Bid Evaluation Summary

Transcription

Bid Evaluation Summary
PUNJAB CITIES GOVERNANCE IMPROVEMENT
PROJECT
Bid Evaluation Report & Recommendation for Award of
Contract
IBRD Loan or IDA Credit No.: IDA 5153 PK
Contract Name:
Replacement of Forcemain from Noor Pur Pumping Station
to Paharang Drain for Efficiency Improvement by Single
Stage Pumping.
Identification Number:
PCGIP 2014-15/WASA-F / 20
Name of Employer:
Water and Sanitation Agency Faisalabad, Govt of the Punjab
Date of Submission: ___________________
Punjab Cities Governance Improvement Project
Table of Contents
TABLE OF CONTENTS
1.0
INTRODUCTION........................................................................................................1
2.0
EXAMINATION FOR COMPLETENESS OF BIDS.............................................3
3.0
DETERMINATION OF SUBSTANTIVE RESPONSIVENESS OF BIDS ...........4
4.0
DETAILED EVALUATION OF BIDS ......................................................................5
5.0
COMPARISON OF BIDS AND DETERMINATION OF THE LOWEST
EVALUATED BID ......................................................................................................6
6.0
POST QUALIFICATION EVALUATION. ..............................................................7
7.0
CONCLUSIONS AND RECOMMENDATIONS. ....................................................8
APPENDIX 1:
ADVERTISEMENT ................................................................................9
APPENDIX 2:
BID OPENING RECORD ...................................................................10
APPENDIX 3:
COMPARATIVE STATEMENT .........................................................26
Page i
Punjab Cities Governance Improvement Project
1.0
INTRODUCTION
1.1
Project Background
Bid Evaluation Report
Introduction
The Government of the Punjab has received a credit (Cr No. 5153-PK) from the
International Development Association towards the cost of Punjab Cities Governance
Improvement Project and intends to apply part of the funds to cover eligible payments
under the Contract Replacement of Forcemain from Noor Pur Pumping Station to
Paharang Drain for Efficiency Improvement by Single Stage Pumping. Since the
estimated cost of this work is PKR 54.352 million, therefore, the procurement is
processed through NCB method in accordance with World Bank guidelines.
1.2
General
The invitation for bids was published in daily Tribune newspaper on 09-12-2014,
daily Nawai Waqat Newspaper on 11-12-2014 and on PPRA website on 10-12-2014
(Appendix -1 attached). Following interested contractors acquired the Bidding
documents from District Officer Roads Office:

M/S Al-Hamad associates Faisalabad.

M/S Ch. Farzand ali & Co Chishtian

M/S Muhammad Hanif Anjum Toba Tek Singh

M/S Rasheed Construction Company, Faisalabad

M/S Mansoor & Company

M/S Al Fazal Construction, Sahiwal

M/S Shad construction Multan

M/S Shehzone Engineering Lahore

M/S Elcon Associates Faisalabad

M/S New Technical Associates, Faisalabad

M/S Saleem Engineers, Faisalabad

M/S Usmani Associates Karachi

M/S Design & Engineering Lahore

M/S N.P.I Construction Faisalabad

M/S Moazzam Corporation Lahore
Page 1
Punjab Cities Governance Improvement Project
1.3
Bid Evaluation Report
Introduction
Submission of Bids
The date and time for submission of bids was fixed on January 17th 2015 at 11:30 AM
and bids from Below mentioned Bidders were received on the fixed date and time:
1.4

M/S N.P.I Construction Co, Faisalabad.

M/S New Technical Associates Faisalabad.
Bid Opening
Bids were opened on January 17th 2015 at 12:00 P.M in the office of conference room
of WASA Faisalabad by the Bid opening Committee in presence of bidders or their
representatives. The bidder’s names, the amount of bid prices, the presence or absence
of bid security and its amount were announced and recorded. The Record of Bid
Opening was prepared soon after the bids were announced and a copy of the Record
of Bid Opening is attached as Appendix-2.
The Summary of Financial Bid of only bidder as declared at the time of opening of
Bids is as follows:
BIDDER
TOTAL BID
AMOUNT
(RS.)
M/S N.P.I Construction
62979427.00
Co, Faisalabad
M/S
New
Technical
Associates Faisalabad
1.5
49593688.00
Amount of
Bid
Security
REPRESENTATIVE
OF BIDDER
PRESENT
1259764
M. Saeed
1020000
M. Javaid
Basic Data and Exchange Rates
Since the rates quoted are in Pakistani Rupees basic data for exchange rate is not
applicable.
1.6
Bid Evaluation
The Bid opening committee also evaluated the bids on given parameters mentioned in
the documents.
Page 2
Punjab Cities Governance Improvement Project
Bid Evaluation Report
Examination for Completeness of Bids
2.0
EXAMINATION FOR COMPLETENESS OF BIDS
2.1
Bid Documents
The bids submitted were first examined to check whether the bidders submitted all the
documents and information required by the bidding documents. The areas covered by
the examination were.






Form of Bid and Bill of Quantities
Bid Security
Propriety of Signature and Power of Attorney
Completeness
Documents establishing the eligibility of bidders
Substantial Responsiveness
The bidders have provided the above documents and also bid security.
The record of checking for completeness of bid documents is attached.
2.2
Propriety of Signature and Power of Attorney
Bid documents were signed by all the Bidders.
Page 3
Punjab Cities Governance Improvement Project
Bid Evaluation Report
Responsiveness of Bids
3.0
DETERMINATION OF SUBSTANTIVE RESPONSIVENESS OF
BIDS
3.1
Eligibility of Bidders.
All the bidders are based in Pakistan and have valid Pakistan Engineering Council
(PEC) registration.
3.2
Bidders Qualifications & Determination of Responsiveness of Bid
The updated information regarding technical capability of the bidder was examined.
The original Bid documents received by the department indicate that the bidders have
submitted the bids on prescribed forms with bidding documents which include the
prescribed required information.
3.3
Arithmetic Check and Corrections
The Bids were checked for arithmetic corrections and corrections have been applied
where required. The respective details of the items and areas of corrections have been
summarized as following:
BIDDER
M/S
N.P.I
Construction
BID AMOUNT AT
OPENING (RS.)
ARITHMATICALLY
CORRECTED BID (RS.)
Co,
Faisalabad
62979427.00
62979428.00
49593688.00
51785403.00
M/S New Technical Associates
Faisalabad
The bidders have not added any items, or made any adjustment and not deviated price.
3.4
Compliance with Commercial Terms and Conditions
3.4.1 Bid Validity and Bid Security
The bid validity period of 45 days from the date of bid opening was specified in the
bid documents. All bidders have submitted Bid Security with validity.
3.4.2 Time for Completion
3.5
The bidders agreed to complete the work within 120 days from the date of
commencement of work as per bid documents.
Compliance with Technical Requirements
The Bid compliance has been reviewed with the requirements for the submission of
bids, which includes the completion of the Bill of Quantities.
3.5.1 Technical Deviations
The bids do not contain technical deviations.
Page 4
Punjab Cities Governance Improvement Project
4.0
DETAILED EVALUATION OF BIDS
4.1
Selection of Bids for Detailed Evaluation
Bid Evaluation Report
Detailed Evaluation of Bids
As discussed in Section 3 of this Report, the bids submitted by the bidders were
examined, found substantially responsive to the bidding documents.
4.2
Clarifications
Bidders were not requested for any clarifications to obtain any further information
regarding works.
Page 5
Punjab Cities Governance Improvement Project
Bid Evaluation Report
Comparison of Bids
5.0
COMPARISON OF BIDS AND DETERMINATION OF THE
LOWEST EVALUATED BID
5.1
Lowest Evaluated Bid
The bid prices for compliance with the technical requirements as discussed in
paragraph 4.3 above were shown in Bid Prices Comparison and detailed item based
comparative statement also attached to this Report as Appendix 3.
BIDDER
ARITHMATICALLY
CORRECTED BID (RS.)
M/S N.P.I Construction Co,
62979428.00
Faisalabad
M/S
New
5.2
2nd Lowest
1st Lowest
Technical
Associates Faisalabad
RANKING
51785403.00
Reasonable Price of the Lowest Evaluated Bid
The bids were compared with the Engineer’s Cost Estimate and the comparative
statement is enclosed.
BIDDER
ENGINEER’S ESITMATE
ARITHMATICALLY
CORRECTED BID
(Rs.)
ABOVE / BELOW
ENGINERS
ESTIMATE
54352558.00
N/A
M/S N.P.I Construction Co,
62979428.00
Faisalabad
M/S
New
Technical
Associates Faisalabad
51785403.00
8626870
-2567155
The details of bids’ comparison with the Engineers Estimate are given in Appendix 3
of this report.
Page 6
Punjab Cities Governance Improvement Project
6.0
Bid Evaluation Report
Post Qualification Evaluation
POST QUALIFICATION EVALUATION.
Since the lowest bidder was not already prequalified, therefore post qualification was
done based on the part 2 of the bidding documents. The detail is as under:
6.1
Liquid Assets:
The liquid asset detail shows that the contractor’s having more than PKR 15.0 million
liquid asset / credit facility net off other contractual commitments.
6.2
Works Completed:
The value of same nature work done in last 5 years by the lowest contractor is more
than PKR 200 million.
6.3
PEC Registration:
The contractor has registered.
6.4
Considering Para 6.1 to 6.3, the qualification of the lowest bidder for the subject work
is supported.
Page 7
Punjab Cities Governance Improvement Project
7.0
Bid Evaluation Report
Conclusions and Recommendations
CONCLUSIONS AND RECOMMENDATIONS.
Based on the detailed evaluation and findings presented in this report, M/S New
Technical Associates Faisalabad has submitted the lowest evaluated and
substantially responsive bid of PKR 51785403.00 which is PKR 2567155 less than
the Engineer’s Estimate of PKR 54352558.00. It is recommended that World Bank
may notify the Employer of its approval in time to issue the letter of acceptance to the
recommended bidder before expiration of the bid validity period.
Page 8
Punjab Cities Governance Improvement Project
APPENDIX 1:
Bid Evaluation Report
Appendix 2: Bid Opening Record
ADVERTISEMENT
Daily Nawa- i - Waqat
Page 9
Punjab Cities Governance Improvement Project
APPENDIX 2:
Bid Evaluation Report
Appendix 2: Bid Opening Record
BID OPENING RECORD
Attendance Sheet of Procurement Committee
Page 10
Punjab Cities Governance Improvement Project
Bid Evaluation Report
Appendix 2: Bid Opening Record
Bidders Attendance Sheet
Page 11
Punjab Cities Governance Improvement Project
Bid Evaluation Report
Appendix 2: Bid Opening Record
Minutes of Bids Opening
Page 12
Punjab Cities Governance Improvement Project
Bid Evaluation Report
Appendix 2: Bid Opening Record
Page 13
Punjab Cities Governance Improvement Project
Bid Evaluation Report
Appendix 2: Bid Opening Record
Page 14
Punjab Cities Governance Improvement Project
Bid Evaluation Report
Appendix 2: Bid Opening Record
Bid Opening Checklist
(To be filled out for each bid as it is read out)
Contract Reference: Replacement of Forcemain from Noor Pur Pumping Station to
Paharang Drain for Efficiency Improvement by Single Stage Pumping.
Bid Opening Date: 17-01-2015
Time: 12:00 PM
Name of Bidder: M/S N.P.I Construction Co Faisalabad.
(a)
Is outer envelope of bid sealed? YES
(b)
Is bid form completed and signed? Yes
(c)
Expiration date of bid:45 Days
(d)
Is documentary authority for signing enclosed? Yes
(e)
Amount of bid security (if required):
(f)
Describe
any
“Substitution,”
PKR 12,59,764/“Withdrawal,”
or
“Modification”
submitted_______NIL_____________________________________________________
(g)
Value of Liquid Assets as required = Credit Facility of 550.0 Million
(h)
Describe
any
discounts
or
modifications
offered:____________________________________________________________________
(i)
Value of work done in last five years is according to required: 1012 Million in 2010-11
(j)
Name of bidder or representative present: Mr. Saeed
(k)
Total bid price: PKR 62979427.00/- (list currencies and amounts or percentages)
Signature of responsible official:
Date: 17-01-2015
Page 15
Punjab Cities Governance Improvement Project
Bid Evaluation Report
Appendix 2: Bid Opening Record
Bid Opening Checklist
(To be filled out for each bid as it is read out)
Contract Reference: Replacement of Forcemain from Noor Pur Pumping Station to
Paharang Drain for Efficiency Improvement by Single Stage Pumping.
Bid Opening Date: 17-01-2015
Time: 12:00 PM
Name of Bidder: M/S New Technical Associates Faisalabad.
(a)
Is outer envelope of bid sealed? YES
(b)
Is bid form completed and signed? Yes
(c)
Expiration date of bid:45 Days
(d)
Is documentary authority for signing enclosed? Yes
(e)
Amount of bid security (if required):
(f)
Describe
any
“Substitution,”
PKR 10,20,000/“Withdrawal,”
or
“Modification”
submitted_______NIL_____________________________________________________
(g)
Value of Liquid Assets as required = Credit Facility of 15.0 Million
(h)
Describe
any
discounts
or
modifications
offered:____________________________________________________________________
(i)
Value of work done in last five years is according to required: 220 Million in 2011-12
(j)
Name of bidder or representative present: Mr. Javaid
(k)
Total bid price: PKR 49593688.00/- (list currencies and amounts or percentages)
Signature of responsible official:
Date: 17-01-2015
Page 16
Punjab Cities Governance Improvement Project
Bid Evaluation Report
Appendix 2: Bid Opening Record
Bid Evaluation Standard Forms
Table -1 Identification
1.1
1.2
1.3
1.4
Name of Borrower
Loan/Credit number
Date of effectiveness
Closing date
(a) original
(b) revised
1.5 Name of project
1.6 Purchaser (or Employer)
(a) name
(b) address
1.7 Contract number (identification)
1.8 Contract description
1.9
1.10
1.11
1.12
1.13
1.14
Cost estimate1
Method of procurement (check one)
Prior review required2
Domestic preference allowed
Fixed price contract
Cofinancing, if any:
(a) agency name
(b) percent financed by agency
The Govt of the Punjab
IDA 5153 PK
30-06-2017
Punjab Cities Governance Improvement
Project
Water and sanitation Agency, Faisalabad.
Opposite Allied Hospital Jail Road Fsd.
PCGIP 2014-15/WASA-F/20
Replacement of Forcemain from Noor Pur
Pumping Station to Paharang Drain for
Efficiency Improvement by Single Stage
Pumping
54.352 Million
ICB
LIB
NCB
Yes
No
Yes
Yes
No
Yes
No
Nil
Page 17
Punjab Cities Governance Improvement Project
Bid Evaluation Report
Appendix 2: Bid Opening Record
Table-2 Bidding Process
2.1 General Procurement Notice
(a) first issue date
(b) latest update
2.2 Prequalification, if required
(a) number of firms prequalified
(b) date of Bank’s no-objection
2.3 Specific procurement notice
(a) name of national newspaper
(b) issue date
(c) name of international
publication
(d) issue date
(e) number of firms notified
2.4 Standard Bidding Document
(a) title, publication date
(b) date of Bank’s no-objection
(c) date of issue to bidders
2.5 Number of firms issued documents
2.6 Amendments to documents, if any
(a) list all issue dates
(b) date(s) of Bank’s no-objection
2.7 Date of pre-bid conference, if any
2.8 Date minutes of conference sent to
bidders and Bank
09-12-2014
N/A
Daily Tribune and PPRA Website 09-12-2014
& Daily Nawa-i-Waqat dated 11-12-2014
09-12-2014
09-12-2014
09-12-2014 to 15-01-2015
15
1.
1.
2.
2.
3.
3.
Page 18
Punjab Cities Governance Improvement Project
Bid Evaluation Report
Appendix 2: Bid Opening Record
Table-3 Bids Submission and Opening
3.1
(a)
(b)
3.2
3.3
3.4
3.5
(a)
(b)
(c)
Bid submission deadline
original date, time
extensions, if any
Bid opening date, time
Record of bid opening, date sent to
Bank
Number of bids submitted
Bid validity period (days or weeks)
originally specified
extensions, if any
date of Bank’s no-objection, if
required1
17-01-2015 Till 11:30PM
17-01-2015 at 12:00PM
19-01-2015
02
45 days
Page 19
Punjab Cities Governance Improvement Project
Bid Evaluation Report
Appendix 2: Bid Opening Record
Table -4 Bids Prices (As read out)
Bidder Identification
City/State or Province
Name
(a)
Country
Read-out Bid Price(s)1
Currency(ies)
Amount(s) or %
Modifications or
Comments2
(b)
(c)
(d)
(e)
(f)
Punjab
Pakistan
PKR
62979427.00
NIL
Punjab
Pakistan
PKR
49593688.00
M/S N.P.I Construction Co,
Faisalabad
M/S
New
Technical
Associates Faisalabad
etc.
Page 20
Punjab Cities Governance Improvement Project
Bid Evaluation Report
Appendix 2: Bid Opening Record
Table-5 Preliminary Examination
Bidder
Verification
Eligibility
Bid Security
Completeness
of Bid
Substantial
Responsiveness
Acceptance for Detailed
Examination
(a)
(b)
(c)
(d)
(e)
(f)
(g)
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
M/S
Construction
N.P.I
Co,
Faisalabad
M/S
New
Technical
Associates
Faisalabad
Page 21
Punjab Cities Governance Improvement Project
Bid Evaluation Report
Appendix 2: Bid Opening Record
Page 22
Punjab Cities Governance Improvement Project
Bid Evaluation Report
Appendix 2: Bid Opening Record
Table-6 Corrections and unconditional Discounts
Bidder
Read-out Bid Price(s)
Corrections
Corrected Bid
Price(s)
Currency(ies)
Amount(s)
(b)
(c)
(d)
(e)
(f) = (c) + (d)+
(e)
(g)
(h)
(i) = (f) – (h)
Co,
PKR
62979427.00
NIL
NIL
62979428.00
NIL
NIL
62979428.00
M/S New Technical
PKR
49593688.00
NIL
NIL
51785403.00
NIL
NIL
51785403.00
(a)
M/S
Construction
Computational Provisional
Errors1
Sums
Unconditional
Corrected/Discounted
Discounts2
Bid Price(s)
Percent Amount(s)
N.P.I
Faisalabad
Associates Faisalabad
etc.
Page 23
Punjab Cities Governance Improvement Project
Bid Evaluation Report
Appendix 2: Bid Opening Record
Table 7. Additions, Adjustments, and Priced Deviations
Specify Evaluation Currency: PKR
Bidder
Corrected/Discounted Bid
Price1
Additions2
Adjustments2
Priced Deviations2
Total Price
(a)
(b)
(c)
(d)
(e)
(f) = (b) + (c) + (d) + (e)
62979428.00
Nil
Nil
Nil
62979428.00
51785403.00
Nil
Nil
Nil
51785403.00
M/S N.P.I Construction
Co, Faisalabad
M/S
New
Technical
Associates Faisalabad
etc.
Page 24
Punjab Cities Governance Improvement Project
Bid Evaluation Report
Appendix 2: Bid Opening Record
Table-8 Proposed Contract Award
1.
2.
Lowest evaluated responsive bidder
(proposed for contract award).
(a) name
(b) address
If bid submitted by agent, list actual
supplier.
(a) name
(b) address
M/S New Technical Associates,
Faisalabad
N/A
3.
If bid from joint venture, list all
partners, nationalities, and estimated
shares of contract.
4.
Principle country(ies) of origin of
goods/materials.
Pakistan
Estimated date (month, year) of
contract signing.
February
Estimated delivery to project
site/completion period.
15-06-2014
5.
6.
N/A
Currency(ies)
7.
8.
9.
10.
11.
12.
Bid Price(s) (Read-out)
Corrections for Errors
Discounts
Other Adjustments
Proposed Award
Disbursement Category
PKR
PKR
PKR
PKR
PKR
Amount(s) or %
51785403.00
51785403.00
PCGIP Funds
Page 25
Punjab Cities Governance Improvement Project
APPENDIX 3:
Bid Evaluation Report
Appendix 3: Comparative Statement
COMPARATIVE STATEMENT
NAME OF WORK:- REPLACEMENT OF FORCEMAIN FROM NOOR PUR PUMPING STATION TO
PAHARANG DRAIN FOR EFFICIENCY IMPROVEMENT BY SINGLE STAGE PUMPING.
Estimated Cost: Rs.5,43,52,558/-
Date of opening: 17-01-2015
Estimated Cost
S.
No
.
MRS
Rates
Description
Unit
Qty
Rate (Rs.)
Amount
Time Limit: 4 Months.
1/2
M/S N.P.I Construction
Co, Faisalabad.
2/2
M/S New Technical
Associates, Faisalabad.
Quoted
Rates
Amount
Quoted
Rates
Amount
1000.00
82500.00
700.00
57750.00
Sub Head # 1: P/L Forcemain GRP 700mm dia.
1
2
C4/45
C3/42
Dismantling
of
T.S.T
Road
100 Cft
8250.00
781.45
64469.625
Earth work excavation in open cutting for sewers and manholes as shown in drawings including shuttering and
timbering, dressing to correct sections and dimensions according to templates and levels, and removing surface
water, in all types of soil except shingle gravel and rock.
0-7' depth
7-15' depth
100
0 Cft
100
0 Cft
348705
3560.15
261923
5962.25
1241442.10
6
1561650.40
7
5270.00
1837675.35
3500.00
1220467.50
6000.00
1571538.00
4000.00
1047692.00
Page 26
Punjab Cities Governance Improvement Project
3
N.S
Providing and Laying cutting, jointing and testing GRP pipe, filament wound, uniformaly enriched with aggregate
resin mortar of silica sand mechanically with bell and spigot joint with 2 rubber rings according to ASTM 2996,
AWWA C-950 Class 'C' PN 9 bar complete lay in trenches. 700mm clear internal dia.
Class 'C' PN
9 bar
Class 'B' PN
6 bar
4
N.S
6
N.S
C3/13
C-
Per Rft
3985
4626.00
18434610
5373.00
Per Rft
7024.25
4094.00
28757279.5
4497.00
21411405.0
0
31588052.2
5
4750.00
3800.00
18928750.0
0
26692150.0
0
Providing and Fixing GRP pipe, fittings filament wound, uniformaly enriched with aggregate resin mortar of silica
sand mechanically with according to ASTM 2996, AWWA C-950 Class 'C' PN 9 bar complete lay in trenches.
700mm clear internal dia.
Bend 45°
5
Bid Evaluation Report
Appendix 3: Comparative Statement
Each
4
45030.00
180120
91000.00
364000.00
45000.00
180000.00
P/Fixing non return valve C.I body having full flow with stainless steel body seat / ring and synthatic imported rubber
sheet on other site and imported stainless steel shaft pin openable type complete.
700 mm dia.
Per Rft.
1
(I)
Rehandling
of
earthwork
lead
upto
single throw
of
kassi,
pharoah
or
shoevel.
(II)
100
0 Cft
100 Cft
540886.
5
540886.
185315.0
0
185315
600000.0
0
600000.00
185000.0
0
185000.00
765.60
366.20
414102.704
4
198072.636
1000.00
750.00
540886.50
405664.88
1000.00
100.00
540886.50
54088.65
Page 27
Punjab Cities Governance Improvement Project
3/24
7
N.S
8
N.S
0
5
100
0 Cft
3
540886.
5
469.35
253865.078
8
750.00
405664.88
100.00
54088.65
Restoration
of T.S.T
Road.
Each
8250
100.00
825000
140.00
1155000.00
100.00
825000.00
Providing of
pit sand,
rehandling in
trenches,
flooding,
leveling &
dressing
complete.
Each
23554.6
9
22.00
518203.18
21.20
499359.43
20.00
471093.80
450000.0
0
450000.00
Constructio
n of valve
non return
valve
chamber
9
i
Compaction
of Earth Work
(soft ordinary
or hard soil).
(III)
Remaining of
Earth Work.
Bid Evaluation Report
Appendix 3: Comparative Statement
17.1
to
17.5
Excavation in foundation of building, bridges and other structures, including dagbelling, dressing, refilling aroung
structure with excavated earth, watering and ramming lead upto one chain and lift upto 5 ft.
b.in ordinary
100 Cft
722.5
4118.40
2975.54
3000.00
2167.50
Page 28
Punjab Cities Governance Improvement Project
soil.
ii
20.1
Bid Evaluation Report
Appendix 3: Comparative Statement
0
Cement
concrete
brick
or
ballast 1 1/2"
to 2" gauge in
foundation
and
plinth
Ratio (1:4:8)
100 Cft
36.13
10642.85
3845.26
9500.00
3432.35
iii
20.1
P.C.C. (1:2:4)
100 Cft
18
19174.30
3451.37
16000.00
2880.00
vi
21.1
to
21.5
Pacca brick
work other
than building
upto 10 ft
height (1:4)
cement sand
mortor.
100 Cft
296.58
17192.40
50989.22
17500.00
51901.50
25.1
to
25.6
Cement
plaster 1/2"
thick (1:3)
thick.
100 Sft
527.25
1473.65
7769.82
1000.00
5272.50
20.4
R.C.C. Slab
(1:2:4)
Per Cft.
43.84
292.90
12840.74
280.00
12275.20
v
vi
Page 29
Punjab Cities Governance Improvement Project
vii
851.5
Fabrication of mild steel reinforcement of cement concrete inclduing cutting, bending, laying in position, making
joints and fastenings, including cost of binding reinfrocmeent (also includes removal of rust form bars.
b) Deformed
bars
viii
10
Providing/fixi
ng 6" thick
R.C.C. man
hole
cover
with
tee
shaped
C.I
frame 22" dia
frame 37.324
kg. and as
per standard
specification.
N.S
Bid Evaluation Report
Appendix 3: Comparative Statement
100
Kg
Each
134.27
11462.50
15390.70
9000.00
12084.30
1.00
4253.80
4253.80
1849.00
1849.00
Providing and installation of M.S welded pipe 700 mm dia 12mm thick, dully painted two coats of epoxy paint on
internal and external surface. Cost also included holing in pipe and welding different size of M.S flanged pipe 10mm
thick as per shown in attached drawing, cost of dressing coupling 700mm dia is also included in rate complete as
per entire surface satisfication of Engineering Incharge.
Each
1
260267.8
4
260267.84
470000.0
0
470000.00
260000.0
0
260000.00
Sub Head # 2: Construction of Discharge Chamber and Connection Pipe at Paharang
Seepage Drain:
Page 30
Punjab Cities Governance Improvement Project
1
C3/42
Earth work excavation in open cutting for sewers and manholes as shown in drawings including shuttering and
timbering, dressing to correct sections and dimensions according to templates and levels, and removing surface
water, in all types of soil except shingle gravel and rock.
(i) 0 ft to 7 ft.
Depth
7-15' depth
2
C6/3b
3
C-6/6
5
C-6/9
C6/27
100 Cft.
0
100 Cft.
0
7981.75
3560.15
28416.23
5270.00
42063.82
3500.00
27936.13
5962.25
4304.74
6000.00
4332.00
4000.00
2888.00
722.00
Cement concrete plain including placing compacting, finishing and curing complete (including screening and
washing of stone aggregate) (1:4:8)
100 Cft.
22.56
10642.85
2401.03
15300.00
3451.68
9500.00
2143.20
Providing and laying reinforced cement concrete (including prestressed concrete), using coarse sand and screened
graded and washed aggregate, in required shape and design including forms, moulds, shuttering, lifting,
compacting,pcuring, renndering and finshing exposed surface, complete (but excluding the cost of steel
reinforcement, its fabrication and placing in position, etc.):Base Slab
Wall & roof
4
Bid Evaluation Report
Appendix 3: Comparative Statement
Per Cft.
Per Cft.
100.92
439.07
219.90
292.90
22192.308
300.00
30276.00
200.00
20184.00
128603.603
300.00
131721.00
275.00
120744.25
Fabrication of mild steel reinforcement for cement concrete, including cutting, bending, laying in position, making
joints and fastenings, including cost of binding wire and labour charges for binding of steel reinforcement (also
includes removal of rust from bars):-
Providing and
fixing 6 in
(150mm)
100 kg.
1619.97
11462.50
185689.06
12000.00
194396.40
11000.00
178196.70
Per Rft
90.00
70.80
6372
150.00
13500.00
70.00
6300.00
Page 31
Punjab Cities Governance Improvement Project
Bid Evaluation Report
Appendix 3: Comparative Statement
wide G.I
sheet
18SWG
stopper to
expansion
joint
6
C21/15
a
Per Rft.
1.00
4253.80
4253.8
4980.00
4980.00
4000.00
4000.00
Supplying, laying, granular material crushed stone) 1/2" to 1" gauge under pipe line and up to half diameter of pipe.
7
8
Providing/fixing 6" thick R.C.C. man hole cover with tee shaped C.I frame 22" dia frame 37.324 kg. and as per
standard specification.
C21/4
Each
.
2317.03
55.80
129290.274
47.00
108900.41
40.00
92681.20
Providing and Laying R.C.C. pipe sewer moulded with cement concrete 1:1.5:3 conforming to ASTM specification C76-79, Class-III, Wall-B, including carriage of pipe from factory to site of wor, lowering in trenches to correct
alignment and grade, jointing with rubber ring, cutting pipes where necessary, testing etc. complete 54"
Per Rft
150.00
3344.00
501600
5277.00
791550.00
3300.00
495000.00
C.I Step @ wt. 3kg each in manhole chambers I/c carriage setting the same in work to correct lines and levels.
9
Eac
h
N.S
10
302.00
3020
350.00
3500.00
250.00
2500.00
Providing of environmental and social management frame work (ESMF).
Page 32
Punjab Cities Governance Improvement Project
(i) Supply of
masks
(ii)Supply of
Shoes
(iii)Supply of
Gloves
(iv)Supply of
First Aid Box
(v)Constructi
on of safety
signs
(vi)Supply of
Goggles
(vii)Supply of
Reflaction
Tape
(vii)Supply of
pole hanging
waste bins
5
Note:
Bid Evaluation Report
Appendix 3: Comparative Statement
Per No.
50
350.00
17500
100.00
5000.00
300.00
15000.00
Per No.
50
2000.00
100000
2620.00
131000.00
2000.00
100000.00
Per No.
50
700.00
35000
790.00
39500.00
500.00
25000.00
Per No.
4
2000.00
8000
6600.00
26400.00
4000.00
16000.00
Per No.
10
4500.00
45000
3000.00
30000.00
4000.00
40000.00
Per No.
50
500.00
25000
500.00
25000.00
300.00
15000.00
Per No.
30
1000.00
30000
237.00
7110.00
300.00
9000.00
Per No.
10
8000.00
80000
500.00
5000.00
400.00
4000.00
In Item No.7 ESMF items i) to vii) are returnable to WASA Faisalabad store after execution of work.
54,352,558
62,979,428
51,785,403
Page 33