GENERAL REQUIREMENTS FOR INSTALLATION AND
Transcription
GENERAL REQUIREMENTS FOR INSTALLATION AND
MINISTRY OF HEALTH MALAYSIA GENERAL REQUIREMENTS FOR INSTALLATION AND MAINTENANCE OF A Centralized THREE PHASE UNINTERRUPTIBLE POWER SUPPLY (UPS) IN HEALTHCARE FACILITIES JUNE 2015 ENGINEERING SERVICES DIVISION MINISTRY OF HEALTH MALAYSIA GENERAL REQUIREMENTs FOR INSTALLATION AND MAINTENANCE OF A Centralized THREE PHASE UNINTERRUPTIBLE POWER SUPPLY (UPS) IN HEALTHCARE FACILITIES All Right Reserved No part of this publication may be reproduced, store in a retrieval system, or transmitted in any form or by any means, electronic, mechanical, photocopy, recording, or otherwise without prior notice, permission of the Ministry of Health Malaysia MOH/ESD/2015-01 GENERAL REQUIREMENTS FOR INSTALLATION AND MAINTENANCE OF A CENTRALIZED THREE PHASE UNINTERRUPTIBLE POWER SUPPLY (UPS) IN HEALTHCARE FACILITIES CONTENTS INTRODUCTION 5 DEFINITION 7 LOCATION 9 UPS INSTALLATION GENERAL REQUIREMENTS 11 MAINTENANCE OF THE UPS 16 REFERENCES 19 ACKNOWLEDGEMENTS 21 ENGINEERING SERVICES DIVISION MINISTRY OF HEALTH MALAYSIA GENERAL REQUIREMENTS FOR INSTALLATION AND MAINTENANCE OF A CENTRALIZED THREE PHASE UNINTERRUPTIBLE POWER SUPPLY (UPS) IN HEALTHCARE FACILITIES INTRODUCTION ENGINEERING SERVICES DIVISION MINISTRY OF HEALTH MALAYSIA 5 6 GENERAL REQUIREMENTS FOR INSTALLATION AND MAINTENANCE OF A CENTRALIZED THREE PHASE UNINTERRUPTIBLE POWER SUPPLY (UPS) IN HEALTHCARE FACILITIES 1.0 INTRODUCTION This guideline on installation and maintenance of a centralized three phase Uninterruptible Power Supply (UPS) was generated in response to the recent fire incidents that occurred in UPS rooms throughout healthcare facilities under the Ministry of Health (MOH). Most of the incidents happened due to poor ventilation design and lack of maintenance activities. This guideline will serve as a reference for all designers, implementers/installers, and maintenance personnel, to ensure that UPS systems are installed appropriately and are well maintained. This guideline is also intended to serve as a resource for any future upgrading projects related to UPS systems. ENGINEERING SERVICES DIVISION MINISTRY OF HEALTH MALAYSIA GENERAL REQUIREMENTS FOR INSTALLATION AND MAINTENANCE OF A CENTRALIZED THREE PHASE UNINTERRUPTIBLE POWER SUPPLY (UPS) IN HEALTHCARE FACILITIES DEFINITION ENGINEERING SERVICES DIVISION MINISTRY OF HEALTH MALAYSIA 7 GENERAL REQUIREMENTS FOR INSTALLATION AND MAINTENANCE OF A CENTRALIZED THREE PHASE UNINTERRUPTIBLE POWER SUPPLY (UPS) IN HEALTHCARE FACILITIES 8 2.0 DEFINITION 1 An Uninterruptible Power Supply (UPS) is necessary for providing a no-break three-phase supply to specific equipment during blackouts, covering the period from the loss of normal supply to the start-up and subsequent electrical power generation of the emergency generator. Without a UPS, even very short power breaks may cause disruption in hospital operations. Any UPS in Healthcare Facilities shall include the following components: a) b) c) d) e) f) g) Rectifier Charger Inverter Control and instrumentation Switch gears Battery bank Electronic and/or manual bypass switch maintenance bypass switch (internal and external) and This excludes ICT and other equipment that have a built-in UPS. Note: 1. Refer to Healthcare Technical Memorandum 2011 ENGINEERING SERVICES DIVISION MINISTRY OF HEALTH MALAYSIA GENERAL REQUIREMENTS FOR INSTALLATION AND MAINTENANCE OF A CENTRALIZED THREE PHASE UNINTERRUPTIBLE POWER SUPPLY (UPS) IN HEALTHCARE FACILITIES LOCATION ENGINEERING SERVICES DIVISION MINISTRY OF HEALTH MALAYSIA 9 GENERAL REQUIREMENTS FOR INSTALLATION AND MAINTENANCE OF A CENTRALIZED THREE PHASE UNINTERRUPTIBLE POWER SUPPLY (UPS) IN HEALTHCARE FACILITIES 10 3.0 LOCATION In healthcare facilities, a UPS shall be installed to provide uninterruptible power supply to all uninterruptible power/ lighting points and life supporting/monitoring equipment in specific critical and emergency areas/departments at the following locations1: a) b) c) d) e) f) g) h) i) Operation Theatre Suites Invasive Cardio Laboratory (ICL) Intensive Care Unit (ICU) Special Care Nurseries (SCN) Neonatal Intensive Care Unit (NICU) Coronary Care Unit (CCU) High Dependency Ward (HDW) Emergency and Trauma (red zone) Fluoroscopy Room Note: 1. Refer to Healthcare Technical Memorandum 2011 ENGINEERING SERVICES DIVISION MINISTRY OF HEALTH MALAYSIA GENERAL REQUIREMENTS FOR INSTALLATION AND MAINTENANCE OF A CENTRALIZED THREE PHASE UNINTERRUPTIBLE POWER SUPPLY (UPS) IN HEALTHCARE FACILITIES UPS INSTALLATION GENERAL REQUIREMENTS ENGINEERING SERVICES DIVISION MINISTRY OF HEALTH MALAYSIA 11 12 GENERAL REQUIREMENTS FOR INSTALLATION AND MAINTENANCE OF A CENTRALIZED THREE PHASE UNINTERRUPTIBLE POWER SUPPLY (UPS) IN HEALTHCARE FACILITIES 4.0 UPS INSTALLATION GENERAL REQUIREMENTS 4.1 The UPS shall be of sufficient capacity to handle the present load and have a minimum of 20% spare capacity for future extensions. 4.2 All UPS installations in new buildings shall avoid ANY water/liquid/gases pathways, sources and outlets2 in the ceiling above the battery bank and control system of the UPS. It is an additional requirement that ceiling facilities be waterproofed in existing UPS rooms. 4.3 All UPS installations in new buildings shall be designed in two (2) connected compartments separated by a two (2) hours fire rated brick wall partition and door or something equivalent to a two (2) hours fire rated wall and door. One compartment will contain the battery bank and the other will house the control system. The compartments must be well air-conditioned by an independent 24-hour cooling system. 4.4 The battery capacity shall be at least one (1) hour1 full load capacity with an electronic and/or manual bypass switch and maintenance bypass switch (internal and external). The UPS should be connected to the essential services supply. The full load discharge capacity has to be specified along with the battery calculation. Note: 1. Refer to Healthcare Technical Memorandum 2011 2. This includes waste water pipes, chilled water pipes, hot water pipes, sanitary pipes, rain water down pipes, etc. ENGINEERING SERVICES DIVISION MINISTRY OF HEALTH MALAYSIA GENERAL REQUIREMENTS FOR INSTALLATION AND MAINTENANCE OF A CENTRALIZED THREE PHASE UNINTERRUPTIBLE POWER SUPPLY (UPS) IN HEALTHCARE FACILITIES 13 4.5 Batteries for the UPS system shall comply with the latest standards set by the International Electrotechnical Commission (IEC) and the Institute of Electrical and Electronics Engineers (IEEE). 4.6 All cells in the same bank shall be of the same size and type. 4.7 Batteries or chargers should not be located in areas of vibration and restricted only to maintenance personnel1. 4.8 Any new UPS system installation must have a minimum one (1) year warranty. 4.9 Any new UPS installation must be provided with a minimum of eight (8) years spare parts availability. A guarantee letter must be issued by the manufacturer before installation. 4.10 The minimum design lifespan of batteries is ten (10) years. 4.11 All battery bank compartments should display a clear legible label or signage indicating the type of battery electrolyte used. Explosion signage must be provided due to the possibility of gas explosion arising from the mishandling of acid and alkaline battery electrolytes. Note: 1. Refer to Healthcare Technical Memorandum 2011 ENGINEERING SERVICES DIVISION MINISTRY OF HEALTH MALAYSIA 14 GENERAL REQUIREMENTS FOR INSTALLATION AND MAINTENANCE OF A CENTRALIZED THREE PHASE UNINTERRUPTIBLE POWER SUPPLY (UPS) IN HEALTHCARE FACILITIES 4.12 The required specifications for the UPS are as follows: a) Output efficiency ≥ 95% b) Power factor ≥ 0.85 4.13 The required environmental conditions for the UPS are as follows: a) Operating Temperature : 0°C to 40°C b) Relative Humidity ≤ 95% c) Room Temperature ≤ 25°C 4.14 The UPS room shall be installed with a suitable Automatic Fire Protection System in both compartments. A smoke detector, heat detector, and clean agent suppression system type substances shall be used in the above system. Other latest fire protection systems will be approved on a case by case basis. 4.15 Upon completion of the UPS installation, all relevant technical documents shall be properly handed over to the respective healthcare facilities. Technical documents shall include but not be limited to the following: a) A Manufacturer’s Operation and Maintenance Manual complete with Manufacturer’s Maintenance Checklists b) Warranty / Guarantee Certificate ENGINEERING SERVICES DIVISION MINISTRY OF HEALTH MALAYSIA GENERAL REQUIREMENTS FOR INSTALLATION AND MAINTENANCE OF A CENTRALIZED THREE PHASE UNINTERRUPTIBLE POWER SUPPLY (UPS) IN HEALTHCARE FACILITIES 15 c) As-Built Drawings - hardcopy and softcopy d) A Testing & Commissioning Report, including a factory acceptance test and safety test 4.16 The implementer or installer shall provide technical training to the respective end user and technical personnel upon completion of the installation. ENGINEERING SERVICES DIVISION MINISTRY OF HEALTH MALAYSIA 16 GENERAL REQUIREMENTS FOR INSTALLATION AND MAINTENANCE OF A CENTRALIZED THREE PHASE UNINTERRUPTIBLE POWER SUPPLY (UPS) IN HEALTHCARE FACILITIES MAINTENANCE OF THE UPS ENGINEERING SERVICES DIVISION MINISTRY OF HEALTH MALAYSIA GENERAL REQUIREMENTS FOR INSTALLATION AND MAINTENANCE OF A CENTRALIZED THREE PHASE UNINTERRUPTIBLE POWER SUPPLY (UPS) IN HEALTHCARE FACILITIES 17 5.0 MAINTENANCE OF THE UPS 5.1 The implementer or installer shall perform Planned Preventive Maintenance (PPM) and rectify any failures or defects during the warranty/defect liability period. 5.2 All maintenance activity competent personnel. shall be performed by 5.3 Routine Inspection (RI) shall be performed daily. RI activity shall consist of: a) Recording room temperature b) Recording operating temperature c) Recording any warning alarm d) Visual inspection e) Checking battery condition f ) Checking the functionality of support systems in the UPS room (e.g., ventilation, fire protection system, etc.) g) Housekeeping of UPS room 5.4 PPM shall be performed based on the manufacturer’s recommendation or according to the MOH’s Hospital Engineering Plan Preventive Maintenance (HEPPM). ENGINEERING SERVICES DIVISION MINISTRY OF HEALTH MALAYSIA 18 GENERAL REQUIREMENTS FOR INSTALLATION AND MAINTENANCE OF A CENTRALIZED THREE PHASE UNINTERRUPTIBLE POWER SUPPLY (UPS) IN HEALTHCARE FACILITIES 5.5 The PPM’s activity details (semi-annually and annually) shall be referred to HEPPM checklists. 5.6 Immediate action shall be taken if any abnormal condition is detected (especially in the UPS battery) to prevent any mishaps from happening. All RI and PPM activities shall be recorded. A log book/log sheet must be made available and updated at all times. 5.7 All spare parts shall be new and genuine, sourced from equipment manufacturers or Original Equipment Manufacturers (OEM) equivalents approved by the government. 5.8 All workmanship shall be in accordance to approved codes and good engineering practices. 5.9 Replacement of the batteries shall be carried out if: a) Efficiency drops to a minimum level of 10% ±5 b) Battery fails or is in poor condition c) Battery exceeds life span based on requirements set by manufacturer ENGINEERING SERVICES DIVISION MINISTRY OF HEALTH MALAYSIA GENERAL REQUIREMENTS FOR INSTALLATION AND MAINTENANCE OF A CENTRALIZED THREE PHASE UNINTERRUPTIBLE POWER SUPPLY (UPS) IN HEALTHCARE FACILITIES REFERENCES ENGINEERING SERVICES DIVISION MINISTRY OF HEALTH MALAYSIA 19 20 GENERAL REQUIREMENTS FOR INSTALLATION AND MAINTENANCE OF A CENTRALIZED THREE PHASE UNINTERRUPTIBLE POWER SUPPLY (UPS) IN HEALTHCARE FACILITIES 6.0 REFERENCES 6.1 Health Technical Memorandum 2011 - Emergency Electrical Services. 6.2 MS IEC 62040 - Uninterruptible Power Supply Unit (UPS). 6.3 MOH HEPPM Guideline - Task No: E31316 / E31315. 6.4 JKR Specification - Contract Document National Cancer Institute (NCI)/IT room specification. 6.5 IEEE 450 (Battery - Lead Acid) 6.6 IEEE 1106 (Battery - Nickel Cadmium) 6.7 Industry Operation and Maintenance Manual: a) Schneider Electric Sdn. Bhd. b) Emerson Sdn. Bhd. c) Socomec UPS (M) Sdn. Bhd. d) Power Solution Sdn. Bhd. ENGINEERING SERVICES DIVISION MINISTRY OF HEALTH MALAYSIA GENERAL REQUIREMENTS FOR INSTALLATION AND MAINTENANCE OF A CENTRALIZED THREE PHASE UNINTERRUPTIBLE POWER SUPPLY (UPS) IN HEALTHCARE FACILITIES 21 ACKNOWLEDGEMENTS ENGINEERING SERVICES DIVISION MINISTRY OF HEALTH MALAYSIA GENERAL REQUIREMENTS FOR INSTALLATION AND MAINTENANCE OF A CENTRALIZED THREE PHASE UNINTERRUPTIBLE POWER SUPPLY (UPS) IN HEALTHCARE FACILITIES 22 ACKNOWLEDGEMENTS The working group on General Requirements For Installation And Maintenance Of A Centralized Three Phase Uninterruptible Power Supply (UPS) In Healthcare Facilities consists of the following representatives: No. Name Designation/Department ENGINEERING SERVICES DIVISION, MINISTRY OF HEALTH 1 Hj Md. Jalal b. Bongkik Director 2 Hj Tauran Zaidi b. Ahmad Zaidi Deputy Director Hospital Operations Section 3 Khairul Azmy b. Kamaluddin Deputy Director Clinic Operations Section 4 Hj Yahaya b. Saad Deputy Director Project Implementation Section 5 Mohd Azizi b. Ibrahim Senior Principle Assistant Director 6 Azrul Aminurrashid b. Roslan Principle Assistant Director Hospital Operations Section 7 Mohd Affendi b. Amran Principle Assistant Director Project Implementation Section 8 Ir. Noor Muhammad b. Abd Rahman Senior Assistant Director Hospital Operations Section 9 Ir. Mohd Hisam b. Sa’at Senior Assistant Director Hospital Operations Section ENGINEERING SERVICES DIVISION MINISTRY OF HEALTH MALAYSIA GENERAL REQUIREMENTS FOR INSTALLATION AND MAINTENANCE OF A CENTRALIZED THREE PHASE UNINTERRUPTIBLE POWER SUPPLY (UPS) IN HEALTHCARE FACILITIES No. Name 23 Designation/Department 10 Shairam b. Salleh Senior Assistant Director Hospital Operations Section 11 Sharminie bt. Zainul Abidin Senior Assistant Director Clinic Operations Section 12 Rijal Mahadi b. Rahindra Senior Assistant Director Project Implementation Section 13 Chwa Chee Woon Senior Assistant Director Project Implementation Section 14 Dazihayu bt. Hamdan Assistant Director Hospital Operations Section 15 Nur Khalida Salmi bt. Mohd Nawar Assistant Director Hospital Operations Section 16 Yom Zuraima bt. Mohd Zaizizi Assistant Director Hospital Operations Section 17 Nur Adilah bt. Razali Assistant Director Hospital Operations Section 18 Muhammad Taheri b. Abdul Rashid Assistant Director Hospital Operations Section 19 Syazwani bt. Yahaya Assistant Director Hospital Operations Section 20 Norsuriana Fatiha bt. Hussin Assistant Director Selangor State Health 21 Izyan Nadirah bt. Sabri Assistant Director Kuala Lumpur Hospital ENGINEERING SERVICES DIVISION MINISTRY OF HEALTH MALAYSIA 24 GENERAL REQUIREMENTS FOR INSTALLATION AND MAINTENANCE OF A CENTRALIZED THREE PHASE UNINTERRUPTIBLE POWER SUPPLY (UPS) IN HEALTHCARE FACILITIES No. Name Designation/Department PUBLIC WORKS DEPARTMENT 1 Muhammad Shukri b. Khasim Senior Principle Assistant Director 2 Rafizan b. Mohamad Rasul Senior Assistant Director Health Works Branch CONCESSION COMPANY 1 Jufri b. Abdul Jalil Faber Medi-Serve Sdn. Bhd. 2 Ir. Abd Razak b. Mohamad Faber Medi-Serve Sdn. Bhd. 3 Khairul Nizam b. Mohd Yusof Radicare Sdn. Bhd. 4 Mohd Zainuri b. Remali Radicare Sdn. Bhd. 5 Zairi b. Othman Medivest Sdn. Bhd. 6 Mohd Saifful Izzuan b. Ishak Medivest Sdn. Bhd. ENGINEERING SERVICES DIVISION MINISTRY OF HEALTH MALAYSIA GENERAL REQUIREMENTS FOR INSTALLATION AND MAINTENANCE OF A CENTRALIZED THREE PHASE UNINTERRUPTIBLE POWER SUPPLY (UPS) IN HEALTHCARE FACILITIES No. Name 25 Designation/Department MANUFACTURER/SUPPLIER 1 Brandon Ng Schneider Electric Sdn. Bhd. 2 Andy Chang Liang Hong Emerson Network Power Sdn. Bhd. 3 Eric Cheah Emerson Network Power Sdn. Bhd. 4 Fong Keng Loong Power Solution Sdn. Bhd. 5 Mohd Hasyidan b. Mohamed Power Solution Sdn. Bhd. 6 Jeffry@Tan Hin Guey Power Solution Sdn. Bhd. 7 Ken Lee Socomec UPS (M) Sdn. Bhd. 8 Alex Ang Eng Hua FPS-ENP Sdn. Bhd. ENGINEERING SERVICES DIVISION MINISTRY OF HEALTH MALAYSIA 26 GENERAL REQUIREMENTS FOR INSTALLATION AND MAINTENANCE OF A CENTRALIZED THREE PHASE UNINTERRUPTIBLE POWER SUPPLY (UPS) IN HEALTHCARE FACILITIES NOTES ENGINEERING SERVICES DIVISION MINISTRY OF HEALTH MALAYSIA ENGINEERING SERVICES DIVISION MINISTRY OF HEALTH MALAYSIA Level 3-7, Block E3, Parcel E, Precinct 1, Federal Government Administrative Centre 62590 Putrajaya. Tel: 03-8000 8000 Fax: 03-8892 4855/4872 http://engineering.moh.gov.my