10,s VIG\ r4- \c trldjj- 113 - Ministry of Statistics and Programme
Transcription
10,s VIG\ r4- \c trldjj- 113 - Ministry of Statistics and Programme
F. No. 8/65/2010-NSC Government of India Ministry of Statistics and Programme Implementation National Statistical Commission Secretariat II Floor, Sardar Patel Bhawan, Sensed Marg, New Delhi-110001. Dated the 18th September, 2013. ORDER Subject: Constitution of working Group for formulating methodology etc., for the 72" Round of NSS. On the basis of a decision" taken by the National Statistical Commission (NSC) in its 59'h meeting held during 19'h to 20tn August, 2013, it has been decided that the 72nd Round of NSS would be devoted to: (a) data for tourism satellite account; (b) household consumption of durable goods/ services; (c) evaluate the methodology for using shorter schedules in the NSS consumer expenditure survey that are currently under the consideration of the Standing Technical Committee on NSSO matters, constituted vide this office order no. 8/64/2010-NSC 'dated 29 th February, 2012; and (d) examine. feasibility of preparing a Master Sample for use in future NSS rounds for facilitating integrated analysis of economic, social and demographic data including life of each master sample, common set of core items to be covered in every survey round to study data interrelationships and possibility of selecting overlapping samples in two or more surveys to provide for integration of data from the surveys. Composition 2. The NSC decided that a Working Group shall be constituted to assist it in laying down sampling design, methodology and strategies to reduce non-sampling errors for the 72nd Round of NSS, keeping in view comparability and time-frame. The field work for the 72nd Round shall be carried out during July, 2014 to June, 2015 and the results of the survey need to be placed in the public domain latest by June, 2016. Inc Working Group would assist the NSC in the entire gamut of activities within this time frame. 3. Keeping in view the commonalities in the work between the Standing Technical Committee on NSSO matters and the Working Group, it was decided 10,s VIG\ r4- \c trldjj- 113 that the non-official members of the Standing Technical Committee along with a member of the NSC would constitute Core Group within the Working Group. The composition of the Working Group would be as under. Core Group within the Working Group r--1 Prof: Shibdas Bandhyopadhyay, Cha irman Former Member, NSC, Visiting Professor and former Head, Sampling and Official Statistics Unit, Indian Statistical Institute, 203, Barrackpore Trunk Road, Kolkata — 700108 Tele: 033-25752812 (0), 033-23218056 (R) E-Mail:shia.i ical.ac.in (2) Prof. Rajeeva Karandikar Member Director, Chennai Mathematical Institute, H1 Sipcot IT Park, Siruseri, Kelambakkam - 603103 Tel : +91 44 6748 0906 Fax : +91, 44 2747 0225 Mobile: +91 81 4481. 3296 E-Mail: rIkacmi.ac.in or rIkcmiackmail.com (3) Prof. Chandan Mukherjee Member Pro-Vice Chancellor Ambedkar University, Delhi AUD Campus Lothian Road, Kashmere Gate, Delhi -110006 i Mobile: 98107 95016 Email ..: ch n In ukhgjettgmaara_ .. —I I (4) Prof. Rahul Mukerjee, Special Invitee 1 Member, NSC & Professor, Indian Institute IL of Management Kolkata (1) Other members of the Working Group 7 Dr. Diganta. Mukherjee, Sampling and Official Statistics Unit, Indian' Statistical Institute, 203, Barrackpore Trunk Road, Kolkata — 700108 Tele: 033-25752306/2331 (0) .. L_E-Mail: [email protected] - I (6) I Representative of CSO (NAD) i (7) Representative of CSO (SSD) I L(81 L Representative of CSOLESD) 1 (5) Member -1 I ,I Member Member Member _.i 1 (9) DDG & Statistical Adviser, (No Tourism (10) Adviser, Planning Commission (11) Representative of the Office of the Registrar General of India (12) Director General, NSSO_ Member Member Member 1 Member Secretary Terms of Reference 4. The terms of reference for the Working Group in respect of the subject coverage for the 72nd NSS Round mentioned in paras - 1 (a) and (b) shall include, (I) enlisting the requirement of estimates/ indicators/ tables to be generated; (2) reviewing the past data in respect of the estimates/ indicators/ tables to be generated and previcius field experiences in data collection, particularly with reference to non-response/ luke-worm response at various levels of data collection including in respect of items in the data collection schedules, and identifying sampling and non-sampling errors; (3) based on the findings of the aforesaid reviews, preparing all the survey instruments relating to the 72nd Round Survey, namely, the tabulation plan, data collection schedules, manner of data collection, sampling design, estimation procedure, examining the sampling frames and drawing of samples for survey, scrutiny & valid•tion procedure, Instruction manuals, submission of the methodological instruments to the NSC for approval, training of trainers, reviewing and monitoring the progress of the survey, processing and validation of data, preparation of draft survey reports, referring the draft reports to experts, forwarding the draft reports along with the views of experts and the response of NSSO to the Chairman of the NSC, releasing the reports cleared by the Chairman, dissemination of reports and unit-level data to the public/ users, and conducting seminar on the results and experiences gained through the survey; (4) conducting pilot survey before finalizing schedules for data collection; (5) preparing estimates for rates/ ratios as also aggregates for different socioeconomic parameters using population projections and population estimates emerging from the survey; (6) preparing an action plan and monitoring the progress as per the action plan and taking corrective steps, where necessary; '(7) obtaining consent of States/ UTs for participation in the survey and meeting the action plan targets laid down under item (6); and (8) Furnishing all the survey instruments to NSC, as and when ready 5. In respect of the Items mentioned in pares — 1 (c) and (d), the Working Group shall furnish reports drawing on the data and experience obtained in the course of the 72nd round. 6. The work assigned to the Standing Technical Committee shall continue to be carried out by the Core Group of the 72ad Working Group within the mandate. The tenure of the Chairman and Members of the Standing Technical Committee