Martin Hale ABB Product Group EV Charging Infrastructure
Transcription
Martin Hale ABB Product Group EV Charging Infrastructure
Martin Hale ABB Product Group EV Charging Infrastructure SOCIETY OF MOTOR MANUFACTURERS AND TRADERS LIMITED PAGE 1 October, 2011 Martin Hale – Head of Sales and Marketing , UK and Ireland EV Charging Infrastructure Terra 100.2 charging station EV Charging Infrastructure Product Group of ABB • ABB is a leader in power and automation technologies that enable utility and industry customers to improve their performance while lowering environmental impact • ABB in the UK operates from more than 20 locations and employs over 2,300 people • Product Group, EV Charging Infrastructure is part of the ABB’s Discrete Automation and Motion division • In July 2011 ABB strengthened its EV charging activity by aquiring Epyon B.V. • Epyon was a Spin-off from the Delft University of Technology later funded by 4 Venture Capital funds and Lite-On Technology Corporation • Core expertise in rapid charging Li-ion batteries and an early leader in DC rapid charging infrastructure with over 6 years of experience • First commercial rapid charging station was opened May 2010 © ABB Group October 12, 2011 | Slide 3 EV Charging Infrastructure Product portfolio overview Terra DC Fast Chargers Galaxy management tools Houston API Suites Terra Charge Clusters Webconnected intelligent DC rapid charging systems Webbased management tools for site management, statistics and configuration Professional backoffice integration interfaces Turnkey charging solutions for both AC and DC configured to customers’ needs Latest product – 100.2 Base station plus Dual Post © ABB Group October 12, 2011 | Slide 4 Producing, shipping and installing today Charging stations worldwide © ABB Group October 12, 2011 | Slide 5 How to extend electric vehicle range Adding rapid DC charging stations to a 24 hr cycle 16 hours 100 km © ABB Group October 12, 2011 | Slide 6 15 hours 300 km 22,5 hours 300 km plus AC and DC - the difference AC takes 8 hours, DC to 80% takes under 20 mins Slow AC Charging – 8 hours Typical AC slow 3 kW socket at home or work Rapid DC Charging – 20 mins* On-board Charger CHAdeMO module DC Rapid off-board Charging Station Li-ion battery AC low power at home & work, DC high power in public places © ABB Group October 12, 2011 | Slide 7 *Time to 80% charge typically 15 – 20 minutes. Depends on many factors including configuration and state of charge. Electric Vehicle charging standards and range First Japanese, but Europe/US and China are coming Chart showing the range added through 30 minutes of charging (in km): AC Technology 300 DC Technology 200 km 100 0 240V / 10-16A 400V / 16A 400V / 32A CHAdeMO DC Combo Coupler Connection type Cars on OEM roadmap until 2013 Practically all EVs German / US OEMs Chinese std Electric Vehicles AC vs DC More than 95% will DC rapid charge Today History 2011 2012 2013 Beyond Legend: LCVs Fiat/Microv. Peugeot/Citroen Doblo/Fiorino Partner/Berlingo Citroën C-Zero A- and Bsegment C- and Dsegment Micro-cars and concept cars © ABB Group October 12, 2011 | Slide 9 Nissan Leaf Volvo Volkswagen C30 Electric E-Motion BMW i3 Renault Fluence ZE Tesla Roadster Think City Toyota FT-EV Renault Zoe ZE Peugeot iOn Mitsubishi i-MiEV G-segment and SUVs Black Only AC slow charging (3-6 kW) Renault Mercedes Ford Kangoo EV Vito E-cell Connect Tesla Model S Renault Twizy ZE Smart ED BMW ICV & UCV Blue DC fast charging (50 kW) Red / Green AC semi-fast charging (6 - 20 kW) Terra 100.2 Multi-port rapid charge solution Key and unique features UNIQUE BASE STATION PLUS DUAL POST DESIGN – Power electronics out of sight allowing for more flexible site design, less impact on public space and improved running costs – A world first. TWO INTELLIGENT POWER OUTPUTS PER POST – Rapid charges two EVs simultaneously – Intelligently considers each EV’s charging cycle to enable the quickest possible charging time FUTURE PROOF – Different combinations of output possible for current and future standards (eg Japanese + European) – Software controlled for easier protocol & connector upgrades – Customised performance per site © ABB Group October 12, 2011 | Slide 10 Terra 100.2 Multi-port rapid charge solution Key and unique features - continued ROBUST, HIGH QUALITY DESIGN & MANUFACTURE – Modular design using multiple power modules – Silent operation – High grade Stainless Steel construction – Vandal resistant coating – Unrivaled CE third party certification by a notified body INTERNET CONNECTED – Open Charge Point Protocol (OCPP) ready for interoperability – Application Programming Interface (API) layer for back office connectivity including: • • • • • © ABB Group October 12, 2011 | Slide 11 POS and back office billing RFID, SMS or NFC control Grid Control Status Information Remote charge management, monitoring and maintenance Terra 100.2 Applications Infrastructure suppliers (eg utilities) Service Stations Retail Parks Road side retail businesses Private and public car parks Commercial fleets © ABB Group October 12, 2011 | Slide 12
Similar documents
Efacec
The Efacec EV DC Quick Charger can be used to charge all the EVs with CHAdeMO charging standard compliance or Combined Charging System compliance. The DC Quick Charger is user friendly and safe. Af...
More information