Budget 2014-15 - Institute of Business Administration
Transcription
Budget 2014-15 - Institute of Business Administration
Budget 2014‐15 Click on page# Table of Contents 1. Explanatory Memorandum for the Budget 2013‐14 Faculty Publications Ref. Notes Page # Annex – A 1‐57 58‐63 2. Financial Summaries Overview of Budget 64 Budget 2014‐15 65‐66 3. Revenues Program Revenues Program Revenues (Student wise) Non‐Program Revenues Scholarship Income Interest Income R‐1 R‐1A R‐2 R‐3 R‐4 67 68 69 70 71 8 12 32 32‐A 32‐B 32‐C 32‐D 72‐77 78 79 80 81 82 83 84 85 4. Operating Expenses Details of Operating Expenses o EMBA Program o Ardeshir Cowasjee Writing Centre o Talent Hunt Program o IBA ‐ Centers ‐ Operating Performance Center for Executive Education Centre for Entrepreneurial Development Centre for Economic & Business Research Center for Journalism Excellence 5. Capital Expenditure Capital Expenditure Summary Civil Works 33 86 87‐89 ICT Budget for Computers & Peripherals, Software 90 Other Capital Expenditure (Furniture, Equipment, Vehicle and Library Books) 91 Sub: EXPLANATORY MEMORANDUM FOR PROPOSED BUDGET 2014-15 PART A OPERATIONAL HIGHLIGHTS 2013-14 Fresh intake during 2013-14 increased by of 30 percent i.e. from 1003 to 1309. This large increase h as been possible due t o s everal f actors. T he experiment wi th admissions being offe red twice a year i.e . Fall an d Sprin g h as met with rel ative success. As many as 3 01 stud ents o r 23 p ercent of th e tota l were admitted in the Spring s emester w hile 1008 entered in the r egular F all semeste r. Th e m ost unexpected development was the large interest exhibited in the newly introduced BS Accounting & Finance program. As against our estimate of 90 students, we ended up three tim es t his n umber w ith an int ake of 2 72. T he other n ew pr ogram BS So cial Science also met with success. Fresh enrolment in BS (CS) program also expanded from 90 the previous year t o 151. Further , the dec line i n th e enrolment of MBA students following the two y ear wo rk experience sti pulation was arr ested and as many as 192 students were admitted this year ( 175 students last year). The biggest jump was in MBA (Morn ing) p rogram w hich had an en rolment of 97 this y ear recording an increase of 45%. The break-up of this year’s fresh intake is as follows: Table I Fresh intake into IBA BBA 292 MBA Morning 97 MBA Evening 95 B S (CS) 151 B S Eco & Math 116 B S Accounting & Fin 274 B S Social Sc. 113 MS (Eco) 13 MS Math 11 MS CS / IT 20 EMBA 126 PhD (CS) 1 BUDGET 2014-15 Page 1 (a) In all 526 students g raduated th is yea r; 30 2 undergraduates’, 13 8 g raduate degrees and 86 Executive MBA degrees. (b) 15 fu ll time a nd 19 v isiting fac ulty me mbers were recruited du ring the y ear. Two Professors of Practice were also hired. (c) Ten new staff members were recruited for support departments. (d) Students’ societies organized 63 different events throughout the year. (e) 536 students received financial aid in form of scholarships / stipends this year amounting to Rs.8 8.53 m illion including NTHP and STHP. Th e n umber of external sponsors of scholarship has risen from 53 to 65 and their contribution now forms 79 percent of the total scholarship budget. BUDGET 2014-15 Page 2 PROPOSED BUSINESS PLAN 2014-15 An Overview As the curr ent fiscal year would bring to end the strategic plan 2008/09- 2013/14 a comprehensive final implementation report will be submitted to the Board separately. The report will evaluate the o verall progress and also measure the achievement of goals and sub-goals. The Bu siness Plan 2 014-15 is therefore a c ontinuation of the p revious strate gy based on t he co mpletion of remaining actions. As this wil l be a transiti on year in which the Str ategy 2020 will be reviewed and discussed by the Board, the Business Plan’s mai n thr ust will be co nsolidation of the g ains, o vercoming the weaknesses and laying the foundation for the new strategy. Emphasis will be laid this year on the preparatory work fo r se lf-assessment r eport to be su bmitted fo r AACSB accreditation. This report will provide a score card as to where we stand in relation to various standards a nd what we need to do more to r each th at standard. Th e other pre-occupation will be to strengthen the MBA program which is our flag ship program in light of an external review carried out in February-April 2014. In Spring 2015, we will introduce the Exp eriential Learning Project (ELP ) for the BBA se nior class. This will be a big c hallenge as w e have to i dentify at l east 75 com panies wh ere th ese student te ams will be assigned. An equal d aunting task is t o fi nd faculty membe rs who would be supervising and grading these projects. Another area of disappointment has been the performance of the three profit Centres the: Centre for Executive Education (CEE) Centre for Entrepreneurship Development (CED) Centre for Business and Economics Research (CBER) In ot her institutions t hese ce ntres generate r evenues tha t are use d to s ubsidize regular academic programs. We have not been successful in either attracting many companies fo r cu stomized Executive education co urses or in Winning re search grants and con tracts. Up f ront investmen ts in b uilding the capacity o f CED wou ld yield some r esults but after a few y ears. Co nsultancy ass ignments for th e faculty have been too few. Summer program and Summer schools are also not generating BUDGET 2014-15 Page 3 much revenues. The common thread behind this week performance is the reluctance of full time faculty members to actively participate in these activities. As the recurrent expenses on the CEE are likely to increase because of the addition of resi dential acc ommodation at Aman t ower and support staff to man age and operate these expa nded physical facilities, a rethink ing of t he pre sent Busi ness model of CEE would be required. Perhaps a task force consisting of a diverse group of HR managers, alumni of CEE courses and a few faculty members could enlighten us on the changes required. The Financial S ustainability M odel s eems to be holding q uite well. Inter nally generated revenues through introduction of new academic programs, adjustment in fees structures and a 30 percent jump in the enrollment will be able to meet as much as three-fourth of the operational expenditure. The remaining one-fourth will accrue through Government Grants and Interest Income. We expect an operational surplus of Rs.100 million in the coming year whi ch will be utilized for fi nancing a part of t he capital expenditures. After 2014/15 the re will be a sharp drop in the lev el o f capital expenditure and th e size of the overall budget will show a dip. Additional Donor commitments to the tune of Rs.600 m illion w ould still be requi red – Rs. 400 mill ion for completing Physical Infrastructure Projects an d Rs. 200 mi llion to m eet th e ta rget o f th e Gene ral Endowment Fund. BUDGET 2014-15 Page 4 PART B PROPOSED BUSINESS PLAN 2014-15 The proposed Business Plan consists of the following five components as outlined in the Strategic Direction 2008/09 – 2013/14. I. Academic Plan (including Quality Enhancement) II. Technology Up gradation III. Human Resource and Faculty Development IV. Physical Infrastructure Development V. Community Outreach BUDGET 2014-15 Page 5 I. AC ADEMIC PLAN 1. The Academic Plan 2014-15 is based on a projected total student enrollment of 3359 students in a ll the different programs offered at IBA. This wo uld represent an increase of 13 percent over last year’s 2969 students, of this, the fresh intake is estimated at 1084. There has been a gr adual shift towards greater enrollment of full time stu dents who are expected to acc ount for 83 percent o f t he total strength compared to 79 percent last year. It may be recalled that in 2011-12 the proportion of full time students had fallen to low of 68 percent. From the financial sustainability perspective this shift is highly welcome. 2. One of the initiatives take n to imp rove the quality of teaching is the Academic Audit. This activity saw a significant momentum in 2013-14 and approximately 40 courses ha ve b een a udited s o far. The pr ocess entails form ing o f a 3 pe rson committee fo r each co urse b eing au dited com prising of the Chairman of th e Academic Comm ittee, th e conc erned department ch air an d a su bject matter expert from t he d epartment. An initial discussion m eeting is th en held with th e concerned faculty to e nsure their und erstanding of the pro cess a nd to add ress any concerns. Next a class room audit is h eld along with detailed feedback from students i n both gr oups and individually. Fi nally th e e xam scr ipts are r eviewed and fe edback comments for t he instr uctor ar e finalized. The p rocess has also been well received by the faculty, who were initially somewhat skeptical. FACULTY OF BUSINESS ADMINISTRATION OUTCOMES 2013-14 New Programs 3. Two new pro grams n amely BS in Accounting and Fina nce an d BS in So cial Sciences and Liberal Arts were launched in Fall 2013. a. BS Social Science p rogram The program was p repared to pr ovide quality ed ucation in the so cial sciences field. So cial Sci ences core and elective courses are required for BBA students also. b. BS Accounting and Finance program The program has been designed to u pgrade th e quality of i ntake int o Ch artered Acco untancy a nd ot her BUDGET 2014-15 Page 6 Professional Accounting streams while at the same time Students acquire higher ac ademic degree. IBA was the pioneer in th e t aking th is initiative which has now been replicated in several other institutions of the country. Publications: Case Studies and Research 4. Two case st udies were p ublished b y fa culty members in April an d J une 2 013. Research publications include 17 papers in international conferences, 15 in local conferences, 3 ISI Journal publications, and 16 in other national and international journals. International Linkages and Accreditations 5. We have commenced the process of NBEAC accreditation. The initial registration is c ompleted and we are w orking on Self-Assessment Reports due for submission in end June 2014. 6. We hav e also initi ated process for AMBA a ccreditation. T he initi al o nline registration has b een revised and in formation required by them h as been collected. A form al letter of i ntent w ith th e d etailed infor mation about our MBA and Executive MBA programs will be submitted in June 2014. 7. For AACSB accreditation, we are presently working to strengthen our application before submitting th e pre-eligibility form. A co re g roup c onsisting of fa culty members se rving in key positions has b een form ed. Me etings a nd workshops have been conducted and the lead faculty and a team member have been sent to international tr ainings a nd workshops held b y AACSB International fo r better understanding of the process and requirements. 8. An agr eement w as sig ned with ACCA th at all ows e xemption to o ur BS(AF) students from nine papers o f their ce rtification. Th ough th is partnership ha s initially been s et f or a y ear, w e are working on extension of t his p eriod f or f ive terms. Thi s p artnership also provides o ur stu dents wit h opportunity to a vail scholarships for th e sai d c ertification. A si milar a rrangement has b een r eached with CIMA wh ich will allow our BS(AF) stud ents to avail exemption in 7 papers. The agreement will be ink ed in June 2014. An addit ional M OU wit h Institute of Bankers P akistan (IBP) ha s been si gned whic h waives off IBA’s BS(AF) BUDGET 2014-15 Page 7 graduates from appearing at all three lev els of examinations. The candidates will have to appear at only ONE comprehensive examination instead. 9. An agreement has also been signed with L UMS for academic cooperation in the areas of students and faculty exchange, research collaboration, etc. in computer science, information technology, mathematical sciences, economics and law. 10. The I nternational C ommission on W orkforce D evelopment h as en tered into a partnership agr eement wit h th e Centre of Ex ecutive Ed ucation (CEE) for conducting their examination. 11. An MOU h as also b een si gned with IE Business Sch ool, Spai n (ranked 11th in the FT Gl obal MBA Rank ing of 2013) for exchange of stude nts and fac ulty collaboration in research. 12. Twenty Six und ergraduate an d g raduate stu dents attended se mester e xchange programs in F all 2013 and Sp ring 2014. The students atte nded c olleges a nd universities in France, Malaysia, Turkey, USA. In additi on, 3 2 st udents i nterned internationally at Indonesia, Malaysia, Philippines, South Africa, Turkey, USA and Zambia. 13. Eight u ndergraduate students attended summer programs in Su mmer 20 13 a t NUS, Warwick, and USA. We anticipate that around 15 more students will attend this y ear’s summe r programs at Imp erial Col lege London U K, Un iversity of Nottingham Malaysia Campus, NUS Singapore, and University of Massachusetts Amherst USA. Other Initiatives Ardeshir Cowasjee Writing Center: 14. The De partment of Social Sci ences and Lib eral Arts h as established a wri ting center in th e memo ry of the ren owned newspaper columnist, so cial activist and philanthropist Mr . Ardeshir Cowasjee. T his Wri ting center is facilitating and supporting students and faculty members in improving their writing skills. BUDGET 2014-15 Page 8 PROPOSED PLAN 2014-15 15. The Academic Plan will foc us on th e existing programs’ delivery, efficiency and outcomes. Among the few initiatives for the year the noteworthy are a. Develop a t least 2 more activ e le arning and e xposure pr ograms for students and faculty members b. A group of approximately 20 students with four to five faculty members will be sent to SP Jain IMR and ISB India for a sh ort summer e xchange and learning program. We anticipate that this academic cum field visit program custom designed for IBA will provide an en riching learning experience to our students. We also see these programs as the ice-breakers for the two institutions towards students and faculty exchange, and possible research collaborations. c. Invite experts from Germany and if p ossible any o ther country to develop, motivate and encourage the learn and share culture at IBA d. Invite visiting faculty memb ers fro m In dia, Mal aysia a nd Nepal f or s hort term teaching assignments. e. Expand t he opportunities for students t o participate in international exchange programs. BUDGET 2014-15 Page 9 FACULTY OF COMPUTER SCIENCE OUTCOMES FOR 2013-14 16. The year 2013-14 saw the completion of th e expansion of the F CS building, and its dedication as th e HBL Ac ademic Centre. Besides the la bs c ommissioned in 2012-13, three new research labs were commissioned in 2013-14 which were an expanded Robotics/AI Lab, a Telecommunications Research Lab (TRL) and Web Sciences Lab. In December 2013, the Networking Lab equipped with top-of-theline n etworking e quipment fro m Cisc o was also dedicated as th e “Shirazi Networking Lab”. The new facilities have greatly improved the research facilities at the FCS. 17. FCS hosted its ann ual CEO Forum i n Oct ober 2 013 whic h w as att ended by Prominent members from the IT industry of Pakistan. They shared their insight fpr shaping better graduates from the Computer Science department. 18. The BASR which was formed in 2012-13 started functioning as an oversight body with re gular r eview o f the iss ues a rising o ut the PhD an d MS programs, in particular the Computer Science Phd program was regularly discussed in several meetings conducted during the year. Research and International Competitions 19. Karachi Ko alas, the joint RoboCup Socce r team ( 3D Simulation League) of IBA FCS and University of T echnology, Sydney, reached the Quarter Final stages of the World R oboCup 2 013 and wer e r anked 5 th i n th e t ournament. The competition was held in Ei ndhoven, Neth erlands d uring Su mmer of 2013. The performance of team has been improving each year. In 2011, the team was in the Top 16 group, then in 2012 it was in the Top 10 grou p and in 201 3 was ranked 5th in the world. 20. The AI La b also pr oduced a h ome r obotics ap plication the “Karachi C hotu” t hat participated in the Int ernational RoboCup IranOpe n 201 4 held in Tehran, Ira n from 7th - 1 1th Apr il 2014. The team qualified i n the RoboCup@Home le ague BUDGET 2014-15 Page 10 which aims to develop service and assistive robot technology to promote Social Robotics and achieved third position in the competition. 21. The AI Lab a lso a cquired a T urtleBot r obot o btained vi a a research grant provided by the Third World Academy of Science (TWAS), Italy. 22. Zaffar Ahmed Shaikh, a PhD scholar under the supervision of Dr. Shakeel Khoja was awarded a six month International scholarship from HEC-IRSIP on his work on Guided Personal Learning Environments. He will be proceeding to Switzerland in S ummer 2 014 to work with REACT res earch gr oup of EPFL -École polytechnique fédérale de Lausanne, Switzerland (QS World University Ranking: 19). 23. Three BS(CS) pr ojects r eceived fund ing awards from ICT R& D fu nd in 2 014. These were Autonomous Hover of a QuadCopter, ASL(American Sign Language) to Speech conversion and Traffic Congestion Tracking System. Student Society Events and Activities 24. The I BA Comput er Society succe ssfully conducted Connexions 2014, t he annual Computer Science event based on BS(CS) Final Year Projects at the IBA Student Ce nter fo r th e 4t h con secutive ye ar. Th is y ear eleven teams f rom IBA presented their projects to various industrialists and academicians who had been invited to serve as judges. Projects included highly innovative projects such traffic congestion trackin g s ystem for Pakistan, a home r obotics ap plication sys tem, energy monitoring syst em, an i nteractive l earning syst em among s everal other highly innovative and practical applications. 25. A Chapter of the Association for Computing Machinery (ACM), the world’s largest educational, co mputing and scientific soc iety, was also estab lished at I BA in January 2 014. Se minars have s ubsequently started being offer ed w ith t he first session organized in April on the topic of Networking. 26. ProBattle, I BA Co mputer Societ ies annual software and speed programming competition that was started in 2013 held it s 2nd a nnual e vent in Marc h 2014. The overwhelming resp onse fro m 600 participants result ed i n th e number of BUDGET 2014-15 Page 11 competitions b eing increased from 7 to 1 3. Co mpetitions i ncluded S peed Programming, Mob ile Application Dev elopment, Software an d Har dware Project Exhibitions, Innovative Business Id ea, Lego Robot Wrestling, Photography, Web Designing, Po ster D esigning and sev eral ga me p rogramming competitions. A total of Rs. 350, 000 were awarded as cash prizes as compared to Rs. 50,000 in 2013. 27. Student conducted w orkshops, h ighly popular am ong the student body, als o continued in 201 3-14. Workshops th at were held inclu ded Drupal, Ethical Hacking, IBM DB2 Database Certification among others. 28. IBA st udents con tinued to perform extremely well in local c ompetitions. As one example, thr ee stud ents i n fif th sem ester achieved f irst pr ize i n Speed A ndroid Application Development comp etition a t the Developers Day held a t F ast-NU in March 2014. Seminars and Workshops 29. The 5th I nternational C onference o n Information and Co mmunication Technologies (ICICT) 2013 wa s held s uccessfully on the 14t h a nd 15th o f December 2013 at the IBA Main Camp us with th e th eme “ Using Technology to Create a Better W orld”. Th e P resident of Pakist an, Mr. M amnoon Hussain, inaugurated the conference and a la rge number of international delegates came from t op-ranking u niversities in Au stralia, USA, Denmar k, UK , Po rtugal, Egypt, Malaysia among ot hers. Th e co nference provided a platform for leading academics t o discuss the l atest d evelopments in t he f ield of Infor mation and Communication T echnologies (ICT) an d to sh are their re search. Professo r Dr. Atta-ur-Rahman was the chief guest for the closing. 30. The AI Lab o rganized a 2 day long d ata mining wor kshop fo r professionals on December 7-8, 201 3. The wo rkshop fo cused o n providing basic data an alytics techniques to b usiness an alyst, risk m odelers, market r esearchers, etc. T he workshop was attended by a la rge n umber of p articipants from banks, other financial institutions, ma rket research co mpanies, g overnment b odies, NGOs, etc. BUDGET 2014-15 Page 12 31. The AI Lab also organized a 1 day robotics workshop for high school teachers on 29th Nov ember, 2013. The works hop intended t o pr ovide " train-the-trainer" program as there is a lack of formal training in the area of educational robotics. 32. A second Winter School was held in January 2014, and is a c ontinuation of the 2013 initiative to ensure that CS stu dents have cutting edge knowledge of the IT industries latest tools and utilities. A number of excellent lectures were held which included seminars on Python, PHP, Phonegap and Android. Academic Plans for 2014-15 33. The BS(CS) program is also pla nned to b e r e-accredited with the HEC NCEAC (National Computing Education Accreditation Council) during 2014-15 to maintain its top ranked position in the c ountry. The r eaccreditation th at w as originally planned for 2 013-14 wa s postponed due to th e o ngoing c ompletion o f the F CS building and its related research and Lab facilities. 34. The Academi c A udit will continue t o be used to improve the quality o f t he IBA courses. In 2014-15 it is intended to be decentralized and conducted by individual departments with regular oversight by the Chairman of the Academic Committee. 35. Dr. Sajjad Haider received funding to visit University of Technology, Sydney for 2 months (Jan 2014 - Mar 2013). His visit focused on advancing the research and development in Rob oCup Soccer. In ad dition, h e ha s be en able to in itiate ne w joint projects in the emerging field of big data analytics in which workshops and seminars are planned during 2014-15. BUDGET 2014-15 Page 13 II. TECHNOLOGY UP-GRADATION PLAN OUTCOMES 2013-14 The main achievements under the Technology Up-Gradation Plan i n the year 201314 are summarized below: Energizing of Tier III Data Center 36. The Tier III Data Center has been energized since September 2013 and now all the I CT services a re being served from t his Tier II I data ce nter. This c enter provides redundancy as per Tier standards. This state of the art facility is unique for an y educational instituti on in Pa kistan an d through this greater uptime f or services would be achieved. Print Management Solution 37. This s olution e nables us to conta in printing costs a nd sup port environmental sustainability. It provides the facility to track and budget all printing. We can have real time reporting via this solution that has been implemented and working since July 2013. Hardware and Equipment Acquisitions: Procurement of 75 Latest Laptops 38. Seventy F ive latest HP Pro-B ooks la ptops with la rge memory c hips have be en acquired for use by IBA faculty for their teaching and research work. Procurement of 20 Apple Mac Desktops 39. Twenty Apple Ma c de sktops have be en pu rchased fo r the new la b tha t will u se Mac platform. Software Applications 40. Enhancement of ERP System a. Teacher’s Assistance module Teacher’s Assistance module has been developed and integrated in ERP. It is basically de signed for managi ng Teacher’s assistant tasks assigned b y t he concerned faculty. The reports will be used to track TAs by t he HR, Finance and the instructor. BUDGET 2014-15 Page 14 b. Publications data Publications da ta syst em has been developed and integrated wit h the ERP. This module provides single point of en try fo r a ll pu blications d ata, its categorization and verification. c. Uni t system The module for Units-System has been developed and integrated with ERP. This will allow the senior management to track units earned by each faculty member for performing various duties. d. Online Payment System & Online Donation system A highly secure system has been designed, developed & integrated with UBL Bank Payment processing servers. e. Utilization of Learning Management System - Sakai The utilization of LMS is c onstantly m onitored and th e faculty me mbers are also provided tr aining to maximize th e util ization of t he sys tem. W e’ve succeeded in raising the utilization rate from 40% to more than 80% in the last term. f. Course Outline System Course ou tline syst em is des igned to enable th e I nstructor t o add course objectives, outcomes, cour se plan, and m arks distribution. C ourse Outline application is integrated with the ERP. g. Sched uling System Scheduling system is int egrated with the ERP. It will enabl e the examination department to generate the entire timetable for mid-term and final exams. This system is in UAT stage. h. Summer school and summer program online registration Online Registration System for Summe r sch ool and Su mmer Program offers three pr ogram c hoices. After su bmitting ap plication, c andidate can g enerate fee voucher o nline. An Admin control p anel e nables a dmin to view a nd download candidate’s application forms. BUDGET 2014-15 Page 15 i. Information session online registration IBA conducts information sessions at different cities like Islamabad, Lahore on different da tes. An online regi stration system has been dev eloped f or these sessions. New Website Developments 41. After through re quirement gathering all w ebsites have b een c ompleted to meet the specification and requirements of individual departments. a) Department of Accounting & Law http://accounting.iba.edu.pk/ b) FCS Final Year Projects FYP http://fypfcsiba.com/ c) Revamped IBA Libraries http://library.iba.edu.pk/ d) Revamped IBAICM 2014 http://ibaicm.iba.edu.pk/ e) Revamped Telecommunication Research Lab TRL http://trl.iba.edu.pk/ f) Revamped Convocation 2013 http://iba.edu.pk/convo2013/ g) Revamped Summer Program http://iba.edu.pk/summer h) Revamped National Talent Hunt Program http://nthp.iba.edu.pk/ i) Revamped ICICIT 2013 http://icict.iba.edu.pk j) Revamped Quality Enhancement Cell QEC http://qec.iba.edu.pk/ k) Data center http://datacenter.iba.edu.pk/ l) IBA Projects http://projects.iba.edu.pk/ Network Strengthening 42. a. Backup Radio Link Backup r adio link h as been placed between m ain campus - VF R & ma in campus - NGH so t hat if p rimary fiber li nk is down user would get seamless connectivity. b. Laying of dark fiber between Main Campus to the boys and girls hostels. Dark fi ber h as been laid between Mai n campus b oys an d girls h ostels. Now u sers at the b oys and g irls hostels a re abl e to g et good inter net services. BUDGET 2014-15 Page 16 PROPOSED PLAN 2014-15 Mobile Equipment for Video Conferencing 43. Mobile Video Conferencing sol ution e nables the option o f mo ving the v ideo conferencing facility from one classroom to another. The system will be functional from Fall 2014 term. Lecture Recording System 44. It was decided to introduce Lecture Recording System whereby the students will be abl e to review the classroom, presentation and lect ures la ter o nline. The system is expected to become functional in Fall 2014. RFID Solution for Library 45. RFID Solution w ill aut omate Library processes such as item searching, holds and in transit slip printing, Found-Lost items, find mis-shelved items. This solution will become functional at the time of the inauguration of the new library. Smart board 46. Smart board are inte ractive white boards which r ecord all the activities instructor perform such as writing on board, power point presentations etc. These files later can be uploaded and viewed by students for reference purposes. Smart Boar ds will be installed in five classroom initially in Fall 2014 term. Addition of Core Switch / Router / Firewall / IPT router 47. This ad dition is p lanned so th at it would provide a redundancy a t network laye r also. Currently in Tier III data center we have a redundancy at power and cooling level only. Upgradation of Main Campus Server room 48. Upgradation of Main Campus server room has been planned which would be built with HSSD, power and cooling facilities. Upgradation of VC Equipment for City Campus / Aman Tower 49. An up grade of VC codec wit h the latest equipment is planned an d a n ew VC room would be established in Aman tower. RFID solution for staff / students 50. Smart Cards would be provided to staff, faculty and students. This will enable IBA to log attendance, traffic monitoring & merchant facilities for students. BUDGET 2014-15 Page 17 RFID Solution for City Campus Library 51. RFID Solution is planned to be implemented at the City Campus Library. IP Telephony Upgrade 52. IP telephony u pgrade from c all ma nager 7 .1 to 1 0 has been planned, th is upgrade will allow us er to avail video conferencing f acility on their desktop s / devices. T he th ree new buildings have b een e quipped with c omplete IT infrastructure. Migration of Onsite Exchange to Office 365 53. Migration of o nsite exchange to o ffice 3 65 tena nt is in p rogress, it’s a th ree phase migration process in which first phase has been completed, with migration of user data. Smart board 54. Twenty more s mart boards will b e acquired f or the classrooms i n th e coming financial year. Implementation of Fi nancial Ma nagement Module & Human Capita l Management 55. These two remaining modules of ERP ha ve been planned for implementation in the year 2014-15. With these two modules functioning, coverage and integration of all t he operational data will e nable the departments’ acc ess to the same centralized common d atabase. This wi ll d efinitely h elp to impr ove the business process and facilitate higher management to take timely decisions. Oracle Business Intelligence 56. The implementation of the Oracle Business Intelligence application is in progress. The detailed r eports in both graphical a nd t abular f ormats, sh owing tre nds f or analysis will become available to Senior Managers in real time. Online Testing System 57. Online Tes ting System (OTS) is a Mu ltiple C hoice Questions (MCQs) based examination system that p rovides an ea sy to u se en vironment fo r both Test Conductors and Stud ents a ppearing f or Entry Exami nation. BUDGET 2014-15 Page 18 HUMAN RESOURCE PLANS OUTCOMES 2013-14 Faculty Recruitment: 58. During the year 2013-14, a t otal of f ifteen faculty memb ers wer e r ecruited. Among t hem, ten hold P hD degrees from fo reign univers ities. Fiv e o thers possess foreign masters or equivalent professional degrees. In addition two new Professors of Practice have also been appointed. Transition of Administrative Leadership: 59. As part of the Strategic Plan, it was envisaged that IBA will bring in experts in HR, ICT, Internal Audit from outside to develop the policies, procedures and systems. As this task has been completed, smooth transition of responsibilities has taken place and Departmental Directors hired on contract for fixed duration have been replaced an d regular IBA staff h ave taken over as Heads of Inte rnal Au dit, ICT and HR, Departments. These individuals worked as under study for a year or so under the Di rectors. CED, Public Affairs a nd EMBA Di rectors h ave also been replaced by Part t ime Program Directors from among the faculty members as is the c ase fo r other pro grams. Th e bu dgetary c ost savings b ecause o f these changes was about Rs 30 million an nually. The only Director who will complete his t erm i n 2 014 is Director Projects a s three m ajor pr ojects ha ve t o be supervised by him. Outsourcing of Support Services: 60. The policy of O utsourcing of supp ort services was i mplemented since September, 201 3 f ollowing t he tend ering p rocess. U nder thi s co ntract, the selected contractor w ill provide support st aff to IBA a s per institutional needs in General Administration, F acilities Ma nagement (including G eneral Maintenance, Operational Maintenance, Spo rts and Re sidential Facil ities Maintenance), Catering, Security an d Tra nsport Services. All futu re re quirements of support services staff will be catered through this outsourcing channel. Health Insurance: BUDGET 2014-15 Page 19 61. On the advice of the A&FC of IBA, the feasi bility of covering employees’ medical benefits thr ough h ealth insur ance w as ass essed and the te nder wa s f loated in March, 2014. Ne cessary formalities have been completed in this regard and the lowest premium cost was quoted by “Asia Care Insurance Company”. This policy will be effective from Ju ly 1, 2014. This ini tiative is expected to ease the access of emp loyees to i mproved m edical fa cilities whil e IBA wi ll be able t o c ontrol its expenses. Transformational Leadership Program: 62. A special 4 days “T ransformational Leadership Pr ogram” was organized in collaboration wit h th e CEE in August, 201 3 for the senior m embers of IB A (current and future) academic and administrative leadership & managers. Customer Satisfaction Survey: 63. The fo urth ro und of the Customer Satisfaction Survey of IBA Service Un its wa s completed in December, 20 13; an d the final r eport was presented by th e consultants (Nielsen, Pakistan) to the Executive Committee in May, 2014. Performance Management Workshops: 64. Training sess ions on Performance Man agement we re held fo r sta ff an d fa culty. These sessions are p articularly useful for new staff and faculty members as IBA is unique among academic Institutions to have such a Performance Management system in place. Customer Services Workshop: 65. To create customer support orientation among IBA front offices, program offices and service unit staff, one day training workshops titled “Customer Services” was organized in July 2013. . BUDGET 2014-15 Page 20 PLANS FOR 2014-15 Communication Skills Training for Management Staff: 66. As part of the initi ative to dev elop an i nternal man agerial pool, sev eral training courses have been designed for the Management Staff. For example, in 2014/15 In-house training h as been p lanned o n sp eech communications, presentation skills and wri ting skills. In addition Personal Effectiveness C ourses w ill al so be offered to the interested employees. Modifications in Promotion Rules: 67. The Pro motion Rul es of non-teaching em ployees hav e been modified to all ow managerial staff to be pro moted to higher po sitions if they meet the el igibility criteria of performance, serv ice length and experience o f work ing in d ifferent departments. It is e xpected tha t this mo dification will h elp in m otivating, and retaining q uality human re source of IBA and in grooming the m f or taking up higher managerial positions in the future. This year 16 staff members have been promoted on the basis of their performance and seniority. Modifications in Staff Welfare Fund (SWF): 68. The e xisting rules of SWF were modified to further enhance the scope o f these rules for benefiting a larger group of employees. A study has been conducted to assess the f inancial imp lications o f edu cating t he ch ildren of lo wer g rade employees at quality schools. Schemes for Employees in Pipeline: 69. New sc hemes and b enefits that ar e under co nsideration fo r em ployees in clude Umrah scheme which wi ll be based on the lucky draw. It is propos ed tha t three full-time of e mployees of IBA will be s ent on 15 days Um rah every ye ar. In addition, a fter the development o f sports fa cilities, e xtra-curricular activities including sports events and picnics will also be arranged for employees. HCM Software 70. Based on the fe edback o btained f rom o rganizations cur rently using Pe opleSoft HCM and the costs and volume of work involved at IBA, the option of developing an i n-house HR modu le for IBA is being e xplored. This module will t hen be integrated with the main ERP system. BUDGET 2014-15 Page 21 71. This y ear, “Empl oyees’ Attendance and Flexible Timings Rul es” and “S tudent Recruitment Rules” were updated by incorporating required elaborations. 72. Ten (10) non-teaching employees wer e pr omoted i n t he perf ormance a ppraisal cycle; in a ddition, fo ur (04) staff memb ers wer e pr omoted against externally advertised p ositions; these internal ca ndidates wer e s elected o n merit, after competing with external candidates. Faculty Development Training and Development of Faculty Members 73. Table below shows the break-up of faculty pursuing higher education: Faculty Pursuing Higher Education S# Qu alification 1 Purs uing PhD 2 Purs uing Post-Doc 3 Purs uing MPhil Total 15 Foreign 14* 01 - *05 are on Split PhD Local 02 01 03 No. 16 01 01 18 Of the 18 full -time faculty members p ursuing Ph D, four (0 4) are enrolled in Split PhD/DBA program at IMT-GEM and one (01) is enrolled in the University of Southampton; Nine ( 09) fac ulty m embers are enrolled in differ ent i nternational un iversities (03 in UK, 02 in USA, 01 in Spain, 01 in Australia, 01 in New Zealand and 01 in Malaysia), Locally pursuing PhDs include one (01) at LUMS and one (01) in IBA. One ( 01) i s doing post-doctoral fello wship at NUS, Singapore a nd o ne (01) faculty m ember is pursuing M. Phil degree on s elf-sponsorship b asis at the Institute of Educational Development (IED), Aga Khan University. 74. The fo llowing table sh ows the numbers o f fa culty who hav e be en exposed to training opportunities outside Pakistan during 2013-14. BUDGET 2014-15 Page 22 Number of Faculty participations at Foreign and Local Conferences / Seminars / Training F Short Training / Courses Conferences / Seminars / Forums (attended only) 2013-14 oreign Local 12 62 02 08 Professional Development (incl. presentation of papers and cases in conferences / research forums) 19 04 Academic Development Post-Doctoral Programs PhD Colloquium / Doctoral Consortiums 14 01 - 03 - Total Number of Faculty 48 77 75. These f aculty members attended i nternational t raining programs t o develop expertise in their concerned a reas and improve pedag ogical s kills and during 2013-2014. Here are some of the highlights:a. Three faculty memb ers a ttended 3 weeks IFP pro gram held in Spain during June 2013. b. Three faculty members attended 2 weeks IMTA program held i n Slovenia during June 2013. c. One faculty me mber attended Babson Col lege, USA for six we eks in Spring 2013. d. Two faculty m embers a re attending International F aculty Pr ogram (IFP) during June 2-20 2014 in Barcelona, Spain. e. Dr. W asim Azhar, H aas Bu siness Scho ol, Berke ley USA led and supervised cas e teac hing s ession to MBA and senior BBA c lasses. He also conducted two workshops on “Designing Engaging Assignments and Projects” a nd “Onli ne Co llaboration To ols and Ide as”. His v isit was f rom December 14 to December 28, 2013. f. Four S ES experts Dr. Kl aus Dielmann, Se nior Le cturer Mr. H artmut, Dr. Manfred Akstinat a nd Dr. Lindermann fr om Germ any v isited IBA d uring 2013 – 20 14. Th ese experts co nducted workshops fo r fa culty memb ers, took s essions with stu dents i n t heir areas of ex pertise, were i nvolved in CED for a gri –e ntrepreneurship, techn o-entrepreneurship and oth er initiatives. BUDGET 2014-15 Page 23 Journal Articles 76. The total number of journal publications was twenty seven (27) during July 2013 to June 2 014. Out o f which eig ht (8) articles we re pub lished in ISI in dexed journals. Th irty one ( 31) r esearch pa pers were p resented a t international/ national conferences and research seminars during July 2013 till June 2014. The details are available in the annexure A Faculty Mentoring 77. To mento r and fac ilitate the f aculty members in the ir development pl ans, Dr. Zahoor H assan, a r enowned academician was i nvited t o IBA for thr ee m onths with a focus on following areas. a. Mentor and coach faculty members b. Take IBA MBA program to the next level c. Improve the case-writing activities and related processes at IBA d. Support in the AACSB accreditation process 78. Several faculty mem bers av ailed o f this o pportunity and sought his a dvice and guidance on the ir professional development, case w riting. Thr ee core g roups o f Case W riting, MBA Program a nd AACSB Accreditation we re developed. Thes e groups are now meeting at regular intervals to proceed further. PROPOSED PLAN 2014-15 79. Four faculty members will be sent on international trainings to update them with new technologies, methods and pedagogies. BUDGET 2014-15 Page 24 III. PHYSICAL INFRASTRUCTURE DEVELOPMENT PLAN OUTCOMES 2013-14 80. During the year 2013-14, fifteen (15) Projects were under execution (12 new and 3 Proj ects for renovation and up-gradation). Ou t of these, 9 p rojects we re completed and possession handed over. (One of renovation & 8 new projects). 81. There have been a f ew s etbacks i n progress mainly d ue t o value engineering exercises, law & o rder situ ation in the C ity, ch anges from IBA side, scarcit y of labor an d material, un announced cl osure of all commercial busin ess, non- availability of transportation due to closure of gas stations. 82. The major cause of del ay in Am an To wer has be en th e r e-designing of si x (6 ) Packages and subsequent value engineering. Although some valuable time has been lost yet a saving of approximately Rs.125.00 Million was achieved from the bid amo unts. Another reas on h as b een ch ange in l ayouts of many fl oors to accommodate users’ requirements. 83. The pr ogress o n ph ysical in frastructure has b een b etter th is year u nlike th e previous year whe n 75% o f the budgetary allocations for buildings and facilities were utilized. This y ear Rs.1,000.00 Million is ex pected to be s pent which would be around 90% of the budgeted amount of Rs.1,122.00 Million. 84. The list of Projects completed in 2013-14 that are fully functional and operational is given below: i) HBL Academic Centre at City Campus ii) Power Centre iii) Ele ctrical Infrastructure iv) Laying of Water Pipeline and construction of Water Tanks v) Sewage Treatment Plant vi) M. Habibullah Visiting Faculty Residence vii) New Girls Hostel viii) Soakage pits for colony, Boys hostel and girls hostel ix) Electrical Infrastructure for colony, Boys hostel and girls hostel BUDGET 2014-15 Page 25 PROPOSED PLAN 2014-15 85. Six new projects have been added for execution to projects already in hand. Out of these 12 projects in hand, eleven (11) projects are scheduled to be completed in 2014-15 wh ile one project i.e. co nstruction of Ne w Boys H ostel Blocks B&C will be completed in 2015-2016. It is p roposed to i ncur an expenditure of Rs.960 Million during the fiscal year 2014-15 on twelve on-going projects. Eleven of them are scheduled for completion during the year. 86. The following projects are scheduled to be completed in 2014-15: i) Renovation and Up-Gradation of F auji Fe rtilizer B uilding (Administration Block) ii) Renovation and Up-Gradation of Mian Abdullah Library Main Campus iii) External Development Works City Campus iv) Construction of MJ Auditorium, City Campus v) External Development Works at Main Campus vi) Construction of Multi-Storied Building (Aman Tower), City Campus vii) Construction of Clinic viii) Construction of Transport Facilities Building xi) Façade and Interior Development of Multi-purpose Building and Construction of Server Room at Ground Floor Multi-Purpose x) Old Mosque Development xi) Existing Canteen Façade Development 87. Projects Scheduled to be completed in 2015-16 i) Construction of New Boys Hostel Block B&C BUDGET 2014-15 Page 26 IV. COMMUNITY OUTREACH CENTER FOR ENTREPRENEURIAL DEVELOPMENT (CED) OUTCOMES 2013-2014 National Consortium 88. A n ational consorti um on En trepreneurship Educ ation and Training has b een established. Eight regional universities from all the provinces (listed below) have joined this partnership. i) NED University of Engineering & Technology - Karachi ii) IBA - Sukkur iii) Indus Valley School - Karachi iv) University of Engineering & Technology - Lahore v) GIFT University - Gujranwala vi) National University of Science & Technology - Islamabad vii) Institute of Management Sciences – Peshawar viii) Baluchistan U niversity of Infor mation Te chnology and Management Sciences – Quetta Research, Education & Training 89. The following activities were carried out during the year: The Global Entrepreneurship Research Surveys (GEM) for the year 2010 and 2011 were carried out. IBA branded a business plan competition named “INVENT” which is being held for the third time now. Entrep reneurship courses in the BBA and the MBA p rogram were introduced, Specialized BBA program focused in entrepreneurship was established, Social Entrepreneurship Event ISERVE Several workshops were conducted at different Universities. 90. Eleven research papers were published and presented at conferences across the world. BUDGET 2014-15 Page 27 Incubators: 91. Twenty Eig ht businesses w ere provided i ncubation s pace at CE D. Many of o ur EDP students were provided small seed money ranging from Rs. 10,000 to Rs. 25,000. We h ave also expe rimented do ing a c rowd funding ev ent w hereby businessmen from industry are invited and the students get to pitch their ideas in front of them. If the investors are convinced b y the business plan th ey invest in the business wit h a certain percentage sh are of profits. One of the c ompany “Papa Jobs” was able to raise Rs. 500 ,000 from a group of inv estors for a 35% return on investment. Invent 2013 92. A na tionwide business competition was su ccessfully held in IBA whic h attracted more th an 30 00 stud ents f rom al l over th e co untry. T he c ompetition was held over a p eriod of 6 months, where students were shortlisted on the basis of their business i dea and imp lementation. The finale was h eld in June a nd students were awarded cash prizes. CED Accelerator program 2013. 93. CED successfully conducted a business accelerator program for students from all over the city. To qualify for a s eat in the program the student(s) have to present their idea to a panel of judges. After which the successful students are allotted an incubation space alo ng with mentoring an d n etworking with successful entrepreneurs. Many of the companies are performing very well and are earning reasonable amount of revenues. Kids Entrepreneurship Program 94. A summer program o n Kids Entre preneurship was or ganized for school g oing kids b elonging to un derprivileged areas. The y were trained o n h ow to think like an entrepreneur and advises were given on how to h elp parents earn income as well as continue to attain high education. BBA Entrepreneurship 95. Based on new pe dagogy stud ents o f BB A – Entrepreneurship ha ve successfully launched their business without any borrowing from the institute. Majority of the BUDGET 2014-15 Page 28 students h ave their b usinesses up an d run ning wit hin IBA a nd a re doing v ery well. EDP Success 96. After successful completion of the EDP batch, a surv ey was done to assess how many stu dents were running their b usinesses. T he s urvey revealed that mo re than 70% of the students from batch II had their business up and running. Some were doing very well while some needed further guidance. Thus as a f ollow up, students wer e called in CED for further m entoring an d gui dance o n impr oving their business performance. PROPOSED PLAN 2014-2015 Education 97. The following activities related to teaching are planned. Incorporating t he new t heory of effectua tion i n all t he entr epreneurship courses. The following new Entrepreneurship courses in the BBA/MBA program will be offered: En trepreneurial Management En trepreneurial Marketing Entrepreneurship and opportunity recognition So cial Entrepreneurship New Training Courses 98. CED plans to offer various short term courses on different aspects, themes and for varied target g roups. Co urses and activities specific to women’s entrepreneurship and family business are also being developed. The courses that will be offered in 2013-14 tentatively are: a) 18 months Post Graduate Diploma in Entrepreneurship & Family Business in collaboration with SP Jain Institute of Research and management. b) 4 month W omen En trepreneurship Progr am in part nership with Enclude Solutions c) Tech nology entrepreneurship for Engineers BUDGET 2014-15 Page 29 d) Entrepreneurship Development Program (EDP) 99. Several research studies are planned to be undertaken during 2014-15 including several c ase stu dies, r eports on State of Entrepreneurship and Imp act o f EDP program and Invent. Incubators 100. It is envisioned that CED will incubate more than 50 companies in the coming year a s already the num ber has re ached 2 8. Many com panies have g raduated and many are in the process of improving their business. EXECUTIVE MBA PROGRAMS 101. At the beginning of FY 2013-14, there were 261 participants in EMBA program. During this year, 127 professionals completed their course work and moved out of the activ e tally. W e ca rried o ut three i nduction eff orts, re sultantly 126 new participants joined in, carrying the year end number to 260. 102. During FY 20 14-15, ove r 12 0 EMBA p rofessionals are expected to co mplete their education a nd w ill m ove out from th e a ctive lot. To r eplenish this natural outflow, we hav e pl anned at le ast two induction efforts during August a nd December 2014. EMBA marketin g p lan includes personal v isits to t he select corporate e ntities a nd m aking presentations to th e ma nagement and p otential candidates. In addition to th is, the pr ogram office will reach out to th e serving executives throu gh; letters, em ails, p hone calls a nd social media. Efforts are also underway to market selective EMBA courses to those professionals, who either c ould not cle ar the a dmission test or a re unable to joi n a f ull two years degree pr ogram. W ith the projected fr esh i ntake of 12 0 p articipants the y earend tar get of active r egistration (on a verage) for EMBA will be 2 72 with estimated fee revenue of Rs.61 million. CENTRE FOR EXECUTIVE EDUCATION OUTCOME 2013-14 Open Enrollment Programs BUDGET 2014-15 Page 30 103. Thirty Nine open enrollment workshops were conducted during July 2 013-May 2014. 750 executiv es were trained in th ese workshops. Thes e in cluded workshops cond ucted in col laboration wit h international bus iness schools and foreign faculty such as the In dian Sch ool o f Business a nd SP Jai n Institute of Management and Research, Mumbai Customized Programs Client-Specific Diploma/ Certification 104. This year CEE trained the 3rd batch of the PGD i n Business Administration for Atlas G roup (35 ca ndidates) of Companies, the cla ss work a nd live projects completed. Res ult is b eing co mplied. CEE t rained 2nd b atch t raining for Certification of Business Administration for Sanofi-Aventis (45 candidates). Short Duration Courses 105. Tailor m ade train ings w ere conducted fo r el even cl ients, in w hich 736 participants were trained. PROPOSED PLAN 2014-15 Open Enrollment Programs 106. CEE pl ans to off er approximately 40 o pen e nrollment programs i ncluding collaborative semi nars with Ce nter for Ex ecutive Educati on-Indian Schoo l of Business Hyderabad, India and S. P. Jain Institute of Management & Research, Mumbai. 107. Strategic thru st will be on high-end work shops c onducted by facu lty me mbers and other institutions o f h igh r epute as well a s co nducted by the f aculty from ISB, INSEAD, HAAS, Queen’s Business School etc. Customized Programs 108. This year CEE will continue to train the 4th batch of th e DBA for Atlas Group of Companies and co mplete second batch tr aining fo r Certification o f Busi ness Administration for Sanofi-Aventis. Diploma Programs 109. HR, Hospital, PM, SCM are under approval with Academic Board. BUDGET 2014-15 Page 31 HR Diploma: The diploma is rev iewed by ten practitioners, 4 academicians and a b ody of Pakist an Society for H uman Resource Management. The course content is ready. Hospital Management Dipl oma: Th e course c ontents h ave be en reviewed a nd f inalized by t he g roup comp rising of t he pr ofessionals and academicians fr om th e Indus Hospital, Ag ha Khan U niversity Hospital, Tabba Hospital and Liaquat National Hospital. Project M anagement Diploma: The co urse co ntent is accredited by Project Management Institute US. Re ady for delivery after the Academic Board approval SCM Di ploma: Altho ugh c ourse c ontent is r eady, inte rnational accreditation wit h the Supply Ch ain Council is a waited. The course content is developed with the team of expert and practitioners. 110. Once t he Academic Board approves, CEE p lans t o offer (Th ree) 3 Pos t Graduate Diploma in the following fields: Diploma in Project Management Diploma in Su pply Chain Management with th e Supply Chain Council (SCOR) USA Diploma in Hospital Management or Human Resource Board level programs with SECP 111. CEE-IBA has been granted accredited education provider status by SECP. This will enable t he CEE to hol d C orporate Go vernance Courses f or the Board Members. SKILLS DEVELOPMENT PROGRAMS OUTCOMES 2013-14 Skills Development Programs 112. Thirty One skills development programs were conducted during July 2013-May 16, 2014. 583 executives, students & teachers were trained in these courses. Programs were offered under Eighteen (18) titles. BUDGET 2014-15 Page 32 Fourteen (14) new titles were introduced this year PROPOSED PLAN 2014-15 Skills Development Program 113. Approximately Fort y Se ven (47 ) skills de velopment p rograms are pl anned for 2014-15. Nearly 799 e xecutives, stud ents & teac hers wi ll be tr ained in th ese courses. Programs will be offered under Twenty Three (23) titles. Six (6) new titles are planned to be introduced this year NATIONAL TALENT HUNT PROGRAM 114. In 2013, the 9th batch of the NTHP program was launched by including both the HSSC Level – I students who have cleared matric in 2012 and those who would be a ppearing for HSSC L evel – I ex amination in t he ye ar 2013. Both th ese groups were brought to IBA for one month orientation program in 2013 followed by another or ientation program in 2014. Those stu dents w ho h ave a lready cleared the HSSC L evel – I examination in th e year 2012 and have taken the one month orientation program in th e y ear 2 013, wil l be inv ited a gain i n 2014 after their HSSC Level-II examination. A total of 357 candidates appeared at the initial screen ing t est, for the batch 2 013, Sixty Th ree (63) ca ndidates we re selected fo r o ne m onth o rientation. Thirty Six (36 ) st udents wh o had c leared their HSS C II appe ared at the IBA Aptitude Test a nd 2 2 successfully gained admission in the BBA/BS programs. 115. The 10th Batch of the NTHP Program was launched by focu sing on a revis ed marketing strate gy. A special session wa s arranged f or Hi gh Achievers of the TCF School which r esulted in 52 can didates ap plying for the NTHP p rogram. 600 candidates appeared at the initial sc reening test for th e 2 014 orientation program, 82 candidates were selected out of them. SINDH FOUNDATION PROGRAM 116. In collaboration with the Community Development Program –CDP, Government of Sindh, IBA launched the ‘IBA-Sindh Foundation Programme -2013’ to identify meritorious-cum-needy students from the less advanced districts of Sindh . The selected students are provided an intensive six months foundation program that BUDGET 2014-15 Page 33 prepares them for taking the IBA or other institution entrance examination and interview. 475 students applied for the Sindh Foundation Program out of which 199 c andidates ap peared i n t he in itial s creening test. 38 ca ndidates w ere selected for the six month Foundation course. Up on completion of the course 10 candidates were succ essful i n ob taining adm ission in t he BS (CS) and BS (Economics & Mathematics) Program. 117. The 2nd Batch of the Sindh Foundation Program has specially targeted students belonging to t he Inter ior Si ndh and those fr om T CF sch ools. 31 6 can didates have applied for the SFP Program 2014 out of which 206 candidates appeared in t he i nitial screening test. 32 candidates w ere s elected for t his six mo nths program. PROPOSED PLANS 2014-15: 118. For the recruitment of Batch 2015, we have the following plans: a. To visit the major schools & colleges throughout Pakistan to promote the NTHP & Sindh Foundation Program. b. To lau nch th e Ambass ador Progr am f or the IBA students wh o w ould promote the NTHP/Foundation Program in their hometowns by visiting the major colleges/schools. c. To contact, The Citizen Foundation for holding awareness seminars about these programs in their regional TCF schools & colleges of Pakistan. d. Flyers, Posters & Standee distribution will be ca rried th rough BDO’s of Meezan Bank Limited in their respective regions. e. To contact all th e BISE bo ards of Pakistan to collect the following lists of students: i. Matric: List of a ll groups w ho have cl eared m atric examination in 2013. The eligibility criteria will be 80% or above. ii. HSSC L evel-I: List of all groups wh o have clea red HSSC Lev el-I examination in 2013. The eligibility criteria will be 75% or above. f. To p romote the N THP/Foundation P rogram through th e Facebook, P rint Media-AD and internal Newsletter. g. To c ollect the data f rom t he NT HP/STHP Alumn i m embers to use it f or research purpose. BUDGET 2014-15 Page 34 119. Two separate p rograms ar e b eing planned for br inging in tale nted a nd deserving students b elonging to the de prived areas of Baluchistan & Khyber Pakhtunkhwa students to IBA and preparing th em fo r the aptitu de te st for the undergraduate programs. Curr ently pr oposals h ave been se nt to the CMEEF (Khyber Pakhtunkhwa), HEC- US-AID and Government of Baluchistan. BUDGET 2014-15 Page 35 Part C PROPOSED BUDGET 2014-15 Review of Budget 2013-14 120. The total actual expenditure (Revenue & Capital) is expected to be in the range of Rs.1 965 mil lion a gainst the appr oved b udget o f Rs.2206 mill ion (net of Depreciation) – a s aving of Rs.241 mi llion m ainly be cause of lower c apital expenditure incurred during the year. Table I compares the actual outcomes for different heads against the budget appropriations and show the variances. Table – I Comparison of Budget 2013-14 with Actual Projections (A) A. Expenditure A-1 Operating Expenditure (net off Dep) A.2 Capital Expenditure Budget Projected 2013-14 Actuals Variation 955.3 919.3 36.1 1,250.5 1,045.4 205.1 2,205.9 1,964.7 241.2 715.9 754.0 38.1 (B) Revenue B.1 Operating Revenues (net of amortization) B.2 HEC Grants 91.8 119.5 27.7 B.3 Govt. of Sindh – Grant in Aid 50.0 50.0 - B.4 Interest on Reserves 99.4 96.1 (3.3) 957.1 1,019.6 62.6 835.4 607.9 (227.5) (413.4) (337.1) 76.3 Other Sources of funding Net (Deficit)/Surplus 121. The actual operati ng expenditure was Rs.919 million for th e ye ar against th e approved budget of Rs.955 million – an u nder expense of Rs.36 million largely caused by low employment cost during the year. The actual Capital expenditure BUDGET 2014-15 Page 36 however, estimated at Rs.1,045 million has fallen short of the Rs. 1,251 million budget estimate by Rs. 205 million . The main source of this shortfall was slow progress i n t he c onstruction o f A man T ower at t he C ity C ampus. Ce rtain exceptional circumstances such as ba d law an d or der situation and unanticipated shut down of business and transport in the city also slowed down the pace of construction. 122. The physical pr ogress ma de on the b uildings, facil ities, a cquisition of equipment, furnitur e a nd fix tures is co mmensurate with the disbursement of funds. Cost overruns over and above the original tendered amounts have been kept to minimum possible levels. 123. The total revenues of the Fiscal year 2013-14 (Rs.1,020 million) are higher than Rs.957 m illion a pproved i n the bud get, mainly be cause of the increase in students’ e nrolment b y 153 stu dents (A ctual enrolment was 2969 st udents – Budgeted was 2 816 students) and the income realized on faculty development under the HEC – PSDP project. Faculty development amount could not be used in the earlier years due to lower number of Ph.Ds. sent abroad. 124. As against the a pproved operational budget 2 013-14 (Ta ble II) the projected outcomes till June 3 0 show a surplus o f Rs. 100.4 million as agai nst the budgeted surplus of Rs.2 million. The actual draw down on IBA reserves would be limited to Rs.337 million against budget estimate o f Rs.413 million. An amount of Rs.175 m illion has be en pr ovided as bri dge fina ncing to co ver the temporary funding gap and to ke ep up the momentum of physical progress on planned projects. This amount will be recovered from the donors in the c oming years in accordance with the agreed disbursement schedule. BUDGET 2014-15 Page 37 TABLE II Summary of Budget and actual outcome Budget Projected 2013-14 Actuals Variation 1. Operational Budget Operating Revenues 715.9 754.0 38.1 Operating Expenses 955.3 919.3 36.1 Operational Deficit 239.4 165.2 74.2 141.8 169.5 27.7 99.4 96.1 (3.3) 241.1 265.6 24.5 1.7 100.4 98.7 1,250.5 1,045.4 (205.1) 1,248.8 945.0 4. Total External Financing 835.4 607.9 5. Draw down from reserves 413.4 337.1 Financed By Government grants Income from Investment Surplus / (Deficit) on Operational Budget 2. Capital Budget Capital Expenditure 3. Total Funds Required BUDGET 2014-15 Page 38 BUDGET PROPOSAL FOR 2014-15 125. Table III present the summary of Budget proposals for 2014-15. It is e stimated that th e total expenditure during t he ye ar will reach a l evel of Rs.2.121 billion against th e tot al resources of Rs. 1.98 5 billion l eaving an overall deficit of Rs.135 million. BUDGET 2014-15 Page 39 TABLE III Summary of Budget 2014-15 compared with Projected actuals Budget 2014-15 (A) Expenditure A1 Operating Expenditure (net off Dep) A.2 Capital Expenditure Projected Actuals Variation 2013-14 1,160.9 919.3 (241.6) 959.7 1,045.4 85.7 2,120.6 1,964.7 (155.9) (B) Revenue B.1 Operating Revenues (net of amortization) 982.2 754.0 228.1 B.2 HEC Grants 142.1 119.5 22.6 B.3 Govt. of Sindh – Grant in Aid 60.0 50.0 10.0 B.4 Interest on Reserves 110.0 96.1 13.8 1,294.3 1,019.6 274.6 690.9 607.9 83.0 (135.4) (337.1) 201.6 (C) External Funding Donor Funding Net (Deficit)/Surplus 126. The expenditure level show an increase of Rs.156 million or 8 percent over the projected actual ex penditure of Rs.1.9 65 billion i ncurred i n 20 13-14. Chart I shows t he b reakup of the to tal expenditure in 2014-15 into i ts two ma jor components – 4 5 percent on C apital e xpenditure a nd 55 percent o n operational. In 2013-14 Capital expenditure had accounted for 53 percent of the total and operational expenditure 47 percent. 127. Most of th e pr oposed in crease in expenditures can b e attributed to ris e in operational ex penditure by 26 percent i.e. from Rs. 9 19 mi llion in 2 013-14 to Rs. 1,161 million in 2014-15. 128. Capital expenditure in the coming year is planned a t Rs.960 million – 8 percent lower than the current year as most of the projects have either been completed BUDGET 2014-15 Page 40 or will be comple ted. The p ickup in the pace of work on the Aman Tower building, witnessed in the last few months, is expected to continue unabated. BUDGET 2014-15 Page 41 BUDGET 2014-15 Page 42 129. Chart II sho ws the breakup of th e total resources that are likely to b e available to meet the b udgetary targets. Th e c ontribution of dono rs is e nvisaged at 33 percent. Another 46 percent will accrue from Ope rational revenues, 10 percent from the Government grants, 5 percent from investment income, and 6 percent by draw down from IBA reserves. IBA reserves will therefore decline to almost negligible amount. However as at 30 June 2015, bridge financing against donor commitments for projects would be Rs.108 million approximately. BUDGET 2014-15 Page 43 BUDGET 2014-15 Page 44 130. The Ope rational Bu dget co nforms to the Financial Su stainability Model that is based on the premise th at o perational r evenues s hould s uffice to fi nance operational e xpenditure. Operational re venues of Rs.1294 mill ion will be adequate to ta ke c are of operationa l expenditure of Rs.1161 m illion. There is some de gree o f con servatism built in th e revenue pr ojections. The ne wly introduced programs assume intake of 180 in BS Accounting and Finance and 90 students in BS Social Sciences. In c ase, 60 more students are admitted to BS Accounting and Finance, which still seem to be attracting a lot of attention, an ad ditional y ield of Rs.1 8 m illion c an be ex pected but this amo unt is not included in the e stimates o f operational revenues. On the negative side, if the K-Electric electricity tariff s rise our estimates of util ities will fa ll short o f the Actuals leaving an uncovered g ap. T hus, the r ange of operational budget outcomes could be plus 3 percent o f t he point esti mate pro posed t o m inus 3 percent. 131. Table IV below pres ents the ne t funding so urces for the three ye ars. Th e welcome news is that in ternally generated funds i.e. tuiti on and other fees will account for 46 percent of the total funding up from 32 percent two years ago. As capital projects are coming to culmination point the relative contribution of donor funds has declined to 33 percent compared to 45 percent in 2012-13. BUDGET 2014-15 Page 45 TABLE – IV Net Funding Sources 2013-14 and 2014-15 (Percentage Share) Budget Budget Actual Budget Actual 2014-15 2013-14 2013-14 2012-13 2012-13 Tuition fees & other fees 46 32 38 27 32 Endowment / In 55 5 6 10 33 38 31 55 45 7 5 vestment Income Domestic Gifts / Donations / Grants Government Support 10 6 968 including Development Draw Drawn from 6 19 17 Reserves Estimated Operating Revenues 132. The Operating Revenues for the year 2014-15 are estimated at Rs.970 million - 28% higher than the Projected Actual Revenues at Rs.758 million. The ov erall increase of Rs. 212 million has been decomposed in Table V below:- BUDGET 2014-15 Page 46 Table – V Summary of Operating Revenues (Rs. million) Proposed Projected Budget Actual 2014-15 2013-14 % Variance Increase Program Revenues 735 605 130 21.5% Non-Program Revenues 120 80 40 50.0% 5 74 41 41.2% 70 758 212 27.9% Scholarships 11 Total 9 133. Chart III sho ws the comparative picture of revenues mob ilized in 2013-14 and proposed for 2 014-15. As can be note d, the relative contribution of Re gular programs has now risen to almost one half of th e total revenues. Thus internal revenue generation from Regular and Executive Progr ams / Non-program fees now a ccount fo r almost 75 percent of the total, the re maining 25 percent from Government Gra nts a nd Ex ternal Sc holarships. In 2 013-14 internal revenue generation contributed 68 percent of the total. 134. The main explanatory variables for increase in operating revenues are: Increase in fresh intake of students 88m Proposed fee increase by 10% effective from Fall 2014 74m Non program revenue increase 40m Increase in Scholarship funding 41m Total 243m 135. It may b e relevant to p oint out that the f ees for BS Accounting and F inance have been ra ised t o the same le vel as BBA becaus e the d emand for this program was unexpectedly high in 2013-14. The increase in fees proposed for BUDGET 2014-15 Page 47 next aca demic y ear is 10% (for all stu dents); The existing a nd proposed fee structure (per semester) are presented below: Table – VI Tuition Fee Structure Programs BBA / MBA / BS Accounting and Finance BS 7 MS / MBA Evening (Fee for average three courses) Existing Proposed Fee Fee 126,000 138,000 2,000 80,000 63,000 69,000 BUDGET 2014-15 Page 48 BUDGET 2014-15 Page 49 Estimated Operating Expenses 136. The p roposed Operating Expenditure o f R s.1,510 mil lion represents 25% increase over the actual expenditure of Rs.1,210 million for the last year (Table VII below). Net of depreciation, the increase is 26 percent – Rs.1161 million visa-vis Rs.919 million. BUDGET 2014-15 Page 50 TABLE – VII Summary of Operating Expenses (Rs. In 000) Budget Projected 2014-15 Actuals Variance % Change 2013-14 A) Employment Cost B) De preciation Expense C) Scholarships D) Util ities E) ICT Services F) Repair & Maintenance G) Talent Hunt Program H) Training & Development I) Students' Transportation J) Insurance Expense K) Printing and Stationery L) Fuel & Diesel Expenses M) Library Services N) Se curity Services Seminars, Meetings, & O) Convocation Expenses 621,108 349,513 91,430 91,230 89,678 68,098 53,421 40,228 23,603 14,600 14,715 12,000 10,100 10,530 514,163 290,917 66,191 77,519 46,928 50,408 25,923 30,453 21,571 10,297 12,366 11,229 10,126 8,497 106,945 58,597 25,238 13,711 42,750 17,690 27,498 9,775 2,032 4,303 2,349 771 -26 2,033 20.8% 20.1% 38.1% 17.7% 91.1% 35.1% 106.1% 32.1% 9.4% 41.8% 19.0% 6.9% -0.3% 23.9% 7,922 5,872 2,050 34.9% r Expenses 12,263 1,510,437 27,720 1,210,179 -15,458 300,258 -55.8% 24.8% Net off Depreciation 1,160,924 919,263 241,661 26.3% P) Othe 137. Table VII presents a com parative pictu re of o perating exp enses for the y ear 2014-15 an d p rojected actua ls of 2013-14 wh ich do not differ very much a nd are m ore o r l ess stable. Th e tota l increase of Rs. 300 million c an be decomposed into two major components – Employment cost increase of Rs.107 million and running expenses of Rs.19 3 million. The expansion in physical and ICT infrastructure at IBA during last few years has not only attracted substantial increase in stud ents’ strength but ha s l ed to progressive i ncrease i n our operational expenses. The nota ble incr eases a re an ticipated in Depreciation, Facilities man agement and Uti lities. A detailed a ccounting of changes is presented in (a) to (f) below: BUDGET 2014-15 Page 51 (a) Salaries of Faculty and Staff (increase by Rs.107 million) The bud get fo r Fa culty & Staff sa laries wo uld be im pacted by the Average annual increment approved by the Board of Governors for the faculty / staff. (b) Depreciation expense (Increase by Rs.59 million) The depreciation ex pense h as b een moving u pwards a ligned wit h the increase in Fixed Assets, especially depreciation on Computers & peripherals @33% a nd civ il w ork projects com pleted in current and next fiscal y ear as follows: Major projects Capitalized during 2013-14: FCS Building P ower Centre Electrical Infrastructure Visiting Faculty Residence New Girls Hostel Major projects expected to be Capitalized during 2014-15: Multi-Storied Building (Aman Tower), City Campus Administration Block Main Campus Library Main Campus Auditorium, City Campus Cli nic (c) Transport Facilities Building Scholarships (increase by Rs.25 million) IBA will offer M erit scholars hips to 1 22 students in 20 14-15 as co mpared to 105 st udents in 2 013-14. Need bas ed scholarships will b e awar ded to 334 students in 2014-15 relative to 348 students in 2013-14). The increase can be explained as:- Merit scholarships by Rs.4 million - Need based scholarships by Rs.21 million BUDGET 2014-15 Page 52 This increase is expected as our students’ strength will also rise from 2969 to 3359. Need based scholarships are almost fully covered through external funding. (d) Utilities (increase by Rs.14 million) Major i ncrease is due t o increase i n electricity lo ad & its consumption at both campuses. KE electric tariff also increased by 12% to 14%. (e) ICT Services (increase by Rs.43 million) The additional exp enditure is attrib utable t o the support services of Hardware purchased in earlier years. Most of the hardware purchased had 3 years of Service Level Agreements (SLA) embedded in them, which have expired. (f) Repair & Maintenance (increase by Rs.18 million) This includes various ma intenance c ontracts for Eq uipment & Buildi ng. Detai ls are as under: Air conditioners & Chillers at an estimated cost of Rs.18.0 million Various s ervices have als o been outsourced to upke ep th e Bui lding and Structure at Rs.39 million. This mainly includes the Janitorial and Housekeeping services, Service Level agreements (SLAs) for Garbage disposal and Building Management System etc. (g) Training & Development (increased by Rs.10 million) Includes c ost of 10 faculty memb ers fo r PhD program including 8 faculty members on Split Ph.D. from India/France a nd Southampton, UK. The fundi ng of these scholarships w ill be met from HEC – PSDP project. Other Foreign & Local trainings are budgeted for the next year at a cost of Rs.5.5 million including trainers invited from abroad. BUDGET 2014-15 Page 53 BUDGET 2014-15 Page 54 Capital Expenditure 138. Table VII I sh ows the tota l c apital expenditure pr oposed fo r 20 14-15 i.e. Rs.959.7 million o f which Rs.867 mil lion would be fo r ci vil wo rks wh ile Rs.64 million are al located f or the information and Communication Technology (ICT) projects. Table VIII Summary of Capital Expenditure Rs. In million Budget (a) Civil Works Projects 2014-15 Type of Project Renovation Projects at City Campus 39.9 HBL Academic Centre 1.5 External Development 38.4 Renovation Project at Main Campus 97.5 Mian Abdullah Library 43.1 Fauji Fertilizer Building (Administration Block) 54.4 New Projects at City Campus 470.0 Aman Tower 470.0 New Projects at Main Campus 204.0 Govt. of Sindh Boys Hostel 80.0 NBP Technology Block (Multipurpose Bldg) 11.0 External Development 90.5 Clinic Building 15.0 Transport Facility Building 7.5 Architect's, Consultants' & Project Managers' fee 35.2 Miscellaneous Works & Jobs 20.1 Total: 866.78 (b) IC T Requirements Hardware Costs 60.2 Software Costs 3.5 63.68 (d) Other Capital Expenditures Furniture & Fixture, Equipment, vehicles, Library Books etc. 29.2 Total: 959.70 BUDGET 2014-15 Page 55 139. It may b e seen that the major component of capita l budget for this y ear would be Ama n T ower at th e City Campus which will co nsume a lmost half of the budget. External development projects at both the campuses are als o likely to reach their end point in this fiscal year. The Government of Sindh has approved funding for starting work on block B and C of Boys Hostel. RISK TO THE BUDGET OUTLOOK 140. Major risk for the year 2014-15 will be that of filling in the gap between the total funding re quirement an d th e amo unts likely to b e available from th e donors. The ov erall shortfall betw een re sources availa ble and the res ources r equired would be of Rs.135.4 million which will be met from the IBA re serves leaving a marginal balance. Howeve r, in order t o co mplete th e pla nned projects, IBA is required to raise Rs.600 million in the next two years to fill in the funding gap. To mitigate t his r isk ne w start-ups such as Faculty Apartm ents, external development works a t various IBA loca tions, interior decor ation of t he A man Tower have to be revisited. This should be judged against the foregone benefits of Ex ecutive Educ ation r esidential c ourses a nd attracting ex patriate fac ulty to IBA. 141. The oth er risk in achieving the budget targets fo r capit al ex penditures would remain poor security / la w and order situation in Karachi. Though the s ituation has improved a bit. In ca se the situation p ersists, Capital expenditure may not reach the target an d the re may be under sp ending. In tha t case, the IBA Reserve draw down will be reduced to that extent and we would end up with a larger reserve on June 30 2015 than projected in the Budget. 142. Finally, IBA h as been providing bridge financing out of its own reserves for the projects where th e di sbursements f rom donors t ake pl ace in installments and are spread over n ext few years. There is a risk th at some of th e donors may back out of their commitments. As most of the d onors from whom we have got the pledges a re well reputed c orporate entities or w ell r espected foun dations and philanthropic organizations th e cha nces for this risk to materialize appear slim. But we have to mitigate this risk by continuous monitoring and follow up. BUDGET 2014-15 Page 56 CONCLUDING REMARKS 143. IBA has converted its cash a nd li quid reserves into real ass et formation a s it renovates, moderni zes t he existing buil dings and f acilities and c onstructs new ones. This b udget mo ves further in th at d irection an d pl ans to a dd up cap ital assets of Rs.960 million during the year 2014-15. 144. The changes in the net asset position of IBA be tween June 2008 to June 2014 are summarized below:(Rs. in million) Financial Assets IBA Reserves on 6/30/08 1,133 Endowment Funds 6/30/08 21 IBA Reserves on 6/30/14 139 Endowment Funds 6/30/14 768 (Including General En dowments, En dowed Chairs a nd e ndowments for Fa culty Development/ Scholarships/NTHP) Capital Assets On 6/30/08 290 On 6/30/14 4,226 Total Financial and Capital Assets On 6/30/08 1,444 On 6/30/14 5,133 Net Addition in Financial & Capital Assets between 2008 and 2014 3,689 145. Approval of the BO G is so ught for the Budget proposals for 2014-15 contained in this memo. BUDGET 2014-15 Page 57 Annexure A Faculty Publications 2013-14 Conference - International: Faculty of Business Administration: 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. Farah Naz Baig, Jami Moiz, ”Materialism and Beauty Perceptions amongst the Young Female Pakistani Consumers”, ISMS, Published by: INFORMS Marketing Science, Istanbul, Turkey, July 11, 2013-February 13, 2014. Dr. Huma Amir, ” Exploratory St udy on Changing Cons umer Cultural Tr ends in a Developing Ec onomy”, The 35th INFORMS Mar keting Science Conference, Published by: INFORMS, Istanbul, Turkey, July 11, 2013-July 13, 2013. Dr. Ze enat Isma il, Jehangir K aleem, ”Television Viewing and C onsumer Behaviour: The Effect o f Personality Traits and Demo graphic Variables on Children’s Co nsumer Soc ialization”, 3rd Shangh ai In ternational Conference on S ocial S ciences- S ICSS, Published by: 3rd -S ICSS 20 13, Shang hai, China, July 11, 2013-July 13, 2013. Dr. Huma Amir, ”From Print to E-Newspaper Readership: An Analysis of Relevant Factors for Transition to O nline Readership”, Proceedings of LCBR European Marketing Conference 2013, Published by: Lupcon Center for Business Research, Frankfurt, Germany, August 15, 2013-August 16, 2013. Nida A slam Khan, ” The Effectiveness of Ge nerational Seg mentation in Tele communication Sec tor: a n E xploratory Stud y of P akistani Mark et”, L CBR European Marketing Conference, Published by: Lupcon Center for Business Research, Frankfurt, Germany, August 15, 2013-August 16, 2013. Mahreen Nazar, Dr. Mohammad Nishat, ”Desirable code of corporate governance for non-listed companies – An Experience from Pakistan”, EUROMED conference, Lisbon, Portugal, September 1, 2013. Dr. Huma Naz Siddiqui Baqai, ”Pakistan in Trans ition towards a Substantive Democracy”, International Conference on Social Sciences (ICSS), Izmir, Turkey, October 4, 2013-October 5, 2013. Mohammad Kamran Mumtaz, ”Development of an Innovative Methodology for Design of Milk Collection Network”, 44th Annual Meeting of the Decision Sciences Institute, Baltimore, Maryland, United States, November 16, 2013-November 19, 2013. Mohammad Kamran Mumtaz, ”Designing the Milk Collection Network”, 3rd South Asian Management Research and Case Conference 2013, Bangalore, India, December 1, 2013. Yasmin Za far, Salman, F aryal, ”CONSUMER PURCHASE BE HAVIOUR OF BRANDED COTTON FABRI CS I N PAKISTAN AN EXPL ORATORY RE SEARCH”, ANZ MAC Con ference P roceedings 2013 Link:http://anzmac.org/conference/2013/papers/anzmac2013-427.pdf, Published b y: ANZMAC 201 3, A uckland, N ew Z ealand, De cember 2, 201 3December 4, 2013. Dr. Moha mmad N ishat, Ahmad Gh azali, ”Corporate Governance a nd Firm P erformance: An Agenc y Cost Persp ective from Pakistan”, P roceedings World Finance and Banking Symposium, Page(s): 77, Beijing, China, December 16, 2013-December 17, 2013. Mohammad Kamran Mumtaz, Chatha, K. A, ”Value Chain Analysis in a n Emerging Market Dairy”, 3rd South Asian Management Research and Case Conference 2013, Bangalore, India, December 27, 2013-December 29, 2013. Salman Ahmed Shaikh, ”Micro-foundations of God-Conscious Economic Agents in Islamic Economy”, Proceedings, The Tenth International Conference On Ta whid a nd Th eW orld Sy stem BUDGET 2014-15 Page 58 14. 15. 16. p.326-344. ISBN 978-967-12286-0-9, Published by : University Kebangsaan Malaysia, Ka ula La mpus, M alaysia, December 26 , 2 013-December 27, 2013. Usman Nazir, Leon Me nezes, ” Creative Ch aos L LC c ase s tudy fo r 3 rd So uth A sian Ma nagement R esearch and C ase Conference 2 013”, 3rd S outh Asian Management Research and Case Conference, Indian Institute of Management Bangalore, Published by: INDIAN SCHOOL OF MANAGEMENT, Bangalore, India, December 27, 2013-December 29, 2013. Mohammad K amran Mumtaz, Jalil, M. N, Chatha, K. A, ”Designing the Milk Collec tion Network using I ntegrated Location Ro uting Approach”, Proceedings o f the 2 014 I nternational Conference on Industrial Eng ineering a nd Op erations Management Bali, Page(s): 1057-1068, Bali, Indonesia, January 7, 2014-January 9, 2014. Muhammad As if, ”Time Table and Sc heduled M eetings Problem: Co nstraint Op timization th rough Ev olutionary Algorithm”, Conference P roceedings: World S ymposium on Co mputer App lication and R esearch W SCAR 2 014, Published b y: World Symp osium o n Computer App lication and R esearch, Sousse, Tunisia, January 18, 2014-January 20, 2014. Faculty of Computer Science: 1. Imran Batada, Asmita Rahman, ”Role of Search Engine Optimization and E-marketing towards a stronger Web Presence.”, 6th International Conference on Computer Science, Published by: 6th International Conference on Computer Science, Paris, France, December 20, 2013-December 21, 2013. Conference - Local: Faculty of Business Administration: 1. 2. 3. 4. 5. 6. 7. Dr. H uma N az S iddiqui Baqai, ”Sexual Harassment”- A t aboo o r Re ality”, C onference o n Framework of Res pectful Workplace – “ Merit Culture ”, Published by: Innovative Keys, Karachi, Pakistan, June 22, 2013-June 22, 2013. Mohammad Kamran Mumtaz, ”Innovative methodology fo r th e analysis of s upply c hain networks”, LUMS Res earch S eminar S eries 2 013, Published by: LUMS, Lahore, Pakistan, September 20, 2013. Dr. Moha mmed Reh an Ma lik, ”"Study of Hu manities for Influencing So cial Reform in Pa kistan"”, Japan National Institute of H umanities, 4th Annual International Co nference, New H orizons in Is lamic Area Studies : Enc ounters, Re flections, and Col laborations, Vol: 4, Published b y: Japan N ational Institute of Humanities and LUMS, Lahore, Pakistan, November 2, 2013-February 4, 2014. Dr. Amber Gul Rashid, ”Young, Intelligent, Assertive - What's Holding Them Back?”, International Conference on Entrepreneurship for Young Women and Using o f New Te chnologies: Issues and Challenges, Fa tima Jinnah W omen's University, Published b y: NASIC, Pak istan, No vember 26, 2 013November 27, 2013. Syed Ammad, Dr. Qazi Masood Ahmed, ”Dynamic Effects Of Energy Sector Public Investment On Sectoral Economic Growth: Experience from Pakistan Economy”, 29th Annu al G eneral Meetin g an d C onference - Energ y S ecurity and E conomic S ustainability: T he W ay Forward, Published b y: Pakistan Society of Development Economics, Islamabad, Pakistan, December 19, 2013-December 21, 2013. Dr. Adnan Haider, Dr. Qazi Masood Ahmed, Zohaib Jawed, ”Determinants of Energy Inflation in Pakistan: An Empirical Analysis”, 29th Annual General Meeting and Conference - Energy Security and Economic Sustainability: The Way Forward, Published by: Pakistan Society of Development Economists, Islamabad, Pakistan, December 19, 2013-December 21, 2013. Farah Naz Baig, ”Match or Clash: Self brand Congruity and Mobile Phone Selection”, SZABIST National Research Conference, Published by: SZABIST, BUDGET 2014-15 Page 59 8. 9. 10. 11. 12. 13. 14. Karachi, Pakistan, December 21, 2013. Dr. Mohammed Rehan Malik, ”"Public Libraries in Karachi: Forms, Functions, and Governance"”, 1st South Asian Cities Conference and Pakistan Urban Forum 2014, Vol: 1, Published by: 1st South Asian Cities Conference, Karachi, Pakistan, January 9, 2014-January 12, 2014. Dr. Mohammed Rehan Malik, ”"Public Protests: Ethics, Culture, and Public Spaces in Karachi"”, 1st South Asian Cities Conference and Pakistan Urban Forum 2014, Vol: 1, Published by: 1st South Asian Cities Conference, Karachi, Pakistan, January 9, 2014-January 12, 2014. Salman Ahmed Shaikh, ”Tax Increment Financing in Pakistan”, Pakistan Urban Form, Published by: Pakistan Urban Forum, Karachi, Pakistan, January 10, 2014-February 12, 2014. Salman Ahmed Shaikh, ”Islam And Huma n Development”, Proceedings, Divine Economics Conference, Published by: AJK University, Muzaffarabad, Pakistan, December 12, 2013-December 14, 2013. Salman Ahmed Shaikh, ” Determinants fo r Savings in Urb an Pakistan”, Pro ceedings, 3 rd IR C, Sza bist, Published by : Szabist, Ka rachi, Pakistan, December 15, 2013-December 15, 2013. Mohammad Kamran M umtaz, ” Integrated loc ation rou ting decision problem in a milk co llection net work”, LUMS Res earch S eminar S eries 2013, February 14, 2014. Salman Ahmed Shaikh, ”Investment Decisions by Analysts”, Proceedings, 3rd IRC, Szabist, Published by: Szabist, Karachi, Pakistan, December 15, 2013-December 15, 2013. Journal - ERA: Faculty of Business Administration: 1. 2. Dr. Mahnaz Fatima, ”Impact of ISO 9000 on Business Performance in Pakistan: Implications for Quality in Developing Countries”, Quality Management Journal, Vol: 21, Issue: 1, Page(s): 16-24, Published by: American Society for Quality., USA, United States, January 1, 2014. Dr. Nausheen Hafeeza Anwar, ”Urban Transformations: Brokers, Collaborative Governance & Community Building in Karachi’s Periphery”, South Asian History and Culture, Vol: 5, Issue: 1, Page(s): 75-92, January 1, 2014. Faculty of Computer Science: 1. 2. 3. 4. Ali Raza, Dr. Sajjad Haider, ”Designing and Optimization of Omni-directional Kick for Bipedal Robots”, Lecture Notes in Computer Science,, Vol: 7906, Page(s): 292 – 301, July 1, 2013. Syeda Saleha Raz a, Dr. Sajjad Haider, Mary-Anne W illiams, ”Robot Re asoning using First-Order B ayesian Net works”, Lecture N otes in Computer Science, Vol: 8032, Page(s): 1-12, August 1, 2013. Dr. Qura tulain N izamuddin R ajput, Nida Sadaf Khan, As ma Larik , Dr. S ajjad Hai der, ” Ontology b ased Expert System fo r Sus picious Trans actions Detection”, Computer and Information Science, Vol: 7, Issue: 1, Page(s): 103-114, Published by: Canadian Center of Science and Education, January 1, 2014. Dr. Qura tulain N izamuddin R ajput, Nida Sadaf Kh an, As ma La rik, Dr. Sajjad H aider, ” Ontology Bas ed Expert-Syst em fo r Sus picious Tra nsactions Detection”, Computer a nd Information Sc ience (CIS ), Vol: 7, Issue: 1, Page(s): 103-114, Published by : Canadian C enter of S cience and E ducation, January 13, 2014. BUDGET 2014-15 Page 60 Journal - ISI: Faculty of Business Administration: 1. 2. 3. 4. 5. 6. Kashif Imran, Dr. Moha mmad Ni shat, ” Determinants o f b ank credit in Pak istan: A supply s ide appr oach”, Ec onomic Modelling, Vol: 35, Issue: September, Page(s): 384-390, September 1, 2013. Syeda Beena Butool, ”Pakistani Responses to AfPak Policy: Local Narratives and an Ending Global War?”, Asian Survey, Vol: 53, Issue: 6, Page(s): 1005-1036, Published by: University of California Press, Berkley, United States, December 1, 2013. Naeem Sa diq, Dr. M. Sh ahid Qure shi, ”Estimating R ecurrence Inte rvals of Ext reme Ra infall through a P robabilistic Modelling ap proach for differ ent urban areas of Pakistan”, The Arabian Journal for Science and Engineering., Arab J Sci Eng (2014), Vol: 39, Issue: 1, Page(s): 191-198, Published by: Springer Publishing, Saudi Arabia, January 1, 2014. Asif Ali A bbasi, Dr. M . Shahid Qures hi, ”Estimating Glo bal, Diffus e Solar Radiation fo r C hhor and Va lidate with S atellite -Bas ed Data”, Th e Arabi an Journal for Science and Engineering, Vol: 39, Issue: 1, Page(s): 175-179, Published by: Springer Publishing, Saudi Arabia, January 1, 2014. Unbreen Qay yum, Musleh-ud Din, Dr. Adnan Ha ider, ” Foreign Aid, Ex ternal De bt a nd G overnance”, Ec onomic Modelli ng, Vol: 37, Issue: February, Page(s): 41-52, Published by: Elsevier, London, England, February 1, 2014. Dr. Naus heen Ha feeza Anwar, ”The P ostcolonial City in Sou th As ia”, Sin gapore Journal of Tropical G eography, Vol: 35, Issue: 1, Page(s): 22-38, Published by: WILEY-BLACKWELL, March 1, 2014. Faculty of Computer Science: 1. 2. Dr. Juna id Al am Kha n, ” On th e (De) Ho mogenization of S agbi B ases”, Ana lele St iintifice a le Univ ersitatii Ovidius Constanta, Seria Matematica, Vol: 21, Issue: 2, Page(s): 173-180, Published by: Ovidius University, Constanta, Romania, Romania, July 16, 2013. Dr. Junaid Alam Khan, ”Converting Subalgebra Bases with the Sagbi Walk”, Journal of Symbolic Computation, Vol: 60, Page(s): 78-93, Published by: ELSEVIER, United States, January 1, 2014. Journal - National: Faculty of Business Administration: 1. 2. 3. 4. Qudsia T ariq, Dr. Ze enat I smail, Assma A shraf, ”Humor a s a n Effective Stres s Co ping Strategy fo r Cardiac Patients”, Bahria J ournal of Profe ssional Psychology(BJPP), Vol: 12, Issue: 2, Page(s): 7-23, Published by: Bahria Journal of Professional Psychology(BJPP), Karachi, Pakistan, July 1, 2013. Dr. E rum Haf eez, ” Facebook Us age P atterns in Pak istani Y outh a nd its S ocio-Psychological Implic ations”, Ac cepted for pu blication: J ournal of Social Sciences and Humanities, Faculty of Arts., Published by: Faculty of Arts, University of Karachi, Karachi, Pakistan, July 1, 2013-December 31, 2013. Dr. Adnan Haider, Asad J an, Kalim Hyder, ”On the (Ir) Relevance of Moneta ry Aggregate Targeting in Pak istan: An Eclectic View”, Lahore J ournal of Economics, Vol: 18, Issue: 2, Page(s): 65-119, Published by: Lahore School of Economics, Lahore, Pakistan. Lahore, Pakistan, December 3, 2013. Dr. Adnan Haider, Dr. Qazi Ma sood Ahme d, Zohaib J awed, ”Determinants o f Energy I nflation in P akistan: An Emp irical A nalysis”, Pak istan Development Review, Vol: 52, Issue: 4, Page(s): 1-20, Published by: Pakistan Institute of Development Economics, Islamabad, Pakistan, December 24, BUDGET 2014-15 Page 61 2013-December 26, 2013. Faculty of Computer Science: 1. AHMED, Rizw an R aheem, Yaseen Ah med Meenai, HUSSAIN F azal, ”Study o f Ec onomic Development of Pak istan through S tock Market: Casual Relationship Of Stock Prices And Ma croeconomic I ndicators”, Jo urnal o f B usiness R eview (ISSN = 1990-6587), Vol: 8, Issue: 2, Page(s): 124-141, Published by: IBA Karachi, Karachi, Pakistan, July 1, 2013. Journal - Other International: Faculty of Business Administration: 1. 2. 3. 4. 5. 6. Mohsin H asnain A hmad, Dr. Qa zi Ma sood Ah med, ” Trade Facilitatio n, Re gulatory Q uality and E xport Performance: Empirical Investig ation for S outh Asian Countries”, Indian Journal of Economics and Business, Vol: 12, Issue: 2-4, July 1, 2013. Dr. Zeenat Ismail, Saba Ali, ”Human Brands: Investigating Antecedents to Consumers’ Strong Attachment to Celebrities”, Review of Integrative Business & Economics Research Journal, Vol: 2(2013), Issue: 2, Page(s): 53-59, Published by: RIBEJ, Bangkok, Thailand, July 1, 2013. Hans Degryse, Dr. Muhammad Ather Elahi, María Fabiana Penas, ”Determinants of Banking System fragility, a regional Perspective”, European Central Bank Working paper series No. 1567, July 1, 2013. Dr.Qudsia Ta riq, Dr. Zeenat I smail, ” Reasons for Pak istani W omen to St ay/Leave an Abusive Re lation”, ME DITERRANEAN JOURNAL OF SO CIAL SCIENCES, Vol: 4, Issue: 6, Published by: MEDITERRANEAN JOURNAL OF SOCIAL SCIENCES, USA, United States, July 12, 2013. Dr. Kamra n Siddiqui, Saima H usain, ” ZARCO Exchan ge: C orporate G overnance Fa ilure”, IUP Journal o f Corporate Governance, Vol: 12, Issue: 4, Page(s): 57-61, Published by: IUP Publication, India, October 1, 2013. Salman Ahmed Shaikh, ” Economic A nalysis o f Islamic Ban king in Pak istan”, J ournal o f Mua malat a nd Is lamic Fina nce R esearch, Vol: 10, Issue: 1, Published by: University Sains Islam Malaysia, Kaula Lampur, Malaysia, December 31, 2013. Faculty of Computer Science: 1. Shama Siddiqui, Dr. Sayeed Ghani, ”Analytical Model for Delay Distribution of PRMAC”, IEEE Proceedings of 11th International Conference on Frontiers of Information Technology, (FIT), Islamabad, Pakistan, December 16, 2013-December 18, 2013. Major Intellectual contribution: Faculty of Business Administration: 1. 2. Dr. Syed Noman Ul Haq, ”On the Virtues of Vices”, Dawn Books and Authors, July 11, 2013. Dr. Syed Noman Ul Haq, ”From the Guadalquivir to the Edge of Indus”, Dawn Books and Authors, July 14, 2013. BUDGET 2014-15 Page 62 3. 4. 5. 6. 7. 8. 9. 10. N. Trakakis, Graham Oppy, Dr. Syed Noman Ul Haq, ”Medieval Philosophy of Religion”, Acumen, London, England, July 31, 2013. Dr. Syed Noman Ul Haq, ”Whither Portraiture?”, Dawn Books and Authors, September 8, 2013. Amir Hussain, ”Co-Editor: 5th 2013 ICICT Proce edings (IEEE)”, IEE Xplore, Published by: IEEE, Karachi, Pakistan, December 14, 2013-December 15, 2013. Dr. Syed Noman Ul Haq, ”'The Horribly Howling’ and ‘the Victor’”, Dawn Books and Authors, December 15, 2013. Dr. Nadya Qamar Chishty Mujahid, ”Invited book review of Elizabeth Gilbert's The Signature of All Things”, DAWN newspaper, January 1, 2014. Dr. Nadya Qamar Chishty Mujahid, ”Invited book review of Kamila Shamsie's A God in Every Stone”, DAWN newspaper, January 1, 2014. Dr. Nadya Qamar Chishty Mujahid, ”Explaining the Major Themes in English Poetry”, Book with the Edwin Mellen Press, January 1, 2014. Dr. Syed Noman Ul Haq, ”On the Romance of the Metaphorical with the Real”, Dawn Books and Authors, February 9, 2014. Faculty of Computer Science: 1. S. Khurs heed Alam, ”STATISTICS - Con cepts and method s”, TEXT BOOK, Vol: 1, Issue: 17th, Page(s): 800, Published b y: IQRA PUB LISHERS, KARACHI, Pakistan, August 1, 2013. BUDGET 2014-15 Page 63 Institute of Business Administration, Karachi Overview of Budget I Total Expenditure a) Operational Expenditure b) Centers c) Capital Expenditure II Total Resources a) Operational Revenues b) Resources for Capital Projects (Rs. in 000) Budget 2014‐15 Budget 2013‐14 Projected Actuals 1,510,437 (12,467) 959,704 2,457,674 1,317,317 (2,597) 1,250,511 2,565,231 1,210,179 4,206 1,045,399 2,259,784 1,453,280 1,087,895 1,148,473 690,930 835,409 607,942 2,144,210 1,923,304 1,756,415 (Deficit)/Surplus (313,464) (641,927) (503,369) (Deficit)/Surplus (Excl. Depreciation & Amortization) (135,474) (413,378) (337,077) BUDGET 2014-15 Page 64 Institute of Business Administration, Karachi Budget 2014‐15 (Rs. In 000) Note Ref Budget 2014‐15 Budget 2013‐14 Projected Actuals 2013‐14 Operating Revenues Program Revenue R‐1 734,840 583,961 604,712 Non‐Program Revenue R‐2 120,104 59,992 79,777 Scholarships R‐3 72,222 47,853 51,046 Talent Hunt Program 32 42,526 21,537 22,712 Scholarships & Talent Hunt Program Total Operational Revenues 969,691 713,343 758,247 Interest Income R‐4 109,963 99,372 96,122 Government Grants HEC ‐ Recurring Grant 110,000 91,756 91,756 HEC ‐ Grant against PSDP Project 32,103 ‐ Govt. of Sindh ‐ Grant in Aid 60,000 50,000 50,000 27,724 202,103 141,756 169,480 Total Internal Resources 1,281,757 954,471 1,023,848 Deferred Income Amortization Amortization against Externally funded Capital Projects 171,523 133,424 124,624 1,453,280 1,087,895 1,148,473 Total Income Operating Expenses Employment Cost 1 621,108 573,356 514,163 Training & Development 2 40,228 30,408 30,453 Faculty Research Grants and Expenses 3 5,000 5,000 2,779 Seminars, Meetings, & Convocation Expenses 4 7,922 8,018 5,872 Accreditation, Memberships and Linkages 5 2,500 2,164 1,560 Quality Enhancement Cell (QEC) 6 5,164 2,774 3,278 Library Services 7 10,100 7,300 10,126 Ardeshir Cowasjee Writing Centre 8 1,607 ‐ Students' Transportation 9 23,603 21,804 21,571 Scholarships 10 91,430 63,689 66,191 Talent Hunt Program 11 53,421 28,602 25,923 Utilities 12 91,230 67,200 77,519 Fuel & Diesel Expenses 13 12,000 15,000 11,229 BUDGET 2014-15 ‐ Page 65 Traveling Expenses 14 6,048 4,471 4,965 Printing and Stationery 15 14,715 14,624 12,366 Communication 16 4,350 3,200 3,676 Insurance Expense 17 14,600 10,900 10,297 Advertising Expense 18 6,500 5,800 4,900 Entertainment 19 3,700 3,300 3,394 Other Administrative Expenses 20 1,250 950 345 Security Services 21 10,530 5,544 8,497 Temporary Rented Facility (APWA) 22 2,376 2,970 2,970 Contingent Expenses 23 1,000 1,000 730 Legal and Professional Charges 24 3,356 2,413 2,348 Bank Charges 25 600 450 320 Overheads recovered from IBA‐Centers 26 (38,725) (22,665) (6,859) Repair & Maintenance 27 68,098 36,447 50,408 Residential & Lodging Facilities 28 2,733 ‐ ICT Services 29 89,678 57,626 46,928 Testing Services 30 4,804 3,000 3,315 31 349,513 361,973 290,917 1,510,437 1,317,317 1,210,179 Depreciation Expense Total Operating Expenses ‐ Total Operating Expenses (net of Depreciation) 1,160,924 955,344 919,263 Surplus/(Deficit) from IBA Activities (57,157) (229,422) (61,707) Surplus from IBA Activities (Excl. Depreciation & Amortization) 120,832 (873) 104,586 (Deficit)/Surplus from Profit Centers 32 12,467 2,597 (4,206) (44,691) (226,826) (65,912) (Deficit)/Surplus Surplus from IBA Activities (Excl. Depreciation & Amortization) Capital Expenditure 133,299 1,724 33 Resources for Capital Projects 100,380 959,704 1,250,511 1,045,399 690,930 835,409 607,942 (135,474) (413,378) (337,077) Net (Deficit)/Surplus BUDGET 2014-15 Page 66 Note Ref R‐1 PROGRAM REVENUE Budget 2014‐15 Sr. No. Programs Number of Amount * Students Budget 2013‐14 Projected Actual 2013‐ 14 Number of Students Budget Amount Number of Students Projected Actuals IBA Regular Programs (BBA, BS, MBA & MS) 1 2 3 4 5 6 7 8 BBA BS‐CS BS‐Eco & Maths BS‐Social Science BS‐Acc & Finance MBA MS Economics (Morning) MS Maths (Morning) 1151 424 354 194 440 186 20 17 315,744 65,760 55,280 28,800 102,045 49,956 2,706 2,244 1263 341 274 58 58 134 9 318,276 49,104 39,456 8,352 10,440 33,768 1,080 1201 369 253 109 272 137 13 7 301,140 48,672 35,136 12,096 47,070 34,776 1,500 780 2786 622,535 2137 460,476 2361 481,170 0 0 247 29 272 0 0 21 4 345 115 27,428 4,083 61,010 17,325 2,000 60 0 267 78 250 0 0 20 4 6,300 ‐ 28,056 8,190 62,500 16,439 2,000 33 2 223 56 273 0 0 19 2 4,494 273 35,511 4,998 58,899 18,057 1,309 573 112,305 679 123,485 608 123,542 3359 734,840 2816 583,961 2969 604,712 IBA Executive Programs 9 10 11 12 13 14 15 16 17 MS Economics Evening MS Math Evening MBA Evening MS CS/IT EMBA Summer Regular Summer School PhD CS PhD Economics TOTAL PROGRAM REVENUE * with Fee increase of 10% BUDGET 2014-15 Page 67 Note Ref R‐1A PROGRAM REVENUE (Student wise) Budget 2014‐15 Sr. No. Programs Budget 2013‐14 Total Students Amount * Fresh Intake Total Students Budget Amount 250 120 110 90 180 100 10 10 1151 424 354 194 440 186 20 17 315,744 65,760 55,280 28,800 102,045 49,956 2,706 2,244 350 100 100 60 60 70 10 1263 341 274 58 58 134 9 870 2786 622,535 750 345 115 27,428 4,083 61,010 17,325 2,000 2 2 0 0 247 29 272 0 0 21 4 214 573 1084 3359 Average Fee Fresh Intake Projected Actual 2013‐14 Fresh Intake Total Students Projected Actuals 318,276 49,104 39,456 8,352 10,440 33,768 1,080 292 151 116 113 274 97 13 7 1201 369 253 109 272 137 13 7 301,140 48,672 35,136 12,096 47,070 34,776 1,500 780 2137 460,476 1063 2361 481,170 6,300 ‐ 28,056 8,190 62,500 16,439 2,000 0 4 95 20 126 0 0 1 0 33 2 223 56 273 0 0 19 2 4,494 273 35,511 4,998 58,899 18,057 1,309 2 2 60 0 267 78 250 0 0 20 4 112,305 249 679 123,485 246 608 123,542 734,840 999 2816 583,961 1309 2969 604,712 IBA Regular Programs (BBA, BS, MBA & MS) 1 2 3 4 5 6 7 8 BBA BS‐CS BS‐Eco & Maths BS‐Social Science BS‐Acc & Finance MBA MS Economics (Morning) MS Maths (Morning) 274,320 155,094 156,158 65,455 526,005 268,581 135,300 132,000 IBA Executive Programs 9 10 11 12 13 14 15 16 17 MS Economics Evening MS Math Evening MBA Evening MS CS/IT EMBA Summer Regular Summer School PhD CS PhD Economics TOTAL PROGRAM REVENUE 111,043 140,776 224,301 80 10 120 BUDGET 2014-15 100 25 120 Page 68 Note Ref R‐2 NON‐PROGRAM REVENUE Budget 2014‐15 Sr. No. 1 2 3 4 5 6 7 8 9 Programs Admission Charges Transcript Lab cum Library Charges Examination Charges Development Charges Testing Service Comprehensive Exam Fee Hostel Fee Student Transportation Fee TOTAL NON‐PROGRAM REVENUE Budget 2013‐14 Projected Actual 2013‐14 Number of Students Amount Number of Students Budget Amount Number of Students Projected Actuals 780 780 3062 3062 3062 8815 200 275 125 14,400 1,920 21,067 6,019 12,038 35,260 1,600 19,800 8,000 875 875 2542 ‐ ‐ 4835 225 230 125 8,750 875 15,252 ‐ ‐ 15,720 1,350 12,420 5,625 826 826 5791 ‐ ‐ 7345 195 261 124 11,820 1,182 12,978 ‐ ‐ 29,696 1,169 14,518 8,415 120,104 BUDGET 2014-15 59,992 79,777 Page 69 Note Ref R‐3 Scholarships Budget 2014‐15 S.# 1 2 3 4 Name of Scholarships HEC ‐ USIAD Scholarship HEC Need Based Scholarship Sindh Endowment Scholarship * Punjab Education Endowment Fund Total 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 Mubashira Hafeez Scholarship A.W.K Scholarship Aftab Associates Scholarship Habib Metropolitan Bank Ltd. Oxford & Cambridge Scholarship Shell Pakistan Scholarship Abdul Fatah Memon Scholarship G.M. Qureshi Scholarship Lucky Cement / Abdul Razzak Tabba Scholarship Barclays Scholarship Bhaimian Foundation Infaq Foundation Anonymous Scholarship SSGC Scholarship Philip Morris Pakistan Scholarship Mateen Family Scholarship Fauzia Rashid Scholarship IBA Faculty Scholarship Burj Bank Amir Saleem Scholarship Helium Pvt Ltd Chevron ICS Group Abdul Wahid Butt Azim Sultan Scholarship Indigo Textile Scholarship Akhtar Textile Scholarship Syed Sarfaraz Ali Ghori Scholarship Sehr Fatima ‐ Class of 1994 (Hasnain Sheriff) Rummana Hasan ‐ Class of 1993 Total 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 HBL Endowment Fund Scholarship PSO Endowment Fund Scholarship The Sapphire Endowment Fund Scholarship Syed Mumtaz Saeed Scholarship Feroze Textile Ltd Scholarship Dr. I. A. Mukhtar Endowment Scholarship IBA Karachi Class of 1986 Anonymous (General Shipping) HBFC Scholarship Sardar Yasin Malik (Hilton Pharma) Scholarship IBA ‐ Atlas Foundation Scholarship Muhammad Umar Khan Shaheed Scholarship Atiya‐e‐Nasim Scholarship Zahida Zorawer Endowment Scholarship Jamsheed Marker Endowment Scholarship Total IBA Scholarship Merit Based (New Students) Merit Based (Existing Students) Needs Based ** IBA ‐ HEC Scholarship (for Shortfall in tuition fee) Total 50 a b c d Sub Total Projected Actual No of Students Amount Rs. No of Students Amount(S) Rs. Budget 2013‐14 50 35 100 8 193 19,438,000 7,600,000 21,539,700 2,060,000 50,637,700 2,428,000 6,720,000 20,650,709 8 31 112 2,276,250 6,075,000 23,933,000 29,798,709 151 32,284,250 1 0 276,000 ‐ ‐ ‐ 360,000 724,000 138,000 138,000 5,490,815 252,000 504,000 252,000 500,000 780,000 1,256,000 126,000 126,000 4,023,461 504,000 504,000 252,000 2,520,000 588,000 756,000 528,000 264,000 1 236,000 ‐ ‐ 5 2 1 1 2 1 1 3 4 4 1 10 5 3 1 1 140 300,000 ‐ 72,000 115,500 4,991,650 ‐ 252,000 ‐ 4,529,950 ‐ ‐ 516,000 243,000 160,000 144,000 252,000 57,750 273,000 576,000 819,000 252,000 490,000 500,000 486,000 252,000 252,000 15,769,850 6 2 1 1 45 1 1 1 45 1 1 2 3 4 1 4 2 2 1 1 105 276,000 ‐ 2,760,000 612,000 ‐ 580,000 290,000 160,000 ‐ 276,000 276,000 552,000 828,000 1,104,000 276,000 500,000 500,000 552,000 276,000 276,000 17,220,815 3 2 1 1 1 1 1 1 1 4 3 1 2 1 3 26 240,000 552,000 80,000 276,000 560,000 80,000 160,000 80,000 276,000 320,000 583,000 160,000 320,000 80,000 596,000 4,363,000 252,000 487,271 115,005 378,000 567,000 126,000 239,091 205,856 504,000 189,000 504,000 252,000 3 264,750 1 2 4 2 2 3 1 2 3 1 126,000 378,000 549,000 135,000 234,000 189,000 252,000 189,000 531,000 144,000 3,567,223 24 2,991,750 47 75 10 5,292,000 8,820,000 1,260,000 464,000 15,836,000 35 70 33 132 6,486,000 10,350,000 1,380,000 992,000 19,208,000 138 4,347,000 8,085,000 2,362,500 351,000 15,145,500 456 91,429,515 63,689,393 453 66,191,350 20 2 2 1 1 500,000 252,000 ‐ 14,487,461 1 46 Note:‐ *Sindh Endowment scholarship is estimated on last year projected actual figure. ** 41 Students to be adjusted from Sindh Endowment Scholarship Program an Amount of Rs. 5,737,500/‐ BUDGET 2014-15 Page 70 R‐4 (Rs. In 000) Budget 2014‐ 15 Interest Income Budget 2013‐14 Projected Actuals 2013‐14 General Reserves 25,109 28,704 40,693 Endowment Fund 79,498 66,482 50,788 Faculty Development Fund 5,356 4,186 4,641 109,963 99,372 96,122 BUDGET 2014-15 Page 71 Institute of Business Administration, Karachi Budgeted Operating Expenses 2014‐15 Budget 2014‐15 Notes Ref. 1 Compensation and Benefits Salary & Wages Faculty Full Time Business Admin CS & Maths Visiting Faculty Business Admin CS & Maths Teaching & Research Assistants Faculty Support Staff Management Executives Admin Support PT Students Work Study Non‐academic Expenses Administrative Support Staff Management Executives Admin Support Internships Other Employment Cost Over Time Leave Encashment Benefits Long Term Benefits Commutation & Pension Expense Gratuity Expense Provident Fund (IBA Contribution) Group Insurance Other Benefits Hospitalization / Medical Insurance Rewards Staff Welfare Invigilation Remuneration Exemptions to Fee Waivers (Rs. In 000) Projected Actuals 185,299 146,354 82,215 64,592 39,049 33,663 31,150 24,076 800 521 24,302 6,641 6,753 10,000 500 21,005 6,143 5,542 12,865 488 68,276 58,095 8,582 7,809 45,707 40,840 500 20,908 20,513 29,405 20,769 24,112 6,515 9,722 750 21,865 5,511 8,440 553 11,018 1,500 2,205 2,700 2,500 10,192 1,227 1,145 ‐ 1,953 621,108 514,163 Total Employment Cost BUDGET 2014-15 Page 72 Notes Ref. Budget 2014‐15 (Rs. In 000) Projected Actuals 338,513 171,261 50,313 61,021 621,108 269,206 152,787 41,283 50,886 514,163 36,103 1,500 2,625 40,228 25,788 1,803 2,862 30,453 5,000 2,779 2,467 885 775 1,050 690 200 ‐ ‐ 200 300 1,355 7,922 1,741 88 515 808 45 25 558 538 123 220 1,211 5,872 2,500 1,000 (1,000) 2,500 1,560 1,722 (1,722) 1,560 4,399 465 300 5,164 2,946 220 112 3,278 Memo Items: a) b) c) 2 Salary and Wage expenses Faculty Non‐Faculty Overtime and Leave Encashment Benefits Total Employment Cost (a + b + c) Training & Development Faculty Development Program External Expert Services Staff Training & Development 3 Faculty Research Grants and Expenses 4 Seminars, Meetings, & Convocation Expenses Convocation Social Events Orientation Program Open House Alumni & RM Public Affairs ICICT ICM CDC FCS Seminars Misc. Seminars, Conferences and Meetings 5 6 7 Accreditation, Memberships and Linkages Subscriptions and Memberships Students' Exchange Program, Academic Competitions Reimbursements from exchange program commitments Quality Enhancement Cell (QEC) Payroll Expense Operations AACSB related activities Library Services Newspapers Periodicals & Journals Sources for Research Data Centre BUDGET 2014-15 600 288 2,250 2,341 3,250 3,386 Page 73 (Rs. In 000) Budget Projected 2014‐15 Actuals 4,000 4,111 10,100 10,126 Notes Ref. Online Subscriptions 8 Ardeshir Cowasjee Writing Centre 9 Students' Transportation Drivers' Salary & Allowances Fuel Repair & Maintenance Rented Vehicles Insurance Expenses Taxes 10 Scholarships IBA Scholarships Merit Based Need Based HEC Sindh/Pujab Endowment Others 11 National Talent Hunt Program 12 Utilities Gas Water Electricity Generators on Rentals 13 14 Fuel & Diesel Expenses Fuel ‐ Vehicles Diesel for Generators ‐ 3,409 13,000 2,300 3,116 1,357 421 23,603 3,264 11,292 3,701 2,306 869 139 21,571 16,836 2,372 27,038 23,600 21,584 91,430 12,432 2,714 8,351 23,933 18,762 66,191 53,421 25,923 500 3,500 85,356 1,874 91,230 20 7,174 68,432 1,893 77,519 8,000 6,440 4,000 4,789 12,000 11,229 Traveling Expenses Traveling Expenses ‐ Foreign 1,446 1,257 (including reimbursement of traveling to outsiders & students) Traveling Expenses ‐ Domestic (including reimbursement of traveling to outsiders) Other Traveling Expenses 15 1,607 3,990 3,469 612 239 6,048 4,965 Printing and Stationery Printing and Publication BUDGET 2014-15 Page 74 Budget 2014‐15 850 900 925 1,000 1,000 4,675 (Rs. In 000) Projected Actuals 796 812 387 900 840 3,735 Office Stationery Photocopy Charges Printers' Toners Master Roll & Copy Printer Ink Others ‐ Printing & Stationery Total Printing and Stationery 2,000 1,000 5,000 540 1,500 14,715 1,886 955 4,373 ‐ 1,416 12,366 Communication Postage/Courier Telephone/Mobile Others ‐ Communication Total Communication 1,400 2,400 550 4,350 1,343 1,761 572 3,676 14,600 10,297 Notes Ref. Prospectus Graduate Directory Printing Alumni Newsletter, Directory & Cards Transcripts & Degree Printing Others ‐ Printing & Publication 16 17 Insurance Expense Vehicles, Buildings, Furniture, Fixtures Generators, Office Equipment, Computers & Peripherals Total Insurance Expense 14,600 10,297 18 Advertising Expense 6,500 4,900 19 Entertainment 3,700 3,394 20 Security Services Security Expense ‐ Outsourced 10,530 8,497 Memo Item Compensation and Benefits of Security Staff (from Budget head 1) Rs.9.3 million 21 Other Administrative Expenses Uniforms Degree Verification Charges Sports Supplies Contribution to University Fund Total Other Administrative Expenses 800 200 150 100 1,250 305 4 ‐ 36 345 22 Temporary Rented Facility (APWA) 2,376 2,970 23 Contingent Expenses 1,000 730 BUDGET 2014-15 Page 75 Notes Ref. 24 Legal, Consultancy and Professional Charges Audit Fee & Other Expenses Audit Fee Out of Pocket Expenses Consultancy Fee Financial Consultancy HR Consultancy Other ‐ Consultancy Bank charges Bank Charges Fee Collection Charges (Rs. In 000) Projected Actuals 440 375 66 38 506 413 150 1,000 200 1,350 Legal charges Legal & professional charges Total Legal and Professional Charges 25 Budget 2014‐15 43 319 ‐ 362 1,500 1,573 3,356 2,348 350 293 250 27 600 320 26 Overheads recovered from IBA‐Centers (38,725) (6,859) 27 Repair & Maintenance Building and Structures Air conditioners & Chillers Generators Motor Vehicles General Mach. & Equipment Furniture and Fixture Other Repair & Maintenance Total Repair & Maintenance 38,727 18,076 3,894 2,500 2,150 1,600 1,150 68,098 28,650 14,358 1,255 2,406 1,920 1,580 239 50,408 Residential & Lodging Facilities (Aman Tower/VFR) Outsourcing Services Kitchen Supplies Bedrooms Supplies Common Area Supplies General Maint ‐ Residential Facilities Total Residential & Lodging Facilities 1,533 500 350 150 200 2,733 ‐ ‐ ‐ ‐ ‐ ‐ 66,028 14,000 9,150 500 89,678 23,811 13,340 9,313 465 46,928 28 29 ICT Services Repairs & Maint:‐ Computer Hardware and Software Internet charges Technology Licenses Computer Supplies BUDGET 2014-15 Page 76 Budget 2014‐15 (Rs. In 000) Projected Actuals 4,804 3,315 Notes Ref. Memo Item Compensation and Benefits of ICT (from Budget head 1) Rs.22.0 million 30 Testing Services Memo Item Compensation and Benefits of Testing Services (from Budget head 1) Rs.2.58 million Testing arrangement expenses (from Budget head 4) Rs.0.75 million 31 Depreciation Expense Dep. Exp. ‐ Building & Structures Dep. Exp.‐Equipment & Machinery Dep. Exp. ‐ Computers & Peripherals Dep. Exp. ‐ Software Dep. Exp. ‐ Library Books Dep. Exp. ‐ Vehicles Dep. Exp. ‐ Furniture & Fixtures Dep. Exp. ‐ Sports Goods Total Depreciation Expenses 171,860 69,842 66,658 2,373 9,298 8,382 20,270 830 349,513 Total Operating Expenses 1,510,437 1,210,179 BUDGET 2014-15 107,866 60,261 84,496 12,879 7,980 7,085 9,720 630 290,917 Page 77 IBA ‐ EMBA Programs Budget for the year 2014‐15 Budget 2014‐15 Budget 2013‐14 Projected Actual Operating Revenue Operating Revenues 61,010 62,500 58,899 Operating Expenses Salaries, Wages Benefit etc. 3,065 3,491 3,614 Visiting Faculty & mentoring 11,000 10,000 6,706 Traveling Expenses 500 300 141 Printing & Stationary 500 500 21 Communication 200 200 37 Depreciation 600 600 146 Repair and Maintenance 200 100 25 Insurance 100 100 22 Advertisement 500 500 Entertainment 500 500 129 Office Supplies 100 100 55 Misc. 50 50 12 17,315 30,274 10,908 Surplus from the Program 43,695 32,226 47,991 BUDGET 2014-15 Page 78 IBA ‐ Ardeshir Cowasjee Writing Centre Budgeted Income and Expenditure Statement For the year 2014‐15 8 (RS.000) Budget 2014‐15 Operating Revenue Revenue from Endowment Fund 771 Operating Expenses Salaries & Wages Teaching / trainers' Remuneration Printing and Stationery/Photocopy etc. Communication Events and meetings Miscellaneous Total Expenses 680 1,520 84 30 40 25 2,379 Profit / Loss (1,607) BUDGET 2014-15 Page 79 Talent Hunt Programs Note Ref 11 Budget 2014‐15 (Rs.000) Orientation/Foundation Program Budget 2014‐15 Accommodation Breakfast, Meals and Refreshments Trainer’s remuneration for teaching Mentor’s remuneration Other personal expenses of trainees / Stipend Miscellaneous expenses & Contingencies 1,980 3,584 1,184 258 1,200 (Testing Fee, Medical, Newspaper, Contingent expenses) Total Orientation Cost 1,349 9,555 Salaries Printing and Stationery Postage & Courier Expense Advertising Expense Study Tour Testing related Expenses Misc. Expenses Total Program Management Cost 3,605 216 251 382 520 250 242 5,466 Program Management Cost Scholarship Fee Scholarship Expense Total Scholarship: 38,399 38,399 Total Talent Hunt Cost 53,421 Funding Sources IBA, Karachi Support from NTHP Fund Ihsan Trust Sindh Govt. Other Donors (HEC. PEEF, CMEF‐KPK, BTHP etc.) 14,225 3,121 17,204 2,512 19,689 56,751 BUDGET 2014-15 Page 80 32 (Rs. In 000) IBA ‐ Centers ‐ Operating Performance Note Ref Budget 2014‐15 Budget 2013‐14 Projected Actuals 2013‐14 Center of Executive Education Expenses 32‐A 9,286 9,003 1,725 Centre for Entrepreneurial Development 32‐B 3,639 (5,796) (3,145) Centre for Business & Economic Research 32‐C (458) (610) (2,785) Center for Journalism Excellence* (Deficit)/Surplus from Profit Centers 32‐D ‐ ‐ ‐ 12,467 2,597 (4,206) * The center will be started in July 2014; all expenses will be funded through USAID and IBA will be paid for overheads only. BUDGET 2014-15 Page 81 IBA ‐ Center of Executive Education ( CEE ) Note Ref 32‐A Budget 2014‐15 Projected Actual 2013‐14 Budgeted Expenditure Statement (Workshops, Diploma & Certificate Courses for Commercial Organizations) For the year 2014‐15 OPEN ENROLLMENT WORKSHOPS Workshops Family High End Workshops for Mid Business Workshops with ISB Managers Workshops CUSTOMIZED WORKSHOPS 1 (atlas) Diploma in Business Administration (1 Year) Skill Development Diploma 3 Diploma 4 SDP Open (Human SDP General (Hospital Enrolment Resource Customized CEE Management) Program Management Diploma 1 Diploma 2 2 (sanofi) 3 (others) (Project (Supply Chain Management) Management) (Rs.000) Operating Revenue Total Revenue per program 11,520 10,000 18,900 4,500 7,972 4,000 8,750 6,250 6,250 6,250 6,250 11,100 1,125 ‐ 102,867 38,275 Operating Expenses Salary & Allowances Teaching / trainers' Remuneration 9,903 9,903 7,520 2,496 2,000 13,973 1,002 1,215 480 1,344 2,730 2,730 2,730 2,730 5,000 240 Transportation & Traveling Expenses Boarding & Lodging Expenses 1,000 ‐ ‐ 38,670 9,132 400 1,400 964 210 345 3,897 ‐ 300 4,752 4,345 Printing and Stationery/Photocopy etc. 384 800 90 100 12 90 120 260 260 260 260 135 13 2,784 1,596 Communication ‐ ‐ ‐ ‐ ‐ ‐ ‐ 125 125 85 Repair & Maintenance ‐ ‐ ‐ ‐ ‐ ‐ ‐ Advertising Expense 1,050 1,500 1,350 750 ‐ ‐ ‐ Entertainment/Lunch etc. 450 1,200 900 180 392 40 175 ‐ Assessment ‐ Membership Fees ‐ Photography/ video recording 200 60 45 70 15 10 30 6 6 6 6 45 13 contingency ‐ Overheads to IBA Total Expenses 22,022 6,852 2,831 1,407 700 1,020 2,266 1,158 2,528 1,735 1,735 1,735 1,735 2,924 249 7,411 8,717 17,267 4,467 7,797 1,778 4,197 5,129 4,964 4,994 4,994 9,279 785 11,803 93,581 36,550 Profit / Loss 4,109 1,283 1,633 33 175 2,222 4,554 1,121 1,286 1,256 1,256 1,822 340 (11,803) 9,286 1,725 500 500 183 200 200 200 200 675 ‐ ‐ ‐ 300 270 1,550 1,550 ‐ 198 33 63 63 200 6,125 1,646 3,907 3,144 ‐ BUDGET 2014-15 275 631 757 200 512 326 300 700 ‐ Page 82 Note Ref IBA ‐ Centre for Entrepreneurial Development USTDA PROJECTS Budget for the year 2014‐15 Diploma in EDP Ent course for British Entr training Family Balochistan/ technical Council for faculty Business Sindh universities Funding Revnue from Programs/Workshops Inccubation Operating Expenses Salary Expense(Staff) International Training on Entrepreneurship Strategies PGD Faculty Lodging & Traveling ‐ International Lodging & Traveling ‐ Local Curriculum Design Trainings Event Management Faculty Remuneration Enterntainment Printing & Strationary Student Support‐Hostel Outsourcing Advertisement GEM Membership fees Miscelleneous Overheads to IBA 32‐B 11,018 10,000 800 10,000 800 11,018 1,000 1,000 2,000 800 500 200 1,500 1,053 1,053 1,300 1,300 Rs. 000 GEM Pakistan Project EDP 3,795 10,688 3,795 10,688 420 3,000 400 500 300 300 150 100 3,430 1,000 500 13,200 200 560 500 200 13,200 1,060 Budget 2014‐15 ‐ 53,114 8,597 5,615 7,091 2,000 2,000 2,000 2,060 1,900 3,500 800 800 200 980 6,940 1,720 1,350 5,080 500 1,800 500 2,000 1,050 1,000 1,000 9,680 300 1,700 180 1,700 140 1,200 1,500 220 300 200 1,350 300 1,000 300 1,050 4,000 Total Expenses 6,800 500 8,230 750 1,100 2,780 6,900 140 9,400 ‐ 5,000 Surplus / Loss from CED Operations 3,200 300 2,788 303 200 1,015 3,788 60 3,800 1,060 (5,000) 3,639 BUDGET 2014-15 Projected Actual 41,054 11,560 8,072 500 525 1,000 400 360 350 1,050 200 100 600 Incubation Consultancy Women & Other Other Clinics Entrepr. Programs 49,475 1,590 49.23 773 1,460 138 63 571 7 11,743 (3,145) Page 83 IBA ‐ Centre for Economic & Business Research Note Ref 32‐C Budget for the year 2014‐15 Rs. 000 Budget 2014‐15 Budget 2013‐14 Projected Actual Operating Revenue Project 1 SBP (CCI+PCI) Project 2 IFPRI Project 3 Sindh Government Income from Business Review 5,500 4,133 4,133 2,400 1,000 2,710 1,800 5,000 450 240 Total Revenues 10,150 10,133 7,083 Operating Expenses Salary Wages and Benefits Researcher's Remuneration Transportation & Traveling Expenses Business Review Printing/Stationery & Postal etc. Communication (Telephone, Internet etc.) Entertainment Others Overhead to IBA Total Expenses Surplus/(Deficit) 2,677 4,500 1,400 300 80 500 200 951 10,608 2,018 5,000 2,500 300 25 200 200 1,500 11,743 2,729 5,982 64 231 80 590 215 (24) 9,868 (458) (1,610) (2,785) BUDGET 2014-15 Page 84 IBA ‐ Centre for Journalism Excellence Budgeted Income and Expenditure Statement For the year 2014‐15 32‐D (RS.000) Budget 2014‐15 Operating Revenue Revenue 46,552 Operating Expenses Salaries & Wages Traveling & Per Diem Supplies Other Direct Costs Overheads to IBA Total Expenses 12,240 23,220 1,320 3,700 6,072 46,552 Profit / Loss ‐ BUDGET 2014-15 Page 85 Note Ref 33 Planned Capital Expenditure 2014‐15 Description Buildings & Structures (Rs. in 000) Computers & Furniture & Machinery & Softwares Peripherals Fixtures Equipment Library Books Vehicles Total Budgeted Civil Works Projects 2014‐15 (including Interior décor, Furnishing & ICT Equipment) Other Capital Expenditure 764,966 2,500 767,466 60,183 60,183 3,500 3,500 96,740 5,070 1,800 98,540 9,930 7,000 15,000 7,000 BUDGET 2014-15 866,776 8,015 8,015 92,928 959,704 Page 86 Budget 2014‐15 Civil Works Project Code 401 RC 401.1 401.1.1 401.1.2 401.1.3 401.2 401.2.1 401.2.2 401.2.3 401.2.4 401.3 401.3.1 401.3.3 401.3.2 401.4 401.4.1 401.4.2 401.4.3 401.4.4 401.4.5 401.4.6 401.4.7 401.4.8 401.4.9 402 RM 402.1 402.1.1 402.1.2 402.2 402.2.1 Project Title Budget 2014‐15 Renovation Projects at City Campus Faysal Bank Academic Centre Refurbishment, Renovation of Class Rooms(BW) (First Floor) Furniture Fixtures of class rooms including ground floor and IT component Addition of Class rooms on G.F +Bathrooms (BW) HBL Academic Centre Renovation & extension including voice and Data Cabling Furniture Fixtures including G.F. & 4th floors (F&F) Elevator Parking Area Development Towfiq Chinoy Building (Administration Block) Extension of Admin Block including A/C, Server room Phase‐II of Admin Block & Façade Development Furniture for new extension(F&F) External Development Building works (Shifting of Substation) Load Extension From 374 to 850 KW Construction of New Substation & Shifting of Generators New Connection for AMAN Tower (from KESC to City Campus) Gas, Water & Sewerage Connections Gas ‐ Internal Pipelines External Development (including Parking Area Development) AMAN Tower Grilled Front Wall AMAN Tower South Wall and ramp Sub total 132,946 55,691 5,865 71,389 86,016 78,417 4,064 3,535 ‐ 69,876 67,155 1,797 923 141,070 7,510 2,046 44,411 13,603 12,000 2,500 49,000 5,000 5,000 429,907 ‐ 149,000 127,000 22,000 63,589 63,589 43,085 31,446 11,640 ‐ 1,535 1,535 38,407 5,907 2,500 20,000 5,000 5,000 39,942 Renovation Project at Main Campus 402.2.2 402.3 Mian Abdullah Library Civil, Electrical, Mechanical & HVAC & interior(BW) Interior Decoration & Furniture G & T Auditorium Civil, Electrical, Mechanical & HVAC(BW) Interior & furniture(F&F) (Fountain area lobbies, sitting area, back stage, stage, etc.) Adamjee Academic Block 402.3.1 402.3.3 402.3.2 402.4 402.4.1 New class room and old Class Rooms renovation including bathrooms, A/C Façade Ramp & Construction(BW) Class Rooms Furniture & Seminar room (F&F) & IT Sir Anwar Pervaiz Boys Hostel On going Works of renovation 402.4.2 402.5 402.5.1 402.5.2 Furniture For Dorm, GYM, Laundry, lounge, Kitchen Building, new rooms, dining Fauji Fertilizer Building (Administration Block) Ground + 3 Stories Interior Decoration & Furniture Elevator Data Center Improvement of Staff Town Building Works Sub Total: 402.5.3 402.6 402.6.1 Cost of Completion of Project BUDGET 2014-15 0 98,310 ‐ 93,620 4,690 94,744 90,954 3,790 199,151 171,229 23,000 3,535 1,387 136,926 136,926 743,106 ‐ 54,424 35,788 15,101 3,535 ‐ 97,509 Page 87 Budget 2014‐15 Civil Works Project Code 403 NC 403.1 403.2 403.3 403.3.1 403.5 403.6 403.6.1 403.6.2 403.6.3 403.7 403.7.1 Cost of Completion of Project Project Title New Projects at City Campus Master Plan of IBA City Campus Captive Power Generation Student lounge and Canteen Building Works Security & Pump Room AMAN Tower Building Works Interior Decoration & Furniture Extension of Basement Auditorium (JS) Building Works 95 2,064 5,347 5,347 1,297 1,079,058 975,000 100,000 4,058 ‐ Sub Total: 404 NM 404.1 404.1.2 404.1.3 404.1.4 404.2 404.2.1 404.2.2 404.2.3 404.2.4 404.2.5 404.3 404.3.1 404.3.2 404.3.3 404.4 404.4.1 404.4.2 404.4.3 404.5 404.5.1 404.5.2 404.5.3 404.5.4 404.6 404.6.1 404.6.2 404.6.3 404.7 404.8 404.8.1 404.8.2 404.8.3 404.9 404.9.1 404.9.1a 404.9.2 404.9.3 Budget 2014‐15 1,087,860 ‐ 470,000 400,000 70,000 ‐ 470,000 New Projects at Main Campus UBL Sports Arena Sports Ground Electrical Conduits & Piling for Poles Pavilion Capt. Haleem Siddiqui Boys Hostel Building Works ‐ Block A Furniture & Fixtures ‐ Block A Building Works ‐ Block B&C Furniture Works ‐ Block B&C Boundary wall including external lights Tabba Academic Block Building Works Interior Decoration & Furniture & Fixtures IT infrastructure Alumni Student Centre Building Works Furniture & Fixtures (Interior decoration) GYM & other sports Equipment M. Habibullah Visiting Faculty Residence Building Works Furniture & Fixtures IT infrastructure External Development NBP Technology Block (Multipurpose Bldg) Building Works (G.F) Upgradation of Server room Building Works (F.F) Façade uplifting Girls Hostel Extension and furniture New Girls Hostel Building Works Furniture & Fixtures External Development External Development Roads, Pathways, Parking, Landscaping, Water & Sewerage system Sewerage Treatment Plant Construction of Three KESC Substation Electrical system Rectification BUDGET 2014-15 44,765 38,000 10,000 376,915 143,050 5,920 214,000 5,945 8,000 247,852 235,962 11,890 176,030 169,000 7,030 ‐ 128,580 110,767 4,269 879 12,665 25,161 9,867 12,294 3,000 11,891 139,933 118,503 21,430 ‐ 512,643 93,228 25,000 4,600 5,189 80,000 ‐ 80,000 ‐ ‐ ‐ 11,000 5,000 3,000 3,000 ‐ 90,523 61,019 12,504 Page 88 Budget 2014‐15 Civil Works Project Code 404.9.4 404.9.5 404.9.6 404.9.7 404.9.8 404.9.11 404.9.12 404.9.13 404.9.16 404.9.17 404.9.18 404.9.19 404.9.20 404.1O 404.10.1 404.10.2 404.11 404.11.1 404.11.2 404.12 404.13 405 CT 405.1 405.1.2 405.2 405.3 405.4 405.5 Cost of Budget Completion of 2014‐15 Project New Connections HT of 660 KW ‐ Staff Colony 978 New Connections HT of 750 KW ‐ Boys Hostel 3,055 Extension of Load from 400 KW to 2500 KW 54,537 Electrical Infrastructure inc: Back up Power includes power hub for SS1 & SS2 132,000 Water Pipe Line 80,781 9,326 Sui Gas Connection MC External Development ‐ Boys Hostel 12,200 External Development ‐ Staff Colony 10,600 Electrical Infrastructure ‐ Boys Hostel 16,771 Electrical Infrastructure ‐ Staff Colony 21,000 Waste Water Disposal System (Boys Hostel & Staff Colony) 7,000 2,500 Sui Gas ‐ Internal Pipelines Street & External Lighting System 17,000 17,000 Sir Anwar Perviz Prayer Hall 16,529 ‐ Building Works 16,529 ‐ Furniture & Fixtures Aman Centre for Entrepreneurial Development 267,079 Building Works 252,057 Interior Decoration & Furniture & Fixtures 15,022 20,000 15,000 Clinic Building 7,500 7,500 Transport Facility Building ‐ Sub Total: 2,025,877 204,023 Project Title Architect's, Consultants' & Project Managers' fee Project Architects & Consultants fee Project Architects & Consultants fee HEC Financed Project Managers fee Competition fee for new projects Specialty Consultants Professional Fee for AMAN Tower Sub Total: 406 MISC 406.1 406.6 406.7 406.8 406.9 406.1O 406.11 406.12 406.13 406.14 Miscellaneous Works & Jobs Construction of Security/Reception Rooms ‐ City & Main Campus Unforeseen Works Pedestrian Bridge Cost of Project Execution Staff Initial Setup Expenses for Temporary Faculty (APWA) Lab‐16 City Campus and Server Room Main & City Campus Soil Investigation & Structural Testing Site Clearance of Staff Town Furnished Site Office for Newspeak Furnished Site Office for Project Managers (Consult‐tec) 642 11,873 ‐ 137,590 1,319 5,704 1,216 350 81 137 Sub Total: 158,912 Grand Total: BUDGET 2014-15 137,810 1,795 75,493 740 824 77,000 293,662 4,739,324 11,000 10,000 14,170 35,170 2,000 18,132 20,132 866,776 Page 89 ICT DEPARTMENT Budget 2014‐15 (Rs. 000) COMPUTERS & PERIPHERALS S. No DESCRIPTION Units Total 1 Desktop PCs (Labs & Aman Tower) without stand 65 4,225 2 Cisco Core Switch with two Supervisor Engine and Complete Modules 1 14,350 3 IP Phones 40 1,120 4 Video Conferencing equipment for Aman Tower 1 2,000 5 Library Security System for City Campus ‐ RFID System for City Campus RFID Solution ‐ Smart Card Solution for faculty, students and staff (Security, Canteen 1 7,500 6 & Students Center) 1 7,500 7 Multimedia Projectors 20 2,600 8 Smart Screen 20 5,000 9 Cisco Router For Internet 1 2,750 10 High end multimedia Projectors for Auditorium 3 2,025 11 Cisco Firewall 1 1,650 12 Touch Screen Terminals for Library 5 500 13 UPS 2 1,000 14 Desktop Scanners 9 200 15 Flash Drives / Pocket Drives 11 100 16 17 Digital Camera Printers & Copiers a. Black/white with LAN option b. Printing Machine for Testing c. Photocopier d. All in one Printer e. Color Printer 3 150 11 1 3 3 1 2,750 1,500 600 300 140 18 Misc. Hardware Items 1,500 19 Hardware Requirement for Research and Teaching 723 Total Hardware Cost 60,183 SOFTWARE 1 Human Resource Cost for ERP Financials & HCM Implementation 2 1,500 1 2,000 Misc. Software Requirement 2 Other Misc. Software Total Software Cost 3,500 Grand Total: BUDGET 2014-15 63,683 Page 90 Rs. 000 MACHINERY & EQUIPMENT S. No. Description Quantity Total Cost 1 LED TVs (with Connections and Installation) VFR/Aman Tower 2 LED TVs (with Connections and Installation) Main Campus 40'' 8 800 3 LED TVs (with Connections and Installation) 60'' 2 600 4 Room Refrigerator Library VFR/Aman Tower 33 660 32'' 45 1,800 Security Equipment 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 (Cameras, Walk Through Gates, Road Blockers, Walkie‐talkie Sets) Security Equipment (Library) Water Cooler along with filters Attendance Machine Photocopy Machine Insect Killer Lamination Machine Vacuum cleaner Microwave Oven Digital Camera Water Dispenser Slide Changer Weighing Machines (Gym) Electric Tea Kettles Misc Equipment from Boys Hostel TOTAL MACHINERY & EQUIPMENT 4 1 30 3 4 5 1 4 5 2 2,310 2,700 200 200 150 150 33 60 50 50 56 25 20 6 60 9,930 Rs. 000 FURNITURE & FIXTURE S. No. Description 1 White Board 2 Other Misc Furinture Items TOTAL FURNITURE & FIXTURE Quantity Total Cost 25 1,000 800 1,800 Rs. 000 VEHICLES S. No. Description Quantity Total Cost 1 2 3 4 Hino Coaster Toyota Corolla GLi Car Suzuki Cultus Honda CD‐70 Motor Cycle 1 1 1 1 1 BUILDING & STRUCTURE Refurbishment of Water and Sewerage Lines of Staff Town area 5,100 1,800 1,040 75 8,015 Rs. 000 Job 2,500 2,500 Rs. 000 LIBRARY BOOKS 1 Library Books TOTAL BUDGET 2014-15 7,000 7,000 Page 91 NOTES NOTES