The GHREPOWER 50kW wind turbine has a gearless design, offering the
advantages of:
•
Greater simplicity and reliability
•
Quieter operation
•
Greater efficiency
GHREPOWER can supply a complete wind energy system, which includes
the turbine, controller, inverter and associated cabling. All components of the
system come with a 5 year manufacturer’s warranty. GHREPOWER can also
offer a five-year maintenance contract.
The GHREPOWER 50kW wind turbine is currently undergoing MCS testing,
with certification expected imminently.
Current Installations
There are three GHREPOWER 50kW wind turbine installations in Scotland, in
addition to 23 others worldwide, in countries including the USA, Sweden, Italy
and Belgium. In Scotland, one GHREPOWER 50kW wind turbine is at the
TUV testing centre, undergoing MCS testing, and two are installed at
Bathgate Sports Centre in West Lothian. It is possible to arrange a visit to
these turbines, if desired.
01792 846953
www.ghrepower.co.uk
GHREPOWER
Powering Your Future
Technical Data
General details
Model
FD14.2-50/12
Rated power
50 kW
Turbine type
Upwind
Rotation direction
Clockwise
Rotor diameter
14.2m
Hub heights available
20.6 m, 25.6 m, 30.6 m
SWT class
S
Colour
White
Rotor
Number of blades
3
Speed
Variable
Design rotor speed
85 rpm
Maximum rotor speed
120 rpm
Direction of rotation
Clockwise
Swept area
158.37 m2
Blade material
FRP
Speed regulation
Stall control, Active yawing,
Electromagnetic brake and Mechanical
brake
Brake
Braking system
Air compressor
Performance
Working wind speed
3 – 25 m/s
Rated wind speed
12 m/s
Survival wind speed
59.5 m/s
Rated output voltage
380 V (AC)
Remote monitoring system
SCADA
Generator
Generator type
3 Phase, Permanent Magnet
Gearbox
Gearbox type
No gearbox – Direct Drive
01792 846953
www.ghrepower.co.uk
GHREPOWER
Powering Your Future
Tower
Tower sizes
20 m, 25 m, 30 m
Tower type
Tubular
Tower material
Steel
Tower sections
Weights
Blade
213 kg
Nacelle
2,720 kg
Tower
5,496 kg, 9,256 kg, 12,500 kg
Power Curve
GHREPOWER 50kW Power Curve
60
Power Output (kW)
50
40
30
20
10
0
3
4
5
6
7
8
9
10
Wind Speed at Hub (m/s)
01792 846953
www.ghrepower.co.uk
11
12
13
14
GHREPOWER
Powering Your Future
Estimated Energy Yield
The table below gives the estimated yields for a variety of wind speeds.
Average Wind
Speed at Hub
Estimated
Annual Energy
Yield
Estimated
Annual CO2
Saved
Estimated
Annual Income*
4 m/s
29.1 MW/h
13.4 tonnes
£9,653
5 m/s
54.1 MW/h
24.9 tonnes
£17,927
6 m/s
87.4 MW/h
40.2 tonnes
£28,959
7 m/s
124.8 MW/h
57.4 tonnes
£41,370
8 m/s
154 MW/h
70.8 tonnes
£51,023
* Estimated income is based on the following assumptions:
• Current Ofgem FIT rate of £0.254 per kW/h
• Current FIT export rate of £0.031 per kW/h
• 50% on-site consumption, with savings from own energy use at £0.12
per kW/h
• LEC income on energy used at 0.485p per kW/h
• 95% availability
Estimated Annual Energy Yield (kW/h)
GHREPOWER 50kW Estimated Annual Energy Yield
180000
160000
140000
120000
100000
80000
60000
40000
20000
0
4
5
6
7
Average Wind Speed at Hub (m/s)
01792 846953
www.ghrepower.co.uk
8
GHREPOWER
Powering Your Future
GHREPOWER 50kW Estimated Annual Income
Estimated Annual Income
£60,000
£50,000
£40,000
£30,000
£20,000
£10,000
£0
4
5
6
7
Averwage Wind Speed at Hub (m/s)
01792 846953
www.ghrepower.co.uk
8
GHREPOWER
Powering Your Future
Noise
The noise characteristics for a turbine with a 25m hub are as follows:
Wind speed at hub
6 m/s 10 m/s 15 m/s
Noise at base (dB(A)) 58
60
62
GHREPOWER 50kW Wind Turbine with 25m Hub Height
Sound Power Level (dB) at Base
Sound Power Level (dB)
63
62
61
60
59
58
57
56
4
6
8
10
12
14
16
Wind Speed at Hub (m/s)
This data is based on results of internal testing provided by GHRE China to
GHRE UK on 11th February 2011.
Note that the sound power level of a wind turbine depends on several factors
such as but not limited to regular maintenance and day-to-day operation.
Therefore, this information does not constitute a warranty towards the
customer that the wind turbine will meet the exact sound power level values
provided in this document at any project specific site.
01792 846953
www.ghrepower.co.uk
GHREPOWER
Powering Your Future
Crane and Access Requirements
The turbine components will be delivered in standard 40 foot shipping
containers. The turbine requires a 25 tonne crane for construction. A suitable
access route for these vehicles will need to be identified.
At the site, an access track will need to be constructed to the turbine
locations. This would be composed of hardcore and is expected to be 4m
wide with a depth of 300mm, subject to survey. A crane hard-standing of 10m
x 10m will also be required, constructed to the same specification as the
access track.
Foundation Design
The foundation is made up of high-strength concrete, steel reinforced mesh,
and high tension foundation bolts. Adjustable piping, and tubing for the
earthing and cabling will be buried within the concrete. Before the foundation
construction takes place a geotechnical survey is required, and the exact
foundation specification altered with respect to this.
The expected foundation size is 6 m x 6 m and between 1.8 and 2.4 m deep.
Contact
For further information, please contact Joseph Deng:
Email:
[email protected]
Tel:
01792 846953
Website:
www.ghrepower.co.uk / www.ghrepower.ie
01792 846953
www.ghrepower.co.uk