TST Projects - Roundtable Design Group
Transcription
TST Projects - Roundtable Design Group
THE PROJECTS The Projects TST Construction Group, Inc. Dedicated to delivering on time 7,423 sq ft Northlake Mall Charlotte, NC FIREBIRDS ROCKY MOUNTAIN GRILL “UNIQUE CHALLENGE” After issues with the design of an earlier store, Firebirds wisely offered us an all inclusive project for the company’s Northlake store. We were hired for design/build and given the tasks of handling signage, music systems, security, fire alarm systems, décor packages, lease negotiations, as well as many other aspects of the project. We jumped in with both feet, ultimately came in at more than $50,000 dollars under budget, and missed the original date by only one day. We ran this project concurrently with another design/build Firebirds restaurant in Memphis, TN. Between the two, we had our hands full for several months. • Total Cost: $1.9M • Duration of Project: 150 Days • Size of Project: 7,423 sq. ft. • Location: Charlotte, NC TST Construction Group, Inc. E5.0 7,348 sq ft Raleigh, NC FIREBIRDS ROCKY MOUNTAIN GRILL “UNIQUE CHALLENGE” • Total Cost: $1.2M • Duration of Project: 150 Days • Size of Project: 7,348 sq. ft. • Location: Raleigh, NC E5.0 TST Construction Group, Inc. We handled our 5th Firebirds Rocky Mountain Grill project in true TST fashion. When we immediately saw some “red flags,” we double checked everything with our client. Our experience enabled us to make changes we knew the client would want. Even with more than 97 changes, TST still made the original completion date. 7,565 sq ft Stonecrest Shopping Center Charlotte, NC FIREBIRDS ROCKY MOUNTAIN GRILL Prior to TST “UNIQUE CHALLENGE” Rocky Mountain Grill exudes high-end comfort. Dining guests relax at the bar by the stone hearth before making their way to their tables in the grand dining room. • Total Cost: $1.5M • Duration of Project: 270 Days • Size of Project: 7,565 sq. ft. • Location: Charlotte, NC TST Construction Group, Inc. E5.0 7,453 sq ft Streets of South Point Durham, NC “UNIQUE CHALLENGE” • Total Cost: $1.4M • Duration of Project: 130 Days • Size of Project: 7.453 sq. ft. • Location: Durham, NC E5.0 TST Construction Group, Inc. Natural materials were used to create the feeling of an Aspen lodge. As a result, Firebirds is one of the most popular – and most unique – restaurants in its area. 7,500 sq ft Richmond, VA FIREBIRDS ROCKY MOUNTAIN GRILL Courtesy of Little Architects “UNIQUE CHALLENGE” “The Short pump location was our second mall project for the Firebirds concept after the Durham project at the Streets of Southpoint. The most challenging task was to identify quality subcontractors in the area and hire them because there were two mega malls being built at the time with over 75 tenants in each all doing up fit work. Needless to say, manpower, equipment, and materials were also among the other shortages in Richmond at the time. Fortunately, we were able to self perform the critical path items and open on schedule with the mall over Labor Day weekend.” • Total Cost: $1,332,422 • Duration of Project: 150 Days • Size of Project: 7,500 sq. ft. • Location: Richmond, VA TST Construction Group, Inc. E5.0 FIREBIRDS ROCKY MOUNTAIN GRILL Courtesy of Little Architects “UNIQUE CHALLENGE” • Total Cost: $990,484 • Duration of Project: 130 Days • Size of Project: 7,000 sq. ft. • Location: Memphis, TN E5.0 TST Construction Group, Inc. “Memphis was a great project for TST. Anytime you can go into an existing restaurant with power, water and gas, you are ahead of the game. Of course there wasn’t much left of the original Don Pablo’s when we got through with it but, you couldn’t tell what it used to be when we were finished with it. An entirely new interior, new kitchen, new face lift, manicured landscaping, and new parking lot made this ‘big box’ look like a slice right out of the Colorado landscape.” 7,000 sq ft Memphis, TN 1,800 sq ft Winston Salem, NC KRISPY KREME “UNIQUE CHALLENGE” When my friend Steve Starr at Little Diversified Architectural Consultants was hired to develop a new store concept for Krispy Kreme, he called and asked me to work with him on it. The challenge was to build an entire store mock-up for the CEO to review and approve. The architects would draw something on a “napkin” that morning, and TST would build it that afternoon. The project was fun. The deadline was nervewracking. But as expected, Steve and his team worked extremely well with me and my team. We aced the client’s deadline, and as you can see, the concept looked great. • Total Cost: $64,951 • Duration of Project: 45 Days • Size of Project: 1,800 sq. ft. • Location: Winston Salem, NC TST Construction Group, Inc. E5.0 JAZZ CAFE 4,516 sq ft Charlotte, NC “UNIQUE CHALLENGE” • Total Cost: $526,331 • Duration of Project: 60 Days • Size of Project: 4,516 sq. ft. • Location: Charlotte, NC E5.0 TST Construction Group, Inc. After the owners interviewed five groups for this project, we were selected as the negotiated GC. We went right to work, reviewed the drawings and found that with a few design changes to the MEP systems, we could save the client $25,000. In looking out for the client’s best interests, some people would say we could have shot ourselves in the foot. Unless we were able to redesign drawings, resubmit permit applications, and complete the work within the original time frames, the owners would incur large penalties. In my book, pulling this one off was nothing short of a miracle, but in the end, we did it and did it well. 15,000 sq ft Uptown Charlotte, NC FOX & HOUND First Floor Second Floor “UNIQUE CHALLENGE” “The design of these restaurants plays an essential role in our success” is a common phrase used by Total Entertainment Restaurant Corporation, owners of Fox & Hound. They strive to create a distinctive, highly entertaining and unique atmosphere in each restaurant by featuring warm lighting, high ceilings and rich wood-finished interiors. • Total Cost: $580,000 • Duration of Project: 55 Days • Size of Project: 15,000 sq. ft. • Location: Charlotte, NC TST Construction Group, Inc. E5.0 FOX & HOUND “UNIQUE CHALLENGE” • Total Cost: $363,000 • Duration of Project: 50 Days • Size of Project: 7,227 sq. ft. • Location: Charlotte, NC E5.0 TST Construction Group, Inc. Each restaurant is typically divided into three large rooms with the bar and primary dining room centrally located while the two side rooms are partitioned from the bar and dining area by etched glass. Guests are attracted to the elegant, yet comfortable polished brass, embroidered chairs and booths and hunter green and burgundy walls. 7,227 sq ft Ballantyne Charlotte, NC 7,925 sq ft Birkdale Village Huntersville, NC FOX & HOUND “UNIQUE CHALLENGE” This was TST’s third Fox & Hound, so it should have been an easy project. But the client’s decision to redesign the concept from front-to-back to create a more family-friendly atmosphere changed the drawings dramatically. With overhauls ranging from a new kitchen to a new front of house, it was like building something we had never encountered. After the fifth revision to the drawings and submission after submission to the city for permitting, we completed the restaurant on the eightieth day of construction. We made it just in time for the permit to be approved, and all the inspections to be finalized the next day. • Total Cost: $811,773 • Duration of Project: 80 Days • Size of Project: 7,925 sq. ft. • Location: Huntersville, NC TST Construction Group, Inc. E5.0 BAXTER’S BLUE MARLIN “UNIQUE CHALLENGE” • Total Cost: $508,000 • Duration of Project: 60 Days • Size of Project: 4,100 sq. ft. • Location: Columbia, SC E5.0 TST Construction Group, Inc. The atmosphere of Blue Marlin is sophisticated with upscale dark woodwork, soft lighting and the warm sounds of Frank Sinatra. 4,100 sq ft Columbia, SC 2,650 sq ft Charlotte, NC ONEO BISTRO & WINE BAR “UNIQUE CHALLENGE” Oneo was our first Design-Build/Turnkey restaurant project. We put together a great team of architects and engineers, subcontractors, and vendors to handle every aspect of this project. We took the lead on everything from lease negotiations to kitchen equipment and furniture. All our client had to do was show up with pots and pans and start cooking. From lease execution on August 22nd to turnover December 10th, TST designed it, permitted it, constructed it (50% self-performed), equipped it, and furnished it, on time and under budget. • Total Cost: $555,198 • Duration of Project: 100 Days • Size of Project: 2,650 sq. ft. • Location: Charlotte, NC TST Construction Group, Inc. E5.0 1,671 sq ft Charlotte, NC THE GREAT FRAME UP “UNIQUE CHALLENGE” • Total Cost: $47,265 • Duration of Project: 30 Days • Size of Project: 1,671 sq. ft. • Location: Charlotte, NC E5.0 TST Construction Group, Inc. The Great Frame-Up was the kind of project we really enjoy doing. Our client came to us because of our work at Oneo in the same shopping center and basically hired us on his gut feeling about us. The most challenging part of his project was not the construction (completed in four weeks start to finish), but rather getting fixtures from the franchise authorized dealer. Our client could not get his custom-made fixtures in time for the store opening because of the fixture company’s work backlog. Our solution was to build them and install them ourselves for the same price as the franchise’s fixture company while construction was going on. Again, we came in on time and on budget. 6,700 sq ft Pineville, NC ZOBO.TV “UNIQUE CHALLENGE” neously. It offered TST an opportunity to help the client be as creative as possible as construction proceeded without completed drawings or a concept. We didn’t even know the name of the project until it was halfway completed. The owner provided a design team in New York City, and TST provided the project architect in Charlotte. We also took responsibility for curved walls and colored graphics inside and out. From signage and awnings to fabric walls, curtains, and custom-made furniture, TST contributed to the success of Zobo.tv every step of the way. • Total Cost: $414,683 • Duration of Project: 78 Days • Size of Project: 6,700 sq. ft. • Location: Pineville, NC TST Construction Group, Inc. E5.0 FORE THE LINKS Courtesy of Little Architects Prior to TST “UNIQUE CHALLENGE” • Total Cost: $300,000 • Duration of Project: 75 Days • Size of Project: 4,100 sq. ft. • Location: Charlotte, NC E5.0 TST Construction Group, Inc. tion of the finest in men’s and women’s golf apparel, sportswear and shoes. Other golf-related items include specialty clubs, jewelry, books and home accessories. 4,100 sq ft Charlotte, NC 1,800 sq ft Phillips Place Charlotte, NC DEAN & DELUCA 3,554 sq ft Peninsula Cornelius, NC Phillips Place, Charlotte, NC Prior to TST Peninsula, Cornelius, NC Prior to TST Wine Room, Phillips Place Charlotte, NC Wine Room, Phillips Place Charlotte, NC Courtesy of Little Architects “UNIQUE CHALLENGE” Eric and his team accomplished both, using clean lines and materials that focus customer attention on Dean & Deluca’s exceptional product offerings. Shortly after this shop opened, the team completed the neighboring Dean & Deluca Wine Bar, which welcomes clients with its warm wood floors and gracious wine displays. • Total Cost: $430,000 • Duration of Project: 60 Days • Size of Project: 1,800 sq. ft. • Location: Charlotte, NC • Total Cost: $515,000 • Duration of Project: 75 Days • Size of Project: 3,554 sq. ft. • Location: Cornelius, NC TST Construction Group, Inc. E5.0 DEAN & DELUCA 2,500 sq ft Stonecrest Shopping Center Charlotte, NC 2,555 sq ft Uptown Charlotte, NC Stonecrest Shopping Center Charlotte, NC Prior to TST Uptown, Charlotte, NC Prior to TST Stonecrest Shopping Center Charlotte, NC Stonecrest Shopping Center Charlotte, NC Courtesy of Little Architects “UNIQUE CHALLENGE” • Total Cost: $395,000 • Duration of Project: 55 Days • Size of Project: 2,500 sq. ft. • Location: Charlotte, NC E5.0 • Total Cost: $460,000 • Duration of Project: 70 Days • Size of Project: 2,555 sq. ft. • Location: Charlotte, NC TST Construction Group, Inc. Dean & Deluca is one of the country’s best-known purveyors of gourmet foods, kitchenware and gifts. It was important to create an upscale atmosphere that reflects Dean & Deluca’s quality while maintaining ample room for customers to browse and shop. 5,100 sq ft Raleigh, NC 10,000 sq ft Augusta, GA Raleigh, NC Augusta, GA STOOL PIGEONS Raleigh, NC Raleigh, NC “UNIQUE CHALLENGE” Imagine walking into your neighborhood’s most exciting watering hole and finding an exceptionally friendly bar and restaurant awaiting you. Known fondly as “The Coop” to its many regulars, Stool Pigeons has abundant, comfortable booth seating that borders a spacious table area. • Total Cost: $329,723 • Duration of Project: 60 Days • Size of Project: 5,100 sq. ft. • Location: Raleigh, NC • Total Cost: $75,305 • Duration of Project: 30 Days • Size of Project: 10,000 sq. ft. • Location: Augusta. GA TST Construction Group, Inc. E5.0 STOOL PIGEONS 5,178 sq ft Charlotte, NC Charlotte, NC “UNIQUE CHALLENGE” • Total Cost: $316,642 • Duration of Project: 60 Days • Size of Project: 5,178 sq. ft. • Location: Charlotte, NC E5.0 TST Construction Group, Inc. Overhead, large ceiling fans provide the right touch of coolness. Eight color TVs fill the back wall, giving plenty of viewing opportunities to guests sitting at the oversized wood bar that extends the full length of the space. It is truly a pleasant place in which to roost. 3,500 sq ft Charlotte, NC “UNIQUE CHALLENGE” TST introduced an entirely new remodel package with materials that were more cost-effective. We reworked wooden trims, doors, ceilings and carpet. Bojangles’ was so pleased that they returned again and again to TST. They have asked us to bid on new jobs and redesign existing restaurants. • Total Cost: $55,000 • Duration of Project: 30 Days • Size of Project: 3,500 sq. ft. • Location: Charlotte, NC TST Construction Group, Inc. E5.0 3,500 sq ft Albermarle, NC 900 sq ft Conover, NC Albermarle, NC Albermarle, NC Conover, NC “UNIQUE CHALLENGE” • Total Cost: $53,000 • Duration of Project: 30 Days • Size of Project: 3,500 sq. ft. • Location: Albermarle, NC E5.0 • Total Cost: $71,989 • Duration of Project: 30 Days • Size of Project: 900 sq. ft. • Location: Conover, NC TST Construction Group, Inc. For over 25 years, Bojangles has offered its customers the best-tasting chicken and biscuits around. What started out as a distant dream of two veteran restaurant operators is now a successful franchise system of nearly 300 restaurants from Florida to New York. Eric’s construction team was hired to review and improve upon this restaurant which was recently remodeled by another contractor. 15,000 sq ft Savannah, GA Prior to TST Prior to TST “UNIQUE CHALLENGE” Construction of the Myers Middle School gymnasium was Phase I of a multi-phase project. The students needed a modern gym that conformed to today’s ADA building codes and current standards for bleacher seating capacity and energy efficiency. Eric and his construction team built the gym from the ground up, creating not only a top-notch space for the students’ use, but also plenty of storage for physical education equipment and offices for the teachers. Today, the rest of the school building has been demolished and rebuilt — but the gymnasium still stands. • Total Cost: $1.9M • Duration of Project: 270 Days • Size of Project: 15,000 sq. ft. • Location: Savannah, GA TST Construction Group, Inc. E5.0 35,000 sq ft Statesboro, GA Prior to TST Prior to TST STATESBORO REGIONAL LIBRARY Prior to TST “UNIQUE CHALLENGE” • Total Cost: $1.2M • Duration of Project: 330 Days • Size of Project: 35,000 sq. ft. • Location: Statesboro, GA E5.0 TST Construction Group, Inc. The library, originally built in 1981, was in serious need of an upfit. Eric’s original proposal was to add an additional 9,000 square feet to the 30,000 square foot building. The proposal came in under budget – so much so, in fact, that the contractor team was asked to increase the addition by one-third the size, to 12,000 square feet. The existing library was gutted, the electric and HVAC systems were replaced, and a new roof and carpeting were added. Best of all, the expanded project was completed in the time frame of the original proposal. 11,000 sq ft Savannah, GA HUNTER ARMY AIRFIELD BRANCH EXCHANGE Prior to TST “UNIQUE CHALLENGE” The Fort Stewart/Hunter Army Airfield complex is the U.S. Army’s premier heavy-force power projection platform on the East Coast. It is home to the most highly trained and rapidly deployable mechanized force in the world — the 3rd Infantry Division (Mechanized), the “Iron Fist” of the XVIII Airborne Corps. The airfield’s brass wanted a new, comfortable Exchange that would operate much like a civilian convenience store. Eric’s team cleared the lot and built the store from the ground up, including a brick exterior and mett al standing-seam roof. The contractors also built a complete gas station, adhering to the strict environmental guidelines demanded by the EPA. They installed the pumps and tanks and even created the durable gas station canopy after the original canopy-maker bowed out of the project. The Army now considers this Exchange a prototype for next-generation Exchange stores at military bases across the country. • Total Cost: $1.2M • Duration of Project: 300 Days • Size of Project: 11,000 sq. ft. • Location: Savannah, GA TST Construction Group, Inc. E5.0 WOLFMAN PIZZA “UNIQUE CHALLENGE” • Total Cost: $331,000 • Duration of Project: 70 Days • Size of Project: 2,500 sq. ft. • Location: Charlotte, NC E5.0 TST Construction Group, Inc. Not only does Wolfman Pizza provide the freshest and most delicious variety of pizzas in Charlotte, its Myers Park location exudes comfort and elegance not normally found in a pizza restaurant. The open ceiling, beautiful wood bar and rich textures and colors in the seating area make the room feel especially large, open and inviting. The big screen TV on the back wall, combined with plenty of seating room in the front, encourages visitors to pull up a chair and stay awhile. 2,500 sq ft Charlotte, NC Thompson • St-Cyr • Thompson Construction Group, Inc. 105-B Center Lane Huntersville, NC 28078 704-948-9493 www.tstcg.com