print page
Transcription
print page
Hotel and Thermal Spa Bad Mitterndorf Hotel, Bad Mitterndorf Exterior view Exterior swimming area Interior view Facts & Figures Company: Porr Bau GmbH Region 1 | NL Steiermark | Hochbau Customer: Grimming Therme GmbH Project type: Hotel Land / city: Austria, Bad Mitterndorf Commencement: 11.2006 Completion: 09.2009 Contact: BM Dipl.Ing. Hartwig Holweg, [email protected] Project scope: Project development and general contractor Construction volume: 48,0 million EUR Ground-breaking Ceremony for the Grimming Thermal On 12 December 2007, the ground-breaking ceremony took place for the construction of the Grimming-Therme in the Styrian village of Bad Mitterndorf. At this point, the sheer size of the 49,000 square metre plot already indicated the magnitude of this project. development of the Ausseerland-Salzkammergut region and serves as a significant engine for all-year tourism." Information on the thermal spa in Grimming is available at http://www.grimming-therme.com/ Leading an entire region into the future "The fact that this project was a success is not only of symbolic significance. When it comes to opportunities for our youth, it was a quantum leap for the entire district of Liezen", explains the town's mayor Dr. Karl Kaniak and numerous well-known personalities from economics, tourism and politics couldn't agree more. Governor Mag. Franz Voves praised the area's combined efforts: "Here in Bad Mitterndorf, we invest strategically and use the available infrastructure optimally. The outstanding cooperation between the mayors of Pichl/Kainisch, Tauplitz and Bad Mitterndorf made it possible to preserve the people's beautiful home region while creating jobs and hope for the local youth". The scope of the project "Grimming-Therme" was quite impressive: Upon opening the thermal spa and hotel of the Aldiana Group in summer 2009, guests were able to enjoy pools measuring a total of approximately 800 square metres as well as 166 modern hotel rooms. However, with an expected indirect profitability of 15 to 20 million Euros per year, this was a terrific investment. In his speech, Deputy Governor Hermann Schützenhöfer also emphasised the project's significance for the region: "The Grimming-Therme contributes to the continued PORR AG | Absberggasse 47, A-1100 Wien | T | F | [email protected] | ZZZSRUUJURXSFRP Powered by TCPDF (www.tcpdf.org)