Camp Manitoqua Aquatic Center - Iprm Construction Management
Transcription
Camp Manitoqua Aquatic Center - Iprm Construction Management
Camp Manitoqua Aquatic Center Manitoqua Ministries, Inc AQUATIC Design-Build was the construction delivery method Existing bathhouse was preserved but completely updated All areas are fully accessible for all ages and abilities of campers at Camp Minitoqua Project Scope The scope of this project was to replace a existing pool, with a new aquatic center. The new aquatic center featured; a fully accessible four-foot, zerodepth leisure pool, a plunge area for two water slides, a large deck with large shade structures and a splash pad with water play features. Also included were health and safety updates to the existing bathhouse and a new pool house for the filtration equipment. Project Name: Camp Manitoqua Aquatic Center Project Location: 8122 Sauk Trail, Frankfort, Illinois 60423 Project Type: New Construction Delivery Method: Design-Build Total Project Budget: $2,203,824 Total Project Cost: $2,242,072 Owner: Manitoua Ministries, Inc. Owner Contact: Project Architect: PHN Architects Project Contact Person: Jim Leppert, Project Manager www.iprmanage.com Camp Manitoqua Aquatic Center Manitoqua Ministries, Inc New pool house featuring all new filtration equipment. Inside the new pool-house, all pumps and filtration were moved from the basement to a central area, easily for accessible for maintenance and winterization. Aerial rendering of new aquatic layout of the Camp Manoquia’s facilities located in Frankfurt, Illinois. New splash-pad with water features for campers of all ages and ability. www.iprmanage.com