LCC status Lyn Evans

Transcription

LCC status Lyn Evans
LCC status
Lyn Evans
1
April 18, 2015
PAC Orsay
ILC in Linear Collider Collaboration
ICFA
FALC
Chair: J Mnich
Chair: J. Wormseley
To prepare for the ILC project realization
・Detailed design study
・Cost-effective project realization
Program Adv. Committee
PAC – Chair: N. Holtkamp
Linear Collider Board
LCB – Chair: S. Komamiya
Linear Collider Collab.
LCC Directorate
Regional Directors
-
KEK
KEK
LC Project
Office
- A. Yamamoto
Acc.
Tech.
Board
Tech. S.
Phys. & Detector
2 to LCC-Phys
To be linked
B. Foster (EU)
H. Weerts (AMs)
A. Yamamoto (AS)
– H. Murayama
- Director: L. Evans
ILC
CLIC
– M. Harrison
– S. Stapnes
- (Deputy) H. Hayano
Acc. Design &
Integration (ADI)
Deputy (Physics)
Physics &
Detectors
– H. Yamamoto
Technical
Support
April 18, 2015
PAC Orsay
Charge to the PAC
1.
2.
3.
4.
5.
6.
7.
8.
3
Assess the level of resources needed to keep the Project viable
until a Japanese decision is made.
Given the finite resources available, are the LCC’s priorities
appropriate?
Are the conventional facilities design and other site specific issues
for the Japanese preferred site progressing satisfactorily?
Are there adequate test facilities available to answer outstanding
technical questions?
Is the planning for the detectors proceeding satisfactorily to
produce viable designs?
Is there an appropriate amount of synergy between ILC and CLIC
activities?
Comment on the technical viability of the various proposed ILC
running scenarios.
Does the PAC have any comments on LCC’s proposed ILC
governance plan?
April 18, 2015
PAC Orsay
MEXT’s Organization for Studying ILC
SCJ
Recommendation in 2013
MEXT
ILC Taskforce
formed in 2013
Academic Experts Committee
formed in 2014
Particle & Nuclear Phys.
Working Group
TDR Validation
Working Group
formed in 2014
formed in 2014
April 18, 2015
PAC Orsay
4
140913
Progress in MEXT Academic Expert Committee for the ILC
http://www.mext.go.jp/b_menu/shingi/chousa/shinkou/038/attach/1353571.htm
Particle and Nuclear Physics WG
TDR Verification WG (* closed mtg)
1st Academic Expert Committee (14/05/08)
1st : 6/24
Status and Prospect for Particle Physics
ILC Project and the Physics
1st: 6/30
2nd : 7/29
Strategies at EU and Ams
2nd : 7/28* SRF and the cost
3rd : 8/27
Cosmic-ray and astrophysics
ILC Science Objectives
3rd: 9/8*
SRF and the cost (continued)
CFS
4th : 9/22
Flavor and Neutrion Physics
IILC Science Objectives
4th: 11/4*
ILC construction cost
5th : 10/21
Summary discussion for a report
TDR and the cost, generally reported
2nd Academic Expert Committee (14/11/14)
6th : 1/8
Experience from SSC
ILC Science Objectives
5th:1/26*
ILC Accelerator and human resources
7th : 2/17
Science Objectives per
6th :3/2*
Summary discussions
8th : 3/30
Summary discussion for a report
3rd Academic Expert Committee (15/4/21)
April 18, 2015
PAC Orsay
5
6
April 18, 2015
PAC Orsay
Test Facilities around the world
7
Test facility
Used by
Purpose
Facet-SLAC
CLIC
Beam-based alignment
CTF-CERN
CLIC
Two beam acceleration
ATF2-KEK
ILC/CLIC
Low emittance, final focus
STF-KEK
ILC
High gradient acceleration
FLASH-DESY
ILC
High gradient, high current
NML
ILC
Complete cryomodules
CesrTA
ILC
Electron cloud
April 18, 2015
PAC Orsay
Production facilities
Production Facilities
8
Cavities and cryomodules
KEK
Cavity R&D
Cavities
DESY 24 cavities from XFEL production
Cavities
JLAB High-gradient cavities
XFEL
DESY Industrial production
April 18, 2015
PAC Orsay
Common working groups
•
•
•
•
•
•
9
Damping rings
Sources
Beam delivery system
Conventional facilities
Power couplers
Tuners
April 18, 2015
PAC Orsay