Overview of Transportation Utility Fee
Transcription
Overview of Transportation Utility Fee
Budget Highlights Overall a) Includes next year’s budget plus a five year projection designed to maintain a 5% bottom line in General Fund and a Debt Coverage Ratio of at least 1.25. b) Zero percent increase in health insurance. c) Fuel and Utilities down across all funds and departments. d) Self-funded costs are up as equipment is being replaced. e) Capital spending based on Council’s goals and objectives from budget retreat. General Fund a) Amended transfer from Electric formula from 15% to 2 cents per Kwh. (15% equals approximately 1.9 cents per Kwh) b) Includes new sanitation contract with Clawson Disposal. c) Sales Tax and Ad Valorem Tax up over previous years. d) Two new positions to replace Director of Administrative Services position. e) Increase Insurance Coverage to include higher coverage limits and include the electric grid. f) Zero percent increase in health insurance. g) Police K-9 Unit. h) Removed cash funding for Special Operations Unit. i) Increase in Fire Department Salaries. j) EMS Revenue lagging behind expenses. k) Included funding for an ISO rerate, EMS school certification, rescue equipment and new Ventilator. l) Self-funded up in Fire due to new 911 ambulance and transport van. m) Included funding for brush pickup. n) Self-funded up in Streets for new flatbed truck and street sweeper. o) Buildings and grounds budget increased in parks for expansion of effluent irrigation system at quad-plex. p) Included funding for assuming responsibility for LCRA NPS program (water quality). q) Reduced abatement funding. r) Consolidated expenses into City Shop. s) YMCA subsidy reduces to $100,000. Hotel/Motel a) Includes $175,000 for Badger Building b) Includes $40,000 for Christmas lights. Airport a) Conservative Fuel Sales Assumptions. Electric a) Amended transfer to General Fund formula from 15% to 2 cents per Kwh. (15% equals approximately 1.9 cents per Kwh) b) Electric Sales and Cost of Power budgeted based on historical net difference. c) Includes DOL training program previously approved by Council. d) Includes Meter Data Management Software. e) Includes $40,000 from HOT for Christmas lights. Water/Wastewater a) b) c) d) Includes final payment expiration of 2010 Tax Note. Conservative revenue estimates. Salaries shifted between water and wastewater. Includes increased funding in Water Chemicals for treating hardness of well water. e) Includes increased funding in Wastewater Chemicals for Type 1 effluent. f) Includes funding for automating effluent reuse to golf course. Golf Course a) Transfer for Operations of $75,410. b) Self-Funded increased for new carts and equipment. c) Salaries are down from previous years due to staffing changes. EDC Includes Funding for: a) b) c) d) e) Honey Creek Property on 281 South. Badger Building. 21 Acre Commercial Park. MyTown. $200,000 assistance with ladder truck. Interest and Sinking a) Will utilize fund balance from prior years to reduce I&S tax collection, which will result in increased collections for M&O in General Fund. City Council Goals and Objectives FY 2016/2017 2015/16 Cash at Year End EDC Payment Ladder Truck 2016/17 Net Profit (Projected) Ranking Committed Committed Committed Committed Committed Committed High High High High High High High High Medium Medium Medium Medium Project SSES Engineering 281 South W/WW Line Extensions (Phase 1) Honey Rock Electrical Costs Highland Oaks Electrical Costs The Ranch Electrical Costs YMCA Capital Maintenance Emergency Services Radios Rescue Tools Streets Police Station Architectural Patrol K-9 281 South Water Line Extension (Phase 2) Meter Data Management Software (MDM) City Hall Remodel Delaware Springs Improvements West Tank Second Pump Restroom at Hamilton Creek Park Drainage Infrastructure $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ Total Cost 90,000 10,000 150,000 50,000 30,000 50,000 210,000 30,000 400,000 250,000 22,000 125,000 120,000 55,000 100,000 20,000 60,000 Pending $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ Funds From Other Sources 10,000 75,000 25,000 15,000 125,000 - $ $ $ $ 688,366 200,000 1,200,000 2,088,366 $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ Net Effect on Cash 90,000 75,000 25,000 15,000 50,000 210,000 30,000 400,000 250,000 22,000 120,000 55,000 100,000 20,000 60,000 Estimated EOY Cash $ 1,998,366 $ 1,998,366 $ 1,923,366 $ 1,898,366 $ 1,883,366 $ 1,833,366 $ 973,366 $ 943,366 $ 1,433,366 $ 1,183,366 $ 921,366 $ 921,366 $ 801,366 $ 746,366 $ 646,366 $ 626,366 $ 566,366 $ 566,366 Resources In-Kind (Water/WW), City Engineer, Administration Contractor In-Kind (Electric) In-Kind (Electric) In-Kind (Electric) Contractor In-Kind (Police, Fire/EMS), Vendor Vendor In-Kind (Streets) In-Kind (Admin and PD Staff, Council Committee), Architect and Contractor Police Contractor In-Kind (Electric, Water, Utilities) Contractor In-Kind (Streets, DS) In-Kind (Water), Contractor In-Kind (Water, Parks, Electric), Contractor In-Kind (Admin, Planning, Streets), Engineer