RapidFrac® and RapidFrac Non-Delay (ND) Multistage

Transcription

RapidFrac® and RapidFrac Non-Delay (ND) Multistage
COMPLETION SOLUTIONS
Unconventional Completions
RapidFrac® and RapidFrac Non-Delay (ND) Multistage
Fracturing Systems
For use with Multi-Point Completions and Sub-Interval Fracturing
RapidStage®
Sleeves
Swellpacker®
Isolation System
RapidStart®
Initiator Sleeves
Swellpacker
Isolation System
HAL36485
RapidFrac®
Sleeves
®
RapidFrac and RapidFrac ND systems for openhole applications
RapidStart®
Initiator Sleeves
RapidStage®
Sleeves
HAL36932
RapidFrac® ND
Sleeves
RapidFrac and RapidFrac ND systems for cemented applications
®
RapidFrac multistage fracturing systems provide operators
enhanced options for completing multi-interval wellbores to
enable highly accurate placement of fractures, with minimal or
no intervention. These multi-entry sleeve systems allow access
to multiple fracture points within an isolated interval and are
available in either standard delayed or non-delayed opening
options. Both sleeves allow the outflow ports to be fully open or
customizable to the needs of the planned treatment.
A RapidFrac system includes either standard RapidFrac sleeves
or the new RapidFrac ND (non-delay) sleeves and a RapidStage
sleeve within a single interval. The ND system offers a lower-cost
completion solution while maintaining much of the premium
capabilities of the standard RapidFrac system. This exposes the
reservoir face to multiple fracture points, similar to the “plug and
perf ” process, without the loss of time, waste of water resources or
extended exposure of personnel. Numerous fracture points can be
applied within an isolated interval.
®
RapidFrac completion systems can be run into the wellbore using
the VersaFlex liner hanger system or production casing to surface.
Based on reservoir conditions, isolation can be achieved with
either the Swellpacker isolation system or ZoneGuard packers
for an openhole completion. Cement isolation, such as Halliburton
SoluCem cement, is also an option.
®
®
®
™
Operators completing in the major North America shale plays
report that the RapidFrac system enables them to complete
their wells more quickly than a ‘plug-and-perforate’ system,
while delivering increased initial production. The application of
RapidBall dissolvable ball technology helps eliminate the need for
costly wellbore cleanout operations.
™
COMPLETION SOLUTIONS
RapidFrac® Systems
®
HAL40391
®
RapidFrac ND Sleeve
The RapidFrac ND system is a ballactivated fracturing sleeve, which enables
multiple entry points in a target fracturing
stage. By allowing multiple entry points per
target fracturing stage, RapidFrac ND sleeves
allow operators to mimic traditional plug
and perf operations with the efficiency of a
ball drop fracturing sleeve system. RapidFrac
ND sleeves can be run in horizontal or
vertical wellbores on either production liners
or long casing strings. Multiple RapidFrac
ND sleeves can be run with a single
RapidStage sleeve and the exit ports in the
fracturing sleeves can be customized to any
ID desired. The completion can be optimized
with AccessFrac PD diversion treatment to
maximize reservoir contact.
®
RapidFrac sleeves are activated by releasing
a ball at surface into the stimulation fluid
stream. The ball travels down the wellbore
and lands on the targeted RapidFrac
landing baffle. The standard sleeve features
a delayed-open response, whereas, the
ND sleeve opens as soon as the ball passes
through the baffle. The ball will continue
along the wellbore opening each RapidFrac
sleeve within the target stage.
Once fracturing is completed, well cleaning
is assisted by flowing all lower
zones simultaneously.
Features
• Up to 55 multi-entry stages per wellbore
with RapidFrac ND sleeves and 24 with
standard RapidFrac sleeves
• Multiple sleeves per target stage
• Up to 100 bpm fracturing rates
• 10,000 psi and 350°F rating
• Customizable exit ports
®
• Compatible with SoluPort protectors
for cemented applications
• Available for openhole isolated
or cemented applications
Benefits
• Maximizes reservoir contact
• Lower completion costs
• 50% faster than traditional plug and
perforate completions
• Decreases water and chemical usage
• Minimizes over displacement
™
• If used with RapidBall dissolvable balls
no intervention is required
HAL36115
RapidFrac® ND System Specifications
®
RapidFrac Sleeve
Casing
Size
(in.)
Number
of Stages
Temperature
Rating (°F)
Maximum Differential
Pressure Rating (psi)
Maximum
Treatment
Rate (bpm)
5 1/2
55
350
10,000
100
RapidFrac® System Specifications
Casing
Size
(in.)
Number
of Stages
Temperature
Rating (°F)
Maximum Differential
Pressure Rating (psi)
Maximum
Treatment
Rate (bpm)
4 1/2
24
350
10,000
100
5 1/2
24
350
10,000
100
For more information on how the RapidFrac® sleeve systems can help you with selective
multi-zone operations, contact your Halliburton representative or email [email protected]
© 2014 Halliburton. All rights reserved. Sales of Halliburton products and services will be in accord solely with the terms and conditions contained in the contract
between Halliburton and the customer that is applicable to the sale. H08004 12/14
www.halliburton.com