request for eoi punjab saaf pani company

Transcription

request for eoi punjab saaf pani company
PUNJAB SAAF PANI COMPANY
REQUEST FOR EOI
PROCUREMENT OF ENGINEERING MANAGEMENT CONSULTANTS
Government of the Punjab plans to develop sustainable safe drinking water supply solutions
in the rural, peri-urban areas of the province with special focus on unserved areas having
brackish or contaminated water. This project is being rolled out through Puniab Saaf Pani
Company (PSPC). PSPC has been established by the Government of Punjab under Section
42 of the Companies Ordinance, 1984 as project design and delivery vehicle.
In Phase-2, five regional packages including 4-5 districts each in the Punjab will be rolled out.
Engineering Consultancy Firms are to be hired in accordance with the Punjab Procurement
Rules, 2014. Firms with relevant expertise and experience and registered under national and
provincial laws are eligible to apply. The lead firm with national or international experience
and/or JVs with national and international partners may apply. Positions of Team Leader,
Water Treatment & Design Expert and Procurement Specialist have to be filled by qualified
and experienced international consultants. The EoI pertains to the following districts.
Package 4: Rawalpindi, Jhelum, Attock, Chakwal
Package-5: Sargodha, Mianwali, Bhakkar, Khushab, Chiniot
Package-6: Multan, PakPattan, Vehari, Khanewal, Jhang
Package 7: Narowal, Sialkot, Gujrat
Package 8: Lahore, Gujranwala, Shiekhupura, Hafizabad, Mandi Bahaduin
NOTE: The client may change or delete or merge any of these packages.
Scope of the work
Preliminary survey and desk study for Identification of locations /villages/settlements for
water supply interventions using appropriate tools and Techniques
Review & validation of existing water works and water sources in project areas and
situation analysis for preparing long list of locations for water supply interventions.
Preliminary Feasibility, including identification of multiple water solutions, conceptual
design and rough cost estimates for the long listed locations
Detailed Engineering Design or EPC documents for feasible water supply solutions in
shortlisted locations as required.
Development of Bill of Quantities (BoQs), Tender Documents, Specifications, Drawings,
Engineering Estimates, Bid Evaluation Reports
Resident Construction Supervision.
Prepare performance improvement plans for small capital works where needed.
Review of existing SCADA and MIS Monitoring system for capital works as required.
Prepare IEE/EIA Reports and provide technical assistance for approvals.
Master Planning for safe water supply solutions in rural and peri- urban areas up to year
2020
Detailed TOR/EOI documents can be obtained from office of the undersigned or formal
request through email from [email protected] or
[email protected]. The EOls should be received in three hard copies by
post by the 13th of April, 2015 no later than 4:00 pm PST.
Chief Executive Officer
44-C-1, Gulberg-III, Off M. M. Alam Road, Lahore, Pakistan. Ph: (92) 042-99268274-8, Fax: (92) 042-99268279
[email protected] www.saafpani.punjab.gov.pk
punjabsaafpani
@punjabsaafpani