fruit of corruption 2016 - Sagip
Transcription
fruit of corruption 2016 - Sagip
FRUIT OF CORRUPTION (Part 3 of the Investigative Documentation Legwork of Samahang Gagabay Sa Inaasam Na Pagbabago Ng Bayan (SAGIP-BAYAN), Inc.; Dekalibre Center for Investigative Journalism Network (DCIJN) together with the helpmates anti-corruption and environmental organizations the Volunteers Against Crime and Corruption Camarines Norte–Chapter (VACC-CNC) and Tanggol Kalikasan Camarines Norte) The following documentary evidence is the result of the actual documentation legworks of the above mentioned organizations, which our voluntary and official conduct are integral part of our journalistic investigation legworks, which the gathered documents together with the undersigned “main affidavit” and “supplementary affidavit” are already submitted to the National Bureau of Investigation-Environmental Crime Division (NBI-EnCD), thru Special Investigator Marvin Matamis and Atty. Reynaldo Remo (NBIEnCD/Ex-O) and members of the formed Special Investigation Team ‘SCULPTED PEPPER”, as per Memorandum Order dated March 3, 2015 of former DOJ Secretary Liela De Lima. THE FRUIT OF CORRUPTION WE HAVE UNMASKED ARE FROM THE THREE (3) IDENTIFIED MAJOR SOURCES OF ILL-GOTTEN GAINS: (1) FROM THE BILLIONS WORTH OF CAMARINES NORTE’S MINERAL WEALTH WHICH WAS SMUGGLED AND STOLEN FROM THE PROVINCE OF CAMARINES NORTE; (2) MONOPOLY OF INFRASTRACTURE PROJECTS AND; (3) (3) FROM THE ILLEGAL GAMBLING OPERATION (VIRTUAL GAME – “JUETENG”). “THE FOLLOWING COMMERCIAL QUARRY STOCK YARD AREAS, RESIDENTIAL BUILDING, HEAVY EQUIPMENT, AND MACHINERIES, VARIOUS REAL PROPERTIES, LUXURY VEHICLES ARE MATERIAL EVIDENCE OF THE PROCEEDS OF UNLAWFUL ACTIVITIES, WHICH DID NOT APPEAR TO THE DECLARED PERSONAL, REAL PROPERTIES AND BUSINESS INTERESTS OF GOVERNOR EDGARDO TALLADO IN HIS SUBMITTED STATEMENT OF ASSETS LIABILITIES AND NET WORTH (SALN) FROM 2010-2014. THESE ARE CONCEALED TO THE PUBLIC AND TO THE GOVERNMENT BY MEANS OF USING RELATIVES, CRONIES, AND FRIENDS AS FRONT OWNERS, CONTRACTORS, QUARRY & MINING OPERATORS AND AS FAR AS DUMMY MINING OPERATORS AND DUMMY EXPORTERS WHICH ARE ALL GOVERNMENT ISSUED PERMITS THAT TEMPORARY IN NATURE ARE ALL ISSUED BY GOV. EDGARDO TALLADO THIS WAS DESCRIBES WITH THE MENTIONED AFFIDAVITS; AND THE FOLLOWING DEMONSTRATED LIST OF IDENTIFIED LOCATION OF PROPERTIES ARE NOT INCLUDED TO THE Page 1 of 45 COMPLAINT FILED BY THE NATIONAL BUREAU OF INVESTIGATION (NBI) AGAINST GOV. TALLADO TO THE OFFICE OF THE OMBUDSMAN: RESIDENTIAL BUILDING CONSTRUCTED FOR HIS ALLEDGED MISTRESS (Estimated Value P8 million pesos): 1. The below picture of residential building with more or less 1,ooo square meters, located at Brgy. Borabod, Daet, Camarines Norte. It was constructed by Efren Sale @ka EUS, a wellknown dummy contractor of Gov. Tallado. Accordingly it was built intended for his alleged mistress a certain Katrina (Kaye) De Jesus. She is the person mentioned by Gov. Tallado when his public apology was rendered, after the viral incident of sex photo scandal which the governor self confessed wife Josefina Tallado, whom he earlier thought was kidnapped surfaced last October 17, 2014, and revealed that she ran away from their home. She said fear of her husband prompted her to disappear after he blamed her for the leak of the compromising photos. This property is formerly in bank position (DBP). Estimated Value of Php 8,000,000.00. Back View Photo no.1 Page 2 of 45 Back View Photo no. 2 Side View Photo No. 3 Page 3 of 45 Side View Photo No. 4 QUARRY MATERIALS STOCK YARD AND MOTORPOOL OF HEAVY EQUIPMENTS – ARNOLD ZAMORA (Valued more than P150 Million Pesos) 2. The pictures of heavy equipments and machineries, located inside of this compound, with perimeter fenced are estimated to more than 1,000 square meters. They are used this area as MOTORPOOL of HEAVY EQUIPMENT, GARAGE and SHOP. Also this area is adjascent to the sourced of quarry materials for sand and gravel supplies, which permits are issued by Gov. Tallado to his dummy contractors to operate sand and gravel quarry operations, using his dummy contractor Arnold Zamora for this below describes location at Barangay, Daculang Bolo, Municipality of San Lorenzo Ruiz, Camarines Norte. All heavy equipments inside this motorpool and the quarry materials stock piled to this area is owned by Gov. Tallado; using his hired project engineer as front owner. This area including the building, dump trucks, heavy equipment and sand & gravel quarry materials are valued of more than Php150 Million Pesos. The following documentation pictures describes as follows: Page 4 of 45 Picture No. 1 This photo shows the activity at stock pile area outside the motor pool compound with the ongoing movement of backhoe. INFRONT OF MOTORPOOL SHOP GATE Picture No. 2 Page 5 of 45 Picture No. 3 NOTE: ALL HEAVY EQUIPMENT AND DUMP TRUCKS UTILIZED BY GOV. TALLADO’S GROUP AS FRONT MINING COMPANY OF BOHAI TOP INTERNATIONAL MINING CORPORATION, WERE TRANSFERRED TO THIS AREA. THOSE EQUIPMENT AND DUMP TRUCKS THAT SCAPED FROM NAPAOD AND BENIT DURING THE NBI ANTIILLEGAL MINING OPERATION LAST FEBRUARY 6, 2014 AT NAPAOD AND BENIT, LABO, CAMARINES NORTE. Sighted inside this compound are dump trucks with the same feature to machinery equipment and dump trucks at Napaod mining area. Picture No. 4 Page 6 of 45 Picture No. 5 “CHENGLONG Yellow Dump Trucks with the same brand used by Bohai Top” Picture No. 6 Page 7 of 45 Picture No. 7 (Side View of Motor pool Shop) Picture No. 8 (Back View of Motor pool Shop) Page 8 of 45 Picture No. 9 (Side portion of Motor pool Shop – rock crasher) End of Zamora. SAND & GRAVEL STOCK YARD, MOTORPOOL OF HEAVY EQUIPMENTS, PARKING AREA OF LUXURY VEHICLES, ROCK CRASHING EQUIPMENTS, TWO STOREY BUILDING USED AS ENGINEERING CONSTRUCTIONS OFFICE – FRONT EFREN U. SALE (Valued more than P200 Million Pesos) 3. This area is more than one (1) hectare which is also a maintained MOTOR POOL, HEAVY EQUIPMENT MACHINERIES AND LUXURY VEHICLES GARAGE AND STOCK PILING AREA OF QUARRY Mancamagong Road, Basud, Camarines Norte. The front owner of this motorpool is the most favored dummy contractor of Gov. Tallado, Engr. Efren and permit benificiary of sand and gravel quarry permit issued by Gov. Tallado. (Pictures below are bigger than compare to Engr. Zamora’s maintained area). ENGR. EFREN U. SALE @ka EUS, used by Tallado in all monopolization activities of the Governor in all big infrastructure projects of the Provincial Government of Camarines Norte; especialy the proceeds of almost P800 Million Pesos loaned transaction at LandBank. Engr. Sale’s team with Benito Ochoa @ka “B2K”. They are the front contractors of the Governor using his controlled supplies of quarry Page 9 of 45 materials with the active participation of Governors Task Force in conducting check-point at the exit of various quarry areas, with matching order to all quarry operators and suppliers, to do not delivered any construction materials in several projects of contractors that did not follow to caprices of Gov. Tallado. Not only in Provincial Government, but up to national funded projects, being implemented by the DPWH, DOT, DA, DAR, NIA, PAMANA and other sources of funds. (The following documentary pictures describes the area: Picture No. 1 (Office and SUV parking area) Picture No. 1 (2 storey building with parking area with function as WORKING AREA or OFFICE that emanated all plans and project by Gov. Tallado in Camarines Norte, in this area we will notice that the routine of Assistant Provincial Government Engineer Johnny Enova consumed his the daily working hour in this area.) Page 10 of 45 Picture No. 2 (Office and SUV parking area 2) Picture No. 3 (Office and SUV parking area 3) Page 11 of 45 Picture No. 4 (Office and SUV parking area 4) Picture No. 5 (Office and SUV parking area 5) Page 12 of 45 Picture No. 6 (Office and SUV parking area 6) Picture No. 7 (Office and SUV parking area 7) Page 13 of 45 Picture No. 8 (Machinery equipment repair shop and parking area, front view) Picture No. 9 (Machinery equipment repair shop and parking area, side view) Page 14 of 45 Picture No. 10 (starting portion of parking area for heavy equipment) Picture No. 11 (cont.. of parking area for heavy equipment) Page 15 of 45 Picture No. 12 (cont.. portion of parking area for heavy equipment) Picture No. 13 (cont.. portion of parking area for heavy equipment) Page 16 of 45 Picture No. 14 (cont...of parking area for heavy equipment & start of sand and gravel stock pile area) Picture No. 15 (cont...of parking area for heavy equipment & start of sand and gravel stock pile area) Page 17 of 45 Picture No. 16 (cont...of parking area for heavy equipment & start of sand and gravel stock pile area) Picture No. 17 (cont...of parking area for heavy equipment & at the back portion is sand and gravel stock pile area) Page 18 of 45 Picture No. 18 (cont...of parking area for heavy equipment & at the back portion is sand and gravel stock pile area) Picture No. 19 (cont...of parking area for heavy equipment & at the back portion is sand and gravel stock pile area) Page 19 of 45 Picture No. 20 (cont...of parking area for heavy equipment & at the back portion is sand and gravel stock pile area) Picture No. 21 (cont...of portion for sand and gravel stock pile area) Page 20 of 45 Picture No. 22 (cont...of sand and gravel stock pile area) Picture No. 23 (cont...of sand and gravel stock pile area) Page 21 of 45 Picture No. 24 (cont...of sand and gravel stock pile area and start of office building connected with picture no. 1) Picture No. 25 (counter angle of parking area for heavy equipment) Page 22 of 45 Tallado Beach House Mansion at San Jose Beach Section of Cory Aquino Boulevard, Talisay, Camarines Norte – 1.5 Hectares of Public Land taken from the LandLess Farmers thru “Handog Titulo Program Para Sa Mamamayan”. 4. The below documentation picture of SAN JOSE BEACH MANSION WORTH OF P500 MILLION PESOS including all improvements to the public land with an area of 1.5 hectares (15,000 square meters) which was aquaired by Gov. Tallado, thru the “HANDOG TITULO PROGRAM PARA SA MAMAMAYAN” being implemented by DENR. That this malfeasance act of Gov. Tallado shows the blatant manipulation of how the program of the national government to give land to the landless farmers, but the primary beneficiary in the province of camarines Norte is Governor Tallado. (Attached herewith a copy of the Title registered to Spouses Edgardo and Josefina Tallado). This property is located at San Jose, Talisay, Camarines Norte. This area is along with the ongoing construction of the longest Boulevard in the country and it was named CORY AQUINO BOULEVARD. This project is included with the DPWH-DOT Convergence Program for Enhancing Tourism Access for the PRESIDENT CORY AQUINO BOULEVARD inclusive of the construction of two bridges, in Camarines Norte amounting to P450 Million. The contractors of this projects is Efren Sale (EUS Construction a Category B contruction company) and Benito Ochoa (B2K Construction also a category B construction firm). These two dummy contractors of Gov. Tallado are the winners of almost Five (5) contracts worth P50 million each contracts being undertaken by DPWH Region 5 along the Pres. Cory Aquino Blvd., which will be the longest boulevard in the country when completed at approximately 8.7 kilometers, stretching the towns of Daet, Mercedes to Talisay in Camarines Norte. “TO PROVIDE LAND FOR THE LANDLESS: DOCUMENTS REVEALED CAMARINES NORTE SUSPENDED GOVERNOR IS THE PRIME BENEFICIARY OF DENR ‘HANDOG TITULO PROGRAM PARA SA MAMAMAYAN” The following documents revealed that the Provincial Environment and Natural Resources Office (PENRO) thru Elpidio Z. Orata, OIC PENR Officer of Camarines Norte was awarded to Edgardo A. Tallado married to Josefina Tallado of Labo, Camarines Norte the parcel of public land with Title No. 2013000103, containing an area of FIFTEEN THOSAND FIVE HUNDRED FIFTY SIX (15,556) SQUARE METERS, on June 20, 2013. Below is a photo copy of Land Title No. 2013000103 registered in the name of EDGARDO ANGELES TALLADO married to JOSEFINA BANING TALLADO: Page 23 of 45 Page 24 of 45 Page 25 of 45 The construction and improvement of Pres. Cory Aquino Blvd., when completed, would further lead local and international visitors to: Calaguas Island in the town of Vinzons, the number one beach destination in Camarines Norte; Bagasbas Beach in Daet, the province’s surfing and kite spot; and to the town of Mercedes, dubbed as the “Fish Bowl Capital” of Bicol. Pictures of Cory Aquino Boolevard San Jose Section, Talisay, Cam. Norte: Picture of cory Aquino Boulevard Mercedes section: Page 26 of 45 Picture of Cory Aquino Boulevard Bagsbas, Daet Section: The construction and improvement of Pres. Cory Aquino Blvd. is under the DOT-DPWH Convergence Program for Enhancing Tourism Access, which aims to establish mutual cooperation to jointly undertake the identification, evaluation, prioritization and implementation of tourism infrastructures in declared tourism destinations. The projects include the rehabilitation/improvement/construction of San Jose Section in the municipality of Talisay, the Bagasbas Section in Daet, the Mercedes-Bagasbas Road, and the construction of two (2) other bridges. “But in connection with this infrastructure tourism development project the beach shoreline fronting said breakwater or seawall, a 1.5 hectares of public land suited for Beach Development Purposes is now owned by Gov. Tallado, which he aquired thru the HANDOG TITULO PROGRAM PARA SA MAMAMAYAN being process by the DENR to the qualified applicant. (Some of documentary evedinces gathered in connection with this questionable process of DENR and Governor Tallado will be discussed in other documentary presentation). “Gov. Tallado was the prime beneficiary of the public land due for the benefits of the Landless Farmers in Camarines Norte, but again like the monopoly of government infrastructure contracts, illegal mining and fradaulent export shipments of mineral ores, in this situation Governor tallado’s personal interests was prevailed.” Page 27 of 45 The following documentation pictures of the Governors Beach House mansion describes his questionable acquisitions of Ill-Gotten Gains which is disproportionate to his lawful income. (2016 photo)1: The clamor of the people are again correct, of evaluating the very purpose of Tallado’s exerted effort to control the Cory Aquino Boulevard Project. First, is for the benefits of his construction business with the free acces to his issued Quarry Permits. Secondly, he will be the primary beneficiary of the development impact of the project, aside from he is the 70% owner of the contracts and only 30% for Efren Sale and Benito Ochoa (Base on the affidavit executed by Jariel Pentescostes, former business partner of Efren sale); and ultimately, because of his crafty character, from Tallado’s acquired 1.5 hectares public land will occur now the “TALLADO’S BEACH HOUSE MANSION”, which was valued about P500 million pesos. Page 28 of 45 (2016 photo)2: This pictures describes of how broadly the above Tallado’s personal property. (2016 photo)3: Page 29 of 45 (2015 photo)1: (2015 photo)2: Page 30 of 45 (2015 photo)3: (2015 photo)3: Page 31 of 45 (2015 photo)4: (2015 photo)5: Page 32 of 45 (2015 photo)6: (2015 photo)7: Page 33 of 45 (2015 photo)8: (2015 photo)9: Page 34 of 45 (2015 photo)10: (2015 photo)11: Page 35 of 45 (2015 photo)12: THE TALLADO’S FAMILY AS BENEFICIARIES OF THE PROCEEDS OF ILL GOTTEN GAINS – ELSA TALLADO (Sister of Governor Tallado) 5. FIVE (5) DOORS APARTMENT located at Happy Homes Pasig, Phase 1, near Barangay Hall of Brgy. 2, Daet, Cam. Norte, manage by Tallado’s sister ELSA TALLADO, constructed without securing Building Permit according to the Municipal Engineering Office of Daet. Page 36 of 45 Page 37 of 45 6. Residential building three (3) storey building located at Brgy. 2, Daet, Cam. Norte, also manage by Tallado’s sister ELSA TALLADO, purchased from FLORES FAMILY. Brgy. 2, Pasig, Daet former Flores Residence at the back of this front 1 storey house. Page 38 of 45 7. (1) storey residential building with yellow color near at the 4 DOOR APARTMENT in Happy Homes Pasig, Phase 1, Daet, Cam. Norte; sold from Salvador Ibasco Family. (without photo) Page 39 of 45 Page 40 of 45 8. (2) storey residential building at Brgy. Anameam Labo, Cam. Norte, using Rico Tallado as front owner, brother of Gov. Tallado, which Rico’s function is in charge to the collections of PROCESS GOLD from Small Scale Gold Processing Plant in Paracale and Jose Panganiban, Camarines Norte. Page 41 of 45 Page 42 of 45 Rico Tallado’s other functions is the collection of SAKADA (sack) of RAW GOLD ORE from various illegal SMALL SCALE MINING OPERATORS in several gold rush mining area in Camarines Norte, such as: Sitio Bulaay, Brgy. Palanas; Sitio Maning, Brgy. Casalugan; Brgy. Gumaos and other gold rush Brgy at Paracale, Camarines Norte. Brgy. Malaya, Napaod and Benit in Labo, Camarines Norte, and Brgy. Sta. Barbara at Jose Panganiban, Camarines norte. Page 43 of 45 9. Another property of two (2) storey residential building at Basiad Sta. Elena, Cam. Norte, using Artemio Serdon Jr an incumbent Sta. Elena town Municipal Councilor as a front owner. A dummy contractor of Gov. Tallado in all government construction business by utilizing Mayor Ong of San Vicente town, owned JCO Construction license. 10. 3 hectares in land area suited for beach development at Calaguas, Island, Vinzons, Camarines Norte. (No picture) 11. 24 hectares real property located at Brgy. Bibirao, Daet, Camarines Norte acquired by Gov. Tallado thru Efren Sale. (No picture) In connection with the above documentations and stipulation of the amassed, accumulated or acquired ill-gotten wealth through a combination or series of overt or criminal acts undersigned is hereby respectfully requests for an urgent continuation of the investigation in support to the complaint filed by the NBI relation to the violations of the laws committed by Camarines Norte Governor Edgardo A. Tallado, on September 28, 2015, before the Honorable Office of the Ombudsman for Violations of R.A 3019, R.A.6713, R.A. 7942 and P.D.1856 all related to the Illegal Mining and Smuggling of Mineral Ores. However, the involvement of Governor Edgardo Tallado in the secondly identified areas or sources of corruption, money with the governor personal involvement in various government infrastructure projects are not fully accomplished, by the National Bureau of Investigation (NBI) as mentioned in Page 44 of 45 the second Memorandum Order issued by former DOJ Secretary Liela De Lima, based in our request for investigation and prosecution of Governor Tallado, dated January 15, 2015. Our previous request that already acted upon by the NBI is our previous request dated May 3, 2014 (Mining, Export and Jueteng). The foregoing Statement is a formal complaint against Governor Edgardo A. Tallado, that may be liable for the violations and omissions contained in this document for the crime of Plunder and other applicable laws that the identification of corresponding charges is left to the determination of the investigating authority. I PRESENT ALL THESE, TO ASSERT CIVILIAN SUPREMACY OVER ALL ELECTED OFFICIALS IN THE PROVINCE AND CONCERNED GOVERNMENT AGENCIES, TO INVESTIGATE THIS MATTERS AND TAKE NECESSARY ACTIONS FOR THE SAKE OF TRUTH AND ACCOUNTABILITY. After having been duly sworn to, in accordance with law, do hereby depose and signed this instrument having personal knowledge of the above discussed facts. Signed this 22nd Day of May 2016 at Daet, Camarines Norte. ROMELITO I. FENIX TIN No. 916-928-924 President: Samahang Gagabay sa Inaasam na Pagbabago ng Bayan (SAGIP-BAYAN Inc.), Convenor: Dekalibre Center for Investigative Journalism Network (DCIJN) Mailing Address: DZAU Bldg, Binanuan, Talisay, Camarines Norte Email Adress: [email protected] Website: http://sagipbayan.org Mobile: 0927 641 0111 Page 45 of 45