wolfram bergbau und hütten ag 2015
Transcription
wolfram bergbau und hütten ag 2015
WOLFRAM BERGBAU UND HÜTTEN AG 2015 1 WOLFRAM BERGBAU UND HÜTTEN AG 2015 2 WOLFRAM BERGBAU UND HÜTTEN AG (WBH) Wolfram’s objective is zero harm to our people, the environment we work in, our customers and our suppliers SAFETY FIRST Emergency Number Alarm Protective Equipment Assembly Point Emergency Exit BUSINESS WITHOUT CORRUPTION Wolfram has zero tolerance in respect to corruption. Our commitment to ethical business practices is well-established and absolute. Follow AntiCorruption Policy Keep our history in mind Remember: Bribery is a crime Show integrity 5 WOLFRAM – WORLD LEADING TUNGSTEN CARBIDE SUPPLIER OWN TUNGSTEN MINE, AUSTRIA 13% OF SUPPLY 7 RECYCLING ~50% OF SUPPLY INVESTMENT FOCUS WORLD CLASS POWDER MANUFACTURING TECHNOLOGY 13% WORLD WIDE MARKET SHARE IN THE CEMENTED CARBIDE INDUSTRY LEVERAGING THE FULL SPECTRUM OF SUPPLY Finished products Raw materials Conversion Purchase Concentrate APT W-Oxide W-Powder WC-Powder 2 WBH residues 29 13 33 1 9 0 0 Secondary raw material 44 13 Concentrate from Mittersill APT W-Oxid W-Powder 90 100 100 WC-Powder 88 12 Delivery 100 PRIMARY RAW MATERIAL SUPPLY STRATEGY Canada Russia United Kingdom Austria Spain Thailand Vietnam Brazil Rwanda Bolivia country with mine supply to WBH other major tungsten mining countries minor / intermittent tungsten producer 10 Australia SUPPLYING THE CEMENTED CARBIDE AND TUNGSTEN INDUSTRY CUSTOMERS CUSTOMERS´ PRODUCTS , INTERNAL SALES (Sandvik Machining Solutions, Sandvik Mining, Sandvik Hyperion) ~ 45% EXTERNAL SALES ~ 55% Inserts Round Tools Mining/Construction Tungsten alloys CUSTOMERS´ BENEFITS Waste reduction Production stability Improved performance in end product 11 MITTERSILL MINE • Biggest underground mine of Austria • Modern mine working at an elevation between 650 and 1300 msl • Operation in natural reserve close to National Park • One of the best hidden mines in the world • 80 Employees 12 CHALLENGES KEEP TRACK WITH INCREASED THROUGHPUT • Increased ore production rate (+15 %) • Interim suspension of sublevel caving (including loss of good ore) STEADILY INCREASING DEPTH OF THE MINE • Longer distances • Increased pressure / Temperature 13 CHALLENGES TAILINGS POND FACILITIES • Environmental protection (distruction of wetland) • Water retention / flooding issues (consumption of retention volume MAINTAIN RECOVERY RATES • Lower ore grade • Ore composition 15 SITE MANAGEMENT SANKT MARTIN 20 SITE MANAGEMENT DATA AND EXAMPLES - CHALLENGES • Site facts: 290.000 ( 95.000)m², 550x125m, MSL: 350 m, buildings area 31.000 m² • Days without LTI : EL, ME, IFM, TE 667 – 2223 • 24/7 Maintenance Shift • Infrastructure – Site Planning • TE – Project Investments and plant improvements • Authority Matters – State and Local Approvals • Challenges: Driving Effectivness and Efficiency – Cost – Legal requirements 21 BW30 DAS GEBÄUDE UNIVERSITY 33 Fundamental research and talent pool BW30 DAS GEBÄUDE 34 BW30 ENERGIE Beheizung Fernwärmeversorgung durch Wärmeauskoppelung Produktion Kühlung Absorptionskälte angetrieben durch Fernwärme im Nachbargebäude 35 Sonneneinstrahlung sonnenstandsgeführte und indensitätsabhängige Jallousielamellennachführung BW30 ENERGIE - FERNWÄRME 36 www.wolfram.at