APPLICATION NO: - St Helens Council
Transcription
APPLICATION NO: - St Helens Council
Planning Committee 24/03/2015 APPLICATION NO: LOCATION: PROPOSAL: WARD: PARISH: CASE OFFICER: AGENT(S) / APPLICANT(S): P/2015/0054 THE ELMS 50 COWLEY HILL LANE ST HELENS MERSEYSIDE Change of use from former NHS office and therapy room to residential care facility. Windle N/A Joanne Sheridan DP DESIGN SERVICES MR DAVID PRICE ECCLESTON DEVELOPMENT PLAN ALLOCATION: National Planning Policy (2012) National Planning Policy Framework (NPPF) St Helens Local Plan Core Strategy (2012) CSS1 Overall Spatial Strategy CP 1 Ensuring Quality Development in St. Helens CP 2 Creating an Accessible St. Helens CH 1 Meeting St. Helens’ Housing Requirement CH 2 Meeting St. Helens’ Housing Needs CQL 5 Social Infrastruture See Section 3 - Policy Context See Section 4 - Consultations See Section 5 – Representations See Section 6 – Planning History Thirty two letters of objection, five circular letters and a 34 signature petition received Grant permisison subject to conditions BACKGROUND PAPERS: REPRESENTATIONS: RECOMMENDATION: / 1.0 Application Site 1.1 The site subject of the application is a well established, predominantly residential area. This application relates to a site currently occupied by two buildings, known as The Elms, Cowley Hill Lane. The Elms itself is a large detached building, with good architectural detailing, although unfortunately the widows have been replaced without thought to the original character of the building. The building is set back into the site by approximately 16m, but remains an imposing building in the street scene due to its scale and position. The building has two large bay windows to the front, with the main entrance to the building to the east. The building has been extended to the rear. 1.2 To the rear of this building is a second building which is single storey, and a much later addition. There is one vehicular access to the site via Cowley Hill Lane, although the site itself stretches eastwards and bounds Oxford Street. 1.3 The last use of both buildings were offices. 1.4 The site itself is physically bounded by residential properties to the north (still under construction) and the south; by Oxford Road to the east and by Cowley Hill Lane to the west. To the west across Cowley Hill Lane is Briars Green, whose houses back onto Cowley Hill Lane. P/2015/0054 Planning Committee 24/03/2015 2.0 The Application 2.1 The proposal seeks to change the use of the property from office use (formerly NHS office, Use Class B1) to a residential care facility (Use Class C2). 2.2 The Elms (front building) would be the residential care facility. The ground floor would have a lounge, games room, dining room, kitchen, respite room, bathroom/toiliet facility and a staff room. At first floor, there would be four bedrooms, bathroom/toilet facility, recereation room and a kitchen and to the second floor there would be three bedrooms, bathroom/toilet facility, recereation room and a kitchen. 2.3 The building to the rear would be retained as incidental offices and therefore its use would not change as part of this application. 2.4 In planning terms, Use Class C2 covers hospitals, nursing homes, hospices and childrens’s homes. Originally, the applicant did not state in their application that the proposal was for a children’s home, but there was no requirement to. 2.5 The applicant has been fully co-operative with the Council when further information was requested. 2.6 The applicant submitted the following information on 17th February 2015: ‘The Elms if it is granted planning permission will develop a service for children and young people who require therapeutic parenting approaches to help them begin their road to recovery after suffering trauma, abuse and neglect. At present there are no children identified for the provision and this will not happen until the purchase and planning is completed and the refurbishment of the building can begin to transform the house into a family home. Whilst we cannot specify our specific client group at this point, we can confirm that we do not intend to be a rehabilitation provision for offenders. Homescope is a company that has been in existence for 10 years and has a good reputation with the commissioning authorities. The company currently employs 20 members of staff. Homescope currently offers the following services: - Group semi -independent provision in the Sefton area for young people leaving local authority care - Floating support work for vulnerable adults in the Sefton and Wigan area - Supported Lodgings in the Wigan area - Children’s residential home (Sefton Area) The proposal for the development at the Elms will offer a very supportive environment in which children and young people can access the interventions they need to assist them to manage their behaviour and emotions. The project will have sensory rooms and the facility to support children with their education. The annexe will be home to the office where I will be situated P/2015/0054 Planning Committee 24/03/2015 supported by the administrative team. The project will generate employment and opportunities for people in St Helens and individuals who are already employed within the company.’ 2.7 The applicant submitted the following information on 18th February 2015: ‘The age range of the children is not specified, but the range would be 6 to 18 depending on their needs. In our current residential provision we tend to work with the lower age range, however we do have one 16 year old who is placed due to her level of cognitive ability. We have applied for the maximum of 7 places, however we do not anticipate having this number of children at one time and may reduce this according to the needs of the children placed. Certainly we intend to build the service slowly and would only anticipate working with a maximum of 4 children in the first 12-18 months. Part of the reasoning for this is to embed specialist approaches within a new team of staff and part, because the match and blend of children living together is vital for success. In our provision in Liverpool we have run at 75% occupancy for nearly 2 years due to the complexity of need. We are an ethical provider who's main concern is the well-being of the children we care for. The number of staff will be relevant to the number of children placed. If we assumed 4 children for the first 12-18 months we would have two residential staff and a manager. The staff based with myself in the office building would be one full time administrator, one part time finance worker, one part time HR and one part time consultant. Currently we have a residential provision in Waterloo which is home to three children who require quite specialist approaches to enable them to recover trauma and abuse. The home has had successful outcomes and we pride ourselves on being unique in the fact that it really is a warm and nurturing environment. Staff are highly trained and receive consultation to assist their approaches from an psychotherapist. We work with children from Sefton and Wigan and have positive feedback from all other professionals and commissioners. During the planning stage neighbours were concerned about the housing of offenders, but now are sympathetic to the work we do and in the main have positive things to say. We have had one issue with the next door neighbour, but this has been resolved through consultation and relationship building.’ 2.8 No external alterations are proposed as part of this application. 3.0 Policy Context 3.1 The application has been considered having regard to Article 1 of the First Protocol of the Human Rights Act 1998, which sets out a persons rights to the peaceful enjoyment of property and Article 8 of the Convention of the same Act which sets out his/her rights in respect for private and family life and for the home. Officers consider that the proposed development would not be contrary to the provisions of the above Articles in respect of the human rights of surrounding residents/occupiers. P/2015/0054 Planning Committee 24/03/2015 3.2 This application has been considered in relation to Section 17 of The Crime and Disorder Act. The Police have been afforded the opportunity to comment on this scheme – see section 4 Consultations. 3.3 The application has been considered in accordance with the St Helens Council’s Comprehensive Equality Policy, which seeks to prevent unlawful discrimination, promote equality of opportunity and good relations between people in a diverse community. In this case the proposed development is not anticipated to have any potential impact from an equality perspective. 3.4 The following policies are relevant to the determination of this application: 3.5 National Planning Policy Framework The Framework states that there is a presumption in favour of sustainable development which should be seen as a golden thread running through plan making and decision taking. For decision taking, this means that developments which accord with the development plan should be approved without delay unless material considerations indicate otherwise. Paragraph 19 states that planning should encourage and not act as an impediment to sustainable growth, significant weight should be placed on the need to support economic growth through the planning system. 3.6 Development Plan The adopted development plan for St Helens consists of the St Helens Local Plan Core Strategy (adopted 2012); saved policies in the St Helens Unitary Development Plan (adopted 1998); and the Joint Merseyside and Halton Waste Local Plan (adopted 2013). 3.7 St Helens Local Plan Core Strategy (2012) The following policies are relevant: CSS1 Overall Spatial Strategy CP1 Ensuring Quality Development in St Helens CP2 Creating an Accessible St Helens CH 1 Meeting St. Helens’ Housing Requirement CH 2 Meeting St. Helens’ Housing Needs CQL 5 Social Infrastruture 3.8 Saved Policies of the St Helens Unitary Development Plan No polices applicable. 4.0 Consultations 4.1 Highways Advisor: It is considered that the proposed residential facility and retained office accommodation to the rear of the site, will generate similar levels of activity/parking to previous historic levels, when the premises served as an NHS health facility. Bearing this in mind, and given the access arrangement, parking and servicing provision within the site, which is deemed acceptable to serve the proposal, there are not considered to be any significant highway implications, P/2015/0054 Planning Committee 24/03/2015 and there are no objections subject to appropriate conditions being attached to any approval subsequently granted. 4.2 Council’s Children and Young Peoples Service (CYPS) : CYPS have met with this Company and they have outlined their plans for this new home. This is not a provision CYPS have encouraged or asked for – the applicant asked for a meeting once they had bought the building and wanted to outline their plans The proposal is very much like the 'Briers Hey' 8 bed development that is currently being developed in Rainhill by Raphael Healthcare; CYPS have talked to the applicant regarding bringing in young people from other Local Authorities and advised that St Helens Council would not want complex young people 'importing' from Southern Authorities to fill the beds and make it financially viable. Currently in this vicinity are: Inspire - 2 bed children's home & 3/4 bed semi independent unit Moving Up - 4 bed semi independent unit PIC - 1 bed childrens home SHAP 162 8 bed accommodation project is also fairly close by. St Helens is sufficient in general accommodation. When Briers Hey opens (dependent on their quality), St Helens should have a provision that also caters for more complex needs albeit a large provision. There is provision already in the same street which could be problematic. The proximity to the other settings has the potential to cause problems in the community as young people tend to gravitate to each other. 4.3 Police: St Helens is sufficient in general accommodation. When Briers Hey opens (dependent on their quality), St Helens should have a provision that also caters for more complex needs albeit a large provision. There is provision already in the same street which could be problematic. 5.0 Representations 5.1 The application was publicised by individual neighbour notification letters and by site notices. 5.2 As a result of the publicity given to the application, 32 letters of objection have been received, 5 circular letters and one petition with 34 signatures. 5.3 The letters raise the following issues: Increase in anti-social behaviour The proposal would have a negative impact on the area Significant increase in traffic and emergency vehicles visiting the property The change of use will cause an atmosphere of unrest This type of use is not suitable for a quiet residential area which consists of families, young children, vulnerable adults and the elderly The area is predominantly family homes with a lot of children playing in the area and parks Concern that the quiet residential area would be interrupted by the proposal to house young males P/2015/0054 Planning Committee 24/03/2015 - Concern about the concentration and number of young people of a similar age in a single dwelling Potential for noise and disruptive behaviour This is not a suitable area or a residential care facility for children up to the age of 18 and who may be young offenders Private properties would be overlooked by this residence The upper floor of the building can see directly into private property The property has not been used for residential purposes for years and only occupied from 9-5 during the week; if the property is occupied 24/7 privacy will be affected all the time Information has not been shared with residents which is suspicious The applicant should make their intention clear to the public before the application is granted Understand that this is for the rehabilitation for 16-18 years olds and will house 6/7 adults Been informed by a reliable source that the care facility is going to be used for 16-18 year old males who have been in care and may be exoffenders Remind the Council of their obligation to safeguard the local community It is clear that the emergency services will be called to the premises quite often to assist the staff in the residents control and management The residential care will mean the site is occupied by persons who may potentially cause vandalism, damage and graffiti to neighbouring properties Already have a rehabilitation home at Wolsely Road Disappointment by the lack of public consultation undertaken The applicant shows a complete disregard for the impact their application would have on local residents Concern that this application is a device to gain consent for a home on the site, despite the fact that a 7 bed unit is economically unsound to gain consent to redevelop for a larger home No provision for outdoor space Did not consult properties at Briars Green and there has been no notice in the local press An impression has been created that the application has been handled in such a way as to minimise objections The underhand way the Council has dealt with this - not given any advance notice that this was in the pipeline because of the ill feeling they must have known it would cause It will become a meeting point for all the other teenagers in the area and will have rubbish and other unsavoury objects littering the street as well as foul language and loud music Devalue house prices in the area The proposal could affect house prices of the new development any many neighbours could go straight into negative equity This proposal could house people up to the age of 23 and even older according to the applicants’ own information Does this proposal include any registered SO, schedule 2 YP, young offenders Inadequate car parking with 14 spaces for 15 staff; parking already an issue in the area Not enough information has been provided with regards to the proposed use The need for the development has not been established P/2015/0054 Planning Committee 24/03/2015 - - The use C2 is defined as “use for a provision of secure residential accommodation, including as a prison, young offenders institution, detention centre, secure training centre, custody centre, short term holding centre, secure hospital, secure local authority accommodation or use a military barracks.” The recreation area lead to noise Loss of privacy and amenity and takes no account of Jubilee Gardens development Highways Assessment is required Proposal would be contrary to CH 2, CP1, St Helens Householder Development SPD and St Helens Ensuring a Choice of Travel SPD One letter of objection states is also accompanied by two appeal decisions relating to two dismissed appeals for similar uses in residential areas. 6.0 Planning History 6.1 1291/003: Erection of a single storey detached pitched roof building to form Health Authority Community Offices together with provision of parking areas. Granted 12th March 1992. 7.0 Assessment 7.1 The main policy to consider is Core Strategy policy CP 1 'Ensuring Quality Development in St Helens' which states that all proposals for development are expected to maintain or enhance the overall character and appearance of the local environment and be sympathetic to surrounding land uses and occupiers, avoiding detrimental impact on the amenities of the local area, in particular residential amenities. Core Strategy policy CP 2 'Creating an Accessible St Helens' applies which seeks to ensure adequate parking is made available for development proposals. Also applicable are CH 1 'Meeting St Helens' Housing Requirement' which seeks to ensure the net housing requirement for St Helens over the plan period by supporting the reuse and conversion of appropriate buildings for housing and CH 2 also applies which seeks to meet the need of housing in St Helens by providing a suitable mix of housing to deliver sustainable communities. 7.2 Principle of residential care facility: 7.2.1 The proposal seeks to convert The Elms into a residential care facility. The application is submitted by Home Scope who, should planning permission be granted, state that they aim to develop a service for children and young people who require therapeutic parenting approaches to help them begin their road to recovery after suffering trauma, abuse and neglect. 7.2.2 The proposed change of use is residential in character, although not a dwelling house as such. The use would be very low key being a residential care home for young people who require a safe environment where appropriate treatment therapies can be administered. This use falls within Class C2 of the Use Classes Order 1987 (as amended). The applicant has indicated that most clients would be younger teenagers with older individuals catered for on occasion. The proposal is not to accommodate those who have previously committed an offence or those requiring a secure environment (secure facilities do not fall within Class C2 but rather a specifically defined Class C2A). P/2015/0054 Planning Committee 24/03/2015 7.2.3 Regardless of the age of the occupiers of the proposal, the question is whether or not the conversion of the office building, which lies within a well established residential area, is appropriate to be changed into a residential care facility. 7.2.4 It is considered that the proposal is acceptable and would comply with Core Strategy policy CP 1, as the proposal would bring a large, vacant three storey building back into use and residential use. The fact it is a residential care facility means it would be in keeping with the area. Policy CP1 seeks to protect the character of the area where the proposed development is located. An overconcentration of such facilities can alter the character of an area. In this instance, whilst it is acknowledged that other care facilities exist in the wider area, they are not so concentrated that such an impact on character can be demonstrated. Furthermore, the Core Strategy does not contain a specific planning policy on the need, or otherwise, for such facilities Therefore, the applicant does not need to demonstrate there is a need for a such a facility in St Helens and this cannot be regarded as a determining factor. 7.2.5 The proposal would also comply with CH 1 which states that the Council’s housing requirement will be achieved through the supporting the reuse and conversion of appropriate buildings for housing and CH 2 which states that a suitable mix of high quality housing will be provided to deliver sustainable communities by planning for extra care and supported housing appropriate to local needs. 7.2.6 Overall, The Elms is considered to be appropriate for the use proposed in that it is a large detached building, in a well established residential area. A residential area is also considered to be appropriate to establish a residential care facility, whether that be for children or adults. 7.3 Car parking and servicing: 7.3.1 The site has adequate parking provision and this is accepted by the Council’s Highways Advisor (see section 4.0 consultations). The proposal complies with CP 2 as adequate car parking is to be provided as part of the proposal. Car parking will be secured by condition. 7.4 Objections received: The main issues raised by residents seem to be regarding the type of person who would be cared for at the facility, anti social behaviour, noise and general disturbance, car parking and loss of privacy and amenity. 7.4.1 Persons cared for: A lot of the letters make reference to the 'type' of person being cared for with a lot of residents stating 16-18 year old male young offenders and should the application be granted and raise concerns of anti social behaviour, noise and disturbance. It is not the purpose of the planning system to control the tenants/occupiers residential care facilities and this is not a material planning consideration. With that said, the applicant did provide information regarding the care they provide. The applicant has stated there are a maximum of 7 residents requiring care. The applicant is not specific regarding age range. P/2015/0054 Planning Committee 24/03/2015 The Use Class being applied for is C2 ‘Residential Institution’ which includes childrens homes, nursing homes and hospitals. 7.4.2 Anti-social behaviour, noise and general disturbance: All children’s homes are inspected by OFSTED. The standard the homes are inspected against is the ‘National Minimum Care Standards for Residential Care.’ Those running the home would therefore have responsibility for ensuring that the children behaved in a reasonable and acceptable manner. Other legislation includes Children’s Homes Regulations 2001 and Children Act 2004. It is explicitly advised by Government that it is not the purpose of planning to duplicate the controls of other legislation. 7.4.4 Privacy and amenity: With specific reference to the objections received, some letters raise issues of privacy and overlooking. Obviously the internal layout of the dwelling is proposed to be altered to accommodate the bedrooms and recreation rooms required to allow the building to function. It is not considered that this proposal adversely changes the current situation in terms of privacy and overlooking in that no extensions are proposed and no additional windows are proposed therefore the objectors property would be largely unaffected by the proposal. The interface distance between this property and the properties to the rear is 25m. The proposal is considered to comply with policy CP 1 which states that development proposals should be sympathetic to surrounding land uses and occupiers, avoiding detrimental impact on the amenities of the local area, in particular residential amenity and also ensure that the amenities of occupiers of new development. 8.0 Conclusions 8.1 The change of use is considered to be acceptable and would be in keeping with the character of the existing residential area. This proposal would bring back into use, a large, vacant property within a residential area to be used for residential purposes again which is to be viewed positively. The change of use provides an adequate level of parking for the proposed use. The proposal would accord with the provisions of St Helens Local Plan Core Strategy policy CP 1 and National Planning Policy Framework paragraph 51. 9.0 Recommendation 9.1 Grant planning permission subject to the following conditions: 1. The development must be begun within three years of the date of this decision notice. 2. The development shall not be brought into use until the areas indicated on the submitted plans to be set aside for parking and servicing have been surfaced, drained and permanently marked out or demarcated in accordance with the details and specifications shown. The parking and servicing areas shall be retained as such thereafter. 3. No development shall take place until a scheme for the provision of cycle parking, in accordance with the Council’s current standards, has been submitted to and approved in writing by the Council as Local Planning Authority. The scheme shall be implemented as approved before any part of the development is brought into use and shall be retained as such P/2015/0054 Planning Committee 24/03/2015 thereafter. Notwithstanding the provisions of the Town and Country Planning Act (General Permitted Development) Order 1995 (or any Order revoking or re-enacting that Order) no Building works, which reduce this provision, shall take place except following the express grant of planning permission by the Council. P/2015/0054 Planning Committee 24/03/2015 10.0 Images P/2015/0054 Planning Committee 24/03/2015 View from Cowley Hill Lane View from Cowley Hill Lane P/2015/0054 Planning Committee 24/03/2015 Existing office building to the rear P/2015/0054 Planning Committee 24/03/2015 P/2015/0054 Planning Committee 24/03/2015 P/2015/0054