June 2015 - Clarence City Council
Transcription
June 2015 - Clarence City Council
Clarence City Council Quarterly Report 1/4/2015 – 30/6/2015 CONTENTS INTRODUCTION 3 HIGHLIGHTS 4 GOVERNANCE 5 COMMUNITY LEADERSHIP 11 ENVIRONMENT 13 BUILT ENVIRONMENT 13 NATURAL AREA MANAGEMENT 22 SOCIAL INCLUSION 24 COMMUNITY, FAMILY AND YOUTH SERVICES 24 COMMUNITY SAFETY AND WELLBEING 29 PROSPERITY 37 CITY PLANNING 37 ECONOMIC DEVELOPMENT 39 FINANCIAL MANAGEMENT Quarterly Report – June 2015 41 2 INTRODUCTION The purpose of this report is to provide Council with a basis for monitoring the performance of the organisation against Council’s Annual Plan. The report is in two major sections. The first section provides details of significant activities undertaken under six goal areas, consistent with Council’s previously adopted Strategic Plan 2010-2015 – Social Inclusion, Prosperity, Environment, Governance, Community Leadership and Financial Management. The second section provides Key Performance Indicators and Outcomes for each of the program areas described in Council’s Annual Plan and Budget. Details of financial information are also included. Council’s 2014/15 Annual Report will be based on the content of the Quarterly Reports. Quarterly Report – June 2015 3 HIGHLIGHTS A Centenary of ANZAC – 100 Years of Service at Home and Abroad Exhibition was held at the Rosny Barn. Council accepted a tender for just over $844,000 for construction of a signalised intersection at Alma Street and Cambridge Road, Rosny Park. Council approved new recreational facilities at Kangaroo Bay including clubrooms, change rooms, public toilets, a kiosk and function room. Council invited expressions of interest for development proposals at Kangaroo Bay including accommodation, tourism, apartments, retail, entertainment, hospitality and water transport. Council’s Family Day Care Scheme received an overall rating exceeding the National Quality Standard which is an exceptional result. The multicultural World Games Day event was successfully held in May at Bellerive Oval. Quarterly Report – June 2015 4 GOVERNANCE Audio Visual Recording of Council Meetings The consideration of the possible introduction of audio visual recording of Council was the subject of a Council workshop. Based on the implementation considerations a draft policy for this new initiative was prepared for the Council’s final endorsement. Audit Committee Recruitments associated with the appointment to fill a vacant position on the Committee was finalised. The scope for the final project for 2014/15, Project 41: Parks and Recreation Facilities Safety and Risk Assessments have been approved and work on the project has commenced. Next year’s internal audit program has been considered by the Committee and submitted to the Council for endorsement. Review of Legislation Officers submitted a response paper in February to the review being undertaken by the Department of Justice into the Tasmanian Building Regulatory framework. It is expected that draft legislation will be available for comment in August 2015 with legislation expected to be tabled in Parliament September/October 2015. Final submissions were made to the reviews of the Local Government (General) Regulations 2005 and the Local Government (Meetings) Regulations 2005 Replacement regulations for these matters commenced on 29 June 2015. Officers have prepared information on the changes for Council and have commenced reviewing existing policies and processes in light of the legislative changes. Lease Policy Review A review of the current Lease Policy is being undertaken to include: - provision for new leases and lease renewals for exclusive use facilities to be based on equity contribution; and - to ensure equitable pricing for lease rents, licences and hire rates taking into account equity and exclusive use benefits. - to encourage participation and ensure fees are set at an affordable and sustainable level. - that a component of lease rent from exclusive occupancy and use be set aside in a future facility development fund to support the future development or redevelopment of additional multi-use/shared community facilities. Quarterly Report – June 2015 5 Review of Council Committee Constitutions Further progress has been made in the general review of constitutions for Council’s management and advisory committees. The constitution of the Tracks and Trails Committee is nearing completion and will be presented to the Council in the near future. Some changes have been generally applied to all management committees whilst specifically the following constitutions have been reviewed: - Australia Day Awards Committee, and Cultural History Advisory Committee Howrah Recreation Centre Following a review of strategic, service delivery and resourcing needs required at the Howrah Recreation Centre two revised positions were advertised and following interviews, appointments have now been finalised. Bellerive Beach Park Car Park Petition A petition signed by 647 people was received by Council requesting Council maintain the existing Bellerive Beach Park Car Park in its current location and to reaffirm and honour the 2012 Bellerive Beach Park Master Plan. Council at its meeting of 11 May 2015 resolved that the petitioners be advised Council confirms its decision of 16 March 2015 to proceed with the Revised Bellerive Beach Park Master Plan to be staged over three financial years subject to Council approval as part of future Annual Plans. Petition – Footpath at Barilla Holiday Park to Cambridge Primary School A petition was tabled at the Council meeting on 12 January 2015 requesting Council construct a footpath from Barilla Holiday Park to Cambridge Primary School. The petitioners were advised that Council would follow up the matter with the Department of State Growth and also that Council would consider the suggested footpath in the Cambridge Master Plan. Rosny Children’s Choir Building Currently the building is being hired by community groups. Consultancy services have been briefed for the development of a high level business plan for a Bellerive Village/Kangaroo Bay/Rosny Park Cultural Precinct. The plan will include consideration of this property as well as 13, 17 and 19 Cambridge Road, Bellerive Boardwalk and the Rosny Farm. Once the business plan is finalised and considered by Council the future of this building will be determined. Old Bellerive Police Station Council considered an offer by the Premier to purchase the Old Bellerive Police Station (13 Cambridge Road) and has agreed to defer the matter pending a further approach to the State Treasurer. Quarterly Report – June 2015 6 The Bellerive Community Arts Centre Building (17 Cambridge Road) This property is in the process of being transferred to Council on terms previously agreed. Land dealings for Kangaroo Bay Re-Development All land transactions are currently on hold pending finalisation of subdivision works. Maxwells Road The former sewerage infrastructure site in Maxwell’s Road has been rezoned from Special Use to Industry and full environmental clearances have been obtained for the site. Officers are preparing documentation to enable possible sale of 21 Maxwells Road to an adjoining property owner(s). TasNetworks Easement Negotiations Council has approved the creation of easements throughout Rosny Park for the upgrade of the electricity supply on the Eastern Shore to the new Rosny Substation site at 124 Cambridge Road, Rosny Park. Negotiations concerning Council’s approval to enter into a Heads of Agreement with Tas Networks which will underpin both parties commitment to transact the necessary land transactions to achieve the desired outcomes of the parties have been ongoing. Rosny Hill Lookout - Temporary Road Closure In order to undertake tree pruning maintenance at the Rosny Hill Lookout road and car park area, it was necessary to close the road to all traffic between the hours of 7.30 am to 4.30 pm on Wednesday 10 June 2015 and Thursday 11 June 2015. The closure was advertised in the Mercury and the local tour operator was contacted regarding the road closure and they confirmed no tours were planned on those two days. Heavy Vehicle Access into Local Roads – National Heavy Vehicle Regulator Council’s officers have provided pre-consent routes within its road network for the Special Purpose Vehicles such as cranes and concrete pumps etc. The Department of State Growth and the National Heavy Vehicle Regulator now require pre-consent for Over Size and Over Mass (OSOM) vehicles on Council roads. Council staff have created a list of the Council’s strategic routes based on the previous use and current and future land use to be included on the approved route. Council officers will work together with the Department of State Growth and the National Heavy Vehicle Regulator representatives through LGAT. Black Spot Funding The Department of State Growth (DSG) has advised that the Australian Government has approved funding of a Black Spot Project 2015/2016 in the City. This project has been included within the 2015/2016 Capital Works Program. Quarterly Report – June 2015 7 The project involves the construction of a right turn lane into Kennedy Drive at the Runway Place intersection of Cambridge. Works are to be completed by 30 June 2016. Cambridge War Memorial The Cambridge Fire Brigade (CFB) completed the establishment of a War Memorial at the Cambridge Memorial Oval. The CFB received a grant through the Australian Government ANZAC Centenary Local Grants program to establish the memorial. The project involved the installation of a concrete base with “Lest We Forget” etched into the concrete, block walls, three stone plinths with bronze plaques for the three services, flagpoles, landscaping and the relocation of the cannon. The CFB involved the Cambridge Primary School in the planning and implementation of the memorial. Council assisted this project by undertaking the initial site works including removal of trees, repairing and re painting text on the stone gate columns, preparing a new base and relocating the cannon alongside the memorial and installing a new seat at the previous cannon site. The Inaugural Service at the memorial was held at 11:30am on Friday 24 April 2015. NBN Rollout The NBN rollout work involves the installation of conduits, cables and cabinets in roads and road reservations and is currently underway in Geilston Bay. As the Geilston Bay area was listed for footpath remediation works, Council has been working in conjunction with NBNCo in regards to the reinstatement. Any footpaths identified for reconstruction, prior to the installation of the fibre optic network, are to have temporary repairs only, by NBNCo contractors until Council’s footpath remediation program commences in this suburb. This is due to commence in August 2015. Street Lighting – Full Retail Contestability LGAT has been successful in negotiating a bulk local government contract for street lights with the existing supplier Aurora Energy. The contract term is two years commencing from 1 July 2015. This contract will have a common unit rate for an individual street light type which is expected to deliver a saving of around 5% on this year’s (2014/2015) recurrent street lighting cost. DSG – Works on East Derwent Highway DSG’s contractor Andrew Walter Constructions Pty Ltd commenced work in January 2015 and will continue until May 2015, weather permitting, on a new slip lane onto East Derwent Highway at Otago and junction improvements to the left turn lane at the existing East Derwent Highway/Goodwood Main Road junction for northbound traffic. VEC Civil Contracting has been awarded the contract to construct the East Derwent Highway/Tasman Highway interchange upgrade works. Preliminary works have commenced and should continue throughout the year with traffic and speed restrictions Quarterly Report – June 2015 8 likely as construction activity intensifies. Construction is expected to be completed by mid2016. Lauderdale to Rokeby Pedestrian connection options - Clarence Foreshore Trail As a result of a Council Workshop on 24 November 2014 on the Lauderdale to Rokeby Clarence Foreshore Trail, Council requested a survey to see who would use the track and the community’s preference on three options for the walking track. The results of the consultation were presented to a Council Workshop on Monday 13 April 2015 and considered by the Council at the Council Meeting held on 11 May 2015 with the outcome that the foreshore option shown on the attached plan remains Council’s preferred route for the Clarence Foreshore Trail from Lauderdale to Rokeby, Council staff to undertake further discussions with residents and provide a further report to Council. - Multi use pathway along South Arm Road At the Council Meeting on 22 June 2015 Council resolved to request the Department of State Growth for a shared multi-purpose pathway along the South Arm Highway from Oakdowns to Lauderdale. A letter has been sent to the Department of State Growth but as yet no response has been received. Clarence Sustainable City Poster Competition for 2015 The ninth Clarence City Council primary schools poster competition occurred during this quarter. An award presentation ceremony with invited media took place on 6 May 2015 at the Rosny Barn with the short-listed poster entries on public display from 6 May 2015 to 10 May 2015. Walk and Talk – Positive Ageing and Healthy Gardening The first of two Clarence City Council “Walk and Talk” Climate Change Forums was held on 2 May 2015 at the Richmond Hall Supper Room. Speakers presented topics and answered questions relating to healthy ageing, gardening and climate change. Walk and Talk – Beach Suburb, Salt-Marsh and Sea Level The second of two Clarence City Council “Walk and Talk” Climate Change Forums was held on 6 June 2015 at the Bayview Park, Lauderdale. Speakers presented topics and answered questions relating to beach erosion, salt marshes and coastcare issues on the impacts of anticipated sea level rise at Lauderdale. Safer Road: Vulnerable Road User Program 2015/2016 The Department of State Growth has written to Council inviting nominations for next Year’s Vulnerable Road User Program 2015/2016. Council made a submission for the improvement of the footpath connection along Rosny Hill Road from Tasman Highway Quarterly Report – June 2015 9 overpass to Riawena Road. Council have not been informed on the success or otherwise of the submission. Bellerive Oval Transport Plan There were 2 AFL games played at Bellerive Oval that required the implementation of the full Bellerive Oval Transport Plan (BOTP): - North Melbourne V Richmond held on Saturday 9 May 2015; and - North Melbourne V West Coast Eagles held on Sunday 7 June 2015. Rokeby Road Stage 2 Detention Basin Works and use of Buckingham Drive The Department of State Growth advised that its contractor Andrew Walter Constructions will be using a section of Buckingham Drive during the construction for a storm water detention basin at 457 Rokeby Road for carting the material to and from the site. The majority of truck traffic will occur during the first week which started on Monday 22 June 2015 when excavation and filling occurred. The Department of State Growth sent a letter to all local residents advising them of the works. Quarterly Report – June 2015 10 COMMUNITY LEADERSHIP Local Government Association of Tasmania (LGAT) A General Meeting of the Association was held on 30 April 2015. The meeting was held in response to Councils seeking discussions about the way forward with voluntary amalgamations and on the strategic sharing of services. The Annual Conference of the Association is due to commence on 22 July 2015. Marketing and Promotion Various Council projects, issues and events were promoted including: - a call for development proposals at Kangaroo Bay including accommodation, tourism, apartments, retail, entertainment, hospitality and water transport; - the Centenary of ANZAC – 100 Years of Service at Home and Abroad exhibition held at the Rosny Barn; - awarding of preferred developer status to Hunter Developments, as part of the third stage of the Expression of Interest process, enabling the Rosny Hill concept to be released for public consultation and feedback; - roadworks to install a turning lane at the intersection of Acton Road and Tara Drive; - awarding nine community grants to a range of organisations for projects such as mental health, a men’s shed and a community garden; - acceptance of a tender for the construction of the signalised intersection at Alma Street and Cambridge Road, Rosny Park; - approval of Council’s 2015/16 Budget; - approval of new recreational facilities at Kangaroo Bay including clubrooms, change rooms, public toilets, a kiosk and function room; and - new stage and upgraded toilet facilities at Simmons Park. Sponsorship of major events included the City of Clarence Squash Championships (November 2015) and the AFL Masters competition (October 2015). Sponsorship of major events included the 2015 International Masters Golf played at Tasmania and Royal Hobart Golf Courses, the major 2015 musical production at Rosny College and the Australian Open Archery Championships held at the Lauderdale Equestrian Centre. Community Participation/Consultation A Working Group continued to meet to facilitate the implementation of Council’s adopted Community Participation Policy. The review of the Dog Management Policy is a current priority for the Group. Quarterly Report – June 2015 11 Council Publications/Internet Site Work was completed on the July 2014 newsletter. A combined 2014/15 Info Book/Community Directory was published for distribution with the July rates notice. A new Popular Tracks and Trails in Clarence booklet was published. This updated the previously published ‘Popular Walks in Clarence’. A new webpage relating to the Racism – It Stops With Me campaign was published. Aldermen’s Allowances and Entitlements Details of the full cost of all entitlements and allowances paid to Aldermen are included in the attached table (see page 54). Quarterly Report – June 2015 12 ENVIRONMENT BUILT ENVIRONMENT Lauderdale Canal Beach Access and Bambra Reef Trial Groyne Council at its meeting held 17 March 2014 approved, in principle, the construction of the proposed sand dune and DDA compliant access at the Lauderdale Canal Access. Tender document is currently under development for the design and obtaining approval from Crown Land Services and under the EPBC Act for these projects. Cambridge Sewage Lagoons Council officers are currently seeking quotes from consultant engineers to complete a final design of the stormwater harvesting and reuse scheme. The consultant will also undertake a review of existing services and prepare earthworks designs for the Cambridge Memorial Oval Master Plan. Green Waste Collection Requests for additional bins are continuing with bins supplied to residents seeking multiple services and residents in multiple unit sites requesting bins. The total number of bins now in service is 19611. Greenwaste Residential Collections Total Services 19,611 as at 30 June 2015 No. of Tonnes % Usage of Ave weight per Month Collections Collected collections collection in KG July 2013 August 2013 September 2013 October 2013 Average for 4 collections 2,942 3,226 4,085 4,192 November 2013 December 2013 January 2014 February 2014 March 2014 April 2014 May 2014 June 2014 July 2014 August 2014 12,708 14,232 15,040 12,246 12,102 11,757 10,626 8,695 9,114 9,049 Quarterly Report – June 2015 72.52 86.46 113.7 120.32 401.54 412.48 312.12 204.7 201.3 211.4 191.38 165.26 186.09 180.36 13 15.45% 16.94% 21.45% 22.02% 24.65 26.80 27.83 28.70 19% 27.00 kg 66.74% 74.75% 78.99% 64.32% 63.56% 61.75% 55.81% 45.67% 47.87% 47.53% 31.60 28.98 20.75 16.72 16.63 17.98 18.01 19.01 20.42 19.93 September 2014 October 2014 November 2014 December 2014 January 2015 February 2015 March 2015 April 2015 May 2015 June 2015 Average for 20 collections since November 2013 10,964 11829 11435 12879 14197 13324 13158 14242 10204 8693 231.82 251.1 229.2 256.5 346.82 305.04 290.26 299.64 212.63 170.28 57.58% 62.69% 60.63% 67.17% 73.36% 68.85% 67.99% 72.62% 52.03% 44.32% 21.14 21.23 20.04 19.82 24.43 22.89 22.06 21.04 20.84 19.59 11824 253.0 61.71% 21.16kg By comparison the usage for the previous greenwaste collection system averaged around 4,200 collections and 115 tonne per 4 weekly cycle. Projects Update During the quarter, Council’s Asset Management Staff were working on developing designs, specifications and tender documentation for a number of infrastructure projects. - Playground equipment replacement; - Playground ancillary equipment such as shade structures, bbqs and rotundas; - Kangaroo Bay Urban Design Master plan – traffic management investigation, proposed road upgrades and associated subdivision proposal including the design work for Stage 1 - Cambridge Road/Alma Street ; - Kangaroo Bay Oval Clubrooms/Change rooms tender document and Planning Development Approval; - Kangaroo Bay youth space skate park; tender document and Planning Development Approval; - Bellerive Beach Park Master Plan detailed design documentation and tender document for Derwent Street Car park; - Footpath remediation program tender document; - Bellerive Beach Park Master Plan detailed design documentation and tender document for All Abilities Play Space; - Simmons Park design of toilet facility and performance stage; tender document and Planning Development Approval; - Stormwater designs for South Street stormwater main, tender document; - Stormwater designs for Cremorne; tender document; Quarterly Report – June 2015 14 - Stormwater design for Clinton Road/Oscars Place, Geilston Bay; - Stormwater design for Mannata Street, Lauderdale; - Howrah Recreation Centre – DDA upgrade; tender document and Planning Development Approval; - Luttrell Avenue stormwater pit upgrade; - Bellerive Bluff – Stormwater and Foreshore Sea Wall Works detailed design documentation and tender document; - Saundersons Road Foreshore Embankment Stabilisation detailed design documentation and tender document; - Clarence Foreshore Trail and multi-user pathway along Tranmere Road detailed design documentation - Acton Road/Tara Drive intersection detailed design documentation and tender document; - Pass Road Footpath extension detailed design documentation; - Road, footpath and stormwater improvements in Victoria and Gunning Street, Richmond detailed design documentation and tender document; - Simmons Park Rain Garden detailed design documentation and tender document; - Stormwater harvesting and reuse project, Cambridge Memorial Oval detailed design documentation and tender document; - Bathurst Street, Richmond culvert; - Howrah Bowls Indoor Facility; tender document and Planning Development Approval; - Stormwater catchment management plans; and - South Arm Oval Master Plan, concept plan and consultation. Council staff were also involved in project management and contract administration for the following larger projects; - Rehabilitation of the two former sewerage lagoons at Cambridge; - Clarence High School and Lindisfarne North Primary School mowing and maintenance contract administration; - Kangaroo Bay Oval curating and oval maintenance contract supervision; - Kangaroo Bay Urban Master Plan roadworks – Stages 1, 2 and 3; - Lower River Street - Bellerive outfall installation; Quarterly Report – June 2015 15 - Bellerive Community Arts Centre Courtyard; - Saundersons Road Foreshore Embankment Stabilisation; - Bellerive Bluff – Stormwater and Foreshore Sea Wall Works; - Lindisfarne Streetscape Stage 3a Derwent Avenue; - Lauderdale Structure Plan Stage 1 Drainage works; - Minerva WSUD project; - Major pavement reconstruction program; - Asphalting resurfacing works; - Acton Road/Tara Drive intersection; - Victoria Esplanade car park construction; - Richmond Bridge Vegetation Management Plan; - Intersection upgrade at Acton Road/Tara Drive, Acton; - Clinton Road/Oscar’s Place, Geilston Bay Stormwater; - Lindisfarne North Primary School – Oval Improvements and - Reseal program 2014/2015; Council’s staff resources were also committed to; - Implementing Council’s 2014/2015 Annual Plan; - Developing Council’s 2015/2016 Annual Plan; - Provision of advice to the Copping Refuse Disposal Site Joint Authority and the Southern Waste Strategy Authority. - Provision of advice to developers and planning staff on major projects and their impact on infrastructure and service levels within the City. - Liaison with sporting clubs on leases and development of grounds at specific sites in the City; - Checking and inspecting Council’s assets being modified by NBNCo Contractors. - Managing various community consultation proposals for traffic calming, works programs, parking restrictions and liaison with the Department of State Growth on road safety and traffic management issues across the City. Quarterly Report – June 2015 16 - Council staff are developing, in consultation with consulting engineers, a stormwater network model for the catchment management plans as required under the Urban Drainage Act. Tenders Quotations and Tenders let during the quarter: TENDER T980/14 Car Park Construction, Victoria Esplanade, Bellerive T1007-15 Intersection Upgrade – Acton Road and Tara Drive T1018/14 Saundersons Road, Risdon – Foreshore Embankment Work T1031-15 Kangaroo Bay Roadworks Stage 1 Alma Street Intersection T1028-15 Howrah Recreation Centre DDA Upgrade T1034-15 Bellerive Bluff – Stormwater and Foreshore Sea Wall Works T1041-15 Cambridge Road – Asphalt Resurfacing Works T1042-15 Road and drainage works – Victoria Street and Gunning Street Total Value of Tenders Let Exc GST AWARDED TO COST (EXC. GST) Statewide Earthworks Pty $105,500.00 Ltd Spectran Contracting Pty $246,501.64 Ltd RM Worbey Constructions $109,430.00 Pty Ltd RCCC Civil Pty Ltd Contracting $844,227.50 Lamcon Constructions and $294,026.00 Maintenance Statewide Earthworks Pty $107,500.00 Ltd Downer EDI Works Pty Ltd $645,539.55 Andrew Walter Construction Pty Ltd $574,363.60 $2,927,088.29 Road to Recovery – Additional Funds The Australian Government has announced a policy to direct the first two years of revenue from fuel price indexation towards Roads to Recovery. Ove the next two years, local governments across Australia will receive an extra $300 million (in 2015-2016), on top of the already doubled $700 million for this year and an extra $805 Million (in 2016-2017) in addition to the $350 Million already scheduled. The exact details of the quantum of funds that Council can expect and the timing of the funds will be advised as more details become available. Quarterly Report – June 2015 17 Clarence Aquatic Centre Fees for 2015/2016 As part of the Management Agreement between the YMCA Hobart Inc. and Council, the YMCA are to advise of proposed fees and charges. The Management Agreement does not require Council approval for fees as that is up to the YMCA as the operator to determine in terms of the overall market sector it operates in. On 15 June the CEO of YMCA Hobart Inc. advised the fees for 2015/2016; it is the first increase in fees since 2013. The Clarence Aquatic Centre frees and charges compare very favourably to Hobart and Launceston’s 2014/2015 fees. Grants National Stronger Regions Fund Application – Cambridge Sporting Precinct Council at its meeting held on Monday 1 December 2014 approved the General Manager to make application under the Australian Government’s National Stronger Regions Fund for Stage 1 of the development at the Cambridge Sporting Precinct in partnership with Football Federation Tasmania. Council has been advised that this application has been unsuccessful. SRT Major Facilities Grant Application: Howrah Bowls Indoor Bowls Centre Council’s application under the Sport and Recreation Tasmania Major Grants Program for funding of $80,000 towards the Howrah Bowls Club Indoor Bowls Facility was successful. SRT Major Facilities Grants awarded to other Clubs Grants have been awarded to the Geilston Bay Tennis Club Inc. to replace the lighting on courts 1, 2, 3 and 4 in the amount of $45,922 and the Rosny Tennis Club Inc. to resurface courts 3 and 4 with synthetic grass in the sum of $30,000. MAST Submissions Council’s application for a funding contribution towards the upgrading of the boat ramp including the installation a jetty at Montagu Bay has been successful. However in relation to Council’s application to MAST for funding towards the upgrading of the extension of the Opossum Bay, Doran’s Road and Kangaroo Bay (Rosny) boat ramps, MAST have advised that this application was unsuccessful. Commonwealth Energy Efficiency Program Grant Following the change in government, funding for this grant was deferred. The first payment component of this grant of $34,353 has since been received. In response to updated costings for the physical works at the Clarence Plains Youth Centre, negotiations were entered into in the detail of the project timeline and delivery of the remaining grant funding component (anticipated as $74,064). Managerial changes in the Federal administration of the grant, and subsequent conflicting advice received, has led to some frustration in progressing the project. Continuing delays have resulted in the project no longer being achievable against the remaining timeframe for completion and Council has signed a Deed of Termination by Quarterly Report – June 2015 18 Mutual Agreement to the Funding Agreement from the Department of Industry and Science. Advice is due early next financial year on the status of this Grant. ROADS AND FOOTPATHS Infrastructure Works in Kangaroo Bay Drive Major road reconstruction and infrastructure upgrade works continue to be undertaken in Kangaroo Bay Drive and are scheduled for completion early in the new financial year which will then allow the construction of the Alma Street connection. South Arm Kerb and Gutter Construction Works The construction of kerb and gutter and footpath along the south side of South Arm Road between Church Street and Ralph Terrace has been completed. Steps Leading from Richmond Village Green to Coal River Work to replace the top landing commenced in May 2015 and was completed at the end of June 2015 in time for the school holidays. Minor Road Failure in Victoria Esplanade Another small section of the recently sealed Victoria Esplanade road has failed towards the eastern exit. Council’s contractor, under the provisions of the defects liability clauses in the contract, made repairs. Some drainage work has been undertaken to reduce subsoil moisture flow into the subgrade beneath the road pavement at the failed areas. Tranmere Road Foreshore Pathway Council commenced work to continue the Clarence Foreshore Trail and multi-user pathway along Tranmere Road, Tranmere. The 2.5 metre concrete pathway on the western side of Tranmere Road is from the boat ramp south of Cohuna Street to the bus stop north of Arlunya Street, Tranmere. Footpath Repair Suburb Schedule The consultancy Esk Mapping and GIS completed the data capture and provided the data files to Council. This data is now being used for the footpath remediation program. The scheduled program for the remainder of the year is set out below: Suburb Time frame Warrane Current to End July Geilston Bay August to October Mornington November to January This program may be subject to change if NBN Co vary their current construction plans. Quarterly Report – June 2015 19 Other Road Projects The preparation and sealing of Dysart Street in Clifton Beach was completed this quarter. The preparation and sealing of Dorans Road Boat Ramp carpark was completed. Road reconstruction linking The Esplanade and George Street, Dulcot was completed this quarter. Changes to islands, parking and traffic and pedestrian management in the Bayfield Street Carpark commenced this quarter. The construction of DDA compliant pedestrian crossings was completed in CR Barnard Drive. The construction of DDA compliant pedestrian crossings commenced in various locations on East Derwent Highway. The gravel resheeting of Woodlands Road and Dorans Road in Sandford and George Street in Dulcot was completed. The construction of a gravel path from Kennedy Drive to the Ovata Place commenced this quarter. Pavement repairs associated with the maintenance program were completed in the following locations: Acton Road, Acton Drive, Carella Street, Dorans Road, King Street – Bellerive, Oceania Drive, Trikala Place, Nowra Road, Hance Road, Moirunna Road, Kaoota Road, Dorans Road, School Road, Kellow Place, Mockridge Road and Tollard Drive. Construction of Kerb and Gutter on Spitfarm Road, Opossum Bay between 62 and 74 was completed. Guide post replacement continues throughout the City. Footpath repairs and maintenance works, as part of the Footpath Remediation Program continued in the Warrane Area. Also a number of small repairs in various suburbs were completed outside the programmed areas to address significant risk management issues. Pothole repairs and patching were undertaken in the following areas: South Arm, Sandford, Lauderdale, Acton, Rokeby, Richmond, Cambridge, Mornington, Warrane, Rose Bay Lindisfarne and Geilston Bay. Grading of unsealed roads occurred in the following areas: Bicheno Street in Clifton Beach Area; Forest Hill Road, Woodlands Road and Dixons Point Road in the Sandford area; Prossers Road, Coldblow Road, Marengo Road, and Enfield Lane in the Richmond area; Quarterly Report – June 2015 20 Hobdens Road, Hanslows Road, Denholms Road and Kings Road in the Cambridge area; Belbins Road and Grahams Road in the Mt Rumney area and Begonia Street in Flagstaff Gully. STORMWATER Minerva Creek Reserve – Water Sensitive Urban Design Works Spectran completed the Water Sensitive Urban Design Works in Minerva. Some material was washed out due to heavy rain. Design of the rectification work is complete and an appropriate weather period is being awaited upon for the works to occur next quarter. South Street/Lower River Street Stormwater Upgrade The contract for the reinstallation of the stormwater outfall pipes in Lower River Street, Bellerive was completed in June 2015. Other Stormwater Projects The original stormwater design for Lauderdale Structural Plan in Mannata Street has been completed with work to commence on stage 2 after winter. Construction of the Bathurst Street box culvert extension and associated works was completed. Works were completed in the Geilston Bay, Montagu Bay and Lindisfarne areas clearing debris from stormwater pits and pipes. Stormwater main upgrade was completed in Clinton Road/Oscars Place, Geilston Bay. Two rounds of maintenance and cleaning on Gross Pollutant Traps were completed during the quarter. Work continued on obtaining the necessary stormwater pits/pipe information to assist in network modelling for the catchment management plans as required under the Urban Drainage Act. FACILITIES Closure of Clarence Aquatic Centre for Maintenance Council has allocated funding for programmed maintenance works at the Clarence Aquatic Centre. All works have now been completed and the Centre opened on Monday 18 May 2015. Quarterly Report – June 2015 21 NATURAL AREA MANAGEMENT Mt Rumney Bushfire Protection, Swift Parrot Habitat and Cat Survey Project Report The Mt Rumney Landcare Group Inc. received funding from Clarence City Council’s Landcare Grants Program 2014-15 in conjunction with NRM South’s Naturally Inspired Grants Program to plan and implement the Mt Rumney Bushfire Protection, Swift Parrot Habitat and Cat Survey Project. The project was carried out in collaboration with Clarence City Council, NRM South, Hobart City Council, Hobart Fire Management Area Committee, Tas Fire Service, Cambridge Volunteer Fire Brigade and Welling Consulting. The Report relates to the high conservation and fire prone woodlands in the Mt Rumney – Mt Canopus region. Bellerive Bluff – Victoria Esplanade Risk Management Plan Due to a number of risk issues identified as part of a risk management audit undertaken in the Bellerive Bluff and Victoria Esplanade area, a list of actions was set up, in particular relating to concerns regarding the new block retaining wall. There has been constant dialogue between Council staff and representatives of the Bellerive Bluff Land and Coast Care Group on matters relating to risk issues and works in relation to the adopted Landscape Plan. This dialogue will continue throughout the implementation of the Landscape Plan over future years. Trees During the quarter 11 applications were received under the Management of Trees on Council Land Policy. Those applications sought removal of 12 individual trees and a copse of Allocasuarina verticillata. Of those applications all trees are still being processed and will be reported on next quarter. There was 1 tree remaining from last quarter that is still being processed. The information for this quarter has been included graphically in the performance indicator sheets. Advanced tree planting program and semi-advanced tree planting for various locations commenced in accordance with the Management of Trees on Council Land Policy. Fuel Reduction Burns on Council owned Land Fuel reduction burns continued on Council owned land as per the 17 Bush Fire Management Plans which apply to all Council’s Natural Area Reserves. Parks and Reserves Maintenance - Soft fall material replacement and aeration continued in the Council’s playgrounds throughout the City. Quarterly Report – June 2015 22 - Graffiti removal program is continuing in all skate parks and other areas throughout the City. - Oval renovations for sports season changeover was completed for changeover for the winter sports rosters. - Irrigation review and maintenance continued on a number of council sporting facilities. - Application of fertilizer on ovals was completed as per the annual program. - Sports ovals de-compaction works continued (Verti-drain). - The installation of the soft fall around the new play equipment was completed. - Follow up review, inspection and clearing of Firebreaks throughout the municipality continued as conditions require. - Continuation of inspection, preparation and burning of Natural Areas as per the management plans continued as conditions allowed. - Maintenance and Management of natural areas as per the various Natural Area Management Plans Local Area Management Plan – East Marsh Lagoon Council at its meeting held 3 February 2014, approved the preparation of a non-statutory joint management plan for the area that incorporates the Ralphs Bay Conservation Area, East Marsh Lagoon and Racecourse Flats, including land managed by the Crown and Council. This project has stalled primarily due to a lack of resourcing at the Departmental level, with Parks support: the project remains part of the Department’s Business Plan, so approval from the Minister will allow the Department to continue to devote time to it. Swift Chatter – Land and Coastcare Newsletter Council staff have established a new communication letter to be distributed throughout Council’s network of Land and Coast Care Groups called “Swift Chatter” The newsletter is to inform groups of current issues, provide updates on Council activities, general environmental and sustainability information and funding opportunities. Quarterly Report – June 2015 23 SOCIAL INCLUSION COMMUNITY, FAMILY AND YOUTH SERVICES Rosny Child Care Centre In June a visiting performer from Sydney held a show at the centre. ”Playing with Poems” was focused on rhymes and poems for children aged 2-5years. The show tied in with many aspects of the Early Years Learning Framework. Plans to get the front garden under way this quarter were delayed due to a blockage in the stormwater drain causing a flood in our rear playground and has been rescheduled to start in July. Family Day Care The Scheme went through the Assessment and Rating process in April. This is part of the National Quality Framework which in accordance with the Education and Care Services National Law Act 2010 covers all child care services. The final assessment gave the scheme an overall rating of Exceeding the National Quality Standard. This is the first time the scheme has been assessed under the NQF and this is an exceptional result. The Education and Care Unit have conducted targeted unannounced visits to educator’s homes where they checked a range of compliance requirements within each environment. No major issues were identified. Clarence Outside School Hours and Holiday Care The service is preparing for the impending Assessment and Rating visit at Lindisfarne North After School Program in July. The service is currently reviewing the following policies and procedures: Child Protection Policy; Weather Protection Policy – Sun Smart Policy; Confidentiality and Privacy Policy; General Cleaning and Maintenance Policy; and Excursion Policy. Approval to operate a new service at Emmanuel Christian School was finally received from the Education and Care Unit and Australian Government Department of Education. It is anticipated to commence in Term 4. Youth Services Youth Plan Consultation is underway with local High Schools including Rokeby and Rose Bay. This is scheduled for the beginning of Term 3. Quarterly Report – June 2015 24 Youth Week Successful events were held at Rokeby, Clarence and Rose Bay High Schools with each event organised by students at the schools and facilitated by Youth Services. Student feedback from the events was very positive. A highlight for the students this year was budget control – giving them the flexibility to choose activities and create an event suitable for their own school. Evening Recreation Programs Cultural awareness has become an underlying theme in the recreation programs this year with tolerance and acceptance being promoted as normal behaviour. Young people are given the opportunity to either cook or serve each week and eating together has become an established activity. - Monday Nights (Clarence Plains Youth Centre) Numbers at the program have increased in Term 2 but are still variable. The kitchen is a place of enthusiastic activity and invention with “cook-offs” amongst the young people a very popular way of promoting skills of food planning, preparation and cooking. - Tuesday Nights (Risdon Vale) Risdon Vale recreation program continues to attract high numbers. The majority of young people are engaging well with activities in cooking, sports and games. - Thursday Nights (Mornington/Warrane) Numbers of young people attending the program have increased to approximately 20 each week with the 12 -13 age group becoming more regular attendees. School Holiday Program Two programs were organised for the April School Holidays to cater for the grade’s 5-8 age group and 14+. These programs included a trip to Bonorong Wildlife Sanctuary and Richmond Maze, and a visit to Zone 3 and Moonah Bowl. Homework Program The Homework program with Rokeby Neighbourhood Centre has grown in numbers with a consistent level of attendance. The program offers young people the opportunity to complete worksheets, learn new things on the internet and eat a healthy meal provided by the Neighbourhood Centre. Bike workshops Youth Services have been working closely with the Risdon Vale Bike Collective with positive outcomes for both services. Youth Services staff have been able to develop stronger relationships with participants from the Risdon Vale Recreation Program whilst also increasing their skills in the maintenance and restoration of bikes. Youth Services also Quarterly Report – June 2015 25 provided support and attended the opening of the BMX track established by Risdon Vale Bike Collective. - Open Bike Workshop A steady number of young people have been dropping into the Open Bike Workshop on Wednesday afternoons and as a result of the high visibility of the program, we have had an influx of donations. - Friday Options Bike Program – Youth Services and Clarendon Vale Primary The Options Bike Program continued in Term 2 with approx 5-6 students attending each week. The program is available for Grade 5/6 students who are able to independently manage tools. Friday Options Gardening Program The Youth Service is engaged in an options gardening and landscaping program with the Clarendon Vale Primary school, with a Youth Worker utilising his horticultural skills and knowledge developing the school garden and undertaking community based landscaping projects with students. Find Your Voice Choir Find Your Voice Choir continues to operate from the Youth Centre every Wednesday afternoon. Each week a group between 15 and 20 local residents and workers join in song, a chat and afternoon tea. Graffiti Reduction Program - Community based projects Planning has started to paint the Warrane underpass on Cambridge Road with Warrane Primary School grade 5/6 class. Youth Services have also been approached by Centrelink to paint a wall in Rosny which is constantly being tagged. It is anticipated this will be completed later in the year. - School based Street Art Workshops The school based program has been simplified with a strong focus around the legal difference between graffiti and street art – and the implications of both. The high school program has been positively embraced by Principals and students from Rokeby, Clarence and Rose Bay High Schools. Workshop Program Working closely with the Clarence Plains Community Shed, the Workshop clean-up is almost complete creating a much more functional workspace. - Rose Bay High School Workshop Program 5 young people attend this program for a full morning each Thursday. The Youth Worker is utilising his workshop knowledge and skills providing support to participants on projects. Quarterly Report – June 2015 26 - After School Open Workshop for 14+ - ‘Reshape, Repair, Recycle, Re-use’ Numbers have increased since Term 1 and now 3 – 4 young people are regularly and enthusiastically attending this program. Youth Network Advisory Group (YNAG) The Youth Network Advisory Group (YNAG) have continued with their 15 ‘Celebrations’ for 15 years of service, including YNAG representatives contacting past members to interview them about where they are now, and what impact being a member of YNAG had on their personal development. Volunteer Services Service Information: Currently 35 volunteers have provided services to 87 clients. The Service is looking at options to recruit more volunteers. Volunteers and their partners were treated to an afternoon tea as a thankyou for National Volunteer Week. Eating with Friends This program is always very well patronised with an average of 60 people attending each lunch in April and May. Eight volunteers, a bus driver, plus administration support are required to keep the functions running smoothly. The Clarence Business Community continues to support the lunches with ongoing donations for raffles, lucky door prizes and discounts when items are purchased from their shops. The Coordinator attended the Department of Social Security workshop on ‘My Aged Care’ held in May. The workshop primarily focused on information to ensure services have their provider portal ready to go live on 1 July 2015. From the 1 July 2015 Tas Care Point will be the only gateway for people under 65 to access home based services. Live Well Live Long Program The Live Well Live Long program held at the Clarence Integrated Care Centre is into its second year. The Clarence Volunteer Service continues to be involved and is providing assistance to the program. Community Development Howrah Men’s Shed The Howrah Men’s Shed Association has worked very hard over the last few months to lay the slab foundation and now the shed is in place. Planning is underway for the official opening of the shed in late September early October. Quarterly Report – June 2015 27 Food Connections Clarence The partnership continues to progress very well. Although the project finishes in June 2015 the partnership model will continue. Monthly cooks have begun from the Clarence Seniors and Citizens Centre, with Rose Bay High School students and the support of two volunteer chefs. Volunteer Recognition Ceremony Council’s annual volunteer recognition ceremony and afternoon tea event was held in May at the Tasmania Golf Club in Cambridge. aWake Project This project is in collaboration with the Warrane Mornington Neighbourhood Centre, Fairway Rise Retirement Living, Clarence Positive Ageing Advisory Committee (CPAAC), a Music Therapist and the Tasmanian Association of Hospice and Palliative Care (TAHPC). The project focuses on raising the profile of having positive and engaging conversations about death and dying. Racism. It Stops with Me launch Council partnered with a number of organisations including Eastlands, Rose Bay High School, Soroptimist International of Hobart, Cambridge Primary School, Passion of Purpose Group, Colony 47, Migrant Resource Centre South, and Clarendon Vale Neighbourhood Centre to launch a Clarence-based campaign on the in May at Eastlands. The Office of the Anti-Discrimination Commission supported the public launch. The campaign launch was hugely successful featuring a cultural performance, personal testimony and short speeches from those who pledged to support the campaign. The launch received strong media attention so the message that racism is not okay in our community was able to be magnified. World Games Day This event was held in May at Bellerive Oval with over 1500 people attending the day which was a great multicultural event featuring games, sports, activities, music and food. The World Cup soccer tournament was a highlight with the Bhutanese team taking out the men’s trophy, and UTAS Under 17s taking out the girls trophy. Other highlights include the performances, food and children’s activities. Establishment of Community Health and Wellbeing Advisory Committee (CHAWAC) Working Groups The CHAWAC agreed to go ahead with the establishment of three working groups. Each of these groups is determining its priorities and group membership. Information/Communication Working Group – The Information/Communications Working Group has worked on branding for the health and wellbeing program and has been working on content and design of the “Live - City of Clarence” website. The website will Quarterly Report – June 2015 28 have a soft launch in the coming quarter and will be officially launched at the Living Well in Clarence event in November. This group intends to recruit additional members from the community. Health Promotion Working Group – The Health Promotion Working Group has identified a number of possible priorities but is currently focusing on recruiting membership from the community. An Expression of Interest process has been undertaken and additional members will be determined in July. Livability / Environment Working Group – This group has been reviewing current and potential activities and is in the process of determining its priorities for the coming year. Collective Impact – “One Community Together” project developments One Community Together is progressing with a number of projects with safety in the community remaining a heightened issue in Clarence Plains. Trail bikes and hooning, and youth engagement remain a concern for residents in the area. The group are currently working on plans for: - a community clean-up in October; branding for ‘One Community Together’; finalising structure arrangements for ‘One Community Together’; and engaging young people. Fitness in the Park Winter Program Winter sessions resumed in April. Two sessions are being held each week on a Wednesday and Friday at Simmons Park and Bellerive Beach Park respectively. An evaluation of the program will be undertaken in July. COMMUNITY SAFETY AND WELLBEING Clarence Community Road Safety Partnership (CCRSP) The partnership with the State Government no longer applies as the funding model is moving to a grants process for road safety. The committee is continuing to review potential opportunities for road safety with some options emerging. RACT facilitated a meeting with Southern Councils with the idea to collaborate on joint projects. Trail Bikes The Trail Bikes Working Group has met again to look at strategies around education, diversion and enforcement. The Risdon Vale Bike Collective has been an effective diversion model with positive outcomes in Risdon Vale in relation to trail bikes. Clarence Plains continues to have issues in this area. Youth Services and Mission Australia Housing are looking at potential opportunities to work with Cambridge Moto. Quarterly Report – June 2015 29 Clarence Community Gardens Work continued on the ongoing development of the community garden in Risdon Vale. Volunteers work in the garden and it has become a successful source of produce for the community. An invitation to participate in the “Seed 2 Plate” project in Clarendon Vale, which has funding available to establish a community garden was received. Support to the project will be provided as needed. Healthy Food Access Tasmania – Spatial Mapping Project The spatial mapping project working group has undertaken an initial mapping exercise to map the location of shops where a healthy food basket is available for purchase and the area within 500 m of these shops within Clarence. In addition the group has produced more detailed maps of three areas: South Arm / Opossum Bay, Risdon Vale, and Warrane / Mornington. These maps are being shown to residents in the area to check them against the realities they experience. Consultations are taking place in June / July in Risdon Vale, Warrane and South Arm at various events and programs. Older Culturally and Linguistically Diverse Residents Council’s Positive Ageing Advisory Committee are working with the Migrant Resource Centre on establishing networks with older migrant groups for the use of facilities in Clarence to meet their identified needs. Indigenous Initiatives Council will support the annual national competition for students in NAIDOC Week once again in 2015. Council was invited to attend the flag-raising ceremony to be held at Risdon Cove. Community Arts Sixteen designers have been selected for the finalists’ exhibition of the Clarence Prize for Excellence in Furniture Design to be held in August/September. An exhibition was held in the Barn by renowned textile artists India Flint through March and early April in partnership with the Tasmanian International Arts Festival. A major exhibition was held in the Barn to mark the Centenary of Anzac. The exhibition titled Centenary of Anzac: Service at Home and Abroad explored two sides of the Anzac story – the experience of Clarence people serving overseas and the effects of the war on those left behind. Council published an exhibition booklet to compliment the exhibition. The exhibition received $10,000 from the Federal Government Centenary Local Grants Program. Quarterly Report – June 2015 30 In June Council partnered with the Dark Mofo Festival to present a major solo exhibition in the Barn. Melbourne based contemporary textile artist Douglas McManus presented his specially created exhibition titled Laundry of the Terminal Psyche. The exhibition received high praise from those who visited. Other exhibitions in the quarter were local artist Mary Buchanan Bailey and local printmaking collective Hunter Island Press (HIP). Incorporated in HIP’s exhibition was some collaborative work with the Hazara community made possible through a Clarence City Council community support grant. The Bonsai Society held their annual display in the Barn which was very well attended. Events Council’s annual events program Planning is well underway for the next season of Council’s annual events program: The Seafarers’ Festival’s water program will be modified in 2015 to focus on a smaller range of fun activities within the ‘lagoon’; a DPAC grant for a ‘Human Library’ program is being sought for Australia Day on the Boardwalk; the Clarence Jazz Scholarship Program application process opened in June; and a new film festival BOFA @ the Barn is scheduled for September and if successful could become an annual event. World Games Day was held in May and was the first time Council had partnered with Cricket Tasmania to present a community event at Bellerive Oval. Thirty six organisations were involved in a variety of activities including sport, games, food, dance, music and information sharing. Over 1500 spectators attended and the event which provided a fun family day of multicultural activities accessible to all. Council events assistance Extra assistance was given to the Richmond ANZAC Day service to enable them to close the Richmond Bridge for a march. The last Skateboard Hub presented by Skateboarding Australia was presented in June. The organisation has lost its Federal funding. Council’s Events and Youth Teams are negotiating with a new service provider to continue offering Skateboard demonstration training at our local skate parks. The Events Special Committee The Committee met in June to discuss the BOFA @ The Barn proposal, new licensing options for Seafarers’ and Jazz Festivals, and statistics on the new Arts and Events Website. The Committee was informed about developments around Kangaroo Bay and the Bellerive Boardwalk. Quarterly Report – June 2015 31 Community Grants This quarter, 18 Quick Response Grant applicants received grant funding totaling $2,660 for small activities, projects or to represent their state in a range of sporting and academic endeavours. Of the 11 applications received in the March round of Community Support Grants, 9 applicants were successful in receiving a total of $12,495 in funding. The funding was approved for activities including youth health related projects, arts projects, skills workshops, community garden project, equipment purchases. Special Event Licencing There were seven (7) Special Event licences issued this quarter. They included a MidWinter Festival at Clarendon Vale, school fairs and community events. Food Handler Training and Education The following food handler training sessions were held over this quarter: Location of Training Session No. of Attendees Migrant Food Handler Training 13 “I’m Alert” on-line food handler training 372 Family Day Care Educators 3 Mornington Inn 18 Presbyterian Care Tas 7 Clarendon Vale Neighbourhood House 18 Family Day Educators 3 Outside School Hours Care Student Hand 450 Wash Demonstration Temporary Food Registration Temporary food licences were issued to sixty three (63) temporary food businesses working in Clarence. These businesses operated at Cambridge Park, Bunnings Rosny Park and various school/community functions. Food Registrations Food registration renewal forms were sent to 291 food businesses within Clarence over this period. The registrations forms were processed and forwarded to operators. On-Site Wastewater Management Inspections of wastewater treatment systems continue to be undertake on properties brought to our attention through the 337 Certificate process. During this quarter, forty two (42) inspections were undertaken. There were forty three (43) special plumbing permits lodged in this period for which permits were issued for on-site wastewater management systems for properties that are not connected to sewer. Quarterly Report – June 2015 32 Immunisation Program The 2015 school immunisation program continued this quarter. Immunisation of all grade 7 students was undertaken at high schools in Clarence. The fortnightly community clinics being held at the Integrated Care Centre in Bayfield St, Rosny Park continue to be well attended. Water Sampling The winter sampling program for the Derwent River was conducted during this period with results exceeding the RWQ acceptable limit for enterococci at Howrah Beach and Little Howrah Beach in May. Little Howrah Beach results were particularly high and this is thought to be related to heavy rain in the previous 24 hours combined with strong wind from the north-west creating a current down the beach towards Little Howrah. Investigations of stormwater outfalls at Howrah Beach were conducted after heavy rainfalls in May and June. These samples showed consistently high results for enterococci from Howrah, Lucas Street and Salacia Street after rainfall. Rivulet sampling was undertaken after two separate rainfall events at Lower and Upper Kangaroo Bay Rivulet and Lower and Upper Clarence Plains Rivulet during the quarter. On 5 May all sites apart from Upper Clarence Plains Rivulet exceeded the ANZECC guidelines for Secondary contact for enterococci. On 17 June Upper Kangaroo Bay Rivulet and Lower Clarence Plains both exceeded ANZECC guidelines for Secondary contact for enterococci with the Upper Kangaroo Bay result extremely high. The Upper Kangaroo Bay Rivulet was resampled on the 25 June and returned a result below guideline limits. Rivulet sampling will continue after rainfall events to build up baseline data. Environmental Health Complaints There have been 56 complaints received this quarter. This is an increase of 8 compared with the last quarter. The details of complaints were: Number o Noise 19 o Pollution 15 o Litter 8 o Other 5 o Food 4 o Onsite 2 o Build 2 o Premises 1 Quarterly Report – June 2015 33 Building There were 202 building permits issued this quarter. This is an increase of 26 compared with last quarter and an increase of 30 for the same period last year. Month Permits Issued o April 61 o May 70 o June 71 Plumbing 240 Plumbing permit applications were received for new and additional works. This is an increase of 8 compared with last quarter and a decrease of 48 for the same period last year. Month Applications Lodged April 87 o May 83 o June 70 o Animal Control There were 315 complaints received about dogs this quarter. This is an increase of 30 compared with last quarter. The main details of complaints were: o Dog at large 172 o Barking Complaints 100 o Dogs Attacks 23 o Other 20 69 infringement notices were issued this quarter for dogs at large (67), unregistered dogs (1) and other (1). Over this quarter 119 dogs were collected and taken to the Dogs Home. Preparations has commenced for the review of the Dog Management Policy. Parking Patrols undertaken during this quarter resulted in 1014 infringements being issued. o April 294 o May 408 o June 312 Key activities planned for next quarter include: - The Clarence Prize for Excellence in Furniture Design to be awarded In partnership with the Festival of Voices, 8 performance will be presented over 2 weekends in July - Street Art Workshops within schools - Youth Assist promotions at local high schools Quarterly Report – June 2015 34 - Collective Impact workshop at the Tasmanian Youth Conference with Mission Australia Community Planning and Development Framework – develop project plan Community Safety Project - Scoping CHAWAC Working Groups – recruitment and priorities Health and Wellbeing Communication through website and social media “One Community Together” Collective Impact project Spatial mapping project Fitness in the Park evaluation Clarence Community Road Safety Partnership review Regional Wellbeing Survey Dog Management Policy review September round of Community Support Grants Clarence Street Collaborative Reference Group Council’s decision is to assess the recommendations of the Group in association with key interest and technical groups. Metro Tasmania, RACT, Department of State Growth, Road Safety Advisory Council and Bicycle Network Tasmania has been invited to form the Technical Advisory Group to consider the 8 recommendations of the Reference Group. The desirability and feasibility of the project will be assessed by this Technical Advisory Group and reported back to Council through a Workshop session early in the new financial year. Seven Mile Beach Sport and Active Recreation Precinct Master Plan Planning has progressed to determine Hobart Airport’s preferred alignment for the extension to Holyman Drive. The result of which will impact on the proposed layout of the sporting facilities proposed in the Master Plan Crown Land Services is progressing the transfer of the remaining Crown Land at 87 Surf Road, Seven Mile Beach to Council. Natone Hill Bushland and Geilston Bay Coastal Reserve Activity Plans Public consultation has recently closed and the results are to be presented to Council at the 3 August 2015 Council meeting. Potters Hill Bush Reserve Activity Plan Consultation Following public consultation the final draft of the Reserve Activity Plan is complete and ready to be presented to Council at the 13 July 2015 Council meeting. Bellerive/Howrah Coastal Reserve Activity Plan Consultation Public consultation has recently concluded with the final draft to be presented to Council at the 13 July 2015 Council meeting. South Arm Oval – Recreation Master Planning Public consultation has recently concluded on the draft Master Plan. The results of the consultation were adopted at the Council meeting on 1 June 2015 with some amendments. Quarterly Report – June 2015 35 A letter has been sent to all the respondents to the Draft Master Plan advising them of the amendments adopted by Council. Clarence High School Sports Ground Funding provided in the 2015/2016 budget will complete the remaining stage of the Little Athletics Field Facilities. Kangaroo Bay Rivulet Track At the Council meeting on 12 January 2015 Council adopted to construct the Kangaroo Bay Rivulet Track. Approvals and quotations have been sought for the safety fencing associated with the track. Tracks and Trails Action Plan Review At its meeting held 1 June 2015 Council adopted the draft Tracks and Trails Action Plan 2015-2020 and resolved to undertake public consultation on the document. An advertisement was placed in the Mercury newspaper on Saturday’s 13 and 20 June 2015 inviting feedback on the draft Tracks and Trails Action Plan. The feedback form can be viewed and downloaded from Council’s website www.ccc.tas.gov.au. The draft Tracks and Trails Action Plan will also be on display at the Council Offices foyer, Rosny Park. The closing date for the return of feedback forms is 10 July 2015 with a report back to Council at its meeting scheduled for 3 August 2015. Simmons Park - Extension Due to the popularity of the new playground, Council has agreed to extend the playground to include additional toddler equipment; 4 bay swing set, small basket swing, combination unit and baby swing set; this work will be funded from the 2015/2016 Capital Works Program. Bellerive Beach Park Master Plan Design has commenced on Stage 1 of the Bellerive Beach Park Master Plan. Council has engaged the services of Child Friendly by Design, led by international play specialist Ms Nikke Gladwin to consult with children across a wide range of ages, abilities and backgrounds with a view to seeking their ideas, creativity and aspirations for the play space. An introductory meeting was held between the consultant and key Council staff on Monday 25 May 2015 which outlined the process of consultation and the key aspects for working with children in relation to this project. Several groups and schools have been approached to participate in this process and included children, parents and teachers. Quarterly Report – June 2015 36 PROSPERITY City Planning Planning Approvals There were 112 development and subdivision applications determined in the quarter, compared with 110 in the previous quarter. Average processing times for development and subdivision were 34 and 38 days respectively. The percentage of discretionary applications lodged under PD4 continues to represent a large portion of the total number of applications lodged. Specifically, PD4 applications make up 25% of all development and subdivision applications lodged this quarter. The following graph illustrates the recent trend for applications lodged. 160 140 120 100 80 PD 4 Applications 60 Total Applications lodged 40 20 0 JanOctJulAprJanMar '12 Dec '12 Sep '13 Jun '14 Mar'15 There were two appeals decided during the April - June quarter - one appeal was withdrawn and one appeal was resolved by Consent Decision. Planning Scheme With the introduction of the Clarence Interim Planning Scheme 2015 all unresolved Planning Scheme amendment applications lodged under the previous Planning Scheme became ineffectual and were consequently cancelled. Quarterly Report – June 2015 37 PLANNING SCHEME AMENDMENTS No. ADDRESS COMMENT STATUS Nil Planning Appeals The status of appeals for the quarter is shown in the table below. PLANNING SCHEME APPEALS No. ADDRESS DESCRIPTION D-2014/131 20 Derwent Avenue, GEILSTON BAY 3 multiple dwellings SD-2014/33 26 Mannata Street, LAUDERDALE 7 lot plus balance subdivision and associated fill D-2015/41 731 Dorans Road, SANDFORD Kennels SD-2015/10 14 Bayside Drive. LAUDERDALE 5 lot subdivision Withdrawn SD-2013/49 116, 226, 238, 254 & 260 Acton Drive, ACTON PARK 3 Lot Subdivision Consent agreement pending STATUS Consent Decision Hearing scheduled July 2015 Consent agreement pending Regional Planning Initiatives The STCA lead the Southern Tasmanian Regional Planning Project, which resulted in the regional strategy and the development of consistent planning schemes, including the draft Interim Clarence Planning Scheme. This interim scheme was finalised during the quarter and information received that it would come into force as the Clarence Interim Scheme on 1 July 2015. Other Planning Initiatives The process for electronic lodgement of planning applications has progressed in this quarter with around 80% of all planning applications lodged electronically. While this project is continuing to work towards full electronic internal, ongoing improvements and additional processes, such as those necessitated by the Land Use Planning and Approvals Amendment Quarterly Report – June 2015 38 (Streamlining of Process) Act 2014, have also been developed and the new deadlines are being achieved. Requests for Preliminary Planning Assessments Council continues to offer a free preliminary assessment service for new proposals, to assist prospective developers determine whether applications are required; how to deal with variations; and to refine their plans generally. This is often a complex assessment process, particularly where PD4 proposals are involved. The following chart shows there continues to be a high level of usage. 250 200 150 100 50 0 Jan-Jun 13 Jul-Dec13 Jan-Jun 14 Jul-Dec14 Jan-Jun 15 Economic Development Kangaroo Bay Project Civil construction works in relation to the Rosny Hill Road junction upgrade were largely completed by the end of June 2015. Construction of the realigned Kangaroo Bay Drive was 60% completed. Work commenced on the Alma Street extension to Kangaroo Bay Drive and the installation of traffic lights at the Cambridge Road junction. Work continued on the urban design and landscaping elements of the project, including the parklands precinct. Stage 1 of the request for proposals process for development within the new Kangaroo Bay development parcels was in progress. A development application was prepared for Stage 2 of the Kangaroo Bay foreshore promenade linking to Rosny College and the proposed new sportsfield changerooms. Rosny Hill Nature Recreation Area Further assessment by Council of a proposal in relation to the expression of interest process for Rosny Hill nature recreation area awaited the results of a public consultation process conducted by the proponent. Quarterly Report – June 2015 39 Tourism, visitor and leisure-based industries and infrastructure Marketing was undertaken within various visitor promotion publications, including the winter marketing campaigns of regional publications. Business advisory services and networking A grant funding agreement was established with the Department of State Growth in regard to State funding for the delivery of enterprise services through Business East Inc. Regional development A general meeting of the South East Region Development Association Inc. (SERDA) was held at Sorell on 16 April 2015, attended by representatives of Sorell, Tasman, Glamorgan/Spring Bay and Clarence Councils. Issues discussed included the commencement of a South-east region infrastructure development study. A Regional Development Australia (RDA) economic forum was attended at Brighton on 16 June 2015. Council business support services On-going business support and assistance service to clients seeking to develop or expand business in Clarence was provided during the quarter. Assistance included the provision of: - advice on Council strategies and projects that may impact upon proposals; information on planning scheme processes and provisions; information on local area and regional industry development strategies; and referrals to business assistance and advisory services if required. Quarterly Report – June 2015 40 FINANCIAL MANAGEMENT The performance against budget for the quarter is detailed in individual program reports and overall results for the quarter were favourable. Operational revenue and expenditure Aggregate revenue is below budget, however this relates only to timing issues – underlying revenue exceeds budget expectations by approximately $250,000. The underlying result is primarily due to court costs being awarded to Council but which were not budgeted for, and strength in building and plumbing. Three major timing issues have resulted in revenues appearing to be below budget. The first is receipt of some $2.6 million (from a total of $5 million) from the Australian Government relating to the Kangaroo Bay redevelopment being delayed until the 2015/2016 year. In addition, a $500,000 contribution towards the Kangaroo Bay Oval change/club room facility had been included in the estimates. Council approved the terms of a deed relating to this during 2014/2015; a payment of $650,000 is due early in 2015/2016. Offsetting these two matters has been advance payment of approximately $1.3 million in Grants Commission funding relating to the 2015/2016 year; this was received on 30 June 2015 and, under the accounting standards, must be recognised in the 2014/2015 year. Expenditure is favourable across all program areas. Governance has savings in salaries, lower than estimated audit costs, and timing of the strategic plan review (now in 2015/2016). Favourable expenditure in City Future is related to salary and consultant costs, including the Lauderdale Structure Plan (which has been funded over two years), economic development (Business East funding), and low expenditure on the planning scheme. Communities and People (other) displayed a substantial favourable result throughout the year, due to employee costs being below budget and numerous other projects also below expectations, including projects in Health, Community Development, Community Arts and Youth. Communities and People (Active & Passive Recreation) also has a favourable result, including the contract for the maintenance of Clarence High Oval only commencing at the beginning of January 2015 and energy costs at the Clarence Pool remain below budget expectations, as is sports ground remediation. Stormwater costs are below budget mainly due to inspection and repairs costs being well below budget, together with a range small projects. Collection and recycling costs in Natural Environment are under budget, but may be adjusted by year end accruals. The Roads program is also performing favourably in financial terms, primarily due to sealed/unsealed road maintenance costs and street lighting charges being below expectations. Quarterly Report – June 2015 41 Facilities Management is favourable due to a range of minor variances, the largest being water rates and vandalism. Capital Works Program A schedule providing full details of the current position of the Capital Expenditure Program has been included as part of this report. Other Cash flows and liquidity remain strong, as indicated by the accompanying balance sheet. This is consistent with both long term trends and Council’s adopted 10 Year Financial Management Plan. Supplementing this, and following work undertaken by Council’s Audit Panel, the Governance graphs now include the indicator “Net Financial Liabilities Ratio” which shows net financial liabilities as a proportion of recurrent income. The Auditor General has an indicative benchmark, this ratio being zero, although notes that the range -50% to 0 is acceptable. Council’s ratio is significantly above these benchmark levels. Under the 10 Year Financial Management Plan it is expected to reduce modestly, consistent with the combination of cash being utilised for infrastructure renewal and conservative assumptions around financial liabilities. Quarterly Report – June 2015 42 Clarence City Council Interim Balance Sheet as at 30 June 2015 30 June 2015 $000 Cash and Investments Receivables * Prepayments Other Current Assets Total Current Assets 30 June 2014 $000 55,925 7,395 287 135 63,742 53,764 3,223 498 432 57,917 Land Buildings Roads Waste Management Drainage Plant and Equipment Parks Equipment Work in Progress Receivables Ownership Interest in Associates Investment in Southern Water Total Noncurrent Assets 67,096 28,025 175,125 722 81,029 1,572 7,564 21,727 0 1,776 162,511 547,148 67,096 28,351 182,658 745 82,968 1,845 8,395 5,337 1,756 1,776 162,511 543,438 Total Assets 610,889 601,355 Creditors and Borrowings Provisions Total Current Liabilities (2,810) (1,905) (4,716) (5,845) (3,683) (9,528) Borrowings Provisions Total Noncurrent Liabilities (703) (538) (1,241) (542) (538) (1,080) Total Liabilities (5,957) (10,608) Total Net Assets 604,933 590,747 Accumulated Surplus Reserves (417,984) (186,949) (403,775) (186,972) Total Equity (604,933) (590,747) Page 43 Clarence City Council Summary of Programme Performance Recurrent Expenditure and Income 1 July 2014 to 30 June 2015 Expenses Budget Budget YTD Actual Variance $000 $000 $000 $000 Employee Costs Plant Hire Materials Contracts Depreciation Loan Interest Other 15,269 2,287 2,062 9,421 5,962 37 15,866 15,269 2,287 2,062 9,421 5,962 37 15,866 14,824 2,299 1,655 9,148 5,962 35 14,786 445 (12) 407 273 2 1,080 Total Expenses 50,904 50,904 48,709 2,195 Rates Fees and Charges Grants Interest Other 43,738 3,440 11,746 2,238 5,192 43,738 3,440 11,746 2,238 5,192 43,805 3,593 9,902 2,155 5,355 (67) (153) 1,844 83 (163) Total Revenues 66,354 66,354 64,810 (1,544) (15,450) (15,450) (16,101) Revenues Net Total 651 Note: (1) Annual budget shows surplus due to effect of Capital Expenditure Programme and loan principal Page 44 governance GOAL Representing the community through leadership in a consistent, accountable and financially OBJECTIVES & STRATEGIES n To provide a clear strategic direction for the future of the City n To provide leadership in representing the interests of the City n To actively engage the community in Council activities and issues n To ensure the operations of the Council are conducted in a responsible and accountable manner n To pursue excellence in all its activities PROGRAMS Governance includes the following programs and activities: Leadership, strategy & policy Statutory reporting & performance measurement Communications & consultation Finance FINANCIAL RESOURCES Expenses Employee Costs Plant Hire Materials Contracts Depreciation Loan Interest Other Total Expenses Revenues Rates Fees and Charges Grants Interest Other Total Revenues Net Total CAPITAL TRANSACTIONS Asset Purchases Loan Principal Repayments Borrowings Transfer to Reserves Transfer From Reserves Variations From Operating Plan BUDGET 1,435 69 93 37 7,318 8,952 BUDGET TO DATE ACTUAL TO DATE 1,435 69 93 1,308 69 37 7,318 8,952 35 7,260 8,796 124 37,385 230 2,216 3,965 43,796 (34,844) 37,385 230 37,443 290 2,216 3,965 43,796 (34,844) 2,115 3,951 43,799 (35,003) 161 5,702 185 161 5,702 185 161 5,702 185 VARIATION 127 (31) 2 58 156 58 60 (101) (14) 3 159 - Page 45 Page 46 Jul Apr Mar Feb Jan Dec Nov Oct Sep 1 STATE RANKING 1 95% 65% 2002 1 97% 70% 2003 2 81% 63% 2004 3 85% 61% 2005 1 94% 68% 2006 1 96% 67% 2007 1 99% 69% 2009 COMMENTS Note - In 2004 CMP introduced more rigrous audit substantiation criteria. Assessments now carried out every 2 years. 98% CLARENCE 2001 Clarence Risk Management Assessments vs State Average 70% Aug STATE AVERAGE 0% 20% 40% 60% 80% 100% 120% COMMENTS 0% 10% 20% 30% 40% 50% 60% 70% 1 Jun 98% 79% 2012 COMMENTS 400 500 600 700 800 900 1,000 1,100 1,200 1,300 1,400 1,500 COMMENTS 0 1 2 3 4 5 6 7 8 Aug Jul-14 80% Current Year Last Year Requests Rec'd Incoming Correspondence Volume Oct Sep-14 90% Sep Aug-14 Right to Information Requests Nov Oct-14 9 Dec Nov-14 Level of Attendance at Council Meetings Apr Mar-15 100% May Apr-15 Governance Jan Dec-14 Jul Jun-14 Feb Jan-15 Mar Feb-15 0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100% % comp by stat time Jun May-15 governance Jun-15 May Page 47 COMMENTS: Outstanding rates at 30 June broadly flat each year, however a slight increase at June 2015. A range of actions has recently been agreed through the Audit Panel to assist in addressing the level of outstanding rates. -8% -6% -4% -2% 0% 2% 4% 6% 8% 10% 12% Proportion of outstanding rates payable COMMENTS: Graph of key indicator now included in Quarterly Report following Audit Panel recommendation. Actuals well above benchmark, with forecasts reflecting 10 year plan. 2016-17 Auditor General 10 Year Plan BenchMark Mar-12 Actual Return Dec-12 Sep-12 Jun-12 Annual Growth in Rates Base COMMENTS: Sharp increase in 06/07 due to completion of Risdon Prison and "catch up" of outstanding valuations through revaluation process. Increase in 08/09 due to Cambridge Park. 0.5% 1.0% 1.5% 2.0% 2.5% 3.0% 3.5% 4.0% Jun-13 Av 30 Day Bank Bill Mar-13 COMMENTS: Interest returns remain above 30 day bills Jun-10 Jun-94 2015-16 10 Year Plan Sep-10 Jun-95 2014-15 10 Year Plan 0% Dec-10 Jun-96 2013-14 1% 10% Mar-11 Jun-97 2012-13 2% 20% Jun-11 Jun-98 2011-12 3% 30% Sep-11 Jun-99 0% 4% 40% Dec-11 Jun-00 0% 5% 50% 6% 60% Jun-01 59% 7% Jun-02 67% Jun-03 70% 8% Jun-04 71% Jun-05 79% Jun-06 80% Jun-07 86% Sep-13 Jun-08 85% Dec-13 Jun-09 90% Mar-14 Jun-10 Return on Investments Jun-14 Jun-11 Net Financial Liabilities Ratio Sep-14 Jun-12 100% Dec-14 Jun-13 Finance Mar-15 Jun-14 governance Jun-15 Jun-15 Page 48 NAB Total, 21,000,000, 43% BankWest Total, 2,000,000, 4% ANZ Total, 4,999,990, 10% CBA Total, 21,000,000, 43% Investment Portfolio Overview 60% 50% 40% 30% 20% 10% 0% governance 96% 4% Proportion of Portfolio 100% Maximum Allowance 50% 0% Maximum Benchmark Actual Holdings to Maximum Holdings by Investment Category Proportion of Portfolio Actual Holdings to Maximum Holdings by Institution 30% Page 49 Levels of attendance at Council meetings Monitoring of Council activities against established benchmarks Budget prepared and adopted before commencement of financial year Number of policies developed and reviewed Preparation of quarterly reports including variations to Budget Submissions Role of Local Government Strategic Action Plan - Premier's Local Govt Council Future of Southern Region Waste Group - Southern Waste Strategy Authority Board Local Government (Meeting Procedures) Regulations - Local Govt Division Policies developed/reviewed Review of actions in Council's previously adopted Economic Development Plan Biennial Parking Survey and Review of Council's Parking Policy and Strategy Annual Report published by November 2014 Newsletters prepared in time to be issued with rate instalments Conduct of ordinary Council meetings, agenda and minutes preparation Governance Key performance indicators and outcomes governance Annual Report presented to Council's Annual General Meeting July 2015 newsletter prepared Agendas and meetings held as scheduled. Minutes of meetings confirmed by Council as required Refer table for details Reporting of KPI's and oucomes provided through Council's Quartely Report 2015/16 Annual Plan and Budget adopted in June 2015 No of policies developed - 1 September, December, March and June Quarterly Reports completed Page 50 Unqualified audit report 1 July issue of rates notices < 5% outstanding rates at 30 June Investment return vs average 30 day bill rate Insurances reviewed and placed by 30 June Invoices processed per FTE Financial Management Key performance indicators and outcomes governance audit report issued on 11 September 2014 notices issued Mon 6 July 2015 5.35% outstanding at end Jun 2015 Actual 3.1%, Average 30 day bills 2.11% All insurance policies reviewed and in place by 30 June 2014 4059 invoices processed per FTE Rates Unqualified corporatesupport PROGRAMS Corporate support includes the following programs and activities: Human resource management Information management Corporate compliance and legal services FINANCIAL RESOURCES BUDGET BUDGET TO DATE Expenses Employee Costs 2,220 2,220 Plant Hire 57 57 Materials Contracts Depreciation Loan Interest Other 2,001 2,001 Total Expenses 4,278 4,278 Revenues Rates Fees and Charges 6 5 Grants Interest Other Total Revenues 6 5 Net Total 4,272 4,273 CAPITAL TRANSACTIONS Asset Purchases Loan Principal Repayments Borrowings Transfer From Reserves 55 55 Variations From Operating Plan The "other" payment in revenue is a reimbursement of court costs. ACTUAL TO DATE 2,173 57 - VARIATION 2,012 4,242 47 (11) 36 14 203 217 4,025 9 203 212 248 55 - Employee Numbers Employee Numbers by Group 120 100 82 82 69 70 80 Last Quarter 60 40 23 23 29 29 20 20 This Quarter 20 Financial Management Customer Services Physical Services Asset Management Governance 0 COMMENTS: Page 51 Page 52 have met contractual obligations and payments are within adopted Availability and integrity of all relevant information systems to meet end user requirements Information Management Provide timely and accurate payroll services consistent with agreement and statutory requirements Provide integrated employee and workers compensation support services to employees and workers compensation staff Provide advice and representation with respect to any industrial dispute, or other dispute related to employment of Council staff Provide management support including salary/wage expenditure reporting, leave reporting and workforce planning services (including position information, recruitment and termination services) Coordinate and develop Council's health and safety management systems, including incident reporting and work practice improvements The Develop, implement and operate consultative mechanisms within Council's various workplaces for each workforce and system integrity at or above acceptable levels during the quarter. Some scheduled down-time due to systems maintenance. Availability are currently 2 open workers compensation claims, with 1 new claim arising during the quarter. One long term workers compensation claim remains unresolved. Rehabilitation plans include 2 plans arising from workers compensation claims, and 1 related to a sick leave matters. Council's payroll was delivered on time and with a high degree of accuracy. All payments, including superannuation and payroll tax, have been met. There were no reportable incidents to Workplace Standards during this period. Council underwent Stage 2 of the Work Health and Safety Certification Audit during this quarter. There the quarter there were 2 resignations and 1 recruitment of permanent employees. During Outdoor Workers Consultative Committee has continued to meet, assisting in the review of a number of work health and safeyt policies and procedures. There were no industrial matters during this quarter. Continued monitoring of Council's enterprise agreement conditions and relevant employment arrangements. Estimates Suppliers Provide a responsive industrial relations framework, including certified agreements & individual employment arrangements for Council employees Human Resources External contracts performing in accordance with requirements and within budget Corporate Management Key performance indicators and outcomes corporatesupport QUARTERLY REPORT 1/4/15 – 30/6/15 The following is a statement of the attendance of Aldermen at Meetings of Council during the Quarter 1 April to 30 June 2015. Alderman Campbell Alderman Chipman Alderman Chong Alderman Cusick Alderman Doust Alderman Hulme Alderman James Alderman McFarlane Alderman Peers Alderman Thurley Alderman von Bertouch Alderman Walker Meetings Held Meetings Attended 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 3 4 4 4 3 4 4 4 4 Page 53 Quarter 48673.18 29560.09 109527.82 13930.26 TOTAL 313.00 1125.00 1675.99 3539.61 1004.81 4211.59 65.00 630.91 789.20 Total Entitlements Telephone Calls - Fax Telephone Rental - Fax Telephone Calls Landline Telephone Calls Mobile Child Care Telephone Rental Landline 100% Telephone Rental Landline 50% Telephone Rental Mobile 100% Telephone Rental Mobile 50% 65.00 393.09 1421.83 2677.07 125.05 173.67 1666.48 Software & Consumables ($500 pa) 797.54 12254.27 45133.57 28555.28 105316.23 3249.44 12121.43 18075.40 66564.21 Internet Access Cab Charge Travelling Expenses Private Vehicle Travelling Expenses Taxi Fares YTD 26630.59 7230.44 26630.59 5023.83 18502.98 Postage Allowance Conferences/Seminars Registration Fees etc Personal Computer and Printer 189.16 Business Cards Plain Paper A4 ($5.40 per ream) Envelopes ($35.00 per box 100) Aldermen's Room Letterhead ($38.75 ream) Total Allowances Mayoral Vehicle Allowances - Mayor Allowances - Deputy Mayor Allowances - Alderman 7230.44 YTD Ald Campbell Ald Chipman Quarter 779.23 10507.93 32530.59 3277.49 5900.00 2498.26 5120.77 779.23 7230.44 26630.59 7230.44 26630.59 YTD Ald Chong Quarter 0.00 10675.43 881.44 557.00 324.44 9793.99 9793.99 YTD Ald Cooper Quarter 0.00 Quarter Quarter YTD YTD Ald Doust Quarter YTD Ald Hulme Quarter YTD Ald James Quarter 73.70 73.70 145.00 1116.58 472.41 1541.82 642.29 1158.60 99.30 222.61 1531.89 359.40 356.88 897.46 5404.18 299.20 1469.20 98.12 222.61 1626.49 59.90 217.63 1452.21 140.00 150.00 473.40 372.73 2341.49 119.85 252.88 1718.09 311.70 2205.99 100.00 252.88 1179.00 1067.86 4049.57 971.80 10099.72 1006.66 36.00 5505.82 72.00 320.00 1910.24 1249.00 225.75 61.72 113.10 388.93 137.00 475.85 2508.90 225.75 113.10 137.00 239.60 971.80 357.00 14.00 3249.44 16375.85 798.16 1808.36 740.41 0.00 178.10 8116.06 0.00 603.79 404.80 2610.74 1958.23 129.00 0.00 113113.95 12121.43 2579.81 5100.92 1661.59 0.00 214.10 18293.15 99.30 1143.61 2369.64 11831.27 2385.23 574.00 396.36 17.50 416755.70 10643.37 7687.89 17765.51 9928.63 31796.64 7230.44 18365.57 8696.75 31329.70 8127.90 32034.77 849.38 9793.99 7603.17 28972.08 7230.44 17904.46 11280.01 36730.31 7706.29 29139.49 129489.80 465882.91 49127.21 65.44 0.00 1528.97 1466.31 4699.11 282.93 971.80 350.00 26630.59 7230.44 26630.59 18502.98 66564.21 65.44 928.91 2698.19 5166.05 150.00 884.46 1500.06 215.43 1595.03 2475.71 97.20 370.22 129.00 96.06 9793.99 7230.44 26630.59 7230.44 16836.60 7230.44 5023.83 18075.40 86765.28 YTD 319567.08 Total Quarter 81.47 457.45 100.00 172.34 185.11 70.00 204.24 0.00 YTD Ald Walker Quarter 26630.59 7230.44 26630.59 YTD Ald von Bertouch Quarter 81.47 105.24 84.39 80.00 90.84 342.00 96.06 17.50 9793.99 7230.44 16836.60 7230.44 26630.59 7230.44 16836.60 7230.44 26630.59 7230.44 26630.59 YTD Ald Thurley Quarter 9793.99 7230.44 26630.59 7230.44 16836.60 7230.44 Ald McFarlane AldMcManus Ald Peers Quarter YTD Quarter YTD Quarter YTD 9793.99 7230.44 16836.60 7230.44 26630.59 7230.44 16836.60 7230.44 26630.59 7230.44 26630.59 YTD Ald D Cusick Ald P Cusick ALDERMAN ALLOWANCES AND ENTITLEMENTS 1/4/15 - 30/6/15 communitiesandpeople GOAL Participate, celebrate, engage and contribute to life and growth of the City OBJECTIVES & STRATEGIES n To enhance the health, wellbeing, safety and accessibility to services for all people in the community n To enhance and increase the opportunities for all people in the community to participate in recreational activities n To enhance and increase the opportunities for all people in the community to participate in cultural and social activities n To create a community focal point for the City n To identify and respond to specific needs of different age groups within the community n To increase awareness and participation in community affairs, activities and events PROGRAMS Communities and people includes the following programs and activities: Public & environmental health, Child care services, Youth services Community arts, Community development, Positive ageing Animal control, Parking control, Volunteer assistance services Active recreation, Passive recreation, Civic activities & events Customer services FINANCIAL RESOURCES Expenses Employee Costs Plant Hire Materials Contracts Depreciation Loan Interest Other Total Expenses Revenues Rates Fees and Charges Grants Interest Other Total Revenues Net Total CAPITAL TRANSACTIONS Asset Purchases Loan Principal Repayments Borrowings Transfer From Reserves Variations From Operating Plan BUDGET TO DATE ACTUAL TO DATE 2,728 220 155 75 1,162 4,340 2,728 220 155 75 1,162 4,340 2,693 221 92 50 837 3,893 35 (1) 63 25 325 447 466 51 364 881 3,459 463 51 364 878 3,462 474 39 403 916 2,977 11 (12) 39 38 485 115 103 115 103 103 BUDGET VARIATION 115 - Page 55 communitiesandpeople - active & passive recreation GOAL Participate, celebrate, engage and contribute to life and growth of the City OBJECTIVES & STRATEGIES n To enhance the health, wellbeing, safety and accessibility to services for all people in the community n To enhance and increase the opportunities for all people in the community to participate in recreational activities n To enhance and increase the opportunities for all people in the community to participate in cultural and social activities n To create a community focal point for the City n To identify and respond to specific needs of different age groups within the community n To increase awareness and participation in community affairs, activities and events PROGRAMS Communities and people includes the following programs and activities: Public & environmental health, Child care services, Youth services Community arts, Community development, Positive ageing Animal control, Parking control, Volunteer assistance services Active recreation, Passive recreation, Civic activities & events Customer services FINANCIAL RESOURCES BUDGET BUDGET TO DATE ACTUAL TO DATE VARIATION Expenses Employee Costs 1,655 1,655 1,629 26 Plant Hire 588 588 573 15 Materials 596 596 465 131 Contracts 1,259 1,259 1,278 (19) Depreciation Loan Interest Other 570 570 448 122 Total Expenses 4,668 4,668 4,393 275 Revenues Rates Fees and Charges 409 409 387 (22) Grants 1,888 1,888 1,774 (114) Interest Other 187 187 157 (30) Total Revenues 2,484 2,484 2,318 (166) Net Total 2,184 2,184 2,075 109 CAPITAL TRANSACTIONS Asset Purchases 10,893 10,893 3,855 7,038 Loan Principal Repayments Borrowings Transfer From Reserves 2,564 2,564 2,564 Variations From Operating Plan Grants affected by $500K which is funds from Cricket Tasmania - to be paid July 2015, however half of 2015/16 Grants Comm rec'd in advance $407K. Therefore net loss in grants of $93K Page 56 communitiesandpeople - self funded GOAL Participate, celebrate, engage and contribute to life and growth of the City OBJECTIVES & STRATEGIES n To enhance the health, wellbeing, safety and accessibility to services for all people in the community n To enhance and increase the opportunities for all people in the community to participate in recreational activities n To enhance and increase the opportunities for all people in the community to participate in cultural and social activities n To create a community focal point for the City n To identify and respond to specific needs of different age groups within the community n To increase awareness and participation in community affairs, activities and events PROGRAMS Communities and people includes the following programs and activities: Public & environmental health, Child care services, Youth services Community arts, Community development, Positive ageing Animal control, Parking control, Volunteer assistance services Active recreation, Passive recreation, Civic activities & events Customer services FINANCIAL RESOURCES Expenses Employee Costs Plant Hire Materials Contracts Depreciation Loan Interest Other Total Expenses Revenues Rates Fees and Charges Grants Interest Other Total Revenues Net Total CAPITAL TRANSACTIONS Asset Purchases Loan Principal Repayments Borrowings Transfer From Reserves Variations From Operating Plan BUDGET TO DATE ACTUAL TO DATE 1,477 32 10 1,817 3,336 1,477 32 10 1,817 3,336 1,486 32 1,702 3,220 (9) 10 115 116 948 2,159 22 185 3,314 22 948 2,159 22 185 3,314 22 914 2,213 40 149 3,316 (96) (34) 54 18 (36) 2 118 - - BUDGET - - VARIATION - Page 57 Page 58 This Year Last Year Numbers of Immunisations Administered Dog Complaints Received This Year Last Year COMMENTS: Dog Complaints consisted of: - At Large (172), Barking (100), Attack 23), Other (20) for this quarter. 50 60 70 80 90 100 110 120 130 Environmental Health Complaints This Year Last Year OSHC - This Year Outside School Hours and Holiday Care Holday Care - This Year OSHC - Last Year Holiday Care - Last Year COMMENTS: Average number of children in care per month - April (After School - 195 & Holiday Care - 57), May (158) and June (172) 0 50 100 150 200 250 COMMENTS: Majority of complaints related to Noise (19), Pollution (15), Litter (8), other (5), Food (4), Onsite (2), Building (2), Premises (1). 0 5 10 15 20 25 30 35 40 communities and people COMMENTS: Regular immunisation and school clinics have been well attended. 1021 immunisations administered this quarter. 0 200 400 600 800 1000 1200 1400 Jul-12 Jul-14 Jul-14 Jul-14 Aug-14 Aug-14 Aug-14 Aug-14 Sep-14 Sep-14 Sep-14 Sep-14 Oct-14 Oct-14 Oct-14 Oct-14 Nov-14 Nov-14 Nov-14 Nov-14 Dec-14 Dec-14 Dec-14 Dec-14 Jan-15 Jan-15 Jan-15 Jan-15 Feb-15 Feb-15 Feb-15 Feb-15 Mar-15 Mar-15 Mar-15 Mar-15 Apr-15 Apr-15 Apr-15 Apr-15 May-15 May-15 May-15 May-15 Jun-15 Jun-15 Jun-15 Jun-15 Page 59 Aug-14 Jul-14 Jul-14 This Year Last Year Volunteer Hours Volunteer Hours - TY Volunteer Hours - LY COMMENTS: Volunteer hours for the quarter - April (235), May (253), June (161). 0 50 100 150 200 250 300 350 Aug-14 COMMENTS: Average attendance figures - April (30), May (29.6) June (30). 0 5 10 15 20 25 30 Sep-14 Sep-14 Avg EFT by Month Weekly Avg Children in Care Jun-15 May-15 Apr-15 Mar-15 Volunteers - Transport Trips Transport - This Year Transport - Last Year COMMENTS: Total transport trips - April (113), May (104), June (72) 0 20 40 60 80 100 120 140 160 180 200 COMMENTS: Average number of children in care - April (341), May (332) June (335). 0 50 100 150 200 250 300 350 400 Jul-14 Jul-14 Oct-14 Oct-14 Aug-14 Aug-14 Nov-14 Nov-14 Sep-14 Sep-14 Dec-14 Dec-14 Oct-14 Oct-14 Jan-15 Jan-15 Nov-14 Nov-14 Feb-15 Feb-15 Dec-14 Dec-14 Mar-15 Mar-15 Jan-15 Jan-15 35 Feb-15 Apr-15 Apr-15 Family Day Care Average Placements Mar-15 May-15 May-15 450 Apr-15 Attendance at Rosny Child Care Centre May-15 40 Jun-15 Jun-15 Feb-15 communities and people Jun-15 Page 60 Jul-Sep 14 Number of Volunteers Apr-Jun 15 Jan-Mar 15 Oct-Dec 14 Apr-Jun 14 Oct-Dec 13 Participation Levels at Community Arts Activities & Events This Year Last Year COMMENTS: Participation levels at Community Arts events & Activities - April (1683), May (2838) and June (1691). 0 500 1000 1500 2000 2500 3000 3500 COMMENTS: The Volunteer Service is currently assisting an average of 87 clients by 35 active volunteers. Number of clients Exhibitions The Barn Visitor numbers to Exhibitions and the Barn This Year Last Year Visitors to Rosny Farm COMMENTS: Visitor numbers to Rosny Farm - April (1402), May (2555) and June (1420). 0 500 1000 1500 2000 2500 3000 3500 COMMENTS: Visitor numbers to Exhibitions in the Gallery & Barn - April (1370) May (1030) and June (1420). 0 500 1000 1500 2000 Jul-14 Jul-14 Jul-Sep 13 Jul-14 2500 Aug-14 0 Aug-14 Sep-14 Sep-14 20 Sep-14 Oct-14 Oct-14 Jan-Mar 14 Oct-14 Nov-14 Nov-14 40 Nov-14 Dec-14 Dec-14 60 Dec-14 Jan-15 Jan-15 80 Jan-15 Feb-15 Feb-15 100 Feb-15 Mar-15 Mar-15 120 Mar-15 Apr-15 Apr-15 Volunteer Services Assistance Apr-15 May-15 May-15 140 May-15 Aug-14 communities and people Jun-15 Jun-15 Jun-15 Page 61 Jul-14 This Year Last Year Youth Participation levels at supervised recreation activities Warrane/Mornington This Year Last Year COMMENTS: Attendedance at the program in April (30), May (52) and June (95). 0 10 20 30 40 50 60 70 80 90 100 Jul-14 COMMENTS: Attendedance at the program in April (28), May (23) and June (45). 0 20 40 60 80 100 120 140 Youth Participation levels at supervised recreation activities - Risdon Vale This Year Last Year Youth Participation levels at other activities This Year Last Year COMMENTS: Over 2150 students attended the in-school Youth Week festivities at Rose Bay, Clarence and Rokeby High Schools and Rosny College. 0 500 1000 1500 2000 2500 3000 COMMENTS: Attendedance at the program in April (46), May (89) and June (112). 0 20 40 60 80 100 120 Jul-14 Aug-14 Aug-14 Aug-14 Aug-14 Sep-14 Sep-14 Sep-14 Sep-14 Oct-14 Oct-14 Oct-14 Oct-14 Nov-14 Nov-14 Nov-14 Nov-14 Dec-14 Dec-14 Dec-14 Dec-14 Jan-15 Jan-15 Jan-15 Jan-15 Youth Participation levels at supervised recreation activities - Clarence Plains Jun-15 Jun-15 Feb-15 Feb-15 Feb-15 Feb-15 Mar-15 Mar-15 Mar-15 Mar-15 Apr-15 Apr-15 Apr-15 Apr-15 May-15 May-15 May-15 May-15 Jul-14 communities and people Jun-15 Jun-15 Page 62 Improve service coordination and childcare options and viability Maintain accreditation, licencing and registration requirements Family Day Care Review Customer Service Charter Implementation of the customer service module (Pathway) for tracking customer contacts Customer Service Review food risk management regime and contaminated sites register Develop an Environmental Health Plan Provide timely and relevant information Conducting immunisations according to schedule Number of onsite wastewater inspections Response time for sampling of food and water - average 48 hours Participation levels in food handler training sessions Environmental Health Services Response time to urgent dog complaints - 24 Hours / 7 Days a week Response time to routine dog complaints - 1 working day Review the Dog Management Policy Respond to public complaints and provide information to assist with weed eradication within the City Provide timely and relevant information Implement Hand Held Devices Ranger Services Key performance indicators and outcomes communitiesandpeople calls responded to within time frame. calls responded to within time frame. The Dog Management Policy review commenced in June. Council officers respond to complaints and carry out inspections. Letters are sent to property owners to abate the nuisance. DogNews and registration renewals went sent to all registered dog owners in Devices are in the process of beign upgraded to include dog infringements. properties were inspected during this quarter through the 337 process. of target achieved over last quarter. 372 participants completed the on-line food handler training program and 62 participants attended Food Handlers training sessions run by Council Environmental Health Officers Community and school clinics continue to be well attended. 1021 vaccinations administered this quarter. The Autumn edition of Food News was distributed to all registered food premises. Review on-going. The draft Plan is yet to be finalised policy has been implemented. review undertaken. The Centre has gained an “Exceeding National Quality Standard” overall rating following the Assessment and Ratings visit. The scheme is preparing for an Assessment and Rating visit from an assessor with the Education and Care Unit scheduled for April. ICT Revised 100% 42 All All Page 63 Continue the Live Well, Live Long Project Recruit new volunteers Review Volunteer Program Continue implementation of the 'Planting Ahead' Project Clarence Community Volunteer Service Provide timely and relevant information Review the Youth Plan Participation levels at supervised youth recreational activities and alternative learning programmes at Clarence Plains Participation levels at supervised youth recreational activities and alternative learning programmes at Warrane/Mornington Participation levels at supervised youth recreational activities and alternative learning programmes at Risdon Vale Participation levels at supervised recreational activities at other areas Participation Levels - Youth Network Advisory Group Youth Services Improve service coordination and childcare options and viability Maintain accreditation, licencing and registration requirements Outside School Hours Care & Vacation Care Improve service coordination and childcare options and viability Develop garden at Rosny Childcare Centre Maintain accreditation, licencing and registration requirements Rosny Child Care Centre Key performance indicators and outcomes communitiesandpeople total of 177 attendances in this quarter. total of 247 attendances in this quarter. A A active clients. 35 volunteers. to be reviewed in 2015. Gardening volunteers continue to assist clients through the 'Planting Ahead' program. There continues to be a waiting list for gardening services and the books are currently closed. The Live Well, Live Long project is continuing in 2015. Program 87 An total of 1545 attendances to other activities this quarter. average of 10 attendances at Youth Network Advisory Group meetings each fortnight. The review of the Plan has commenced with consultations with local high schools. Youth Services Program, Youth Assist and YNAG regularly promoted through local primary and high schools. A total of 96 attendances in this quarter. A Centres that have had their Rating and Assessment visits have received an overall rating of working toward or meeting the National Quality Standard. Approval has been given to operate a new service at Emmanuel Christian School to commence in Term 4. The Centre has been awarded an “Exceeding National Quality Standard” overall rating following the Assessment and Ratings visit, . Numbers of children in care remain steady. Commencement due to start in July 2015 The Page 64 Number of Visitors to Rosny Farm Review Cultural History Plan Implement the revised Cultural Arts Plan including Public Art works Conduct ANZAC exhibition and Edward Abbott celebration. Review the Community Grants Policy and Guidelines Publish Community Directory Implement Community Health & Wellbeing Plan Review Anti-Graffiti project Implement the revised Access Plan Implementation the revised Positive Ageing Plan Community Development Develop business case for use of Council buildings in Bellerive. Identify and develop opportunities for the acquisition and installation of public art within the City. Level of community participation in arts, crafts, cultural & heritage activities Level of involvement in assisting community groups with cultural activities and applying for grants Number of exhibitions, and activities held at Rosny Historic Centre Community Arts Key performance indicators and outcomes communitiesandpeople total of 6212 attendances at arts and cultural activities city wide. Bonsai Society held their annual display in the Barn in May. Clarence Positive Ageing Committee (CPAAC) continue to implement the Plan. The Disability Access Advisory Committee (DAAC) are working together to implement the plan. Committee has been established to implement the Plan. Working collaboratively with community, schools, Police & Youth Justice to continue a multi-faceted approach to reducing illegal graffiti. The 2015/2016 edition of the Community Directory has been updated and sent to residents. Draft changes to Partnership Grants eligibility and constitution to go to Council for adoption. The The were 5377 visitors to the Rosny Farm. Cultural History Plan is to be reviewed in 2015. Community Arts staff working on implementing the actions of the Plan. Councilcurating a major exhibition in April the "Centenary of Anzac: Service at Home and Abroad" to mark the Centenary of Anzac Business case is to be developed. Work on commissioning a public artwork for Bellerive Community Arts Centre is being developed. There held at the School House Gallery and The Barn included 'Exquisite' - Christine Scott, 'Exposure' - Life Without Barriers, 'Poster Competition ' Local schools, 'Dying is an Art' - Mary Bailey, 'Embracing Diversity' - Hunter island Press, 'Back Country' - India Flint, 'Centenary of ANZAC' - Clarence Council and 'Laundry of the Terminal Psyche' - Douglas McManus. Exhibitions The A Page 65 Cleaning change rooms in accordance with hiring roster Undertake risk management inspections and document / report on a scheduled basis and repair as required Removing litter as required when on site and as per works orders Replace synthetic wickets on a three-year cycle Repair synthetic wickets as necessary Replace goal posts as necessary Undertake maintenance to address change of seasonal sports code Ensure all built facilities within Council maintained areas comply with relevant Legislation As the need arises convert unused active recreation areas to parkland with turfed areas, trees, seating and walking paths Ensure all built facilities within Council maintained areas comply with relevant Legislation Maintenance: Undertake a maintenance program for topdressing, coring, fertilising, spraying, irrigating and over-seeding on a scheduled basis Mow and line-mark sports grounds (on average) on a weekly basis Renovate one oval per year Provide gender specific facilities including change rooms, toilets, showers to meet identified and affordable needs of the community Development: Develop playing facilities suitable for organised sport Active Recreation Key performance indicators and outcomes communitiesandpeople works being undertaken. Compliance Ongoing Ongoing Ongoing Ongoing Ongoing Ongoing Ongoing Wentworth works being undertaken. Park Touch Football fields ground renovation works completed. renovation workscompleted for winter sports. Ongoing Oval Compliance High School Oval Stage 1 athletic field facilities constructed. Kangaroo Bay Oval extension works completed. Geilston Bay High Schopol Oval upgrade complete Clarence High School Change Rooms Complete - Certificate of Occupancy Issued. Wentworth Park Change Room upgrade. Development application approved, building plans lodged for assesment. Active participation increasing no conversion proposed at this stage. Clarence Page 66 In regional parks provide play equipment, shade / sheltered areas and picnic / BBQ and Public Toilet facilities (scope of facilities dependant upon population serviced) Develop neighbourhood parks to meet future requirements of parkland with turfed areas, trees, seating and in larger parks walking paths Remove play equipment assessed as Non Compliant Ensure all built facilities within Council maintained areas comply with relevant Legislation Maintenance: Mow broad acre lawns on average once a month except high profile areas that are mown on a fortnightly basis Undertake risk management inspections and document / report on a scheduled basis and repair as required Remove mid-story and dead / dying vegetation and replace as programmed Mulch high profile areas / garden beds on average each year Mulch other areas as necessary Council offices – flower beds replaced twice a year, mow lawn weekly and fertilise twice a year Control weeds and pests to maintain healthy vegetation Remove litter as required when on site and as per works orders Undertake external play equipment audit twice a year and repair as required Development: Regional Park Development - Stage 1 icon/concept park Establish minor regional parks at Clarendon Vale, Clifton Beach, Cremorne, Lauderdale, Opossum Bay, Oakdowns, Risdon Vale, Richmond, Rokeby, Seven Mile Beach, South Arm, and Tranmere Park Stage 2 contract works completed. works in Clarendon Vale Social Heart completed Ongoing Ongoing Ongoing Ongoing Ongoing Ongoing Ongoing Ongoing Ongoing Ongoing Ongoing Planning Play and ordering of park furniture is ongoing. Plan for South Arm Oval adopted equipment installation for Barana Park, Carbeen Play Park and Risdon Vale Park is completed. Master Landscaping Simmons Passive Rec: Regional & Neighbourhood Parks, Ancillary Properties and Council Offices Key performance indicators and outcomes communitiesandpeople Page 67 IPM Safety Grand Opening Opening of new Houston's Farm Facility Regional Cabinet Meeting and Community Luncheon Lindisfarne RSL pre-ANZAC Day Book Launch War Memorial Inaugural Service - Cambridge Memorial Oval Attended various ANZAC Day services Centacare Group Home Opening - Geilston Bay Public Forum - Rosny Hill Volunteer Recognition Afternoon Tea Official Launch of the Richmond Farmers and Makers Market Launch of Racism - It Stops With Me Clifton Beach Surf Club Annual Dinner and Awards Night Coal River Valley Historical Society - Presentation by students re ANZAC Centenary Roches Beach Walk and Talk Opening of Extension to Sea Rescue Tasmania Facility Wildcare Deslacs Sign Launch South Arm Memorial Wall Blessing and Annual Lunch Opening various exhibitions at Schoolhouse Gallery Civic Functions, Openings Conducted/Attended: Implement the Events Plan including establishing an Arts/Events website, growing Jazz Festival and improving marketing/promotion Civic Activities and Events - Key Outcomes Key performance indicators and outcomes communitiesandpeople Arts/Events website is now operational. Youth Week Roadshow - Rokeby High School Youth Week Roadshow - Rosny College Anzac Day: Rosny Park Anzac Day: Lindisfarne Anzac Day: Richmond Anzac Day: South Arm Youth Week Roadshow - Clarence High School Barn Market World Games Day - Blundstone Arena Skateboard Hub - Geilston Bay Events/Festivals/Fairs Conducted: The cityfuture GOAL Plan, lead and provide for the growth of the City OBJECTIVES & STRATEGIES n Provide for and encourage land use planning based on community values and needs n To encourage broadly based economic growth within the City n To maximise the economic benefits of tourism n To enhance the vibrancy and profile of the City PROGRAMS City future includes the following programs and activities: Integrated assessment (Planning, subdivision, building, plumbing) Statutory planning FINANCIAL RESOURCES Expenses Employee Costs Plant Hire Materials Contracts Depreciation Loan Interest Other Total Expenses Revenues Rates Fees and Charges Grants Interest Other Total Revenues Net Total CAPITAL TRANSACTIONS Asset Purchases Loan Principal Repayments Borrowings Transfer To Reserves Transfer From Reserves Capital Contributions (POS etc) Variations From Operating Plan BUDGET BUDGET TO DATE ACTUAL TO DATE VARIATION 1,925 77 661 2,663 1,925 77 1,852 77 661 2,663 258 2,187 73 403 476 1,133 50 10 1,193 1,470 1,133 50 10 1,193 1,470 1,241 50 10 1,301 886 108 108 584 - 25 160 25 208 - 25 160 48 Page 68 Page 69 0 10 20 30 40 50 60 70 46 27 September 51 November 23 30 January Jul-13 Nov-13 Mar-14 Building Applications 41 37 50 37 May 40 Nov-14 Mar-15 March Jul-14 23 Planning & Subdivision Approvals Nov-12 Mar-13 July Jul-12 COMMENTS: 0 10 20 30 40 50 60 70 80 90 100 Building COMMENTS: Number of Applications Planning Number of Applications 35 July September November Statutory Timeframe 42 Days January March Planning & Subdivision - Average Processing Time May COMMENTS: 0 January 2 4 6 8 10 June November Apr-13 Sep-13 Statutory Timeframe 7 Days Feb-14 Jul-14 Building Permits - Average Processing Time Dec-14 May-15 COMMENTS: Extensions of time required to enable consideration at the Council meeting. 0 10 20 30 40 50 cityfuture Number of Days Number of Days Page 70 Undertake Plumbing Inspections = 1 day Processing Time for Special Plumbing Permits = < 14 days Plumbing Average processing time for Building Applications under Building Act 2000 = 7 days Processing time Building Certificates = < 12 days Undertake Building Inspections = 1 day Building Average Processing time for Planning Applications = < 30 days Average Processing time for Subdivision Applications = < 35 days Planning Appeal Outcomes Planning Key performance indicators and outcomes cityfuture inspections undertaken within a day of applications over the quarter met the performance target of <14 days processing time 7 days inspections undertaken within a day 100% All All Average Average processing time 3 days processing time = 34 days processing time = 38 days There were 2 appeals decided during the April - June quarter - 1 appeal was withdrawn and 1 appeal was resolved by Consent Decision. Average Average naturalenvironment GOAL To care for the natural environment OBJECTIVES & STRATEGIES n To enhance and protect the City's natural assets n To prepare for the effective management of natural events or emergencies n To promote environmentally sustainable practices n To promote the use and appreciation of the natural environment PROGRAMS Natural environment includes the following programs and activities: Waste management Fire management Natural areas management Emergency management FINANCIAL RESOURCES Expenses Employee Costs Plant Hire Materials Contracts Depreciation Loan Interest Other Total Expenses Revenues Rates Fees and Charges Grants Interest Other Total Revenues Net Total CAPITAL TRANSACTIONS Asset Purchases Loan Principal Repayments Borrowings Transfer From Reserves Variations From Operating Plan BUDGET TO DATE ACTUAL TO DATE 1,185 250 432 5,197 314 7,378 1,185 250 432 5,197 314 7,378 1,134 354 325 5,013 310 7,136 51 (104) 107 184 4 242 4,361 54 282 4,697 2,681 4,361 54 282 4,697 2,681 4,351 52 301 4,704 2,432 (10) (2) 19 7 249 1,092 57 1,092 57 285 57 BUDGET VARIATION 807 - Page 71 Page 72 Callbacks Area monitored, Ha Prescribed Fuel Reduction Burns Fire Management Expenditure Wild fire events Performance Indicators Environmental Management 757 Data Not Available $ 254,871 47,874 3,942 Transfer Stn users Hard Waste Users N/A 479,974 284 1,041 276 N/A Callbacks Callbacks Garbage Bin replacements/repairs Recycling Bin replacements/repairs Green Waste Bin replacements/repairs Green Waste Recycling Collections 997,260 542 263.99 40.54 184.28 220.91 441.57 Cost $/Tonne Kerbside Waste Collection Transfer Station - CSO Recycling Green Waste Hard Waste/E Waste Utilisation Total Collections Garbage Collections 4,943 30% 2,845 347 Environment Recycling (T) Transfer Station % recovery Green waste (T) Hard Waste Collection (T) $ $ $ $ $ 7,993 8,706 22,423 22,423 N/A Total 2012-2013 Waste generation, Tonnes (T) Transfer Station (T) Household Collections (T) No. Kerbside Services Garbage Recycling Green Waste Performance Indicators Waste $ 3 778 291,634 46,955 7,950 979 304 84 111,851 350 478,405 445 1,000,370 824 $232.95 $42.51 $210.52 $241.34 $427.08 4,237 25% 3,624 540 8,955 9,009 22,850 22,611 18,322 Total 2013-2014 2014-2015 $ 3000.00 COMMENTS: 2000.00 5 778 Jul Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Kerbside Garbage Collection 2014-2015 (Tonnes) Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Kerbside Garbage Tonnes Collected 2013-2014 Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Tonnes Collected 2014-2015 Jul Kerbside Recycling Jul Sep Oct Nov Dec Total All Waste 2012-2013 Total All Waste 2014-2015 (YTD) Aug Feb Mar Apr May Jun Total All Waste 2013-2014 Jan Total Kerbside & Transfer Station Waste (Tonnes) Collected from Clarence Households COMMENTS: 0.00 500.00 1000.00 46,914 1500.00 6,900 285,979 0 200 400 600 800 1000 0 100 200 300 400 500 COMMENTS: 1141 389 2500.00 220 139,334 534 506,641 365 1,060,437 842 $210.86 $38.44 $189.96 $254.30 $449.09 4,244 26% 4,134 435 9,194 9,145 23,536 23,045 19,352 Total (YTD) Tonnes Tonnes Tonnes 0 100 200 300 400 500 Tonnes Collected 2014-2015 Tonnes Collected 2012-2013 Tonnes Collected 2013-2014 Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Kerbside Green Waste COMMENTS: 3942 7950 6900 Collections 2013-2014 Collections 2014-2015 COMMENTS: Jun 15 62 Number of Prpoerties Kerbside Hard Waste Collected From Collections 2012-2013 0 1000 2000 3000 4000 5000 6000 7000 8000 9000 Annual Hard Waste Collection Trees Approved for Removal Mar 15 93 4 7 Applications Refused Dec 14 77 4 4 13 Trees Removed for Risk Reasons Sep 14 91 6 13 2 Natural Environment Tree Removal Applications & Enquiries Telephone Enquiries 0 20 40 60 80 100 120 COMMENTS: Kerbside Green Waste Collection Service changed to wheelie bin service as of Nov 2013 Tonnes Number natural environment Total Properties Page 73 Undertake risk management inspections and document / report on a scheduled basis and repair as required Respond to risk management Development: Maintenance: Implement control program for priority weeds identified in Council's adopted weed strategy Support Landcare Coastcare Groups with a $30,000 grants program Remove litter as required when on site and as per works orders Natural Areas Assess all Council properties (excluding those included in the fire management plan) for fire hazard. For those properties considered a fire hazard maintain a fuel reduced zone around the property perimeter annually Review fire management plan once every five years and implement Fire Management Environmental Management Collect bulk hard waste from waste rated properties annually Litterbins in Richmond and Major Shopping areas emptied daily, other litterbins and “Doggy Do” bins emptied twice a week Dispose of waste in accordance with licence conditions Public place facilities recycling Collect green waste from properties receiving the service every four weeks Collect specified recyclables from waste rated properties fortnightly Collect solid waste from waste rated properties weekly Waste Collection & Disposal Key performance indicators and outcomes naturalenvironment completed and plan adopted by Council in 2011 fuel reduction works for 2014 - 2015 completed. Undertaken as necessary Ongoing Ongoing funding applications awarded for 2014-2015 Weed Strategy completed, awaiting broad community consultation Grants Draft Review Scheduled 70 by Copping Refuse Disposal Site Joint Authority. public place recycling bins installed across the City and collected by Veolia for processing. Undertaken - Collection contract with Veolia (2013-2020) operating in accordance with conditions. Waste delivered to the Mornington Park Waste Transfer Station Ongoing - Collection contract (2013-2020) with Veolia. Material delivered to SKM Recycling for processing. Ongoing - Processing contract (2014-2019) with SKM Recycling Ongoing - MWB collection contract with Veolia (2013-2020). Material delivered to the Mornington Park Transfer Station for processing. Annual hardwaste collection undertaken in November 2014. Ongoing. Ongoing Page 74 Work in consultation with relevant agencies and community groups to develop, test and refine emergency response mechanisms Implementation of the Emergency Recovery Plan (ERP) for the City Emergency Management Key performance indicators and outcomes naturalenvironment off. The Two City of Clarence Community Recovery Plan was completed and signed A permanent recovery kit is now located at the South Arm Community Centre. portable recovery kits have been developed and are stored at the Clarence City Council Chambers and Depot An exercise was undertaken in 2014 to test the activation of the South Arm Community Centre as an evacuation and recovery centre, this will include participation by Tasmanian Health Organisation South, SES, Salvation Army, Department of Health and Human Services and other Southern Councils. infrastructure GOAL Infrastructure that underpins and enhances the life and growth of the city OBJECTIVES & STRATEGIES n To ensure that existing infrastructure is maintained and renewed to meet identified service and amenity levels n To provide for infrastructure that meets the future needs of the community PROGRAMS Infrastructure includes the following programs and activities: Roads Drainage Facilities management infrastructureroads FINANCIAL RESOURCES Expenses Employee Costs Plant Hire Materials Contracts Depreciation Loan Interest Other Total Expenses Revenues Rates Fees and Charges Grants Interest Other Total Revenues Net Total CAPITAL TRANSACTIONS Asset Purchases Loan Principal Repayments Borrowings Transfer To Reserves Transfer From Reserves Variations From Operating Plan BUDGET BUDGET TO DATE ACTUAL TO DATE VARIATION 1,827 736 521 1,716 3,700 1,101 9,601 1,827 736 521 1,716 3,700 1,101 9,601 1,813 697 541 1,705 3,700 1,026 9,482 14 39 (20) 11 75 119 30 5,963 117 6,110 3,491 30 5,963 117 6,110 3,491 22 3,434 119 3,575 5,907 (8) (2,529) 2 (2,535) (2,416) 18,578 9,045 18,578 9,045 14,234 9,045 4,344 - Page 75 infrastructurestormwater FINANCIAL RESOURCES BUDGET Expenses Employee Costs 515 Plant Hire 149 Materials 126 Contracts 252 Depreciation 579 Loan Interest Other 24 Total Expenses 1,645 Revenues Rates 1,992 Fees and Charges Grants 1,300 Interest Other Total Revenues 3,292 Net Total (1,647) CAPITAL TRANSACTIONS Asset Purchases* 4,326 Loan Principal Repayments Borrowings Transfer To Reserves Transfer From Reserves Variations From Operating Plan Half of 15/16 grants commission paid in advance BUDGET TO DATE ACTUAL TO DATE 500 111 70 237 579 VARIATION 515 149 126 252 579 24 1,645 26 1,523 15 38 56 15 (2) 122 1,992 1,300 3,292 (1,647) 2,011 1,910 3,921 (2,398) 19 610 629 751 4,326 - 2,713 - 1,613 - Page 76 infrastructurefacilitiesmanagement FINANCIAL RESOURCES BUDGET Expenses Employee Costs 302 Plant Hire 109 Materials 222 Contracts 829 Depreciation 1,683 Loan Interest Other 898 Total Expenses 4,043 Revenues Rates Fees and Charges 164 Grants 53 Interest Other 364 Total Revenues 581 Net Total 3,462 CAPITAL TRANSACTIONS Asset Purchases 1,955 Loan Principal Repayments Borrowings Transfer From Reserves 575 Variations From Operating Plan Half of 15/16 grants commission paid in advance BUDGET TO DATE ACTUAL TO DATE 302 109 222 829 1,683 898 4,043 236 108 162 741 1,683 164 53 364 581 3,462 199 181 363 743 3,094 1,955 575 923 575 907 3,837 VARIATION 66 1 60 88 (9) 206 35 128 (1) 162 368 1,032 - Page 77 Page 78 0 100 200 300 400 500 COMMENTS: $- $200,000 $400,000 $600,000 Roads COMMENTS: Number of Requests Roads Dec Mar Sealed Road Maintenance cost 2014-2015 Cost per quarter Sealed Road Maintenance cost 2013-2014 Cost per quarter Sealed Road Maintenance cost 2012-2013 Cost per quarter Sep Sealed Road Maintenance Cost Potholes Repairs 2014-2015 Jun Jun Potholes Repairs 2013-2014 Mar Pothole Requests2014-2015 Dec Pothole Requests 2013-2014 Sep Pothole Requests and Repairs infrastructure 0 100 200 300 400 Sep Footpath Repairs 2013-2014 Footpath Requests 2013-2014 Dec Footpath Repairs 2014-2015 Footpath Requests 2014-2015 Mar Footpath Requests and Repairs Jun COMMENTS: $- $50,000 $100,000 $150,000 $200,000 Dec Mar Unsealed Road Maintenance cost 2014-2015 Cost per quarter Unsealed Road Maintenance cost 2013-2014 Cost per quarter Unsealed Road Maintenance cost 2012-2013 Cost per quarter Sep Unsealed Road Maintenance Cost Jun COMMENTS: Footpath requests are inspected in accordance with Council's adopted risk assessment for footpath trip hazards. A contract was awarded in July 2014 to undertake inspection and reporting on defects identified in multi purpose pathways and footpaths. This report will determine the repair works to be undertaken based on the defect level (trip size). Number of Requests Page 79 40 35 30 25 20 15 10 5 0 Dec Gravel Road Graded 2014-2015 Gravel Road Graded 2012-2013 Sep Gravel Road Graded 2013-2014 Mar Unsealed Length of Road Graded Jun Sept Maintenance Cost 2013 - 2014 Dec Jun Maintenance Cost 2014 - 2015 Mar Stormwater Maintenance Costs Maintenance Cost 2012 - 2013 $- $50,000 $100,000 $150,000 $200,000 COMMENTS: Maintenance Cost Stormwater COMMENTS: The grading of gravel roads is determined on condition inspection and therefore not all roads are graded within the same period. Length, km Roads infrastructure COMMENTS: 0 10 20 30 40 50 Requests 2012/2013 Sept $ per km 2012-2013. Sep Mar Requests 2013/2014 Dec Mar Stormwater Requests $ per km 2013-2014. Dec Requests 2014/2015 Jun $ per km 2014-2015. Jun Unsealed Maintenance Cost per km of Road Graded COMMENTS: $12,000 $10,000 $8,000 $6,000 $4,000 $2,000 $0 Number of Requests Page 80 Sep Expenditure 2013-2014 Dec Expenditure 2014-2015 Mar Vandalism & Graffiti costs per Quarter Expenditure 2012-2013 $0 $10,000 $20,000 $30,000 $40,000 $50,000 $60,000 COMMENTS: Cost Facilities Management infrastructure Jun YTD Expenditure YTD Expenditure / Budget $48,769 $31,693 $46,946 Quarterly Expenditure Comparison Expenditure 2012-2013 Expenditure 2013-2014 Expenditure 2014-2015 $163,778 $158,150 $156,079 $174,750 $148,404 $172,936 Annual Budget Vandalism Annual Expenditure Comparisons COMMENTS: Period Page 81 Grade unsealed roads up to 3 times a year with the exception of Begonia Street which is to be graded up to 6 times a year Grade unsealed car parks up to 3 times a year as necessary Road culverts inspected up to 3 times a year and cleared as necessary Pick up roadside litter on Council maintained roads within 14 days of request Bridges inspected annually and repaired as required All damage attended to 24 hours a day, 7 days a week, repaired as required Attend to damaged / stolen road furniture within 14 days of notification Urban sealed roads swept at least once every 6 weeks Road reserves inspected annually and P1 hazards dealt with on a scheduled basis. Inspections include footpaths & cycleways, kerb & guttering, traffic management signs on Council roads, street signs, safety fence, guide posts, guard rails, post & cable barriers, seats, litter / doggie bins, flagpoles / lightpoles, light bollards and vegetation Richmond township nature strips mowed monthly (Winter period as necessary) Mowing of road verges along arterial rural roads as defined in Council’s Road Asset Management Plan 2.4 m wide, once a year Mowing of road verges along non-arterial rural roads as defined in Council’s Road Asset Management Plan 1.2m wide, once a year Development Implement a road hierarchy to improve traffic flow and provide a road width ‘fit for purpose’ as defined in Council’s Highways ByLaw Maintain a sealed surface on all roads where a seal exists in accordance with Council’s Road Asset Management Plan. Provide a sealed surface on unsealed roads if it is economic to do so or if there are significant safety reasons All new works are to be designed and constructed as defined in Council’s Highways By-Law Maintenance Maintain rural road shoulders as required All roads inspected and all potholes and edgebreaks repaired up to 4 times per year. Roads Key performance indicators and outcomes infrastructure as necessary as a result of maintenance inspections spraying around guide posts and road signs will be undertaken pending weather conditions and verge growth. Weed spraying around guide posts and road signs will be undertaken pending weather conditions and verge growth. Weed On-going Undertaken as necessary as necessary Undertaken as necessary Inspected twice per year and maintenance undertaken as necessary On-going Undertaken as necessary On-going Undertaken as necessary Undertaken Graded Undertaken as necessary as necessary Undertaken On-going as necessary progress Undertaken In Page 82 Development System capable of handling a 1/20 yr flood Water quality to satisfy Protected Environmental Values (PEVs) Ensure confined spaces are built in accordance with Council policy to comply with statutory requirements Maintenance Inspect drainage pits each year and clear as required Respond immediately 24 hours / 7 Days per week to any emergency that may cause potential flooding, environmental harm or property damage Respond and inspect seepage/drainage problems within 14 days of being reported and all P1 and P2 tasks completed within schedule (where P1 =public/ environment safety and to be repaired within 1 month, P2 =may result in damage to other assets and to be repaired within 3mths). Maintain unrestricted channels in rivulets/open drains on Council land on a five year program Maintain GPT’s, on a 3 monthly cycle. Maintain major stormwater outlets on a 4 monthly cycle and after major storms Identify, mark, and define confined spaces in accordance with statutory requirements Modify confined spaces in accordance with Council policy to comply with statutory requirements Stormwater Respond to tree maintenance risk management and sight hazard issues within road reservations as necessary Road safety audit to be conducted on a 5 yearly basis and Road condition survey undertaken on a 2 yearly basis Ensure all works undertaken within Council maintained road reservations comply with relevant codes of practice Maintain jetties and boat ramps controlled by Council Ensure all built facilities within Council maintained areas comply with relevant Legislation Roads/Cont… Key performance indicators and outcomes infrastructure as necessary adhered to progress Going Going On On Going Going Going and undertaken as necessary On Going On Undertaken In On On as necessary problem areas being investigated for compliance guidelines being progressively implemented On Going WSUD Existing Compliance On-going adhered to Safety audit completed, Septemmber 2014 Compliance Road Undertaken Page 83 Ensure all built facilities within Council maintained areas comply with relevant Legislation. Maintenance Develop maintenance / inspection / planned repair program and complete all P1 and P2 tasks within schedule (where P1=public safety & to be repaired within 1 month, P2=may result in damage to property and to be repaired within 3mths) Clean public toilets & BBQ's in: Richmond Toilets twice a day / 7 days a week / 52 weeks a year with additional cleaning undertaken in accordance with tourist cruise ship summer schedules High use urban areas once a day/ 7 days a week/ 52 weeks a year Low use urban areas once a day/7 days a week/25 weeks a year (summer) Low use urban areas once a day/ 3 days a week/ 25 weeks a year (winter) Cambridge once a day / 2 days a week / 52 weeks a year Provide financial assistance to the operations of the SES Clarence unit Ensure all built facilities within Council maintained areas comply with relevant Legislation. Development Provide community facilities to meet identified and affordable needs of the community Facilities Management Key performance indicators and outcomes infrastructure Recreation Centre upgrade commenced. engaged to undertake compliance works as required Going On On Going Going On Going On Going In progress Contractors engaged to undertake compliance works as required On Going On Contractors Howrah Bay Promenade Extension Stage 2. TasWater have completed work on the relocation of the major Sewer Main across Kangaroo Bay. Kangaroo Clarence Aquatic Centre Activity Report June 2015 Annual Budget YTD Budget Actual % Gross Audited Receipts (**refer below) $84,310 $84,310 $84,362 Total Revenues $84,310 $84,310 $84,362 Power & Gas YMCA Maintenance, Security, Compliance Total Expenses $207,000 $273,293 $51,650 $531,943 $207,000 $273,293 $51,650 $531,943 $201,168 $275,437 $90,678 $567,283 Net Comments: $447,633 $447,633 $482,921 Total Attendees For Period July 2013 to June 2014 Total Attendees For Period July 2014 to June 2015 Percentage Variance Previous Year (++ refer below) Total Expenses ** Income from YMCA (% of Gross Audited Receipts) is due following the YMCA end of financial year audit process and will be paid in accordance with the lease agreement. 600000 500000 Amount The emergency maintenance budget was over expended due to two major mechanical breakdowns, one of the two water heat pumps and one of the two air handling heat pumps failed. The failures were repaired quickly and there was no inconvenience to patrons. 131,927 115,257 -12.6% YTD Budget Total Expenses 400000 300000 200000 100000 0 Total Expenses YTD Budget 18,000 Clarence Aquatic Centre Attendees The Aquatic Centre was closed for maintenance from 28 March to 30 April 2013 and 2 April to 18 May 2015. 16,000 14,000 12,000 10,000 8,000 6,000 4,000 2,000 2012-2013 2013-2014 Jun May Apr Mar Feb Jan Dec Nov Oct Sep Aug Jul Number of Patrons Total Expenses 2014-2015 Page 84 Pindos Park 1892 Beach Erosion Protection TOTAL - PROJECTS CURRENTLY DEFERRED 2493 Bellerive Streetscaping Natural Environment 2407 2268 Council Chambers Chiller Upgrades 2333 Clarence Senior Citizens 2593 Grange Road Complex 2594 Hot Water System Upgrade - various Communities & People 2338 Public Art 2370 Bellerive Beach Park 500,000 1,869,547 31,345 0 30,013 0 Quotation document for design consultants and approvals being developed. Physical construction deferred for further consideration by Council. 0 21,057 114,930 376,135 3,482 Major project on hold, smaller works have been undertaken Council decision to defer - 12 Jan 2015 BBQ and shade structure project on hold. Associated public toilet construction was deleted from 2013/2014 programme due to adverse response from adjacent residents. Project deferred pending road reconstruction that will include kerb returns at intersections and parking bays. -901 4,875 0 0 163,317 15,000 61,915 53,000 32,873 Requires Council decision Complete-CEEP project included Council Chambers chiller upgrade completed in 2013/2014. Allocation reflects grant monies not yet received. CEEP Grant to be terminated. Depending on reconciliation a small amount of funds may return to Council. No further works planned Committee does not believe chairlift is necessary Projects to be modified following cancellation of CEEP Grant Projects to be modified following cancellation of CEEP Grant Unable to proceed until downstream channel is upgraded as part of 2015/16 Stormwater Program Drainage works to be constructed in conjunction with road reconstruction in 2015/16 Preliminary design completed - dependant on Eastlands development Planning commenced - deferred, awaiting subdivision Deferred pending construction of culvert in Bridge Street Comment 1,500 Estimated Completion Date 95,532 0 % Complete 0 171,000 Bridge St Drainage Imp 0 0 0 Total Cost plus Orders Placed YTD 30,000 16,000 39,500 169,000 Total Budget 2014/15 (Includes Carryovers) Rosny Farm/Golf Course Access Begonia St/Flagstaff Gully Bridge St - Richmond 2656 Franklin/Victoria St Drainage Facilities Management 1810 Construction of Aldermen's Room 2655 2518 2560 2654 Stormwater Description Section A - Projects Currently Deferred Roads Project capital works Page 85 2252 2257 2258 2311 2314 2480 2486 2489 2491 2519 2521 2559 2562 2565 2566 2599 2600 2601 2602 2604 2607 2630 2631 2005 2010 2085 2157 2243 1899 1905 2004 2632 2633 2634 2635 277,319 30,000 246,305 189,320 390,817 19,246 350,040 50,632 3,456,559 379,661 20,000 2,486,284 41,939 9,833 85,000 145,300 260,000 117,838 3,496 220,000 125,294 140,000 70,000 DDA works Bus Bays Bridge Works Lindisfarne streetscape Cycle Way Access Rd upgrade Mornington Rd Torrens St & Victoria Esp - Seal Gravel Pathways Rural and Residential Kangaroo Bay Road Bayfield St Traffic Management Street Lighting - Chipman's Road Kangaroo Bay Dr major works Laneway Sealing - various Queen St - med & K&G replacement 204 Tranmere Rd - Rep Wall George St Road Construction South Arm Hwy K&G & Foot Path Saundersons Rd Embank Stabilisation Yolla/Topham St Pindos Park Multi User Path Otago Bay Rd Foot Path - Stage 1 Vic Esp Car Park Seal Lindisfarne Oval Seal Car Park 793,000 60,000 211,500 48,000 2,789,405 1,637,162 75,000 319,759 135,000 Renewal - Road Resealing Footpath Inspection Rectification Resheeting Gravel Roads Black Spot Federal Bellerive Village Car Park Bell Park - Car Park Construction Dorans Rd - Boat Ramp Car Park St John Circle K&G Turning Ci Dysart St Clifton Road Sealing 331,840 21,934 2,915,195 Total Budget 2014/15 (Includes Carryovers) Bayfield St Scape Redevelopment South Arm Highway Bollards Major Digouts Description Section B - Projects Currently in Progress Roads Project Page 86 5% 100% 80% 65% 100% 100% 100% 100% 5% 100% 100% 100% 67% 100% 100% 100% 80% 5% 100% 90% 100% 100% 100% 100% 100% 10% 100% 5% 100% 100% 5% 38% 100% 100% 100% 2,469,316 1,638,739 77,811 318,355 136,611 281,106 34,842 197,554 160,537 208,985 19,247 353,153 50,718 2,856,839 64,035 20,075 2,245,595 43,191 9,813 96,430 181,150 273,915 118,745 0 74,651 123,437 112,381 0 305,261 45,284 218,831 56,884 % Complete 0 17,158 2,330,346 Total Cost plus Orders Placed YTD Nov-15 Oct-15 Jun-16 Aug-15 Sep-15 Sep-15 Dec-15 Dec-15 Sep-15 Sep-15 Dec-15 Dec-15 Estimated Completion Date Concept streetscape plan completed and considered in Council workshop. Council approved a consultation program and property owners and business operators are currently being consulted Complete Remainder of works to Sept Council meeting. Cambridge Rd sealing Tender awarded 22 June 2015 Council meeting, work to occur Sept 2015 Complete Complete Complete Complete Includes Gunning/Victoria Street; tender awarded at June 15 Council meeting Complete Complete Complete Multiple projects - Simmons Park connection outstanding Complete Complete Complete Tenders let; Stage 2 works underway Design Commenced Complete Works underway Complete Complete Complete Complete Complete Tender awarded at Council Meeting June 2015. Work underway Aug Complete Planning commenced Complete Complete Design Commenced Eastern car park complete. Tender let for Western car park at July Council Meeting Complete Complete Complete Comment 2636 2637 2638 2639 2640 2641 2642 2643 2644 2652 2653 Total Roads Project Page 87 Description Spitfarm Rd Kerb No. 62 & 74 Grafton Road K&G & Foot Path Wellington St seal shoulder Cambridge Rd Line Marking Surf Road master plan design 7MB Path - Acton Rd to Ovata Flagstaff Gully Foot Path Glenelg St Footpath Clarence St Safety Assessment Dunbarton Dr-stabilise road Pass Road Footpath 62,000 90,000 25,000 50,000 50,000 200,000 50,000 12,000 50,000 15,000 124,000 19,180,678 Total Budget 2014/15 (Includes Carryovers) Total Cost plus Orders Placed YTD 78,619 0 24,859 0 0 53,784 1,540 12,108 11,666 10,010 10,110 15,343,691 Estimated % Complete Completion Date 100% 0% Sep-15 100% 5% Dec-15 0% Jun-16 25% Sep-15 0% Sep-15 100% 20% Dec-15 100% 5% Sep-15 Work underway Design complete Complete Council Workshop in Sept 15 Complete Design Commenced, works scheduled for August Complete Design complete, work to commence July 2015 Complete Finalising design with adjacent properties Comment Decommission Cambridge Lagoons Salacia Ave - drainage system SW Pump Station Upgrades Cremorne Storm Water Imp Works Roaches Beach Rd - Bank Stab Luttrell Ave SW Upgrade Lauderdale Drainage - Structural Plan Bathurst St Flood Ass Imp Cambridge Rd/Shackleton upgrade reticulation Kangaroo Bay Dr SW Upgrade Faggs creek remediation WSUD creek remediation 2030 Barn Complex Redevelopment 2118 Public Toilets 2120 Kangaroo Bay Plan Implementation 2331 Bellerive Boardwalk - DDA Toilet 2334 Clarence Council Depot 2590 Cemetery Bollards Torrens St 2592 Bellerive Community Arts Centre 2623 Cambridge Hall 2624 Beltana Bowls Club 2625 Men's Shed Howrah (Council portion) Total Facilities Management 2646 Urban Drainage Act 2647 Wetland Management Plans 2648 Gunning St Stormwater System Total Stormwater Facilities Management 1827 Howrah Recreation Centre 2446 2523 2524 2548 2551 2584 2586 2588 2589 2595 2645 2319 Capacity Augmentation Works Minor Stormwater Projects Seven Mile Beach Drainage Lindisfarne Bay Sediment System Capacity Flooding Stormwater 1157 1722 2212 2214 2274 Description Project Page 88 72% 18% 50% 100% 100% 5% 10% 5% 15% 100% 0% 100% 0% 50% 0% 10% 80% 70% 5% 0% 100% 15% 100% 80% 100% 100% 100% 6,686 48,482 44,309 10,268 35,480 1,162 0 105,590 102,033 24 270,000 1,200 120,997 0 150,000 2,118,299 310,545 32,014 8,175 24,691 272,609 28,780 1,200 49,324 13,113 20,328 31,319 792,097 250,000 15,000 150,000 3,753,319 271,200 47,645 70,000 551,889 324,550 69,237 1,200 68,000 12,672 20,328 30,628 1,467,349 43,029 44,000 9,421 270,000 19,995 50,000 354,500 102,000 150,436 270,000 52,000 37,779 1,346,314 973,242 % Complete 70% 100% 0% 100% Total Cost plus Orders Placed YTD 235,688 4,054 0 9,085 334,491 4,055 241,199 9,100 Total Budget 2014/15 (Includes Carryovers) Comment Aug-15 Work underway Barn awning complete awaiting lighting to be installed . Funds to be Jun-16 carried over. Should be completed in 2015/16 year Sep-15 Assessment commenced Dec-15 Subject to approval to modify bay and DA process Complete Sep-15 Energy management and lighting still outstanding Complete Sep-15 Courtyard work complete awning design underway Complete Complete Complete Year 1 Budget of a six year program of works. Commenced preparing Dec-15 Derinya St catchment management plan Sep-15 Sep-15 Design commenced, tender awarded at June 2015 Council meeting Dec-15 Sep-15 In progress Complete Jun-16 Funds for water garden - Design underway Complete Rectification work complete, 2nd stage let 13 June 2015 Council Oct-15 meeting Lower Minerva practically complete - Some remediation by contractor Oct-15 required. Upper Minerva scheduled Spring 2015 More detail required by EPA, further samples taken and report Dec-15 submitted to EPA Complete Complete Dec-15 Design commenced, tender due to Council Oct 2015 Dec-15 Planning commenced, design with consultants Dec-15 Design complete Dec-15 On hold til Sept 2015 due to high water table Complete Jun-16 Planning commenced Complete Estimated Completion Date 2362 2375 2376 2379 2381 2384 2385 2391 2392 2393 2394 2395 2401 2409 2356 2357 2358 2052 2141 2283 2302 2329 2341 2343 2345 2346 2347 2348 2349 2355 2051 2049 Seven Mile Beach - Recreation Master Plan Carella Park Charles Hand Park Conara Road Reserve Park Cremorne Apex Park Eastwood Play Park Elinga Play Park Hookey Street Park Kangaroo Bay Park Kerria Play Park Lauderdale Canal Park Laurel Play Park Morrisby Play Park Raleigh Court Park South Arm Oval Wentworth Park Ovals Geilston Bay High Ovals 134,151 37,000 97,500 8,000 31,568 28,500 4,250 21,684 1,691,081 28,500 22,000 13,742 42,000 10,000 54,000 213,353 200,000 9,417 394,389 69,080 225,313 12,000 50,000 11,213 10,320 1,991,809 2,989 45,000 125,320 1,940 19,680 Youth Plan DDA Plan Review Development of Tracks & Trails Shade Structures Aquatic Cent Upgrade Richmond Village Green Cambridge Oval Clarendon Vale Oval Geilston Bay Oval Field Kangaroo Bay Ovals Oval - Lauderdale Lindisfarne Oval - No 1 Lindisfarne Oval - No 2 Oval - Sandford 44,171 39,389 52,640 490,000 Total Budget 2014/15 (Includes Carryovers) Positive Ageing Plan Outcomes Description Communities & People 1764 Anzac Park 1821 Regional Park Development Acton Court 1913 Cambridge Oval Sports Ground Project Page 89 100% 20% 0% 10% 1% 0% 30% 40% 100% 100% 0% 100% 100% 30% 100% 5% 5% 100% 12% 60% 100% 9% 100% 10% 100% 100% 60% 100% 100% 5% 100% 5% 100% 100% 100% 8,688 550 1,810 113,471 31,942 215,307 4,370 0 11,212 10,320 466,305 3,606 915 14,064 1,940 8,146 120,406 198,146 15,050 36,139 1,010 13,245 33,878 25,918 3,300 21,699 99,967 24,450 3,105 10,691 41,935 3,492 % Complete 38,686 11,201 0 Total Cost plus Orders Placed YTD Comment Dec-15 Master Plan adopted by Council. Implementation works later this year. Complete Dec-15 Tender to Council in Sept 2015 Complete Complete Sep-15 Equipment ordered Complete Complete Feb-16 Tender to Council in Sept 2015 Complete Dec-15 Planning commenced Complete Complete Complete Dec-15 Developing lease agreement Complete Complete Mar-16 Building design drawings for tender Complete Sep-15 Planning complete Sep-15 Washdown - approvals outstanding Complete Master Plan adopted Stage 1 commenced awaiting approvals for Oct-15 building Dec-15 Irrigation and resurfacing complete. Building design commenced. Complete Complete Complete Jun-16 Stage 2 commenced, review future stages Dec-15 Planning commenced Some tasks underway however yet to be competed. Budget will be Jun-16 carried over with a further $10,000 to be expended by June 2016 Implementation of the Youth Plan continues. The plan review is underway and consultations have commenced. Budget will be carried Jun-16 over to 2015/2016 Identified actions are yet to commence. Budget will be carried over Jun-16 with a further $5,000 will be expended by June 2016 Dec-15 Kangaroo Bay approvals outstanding Dec-15 Planning commenced, vandalised shade replaced Complete Estimated Completion Date 58,000 9,604,424 40,000 9,511 10,000 1,153,877 15,000 RCCC Front Garden Clarence High Oval Development Cambridge Township - Master Plan Lindisfarne Tennis Club (Council portion) Water Connect - Howrah Pt 75,219 10,000 30,750 907,212 15,000 5,830 2,000 3,675 959,180 52,526 15,435 9,210 Total Budget 2014/15 (Includes Carryovers) Description Richmond Riverbank Park Risdon Vale Park Shoreline Park Lighting Simmons Park Wentworth Park Play Park Clarendon Vale Social Heart Park Richmond Skate Park South Street Reserve Howrah Bowls Club Base Montagu Bay Boat Ramp Seating on bus routes NBN - Connecting Community Risdon Vale Mountain Bike Path (Council portion) 2622 Total Communities & People 2620 2621 2596 2580 2582 2411 2412 2417 2418 2426 2429 2430 2442 2513 2541 2542 2569 Project Page 90 95% 100% 50% 40,291 8,669 55,152 3,459,580 10% 98% 5% Sep-15 Aug-15 Sep-15 Dec-15 Estimated % Complete Completion Date 100% 100% Jul-15 80% Aug-15 50% Nov-15 50% Aug-15 100% 100% 100% 5% Apr-16 0% Dec-15 5% Jun-16 100% 0 1,000,738 0 Total Cost plus Orders Placed YTD 82,835 10,000 30,748 588,518 7,451 3,659 1,304 3,675 31,368 0 186 23 Complete Complete Park lighting design finalised. Purchase order issued. Toilet DA obtained. Detailed design commenced Work commenced Complete Complete Complete Tender to Council in September 2015 MAST application approved. Design being finalised. Request driven Complete Work to commence in July 2015. Budget will be carried over and will be expended by June 2016. Extension of field facilities approved in 2015-16 budget Planning commenced Works Complete. Government grant of $47.7K provided direct to third party and requires Council decision to remove from budget as a consequence (see separate mention in Deferred section) Work commenced Draft Meehan Range mountain bike strategy complete. Grant provided directly to third party instead of Council (see Deferred Section). Requires Council decision to remove from budget as a consequence. Comment NOTE: 13,024 14,953 9,841 0 5,745 11,900 106,085 0 16,044 10,000 187,592 21,901,260 34,534,753 Total Cost plus Orders Placed YTD 167,797 21,000 6,901 3,284 5,000 12,000 141,000 110,000 52,000 10,000 528,982 Total Budget 2014/15 (Includes Carryovers) 0% 75% 100% 100% 100% 25% 5% 5% 0% 60% % Complete Comment Dec-15 Aug-15 Costs committed Quotation document for design consultants and approvals being developed. Project deferred subject to further consideration by Dec-15 Council. Sep-15 Complete Complete Complete Aug-15 Funds committed and work has commenced. Sep-15 Tender awarded at Council June 2015 meeting Dec-15 Quotation document for design and approvals being developed Estimated Completion Date TENDERS TO THE VALUE OF $574,364 HAVE BEEN LET BUT ARE NOT YET REFLECTED IN EXPENDITURE OR COMMITMENTS TOTAL - PROJECTS CURRENTLY IN PROGRESS 1892 Beach Erosion Protection 2526 Upgrading Fire Trails 2527 Erosion Protection Bell bluff 2546 Roscommon Management Plan 2547 Sheoak Point Revegetation 2583 Seven Mile Beach 2626 Bellerive Bluff Erosion Pro 2627 Lauderdale Canal Closure 2628 Opossum Bay - 68 Spitfarm Rd 2629 Roscommon Reserve Total Natural Environment Description Natural Environment Project Page 91