, in 2010, a regrouping of local routes was established to provide a more equitable comparison of route performance. Rather than evaluating productivity within a single “local routes” group that included all local routes, local routes have been classified into “major locals” and “locals”. Similarly, for express routes, reverse commute express routes have been given a separate classification from the typical peak period, peak direction express routes. While Central Ohio Transit Authority 4-8 2015-2019 Short-Range Transit Plan 4 – Standards for Service Design peak direction express routes primarily serve the high-density downtown employment area, reverse commute express routes are designed to help central city residents gain access to lower-density suburban area employment markets. Separating these two distinct express types allows a fairer comparison of their overall performance. Following each service period trimester, as part of each trimester’s productivity evaluation, planning staff develops ridership graphics, which include route performance for the most recent three trimesters. Graphs are produced for each route type: major local, local, express, reverse commute express, crosstown, and LINK. Productivity graphs for each of these route categories utilizing January to December 2014 weekday ridership data are presented on the following pages. Central Ohio Transit Authority 4-9 2015-2019 Short-Range Transit Plan 4 – Standards for Service Design Major Local Line Productivity Jan. 2014 – Sep. 2014 Trimesters Weekday Date Averaged Over Trimester Period Sept. 2014 Major Locals AVG = 29 Figure 4-1 Major Local Line Productivity Central Ohio Transit Authority 4-10 2015-2019 Short-Range Transit Plan 4 – Standards for Service Design Local Line Productivity Jan. 2014 – Sep. 2014 Trimesters Weekday Date Averaged Over Trimester Period Sept. 2014 Local AVG = 19.6 Figure 4-2 Local Line Productivity Routes #13, #14, and #19: Operates during peak period only. Route #21: Operates late night Thursday – Saturday. Route #222: Operated late night Friday – Saturday Route #98: The #98 Columbus Zoo runs seasonally and is omitted from the Productivity Chart in order to avoid skewing Local Line Productivity. Central Ohio Transit Authority 4-11 2015-2019 Short-Range Transit Plan 4 – Standards for Service Design Express Line Productivity Jan. 2014 – Sep. 2014 Trimesters Weekday Date Averaged Over Trimester Period Sept. 2014 Express AVG = 11.8 Figure 4-3 Express Line Productivity Central Ohio Transit Authority 4-12 2015-2019 Short-Range Transit Plan 4 – Standards for Service Design Reverse Commute Line Productivity Jan 2014 – Sep 2014 Trimesters Weekday Date Averaged Over Trimester Period Sept. 2014 Reverse Commute AVG = 6.9 Figure 4-4 Reverse-Commute Express Line Productivity Central Ohio Transit Authority 4-13 2015-2019 Short-Range Transit Plan 4 – Standards for Service Design Crosstown Lines Productivity Jan. 2014 – Sep. 2014 Trimesters Weekday Date Averaged Over Trimester Period LINK Line Productivity May 2014 – Sept. 2014 Trimesters Weekday Date Averaged Over Trimester Period Sept. 2014 Crosstown AVG = 15.6 Figure 4-5 Crosstown-Line Productivity Central Ohio Transit Authority 4-14 2015-2019 Short-Range Transit Plan 4 – Standards for Service Design Sept. 2014 LINK AVG = 26.5 Figure 4-6 CBUS LINK Line Productivity – 2014 Central Ohio Transit Authority 4-15 2015-2019 Short-Range Transit Plan 4 – Standards for Service Design 4.3.1 Productivity and Economic Standards COTA uses ridership productivity and economic subsidy as its primary measures of transit performance. Ridership productivity is measured in terms of riders per revenue hour of service (Local, Crosstown, and LINK routes) or riders per revenue trip (Express routes). Economic performance is measured by calculating the subsidy per passenger trip based on boardings. Routes within each service category will be ranked according to the productivity and measures and compared to the minimum standards identified for each service category. A productivity rating will then be calculated for each route and a corresponding list of actions (see Table 4-7) will be identified for further evaluation. New routes should meet the applicable standards for the service category after one year of operation. All new routes will be reviewed each trimester and routes that have not shown adequate progress toward meeting the standards will be targeted for marketing promotions or possible service modifications to improve productivity. The ridership and economic standards are calculated as follows: Passenger boardings per revenue hour – The number of average daily boardings per route (as reported by COTA’s Automatic Passenger Counter data) divided by the daily number of revenue hours of service. The standard is calculated as the average of all routes in each service category. Passenger boardings per revenue trip – Because express routes may vary significantly in route length and one-way travel times, a different ridership productivity measure is used. This measure is defined as the number of average daily boardings (as reported by COTA’s farebox data) divided by the number of daily revenue trips. The standard is calculated as the average of all express routes. Operating subsidy per passenger boarding – The average daily operating cost (direct operating cost) of a route less average daily passenger revenue divided by number of passenger boardings. The standard is calculated as the average of all routes in each service category. Central Ohio Transit Authority 4-16 2015-2019 Short-Range Transit Plan 4 – Standards for Service Design The ridership productivity measure for each route then will be ranked and their productivity rating will be calculated as a percentage of the productivity standards: Local, Crosstown and LINK routes: Ridership productivity rating = 1 + (Route riders per hour – Standard riders per hour) Standard riders per hour Or Express routes: Ridership productivity rating = 1 + (Route riders per trip – Standard riders per trip) Standard riders per trip And Economic productivity rating = 1 + (Standard operating subsidy – Route operating subsidy) Standard operating subsidy Tables 4-1 through 4-4 summarize the productivity standards for the Local, Crosstown, LINK, and Express service categories, respectively. 4.3.2 Potential Actions The potential actions that may be evaluated, recommended, and ultimately implemented for each route will be determined by its productivity rating. A productivity rating greater than 100% (i.e., better than average performance), may indicate a need to increase service on the route in order to better serve unmet transit demands or reduce passenger loads (passengers per seat). On the other hand, a productivity rating less than 100% (i.e., worse than average performance) may indicate a need for actions to increase ridership or reduce service levels. For any route that has a productivity value less than 50%, an in-depth analysis of that route’s performance should be conducted. That analysis should assess the comparative productivity of each scheduled trip and route segment (for weekdays, Saturdays, and Sundays) with the objective of identifying unproductive services. Potential actions designed to increase ridership and/or reduce service levels include Central Ohio Transit Authority 4-17 2015-2019 Short-Range Transit Plan 4 – Standards for Service Design marketing, promotions, reducing the span of service (i.e., eliminating early morning or night trips), stretching the service frequency, changing the route alignment, and, as a last resort, eliminating the route. COTA may also elect to hold informal public meetings to elicit comments from existing and potential riders regarding ways to improve service. Similarly, an in-depth analysis should be conducted for any route that has a ridership productivity value greater than 150%. Potential actions may include increasing the span of service (e.g., adding early morning or night trips, implementing new Saturday or Sunday service), improving the service frequency, or adding a new route. Less detailed analyses should be conducted for the remaining routes that have productivity values greater than 50% and less than 150%. Table 4-7 lists potential actions that can be evaluated for varying levels of productivity ratings. Table 4-1 Major Local Route Productivity (September 2014 Trimester) Weekday Line # Line Name 1 Cleveland/Livingston 2 E Main/N High 10 E Broad/W Broad Standard for Route Type Productivity (Pass/Rev. Hr) 27.44 28.25 31.87 28.96 Productivity Subsidy per Index Passenger 0.95 $1.32 0.98 $1.25 1.10 $1.14 1.00 $1.07 Central Ohio Transit Authority 4-18 Subsidy Index 0.94 0.99 1.09 Combined Index 0.94 0.98 1.09 1.00 1.00 2015-2019 Short-Range Transit Plan 4 – Standards for Service Design Table 4-2 Local Route Productivity (September 2014 Trimester) Weekday Line # 3 4 5 6 7 8 9 11 12 131 141 15 16 18 192 213 Productivity Productivity Line Name Index (Pass/Rev. Hr) W Mound/Northwest Blvd 17.49 0.89 Indianola/Parsons 20.12 1.03 West 5th Ave 13.69 0.70 Sullivant/Mt Vernon 22.91 1.17 Neil/Whittier 22.79 1.16 Hamilton Ave/Frebis 23.03 1.17 Leonard/Brentnell 15.29 0.78 Oak/Bryden/St Clair 18.52 0.94 McKinley/Fields 17.83 0.91 US 33/Watermark 6.32 0.32 Harmon/Greenlawn 6.67 0.34 Grove City 18.45 0.94 E Long/S High 21.09 1.08 Kenny 18.92 0.97 Arlington/Grandview 9.24 0.47 Night Owl 18.76 0.96 Standard for Route Type 19.60 1.00 Subsidy per Passenger $2.92 $2.27 $3.73 $1.96 $1.74 $1.99 $3.27 $2.42 $3.26 $14.92 $16.67 $2.51 $2.23 $2.41 $7.15 $2.52 Subsidy Index 0.823 1.056 0.644 1.222 1.380 1.206 0.734 0.990 0.740 0.161 0.144 0.957 1.077 0.996 0.335 0.952 Combined Index 0.86 1.04 0.67 1.20 1.27 1.19 0.76 0.97 0.82 0.24 0.24 0.95 1.08 0.98 0.40 0.95 $2.40 1.00 1.00 1 Route operates peak period only trips between downtown and COTA McKinley Ave. garage. Most service hours on this line would transfer into deadhead hours on other lines if this line were discontinued. 2 Service is peak period only, with 60 minute frequency of service. 3 Operates only on Thursday, Friday, and Saturday nights. Note: The #98 Columbus Zoo runs seasonally and is omitted from the Productivity Table in order to avoid skewing Local Line Productivity. Central Ohio Transit Authority 4-19 2015-2019 Short-Range Transit Plan 4 – Standards for Service Design Table 4-3 Crosstown Route Productivity (September 2014 Trimester) Weekday Productivity Productivity Subsidy per Subsidy Combined Index Passenger Index Index (Pass/Rev. Hr) 7.27 0.47 $8.25 0.427 0.45 17.52 1.12 $5.57 0.633 0.88 11.52 0.74 $3.07 1.147 0.94 10.77 0.69 $5.57 0.633 0.66 16.75 1.07 $3.07 1.147 1.11 13.49 0.86 $4.17 0.845 0.85 13.65 0.87 $4.43 0.795 0.83 19.55 1.25 $2.65 1.333 1.29 18.85 1.21 $2.73 1.29 1.25 9.92 0.64 $5.91 0.596 0.62 8.81 0.56 $7.05 0.500 0.53 Line # Line Name 80 OSU/Lennox 81 Hudson/Ohio 82 Grandview/OSU 83 Oakland/Weber 84 Hilliard/Arlington/OSU 87 Cassady 89 Hamilton Rd 92 James/Stelzer 95 Morse/Henderson 96 5th Ave 118 Sawmill Standard for Route Type 15.61 1.00 $3.53 1.00 1.00 Table 4-4 LINK Route Productivity (September 2014 Trimester) Weekday Line # Line Name 70 CBUS Standard for Route Type Subsidy per Subsidy Productivity Productivity Index Passenger Index Combined Index (Pass/Total. Hr) 23.00 1.00 $2.77 1.00 1.00 23.00 1.00 $2.77 1.00 1.00 Note: Only Total Hours were available as of September 2014 trimester. During the September 2014 Trimester the CBUS was free to all passengers. Central Ohio Transit Authority 4-20 2015-2019 Short-Range Transit Plan 4 – Standards for Service Design Table 4-5 Express Route Productivity (September 2014 Trimester) Weekday Line # Line Name 30 Smoky Row 31 Worthington 32 Crosswoods 33 North Central 34 Karl 35 Tamarack 36 Annehurst 37 Westerville 38 Easton 39 New Albany 41 Gahanna 43 E Broad 44 North Reynoldsburg 45 Reynoldsburg 46 Eastland 47 Brice 49 Southeast 53 Lincoln Village 55 Gender 57 Hilliard 58 Dublin 60 Arlington 61 Kenny 64 Grove City 66 Hilliard/OSU 67 East Hilliard Productivity Productivity Index (Pass/Rev. Hr) 13.00 1.06 13.92 1.27 18.22 1.02 9.25 0.72 13.10 1.01 8.17 0.65 20.05 1.46 8.48 0.82 17.30 1.31 10.45 0.63 16.20 0.90 15.00 0.84 12.86 0.98 18.22 0.95 8.98 0.60 22.06 1.17 11.27 0.88 19.76 1.14 16.95 1.04 15.27 1.14 18.62 1.34 10.00 0.65 18.37 1.38 16.97 0.97 10.65 0.67 7.88 0.53 Subsidy per Passenger $4.36 $4.36 $3.71 $9.30 $5.50 $10.26 $2.66 $8.18 $4.12 $4.58 $5.16 $5.56 $5.84 $3.42 $9.05 $3.10 $7.30 $3.18 $4.73 $4.26 $2.72 $9.67 $3.53 $3.57 $8.40 $11.31 Subsidy Index 1.080 1.080 1.271 0.506 0.856 0.459 1.770 0.576 1.142 1.028 0.913 0.847 0.806 1.375 0.520 1.519 0.645 1.482 0.996 1.107 1.732 0.487 1.334 1.318 0.561 0.416 Combined Index 1.07 1.17 1.15 0.61 0.93 0.56 1.62 0.70 1.22 0.83 0.91 0.84 0.89 1.16 0.56 1.34 0.76 1.31 1.02 1.13 1.53 0.57 1.36 1.14 0.62 0.47 Standard for Route Type 14.73 1.00 $4.71 1.00 1.00 Note: The #52 OSU-Airport runs seasonally and is omitted from the Productivity Table in order to avoid skewing Express Route Productivity. Central Ohio Transit Authority 4-21 2015-2019 Short-Range Transit Plan 4 – Standards for Service Design Table 4-6 Reverse-Commute Express Route Productivity (September 2014 Trimester) Weekday Line # Line Name 27 Brooksedge 29 Polaris 40 New Albany Bus. Park 48* Eastgreen 54 London-Groveport 56 Tuttle 59 Dublin/Metro 65* Southpark 68* Hilliard/Westbelt Standard for Route Type Productivity Productivity Index (Pass/Rev. Hr) 4.43 0.45 11.23 0.78 8.39 0.49 5.81 0.25 14.37 0.69 9.15 0.51 8.98 0.78 11.14 0.53 10.98 0.61 8.84 Subsidy per Passenger $13.12 $5.97 $9.33 $13.58 $4.04 $9.86 $6.75 $5.13 $6.07 Subsidy Index 0.593 1.305 0.835 0.574 1.928 0.790 1.153 1.518 1.283 Combined Index 0.52 1.04 0.66 0.41 1.31 0.65 0.96 1.02 0.95 $7.79 1.00 1.00 1.00 *Starred reverse-commute express routes utilize a bus that travels from a COTA garage to a suburban area to then operate as a regular express route to downtown. The travel time from the station to the beginning of the route, known as deadhead, would use COTA resources whether or not the reverse-commute express route were in-service. Reverse-commute express routes provide access to suburban jobs for COTA customers. Please note that significant COTA resources would not be saved if the reverse-commute express route was discontinued. For example, in the morning, the #65 Southpark travels from the COTA garage to Downtown, to Southpark, then to the Grove City Park and Ride, at which time it becomes the #64 Grove City, operating between the Park and Ride and Downtown. Table 4-7 Potential Actions for Ridership Productivity Ratings Potential Actions Reduce Service / Increase Productivity 1. Marketing Promotions 2. Reduce Span of Service 3. Stretch Service Frequency 4. Change Route Alignment 5. Eliminate Route 02525% 50% 5075% 75100% 100150% 150%+ Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes No Yes Yes Yes Yes No No No No No No No No No No No No No No No No No No No No No No No Yes Yes No Yes Yes Yes Increase Service / Decrease Productivity 1. Increase Span of Service 2. Improve Service Frequency 3. Add New Route Central Ohio Transit Authority 4-22 2015-2019 Short-Range Transit Plan 4 – Standards for Service Design 4.3.3 Implementation Process The Route Performance Evaluation Process, previously described, should be conducted annually. For remedial actions that constitute a non-substantial change in service (less than 25% of daily revenue hours or route miles), COTA’s Scheduling and Planning Departments should make recommendations to the Vice President of Planning and Service Development and the President/CEO for approval and implementation. For major actions (more than 25% of daily revenue hours or route miles), the Scheduling and Planning Departments should present their recommendations to a staff committee comprised of the Operations and Planning and Service Development Divisions. After the committee concurs, recommendations should be advanced to the Vice President of Planning and Service Development, the President/CEO and Board of Trustees for approval and implementation. Major actions may also require public comment meetings prior to implementation. 4.3.4 Other Considerations In the course of applying the Route Performance Evaluation Process, COTA has recognized that there are special circumstances that should also be considered in addition to the technical measures described above. For certain routes, a quantitative evaluation alone may not accurately portray the benefits that are derived to both passengers and non-passengers. Following are four categories of routes that may be exempt from the Route Performance Evaluation Process. • “Lifeline” routes serve disadvantaged constituents, primarily low-income riders. Without the existence of bus service, the users or residents would not be able to obtain key services. Lifeline locations include the following four categories: subsidized housing, publicly-operated social service facilities, publicly-operated hospitals, and public post-secondary schools. A “Lifeline” route uniquely serves one or more of the above locations (no other local route operates within ¼ mile of the location); • Newly implemented routes are exempt from the Route Performance Evaluation Process for a period of one-year from the start-up date. During this period, route performance should be monitored and reported each trimester and minor revisions can be made to improve performance. Major revisions to the newly implemented routes should not be made until the end of the one-year (“break-in”) period. Central Ohio Transit Authority 4-23 2015-2019 Short-Range Transit Plan 4 – Standards for Service Design This exception can also be applied to poorly performing routes that have a major service revision within the past year; 4.4 • Certain COTA routes may be implemented as demonstration services intended to address a particular function for a specified time period. These routes may be exempt from the Route Performance Evaluation Process if the service has regional or local significance; and • A portion of operating expenses for certain routes may be subsidized by other public agencies, government programs, or private businesses (e.g., Federal Job Access and Reverse Commute grants and OSU). COTA may elect to exempt these routes from the Route Performance Evaluation Process, or add the subsidy contribution to the passenger revenue in the economic productivity criteria. Data Collection and Service Change Process Route performance data is used to evaluate service. COTA collects data in a number of ways: • 138 buses equipped with Automatic Passenger Counters (APC) provide COTA with travel time, passenger activity at the bus stop level, passenger load data, and other statistics used in route planning. As of January 2015, COTA operates an active fleet of 336 buses and 156 APC units; and • Electronic Fareboxes collect revenue and ridership data through customer and driver interaction with the units. COTA's entire active fleet of fixedroute buses is equipped with these fareboxes. The current system includes coin/bill insertion (which registers fare input based on size, so all bills are classified as $1), a magnetic stripe pass read-only swipe reader, and a Ticket Reading and Issuing Machine. Additionally, the operator has access to a keypad that allows recording of fares that are not readable by the farebox. In March 2010, COTA, with the assistance of IBI Group, completed a Fare System Preliminary Engineering study. A technological upgrade to the current system, which incorporated increased memory and computing speed within the shell of the existing fare collection system, was implemented in 2011. Two of the major outcomes of this upgrade include the ability to read and validate OSU Buck ID’s and capture transaction details for all fare payments. During 2015, COTA will hire a consultant to investigate the feasibility for implementing a contactless smart card system or open fare payment system in order to provide flexible fare payment options. Central Ohio Transit Authority 4-24 2015-2019 Short-Range Transit Plan 4 – Standards for Service Design The Planning and Service Development Division recommends service changes; the division prepares a list of changes that are reviewed by the Board of Trustees and the President/CEO. The final set of service changes is then directed to the offices and departments that have responsibility for the implementation of new service. The division staff monitors the progress of each service change to ensure the process stays on schedule. Changes are scheduled three times a year on the first Monday of January, May, and September. 4.5 Transit System Review Recommended Standards The Transit System Review (TSR) presents a recommend bus network that was developed through public input and based on the concept of allocating resource between two competing service goals: efficient, high-ridership service and low-ridership, coverage service that serves essential locations. New service design standards were developed to support the underlying principles of the TSR. See Section 6.1 for more information regarding the TSR. The recommend standards take into account the performance of COTA’s current bus network and the demographic and economic conditions in central Ohio. However, COTA will re-evaluate the proposed standards prior to implementation in May 2017, to ensure compliance with Federal polices and to better fit the mission, vision, and values of the agency. The following recommendations were developed by the consultant team that led the TSR process and through close consultation with COTA. 4.5.1 Principles The key principles used in developing standards from the TSR report (Appendix B) are: • Standards should measure services against their actual purposes, not purposes for which they are not intended. • While standards are conventionally applied to lines, some standards only make sense at the level of the line segment because a line may come apart into two or three segments that differ in purpose. • While standards are conventionally applied to lines, the real outcomes of transit happen at the level of the network. Care should be taken in assessing a line as deficient if performance on other lines is likely to be heavily affected by its demotion or deletion. This is especially true of the Central Ohio Transit Authority 4-25 2015-2019 Short-Range Transit Plan 4 – Standards for Service Design network of high-frequency services, where the interdependence between the elements of the network is the whole point of the design. In the proposed bus network, service was designed to fulfill a ridership or coverage purpose. The physical characteristics of where a route served determined whether a service should be ridership or coverage. Section 6.1 details the difference between the two purposes. 4.5.2 New Service Types A key part of the TSR is the introduction of redefining how service is categorized. Local and crosstown categories are replaced with frequent (15 minute or better), 30-minute and 60-minute service type categories. The express, peak only, service category is retained. Additionally, service performance will be evaluated by its purpose, either ridership for high frequency lines or coverage for 60-minute and express lines. 30-minute service will be split between ridership and coverage, a discussion of determining which category a service falls into is found below. Table 4-8 Service Categories SERVICE TYPE MAP COLOR Frequent Network 30minute Service 60minute Service Express Service ALL-DAY FREQUENCY PURPOSE < = 15 min Ridership Red Blue 30 min Mixed Green Coverage Orange 60 min peak trips only Coverage In the future, there may be need for other categories such as BRT (Bus Rapid Transit) as a fifth category above the Frequent Network, with a Ridership purpose. It is conceivable that at some point there could be ridership-justified Express services, though this is likely only when the costs and inconvenience of driving alone reach a level that pushes larger numbers of people to seek an alternative, as tends to be the case in more congested cities. Central Ohio Transit Authority 4-26 2015-2019 Short-Range Transit Plan 4 – Standards for Service Design 4.5.3 Assigning Categories to Line Segments One challenge of using frequency-based or purpose-based standards is that part of a line may be in one category and part in another. Many lines in the proposed network have an inner frequent segment, which is clearly ridership-justified and less frequent tails, or branches which could be considered coverage-justified. In these cases, it is recommended that: • If the low-frequency portion of a line is less than 10% of the total revenue hours, the entire line can be analyzed in the higher-frequency category. • Otherwise, the frequent and infrequent segments should be separated and assigned to separate categories. If a low frequency arises from a mid-route split or minor variant, the line should be identified in the higher-frequency category. To analyze the productivity of an inner versus an outer line segment, where the inner segment has higher frequency and usually higher ridership, the following analytical method is used: • For ridership: o Using APC data, identify the total inbound boardings and outbound alightings 7 that occur on the outer segment. Add these two numbers together to get the total ridership that makes some use of the outer segment. o Subtract this number from the total line ridership to get boardings assignable entirely to the inner frequent segment. • For cost drivers such as vehicle hours or revenue hours: o Using a costing tool such as Transitmix.net, estimate the cost of operating the frequent inner segment alone, excluding the outer segment. o Assign that cost to the inner segment. Assign the difference between that cost and the line’s full cost to the outer segment. 7 This method counts each trip once and does not double-count trips that are entirely within the outer segment. If there are difficulties with counting alightings, simply count the total inbound boardings and double, presuming most trips are round trips, to capture the trips alighting in the segment. Central Ohio Transit Authority 4-27 2015-2019 Short-Range Transit Plan 4 – Standards for Service Design It is not necessary that this calculation be calibrated to actual costs, so long as the percentage split emerging from the analysis is correct. Several other input versus output metrics can be counted in similar ways. 4.5.4 Alignment of Categories with Service Purpose The Board approved guidelines for allocating 70% of resources to ridership service and 30% to coverage service requires a method of assigning routes to one of the two categories. Assigning a route of one of the two purposes is straightforward except in the case of 30-minute service. The following methodology is proposed to be used: • Frequent lines are ridership justified. The expensive concentration of resources on certain streets is an inefficient way to provide coverage but seems to be essential for the best ridership outcomes, as demonstrated by the high performance of frequent lines in the existing network. • Hourly lines are coverage justified. This minimal level of service generates poor productivity wherever it is operated. Instead, the purpose of this level of service is about extending a basic level of access to as many people or jobs as possible. This implies spreading resources thinly across a large area, which is the coverage goal. • Express lines are coverage justified because, currently, the Columbus area lacks the traffic congestion, downtown-parking costs and other disincentives to driving that would motivate nine-to-five long-distance commuters to seek alternatives to driving in large numbers. This may change over time and it is possible that a ridership-justified express service could emerge in the future. • Half-hourly lines may have a mixture of both purposes. Segments may be: o Ridership-justified, because they are top performers in the half-hourly category and ready for promotion to frequent service as soon as resources permit; or o Coverage-justified, if the necessary conditions for very high ridership are not present, but ridership is still high enough to justify the frequency. Typically, this means that the line is unlikely to graduate into the Frequent Network, but is more productive than it would be if the service were cut to hourly. Central Ohio Transit Authority 4-28 2015-2019 Short-Range Transit Plan 4 – Standards for Service Design 4.5.5 Structure of Standards Table 4-9 presents the recommended standards to adopt following full implantation of the TSR recommendations (May 2017). The specific thresholds of each standard were estimated by the consultants and subject to revision. The rows of the table represent the main service types with a note as to their purpose. Since frequent services are ridership-justified and hourly services are coveragejustified, the standards for these represent a recommended approach to evaluating these services against their purposes. Table 4-9 Proposed Standards For the 30-minute category, it is recommended that lines be evaluated against a standard that is partway along the range between the two extremes. The columns of the table are organized by the type of standard – i.e. what kind of performance is to be measured. The table sorts standards into three very different kinds: • Defining Features are part of the definition of a category. If a service does not have these features, it should not be in this category. Central Ohio Transit Authority 4-29 2015-2019 Short-Range Transit Plan 4 – Standards for Service Design • Input Targets. These describe features of the transit product to be provided. • Output Targets. These describe outcomes of the product, including ridership (and related measures) as well as coverage (and related measures). It is the output targets that are the ultimate measure of transit’s success. Input targets are designed to encourage the creation of a network that will deliver on the output targets, but if the two kinds of target fall out of alignment, the input targets must be refined to better deliver the outputs. However, the proposed input targets do reflect significant professional experience, including the lessons of COTA’s own existing ridership patterns, regarding how inputs are likely to correspond to outputs, especially ridership or productivity outputs. Defining Features: Frequency All-Day frequency is the single most important defining standard. All-day means “throughout both peaks, the daytime period between them, and into the early evening.” Span standards below clarify this range. Defining Features: Span The TSR recommends matching the span to the frequency categories and purpose. Using this system, the justification for a long span is much higher for ridership-justified services than for the coverage-justified. Weekend span is proposed to be increased. Riders who rely on transit tend to have work and errand commitments seven days a week. To reflect these realities, the proposed network extends minimum spans on ridership-justified services to 18 hours weekday, 17 Saturday, and 15 Sunday. Coverage services, whose purpose is more “lifeline”, tolerate a shorter minimum span but still a longer one than is used today: a span of 14 hours, 7 days a week is recommended. Defining Features: Stop Spacing COTA has existing Board Adopted bus stop guidelines. This section presents recommendations for how these guidelines could be updated once the proposed network is fully implemented. COTA will consider the recommended spacing to determine if a change is warranted in the current guidelines. Central Ohio Transit Authority 4-30 2015-2019 Short-Range Transit Plan 4 – Standards for Service Design Closely-spaced stops make it easier to access a service but make that service less attractive to riders, because it runs more slowly and often less reliably. When planning for high ridership it is important to encourage customers to gather at the fewest possible, stops to reduce the total time used to accelerate and decelerate at each stop per bus. For the local-serving lines (Frequent, 30-min, hourly) stop spacing should be set according to the following principles: • Frequent Network stop spacing can be up to 1/4 mile and should not be less than 800 feet, because the heavy ridership and high level of investment by COTA both require that these lines move expeditiously. Stop spacing up to 1/4 mile is increasingly accepted for high-frequency services when accompanied with appropriate amenities. • Spacing on hourly coverage lines can be much closer, because these lowridership services rarely stop at every stop. Stop spacing thus has less of an impact on speed and reliability than it does on frequent services. • Regardless of spacing standard, stops for service in opposite directions should not be placed where it is not safe for an able-bodied person to cross the street in most traffic conditions. • As a line approaches a low-ridership endpoint, fewer passengers are trying to ride through a stop and the likelihood of the bus stopping at every stop is lower. In this case, stop spacing can be closer but should still not exceed the indicated minimum. Input Target: Reliability and On-time Performance The proposed on-time performance standard is constant across all of the all-day service types and similar to the current standards. Under normal conditions, the Frequent Network is likely to experience the greatest delays, and it will be tempting to set lower standards for it. However, it also carries the most people, so its delay counts most heavily in determining the customer experience of service. For this reason, a strong commitment to on-time performance on the Frequent Network is essential. Input Target: Amenity Signage and information systems should convey the categories of service as useful information for the public. Central Ohio Transit Authority 4-31 2015-2019 Short-Range Transit Plan 4 – Standards for Service Design Beyond this, all infrastructure investment should be guided by trying to improve the customer experience of the greatest possible number of people. This means that stop amenities should be keyed to the number of boardings at that stop, though higher amenity may be appropriate in a developing area where much higher ridership is expected at build-out. In general, the busiest stops will be on the Frequent Network, so these will be where the overall benefit of amenities is greatest. Some downtown and park-andride stops on the Express network may also justify amenities based on brief peaks of demand. Input Target: Loading The existing standard of 120% maximum seated load, which generally reflects a comfortable standing load, is retained, with 100% for express services. Output Target: Ridership The ridership measure that matters most is productivity. Productivity is typically measured as boardings per revenue hour of service. Where fares are constant across the network, farebox recovery tracks with productivity, so managing for one outcome effectively manages for the other. The productivity standards shown here are not acceptable minimums, but rather an acceptable average across all lines in the category. On any one route, productivity less than 2/3 of this average should be considered cause for review. This approach is especially important for the Frequent Network because it is a network. Relying too narrowly on line-by-line evaluation can miss the strong level of interdependence. The justification for the recommended targets is as follows: • Frequent Network’s target of 28 boardings/revenue hour is slightly below the current performance of the three existing Frequent routes (1, 2, and 10). The recommended network improves service even on these corridors and reduces duplicative services, so productivity on these corridors is likely to rise. However, the dramatic expansion of the Frequent Network under the plan may reduce productivity slightly as other corridors are introduced into the network. • The 30-minute network’s target of 17 boardings/revenue hour matches current average performance of 17.5. Some loss of productivity in this Central Ohio Transit Authority 4-32 2015-2019 Short-Range Transit Plan 4 – Standards for Service Design layer should be expected as the most productive 30-minute segments are promoted out of this category and into the Frequent Network under the plan. On the other hand, the reduction of duplication should have an upward impact on ridership. • The hourly network’s target of 10 boardings/revenue hour is below existing performance of 12.9 boardings/hour; again, because some of the stronger services are being promoted while new outer-suburban coverage is being added in this category. Since all hourly services are justified by coverage, the coverage standard takes precedence over the ridership standard because coverage, not ridership, is the purpose of these services. • The Express network’s standard of 15 boardings/vehicle hour is above the current performance. The Express network is considerably streamlined under the plan and an increase in ridership is expected to occur. For the Express network, it is important to set the standard in terms of total vehicle hours, not revenue hours. The difference is deadhead time – time spent traveling out of service, typically between the operating base and the point where the bus enters or leaves the line. Reporting boardings/revenue hour therefore conceals the real cost of one-way express services, artificially inflating their performance. For this reason, targets for express services should be expressed as boardings / total vehicle hour. For other services, revenue hours are acceptable because the difference ratio of revenue hours to vehicle hours is roughly constant. Output Target: Coverage The primary outcome of coverage service is a basic level of access to as many people and jobs as possible. The measure of this outcome is the percentage of the COTA service area’s residents and jobs that are within a fixed access distance of service. A typical coverage standard takes the form: __ % of population and jobs will be within ___ (distance) of service. The coverage analysis will need to be periodically updated as development patterns change. A 1/4 mile air distance is used as the standard distance. The use of air distances is a problematic approximation, because the actual walkability of communities varies widely across the region. A coverage standard that reflected actual customer experience would be preferred if sidewalk location data is available. Central Ohio Transit Authority 4-33 2015-2019 Short-Range Transit Plan 4 – Standards for Service Design 4.5.6 Monitoring Service and Addressing Deficiency The role of service standards is to provide measurable benchmarks against which performance can be monitored. The standards provide a clear signal when some aspect of performance is unacceptable. That signal should trigger an evaluation of the problem and a plan of action for resolving it. The frequency and nature of monitoring varies by the type of standard: • Frequency, Span, Stop Spacing, and Coverage are the outcome of planning activities and can be verified for compliance with the standards at the time a plan is proposed and adopted. Systemwide coverage should also be reviewed whenever updated population and jobs data is available, to observe whether coverage rates have changed due to shifts in population and job locations even as the system has remained static. • On-Time Performance is available on at least a monthly basis. These standards should be achievable on average over each month, though exceptions may be made for long periods of severe weather. On-time performance problems should be addressed as quickly as possible. • Productivity should be achieved as an annual average including a complete cycle of seasons. Any new service or network element should be allowed to run an entire year before judgments are made about inadequate productivity of certain segments. Appropriate marketing – especially distinctive branding and marketing of the Frequent Network – is a key precondition for success at that layer. The following guidelines apply to the monitoring of standards: • Productivity outcomes are the result of an entire network layer of a given frequency. Thus, the standard presented in the table is the average across the entire layer that should be achieved, while a deficiency for a single line is identified only when that line drops below two thirds of that standard. This is important to ensure that the interdependence of elements of a network is recognized when a line is declared deficient. • Productivity standards are segment-based, so they will require segmentlevel assessment of ridership. • To capture the interdependence of Frequent lines, any low-performing Frequent line should be analyzed as follows before considering reducing its frequency: o Does the line have an inner segment which connects with other Frequent lines and outer segments that do not? Central Ohio Transit Authority 4-34 2015-2019 Short-Range Transit Plan 4 – Standards for Service Design If so, look at the productivity of these outer segments in isolation to see if these are the cause of poor performance. If so, the segmentation of the line can be revised and the outer segment demoted to a lower frequency and service category. o Does the line show strong evidence of high transfer volumes at key Frequent network intersections? If so, assume that any service reduction will cause ridership drops not just on the line under study but also on the intersecting line. • On-Time performance should be reviewed on the route level based on monthly reports. It is usually possible to determine whether a delay problem correlates with a particular route segment, a particular time of day, a particular operator, or a particular vehicle type. The appropriate action will depend on this analysis. Updating Service Purposes as Networks and Performance Change In the service standards Table 4-9, the purpose column indicates the intention behind each kind of service: ridership or coverage. In the future, it will be necessary to update this evaluation as ridership evolves. This updating is not necessary for monitoring the service standards, since halfhourly services have their own standards that reflect their mixed purpose, but it is necessary to determine whether the overall split of the budget between ridership and coverage matches the adopted policy. The primary challenge is the 30-minute category. Frequent services are all ridership-justified. Hourly services are all, by definition, coverage services. Express services should be presumed to be coverage services until such time as they begin to perform in a range where – measured in boardings / vehicle hour – they begin to match the performance of the Frequent Network. At that point, a category of ridership-justified Express services can be created. When determining the purpose of a half-hourly service, the following considerations can be used. • If the segment’s productivity is in the range of Frequent Network services, then it is a ridership service. • If the segment’s productivity, compared to that of the total network, is below the percentile defined by the percentage of the network devoted to Central Ohio Transit Authority 4-35 2015-2019 Short-Range Transit Plan 4 – Standards for Service Design coverage, then it is a coverage service. For example, the current allocation assigns 30% of service to the coverage goal, so if the productivity of the route is in the bottom 30% systemwide, it can be assigned to that coverage goal. • If ridership is clearly very different on one part of a segment than another, divide the segment into smaller segments and assign purpose separately and see if this produces segments satisfying the above criteria. In certain cases: • If there are clear reasons to expect ridership to dramatically improve soon, such as imminent development or redevelopment, provisionally assign the line to the ridership purpose. Any such imminent improvement should be an improvement in one or more of the necessary features for ridership that arise from the built form: density, walkability, linearity, and continuity. • If the built environment is mostly unfavorable to transit (in terms of generally low density, walkability, linearity, and continuity) and shows little sign of changing for the better, assign the line to the coverage purpose. There is no way to completely remove professional judgment from the process of inferring intentions from services, which is why the allocation of service between ridership and coverage is a guideline. Allocating service to one of the purposes may change during re-evaluation processes. Reviewing 30-minute Purpose Ranking When a 30-minute segment is assigned to a ridership or coverage purpose, it should be reviewed in the following terms: • Half-hourly segments categorized as ridership may be in line for promotion to the Frequent Network as resources permit. However, there may be cases – such as segments driven by a strongly daytime-only or peak demand – where the service may stabilize at 30-minute base frequency as optimal for maximum productivity, and continue to satisfy the standard for a ridership-justified line (i.e. the Frequent Network standard). • In this case, service should be reviewed by whether its frequency is deserved, as opposed to the hourly frequency that is typical of coverage service. There may be extenuating circumstances; for example, in some cases, no resources may be saved by reducing the frequency, or the frequency may be created by hourly branches further out that cannot be cut further. Central Ohio Transit Authority 4-36 2015-2019 Short-Range Transit Plan 4 – Standards for Service Design 4.5.7 COTA Evaluation of TSR Service Standards Recommendations As mentioned above, COTA will evaluate the proposed standards and method of allocating purpose prior to implementation in May 2017. Standards may change based on changes to the proposed bus network in Section 6. The Short-Range Transit Plan will be updated in 2017 with the finalized standards. 4.6 Bus Stop Design Guide 4.6.1 Purpose This COTA Bus Stop Design Guide manual is intended to act as both an internal resource for COTA and as guidance for municipalities and developers to create and review development proposals to ensure that they are consistent with COTA standards and guidelines for providing adequate accessibility and amenities at bus stops. The manual is available for review and download at www.COTA.com. In general, COTA is solely responsible for the siting and installation of new bus stops, whether those stops are simply a signpost in the ground, a passenger shelter, or a transit hub with enhanced passenger amenities. COTA staff provides initial recommendations regarding where bus stops will be placed and what amenities, if any, will be installed. COTA then works with the appropriate jurisdiction to obtain permits for the installation of the bus stop and determine the final location. If COTA constructs concrete passenger pads or shelters at a bus stop, it is responsible for ensuring that the bus stop meets all federal, state, and local regulations, including those associated with the Americans with Disabilities Act (ADA). While it is COTA’s role to provide public transit service in the central Ohio region and to install bus stops, in general it is the role of municipalities and developers to provide infrastructure for pedestrians, motorists, and bicyclists to access that transit service. Thus, when new development or redevelopment occurs at or near an existing COTA bus stop location, it is the developer’s (or municipality’s) responsibility to ensure that the bus stop can be adequately served by COTA’s transit vehicles and easily accessed by transit customers. Adherence to the Americans with Disabilities Act (ADA) guidelines as well as applicable roadway design standards are important to providing access to transit. Central Ohio Transit Authority 4-37 2015-2019 Short-Range Transit Plan 4 – Standards for Service Design COTA encourages developers to take existing and proposed bus stops into account from the beginning of the planning and design processes. Developers and local officials should seek the guidance of COTA staff in making design decisions on development and local infrastructure that affects transit stops. Please note, however, that it is the responsibility of the developer to ensure that all construction and design regulations are met, particularly when they are more stringent than COTA guidelines. 4.6.2 Goals These guidelines will help COTA, developers, and municipalities meet the needs of the community by pursuing the following goals: • Bus stops should be placed in convenient locations that do not compromise the safety of customers, pedestrians, bicyclists, or vehicles. • Bus stops should be spaced to maximize the efficient operation of transit service while not requiring riders to walk excessive distances (i.e. greater than one half mile) to the nearest bus stop. • Bus stops should be clearly and consistently identifiable with up-to-date information for riders about services at the bus stop. • Bus stops should have appropriate amenities based on the usage of that stop and the surrounding land use. • Where reasonable, bus stops should be accessible. Americans with Disabilities Act (ADA) considerations will be given top priority in the siting and design of new and existing bus stops. • Bus stops should be well-maintained and free of trash and vandalism. • Facilities surrounding bus stops such as roadways and pedestrian amenities should be transit-supportive and designed according to sound engineering practices. COTA should solicit community input for all major bus stop changes and respond promptly to inquiries and complaints from customers and bus stop neighbors. Central Ohio Transit Authority 4-38 2015-2019 Short-Range Transit Plan 4 – Standards for Service Design 4.7 Bus Stop Spacing Guidelines Bus stops should be spaced to balance the need for a quick in-vehicle travel time with considerations of the distance customers must travel to access the bus stop. When stops are spaced closely together, customers have convenient access as they are likely traveling a short distance to the nearest bus stop. However, closely spaced stops are likely to result in a longer ride for customers because of the number of times the bus needs to decelerate, come to a complete stop, and then accelerate and re-merge into traffic. Having fewer stops along a bus route will inconvenience some customers who will be required to travel further to the nearest stop, especially if they have a mobility limitation. At the same time, having a greater distance between bus stops benefits passengers by reducing the in-vehicle travel time and benefits the transit agency through reduced maintenance costs of underutilized bus stops. Therefore, optimally spacing bus stops can have positive impacts on the quality of service as well as operational effectiveness and efficiency. COTA developed new bus stop spacing guidelines in 2009 (Table 4-10). The guidelines were developed based on the review of research studies on the optimal spacing of bus stops, existing bus stop spacing standards at other transit agencies, and feedback from the public, municipalities, and other stakeholders. Table 4-10 Bus Stop Spacing Guidelines Density High Density, CBD, Shopping (>20 persons/acre) Fully developed residential area (10 – 20 persons/acre) Low density residential (3 – 10 persons/acre) Rural (or Express Bus Service) (0 – 3 persons/acre) Bus Stop Spacing Range 500 – 700 ft. 700 – 850 ft. 850 – 1200 ft. 1200+ ft. These are general guidelines and the actual placement of bus stops is influenced by additional factors. When placing new bus stops or analyzing existing stop spacing, COTA examines the following criteria: • Ridership – COTA will prioritize removing stops with low ridership rather than stops with very high ridership, which may result in uneven spacing on portions of the lines, if for example two very high ridership stops exist in close proximity to each other; Central Ohio Transit Authority 4-39 2015-2019 Short-Range Transit Plan 4 – Standards for Service Design 4.8 • Crosswalks- COTA will prioritize placing new stops at intersections with safe crosswalks to discourage unsafe pedestrian crossings, which may result in uneven stop spacing on portions of the lines; • Accessibility – COTA may choose not to place or to remove stops along unsafe roadways with no pedestrian amenities, even if the spacing guidelines call for more closely spaced stops; • Special Populations – COTA may place stops more closely together if the stops are in close proximity to concentrations of people with mobility limitations, elderly populations, or medical facilities; • Nearby Destinations – COTA may place stops more closely than the guidelines call for if there are major trip-generating destinations such as employment centers; and • Transfer Opportunities – COTA may place stops more closely together than recommended if it is necessary to do so in order to make transfers possible between multiple lines. Bus Stop Inventory and ADA Improvements The bus stop is the building block of COTA’s transit system and is the primary location where passengers interact with the transit service. Thus, it is important that COTA has an accurate and detailed dataset regarding the physical and service-related attributes of each bus stop in the system. COTA staff began a detailed inventory of all 4,000 bus stops in late 2012. Bus stops are being inventoried with a handheld computer device that can collect several attributes of each bus stop (such as the presence of shelters and sidewalks) as well as GPS location and photographs. One of the major goals of this bus stop inventory is to take stock of the pedestrian accessibility to each of COTA’s bus stops, with particular attention paid to accessibility for persons with limited mobility and adherence to the standards put forth by the Americans with Disabilities Act (ADA). With the accessibility information gathered during the bus stop inventory process, COTA’s long-term goal is to regularly pursue funding opportunities to improve bus stops and increase accessibility. As a first step towards this goal, in 2012 COTA partnered with the City of Columbus’ now-dissolved Division of Mobility Options to apply for a Federal Transit Administration (FTA) grant to build sidewalk connections to important bus stops. COTA used several sources of data to identify bus stops without sidewalk Central Ohio Transit Authority 4-40 2015-2019 Short-Range Transit Plan 4 – Standards for Service Design connections that persons with disabilities were likely to use. The joint grant application submitted by the MORPC recommended that the FTA grant the full funding amount of $638,194 to the City of Columbus and COTA. COTA plans to continue pursuing similar funding opportunities in future years in order to improve accessibility to bus stops throughout the service area. 4.9 Title VI Adherence and Environmental Justice In addition to the previously discussed evaluation procedures, COTA's planning process is sensitive to the needs of minority communities. As a federally funded and regulated transit provider through the FTA, COTA has a responsibility to adhere to the objectives of Title VI of the Civil Rights Act of 1964 as well as the policies set forth in the Executive Order on Federal Actions to Address Environmental Justice in Minority Populations and Low-Income Populations (1994). Title VI The objectives of the FTA Title VI program are as follows: • To ensure FTA-assisted benefits and related services are equitably distributed without regard to race, color or national origin; • To ensure that both the level and quality of transit services provide equal access and mobility for any person without regard to race, color or national origin; • To prevent the denial, reduction, or delay in benefits related to programs and activities that benefit minority populations or low-income populations; • To ensure that access to the planning and decision-making process is open and provided without regard to race, color or national origin; • To ensure that decisions on the location of transit facilities and services are made without regard to race, color or national origin; and • To ensure meaningful access to programs and activities by persons with limited English proficiency. These objectives are the basis for the implementation of the FTA Title VI program. To comply with these objectives, COTA has adopted the suggested methodology and framework set forth in the Title VI reporting guidelines (FTA Circular 4702.1B) for compliance assessment. Central Ohio Transit Authority 4-41 2015-2019 Short-Range Transit Plan 4 – Standards for Service Design By using this methodology, COTA will monitor and compare performance of all its routes based on level of service and quality of service criteria. To facilitate this evaluation, COTA will continue to collect data relating to its service standards, such as load factor, vehicle assignment, frequency, and on-time performance. These analyses will be conducted on a route-by-route basis each service change period, thus enabling a system-wide evaluation. Where a variance exists, these findings will be used to modify service delivery in order to comply with the Title VI program’s stated objectives. In 2013, COTA submitted a new Title VI triennial report to FTA, which documented the results of this methodology and showed COTA’s compliance with the Title VI regulations during years 2010-2013. Environmental Justice (EJ) Although no formal report is required, FTA requires transit providers to incorporate environmental justice and non-discrimination principles into transportation planning and decision-making processes as well as environmental review for specific projects. The two primary classes considered are minorities and lowincome populations. Three main principles guide the EJ process: • To avoid, minimize, or mitigate disproportionately high and adverse human health and environmental effects, including social and economic effects, on minority populations and low-income populations; • To ensure the full and fair participation by all potentially affected communities in the transportation decision-making process; and • To prevent the denial of, reduction in, or significant delay in the receipt of benefits by minority and low-income populations. EJ policy requires analysis of transit activities if a low-income and/or minority population is impacted by such activities. The analysis compares the impacts of low-income and minority populations to those of non-low-income and non-minority populations. COTA reviews the results of the analysis to guide decision makers in choosing alternative actions that reduce the difference in impacts between lowincome and minority populations and non-low-income and non-minority populations. Central Ohio Transit Authority 4-42 2013-2017 Short-Range Transit Plan 5 – Planned Service Changes 5 Current Fixed-Route Service 5.1 Current COTA System COTA’s public transit services are provided via two primary service operations: fixed-route service and paratransit service. The following information describes in greater detail the important role each of these programs serves in providing transit service to central Ohio residents. Figure 5-1 Fixed-Route Bus 5.1.1 Fixed-Route Service The backbone of COTA’s public transit system is fixed-route bus service. Service is provided on a repetitive, fixed-schedule basis along specific streets, with vehicles stopping to pick up passengers at, and deliver passengers to, specific locations. COTA currently operates four types of fixed-route service and may add two additional types in the future: Current Fixed-route Service Types Local: Service, which operates primarily on arterial streets and connects to the Downtown Central Business District. Local service makes all stops along the route, with spacing between stops based on COTA’s bus stop spacing standards. Crosstown: Non-radial service that does not enter the Downtown Central Business District. Crosstown service makes all stops along the route, with spacing between stops based on COTA’s bus stop spacing standards. Express: Service that operates at peak periods between an outlying origin point and either the Downtown Central Business District or other major employment centers. Reverse-Commute Express Service generally operates at peak periods and usually originates at the Downtown Central Business District and has a final destination at an outlying employment center. Central Ohio Transit Authority 5-1 2013-2017 Short-Range Transit Plan 5 – Planned Service Changes LINK: Service confined to a specific locale, such as a downtown or neighborhood, with connections to major traffic corridors and/or transfer points. Potential Future Services Limited-Stop: Service operates along major transit corridors with stops only at major transfer points and destinations. Limited-stop service operates at a lower frequency and span of service than Local service, but provides reduced travel times between major destinations. Bus Rapid Transit (BRT): A form of limited-stop service that incorporates higher service frequency. BRT service provides the use of technologies to increase speed of service such as traffic signal priority and off-board payment options. BRT also offers unique route branding and increased passenger amenities. A timed-transfer system goes into effect at 10:00 p.m. on weekdays allowing passengers to conveniently transfer in the downtown. Currently, the final transfer trip from the downtown is 12:00 a.m. on weekdays, 12:00 a.m. on Saturdays, and 9:00 p.m. on Sundays. COTA offers a late-night line that serves major destinations. Line 21 Night Owl provides late-night service on Thursday, Friday, and Saturday, between Downtown, the Arena District, Short North, OSU, and the Park of Roses along North High Street from 7:00 p.m. to 2:45 a.m. Table 5-1 summarizes the COTA fixed-route service by day of week and time of day. Maps of the entire COTA system, as well as evening, Saturday and Sunday service follow the Existing Service table. COTA’s current passenger fare structure is included in Table 5-2. Central Ohio Transit Authority 5-2 2013-2017 Short-Range Transit Plan 5 – Planned Service Changes Table 5-1 Existing COTA Service as of January 2015 Route LOCALS #1 Cleveland/Livingston #2 E. Main/N. High #3 W. Mound #3 Northwest Blvd. #4 Indianola/Parsons #5 W. Fifth Ave. #6 Sullivant/Mt. Vernon #7 Neil/Whittier #8 Hamilton/Frebis #9 Leonard/Brentnell #10 E. Broad/W. Broad #11 Oak/Bryden/St.Clair #12 McKinley/Fields #13 US 33/Watermark #14 Harmon/Greenlawn #15 Grove City #16 E. Long /S. High #18 Kenny #19 Arlington/Grandview #21 Night Owl (*Thursday, Friday, and Saturday only) EXPRESS #27 Brooksedge (Reverse) #29 Polaris (Reverse) #30 Smoky Row #31 Worthington #32 Crosswoods #33 North Central #34 Karl #35 Tamarack #36 Annehurst #37 Westerville #38 Easton #39 New Albany #40 New Albany Business Park (Reverse) #41 Gahanna #43 E. Broad #44 N. Reynoldsburg #45 Reynoldsburg AM Weekday MID PM Evening Saturday Sunday & Holiday x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x No No x x x No x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x No No No x x No x x x x x x x x x x x x x No No x x x No x x x No x x x x x x x x x No No x x x No No No No x* x No x x x x x x x x x x x x No No No No No No No No No No No No x x x x x x x x x x x x No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No x No x No No No x x x x No No No No x x x x No No No No No No No No No No No No Central Ohio Transit Authority 5-3 2013-2017 Short-Range Transit Plan 5 – Planned Service Changes Route EXPRESS (continued) #46 Eastland #47 Brice #48 Eastgreen (Reverse) #49 Southeast #52 OSU/Airport AM #53 Lincoln Village #54 London-Groveport (Reverse) #55 Gender #56 Tuttle (Reverse) #57 Hilliard #58 Dublin #59 Dublin/Metro (Reverse) #60 Arlington #61 Kenny #64 Grove City #65 Southpark (Reverse) #66 Hilliard/OSU #67 East Hilliard #68 Hilliard/Westbelt (Reverse) CROSSTOWNS #80 OSU/Lennox #81 Hudson/Ohio #82 Grandview/OSU #83 Oakland/Weber #84 Hilliard/Arlington/OSU #87 Cassady #89 Hamilton Rd #92 James/Stelzer #95 Morse/Henderson #96 5th Ave. #118 Sawmill CBUS Link #70 CBUS Link (operates at beginning and end of OSU academic quarters) Weekday MID PM Evening Saturday Sunday & Holiday x x x x No No No No x x x x No No No No No No No No No No No No x x x x x x x No x x x x x x x x x x x x No x No No No No No No No No No No No No x x x x x x x x x x x x x x No x No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No x x x x x x x x x x x x x x x x x x x x x x No x x x x x x x x x x No x x x x x x x x x x x x No x No x x x x No No x x No No No No x x x No No x x x x x x Central Ohio Transit Authority 5-4 2013-2017 Short-Range Transit Plan 5 – Planned Service Changes Table 5-2 COTA Fare Structure Effective January 1, 2012 CASH FARES Local, Crosstown Express COTA LINK Transfers (valid for 2 hours) $2.00¹ $2.75 $1.00¹ FREE¹ PASSES 1-Day Pass Adult Reduced Fare Agency $4.50⁴ $2.25⁵ $4.00 7-Day Pass $25.00⁴ 31-Day Pass Local Express Discount Fare (Senior Discount with Key ID Card and children 48” tall to 12 years of age) Mainstream $62.00² $85.00 $31.00 $105.00³ SPECIAL REDUCED FARES (For Fixed-Route Service) Senior Discount/Key Card Senior Discount/Key Card COTA LINK ADA Card Children 48” tall and over through 12 years of age Children under 48” tall (Limit 3 with an adult family member) $1.00 $0.50⁶ FREE $1.00 FREE PROJECT MAINSTREAM ADA trip Non ADA trip $3.50 $5.00 ¹In addition to a transfer ticket, an additional $0.75 is required when transferring from Local or Crosstown to Express service. Senior and Key cardholders do not pay upcharge for Express lines ²An additional $0.75 upcharge when used on Express routes. ³An additional $1.50 upcharge required for non-ADA trips. ⁴An additional $0.75 is required on Express routes. ⁵Senior ID Card, Key Card, Children 48”+ tall through 12 years of age. ⁶ An additional $0.50 upcharge when transferring to Local or Express routes. Central Ohio Transit Authority 5-5 2013-2017 Short-Range Transit Plan 5 – Planned Service Changes 5.2 Key Operating Statistics COTA provides the Federal Transit Administration (FTA) with financial and operating statistics on a yearly basis. The annual National Transit Database Report summarizes this data. Key operating statistics from COTA’s unaudited 2013 National Transit Database Report are found in Appendix A. 5.3 Rider Characteristics During the spring and fall of 2013, an on-board passenger survey was conducted on all COTA routes. The survey was conducted in cooperation with MORPC, the region’s metropolitan planning organization, ODOT, the Federal Transit Administration (FTA), and the Ohio State University. The purpose of the survey was to capture accurate and reliable travel patterns and socio-demographic characteristics of the community’s transit passengers. The details obtained through the use of the survey are being utilized to help update MORPC’s regional transportation model, and to assist with future transit planning and marketing efforts. Among other important data derived from the 2013 survey, key findings included: Over half of all riders are under 35 years of age (55%). Express bus riders are more likely to be between 35 and 64 years of age (67%); What is your age? Central Ohio Transit Authority 5-6 2013-2017 Short-Range Transit Plan 5 – Planned Service Changes 71% of rider households have an annual income of less than $25,000; while 81% of express riders have an annual income greater than $25,000; Total Annual Household Income 70% of riders are employed; Employment Status? Central Ohio Transit Authority 5-7 2013-2017 Short-Range Transit Plan 5 – Planned Service Changes About 61% of all riders are transit-dependent; How many cars, trucks, etc. are available to your household? 53% of riders are African-Americans, 41% are White/Caucasians; What is your race/ethnicity? Central Ohio Transit Authority 5-8 2013-2017 Short-Range Transit Plan 5 – Planned Service Changes 25% make at least one transfer to complete a one-way trip; and Number of transfers during a one-way trip 51% of trips are work related. Trip purpose? Central Ohio Transit Authority 5-9 2013-2017 Short-Range Transit Plan 6 – Planned Fixed-Route System 6 Planned Fixed-Route System COTA will continue to make significant improvements to the bus network through May 2017. These planned improvements are based on recommendations from the Transit System Review (TSR), a yearlong study of COTA’s bus network led by a consultant team, IBI Group Inc., and completed in October 2014. (See Section 4.5) The recommendations in the TSR were developed with input collected through substantial public outreach, including public meetings, focus groups, an advisory committee, COTA Board of Trustees, an online survey, and social media. The plan can be found on COTA’s website at www.cota.com/tsr. The proposed bus network in the TSR forms the foundation of the planned service changes found in this SRTP (See Figure 6.1). The planned service changes will substantially improve the bus network, including the following: • 10% increase in ridership after two years of implementation; • Twice as many high frequency lines with 15 minute or better service, all day, seven days a week, growing from six to twelve; • A grid-like system to reduce the need to travel Downtown for transfers; • Major expansion of weekend service, reflecting the all-week nature of retail and service employment; • New connections to suburbs and job centers seven days a week (such as Polaris, Rickenbacker and New Albany); • Clock-face frequency, meaning the bus will come every 15 (or less), 30 or 60 minutes; • Alignments are easier to understand with fewer deviations and straighter alignments; • More trips per express line, but fewer express routes overall; and • Better use of capital resources. • More use of Easton Transit Center as a major transfer location; • More use of COTA’s downtown transit terminals; • Fewer buses in the fleet, but same amount of service; Reduce need for future additional storage and maintenance facilities. Central Ohio Transit Authority 6-1 2013-2017 Short-Range Transit Plan 6 – Planned Fixed-Route System Figure 6-1 SRTP Proposed Network Midday Frequency Central Ohio Transit Authority 6-2 2013-2017 Short-Range Transit Plan 6 – Planned Fixed-Route System To guide the creation and implementation of the proposed network, the consultant team recommended that COTA adopt a policy as to how to allocate its bus service. COTA is often asked to provide both high-ridership, efficient service in busy corridors, such as High Street, and coverage service to regionally important locations, such as job centers and low-income neighborhoods in less dense areas, that generate low-ridership. As such, the proposed network allocates approximately 70% of bus service to high-ridership service and 30% to coverage service, mirroring the current network. This allocation policy will be used when modifying or expanding the bus network following full implementation of the TSR recommendations scheduled for May 2017. 6.1 Service Investment Strategy In November 2014, COTA’s Board of Trustees adopted the recommendation service allocation policy, directing staff to invest approximately 70% of bus service into high-ridership lines and 30% into coverage lines, service in regionally important areas that likely generate low-ridership. This policy is meant as a guideline to be applied when the final implementation of the TSR is complete and for all future changes to the bus network beyond that point. This strategy reflects COTA’s current bus network, which also invests approximately 70% of service in high-ridership lines and 30% in coverage. High-ridership lines serve corridors such as N. High St., E. Broad St., W. Fifth Ave., E. Main St., Cleveland Ave., and Livingston Ave. This service and the surrounding corridor exhibit universal characteristics that generate high-ridership: • Walkability – Service is easy and safe to access, such as a prevalence of sidewalks and pedestrian crossings; • Density – There are many people living and jobs located around the service; • Linearity – Service can travel in a reasonably straight line that riders and potential riders perceive as direct; • Continuity – The corridor service travels along has few gaps where there are no potential riders, such as parking lots, vacant lots and rural green space; • Uniqueness – Service does not overlap or compete with other service within ¼ mi. unless the demand within the overlapping and competing area is high. Central Ohio Transit Authority 6-3 2013-2017 Short-Range Transit Plan 6 – Planned Fixed-Route System Coverage lines serve areas that do not exhibit characteristics of high-ridership service, but yet are important to serve. These areas include low-density suburban communities, e.g., the Rickenbacker area, New Albany Business Park, HilliardRome Rd., and Polaris Fashion Place. The methodology for determining if a service falls into the ridership or coverage category is found in Section 4.5. 6.2 Developing the Proposed Bus Network The process to complete the TSR was divided into three main phases with the review completed in October 2014 (See Figure 6-2). In the first phase, the consultant team assessed the current conditions of COTA’s bus network as well as regional demographic information, such as population and job locations. The assessment provided line-by-line narrative describing factors that contribute to the performance of each line. Using this information, in the second phase the consultant team led a three-day workshop to develop three alternative transit networks. Each network demonstrated what the bus network could look like if service was allocated in different ways between high-ridership and coverage lines. The three alternatives presented a bus system allocating 90% of service to high-ridership lines and 30% to coverage, 50% to high-ridership lines and 50% to coverage and 70% to highridership lines and 30% to coverage. In January, a project advisory committee comprised of business, social service and advocacy leaders from across central Ohio and focus groups were formed to guide the project. Figure 6-2 TSR Timeline Central Ohio Transit Authority 6-4 2013-2017 Short-Range Transit Plan 6 – Planned Fixed-Route System The three alternatives were presented to several public and stakeholders for input. Five public meetings were held in March 2014 as well as a project advisory committee meeting. The preferred alternative was the third that allocated 70% of service to high-ridership lines and 30% to coverage, similar to COTA’s existing system. Guided by public and stakeholder input, a single, proposed bus network was developed in the third phase. The consultant team led a workshop with staff and a separate workshop with COTA’s Board of Trustees to create the proposed network. In May and June of 2014, the network was taken back to the public, advisory committee and focus groups. Comments received were incorporated into refinement of the network. In October 2014, a final report was delivered to COTA from the consultant team. In November 2014, COTA’s Board of Trustees accepted the report, noting the quality of work complete, but did not officially adopt the plans within. The intent is to allow COTA staff to refine the proposed plans and present the refined plans to the public for an additional opportunity to provide feedback. 6.3 Planned Implementation COTA plans to implement the proposed network in two phases. Phase I will implement changes that have relatively minor impacts on current riders and the bus network during COTA’s service changes every January, May and September between January 2015 and January 2017. Public meetings will be held to solicit comments as per COTA’s service change practice. The remainder of the changes not implemented in Phase I will be implemented in Phase II, on May 1, 2017. Phase II will include those major realignments that are too complex to integrate into a normal service change process, renumbering of many lines, consolidation of duplicative service, discontinuation of service and restructuring of express service. On-time performance and any other operational issues identified after implementation will be adjusted in September 2017. In the summer of 2015, COTA plans to hold public meetings regarding the proposed network to finalize the plans. Additionally, an extensive outreach effort will be developed to inform riders of final changes. Additionally, Planning and Scheduling staff are working to make adjustments to service based on a low projection of estimated service hours to implement the plan provided by the project consultant. Central Ohio Transit Authority 6-5 2013-2017 Short-Range Transit Plan 6 – Planned Fixed-Route System 6.3.1 Planned Park & Ride Changes As part of the CMAX Cleveland Avenue Bus Rapid Transit project, COTA plans to open a new transit center and Park & Ride near Cleveland Avenue and SR-161 next to Meijer, and to move the Northern Lights Park & Ride to a new location immediately north of its current location. In the southeast, COTA plans to move the current Canal Winchester Park & Ride south on Gender Road to a newly constructed location at Winchester Pike in 2016. In the northwest, COTA plans to relocate the Dublin Dale Drive a Park & Ride. The location has yet to be identified. COTA was approached by City of Dublin Officials in late 2014 regarding the City’s Bridge Street District development plans. The 1,100 acre mixed-use development, commercial, housing, entertainment, civic and park amenities. The development plans require use of COTA’s existing park and ride site. As COTA desires to align its goals with those of local communities, efforts continue to identify a new park and ride location that best serve our customer’s mobility needs, while supporting Dublin’s efforts to attract new businesses, jobs, residents, and visitors. See Section 10.4 for additional details. Central Ohio Transit Authority 6-6 2013-2017 Short-Range Transit Plan 6 – Planned Fixed-Route System Figure 6-3 Current/Proposed High-Frequency Network Central Ohio Transit Authority 6-7 2013-2017 Short-Range Transit Plan 6 – Planned Fixed-Route System Figure 6-4 Proposed Express Network Central Ohio Transit Authority 6-8 2013-2017 Short-Range Transit Plan 6 – Planned Fixed-Route System Table 6-1 Proposed TSR Frequencies TSR Proposed Local Frequencies Route # Route Name Frequency Early AM (5:30am6:30am) Frequency AM PEAK (6:30am 9:00am) MID (9:00am4:00pm) PM (4:00pm7:00pm) EVE (7pm10:00pm 10 15 10 30 Segment Type Purpose Trunk Ridership Trunk Coverage 60 30 30 30 30 Late Night (10:00pm1:00am) Weekday Span (hours) Sat Base Sat Eve Sun Base Sun Eve Sat/Sun Span (hours) 16 30 30 30 30 16/15 60 19.5 30 30 30 30 18/16 11 CMAX Cleveland Avenue BRT Cleveland 1 Kenny / Livingston 1 Livingston Trunk Ridership 30 10 15 10 15 30 19.5 15 15 15 15 18/16 Kenny Trunk Ridership 30 10 15 10 15 30 19.5 15 15 15 15 18/16 1a-Kenny - Dublin Branch Coverage 60 40 60 40 60 60 19.5 60 60 60 60 15/15 1b-Kenny - Hard Rd Branch Coverage 60 40 60 40 60 60 19.5 60 60 60 60 15/15 BRT 1 2 E Main / N High 2 N High Trunk Ridership 30 10 15 10 15 30 19.5 15 15 15 30 18/16 E Main 2b-East Main - County Line Trunk Ridership 30 10 15 10 15 30 19.5 15 15 15 30 18/16 2 Branch Ridership 60 20 30 20 60 60 19.5 30 30 30 30 18/16 2L N High-Polaris Limited Trunk Ridership 30 30 30 30 30 30 19.5 30 30 30 30 18/16 3 Northwest Blvd / Parsons 3 Parsons Trunk Ridership 60 15 30 15 30 60 19.5 30 30 30 30 18/16 3 Northwest Blvd Trunk Ridership 60 15 30 15 30 60 19.5 30 30 30 60 18/16 4 Indianola / S High Central Ohio Transit Authority 6-9 2013-2017 Short-Range Transit Plan 6 – Planned Fixed-Route System TSR Proposed Local Frequencies Route # Route Name Frequency Segment Type Purpose Early AM (5:30am6:30am) Frequency AM PEAK (6:30am 9:00am) MID (9:00am4:00pm) PM (4:00pm7:00pm) EVE (7pm10:00pm Late Night (10:00pm1:00am) Weekday Span (hours) Sat Base Sat Eve Sun Base Sun Eve Sat/Sun Span (hours) 4 Indianola Trunk Ridership 60 15 30 15 30 60 19.5 30 30 30 60 18/16 4 S High Trunk Ridership 60 15 30 15 30 60 19.5 30 30 30 60 18/16 5 W 5th Ave / Whittier W 5th Ave Trunk Ridership 60 15 15 15 30 60 19.5 15 30 15 30 18/16 5a-W 5th Ave- Wilson 5b-W 5th Ave- Renner P&R Whittier Branch Coverage 60 60 60 60 60 60 19.5 60 60 60 60 18/16 Branch Coverage 60 60 60 60 60 60 19.5 60 60 60 60 18/16 Trunk Ridership 60 15 15 15 30 60 19.5 15 30 15 30 18/16 9a Whittier - Rickenbacker 9b Whittier - Gender Town Center Branch Coverage 60 30 30 30 60 60 19.5 30 60 30 60 18/16 Branch Coverage 60 30 30 30 60 60 19.5 30 60 30 60 18/16 Trunk Ridership 30 15 15 15 15 30 19.5 15 15 15 15 18/16 6 Sullivant / Mt Vernon - E 5th Ave Sullivant and Mt Vernon (common segment of 6-15) Sullivant Trunk Ridership 60 30 30 30 30 60 19.5 30 30 30 30 18/16 6 Mt Vernon - E 5th Ave Trunk Coverage 60 30 30 30 30 60 19.5 30 30 30 30 18/16 8 Karl Trunk Ridership 60 15 15 15 30 60 19.5 15 30 15 30 18/16 10 E Broad / W Broad E Broad 10-East Broad - County Line Trunk Ridership 30 10 12 10 15 30 19.5 12 15 12 15 18/16 10 Branch Ridership 60 20 24 20 30 60 19.5 24 30 24 30 18/16 5 5 6 6 Central Ohio Transit Authority 6-10 2013-2017 Short-Range Transit Plan 6 – Planned Fixed-Route System TSR Proposed Local Frequencies Route # Route Name Frequency Segment Type Purpose Early AM (5:30am6:30am) 30 Frequency AM PEAK (6:30am 9:00am) MID (9:00am4:00pm) PM (4:00pm7:00pm) EVE (7pm10:00pm Late Night (10:00pm1:00am) Weekday Span (hours) Sat Base Sat Eve Sun Base Sun Eve Sat/Sun Span (hours) 10 12 10 15 30 19.5 12 15 12 15 18/16 20 20 20 30 15 30 30 30 60 9 10 W Broad Trunk Ridership 12 McKinley/Fields Trunk Coverage 15 Grove City / Mt Vernon Stelzer Grove City Trunk Coverage 60 30 30 30 30 60 19.5 30 30 30 30 18/16 15 Mt Vernon - Stelzer Trunk Coverage 60 30 30 30 30 60 19.5 30 30 30 30 18/16 17 Brentnell / W Mound 17 W Mound Trunk Coverage 60 30 60 30 60 60 19.5 60 60 60 60 15/15 17 Brentnell Trunk Coverage 60 30 60 30 60 60 19.5 60 60 60 60 15/15 18 Bryden / Joyce 18 Bryden Trunk Coverage 60 60 60 60 60 60 15.5 60 60 60 60 15/15 18 Joyce Trunk Coverage 60 60 60 60 60 60 15.5 60 60 60 60 15/15 Ohio Trunk Ridership 60 10 15 10 15 60 19.5 15 15 15 30 18/16 Branch Ridership 60 20 30 20 30 60 19.5 30 30 30 30 18/16 15 80 80 Ohio Crosstown Fairwood Loop 85 Brice Rd Trunk Coverage 60 60 60 60 60 60 15.5 60 60 60 60 15/15 86 Hilliard-Rome Rd Trunk Coverage 60 60 60 60 60 60 15.5 60 60 60 60 15/15 Central Ohio Transit Authority 6-11 2013-2017 Short-Range Transit Plan 6 – Planned Fixed-Route System TSR Proposed Local Frequencies Route # Route Name Hamilton Rd 89 89 Hamilton Rd Rickenbacker Frequency Segment Type Purpose Early AM (5:30am6:30am) Trunk Coverage 60 Select Trips Coverage Frequency AM PEAK (6:30am 9:00am) MID (9:00am4:00pm) PM (4:00pm7:00pm) EVE (7pm10:00pm Late Night (10:00pm1:00am) Weekday Span (hours) 30 30 30 60 60 19.5 60 60 5.5 Sat Base Sat Eve Sun Base Sun Eve Sat/Sun Span (hours) 30 Wee kday Only 60 30 Wee kday Only 60 15/15 0 92 Stelzer Trunk Ridership 60 15 15 15 15 60 19.5 15 15 15 30 18/16 93 Hudson Trunk Ridership 60 15 30 15 60 60 19.5 30 60 30 60 18/16 Trunk Ridership 60 15 30 15 30 60 19.5 30 30 30 30 15/15 94 N Broadway 94 North Broadway Crosstown - Hilliard-Rome Rd Branch Coverage 60 30 60 30 60 60 19.5 60 60 60 60 15/15 Morse 95 Morse Crosstown Tuttle Trunk Ridership 60 15 15 15 30 60 19.5 15 30 15 30 18/16 95 Branch Ridership 60 30 30 30 60 60 19.5 30 60 30 60 18/16 96 Dublin-Granville Trunk Coverage 60 30 30 30 60 60 19.5 30 60 30 60 18/16 400 Airport Trunk Coverage 60 60 60 60 60 60 15.5 60 60 60 60 15/15 Central Ohio Transit Authority 6-12 2015-2019 Short-Range Transit Plan 7 – COTA Fixed-Route Bus Fleet Table 6-2 Existing Park and Ride Locations Existing Map Site 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Name / Date Effective Berwick Plaza 2/24/1975 Broad & Southampton 1/1/1974 Cleveland & Mecca Loop Crosswoods 7/14/1993 Delawanda 10/1/2003 Dublin Dale Dr. 1995 Eastland Mall 1/5/2009 Easton Transit 5/1/2002 Gender Rd. 1/4/2010 Great Southern 1974 Griggs Dam 12/18/1995 Grove City 9/17/1987 Hilliard Cemetery Rd. 9/2/1986 Hilliard United Methodist Church 1/1/2008 Indianola & Morse 10/1981 Macy’s Kingsdale 1974 Livingston & Barnett 9/29/1982 Main & Weyant Loop New Albany 4/2002 Northern Lights 1978 Location Refugee Rd. & Winchester Pike W. Broad St. & Southampton Ave. Cleveland Ave. & Mecca Rd. 7460 Huntington Park Dr. 4939 N High St. 4450 Dale Dr. 4138 Refugee Rd. 4260 Stelzer Rd. 5336 Gender Rd. S. High St. & Obetz Rd. Riverside Dr. & Nottingham Rd. 2321 Old Stringtown Rd. 4199 Parkway Ln. 5445 Scioto Darby Rd. 4720 Indianola Ave. 3206 Tremont Rd. 3380 E. Livingston Ave. E Main St & Weyant Ave. 20 S. Third St. (United Methodist Church) Cleveland Ave. at Innis Rd. Central Ohio Transit Authority 6-13 2015-2019 Short-Range Transit Plan 7 – COTA Fixed-Route Bus Fleet Existing Map Site 21 22 23 24 25 26 27 28 29 Name / Date Effective Olentangy and Bethel 1982 Renner Rd. 1/5/2009 Reynoldsburg 7/1985 Royal Plaza 7/1986 St. Andrew 11/10/1994 St. Peter's 11/10/1994 Westerville 1/9/1981 Westwoods 10/25/1994 Whitehall 6/28/1993 Location 4990 Olentangy River Rd. 5608 Renner Rd. 2100 Birchview Dr. Agler Rd. & Stygler Rd. 1985 Swansford Dr 6899 Smoky Row Rd. 312 W. Main St. 55 Westwoods Blvd. Central Ohio Transit Authority 6-14 4540 E. Broad St. 2015-2019 Short-Range Transit Plan 7 – COTA Fixed-Route Bus Fleet 6.4 CMAX Cleveland Avenue Bus Rapid Transit (2017) Bus Rapid Transit (BRT) offers a variety of tools to help increase the speed and convenience of transit service and improve mobility, including but not limited to: • Traffic signal priority; • Fewer stops than traditional local routes; • Uniquely branded and designed stations and vehicles; • Real-time passenger information; and • Improved pedestrian amenities In November 2010, COTA was awarded grant funding from FTA’s former Section 5339 Livability Funding Opportunity: Alternative Analysis Program to investigate BRT and other transit alternatives in the northeast travel corridor (see Figure 6.5). COTA operates several lines within this corridor, including the #1 Cleveland Local. As one of COTA’s busiest lines with 4,900 average weekday riders, this line experiences frequent standing loads. An Alternatives Analysis (AA) was conducted in 2011-2012, and in June 2012, COTA’s Board of Trustees adopted a 15.6 mile Locally Preferred Alternative comprised of a combination of Bus Rapid Transit (BRT) service operating in mixed traffic primarily along Cleveland Avenue between downtown Columbus and SR-161 (10.3 miles), with enhanced local service continuing north to Polaris Parkway (5.3 miles). Additionally, MORPC adopted the project into the region’s Metropolitan Transportation Plan. In April 2013, COTA received approval from the FTA to enter into the next phase, Project Development, which included preliminary engineering and an environmental study. The project was awarded environmental clearance in July 2014, and following completion of preliminary engineering in August 2014, an FTA Small Starts grant funding request was submitted on September 8, 2014. In February 2015, it was announced that the CMAX project is included in President Obama’s federal fiscal year 2016 budget that was submitted to Congress for adoption. The President’s proposed budget includes an 80% ($38.1 million) federal funding level for the estimated $47.7 project cost, the maximum funding Central Ohio Transit Authority 6-15 2015-2019 Short-Range Transit Plan 7 – COTA Fixed-Route Bus Fleet level for Section 5309 federal grants. The remaining 20%, or $9.6 million, will be funded from COTA’s local sales tax receipts. Started in December 2014, COTA will continue with the current phase of the project, Final Design, which is expected to be completed in the fall of 2015. Final Design includes completing engineering and design to the 100% level, acquisition of real estate, development of cooperative agreements with the City of Columbus, Franklin County, City of Westerville and the Ohio Department of Transportation, and several other tasks necessary to complete prior to start of construction. Figure 6-6 displays the CMAX Cleveland Avenue BRT alignment, stations, and transit facilities (Northern Lights Shopping Center area park and ride and Meijer area transit center and park and ride). In total for both directions, there are 62 designated BRT stations. On weekdays, the BRT will operate at 10-minute service frequency during peak hours and 15-minute service frequency during off-peak hours between downtown Columbus and SR-161, and on weekends 30-minute service frequency. BRT buses will operate within existing traffic lanes along the corridor, and to improve on-time performance, traffic signals will be coordinated along Cleveland Avenue between Fort Hayes and SR-161 to allow buses priority through intersections if buses are running off schedule. With fewer stops, BRT travel times can be reduced by 21% over current Local Line 1 Cleveland trip times. An example rendering of a CMAX station can be found in Figure 6-7. Elements found in more robust BRT systems (e.g., Cleveland’s Healthline, etc.) include dedicated, bus-only travel lanes, and off-board fare collection for a majority of the route. Unfortunately, while dedicated bus lanes exist on High Street in the Downtown area during peak travel times, Cleveland Avenue does not have the capacity to allow for implementation of dedicated bus lanes. Due to cost constraints, at this time COTA does not plan to implement an off-board fare collection system, however, select high boarding activity stations will be outfitted with ticket vending machines designed to speed-up the boarding process. Central Ohio Transit Authority 6-16 2015-2019 Short-Range Transit Plan 7 – COTA Fixed-Route Bus Fleet Figure 6-5 Northeast Corridor Study Area Central Ohio Transit Authority 6-17 2015-2019 Short-Range Transit Plan 7 – COTA Fixed-Route Bus Fleet Figure 6-6 CMAX Cleveland Avenue Central Ohio Transit Authority 6-18 2015-2019 Short-Range Transit Plan 7 – COTA Fixed-Route Bus Fleet Projected costs and service hours are programmed into COTA’s 2013-2017 TIP (TIP) financial model found in Section 14. Major capital items include 14 new, uniquely branded CNG powered buses and shelters, construction of a park and ride in the Northern Lights area, a transit center and park and ride in the area of SR-161 and Cleveland Avenue, resurfacing of curb lanes along Cleveland Avenue between Westerville Road and SR161, implementation of signal priority for buses along Cleveland Avenue, real-time passenger information displays at BRT stations, and ticket vending machines at select high boarding locations along the route. Project benefits include: • Travel time savings of approximately 21 percent; • A projected 15% to 30% increase in ridership within the first five years; • More travel options for transit-dependent populations; • Improved pedestrian access and waiting areas; • Unique branding helps ease of use; • Next bus arrival time information; and • Opportunities for economic development within the corridor. It is estimated the BRT project will be completed and introduced into service in May 2017. Key to the success of any major service investment such as BRT is close coordination and partnership with local agencies, community stakeholders, and community leaders. Similar to efforts established during the AA, development of BRT service will require close coordination with the City of Columbus, City of Westerville, Franklin County, Clinton Township, the Village of Minerva Park, ODOT, MORPC, and other agency and stakeholder initiatives to help enhance the Northeast Corridor by: • Improving mobility options; Central Ohio Transit Authority 6-19 2015-2019 Short-Range Transit Plan 7 – COTA Fixed-Route Bus Fleet • Promoting economic development opportunities, and; • Promoting quality and affordable housing. It should be noted that in conjunction with implementation of BRT service on Cleveland Avenue, the existing #1 Cleveland Local will be modified to operate between Downtown and SR-161 (rather than to Ohio Health’s Westerville Campus on Polaris Parkway), with 30-minute frequency of service all day, and will serve all local stops along the modified route. 6.5 Short-Range Transit Plan Public Outreach Public engagement and conversation is critical to the success of COTA’s planning efforts. Not only does COTA conduct outreach as a public agency, COTA also relies on its riders, community leaders, local governments, business communities, and other stakeholders to provide invaluable input about current and future transit needs. Typically, two rounds of public meetings are held during the process of developing the SRTP, one set in the fall previous to the completion of the document and one set in the spring. However, since the service plan and supporting capital plan are based on the proposed changes in the Transit System Review, which included substantial Public and stakeholder outreach, only one set of public meetings were held for this SRTP. (See Section 6 for more details). As part of the TSR process, two rounds of public meetings were held in March and May of 2014. Each round consisted of five meetings held in various communities throughout COTA’s service area. The public was able to provide input both at the meetings and online through social media, email, and COTA’s website (www.cota.com/tsr). In addition to public meetings, three focus groups and an advisory committee were formed. The advisory committee was comprised of representation of a cross-section of COTA and community stakeholders, such as business leaders, social services, passengers and community leaders. The focus groups were similarly comprised of a large crosssection of stakeholders but included more technical and user focused discussion including individuals such as local municipal staff, young professionals, disabled Central Ohio Transit Authority 6-20 2015-2019 Short-Range Transit Plan 7 – COTA Fixed-Route Bus Fleet riders, seniors, and social service transportation providers. At the beginning of the study, an online survey was launched to gauge the needs of the community. COTA’s Board of Trustees was also kept engaged with the process. As representatives of the community and governing board of COTA, their input, discussion, and support led to the successful completion of the document. In November 2014, COTA’s Board accepted the final report and adopted the 70% ridership/30% coverage service allocation guidelines. See Section 6.1 for more details. 6.5.1 Public Involvement and Implementation The proposed bus network in this plan is not a finalized network, but represents the current, most up-to-date version of the proposed network. COTA has been and will continue to refine the network, identify operational challenges, adjust alignments, and make other related changes. COTA staff estimates that the bus network proposed in the TSR contains slightly more service than what is expected to be affordable in 2017. The final bus network plan is expected to be finished by the end of 2015 after public outreach is conducted. As mentioned in 6.1, the implementation of the TSR will be conducted in two phases. The first using the normal service change process, will propose to implement changes in the TSR that minimize the impacts on the structure of the current network, during COTA’s normal service change process. These include increases in frequency and alignment changes that do not affect other lines. Phase one began in January 2015 and will continue through January 2017. Public input will be collected during regular service change meetings. Phase 2 will be completed in May 2017 with September 2017 reserved to make minor adjustments. Most of the changes in the TSR will occur in Phase 2. In the summer and fall of 2015, COTA plans to hold public meetings to present the refined proposed bus network. The input collected will be directly incorporated into the decision making process to finalize the proposed network. Comments will still be accepted throughout the process up until implementation, similar to how COTA currently continually collects comments regarding plans. In late 2016 and/or early 2017, COTA will conduct an expansive outreach initiative that will educate riders and the Public on the Central Ohio Transit Authority 6-21 2015-2019 Short-Range Transit Plan 7 – COTA Fixed-Route Bus Fleet upcoming major changes to the system in May 2017. To encourage current riders to plan their new trips or find alternative transportation options, COTA will be developing an outreach strategy in 2015 that seeks to inform riders far in advance of the changes. Central Ohio Transit Authority 6-22 2015-2019 Short-Range Transit Plan 7 – COTA Fixed-Route Bus Fleet 7 COTA Fixed-Route Bus Fleet 7.1 Active Fleet As of March 2015, COTA operates an active fleet of 336 coaches. An additional 8 buses are kept in reserve as an inactive or contingency fleet, and two buses are inoperable and scheduled for sale or salvage. COTA also has a “historical” bus that is used for special events and parades. For more information on COTA’s fleet, including the number of coaches, status, year of manufacture, manufacturer, and seating capacity, see Table 7-1. 7.2 Fleet Spare Ratio By Federal guidelines, the number of spare vehicles in the active fleet should not exceed 20% of the number of vehicles operated in maximum service. As of March 2015, COTA operated 257 buses in the morning peak period and 280 buses in the PM peak period. The remaining active vehicles are retained as emergency spares (i.e., for breakdowns, manufacturer recalls, passenger overload relief, and special service) or for preventive maintenance (PM). 7.3 Future Bus Purchases Federal Transit Administration (FTA) guidelines state that heavy-duty transit coaches have a minimum 12-year or 500,000 mile service life. Each year, COTA implements service changes on the first Monday in January, May, and September. As such, COTA’s bus replacement and expansion planning efforts are targeted to meet the vehicle needs for each future service change period. Table 7-2 and Table 7-3 provide a detailed listing of COTA’s bus replacement schedule and the planned acquisition of expansion vehicles necessary to carry out this SRTP service plan is discussed in Section 6. As described in Section 1, COTA anticipates an estimated 19% increase in annual service hours over the next three years. The procurement process for ordering and delivering fixed-route buses takes approximately 12 to 18 months. COTA uses a “level buying” program as much as possible for bus acquisitions to minimize the variable number of buses that are purchased each year. This approach allows COTA to reduce the average age of the fleet and increase the fleet size to meet service expansion requirements. In the long term, this program allows COTA to better plan for the capital expenses related to bus purchases. Central Ohio Transit Authority 7-1 2015-2019 Short-Range Transit Plan 7 – COTA Fixed-Route Bus Fleet 7.4 Funding of Future Bus Purchases Funding for future bus replacement and expansion involves a variety of sources, including Federal Congestion Mitigation and Air Quality (CMAQ) grants, Federal Section 5309 grants, Federal Section 5307 Urban Formula grants, the Ohio Department of Transportation’s (ODOT) Public Transit Grant Program funds, and COTA’s local sales tax receipts. CMAQ provides funding for projects and programs in air quality non-attainment and maintenance areas for ozone (discussed in Section 7.6), carbon monoxide, and particulate matter aimed at reducing transportation related emissions. CMAQ funds are apportioned to qualifying areas according to a formula based on population and severity of pollution. In central Ohio, the CMAQ funds are administered by the Mid-Ohio Regional Planning Commission (MORPC). Every two years, MORPC solicits applications for transportation projects and programs that are located within its transportation planning area. In June 2014, MORPC solicited applications for awarding funding to projects and programs for State Fiscal Years (SFY) 2016-2019. At the present time, COTA is scheduled to receive over $7.4 million in MORPC attributable CMAQ funds during SFYs 2016-2019 to assist in funding future Compressed Natural Gas (CNG) vehicle replacements. There is formidable competition for federal and state assistance and the availability of various federal and state monies to fund all future bus replacement and expansion needs is not a given. COTA will actively pursue other possible sources of capital grant monies, including a partnership with MORPC to identify opportunities for funding COTA's bus replacement needs. The successful passage of Issue 7 in 2006 was critical in providing additional local funding resources to help offset shortfalls in federal and state capital assistance, and in allowing COTA to expand much needed transit services in central Ohio. Central Ohio Transit Authority 7-2 2015-2019 Short-Range Transit Plan 7 – COTA Fixed-Route Bus Fleet Table 7-1: Current Roster of Equipment Total Fleet As of December 2014 (Note: All buses are ADA accessible) Manufacturer Power Length Seating Capacity Number of Vehicles Active 2014 GILLIG CNG 40' 39 A/C – Ramp 21 21 1 2014 GILLIG CNG 35’ 32 A/C – Ramp 7 7 1 2014 GILLIG CNG 30’ 23 A/C – Ramp 8 8 1 2013 GILLIG CNG 40’ 39 A/C – Ramp 18 18 2 2013 GILLIG CNG 35’ 32 A/C – Ramp 12 12 2 2012 GILLIG Diesel 40' 39 A/C – Ramp 23 23 3 2011 GILLIG Diesel 40' 39 A/C – Ramp 37 37 4 2011 GILLIG Diesel 30' 23 A/C – Ramp 3 3 4 2010 GILLIG Diesel 40' 39 A/C – Ramp 37 37 5 2010 GILLIG Diesel Hybrid 40' 39 A/C – Ramp 6 6 5 2010 GILLIG Diesel 30' 23 A/C – Ramp 3 3 5 2009 GILLIG Diesel 40' 39 A/C – Ramp 30 30 6 2009 GILLIG Diesel 30' 23 A/C – Ramp 10 10 6 2008 GILLIG Diesel 40' 39 A/C – Ramp 30 29 2008 GILLIG Diesel 30' 23 A/C – Ramp 10 10 7 2007 GILLIG Diesel 35' 32 A/C – Ramp 32 32 8 2005 New Flyer Diesel 40’ 39 A/C – Ramp 5 5 10 2005 GILLIG Diesel 35’ 32 A/C – Ramp 12 11 Diesel 40’ 39 A/C – Ramp 5 5 11 Diesel 40’ 38 A/C – Ramp 10 10 12 Diesel 40’ 39 A/C – Ramp 21 19 Diesel 40' 53 A/C – Lift 1 2004 2003 2001 1963 New Flyer New Flyer New Flyer GMC Total 341 Sale Pending Special Service Contingency Equipment Year of Manufacture Fleet Age In-Active 1 1 2 10 1 52 2 Active Fleet Average Age (in years) Central Ohio Transit Authority 7-3 7 14 2 1 336 (years) 5.729 2015-2019 Short-Range Transit Plan 7 – COTA Fixed-Route Bus Fleet Table 7-2 Active Fleet Bus Replacement Schedule NOTE: End of Year - September Numbers YEAR 2001 2003 2004 2005 2005 2007 2008 2008 2009 2009 2010 2010 2010 2011 2011 2012 2013 2013 2014 2014 2014 2014 2015 2015 2016 2016 2017 2018 2019 MFG NEW FLYER NEW FLYER NEW FLYER GILLIG NEW FLYER GILLIG GILLIG GILLIG GILLIG GILLIG GILLIG GILLIG GILLIG GILLIG GILLIG GILLIG GILLIG GILLIG GILLIG GILLIG GILLIG GILLIG GILLIG GILLIG GILLIG GILLIG GILLIG TBD TBD LENGTH SEATING BUY QTY 40' 39 62 40' 39 10 40' 39 5 35' 39 12 40' 39 5 35' 32 32 30' 23 10 40' 39 30 30' 23 10 40' 39 30 30' 23 3 40' 39 37 40' 39 6 30' 23 3 40' 39 37 40' 40 23 40' 39 18 35' 32 12 40' 38 21 35' 31 7 30' 24 2 30' 24 6 40 39 33 35 31 5 TBD TBD 18 40' 38 14 TBD TBD 14 TBD TBD 28 TBD TBD 28 (entered by hand) Total Active Fleet Size PEAK FLEET Red Figures represent # of vehicles extended beyond their Less than 20% Spare Ratio useful life of 12 years Contingency Total Fleet 2015 Historical Special Fleet Total Total Fleet 1. 2. POWER PLANT DIESEL DIESEL DIESEL DIESEL DIESEL DIESEL DIESEL DIESEL DIESEL DIESEL DIESEL DIESEL D / HYBRID DIESEL DIESEL DIESEL CNG CNG CNG CNG CNG CNG - CBUS CNG CNG CNG CNG - BRT CNG CNG CNG 6 5 11 5 32 10 29 10 30 3 37 6 3 37 23 18 12 21 7 2 6 33 5 2016 1 5 32 10 29 10 30 3 37 6 3 37 23 18 12 21 7 2 6 33 5 18 14 2017 4 29 10 30 3 37 6 3 37 23 18 12 21 7 2 6 33 5 18 14 14 2018 5 10 30 3 37 6 3 37 23 18 12 21 7 2 6 33 5 18 14 14 28 351 293 362 302 332 277 332 277 17 3 37 6 3 37 23 18 12 21 7 2 6 33 5 18 14 14 28 28 332 277 58 60 55 55 55 4 355 5 367 0 332 0 332 0 332 1 356 1 368 1 333 1 333 1 333 Total Active Fleet is all buses determined to be eligible for active service. Does not include contingency vehicles and buses, which may be out of service due to a major accident or fire damage. Bus replacement and expansion schedule is based upon expansion of services hour calculated in Q4 of 2012. Current increase in service hours is greater than listed but only those hours allocated to planned service are listed. See Section 1.4.1 and 6 for more details. Central Ohio Transit Authority 7-4 2019 2015-2019 Short-Range Transit Plan 7 – COTA Fixed-Route Bus Fleet Table 7-3 Peak Fleet Utilization 30’/35’/40’ Fixed-Route Buses (Trimester Calendar Year) 1st Tri 2015 2nd Tri 3rd Tri 1st Tri 2016 2nd Tri 3rd Tri 1st Tri 2017 2nd Tri 3rd Tri 1st Tri 2018 2nd Tri 3rd Tri 1st Tri 2019 2nd Tri 3rd Tri 5 4 9 5 -2 6 4 -29 0 0 0 0 0 0 0 280 284 293 298 296 302 306 277 277 277 277 277 277 277 277 56 56.8 58.6 59.6 59.2 60.4 61.2 55.4 55.4 55.4 55.4 55.4 55.4 55.4 55.4 Actual Spare Fleet 56 56 58 59 59 60 61 55 55 55 55 55 55 55 55 Total Active Fleet 336 20.0 % 340 19.7 % 351 19.8 % 357 19.8 % 355 19.9 % 362 19.9 % 367 19.9 % 332 19.9 % 332 19.9 % 332 19.9 % 332 19.9 % 332 19.9 % 332 19.9 % 332 19.9 % 332 19.9 % Additional Peak Vehicles PM Peak Bus Requirement Calculated Spare (20% Of Peak) Actual Spare Ratio (%) 1. 2. 3. Peak Fleet is those vehicles planned to be in service during the morning and evening peak periods. Active Spare Ratio = Active Spare Fleet / PM Peak Bus Requirement Total Active Fleet is all buses determined to be eligible for active service. Does not include vehicles, which are out of service due to a major accident or fire damage, or contingency vehicles. 7.5 The COTA Contingency Fleet Plan In addition to the active fleet, COTA maintains a small quantity of coaches designated as a contingency fleet. The size of COTA’s contingency fleet is based on average age of the operational fleet, service miles, new purchases, future service plans, and space available to store the vehicles. The contingency fleet may be required under the following conditions: • Unanticipated Ridership – A sudden unanticipated increase in bus ridership could require a corresponding increase in the level of bus service. Such a ridership increase would most likely occur as a result of an energy-related emergency or weather conditions. However, a similar situation could occur due to a major transportation corridor construction project (causing extreme delays, etc.) or the failure of a major transportation facility such as a river crossing, etc. • Catastrophic Loss of Active Bus Fleet – A sudden unanticipated decrease in the availability of buses in the active bus fleet could require that buses in storage be placed back into service. Such an event could occur if a significant number of buses were damaged or destroyed by fire, tornado, flood, or other act of nature. A similar need could arise as a result of the premature failure of a major component of a group or sub fleet of buses, e.g., an engine or transmission failure, or cracking of structural frame members. • Bus Unavailability – An event that would require major bus fleet expansion may well be national in scope (an energy crisis for example). Central Ohio Transit Authority 7-5 2015-2019 Short-Range Transit Plan 7 – COTA Fixed-Route Bus Fleet Consequently, many transit agencies may be attempting to secure additional buses at the same time. This could result in long lead times to acquire needed buses, which would be prohibitive in terms of responding to the crisis at hand. • 7.6 Maintenance – Buses in the contingency fleet are on a 6,000-mile Preventive Maintenance (PM) schedule in accordance with COTA’s approved Maintenance Plan. Periodic start-ups will occur between normal PM inspections so that the fleet remains ready for service at all times. Vehicle history records are maintained for each bus. Air Quality Improvement Programs and Alternative Fuels Over the past two decades, an increasing number of alternative fuels and new emerging bus technologies have been developed and commercialized. Selecting the best fuel and technologies for COTA’s transit fleet is a high priority. COTA is committed to contributing to the growth of regional alternative fuel use and to being a leader in environmental stewardship. The Environmental Protection Agency (EPA) has mandated a reduction in the emissions of nitrous oxide, sulfur dioxide, and hydrocarbons. In 2000, COTA joined forces with MORPC’s Air Quality Program, which was formed to address the region’s growing air quality issues. This program’s membership includes representation from local governments, health-based organizations, businesses, and environmental interests. Low-sulfur petro-diesel engine emission reductions, mandated by the EPA, offer significant opportunities for fine particulate matter and ozone improvements. Through the use of alternative engine fuels, COTA will continue to be proactive in improving air quality in the region. One initiative COTA has implemented to improve the region’s air quality and quality of life is using alternative fuels such as CNG and reducing its dependency on petrodiesel. As mentioned above, COTA has begun to transition its fleet from diesel buses to CNG buses. This change will reduce costs and result in quieter buses and cleaner air. The transition to CNG buses will decrease greenhouse gas emissions as compared to the existing diesel-fueled buses. CNG is a fueling system that is used successfully in many US transit agencies and is even more prevalent in Central Ohio Transit Authority 7-6 2015-2019 Short-Range Transit Plan 7 – COTA Fixed-Route Bus Fleet other countries. This reliable technology achieves significant air quality improvements. According to the U.S. Department of Energy Alternative Fuels and Advanced Vehicles Data Center, In April 2004, the EPA designated the central Ohio region as “non-attainment” for failing to meet minimum air quality standards for ozone. In addition, Franklin, Delaware, Licking, and Fairfield counties are designated as “non-attainment” regions for particulate matter (2.5 microns). A study conducted by the U.S. Department of Energy concluded that CNG buses emitted 85% less total particulate matter than their diesel counter parts. CNG buses also emitted 53% less nitrogen oxide NOx and 89% less carbon monoxide (CO) than diesel buses. Additionally, Franklin County is currently listed as “maintenance” status for eighthour ozone, meaning the County has achieved EPA attainment standards but has not been fully classified as an attainment zone. According to the Clean Alternative Fuels: Liquefied Natural Gas fact sheet published by the EPA in 2002, CNG produces 50% less volatile organic compounds (VOCs) than diesel fuel. The VOCs contribute directly to an increase in ground level ozone measures. The gradual conversion to CNG from diesel will improve air quality in the COTA service area. 7.6.1 Conversion to Compressed Natural Gas (CNG) Starting in 2013, COTA began transitioning its fleet from the use of conventional diesel fuel (ULSD) to CNG. CNG is less expensive than diesel when compared to the average price of gallons per Btu. It is financially Figure 7-1 CNG-powered fixed route bus prohibitive to replace all buses at one time with CNG alternatives. As such, COTA will use a phased approach, dependent upon funding, by replacing up to onetwelfth of its fleet annually. COTA presently has a CNG fueling stations at the McKinley Avenue bus garage. Included in this SRTP timeframe is the conversion of both the Fields Avenue and mobility services facilities to CNG. The conversion is projected to begin in 2017. (See Sections 10.1.3 and 10.1.4). Central Ohio Transit Authority 7-7 2015-2019 Short-Range Transit Plan 7 – COTA Fixed-Route Bus Fleet COTA is scheduled to take delivery of 38 new CNG powered buses by the beginning of March 2015, replacing 21 of the 2001 series buses; the remaining are needed for expansion. This is the 3rd year of a five-year contract with Gillig Corporation in which COTA will order up to 30 buses per year to meet service and replacement requirements. COTA’s replacement schedule for the next five years is included in Table 7-2. During this timeframe, COTA will not only be replacing an estimated 100 coaches but also adjusting the number of coaches to meet service requirements. In total, COTA’s active fleet will change from 351 buses to a projected 332 buses by 2017 due to service changes detailed in Section 6. 7.6.2 Hybrid Electric Diesel Buses In June 2010, COTA placed into service six hybrid electric buses. The buses were purchased with the assistance of $2.1 million in CMAQ Improvement Program funds through the combined efforts Figure 6-2: Hybrid-electric fixed route bus of ODOT and MORPC. As a result of this assistance, COTA is able to evaluate the environmental and economic benefits of operating hybrid electric buses in the central Ohio region. While this technology has allowed us to improve the fuel economy of a transit bus by 36%, as well as reduce noise and overall emissions, it has yet to be determined if the significantly higher acquisition cost of these vehicles warrants additional purchases. 7.7 Fleet Maintenance Objectives Preventive Maintenance (PM) is a mainstay of COTA’s maintenance efforts, with reliability improving steadily over the past three years. It is COTA’s intention to constantly improve the PM program, moving from a position of reactive maintenance to a more deliberate, consistent, and proactive maintenance operation. The Vehicle Maintenance department is responsible for the development of scheduled COTA maintenance programs. All programs are reviewed annually for adequacy and applicability. Manufacturer’s recommendations, historical data on Central Ohio Transit Authority 7-8 2015-2019 Short-Range Transit Plan 7 – COTA Fixed-Route Bus Fleet bus system performance obtained from the Ellipse Asset Management software system, and direct feedback from bus maintenance provide the foundation for evaluating the PM program’s effectiveness. The PM functions outlined are set forth in detailed step-by-step procedures found in bus manufacturer’s maintenance manuals and COTA standard practice bulletins, standard operating procedures, and maintenance directives located at each operating division and maintenance shop. Completed preventive and corrective maintenance activities are documented on the appropriate forms, reviewed and certified by a supervisor, and entered into the reporting system. The scheduled maintenance program is designed to prolong bus reliability by detecting potential defects and correcting them before they fail. It also allows equipment requiring lubrication, measurement, and adjustment to be serviced. Buses are withdrawn from service at regular mileage-based intervals to permit the following PM actions: • Inspection of equipment to determine its condition compared with established standards; • Routine service: lubricating, replacing filters, replenishing fluids, and making adjustments; • Cleaning of exterior and interior surfaces and equipment; and • Scheduled replacement of electrical and mechanical equipment. The PM inspections are conducted at the following intervals: • A-Inspection: This general PM is performed every 6,000 miles. It includes an oil change, lube service and a general inspection of all major areas as outlined on the PM checklist; • B-Inspection: This PM is performed every 12,000 miles and incorporates all the requirements outlined for the “A” inspection plus additional checks to some of the major areas of the vehicle, including replacement of fuel filters; • C-Inspections: This PM is performed every 24,000 miles and includes the requirements as outlined on the A and B PM’s plus additional detailed checks into the major areas of the vehicle, including the replacement of transmission and engine air filters; Central Ohio Transit Authority 7-9 2015-2019 Short-Range Transit Plan 7 – COTA Fixed-Route Bus Fleet • D-Inspection: This PM is performed every 48,000 miles and includes the requirements as outlined on the A, B, and C PM’s plus additional detailed checks into the major areas of the vehicle, including replacement of all fluids and filters; and • E-Inspection: This PM is performed every 96,000 miles and includes the requirements as outlined the A, B, C, and D PM’s plus a transmission and coolant flush. ADA Equipment: Ramp equipped coaches are inspected during the normal PM process. HVAC PM - is “date” based and is scheduled twice a year. Engine Tune-Up: are “date” based and are scheduled once a year. 7.8 Other Equipment In addition to the primary passenger amenities such as buses, park and ride lots, bus stops and shelters, COTA employs other equipment and facilities as part of a behind-the-scenes effort to keep operations running efficiently. This equipment is described below. 7.8.1 Non-Revenue Vehicles COTA has established a replacement schedule and identified additional fleet requirements to support transit operations through 2019. Various types of service vehicles are distributed among the departments that support operations, including passenger automobiles and vans, police cruisers, heavy-duty service trucks (bucket, box, flat bed), and pickup trucks. Over the span of this SRTP, 38 vehicles in total are scheduled for purchase. COTA staff utilizes these vehicles for administrative functions, maintaining COTA infrastructure, and supporting maintenance activities on the fixed-route fleet. The cost of the non-revenue vehicles is $1,666,100 and will be funded from the dedicated local sales tax. Table 7-4: Non-Revenue Vehicle Purchases and Estimated Cost by Year 2015 2016 2017 2018 2019 Quantity 8 8 8 6 8 Est. Cost $510,000 $369,000 $334,000 $225,000 Central Ohio Transit Authority 7-10 $330,000 2015-2019 Short-Range Transit Plan 8 – Mobility Services 8 Mobility Services COTA’s Mobility Services department is responsible for meeting the requirements of the Americans with Disabilities Act (ADA) by providing paratransit service that complements the fixed-route fleet. Paratransit operations serve the elderly and persons with disabilities. Mobility Services will continue to develop alternative transportation options that exceed COTA’s traditional fixed-route and paratransit services. COTA’s vision is to be the region’s transportation leader. This goal includes providing a full service mobility management system that requires a variety of functions and activities to meet the needs of the community. In the years ahead, COTA will continue to strive for recognition as being more than a transportation provider. 8.1 Mainstream Paratransit Services COTA Mainstream Paratransit service is provided for individuals who are unable to use the regular fixed-route bus service due to a disability. The service is based on ADA eligibility criteria. Transportation service is provided throughout the COTA service area, which includes Franklin County and select portions of Delaware, Fairfield, and Licking counties (see Figure 2-4). Since 2011, COTA has contracted with First Transit, a transportation service provider, to perform paratransit service operations. Contract cost is negotiated annually. Operating statistics for Mainstream are monitored on a daily, weekly, and monthly basis. The service provider contract requires ADA compliance as well as adherence to various performance standards including: • Zero ADA trip denials; • On-time performance; • Productivity goals for passenger trips per revenue hour; • Missed trips; • On-board monitoring; and • Vehicle maintenance requirements. Statistical outcomes also include customer-service requests, customer trips, operating expenses, revenue recovery, and other indicators. Outcomes are Central Ohio Transit Authority 8-1 2015-2019 Short-Range Transit Plan 8 – Mobility Services tracked and reported monthly. Information is compared to prior months and prior years to analyze and assess significant trends or anomalies regarding service delivery. Table 8-1 summarizes Mainstream operating results for COTA’s calendar years. One component in providing alternative methods to traditional mobility service delivery is COTA’s non-ADA service. Non-ADA service is offered to customers who reside more than ¾ mile away from fixed route service or travel outside of service area but within COTA’s taxing district. Central Ohio Transit Authority 8-2 2015-2019 Short-Range Transit Plan 8 – Mobility Services Table 8-1 Mainstream Report for 2013-2014 Central Ohio Transit Authority 8-3 2015-2019 Short-Range Transit Plan 8 – Mobility Services 8.2 Functional Ability Assessments Federal regulations require COTA to determine ADA eligibility by performing physical functional assessments at its Mainstream and Eligibility Assessment Facility. The assessment process determines which applicants are eligible and includes a focus on functional and observational aptitudes. The assessment center includes a variety of simulated features that applicants may Figure 8-1 Assessment Center encounter while using COTA, including stairs, ramps with varied slopes, sidewalks, broken sidewalks, grassy, gravel, and sandy terrain, a passenger shelter, a simulated traffic light with crosswalk, a scale to weigh applicants in their mobility device to determine if they are within ADA maximum weight limits, and a permanent halfbus with all the functionality of a larger, fixed-route vehicle. Video recordings of five distinct COTA bus lines can be displayed on the bus window monitor providing paratransit applicants with real images of the bus traveling down the street. While on the bus, applicants are asked to pull the stop request cord when a previously noted landmark is on the screen. All assessments are performed by COTA’s trained Eligibility Administrators. All re-certifications for service and first-time applicants are required to attend a functional assessment unless it has been determined that the customer has a “permanent” disability and their functional abilities are unlikely to change. The process is necessary to ensure all customers and applicants are treated fairly and equitably. Mainstream provides reservations (maximum seven days in advance) and subscription (standing orders) service. Subscription customers have the ability to travel from the same origin to the same destination at least once a week. Customers may request reservations as needed. In compliance with ADA regulations, COTA takes every opportunity to schedule at least 50% of total trips during any service hour as subscription service. This policy helps to manage the service more efficiently while providing maximum convenience to customers. COTA’s goal is to log as many subscription trips as possible while complying with ADA guidelines. Central Ohio Transit Authority 8-4 2015-2019 Short-Range Transit Plan 8 – Mobility Services 8.3 Mainstream Paratransit Fleet Mainstream’s current active fleet consists of 64 vehicles. There are two additional vehicles that are held out of service and are used as training buses. In 2014, COTA purchased 12 MV-1 vehicles. MV-1 vehicles are van-like in design with a more durable frame, side loading entry ramp and seating for up to six people. 2015 vehicles have not yet been purchased. COTA plans for routine replacement of existing Paratransit vehicles that will be approaching their expected useful life over the next five year planning cycle. COTA intends to utilize federal Section 5307 monies to help fund future Paratransit vehicle purchases through 2019. As such, COTA’s replacement schedule is based on FTA’s criteria for the minimum useful life of transit buses and vans. Figure 7-2: MV-1 Vehicle Transit agencies purchasing transit buses and vans using federal capital funds are required to keep these vehicles in service for a minimum period of time (years) and/or number of miles prior to that vehicle’s retirement to ensure effective use of federally funded assets. This minimum service-life requirement differs based on bus and van size and other characteristics. For planning purposes, COTA follows a minimum five-year or 150,000 mile limit, whichever comes first, minimum life FTA criteria for Paratransit vehicles. Because Paratransit vehicles usually reach 150,000 in approximately four years, the replacement plan (Table 8-4) for Paratransit vehicles is based on a four-year lifespan. In 2012, COTA procured its first hybrid (diesel-electric) vehicle for its Paratransit fleet. Staff has evaluated the life cycle costs of operating this vehicle and has determined that there is not a beneficial savings through its daily operation to substantiate the significantly higher acquisition cost. COTA will continue to seek ways to lower Mainstream vehicle operating and maintenance costs while working to reduce particulate emissions for improved air quality in the region. Central Ohio Transit Authority 8-5 2015-2019 Short-Range Transit Plan 8 – Mobility Services Table 8-2 Mainstream Fleet Roster as of March 2015 Special Service Contingency In Active Manufacturer Power Length Seating Capacity Equipment Number of Vehicles Active 2014 Champion Chevy Diesel 24' 8 Braun 12 12 12 2014 MV-1 Gas 24' TBD 12 12 12 2013 Champion Chevy Diesel 24' 8 9 9 18 2012 Arboc Hybrid 24' 8 1 1 3 2012 Champion Chevy Diesel 24' 8 Braun 19 19 57 2011 Champion Chevy Diesel 24' 9 Braun 13 11 66 64 Braun Total Central Ohio Transit Authority 8-6 2 Sale Pending Year of Manufacture Average Active Fleet Age (in years) 44 2.21 2015-2019 Short-Range Transit Plan 8 – Mobility Services Table 8-3 Maninstream Vehicle Replacement Schedule Year MFG Power Length Seating Lift? Buy Qty 2015 2008 StarCraft Chevy DIESEL 24' 9 Y 2011 Champion Chevy DIESEL 24' TBD Y 2012 Arboc Chevy HYBRID/ DIESEL 24' TBD 2012 Champion Chevy DIESEL 24' 2013 Champion Chevy DIESEL 2014 Champion Chevy 2014 Y 1 1 TBD Y 21 12 24' TBD Y 14 9 4 DIESEL 24' TBD Y 9 12 12 MV-1 GAS 24' TBD Y 24 12 12 10 2015 Champion Chevy DIESEL 24' TBD Y 20 20 20 20 12 2016 TBD TBD TBD TBD Y 20 20 20 20 14 2017 TBD TDB TBD TBD Y 20 20 20 20 2018 TBD TDB TBD TBD Y 20 20 20 2019 TBD TBD TBD TBD Y 20 Total Fleet Size Red figures represent # of vehicles extended beyond their useful life of 4 years or 150,000 miles. TBD = To be determined 2016 2017 2018 2019 20 66 68 70 72 74 58 60 62 64 66 6 6 6 6 6 20 18 18 18 18 Peak Fleet Spares Fleet Replacement Fleet Expansion 0 2 2 2 2 Active Fleet 64 66 68 70 72 Training Buses 2 2 2 2 2 The 2015-2019 SRTP TIP program calls for conversion of mainstream vehicles from diesel to CNG Powered engines. Located at Fields Avenue, the mobility services facility is scheduled to be converted in the 2017-2018 timeframe, in conjunction with the conversion of the Fields Ave fixed route bus storage facility. Central Ohio Transit Authority 8-7 2015-2019 Short-Range Transit Plan 8 – Mobility Services 8.4 Development of Alternative Mobility Service Delivery Options Due to the potential rising cost of and increased demand for Paratransit service, COTA continues to explore methods of cost reduction while meeting the transportation needs of the community. COTA continues its mission to provide transportation options for Mainstreameligible customers. COTA’s non-ADA transportation provides demand response to customers who want to travel outside of COTA’s ADA service area. Service hours for non-ADA trips are: Monday-Friday Saturday Sunday 5:00 a.m. - 10:00 p.m. 7:00 a.m. - Midnight 7:00 a.m. - 10pm Non-ADA trip fare is $5.00 per trip. Customers must call 24 hours in advance to schedule service. There is no charge for personal care attendants accompanying passengers. COTA uses the following initiative to reduce operating costs. 8.4.1 Will Call Program COTA’s “Will Call” program is for eligible Mainstream customers who require long-term medical treatment such as dialysis, or chemotherapy. The program was designed to supplement Mainstream service and help alleviate situations where customers have to wait for the vehicle after finishing their treatment. Customers contact the Will Call transportation provider directly to schedule trips. The service is available Monday through Friday from 5:00 a.m. to 9:00 p.m. The fare for this service is $4.00. In 2012, COTA awarded a one-year contract to Universal Transportation Systems, LLC (UTS) to operate the Will Call Program, with an option to renew up to two additional one year terms. Currently, the Will Call program provides approximately 300 trips per month. 8.5 Community Involvement COTA staff works closely with members of its Accessible Transportation Advisory Committee (ATAC). The COTA Board of Trustees recognizes ATAC as Central Ohio Transit Authority 8-8 2015-2019 Short-Range Transit Plan 8 – Mobility Services community members who can help improve COTA’s service by providing feedback from a customer’s perspective. The group meets monthly to discuss transportation issues, and twice a year (June and November) with members of COTA’s leadership team. 8.6 Mobility Advisory Board The COTA Mobility Advisory Board was established to advise the organization on possible transportation solutions. The group meets bi-monthly to provide feedback about COTA’s transportation services and regional demands. The group is comprised of community organizations who are able to offer advice concerning transportation issues regarding persons with disabilities, older adults and those who need rides to work. The following organizations are members of COTA’s Mobility Advisory Board: o o o o o o o o o o o o o o o 8.7 AARP WorkSearch Foundation Alvis House Central Ohio Area Agency on Aging Jewish Family Services Columbus City Schools Frankin County Department of Developmental Disabilities Franklin County Department of Job and Family Services National Church Residences Center for Senior Health dba Heritage Day Health OSU Extension Service City of Columbus (Transportation Division) MORPC Lifecare Alliance Franklin County Office on Aging Columbus State Community College MidOhio Board of Independent Living Environment Future Paratransit Service Activities The SRTP includes a projected increase in Mainstream service that addresses existing and future needs of the community served. As such, Mobility Services plans the following initiatives during the next five years: • Expand the eligibility assessment process to include trip by trip eligibility. This is a way to evaluate environmental, architectural and transit system barriers in the service area to better meet the needs of our passengers. Central Ohio Transit Authority 8-9 2015-2019 Short-Range Transit Plan 8 – Mobility Services 8.8 • Continue to increase paratransit services to complement fixed-route service increases. This will include increases in the non-ADA and Will Call programs. • An update to the Trapeze scheduling software system that will enable customers to schedule and confirm trips via the Internet. In addition, customers will have cell phone access to route and trip information. Accessible Fixed-Route Services COTA continues to improve the accessibility of bus stops based on passenger requests and information from previous bus stop inventories. Additionally, several Intelligent Transportation Systems (ITS) projects such as Automated Vehicle Annunciators (AVA) have been implamented to help improve transit services for individuals with disabilities. Further information about ITS-related projects can be found in Section 9. 8.9 Mobility Services and Transportation Coordination The following information describes coordinated mobility projects. 8.9.1 Potential Mobility Management Service Options During the SRTP timeframe, innovative service options and programs have been identified which include but are not limited to the following areas: • Extend fixed-route service coverage; • Enhance reverse commute service; • Partner with agencies that provide employment van shuttle service; • Continue partnerships with transportation providers for Fairfield County Board of Developmental Disability and Franklin County Job and Family Services; • Partner with agencies for demand-response service; • Partner with agencies on the development of a dial-a-ride program; and • Continue to participate in vanpooling/ridesharing programs. Central Ohio Transit Authority 8-10 2015-2019 Short-Range Transit Plan 8 – Mobility Services 8.9.2 Travel Training COTA provides trip-specific travel training to individuals or groups who would like to learn how to ride the bus. • Travel training sessions will continue to be provided to individuals who are not native-English speakers, such as members of the Somali and Latino communities. • COTA staff provides an orientation program for new eligible customers. The program is also offered to customers who have already been certified to use paratransit service. The training educates customers on how to use Mainstream service effectively and efficiently. Central Ohio Transit Authority 8-11 2013-2017 Short-Range Transit Plan 9 – COTA Initiatives 9 COTA Transit Service Initiatives 9.1 Connecting to Outlying Employment Centers There are a growing number of employment centers in central Ohio outside of Downtown Columbus. In an effort to connect inner-city residents to suburban job opportunities, COTA offers several reverse commute express lines that travel from Downtown Columbus to outlying areas. Because these lines often end at transit centers or Park & Rides, they do not directly connect employees to their job sites. In an effort to address this gap in “last mile” service, COTA hopes to partner with local municipalities, employers, and the Mid-Ohio Regional Planning Commission (MORPC) to offer shuttle service from COTA facilities to employment centers. In 2014, COTA partnered with the City of New Albany to launch the SmartRide shuttle. Funded by New Albany, the service connects COTA’s New Albany Park & Ride to all employers in the New Albany International Business Park, which boasts more than 12,000 jobs. COTA will continue to look for opportunities to replicate this successful model in other outlying employment centers. 9.2 Bus on Shoulder (BOS) Program In coordination with ODOT and MORPC, in 2006, COTA began operating express buses on freeway shoulders. Buses traveling on I-70 between downtown Columbus and SR-256 east of Downtown are able to merge onto the freeway shoulder to avoid congestion delays. Buses may use the shoulder when traffic speeds drop below 35 mph, and buses may not exceed traffic speeds by more than 15 mph. Figure 9-1 I-70Bus on Shoulder Utilized under bus operator discretion, the I-70 BOS project has resulted in reduced travel times and improved schedule adherence for the express routes using this freeway. As such, during 2015, COTA, ODOT, and MORPC are again partnering to implement the region’s second BOS corridor – I-670 between downtown Columbus and I-270 east of Downtown. While the first corridor along I-70 utilizes the outside (or right) berm, the I-670 corridor will utilize the inside, or left shoulder, similar to Cincinnati’s I-71 BOS corridor. To date, test runs have been conducted and coordination continues with state and local police agencies. Following installation of freeway marker signs and training of COTA operators, Central Ohio Transit Authority 9-1 2013-2017 Short-Range Transit Plan 9 – COTA Initiatives implementation for the I-670 BOS corridor is scheduled to begin September 8, 2015. 9.3 Bicycles and Transit Integrating bicycles with transit provides numerous benefits. Bicycling increases bus stop accessibility and provides greater mobility to customers at the beginning and end of their transit trips. Bicycle on transit services provide bicyclists with option to use transit to avoid riding after dark, in poor weather, or in areas that do not provide comfortable bicycle access. Improving bicycle and transit connections may also help to decrease automobile traffic congestion and help reduce air pollution by reducing motor vehicle trips. Figure 9-2 Loading Bicycle on bus COTA supports and encourages bicycle access to its terminals, facilities, and services by providing accommodations for customers using bicycles when practicable. All COTA fixed-route buses are equipped with a bicycle rack that holds two bicycles, allowing customers to take their bicycle with them while using public transit. COTA will continue to build on the progress of its successful Bike & Bus program through Figure 9-3 Bicycle Racks at collaboration with partners such as MORPC COTA Spring Street Terminal and bicycling advocate groups. In addition, bicycle parking is included, where feasible, when upgrading or building new facilities. COTA is a sponsor of MORPC’s Columbus Metro Bike Map. The map depicts bicycling routes throughout the central Ohio region based on bikeway levels of service. A printed map is updated and distributed, free to the public, every few years. The map is also available in an interactive online format, which is routinely updated. More information is available online at: http://morpc.org/transportation/bicycle-pedestrian/columbus-metro-bike-map. Central Ohio Transit Authority 9-2 2013-2017 Short-Range Transit Plan 9 – COTA Initiatives 9.4 Academic Pass Programs COTA has developed pass partnerships with The Ohio State University (OSU), Columbus City Schools (CCS) and Columbus College of Art and Design (CCAD) by providing students access to transit services at a reduced cost. COTA’s partnerships began with OSU began in 1997 and with CCS and CCAD in 2006. The programs offer students access to any COTA bus with their student identification card. Beginning in 2012, OSU students switched from showing their student ID to swiping it through the farebox, and beginning January 2015, COTA launched a swipe conversion with CCAD as well. For unlimited use of the COTA system, OSU students pay a $13.50 fee per semester, and CCAD provides COTA $18.50 per student per semester. Students from CCS can ride on specified dates and times at a fare rate of $1.00 per student ride. These partnerships serve to provide mobility to students, open up destinations to people unfamiliar with the city, and attract new riders to COTA who may become long-term transit riders after graduation. In addition, COTA has introduced new service around OSU based largely on requests and recommendations from OSU students. Through the terms of the contract, COTA employs an OSU student as a Marketing Intern each year to provide valuable professional experience while presenting COTA with a unique advantage of student-to-student marketing. COTA is currently working with CCAD to determine new collaborative opportunities with students there as well. Ridership of OSU students represented approximately 7.6% of overall system ridership in 2014. As a result of the strong student support for the partnership, the program has led to numerous improvements to COTA service in the OSU area, effectively connecting OSU to the entire COTA network. COTA’s TSR plan proposes changes to how the OSU area is served by transit. In conjunction with OSU’s 2014 Comprehensive Transportation and Parking Plan, the university operated Campus Area Bus Service (CABS) would serve as the transit option for moving through the campus area. COTA’s proposed TSR network focuses on improving connections between OSU and the central Ohio region and would bring customers to the periphery of the university where they could transfer to CABS to reach destinations within campus. More information about planned changes to COTA’s system can be found in Section 6. Central Ohio Transit Authority 9-3 2013-2017 Short-Range Transit Plan 9 – COTA Initiatives 9.5 Employer Pass Programs COTA has a strong partnership with Franklin County. Currently Franklin County employees qualify for a subsidized bus pass that is supported by both the County and COTA. Franklin County grants employees a 70% discount from passes, which is automatically deducted from their paycheck. As long as Franklin County has a minimum enrollment of 350 participants, COTA offers a 10% discount to the pass. The 2014 cost for an enrolled Franklin County employee for a Local 31-Day Pass would cost $12.40; the 2014 cost for the same employee for an Express 31-Day Pass would cost $17.20. After enrolling through County payroll, the cost of the pass is automatically deducted, and the pass is also automatically activated on the employee’s photo ID badge. 9.5.1 Future Employer Pass Programs Plans Franklin County and COTA are collaborating to turn the current pass program in to an “All-for-One” pass, which would grant all Franklin County employees access to the pass. Franklin County would be billed on a per-ride basis, so any employee who swipes their badge on a COTA bus will later be paid for at a subsidized rate. The Ohio State University has expressed interest in a Faculty & Staff program for many years. COTA is working with OSU on finalizing a program that would grant a $4 discount to employees at a pre-tax rate. Employees would register with OSU Payroll & HR, and in return their employee photo ID (BuckID) would be activated to swipe upon boarding. The employee’s pass would offer unlimited rides per month. 9.6 Special Events COTA will continue to provide supplementary bus service for special events including: • Red, White & BOOM! (Columbus’ downtown Independence Day celebration): COTA augments its normal fixed-route service with additional trips on local routes as well as evening express service between select Park & Ride facilities and the central business district; • Ohio State University home football game service. Due to strong demand for parking and limited availability of spaces on campus, COTA, Ohio State, and the Ohio Expositions Commission have partnered since 1998 to provide direct bus service between the Ohio Expo Center and Ohio Central Ohio Transit Authority 9-4 2013-2017 Short-Range Transit Plan 9 – COTA Initiatives Stadium. Before and after each home football game, COTA also provides express service at the Crosswoods and Delawanda Park & Rides, and offers increased frequency of service on 2 North High Street and 18 Kenny Road local lines; and • Summer festivals and community events: COTA provides additional fixedroute service during Columbus’ busy summer festival season. Working closely with festival organizers and local authorities, COTA adds capacity to local lines and the CBUS downtown circulator to accommodate festival goers, reduce parking stress on downtown and adjacent neighborhoods, and encourage alternative transportation to and from these large events. Events include The Columbus Arts Festival, Columbus PRIDE Festival, ComFest, Columbus Jazz and Rib Festival, Highball Halloween, New Year’s Eve and the NHL All-Star Game. Meeting, convention and event recruitment: COTA works closely with Experience Columbus, the Greater Columbus Sports Commission and the City of Columbus to ensure transportation needs are met and concerns are addressed when recruiting large meetings, conventions and events, such as the 2016 Democratic National Convention and the 2017 Women’s Final Four. COTA’s marketing, planning and operations staff continually reviews the merits of each of these services on a case-by-case basis before a decision is made to commit transit resources. 9.7 Passenger Information COTA provides information to its customers and other stakeholders in a variety of ways: • Website and social media; • Timetables: COTA designs, updates and produces a printed timetable for every route with maps, departure and arrival times at timepoints, and other information for customers; • System Map: COTA designs, updates and produces a large fold out map of COTA’s system with important customer information and how to use public transit in central Ohio; • Brochures: COTA designs and produces brochures on various topics to inform new and existing customers about special programming, how to access public transit in central Ohio and other topics. A sampling of brochures available include: senior services, how to ride guide, fares, Catch the CBUS, opportunities for Ohio State students, and seasonal Summer YouthPass information; Central Ohio Transit Authority 9-5 2013-2017 Short-Range Transit Plan 9 – COTA Initiatives • Commuter bulletins: COTA designs commuter bulletins about service changes and disruptions, special promotions and notifications, opportunities for public input and public meetings, that are placed on coaches, passenger shelters and impacted bus stops; • Display monitors: COTA places customer information on display monitors in the lobby of 33 N. High St,, including public meeting notifications, special promotions, fares and customer service information; • On-board announcements: COTA places audio announcements of relevant passenger information on coaches; and • On-board placards: COTA designs, produces, and installs on-board placards with information about riding COTA, regulations and expected behaviors, security information and other topics to inform customers about riding public transit and tips to make their experience as pleasant as possible. 9.7.1 COTA Customer & Quality Service COTA’s pass sales and customer service center is located in the lobby of the William J. Lhota Building at 33 N. High St. in downtown Columbus. Fare media, Senior, Key and ADA identification cards, schedule information, and Lost and Found items can be obtained at this location. COTA has three Ticket Vending Machines (TVMs) located in downtown at the William J. Lhota Building, COTA Transit Terminal (25 E. Rich St.), and Spring Street Terminal (33 W. Spring St.). In addition, fare media is available for purchase at 63 outlet locations throughout Franklin County (39 public and 24 private). A customer information center (which provides telephone information to the public), and COTA's Quality Service offices are operated at McKinley Operations, 1600 McKinley Ave. Schedule and other COTA information also can be obtained interactively via telephone or COTA’s website 24 hours a day. In 2014, COTA’s customer information call center received 1,645,075 calls. 9.7.2 cota.com In 2014, unique visits to cota.com averaged 100,000 per month. In February 2015, COTA launched an improved, device-responsive website. Customers can more easily plan trips, access schedules, destinations, service changes, public meetings, and employment and Central Ohio Transit Authority 9-6 2013-2017 Short-Range Transit Plan 9 – COTA Initiatives vendor opportunities. For the first time, COTA customers will be able to purchase bus passes online. Information is displayed as HTML and PDF’s for customers’ convenience. In addition, COTA is providing information about detours, delays, and changes in schedules, which customers may subscribe to and receive by text or through email. Information about COTA programs and initiatives [e.g., Bus Stop Service Improvement Project (BSSIP)] are accessible online. Customers continue to have the ability to plan their trip using Google Transit. Customers may access line and schedule information by texting their bus stop ID to a designated number. In addition to the website, COTA manages a Facebook, Twitter, Instagram and YouTube account to stay engaged with customers. COTA is constantly evaluating other social media tools to determine their value to COTA and customers alike. As part of the SRTP, COTA will continue to monitor and invest in the latest computer hardware and software, and Internet technologies available to deliver accurate and timely transit information to central Ohio residents. 9.7.3 Automatic Vehicle Annunciators Over the past several years, COTA has made a significant investment in Intelligent Transportation Systems (ITS), to better manage and improve how COTA communicates and offers services to the public. One component of ITS, the Automatic Vehicle Annunciator (AVA) is a project that was initiated in January of 2003 and was fully functional for public use in May 2005 (see Section 11.2). The AVA automatically announces and displays next stop information for the benefit of hearing and visiondisabled passengers. This system also improves service to COTA’s riders, especially to people not familiar with the stops of a particular route; or, to all riders when visibility is poor or limited due to nighttime hours or inclement weather conditions. The AVA System enables COTA to meet or exceed all ADA requirements and will be included in all future bus buys. Central Ohio Transit Authority 9-7 2013-2017 Short-Range Transit Plan 9 – COTA Initiatives 9.7.4 Service Change Public Meetings and other Public Communications COTA regularly communicates to its passengers on board the bus, at bus stops, and on the website via commuter bulletins, interior placards, website updates, and information brochures that feature upcoming events and news about the COTA system. COTA holds public input and comment meetings to discuss service adjustments prior to the January, May, and September service changes. For each service change period, a minimum of four public meetings are held to solicit public input regarding potential service modifications. Two meetings are held three to four months prior to the service change implementation date in order to encourage public feedback to service proposals, and if feasible, adjustments are made by staff to the potential modifications. A second set of two community outreach meetings are held to present the final draft list of modifications, and to solicit additional feedback. Commuter bulletins will also continue to be posted at bus stops affected by a proposed service modification. Bulletins posted at bus stops include a description of the proposed modification, maps (if applicable), and instructions regarding how to provide feedback to COTA about the proposed changes. Commuter bulletins will also be posted on COTA buses, which indicate the routes that will be affected by a service modification. 9.7.5 Planning and Community Outreach Public Meetings COTA routinely solicits public input and feedback when planning future transit enhancements. COTA engages robust public involvement and public comment programming to meet all requirements under Title VI, ADA, and Environmental Justice regulations. With a focus on soliciting public input and listening to what our customers, community residents, and businesses have to say about their public transit system, COTA will continue efforts to utilize this valuable information for improving the bus system. Each year COTA staff develops a Community Outreach and Education Plan (COEP). Implementation of the COEP has enabled COTA to develop new constituencies and community partnerships, engage the community in Central Ohio Transit Authority 9-8 2013-2017 Short-Range Transit Plan 9 – COTA Initiatives the planning process, and provided COTA officials with valuable community input on transit initiatives. Ongoing outreach activities include, but are not limited to, convening targeted community leaders for roundtable discussions; serving on various planning committees; delivering presentations to neighborhood groups, business and social/civic organizations; providing travel training for immigrant/English as a Second Language groups, and meeting with citizen advisory groups, local governments, elected officials, etc. Over the past three years, COTA has conducted and/or participated in over 1000 outreach activities. Central Ohio Transit Authority 9-9 2013-2017 Short-Range Transit Plan 10 – COTA Facilities 10 COTA Facilities 10.1 Bus Storage, Maintenance and Administrative Office Facilities 10.1.1 Administrative Offices and Retail Pass Sales Center In 2010, COTA relocated its administrative offices to 33 North High Street in order to assume a greater presence at Broad and High streets, where much of its service operates. Purchased in 2008, COTA’s administrative office, pass sales center, and an operator relief station are located just north of the intersection of Broad Street and High Street in downtown Columbus. COTA customers have convenient access Figure 10-1 COTA Administrative Offices and Pass Sales Center to the pass sales and customer information center located in the lobby at 33 North High. This location serves as the main pass sales outlet for COTA passes, as well as the location where customers can be photographed in order to obtain a senior or Key Discount ID Card. Inside the lobby customers have access to free information about COTA services including route timetables, system maps, service change guides, and rider handbooks. In 2013, as part of the fare collection system upgrade, COTA installed a ticket vending machine at this location. The upper floors of 33 North High Street house COTA’s administrative operations, which is in proximity to much of COTA’s fixed-route service. Therefore, no parking is provided for the approximately 100 Administrative employees. All employees are encouraged to ride COTA to and from work. Many employees have opted for the convenience of COTA service and are now daily users of the very service they work each day to plan, schedule, and manage. Central Ohio Transit Authority 10-1 2013-2017 Short-Range Transit Plan 10 – COTA Facilities By encouraging transit professionals to ride the bus daily, the community realizes an environmental benefit by having fewer single occupancy vehicles on the road each day. Employees provide input and ideas about COTA service through an interactive feature called “My Ride” available on the company’s intranet website. The 33 North High Street location also hosts COTA Board meetings and other public meetings, greatly improving accessibility via public transit. Built in 1905, this 78,240 square foot, ten-story building has been renovated to like-new conditions and designed to meet Leadership in Energy & Environmental Design (LEED) green building certification requirements. In 2012, the US Green Building Council (USGBC) awarded the building a “Silver” certification. This certification further demonstrates COTA’s commitment to improving the environment through sustainable site development, water savings, and improved energy efficiency. As of January 2015, COTA occupies eight floors, including the lower level that contains a driver report center, an employee wellness center, and a print services office. Approximately 24,000 square feet of the space is currently leased on the remaining three floors. 10.1.2 McKinley Avenue – Bus Storage, Maintenance, and Customer Service Call Center Facility Located at 1600 McKinley Avenue, this 400,000 square foot bus storage and maintenance facility was completed in 1980. It has indoor storage capacity for 240 large 40-foot buses. This maintenance facility can perform all services required for the bus fleet. It contains both heavy and Figure 10-2 1600 McKinley Ave. Fixed-Route Bus Storage and light maintenance areas, a body Maintenance Facility shop, paint shop, and where the cleaning of the buses is performed by including two-automated bus washers. As of March 2015, thirty-four routes operate out of the McKinley Avenue facility. Central Ohio Transit Authority 10-2 2013-2017 Short-Range Transit Plan 10 – COTA Facilities The McKinley Facility houses the customer call center. Housed next to COTA’s radio communications and dispatch operations, this location is adjacent to COTA’s operational hub. After more than 30 years in service, the McKinley Avenue Facility experienced numerous mechanical, electrical, and equipment failures. In order to remedy these problems COTA is currently in the midst of a projected $97.7 million renovation and construction project. Because of the size, complexity, and cost of the project, the work is being executed in phases. Following is a summary of project improvements completed by phase: • Phase 1 was completed in 2010 at a cost of $7.3 million. During this phase, COTA upgraded various safety related features, including the replacement of aging vehicle lifts and critical support equipment in heavy maintenance. • Phase 2 of the capital project was completed in 2013 at a cost of $32.5 million. This phase consisted primarily of two specific components: o Construction of a Compressed Natural Gas (CNG) Fueling Station. COTA made the decision to convert its diesel fleet to CNG-powered vehicles. This commitment, based on both environmental and economic factors, will result in air quality improvement and substantial reduction in operating fuel costs. o Recommendations necessary to meet CNG compliance standards. • Phase3A/3B construction began in 2014 with an estimated cost of $30.2 million. This phase includes several major elements: A satellite CNG fueling station CNG expansion to 240 buses New bus wash equipment A 30,000 square foot addition housing a new operator dayroom and training areas o First floor interior improvements and renovation of the second floor administrative areas o HVAC, plumbing and electrical upgrades o o o o Central Ohio Transit Authority 10-3 2013-2017 Short-Range Transit Plan 10 – COTA Facilities The renovation will also: • • • • • • Improve energy efficiency; Reduce greenhouse gas emissions; Meet all code requirements for CNG operations and ADA accessibility; Improve operational Figure 10-3 COTA’s CNG Fueling Station flow efficiencies and best practices; Expand fleet storage capacity to 275 buses; and Accommodate current and long-term facility administration programming needs. The remaining $27.7 million is designated for Phase 3C which includes a new exterior façade, test track, and miscellaneous interior concrete repairs. Renovations are designed to meet Leadership in Energy and Environmental Design (LEED) Silver certification. LEED design and construction will result in lower long-term operating costs. Figure 10-4 Proposed McKinley Ave. Site Plan In 2013, COTA purchased its first 30 CNG buses; the current CNG fleet totals 104 with the delivery of 38 buses delivered first quarter 2015. Since the useful life of a transit bus is 12 years it is anticipated that COTA's entire fleet will be converted to CNG-powered buses by 2025. Central Ohio Transit Authority 10-4 2013-2017 Short-Range Transit Plan 10 – COTA Facilities This is projected to generate fuel savings of up to $7 million annually, compared to current diesel costs. 10.1.3 1333 Fields Avenue – Bus Storage and Maintenance Facility This site is one component that makes up COTA’s Fields Avenue Campus. As described below, the Campus also includes the Mobility Services facility and the Street and Remote Maintenance facility. Located 1333 Fields Avenue, this facility was constructed as a one-story 275,130 square foot building in 1984 was designed to accommodate Figure 10-5 1333 Fields Avenue COTA Fixed-Route Bus Storage and 180 coaches. Maintenance Facility In 2009, COTA undertook a complete renovation of the Fields Avenue facility. The Fields Avenue renovation allows for the possible operation of articulated buses from this facility. The $18 million Fields Avenue facility renovation design included innovative, energy-efficient, and environmentally responsible construction methods; the building was commissioned receiving a LEED “Gold” certification. At the time of its commissioning, it was one of only five LEED Gold buildings in central Ohio. As COTA expands its CNG fleet, this facility will be upgraded to accommodate CNG-fueled vehicles. It is anticipated that this project will begin in 2017, contingent upon available funding. As of March 2015, 33 routes operate from Fields Avenue. 10.1.4 1330 Fields Avenue – Mainstream and Eligibility Assessment Facility This 104,000 square-foot facility is located on the east side of COTA’s Fields Avenue Campus. The building houses operation, maintenance and administrative functions for Mainstream, COTA’s demand-response service for persons with disabilities. In 2011, COTA relocated Mainstream operations into this newly constructed facility. Central Ohio Transit Authority 10-5 2013-2017 Short-Range Transit Plan 10 – COTA Facilities The facility cost $21.5 million. Eighty-five percent, or $17.63 million of the project costs were funded through federal grants ($9.4 million from Section 5309 and $5.1 million from the American Reinvestment and Recovery Act, and $3.1 from CMAQ) and 18% or $3.9 million, from local funding sources. Figure 10-6 COTA Mainstream and Eligibility Assessment Facility The facility includes: • • • • • • Storage and maintenance for up to 110 paratransit vehicles; Six vehicle maintenance bays; Administrative offices; State-of-the-art eligibility assessment center; One vehicle wash; and Two fueling islands. As of March 2015, the Mainstream fleet size consists of 64 cutaway vehicles. In 2013, COTA purchased MV-1 (mobility vehicles) model vehicles (see Section 8.3). The building was located as close as possible to the center of the Mainstream pick-up and drop-off locations so that deadheading costs are minimized. As COTA expands its CNG fleet, plans are to upgrade this facility to accommodate CNG-fueled vehicles. Contingent upon available funding, it is anticipated this upgrade project will begin in 2017. As part of COTA’s sustainability commitment, the facility was designed to qualify for “Silver” certification under the LEED program as defined by the USGBC. In late 2012, COTA received confirmation from USGBC that the facility met Silver Certification. The building takes advantage of abundant natural lighting in the administrative offices and bus storage area, reducing the dependence on artificial lighting. Sustainability characteristics designed to reduce operational costs also include: Central Ohio Transit Authority 10-6 2013-2017 Short-Range Transit Plan 10 – COTA Facilities • Below floor HVAC systems providing both heat and air conditioning (as opposed to ceiling systems), reducing the heat and air conditioning lost when traveling through typical air ducts; • Rainwater harvesting system consisting of three 15,000-gallon underground storage tanks which capture rainwater from the roof and store it for bus wash and toilet use; • Irrigation-free landscaping • White membrane roofing; and • Roller compacted concrete (RCC) in the employee and visitor parking areas reduce the heat produced by typical oil-based products. With the volatility of oil prices, RCC has become an alternative that is less expensive and more durable. The facility includes a state of the art “Eligibility Assessment” center, consisting of a half-bus with all the functionality of a larger, fixed-route vehicle. The modified testing bus is capable of kneeling, has functioning destination signs, and an automatic vehicle-annunciation system. Video recordings of five distinct COTA bus Figure 10-7 Eligibility lines can be displayed on the bus Assessment Center window monitor providing paratransit applicants with real images of the bus traveling down the street. The center also has varying degrees of ramps and sidewalk configurations that test the physical abilities of transit users, and a mock-signalized intersection with walk/don’t walk signs that have ambient noise levels to mimic a real-life travel scenario. 10.1.5 1325 Essex Avenue – Street and Remote Maintenance Facility In 2008, COTA purchased a 2.23-acre site at 1325 Essex Avenue with an existing 12,000 square foot building which was constructed in the late 1980s. In 2012, COTA performed a renovation and expansion of the Essex Avenue facility, which was completed in 2013 for $3.7 million dollars. The renovation of the existing facility and the addition of 8,000 square feet of maintenance/storage space, parking lot expansion construction of a salt dome, and newly installed mechanical/electrical Central Ohio Transit Authority 10-7 2013-2017 Short-Range Transit Plan 10 – COTA Facilities systems to meet current operational demands and future system growth. The completed renovation project was awarded LEED “Silver” certification. This facility houses staff and equipment for the Street and Remote Department to support the Figure 10-8 1325 Essex Avenue Street and maintenance of bus stops Remote Maintenance Facility and shelters located throughout our approximately 560 square-mile service area. The Street and Remote department performs a variety of support functions for approximately 3,700 bus stops, including: pavement repairs, concrete work, excavation, installation of sign poles, new passenger shelter installation, and special event support. 10.2 Transit Center, Bus Layover Facilities 10.2.1 Linden Transit Center - 1394 Cleveland Avenue Located at the intersection of Cleveland and 11th Avenues, this inaugural urban transit center opened in October 1999. The 20,500 square-foot facility is part of COTA's Livable Communities Initiative (LCI) project for the Linden area, and includes such amenities as childcare and health care. Seven bus routes currently serve the transit center to COTA’s fixed-route services. Express bus routes serving the Linden Transit Center also provide connections to job centers around the I-270 Outerbelt, such as the Polaris area located just north of I-71 and I-270, the Easton development area near Morse Road and I-270, and the New Albany Business Campus. Since opening, Linden has also served as a successful communitybased facility providing increased services for the surrounding neighborhood—for example, providing accessible and affordable meeting space for neighborhood civic groups, community meetings, election polling, and Central Ohio Transit Authority 10-8 2013-2017 Short-Range Transit Plan 10 – COTA Facilities other gatherings. The Federal Transit Administration (FTA) provided $2.1 million in funding for the Linden Transit Center, with an additional $268,000 from the Ohio Department of Transportation (ODOT). Figure 10-9 Linden Transit Center With revenue generated through tenant occupancy, the operating costs are fully recovered. 10.2.2 Easton Transit Center – 4260 Stelzer Road Opened in May 2002, this facility is located on 2.76 acres of land that was generously donated by the Limited and Georgetown Companies. Serving commuters in northeastern Franklin County, the Easton Transit Center is located just north of Morse Road at the southeast corner of Transit Drive and Stelzer Road. As part of COTA's LCI project Figure 10-10 Easton Transit Center for the Easton area, the transit center contains a 1,360 square foot enclosed space that includes a waiting area, staff attendant booth (no longer in operation) and driver restroom. The transit center also includes 41 parking spaces, 4 dedicated large-bus bays, and platform space for 4 to 5 smaller, circulator buses. Five bus lines currently serve the transit center, including local, crosstown, and express service, providing direct connections to many of Easton’s shopping, dining, and entertainment venues. Central Ohio Transit Authority 10-9 2013-2017 Short-Range Transit Plan 10 – COTA Facilities 10.2.3 Easton Daycare Facility – 4242 Stelzer Road Constructed in 2005, the daycare is conveniently located on a contiguous parcel with the Easton Transit Center providing easy access for COTA passengers. The 9,948 square-foot facility consists of administrative offices, conference rooms, dedicated infant, toddler and Figure 10-11 Easton Day Care Center pre-school rooms (with restroom facilities for each area), activity areas, a kitchen, restrooms, and a fenced outside play area. This facility can accommodate up to 135 children. In June of 2010, COTA entered into a new five-year lease agreement with Childcare Centers, LLC. The provider is responsible for monthly lease payments to COTA for the facility, and is responsible for all operating costs. The lease payments cover the yearly maintenance costs for the transit center. 10.2.4 Near East Transit Center – 1125 East Main Street In 2005, COTA completed the construction of the 9,647 squarefoot transit center, located on the southeast corner of East Main Street and Champion Avenue. Through a partnership with the Columbus Compact Corporation [a non-profit 501 (c) (3) organization charged with the administration of the Department of Housing and Urban Figure 10-12 Near East Transit Center Development (HUD) designated Empowerment Zone (EZ) for distressed communities], COTA obtained the 0.74-acre parcel. The building opened in September 2005 with a medical facility as the major tenant. With the addition of a cell phone service store, this facility serves to help attract COTA customers. COTA passengers are able to wait inside the facility, which is equipped Central Ohio Transit Authority 10-10 2013-2017 Short-Range Transit Plan 10 – COTA Facilities with comfortable benches. Two bus lines currently serve the Near East Transit Center. The building’s operating costs are covered through lease payment revenues. 10.2.5 Proposed Northern Lights Area Transit Center/Park & Ride Included in the 2015-2019 COTA TIP is the development of a new, COTA owned park and ride facility in the Northern Lights area along Cleveland Avenue as part of the Cleveland Avenue BRT Project. The proposed facility will replace the existing leased park and ride location at Northern Lights Shopping Center, an urban strip mall development and primary destination within the Cleveland Avenue corridor. Development of a park & ride in this area has been under consideration for several years, and aligns with various area plans focused on improvements to the area, including Franklin County’s Clinton-Mifflin Land Use Plan and City of Columbus Linden Area Traffic Management Plan. The #1 Cleveland Local connects areas of lower income, minority populations to important employment centers such as downtown Columbus, St. Ann’s Hospital, and Columbus State Community College. COTA’s existing bus stop and layover location within the Northern Lights Shopping Center complex is the busiest passenger activity stop outside of the Downtown area, with a combined average of nearly 1,000 boardings and alightings occurring each weekday. The #1 Cleveland is COTA’s second busiest line in the system. With the addition of BRT ridership in the corridor is projected to grow 15-30% within the first five years of BRT operation. The leased park and ride location is limited to 60 parking spaces, a passenger shelter on a concrete passenger platform, and a bus bay area that accommodates only two 40-feet, fixed-route vehicles. As part of the CMAX BRT project, the proposed new park and ride to be constructed in 2016 will have 129 parking spaces and 6 bus bays. The facility will also be designed to accommodate 60’ articulated busses should COTA purchase these in the future. Funding for the park and ride has been budgeted in the project costs for the proposed Cleveland Avenue BRT service (see Section 14.5.2). In 2015, COTA plans to purchase property that will meet the needs for expanded service along this area of Cleveland Avenue. An Central Ohio Transit Authority 10-11 2013-2017 Short-Range Transit Plan 10 – COTA Facilities environmental review as required by the National Environmental Policy Act (NEPA) has been conducted and approved. Final design will be completed in 2015 with construction occurring in 2016. This facility is scheduled to be completed in late 2016/early 2017. Real estate costs are estimated at $2 million and construction costs at $1.8 million in year of expenditure. Development of a park and ride will include significant public involvement, including meetings with officials from Clinton Township, Franklin County, and City of Columbus, area commissions, civic associations and other community stakeholders, and meetings open to the general public. COTA desires to increase the number of available park and ride spaces, provide an enclosed passenger waiting area, restrooms for bus operators, and space to accommodate a minimum of six 40-foot, fixed-route buses. Central Ohio Transit Authority 10-12 2013-2017 Short-Range Transit Plan 10 – COTA Facilities 10.3 Downtown Express Terminals COTA has two downtown terminals that are utilized by express routes during peak travel periods. In support of COTA’s commitment to convert its fleet from diesel to CNG-fueled vehicles, it was necessary to make improvements to these facilities, as well as the need to improve customer waiting areas and amities for increased future use of the facility. Figure 10-13 Spring Street Terminal 10.3.1 Spring Street Terminal – 33 West Spring Street This terminal is located on Spring Street between High and Front Streets. The terminal was demolished and completely renovated during 2014, reopening in February 2015. The $2.4 million improvement project includes modifications to make the terminal CNG and ADA compliant, make all entrances compliant with COTA standards for minimum clearance, and incorporate COTA’s new branding initiatives. These improvements include a new canopy and structure; new pavement, striping, and indoor patron waiting areas with way-finding between stations. New light fixtures, security system, digital signage, and branding have been installed throughout the terminal. 10.3.2 COTA Transit Terminal – 25 East Rich Street In 1989, COTA moved into its 41,000 square-foot South Express Terminal. The terminal is located east of High Street between Rich and Main Streets adjacent to Columbus Commons Park. Access to the terminal is from both Rich and Main Streets. Elevators at both entrances provide pedestrian access to the terminal from all levels. The terminal is able to accommodate ten Figure 10-14 COTA Transit Terminal Central Ohio Transit Authority 10-13 2013-2017 Short-Range Transit Plan 10 – COTA Facilities buses at one time, five in each direction. Terminal design permits buses to pull in at an angle and pull out directly after passenger boarding and alighting. This feature increases the safety for COTA's passengers and facilitates the smooth flow of buses through the terminal. Currently, twenty express routes and one local route serve this facility. Improvements to this location, were completed in 2014, which allow for the operation of CNG-fueled vehicles. The central portion of the terminal is a dedicated waiting area for bus patrons. The waiting area has been equipped with heating sources to increase passengers’ comfort as they wait. New ceilings, lighting, overhead doors, and security equipment were installed. Upgrades to restrooms, a new security kiosk, branding televisions, and marketing imagery throughout the facility provide improved service from this terminal. This area will also receive a new floor finish that is durable and safe for all weather conditions and easy to maintain with installation to be completed in the first quarter of 2015. 10.4 Park and Ride Lots COTA operates a network of commuter Park & Ride lots throughout Franklin County and encourages their use to reduce central Ohio traffic congestion during peak period travel times and to help improve the region’s air quality. Park & Ride facilities allow commuters throughout the area to conveniently access COTA’s bus lines. Each Park & Ride provides free parking. The Park & Rides provide access to various destinations, primarily in downtown Columbus. As of March 2015, COTA operated 28 Park & Ride lots throughout Franklin County. A map and description of these lots are presented in Figure 10-15 and Table 10-1, respectively. There are 2,304 free parking spaces provided at the Park & Ride lots. Average usage of the lots, as of March 2015, is shown in Table 10-2. The New Albany, Dublin Dale Drive, and Gender Road locations have the highest percentage of use, while Reynoldsburg has the highest average number of spaces used. COTA’s Park & Rides include a mixture of COTA-owned and leased facilities. COTA has partnered with area churches and shopping centers in order to provide Park & Ride service, which is mutually beneficial for COTA, its customers, and local retail merchants and churches. Central Ohio Transit Authority 10-14 2013-2017 Short-Range Transit Plan 10 – COTA Facilities Passenger amenities typically provided at the Park & Rides include enclosed and comfortable passenger shelters with bench seating and bus schedule information, while several locations include open-air bike racks. Figure 10-15 COTA Park and Ride Locations as of March 2015 Central Ohio Transit Authority 10-15 2013-2017 Short-Range Transit Plan 10 – COTA Facilities Table 10-1: COTA Park & Ride Lots as of March 2015 Map Site 1 2 3 4 5 6 7 8 9 Name and Date Effective Location Refugee Rd. Berwick Plaza & Winchester 1975 Pike W. Broad St. Broad & & Southampton Southampton 1974 Ave. 7460 Crosswoods Huntington 1993 Park Dr. Delawanda 4939 N High 2003 St. Dublin Dale Dr. 1995 Eastland Mall 2009 Easton Transit 2002 Gender Rd. 2010 Great Southern 1974 4450 Dale Dr. 4138 Refugee Rd. 4260 Stelzer Rd. 5336 Gender Rd. S. High St. & Obetz Rd. City Number Of Shelter Spaces Serving Agreement Columbus 60 Yes #46 Informal agreement Columbus 68 Yes #10, #53 COTA Owned Columbus 169 Yes #2, #31, #32 COTA Owned Columbus 58 Yes #2, #4 #31, #95 COTA Owned Dublin 82 Yes #58, #59 COTA Owned Columbus 27 Yes #11, #46, #92 Lease Columbus 41 Yes #16, #38, #40, #95 COTA Owned Canal Winchester 40 No #55 Lease Columbus 84 Yes #4, #16 Lease 10 Griggs Dam 1995 Riverside Dr & Nottingham Rd. Columbus 28 Yes #58, #59 City of Columbus Informal Agreement 11 Grove City 1984 2321 Old Stringtown Rd. Grove City 150 Yes #15, #64, #65 COTA Owned Hilliard 90 Yes #66, #67, #68 COTA Owned Hilliard 37 Yes #57, #66, #67 Lease Columbus 105 Yes #4, #95 Informal Agreement Upper Arlington 46 Yes #3, #19, #60, #83, #84 Informal agreement Columbus 101 Yes #1, #92 COTA Owned 12 13 14 15 16 Hilliard 4199 Parkway Cemetery Rd. Ln. 1986 Hilliard United Methodist 5445 Scioto Church Darby Rd. 2008 Indianola & 4720 Morse Indianola Ave. 1981 Kingsdale 3206 Tremont Macy’s Rd. 1974 Livingston 3380 E. & Barnett Livingston 1982 Ave. Central Ohio Transit Authority 10-16 2013-2017 Short-Range Transit Plan 10 – COTA Facilities Number Of Shelter Spaces Map Site Name and Date Effective Location City 17 Main & Weyant 1974 E. Main St. & Weyant Ave. Columbus 12 New Albany 18 19 20 21 22 23 24 25 26 27 28 20 S. Third St. (United Methodist Church) Northern Cleveland Lights Ave. at Innis 1978 Rd. Olentangy and 4990 Bethel Olentangy 1982 River Rd. Renner Rd. 5608 Renner 2009 Rd. Reynoldsburg 2100 1985 Birchview Dr. Royal Plaza Agler Rd. & 1986 Stygler Rd. St. Andrew 1985 1994 Swansford Dr. St. Peter's 6899 Smoky 1994 Row Rd. Westerville 312 W. Main 1981 St. 55 Westwoods Westwoods 1994 Blvd. Whitehall 4540 E. 1993 Broad St. New Albany 2002 Serving Agreement Yes #2 COTA Owned 26 No #39 Lease Columbus 60 Yes #1, #9, #27 #35 #37, #40, #83, #87 Lease Columbus 150 Yes #30, #95 Lease Columbus 116 Yes #5, #57, #66 COTA Owned ReynoldsBurg 214 Yes #1, #2 #45 #47, #48 COTA Owned Gahanna 40 Yes #41, #42 Lease Dublin 14 No #30 Lease Columbus 20 No #30 Lease Westerville 230 Yes #1, #27, #33, #36,#37 Lease with City of Westerville Columbus 100 Yes #10,#53 COTA Owned Whitehall 148 Yes #10,#43, #87,#89 COTA Owned **Actual utilization may vary due to shared use lot Central Ohio Transit Authority 10-17 2013-2017 Short-Range Transit Plan 10 – COTA Facilities Table 10-2: Average Park & Ride Utilization January 2012 – January 2013 Total # of Spaces Average # of Spaces Used Average Capacity Utilization Berwick Plaza 60 10 17% Broad/Southampton 68 8 12% Crosswoods 169 35 21% Delawanda 58 25 43% Dublin Dale Dr 82 60 73% Eastland Mall 27 3 11% Easton Transit 41 12 29% Gender Rd 40 28 70% Great Southern 84 13 15% Griggs Dam 16 10 63% Grove City 150 33 22% Hilliard Cemetery Rd 90 13 14% Hilliard United Methodist Church 37 2 5% Indianola & Morse 105 24** 23% Kingsdale Macy’s 46 20** 43% Main & Weyant 12 0 0% Livingston & Barnett 101 17 17% New Albany 26 20** 77% Northern Lights 60 27 45% Olentangy & Bethel 150 13 9% Renner Rd 116 49 42% Reynoldsburg 214 92 43% Royal Plaza (Gahanna) 40 8 20% St. Andrew’s 14 5 36% St. Peter’s 20 7 35% Westerville 230 79** 34% Westwoods 100 12 12% Whitehall 148 21 14% 646 28% Location TOTAL P&R SPACES 2392 **Actual utilization may vary due to shared use lot Central Ohio Transit Authority 10-18 2013-2017 Short-Range Transit Plan 10 – COTA Facilities 10.4.1 Recent Park and Ride Development COTA continues to pursue additional Park & Ride locations in order to help reduce vehicle miles traveled (and the associated carbon emission levels), alleviate present and future traffic congestion in the region, and help promote public transit as a viable option in meeting an individual’s transportation needs. Projects completed since the last SRTP (2013-2017) are listed below. Figure 10-16 New Albany Park and Ride Redesign and development of the Groveport and Parson Loop • This redevelopment added sidewalks and more pedestrian friendly mobility. It also resurfaced the road after years of deterioration and improved the Park & Ride’s aesthetics. New Albany Park & Ride • The New Albany Park & Ride is located approximately one mile north of SR 161 and SR 62 in the New Albany Business Park. The site was approved for purchase by the COTA Board of Trustees in November 2013. • COTA previously leased twenty-six parking spaces from the New Albany United Methodist Church located at 20 South Third Street. The new Park & Ride is designed for a total of one hundred seventysix parking spaces. Initially, Phase I was constructed with eightyeight (88) parking spaces. Additional spaces will be added as needed to accommodate demand. COTA completed the project in August 2014. • COTA has increased its express and reverse commute services to New Albany upon completion of the Park & Ride. To that end, COTA has formed a partnership with the City of New Albany, which provides shuttle service within the business park to and from the Park & Ride for the reverse commute service. Central Ohio Transit Authority 10-19 2013-2017 Short-Range Transit Plan 10 – COTA Facilities 10.4.2 Future Park and Ride Development Population growth, volatile gas prices, and an increased awareness of potential cost savings and environmental benefits derived from the use of public transit remain strong factors for development of future Park & Rides. Strategically purchasing Park & Ride locations ensures COTA has a more permanent presence and an opportunity to provide long-term service to the region. The following locations were identified as priority areas for future Park & Rides over the next five years: • Northern Lights area (see Section 10.2.5) • Cleveland Avenue & SR-161 area • Southeast Columbus/Canal Winchester, Gender Road and US-33 area; and o The land was purchased along Gender and Winchester Pike roads. There are additional parcels that are planned to be sold as part of the purchase to offset the purchase price. The Park & Ride will be designed in 2015, constructed in 2016, with an anticipated opening date of September 2016. • Northwest Dublin Area (lease facility) In conjunction with the proposed CMAX Bus Rapid Transit project, COTA proposes to redevelop an existing Park & Ride and develop a new Park & Ride near Cleveland Avenue. A new COTA-owned Park & Ride facility in the Northern Lights area is proposed to replace the existing leased Park & Ride location at the Northern Lights Shopping Center. In addition, COTA proposes to construct a new transit center/Park & Ride just south of the Cleveland Avenue and SR-161 intersection in 2016. The Canal Winchester and Dublin areas have seen significant residential and commercial growth and development over the last decade. Potential Park & Rides locations would be identified and purchased as a strategic investment for future service. The Dublin area Park & Ride location has yet to be identified. Critical to expanding Park & Ride locations is working with area communities, engaging the public, and identifying and purchasing the Central Ohio Transit Authority 10-20 2013-2017 Short-Range Transit Plan 10 – COTA Facilities necessary property in an area that provides accessibility, visibility, safety and bus service as a competitive mode of transportation with the automobile. Proposed Park & Ride locations are shown in Figure 10-15. Table 10-3 Planned Park & Rides Locations Planned Park & Rides Labels Description 1 Dublin Area 2 Northern Lights Area 3 Cleveland Ave & SR 161 4 Canal Winchester, Gender Road & US-33 area 10.5 Passenger Shelters COTA owns and maintains approximately 372 passenger shelters, primarily located at major boarding or transfer locations, Park & Rides, shopping centers, and medical facilities. While COTA strives to provide comfortable waiting areas for all passengers, shelter installation must be prioritized due to limited resources. In 2014 COTA created the Bus Stop Design Guide, it contains site guidelines for passenger shelters as well as specifications on bus stops, ADA compliance, and bus pads. This guide is used by COTA, municipalities, and developers in order to create areas that are developed as transit oriented design (TOD). Figure 10-17 COTA Passenger Shelter and Trash Receptacle 10.5.1 Shelter Site Selection Process COTA uses ridership figures as the primary criterion for determining which bus stops warrant shelters. Locations with 35 passenger boardings per day or more will be considered for shelters. Yet, there are additional criteria that are taken into account when considering shelter placement: • Proximity to medical facilities; • Proximity to senior housing; • Frequent wheelchair lift usage; Central Ohio Transit Authority 10-21 2013-2017 Short-Range Transit Plan 10 – COTA Facilities • Major transfer point; • Serves a park & ride; • Serves a major activity center; and • Shelters funded and maintained by others. If a bus stop meets COTA’s shelter criteria, it may be considered for passenger shelter placement. Meeting these criteria, however, does not guarantee shelter installations. Existing site conditions such as the following may make shelter placement unfeasible: • Adequate shelter of some type is readily available • Shelter location is not approved by the local authorities • Shelter location generates severe local citizen/business opposition • Inadequate Right-of-Way • Lack of existing pedestrian amenities 10.5.2 Downtown Shelters COTA partnered with students from the Columbus College of Art and Design (CCAD), to design new passenger shelters that replaced those currently installed along High Street in downtown Columbus. The installation was completed in the fall of 2014. As noted earlier, COTA’s Transit System Review may result in some service changes in the downtown area. If this creates a significant increase in bus volumes on another downtown street, the new shelters may also be placed at the downtown stops along that street. Central Ohio Transit Authority 10-22 2013-2017 Short-Range Transit Plan 10 – COTA Facilities Medium shelter Large shelter Figure 10-18 Downtown Shelters 10.5.3 Downtown Transit Stations COTA staff is investigating implementation of several “Transit Stations” within the Downtown area. These stations would be located at high boarding and/or transfer locations. While the station concept is still under development, it is envisioned that these facilities would be somewhat larger than the typical downtown shelter, provide enhanced weather protection, and have additional amenities. The number and location of transit stations is identified during the Transit System Review discussed in Section 4.5. 10.6 Bus Stop Signs As of March 2015, COTA has 3,532 bus stops installed throughout the COTA service area. In 2014, COTA began installing new bus stop signs that will eventually replace all of the existing signs. The new sign is designed with similar dimensions as the existing sign. It includes a highly reflective film that will improve nighttime visibility for both customers and drivers. Initially, COTA will use the new sign when implementing new design as needed. COTA will begin replacing 20 to 25% of the signs each year over the next four to five years. Central Ohio Transit Authority 10-23 Figure 10-19 New Bus Stop Sign 2015-2019 Short-Range Transit Plan 11 – Intelligent Transportation Systems (ITS) 11 Intelligent Transportation Systems (ITS) In the public transit sector, ITS represent a range of technologies including, Computer Aided Dispatch/Automatic Vehicle Location (CAD/AVL), traveler information, electronic fare payment, transit security systems, Automated Passenger Counters (APC), vehicle fleet monitoring devices, traffic signal priority, and a variety of operations and planning oriented applications. For several years, COTA has implemented a number of new technologies that are utilized to support operations and planning, including those which improve on-time performance and reliability. During the 2015-2019 SRTP timeframe, COTA will complete the implementation of an updated ITS system including dynamic message signs at key high ridership stops, park and rides, transit centers, and selected shelters that will provide riders with next bus arrival information. Additionally, COTA will make available real-time next bus arrival information via web-enabled mobile technologies such as smart phones and tablets. COTA will implement traffic signal priority at intersections along Cleveland Avenue to allow for the faster, more efficient movement of public transit vehicles through congested corridors and investigate its use within other traveled corridors as well. The following section describes COTA’s short-range technology initiatives to improve operations and enhance service to our customers. As one of several alternatives to costly infrastructure solutions, ITS provides the technology to enable people to make smart travel choices, and continued deployment of ITS strategies is an important component of COTA’s long-range and short-range transit plans. ITS has created opportunities to respond proactively to increasing demand for efficient operation of public transit services, and to convey information in a more timely manner to our customers. This includes global positioning system (GPS) technology that provides real-time schedule information to riders, electronic fare payment for greater customer convenience and faster boarding times, and devices that integrate with traffic signal systems allowing transit vehicles priority over other vehicles. Figure 11-1 Automatic Vehicle Location Central Ohio Transit Authority 11-1 2015-2019 Short-Range Transit Plan 11 – Intelligent Transportation Systems (ITS) COTA plans to implement advances in vehicle dispatching, tracking, and telecommunications that will result in safer, more reliable, more responsive and more accessible service. COTA’s ITS enhancements are designed to: • Make bus travel easier for all passengers, including those with hearing and vision disabilities; • Avoid traffic congestion and improve on-time performance; • Provide timely and comprehensive transit information such as real-time “next bus” arrival information on variable message signs located at key high ridership stops, park and rides, transit centers and selected shelters; • More timely and easier access to route and schedule information via the use of current technologies including variable electronic message displays, as well as improved access through a variety of devices including desktop and laptop computers, smart phones, and tablets; and • Provide real-time transit performance and customer data via automated reports and dashboards for COTA management decision making. Specific components of COTA’s overall ITS initiatives include: • Computer Aided Dispatch/Automatic Vehicle (CAD/AVL); • Onboard automated stop announcements; • Traveler information systems; • Automatic Passenger Counters (APC); • Fleet maintenance technologies; • Safety and security, and • Transit signal priority. Over the next five years, COTA will pursue implementation of the following technologies: • More advanced web-based and interactive voice response (IVR) traveler information systems for both fixed-route and paratransit riders; • Driver training and on-board vehicle monitoring systems; • Transit intelligence system for internal management; Central Ohio Transit Authority 11-2 2015-2019 Short-Range Transit Plan 11 – Intelligent Transportation Systems (ITS) • Demand response systems to improve paratransit operations and customer interfaces (e.g., IVR and Internet based reservation capabilities, automated certification notifications, etc.); • Fleet maintenance technologies, and • Transit signal priority. 11.1 Computer Aided Dispatch/Automatic Vehicle Location The heart of COTA’s ITS program is its CAD/AVL system. This system provides COTA dispatchers and supervisors with the capability of real-time location tracking of each bus. GPS devices placed on each fixed-route, demandresponse, supervisor, and maintenance vehicle allow dispatchers to monitor a particular vehicle’s location. Additionally, the system can automatically calculate important operational Figure 11-2 COTA Radio Room metrics for fixed-route vehicles, such as whether the bus is running on-time, early, or late compared to scheduled times. The system, which is integrated with Franklin County’s 800 MHz radio system, sends and receives fleet data over the same radio frequencies used by dispatchers to communicate with COTA operators. In addition to tracking a vehicle’s location in real time, the CAD/AVL system also archives information for future performance analysis, and assists in incident resolutions. This archive function provides the ability to “playback” events on a computer, allowing staff to review and remedy where buses encountered delays or other operational issues along a route. Further, data retrieval allows for a wide range of incidents and disputes to be resolved quickly and easily; eliminating the need to spend numerous hours of limited staff time resolving issues. Additional analysis includes the ability to determine if the current route structure is providing the greatest efficiencies, and if recent service changes are having the intended effect on route efficiency and customer convenience. Between 2009 and 2012, COTA replaced its CAD/AVL software on fixed-route and paratransit buses with a system from Trapeze ITS, a division of Trapeze Group, a leading global provider of solutions for public transit. In 2015, COTA will complete the installation of this newer technology that also incorporates several ITS components: Central Ohio Transit Authority 11-3 2015-2019 Short-Range Transit Plan 11 – Intelligent Transportation Systems (ITS) • Electronic manifest for paratransit operations; • Driver training and on-board vehicle component and performance monitoring; • Paratransit demand response systems (IVR and Internet-based reservation communication and automated notification); and • Paratransit secure web-based service that enables passengers, service providers and other users to view, request and cancel demand response trips. 11.2 Onboard Automated Stop Announcements Enhancing the experience of riding on a COTA vehicle is a major component of the ITS program. COTA completed installation of an Automated Vehicle Annunciator (AVA) system in 2005 to make bus travel easier for all passengers, especially those with hearing and vision disabilities. As a bus approaches a stop, the AVA system automatically announces the next stop, as well as displaying it on a variable message sign inside the bus. The announcements are made using the bus’ existing public address system that has speakers inside and outside the bus. The variable message signs are ceilingmounted at the front of each bus inside the vehicle. Utilizing a CAD/AVL system which tracks locations of all buses, COTA’s fixedroute fleet provides benefits, not only for passengers with hearing and vision disabilities, but also to other riders who may not be familiar with the stops on a particular route, and to passengers who have difficulty identifying their bus stop location due to poor or limited visibility at night or during inclement weather. The AVA system was completed with the installation of the new CAD/AVL system, in 2012. All new buses will be equipped for this system. 11.3 Traveler Information Systems This ITS application provides a web-based itinerary planner through which customers can access interactive screens on the COTA web site to input origin/destination and arrival/departure information, quickly generate itineraries for trips, look up popular destinations, and receive complete, printable itineraries including maps, transfers, stop locations, fares, and travel instructions. In 2008, COTA partnered with Google to provide trip planning for COTA’s customers via Google Maps. In addition to Trapeze’s “Bus Tracker” web-based itinerary trip Central Ohio Transit Authority 11-4 2015-2019 Short-Range Transit Plan 11 – Intelligent Transportation Systems (ITS) planner, customers now have two options for obtaining trip planning information via the web. Future travel information initiatives planned for the 2015-2019 timeframe will feature “next bus” information at high volume passenger locations, a web-based email Figure 11-4 Online subscription service to Trip Planner notify customers via email when their bus is within a specified time from the stop, or if there is an unexpected change in normal bus operation. This real-time data could be sent to devices including flat panel displays at passenger shelters and transit centers. Figure 11-3 Traveler Information As the Trapeze ITS installation comes to completion, COTA will display “next bus” information at main transit hubs, transit centers, and other high volume passenger shelters via display panels. These signs will provide a time-based countdown for the arrival of the next bus in addition to informing the customer if the bus they were waiting for has left or is yet to arrive. A time-based countdown is considered to be the most user-friendly format for presentation and can be readily implemented with scheduled time, current time, and schedule adherence data. 11.4 Electronic Fare Collection Providing easier payment options is another way in which COTA’s ITS program will enhance the customer’s experience. Electronic fare payment and collection systems that collect and process fares enable customers to use a variety of mediums (magnetic stripe cards, smart cards, mobile ticketing, cash, etc.) to pay for transit trips, while simplifying fare collection for the transit agency. Electronic forms of Figure 11-5 Electronic Fare Payment Central Ohio Transit Authority 11-5 2015-2019 Short-Range Transit Plan 11 – Intelligent Transportation Systems (ITS) payment can also identify passengers for billing purposes. Currently, the fareboxes support exact change (using both coin and paper) and COTA’s magnetic fare cards. Installed in 1995, the fareboxes have served COTA well and lasted far beyond their estimated useful life of eight years. In 2010, COTA, along with consultants from IBI Group, completed an assessment of the current system and available smart card technology in the marketplace. As a result of this study, a phased approach will be taken to upgrade COTA’s fare collection technology. In 2011, Phase 1 upgraded the existing system and in 2015, COTA will hire a consultant to explore other means of electronic payment during Phase 1. Starting in March 2011, Phase 1, allowed magnetic verification of each OSU student ID presented as fare payment. OSU and COTA shared a goal of accurately measuring student ridership and ensuring that only currently enrolled students were allowed to use their IDs for payment. The upgrade also provided enhancements that benefited the Columbus City Schools (CCS) pass program, as well as other group programs. Among other benefits resulting from this upgrade, the fareboxes provide transactional data for each boarding including GPS location, method of payment, and a unique identifier for magnetic media used or issued during the transaction. Resulting data is used by planning and marketing staff to better understand the use of the system. The Phase 1 upgrade and refurbishment project was completed at a cost of under $2.35 million, or $5,329 per farebox, which included labor, materials, and spare parts, two sets of related garage vault and computer equipment, and associated network hardware and software. Phase 1 was completed by June 30, 2011. Upgrading the farebox system to incorporate advanced technologies would allow COTA to: • Consolidate and simplify the number of discounted fare options; • Speed passenger boarding times at bus stops; • Generate ridership information based on farebox data; • Allow passenger boarding data to be evaluated at the bus stop level; and • Reduce farebox maintenance costs. Central Ohio Transit Authority 11-6 2015-2019 Short-Range Transit Plan 11 – Intelligent Transportation Systems (ITS) The system would encourage the use of pre-paid fare methods and allow users to select the product that best fits their individual needs. In April 2015 COTA will enlist the services of a technology consultant to in part, recommended an advanced technology payment system. 11.5 Automated Passenger Counters ITS applications will continue to enhance COTA’s ability to ensure that public transit serves as many customers as possible. APCs use electronic sensors near the front and rear doors of selected COTA fixed-route vehicles to count daily boardings and alightings at each bus stop. As future bus buys are executed, COTA will continue to maintain APC units on approximately 30% of the total fleet. Utilizing APC data, COTA planners can make timely decisions affecting route alignments and improved vehicle on-time performance, all with a goal to increase ridership, improve system efficiency and reliability, and ultimately, customer satisfaction. Figure 9-6: Automated Passenger Counters 11.6 Fleet Maintenance Included with the Trapeze CAD/AVL upgrade is the ability to provide enhanced maintenance capability to the fleet through vehicle component monitoring (VCM). VCM, or Preventive Maintenance (PM) software, enables automatic monitoring of transit vehicle engine components and provides warnings to COTA’s maintenance personnel if failures are about to occur. This element would eventually integrate with COTA’s existing maintenance records software. To monitor the COTA vehicle, an on-board microcomputer will be connected to various input devices: engine sensors, GPS receiver, ramp deployment signals, and odometer sensors, which can record characteristics such as acceleration/deceleration, speed/RPM, engine run time, and cumulative distance traveled. External sensors can also be connected to the on-board microcomputer to record temperatures (engine, coolant, interior passenger comfort), road Central Ohio Transit Authority 11-7 2015-2019 Short-Range Transit Plan 11 – Intelligent Transportation Systems (ITS) conditions (vibration), air compression usage (tire pressure), and stress on brakes. When the vehicle returns to the garage, the data can be downloaded via the wireless local area network to the maintenance system in order to help maintenance personnel conduct proactive fleet maintenance in a more timely and efficient manner, reducing overall maintenance costs. COTA’s future ITS plans also include an Intelligent Vehicle Initiative (IVI). IVI systems are designed to enhance the safety of the bus by providing crash warning and crash avoidance capabilities. IVI systems address behaviors including following too close, unintended lane departures, driving too fast around turns, and other operational characteristics. The plan to implement IVI technologies is currently being evaluated and is not being planned for deployment in the 2015-2019 timeframe. 11.7 Safety and Security Ensuring the safety of customers and operators is one of COTA’s highest priorities. Over the last few years, COTA, along with many other public organizations, has expanded interest in security to include its fleet and facilities. (See Section 12) Examples of ITS technologies used in ensuring a safe and secure environment include a video surveillance system, which incorporates three cameras in each fixed-route bus, images from which are stored automatically to hard drives on the buses. Additional on-board security features include emergency alarms and other sensitive security features, which allow dispatchers to monitor situations on the bus and act accordingly. COTA also currently monitors its facilities with a closed circuit television (CCT) surveillance system. Finally, each COTA facility maintains controlled access through a key card system. Over the 2015-2019 timeframe, COTA will continue to make significant investments in ITS security and safety technologies. Examples include the CAD/AVL upgrade described above, and other equipment that will assist COTA in monitoring and responding to situations on board vehicles, along the routes, and at transit facilities. 11.8 Transit Signal Priority (TSP) Over the past few years, implementation of various ITS technologies has been conducted by several local municipalities. For example, the City of Columbus and the Ohio Department of Transportation (ODOT) have installed real-time cameras Central Ohio Transit Authority 11-8 2015-2019 Short-Range Transit Plan 11 – Intelligent Transportation Systems (ITS) at numerous intersections and highway areas in central Ohio in order to help monitor traffic flow, decrease traffic incident response times, and improve overall safety of operations. Another area of ITS integration and partnering with local agencies includes the ability to interface with the City of Columbus’ traffic signal system and provide COTA buses priority at certain intersections when buses are running late. TSP enables a green light or truncate a red light (with certain parameters). The CMAX BRT project will utilize TSP, and COTA will continue to work closely with City of Columbus Traffic Engineers to ensure proper design of the system. COTA planning and IT staff will also investigate the potential for replicating TSP along other high ridership and high traffic congestion times corridors during the 20152019 SRTP timeframe. COTA completed an AA study in 2012, which examined the feasibility of operating a Bus Rapid Transit (BRT) line along Cleveland Ave. Part of this study included implementing signal priority, primarily along Cleveland Ave. See Section 14.5.6 for more information. Over the next five years, COTA will continue to pursue diverse ITS technologies to increase mobility and enhance transit operations by making travel safer, more efficient, cost-effective, and convenient. Central Ohio Transit Authority 11-9 2015-2019 Short-Range Transit Plan 12 – Security and Emergency Services 12 Security and Emergency Services COTA places a high priority on employee and passenger safety and security. COTA places a high priority on the importance of preparedness for and responding to a variety of security-related incidents and emergencies that may result from natural or humanmade disasters. COTA is an active community partner in regional security and emergency response planning, playing a vital role in response to and recovery from emergencies and other unexpected catastrophic events. Such emergencies, especially those that call for the mobilization of transportation resources, require effective and efficient coordination across a broad spectrum of agencies. COTA’s capability to mobilize resources is profoundly affected by the decisions and directives of others, including law enforcement, fire, and emergency medical services, and local and state planning agencies. To better manage these effects, COTA is actively involved with local central Ohio communities in planning and preparing for emergencies. COTA is prepared to provide specific functions that are identified in local emergency operations plans. Those functions may include but are not limited to: • The emergency evacuation of citizens from disaster affected areas; • Identification and transportation of citizens with disabilities; • Evacuation of schools and day care centers; • Temporary/in-place sheltering of evacuated citizens; and • Transportation of meals, goods, and supplies to an affected area for victims, emergency responders, or to support recovery operations, planned security, and emergency preparedness activities. 12.1 Passenger and Facility Security Over the past decade, COTA reorganized and increased its security enhancements to ensure the safety and well-being of its passengers, employees, and facilities and to provide an environment that is welcoming to customers. To develop an overall picture of the organization, the Security Department conducted Security Risk, Threat, and Vulnerability Assessments to determine weaknesses and strengths in the COTA structure. Several areas targeted for improvement are described below. Central Ohio Transit Authority 12-1 2015-2019 Short-Range Transit Plan 12 – Security and Emergency Services 12.1.1 Special duty officers and unmarked cruisers COTA maintains vehicles for use by uniformed Columbus Police officers. The cars are equipped with interior red and blue lights, public address systems, sirens, police computers, and radio equipment. These vehicles allow COTA to double its resources and reduce the time to respond to coaches in need of assistance. The computers allow officers to immediately receive information on an individual’s criminal status without awaiting the availability of a police dispatcher to conduct a search. The radios provide the advantage of direct contact to the Columbus Division of Police Communications Room for immediate response from on-duty police officers, helicopter support, K9 units, etc., when warranted. Figure 12-1 Police Cruiser Police officers routinely ride COTA coaches providing an additional level of protection for customers and operators. At their discretion, police departments across Franklin County are asked to stop coaches and conduct a courtesy walk-through. COTA has budgeted $$660,000 to hire Special Duty Police Officers for 2015, with inflationary increases included in each additional year of this plan. 12.1.2 Homeland Security COTA has initiated several additional standards to improve its ability to detect and deter terrorist activities within its system. These deterrents include, but are not limited to: • Bomb-sniffing, canine detection teams – Members of the Transportation Security Figure 12-2 Bomb-sniffing Canine Team Central Ohio Transit Authority 12-2 2015-2019 Short-Range Transit Plan 12 – Security and Emergency Services Administration (TSA), Columbus Division of Fire Bomb Squad, and the Ohio Highway Patrol Canine Teams work hand in hand with COTA to search coaches at pre-determined checkpoints and COTA facilities to ensure the safety of passengers, employees, and equipment during heightened security conditions. The Figure 12-3 Visible Intermodal searches serve as a deterrent Protection Response for anyone that may be considering plans to cause harm to the transit system; and • Visible Intermodal Protection Response (VIPR) – The TSA, Ohio Highway Patrol, the Ohio State University Police and the Columbus Division of Police coordinate with COTA to provide a VIPR during OSU football games, Arnold Classic and Columbus’ Red, White, and Boom activities. VIPR provides up to 75 federal agents and police officers to improve the security of COTA passengers, employees, and equipment during the busiest days of the year. VIPR officers ride with passengers, check parked vehicles at park and rides, conduct canine searches on buses, and scout crowds for suspicious activities. 12.1.3 Identicard proximity readers COTA will continue to ensure enhanced security around all facilities. Proximity identification card readers are located at exterior entrances and exits for transit centers and terminals while pedestrian gates and employee ID card readers control access of employees to main parking areas at COTA’s two-bus maintenance and storage facilities. All equipment will be maintained or upgraded with the latest available technologies throughout the SRTP timeframe. 12.1.4 Closed Circuit Television Cameras (CCTV) CCTV cameras have been installed on all COTA buses and facilities. COTA’s major facilities are being upgraded to a new Pelco system as each facility undergoes renovation. In 2009, COTA upgraded the CCTV equipment on buses to include audio capture capabilities. All future bus orders will be equipped with CCTV. Central Ohio Transit Authority 12-3 2015-2019 Short-Range Transit Plan 12 – Security and Emergency Services 12.1.5 Park and Ride Security By the end of 2017, eleven COTA Park and Ride locations will have wireless cameras installed. By 2017, COTA plans to install wireless cameras at all COTA owned park and ride locations. COTA has received permission from the City of Columbus to use city owned fiber optics and wireless systems to help reduce the price of COTA equipment and surveillance. CCTV systems at the Fields Avenue bus garage, Mainstream administration and mobility assessment center building, and administrative offices at 33 N. High Street have each recently received an upgraded Pelco camera system. The new system allows COTA to pre-set programs in the system to automatically move, focus, and auto-zoom cameras to cover extended areas while utilizing fewer cameras. During the 2015–2019 timeframe, security plans include enhancing and replacing Vicon CCTV equipment at the McKinley bus garage and Essex maintenance storage building, and at the Linden, Easton, and Near East transit centers with Pelco CCTV equipment in order to provide operational consistency among facilities. 12.1.6 Other security devices Similar to each bus in COTA’s existing fleet, all future bus buys will include the following security related features: • Exterior destination signs that can be activated to read “Emergency, Please Call Police,” followed by a silent alarm to COTA’s Radio Room; • Convex mirrors to allow the operator complete vision of passengers ; • Bus identification numbers painted on coach tops for easy aerial view (e.g., by police helicopters); • A GPS radio to provide real-time bus location information; and • Emergency buttons included in an upgraded radio system in order to provide a priority and second level of priority notification to the Radio Room. Central Ohio Transit Authority 12-4 2015-2019 Short-Range Transit Plan 12 – Security and Emergency Services 12.1.7 Contracted security guards COTA contracts security guard services to protect its main headquarters at 33 North High Street, and the two bus garages twenty-four hours during the weekdays, weekends, and holidays. COTA has budgeted $220,000 for security guard services in 2015, with inflationary increases included in each additional year of this plan. 12.1.8 Evacuation transportation group In 2006, COTA, the Mid-Ohio Regional Planning Commission (MORPC), Franklin County Emergency Management and Homeland Security Agency (FCEMHS), and the City of Columbus, formed a regional evacuation transportation group to discuss emergency response, evacuation routing, signage, and transportation resources with agencies in the greater Columbus area that have a stake in evacuation planning. On a regular basis, this group discusses the following topics: • Transportation resources; • Evacuation routing and signage; • Review of existing evacuation plans; and • Incident management. FCEMHS’s vision is to continue to develop and update a regional transportation evacuation plan that adds to and complements existing emergency preparedness plans. This strategy contains a summary of transportation options in the event of an evacuation, including evacuation routes out of the area, fuel and food supply provision routes to the area, shelter provisions, flexible and static signage, use of various Intelligent Transportation Systems (ITS) such as radio communications, traffic signal coordination, etc., and law enforcement. COTA also coordinates closely with the Franklin County Emergency Management Agency (FCEMA) and Chemical Emergency Preparedness Advisory Council (CEPAC) on evacuation training in the event of an emergency. This training has included an annual simulated plane crash at Port Columbus International Airport, Rickenbacker Air Base, or Bolton Field. In addition, COTA has been involved in several emergency evacuations (actual and simulated) in Franklin County in recent years. Central Ohio Transit Authority 12-5 2015-2019 Short-Range Transit Plan 12 – Security and Emergency Services During disaster events, it may become necessary to protect citizens by moving or relocating them from areas of the county that are threatened to areas that are more secure. Conducting these types of movements is COTA’s primary responsibility as Franklin County’s #1 Emergency Support Function (ESF) Transportation Coordinator, assisted by support agencies charged through an ESF as part of the Franklin County Emergency Operations Plan. “ESF 1 Transportation” is responsible for management of transportation systems and management of transportation infrastructure during threats or in response to actual incidents. Activities under this ESF are directed by the Franklin County Engineer’s Office (FCEO) and COTA with support from many other transportation industry entities. Transportation encompasses all transit surface modes, including land-based wheeled vehicles, trucks, and buses traveling on streets, roads, highways, and bridges; air travel, rail routes; transportation infrastructures (roads, routes, and bridges) and assets that move people and supplies in and out of Franklin County. ESF 1 presents a coordinated approach to manage surface transportation support, services, and infrastructure essential for emergency response, and to provide public transportation to temporarily replace or augment services affected in an emergency. It is also responsible for restoration of the transportation infrastructure following a public emergency and for ensuring the existence of routes designed to promote the movement of goods, services, equipment, and personnel toward emergency staging areas and any emergency location. Evacuation will be undertaken when it is perceived that there is or may soon become an unacceptable level of risk to health and/or safety of people in a given area. 12.1.9 Mobile Emergency Operations Center (EOC) In March 2013, COTA purchased a mobile EOC to enhance the effectiveness of COTA’s emergency response for assistance to Franklin County Emergency Responders. COTA has been identified by the Emergency Management and Homeland Security Agency as the Transit Coordinator for Franklin County. COTA personnel are responsible for contacting and assigning other agencies to assist in evacuations while tracking the number and types of vehicles, personnel, and assignments Central Ohio Transit Authority 12-6 2015-2019 Short-Range Transit Plan 12 – Security and Emergency Services involved. The Mobile EOC is equipped with radios for communication with COTA personnel and other agencies, chalkboards, a meeting room, computers, and other equipment which will improve communication in and response to emergency situations. 12.2 Other Emergency Services Coordination COTA is the transportation representative of the Ohio Department of Homeland Security’s (ODHS) Border/Transportation Security Chemical, Biological, Radiological, Nuclear, and Explosive (CBRNE) Advisory Committee. The object of this committee is to review and revise all policies and procedures to protect the borders of Ohio from attacks via waterways, land, or air. The committee participants include but are not limited to the ODHS, Ohio State Highway Patrol, Ohio Department of Natural Resources, TSA, Amtrak, CSX Transportation, Norfolk Southern Railroad, Ohio Central Railroad, Ohio National Guard, Franklin County Sheriff, Columbus Division of Fire Bomb Squad, Columbus Division of Police, and the United States Coast Guard. 12.3 Other Security Initiatives To help minimize crime and provide increased security for passengers, employees and facilities, COTA is exploring the possibility of establishing a transit police department either within the Authority or within the Columbus Police or Sheriff’s Department. The Authority will analyze crime statistics between the City of Columbus and COTA’s service area; crimes committed on COTA coaches and property compared to similar crimes at other agencies; and, determine what additional personnel and funds are needed to protect COTA and its customers. 12.4 Ohio Public Transit Association Security Subcommittee In November 2006, members of COTA’s staff recommended and initiated a new Ohio Public Transit Association (OPTA) Security Sub-Committee. This group has representatives from every major, and many of the smaller and rural, transportation systems within Ohio. The members provide training and development for the Security Program Plan, Emergency Disaster and Contingency Plan, Security Tool Kit ingredients, and procedures for the National Incident Management System (NIMS). This committee will continue to spearhead the Ohio Homeland Security’s Transportation version of the computer-based Law Enforcement Response Plan (LERP). The primary purpose of the LERP is to identify equipment and other Central Ohio Transit Authority 12-7 2015-2019 Short-Range Transit Plan 12 – Security and Emergency Services resources each authority has available, which can be utilized during emergency evacuation situations. Specialties and best practices initiatives have been identified and shared with all transit agencies involved in this effort. Agencies have developed key networking partners to assist in the planning and design of their particular authority’s security program. 12.5 Capital Crossroads Special Improvement District (SID) Since COTA’s inception, downtown Columbus has been the heart of COTA’s transit market, and remains the largest employment center in the central Ohio region. Capital Crossroads is a private sector organization created by downtown property owners in 2001. Its primary purpose is to make downtown Columbus the cleanest, safest, and most attractive commercial area in central Ohio. Funded by more than 500 property owners, the SID serves a 32-square block area between the Greater Columbus Convention Center and I-70. The downtown SID Ambassadors provide safety and cleaning services to the District seven days a week. COTA continues to be an integral funding partner to the Capital Crossroads SID project. COTA’s participation in SID funding will protect and enhance COTA’s downtown facilities and be a great benefit to Authority personnel and its customers. In 2015 COTA renewed its yearly agreement with the SID, and contributed $100,000 towards providing supplemental maintenance, security and other essential services within the District. Central Ohio Transit Authority 12-8 2015-2019 Short-Range Transit Plan 13 – Administrative Support Staff 13 Administrative Support Staff COTA’s administration is comprised of six divisions plus the President’s Office. The agency’s administrative organizational structure is displayed below. While many divisions and departments are directly responsible for implementing, planning and supporting bus operations and facilities, such as the Operations, Service Planning and Communications and Marketing divisions, other divisions and departments support the rest of the administration. Human Resources, Labor Relations, Legal divisions, Information Technology, Supply Management, and two departments within the Finance Division, are such examples. Below are summaries of the support divisions and departments, briefly outlining programs and functions of each one. 13.1 Division of Human Resources and Labor Relations The Division of HR and Labor Relations is a strategic partner and support unit for all areas of the Authority. HR provides assistance and expertise in many areas including: benefits administration, compensation and classification, employee development and training, employee and labor relations, safety, and attracting top talent. COTA works closely with all of the Managers and Supervisors throughout the organization and every employee. The Division consists of the following: • The Office of Vice President; • HR Services; • Safety; and • Employee Development. The HR Division strives to find and retain the best-qualified candidates for all positions within the Authority. Even with the financial hardships many communities are facing, central Ohio continues to thrive and grow, which creates a very competitive environment for attracting and retaining top talent. The HR Division continues to balance this challenge with being a good steward of public funds. 13.1.1 Recruitment/Retention COTA hires over 100 Bus Operators per year, on average. The recruitment process is designed to ensure qualified individuals are hired Central Ohio Transit Authority 13-1 2015-2019 Short-Range Transit Plan 13 – Administrative Support Staff and trained to safely perform all aspects of the position. Operators are screened based on their application for employment and are invited to attend a three and a half-hour briefing to introduce them to the position and evaluate their customer service skills. Those who have the skills to move forward in the process are interviewed by COTA management, references are checked, criminal history and driving records are evaluated, and a drug test and physical exam are completed. Applicants must obtain an Ohio Department of Transportation (ODOT) physical card, pass the written portions of the Commercial Driver’s License (CDL) test, and obtain a CDL permit prior to hire. In addition, a comprehensive job analysis was completed in 2012 thoroughly defining the essential functions of several high incumbent positions. Environmental factors as well as the physical demands of the position were analyzed. This data was evaluated by a third party to create a minimum score on a Physical Capability Evaluation (PCE) 8 specifically for the Bus Operator position. Figure 13-1 Isokinetic Evaluation for the PCE Applicants for this position are required to successfully complete and achieve a passing score on the PCE to ensure they can safely perform all physical requirements of the position. This program’s effectiveness is monitored monthly and additional high incumbent positions are being evaluated for implementation in the future. 13.1.2 Compensation and Class Structure Salary structures are an important component of effective compensation programs and help ensure the pay levels for groups of jobs are competitive externally and equitable internally. An effective salary structure allows COTA to reward performance and the development of skills while controlling overall base salary costs by providing a cap on the range paid for particular jobs. Job analysis data is a critical component of the salary structure and is used as the foundation for most functions and activities within the HR discipline. In an effort to improve services and maximize productivity, the HR department evaluates opportunities to leverage new technology, outsource transactional non-core tasks, and 8 PCE is a registered trademark of Industrial Physical Capabilities Services Central Ohio Transit Authority 13-2 2015-2019 Short-Range Transit Plan 13 – Administrative Support Staff streamline internal processes. It is more essential than ever to make sure spending provides the most efficient services to our employees and benefits our stakeholders. 13.1.3 Employee Recognition COTA understands the importance of recognizing our people for their accomplishments. The HR Division works hard to balance being good stewards of public funds with improved employee morale and job satisfaction through a quality recognition Figure 13-2 Employee being recognized by President/CEO Stitt and VP of Operations, Forbes program. This recognition program is intended to reinforce COTA’s values, reduce turnover and create a positive culture. As a part of the Customer Experience Project Initiative, in 2014, the Smile Award Recognition Program was introduced. It provides an opportunity to recognize and reward employees for going above and beyond in the area of customer service. This program enables all employees to recognize their fellow co-workers regardless of level within the organization. 13.1.4 Affirmative Action Plan It is critical to the management team and Board of Trustees that the Authority’s culture provides diversity and inclusion. COTA provides equal employment opportunity to all employees regardless of race, color, religion, sex, sexual orientation, gender identity, creed, national origin, age, political affiliation, military or veteran status, and disability, except where being able-bodied is a bona fide occupational qualification for a specified position. Central Ohio Transit Authority 13-3 2015-2019 Short-Range Transit Plan 13 – Administrative Support Staff COTA’s policy affects all employment practices and prohibits discrimination in any terms, conditions, or privileges of employment. COTA takes these legal obligations seriously and takes positive affirmative action to ensure our workforce is representative of the community in which we serve. If underrepresentation is discovered, goals are established, communicated, and monitored to ensure progress. COTA is proactive in managing our healthcare and workers compensation programs including implementing an ambitious health and wellness program. We understand safe, healthy employees are happier, more productive, and efficient. 13.1.5 Biometrics Program In 2012, COTA management successfully negotiated a biometrics screening program into its contract with the Transport Workers Union Local #208 for employees and spouses in the health plan to participate in a comprehensive 34-panel blood and nicotine test, blood pressure measurement, and health history questionnaire. Each employee and spouse is assigned a unique, achievable goal and is rewarded, through premium incentives, for participation in the program and for achieving the goal on an annual basis. Covered adults Figure 13-3 Biometrics Program are supported with year-round tools and resources designed to keep them engaged and empowered to take control of their health, which has a direct correlation to COTA’s controlling its health care expenses. Smoking is still the leading preventable cause of death in the United States, causing 443,000—or nearly 1 of every 5—deaths annually9. Smokers contribute, on average, an additional $3,500 to health care 9 Centers for Disease Control and Prevention: Tobacco Control State Highlights 2010 Central Ohio Transit Authority 13-4 2015-2019 Short-Range Transit Plan 13 – Administrative Support Staff expenses each year10. Therefore, nicotine users who did not cease their use in 2013 began paying the highest premium level beginning in 2014. In 2015, COTA management successfully negotiated an increase to the employee premium contribution while continuing the same incentives for employees and spouses, where applicable, who participate in the program. An incentive was also introduced for nicotine users to encourage participation in the program, while still requiring a higher premium contribution than non-nicotine users. 13.1.6 Benefits/Wellness Initiatives HR aggressively managed its health insurance costs and achieved only a 2.56% increase in premiums for the 2015 calendar period. This increase compares very favorably to the national average health care premium rate, which is an increase of 4.9% and 6.3% for 2012 and 2013 respectively 11. In addition, significant plan design changes were negotiated with the Transport Worker’s Union Local #208 for the 2016 and 2017 plan years to help drive behaviors to lower cost options, and achieve future cost savings. To further manage COTA’s health care expenses, options to self-insure may be evaluated and medical, prescription, dental and visions plans will be marketed for competitive bid for the plan year beginning in 2016. HR’s initiative centers around the concept that health insurance costs will only decrease through ensuring employees have a vested interest in and a clear understanding of their health status. COTA continues to educate and provide resources to our employees on the importance of being proactive with their annual exams and with their relationship with their physician(s). COTA continues to focus on its wellness initiatives through the “On the Road to Wellness” program with administrative and represented employees serving as wellness ambassadors, regular visits from a Registered Dietician, publication of a monthly wellness newsletter, benefits fairs, and holding and encouraging participation in events designed to increase physical activity. The program will utilize the 10 11 Interactive Health Solutions As reported and predicted by Aon Hewitt Health Value Initiative Database Central Ohio Transit Authority 13-5 2015-2019 Short-Range Transit Plan 13 – Administrative Support Staff aggregate results of the biometric program to focus wellness initiatives on the most prevalent modifiable health risks in COTA’s covered population. Lastly, compliance with and implementation of phased-in provisions of the Affordable Care Act will have a significant impact on HR priorities and expenses in the coming years as we continue to make the best business decisions in a volatile health insurance market. 13.1.7 Safety In 2014, the COTA Safety Committee was re-established and remains a priority initiative for 2015. The Committee’s make-up includes a crosssection of management and represented employees. The intent of the Committee is to identify, eliminate, minimize, and/or control safety hazards and their associated risks. Safety Awareness will be a focus, with safety training classes being offered on topics such as slips/trips/falls, eye/ear protection, fire safety, safe work practices, etc. The Committee will also assist with audits, safety, and wellness fairs and manage a new company-wide Safety Award Program, which will be implemented in the first quarter of 2015. Submission of safety suggestions and/or concerns will be reviewed and evaluated by the Committee. The suggestions and concerns must positively contribute to the safety and wellbeing of COTA’s employees. The Committee will also promote the new focus on safety by partnering with COTA’s Communications Department to assist in marketing the safety campaign initiatives. During 2014-2015, the Safety Department will complete Job Task Analysis (JTA) reports on several positions at COTA. The JTA evaluation of the Operator position was completed in 2014. COTA currently employs over 500 Operators out of a work force of approximately 960. Along with this JTA for Operators, a PCE test has been developed and implemented. Successful applicants for the Operator position will take this functional capacity test prior to their placement in the position. This process helps to ensure that our employees understand the essential functions of their positions and can safely and effectively perform them. Other positions within the organization will have a JTA Central Ohio Transit Authority 13-6 2015-2019 Short-Range Transit Plan 13 – Administrative Support Staff completed along with an appropriate PCE as this program expands. This process promotes the health and safety of our employees and will reduce the potential injuries that could occur if a person cannot safety perform the duties in the position. As a Self-Insured Employer in Worker’s Compensation, COTA continues to save approximately $2.5 million dollars per year. The Safety Department routinely partners with the Ohio Bureau of Workers Compensation – Division of Safety and Hygiene for safety consulting, environmental testing, on-site training, and on-site safety inspections. COTA has used their services in the past and will increase requests this year to include safety inspections of each COTA property to ensure compliance with Occupational Safety and Health Administration requirements. 13.1.8 Training and Employee Development COTA’s ongoing commitment to the growth and success of its employees will continue grow in the next five years. Initiatives of the Training and Development department include: • Efficiencies: Training and employee development at COTA focuses on driving efficiencies cross-functionally across the organization. We continue to evaluate all training programs in place and identify synergies needed between departments. A needs analysis continues to identify cost efficiencies within the department pertaining to delivery methods and learning retention. This includes, but is not limited to, research on learning management systems, webinar platforms, developer resources, and cross-functional department resources. • William J. Lhota Leaders of the Future program: COTA created a leadership program in 2007 known as the “Leaders of the Future Program.” The program, which lasts 12 months, is designed to engage, cultivate, and enhance the leadership competencies and skills of current and emerging leaders within the organization. In 2012, the program was renamed the “William J. Lhota Leaders of the Future Program” in honor of our former President/CEO William J. Lhota. Acceptance into the program is a competitive process and employees are hand-selected by the Authority’s Executive Leadership Team based upon the strength of their application and interview. Central Ohio Transit Authority 13-7 2015-2019 Short-Range Transit Plan 13 – Administrative Support Staff The program focuses on developing a leadership philosophy and leadership soft skills in the participants. Through partnerships with community leaders, we are able to share real-life leadership experiences with them. They are also mentored by a member of COTA’s Executive Leadership Team. Lastly, each class is assigned a leadership project designed to advance the Authority. To date, the program has graduated 42 participants. • Onboarding: Training and Development continues to focus and improve the onboarding experience from the recruiting process to the hire date. As an initiative in 2013, COTA analyzed the New Hire Orientation program and identified ways to make it more effective. Improvements include, but are not limited to, efficiencies with timing and scheduling, updates to the Harassment-Free Work Environment Training, and participant training material revisions. Our continued focus will be to explain COTA’s vision, mission, and core values to new employees and share with them who we are as a company along with how the employees benefit from working at COTA. • Leadership Training: In 2013, Training and Development evaluated and started to build a foundational leadership program for the Authority’s leadership. The program focuses on strengthening the current leadership skills and drives toward a consistent leadership culture across the organization. COTA will continue to expand this program in 2015. The program includes training modules on Getting Started as a New Leader, Essentials of Leadership, Resolving Conflict, Coaching for Success, and Managing Performance Problems. We will identify additional modules on delegation and setting performance expectations in 2015. In addition, mandatory training such as ADA/FMLA, Harassment, Ethics, etc. has also been incorporated. The program has been delivered to the embedded base leadership within COTA and is incorporated into New Hire Leadership Training. • Customer Service Training: Customer service training began as a focus midyear of 2013 for the entire Authority. A needs analysis was performed with all departments to identify internal and external customer interactions. As a result, The COTA Customer Experience Program was created. The program began in the first quarter of 2014 with the launch of the DRIVE the Customer Experience Newsletter. The newsletter Central Ohio Transit Authority 13-8 2015-2019 Short-Range Transit Plan 13 – Administrative Support Staff includes customer service related articles, recognition, training announcements, books, and quotes. In addition to the newsletter, we delivered the training course DISC to all of the Administrative employees. DISC focusing on self-awareness of your own work style, and how to adapt to other work styles. In Q2 of 2014, we launched the SMILE Award Recognition program, which focuses on employees who go above and beyond with their customer service skills. The Customer Experience Program will continue with the launch of the course Critical Elements of Internal Customer Service to all administrative employees, and the course Delivering Exceptional Customer Service to all external customer facing employees. We will continue to focus on improving our employees’ customer service skills in order to reach a high customer satisfaction rate internally and externally. • Professionalism/Communications Training: Moore Counseling and Mediation was hired in the third quarter of 2014 to deliver Professionalism/Communications training to individual departments at COTA. The training focuses on professional behavior and effective communication in the work environment. The training is followed by a mediation session and a two-hour follow-up session at a later date. The success of the training has inspired us to continue the program in 2015. 13.1.9 Labor Relations Three quarters of COTA’s employees belong to the Transport Workers Union Local 208. There are three different bargaining units: 1) Bus Operators; Vehicle and Facilities Maintenance; 2) Customer Service Representatives; and 3) Cashier Clerk/Farebox Pullers. It is extremely important to the leadership team of COTA that the partnership with the Union is strengthened through positive and productive dialogue and relations. The Authority cannot provide the best service to its customers without this relationship. The HR Division is charged with promoting and cultivating this relationship. In addition, the HR Division works hard to provide coaching and counseling to all of the supervisors and managers to ensure they are providing the best leadership to their teams. Initiatives that sought to improve the relations throughout the organization and work towards a positive collective bargaining process began in 2014. Central Ohio Transit Authority 13-9 2015-2019 Short-Range Transit Plan 13 – Administrative Support Staff 13.2 Division of Legal The Legal Division consists of six full-time employees: Vice President of Legal Affairs/General Counsel; Senior Legal Counsel; two Associate Counsels, Claims Adjuster, and an Administrative Assistant. In addition, from time to time, the Division hires law clerks to assist with legal and claims matters and to provide valuable practical experience to law students. Of the Legal Division’s six full- time employees, four are attorneys. Collectively, the attorneys’ responsibilities are to advise and represent the Board of Trustees and the President/CEO on all legal issues and concerns affecting the organization, including making recommendations for policy changes to comply with all laws and regulations as well as organizational goals. In addition, the attorneys advise, consult and represent all Division Vice Presidents and management staff on all legal concerns with particular emphasis on labor relations, employment, workers’ compensation, personal injury defense and other tort litigation, administrative policies, and contractual (procurement) issues, including research and representation in all courts of law and administrative tribunals. Lastly, the attorneys are responsible for managing all outside legal services provided to the organization. COTA’s Claims Adjuster conducts thorough accident investigations involving property damage and personal injuries. The investigation process involves on-the-scene interviews with witnesses and principals involved. The Claims Adjuster also communicates with outside attorneys, doctors and other specialists concerning appropriateness of claims and advises the Vice President of Legal Affairs/General Counsel and/or Associate Counsel accordingly. Lastly, the Administrative Assistant provides administrative support to the entire Division, which includes, but is not limited to, preparing correspondence, maintaining calendars and the Division’s filing system. 13.3 Department of Supply Management 13.3.1 Procurement The COTA Supply Management Department is responsible for the effective implementation of a procurement process that fosters fair and open competition and is conducted under the highest ethical standards for the purchase of goods and services. This process is implemented in accordance with the rules and regulations of FTA Circular 4220.1F and Central Ohio Transit Authority 13-10 2015-2019 Short-Range Transit Plan 13 – Administrative Support Staff Section 306.43 of the Ohio Revised code, resolutions approved by the COTA Board of Trustees and COTA by-laws. Procurements are initiated after receiving a statement of need, a cost estimate, confirmation that the cost is included in the current budget and the determination of the type of procurement method. A request for bids is used when there are complete and adequate specifications or purchase description, the selection can be made on the basis of price, and no negotiations are required. A request for proposals is used when complete specifications are not available, the selection is not based strictly on price (and includes other evaluation criteria, such as qualifications, experience, references, and understanding of the project) and negotiations are required. To achieve maximum participation and to promote full and open competition, solicitations are distributed to vendors via email, advertised locally, and posted on the COTA website. The Supply Management Department includes a Director, a Purchasing Coordinator, a Manager of Supply Management, three Purchasing Agents, a Contracts Administrator, a Contracts/DBE Program Administrator, a Stores Manager, and a Stores Supervisor. The Supply Management Department supports the entire organization through a centralized procurement function, which includes contract administration and stores management. Procuring goods and services for COTA is a cooperative effort, and it is the responsibility of all COTA staff involved in the procurement process to employ sound judgment and appropriate standards of ethics and fairness in carrying out their individual responsibilities and tasks. 13.3.2 Disadvantaged Business Enterprise (DBE) Program COTA is committed to the elimination of discrimination in business practices, including the procurement of goods and services. To this end, COTA has established a DBE Program, as required by Section 26 of 49 CFR. It is the policy of COTA to utilize ready, willing, and able disadvantaged and small businesses, and to use the best efforts possible to level the playing field in the marketplace by ensuring these firms have the opportunity to participate in the procurement process. Central Ohio Transit Authority 13-11 2015-2019 Short-Range Transit Plan 13 – Administrative Support Staff The Program, which the Board has adopted, is designed to identify eligible businesses to ensure these enterprises have an equal opportunity to compete for contracts and sub-contracts and to establish overall race-conscious and race-neutral goals for contracts to be awarded. COTA’s CFO/Vice President of Finance is designated as the DBE Compliance Officer, and has primary responsibility for developing, managing and implementing the DBE Program. The CFO/Vice President of Finance reports to the President/CEO, who has the overall responsibility to ensure the program is conducted effectively and equitably by COTA. The Supply Management Department is tasked with the day-to-day implementation of the DBE Program, including development of the annual goals, reporting as required by the FTA and COTA policy, and monitoring contractor compliance. 13.3.3 Small Business Development Program (BDP) COTA has initiated a DBE/SBE Development Program in accordance with Title 49 CFR Appendix C to Part 26 and its own internal guidelines. This program is managed and implemented by the Supply Management Department. The purpose of the program is to provide training and developmental assistance to move DBEs and SBEs into non-traditional areas of work and/ or become independently competitive in the marketplace outside the DBE program, and with COTA’s own purchasing system in areas that have historically lacked DBE participation. The COTA BDP permits certified Disadvantaged Business Enterprises (DBEs), as defined in Title 49 CFR Part 26.2 to participate in the program, and in accordance with Title 49 CFR Part 26.39, has opened the program to other small business concerns (i.e., minority-owned, women-owned, small business enterprise (SBE), EDGE and HUBZone businesses). COTA’s BDP is comprised of two phases: Phase 1 – Developmental and Phase 1I – Transitional. COTA anticipates that this program will result in an increased level of DBE/SBE participation in contracts with COTA, as well as in contracts with other local and regional agencies. Central Ohio Transit Authority 13-12 2015-2019 Short-Range Transit Plan 13 – Administrative Support Staff 13.4 Department of Information Technology The IT Department is an integral unit that supports the organization’s technological and communications needs across COTA’s four primary facilities and many satellite locations. This support includes that of servers and storage, networking, desktop and mobile, cellular and land phones, network security, and system applications. The IT Department is currently focused on ensuring that COTA has the needed IT infrastructure in place to support the short and long ranged transit plans. This will enable us to prepare for technology changes in the transit industry with a renewed focus on security, systems integration, automation, usability, and reliability. All of these efforts will result in enhancing the passenger experience through the use of technology. The IT Department reports to the CFO and is led by the Director of IT with additional input and oversight provided by the Technology Steering Committee. The Technology Steering Committee is comprised of Directors that represent many of COTA’s core business functions. The Technology Steering Committee is designed to work in conjunction with the Capital Program Committee to ensure that priority, funding, and resources are in alignment for execution of technology related initiatives. 13.5 Quality Assurance Within the Operations Division, the Quality Assurance department utilizes various resources to measure and acquire data in relation to Absenteeism, Road Calls, actual miles driven, materials and fluids used in maintaining the fleets (and how those impact budgets) resource hours spent (including overtime) in maintaining the fleets, and the On-Time Performance of bus service. They also review and develop the data collection and input procedures for an array of metrics, identify validity issues (as in conferring with persons originating, handling, entering, or receiving data to identify problems and resolve issues and/or errors), research and analyze current and historical data; generate statistical models and trends to assess performance and cost measures; identify issues and assist in development of strategies to achieve performance and cost efficiencies. Quality Assurance constantly monitors the data for these areas as well as the processes and integrity of the data collected. This monitoring ensures that FTA Central Ohio Transit Authority 13-13 2015-2019 Short-Range Transit Plan 13 – Administrative Support Staff and ADA requirements are achieved and mitigate risk to the authority. This also allows the team to identify opportunities to improve operational performance. Quality Assurance also supports the Operations Division through our Warranty Program. Our Warranty Program coordinates warranty processing of components utilized for our fleet and support equipment, and also coordinates implementation of any retrofits and campaigns to address fleet issues. We also capture and track off-site warranty repairs performed by Original Equipment Manufacturer (OEM) shops for Enterprise Asset Management system (EAM) reporting. As a result of our dedicated efforts, we save hundreds of thousands of dollars each year through a combination of parts and labor supplied under OEM warranty, reducing COTA funds and Public Tax Dollars spent for annual parts and labor. Central Ohio Transit Authority 13-14 2015-2019 Short-Range Transit Plan 14 – Transportation Improvement Program 14 2016-2019 Transportation Improvement Program (TIP) 14.1 Background The TIP delineates a four-year operating and capital plan. Listed in the TIP tables on the following pages are annual service levels, operating and capital expenses, and anticipated financing levels. To avoid confusion, it should be noted that although this program was designed to span four State fiscal years (2016-2019), it actually covers five fiscal years for the Central Ohio Transit Authority (COTA). COTA begins its fiscal year January 1st, while the State of Ohio begins its fiscal year July 1st, and the Federal Government begins its fiscal year October 1st. Therefore, it is necessary for the span of this document to encompass five COTA fiscal years (i.e., 2015-2019) in order to meet state and federal requirements of a four-year program. A discussion of the operating and capital components of the TIP follows. 14.2 Operating Plan The 2016-2019 four-year TIP operating plan represents COTA’s continued response to the growing transportation needs of the central Ohio region by providing an expanded, reliable, and safe transit system. The following is a summary, with supporting tables, of the four-year operating component of the TIP including years 2016 through 2019. The most recently projected data for 2015 has also been included in each of the tables. Table 13-1 displays the existing and projected bus hours of service. The hours of service represent implementation of COTA’s Transit System Review (TSR) service plan. The consultant led TSR analyzed the entire bus system and services, land use changes, the road network, operating budget and the use of technology. The TSR Final Report recommends improvements for positive changes to COTA’s bus service and network for the period 2015-2017, taking into consideration the needs of central Ohio residents, riders, and businesses. As this planning document assumes maintaining COTA’s existing 0.5% sales tax for operating revenue, the projected amount of annual service hours COTA can afford to operate, 1,162,097, will be reached by the end of 2017. A primary goal of the TSR is to improve the effectiveness and continued expansion of the bus network within existing budgetary constraints. Community engagement with the public and stakeholder groups has been key to the ongoing Central Ohio Transit Authority 14-1 2015-2019 Short-Range Transit Plan 14 – Transportation Improvement Program refinement of the proposed TSR network. Section 4.5 describes the TSR in greater detail. In addition to TSR modifications, The TIP calls for continued system-wide expansion of COTA’s fixed-route and paratransit bus service. Overall, the SRTP calls for a 19.3% increase in fixed-route service hours by 2017. As a result of the increase of fixed-route service coverage, the capital plan includes dollars for fleet expansion, and the Mobility Services budget includes funds for a 26% increase in Mainstream service between 2015 and 2019. A more detailed discussion of Mobility Services and Mainstream is contained in Section 8. The number of vehicle hours directly impact each year’s operating expenses. Direct cost per hour and indirect expenses as budgeted for 2015 are included in Table 13-1. From 2015 through 2019, the direct cost per hour was increased by approximately 2.5% per year to account for general inflation, estimated future fuel, and escalating employee benefits costs. A 3.5% increase in cost per year has been budgeted for expanded Mainstream services in order to offset inflation and increase service hours in concert with the fixed route. Operating revenue was estimated based on 2014 operating revenue and historical trends. In order to keep pace with inflation and to achieve a target level of 20% farebox recovery ratio, a fare increase has been budgeted to take effect in 2018. In addition, this plan assumes that the average rate of interest on COTA’s investment portfolio will continue to be less than 1% per year from 2015 to 2019, a significantly lower return on investment then experienced during previous SRTP cycles. Section 14.6, the financial summary of the TIP, summarizes the various sources of revenue and assistance and relates this income to total operating and capital expenses. 14.3 Local Funding In November 1999, COTA won approval by voters to make an existing 10-year 0.25% temporary sales tax, scheduled to expire in 2000, permanent. In November 2006, Issue 7 was approved by voters and created an additional ten-year renewable, 0.25% sales tax to help fund expanded transit services described in the LRTP through December 31, 2016. This TIP assumes a continued local sales-tax funding rate of 0.5%. Although no exact date can be given at this time, during the 2015-2019 timeframe, COTA’s Board of Trustees is Central Ohio Transit Authority 14-2 2015-2019 Short-Range Transit Plan 14 – Transportation Improvement Program expected to consider the timing of placing before voters a renewal request for the existing 0.25% 10-year temporary sales tax. Projecting the sales tax revenue over the next five years is challenging in part due to changing consumer spending habits (e.g., volatile oil prices, etc.). For 2015, COTA’s sales tax is expected to make up approximately 85% of total operating revenues. Recent monthly sales tax receipts have shown positive growth; however, much uncertainty still exists regarding future receipts. Given these economic conditions, the TIP analysis assumes that the tax receipts will grow at an annual rate of approximately 3% for the years 2015 to 2019. 14.4 Capital Plan An outline of the Capital Acquisition Plan is provided in Table 13-2. All projects in the 2015 column have been fully funded as outlined by the Authority’s approved budget. Major capital items in Table 13-2, such as buses, park and rides, and other facilities are described in greater detail in Sections 7 and 10 respectively. Major capital items will be funded primarily with Federal Section 5307 Urbanized Area Formula program grants and Congestion Mitigation Air Quality (CM/AQ) funds. Total capital expenditures planned for 2015-2019 are just under $291 million. Major components of the capital program are discussed in Section 14.5. Existing federal transportation bill language gives regional transit authorities the latitude to use their Section 5307 Federal Formula Assistance on the capitalization of maintenance. This plan assumes that Section 5307 Urban Formula assistance will be utilized for any funding shortfall from other sources for revenue vehicle replacement and/or other qualifying capital projects. On July 6, 2012 President Obama signed into law a new two-year transportation authorization, entitled MAP-21. MAP-21 moved Section 5309 Bus and Bus Facilities Program to a new Section 5339 Bus and Bus Facilities Program. Funds will be transferred by the state to supplement the urban formula grant program (§5307). MAP-21 stipulates an 80% federal and 20% local and state participation on all CMAQ Section 5307 and 5339 grants. On August 8, 2014 Congress passed an extension of MAP-21 through May 31, 2015. 14.5 Major Capital Projects The total five-year Capital Acquisitions Plan is projected to cost nearly $291 million as identified in Table 13-2. During this SRTP timeframe, COTA is Central Ohio Transit Authority 14-3 2015-2019 Short-Range Transit Plan 14 – Transportation Improvement Program proposing significant capital improvement investments aimed to strengthen and provide new transit services in the central Ohio area. 14.5.1 Bus Replacement and Expansion Replacement of aging existing coaches and purchasing new coaches necessary to meet fixed-route and paratransit expansion plans continues to be a priority at COTA. • In addition to the traditional FTA Section 5307 funding, COTA has programmed Congestion Mitigation/Air Quality funds (i.e., MAP-21 Attributable Funds) in the regional TIP. During SFYs 2015-2019, $7,412,000 in MORPC attributable CM/AQ funding will be used towards assisting with the purchase of fixed-route coaches; • In conjunction with the increase in fixed-route service hours during 2015-2019, COTA will be expanding the fixed-route active fleet from 330 to 367 coaches (this total may change due to changes in available service hours). The procurement process for ordering and delivery of fixed-route coaches takes approximately 12 to 18 months. On average, COTA will purchase 28 buses annually from 2015-2019. In 2016, 14 buses for the proposed CMAX Cleveland Avenue BRT service are scheduled to be purchased as part of the buy, and the BRT fleet will replacement schedule will be maintained separately due to their unique design and special branding. As much as possible, COTA desires to maintain a “smoothing” approach to bus purchases in order to replace vehicles in a predictable and timely manner, which allows COTA to ramp up service levels as quickly as possible within financial constraints; and • COTA currently uses 64 vehicles to operate “Mainstream”, a complementary paratransit service for individuals who are unable to use the regular fixed-route bus service due to a disability. As the fixedroute system expands from 2015 through 2019, and the TSR changes implemented, COTA anticipates purchasing additional paratransit vehicles to accommodate expected increases in paratransit service. As a result, the Mainstream fleet is projected to expand by two vehicles each year from 2016 through 2019, resulting in a total fleet size of 74 vehicles by 2019. To provide for this expansion, during the 2015-2019 SRTP COTA has budgeted $7.5 million for the purchase of replacement and expansion paratransit vehicles. Central Ohio Transit Authority 14-4 2015-2019 Short-Range Transit Plan 14 – Transportation Improvement Program 14.5.2 CMAX Cleveland Avenue BRT In February 2015, President Obama presented his 2016 federal fiscal year budget to Congress for adoption, which includes $38.2 million in federal Section 5309 Small Starts Capital Investment Grant funds for the CMAX Cleveland Avenue BRT project. This recommended funding represents 80% of the $47.7 million total project cost. The remaining 20% local match requirement ($9.5 million) will be funded by COTA’s local operating funds. 14.5.3 Non-Revenue Vehicles Non-revenue vehicles are utilized to assist in the operations of COTA’s services. COTA has established a consistent replacement schedule for service vehicles. Examples include vehicles for street supervisors, street facility and road crews, security operations, etc. The non-revenue fleet mix includes cars, vans, large trucks, dump trucks, and pick-up trucks. The estimated program cost for non-revenue support vehicles over the next five years is programmed at $1.7 million. 14.5.4 Facility Construction Projects Continued renovation of the McKinley Avenue bus storage, maintenance, and customer service call center facility is included in the Capital Plan. Described in greater detail in Section 10.1.2, this facility has experienced numerous mechanical, electrical, and equipment failures. Consequently, staff will continue renovation to the building and grounds. This major renovation project was designed in several phases. With completion of Phases 1 and 2, major components of the facility (vehicle lifts, air handlers, vehicle exhaust systems, etc.) were replaced or upgraded. During 2015, $17.6 million has been budgeted for Phase 3 A and B, and includes renovations to administration and customer service and vehicle maintenance areas, as well as construction of a satellite CNG fueling station. During 2016-2018, $31.6 million has been budgeted in order to fund the last phase (3 C) of this long-term renovation project. COTA plans to use local money for this project; however, staff will make every effort to pursue available federal funding opportunities if they arise. Central Ohio Transit Authority 14-5 2015-2019 Short-Range Transit Plan 14 – Transportation Improvement Program COTA will pursue sustainable development practices in the renovation of this facility in order to achieve LEED “Silver” certification when this renovation project is completed. Additionally, renovation of the Fields Avenue Bus Storage and Maintenance Facility and Mobility Services buildings are planned to convert the facilities to service CNG vehicles beginning in 2017. Within the SRTP timeframe, $35.5 million has been budgeted for these two projects. 14.5.5 Strategic Investments – Park and Rides and Turnaround Locations Park and rides and express service were analyzed in the TSR. Poorly performing express services are proposed to be discontinued or streamlined to create fewer services but with more trips per line. The number of express lines are planned to be reduced with implementation of the TSR (see Section 4.5 for details). Under-used park and ride lots are de-emphasized but most areas with express service still have a nearby park-and-ride lot with linking express service. During this SRTP timeframe, COTA will also: • Relocate the Dublin Dale Drive Park and Ride to the Sawmill Rd. area (September 2015); • Relocate park and ride service from a leased lot on Gender Road to a COTA-owned park and ride site which will be constructed in Canal Winchester near Gender Road and Winchester Pike (2016); • Relocate the Northern Lights Park and Ride site. Presently, this leased site limits COTA to 60 park and ride spaces and is inadequate to meet the demands of the proposed CMAX Cleveland Avenue BRT service. As such, the BRT project includes construction of a new, COTA-owned facility just north of the Northern Lights Shopping Center; and • In conjunction with the proposed CMAX BRT project, a new transit center/park and ride will be constructed just south of the Cleveland Avenue/SR-161 intersection (2016) Central Ohio Transit Authority 14-6 2015-2019 Short-Range Transit Plan 14 – Transportation Improvement Program 14.5.6 Other Strategic Investments Improving transportation capacity in the region will require investing in resources that make transit more convenient, reliable, and responsive. These investments could include: • Fixed-guideway options such as BRT; • Non-fixed-guideway options such as BRT in mixed-traffic, a type of BRT service with fewer amenities than a full BRT; • Investigating the feasibility of developing downtown transit stations; • Other capital investments that directly support transit use. Fixed-guideway alternatives are modes of transit that are reserved solely for a specific type of mass transit vehicle. Because fixed guideways are utilized by transit vehicles only, they allow for the quick and timely transport of people to and from key urban centers. Primary examples of fixed-guideway transit can be divided into Commuter Rail (CR), Light Rail Transit (LRT) and BRT alternatives. In total, COTA has programmed $11 million in the TIP for strategic investment planning and acquisitions that provide transportation options in the most congested traveled corridors of the region. 14.5.7 Intelligent Transportation Systems (ITS) ITS is the application of various technologies that improve information, control, and communication systems for a region’s transportation system, including public transit. Examples include travel information systems, traffic signal priority for emergency or public transit vehicles, fleet maintenance systems, and numerous other applications. COTA’s ITS applications are designed to make bus travel easier and more convenient, reduce traffic congestion, provide timely and comprehensive transit information, improve on-time performance, and facilitate integration of COTA’s operations into a regional transportation network. Example components of COTA’s ITS plans include: • Passenger information systems that provide real-time bus arrival/ departure information; Central Ohio Transit Authority 14-7 2015-2019 Short-Range Transit Plan 14 – Transportation Improvement Program • Signal priority systems that adjust traffic signal timing to expedite bus service; and • Electronic fare collection systems, which speed up passenger boarding, and provide opportunities for riders to renew bus passes remotely, using the Internet. ITS components already in place at COTA include: • CAD/AVL; • Onboard automated stop announcements; • APCs; and • Safety and security systems. During the period covered by the 2015-2019 SRTP, COTA has budgeted nearly $1 million for various ITS project components described in greater detail in Section 11. Included in the plans is the installation of COTA’s real time passenger information. 14.5.8 Bus Stop Shelter and Transit Enhancements COTA’s Capital Improvement Plan includes improvements to various passenger amenities such as installation and replacement of bus stop signs, shelters, information displays, trash cans, etc. Investments in these amenities are designed to provide convenient, comfortable, and safe passenger waiting areas for customers. To meet this goal, COTA has programmed $4.1 million for associated transit improvements during the 2015-2019 timeframe. 14.6 Financial Summary Table 13-1 is a financial summary of the system, which displays COTA's projected annual fixed-route service levels, sources of revenue, operating expenses, net capital outlays and resulting cash balances. Since the passage of a 10-year renewable 0.25% sales tax in November 2006, COTA has initiated implementation of many transit enhancements described in the 2006 LRTP. In 2008, however, a major nationwide economic slowdown began which has negatively impacted several sectors of the economy, and led to significantly higher unemployment rates in the region. In 2010, COTA adjusted its Central Ohio Transit Authority 14-8 2015-2019 Short-Range Transit Plan 14 – Transportation Improvement Program rate of annual service hour expansion as described in the 2012 LRTPs from 60,000 annual hours to 30,000 annual hours. Economic improvement in the last few years allowed COTA to increase annual hours of expansion to approximately 60,000 hours per since 2013. COTA will continue to maintain prudent management of its financial resources and a conservative projection of future local sales tax receipts and federal and state financial assistance. This five-year plan (2015-2019) represents implementation of recommendations that were included in the TSR bus service plan, and takes into account numerous public and stakeholder comments received during development of the TSR service plan. During 2015-2017, COTA plans to continue to expand service at an annual rate of approximately 60,000 hours. In addition, COTA will continue to monitor the performance of existing routes to help ensure that the transit system is operating efficiently and so operational resources can be allocated in the most efficient manner. COTA's Board of Trustees and management staff will continue to work vigorously to provide affordable, cost-effective public transit services to the citizens of Central Ohio. Central Ohio Transit Authority 14-9 2015-2019 Short-Range Transit Plan 14 – Transportation Improvement Program Table 11-2 System Capital Program Table 14-1: Financial Summary CENTRAL OHIO TRANSIT AUTHORITY SRTP 2015-2019 levy continuation Beginning service hours Change in hours Ending service hours Projected 2015 974,100 71,986 1,046,086 Projected 2016 1,046,086 60,673 1,106,759 Projected 2017 1,106,759 55,338 1,162,097 Projected 2018 1,162,097 0 1,162,097 Projected 2019 1,162,097 0 1,162,097 Passengers 20,097,113 21,825,172 23,663,493 23,158,722 23,663,493 SOURCES Total Sales and Use Tax Passenger Revenues Federal Asst.(JARC, 5307, Misc Grants) State Assistance Fuel Tax Refund (State) Investment Income Lease Income Other (Miscellaneous) $ 118,662,710 $ 20,840,706 $ $ $ 709,851 $ 204,265 $ 716,908 $ 45,382 $ 122,222,591 $ 22,632,703 $ $ $ 692,449 $ 487,429 $ 716,908 $ 45,382 $ 125,889,269 $ 24,539,042 $ $ $ 686,679 $ 505,259 $ 716,908 $ 45,382 $ 129,036,500 $ 25,936,842 $ $ $ 656,384 $ 490,832 $ 716,908 $ 45,382 $ 132,262,413 $ 26,502,165 $ $ $ 626,090 $ 572,063 $ 716,908 $ 45,382 TOTAL SOURCES $ 141,179,821 $ 146,797,462 $ 152,382,538 $ 156,882,849 $ 160,725,020 USES Operating Labor $ 37,412,808 $ 40,557,271 $ 43,670,559 $ 45,854,087 $ 48,146,792 Adminstrative Labor Benefits Services Paratransit $ 15,761,746 $ 24,150,844 $ 9,664,791 $ 7,912,423 $ 16,542,105 $ 25,262,596 $ 7,989,026 $ 8,387,168 $ 17,326,789 $ 27,539,721 $ 8,378,986 $ 8,890,398 $ 17,846,592 $ 28,916,707 $ 8,588,461 $ 9,423,822 $ 18,381,990 $ 30,362,542 $ 8,803,173 $ 9,989,251 Fuel $ $ $ $ $ Other Materials and Supplies Utilities Casualty & Liability Costs Other TOTAL USES $ 8,455,668 $ 2,012,594 $ 348,753 $ 2,628,184 $ 117,130,803 $ 9,080,491 $ 2,062,908 $ 377,700 $ 2,712,575 $ 121,520,598 $ 9,693,491 $ 2,114,481 $ 406,027 $ 2,797,835 $ 129,607,479 $ 9,935,828 $ 2,167,343 $ 416,178 $ 2,867,781 $ 134,618,987 $ 10,184,224 $ 2,221,527 $ 426,583 $ 2,939,475 $ 140,057,744 $24,049,018 $25,276,864 $22,775,059 $22,263,861 $20,667,277 ($26,783,060) ($9,119,863) ($18,058,704) ($32,984,346) ($44,848,820) $ 127,351,589 $ 116,631,105 NET (OPERATIONS) Capital Ending Cash Balance- in Current Dollars 8,782,992 $ 106,478,234 8,548,758 $ 122,635,235 8,789,192 Central Ohio Transit Authority 14-10 8,602,188 8,602,188 $ 92,449,562 2015-2019 Short-Range Transit Plan 14 – Transportation Improvement Program Table 14-2: System Capital Program CENTRAL OHIO TRANSIT AUTHORITY System Capital Program SRTP 2015-2019 Fiscal Year 2015 2017 2016 2018 2019 SOURCES State Funding Federal Funding TOTAL SOURCES 1,695,872 30,516,006 32,211,878 1,049,393 35,625,985 36,675,378 1,567,312 25,228,710 26,796,022 1,747,258 27,683,280 29,430,539 1,764,731 31,635,121 33,399,852 18,563,946 509,375 7,654,488 2,971,482 61,970 4,834,016 17,851,933 1,276,302 2,560,000 1,375,820 - 16,414,437 369,000 22,600,000 2,567,830 750,000 3,500,000 750,000 1,200,000 2,100,000 1,475,290 - 7,359,413 334,000 7,400,000 2,350,000 65,353 3,500,000 11,167,000 1,200,000 2,100,000 1,519,548 - 15,307,578 225,000 10,000,000 857,422 67,324 3,500,000 27,495,000 784,926 2,100,000 1,565,135 - 15,919,881 330,000 24,000,000 883,359 69,360 3,500,000 28,500,000 808,670 2,100,000 1,612,089 - 1,335,606 1,250,000 500,000 512,500 525,313 58,994,938 52,976,557 37,495,314 62,414,884 78,248,672 (26,783,060) (16,301,179) (10,699,292) (32,984,346) (44,848,820) USES Fixed Route Buses- CNG Non-revenue Support Vehicles Bus Rapid Transit Park & Ride's ITS Com puter Hardw are \ Softw are Facility Im provem ents Shop / Other Equipm ent Strategic Investm ents- Property Paratransit Vehicles Bus Stops, Shelters/Signage Etc.. Transit Enhancem ents TOTAL USES Local Capital Requirement Central Ohio Transit Authority 14-11 2015-2019 Short-Range Transit Plan Appendences Appendix A NTD Information Central Ohio Transit Authority 1 2015-2019 Short-Range Transit Plan Appendences Central Ohio Transit Authority 2 2015-2019 Short-Range Transit Plan Appendences Appendix C List of Acronyms Acronyms Name ADA Americans with Disabilities Act APC Automatic Passenger Counter AVA Automated Voice Annunciator BOS Bus On Shoulder BRT Bus Rapid Transit BSSIP Bus Stop Spacing Improvement Project CAD/AVL Computer-Aided Dispatch and Automatic Vehicle Location CEI Cost Effective Index CIP Capital Improvement Program CMAQ Congestion Mitigation and Air Quality COTA Central Ohio Transit Authority CR Commuter Rail CTC Columbus Transit Company DEIS Draft Environmental Impact Statement EPA Environmental Protection Agency EPS Electronic Payment System FTA Federal Transit Administration FY Fiscal Year GPS Global Positioning Satellite HUD Housing and Urban Development, (Department of) ITS Intelligent Transportation System LPA Locally Preferred Alternative LRT Light Rail Transit LRTP Long-Range Transit Plan LRV Light Rail Vehicle MORPC Mid-Ohio Regional Planning Commission mph miles per hour MSA Metropolitan Statistical Area NCTP North Corridor Transit Project NEPA National Environmental Policy Act ODOT Ohio Department of Transportation PE Preliminary Engineering PI Public Involvement ROW Right of Way Central Ohio Transit Authority 3 2015-2019 Short-Range Transit Plan Appendences Acronyms Name SAFETEA-LU Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users (Federal surface transportation authorization for 2005-2009) SFY State Fiscal Year SRTP Short-Range Transit Plan TIP Transportation Improvement Program TOD Transit-Oriented Development VCM Vehicle Component Monitoring YOE Year of Expenditure Central Ohio Transit Authority 4