Executive Engineer - South - Bangalore Development Authority

Transcription

Executive Engineer - South - Bangalore Development Authority
Declaration of BDA Under Section 19 (8)(a)(iv) of RIA-2005
Files handled in Executive Engineer (South Division)
Sl NO.
Name of the Work
Work Order No.
1986-87
1
Repainting of Layout from Boards in BSK III Stg
BDA/EE(S)/DM/166/86-87, 20.06.87
2
Estimate for providing and fixing MS frame cazing to RCC name
boards in BSK III Block II Stg
BDA/EM/1235/86-87, 07.05.87
3
Formation of Layout in Sy No 108 to 102 of Hosakerehally and Sy
No 7 of Ittamodu Village in BSk III stage
BDA/EE(S)/DM/WO/611/86-87 Dt: 1.1.87
4
Sinking of 150mm Dia Borewell, Construction of Platform and fixing
India mark-II Hand Pump at.
BDA/EE(S)/DM/538/86-87 Dt: 7.2.87
5
Siniking of 150mm Dia Borewell, Construction of Platform and
fixing India mark-II, Hand Pump at.
BDA/EE(S)/DM/546/86-87 Dt: 9.2.87
6
Formation of road in Sy No 8,9&10 of Marenehaly, Sarakki, II
Phase
Sinking of 150mm Dia Borewell, Construction of Platform and fixing
India mark-II Hand Pump at.
BDA/EE(S)/DM/
8
Sinking of 150mm Dia Borewell, Construction of Platform and fixing
India mark-II Hand Pump at.
BDA/EE(S)/DM/
/86-87 Dt: 2.2.87
9
Providing Cleaning the Jungle and chekedup drains in KSRTC,
Layout SRK Iind Phase
Sinking of 150mm Dia Borewell, Construction of Platform and fixing
India mark-II Hand Pump at.
BDA/EE(S)/DM/
/86-87 Dt: 7.2.87
7
10
/86-87 Dt: 5.2.87
BDA/EE(S)/DM/544/86-87 Dt: 9.2.87
BDA/EE(S)/DM/534/86-87 Dt: 7.2.87
11
Sinking of 150mm Dia Borewell, Construction of Platform and fixing
India mark-II Hand Pump at.
BDA/EE(S)/DM/537/86-87 Dt: 7.2.87
12
Sinking of 150mm Dia Borewell, Construction of Platform and fixing
India mark-II Hand Pump at.
BDA/EE(S)/DM/545/86-87 Dt: 9.2.87
13
Sinking of 150mm Dia Borewell, Construction of Platform and fixing
India mark-II Hand Pump at.
BDA/EE(S)/DM/494/86-87 Dt: 9.2.87
14
Sinking of 150mm Dia Borewell, Construction of Platform and fixing
India mark-II Hand Pump at.
BDA/EE(S)/DM/493/86-87 Dt: 2.2.87
15
Sinking of 150mm Dia Borewell, Construction of Platform and fixing
India mark-II Hand Pump at.
BDA/EE(S)/DM/527/86-87 Dt: 9.2.87
16
Sinking of 150mm Dia Borewell, Construction of Platform and fixing
India mark-II Hand Pump at.
BDA/EE(S)/DM/515/86-87 Dt: 7.2.87
17
Sinking of 150mm Dia Borewell, Construction of Platform and fixing
India mark-II Hand Pump at.
BDA/EE(S)/DM/513/86-87 Dt: 7.2.87
18
Sinking of 150mm Dia Borewell, Construction of Platform and fixing
India mark-II Hand Pump at.
BDA/EE(S)/DM/512/86-87 Dt: 7.2.87
19
Sinking of 150mm Dia Borewell, Construction of Platform and fixing
India mark-II Hand Pump at.
BDA/EE(S)/DM/511/86-87 Dt: 7.2.87
20
Sinking of 150mm Dia Borewell, Construction of Platform and fixing
India mark-II Hand Pump at.
BDA/EE(S)/DM/510/86-87 Dt: 9.2.87
21
Sinking of 150mm Dia Borewell, Construction of Platform and fixing
India mark-II Hand Pump at.
BDA/EE(S)/DM/509/86-87 Dt: 7.2.87
22
Sinking of 150mm Dia Borewell, Construction of Platform and fixing
India mark-II Hand Pump at.
BDA/EE(S)/Dm/508/86-87 Dt: 9.2.87
23
Sinking of 150mm Dia Borewell, Construction of Platform and fixing
India mark-II Hand Pump at.
BDA/EE(S)/DM/507/86-87 Dt: 7.2.87
24
Sinking of 150mm Dia Borewell, Construction of Platform and fixing
India mark-II Hand Pump at.
BDA/EE(S)/HD/506/86-87 Dt: 9.2.87
25
Sinking of 150mm Dia Borewell, Construction of Platform and fixing
India mark-II Hand Pump at.
BDA/EE(S)/DM/504/86-87 Dt: 7.2.87
26
Sinking of 150mm Dia Borewell, Construction of Platform and fixing
India mark-II Hand Pump at.
BDA/EE(S)/DM/522/86-87 Dt: 9.2.87
27
Sinking of 150mm Dia Borewell, Construction of Platform and fixing
India mark-II Hand Pump at.
BDA/EE(S)/DM/521/86-87 Dt: 7.2.87
28
Sinking of 150mm Dia Borewell, Construction of Platform and fixing
India mark-II Hand Pump at.
BDA/EE(S)/HD/543/86-87 Dt: 7.2.87
29
Sinking of 150mm Dia Borewell, Construction of Platform and fixing
India mark-II Hand Pump at.
BDA/EE(S)/DM/528/86-87 Dt: 7.2.87
30
Sinking of 150mm Dia Borewell, Construction of Platform and fixing
India mark-II Hand Pump at.
BDA/EE(S)/DM/495/86-87 Dt: 2.2.87
31
Sinking of 150mm Dia Borewell, Construction of Platform and fixing
India mark-II Hand Pump at.
BDA/EE(S)/Dm/
32
Sinking of 150mm Dia Borewell, Construction of Platform and fixing
India mark-II Hand Pump at.
BDA/EE(S)/DM/504/86-87 Dt: 2.2.87
33
Sinking of 150mm Dia Borewell, Construction of Platform and fixing
India mark-II Hand Pump at.
BDA/EE(S)/DM/500/86-87 Dt: 2.2.87
34
Sinking of 150mm Dia Borewell, Construction of Platform and fixing
India mark-II Hand Pump at.
BDA/EE(S)/DM/497/86-87 Dt: 2.2.87
35
Sinking of 150mm Dia Borewell, Construction of Platform and fixing
India mark-II Hand Pump at.
BDA/EE(S)/DM/518/86-87 Dt: 7.2.87
36
Sinking of 150mm Dia Borewell, Construction of Platform and fixing
India mark-II Hand Pump at.
BDA/EE(S)/DM/501/86-87 Dt: 2.2.87
37
Sinking of 150mm Dia Borewell, Construction of Platform and fixing
India mark-II Hand Pump at
BDA/EE(S)/DM/514/86-87 Dt: 9.2.87
38
Sinking of 150mm Dia Borewell, Construction of Platform and fixing
India mark-II Hand Pump at
BDA/EE(S)/DM/
39
Sinking of 150mm Dia Borewell, Construction of Platform and fixing
India mark-II Hand Pump at
BDA/EE(S)/DM/539/86-87 Dt: 7.2.87
40
Sinking of 150mm Dia Borewell, Construction of Platform and fixing
India mark-II Hand Pump at
BDA/EE(S)/DM/519/86-87 Dt: 7.2.87
41
Sinking of 150mm Dia Borewell, Construction of Platform and fixing
India mark-II Hand Pump at
BDA/EE(S)/DM/
42
Sinking of 150mm Dia Borewell, Construction of Platform and fixing
India mark-II Hand Pump at
BDA/EE(S)/DM/525/86-87 Dt: 9.2.87
/86-87 Dt: 2.2.87
/86-87 Dt: 9.2.87
/86-87 Dt: 9.2.87
43
Sinking of 150mm Dia Borewell, Construction of Platform and fixing
India mark-II Hand Pump at
BDA/EE(S)/DM/503/86-87 Dt: 2.2.87
44
Sinking of 150mm Dia Borewell, Construction of Platform and fixing
India mark-II Hand Pump at
BDA/EE(S)/DM/536/86-87 Dt: 7.2.87
45
Sinking of 150mm Dia Borewell, Construction of Platform and fixing
India mark-II Hand Pump at
BDA/EE(S)/DM/535/86-87 Dt: 7.2.87
46
Sinking of 150mm Dia Borewell, Construction of Platform and fixing
India mark-II Hand Pump at
BDA/EE(S)/DM532/86-87 Dt: 7.2.87
47
Sinking of 150mm Dia Borewell, Construction of Platform and fixing
India mark-II Hand Pump at
BDA/EE(S)/DM/533/86-87 Dt: 7.2.87
48
Sinking of 150mm Dia Borewell, Construction of Platform and fixing
India mark-II Hand Pump at
BDA/EE(S)/DM/
49
Sinking of 150mm Dia Borewell, Construction of Platform and fixing
India mark-II Hand Pump at
BDA/EE(S)/Dm/524/86-87 Dt: 9.2.87
50
Sinking of 150mm Dia Borewell, Construction of Platform and fixing
India mark-II Hand Pump at
BDA/EE(S)/DM/517/86-87 Dt: 7.2.87
51
Sinking of 150mm Dia Borewell, Construction of Platform and fixing
India mark-II Hand Pump at
BDA/EE(S)/DM/516/86-87 Dt: 9.2.87
52
Sinking of 150mm Dia Borewell, Construction of Platform and fixing
India mark-II Hand Pump at
BDA/EE(S)/DM/520/86-87 Dt: 7.2.87
53
Sinking of 150mm Dia Borewell, Construction of Platform and fixing
India mark-II Hand Pump at
BDA/EE(S)/DM/
54
Sinking of 150mm Dia Borewell, Construction of Platform and fixing
India mark-II Hand Pump at
BDA/EE(S)/DM/523/86-87 Dt: 7.2.87
55
Sinking of 150mm Dia Borewell, Construction of Platform and fixing
India mark-II Hand Pump at
BDA/EE(S)/DM/543/86-87 Dt: 7.2.87
56
Sinking of 150mm Dia Borewell, Construction of Platform and fixing
India mark-II Hand Pump at
BDA/EE(S)/DM/529/86-87 Dt: 9.2.87
57
Sinking of 150mm Dia Borewell, Construction of Platform and fixing
India mark-II Hand Pump at
BDA/EE(S)/DM/540/86-87 Dt: 7.2.87
58
Sinking of 150mm Dia Borewell, Construction of Platform and fixing
India mark-II Hand Pump at
BDA/EE(S)/DM/541/86-87 Dt: 7.2.87
/86-87 Dt: 7.2.87
/86-87 Dt: 7.2.87
1987-88
59
Levelling the CA site at Ittamadu village in BSK III Stg
BDA/EE(S)/DM/T656/87-88, 02.01.88
60
BDA/EE(S)/DM/T648/87-88, 0401.88
61
Improvement to 30' wide parallel road to 100' ring road BSK III Stg
III Phase I to III Block
Improvement to roads in BSK III stage III Phase II Block
62
Improvement to cross roads of BSK III Stg III Phase II Block
BDA/EE(S)/DM/T616/87-88, 04.01.88
63
Improvement to road of Ittamadu village in BSK III Stg III Block
BDA/EE(S)/HD/T686/87-88, 04.01.88
64
Urgent repairs to drains in Raghavendra Block of BSK III Stg
BDA/EE(S)/DM/T618/87-88, 04.01.88
65
Estimate for removal of slit in drains cuttings patch repairs to roads
of Radha Krishna HBCS I Stg
BDA/EE(S)/DM/T657/87-88, 04.01.88
66
Filling up sital halla for additional sites in BSK III Stg III Phase IV
Block
Providing Layout roads for layout and road direction in SY. No. 95,
96, 121 and 122 of Hosakerehally village in BSK III Stg
BDA/EE(S)/DM/514/87-88, 05.01.88
67
68
BDA/EE(S)/DM/T638/87-88, 04.01.88
BDA/EE(S)/DM/T641/87-88, 05.01.88
Providing RCC boards for layouts directions and road directions at
layout in Sy. Nos 89 to 91 and 94 of Hosakerehally village in BSK
III Stg
Clearing silt from drains & levelling footpath at BSK III Stg II Phase
VI Block
Improvements to roads in BSK III Stg III Phase IV Block
BDA/EE(S)/DM/T685/87-88, 05.01.88
Clearing silt from drains and levelling footpath at Muneswara Block
in BSK III St Part II
Clearing silt from drains and levelling footpaths at Muneswara
Block BSK III Stg Part I
Formation of footpath to 50' approach road to Avalahally in BSK III
Stg
Drains and levelling the footpath at Nagendra Block BSK III Stg
Part II
Improvements to roads in BSK III Stg III Phase I Block
BDA/EE(S)/DM/T-617/87-88, 05.01.88
76
Clearing the silt form the side drains and levelling the footpath at IV
Block BSK III Stg II Phase
BDA/EE(S)/DM/T621/87-88, 05.01.88
77
Providing fencing to Kempegowda Tower at Gavipura village in
BSK III Stg
Providing fencing to CA Site in ITI Layout in Sy. No. 10 of
Kathariguppa at BSK III Stage
Constructions of masonry drain to I cross road in Sy. No. 45 of
Govinayakanahally in Kumaraswamy Layout
BDA/EE(S)/DM/T620/87-88, 05.01.88
69
70
71
72
73
74
75
78
79
BDA/EE(S)/DM/T615/87-88, 05.01.88
BDA/EE(S)/DM/658/87-88, 05.01.88
BDA/EE(S)/DM/T619/87-88, 05.01.88
BDA/EE(S)/DM/T647/87-88, 05.01.88
BDA/EE(S)/DM/T622/87-88, 05.01.88
BDA/EE(S)/DM/T-632/87-88, 05.01.88
BDA/EE(S)/DM/T624/87-88, 06.01.88
BDA/EE(S)/DM/765/87-88, 08.01.88
80
Clearing the silt in Kumaraswamy Layout II Stage
BDA/EE(S)/DM/T626/87-88, 08.01.88
81
Levelling the Park in Channammanakere Achukat Layout in BSK III
Stg
Removal of silt in drains berm cutting in patch repair to roads in
BSK III Stg IV Phase VII Block
BDA/EE(S)/DM/T642/87-88, 12.01.88
83
Improvement to roads in Sy. No. 120 of Kathriguppa BSK III Stg
BDA/EE(S)/DM/T651/87-88, 13.01.88
84
Providing RCC boards for main roads and cross roads direction in
Srinivasanagar I Stg BSK III Stg
BDA/EE(S)/DM/715/87-88, 14.01.88
85
Repairs to Kathriguppa road near vidyapeeta circle in BSK III Stg
BDA/EE(S)/DM/748/87-88, 14.01.88
86
Construction of culverts and drains n Sy. No. 7 of Karisandra BSK
II Stage
Clearing silt from drains dd& levelling footpath at Nagendra Block
BSK III Stg
Clearing silt from drains & levelling footpath in the layout in Sy. No.
95, 96, 121 & 122 of Hoskerehally BSK III Stage
BDA/EE(S)/DM/T691/87-88, 25.01.88
Clearing silt from drains & levelling footpath in BSK III Stg II Phase
VII Block
Improvements to roads in BSK III Stg III Phase III Block
BDA/EE(S)/HD/745/87-88, 22.02.88
91
Providing & fixing RCC Street name boards for main roads and
cross roads in Sy. No. 120 (new) of Kathruguppa in BSK III Stg
BDA/EE(S)/DM/1/87-88, 24.03.88
92
Construction and lowering of existing culvert 58th cross in II Stg of
Kumaraswamy Layout
BDA/EE(S)/DM/94/87-88, 27.05.87
93
Transportation and dumping of Garbage from BSK III Stg
BDA/EE(S)/HD/168/87-88, 25.06.87
94
Providing name board and main and cross road boards to
Avalahally in BSK III Stg
Providing fixing and painting RCC Name boards to East of
Kathriguppa BSK III Stg IV Phase
BDA/EE(S)/HD/281/87-88, 01.08.87
96
Providing and fixing and painting name boards (route mark boards)
with RCC BSK III Stg III Phase VI Block
BDA/EE(S)/HD/324/87-88, 10.09.87
97
Providing road boards (route mark boards) to Channammanakere
Atchkat Layout in BSK III Stg
BDA/EE(S)/DM/135/87-88, 11.09.87
98
Providing door frame and shutters (balance work) to EWS Houses
I block (Toilet doors) Kumaraswamy Layout 1000 Houses I Stage
BDA/EE(S)/HD/335/87-88, 15.09.87
82
87
88
89
90
95
BDA/EE(S)/DM/T650/87-88, 13.01.88
BDA/EE(S)/HD/755/87-88, 02.02.88
BDA/EE(S)/HD/746/87-88, 22.02.88
BDA/EE(S)/DM/771/87-88, 19.03.88
BDA/EE(S)/HD/312/87-88, 01.09.87
99
Work of repainting of street name boards at BSK III Stg and III
Phase I Block II Block & IV Block
BDA/EE(S)/HD/151/87-88, 18.09.87
100
Removing of shculder drains and clearing thensilt and resettint the
same in 9th cross of Sarakki I Phase Ch 0 to 400 mtr
BDA/EE(S)/HD/T403/87/88, 19.09.87
101
Providing & fixing M S Frame Caging to RCC Name Boards in BSK
III Stg
Removing of jungle silt lowering berms and repairs to drains in
Channammanakere Atchkat in BSK III Stg
BDA/EE(S)/HD/419/87-88, 28.10.87
Improvement to 80' main road of Kathriguppa in BSK III Stg III
Phase
Formation of road in Sy. No. 24 of Karisandra in Bavaninagar
slums roads 1,2 &3
Filling up of hallax in Sy. No. 109 of Kathriguppa in BSK III Stg III
Phase
Improvement to 80' wide road which is joinging to ring road in BSK
III Stg III Phase IV Block
BDA/EE(S)/HD/494/87-88, 03.12.87
107
Estimate for the formation of additional sites in Sy. No. 6 of
Govinayakanahalli Kumaraswamy Layout
BDA/EE(S)/DM/*521/87-88, 10.12.87
108
Formation of roads in Sy. No. 17/1, 27/1 and 27/2, of Avalahally
village in BSK III Stg
Balance work of formation of 100' road in BSK III Stage, from 36th
cross of BSK III Stage, upto Hosakerehally
BDA/EE(S)/DM/*525/87-88, 10.12.87
110
Formation of 60' road (Balance length) in Sy No.27/1, 27/2 and
17/1 of Avalahally in BSK III Stage.
No.BDA/EE(S)/DM/T-523/87-88 DT 10.12.1987
111
Improvement to 40' wide road in BSK III Stage, III Phase, II and IV
Block
Construction of culvert and repairs to road side drain in
Kumaraswamy Layout for rehabilitation of slum dwellers from
southend circle
Levelling the corner sites in BSK III Stage, III Phase, II Block site
No.218 and 231
Providing name boards for main and cross roads boards to
Raghavendra Block in BSK III Stage.
No.BDA/EE(S)/HD/T-551/87-88 DT 18.12.1987
102
103
104
105
106
109
112
113
114
BDA/EE(S)/HD/493/87-88, 03.12.87
BDA/EE(S)/HD/501/87-88, 04.12.87
BDA/EE(S)/HD/524/87-88, 10.12.87
BDA/EE(S)/DM/539/87-88, 10.12.87
No.BDA/EE(S)/DM/T-522/87-88 DT 10.12.1987
No.BDA/EE(S)/DM/T-552/87-88 DT 11.12.1987
No.BDA/EE(S)/DM/T-609/87-88 DT 10.12.1987
No.BDA/EE(S)/DM/T-
/87-88 DT
115
Providing road direcetion board to Nagendra Block at BSK III stage
No.BDA/EE(S)/DM/T-536/87-88 DT Dt
116
Improvement to 40' and 80' roads in BSK III Stage, III Phase, I
Block
Removal of silt and formation of footpath along 100' ring road in
No.BDA/EE(S)/DM/T-550/87-88 DT Dt
18.12.1987
No.BDA/EE(S)/DM/T-538/87-88 DT Dt
117
BSK III Stage
10.12.1987
118
Removal of silt and formation of footpath along 80' road from SBM
colony to join 100' ring road in BSK III Stage
No.BDA/EE(S)/DM/T-533/87-88 DT Dt
16.12.1987
119
Providing Ons angle caging to layout boards in BSK III Stage, BTM
Layout
Providing road Direction Board to Muneswara Block in BSK III
Stage
Providing Kerb Stones, Shoulder drains and flogging to 80' road
joining to 100' ring road from vidya peeta circle in BSK III Stage.
No.BDA/EE(S)/DM/T-534/87-88 DT Dt
No.BDA/EE(S)/DM/T-535/87-88 DT Dt
06.12.1987
No.BDA/EE(S)/DM/T-549/87-88 DT Dt
16.12.1987
Levelling of Park No.1 at Channammanakere atchkat at
Banashankari III Stage.
Levelling of Park No.3 at Channammanakere atchkat at
Banashankari III stage, Bangalore
No.BDA/EE(S)/DM/T-559/87-88 DT Dt
21.12.1987
No.BDA/EE(S)/DM/T-560/87-88 DT Dt
21.12.1987
124
Formation of additional sites in Sy No.63 of Kathriguppa in B.S.K.III
Stage, IV Phase VII Block (and Construction of Culverts.)
No.BDA/EE(S)/HD/T-628/87-88 DT Dt
18.01.1988
125
Construction of lavataries for slum dwellers rehasilitation from
Hanumanthanagar slum at Kumaraswamy layout
No.BDA/EE(S)/HD/
126
Levelling the sites in between 14th cross & burial gravel in BSK II
Stage.
Levelling the sites in between 14th & 15th cross and burial gravel
in BSK II Stage
Removal of jungle, silt in drains, burm cutting & pulling of pot halls
in 100' ring road from 36th cross to VII block IV Phase BSK III
Stage
Providing painticy to RCC road direction boards and layout boards
in Kumaraswamy layout I & II Stage
120
121
122
123
127
128
129
130
Construction of lavataries for slum dwellers rehasilitation from
Hanumanthanagar slum at Kumaraswamy layout
131
Providing painting to cross for 1000 EWS houses at Kumaraswamy
Layout II Stage
Formation of l/o in Sy.No.17/1, 27/1 & 27/2 of Avalahally village in
BSK III stage, Part 'E'
88-89
132
133
Re-construction of flood damage portion of the SWD in Ch:200 to
240mts in Channamanakere auchukut layout, BSK III stage. (Flood
damage works)
/87-88 DT Dt
BDA/EE/S/PW/WO/212/87-88 dt:10-07-87
BDA/EE/S/PW/WO/AE/442/88-89 dt:16-11-88
134
Formation of EWS for SC/ST in Sy.No.94 & 95 of Hosakerehally,
BSK 3rd stage, 9th main road.
BDA/EE/S/PW/WO/AE/446/88-89 dt:16-11-88
135
Providing barbed wire fencing to CA site. No.3 in VHBCS in 1st
phase, Girinagar, BSK III stage.
BDA/EE/S/PW/WO/AE/448/88-89 dt:16-11-88
136
Protecting the rehabilitated area in Kumaraswamy layout against
flood damage by constructing the lead off drain in Ch:0 to 145
mts(Flood damage works)
Protectiv e work for drain of seepage water in the rehabilitated plot
form area of the slum in Kumaraswamy layout by providing
drainage arrangements.(Flood damage work)
Providing the silt from road side drains in Sri.Siddivinayaka HBCS
ltd, and Khadi Commissioner Employees HBCS at BSK III stage.
BDA/EE/S/PW/WO/AE/452/88-89 dt:18-11-88
Protecting the rehabilitated area in Kumaraswamy layout against
flood damage by constructing the lead off drain in Ch:145 to 225
mts(Flood damage works)
Formation of missing link road in Sy.No.85 of Madivala, Levelling
the corner sites Nos.86 & 59 in Sy.No.85 & 86 of Madivala under
BTM scheme.
Formation of corner sites along 100' ring road near Dhobhighat in
BSK II stage.
Providing RCC layout boards and direction boards to Bank Officers
and officials HBCS layout in Sy.No.51 to 53, 58 to 60 and 70 and
71 of Madivala village under BTM layout.
Metalling the roads in Sy.No.48 & 49 of Madivala village under
BTM layout (Balance I cross road.)
BDA/EE/S/PW/WO/AE/458/88-89 dt:19-11-88
Repairs to the drain damages to the SWD at VII block, III phase at
the upstream side of 100' ring road, Hosakerehally(Flood damage
works)
Formation of corner sites Nos.227, 228, 242 & 243, 220, 235, 236,
249, 250 & 269 by levelling in Channammanakere auchukut layout,
BSK III stage.
Protective work for the rain damaged portion to the terrace in the
park at BSK III stage (Flood damage work)
BDA/EE/S/PW/WO/AE/471/88-89 dt:28-11-88
147
Protective work for the rain damaged portion of the road in EWS
houses area in Kumaraswamy layout, I stage (Flood damge works)
BDA/EE/S/PW/WO/AE/474/88-89 dt:28-11-88
148
Repairs to 100' road at the junction of road connecting
Bannerghatta road and Hosur road in Sy.No.54, BTM layout (Flood
damage works)
BDA/EE/S/PW/WO/AE/475/88-89 dt:30-11-88
137
138
139
140
141
142
143
144
145
146
BDA/EE/S/PW/WO/AE/454/88-89 dt:19-11-88
BDA/EE/S/PW/WO/AE/457/88-89 dt:19-11-88
BDA/EE/S/PW/WO/AE/459/88-89 dt:22-11-88
BDA/EE/S/PW/WO/AE/465/88-89 dt:22-11-88
BDA/EE/S/PW/WO/AE/467/88-89 dt:28-11-88
BDA/EE/S/PW/WO/AE/470/88-89 dt:28-11-88
BDA/EE/S/PW/WO/AE/472/88-89 dt:26-11-88
BDA/EE/S/PW/WO/AE/473/88-89 dt:26-11-88
149
Construction of masonry drain in BTM layout at the junction of 100'
road , southernside of Hosur road, Ch:0 to 75 mts (Flood damage
works)
Improvements to sites to be auctioned in BSK II stage.
BDA/EE/S/PW/WO/AE/476/88-89 dt:30-11-88
Clearing patch repairs & missing slabs of shoulder drains and
providing new shoulder drains to 100' ring road and 80' road near
Co-Op Training College.
Providing barbed wire fencing to CA site. In Sy.No.17 of
Kathriguppa, at BSK III stage.
Providing side drains to roads in Sy.No.45/16 of Avalahally
Muneshwara block-BSK III stage.
BDA/EE/S/PW/WO/JE/484/88-89 dt:02-12-88
154
Construction of culverts across 30' road and providing route mark
boards to the roads in BSK III stage, III phase, III block.
BDA/EE/S/PW/WO/JE/487/88-89 dt:03-12-88
155
Repairs to flood damage portion of the drains & Culverts in BSK III
stage (Flood damage work)
BDA/EE/S/PW/WO/AE/493/88-89 dt:28-11-88
156
Providing dust bins to private layout in f/o VHBCS I & II phase,
Girinagar, BSK III stage.
Desilting the drains of roads in VHBCS layout, II phase, Girinagar,
BSK III stage.
Soling & metalling the road in Sy.No.54 & 55 at the junction of 100'
road to Hosur road - Bannerghatta road (Flood damage work)
BDA/EE/S/PW/WO/AE/518/88-89 dt:03-12-88
Formation of sites along with 100' ring road near Dhobhighat in
BSK II stage.
Protective work for preventing damages to the layout in
Sy.No.134/2 of Kathriguppa by providing masonry drain adjacent to
80' road, BSK II stage.
Construction of masonry drain in Sy.NO.54 at the junction of 100'
road , southernside of Hosur road, Ch:75 to 200mts (Flood
damage works)
Construction of masonry drain in Sy.NO.54 at the junction of 100'
road , southernside of Hosur road, Ch:200 to 300 mts (Flood
damage works)
Asphalting of 80' road at the junction of KR Road in BSK II Stage
BDA/EE/S/PW/WO/AE/495/88-89 dt:09-12-88
164
Formation of layout in Sy. No. 19 of Sarakki under dollar scheme,
Sarakki IV Phase 4th cross road ch 400 to 440 mtr
BDA/EE(S)/AE-2/WO/528/88-89, 27.12.88
165
Formation of layout in Sy. No. 19 of Sarakki under dollar scheme,
Sarakki IV Phase 4th cross road ch 440 to 480 mtr
BDA/EE(S)/WO/AE2/527/88-89, 27.12.88
150
151
152
153
157
158
159
160
161
162
163
BDA/EE/S/PW/WO/JE/482/88-89 dt:28-11-88
BDA/EE/S/PW/WO/JE/485/88-89 dt:02-12-88
BDA/EE/S/PW/WO/JE/486/88-89 dt:03-12-88
BDA/EE/S/PW/WO/AE/488/88-89 dt:03-12-88
BDA/EE/S/PW/WO/AE/490/88-89 dt:03-12-88
BDA/EE/S/PW/WO/AE/496/88-89 dt:09-12-88
BDA/EE/S/PW/WO/AE/523/88-89 dt:09-12-88
BDA/EE/S/PW/WO/AE/524/88-89 dt:09-12-88
BDA/EE(S)/JE/WO/516/88-89, 14.12.88
166
Formation of layout in Sy. No. 19 of Sarakki under dollar scheme,
Sarakki IV Phase 4th cross road ch 280 to 320 mtr
BDA/EE(S)/WO/AE2/525/88-89, 27.12.88
167
Formation of layout in Sy. No. 19 of Sarakki under dollar scheme,
Sarakki IV Phase 4th cross road ch 320 to 360 mtr
BDA/EE(S)/AE2/WO/530/88-89, 27.12.88
168
Formation of layout in Sy. No. 19 of Sarakki under dollar scheme,
Sarakki IV Phase 4th cross road ch 360 to 400 mtr
BDA/EE(S)/AE2/WO/PW/529/88-89, 27.12.88
169
Formation of layout in Sy. No. 19 of Sarakki, under Dollar, IV
Phase 4th cross, ch 240 to 280mtr
BDA/EE(S)/AE/WO/526/88-89, 27.12.88
170
Repairs to Storm water Drain in the flood damaged portion in Sy.
No. 42 of Govinayakanahally at Kumaraswamy Layout
BDA/EE(S)/WO/JE/546/88-89, 30.12.88
171
Formation of layout in Sy. No. 19 of Sarakki under dollar scheme
sarakki layout IV phase 8th main road from ch 130mt to 185 mt
BDA/EE(S)/AE/532/WO/88-89, 30.12.88
172
Formation of layout at Sy. No. 19 of Sarakki under dollar scheme
sarakki layout IV phase 5th main road from ch 0 to 115 mt
BDA/EE(S)/AE/533/WO/88-89, 30.12.88
173
Formation of layout in Sy. No. 47/4, B & 2 and 48/5 & 6 of
Tavarekere Village under BTM Scheme 60' road 0 to 90 mtrs
BDA/EE(S)/DM/545/88-89, 31.12.88
174
Formation of road (balance length) in sy. No. 172 of Bilakanahally
under BTM Scheme (Dollar Scheme) road no 1 & 2
BDA/EE(S)/AE-2/WO/534/88-89, 02.01.89
175
BDA/EES(S)/JE/WO/540/88-89, 04.01.89
176
Widening of 80' wide road in Kathriguppa and construction of
retaining wall in BSK III Stg
Levelling the shop sites in BSK II Stg ch 0 to 50 mtr
177
Levelling the shop sites in BSK II Stg ch 60 to 130 mtr
BDA/EE(S)/JE/WO/541/88-89, 04.01.89
178
Repairs to the rain damaged portion of roads in pipe line road at
BSK III Stg (Flood damage work)
BDA/EE(S)/AE1/WO/567/88-89, 04.01.89
179
Providing barbed wire fencing to CA site no 38 in
Halagavaderahally in F/o BEML HBCS Ltd
BDA/EE(S)/WO/AE-1/566/88-89, 04.01.89
180
Repairs to rain damaged portion of SWD at the upstream of 100'
ring road near Hosakerehally BSK III St. II Ph 7th Block
BDA/EE(S)/AE1/WO/539/88-89, 04.01.89
181
Improvements to sites to be auctioned in BSK II Stg and CT Bed
BDA/EE(S)/WO/JE/561/88-89, 04.01.89
182
Providing barbed wire fencing to CA Land in Sy. No. 134/2 of
Kathruguppa BSK III Stg
Providing barbed wire fencing to CA site No.4 in
Halagevaderahally in favour of BEML HBCS Ltd
BDA/EE(S)/WO/JE/565/88-89, 04.01.89
183
BDA/EE(S)/JE/WO/542/88-89, 04.01.89
BDA/EE(S)/AE1/WO/553/88-89, 05.01.89
184
Providing RCC Boards for layout and road direction in Kalidas
labours HBCS Layout BSK III St
BDA/EE(S)/AE-1/WO/551/88-89, 05.01.89
185
Providing and fixing RCC road direction boards to BEML HBCS
Layout at Halagevaderahally
BDA/EE(S)/AE/WO/549/88-89, 05.01.89
186
Providing RCC Layout boards and name boards to Sy. No. 17/1,
27/1 & 2 of Avalahally BSK III Stg
BDA/EE(S)/AE1/WO/547/88-89, 05.01.89
187
Providing RCC layout and directions boards to KEB Employees
HBCS and Khadi commission HBCS and Providing fencing to CA
site in KEB Employees HBCS in BSK III Stg
BDA/EE(S)/AE1/WO/550/88-89, 05.01.89
188
Formation of 60x50 sides (4nos) in BSK II Stg
BDA/EE(S)/WO/JE/558/88-89, 05.01.89
189
Levelling the Corner site BSK II Stg (Site No. 992/A, 1003/A, 1274,
1275, 1276, 1277, 1509 & 1462)
BDA/EE(S)/JE/WO/552/88-89, 05.01.89
190
Formation of layout under dollar scheme in Sy. No. 56, 57 & 172 of
Bilakanahally under BTM scheme 100 road part A (Balance work)
BDA/EE(S)/WO/AE2/563/88-89, 05.01.89
191
Formation of layout under dollar scheme in Sy. No. 56, 57 & 172 of
Bilakanahally under BTM scheme 100 road part B (Balance work)
BDA/EE(S)/AE2/WO/564/88-89, 05.01.89
192
Constructed of masnory drain (side) on left side of 100' road ch 0
to 25 mtr Sarakki I phase
BDA/EE(S)/AE2/WO/554/88-89, 05.01.89
193
Providing kerbstones and BS Slabs to side drain ch 0 to 45 mtr
from Kanakapura Road Sarakki I Phase
BDA/EE(S)/AE2/WO/557/88-89, 05.01.89
194
Widening of 80' wide road in Kathriguppa and construction of
retaining wall in BSK III Stg
Protection works including construction of SWD and scour filling in
the sital area of Channammanakere Achkat layout BSK III St ch
660 to 675 mtr
Protection works including construction of SWD and scour filling in
the sital area of Channammanakere Achkat layout BSK III St ch
675 to 690 mtr
Constrction catch water drain behind EWS House no. 1 to 26 A
Block Kumaraswamy Layout II Stg
BDA/EE(S)/JE/WO/560/88-89, 05.01.89
Protection work including construction of SWD and scour filling in
the sital area of Channammanakere Achkat Layout BSK III Stg ch
690 to 705 mtr
Construction of catch water drain EWS house No. 480 to 490 and
448 to 479 B Block Kumaraswamy Layout II Stg
BDA/EE(S)/AE/WO/568/88-89, 05.01.89
195
196
197
198
199
BDA/EE(S)/AE1/PW/569/88-89, 05.01.89
BDA/EE(S)/AE1/WO/571/88-89, 05.01.89
BDA/EE(S)/JE/WO/583/88-89, 05.01.89
BDA/EE(S)/JE/WO/584/88-89, 05.01.89
200
201
202
Protection works including construction of SWD and scour filling in
the sital area of Channammanakere Achkat layout BSK in ch 705
to 720 mtr
Construction of flood damaged culvert at the juction of 100 ring
road and 50 road in BSK III Ph I block (flood damage work)
BDA/EE(S)/AE1/WO/570/88-89, 05.01.89
BDA/EE(S)/AE1/WO/624/88-89, 05.01.89
Removal of garbage in Sy. No. 42 & 43 of Srinivasanagar BSK I
Stg
Repairs to rain damaged culvert in I cross road of
Channammanakere Achkat layout in BSK III Stg (flood damage
work)
Repairs to rain damaged culvert 4 nos including RCC deck slab in
Channammanakere Achkat layout BSK III Stg (flood damage work)
BDA/EE(S)/JE/WO/576/88-89, 05.01.89
205
Formation of site by filling up Halla to EWS sites No.829 to 833
and 836 to 842 at BSK III Stage, III Phase, III Block
No.BDA/EE(S)/AE-1/WO/PW/392/88-89 DT
17.10.1988
206
Widening of 30' wide V Cross road leading to BSK III Stage, III
Phase, V Block, in Sy No.83 to 88 of Kathriguppe Village BSK III
Stage.
Removal of silt in drain/berm cutting providing missing slab drain
and Halla filling to the proposed auction sites at C.T. Bed BSK II
Stage.
Earthfilling in road and both sides of SWD in Sy No.2 to 7 and 11
of Gerehally BSK III Stage, Ch 0 to 90mtr.
No.BDA/EE(S)/AE-1/WO/PW/390/88-89 DT
17.10.1988
209
Formation of layout in sy No.6, 7, 8 and 101 of Madivala Village
under BTM Scheme Road No.2 and 3
No.BDA/EE(S)/AE/WO/PW/405/88-89 DT
27.10.1988
210
Formation of layout in Sy No.6, 7, 8 and 101 of Madivala Village
under BTM Scheme Road No. II 'A'
No.BDA/EE(S)/AE/WO/PW/404/88-89 DT
27.10.1988
211
Formation of layout in Sy No.6, 7, 8 and 101 of Madivala Village
under BTM Scheme Road No. I B and 2 B
No.BDA/EE(S)/WO/PW/403/88-89 DT 27.10.1988
212
Levellin th park (C.A. site No.1) in Cahnnammanakere Achkat
layout at BSK III Stage, Bangalore.
No.BDA/EE(S)/AE/WO/PW/409/88-89 DT
29.10.1988
213
Construction of RCC Footbridge across stormwater drain at Ch
300mtr. In Channammanakere layout BSK III Stage
No.BDA/EE(S)/AE/WO/423/88-89 DT 11.11.1988
214
Formation of layout in Sy No.6, 7, 8 & 101 of Madivala Village
under BTM Scheme Road No.I Stage 'A'
No.BDA/EE(S)/AE-2/WO/406/88-89 DT
27.10.1988
215
Formation of roads and drains in BSK III Stage, III Phase, VI Block,
100' ring road from Hume Pipe culvert towards VI Blcok
No.BDA/EE(S)/AE/399/88-89 DT 27.10.1988
203
204
207
208
BDA/EE(S)/AE1/WO/652/88-89, 05.01.89
BDA/EE(S)/AE1/WO/653/88-89, 05.01.89
No.BDA/EE(S)/AE-1/WO/PW/397/88-89 DT
26.10.1988
No.BDA/EE(S)/JE/WO/PW/394/88-89 DT
17.10.1988
(Northernside) Ch 100 to 150 mtr.
216
Formation of roads and drains in BSK III Stage, III Phase, VI Block,
100' ring road from Hume Pipe culvert towards VI Blcok
(Northernside) Ch 50 to 100 mtr.
Formation of roads and drains in BSK III Stage, III Phase, VI Block,
100' ring road from Hume Pipe culvert towards VI Blcok
(Northernside) Ch 0 to 50 mtr.
Formation of road and drains in Channammanakere Achkat layout
in BSK III Stage, III Phase
No.BDA/EE(S)/AE/400/88-89 DT 27.10.1988
219
Desilting the drains and clearing the berms of footpath in
Channammanakere achkat layout in BSK III Stage
No.BDA/EE(S)/AE/WO/PW/430/88-89 DT
15.11.1988
220
Providing painting and fixing M.S.Frame caging for RCC layout
boards in Sy No.9, 10, 86, 85, 92,93 and 172 under BTM Scheme
No.BDA/EE(S)/AE-2/WO/PW/402/88-89 DT
27.10.1988
221
Construction of culvert at the junction of III cross road newly
formed road by the side of Madivala tank and levelling the corner
site No.90 & 58 under BTM Scheme.
Formation of layout in Sy No.6, 7, 8 and 101 of Madivala village
under BTM Scheme I Cross and III Main Road.
No.BDA/EE(S)/AE/WO/411/88-89 DT 29.10.1988
Annual maintenance of borewell at Kumaraswamy Layout I Stage,
BDA, (25 Nos)
Annual maintenance of Borewell at Srinagar I & II Stage and I.T.I.
Layout at BSK III Stage, Behind Vidyapeeta (35Nos)
No.BDA/EE(S)/JE/WO/PW/455/88-89 DT
22.11.1988
No.BDA/EE(S)/JE/WO/PW/456/88-89 DT
22.11.1988
225
Formation of sites for fire victims rehabilated at Sy No.6 of
Govinayakanahally in Kumaraswamy Layout.
No.BDA/EE(S)/DM/WO/PW/412/88-89 DT
03.11.1988
226
Providing barbed wire fencing to C.A. site No.2 Viswabharathi
H.B.C.S. layout II Phase, Girinagar BSK III Stage.
No.BDA/EE(S)/AE-1/WO/428/88-89 DT
15.11.1988
227
Widening or 30' road for the proposed Bus-Bterminus in
Chennammanakere Achkat layout BSK III Stage
No.BDA/EE(S)/DM/WO/424/88-89 DT 11.11.1988
228
Providing dust bins to Channammanakere Achkat layout and east
of kathriguppa at BSK III Stage.
No.BDA/EE(S)/AE-1/WO/434/88-89 DT
15.11.1988
229
Providing dust bins in Sy No.19 to 25 (Part of 22 & 23 of Avalahally
BSK III Stage.
Desilting the drains of roads at Viswabharathi HBCS layout II
Phase, Girinagar at BSK III Stage, I Main to IV main and I to VII
Cross road
No.BDA/EE(S)/AE-1/WO/PW/433/88-89 DT
15.11.1988
No.BDA/EE(S)/AE/WO/426/88-89 DT 11.11.1988
217
218
222
223
224
230
No.BDA/EE(S)/AE1/WO/401/88-89 DT
27.10.1988
No.BDA/EE(S)/AE1/WO/398/88-89 DT
27.10.1988
No.BDA/EE(S)/AE-2/WO/411/A/88-89 DT
29.10.1988
231
232
Desilting the drains of roads at Viswabharathi HBCS layout II
Phase, Girinagar at BSK III Stage, I Main to VIII main and I to III
Cross roads
Providing layout boards and name boards for main and cross
roads in pipe line block I & II at BSK III Stage, Gavipura
233
Providing dust bins in pipe line area block I & II BSK III Stage.
234
Construction of S.W.D. in Sy No.6 of Govinayakanahally,
Kumaraswamy Layout (Formation of Addl. Sites of 20' x 30') Ch 50
to 100 Mtr.
For levelling of 130 sites of 20' x 30' in Sy No.6 of Govinayakanally
at Kumaraswamy Layout.
235
236
237
238
239
240
Construction of Stormwater Drain in Sy No.6 of Govinayanahally
Kumaraswamy Layout (Formation of Additional sites 20' x 30') Ch
0 to 50 Mtr.
Providing dust bins to Sy No.15 and 120 of Kathriguppa in BSK III
Stage
Renewal of providing security arrangaments and demolision party
in BTM Layout
Patch repairs to 80' road Kathriguppa BSK III Stage (From
Vidyapeeta Circle to ring road) due to rain damages
No.BDA/EE(S)/AE/WO/425/88-89 DT 11.11.1988
No.BDA/EE(S)/AE/WO/444/88-89 DT 17.11.1988
No.BDA/EE(S)/AE1/WO/443/88-89 DT
17.11.1988
No.BDA/EE(S)/WO/PW/419/88-89 DT 05.11.1988
No.BDA/EE(S)/DM/WO/PW/418/88-89 DT
05.11.1988
No.BDA/EE(S)/DM/WO/PW/417/88-89 DT
05.11.1988
No.BDA/EE(S)/AE-1/415/88-89 DT 03.11.1988
No.BDA/EE(S)/AE-2/WO//413/88-89 DT
03.11.1988
No.BDA/EE(S)/JE/WO/PW/420/88-89 DT
05.11.1988
Providing side drains and formation of footpath for the balance
portion of 100' ring road near Hosakerehally in BSK III Stage, Ch
1630 to 1730Mtr
Formation of 40' wide roads and drains in BSK III Stage, III Phase,
VI block VII Cross roads.
No.BDA/EE(S)/AE-1/WO/432/88-89 DT
15.11.1988
Providing RCC bcards for layout and road direction in Sy No.62,
63, 45 & 46 I & II Stage of Sri.Radhakrishna HBCS layout BSK III
Stage, Banashankari III Stage.
Re-Construction of the flood damaged portion of the earthern
embankment of the Road in Sy No.6 of G.N.Hally at
Kumaraswamy Layout
Reconstruction of damaged retaining wall by the side of ring road
Dhobighat to protect sites in BSK II Stage (Flood damage works)
No.BDA/EE(S)/DM/437/88-89 DT 17.11.1988
245
Formation of dollar scheme layout in Sy No.56, 57 and 172 of
Bilakanahally under BTM Scheme road No.3
No.BDA/EE(S)/AE2/447/88-89 DT 18.11.1988
246
Construction of culvert across 4 & 5th corss roads in Sy No.85 &
86 of Madivala Village at BTM Scheme.
No.BDA/EE(S)/AE2/WO/462/88-89 DT
26.11.1988
241
242
243
244
No.BDA/EE(S)/AE-1/WO/429/88-89 DT
15.11.1988
No.BDA/EE(S)/DM/438/88-89 DT 17.11.1988
No.BDA/EE(S)/AE/WO/431/88-89 DT 15.11.1988
247
Formation of missing link road in Sy No.6, 7, 8, 101 and 102 of
Madivala under BTM Scheme
No.BDA/EE(S)/AE2/WO/453/88-89 DT
21.11.1988
248
Protective work for EWS houses at Kumaraswamy Layout location
in Terraces for preventings of damages in II block (in between 90 &
91 and 91 and 92 of Houses flood damage works)
No.BDA/EE(S)/JE/436/88-89 DT 17.11.1988
249
Protective mork for EWS houses in Kumaraswamy Layout located
in Terraces for preventing of Damages in I Block (In berween
houses 36 to 50, 51 to 64 and 106 to 137) (Flood Damage work)
No.BDA/EE(S)/JE/WO/435/88-89 DT 17.11.1988
250
Providing Lyaout boards and road direction boards to
Viswabharathi HBCS I and II Phase Girinagar BSK III Stage.
No.BDA/EE(S)/AE-1/WO/449/88-89 DT
18.11.1988
251
No.BDA/EE(S)/AE-1/WO/450/88-89 DT
19.11.1988
252
Formation of corner site Nos.414, 259, 338, 458, 439, 438, 422,
429, 430, 448 by the levelling in Channammanakere Achkat layout
in BSK III Stage (Flood damage works)
Maintanance of approach road of Kuamaraswamy layout
253
Plaintanance of main roads in Kumaraswamy Layout
No.BDA/EE(S)/DM/56/88-89 DT 16.06.1988
254
Improvements to road in Sy No.7 of Karisandra slums area in BSK
II Stage for roads No.1( main road) Road No.2 & 3 ( sub road)
No.BDA/EE(S)/DM/54/88-89 DT 13.06.1988
255
Clearing silt from side drains and levelling the footpath the BSK III
Stage, III Phase, VI Blcok Part 'B'
No.BDA/EE(S)/DM/69/88-89 DT 21.06.1988
256
Construction of stormwater drain in Muneswara block BSK III
Stage, layout Part II Ch.90 to 180Mtr
No.BDA/EE(S)/DM/71/88-89 DT 27.06.1988
257
Sinking of Borewell 150MM Die construction of Plat formm and
fixing India Mark II hand pump at I.T.I. Layout B.S.K. III Stage,
Point No..
Improvements near the public well in Muneswara block of BSK III
Stage
Clearing the side drain and berms cutting in raods of 16th, 16th 'A'
Main and 8th cross in Sarakki II Phase
No.BDA/EE(S)/DM/174/88-89 DT 27.06.1988
Estimate for filling up the Halla in Sy No.109 of Kathriguppa
providing side drains by the side of retaining wall in VIII Cross in
BSK III Stage, III Phase, III Block
Formation of Layout in by the side of Madivala tank in Sy No.75, 85
& 86 of Madivala Ch 0 to 40 Mtr.
No.BDA/EE(S)/DM/200/88-89 DT 08.07.1988
Formation of layout by the side of Madivala tank in Sy No.75, 85 &
86 of Madivala Village under BTM Scheme ch 320 to 380M
No.BDA/EE(S)/DM/
258
259
260
261
262
No.BDA/EE(S)/DM/
/88-89
No.BDA/EE(S)/DM/192/88-89 DT 04.07.1988
No.BDA/EE(S)/DM/193/88-89 DT 04.07.1988
No.BDA/EE(S)/DM/207/88-89 DT 16.07.1988
/88-89
263
Formation of layout by the side of Madivala tank in Sy No.75, 85 &
86 of Madivala under BTM Scheme ch 500 to 550m
No.BDA/EE(S)/DM/204/88-89 DT 16.07.1988
264
Formation of layout the side of Madivala tank in Sy No.84 of
Madivala Village
Estimate for anaintanance of road in the premises of EWS Houses
in Kumaraswamy Layout II Stage
No.BDA/EE(S)/DM/212/88-89 DT 16.07.1988
266
Formation of layout by the side of Madivala tank in Sy No.75, 85 &
86 of Madivala village under BTM ch 260 to 320 Mtr
No.BDA/EE(S)/DM/218/88-89 DT 16.07.1988
267
Formation of layout by the side of Madivala tank to Sy No.75, 85,
216 of Madivala Village BTM Ch 380-440Mtr
No.BDA/EE(S)/DM/613/88-89 DT 04.11.1988
268
Formation of layout by the side of Madivala tank is Sy No.75,
85,286 of Madivala ch 190 to 260Mtr undr BTM
No.BDA/EE(S)/DM/614/88-89 DT 04.11.1988
269
Providing barbed wire fencing to CA sites No.3, 9, 12 at
Channammanakere Achkat layout in BSK III Stage
No.BDA/EE(S)/DM/219/88-89 DT 16.07.1988
270
Rechipcarpetting to damaged portion of roads in BSK III Stage, III
Phase, IV Block, I 'A' & 'B' Cross roads.
No.BDA/EE(S)/DM/230/88-89 DT 20.07.1988
271
Chipcarpetting to damaged portion of roads in Sy No.95, 96 of
Hosakerehally in BSK III Stage
No.BDA/EE(S)/DM/229/88-89 DT 20.07.1988
272
Re-Chipcarpetting to damaged portion of roads in BSK III Stage, III
Phase, IV Block, VII Main I 'C' Cross roads
No.BDA/EE(S)/DM/227/88-89 DT 20.07.1988
273
Re-Chipcarpetting to damaged portion of roads in Sy No.95, 96. Of
Hosakerehally in BSK III Stage, II 'A', 'B' and 'C' Cross roads.
No.BDA/EE(S)/DM/228/88-89 DT 20.07.1988
274
Formation of Layout by the side of Madivala tank in Sy No.79 & 80
of Madivala Village 40' road by the side of foreshore of Madivala
under BTM ch 670 to 730M
Construction of S.W.D. in Sy No.77 of Madivala Village under BTM
II Stage, I Phase
Formation of layout by the side of Madivala tank in Sy No.79 and
80 of Madivala Village in Continuation of 30' road upto 40' road
newly proposed by the side of the foreshore of madivala tank
under BTM Layout
Formation of Layout by the side of Madivala tank in Sy No.79 & 80
of Madivala Village Formation of Continuation of 30' road upto 40'
road newly formed by the side of foreshore of Madivala tank under
BTM scheme
No.BDA/EE(S)/DM/251/88-89 DT 09.08.1988
265
275
276
277
No.BDA/EE(S)/DM/215/88-89 DT 14.07.1988
No.BDA/EE(S)/DM/2643/88-89 DT 08.08.1988
No.BDA/EE(S)/DM/2642/88-89
No.BDA/EE(S)/DM/249/88-89 DT 09.08.1988
278
Formation of layout by the side of Madivala tank in Sy No.78 & 79
of Madivala Village under BTM, Layout ch 610 to 670Mtr
No.BDA/EE(S)/DM/250/88-89 DT 09.08.1988
279
Desilting the B.S.Slab drains of roads of Viswabharathi HBCS
layout Phase. Girinagar BSK III Stage.
No.BDA/EE(S)/DM/244/88-89
280
Rechipcarpetting the damaged portion of III Main road and I 'A'
Cross road in BSK III Stage, II Phase, VI block
No.BDA/EE(S)/AE/PW/266/88-89 DT 16.08.1988
281
Formation of Layout in Sy No.19 of Sarakki under dollar Scheme
IV Phase, III Main Ch 195 to 285Mtr
No.BDA/EE(S)/DM/283/88-89 DT 25.08.1988
282
Rechipcarpetting to damaged portion of IV Main and III Cross road
in Sy No.95, 96, 121 & 122 of Hosakerehally in BSK III Stage.
No.BDA/EE(S)/AE/PW/265/88-89 DT 16.08.1988
283
Formation of road in Sy No.48 & 49 of Madivala under dollar
Scheme Balance Length of I Cross road
No.BDA/EE(S)/AE/PW/261/88-89 DT 11.08.1988
284
Rechipcarpetting to damaged portion of V Main and I 'G' Cross
roads in BSK III Stage, II Phase, IV block
No.BDA/EE(S)/AE/PW/273/88-89 DT 16.08.1988
285
Rechipcarpetting to damaged portion of II Cross road in
Hosakerehally BSK III Stage.
Maintanance of roads and drains in Maruthi HBCS Layout at BTM
Layout.
Formation of 60' Road joining Madivala Village in Sy No.103 of
Under BTM Layout
Formation of layout in Sy No.102/2 of Madivala under BTM layout
road No.2, 3, 4.
Formation of sites in Sy No.57 of Govinayakanahalli,
Kumaraswamy Layout II Stage, bichndign storm water drain
No.BDA/EE(S)/DM/PW/275/88-89 DT 16.08.1988
286
287
288
289
No.BDA/EE(S)/DM/263/88-89 DT 11.08.1988
No.BDA/EE(S)/DM/274/88-89 DT 16.08.1988
No.BDA/EE(S)/DM/270/88-89 DT 16.08.1988
No.BDA/EE(S)/DM/267/88-89 DT 11.08.1988
290
Formation of Layout in Sy No.19 of Sarakki under Dollar Scheme,
Sarakki IV Phase, III Cross and road ch 65 to 130mtr
No.BDA/EE(S)/DM/269/88-89 DT 16.08.1988
291
Formation of layout in Sy No.102/2 of Madivala under BTM layout
road No.I
Providing dust bins to Raghavendra block in Banashankari III
Stage.
Levelling the park (C.A.No.5) in Chennammanakere Achkat Layout
in BSK III Stage, III Phase
No.BDA/EE(S)/AE/PW/264/88-89 DT 16.08.1988
292
293
294
Formation of 100' ring road with S.S.Masonry drain righside
(Northernside) I Cross of VI Block to 80' road BSK III Stage, ch 0 to
30 Mtr
No.BDA/EE(S)/AE-WO/PW/272/88-89 DT
16.08.1988
No.BDA/EE(S)/DM/WO/285/88-89
No.BDA/EE(S)/AE/WO/PW/281/88-89 DT
25.08.1988
295
296
Formation of 100' ring road with S.S.masonry drain right side
(northside) from I Cross of VI Block to 80' road in BSK III Stage, ch
30 to 60Mtr
Improvements to roads in Sy No.7 of Karisandra slums in
Banashakari II Stage, Bangalore
No.BDA/EE(S)/AE/WO/PW/282/88-89 DT
25.08.1988
No.BDA/EE(S)/AE/WO/PW/284/88-89 DT
12.08.1988
297
Clearing the jugle removel of silt in drains and pate to reparirs to
roads at E.W.S. handed in K.M.R. Layout I Stage, Bangalore
No.BDA/EE(S)/DM/280/88-89 DT 12.08.1988
298
Clearing the roads and side drains of I Cross to 2nd 'B' Cross and
18th main to 20th main road in Sarakki II Phase.
No.BDA/EE(S)/AE/WO/PW/279/88-89 DT
25.08.1988
299
Providing dust bins in Sarakki II Phase BDA, B'lore
300
Formation of layout by the side of Madivala tank in Sy No.79 & 80
of Madivala and continuation of existing 30' road to Connect the
existing 60' road by the side of EWS sites in BTM Layout
No.BDA/EE(S)/AE/WO/PW/278/88-89 DT
20.08.1988
No.BDA/EE(S)/AE/WO/PW/306/88-89 DT
25.08.1988
301
Clearing and berm cutting the 16 Main to 18 'A' Main and I & II
Cross roads in Sarakki II Phase
No.BDA/EE(S)/AE/WO/PW/291/88-89 DT
26.08.1988
302
Clearing silt and berm cutting to 9, 10, 10th 'A', 'B' and 11th Cross
roads in Sarakki I Phase
No.BDA/EE(S)/AE/WO/PW/289/88-89 DT
26.08.1988
303
Levelling the park C.A.No.3, in Channammanakere Achkat layout
BSK III Stage, III Phase
Formation & Improvement to 40' road in BSK III Stage, III Phase, II,
III & IV block
Estimate for protection of footpath and side drains to Avalahally
layout (60' road) BSK III Stage
No.BDA/EE(S)/AE/WO/PW/287/88-89 DT
26.08.1988
No.BDA/EE(S)/AE/WO/PW/288/88-89 DT
26.08.1988
No.BDA/EE(S)/AE/WO/PW/298/88-89 DT
29.08.1988
Urgent repairs to the size stone masonry walls in the Western side
of the existing storm water drainin channammanakere Achkat
layout BSK III Stage, Ch 0 to 375 mtr
Formation of road with B.S.Slab drain 11th Cross (Northside) of
S.W.D. at Channammanakere Achkat layout BSK III Stage, IV
Phase
Providing re-Chipcarpetting to the bad asphalted surface with
depression filling and camber surface for 40' main road in
Chenammanakere achkat layout BSK III Stage Ch 308 to 468mtr
No.BDA/EE(S)/AE/WO/PW/295/88-89 DT
20.08.1988
304
305
306
307
308
309
Levelling the Park (C.A. No.2) in Channammanakere achkat layout
in BSK III Stage, III Phase
No.BDA/EE(S)/AE/WO/PW/294/88-89 DT
29.08.1988
No.BDA/EE(S)/AE/WO/PW/302/88-89 DT
30.08.1988
No.BDA/EE(S)/AE/WO/PW/305/88-89 DT
30.08.1988
310
311
312
313
314
Providing rechipcarpetting to bad asphalt surface with depression
filling and camber surface in Chennammanakere achkat layout
BSK III Stage, III Phase, VI Block 4th 'A' Main Ch 0 to 34, 60mtr,
7th cross Road ch 154 to 234Mtr
Rechipcarpetting to the bad asphalt surface with depression filling
camber surface in 100' ring road BSK III Stage, III Phase, ch 135
to 203mtr
Formation of road 'F' in Sy No.108 (Part) and 120 of Hosakerehally
in BSK III Stage.
Re-Chipcarpetting to the bad ashalt surface with depression filling
and camber surface for 40' main road in Channammanakere
achkat layout ch 148 to 308 mtr BSK III Stage.
Providing Re-Chipcarpetting to the bad asphalt surface with
depression filling and camber surface for 40' main road in
Chennammanakere achkat layout BSK III Stage, 0 to 148 Mtr.
No.BDA/EE(S)/AE/WO/PW/315/88-89 DT
30.08.1988
No.BDA/EE(S)/AE/WO/301/88-89 DT 30.08.1988
No.BDA/EE(S)/AE/293/88-89 DT 29.08.1988
No.BDA/EE(S)/AE/WO/300/88-89 DT 30.08.1988
No.BDA/EE(S)/AE2/WO/299/88-89 DT
30.08.1988
315
Removing of silt in road side drains in Kempegowda Gruha
Nirmana S.Sangha Niymaltha Layout BSK III Stage.
No.BDA/EE(S)/AE/WO/PW/316/88-89 DT
30.08.1988
316
Levelling the Park (C.A.No.1) in Chennammanakere Layout in BSK
III Stage, IV Phase, Part II
No.BDA/EE(S)/AE/WO/PW/296/88-89 DT
29.08.1988
317
Formation of road with B.S.Slab drain 10th Main and 11th cross at
Channammanakere achkat Layout BSK III Stage.
No.BDA/EE(S)/AE/WO/PW/297/88-89 DT
29.08.1988
318
Providing dust bins in Sarakki I Phase, Layout
319
Providing dust bins in Mico HBCS Layout Bharath HBCS Layout
Vysya Bank HBCS, and EWS sites layout in Madivala under BTM
Scheme
Estimate for formation of layout in Sy No.43 of Yediyur BSK II
Stage, Bangalore
Formation of 20' x 30' sites in Sy No.62 of Govinayakanahalli,
Kumaraswamy Layout
Formation of site in Sy nO.41 of Govinayakanahally,
Kumaraswamy Layout II Stage.
Urgent repairs to the damaged portion of S.S.Masonry wall in the
Easternside of S.W.D. in Channammanakere Achkat layout in BSK
III Stage, III Phase, ch 117 to 132 and ch 147 to 192 mtr
No.BDA/EE(S)/AE/WO/PW/309/88-89 DT
01.09.1988
No.BDA/EE(S)/WO/PW/286/88-89 DT 26.08.1988
320
321
322
323
324
Re-Chipcarpetting the Circle at the junction of 40' & 50' road and
approach roads to the circle in I, II & III block of BSK III Stage, III
Phase.
No.BDA/EE(S)/JE/WO/PW/290/88-89 DT
22.08.1988
No.BDA/EE(S)/DM/307/88-89 DT 27.08.1988
No.BDA/EE(S)/DM/6293/88-89 DT 06.02.1989
No.BDA/EE(S)/WO/PW/310/88-89 DT 01.09.1988
No.BDA/EE(S)/AE/WO/PW/315/88-89 DT
02.09.1988
325
Re-Chipcarpetting the damaged portion of II Cross road in BSK III
Stage, III Phase, IV Block
No.BDA/EE(S)/WO/PW/314/88-89 DT 02.09.1988
326
Re-Chipcarpetting the damaged portion of 40' main road in
between II & III block in BSK III Stage, III Phase
No.BDA/EE(S)/WO/PW/313/88-89 DT 02.09.1988
327
Re-chipcarpetting the damaged portion of 80' road connecting
Vidyapeetha Circle and 100' Ring road near Khadi commion
Employees HBCS Layout in BSK III Stage, Ch 0 to 70 mtr.
No.BDA/EE(S)/WO/PW/312/88-89 DT 02.09.1988
328
Estimate for levelling the Park (CA site No.4) in
Chennammanakere achkat layout BSK III Stage, IV Phase
No.BDA/EE(S)/AE/WO/PW/311/88-89 DT
01.09.1988
329
Providing and constructing granite S.S.Masonry Parapet wall to
existing RCC Hum Pipe bridge across 100' ring road in BSK III
Stage, III Phase, I block
Providing RCC Boards for road and layout direction in Sy No.7, 23
& 24 of Karisandra slum BSK III Stage
No.BDA/EE(S)/WO/PW/343/88-89 DT 24.09.1988
331
Providing dust bins in BTM II Stage, I Phase, BDA, Bangalore
332
Removal of silt from drains berms cuthings and providing missing
slab to drains in sy no.122 of Kathriguppa at BSK III Stage,
No.BDA/EE(S)/AE/WO/PW/318/88-89 DT
06.09.1988
No.BDA/EE(S)/DM/31/88-89 DT 01.08.1988
333
Construction of Storm water drain in Sy No.7 of Karisandra Slum in
BSK II Stage
Improvement to layout formation for shifting of slums from KMR
Kemple to KMR Layout
Providing dust bins in commercial complex, Banashankari II Stage,
BDA, Bangalore.
Constuction of protection wall to the secured portion of road
leading to mico layout at Bannerghatta road Arekere
No.BDA/EE(S)/AE/WO/PW/330/88-89 DT
01.09.1988
No.BDA/EE(S)/AE/WO/PW/323/88-89 DT
12.09.1988
337
Clearing the roads and side drains in between III cross and 7th
cross road in Sarakki II Phase
No.BDA/EE(S)/AE/WO/PW/340/88-89 DT
17.09.1988
338
Removal of earth from drains and repairs to the slabed drain at
Arekere Mico Karmekara Layout
No.BDA/EE(S)/AE/WO/326/88-89 DT 12.09.1988
339
Repairs to the ward office, at Banashankari III Stage Layout
No.BDA/EE(S)/AE/WO/329/88-89 DT 13.09.1988
340
Rrmoval of silt from the drains and levelling footpath in Avalahally
layout in Sy No.19 to 25 and part of 22 & 23 BSK III Stage,
Bangalore
No.BDA/EE(S)/DM/86/88-89 DT 09.05.1988
330
334
335
336
No.BDA/EE(S)/JE/WO/PW/321/88-89 DT
31.08.1988
No.BDA/EE(S)/DM/331/88-89 DT 01.09.1988
No.BDA/EE(S)/DM/328/88-89 DT 01.09.1988
341
Removing the silt from this drains and duslering footpath in
Avalahally Village (in Sy No. 19 to 25 park of 22 & 23) of BSK III
Stage
Formation of roads in Sy No.24 of Karisandra Jawaharial Slum in
BSK II Stages (Road No.4, 5 and 6)
No.BDA/EE(S)/DM/ /88-89 DT 07.05.1988
343
Formation of roads in Sy No.24 of Karisandra Jawaharial Slum in
BSK II Stages (Road No.1,2 and 7)
No.BDA/EE(S)/DM/93/88-89 DT 12.05.1988
344
Levelling the park C.A. Site in Channammanakere Achkat layout
BSK III Stage, IV Phase.
Levelling the park CA Site No.8 in Channammanakere Achkat in
Banashankari III Stage, IV Phase
No.BDA/EE(S)/DM/90/88-89 DT 11.05.1988
346
Rechipcarpetting to the road (bad) asphalt surface in the depresion
filling to I Main road in BSK III Stage, III Phase, VI bwell
No.BDA/EE(S)/DM/35/88-89 DT 8.04.1988
347
Rechipcarpetting to the bad asphalt surface with depression filling
camber surface to IV 'B' cross road 40' vide in BSK III Stage, III
Phase, VI Block.
Re-chipcarpetting to the bad asphalt surface with depression filling
and camber surface to I cross road in BSK III Stage, III Phase, VI
block
Re-chipcarpetting the bad asphalt surface with depression filling
and camber surface to 40' road in BSK III Stage, III Phase, VI
Block
Formation of road in Sy No.24 of Karisandra jawaharial slum in
BSK II Stage (Road 388)
Rechipcarpetting to I and II Roads in BSK III Stage, III Phase, III
Block
Levelling the C.A.Sites in front of Community hall and alround
community hall constructed in Sy No.23 of Karisandra
No.BDA/EE(S)/DM/32/88-89 DT 8.04.1988
342
345
348
349
350
351
352
353
No.BDA/EE(S)/AE3/82/88-89 DT 07.05.1988
No.BDA/EE(S)/DM/89/88-89 DT 10.05.1988
No.BDA/EE(S)/DM/33/88-89 DT 8.04.1988
No.BDA/EE(S)/DM/34/88-89 DT 8.04.1988
No.BDA/EE(S)/DM/83/88-89 DT 07.05.1988
No.BDA/EE(S)/DM/44/88-89 DT 15.04.1988
No.BDA/EE(S)/DM/47/88-89 DT 19.04.1988
Rechipcarpetting to 4th to 5th Main roads in B.S.K. III Stage, III
Phase, IV Block
Providing steps on Eastern side of commercial complex at B.S.K. II
Stage, Bda Bangalore
No.BDA/EE(S)/DM/42/88-89 DT 18.04.1988
355
Providing water supply and sanitary block in front of community
hall sy No.23 of karisandra slum
No.BDA/EE(S)/DM/87/88-89 DT 09.05.1988
356
Chipcarpetting to roads (Adjacent to Rangarao Layout) in
Banashankari III Stage, III Phase, III Block
No.BDA/EE(S)/DM/43/88-89 DT 15.04.1988
354
No.BDA/EE(S)/DM/66/88-89 DT 22.04.1988
357
Construction of culvert and steps at Community Hall in Sy No.23 of
Karisandra BSK II Stage
No.BDA/EE(S)/DM/38/88-89 DT 16.04.1988
358
Maintenance of roads in Srinivasanagar in Sy No.8 to 14 of
Gerehally BSK III Stage, II Phase, II Reach
No.BDA/EE(S)/DM/75/88-89 DT 02.05.1988
359
Maintenance of Roads in Srinivasanagar in Sy No.8 to 14 of
Gerehally BSK III Stage, II Phase, I Reach
No.BDA/EE(S)/DM/74/88-89 DT 02.05.1988
360
Construction of Retaining wall as citha side of steps at Community
Hall in Sy No.23 of Karisandra BSK II Stage
No.BDA/EE(S)/DM/37/88-89 DT 15.04.1988
361
Improvement to Roads in III Block and filling up hall to corner site
No.403 in II Block in BSK III Stage, III Phase
No.BDA/EE(S)/DM/70/88-89 DT 28.04.1988
362
Removing silt from the drains and levelling foothpath in Avalahally
Sy No.19 to 25 Part of 22 & 23 in BSK III Stage.
No.BDA/EE(S)/DM/78/88-89 DT 05.05.1988
363
Providing barbed wire fencing to the CA site of BSK III Stage, III
Phase V Block, Bangalore
No.BDA/EE(S)/DM/79/88-89 DT 06.05.1988
364
Providing fencing to CA site in Sri.Anjaneyaswamy HBCS pvt
Layout in Sy No.7/2 of Ittamadu Village BSK III Stage.
No.BDA/EE(S)/DM/80/88-89 DT 06.05.1988
365
Providing layout boards and name boards for main and cross
roads in Kempegowda HBCS Layout BSK III Stage, in Sy No.101/1
to 3, 102, 105/2, 107/3 and 108/1 to 2 of Kathruguppa Village
No.BDA/EE(S)/DM/95/88-89 DT 13.05.1988
366
Desilting the drain and clearing the berms of Foot-path in of
Kathriguppa in BSK III stage, IV Phase
No.BDA/EE(S)/DM/98/88-89 DT 13.05.1988
367
Clearing silt from side drains and levelling the footpath in BSK III
Stage, III Phase, VI Block Part 'A'
No.BDA/EE(S)/DM/97/88-89 DT 13.05.1988
368
Rechipcarpetting to damaged poztion of 40' road in BSK III Stage,
III Phase, II Block
Rechipcarpetting to Ist Cross road in BSK III Stage, III Phase, I
Block
Rechipcarpeting to damaged portion of I Cross road in BSK III
Stage, III Phase, II & IV block
No.BDA/EE(S)/DM/112/88-89 DT 23.05.1988
Chipcarpetting to metalled portion of 50' road in BSK III Stage, III
Phase, III block
Rechipcarpetting the damaged portion of road in BSK III Stage, III
Phase, III Block (40' rd)
Chipcarpetting to I main road in BSK III Stage, III Phase, III Block
No.BDA/EE(S)/DM/107/88-89 DT 23.05.1988
369
370
371
372
373
No.BDA/EE(S)/DM/110/88-89 DT 23.05.1988
No.BDA/EE(S)/DM/109/88-89 DT 23.05.1988
No.BDA/EE(S)/DM/108/88-89 DT 23.05.1988
No.BDA/EE(S)/DM/111/88-89 DT 23.05.1988
374
Rechipcarpetting to damaged portion 40' road in BSK III Stage, III
Phase, III & IV block
Rechipcarpetting to 40' wide III main road damaged portion in BSK
III Stage, III Phase, I Block
No.BDA/EE(S)/DM/106/88-89 DT 23.05.1988
376
Rechipcarpetting the damaged portion of II Main Road in BSK III
Stage, II Phase (Between II Cross and 40' Road)
No.BDA/EE(S)/DM/99/88-89 DT 21.05.1988
377
Rechipcarpetting the damaged portion of I 'E' cross road in BSK III
Stage, II Phase
Rechipcarpetting the damaged portion of 80' road from SBMColony to join 100' ring road in BSK III Stage, II Phase, VII Block
No.BDA/EE(S)/DM/101/88-89 DT 21.05.1988
379
Rechipcarpetting the damaged protion of 40' road in BSK III Stage,
II Phase, Hosakerehally layout
No.BDA/EE(S)/DM/100/88-89 DT 21.05.1988
380
Providing barbed wire fencing to the CA site in BSK III Stage, III
Phase, V Block
Levelling of silts between EWS houses (III, IV & V block) in
Kumaraswamy layout.
Construction of Masonry side drain on left side of 100' road ch 50M
to 80Mtrs in Sarakki I phase
No.BDA/EE(S)/DM/105/88-89 DT 21.05.1988
383
Construction of SWD to form site 30' x 40' site in C.T. bed of BSK II
Stage, ch 60 to 80mtr
No.BDA/EE(S)/JE/WO/714/88-89 DT 13.03.1989
384
Formation of layout in Sy No.19 of Sarakki village under dollar
scheme, Sarakki IV Phase I Cross Road ch 100 to 120M
No.BDA/EE(S)/DM/681/88-89 DT 20.02.1989
385
Providing Barbed wire fencing to CA sites No.6 in
Halagevaderahally in Favour of BEML HBCS Ltd
No.BDA/EE(S)/AE1/WO/677/88-89 DT
16.02.1989
386
Providing barbed wire fencing to CA site No.1 in
Halagevaderahally in F/O BEML HBCS Ltd
No.BDA/EE(S)/AE1/WO/287/88-89 DT
20.02.1989
387
Removal of garbage in private layout in F/O Radhakrishna HBCS I,
II & III Stage
Providing security arrangements and demolition party to BTM
layout
Jungle clearing and levelling corner sites Nos. 175, 146, 145, 134,
133, 129, 260, 259, 232 & 140 of proposed for auction in Feb 89 at
BSK III Stage, III Phase, V block
Formation of layout in Sy No.79 & 80 of Madivala village by the
side of foreshore of Madivala tank under BTM Scheme 'B'
No.BDA/EE(S)/AE/WO/696/88-89 DT 24.02.1989
375
378
381
382
388
389
390
No.BDA/EE(S)/DM/113/88-89 DT 23.05.1988
No.BDA/EE(S)/DM/102/88-89 DT 21.05.1988
No.BDA/EE(S)/JE/WO/675/88-89 DT 15.02.1989
No.BDA/EE(S)/JE/WO/659/88-89 DT 06.02.1989
No.BDA/EE(S)/DM/699/88-89 DT 01.03.1989
No.BDA/EE(S)/AE1/WO/702/88-89 DT
01.03.1989
No.BDA/EE(S)/AE2/WO/713/88-89 DT
13.03.1989
391
Formation of layout in Sy No.79 & 80 of Madivala village by the
foreshore of Madivala Tank under BTM Scheme
No.BDA/EE(S)/AE2/WO/712/88-89 DT
13.03.1989
392
Rechipcarpetting the 100' ring road leading from Bannerghatta
road towards Hosur road under BTM ch 435 to 555 Mtr
No.BDA/EE(S)/AE2/WO/719/88-89 DT
16.03.1989
393
Rechipcarpetting 100' ring road from Bannerghatta road towards
Hosur Main road under BTM Scheme ch 555 to 675Mtr
No.BDA/EE(S)/AE2/WO/718/88-89 DT
16.03.1989
394
Rechipcarpetting the 100' ring road from Bannerghatta main road
and connecting Hosur road under BTM Scheme ch 1300 to
1420mtr
Rechipcarpetting the 100' ring road leading from Bannerghatta
road towards Hosur road ch 675 to 795 mtr
No.BDA/EE(S)/AE2/WO/717/88-89 DT
16.03.1989
No.BDA/EE(S)/AE2/WO/720/88-89 DT
16.03.1989
396
Jungle clearing and levelling up of the intermediate sites proposed
for Auction during the month of March 1989 in Jayanagar 8th Block
No.BDA/EE(S)/AE2/WO/PW/723/88-89 DT
22.03.1989
397
Filling and levelling of corner site Nos.557, 565, 566, 575, 580,
581, 586, 587, 596, 597 & 614 proposed for auction in Sarakki III
Phase
Filling up the corner sitesproposed for auction in Banashankari III
Stage, III Phase, IV and I Block
No.BDA/EE(S)/DM/724/88-89 DT 23.03.1989
395
398
399
Levelling the corner site nos 74 & 75 in Sy No. 85 & 86 of Madivala
village under BTM Scheme
400
Providing l/o boards and name boards for main and cross roads in
Sy.No.108 (Part) and 120 of Hosakerehally and 17/1 and 27/1 and
2 of Avalahalli l/o, BSK III stage.
RCC. Layout Boarda and road direction boards for layout formed
in sy. No.29,125,126,127,50 to 53 of and 60 to 63 in BSA-II st. 7th
Block. IV Phase.
Formation of layout in Sy. No. 36 of marenahally village SRK. I
Phase Continuation of 26th main Road from 5th Cross Road,
toward North.
Removal of silt from the drain and levelling footpath in Anjeneya
HBCS. L/o. Pvt.L/o.
Protective works for houses constrcuted in Sy.No. 24 of karisandra
slum by providing masonry drain in bSK-II Stage (Flood damage
work)
Formation of layout in Sy. No. 19 of Sarakki village under dollar
scheme. Sarakki VI Phase, II Main Road Ch. 70 to 125 mtr.
401
402
403
404
405
No.BDA/EE(S)/WO/JE/PW726/88-89 DT
31.03.1989
BDA/EE/S/PW/WO/96/88-89 dt:13-05-88
BDA/EE(S)/JE/WO/646/88-89 Dt: 20/1/89
BDA/EE(S)/AEE/WO/636/88-89 Dt: 20/1/89
BDA/EE(S)/AE1/WO/660/88-89 Dt: 21/1/89
BDA/EE(S)/JE/WO/588/88-89 Dt: 21/1/89
BDA/EE(S)/AE2/WO/615/88-89 Dt: 25/1/89
406
Formation of layout in Sy. No. 19 of Sarakki village under dollar
scheme. Sarakki IV Phase, III Main Road Ch.0 to 70 mtr.
BDA/EE(S)/AE2/WO/617/88-89 Dt: 25/1/89
407
Formation of layout in Sy. No. 19 of Sarakki village under dollar
scheme. Sarakki IV Phase, III Main Road Ch.125 to 180 mtr.
BDA/EE(S)/AE2/WO/616/88-89 Dt: 25/1/89
408
Providing Security arrangements round th clock in three shifts at
EWS.Houses in Kumaraswamy Layout (1.2.88 to 30.4.88)
BDA/EE(S)/JE/WO/314/88-89 Dt: 25/1/89
409
Formation of Layout in Sy.No 19 of SRK. Village under dollar
acheme.SRK. IV Phase Se.9 main CH.320 to 390 mtr
BDA/EE(S)/AE2/WO/631/88-89 Dt: 25/1/89
410
Formation of Layout in Sy.No 19 of Sarakki Village under dollar
acheme. IV Phase IX main road.CH.260 to 320 mtr
BDA/EE(S)/AE2/WO/630/88-89 Dt: 25/1/89
411
Formation of Layout in Sy. No. 19 of Sarakki Village under dollar
scheme. IV Phase. IX Main Ch. 180 to 260mtr
BDA/EE(S)/AE2/WO/629/88-89 Dt: 25/1/89
412
Formation of Layout in Sy. No. 19 of Sarakki Village under dollar
scheme. IV Phase. VII th Main road Ch.255 to 320mtr
BDA/EE(S)/AE2/WO/627/88-89 Dt: 25/1/89
413
Formation of Layout in Sy. No. 19 of Sarakki IV Phase under dollar
scheme. IV Phase. VII th Main road Ch.195 to 255 mtr
BDA/EE(S)/AE2/WO/628/88-89 Dt: 25/1/89
414
Construction of S.W.D.under dollar scheme. In Sarakki Ivphase.
Ch.171 to 190 mtr
Construction of side draing kerbstones removal of silt in the right
side of the existing SWD Sarakki 1st phase
BDA/EE(S)/AE2/WO/637/88-89 Dt: 25/1/89
416
Formation of Layout in Sy. No. 19 of Sarakki Village under dollar
scheme.Sarakki IV Phase. 8th Main road Ch.295 to 355mtr
BDA/EE(S)/AE2/WO/618/88-89 Dt: 25/1/89
417
Formation of Layout in Sy. No. 19 of Sarakki Village under dollar
scheme. IV Phase. 1st Cross Ch.0 to 50mtr
BDA/EE(S)/AE2/WO/641/88-89 Dt: 25/1/89
418
Formation of Layout in Sy. No. 19 of Sarakki Village under dollar
scheme.Sarakki Layout VI Phase. X th Main raod and 2nd Corss
road
Marking good the flood damages to the culvert and SWD at 12th
main road of Nagendra Block. In BSK-IIISt
BDA/EE(S)/AE2/WO/638/88-89 Dt: 25/1/89
420
Providing Submersible Pumpset of 3 H.P. Capacity at C.A. Site in
Banashnkari II Stage. (Manjunatha Temple)
BDA/EE(S)/PW/WO/JE/626/88-89 Dt:28/1/89
421
Sinking Borewell at C.A. Site in Banashankari II Stage (Manjunath
Temple) 150 mm dia
BDA/EE(S)/PW/WO/JE/650/88-89 Dt:28/1/89
415
419
BDA/EE(S)/AE2/WO/715/88-89 Dt: 25/1/89
BDA/EE(S)/AE1/WO/621/88-89 Dt: 28/1/89
422
Formation of Layout in Sy. No. 19 of Sarakki Village under Dollar
Scheme, Sarakki iV Phase, 5th 'A' Cross Road.
BDA/EE(S)/PW/WO/JE/680/88-89 Dt:28/1/89
423
Construction of Masonry side drain in left side of 100' road ch.25 to
50 mtr. Sarakki. 1st Phase.
BDA/EE(S)/AE2/WO/661/88-89 Dt:28/1/89
424
Construction of SWD. In Dollar Scheme. Sarakki IV Phase Ch. 57
to 76 mtrs
Construction of SWD. Under Dollar Scheme.in Sarakki IV Phase
CH. 95 to 114 mtr
Construction of SWD Under Dollar Scheme in Sarakki IV Phase
Ch. 76 to 95 mtr
Construction of SWD Under Dollar Scheme in Sarakki IV Phase
Ch. 19 to 38 mtr
Construction of SWD Under Dollar Scheme in Sarakki IV Phase 'A'
Ch.0 to 19 mtr
Construction of SWD Under Dollar Scheme in Sarakki IV Phase
Ch.380 to 57 mtr
Construction of SWD Under Dollar Scheme in Sarakki IV Phase
Ch.113 to 152 mtr
Construction of SWD Under Dollar Scheme in Sarakki IV Phase
Ch.114 to 133 mtr
Construction of SWD Under Dollar Scheme in Sarakki IV Phase
Ch.152 to 171 mtr
Providing Barbedwire fencing to CA.Site No.2 at
Halagevaderahally in F/o.BEML.HBCS.LTD
BDA/EE(S)/AE2/WO/688/88-89 Dt:30/1/89
425
426
427
428
429
430
431
432
433
434
435
436
437
438
439
Urgent repaire to the grante S.S. Masonry wall for the existing
S.W.D in Betweed 1st cross 40' road and CA Site No. 1
Channamanakere achkat Layout BSK-III St
Providing Barbedwire fencing to CA.Site No.2 in Sri S.Rama Rao
layout BSk-III St layout
Errection of sheds for the rehabilitation of slum Dwellers to be
shifted from Kumaraswamy Hanumanthanagar, to Kumaraswamy
Layout
Dormation of EWS. Sites for SC/St. in Sy No 94 to 95
Hosakerehally at BSk-III St, 8th Main Road Ch.0 to 30 mtr
Formation of layout in Sy No 17, 18 & 19 of Sarakki in F/o.KAS.off.
HBCS Layout
Est. for demarkation of sites & Providing Fencing to Park in
KAS.off HBCS Sy No 17,18,19 of Sarakki
BDA/EE(S)/AE2/WO/689/88-89 Dt:30/1/89
BDA/EE(S)/AE2/WO/684/88-89 Dt:30/1/89
BDA/EE(S)/AE2/WO/682/88-89 Dt:30/1/89
BDA/EE(S)/AE2/WO/ /88-89 Dt:
BDA/EE(S)/AE2/WO/683/88-89 Dt:30/1/89
BDA/EE(S)/AE2/WO/679/88-89 Dt:30/1/89
BDA/EE(S)/AE2/WO/685/88-89 Dt:30/1/89
BDA/EE(S)/AE2/WO/686/88-89 Dt:30/1/89
BDA/EE(S)/AE2/WO/270/88-89 Dt:31/1/89
BDA/EE(S)/AE1/WO/658/88-89 Dt:3/2/89
BDA/EE(S)/JE/WO/120/88-89 Dt:3/2/89
BDA/EE(S)/AE/WO/PW/327/88-89 Dt:9.9.88
BDA/EE(S)/WO/PW/325/88-89 Dt:12.9.88
BDA/EE(S)/WO/PW/338/88-89 Dt:12.9.88
BDA/EE(S)/WO/PW/337/88-89 Dt:12.9.88
440
Formation of EWS. Sites for SC/St in Sy No 94 to 95 of
Hosakerehally at BSK-III St 8th Main Raod Ch 30 to 60 mtr
BDA/EE(S)/AE/WO/PW/339/88-89 Dt:12.9.88
441
Construction of culvert across 60' road at Avalahally in BSK-III
Stage
Providing fencing to CA.Site area between 3rd & 4th Cross Road in
Sarakki. J.P. Nagar 2nd Phase.
BDA/EE(S)/AE/WO/PW/341/88-89 Dt:14.9.88
Providing dust bins to BDA Layout in Sy No 54 of N.S. Palya under
BTM Scheme
Providing Dust bins to KES Layout, Maruthi.HBCS. Layout and
BTM Layout 1st Phase, Under BTM Scheme
BDA/EE(S)/AE/WO/PW/350/88-89 Dt:21.9.88
Prividng fencing to CA Site No.3 in S. RamaRao Pvt. Layout In
BSK-III Stgae
Formation of EWS Sites for SC/ST in Sy No 94 & 95 of
Hoskerehally at BSK-III St. 7th Main Raod
BDA/EE(S)/AE/WO/PW/347/88-89 Dt:24.9.88
447
Formation of Layout in Sy No 19 Sarakki Under Dollar Scheme
Sarakki IV Phase III Cross Road Ch 130 to 195 mtr
BDA/EE(S)/
448
Formation of EWS Sites for SC/ST in Sy No 94 & 95 of
Hoskerehally at BSK-III St. 5th 'A' Main Raod
BDA/EE(S)/AE/WO/PW/380/88-89 Dt:5.10.88
449
Formation of Layout in Sy No 19 of Sarakki under Dollar Scheme
Sarakki IV Phase III Cross Road Ch 195 to 260 mtr
BDA/EE(S)/
88-89 Dt:
450
Formation of Layout in Sy No 19 of Sarakki under Dollar scheme
Sarakki IV phase VI main road Ch 0 to 65 mtr
BDA/EE(S)/
88-89 Dt:
451
Formation of Layout in Sy No 19 of Sarakki under Dollar scheme
Sarakki IV phase IX main road Ch 0 to 90 mtr
BDA/EE(S)/
88-89 Dt:
452
Formation of Layout in Sy No 19 of Sarakki under Dollar scheme
Sarakki IV phase III main road (Balance Partion)
BDA/EE(S)/
88-89 Dt:
453
Construction of stromwater drain (balance Length) in sy no 42 and
43 Gavipura (Srinivasanagar) BSK=III St Ch. 0 to 50 mtr
BDA/EE(S)/AE/WO/PW/356/88-89 Dt:27.9.88
454
Providing Layout Boards and street name boards in sy no 120
(new) of Kathriguppa and ITI Layout in BSK-III St
BDA/EE(S)/AE/WO/PW/369/88-89 Dt:28.9.88
455
Providing fixing RCC.Street name Boards for Cross roads, Main
roads and route mark boards in sy no 15 of Kathriguppa in BSK-III
St
BDA/EE(S)/AE/WO/PW/368/88-89 Dt:28.9.88
442
443
444
445
446
BDA/EE(S)/AE/WO/PW/342/88-89 Dt:20.9.88
BDA/EE(S)/WO/PW/349/88-89 Dt:21.9.88
BDA/EE(S)/AE/WO/PW/348/88-89 Dt:24.9.88
88-89 Dt:
456
Estimate for earthfilling in road portion both side of stormwater
drain in sy no 2 to 7 and 11 of Gerehally in BSK-III St Ch.180 to
240 mtr
Formation of sites in sy no 33, of madivala Village under dollar
scheme in BTM Layout
Formation of EWS Sites and corner sites in sy no 34 & 35/4 of
Madivala Village under BTM Schme
BDA/EE(S)/DM/WO/PW/355/88-89 Dt:28.9.88
459
Formation of Layout in Sy No 19 of Sarakki under Dollar Scheme
Sarakki IV Phase VII Main Road Ch 130 to 195 Mtr
BDA/EE(S)/
88-89 Dt:
460
Formation of Layout in Sy No 19 of Sarakki under Dollar Scheme
Sarakki IV Phase X Main Road Ch 90 to180 Mtr
BDA/EE(S)/
88-89 Dt:
461
Formation of Layout in Sy No 19 of Sarakki under Dollar Scheme
Sarakki IV Phase VI Main Road Ch 65 to130 Mtr
BDA/EE(S)/
88-89 Dt:
462
Formation of Layout in Sy No 19 of Sarakki under Dollar Scheme
Sarakki IV Phase IV Main Road Ch 65 to125 Mtr
BDA/EE(S)/
88-89 Dt:
463
Formation of road in CA area in the Layout in Sy No 95,96,121 and
122 of Hosakerehally in BSK-IIISt
BDA/EE(S)/AE1/WO/PW/363/88-89 Dt:3.10.88
464
Formation of road with BS slab side drains S.S. Masonry retaining
wall and culvert 30' road in between 7th cross BSk-IIISt, III Phase
VI Block and KSRTC 1and in BSK-III St
Formation of EWS sites for Sc/ST in Sy no 94 & 95 of
Hosakerehally at BSK-III St. 1st Cross Road
BDA/EE(S)/AE/WO/PW/383/88-89 Dt:5.10.88
466
Formation of EWS. Sites for SC/ST in Sy No 94 to 95 of
Hosakerehally at BSK-III St 5th Main Raod Ch 100 to 200 mtr
BDA/EE(S)/AE/WO/PW/381/88-89 Dt:5.10.88
467
Formation of EWS. Sites for SC/ST in Sy No 94 to 95 of
Hosakerehally at BSK-III St, 5th Main Raod, Ch 0 to100 mtr
BDA/EE(S)/AE/WO/PW/379/88-89 Dt:5.10.88
468
Formation of Layout in Sy No 19 Sarakki Under Dollar Scheme
Sarakki IV Phase IV Main Road Ch 0 to 65 mtr
BDA/EE(S)/
469
Formation of 20x30 sites (roads and culverts) in Sy No 57 of
Govinayakanahally Kumaraswamy Layout II Stgae
BDA/EE(S)/DE/373/88-89 Dt:5.10.88
470
Maintenance of roads in Kumaraswamy Layout near site nos. 526
to 912
Construction of Masonry wall Layout drain in sy nos 46 of
Govinayakanahally at Kumarswamy Layout 2nd stage
BDA/EE(S)/DE/370/88-89 Dt:5.10.88
457
458
465
471
BDA/EE(S)/AE/WO/PW/353/88-89 Dt:28.9.88
BDA/EE(S)/AE/WO/PW/359/88-89 Dt:29.9.88
BDA/EE(S)/AE/WO/PW/382/88-89 Dt:5.10.88
88-89 Dt:
BDA/EE(S)/DE/372/88-89 Dt:5.10.88
472
Maintenance of roads in Kumaraswamy Layout near site nos. 1060
to 1812
Maintenance of roads in Kumaraswamy Layout near site nos. 914
to 1736
Formation of 40x60 sites in sy no 43 of Govinayankanahally at
Kumaraswamy Layout 2nd Stage
BDA/EE(S)/
475
Formation of 20x30 sites (roads and culverts & drains) in Sy No 61
of Govinayakanahally Kumaraswamy Layout II Stgae
BDA/EE(S)/DM/376/88-89 Dt:5.10.88
476
Construction of stormwater drain (Balance length) in sy no 42 & 43
of Govipura srinivasanagar) BSk-IIIStage Ch. 100 to 150 mtr
BDA/EE(S)/DM/375/88-89 Dt:5.10.88
477
Construction of stormwater drain (Balance length) in sy no 42 & 43
of Govipura srinivasanagar) BSk-IIIStage Ch. 50 to 100 mtr
BDA/EE(S)/DM/374/88-89 Dt:5.10.88
478
Formation of EWS Sites for SC/ST in Sy. No 94 & 95 of
Hosakerehally at BSk-IIIst. 6th main road
BDA/EE(S)/AE/WO/PW/373/88-89 Dt:12.10.88
479
Esrthfilling in road portion and both sides of stormwater drain in
sy.no 2 to 7 and 11 of Gerehally in BSk-IIIst. Ch.90 to 180 mtr
BDA/EE(S)/JE/WO/PW/416/88-89 Dt:12.10.88
480
Providing RCC Boards for road direction to IV,IV & VII Block at
BSK-IIIst. II Phase for laft out roads.
BDA/EE(S)/AE1/WO/PW/391/88-89 Dt:13.10.88
481
Providing Barbed wire fencing to CA Site at BSk-II stage
(Manjunatha Temple) BDA, Bangalore
BDA/EE(S)/JE/WO/PW/389/88-89 Dt:13.10.88
482
Formation of Layout in Sy No. 48/1 of Madivala Village under BTM
Scheme
Removing Silt in drain berm cuttings patch repairs to roads in pvt.
Layouts in f/o Jayanagar HBCS Block-I BSk-Iind Stgae
BDA/EE(S)/AE/WO/PW/388/88-89 Dt:13.10.88
484
Re-Chipcarpetting to 5th, 6th Main and II Cross road danaged
portionin BDA III Stgae III Phase, II Blcok
BDA/EE(S)/
88-89 Dt:
485
Levelling the park (CA Site No. 9) in Channamanakere Achkat in
BSK III Stgae, IV Phase
Clearing silt from side draing and other repairs works in BSK-II
Stgae, III Phase, Vth Block, (Part-II)
BDA/EE(S)/
88-89 Dt:
487
Clearing silt from side draing and other repairs works in BSK-III
Stgae, III Phase, Vth Block, (Part-I)
BDA/EE(S)/DM/989/88-89
Dt: 24.5.88
488
Removing Silt from drains and levelling footoath in Avalahally
Layout (Sy.No.19 25 part of 22&23 in Banashamkari-III Stage
BDA/EE(S)/DM/117/88-89
Dt: 26.5.88
473
474
483
486
88-89 Dt:
BDA/EE(S)/DM/377/88-89 Dt:5.10.88
BDA/EE(S)/DM/378/88-89 Dt:5.10.88
BDA/EE(S)/DM/86/88-89 Dt:19.5.88
BDA/EE(S)/1/2DM/990/88-89
Dt: 24.5.88
489
Formation of 40' wide 1st cross road in Channammanakere achkat
area BSK-III Stage III Phase
BDA/EE(S)/DM/119/88-89
Dt: 26.5.88
490
Construction of Compound wall to Community hall at CA Site in Sy
No 23 of Karisandra BSK-II Stgae
BDA/EE(S)/DM/986/88-89
Dt: 26.5.88
491
Maintenance of roads in Sy No 42 & 43 of Srinivasanagar BSK 1st
Stage
Maintenance of roads in srinivasanagar Sy No 2 to 7 and 11 of
Banashankari-III Stage 1st Stage
BDA/EE(S)/DM/123/88-89
Dt: 1.6.88
BDA/EE(S)/DM/124/88-89
Dt: 1.6.88
493
Removing Silt in drain berm cuttings patch repairs to roads in pvt.
Layouts in f/o Radhakrishna HBCS BSK-IIIStgae
BDA/EE(S)/DM/
88-89
Dt: 1.6.88
494
Removing Silt in drain berm cuttings patch repairs to roads in pvt.
Layouts in f/o Jayanagar HBCS BSK-IIStgae
BDA/EE(S)/DM/130/88-89
Dt: 1.6.88
495
Construction of Storm water drain in Muneswara Block, BSKIIIst.Layout Part "I" Ch. 1 to 90 mtr
BDA/EE(S)/DM/125/88-89
Dt: 1.6.88
496
Re-Chipcarpetting to the BDA asphalted surface with depression
filling filling and camber surface to 100' Ring Raod BSK-IIIst, III
Phase Ch70 to 135 mtr
Re-Chipcarpetting to damaged road 80' from VI Block, to
Vidyapeetha Circle in BSK-III Stage II Phase VI Block
BDA/EE(S)/DM/141/88-89
Dt: 2.6.88
BDA/EE(S)/DM/139/88-89
Dt: 2.6.88
492
497
498
Re-Chipcarpetting to the damaged surface of 80'road between
Mysore-Bank colony and Hosakerehally in BSK-III St
BDA/EE(S)/DM/140/88-89
Dt: 2.6.88
499
Re-Chipcarpetting to the BDA asphalted portion with depression
filling and camber surface to 100' Ring Road in BSK-III st, III Phase
Ch0 to 68 mtr
Re-Chipcarpetting to damaged portion of road III cross and III & I
Main Road in BSK-III st, III Phase, IV Block
BDA/EE(S)/DM/138/88-89
Dt: 2.6.88
BDA/EE(S)/DM/142/88-89
Dt: 2.6.88
501
Providing RCC Layout boards to BSK-III st, IV Phase East of
Kathiguppa and Channammanakere achkat Layout
BDA/EE(S)/DM/133/88-89
Dt: 3.6.88
502
Providing RCC Boards for layout and road direction in Ittmad
Layout BSk-III Stage, III Phase
BDA/EE(S)/DM/134/88-89
Dt: 3.6.88
503
Formation of Layout in Sy No 66 to 69 Madivala Village in F/O.
KAS Officers HBCS. Under BTM Layout Road.No.1
BDA/EE(S)/DM/137/88-89
Dt: 4.6.88
504
Providing RCC Name Boards (Direction Board) to KEB Layout and
Layout in Sy No 20/1B, Thaverekere under BTM. Scheme
BDA/EE(S)/
88-89 Dt:
500
505
Formation of additional Site No. 241/A, in Between Site. No 240 &
241 by Filling the halla in BSK-III st III Phase, Iind Block
BDA/EE(S)/DM/151/88-89
Dt: 6.6.88
506
Formation of Missing link road continuation of Vth Main Road in IV
Block, BSk-III St.III Phase
BDA/EE(S)/DM/150/88-89
Dt: 6.6.88
507
Formation of Layout in Sy No 66 to 69 Madivala Village in F/O.
KAS Officers HBCS. Under BTM Road.No.5 (B)
BDA/EE(S)/DM/161/88-89
Dt: 9.6.88
508
Formation of Service road along stormwater drain connecting
madivala dollar scheme and Hosur road under BTM Layout
BDA/EE(S)/DM/163/88-89
Dt: 13.6.88
509
Formation of approach road from 100' ring road to BDA Layout at
Sy No 4/2 of Tahverekere village under BTM. Scheme.(Balance
length)
Formation of sites(site filling) in Sy No.7 of Ittamadu Village at
BSK-III st.
Providing Barbed wire fencing to CA Site in Govipura village in f/o,
Kalidase Laboures Co-op HBCS C.S. Ltd
BDA/EE(S)/DM/160/88-89
Dt: 13.6.88
Formation of Layout in Sy No 73& 74/1 Sarakki Village in Sarakki I
Phase
Repaire to the flood damaged 100'road at Kanakapura road
Bannerghatta road junction sarakki Ist.
BDA/EE(S)/AE1/WO/582/88-89 Dt: 5.1.89
Widening of 80'wide road in Sy No 10 of Kathriguppa BSK-III
Stgae (Earthwork Only)
Construction of culvert across 100'road at ch.128 mtr. From
Kanakapura road sarakki I phase
BDA/EE(S)/JE/WO/578/88-89 Dt: 5.1.89
Construction of culvert across 80'road junction of 100'road sarakki I
Phase
Embankment to 100'road on eitherside of prepared CD-works at
ch.128mtr from Kanakapura road Sarakki I Phase
BDA/EE(S)/AE2/WO/647/88-89 Dt: 5.1.89
Construction of S.S. Masonry drain along 100'ring road leftside
(southernside) form site no 271 to 278 at BSk III st, III Phase V
Block
Providing Barbed wire fencing to CA site No7 Channammanakere
achkat Layout BSK-III st
BDA/EE(S)/AE2/WO/620/88-89 Dt: 5.1.89
510
511
512
513
514
515
516
517
518
519
BDA/EE(S)/WO/AE1/573/88-89 Dt: 5.1.89
BDA/EE(S)/AE1/WO/579/88-89 Dt: 5.1.89
BDA/EE(S)/PW/WO/577/88-89 Dt: 5.1.89
BDA/EE(S)/AE2/WO/648/88-89 Dt: 5.1.89
BDA/EE(S)/AE2/WO/649/88-89 Dt: 5.1.89
BDA/EE(S)/AE2/WO/623/88-89 Dt: 5.1.89
520
Repaire to rain damaged portion of road in Khadi Commision,
HBCS.Pvt. Layout BSK-III st (Flood damage work)
BDA/EE(S)/AE2/WO/625/88-89 Dt: 5.1.89
521
Providing Barbed wire fencing to CA site No 7 Halagevaderahally
in f/o. BEML.HBCS.Ltd
BDA/EE(S)/AE1/WO/645/88-89 Dt: 5.1.89
522
Filling up of low lying area and quarry pit no.2 in sy no.94 & 95 of
Hosakerehally in BSK-III st
BDA/EE(S)/AE1/WO/622/88-89 Dt: 16.1.89
523
Repairs to the rain damaged SWD it the upstream of 100'ring road
near Hosakerehally BSk-III st, III Phase IV Block (Flood damge
Work)
Dismantling of huts of slum dwellers shifted from Kumarswamy
temple premises to near Mount Joy In Hanumanthanagar to
Kumarsawamy Layout
Providing Gravel Casing and Ocnstruction of Steps in the Slum
rehabilated Area in Kumarswamy Layout
BDA/EE(S)/AE1/WO/667/88-89 Dt: 16.1.89
Embanking the area in site Nos 3851 to 3876 (26 nos) 30x40 sites
of Govinayakanahally Kumaraswamy Layout II Stage (Flood
damge work)
Formation of Layout in sy no 19 of sarakki Village under dollar
scheme sarakki IV phase 8th main ch. 185 to 240 mtr
BDA/EE(S)/
528
Formation of Layout in sy no 19 of sarakki Village under dollar
scheme sarakki IV phase 8th main ch. 240 to 295 mtr
BDA/EE(S)/AE2/WO/592/88-89 Dt: 20.1.89
529
Levelling the corner sites in BSK-IIIst 7 th Block.
BDA/EE(S)/JE/WO/597/88-89 Dt: 20.1.89
530
89-90
Providing Re-chipcarpetting from Dayananda College to
K.S.Layout, I stage, 50' road and bit in II stage, 58th and 69th road.
BDA/EE/S/PW/WO/AE/335/89-90 dt:26-08-89
524
525
526
527
BDA/EE(S)/JE/WO/585/88-89 Dt: 18.1.89
BDA/EE(S)/JE/PW/WO/587/88-89 Dt: 18.1.89
88-89 Dt:
BDA/EE(S)/AE2/WO/591/88-89 Dt: 20.1.89
531
Rechipcarpetting of damaged portion of roads of pipeline road,
Ward office back road and 19th road in Kumaraswamy layout.
BDA/EE/S/PW/WO/AE/336/89-90 dt:26-08-89
532
Providing RCC layout boards and roads direction boards for layout
formed in Sy.No.83 to 88 of Kathriguppa Village in BSK III stage, III
phase.
Construction of Revitment, embankment and retaining wall near
hume pipe culvert , bridge at 100' ring road in BSK III stage.
BDA/EE/S/PW/WO/AE/343/89-90 dt:29-08-89
534
Removal of silt iand repairs to the damaged drains and culverts in
Sy.NO.17,20 and 21 of Gavipura, BSK III stage.
BDA/EE/S/PW/WO/AE/367/89-90 dt:28-08-89
535
Removal of silt iand repairs to the damaged drains and culverts in
Raghavendra block, BSK III Stage.
BDA/EE/S/PW/WO/AE/369/89-90 dt:28-08-89
536
Repairs to the Roads and Drains and removal of silt in BSK III
stgae, - II phase, VI Block.
Formation of road in Sy.No.22 of Govipura Village in BSK III
stage..
BDA/EE/S/PW/WO/AE/360/89-90 dt:28-08-89
533
537
BDA/EE/S/PW/WO/AE/359/89-90 dt:29-08-89
BDA/EE/S/PW/WO/AE/370/89-90 dt:28-08-89
538
Repairs to the Roads and Drains and removal of silt in BSK III
stgae, - II phase, VII Block.
Protection work including construction of SWD and scour filling in
the sital area (missing link) in Channamanakere Auchukut layout,
BSK III stage, Ch.916 to 923 mts.
Formation of corner sites No.15,23,33,45 and 82 in Sy.No.34 of
Madivala in BTM scheme.
BDA/EE/S/PW/WO/AE/375/89-90 dt:28-08-89
541
Formation of corner sites No.73, 72, 56, 63, 65 and 80 in Sy.No.34
of Madivala in BTM scheme.
BDA/EE/S/PW/WO/AE/386/89-90 dt:30-08-89
542
Providing site boundary stones, site No.stones layout boards and
road name boards in layout in Sy.No.112/2, 113/2 and part of 166
of Kathriguppa in F/O.Kempegowda G.N.S.S ltd in BSK III stage,
B'lore.
Cleaning of silt in SWD at Sarakki II phase, Ch.0 to 800mts.
BDA/EE/S/PW/WO/AE/387/89-90 dt:28-08-89
Protection work including construction of SWD and scour filling in
the sital area (missing link) in Channamanakere Auchukut layout,
BSK III stage, Ch.909 to 916 mts.
Filling and levelling the open ditch across the proposed SWD in
Sy.No.48, 49, 50 and 53 of Kathriguppa at BSK III stage, at
Ch.1030mts.
Protection work including construction of SSM and scour filling in
the sital area (missing link) in Channamanakere Auchukut layout,
BSK III stage, Ch.902 to 909 mts.
Protection work including construction of SWD and scour filling in
the sital area (missing link) in Channamanakere Auchukut layout,
BSK III stage, Ch.895 to 902 mts.
Repairs to the Roads and Drains and removal of silt in BSK III
stgae, - Muneswara Block.
Repairs to the Roads and Drains in I Block , III Phase, BSK III
stage.
Repairs to roads in Anjaneya HBCS in Sy.No.7 of Ittamadu, BSK III
stage, (Flood damage work)
BDA/EE/S/PW/WO/AE/402/89-90 dt:26-08-89
539
540
543
544
545
546
547
548
549
550
BDA/EE/S/PW/WO/AE/382/89-90 dt:26-08-89
BDA/EE/S/PW/WO/AE/385/89-90 dt:30-08-89
BDA/EE/S/PW/WO/AE/393/89-90 dt:30-08-89
BDA/EE/S/PW/WO/AE/404/89-90 dt:26-08-89
BDA/EE/S/PW/WO/AE/405/89-90 dt:26-08-89
BDA/EE/S/PW/WO/AE/406/89-90 dt:26-08-89
BDA/EE/S/PW/WO/AE/411/89-90 dt:01-09-89
BDA/EE/S/PW/WO/AE/412/89-90 dt:01-09-89
BDA/EE/S/PW/WO/AE/413/89-90 dt:01-09-89
551
Repairs to the Roads and Drains and Removal of Silt in BSK III
stgae, 2nd phase, IV block,
BDA/EE/S/PW/WO/AE/415/89-90 dt:30-08-89
552
Repairs to the Roads and Drains in BSK III stgae, 3rd phase, II
block, B'lore, Part-A
Desilting of roads and drains at BSK III stage, 3rd phase, III Block,
at Sy.No.109 of Kathriguppa.
BDA/EE/S/PW/WO/AE/416/89-90 dt:30-08-89
Removal of silt in the road side drains in Ittamadu layout at BSK III
BDA/EE/S/PW/WO/JE/418/89-90 dt:01-09-89
553
554
BDA/EE/S/PW/WO/JE/417/89-90 dt:30-08-89
stage.
555
Repairs to the Roads and Drains and removal of silt in BSK III
stgae, 2nd phase, Sy.No.95, 96, 121 & 122 of Hosakerehalli.
BDA/EE/S/PW/WO/JE/419-/89-90 dt:01-09-89
556
Repairs to the Roads and Drains and culverts in IV block, III phase,
BSK III stage.
Clearing the silt inside drains and roads between 14th main to 20th
main in Sarakki II phase, ie, in Roads-10, 10A, 11, 11'A' and 12th
cross roads.
Clearing the silt in side drains and roads from 32nd main road to
37th main and 11th cross road to 14th cross road in Sarakki, I
Phase.
Clearing the silt in Road side drains from 10th cross to 14th cross
road in between 22nd and 23rd main road at Sarakki II phase.
BDA/EE/S/PW/WO/JE/420-/89-90 dt:28-08-89
557
558
559
BDA/EE/S/PW/WO/AE/424/89-90 dt:30-08-89
BDA/EE/S/PW/WO/AE/426/89-90 dt:05-09-89
BDA/EE/S/PW/WO/AE/431/89-90 dt:30-08-89
560
Formation of corner sites under Dollar scheme layout , BTM I
stage, Site Nos.97, 105, 29 & 30.
BDA/EE/S/PW/WO/AE/433/89-90 dt:01-09-89
561
Repairs to pot holes and patch works to 21st road in
Kumaraswamy layout, I stage.
Repairs to pot holes and patch works of 22nd road in
Kumaraswamy layout, I stage.
Repairs to the Roads and Drains in III Block , III Phase, BSK III
stage., Part-A
Removing silt in road side drains and in SWD and protective work
to the SSM walls of SWD in channamanakere Auchukut layout ,
BSK III stage, IV phase in Ch.90 to 180mts (flood damage work)
BDA/EE/S/PW/WO/AE/443/89-90 dt:26-08-89
562
563
564
BDA/EE/S/PW/WO/AE/444/89-90 dt:30-08-89
BDA/EE/S/PW/WO/AE/445/89-90 dt:01-09-89
BDA/EE/S/PW/WO/AE/447/89-90 dt:01-09-89
565
Desilting the storm water drain in Ittamadu Village BSK III stage
(Flood damage work) Ch.90 to 180 mts
BDA/EE/S/PW/WO/AE/448/89-90 dt:01-09-89
566
Removing silt in road side drains and in SWD and protective work
to the SSM walls of SWD in channamanakere Auchukut layout ,
BSK III stage, IV phase in Ch.180 to 270mts (flood damage work)
BDA/EE/S/PW/WO/AE/449/89-90 dt:01-09-89
567
Removing silt in road side drains and in SWD and protective work
to the SSM walls of SWD in channamanakere Auchukut layout ,
BSK III stage, IV phase in Ch.0 to 90mts (flood damage work)
BDA/EE/S/PW/WO/AE/450/89-90 dt:01-09-89
568
Repairs to pot holes and patch works of 2oth road in
Kumaraswamy layout, I stage.
Repairs to pot holes and patch works of 23rd road in
Kumaraswamy layout, I stage.
Repairs to pot holes and patch works of 19th road in
BDA/EE/S/PW/WO/AE/454/89-90 dt:26-08-89
569
570
BDA/EE/S/PW/WO/AE/455/89-90 dt:26-08-89
BDA/EE/S/PW/WO/AE/458/89-90 dt:26-08-89
Kumaraswamy layout, I stage.
571
572
573
574
575
576
577
578
579
580
581
582
Construction of slab culvert in Sy.No.10 of Kathriguppa, 80' road in
BSK III stage-11 nos.
Providing Re-chipcarpetting to 14th road at Kumaraswamy layout, I
stage.
Potholes Filling and Rechipcarpetting to damaged road (80) in
Padmanabhanagar in B.S.K. 3rd Stage.
BDA/EE/S/PW/WO/AE/541/89-90 dt:26-08-89
Formation of layout in Sy.No. 131/1 and 135/1&2 of Kathriguppa
BSK 3rd stage. Construction of storm Water Drain CH. 100 to 125
mts.
Repairs to Flood damaged portion of S.W.D., in Sy. No.42 of
Govinaya kanahalli Kumaraswamy Layout.
BDA/EE/(S)/AE/PW/WO/484/89-90
Site filling of layout in Sy. No.19 of Sarakki under Dollar scheme
5th phase Sarakki layout ( Corner site No.351 and from site No.37
to41 to protect SWD from flood)
Fromtion of layout in Sy.No. 134/1 and 135/1&2 of Kathriguppa
B.S.K., 3rd Stage Construction of storm water drain ch: 25 to 50
mtrs.,
Improvements to layout fromed in Sy.No.120 of Kathriguppa
(Akhila Karnataka Madiwalara Sangha) in BSK.3rd Stage by
Construction of Masonry box drain - ch: 114mtrs., to 171mtrs
BDA/EE(S)/AE/PW/WO/476/89-90
Providing Barbed wire fencing to Site No.1 to 8 at BSK 3rd Stage ,
3rd Phase 5th Block
Site filling of layout in Sy.No.19 of Sarakki under dollar scheme
4th phase Sarakki layout (Corner Site Nos.169,189,105 and 124).
Re - construction of Demolished shed in site No.460 at Sarakki 4th
phase.
Site filling of layout in Sy.No. 19 of Sarakki under Dollar scheme
4th phase sarakki layout .(Corner site Nos' 20,45,44 and 401.)
BDA/EE/S/PW/WO/AE/547/89-90 dt:26-08-89
BDA/EE/(S)/PW/WO/JE/465/89-90
BDA/EE(S)/PW/WO/JE/485/89-90
BDA/EE(S)/PW/WO/JE/467/89-90
BDA/EE(S)/PW/WO/JE/468/89-90
BDA/EE(S)/AE/PW/WO/478/89-90
BDA/EE(S)/PW/WO/JE/493/89-90
BDA/EE(S)/PW/WO/JE/492/89-90
BDA/EE(S)/AE/PW/WO/496/89-90
583
Improvement s to layout formed in Sy.No.120 of Kathrigippa
(Akhila karnataka madiwalara Sangha) in BSK. 3rd stage by
construction of masonry box drain - chainge :57mtr to 114mtrs.,
BDA/EE(S)/PW/WO/JE/497/89-90
584
Formation of layout in Sy.No. 134/1 and 135/1 and 2 of
Kathriguppa, BSK.3rd Stage construction of storm water drain chainage : 75mtrs to 100mtrs.,
Estimate for construction of cubverts in Sy.No. 120 of Kathriguppa
(B.V.P.)
Providing catch water drain between E.M.S.,House at 5th black in
BDA/EE(S)/PW/WO/JE/503/89-90
585
586
BDA/EE(S)/JE/498/89-90
BDA/EE(S)/PW/WO/JE/512/89-90
kumaraswamy layout.
587
588
589
590
Construction of inter connecting slab drain to main storm water
drain on either side of drain in Sy, No.9 of Gerehalli. BSK.3rd stage
7th main road.
Construction of interconnecting slab drain to main storm water
drain on either side of drain in Sy.No. 9 of Gerehalli BSK.3rd stage
4th main road.
Improvements to roads and levelling of sites in Sy.No.120 (Tank
bed) of kathriguppa BSK. 3rd stage (Akhila karnataka madiwalara
sangha).
Filling and levelling the existing pond (open well) in B.S.K., 3rd
stage Behind Vidyapeetha.
BDA/EE(S)/PW/WO/JE/511/89-90
BDA/EE(S)/PW/WO/JE/510/89-90
BDA/EE(S)/PW/WO/JE/509/89-90
BDA/EE(S)PW/WO/JE/507/89-90
591
Desilting of S.W.D., between B.S.K.2nd and 3rd stage , along 100'
Ring road ch:775 to 1173mtrs.
BDA/EE(S)/PW/WO/JE/508/89-90
592
Maintenance of roads at padmanabhanagar, 2nd stage in B.S.K.
3rd stage.
Maintenance of roads and drains at padmanabhanagar . 1stage .
B.S.K. 3rd stage
Construction of inter connecting slab drain to main storm water
drain on either side of drain in Sy No.9 of Gerahalli, B.S.K., 3rd
stage 9th main.
Construction of inter connecting slab drain to main storm water
drain on either side of drain in Sy.No. 9 of Gerahalli, B.S.K., 3rs
stage 8th main road.,
Improvement to slab drain & Providing missing slab in Sy.No. 120
of Kathriguppa B.S.K. 3rd stage
BDA/EE(S)/PW/WO/JE/514/89-90
597
Formation of roads in Karisandra village (Gramation) at B.S.K.,2nd
stage (6th,5th,4th,main & 25th cross road).,
BDA/EE(S)/PW/WO/JE/518/89-90
598
Formation of roads in karisandra village (Gramathana) at
B.S.K.,2nd stage (1st,2nd, and 6th main road),
BDA/EE(S)/PW/WO/JE/506/89-90
599
Formation of layout in Sy.No. 134/1 and 135/1&2 of Kathriguppa,
BSK 3rd stage construction of storm water drain ch:0 to 25 mtrs.,
BDA/EE(S)/JE/PW/OW/504/89-90
600
Site filling of layout in Sy.No.19 of Sarakki under Dollar scheme 4th
phase sarakki layout (corner site Nos' 57,96,368,395,
BDA/EE(S)/AE/WO/PW/542/89-90
601
Construction of masonry protection wall in Sy.No. 92 and 93 of
Tavarekere village under B.T.M. 1st stage chainage : 0 to 45mtrs.,
BDA/EE(S)/PW/WO/JE/534/89-90
593
594
595
596
BDA/EE(S)/PW/WO/JE/513/89-90
BDA/EE9S0/PW/WO/JE/516/89-90
BDA/EE(S)/PW/WO/JE/515/89-90
BDA/EE(S)/PW/WO/JE/517/89-90
602
Clearing silt from the drain in Krishananagar Industrial and
residential Association (K.I.R.A) Layout under B.T.M.Scheme.
BDA/EE(S)/PW/WO/JE/536/89-90
603
Formation of layout on Sy.No.47/A.B and 2, 48/5 and 6 of
tavarekere village by filling and levelling the sites proposed for
auction . (Adjacent to 9th block jayanagar) under B.T.M.Scheme.,
BDA/EE(S)/AE2/WO/PW/533/89-90
604
Construction of S.S.Masonry side drain in Sy.No. 8/1. 92 and 93 of
tavarekere village under B.T.M. 1st stage chainage 0 to 140 mtrs.,
BDA/EE(S)/AE2/PW/WO/532/89-90
605
Clearing the silt in storm water drain removing along 9th cross (80'
Road ) in sarakki 1st phase chainage ..900 to 2000 mtrs.,
BDA/EE(S)/AE2/PW/WO/531/89-90
606
Clearing the silt in roads and side drain in sarakki 2nd phase in
between cross roads of 19th and 20th main road ., (1st to 3rd cross
road)
Filling and leveling the corner site Nos, 1357,
1358,1375,1376,1280, & 1245 at sarakki 2nd phase prepared for
auction.
Construction of masonary protection wall in Sy.No.92 and 93 of
tavarekere village under B.T.M. 1st stage ch. 45 to 90mtrs..
BDA/EE(S)/AE/PW/WO/543/89-90
607
608
BDA/EE(S)/AE/WO/PW/540/89-90
BDA/EE(S)/AE/PW/WO/537/89-90
609
Improvement to layout formed in Sy.No. 120 of Kathriguppa (Akhila
karnataka madiwalara sangha) in B.S.K. 3rd stage by construction
of masonry box drain chainage :-0 to 57mtrs.,
BDA/EE(S)/PW/WO/JE/545/89-90
610
Construction of wing wall, protective wall and toe wall on the
downstrem side of piped bridge in 100' Ring Road at B.S.K. 3rd
stage (Flood damage work).,
Site filling of layout in Sy.No. 19 of sarakki under dollar sheme 4th
phase sarakki layout ( cornar site Nos. 250,241,249, & 259, )
BDA/EE(S) PW/WO/JE/546/89-90
611
BDA/EE(S)/AE/PW/WO/544/89-90
612
Maintenance of roads and drain in Sy.No. 22 and 111 of arakere
village begur hobali in favour of MICO H.B.C.S.M, Limited.
BDA/EE(S)PW/WO/JE/539/89-90
613
Providing fencing and levelling of C.A.Site No.40 in Sy.No.40 of
marenahalli (Tank bed Area.)
BDA/EE(S)/PW/WO/JE/538/89-90
614
Filling the corner site no, 63 and 74 and intermediate site no, 64
and 73 in dollar at BTM 2nd stage 1st phase .,
BDA/EE(S)/AE/PW/WO/575/89-90
615
Removing site in roads at sarakki 2nd phase 1st cross , 17th A,
17th B, 18th A and 18th B, main road,
BDA/EE(S)/AE/PW/WO/576/89-90
616
Repairs & re-chipcarptting to rain damaged roads in sarakki 2nd
phase, 17th 18th & 20th main road,
BDA/EE(S)/AE/PW/WO/570/89-90
617
Repairs & rechipcarpetting to rain damaged road in sarakki 2nd
phase 24th main ch, 0 to 300mtrs.,
BDA/EE(S)/AE/PW/WO/608/89-90
618
Improvements to roads in Sy.No.34 of madivala village by
providing kerb stones, shoulder drains etc.. under B.T.M., scheme.
BDA/EE(S)/PW/WO/JE/638/89-90
619
Repairs & rechiarpectting to rain damaged roadas in sarakki 2nd
phase 12th,12th A, 11th & 11th B,Cross
BDA/EE(S)/AE/PW/WO/607/89-90
620
Filling the corner site No,61 & intermediate site no.62 in dollar
scheme BTM 2nd stage 1st phase.
BDA/EE(S)/AE/PW/WO/622/89-90
621
Levelling and filling of corner site nos,1202, 1203, 1195, 1209,
1183, 1185, 1186, 1188, 1187, 1192, 1191, 1194, and clearing the
silt and repairs to side drain in Sy.No. 92 & 93 of Tavarekere vilage
under B.T.M. 1st stage .
Removing silt in roads & drain at sarakki 1phase 27th to 32nd main
road 12th to 14th cross roads.
BDA/EE(S)/PW/WO/JE/637/89-90
623
Constructiono of S.W.D., in Sy.No. 11,15 and 16/1B of tavarekere
village in BTM.,1st stage 1st phase chainage : 255 to 315mtrs..
BDA/EE(S)/PW/WO/JE/632/89-90
624
Construction of S.W.D., IN Sy.No. 11,15,and 16/1B of Tavarekere
village in BTM., 1st stage, 1st phase chainage 15mtrs., to
75mtrs.,,
Construction of drain in Sy.No. 172 of Bilakanahalli in BTM.,
Scheme chainage : 404, 5mtrs, to 485mtrs.,
BDA/EE(S)/PW/WO/JE/630/89-90
626
Removing silt in roads and drain at sarakki 2nd phase from 16th to
17th main road and inbetween roads (2nd, 3rd, & 8th, cross roads.)
BDA/EE(S)/AE/PW/WO/628/89-90
627
Construction of S.W.D.,in Sy.No. 11, 15, and 16 of tavarekere
village in BTM., 1st stage , 1st phase chainage : 135mtrs.
To195mtrs.,
Construction of SS Masonry retaining wall in Sy,No.19/1 of
madivala village under B.T.M.scheme (Near dollar scheme )
chainage : 335mtrs.. To 380mtrs..,
Construction of S.W.D.,in Sy.No. 11, 15, and 16/1B of Tavarekere
village in B.T.M., 1st stage 1st phase, chainage : 75mtrs to
135mtrs..,
Repairs & rechipcarpetting to rain damaged 80' road in sarakki
layout ch, 1508 to 1800mtrs.,
BDA/EE(S)/PW/WO/JE/639/89-90
622
625
628
629
630
BDA/EE(S)/AE/PW/WO/624/89-90
BDA/EE(S)/PW/WO/JE/635/89-90
BDA/EE(S)/PW/WO/JE/634/89-90
BDA/EE(S)/PW/WO/JE/621/89-90
BDA/EE(S)/AE/PW/WO/606/89-90
631
Filling the corner site No. 168 & intermediate site No. 166 & 167 in
Sy.No. 172/3 in dollar scheme at BTM 2nd stage 1st phase.
BDA/EE(S)/AE/PW/WO/604/89-90
632
Repairs and rechipcarpetting to rain damaged roads in sarakki 2nd
phase 13th & 14th cross roads
BDA/EE(S)/AE/PW/WO/605/89-90
633
Filling the corner site No,103 & 124 & Intermediate site No. 101,
120, 122, 123, in dollar Scheme at BTM2nd stage 1st phase.,
BDA/EE(S)/AE/PW/WO/629/89-90
634
Cnostruction of drain in Sy.No. 172 of Bilakajalli in B.T.M. schame
chainage : 320 to 404mtrs.,
BDA/EE(S)/PW/WO/JE/636/89-90
635
Repairs to rain damaged road at 2nd cross road from
Bannerghatta road to 6th main road in BTM 2nd stage 1st phase
BDA/EE(S)/AE/PW/WO/603/89-90
636
Construction of masonery box drain in Sy.No. 33, 41, 42, 43, 45,
46, and 47 of Madivala village at dollar scheme under B.T.M.,
scheme chainage : 0 to 80mtrs.,
Construction protection in southern side of 100' road at slum at
BTM, 2nd stage 1st phase.,
BDA/EE(S)/AE/PW/WO/616/89-90
Levelling & filling of corner side in Sy.No. 172 of Bilakanahalli
Dollar scheme in BTM 2nd stage 1st phase site No. 91, 118/A &
128.,
Repairs and rechipcarpetting to rain damaged roads in sarakki 2nd
phase 1st 'A' and 1st 'B' cross road , 18th main and 17th and 17th
'B' joining main roads
Maintanance and repairs to roads and drain in S.B.I.Housing cooperative society layout.
Construction of S.W.D., in Sy.No.11,,15. and 16 of Tavarekere
village in B.T.M., 1st stage , 1st phase chainage : 195mtrs.. To
255mtrs..,
Filling the corner site No. 48 & intermediate site No. 49 & 50 in
Sy.No. 172 of Bilakanahalli at BTM 2nd stage 1st phase.
BDA/EE(S)/AE/PW/WO/627/89-90
637
638
639
640
641
642
BDA/EE(S)/AE/PW/WO/626/89-90
BDA/EE(S)/PW/WO/JE/633/89-90
BDA/EE(S)/PW/WO/JE/623/89-90
BDA/EE(S)/PW/WO/JE/625/89-90
BDA/EE(S)/AE/PW/WO/631/89-90
643
Construction of S.W.D.in Sy.No. 11.15.and 16/1B of Tavarekere
village in B.T.M. 1st stage 1st phase chainage : 315 to 375mtrs..,
BDA/EE(S)/PW/WO/JE/642/89-90
644
Formation of layout in Sy.No.48 to 51 of Kathrigauppa village in
BSK 3rd stage 3rd phase (by the side SWD ) part 'B'.
BDA/EE(S)/AE/617/89-90
645
Repairs to errostion of bed of SWD in channamanakere Atchcut
layout ch. 465 to 490 and 835 to 895mtr.
BDA/EE(S)/AE/PW/WO/618/89-90
646
Formation of layout in Sy.No. 48 to 51 of Kthriguppa village in BSK
3rd stage 3rd phase (by the side of SWD) part 'A'
BDA/EE(S)/AE/PW/WO/619/89-90
647
Repairs to errostion of bed of SWD in channamanakere Atchcut
layout ch. 525 to 610 mtrs..
BDA/EE(S)/AE/PW/WO/620/89-90
648
levelling and filling up of the corner site No.1014. 1016, 1031,
1032, 1074, 1091, 1137, 1140, 1141, and 1150, in Sy.No. 10 and
11 of Tavarekere village under B.T.M.1st stage .
Clearing silt in roads and side drain at sarakki 1st phase, 9th cross
road chainage : 0 to 900 mtrs..
BDA/EE(S)/PW/WO/JE/641/89-90
649
BDA/EE(S)/AE-2/PW/WO/647/89-90
650
Reapirs & rechipcarptting to rain damaged roads in sarakki 2nd
phase in between roads of 14th & 20th main roads .
BDA/EE(S)/AE/PW/WO/650/89-90
651
Reapirs & rechipcarptting to rain damaged roads in sarakki 1st
phase 14th cross road part 2.
BDA/EE(S)/AE/PW/WO/649/89-90
652
Clearing the silt in roads and side drain in sarakki 1st phase, 9th,
10th, 10th 'A' and 10th 'B' cross roads.
BDA/EE(S)/AE-2/PW/WO/644/89-90
653
Clearing the silt in roads and side drain in sarakki 1st phase, 9th to
13th cross roads..
Repairs to drain remetalling & chipearpetting to roads 2nd & 5th
main and 10th and 11th cross road at channamanakere atchcut
layout BSK 3rd stage (Partial).
Providing repairs and rechipcarpetting to the bad asphalting
surface sarakki 1st phase 12th 'A' cross.
BDA/EE(S)/AE-2/PW/WO/643/89-90
656
Repairs and rechipcarpetting to the bad asphalting surface sarakki
1st phase 10th 'B' cross roads.
BDA/EE(S)/PW/WO/JE/651/89-90
657
Repairs & maintenance of Borewells at Muneshwara block
nagendra block 4th, 6th, 7th, block, in 2nd phase Sy.No. 95, 96,
121 & 122 of Hosakerehalli in BSK 3rd stage.
laying C.C. bed for S.W.D. in Channamanakere Atchcut layout
from 1080mtrs to 1140 mtrs..at BSK 3rd stage..
BDA/EE(S)/AE/PW/WO/659/89-90
659
Providing C.C.1:4:8 for bed for the vent way of S.W.D.,in
Channamanakere atchcut layout BSK 3rd stag
BDA/EE(S)/PW/WO/AE/678/89-90
660
Construction of retaining wall over filled up well for the missing link
of the S.W.D.,at chainage: 1030mtr.in C.T.layout BSK.,3rd stage,
Bangalore.
Miantenance of roads in BSK., 3rd stage 4th phase due to flood
damaged 2 to 7 cross.
Miantenance and repairs to 80' road of Kathrigauppa at BSK 3rd
stage, ch, 235mtrs to 460mtrs.,
BDA/EE(S)/PW/WO/AE/677/89-90
654
655
658
661
662
BDA/EE(S)/AE/PW/WO/645/89-90
BDA/EE(S)/AE-2/PW/WO/646/89-90
BDA/EE(S)/PW/WO/AE/681/89-90
BDA/EE(S)/PW/WO/JE/360/89-90
BDA/EE(S)/PW/WO/JE/364/89-90
663
Minatenance of repairs to flood damaged roads portion in 6th cross
road at Kumaraswamy layout.
BDA/EE(S)/PW/WO/JE/362/89-90
664
Maintenance of rehabilitated south end slum in Kumaraswamy
layout.,
Miantenance and repairs to 80' road of Kathrigauppa at BSK 3rd
stage, ch, 466mtrs to 691mtrs.,
BDA/EE(S)/PW/WO/JE/350/89-90
Maintenance of 4th block E.W.S., Houses in Kumaraswamy layout
- 1st stage .,
Construction of slab culvert in Sy.No. 10 of Kathriguppa, 80' road
in BSK, 3rd stage .11Nos..
BDA/EE(S)/PW/WO/JE/363/89-90
668
Miantenance and repairs to 80' road of Kathrigauppa at BSK 3rd
stage, ch, 700mtrs to 925mtrs.,
BDA/EE(S)/PW/WO/JE/348/89-90
669
Maintenance of roads and drain in Kumaraswamy layout 2nd
stage ( EWS., Houses block A & B).
BDA/EE(S)/PW/WO/JE/347/89-90
670
Reconstruction of flood damaged protion of eastern embankment
portion in Sy.No. 6 of G.N.Halli at Kumaraswamy layout 2nd main
road,
Repairs to roads and side drain in Sy.No. 2 to 7 and 11 of
Gerehalli B.S.K. 3rd stage.,
Repairs to damaged roads of padmanabhanagar at BSK. 3rd
stage, from site No.228 to 272.,
BDA/EE(S)/PW/WO/JE/312/89-90
673
Miantenance of roads in padmanabhanagar at BSK, 3rd stage from
site No.207 to 221 and cross roads.
BDA/EE(S)/PW/WO/JE/441/89-90
674
Maintenance of road which is damaged in padmanabhanagar,
BSK, 3rd stage silt No. 6 to 10.,
BDA/EE(S)/PW/WO/JE/440/89-90
675
Patch repairs of roadsin padmanabhanagar at BSK,3rd stage(Opp.
To co-opv.Training collage30'road).
BDA/EE(S)/PW/WO/JE/437/89-90
676
Maintenance of damaged roads due to rain in
padmanabhanagar,BSK, 3rd stage, site No.CA 5 to 378.
BDA/EE(S)/PW/WO/JE/435/89-90
677
Repairs to potholes at padmanabhanagar at BSK, 3rd stage Site
No.493 to 500 (50'roads).
BDA/EE(S)/PW/WO/JE/438/89-90
678
Repairs to damaged protion of roads in padmanabhanagar at BSK.
3rd stage, from site No.40 to 387, (50' roadas ).,
BDA/EE(S)/PW/WO/JE/439/89-90
665
666
667
671
672
BDA/EE(S)/PW/WO/JE/352/89-90
BDA/EE(S)/PW/WO/JE/409/89-90
BDA/EE(S)/PW/WO/JE/311/89-90
BDA/EE(S)/PW/WO/JE/407/89-90
679
Maintenance of park road (50')of padmanabhanagar at BSK,3rd
stage (Patch repairs)site No.501 to 526.
BDA/EE(S)/PW/WO/JE/408/89-90
680
Patch repairs of roadsin padmanabhanagar at BSK,3rd stage from
site Nos.99 to 102,107 to 110, 119 to 122 and 130 to 127/A.
BDA/EE(S)/PW/WO/JE/377/89-90
681
Construction of retaining wall at boundary of Sy.No134/2 of
Kathriguppa to prevent land sliding chainage 0 to 12 mtrs and
29,80mtrs. To 36.30mtrs.,
Maintenance of BSK, 3rd stage, 7th block, along the 100' ring road
due to flood damaged.
BDA/EE(S)/PW/WO/JE/388/89-90
683
Providing layout board and cross broad for the layout of kanaka
gruha H.B.C.S.,at Kaderenahalli at BSK, 3rd stage.,
BDA/EE(S)/PW/WO/JE/390/89-90
684
Removal of silt and repairs to the damaged drains and culverts in
Avalahalli layout BSK, 3rd stage part 'D'
BDA/EE(S)/AE/PW/WO/368/89-90
685
Formation of 30' approch road to Avalahalli layout from mysore
road, BSK,3rd stage chainage: 140mtrs.
BDA/EE(S)/PW/WO/JE/358/89-90
686
Removal of silt and repairs to the damaged bed for S.W.D., in
Sy.No. 17, 20 and 21 of Gavipura BSK, 3rd Stage.,
BDA/EE(S)/PW/WO/AE/357/89-90
687
Formation of missing link road in BSK,3rd stage, 3rd phase 3rd
block.,
Removal of slit in road drain from 1 cross to 4 'C' cross at BSK, 3rd
stage 5th block.,
Desilting the storm water drain in Ittamadu villageBSK,3rd
stage(Flood damaged work)ch, 0 to 90 mtrs.,
BDA/EE(S)/AE/PW/WO/356/89-90
690
Repairs to flood damaged in drain and roads at Ragavendra block,
BSK, 3rd stage (7th and 8th main).
BDA/EE(S)/PW/WO/AE/365/89-90
691
Removal of silt and repairs to the damaged drain and culverts in
Sy.No. 3 and 69 of Gavipura, BSK, 3rd stage.,
BDA/EE(S)/PW/WO/AE/344/89-90
692
Removal of silt and repairs to the damaged drain and culverts in
Avalahalli layout BSK, 3rd stage part'B'.
BDA/EE(S)/PW/WO/JE/354/89-90
693
Removal of silt and repairs to the damaged drain and culverts in
Avalahalli layout BSK, 3rd stage part'C'
BDA/EE(S)/AE/PW/WO/397/89-90
694
Construction of masonary drain on northern boundary 2nd cross
road of dollar scheme layout at sarakki layout 4th phase ch, 300 to
375 mtrs.,
BDA/EE(S)/AE/PW/WO/436/89-90
682
688
689
BDA/EE(S)/PW/WO/JE/389/89-90
BDA/EE(S)/AE/PW/WO/371/89-90
BDA/EE(S)/AE/PW/WO/342/89-90
695
696
697
698
699
700
701
702
703
Construction of masonary drain on northern boundary 2nd cross
road of dollar scheme layout at sarakki layout 4th phase ch, 75 to
150 mtrs.,
Construction of masonary drain on northern boundary 2nd cross
road of dollar scheme layout at sarakki layout 4th phase ch,0 to 75
mtrs.,
Construction of masonary drain on northern boundary 2nd cross
road of dollar scheme layout at sarakki layout 4th phase ch,600 to
675 mtrs.,
Construction of masonary drain on northern boundary 2nd cross
road of dollar scheme layout at sarakki layout 4th phase ch,675 to
750 mtrs.,
Construction of masonary drain on northern boundary 2nd cross
road of dollar scheme layout at sarakki layout 4th phase ch:150 to
225 mtrs.,
Construction of masonary drain on northern boundary 2nd cross
road of dollar scheme layout at sarakki layout 4th phase ch:225 to
300 mtrs.,
Construction of lead off drain from passage between
E.W.S.,Houses to main slab drain in 1st block of E.S.W.Houses in
Kumaraswamy layout ( 73rd to 77th cross).
Construction of retaining wall at boundary of Sy.No. 134/2 of
Kathriguppa to prevent land sliding , chainage: 36.30 to 54.80
mtrs.,
Construction of lead off drain from passage between
E.W.S.,Houses to main slab drain in 1st block of
BDA/EE(S)/PW/WO/JE/395/89-90
BDA/EE(S)/PW/WO/JE/376/89-90
BDA/EE(S)/PW/WO/JE/381/89-90
BDA/EE(S)/PW/WO/JE/378/89-90
BDA/EE(S)/PW/WO/JE/380/89-90
BDA/EE(S)/PW/WO/JE/379/89-90
BDA/EE(S)/PW/WO/JE/337/89-90
BDA/EE(S)/PW/WO/JE/338/89-90
BDA/EE(S)/PW/WO/JE/339/89-90
704
E.S.W.Houses in Kumaraswamy layout ( 82rd to 73th cross).
705
Providing Protection works including construction of S.W.D and
Scour Filling in the sital area of Channammanakere Atchkat layout,
Banashankari III stage - S.W.D. Chainage 735 Mtrs to 747.50 Mtrs
BDA/EE(S)/AE-1/PW/WO/7/89-90 DT 04.04.1989
706
Jungle clearing, picking and restoration of roads in Sy No.44, 45 to
50 and 53 of Govinayakanahalli in Kumara swamy L/O.. II stage
BDA/EE(S)/PW/WO/JE/13/89-90 DT 06.04.1989
707
Maintenance of Sy No.7 and 8 of Yadiyur Village Jayanagar VII
Block (to be handed over to Bangalore City Corporation)
BDA/EE(S)/PW/WO/JE/14/89-90 DT 06.09.1989
708
Filling up well in site No.2463 B and Halla in site Nos 2463(A) and
2498 in Kumaraswamy Layout II Stage.
BDA/EE(S)/PW/WO/JE/2/89-90 DT 03.04.1989
709
Levelling and Embanking the C.A. Site (Park) Facing 50' Road and
junction in between E.W.S. House in Kumaraswamy Layout II
stage.
BDA/EE(S)/PW/WO/JE/3/89-90 DT 03.04.1989
710
Formation of road (missing link) in Sy No.24 of Karisandra BSK II
stage, Bhavani Slum Road 1 and 6
BDA/EE(S)/PW/WO/JE/9/89-90 DT 05.04.1989
711
Maintenance of roads and drains in I.T.I. House Building CoOperetive saciety Layout, Banashankari II stage, Bangalore.
BDA/EE(S)/PW/WO/JE/8/89-90 DT 05.04.1989
712
Jungle clearing at E.W.S. Houses in IV Block of Kumaraswamy
Layout I stage.
Providing Barbad wire fencing to C.A. Site in Banashankari II stage
VII Phase
Rechipcarpeting to the bad asphalting surface with depression
filling for 100' Ring road in sarakki layout ch.omtr. To 200 mtrs.
BDA/EE(S)/PW/WO/JE/21/89-90 DT 10.04.1989
713
714
BDA/EE(S)/PW/WO/JE/25/89-90 DT 10.04.1989
BDA/EE(S)/PW/WO/JE/35/89-90 DT 12.04.1989
715
Rechipcarpetting to the bad asphalted surface with depression
filling for 100' ring road in sarakki layout, ch.210 to 360 Mtrs.
BDA/EE(S)/PW/WO/JE/34/89-90 DT 12.04.1989
716
Repairs due to rain damaged roads at 7th crose and other cross
roads in Channammanakere Atchcut Layout and VI Block, III
Phase in BSK III Stage.
Repairs to the rain damaged portion of 40' and 50' road in I, II and
III Block of BSK III Stage, III Phase
BDA/EE(S)/PW/WO/JE/11/89-90 DT 06.04.1989
Rechipcarpetting to the bad asphalting surface with depression
filling for 100' ring road in sarakki layout, from ch.2800 to
3000mtrs.
Rechipcarpetting to the bad asphlted surface with depression filling
for 100' ring road in sarakki layout ch.1600 to 1800Mtrs.
BDA/EE(S)/PW/WO/JE/33/89-90 DT 12.04.1989
720
Rechipcarpetting to bad asphalted surface with depression filling
for 100' ring road in sarakki layout ch 2200Mtrs
BDA/EE(S)/PW/WO/JE/31/89-90 DT 12.04.1989
721
Rechipcarpetting to the bad asphlted surface with depression filling
for 100' Ring road in sarakki layout. Ch 2600Mtrs. To 2800Mtrs.
BDA/EE(S)/PW/WO/JE/30/89-90 DT 12.04.1989
722
Rechipcartting to the bad asphalting surface with depression filling
for 100' ring road in sarakki layout, ch 2400 to 2500Mtrs.
BDA/EE(S)/PW/WO/JE/29/89-90 DT 12.04.1989
723
Rechipcarpetting to the bad asphalting surface with depression
filling for 100' ring road in sarakki layout, ch from 1150M to
1250Mtrs.
Rechipcarpetting to bad asphelted surface with depression filling
for 100' ring road in sarakki layout, ch 750 to 910Mtrs.
BDA/EE(S)/PW/WO/JE/24/89-90 DT 10.04.1989
Levelling the Park in Kumarasamy Layout I stage near ward office.
BDA/EE(S)/PW/WO/JE/16/89-90 DT 06.04.1989
717
718
719
724
725
BDA/EE(S)/PW/WO/JE/10/89-90 DT 06.04.1989
BDA/EE(S)/PW/WO/JE/32/89-90 DT 12.04.1989
BDA/EE(S)/PW/WO/JE/23/89-90 DT 10.04.1989
726
727
728
729
730
731
732
733
Dismantling of huts of slum dwellere shifted from Kumaraswamy
temple premises near Mount - Joy Hanumanthanagar to
Kumaraswamy Layout
Providing barbad wire fencing to C.A. Site in Sy No.49 of
Kumaraswamy Layout II stage.
Re-Construction of damaged storm water Drain in Sy No.134/2 of
Channammanakere Tank Atchkat, Banashankari III Stage.
Formation of additional sites in Sy No.54, 55 & 56 of G.N.Halli,
Kumaraswamy Layout II Stage (Construction of Culverts 9 [Nine]
Nos.)
Formation of layout and construction of Three Culverts of 30'-0"
Road in Sy No.7 of Ittamadu, Banashankari III Stage.
Rechipcarpetting of roads in Sy No.10, Kathriguppe, Slum Dwellers
area in Banashankari III Stage, IV to VIII Main and II, III, VI and VII
Cross Roads.
Rechipcarpetting of roads in Sy nos.10 of Kathriguppa Slum
Dwellers Area in BSK III stage, IV, V Cross & II, III Maind road
BDA/EE(S)/PW/WO/JE/12/89-90 DT 06.04.1989
BDA/EE(S)/PW/WO/JE/17/89-90 DT 06.04.1989
BDA/EE(S)/PW/WO/JE/18/89-90 DT 06.04.1989
BDA/EE(S)/PW/WO/JE/19/89-90 DT 06.04.1989
BDA/EE(S)/PW/WO/JE/20/89-90 DT 06.04.1989
BDA/EE(S)/PW/WO/JE/51/89-90 DT 12.04.1989
BDA/EE(S)/PW/WO/JE/49/89-90 DT 12.04.1989
Rechipcarpetting to roads in Sy No.10 of Kathriguppa, Kathriguppa
road (Vidyapeeta Circle) to C.T.Achkat, Banashankari III Stage
(Approach Roads IX and X Main Road)
Repaire to damaged portion of road by rechipcarpetting to I cross
road (Southern Kumaraswamy Layout)
BDA/EE(S)/PW/WO/JE/50/89-90 DT 12.04.1989
735
Repairs to damaged portion of roads by Rechipcarpetting to
approach road form Uttarahalli road to Kumaraswamy Layout.
BDA/EE(S)/PW/WO/JE/46/89-90 DT 12.04.1989
736
Rechipcarpetting to dmaged portion of I main road (front of over
Head Tank) in Kumaraswamy Layout, II stage.
BDA/EE(S)/PW/WO/JE/45/89-90 DT 12.04.1989
737
Urgent Repaire to Damaged portions of Roads due to heavy rains
by Rechipcarpetting to Kathriguppa Road in Sy No.10, in BSK III
stage, Ch 120 to 292Mtrs.
Urgent repairs to damaged portions of road due to heavy rains by
Rechipcrpetting to kathriguppa Road in Sy No.10, BSK III Stage,
Ch 294Mtrs to 526Mtrs.
Urgent repairs to damaged portions of road due to heavy rains by
Rechipcarpetting Kathriguppa Road in Sy No.10, Banashankari III
Stage, Ch 536 Mtrs to 727 Mtrs.
Urgent repairs to damaged portions of road due to heavy rains by
Rechipcarpetting to Kathriguppa Road, in Sy No.10, BSK III Stage,
Ch.747Mtrs to 959Mtrs.
Patch repairs to 100' ring road in Banashankari III Stage, Chainage
BDA/EE(S)/PW/WO/JE/44/89-90 DT 12.04.1989
734
738
739
740
741
BDA/EE(S)/PW/WO/JE/47/89-90 DT 12.04.1989
BDA/EE(S)/PW/WO/JE/43/89-90 DT 12.04.1989
BDA/EE(S)/PW/WO/JE/41/89-90 DT 12.04.1989
BDA/EE(S)/PW/WO/JE/40/89-90 DT 12.04.1989
BDA/EE(S)/PW/WO/JE/39/89-90 DT 12.04.1989
0 to 233 Mtrs.
742
Patch repairs to 100' ring road in Banashankari III stage - chainage
239 to 469 Mtrs.
Patch repaire to 100' ring road in Banashankari III Stage Chainage
486 to 720Mtrs.
Providing indicator stones to mark sites and site nos. sarakki IV
Phase, Dollar Scheme.
Formation of layout in Sy No.19 of sarakki under dollar scheme,
sarakki IV phase I Main road ch 150 to 210 M.
BDA/EE(S)/PW/WO/JE/38/89-90 DT 12.04.1989
746
Levelling the Corner sites proposed for Auction during Dec. 1988
and Jan 1989 in B.T.M. Layout, II Stage-I Phase
BDA/EE(S)/PW/WO/JE/52/89-90 DT 12.04.1989
747
Clearing the silt from road drains of 9th cross and 100' ring road in
sarakki layout
Providing barbed wire fencing to C.A.Site No.2 and 3 in
Channammanakere Atchout Layou, B.S.K. III Stage, Bangalore.
BDA/EE(S)/PW/WO/JE/54/89-90 DT 13.04.1989
743
744
745
748
BDA/EE(S)/PW/WO/JE/37/89-90 DT 12.04.1989
BDA/EE(S)/PW/WO/JE/36/89-90 DT 12.04.1989
BDA/EE(S)/PW/WO/JE/63/89-90 DT 19.04.1989
BDA/EE(S)/PW/WO/JE/58/89-90 DT 13.04.1989
749
Providing chipcarepetting to roads in front of EWS houses ( near
line stone factory ) in kumaraswamy layout 2nd stage.
BDA/EE(S)/AE/PW/WO/838/89-90
750
Fromation of road & side drains in srinivasanagar 4th cross to
connect 80' kathriguppa road BSK 3rd stage. Ch,: 275 to 540
mtrs..
Construction of retaining wall to 100' ring road so as to protect from
errossion in Banashankari 3rd stage. Chainage 0 to 22 mtrs..
BDA/EE(S)/AE/PW/WO/797/89-90
752
Repair and rechipcarpetting to damaged roads No. 59,60, 61, 62,
63,64 of kumaraswamy layout 1st stage..
BDA/EE(S)/AE/PW/WO/835/89-90
753
Construction of masonry box drain in Sy.No. 45 to 53 of
Govinayakanahalli in kumaraswamy layout 2nd stage in southern
side.
Construction of masonry drains to lead of storm water from drains
of newly fromed additional sites near lime stones factory in
K.S.Layout 2nd stage..
Construction of storm water drain in Sy.No. 6 of G.N.Halli at
kumaraswamy layout chainage : 50 mtrs. To 100 mtrs.
BDA/EE(S)/PW/WO/JE/814/89-90
756
Widening the road from 20 feet to 30 feet from 18th main to 16th
cross in kumaraswamy layout. 2nd stage,
BDA/EE(S)/PW/WO/JE/828/89-90
757
Repair to damaged protion of road by rechipcarpetting to roads
(front of the site No.722 to 912 in Kumaraswamy layout..
BDA/EE(S)/PW/WO/JE/837/89-90
751
754
755
BDA/EE(S)/AE/PW/WO/791/89-90
BDA/EE(S)/AE/PW/WO/887/89-90
BDA/EE(S)/PW/WO/JE/811/89-90
758
759
Repairs pot holes filling and rechipcarpetting to the bad asphalted
road D,E,G, and H, in Sy.No. 4/1 of Tavarekere in favour of
maruthi HBCS under BTM scheme.
Providing rechipcarpetting to the bad asphalted surface in Sarakki
4th phase 1st main to 7th 'A' main.
BDA/EE(S)/AE-2/PW/WO/858/89-90
BDA/EE(S)/AE/PW/WO/857/89-90
760
Interconnecting slab drains to main SWD on eitherside of SWD in
Sy.No. 8 & 9 of Gerrehalli 2nd 'A' main road in BSK 3rd stage..,
BDA/EE(S)/AE/PW/WO/860/89-90
761
Construction of retaining wall to 100' ring road so as to protect from
errossion in Banashankari 3rd stage. Chainage 76 to 106 mtrs..
BDA/EE(S)/JE/PW/WO/861/89-90
762
Construction of lead off drain in Sy.No. 42 and Gavipura
Banashankari 3rd stage chainage: 0 to 55 mtrs.
BDA/EE(S)/AE-3/PW/WO/862/89-90
763
Interconnecting slab drains to main SWD on eitherside of SWD in
Sy.No.42 & 43 of Gavipura 4th & 5th main road BSK 3rd stage..
BDA/EE(S)/AE/PW/WO/864/89-90
764
Providing dustbins to layout inSy.No. 134/2, 121 and 122 of
kathriguppa in BSK, 3rd stage and in kumaraswamy layout .,
BDA/EE(S)/PW/WO/JE/863/89-90
765
Construction of masonry drain for seepage water at rear side of
madivala tank bound in Sy.No. 67 of madivala village under BTM
scheme ch,: 100 to 150 mtrs..
Construction of seepage drains in KAS and bank officers layout in
madivala village by continuing the existing drain to lead upto hosur
road SWD. Ch, 150 to 200 mtrs,..
Providing & fixing layout board in Sy.No. 4/2 of Tavarekere village
under BTM 1st stage 1st phase.
BDA/EE(S)/AE/PW/WO/853/89-90
768
Providing & fixing layout board in Sy.No.20/1B of Tavarekere
village under BTM 1st stage 1st phase.
BDA/EE(S)/AE/PW/WO/871/89-90
769
Construction of masonary protection wall inSy.No. 2 to 10 of
Madivala village under BTM scheme ch : 140 to 180 mtrs..
BDA/EE(S)/AE/PW/WO/878/89-90
770
Repairs to foold damaged portion of SWD leading from 1st stage of
layout & running across EWS houses & joining the main drain in
K.S. Layout .2nd stage ( Eastern side) .
Repairs to damaged portion ofraod by rechipcarpetting to roads
(front of site Nos.713 to 1059, 1646 to 3140 in Kumaraswamy
layout. 2nd stage..
Sinking of 150mm. Dia borewell. Construction of platfrom and
fixing india mark-2 hand pump between 15th & 18th main road in
BTM. 2nd stage, 1st phase (4Nos ) EWS layout.,
BDA/EE(S)/PW/WO/JE/859/89-90
766
767
771
772
BDA/EE(S)/AE/PW/WO/854/89-90
BDA/EE(S)/AE/PW/WO/872/89-90
BDA/EE(S)/PW/WO/JE/836/89-90
BDA/EE(S)/PW/WO/JE/821/89-90
773
Sinking of 150mm. Dia borewell. Construction of platfrom and
fixing india mark-2 hand pump between 16th & 25th main road in
BTM. 2nd stage, 1st phase (4Nos ) EWS layout.,
BDA/EE(S)/PW/WO/JE/822/89-90
774
Sinking of 150mm. Dia borewell. Construction of platfrom and
fixing india mark-2 hand pump between 19th & 23rd main road in
BTM. 2nd stage, 1st phase (4Nos ) EWS layout.,
BDA/EE(S)/PW/WO/JE/823/89-90
775
Sinking of 150mm. Dia borewell. Construction of platfrom and
fixing india mark-2 hand pump between 25th & 29th main road in
BTM. 2nd stage, 1st phase (4Nos ) EWS layout.,
BDA/EE(S)/PW/WO/JE/824/89-90
776
Rechipcarpetting the bad patches of 80' road from SBM colony to
100' ring road in BSK 3rd stage ch, : 0 to 540 mtrs..,
BDA/EE(S)/AE/PW/WO/847/89-90
777
Repairs to roads and drain and removal of silt in Nagendra block at
BSK.3rd stage. ( Balance portion ),
BDA/EE(S)/AE/PW/WO/819/89-90
778
Repairs to roads and drain and removal of silt in 100' ring road at
BSK 3rd stage ch.1315 to 1980mtrs.
BDA/EE(S)/AE/PW/WO/852/89-90
779
Construction of storm water drain in dollar scheme layout at
sarakki 4th phase. Ch. 536 to 554mtrs.
BDA/EE(S)/PW/WO/JE/187/89-90
780
Construction of storm water drain in dollar scheme layout at
sarakki 4th phase. Ch. 554 to 572mtrs.
BDA/EE(S)/PW/WO/JE/130/89-90
781
Construction of storm water drain in dollar scheme layout at
sarakki 4th phase. Ch. 482 to 500mtrs.
BDA/EE(S)/AE-2/PW/WO/186/89-90 dt-12.6.89
782
Construction of storm water drain in dollar scheme layout at
sarakki 4th phase. Ch. 608 to 626mtrs.
BDA/EE(S)/PW/WO/JE/116/89-90 dt-12.6.89
783
Construction of storm water drain in dollar scheme layout at
sarakki 4th phase. Ch. 518 to 536mtrs.
BDA/EE(S)/PW/WO/JE/118/89-90 dt-12.6.89
784
Construction of storm water drain in dollar scheme layout at
sarakki 4th phase. Ch. 338 to 356mtrs.
BDA/EE(S)/AE-2/PW/WO/128/89-90 dt-14.6.89
785
Construction of storm water drain in dollar scheme layout at
sarakki 4th phase. Ch. 644 to 662mtrs.
BDA/EE(S)/AE-2/PW/WO/142/89-90 dt-14.6.89
786
Construction of storm water drain along 4th cross (60' road ) dollar
scheme layout at sarakki 4th phase chainage: 364 to 392 mtrs.,
BDA/EE(S)/AE-2/PW/WO/155/89-90 dt-14.6.89
787
Construction of storm water drain along 4th cross (60' road ) dollar
scheme layout at sarakki 4th phase chainage: 308 to 336 mtrs.,
BDA/EE(S)/PW/WO/JE/147/89-90 dt-14.6.89
788
Construction of storm water drain along 4th cross (60' road ) dollar
scheme layout at sarakki 4th phase chainage: 336 to 364 mtrs.,
BDA/EE(S)/PW/WO/JE/148/89-90 dt-14.6.89
789
Construction of storm water drain along 4th cross (60' road ) dollar
scheme layout at sarakki 4th phase chainage: 84 to 112 mtrs.,
BDA/EE(S)/PW/WO/JE/129/89-90 dt-14.6.89
790
Construction of storm water drain along 4th cross (60' road ) dollar
scheme layout at sarakki 4th phase chainage: 56 to 84 mtrs.,
BDA/EE(S)/PW/WO/JE/149/89-90 dt-14.6.89
791
Construction of storm water drain along 3rd main road Sy.No.19 in
dollar scheme layout at sarakki 4th phase chainage: 00 to 50 mtrs.,
BDA/EE(S)/AE-2/PW/WO/196/89-90 dt-15.6.89
792
Construction of storm water drain along 3rd main road Sy.No.19 in
dollar scheme layout at sarakki 4th phase chainage: 50 to 100
mtrs.,
Construction of storm water drain along 3rd main road Sy.No.19 in
dollar scheme layout at sarakki 4th phase chainage: 100 to 150
mtrs.,
Construction of storm water drain along 4th cross (60' road ) dollar
scheme layout at sarakki 4th phase chainage: 112 to 140 mtrs.,
BDA/EE(S)/AE-2/PW/WO/195/89-90 dt-15.6.89
793
794
795
796
Construction of culvent at the junction of 6th main and 5th cross,
7th main and 5th cross and 8th main and 5th cross in dollar
scheme layout at sarakki 4th phase.,
Construction of storm water drain along 4th cross (60' road ) dollar
scheme layout at sarakki 4th phase chainage: 168 to 196 mtrs.,
BDA/EE(S)/AE-2/PW/WO/194/89-90 dt-15.6.89
BDA/EE(S)/PW/WO/JE/138/89-90 dt-15.6.89
BDA/EE(S)/AE-2/PW/WO/139/89-90 dt-15.6.89
BDA/EE(S)/PW/WO/JE/134/89-90 dt-15.6.89
797
Construction of storm water drain along 4th cross (60' road ) dollar
scheme layout at sarakki 4th phase chainage: 140 to 168 mtrs.,
BDA/EE(S)/PW/WO/JE/133/89-90 dt-15.6.89
798
Construction of storm water drain in dollar scheme layout at
sarakki 4th phase. Ch.1022 to 1040mtrs.
BDA/EE(S)/PW/WO/JE/141/89-90 dt-16.6.89
799
Construction of masonary drain along site No. 2586 TO 3850 IN
Kumaraswamy layout, chainage 0 to 85 mtrs..,
BDA/EE(S)/PW/WO/JE/158/89-90 dt-16.6.89
800
Construction of storm water drain in dollar scheme layout at
sarakki 4th phase. Ch.968 to 986mtrs.
BDA/EE(S)/PW/WO/JE/177/89-90 dt-19.6.89
801
Construction of storm water drain along 4th cross (60' road ) dollar
scheme layout at sarakki 4th phase chainage: 224 to 252 mtrs.,
BDA/EE(S)/AE-2/PW/WO/154/89-90 dt-19.6.89
802
Construction of storm water drain in dollar scheme layout at
sarakki 4th phase. Ch.500 to 518mtrs.
BDA/EE(S)/PW/WO/JE/176/89-90 dt-19.6.89
803
Construction of storm water drain along 4th cross (60' road ) dollar
scheme layout at sarakki 4th phase chainage: 420 to 448 mtrs.,
BDA/EE(S)/AE-2/PW/WO/157/89-90 dt-19.6.89
804
Construction of storm water drain in dollar scheme layout at
sarakki 4th phase. Ch.572 to 590mtrs.
BDA/EE(S)/PW/WO/JE/185/89-90 dt-19.6.89
805
Construction of storm water drain along 4th cross (60' road ) dollar
scheme layout at sarakki 4th phase chainage: 280 to 308 mtrs.,
BDA/EE(S)/PW/WO/JE/146/89-90 dt-19.6.89
806
Construction of storm water drain along 4th cross (60' road ) dollar
scheme layout at sarakki 4th phase chainage: 252 to 280 mtrs.,
BDA/EE(S)/AE-2/PW/WO/147/89-90 dt-19.6.89
807
Construction of storm water drain along 4th cross (60' road ) dollar
scheme layout at sarakki 4th phase chainage: 392 to 420 mtrs.,
BDA/EE(S)/AE-2/PW/WO/144/89-90 dt-19.6.89
808
Construction of storm water drain in dollar scheme layout at
sarakki 4th phase. Ch.680 to 698mtrs.
BDA/EE(S)/PW/WO/JE/140/89-90 dt-19.6.89
809
Construction of storm water drain in dollar scheme layout at
sarakki 4th phase. Ch.1220 to 1238mtrs.
BDA/EE(S)/PW/WO/JE/143/89-90 dt-19.6.89
810
Maintanance of kumaraswamy layout ( Eastern side of BWSSB
pipe line ),
Maintanence of roads and drains near EWS Houses in 1st block of
Kumaraswamy layout,
BDA/EE(S)/AE-3/PW/WO/151/89-90 dt-19.6.89
811
BDA/EE(S)/AE-3/PW/WO/168/89-90 dt-19.6.89
812
Construction of storm water drain in dollar scheme layout at
sarakki 4th phase. Ch.1004 to 1022mtrs.
BDA/EE(S)/PW/WO/JE/184/89-90 dt-22.6.89
813
Sinking of 150mm. Dia borewell. Construction of platfrom and
fixing india mark-2 hand pump at Nagendra block at BSK,3rd
stage..,
Construction of storm water drain in dollar scheme layout at
sarakki 4th phase. Ch.752 to 770mtrs.
BDA/EE(S)/DM/162/89-90 dt-22.6.89
Construction of culvent at the junction of 2nd main and 4th cross,
3rd main and 4th cross. in dollar scheme layout at sarakki 4th
phase.
Construction of storm water drain in dollar scheme layout at
sarakki 4th phase. Ch.698 to 716mtrs.
BDA/EE(S)/PW/WO/JE/193/89-90 dt-23.6.89
814
815
816
817
Improving low laying area of slum dwellers in Kumaraswamy
layout.,
BDA/EE(S)/PW/WO/JE/178/89-90 dt-23.6.89
BDA/EE(S)/PW/WO/JE/137/89-90 dt-23.6.89
BDA/EE(S)/PW/WO/JE/170/89-90 dt-23.6.89
818
Construction of masonary drain & lead off drain near shifted slum
in kumaraswamy layout..,
BDA/EE(S)/PW/WO/JE/172/89-90 dt-23.6.89
819
Construction of masonary drain & slab drain to lead off water from
EWS.Houses 1st block to storm water drain in kumaraswamy
layout..,
Construction of retaining wall and raising SWD wall near shifted
slum in Kumaraswamy layout.,
BDA/EE(S)/PW/WO/JE/169/89-90 dt-23.6.89
821
Construction of storm water drain in dollar scheme layout at
sarakki 4th phase. Ch.464 to 482mtrs.
BDA/EE(S)/PW/WO/JE/180/89-90 dt-27.6.89
822
Construction of storm water drain in dollar scheme layout at
sarakki 4th phase. Ch.392 to 410mtrs.
BDA/EE(S)/AE-2/PW/WO/173/89-90 dt-27.6.89
823
Construction of storm water drain in dollar scheme layout at
sarakki 4th phase. Ch.1058 to 1076mtrs.
BDA/EE(S)/PW/WO/JE/179/89-90 dt-27.6.89
824
Construction of storm water drain in dollar scheme layout at
sarakki 4th phase. Ch.1040 to 1058mtrs.
BDA/EE(S)/PW/WO/JE/181/89-90 dt-27.6.89
825
Construction of storm water drain along 4th cross (60' road ) dollar
scheme layout at sarakki 4th phase chainage: 28 to 56 mtrs.,
BDA/EE(S)/AE-2/PW/WO/136/89-90 dt-27.6.89
826
Repairs potholes filling & rechipcarpetting to the bad asphalted
road A,B,C,I & J in Sy. No. 4/1 of Taverakere in F/O Maruthi HBCS
under BTM scheme
Providing chipcarpetting to remetalled surface to A D and E roads
in Sy. No. 33 41, 42, 43, 45, 46, & 47 of Maidvala village at Dollar
Scheme under BTM Scheme
Construction of seepage drain in KAS and Bank Officers layout in
Madivala village by continueing the existing drain to lead upto
Hosur road SWD ch 75 to 150 mts
Construction of culverts and Masonry box drain in Sy. No. 45 to 50
and 53 of Govinayakanahalli, K.S. Layout-II Stage
BDA/EE(S)/AE/PW/WO/750/89-90, 09.01.90
830
Construction of Masonry steps for approach to Sy., No. 134/2 of
Kathriguppa in BSK 3 Stg
BDA/EE(S)/PW/WO/JE/787/89-90, 09.01.90
831
Maintenance and Repairs to Road at Srinivasanagar Area II Phase
and Sy. No.22/2 amd 22/4 of Garehalli, BSK III Stage
BDA/EE(S)/PW/WO/JE/762/89-90, 09.01.90
832
Formation of road to connect 80 SBM Colony and 80 Kathriguppa
Main Road through 7th Cross and 2nd B Main in Srinivasanagar,
BSK III Stage, Chainage 0 to 250 Mtrs
Construction of Masonry drain near site No. 3047 in BSK II Stage
BDA/EE(S)/JE/PW/WO/776/89-90, 09.01.90
820
827
828
829
833
BDA/EE(S)/PW/WO/JE/171/89-90 dt-23.6.89
BDA/EE(S)/AE/PW/WO/783/89-90, 09.01.90
BDA/EE(S)/AE/PW/WO/793/89-90, Date:09.01.90
BDA/EE(S)/PW/WO/JE/779/89-90, 09.01.90
BDA/EE(S)/PW/WO/JE/770/89-90, 09.01.90
834
835
836
837
Patch repairs and pot holes filling the badly damaged roads &
rechipcarpetting for roads of padmanabhanagar in BSK III stage
(From Site Nos 39 to 35, 45 to 49, 56 to 61, 1 to 7, 22 to 26, 22 to
71/A 62-661)
Maintenance and repairs to flood damaged roads portion in
arroung south end slum in Kumaraswamy Layout
BDA/EE(S)/AE/PW/WO/758/89-90, 09.01.90
Levelling the Corner Sites for auction in Kumaraswamy Layout-1st
Stage
Removing silt from the drain and levelling footpath in Kalidasa
labouers co-operative housing society ltd., BSK III Stage
BDA/EE(S)/PW/WO/JE/778/89-90, 09.01.90
BDA/EE(S)/AE/PW/WO/777/89-90, 09.01.90
BDA/EE(S)/AE/PW/WO/751/89-90, 10.01.90
838
Construction of retaining wall to 100' ring road so as to protect from
Errossion in BSK III Stage ch 22 to 45 mtrs
BDA/EE(S)/JE/PW/WO/790/89-90, 11.01.90
839
Providing RCC street Name boards in Gerahalli and
Srinivasanagar BSK III Stage
Repainting of street name boards of Kumaraswamy Layout, BSK III
Stage Layout (under the jurisdiction of No. 3 South Sub-Division
BDA/EE(S)/PW/WO/JE/809/89-90, 11.09.90
840
BDA/EE(S)/JE/PW/WO/808/89-90, 11.01.90
841
Construction of masonry Box drain in Sy. No. 6 miniybit of G.N.
Hallif at KS Layout II Stage in Northern Side
BDA/EE(S)/PW/WO/JE/798/89-90, 11.01.90
842
Formation of road to connect 80' SBM colony road and 80'
Kathriguppa Main Road through 7th Cross and 2nd Main in
Srinivasanagar BSK, III Stage Ch: 250mtrs to 500 mtrs
BDA/EE(S)/PW/WO/JE/810/89-90, 11.01.90
843
Constuction of Lead off drain from south end slum to avoid flooding
water to Main SWD in KS Layout I Stage
BDA/EE(S)/PW/WO/JE/856/89-90, 11.01.90
844
Maintenance and repairs to raods in Srinivasanagar area II Phase
& Sy. No. 8 to 14 of Garehalli BSK III Stage
BDA/EE(S)/PW/WO/JE/815/89-90, 11.01.90
845
Providing dust bins in Srinivasanagar roads in the Missing area to
cover the balance area
Sinking of 150mm dia borewell to provide drinking water facility to
the residents of Srinivasanagar I phase in BSK III Stage (4 Nos)
BDA/EE(S)/PW/WO/JE/816/89-90, 11.01.90
846
847
848
Formation of roads and side drains in Srinivasanagar 4th cross to
connect 80' Kathriguppa road BSK III Stage Chainage: 0 to 275
mtrs.
Sinking of 150mm Dia borewell tp provide drinking water facility to
the residential of Srinivasanagar II Phase in BSK III Stage (4 Nos)
BDA/EE(S)/PW/WO/JE/805/89-90, 11.01.90
BDA/EE(S)/PW/WO/JE/812/89-90, 11.01.90
BDA/EE(S)/PW/WO/JE/806/89-90, 11.01.90
849
Sinking of 150mm Borewell and constructing of platform and
providing and fixing India Mark-II hand pump at K S Layout (4 Nos)
BDA/EE(S)/PW/WO/JE/804/89-90, 11.01.90
850
Sinking of 150mm Borewell and constructing of platform and
providing and fixing India Mark-II hand pump at K S Layout (3 Nos)
BDA/EE(S)/PW/WO/JE/807/89-90, 11.01.90
851
Constuction of Masonary protection wall in Sy. No. 2 to 10 of
madivala village under BTM scheme ch 330 to 370 mtrs
BDA/EE(S)/AE/PW/WO/796/89-90, 15.01.90
852
Repairs & rechipcarpetting to the rain damaged portion of roads in
Sarakki II Phase 19th, 19th A & 19 B Main roads
BDA/EE(S)/AE/PW/WO/867/89-90, 15.01.90
853
Repairs & rechipcarpetting to the rain damaged portion of roads in
Sarakki II Phasek 1st, 1st A, 2nd & 2nd A Between 19th & 20th
Main
Repairs & rechipcarpetting to rain damaged portion of road (SBI
colony western portion of road) in Sarakki I Phase
BDA/EE(S)/AE/PW/WO/868/89-90, 15.01.90
Providing chipcarpetting to the A and F roads over remetalled
surface in Sy. No. 33, 41, 42, 43, 45, 46 & 47 of madivala village at
Dollar Scheme under BTM scheme
Constuction of masonary protection wall in sy. No. 2 to 10 of
Madivala village BTM scheme ch 210 to 250 mtrs
BDA/EE(S)/AE/PW/WO/989/89-90, 15.01.90
Construction of seepage drain in KAS and Bank Officers layout in
Madivala Village by continuing the existing drain to lead upto Hosur
Road SWD ch 250 to 300 mtrs
Maintenance of Roads and Drains in KS Layout II Stage (Western
side of 50 roads Northern side overhead Tank
BDA/EE(S)/AE/PW/WO/795/89-90, 15.01.90
854
855
856
857
858
BDA/EE(S)/AE/PW/WO/866/89-90, 15.01.90
BDA/AE/PW/WO/794/89-90, 15.01.90
BDA/EE(S)/PW/WO/JE/799/89-90, 15.01.90
859
Construction of retaining wall to 100' ring road as to protect from
erossion in BSK III Stage ch 45 to 76 mtrs
860
Formation of sites in Sy. No. 43 of Nagasandra in BSK II Stage
BDA/EE(S)/PW/WO/JE/800/89-90, 15.01.90
861
Constuction of retaining wall to the right side of 80' Kathriguppa
road near Vidyapeeta in BSK III Stage to protect road ch 43 to 86
mtrs.
Constuction of retaining wall to the right side of 80' Kathriguppa
road near Vidyapeeta in BSK III Stage to protect road ch 0 to 43
mtrs.
Repairs to flood damaged portion of SWD leading from 1st stage of
layout area running across EWS Houses and joining the main drain
in KS Layout 2nd Stage (Eastern Side)
BDA/EE(S)/PW/WO/JE/801/89-90, 15.01.90
862
863
BDA/EE(S), AE/PW/WO/792/89-90, 15.01.90
BDA/EE(S)/PW/WO/JE/802/89-90, 15.01.90
BDA/EE(S)/PW/WO/JE/789/89-90, 15.01.90
Patchrepairs and pot holes filling for the badly damaged roads &
rechipcarpetting for roads for padmanabhanagar in BSK III Stage
(Site No. 35 to 319, 361 to 370, 21 to 332, 360 to 351, 633 to 519,
527 to 534, 560 to 568)
Patch repairs and pot holes filling for the badly damaged roads &
re-chipcarpetting for roads of Padmanabhanagar in BSK III Stage
(Site Nos 274 to 319, 284 to 294, 307 to 310, 306 to 303, 283 to
319, 326 to 331)
Patch repairs and pot holes filling for the badly damaged roads &
re-chipcarpetting for roads of Padmanabhanagar in BSK III Stage
(Site Nos 493 to 33, 59 to 49, 71 to 81, 93 to 104, 114 to 486, 492
to 482, 476 to 35)
Patch repairs and pot holes filling for the badly damaged roads &
re-chipcarpetting for roads of Padmanabhanagar in BSK II Stage
(Site No. 625 to 632, 641 to 639, 578 to 586, 596/A to 604, 71/A to
615)
Patch repairs and pot holes filling for the badly damaged roads &
re-chipcarpetting for roads of Padmanabhanagar in BSK III Stage
(Site No. 34 to 715, 10 to 697, 12 to 679, 644 to 715, 12 to 14 & 22
to 29)
Repairs to damaged portion of SSM wall of SWD at Ch 830mtrs of
Channammanakere Atchukut Layout, BSK III Stage
BDA/EE(S)/AE/PW/WO/843/89-90, 15.01.90
Providing CC bed for the vent way of SWD from chainage
1040mtrs to 1055 mtrs (Bell mouth portion) including construction
of SSM for the missing link portion in Channammanakere Atchukut
Layout BSK III Stage
Removal of silt and clearing of Jungle in 36th and 38th Main and
entire roads of Sarakki IV Phase
BDA/EE(S)/PW/WO/AE/680/89-90, 22.12.89
872
Construction of lead of drain at Sy. No. 94 & 95 of Hosakerehally
Ch 50 to 100 mtrs at BSK III Stage
BDA/EE(S)/AE/PW/WO/699/89-90, 26.12.89
873
Construction of SSM Storm Water Drain along 100 road at BSK III
stage III phase, 5th block (site No. 281 to 304)
BDA/EE(S)/AE/PW/WO/698/89-90, 22.12.89
874
Repairs & rechipcarpetting to rain damaged portion of road (SBI
colony Eastern side of the road) in Sarakki I Phase
BDA/EE(S)/AE/PW/WO/700/89-90, 26.12.89
875
Construction of Masonry drain to avoid flooding and water
stagnation in play ground at VET school towards Northern side in
Sarakki Layout-Ch 0 to 60mtrs
Cleaning the silt in SWD at Sarakki II Phase Ch 800 to 1600mts
BDA/EE(S)/PW/WO/JE/702/89-90, 26.12.89
864
865
866
867
868
869
870
871
876
BDA/EE(S)/AE/PW/WO/839/89-90, 15.01.90
BDA/EE(S)/AE/PW/WO/841/89-90, 15.01.90
BDA/EE(S)/AE/PW/WO/842/89-90, 15.01.90
BDA/EE(S)/AE/PW/WO/840/89-90, 15.01.90
BDA/EE(S)/PW/WO/AE/679/89-90, 22.12.89
BDA/EE(S)/PW/WO/JE/676/89-90, 23.12.89
BDA/EE(S)/AE/PW/WO/684/89-90, 26.12.89
877
Construction of SS Masonary Drain along 100 ring road at BSK III
stage III Phase 5th Block (Site No 1 to 4)
BDA/EE(S)/AE/PW/WO/697/89-90, 26.12.89
878
Filling up the CA site in Between II & IV block in BSK III Stage III
Phase
Constuction of SS Masonary drain along 100 ring road at BSK III
Stage, III Phase 5th Block (Site No 4 to 8)
BDA/EE(S)/AE/683/PW/WO/89-90, 26.12.89
879
BDA/EE(S)/AE/PW/WO/703/89-90, 26.12.89
880
Construction of size stone masonary SWD at BSK III at III Phase
5th Block along 100 road (Site No 94 to 125)
BDA/EE(S)/AE/PW/WO/704/89-90, 26.12.89
881
Construction of Retaining wall on the left side of 80 wide 9th cross
road in Sarakki I Phase Ch 30mtrs to 60mtrs
BDA/EE(S)/PW/WO/AE2/692/89-90, 26.12.89
882
Repairs to drains and berm cutting to 100 road in Sarakki Layout
Ch 1000mtrs to 1800mtrs
BDA/EE(S)/PW/WO/JE/694/89-90, 26.12.89
883
Maintenance of roads and drains in 16th A Main Road at Sarakki II
Phase
Construction of Retaining wall on the left side of 80 wide 9th cross
road in Sarakki I Phase Ch 60mtrs to 90 mtrs
BDA/EE(S)/PW/WO/JE/691/89-90, 26.12.89
885
Repairs of Drains and Berm cutting to 100 road in Sarakki Layout
Ch 1800mtrs to 2800mtrs
BDA/EE(S)/PW/WO/JE/686/89-90, 26.12.89
886
Construction of lead of drain at Sy. No. 94 & 95 of Hosakerehally
village Ch 0 to 50mts
Construction of SS Masonary drain along 100 ring road at BSK III
stage III Phase 5th Block (Site No 125 to 281)
BDA/EE(S)/AE/PW/WO/688/89-90, 26.12.89
Removal of silt and clearing side berms in Timber Merchant Colony
in Sarakki 1st Phase
Providing dust bins in Muneswara Block and Nagendra block in
BSK III Stage
Providing dust bins in BSK III Stage II Phase IV, VI & VII block and
in the layout in Sy. No. 95, 96, 121 & 122 of Hosakerehally
BDA/EE(S)/PW/WO/JE/689/89-90, 27.12.89
884
887
888
889
890
BDA/EE(S)/PW/WO/JE/690/89-90, 26.12.89
BDA/EE(S)/AE/PW/WO/696/89-90, 26.12.89
BDA/EE(S)/AE/PW/WO/717/89-90, 28.12.89
BDA/EE(S)/AE/718/89-90, 28.12.89
891
Removal of silt in drain & clearing side berms shoulder drain of
24th Main in Sarakki I Phase (21 Main)
BDA/EE(S)/AE/PW/WO/716/89-90, 28.12.89
892
Construction of Masonry Drain to avoid flooding and water
stagnation in play ground at VET school towards Eastern side in
Sarakki Layout Ch 85mtrs to 170 mtrs
Construction of Retaining wall to formation of layout in Sarakki VI
Phase (Right side of SWD) Ch 360mtrs to 400 mtrs)
BDA/EE(S)/PW/WO/JE/724/89-90, 28.12.89
893
BDA/EE(S)/PW/WO/JE/725/89-90, 28.12.89
894
Repairs and rechipcarpetting to the rain damaged portion of roads
in Sarakki II Phase 17th A & 17 B Main Road
BDA/EE(S)/AE/PW/WO/715/89-90, 28.12.89
895
Repairs and rechipcarpetting to rain damaged portion of road in
Timber merchant colony sarakki I phase
BDA/EE(S)/AE/PW/WO/712/89-90, 28.12.89
896
Construction of masonary drain to avoid flooding and water
stagnation in playground at vet school (towards Eastern side in
Sarakki Layout Ch 0 to 85 mtrs
Construction of culvert at the junction of 100 road and kanakapura
road in Sarakki I Phase
BDA/EE(S)/AE/711/89-90, 28.12.89
898
Construction of Drains at the junction of 100 road and Kanakapura
Road in Sarakki Layout I Phase
BDA/EE(S)/PW/WO/JE/709/89-90, 28.12.89
899
Cleaning the side drains and road in Sarakki II Phase from 7th to
9th cross roads and in between roads
BDA/EE(S)/PW/WO/JE/707/89-90, 28.12.89
900
Construction of Retaining wall on the left side of 80 wide 9th cross
road in Sarakki I Phase Ch 90 to 120 mtr.
BDA/EE(S)/AE/PW/WO/705/89-90, 29.12.89
901
Providing RCC Layout boards & name boards to poornapragna
HBCS Ltd. & Sri Sidivinayaka HBCS Ltd in BSK III Stage and in
Sy. No. 109 of Kathriguppa Village BSK III stage
BDA/EE(S)/AE/PW/WO/720/89-90, 30.12.89
902
Providing dust bins in BSK III Stage III Phase III Block and for
private layouts in BSK III Stage
BDA/EE(S)/AE/PW/WO/706/89-90, 30.12.89
903
Removing silt from SWD in Sy. No. 34 of Madivala in BTM scheme
(Flood damage works) Ch 560 to 660 mtrs
BDA/EE(S)/AE/PW/WO/741/89-90, 02.01.90
904
Providing rechipcarpetting to rain damaged portion of 80 road in
Sarakki Layout in Ch 500 to 800 mts
BDA/EE(S)/AE/PW/WO/745/89-90, 02.01.90
905
Filling the corner site no 161 & 162 and intermediate site No. 155
to 160 and 163 to 168, 9th & 10th cross road at BTM II Stage I
Phase
Proposed side drain (balance portion) in II Cross on 29th Main in
BTM II Stage I Phase
Provinding RCC Layout Boards and Name Boards in BTM Layout
II Stage I Phase
Filling of Corner & Intermediate site between 5th and 6th Cross
road at BTM II Stage I Phase
BDA/EE(S)/PW/WO/JE/281/89-90, 29.07.89
897
906
907
908
BDA/EE(S)/PW/WO/JE/710/89-90, 28.12.89
BDA/EE(S)/PW/WO/JE/280/89-90, 29.07.89
BDA/EE(S)/PW/WO/JE/247/89-90, 29.07.89
BDA/EE(S)/PW/WO/JE/251/89-90, 29.07.89
909
Construction of Storm Water Drain in Dollar Scheme layout at
Sarakki IV Phase Ch 1094mtrs to 1112mtrs
BDA/EE(S)/PW/WO/JE/264/89-90, 29.07.89
910
Construction of Storm Water Drain in Dollar Scheme Layout at
Sarakki IV Ph Ch 1112mtrs to 1130mtrs
BDA/EE(S)/PW/WO/JE/263/89-90, 29.07.89
911
Formation of Layout in Sy. No. 172 of Bilakahalli Village under
BTM scheme I cross road From Site No. 144 to 156
BDA/EE(S)/PW/WO/JE/261/89-90, 29.07.89
912
Levelling of Corner site no. 2000, 2007, 1104, 1083, 1221, 1263,
1272 & 1211 proposed for auction at Sarakki II Phase
BDA/EE(S)/PW/WO/JE/270/89-90, 29.07.89
913
Levelling the Corner site no. 1070, 1071, 1037A, 812, 802, 806,
807, 787 proposed for auction at Sarakki I Phase
BDA/EE(S)/PW/WO/JE/271/89-90, 29.07.89
914
Formation of additional sites in Sy. No. 6, 13, 41, 43 & 44
Govinayakanahally at Kumaraswamy Layout
BDA/EE(S)/JE/EST/3346/89-90, 29.07.89
915
Providing Pavement slabs in 1st Block of EWS Houses and
Maintenance of IV & V Block in Kumara Swamy Layout
BDA/EE(S)/PW/WO/JE/289/89-90, 29.07.89
916
Formation and Levelling CA Site in EWS Layout (Opp to Site No.
1012 to 1015) at BTM II Stage I Phase
BDA/EE(S)/PW/WO/JE/248/89-90, 29.07.89
917
Filling the Corner site No. 193 & 194 and Intermediate site No. 190
to 192 and 195 to 197, 11th & 12th Cross at BTM II Stage I Phase
BDA/EE(S)/PW/WO/JE/246/89-90, 29.07.89
918
Filling the Corner site No. 127 & 128 in Sy. No. 172 of Bilakanahalli
(Dollar Scheme) at BTM II Stage
BDA/EE(S)/PW/WO/JE/243/89-90, 29.07.89
919
Construction of Culvert in Sy. No. 79 & 86 of Madivala to existing
30 road I, II, III Cross and newly formed 40' road by the side of
Madivala Tank under BTM Layout Culvert No. 1,2,3,4
BDA/EE(S)/PW/WO/JE/296/89-90, 01.08.89
920
Filling the Corner site No. 44 in Sy. No. 172 of Bilakanahalli (Dollar
Scheme) at BTM II Stage I Phase
BDA/EE(S)/PW/WO/JE/250/89-90, 01.08.89
921
Filling of Corner site No. 125 & 126 and Intermediate site No. 121
to 124 and 127 to 130, 7th & 8th Cross road at BTM II Stage I
Phase
Repairs to side drains and roads damaged due to heavy rain
between 19th and 24th Main at II Stage BTM I Phase
BDA/EE(S)/PW/WO/JE/266/89-90, 01.08.89
Formation and Levelling of CA Site in EWS layout (Opp to Site No.
1005 to 1008) at BTM II Stage I Phase
BDA/EE(S)/PW/WO/JE/255/89-90, 01.08.89
922
923
BDA/EE(S)/PW/WO/JE/265/89-90, 01.08.89
924
Levelling and filling the corner site Nos 179 and 180 and
Intermediate site Nos 177, 178, 181 and 182 between 10th and
11th cross in BTM II Stage I Phase
Repairs to roads and side drains damaged due to heavy rain
between 6th to 10th cross road at BTM II Stage I Phase
BDA/EE(S)/AE/PW/WO/244/89-90, 02.08.89
Formation of Layout in Sy. No. 135 of N S Palya under BTM
Layout Road No. B & C
Urgent repairs to roads damaged due to heavy rains at 5th cross
and adjoining cross roads in BTM II Stage I Phase
BDA/EE(S)/PW/WO/JE/282/89-90, 03.08.89
928
Filling the intermediate site no. 137 to 140 and 147 to 150 and 9th
cross at BTM II Stage I Phase
BDA/EE(S)/PW/WO/JE/283/89-90, 03.08.89
929
BDA/EE(S)/PW/WO/3030/89-90, 20.07.89
931
Levelling the corner site no. 1498 & 1499 in Sy. No. 84 of Madivala
under BTM Layout and Intermediate Site No. 1493 to 1497 and
1500 to 1504
Detailed estimate for levelling the corner site no. 1485 and
Intermediate site no 1486 to 1488 in Sy. No. 84 of Madivala under
BTM Scheme
Provinding Layout Street Name Boards to Dollar Scheme
BDA/EE(S)/PW/WO/JE/258/89-90, 03.08.89
932
Providing Layout Name Boards to Dollar Scheme
BDA/EE(S)/PW/WO/JE/257/89-90, 03.08.89
933
Filling the corner site No. 126/A, 160, 76, 69 & 68 in Sy. No. 172 of
Bilakanahalli (Dollar Scheme) at BTM II Stage I Phase
BDA/EE(S)/PW/WO/JE/297/89-90, 05.08.89
934
Filling the corner site No's 151 and 83 in Sy. No. 172 of
Bilakanahalli BTM II Stage
Construction of lead off drain in Sy. No. 94 and 95 of Hosakerehalli
for EWS SC/ST sites at BSK III Stage
BDA/EE(S)/AE/PW/WO/267/89-90, 05.08.89
Filling the corner site No. 143 & 144 and intermediate site no 140
to 142 and 145 to 147 at 9th cross and 8th cross 29th main road in
BTM II Stage I Phase
Filling the corner site No. 108 & 109 and Intermediate site no. 104
to 107 & 110 to 113 6th and 7th cross road at BTM II Stage I
Phase
Estimate for formation of flood damaged road adjacent to storm
water drain in Sy. No. 134/2 of Kathriguppa in BSK III Stage
BDA/EE(S)/PW/WO/JE/262/89-90, 08.08.89
Formation of side drain to shop sites in Avalahally BSK III Stage
Part A
Raising the road level already formed in Sy. No. 26/2 of Avalahally
and construction of CD works in BSK III Stage
BDA/EE(S)/AE/PW/WO/277/89-90, 09.08.89
925
926
927
930
935
936
937
938
939
940
BDA/EE(S)/PW/WO/JE/275/89-90, 03.08.89
BDA/EE(S)/PW/WO/JE/284/89-90, 03.08.89
BDA/EE(S)/AE/PW/WO/293/89-90, 03.08.89
BDA/EE(S)/AE/PW/WO/268/89-90, 08.08.89
BDA/EE(S)/AE/PW/WO/279/89-90, 08.08.89
BDA/EE(S)/AE2/PW/WO/295/89-90, 08.08.89
BDA/EE(S)/AE/PW/WO/921/89-90, 01.02.90
941
942
943
944
945
946
947
Re-chipcarpetting to 100' ring road in BSK III stage III phase ch
395 to 560 mts
Construction of 1 M vent SS Masonry drain by the side of layout
formed in Sy. No. 108, 120 of Hosakerehalli and Sy. No. 7 of
Ittamadu in BSK III Stage Ch 0 to 65 mtrs
Construction of 1 m vent SS Masonry drain by the side of layout
formed in Sy. No. 108 and 120 of Hosakerehalli and Sy. No. 7 of
Ittamadu in BSK III Stage Ch 65 to 130 mtrs
Construction of 1 m vent SS Masonry drain by the side of layout
formed in Sy. No. 108 and 120 of Hosakerehalli and Sy. No. 7 of
Ittamadu in BSK III Stage Ch 130 to 195 mtrs
Construction of 1 m vent SS Masonry drain by the side of layout
formed in Sy. No. 108 and 120 of Hosakerehalli and Sy. No. 7 of
Ittamadu in BSK III Stage Ch 195 to 260 mtrs
Construction of 1 m vent SS Masonry drain by the side of layout
formed in Sy. No. 108 and 120 of Hosakerehalli and Sy. No. 7 of
Ittamadu in BSK III Stage Ch 260 to 325 mtrs
Providing RCC Layout Boards , Name Boards and Dust Bins and
Repairs to Drains to new Timber Yard Layout, BSK III Stage
BDA/EE(S)/AE/PW/WO/920/89-90, 01.02.90
BDA/EE(S)/AE-1/PW/WO/926/89-90, 01.02.90
BDA/EE(S)/AE-1/PW/WO/928/89-90, 01.02.90
BDA/EE(S)/AE-1/PW/WO/930/89-90, 01.02.90
BDA/EE(S)/AE-1/PW/WO/929/89-90, 01.02.90
BDA/EE(S)/AE-1/PW/WO/931/89-90, 01.02.90
BDA/EE(S)/AWE-1/907/89-90, 01.02.90
948
Repair to road cutting and re-chipcarpetting to bad surfaces due to
flood damdage in Avalahally Main Road at BSK III Stage
BDA/EE(S)/958/89-90, 01.02.90
949
Formation of EWS sites in Sy. No. 94 & 95 of Hosakerehally in
BSK III Std (Filling up of quarry pit from ch 30 to 60 mts)
BDA/EE(S)/AE/PW/WO/949/89-90, 01.02.90
950
Formation of EWS sites in Sy. No. 94 & 95 of Hosakerehally in
BSK III Std (Filling up of quarry pit from ch 0 to 30 mts)
BDA/EE(S)/AE/PW/WO/990/89-90, 01.02.90
951
Re-chipcarpetting to the Bad patches of 50' road in Nagendra
Block BSK III St ch 0 to 240 & 470 to 560 mts
BDA/EE(S)/AE/PW/WO/951/89-90, 01.02.90
952
Re-chipcarpetting to the damaged portion of roads in BSK III
Stage, III Phase II Block
Re-chipcarpetting the Bad patches of 50' road in Muneshwara
Block BSK III Stage, ch 560 mts to 960 mts
BDA/EE(S)/AE/PW/WO/948/89-90, 01.02.90
953
BDA/EE(S)/AE/PW/WO/957/89-90, 01.02.90
954
Repairs to roads & drains and removal of silt in Muneshwara Block
at BSK III Stage (Balance Portion)
BDA/EE(S)/AE/PW/WO/952/89-90, 01.02.90
955
Repairs to roads and side drains from 4th to 10th cross in Sy. No.
83 and 84 of Madivala in BTM II Stage I Phase
BDA/EE(S)/AE-1/PW/WO/947/89-90, 05.02.90
956
Repairs to road in Bannerghatta road in Dollar Scheme in BTM II
Stage I Phase
BDA/EE(S)/AE/PW/WO/936/89-90, 05.02.90
957
Construction of Culverts in Sy. No. 172 of Bilakahalli in BTM II
Stage, I Phase
Providing re-chipcarpetting to bad portions of roads due to road
cuttings and recent rains from 23rd to 28th Main in BTM II Stage, I
Phase
Providing Masonary wall and B S Slab drain in Sy. No. 75/2 of
Madiwala in BTM II Stage I Phase
BDA/EE(S)/PW/WO/JE/935/89-90, 05.02.90
960
Providing Barbed wire fenceing in Sy. No. 94 & 95 along ring road
to protect site area at BSK III St
BDA/EE(S)/AE/PW/WO/941/89-90, 05.02.90
961
Providing road name boards and dust bins in BSK III Stage, III
Phase I to IV Block
Filling the trench between shore road and retaining wall in Sy. No.
74/2 of Madiwala in BTM II Stage I Phase
BDA/EE(S)/AE/PW/WO/943/89-90, 05.02.90
963
Repairs to roads & drains and providing missing drains and
culverts in Kalidasa HBCS Layout in BSK III Stage
BDA/EE(S)/AE/PW/WO/950/89-90, 05.02.90
964
Construction of lead off drain in Sy. No. 42 and 43 of Gavipura,
BSK III Stage Ch 55 to 110 mtrs
BDA/EE(S)/JE/PW/WO/945/89-90, 05.02.90
965
Interconnecting slab drain to main SWD on eitherside of SWD in
Sy. No. 42 & 43 of Gavipura 6th & 7th Main Road-BSK III Stg
BDA/EE(S)/PW/WO/JE/961/89-90, 05.02.90
966
Repairs & Improvements to the bed of SWD in Srinivasanagar from
No. 1487 ch 0 to 70 mts
BDA/EE(S)/AE/PW/WO/946/89-90, 05.02.90
967
Construction of Masonry Culvert and retaining wall near Slum on
100' ring road in BTM II Stage, I Phase
BDA/EE(S)/PW/WO/JE/959/89-90, 06.02.90
968
Re-chipcarpetting the roads at Girinagar I Phase
BDA/EE(S)/PW/WO/AE/966/89-90, 06.02.90
969
Re-chipcarpetting the roads at BSK III Stg, III Phase, V Block
BDA/EE(S)/PW/WO/AE/967/89-90, 06.02.90
970
Formation of sites to be auctioned in BSK II Stg Site Nos. 493/A,
1614/A, 1615/A, 1566/1, 2223, 2205, 2206 and 2422/A
BDA/EE(S)/PW/WO/JE/932/A/89-90, 06.02.90
971
Formation of side drain to shopping complex and shop sites in
Avalahalli BSK III Stg
Filling the wall and formation of road in 5th cross road in Sy. No.
17, 20, 21 of Gavipura by utilising the excavated stuff available in
Avalahalli Layout BSK III Stg
Constuction of SS Masonry protective wall along 9th cross road in
Avalahalli Layout BSK III Stg (Eastern side) Ch 160 to 220 mtrs
BDA/EE(S)/PW/WO/AE/939/89-90, 08.02.90
958
959
962
972
973
BDA/EE(S)/PW/WO/JE/962/89-90, 05.02.90
BDA/EE(S)/PW/WO/JE/973/89-90, 05.02.90
BDA/EE(S)/AE-2/PW/WO/940/89-90, 05.02.90
BDAEE(S)/PW/WO/AE/938/89-90, 08.02.90
BDA/EE(S)/PW/WO/AE/937/89-90, 08.02.90
974
Repairs to roads and side drains damaged due to recent rains in
Sy. No. 74/2 from ring road to 4th cross road in BTM II Stg, I Phase
BDA/EE(S)/PW/WO/JE/969/89-90, 14.02.90
975
Repairs & rechipcarpetting to damaged portion of roads in south
end slum dwellers area in Kumaraswamy Layout in I Main to V
Main I Stage
Construction of Storm Water Drain in Sy. No. 6 of G N Halli K S
Layout Ch from 0 to 50 mtrs
BDA/EE(S)/PW/WO/AE/963/89-90, 19.02.90
976
BDA/EE(S)/PW/WO/JE/983/89-90, 19.02.90
977
Formation of Road Culverts and Drains in Kumaraswamy Layout
(12th to 18th Main Road)
Bda/EE(S)/PW/WO/JE/965/89-90, 19.02.90
978
Formation of balance length of road along SWD road along
retaining wall and construction of 2 Nos Culvert in Sy. No. 134/2of
Kathriguppa BSK III Stg
Re-chipcarpetting the roads in Channammanakere Atchkut Layout
BSK III Stg III Phase
Sinking of 150mm dia Borewell, Construction of platform and fixing
India Mar-II hand pump in Raghavendra Block BSK III Stg (4 Nos)
BDA/EE(S)/PW/WO/JE/984/89-90, 19.02.90
979
980
981
982
983
984
985
986
987
988
989
BDA/EE(S)/PW/WO/AE/978/89-90, 19.02.90
BDA/EE(S)/PW/WO/AE/968/89-90, 19.02.90
Construction of SS Masonry protective wall along 9th cross road in
Avalahalli Layout BSK III Stg (Eastern Side) Ch 220mtrs to
280mtrs
Formation of side drain to shop sites in Avalahally BSK III Stage
Part B
Levelling of corner site no. 43, 29, 28, 12, 68, 67, 76, 83 & 69 in
Sy. No. 108 (part) and 120 of Hosakerehalli and Sy. No. 7 of
Ittamadu in BSK III Stg
Levelling and filling the corner site no's 10, 13, 45 in Sy. No. 172 of
Bilakanahally (Dollar Scheme) under BTM II Stg
BDA/EE(S)/PW/WO/AE/980/89-90, 19.02.90
Formation of layout for proposed EWS sites in Sy. No. 78 and 79
of Madivala by levelling and filling the existing brick kil pits in the
CA site under BTM Layout
Formation of EWS sites in Sy. No. 75 & 76 of Madivala village by
levelling and filling the existing brick kal pits in CA site under BTM
Layout adjacent to EWS sites
Formation of Corner site No's 6, 21, 22, 38, 37 & 5A Dollar
Scheme layout under BTM Layout
BDA/EE(S)/AE/PW/WO/428/89-90, 10.08.89
Repairs to rain damaged roads joining 60' road and cross roads at
BTM II Stg I Phase
Chipcarpetting of roads of Kanaka House Building Co-op Society
at Kaderenahalli
BDA/EE(S)/AE/PW/WO/326/89-90, 10.08.89
BDA/EE(S)/AE/PW/WO/276/89-90, 09.08.89
BDA/EE(S)/PW/WO/JE/288/89-90, 10.08.89
BDA/EE(S)/AE/PW/WO/324/89-90, 10.08.89
BDA/EE(S)/AE/PW/WO/429/89-90, 10.08.89
BDA/EE(S)/AE/PW/WO/330/89-90, 10.08.89
BDA/EE(S)/PW/WO/JE/322/89-90, 10.08.89
990
Chipcarpetting of roads (40x30) of Kanaka House Building Co-op
Society at Kaderenahalli
BDA/EE(S)/PW/WO/JE/321/89-90, 10.08.89
991
Maintenance of II & III block of EWS Houses in I Stg of
Kumaraswamy Layout
Formation of missing link road in Sy. No. 7 of Karisandra BSK II
Stg under 18% grant
Repairs to roads and side drains in Sy. No. 10 of Kathriguppa BSK
III Stg
Maintenance of roads and drains in Kumaraswamy Layout II Stage
(EWS Houses Block C and 50' road)
BDA/EE(S)/PW/WO/JE/332/89-90, 10.08.89
992
993
994
995
BDA/EE(S)/PW/WO/JE/318/89-90, 10.08.89
BDA/EE(S)/PW/WO/JE/290/89-90, 10.08.89
BDA/EE(S)/PW/WO/JE/291/89-90, 10.08.89
Formation filling and protective works in Sy. No. 94 & 95 of
Hosakerehalli BSK III Stg-Formation of EWS sites under SC/ST
Category between 7th & 8th Main
Levelling of shopping complex site and shop site in Avalahalli
layout BSK III Stg
Formation of Embankment to cross roads adjecent to 12th main
road at Sarakki V Phase (Flood Damage work)
BDA/EE(S)/PW/WO/AE/278/89-90, 17.08.89
998
Protecting the road embankment by the side of Halla in Sy. No. 6,
7 & 8 of Madivala in BTM Layout (Flood Damage work)
BDA/EE(S)/PW/WO/JE/301/89-90, 17.08.89
999
Removing silt from SWD in Sy. No. 34 of Madivala in BTM scheme
Ch. 0 to 100 mtrs (Flood Damage work)
BDA/EE(S)/PW/WO/JE/303/89-90, 17.08.89
1000
Construction of Masonry Box drain in 100' ring road by the side of
Dollar Scheme Madivala BTM I Stage
BDA/EE(S)/PW/WO/JE/302/89-90, 17.08.89
1001
Proposed side drain (balance portion) from 29th main to tank shore
road in BTM II Stg I Phase
BDA/EE(S)/AE/PW/WO/317/89-90, 17.08.89
1002
Construction of lead off drain from platform area to avoid flooding
to main SWD in KS Layout Ch 151 mts to 300 mts
BDA/EE(S)/AE/PW/WO/320/89-90, 18.08.89
1003
Repairs to roads and removal of silt in Drains at BSK III Stg III
Phase VI Block
Repairs to roads and removal of silt in drains at BSK III Stg IV
Phase East of Kathriguppa
Maintenance and repairs to 80' road of Kathriguppa at BSK III Stg
Ch 0 to 225 mtrs
Filling the corner site no 32 and 35 in Sy. No. 172 of Bilakanahalli
(Dollar Scheme) at BTM II Stg
BDA/EE(S)/PW/WO/JE/305/89-90, 18.08.89
996
997
1004
1005
1006
BDA/EE(S)/PW/WO/AE/294/89-90, 17.08.89
BDA/EE(S)/PW/WO/JE/299/89-90, 17.08.89
BDA/EE(S)/PW/WO/JE/306/89-90, 18.08.89
BDA/EE(S)/PW/WO/JE/314/89-90, 18.08.89
BDA/EE(S)/PW/WO/JE/300/89-90, 18.08.89
1007
Levelling the corner site no. 1210, 1204, 1220, 1191, 1190, 1170,
1137, 1136 & 1105 of Sarakki II Phase Proposed for auction
BDA/EE(S)/PW/WO/JE/304/89-90, 18.08.89
1008
Repairs to road cutting and improvements to footpath on 100' ring
road at BTM II Stg I Phase
BDA/EE(S)/PW/WO/JE/307/89-90, 18.08.89
1009
Repairs to roads and side drains damaged due to heavy rain
between 25th and 27th cross roads in BTM II Stg I Phase
BDA/EE(S)/PW/WO/JE/325/89-90, 18.08.89
1010
Filling the corner site no. 203 & 204 and Intermediate site no. 199
to 202 and 205 to 208 between 12th & 13th cross road at BTM II
Stg, I Phase
Construction of storm water drain along 4th cross (60' road) in
Dollar Scheme Layout at Sarakki IV Phase Ch 0 to 28 mtrs
BDA/EE(S)/PW/WO/JE/308/89-90, 18.08.89
1011
BDA/EE(S)/PW/WO/JE/430/89-90, 18.08.89
1012
Repairs to flood damaged drains and roads in pipeline I and II
block of Gavipura BSK III Stage
BDA/EE(S)/AE/PW/WO/331/89-90, 22.08.89
1013
Construction of culvert in Sy. No. 79 and 80 of Madivala to existing
30' roads I, II & III cross and newly formed 40' road by the side of
Madivala tank under BTM Layout culvert No. 5,6,7 & 8
BDA/EE(S)/AE/PW/WO/394/89-90, 22.08.89
1014
Raising the existing retaining wall in Sy. No. 4/2 of Tavarekere
under BTM scheme (Flood Damage work)
BDA/EE(S)/PW/WO/JE/392/89-90, 22.08.89
1015
Improvements to CA Site at Dollar Scheme Layout-Madiwala
Facing 100' road at BTM I Stage (Embankment)
BDA/EE(S)/PW/WO/JE/391/89-90, 22.08.89
1016
Levelling the corner site no. 670, 645, 624, 690, 584, 555, 554,
660/A and 646/A at Sarakki II Phase
BDA/EE(S)/PW/WO/JE/400/89-90, 22.08.89
1017
Levelling the corner site nos 1179, 1442, 1486, 1487, 1529, 1776,
1786, 1721 and 1719 at Sarakki II Phase
BDA/EE(S)/PW/WO/JE/401/89-90, 22.08.89
1018
Levelling the corner site nos 1271, 1254, 1253, 1233, 1232, 2009,
2014, 1996, 1997 & 1994 at Sarakki II Phase
BDA/EE(S)/PW/WO/JE/399/89-90, 22.08.89
1019
Levelling the corner site no. 1609, 1622, 1623, 1635, 1630, 1635A,
1630A, 1629, 1616 and 1615 at Sarakki II Phase
BDA/EE(S)/PW/WO/JE/398/89-90, 22.08.89
1020
Construction of lead off drain from platform area to avoid flooding
to main SWD in KS Layout Ch 0 to 150 mts
BDA/EE(S)/AE/PW/WO/309/89-90, 22.08.89
1021
Removal of silt and repairs to the damaged drains and culverts in
Avalahalli layout BSK III Stg Part A
BDA/EE(S)/AE/PW/WO/327/89-90, 23.08.89
1022
Repairs to roads and removal of silt in Drains at BSK III Stg III
Phase Channammanakere Atchcut Layout (Part A)
BDA/EE(S)/PW/WO/JE/328/89-90, 23.08.89
1023
Improvements and maintenance of roads in Sy. No. 120 (New) of
Kathriguppa BSK III Stg (Slum Dwellers area)
BDA/EE(S)/PW/WO/JE/349/89-90, 23.08.89
1024
Maintenance of roads and drains in Sy. No. 42 and 43 of
Srinivasanagar BSK III Stage
Urgent repairs to damaged portion or roads due to heavy rains by
Re-chipcarpetting to Kathriguppa road in Sy. No. 10 BSK III Stg Ch
0 to 112 mtrs
Construction of Storm water drain in Dollar Schems layout at
sarakki IV th Phase. Chainage 356 to 374Mtrs.
BDA/EE(S)/PW/WO/JE/361/89-90, 23.08.89
1027
Construction of storm water drain in Dollar Scheme layout at
sarakki IV Phase Chainage 950Mtrs., to 96 Mtrs
BDA/EE(S)/PW/WO/JE/212/89-90, 11.07.1989
1028
Construction of storm water Drain along 4th cross (60' road) in
Dollar Scheme Layout at sarakki IV Phase. Chainage 196Mtrs to
224 Mtrs.
Construction of storm water drain in Dollar Scheme layout at
sarakki IV Phase Chainage 662Mtrs., to 68 Mtrs
BDA/EE(S)/PW/WO/JE/183/89-90, 04.07.1989
1030
Construction of storm water drain in Dollar Scheme layout at
Sarakki IV Phase, Chainage 190 to 209Mtrs.
BDA/EE(S)/PW/WO/JE/200/89-90, 10.07.1989
1031
Construction of Culvert at the junction of 3rd cross & 5th main and
3rd cross & 7th Main road in Dollar Scheme layout at sarakki IV
Phase.
Construction of storm water Drain in Dollar Scheme layout at
sarakki IV phase. Chainage 209Mtrs to 228 Mtrs.
BDA/EE(S)/PW/WO/JE/245/89-90, 04.08.1989
1025
1026
1029
1032
BDA/EE(S)/JE/PW/WO/48/89-90, 05.04.89
BDA/EE(S)/AE-2/PW/WO/159/89-90, 29.06.1989
BDA/EE(S)/PW/WO/JE/188/89-90, 04.07.1989
BDA/EE(S)/PW/WO/JE/199/89-90, 10.07.1989
1033
Construction of Retaining wall in Karisandra Slum in BSK II Stage.
BDA/EE(S)/PW/WO/JE/214/89-90, 11.07.1989
1034
Formation of Sites to be auctioned in C.T.Bed in Banashankari II
Stage.
Construction of Masonry drain along site No.2586 to 3850 in
Kumaraswamy layout. Chainage 85Mtrs to 170 Mtrs
BDA/EE(S)/PW/WO/JE/213/89-90, 11.07.1989
1035
BDA/EE(S)/PW/WO/JE/197/89-90, 04.07.1989
1036
Construction of Storm water Drain in Dollar Scheme Layout at
Sarakki IV Phase chainage 716 Mtrs to 734 Mtrs
BDA/EE(S)/PW/WO/JE/200/89-90, 10.07.1989
1037
Construction of Storm water Drain in Dollar Scheme layout at
Sarakki IV Phase Chainage 788Mtrs to 806 Mtrs
BDA/EE(S)/PW/WO/JE/225/89-90, 24.07.1989
1038
Construction of Storm water Drain in Dollar Scheme layout at
sarakki IV Phase. Chainage 806 to 824 Mtrs
BDA/EE(S)/PW/WO/JE/199/89-90, 10.07.1989
1039
Construction of Storm water Drain in Dollar Scheme layout at
sarakki IV Phase Chainage 1076Mtrs to 1094Mtrs.
BDA/EE(S)/PW/WO/JE/198/89-90, 10.07.1989
1040
Construction of Storm Water Drain in Dollar Scheme Layout at
Sarakki IV Phase chainage 986Mtrs to 1004Mtrs
BDA/EE(S)/PW/WO/JE/204/89-90, 10.07.1989
1041
Construction of Storm Water Drain in Dollar Scheme at Sarakki IV
Phase chainage 734 Mtrs to 752Mtrs
BDA/EE(S)/PW/WO/JE/231/89-90, 28.07.1989
1042
Construction of Storm Water Drain in Dollar Scheme layout at
sarakki IV Phase chainage 1202 Mtrs to 1220Mtrs
BDA/EE(S)/PW/WO/JE/203/89-90, 10.07.1989
1043
Construction of Storm water Drain in Dollar Scheme layout at
sarakki IV PhaseChainage 914Mtrs to 932Mtrs
BDA/EE(S)/PW/WO/JE/202/89-90, 10.07.1989
1044
Construction of Storm water drain in Dollar Scheme layout at
sarakki IV phase chainage 1184 Mtrs 1202Mtrs
BDA/EE(S)/PW/WO/JE/201/89-90, 10.07.1989
1045
Construction of storm water drain in Dollar Scheme layout at
sarakki IV Phase chainage 896Mtrs to 914Mtrs
BDA/EE(S)/PW/WO/JE/207/89-90, 11.07.1989
1046
Construction of Storm water drain in Dollar Scheme Layout at
sarakki IV Phase chainage 770 Mtrs to 788Mtrs
BDA/EE(S)/PW/WO/JE/206/89-90, 11.07.1989
1047
Construction of storm water drain in Dollar Scheme layout at
sarakki IV phase chainage 842Mtrs to 860Mtrs
BDA/EE(S)/PW/WO/JE/211/89-90, 11.07.1989
1048
Construction of Storm Water Drain in Dollar Scheme layout at
sarakki IV phase chainage 860Mtrs to 878Mtrs
BDA/EE(S)/PW/WO/JE/210/89-90, 11.07.1989
1049
Construction of storm water Drain in Dollar Scheme layout at
sarakki IV Phase chainage 824 Mtrs to 842Mtrs
BDA/EE(S)/PW/WO/JE/208/89-90, 11.07.1989
1050
Construction of Storm water drain in Dollar Scheme Layout at
Sarakki IV Phase Chainage 878Mtrs to 896Mtrs
BDA/EE(S)/PW/WO/JE/209/89-90, 11.07.1989
1051
Construction of Storm Water Drain in Dollar Scheme Layout at
sarakki IV Phase Chainage 932Mtrs to 950Mtrs
BDA/EE(S)/PW/WO/JE/226/89-90, 24.07.1989
1052
Construction of Culvert at the junction of 4th Cross & 9th Main, and
5th Cross and 4th Main and 6th Cross in Dollar Scheme Layout at
sarakki IV Phase
Construction of Culvert at the junction of 2nd cross & 7th Main and
2nd cross & 9th Main in Dollar Scheme Layout at sarakki IV Phase.
BDA/EE(S)/PW/WO/JE/230/89-90, 24.07.1989
1053
BDA/EE(S)/PW/WO/JE/229/89-90, 24.07.1989
1054
Construction of Storm water Drain in Dollar Scheme layout at
Sarakki IV Phase chainage 1148 Mtrs to 1166Mtrs
BDA/EE(S)/PW/WO/JE/218/89-90, 19.07.1989
1055
Construction of Storm water Drain in Dollar Scheme Layout at
Sarakki IV Phase Chainage 1166Mtrs to 1184Mtrs
BDA/EE(S)/PW/WO/JE/217/89-90, 19.07.1989
1056
Construction of Storm water Drain in Dollar Scheme Layout at
Sarakki IV Phase Chainage 1130Mtrs to 1148Mtrs
BDA/EE(S)/PW/WO/JE/216/89-90, 19.07.1989
1057
Levelling oa Auction Sites in Avalahalli layout in BSK III Stage for
the site Nos. 132, 93, 131, 101, 81, 117, 146, 66, 402, 438, 467,
387/a, 15, 16, 30, 1 and 387/c
Levelling of Corner sites in Avalahalli Layout in BSK III Stage for
site Nos.327, 358, 357, 343, 342, 306, 294, 292, 178, 197, 257,
281 and 61 (Pond) & 305
Construction of Storm water drain in Dollar Scheme layout at
sarakki IV Phase ch 428 to 446Mtrs
BDA/EE(S)/PW/WO/JE/222/89-90, 21.07.1989
1060
Construction of storm water Drain in Dollar Scheme layout at
sarakki IV Phase chainage 374 Mtrs to 392Mtrs
BDA/EE(S)/PW/WO/JE/221/89-90, 20.07.1989
1061
Construction of Storm water drain in Dollar Scheme layout at
sarakki IV Phase chainage 410Mtrs to 428Mtrs
BDA/EE(S)/PW/WO/JE/240/89-90, 31.07.1989
1062
Levelling the corner sites Nos.403, 404, 437, 438 & 758 proposed
for Auction at sarakki III Phase
BDA/EE(S)/PW/WO/JE/224/89-90, 22.07.1989
1063
Construction of Compound wall to the park area in the premises of
Commercial Complex at Banashankari II Stage Chainage 0 to 64
Mtrs and 64 to 88 Mtrs
Providing and fixing M.S.Grill to the Court yard of commercial
complex at Banashankari II Stage
BDA/EE(S)/PW/WO/JE/233/89-90, 31.07.1989
1065
Construction of Compound wall to the park area in the premises of
commercial complex at Banashankari II stage
BDA/EE(S)/PW/WO/JE/237/89-90, 31.07.1989
1066
Providing and fixing M.S.grill to the Court yard of the Commecial
Complex at Banashankari II Stage
BDA/EE(S)/PW/WO/JE/234/89-90, 31.07.1989
1067
Construction of Compound wall to the park area in the premises of
Commerctila complex Banashankari II Stage
BDA/EE(S)/PW/WO/JE/236/89-90, 31.07.1989
1068
Levelling the Corner site Nos 447, 446, 538, 74, 71, 350, 318, 317
& 362 Proposed for Auction at sarakki VI Phase
BDA/EE(S)/PW/WO/JE/239/89-90, 31.07.1989
1069
Construction of Foot bridge in between Padmanabhanagar and
BSK II stage
BDA/EE(S)/PW/WO/JE/238/89-90, 31.07.1989
1058
1059
1064
BDA/EE(S)/PW/WO/JE/223/89-90, 21.07.1989
BDA/EE(S)/PW/WO/JE/227/89-90, 24.07.1989
BDA/EE(S)/PW/WO/JE/235/89-90, 31.07.1989
1070
1071
1072
1073
1074
1075
Jungle Clearance and levelling of sites proposed for auctioning for
site No.139, 176, 198, 199, 220, 231, 365 & 364 of BSK III stage,
III phase, V block
Annual Maintenance of Borewell in Sy No.54 of Govinayakanahalli
Kumaraswamy Layout I and II stage
BDA/EE(S)/PW/WO/JE/232/89-90, 28.07.1989
Annual maintenance of Borewells at Srinivasanagar in B.S.K.III
Stage
Annul Maintenance of Borewell in Sy No.13 of Govinayakanahalli
Kumara swamy Layout
Annul maintenance of Borewell in Sy No.2 to 7 of Srinivasanagar
at BSK III Stage
Annual maintenance of Borewell in Sy No.45 of Govinayakanahalli
Kumaraswamy Layout I and II Stage
BDA/EE(S)/PW/WO/JE/522-A/89-90, 27.09.1989
BDA/EE(S)/PW/WO/JE/525-A/89-90, 26.07.1989
BDA/EE(S)/PW/WO/JE/523-A/89-90, 27.09.1989
BDA/EE(S)/PW/WO/JE/524-A/89-90, 27.09.1989
BDA/EE(S)/PW/WO/JE/527-A/89-90, 26.07.1989
1076
Annual Maintenance of Borwell in Sy No.6 of Govinayakanahalli,
Kumaraswamy Layout I and II Stage
BDA/EE(S)/PW/WO/JE/528-A/89-90, 26.07.1989
1077
Annual maintenance of Borewell in Sy No.42 and 43 of
Srinivasanagar at BSK III stage
Annual maintenance of Borewell in Sy No.8 to 14 of
Srinivasanagar at BSK III Stage
Formation of in Sy No.47/A, B, 2 & 48/5 & 6 of Thavarekere village
under BTM Scheme construction of SWD ch 0 to 35 Mtr
BDA/EE(S)/PW/WO/JE/529-A/89-90, 26.07.1989
1080
Formation of layout in sy No.47/A, B, 2 & 48/5 & 6 of Thavarekere
under BTM Schme Construction of SWD ch 35 to 65 Mtr
No.BDA/EE(S)/AE2/WO/72/89-90 DT 28.04.1989
1081
Construction of storm water drains to form 30' x 50' sites (23 Nos)
in CT bed of BSK II stage ch 63 to 84 M.
No.BDA/EE(S)/JE/WO/105/89-90 DT 30.05.1989
1082
Formation of layout in Sy No.47/A, B, 2 & 48/5 & 6 Thavarekere
under BTM Construction masonry S.W.D. Ch 65 to 100 mtr.
No.BDA/EE(S)/AE-2/WO/73/88-89 DT
28.04.1989
1083
Formation of layout in Sy No.17 part of 134/2 or Kathriguppa at
BSK III Stage (Road 7 & 9).
No.BDA/EE(S)/JE/WO/710/88-89 DT 04.08.1989
1084
Providing barbed wire fencing to CA site No.8 in
Halagavaderahally in F/O BEML HBCS ltd
No.BDA/EE(S)/AE1/WO/4/89-90 DT 04.04.1989
1085
Levelling the corner site Nos.1, 12, 13, 57, 21, 47, 46, 22, 32, 34,
58, 60 and 184 proposed for auction in BSK III Stage, III Phase, VI
Block
Levelling of corner site nos.16, 11, 22, 47, 48, 23, 10, 1, 32, 62, 74,
61 and 33 in Channammanakere atchkat layout, BSK III Stage.
No.BDA/EE(S)/JE/PW/WO/5/89-90 DT
04.04.1989
1078
1079
1086
BDA/EE(S)/PW/WO/JE/530-A/89-90, 26.07.1989
No.BDA/EE(S)/AE2/WO/71/89-90 DT 28.04.1989
No.BDA/EE(S)/JE/PW/WO/6/89-90 DT
04.04.1989
1087
Formation of road along the SWD in Gerehalli at BSK III stage.
BDA/EE/S/PW/WO/01/89-90 dt:12-04-90.
1088
Removing silt from storm Water Drain in sy.no. 2 to 6 of madivala
in B.T.M scheme - Ch: 150Mtrs., to 300Mtrs
BDA/EE/S/PW/WO/740/89-90 dt:02-01-90.
1089
Construction of Retaining wall to formation of layout in Satakki VI
phase (Tight side of SWD) Ch. 400 tom 440 mts.
BDA/EE/S/PW/WO/739/89-90 dt:02-01-90.
1090
Formation of 30' wide approach road to newly formed 12 Nos sites
in sy.no. 72 of Madivala village (near K.A.S officers HBCS layout)
under BTM scheme.
Construction of masonry protection wall in sy.no. 2 to 10 at
Madivala (sy.no. 3 to 5) in B.T.M. Layout chainage 90 m to 140
Mtrs)
Providing rechipcarpetting to the bad asphaited surface in sarakki
VI phase 18th A cross, 33rd, 33rd `A` 33rd `D` 33rd `C` & 33rd `D`
main road
Providing rechipcarpetting to the bad asphaited surface in sarakki
VI phase 25, 26 & 29 AB, 30th A, 31st `A` 32nd main and 17th `A`
cross road.
Reparis & rechi pcarpettion to the rain damaged portion of roads in
Sarakki I phase 18th `A` 18th `B` main road
BDA/EE/S/PW/WO/726/89-90 dt:02-01-90.
1091
1092
1093
1094
BDA/EE/S/PW/WO/73/89-90 dt:02-01-90.
BDA/EE/S/PW/WO/732/89-90 dt:02-01-90.
BDA/EE/S/PW/WO/746/89-90 dt:02-01-90.
BDA/EE/S/PW/WO/733/89-90 dt:02-01-90.
1095
Formation of site by billing near KAS HBCS layout in Madivala
under BTM scheme (12 sites will be released)
BDA/EE/S/PW/WO/749/89-90 dt:02-01-90.
1096
Construction of masonary drain to avoid flooding and water
stagnation in play ground at VET school towards Northern side in
Sarakki layout ch 60 to 120 mts
Repairs to drain and berm cutting to 100 road in Sarakki layout ch.
200 to 100 mts
Clearing the silt & berm cutting in 24th main road at Sarakki I
phase ch 0 to 500mts
Construction of Retaining wall to formation of layout in Sarakki VI
phase (Right side of SWD) ch 600 to 640mts
BDA/EE/S/PW/WO/736/89-90 dt:02-01-90.
Construction of masonary Box drain in sy.no. 33, 41, to 43, 45 to
47 of madivala village under BTM sheme (Dollar scheme) ch 334
to 409 mts
Providing rechipcarpetting to rain damaged portion of 80' road in
sarakki layout ch 1895 to 2200 mts
BDA/EE/S/PW/WO/743/89-90 dt:02-01-90.
Providing rechipvarpettion to the bad asphalted surface in Sarakki
IV phase 16th & 17th cross road
BDA/EE/S/PW/WO/785/89-90 dt:02-01-90.
1097
1098
1099
1100
1101
1102
BDA/EE/S/PW/WO/735/89-90 dt:02-01-90.
BDA/EE/S/PW/WO/734/89-90 dt:02-01-90.
BDA/EE/S/PW/WO/747/89-90 dt:02-01-90.
BDA/EE/S/PW/WO/786/89-90 dt:02-01-90.
1103
1104
1105
1106
1107
1108
1109
1110
1111
1112
1113
1114
Filling & forming corner sites in sy.no. 96 to 98 of madivala village
in BTM I stage I phase (site Nos 89, 106, 135, 152, 153, 170, 199,
2166, 217, 234, 235, 252)
Construction of retaining wall on the left side of 80' wide 9th cross,
road in Sarakki I phase ch to 30 mts
BDA/EE/S/PW/WO/752/89-90 dt:02-01-90.
Protection work at junction between Hosur Road and Bannerhgtta
Road 100' Ring Road culvert near Central Silk Board towards
Southern side.
Protection work at junction between Hosur Road and Bannerhgtta
Road 100' Ring Road culvert near Central Silk Board towards
Southern side.
Providing Chipcarpetting to the roads in sy.no. 4/2 of Tavarekere
village under BTM scheme over remetalled surface
BDA/EE/S/PW/WO/742/89-90 dt:02-01-90.
Providing Chipcarpetting to `B`, `C` and `G` roads over Remetalled
surface in sy.no. 33, 41, 42, 43, 45, 46 and 47 of Madivala village
at Dollar scheme under BTM scheme
Construction of rataining wall to formation of layout in Sarakki VI
phase (Tight side of SWD) ch.640 to 680 mts
BDA/EE/S/PW/WO/760/89-90 dt:04-01-90.
Construction of masonary Box drain in sy.no. 33, 41, to 43, 45 to
47 of madivala village under BTM sheme (Dollar scheme) ch 244
to 344 mts
Construction of masonary drain for seepage water at rear side of
madivala tank bund in sy.no. 67 of madivala village under BTM
scheme ch. 0 to 50 mts
Construction of seepage drain in KAS and bank officers layout in
madivala village by continuing the existing drain to lead upto Hosur
Road SWD chainage 200 to 250 mtrs
Levelling the corner site proposed for auction in sarakki II phase
site No 1608, 1597, 1594, 1602, 1554, 1580, 1603, 1636 and
1636/A
Construction of S.S. Masonry side drain in sy.no. 92 and 93 of
Tavarekere village under BTM I stage chainage 280 to 425 mtrs
BDA/EE/S/PW/WO/782/89-90 dt:04-01-90.
BDA/EE/S/PW/WO/753/89-90 dt:02-01-90.
BDA/EE/S/PW/WO/744/89-90 dt:02-01-90.
BDA/EE/S/PW/WO/76/89-90 dt:04-01-90.
BDA/EE/S/PW/WO/781/89-90 dt:04-01-90.
BDA/EE/S/PW/WO/775/89-90 dt:04-01-90.
BDA/EE/S/PW/WO/764/89-90 dt:04-01-90.
BDA/EE/S/PW/WO/784/89-90 dt:04-01-90.
BDA/EE/S/PW/WO/738/89-90 dt:04-01-90.
1115
Construction of Retaining wall to formation of layout in Sarakki VI
phase (Right side of SWD) ch 520 to 560 mts
BDA/EE/S/PW/WO/780/89-90 dt:04-01-90.
1116
Construction of masonary protection wall in sy.no. 2 to 10 of
madivala village under BTM scheme ch 370 to 410 mts
BDA/EE/S/PW/WO/765/89-90 dt:04-01-90.
1117
Filling the corner sites in sy.no. 102/2 in madivala village under
BTM I stage site No. 1, 10, 11, 17
BDA/EE/S/PW/WO/773/89-90 dt:04-01-90.
1118
Repairs and rechipcarpetting to damaged roads to rehabilated
slum dewellers in kumaraswamy layout
BDA/EE/S/PW/WO/774/89-90 dt:04-01-90.
1119
Providign RCC layout and cross roads name boards in sy.no.
134/2, 121 and 122 of Kathriguppa, Banashankari III stage
BDA/EE/S/PW/WO/803/89-90 dt:04-01-90.
1120
Patch repaits and pot holes filling for the badly damaged roads &
rechipcarpetting for roads of padmanaghanagar in BSK III stage
(site No 493 to 33 482 to 492, 35 to 476, 39 to 470 48 to 466 59 to
44)
Construction of retaining wall to 100' ring road so as to protect from
errossion in Banashankari, III Stage Chainage, 106 m to 137 Mtrs
BDA/EE/S/PW/WO/759/89-90 dt:04-01-90.
1121
BDA/EE/S/PW/WO/772/89-90 dt:04-01-90.
1122
Construction of retaining wall to 100' ring road so as to protect from
errossion in Banashankari, III Stage Chainage, 137 m to 168 Mtrs
BDA/EE/S/PW/WO/771/89-90 dt:04-01-90.
1123
Construction of masonry protection wall in sy.no. 2 to 10 of
madivala village under BTM scheme chainage 45 to 90 m
BDA/EE/S/PW/WO/728/89-90 dt:08-01-90.
1124
Construction of Masonry Protection wall in sy.no. 2 to 10 of
madivala vilage, under BTM scheme chainage o to 45 mtrs
BDA/EE/S/PW/WO/729/89-90 dt:08-01-90.
1125
Clearing the silt and Berm cutting in 16th and 17th Cross road in
Sarakki VI phase chainage 0 to 200 mtrs
BDA/EE/S/PW/WO/756/89-90 dt:08-01-90.
1126
Repaintion of Name Boards in Sarakki Layout 1st to 6th Phase
BDA/EE/S/PW/WO/755/89-90 dt:09-01-90.
1127
Construction of masonary protect wall in sy.no. 2 to 10 of madivala
village under BTM scheme ch. 250 to 290 mts
BDA/EE/S/PW/WO/768/89-90 dt:09-01-90.
1128
Construction of masonary protection wall in sy.no. 2 to 10 of
madivala village under BTM scheme ch 290 to 330 mts
BDA/EE/S/PW/WO/769/89-90 dt:09-01-90.
1129
Construction of masonary drain for seepage water at rear side of
madivala tank bund in sy.no. 67 of madivala village under BTM
scheme ch. 50 to 100 mts
Reparis & improvements to roads, removing silt in drain in sy.no.
57/2, 3, 4, of Taverekerevillage in F/O Mental Hospital HBCS in
BTM layout
Providing re-chipcarpetting to the bad asphalted surface in Sarakki
VI phase 16th cross, 35th, & 35th `A` main rd
BDA/EE/S/PW/WO/766/89-90 dt:09-01-90.
Filling the corner sites in Dollar scheme madivala in BTM I stage
site No. 47, 91/A, 66 & 80
BDA/EE/S/PW/WO/763/89-90 dt:09-01-90.
1130
1131
1132
BDA/EE/S/PW/WO/848/89-90 dt:09-01-90.
BDA/EE/S/PW/WO/754/89-90 dt:09-01-90.
1133
Providing chipcarpetting to metalled portion of 40 wide 5th cross
road in BSK III stage III phase, V block
BDA/EE/S/PW/WO/60/89-90 dt:10-04-89.
1134
Providing chipcarpetting to the metalled surface of 6th cross and
2nd `B` main road in BSK, III stage, III phase, V block
BDA/EE/S/PW/WO/61/89-90 dt:10-04-89.
1135
Rising the road level of 12th main road of muneswara block from
50' road in BSK III stage
BDA/EE/S/PW/WO/59/89-90 dt:10-04-89.
1136
Providign Barbed Wire Fencing to CA site No. 5, in
Halagevaderahalli, in favour of BEML Limited
BDA/EE/S/PW/WO/57/89-90 dt:10-04-89.
1137
Levelling and forming of play Ground in CA Site No. 19, Sarakki II
phase, II reach
Providing Barbed wire fencing to CA site in mera naik private
layout Banashanakari III stage
BDA/EE/S/PW/WO/70/89-90 dt:10-04-89.
Clearing an removing silt from 26th and 25th main roads under
BTM II stage I phase
Levelling the corner site No. 203, 204, 165, 166, 78, 79, 66, 90, 91,
121, 106, 107, 231, 232, proposed for auction in Banashankari III
stage III phase, VI block
Formation of road in sy.no. 122 of kathriguppa Banashankari III
stage
Formation of corner sites Nos. 276, 277, 152, 283, 270, 139, 164,
123, 138, 165 and 182 of channammanakere atchcut layout, BSK,
III stage, Banagalore.
Cleaning and removing silt from 27th 28th main road under BTM II
stage, I phase,
Rechipcarpetting to the bad asphalted surface with depression
filling for 100' Ring road in Sarakki Layout, chainage 2050 to 2150
mtrs.
Levelling the CA site in sy.no. 77 of madivala, under BTM layout
(EWS)
Formation of site by levelling and filling for EWS site in sy.no. 79
and 80 of madivala, under BTM II stage
BDA/EE/S/PW/WO/69/89-90 dt:10-04-89.
Providing re-chipcarpetting to the bad asphalted surface with
dcpressiong filling for 100' ring road, in Sarakki layout, ch. 1900 to
2050 mtrs
Levelling and forming of play Ground in CA Site No. 19, Sarakki II
phase, II reach.
Levelling and providing benches to play ground at Banashankari III
stage, III phase V block
BDA/EE/S/PW/WO/84/89-90 dt:22-04-89.
1138
1139
1140
1141
1142
1143
1144
1145
1146
1147
1148
1149
BDA/EE/S/PW/WO/66/89-90 dt:10-04-89.
BDA/EE/S/PW/WO/65/89-90 dt:12-04-89.
BDA/EE/S/PW/WO/15/89-90 dt:03-04-89.
BDA/EE/S/PW/WO/64/89-90 dt:12-04-89.
BDA/EE/S/PW/WO/83/89-90 dt:12-04-89.
BDA/EE/S/PW/WO/75/89-90 dt:22-04-89.
BDA/EE/S/PW/WO/82/89-90 dt:22-04-89.
BDA/EE/S/PW/WO/81/89-90 dt:22-04-89.
BDA/EE/S/PW/WO/74/89-90 dt:22-04-89.
BDA/EE/S/PW/WO/135/89-90 dt:29-04-89.
1150
1151
1152
Levelling and forming of ply ground in CA site No 19, sarakki II
phase, III reach.
Jungle clearance, Earth filling and levelling the auction site Nos.
29, 75, 76, 524, 525, 515, 516, 176 and 48 in Sarakki IV phase
BDA/EE/S/PW/WO/90/89-90 dt:02-05-89.
BDA/EE/S/PW/WO/96/89-90 dt:12-05-89.
Halla filling in sy.no. 108 (part) and 120 of Hosakerehalli, in BSK III
stage, (Corner sites)
Levelling the corner sites of East of Kathariguppa layout in BSK III
stage IV phase (site Nos. 200A, 191, 190, 17A, 16A, 180, 33A,
70A, 71A, 123A)
Sinking of 150MM dia borewell and fixing hand punp at
Banashankari V stage (2 Nos.)
Levelling of shop sites in Avalahalli Layout at Banashankari III
stage
Construction of storm water Drain in Dollar Scheme Layout at
Sarakki IV phase, Chainage 590 to 608 Mtrs.
BDA/EE/S/PW/WO/98/89-90 dt:20-05-89.
1157
Construction of storm water Drain in Dollar Scheme Layout at
Sarakki IV phase, Chainage 446 to 464 Mtrs.
BDA/EE/S/PW/WO/114/89-90 dt:06-06-89.
1158
Construction of storm water Drain in Dollar Scheme Layout at
Sarakki IV phase, Chainage 626 to 644 Mtrs.
BDA/EE/S/PW/WO/111/89-90 dt:06-06-89.
1159
Formation of layout in sy.no. 134/1 and 135/1, 2 of kathriguppa in
Banashankari III stage, Part-I `D` culverts 3 to 9
BDA/EE/S/PW/WO/117/89-90 dt:06-06-89.
1160
Construction of Culvert at the junction of 4th cross and 5th main
7th main and 8th main in Dollar scheme layout at Sarakki IV phase
BDA/EE/S/PW/WO/121/89-90 dt:09-06-89.
1161
Construction of storm water Drain in Dollar Scheme Layout at
Sarakki IV phase, Chainage 266 to 285 Mtrs.
BDA/EE/S/PW/WO/125/89-90 dt:09-06-89.
1162
Construction of storm water Drain in Dollar Scheme Layout at
Sarakki IV phase, Chainage 247 to 266 Mtrs.
BDA/EE/S/PW/WO/127/89-90 dt:09-06-89.
1163
Construction of storm water Drain in Dollar Scheme Layout at
Sarakki IV phase, Chainage 285 to 304 Mtrs.
BDA/EE/S/PW/WO/122/89-90 dt:09-06-89.
1164
Construction of storm water Drain in Dollar Scheme Layout at
Sarakki IV phase, Chainage 304 to 320 Mtrs.
BDA/EE/S/PW/WO/123/89-90 dt:09-06-89.
1165
Construction of storm water Drain in Dollar Scheme Layout at
Sarakki IV phase, Chainage 320 to 338 Mtrs.
BDA/EE/S/PW/WO/124/89-90 dt:09-06-89.
1166
Construction of storm water Drain in Dollar Scheme Layout at
Sarakki IV phase, Chainage 228 to 247 Mtrs.
BDA/EE/S/PW/WO/126/89-90 dt:09-06-89.
1153
1154
1155
1156
BDA/EE/S/PW/WO/101/89-90 dt:23-05-89.
BDA/EE/S/PW/WO/115/89-90 dt:05-06-89.
BDA/EE/S/PW/WO/113/89-90 dt:05-06-89.
BDA/EE/S/PW/WO/112/89-90 dt:06-06-89.
1167
Providing layout boards and missing name boards in Ideal home,
HBCS layout.
Maintenance of private layout in N.S.Palya in F/O KSRTC
employees co-operative society ltd.
BDA/EE/S/PW/WO/396/89-90 dt:24-08-89.
Formation and repairs to road and drains in sy.no. 17, 20 of
Gavipuram 6th cross, connecting Muneswara block, in BSK III
stage
Formation of missing link road in sy.no. 5/1 of Gavipura BSK, III
stage, II block part-B-P and Q roads
BDA/EE/S/PW/WO/865/89-90 dt:22-01-90.
1171
Repairs to roads and drains in between kalidasa layout and Timber
yard layout at BSK III stage
BDA/EE/S/PW/WO/844/89-90 dt:22-01-90.
1172
Formation of `F` road (II main) in sy.no. 108 (part) and 120 of
Hosakerehalli (pro-tective work) in BSK, III stage- part `A`
BDA/EE/S/PW/WO/869/89-90 dt:22-01-90.
1173
Repairs to road ditch at 40' road in sy.no. 89 to 91 & 94 of
Hosakerehally at BSK III stage
Re-chipcarpetting to roads in East of kathriguppa at BSK III stage
IV phase
Protection of layout formed in sy.no. 94 & 95 of Hosakerehally in
8th & 9th main road in BSK III stage
BDA/EE/S/PW/WO/850/89-90 dt:22-01-90.
1176
Formation of missing link road at Ittamadu layout BSK III stage
BDA/EE/S/PW/WO/826/89-90 dt:22-01-90.
1177
Formation of missing link road in sy.no. 5/1 of Gavipura BSK, III
stage, II block part-A, H, J, L roads.
BDA/EE/S/PW/WO/879/89-90 dt:22-01-90.
1178
Re-chipcareptting the bad patches of 80' road from SBM colony to
100' ring road in BSK III stage ch 540 to 1065 mts
BDA/EE/S/PW/WO/846/89-90 dt:22-01-90.
1179
Construction of SWD by converting the existing retaining wall for
giving approaches to site nos. 1 to 5 in sy.no. 109 of kathariguppa
village, BSK, III stage chainage 0 to 36 mtrs
Protection of layout formed in sy.no. 94 & 95 of Hosakerehally in
7th main road in BSK III stage
BDA/EE/S/PW/WO/870/89-90 dt:22-01-90.
1168
1169
1170
1174
1175
1180
1181
1182
1183
Construction of 1m wide lead off drain in channamanakere atchkut
layout at 4th cross road to join SWD in BSK III stage chainage 0 to
70 mtrs
Re-chipcarpetting the damaged portion of roads in sri
siddivinayaka HBCS layout in Banashankari III stage
Repairs to road cutting & re-chipcarpetting to bad surface due to
flood damage in 1st, 5th main and 9th cross road of avalahalli
layout BSK III stage
BDA/EE/S/PW/WO/592/89-90 dt:18-10-89.
BDA/EE/S/PW/WO/820/89-90 dt:22-01-90.
BDA/EE/S/PW/WO/827/89-90 dt:22-01-90.
BDA/EE/S/PW/WO/904/89-90 dt:22-01-90.
BDA/EE/S/PW/WO/818/89-90 dt:22-01-90.
BDA/EE/S/PW/WO/855/89-90 dt:22-01-90.
BDA/EE/S/PW/WO/899/89-90 dt:23-01-90.
BDA/EE/S/PW/WO/898/89-90 dt:23-01-90.
1184
Providing Bus bay in Avalahalli layout in BSK III stage
BDA/EE/S/PW/WO/897/89-90 dt:23-01-90.
1185
Construction of lear of brain in sy.no. 94 & 95 of Hosakarehallli
village ch 135 to 175 mtrs in BSK III stage
BDA/EE/S/PW/WO/889/89-90 dt:23-01-90.
1186
Re-chipcarpettin the damaged portion of 40' road connecting SBE
colony 80' road and kathariguppa 80' road in BSK, III stage, III
phase, I to V block
Repairs to road cutting and rechipcatpetting to bad surfaces due to
flood damaged in pipelinge road and Dobhighat road in BSK III
stage
Providign missing side drains in pipe line I and II Block, and CD
works wherever necessary in Banashankari III stage
BDA/EE/S/PW/WO/896/89-90 dt:23-01-90.
Construction of storm water Drain by converting the existing
retaining wall for giving approaches to site Nos. 1 to 5 in sy.no. 109
of Kathariguppa village, Banashankari III stage - chainge 36 to 66
Mtrs
Repairs to road & drains & removing silt in 80' road between 4th,
6th & 7th block of BSK II phase III stage
BDA/EE/S/PW/WO/605/89-90 dt:23-01-90.
1191
Repairs to roads & drains and removel of silt in 80' road from SBM
colony to 100' ring road in BSK III stage
BDA/EE/S/PW/WO/894/89-90 dt:23-01-90.
1192
Re- Chipcarpetting the damaged portion of roads in BSK III stage
III Phase I block
Construction of lead of drain at sy.no. 94 & 95 of hosekerehalli
village chinage 100 to 135 mts
BDA/EE/S/PW/WO/888/89-90 dt:23-01-90.
Formation of road and improvements to existing drain in bsk III
stage III phase V block
Formation of `F` road (II main) in sy.no. 108 (part) and 120 of
Hosakerehalli (pro-tective work) in BSK, III stage- part `B`
BDA/EE/S/PW/WO/890/89-90 dt:23-01-90.
1187
1188
1189
1190
1193
1194
1195
BDA/EE/S/PW/WO/895/89-90 dt:23-01-90.
BDA/EE/S/PW/WO/906/89-90 dt:23-01-90.
BDA/EE/S/PW/WO/902/89-90 dt:23-01-90.
BDA/EE/S/PW/WO/892/89-90 dt:23-01-90.
BDA/EE/S/PW/WO/901/89-90 dt:23-01-90.
1196
Formation of 5th cross road in BSK III stage III phase V block
BDA/EE/S/PW/WO/891/89-90 dt:24-01-90.
1197
Formation of Residential Sites in sy.no. 94 and 95 of
Hosakerehalli, BSK, III stage
Construction of 1. oom vent ss masonry drain by the side of layout
formed in sy.no. 108 (part) and 120 of HOsakerehalli and sy.no. 7
of Ittamadu in BSK, III stage, chainage 325 mtrs, to 390 mtrs
BDA/EE/S/PW/WO/932/89-90 dt:24-01-90.
1198
1199
Levelling the corner sites in sy.no. 95, 96, 121 and 122 of
Hosakerehalli BSK, III stage, site Nos, 1155, 1173 to 1178, 1178
and 1179, 1181 to 1183
BDA/EE/S/PW/WO/825/89-90 dt:27-01-90.
BDA/EE/S/PW/WO/903/89-90 dt:27-01-90.
1200
Providing providing protection wall (Balance portion) on 100' Ring
Road in sy.no. 74/2 of madivala in BTM II stage I phase Northern
side chainage 700 to 770 mtrs
Repairs to roads and side drains on shore road from 10th to 12th
cross in BTM II stage I phase
BDA/EE/S/PW/WO/900/89-90 dt:29-01-90.
1202
Construction of culvert and BS Slab drain in EWS Area in sy.no.
74/2 of madivala in BTM II stage I phase
BDA/EE/S/PW/WO/908/89-90 dt:29-01-90.
1203
Providing protection wall (Balance portion) on 100' ring road in
sy.no. 74/2 of madivala in BTM II stage I phase, Northern side
chainage 630 to 700 mtrs
Providing protection wall (Balance portion) on 100' ring road in
sy.no. 74/2 of madivala in BTM II stage I phase, Northern side
chainage 70 mtrs
Repairs to Flood Damaged portaion in SWD Leading from sy.no.
134/2, 121 and 122 of x kathariguppa in CT atchkut area BSK 3rd
Stage
Construction of balance length of retaining wall and maintenance
of roads site No 1258 to 1270 in K S Layout II stage
BDA/EE/S/PW/WO/917/89-90 dt:29-01-90.
1201
1204
1205
1206
BDA/EE/S/PW/WO/909/89-90 dt:29-01-90.
BDA/EE/S/PW/WO/916/89-90 dt:29-01-90.
BDA/EE/S/PW/WO/925/89-90 dt:29-01-90.
BDA/EE/S/PW/WO/922/89-90 dt:29-01-90.
1207
Maintenance of roads and drains (site No. 2511 to 4068) of
Kumaraswamy layout II stage (southern side of SWD)
BDA/EE/S/PW/WO/914/89-90 dt:29-01-90.
1208
Providing retaining wall in sy.no. 76 of madivala BTM II stage I
phase
Removing and conveying silt and improvements to layout in sy no.
54 of N s palya in BTM II stage I phase
BDA/EE/S/PW/WO/915/89-90 dt:29-01-90.
1210
Repairs to roads damaged due to recent rain in sy.no. 56, 57 and
172 of Bilakanahalli (Dollar shceme) BTM II stage I phase
BDA/EE/S/PW/WO/913/89-90 dt:29-01-90.
1211
Construction of masonary protection wall in sy.no. 2 to 10 of
madivala village under BTM scheme ch 180 to 210 mts
BDA/EE/S/PW/WO/927/89-90 dt:29-01-90.
1212
Repairs to roads and side drains in EWS area in sy.no. 77/2 in
BTM II stage, I phase
Formation and improvements to CA site in sy.no. 87/2 of madivala
in BTM II stage I phase
BDA/EE/S/PW/WO/923/89-90 dt:29-01-90.
Repairs to 100' road in Bilakahally Dollar scheme in BTM II stage I
phase
Construction of culverts in sy.no. 12 & 19/1 of NS Palya in BTM II
stage I phase
BDA/EE/S/PW/WO/911/89-90 dt:29-01-90.
1209
1213
1214
1215
BDA/EE/S/PW/WO/985/89-90 dt:29-01-90.
BDA/EE/S/PW/WO/924/89-90 dt:29-01-90.
BDA/EE/S/PW/WO/912/89-90 dt:29-01-90.
1216
Repairs to roads damaged due to road cuttings & recent rains in
EWS layout from 16th to 25th main in BTM II stage I phase
BDA/EE/S/PW/WO/918/89-90 dt:30-01-90.
1217
Construction of culverts in Sy. No. 83, of Madivala in BTM II Stage
I Phase
Repairs to road cuttings & Re-chipcarpetting to bad surface due to
flood damage in 2nd 3rd & 4th main sy.no. 3 & 69 of Gavipura BSK
III stage
Construction of SSM protective wall along 9th cross road in
Avalahalli l/o, BSK III stage (Eastern side)- Ch: 280m to 340 mts.
BDA/EE/S/PW/WO/910/89-90 dt:31-01-90.
1218
1219
BDA/EE/S/PW/WO/919/89-90 dt:01-02-90.
BDA/EE/S/PW/WO/964/89-90 dt:19-02-90.
1220
Construction of SSM protective wall along 9th cross road in
Avalahalli l/o, BSK III stage (Eastern side)- Ch: 340m to 400 mts.
BDA/EE/S/PW/WO/970/89-90 dt:19-02-90.
1221
Construction of protective wall fot the l/o in Sy.No.17, 20 and 21 of
Gavipura Raghavendra block, BSK III stage-Ch:780m to 840mts.
BDA/EE/S/PW/WO/971/89-90 dt:19-02-90.
1222
Construction of protective wall fot the l/o in Sy.No.17, 20 and 21 of
Gavipura Raghavendra block, BSK III stage-Ch: 540m to 600mts.
BDA/EE/S/PW/WO/972/89-90 dt:19-02-90.
1223
Construction of protective wall fot the l/o in Sy.No.17, 20 and 21 of
Gavipura Raghavendra block, BSK III stage-Ch: 600m to 640mts.
BDA/EE/S/PW/WO/974/89-90 dt:19-02-90.
1224
Construction of protective wall fot the l/o in Sy.No.17, 20 and 21 of
Gavipura Raghavendra block, BSK III stage-Ch: 660m to 720mts.
BDA/EE/S/PW/WO/975/89-90 dt:19-02-90.
1225
Construction of protective wall fot the l/o in Sy.No.17, 20 and 21 of
Gavipura Raghavendra block, BSK III stage-Ch:720mts to 780mts.
BDA/EE/S/PW/WO/976/89-90 dt:19-02-90.
1226
Construction of SSM protective wall along 9th cross road in
Avalahalli l/o, BSK III stage (Eastern side)- Ch: 400m to 460 mts.
BDA/EE/S/PW/WO/979/89-90 dt:19-02-90.
1227
Formation of l/o formed in Sy.No.94 & 95 of Hosakerehalli in 6th
main road in BSK III stage.
BDA/EE/S/PW/WO/981/89-90 dt:19-02-90.
1228
Construction of SSM drain in BSK III stage, III phase, V block, III
main road.
Providing rechipcarpetting to bad portion of roads due to road
cuttings and recent rains from 17th to 20th main in BTM II stage, I
phase.
Removing & conveying weeds and silt in EWS l/o in Sy.No.74/2 of
Madivala in BTM II stage, I Phase.
BDA/EE/S/PW/WO/986/89-90 dt:19-02-90.
1229
1230
BDA/EE/S/PW/WO/987/89-90 dt:19-02-90.
BDA/EE/S/PW/WO/988/89-90 dt:19-02-90.
1231
1232
1233
1234
1235
1236
1237
1238
1239
1240
Urgent repairs to bad reaches of 100' ring road between
Bannerghatta road and Hosur road by providing asphalting
concrete in Souhern side of BTM II stage, I phase, Ch: 1620m to
1708mts.
Urgent repairs to bad reaches of 100' ring road between
Bannerghatta road and Hosur road by providing asphalting
concrete in Northern side of BTM II stage, I phase, Ch: 1972m to
2060mts.
Urgent repairs to bad reaches of 100' ring road between
Bannerghatta road and Hosur road by providing asphalting
concrete in Northern side of BTM II stage, I phase, Ch: 1620m to
1708mts.
Urgent repairs to bad reaches of 100' ring road between
Bannerghatta road and Hosur road by providing asphalting
concrete in Southern side of BTM II stage, I phase, Ch: 1708m to
1796mts.
Urgent repairs to bad reaches of 100' ring road between
Bannerghatta road and Hosur road by providing asphalting
concrete in Northern side of BTM II stage, I phase, Ch: 1972m to
2060mts.
Urgent repairs to bad reaches of 100' ring road between
Bannerghatta road and Hosur road by providing asphalting
concrete in Souhern side of BTM II stage, I phase, Ch: 2148m to
2236mts.
Urgent repairs to bad reaches of 100' ring road between
Bannerghatta road and Hosur road by providing asphalting
concrete in Northern side of BTM II stage, I phase, Ch: 2324m to
2412mts.
Urgent repairs to bad reaches of 100' ring road between
Bannerghatta road and Hosur road by providing asphalting
concrete in Northern side of BTM II stage, I phase, Ch: 2236m to
2324mts.
Urgent repairs to bad reaches of 100' ring road between
Bannerghatta road and Hosur road by providing asphalting
concrete in Northern side of BTM II stage, I phase, Ch: 2412m to
2500 mts.
Urgent repairs to bad reaches of 100' ring road between
Bannerghatta road and Hosur road by providing asphalting
concrete in Northern side of BTM II stage, I phase, Ch: 360m to
480mts.
BDA/EE/S/PW/WO/992/89-90 dt:19-02-90.
BDA/EE/S/PW/WO/994/89-90 dt:19-02-90.
BDA/EE/S/PW/WO/992/89-90 dt:19-02-90.
BDA/EE/S/PW/WO/993/89-90 dt:19-02-90.
BDA/EE/S/PW/WO/994/89-90 dt:19-02-90.
BDA/EE/S/PW/WO/995/89-90 dt:19-02-90.
BDA/EE/S/PW/WO/1000/89-90 dt:19-02-90.
BDA/EE/S/PW/WO/1001/89-90 dt:19-02-90.
BDA/EE/S/PW/WO/1002/89-90 dt:19-02-90.
BDA/EE/S/PW/WO/1003/89-90 dt:19-02-90.
1241
1242
1243
1244
1245
1246
1247
1248
1249
1250
Urgent repairs to bad reaches of 100' ring road between
Bannerghatta road and Hosur road by providing asphalting
concrete in Northern side of BTM II stage, I phase, Ch: 360m to
480mts.
Urgent repairs to bad reaches of 100' ring road between
Bannerghatta road and Hosur road by providing asphalting
concrete in Northern side of BTM II stage, I phase, Ch: 240m to
360mts.
Urgent repairs to bad reaches of 100' ring road between
Bannerghatta road and Hosur road by providing asphalting
concrete in Northern side of BTM II stage, I phase, Ch: 480m to
600mts.
Urgent repairs to bad reaches of 100' ring road between
Bannerghatta road and Hosur road by providing asphalting
concrete in Northern side of BTM II stage, I phase, Ch: 720m to
840mts.
Urgent repairs to bad reaches of 100' ring road between
Bannerghatta road and Hosur road by providing asphalting
concrete in Southern side of BTM II stage, I phase, Ch: 2324m to
2412mts
Urgent repairs to bad reaches of 100' ring road between
Bannerghatta road and Hosur road by providing asphalting
concrete in Northern side of BTM II stage, I phase, Ch: 1796m to
1884mts
Urgent repairs to bad reaches of 100' ring road between
Bannerghatta road and Hosur road by providing asphalting
concrete in Northern side of BTM II stage, I phase, Ch: 1796m
to1884mts.
Urgent repairs to bad reaches of 100' ring road between
Bannerghatta road and Hosur road by providing asphalting
concrete in Northern side of BTM II stage, I phase, Ch: 240 to
360mts.
Urgent repairs to bad reaches of 100' ring road between
Bannerghatta road and Hosur road by providing asphalting
concrete in Souhern side of BTM II stage, I phase, Ch: 720 to
840mts.
Urgent repairs to bad reaches of 100' ring road between
Bannerghatta road and Hosur road by providing asphalting
concrete in Northern side of BTM II stage, I phase, Ch: 960m to
1080mts.
BDA/EE/S/PW/WO/1003/89-90 dt:19-02-90.
BDA/EE/S/PW/WO/1006/89-90 dt:19-02-90.
BDA/EE/S/PW/WO/1007/89-90 dt:19-02-90.
BDA/EE/S/PW/WO/1008/89-90 dt:19-02-90.
BDA/EE/S/PW/WO/1011/89-90 dt:19-02-90.
BDA/EE/S/PW/WO/1012/89-90 dt:19-02-90.
BDA/EE/S/PW/WO/1012/89-90 dt:19-02-90.
BDA/EE/S/PW/WO/1013/89-90 dt:19-02-90.
BDA/EE/S/PW/WO/1014/89-90 dt:19-02-90.
BDA/EE/S/PW/WO/1015/89-90 dt:19-02-90.
1251
1252
1253
1254
1255
1256
1257
1258
1259
1260
Urgent repairs to bad reaches of 100' ring road between
Bannerghatta road and Hosur road by providing asphalting
concrete in Southern side of BTM II stage, I phase, Ch: 960m to
1080mts.
Urgent repairs to bad reaches of 100' ring road between
Bannerghatta road and Hosur road by providing asphalting
concrete in Northern side of BTM II stage, I phase, Ch: 0m to
120mts.
Urgent repairs to bad reaches of 100' ring road between
Bannerghatta road and Hosur road by providing asphalting
concrete in Souhern side of BTM II stage, I phase, Ch: 2236m to
2324mts.
Urgent repairs to bad reaches of 100' ring road between
Bannerghatta road and Hosur road by providing asphalting
concrete in Northern side of BTM II stage, I phase, Ch: 600m to
720mts
Urgent repairs to bad reaches of 100' ring road between
Bannerghatta road and Hosur road by providing asphalting
concrete in Southern side of BTM II stage, I phase, Ch: 600m to
720mts
Urgent repairs to bad reaches of 100' ring road between
Bannerghatta road and Hosur road by providing asphalting
concrete in Southern side of BTM II stage, I phase, Ch: 120m to
240mts
Urgent repairs to bad reaches of 100' ring road between
Bannerghatta road and Hosur road by providing asphalting
concrete in Southern side of BTM II stage, I phase, Ch: 120m to
240mts
Urgent repairs to bad reaches of 100' ring road between
Bannerghatta road and Hosur road by providing asphalting
concrete in Northern side of BTM II stage, I phase, Ch: 1884m
to1972mts
Urgent repairs to bad reaches of 100' ring road between
Bannerghatta road and Hosur road by providing asphalting
concrete in Southern side of BTM II stage, I phase, Ch: 1884m to
1972 mts.
Urgent repairs to bad reaches of 100' ring road between
Bannerghatta road and Hosur road by providing asphalting
concrete in Southern side of BTM II stage, I phase, Ch: 1708m to
1796 mts.
BDA/EE/S/PW/WO/1015/89-90 dt:19-02-90.
BDA/EE/S/PW/WO/1016/89-90 dt:19-02-90.
BDA/EE/S/PW/WO/1018/89-90 dt:19-02-90.
BDA/EE/S/PW/WO/1018/89-90 dt:19-02-90.
BDA/EE/S/PW/WO/1019/89-90 dt:19-02-90.
BDA/EE/S/PW/WO/1019/89-90 dt:19-02-90.
BDA/EE/S/PW/WO/1020/89-90 dt:19-02-90.
BDA/EE/S/PW/WO/1020/89-90 dt:19-02-90.
BDA/EE/S/PW/WO/1021/89-90 dt:19-02-90.
1261
1262
1263
1264
1265
1266
1267
1268
1269
1270
1271
Urgent repairs to bad reaches of 100' ring road between
Bannerghatta road and Hosur road by providing asphalting
concrete in Southern side of BTM II stage, I phase, Ch: 2412m to
2500 mts.
Urgent repairs to bad reaches of 100' ring road between
Bannerghatta road and Hosur road by providing asphalting
concrete in Southern side of BTM II stage, I phase, Ch:840m to
960mts.
Urgent repairs to bad reaches of 100' ring road between
Bannerghatta road and Hosur road by providing asphalting
concrete in Northern side of BTM II stage, I phase, Ch:840m to
960mts.
Urgent repairs to bad reaches of 100' ring road between
Bannerghatta road and Hosur road by providing asphalting
concrete in Southern side of BTM II stage, I phase, Ch:2060m to
2148mts.
Urgent repairs to bad reaches of 100' ring road between
Bannerghatta road and Hosur road by providing asphalting
concrete in Southern side of BTM II stage, I phase, Ch:2060m to
2148mts.
Urgent repairs to bad reaches of 100' ring road between
Bannerghatta road and Hosur road by providing asphalting
concrete in Southern side of BTM II stage, I phase, Ch:840m
to600mts.
Urgent repairs to bad reaches of 100' ring road between
Bannerghatta road and Hosur road by providing asphalting
concrete in Southern side of BTM II stage, I phase, Ch:0 to 120
mts.
Construction of seepage drain in KAS and bank officers layout in
madivala village by continuing the existing drain to lead upto Hosur
Road SWD chainage 0 to 75 mtrs
Urgent repairs to bad reaches of 100' ring road between
Bannerghatta road and Hosur road by providing asphalting
concrete in Southern side of BTM II stage, I phase, Ch:2148 to
2236 mts.
Repairs to flood damaged 16th and 17th cross road at sarakki VI
phase( under flood damage)
Cleaning the silt in roads and side drains in sarakki II phase in
between cross roads from 14th A to 20th main (12th A to 14 th
Cross Roads)
BDA/EE/S/PW/WO/1022/89-90 dt:19-02-90.
BDA/EE/S/PW/WO/1023/89-90 dt:19-02-90.
BDA/EE/S/PW/WO/1023/89-90 dt:19-02-90.
BDA/EE/S/PW/WO/1024/89-90 dt:19-02-90.
BDA/EE/S/PW/WO/1024/89-90 dt:19-02-90.
BDA/EE/S/PW/WO/1025/89-90 dt:19-02-90.
BDA/EE/S/PW/WO/1026/89-90 dt:19-02-90.
BDA/EE/S/PW/WO/1033/89-90 dt:19-02-90.
BDA/EE/S/PW/WO/1027/89-90 dt:19-02-90.
No.BDA/EE(S)/AE/PW/WO/553/89-90
No.BDA/EE(S)/AE/PW/WO/552/89-90
1272
1273
Site Filling of layout in sy.No. 19 of Sarakki under Dollar scheme
layout IV phase sarakki layout (Corner site nos. 141,160,159,and
142)
Earth filling to C.A.site by the left side of S.W.D., in Sy.No.19 of
Dollar Scheme-Sarakki layout.
1274
Earth filling to C.A.site by the Right side of S.W.D., in Sy.No.19 of
Dollar Scheme-Sarakki layout.
1275
Site Filling of layout in sy.No. 19 of Sarakki under Dollar scheme
layout IV phase sarakki layout (Corner site nos.398,399,362 & 361
1276
Site Filling of layout in sy.No. 19 of Sarakki under Dollar scheme
layout IV phase sarakki layout (Corner site No.150,151,270 and
285)
Site Filling of layout in sy.No. 19 of Sarakki under Dollar scheme
layout IV phase sarakki layout (Corner site No.277,278,329,& 330)
1277
1278
Site Filling of layout in sy.No. 19 of Sarakki under Dollar scheme
layout IV phase sarakki layout (Corner site Nos. 66,67,86,&87)
1279
Site Filling of layout in sy.No. 19 of Sarakki under Dollar scheme
layout IV phase sarakki layout (Corner site Nos.97,132,133,& 168)
1280
Filling and levelling corner site Nos.208,199,152,135,116 and 101
and intermiedite site No.206,207,201,200,149,to 151,136,to
138,113 to 115,102,104 between 5th to 13th cross in Dollar
scheme,at B.T.M., II stage, I phase
Cleaning the silt in roads and side drains in sarakki II phase from
8th to 14th main and in between cross roads 11th to 14 th Cross
Roads)
Filling of corner site Nos. 54 and 59 intermediate site No.55 to 58
on Sy.no.172 of Bilakanahalli, Dollar scheme, B.T.M., Ii stage,I
phase
Site filling of layout in SyNo.19 of Sarakki under Dollar scheme IV
Phase, sarakki layout, (Corner Site Nos. 269,286,260 and 295A).
1281
1282
1283
1284
Site filling of layout in SyNo.19 of Sarakki under Dollar scheme IV
Phase, sarakki layout, (Corner Site Nos.321,338,310 and 3490
1285
Formation of Road ( EWS Balance portion) in SyNo. 77 at 15 the
main BTM II Stage I phase.
1286
Construction of portion wall in SyNo. 74 of Madivala (Eastern side)
at slum in BTM., II stage, I phase.
No.BDA/EE(S)/AE/PW/WO/563/89-90 Dt:6.10.89
No.BDA/EE(S)/AE/PW/WO/561/89-90 Dt:6.10.89
No.BDA/EE(S)/AE/PW/WO/JE/562/89-90
Dt:6.10.89
No.BDA/EE(S)/AE/PW/WO/JE/556/89-90
Dt:6.10.89
No.BDA/EE(S)/AE/PW/WO/JE/560/89-90
Dt:6.10.89
No.BDA/EE(S)/PW/WO/JE/559/89-90 Dt:6.10.89
No.BDA/EE(S)/PW/WO/JE/558/89-90 Dt:6.10.89
No.BDA/EE(S)/PW/WO/JE/557/89-90 Dt:6.10.89
No.BDA/EE(S)/PW/WO/JE/550/89-90 Dt.12.10.89
No.BDA/EE(S)/PW/WO/JE/551/89-90 Dt.12.10.89
No.BDA/EE(S)/PW/WO/JE/554/89-90 Dt.12.10.89
No.BDA/EE(S)/PW/WO/JE/601/89-90 Dt.16.10.89
No.BDA/EE(S)/PW/WO/JE/602/89-90 Dt.16.10.89
No.BDA/EE(S)/AE/PW/WO/572/89-90
Dt.16.10.89
No.BDA/EE(S)/PW/WO/JE/611/89-90 Dt.18.10.89
1287
Levelling the corner site No.161&162 in SyNo.172 of Bilkanahalli
Dollar scheme in BTM II stage I phase.
1288
Formation of layout adjoining to 18th Main road in BTM II stage I
phase (Syno.81)
Construction of Retaining wall from Ch.80 to 160 mts facing 100'
road in BTM Ii stage I phase.
1289
1290
Levelling and Filling the corner site No.23 & 45 and intermediate
site No.24 & 43 in Dollar scheme at BTM II stage I phase.
1291
Repairs to road damages due to rain and road outting in 100' ring
road from Ch. 0 to 502mts at BTM II stage I phase
1292
Construction of culvert between 16th and 26th main and 5th cross
in BTM II stage I phase culvert No. 1 to 12.
1293
Construction of Retaining wall from waste weir to 100' ring road in
BTM II stage I phase.
Formation of road (Balance portion) in SyNo.81/1 of madivala at
BTM II stage I phase.
Formation of layout in SyNo. 83/2 & 84 (part) of Madivala Village in
BTM II Stage I phase.
Formation of layout in SyNo.172/3 of Bilkanahalli in Dollar scheme
at BTM II stage I phase.
1294
1295
1296
1297
Filling the corner site No. 2435 and intermediated site No.33,36 to
38 in SyNo. 172,56 and 57 of Bilkanahalli in BTM II stage I phase.
1298
Formation of layout in SyNo.56,57 and 172 of Bilkanahalli in Dollar
scheme BTM II stage I phase
1299
Formation of layout in SyNo.172 in Dollar scheme Parallel to
bannereghatta road at BTM Ii stage I phase.
1300
Rerpairs to drain and clearning the silt in drains and cutting side
derms in BHBC layout in BTM II Stage I phase.
1301
Filling of corner site Nos. 53 and intermediate site No.51 and 52 of
SyNo.172 of Bilakanahalli Dollar scheme BTM Ii stage I phase.
1302
Formation of layouts (EWS) in SyNo.77 of Madivala in BTM II
stage I phase.
Removing silt in roads and drains at sarakki II phase, 8th, 9th main
road.
1303
No.BDA/EE(S)/AE/PW/WO/597/89-90
Dt.21.10.89
No.BDA/EE(S)/AE/PW/WO/592/89-90
Dt.21.10.89
No.BDA/EE(S)/AE/PW/WO/594/89-90
Dt.21.10.89
No.BDA/EE(S)/AE/PW/WO/566/89-90
Dt.21.10.89
No.BDA/EE(S)/AE/PW/WO/582/89-90
Dt.21.10.89
No.BDA/EE(S)/AE/PW/WO/614/89-90
Dt.21.10.89
No.BDA/EE(S)/AE/PW/WO/571/89-90
Dt.21.10.89
No.BDA/EE(S)/AE/PW/WO/610/89-90
Dt.21.10.89
No.BDA/EE(S)/AE/PW/WO/574/89-90
Dt.21.10.89
No.BDA/EE(S)/AE/PW/WO/596/89-90
Dt.21.10.89
No.BDA/EE(S)/AE/PW/WO/577/89-90
Dt.21.10.89
No.BDA/EE(S)/AE/PW/WO/586/89-90
Dt.21.10.89
No.BDA/EE(S)/AE/PW/WO/600/89-90
Dt.21.10.89
No.BDA/EE(S)/AE/PW/WO/589/89-90
Dt.21.10.89
No.BDA/EE(S)/AE/PW/WO/612/89-90
Dt.21.10.89
No.BDA/EE(S)/AE/PW/WO/568/89-90
Dt.21.10.89
No.BDA/EE(S)/AE/PW/WO/591/89-90
Dt.21.10.89
1304
Cleaning & removing silt from drains and cutting side berms from
26th to 29th main in BTM II stage I phase.
1305
repairs and rechipcarpetting to rain damaged raods in sarakki I
phase 11th A,12th,12th B,13th and 14 cross roads.
1306
repairs and rechipcarpetting to rain damaged raods in sarakki
layout Ch.150 to 460 Mts.
Repairs & Rechipcarpetting to rain damagewd roads in Sarakki II
phase 20th & 21st Main and 2nd, 5th & 6th cross road.
1307
1308
Repairs & Rechipcarpetting to rain damagewd roads in Sarakki II
phase 17th A, 18thB, 16th A Main and 2nd,2nd B cross road.
1309
Repairs & rechipcarpetting to rain damaged 80' road in sarakki
layout Ch. 1060 to 1372 Mts.
1310
Repairs & rechipcarpetting to rain damaged road in sarakki II
phase 24th Main Ch. 300 to 600 Mts.
1311
Formation of layout in SyNo. 83/4 of Madivala in BTM II stage I
phase
Construction of lead off drains in SyNo.85 of Madivala ( Balanace
portion) at BTm Ii stage I phase.
1312
1313
1314
1315
1316
1317
1318
1319
Construction of SS masonry, retaining wall in SyNo.19/1, of
Madivala village under B.T.M., scheme (Near Dollar Scheme)
chainage: 245Mtrs., to 290 Mtrs.,.
the above work has been entrusted to Sri.H.D.suresh,Contractor
on piece work system. The contractor is directed to contact the
AEE., No. 2 south sub-division, BDA and to start the work and
completed the same as per terms of agreement.
Cleaning the silt in roads side drains in sarakki in phase, 11th,
11th'A', 11th 'B' Cross roads & 25th and 26th Main Roads.
Construction of SS masonry, retaining wall in SyNo.19/1, of
Madivala village under B.T.M., scheme (Near Dollar Scheme)
chainage: 200Mtrs., to 254 Mtrs.,.
Construction of Masonary drain on northern boundary 2nd cross
road of dollar scheme layout at sarakki IV phase Ch. 450 to
525mts.
Construction of Masonary drain on northern boundary 2nd cross
road of dollar scheme layout at sarakki IV phase Ch. 525 to
600mts.
Repairs to roads and drains and removal of silt in BSK III stage
Nagendra block.
No.BDA/EE(S)/AE/PW/WO/609/89-90
Dt.21.10.89
No.BDA/EE(S)/AE/PW/WO/588/89-90
Dt.21.10.89
No.BDA/EE(S)/AE/PW/WO/587/89-90
Dt.21.10.89
No.BDA/EE(S)/AE/PW/WO/593/89-90
Dt.21.10.89
No.BDA/EE(S)/AE/PW/WO/583/89-90
Dt.21.10.89
No.BDA/EE(S)/AE/PW/WO/585/89-90
Dt.21.10.89
No.BDA/EE(S)/AE/PW/WO/584/89-90
Dt.21.10.89
No.BDA/EE(S)/AE/PW/WO/581/89-90
Dt.21.10.89
No.BDA/EE(S)/AE/PW/WO/565/89-90
Dt.21.10.89
No.BDA/EE(S)/AE/PW/WO/576/89-90
Dt.21.10.89
No.BDA/EE(S)/AE/PW/WO/580/89-90
Dt.21.10.89
No.BDA/EE(S)/AE/PW/WO/598/89-90
Dt.21.10.89
No.BDA/EE(S)/AE/PW/WO/579/89-90
Dt.21.10.89
No.BDA/EE(S)/AE/PW/WO/434/89-90 Dt.1.9.89
No.BDA/EE(S)/AE/PW/WO/446/89-90 Dt.1.9.89
No.BDA/EE(S)/AE/PW/WO/414/89-90 Dt.1.9.89
1320
1321
Repairs to the roads and drains in II block III phase BSK III stage
'part 'B'.
Desilting of drains in 5th Block, BSK III Stage., III phase, at Vth
cross to IV cross and 1st Main to V Main.
1322
Improvements to Foothpath at 100' Ring road and protection of
piped culvert at the junction of Hosur road in B.T.M., I stage.
1323
Pot holes filling patch rapairs and roads cutting filling to Sy.No. 15
of kathriguppe BSK III stage II to V cross and I,II, and V main
roads.
Providing re-chipcarpetting to 47th,71 & 72 cross roads at
Kumaraswamy layout I stage.
Pot holes filling and patch rapairs in BSK III stage layout VI to VIII
and IX main and X cross road.
1324
1325
1326
1327
Cleaning the drain silt in SyNo. 20/1B in KEB layout at BTM I stage
I phase.
Pot holes filling and patch rapairs of roads in BSK III stage 'B'
cross road and IX cross road.
1328
For sinking of 150mm dia borewell construction plat from and fixing
India mark II hand pumps at Government BSK.III stage Bangalore.
1329
Formation of road by construction retaining wall in SyNo. 45 to 50
and 53 of Govinayakanahalli Kumaraswamy layout Ch.0 to 35mtrs
1330
Formation of road by construction retaining wall in SyNo. 45 to 50
and 53 of Govinayakanahalli Kumaraswamy layout Ch.35 to
61mtrs
desilting of strom water drains along 100' ring road, at BSK II stage
Ch. 0 to 775 mts
Construction of culvert in Sy.No. 9 & 14 of Gerehalli at BSK., III
stage ( 12 Nos.)
Formation of layout in SyNo 134/1 and 135/1 & 2 of Kathriguppe,
BSK., III stage, chainage: 125 Mtrs., to 150mtrs.
1331
1332
1333
1334
Desilting of S.W.D., and clearning water way of S.W.D., near sy.No
134/2, 136,121 and 122 of kathriguppe in BSK III stage.
1335
Formation of layout in SyNo. 134/1 and 135/1&2 of kathriguppe
BSK III stage. Construction of strom water drain Ch.50 to 75 mtrs.
1336
Construction of inter connection slabl drains to main strom water
drain on either side of drains in SyNo. 9 of Gerehalli BSK III stage,
6th main road.
No.BDA/EE(S)/AE/PW/WO/432/89-90 Dt.1.9.89
No.BDA/EE(S)/AE/PW/WO/410/89-90 Dt.1.9.89
No.BDA/EE(S)/AE/PW/WO/451/89-90 Dt.5.9.89
No.BDA/EE(S)/AE/PW/WO/442/89-90 Dt.5.9.89
No.BDA/EE(S)/AE/PW/WO/450/89-90 Dt.5.9.89
No.BDA/EE(S)/AE/PW/WO/457/89-90 Dt.5.9.89
No.BDA/EE(S)/AE/PW/WO/452/89-90 Dt.5.9.89
No.BDA/EE(S)/AE/PW/WO/456/89-90 Dt.5.9.89
No.BDA/EE(S)/AE/PW/WO/460/89-90 Dt.6.9.89
No.BDA/EE(S)/AE/PW/WO/474/89-90 Dt.7.9.89
No.BDA/EE(S)/AE/PW/WO/483/89-90 Dt.7.9.89
No.BDA/EE(S)/AE/PW/WO/470/89-90 Dt.7.9.89
No.BDA/EE(S)/AE/PW/WO/471/89-90 Dt.7.9.89
No.BDA/EE(S)/AE/PW/WO/482/89-90 Dt.7.9.89
No.BDA/EE(S)/AE/PW/WO/475/89-90 Dt.7.9.89
No.BDA/EE(S)/AE/PW/WO/453/89-90 Dt.7.9.89
No.BDA/EE(S)/AE/PW/WO/469/89-90 Dt.7.9.89
1337
Providing chipcarpetting to roads in front of E.W.S. House block 'B'
in Kumaraswamy layout-II stage.
1338
Repairs to damaged portion of road by Re-chipcarpetting in
A,B,C,D and 'E' Blocks of Kumaraswamy layout II stage.
1339
desilting of SWD along 100' Ringroad desides co-operative
trainning college, BSK II stage. Chainage : 1173 to 1448 Mtrs.
1340
Construction of 4 Nos.of culverts and Masonry drains in karisandra
Village, Gramathana at BSK., II stage.
1341
Reparis to damaged portion of road by Re-chipcarpetting to roads
from site No. 1060 to 1260. In Kumaraswamy layout II stage.
1342
Repairs to damaged portion of road by Re-chipcarpetting to roads
( Right side of over Head tank) from site No.1063 to 1319 in
Kumaraswamy layout II stage.
Site filling oflayout in SyNo. 19 of sarakki under Dollar scheme IV
phase sarakki layout (corner site Nos' 123,106,114 & 115)
1343
1344
1345
1346
1347
1348
1349
1350
1351
1352
Formation of corner sites under dollar scheme layout BTM I stage
site Nos' 48 & 57.
Formation of corner sites under dollar scheme layout BTM I stage
site Nos' 60 & 71.
removing silt from strom water drain in SyNo. 34 of madivala in
BTM scheme (flood damage work) ch. 460 to 560 mts
Estimate for removing the silt from the strom water drain in SyNo.
34 of madivala in BTM scheme. Ch.340 to 460 mtrs. (under flood
damages)
Estimate for removing the silt from the strom water drain in SyNo.
34 of madivala in BTM scheme. Ch.220 to 340 mtrs. (under flood
damages)
Estimate for removing the silt from the strom water drain in SyNo.
34 of madivala in BTM scheme. Ch.100 to 220 mtrs. (under flood
damages)
Formation of corner sites under dollar scheme layout BTM I stage
site Nos' 13 &14
Providing chipcarpetting to roads in front of E.W.S. House block 'A'
in Kumaraswamy layout-II stage.
Repairs to damaged portion of road by Re-chipcarpetting to roads
( left side of over Head tank) from site No.1627 to 1698 and 3000
to 3157 in Kumaraswamy layout II stage.
No.BDA/EE(S)/AE/PW/WO/473/89-90 Dt.7.9.89
No.BDA/EE(S)/AE/PW/WO/472/89-90 Dt.7.9.89
No.BDA/EE(S)/AE/PW/WO/487/89-90 Dt.12.9.89
No.BDA/EE(S)/AE/PW/WO/486/89-90 Dt.12.9.89
No.BDA/EE(S)/AE/PW/WO/500/89-90 Dt.12.9.89
No.BDA/EE(S)/AE/PW/WO/501/89-90 Dt.12.9.89
No.BDA/EE(S)/AE/PW/WO/481/89-90 Dt.12.9.89
No.BDA/EE(S)/AE/PW/WO/480/89-90 Dt.12.9.89
No.BDA/EE(S)/AE/PW/WO/479/89-90 Dt.12.9.89
No.BDA/EE(S)/AE/PW/WO/490/89-90 Dt.12.9.89
No.BDA/EE(S)/AE/PW/WO/491/89-90 Dt.12.9.89
No.BDA/EE(S)/AE/PW/WO/489/89-90 Dt.12.9.89
No.BDA/EE(S)/AE/PW/WO/489/89-90 Dt.12.9.89
No.BDA/EE(S)/AE/PW/WO/477/89-90 Dt.12.9.89
No.BDA/EE(S)/AE/PW/WO/464/89-90 Dt.12.9.89
No.BDA/EE(S)/AE/PW/WO/466/89-90 Dt.12.9.89
1353
1354
Pot holes and roads cutting filling of internal roads of
padmanabhanagar, BSK III stage
Pot holes filling and Re-chipcarpetting of damaged road (50') in
padmanabhanagar at BSK III stage.
No.BDA/EE(S)/AE/PW/WO/462/89-90 Dt.12.9.89
No.BDA/EE(S)/AE/PW/WO/463/89-90 Dt.12.9.89
90-91
1355
Repairs such as remetalling and chipcarpetting to 18th 'B' main
road, in J.P.Nagar II phase.
1356
Urgent repairs to roads in Sy.No47/A, B & 2 and 48/5 & 6 of
Tavarekere village unser bTM scheme for 30' wide road ( 38th A
cross).
Providing l/o boards & name boards to Sy.No.47/A, 1&2 & 48/5 & 6
of Tavarekere village under BTM scheme.
BDA/EE/S/PW/WO/AE/278/90-91 dt:02-03-91
Maintenance of side drains, and removing high berms and
protection works to 100' ring road- Ch: 0 to 395 mts, in BSK III
stage.
Removing the silt in existing SWD in Sy.NO.2 to 10 and 34 of
Madivala Village under BTM I stage, Ch: 600 to 900 mts.
BDA/EE/S/PW/WO/AE/287/90-91 dt:04-03-91
1357
1358
1359
BDA/EE/S/PW/WO/AE/279/90-91 dt:27-02-91
BDA/EE/S/PW/WO/AE/292/90-91 dt:04-03-91
1360
Repairs to roads and side drains damaged due to road cutting
done by BWSSB in 7th cross in BTM II stage, I phase.
BDA/EE/S/PW/WO/AE/293/90-91 dt:04-03-91
1361
Improvements to footpath and shoulder drain on ring road fron
Bannerghatta circle to Hosur road, Ch: 1900 to 2500 mts.
BDA/EE/S/PW/WO/AE/299/90-91 dt:04-03-91
1362
Maintenance and repairs to drains in Telecom Employees HBCS
ltd, in BSK III stage.
Repairs to roads and side drains and removing silt adjacent to KEB
Office in BSK III stage.
BDA/EE/S/PW/WO/AE/300/90-91 dt:06-03-91
1364
Providing rechipcarpetting to the bad asphalted surface of 16th 'A',
22nd main, 4th & 5th cross in J.P.Nagar , II phase.
BDA/EE/S/PW/WO/AE/302/90-91 dt:06-03-91
1365
Providing rechipcarpetting to the bad asphalted surface of 17th,
17th'A', 17th 'B', 16th 'A', 25th and 26th cross in J.P.Nagar , II
phase.
Repairs to roads drains in I cross and I main road in VII block, II
phase, BSK III stage.
Providing boundary stones, numbering stones , cross boards in l/o
sy.no.47/A, 1 & 2, and 48/5 & 6 of Tavarekere village under BTM
scheme.
Formation of additional sites in K.S.l/o, formation of 25' X 40' sites.
BDA/EE/S/PW/WO/AE/303/90-91 dt:06-03-91
1363
1366
1367
1368
BDA/EE/S/PW/WO/AE/301/90-91 dt:06-09-91
BDA/EE/S/PW/WO/AE/306/90-91 dt:06-03-91
BDA/EE/S/PW/WO/AE/307/90-91 dt:27-02-91
BDA/EE/S/PW/WO/AE/308/90-91 dt:06-03-91
1369
Providing rechipcarpetting to the bad asphalted surface of 13th
cross from 8th main, J.P.Nagar, II phase.
BDA/EE/S/PW/WO/AE/310/90-91 dt:06-03-91
1370
Urgent repairs to roads damaged due to road cuttings and rain in
Sy.No.34 of Madivala village in BTM I stage, I phase
BDA/EE/S/PW/WO/AE/311/90-91 dt:06-03-91
1371
Urgent repairs to roads damaged due to road cuttings in Sy.No.34
of Madivala village in BTM I stage, I phase (Part'D')
BDA/EE/S/PW/WO/AE/312/90-91 dt:06-03-91
1372
Providing rechipcarpetting to the bad asphalted surface of 100'
road, 15th , Ch: 2200 to 2350 mts.
BDA/EE/S/PW/WO/AE/313/90-91 dt:06-03-91
1373
Construction of Deck slab culverg in Sy.No.92 & 93 of Tavarekere
Village, under BTM, I stage, I phase,
BDA/EE/S/PW/WO/AE/314/90-91 dt:06-03-91
1374
Providing protective work to road for giving approach to site no.180
to 187 in I block, III phase, BSK III stage.
BDA/EE/S/PW/WO/AE/315/90-91 dt:06-03-91
1375
Repairs to fencing of CA site in IV phase, East of Kathriguppa,
BSK III stage.
Formation of additional sites in K.S.l/o-Retaining wall- Ch: 0
to30mts.
Maintenance of roads and drains of 50' road at Nagendra block
and Muneshwara block, BSK III stage.
BDA/EE/S/PW/WO/AE/317/90-91 dt:06-03-91
1378
Providing protective work to road for giving approach to site no.180
to 187 in I block, III phase, BSK III stage.
BDA/EE/S/PW/WO/AE/320/90-91 dt:06-03-91
1379
Maintenance of side drains, shoulder drains and removing high
berms in footpath of 100' ring road from Ch: 395 to 850 mts, in
BSK III stage, III phase.
Protective retaining wall at the junction of Vidyapeeta road and I
main road in Channamanakere auchukut l/o, BSK III stage, III
phase, Vh: 58 to 1030 mts.
Formation of additional sites in K.S.l/o- Retaining wall , Ch:60 to 90
mts.
Estimate for culverts provided for improving the road from BSK
temple to Uttarahalli village under BSK V stage- Ch; 1500 to 2000
mts.
Providing rechipcarpetting to the bad asphalted surface of 12th
cross in Sarakki , II phase.
BDA/EE/S/PW/WO/AE/321/90-91 dt:06-03-91
Providing rechipcarpetting to the bad asphalted surface of 26th,
27th, 24th main, 16th & 17th cross in J.P.Nagar , II phase.
BDA/EE/S/PW/WO/AE/329/90-91 dt:06-03-91
1376
1377
1380
1381
1382
1383
1384
BDA/EE/S/PW/WO/AE/318/90-91 dt:06-03-91
BDA/EE/S/PW/WO/AE/319/90-91 dt:06-03-91
BDA/EE/S/PW/WO/AE/323/90-91 dt:11-03-91
BDA/EE/S/PW/WO/AE/324/90-91 dt:11-03-91
BDA/EE/S/PW/WO/AE/325/90-91 dt:06-03-91
BDA/EE/S/PW/WO/AE/328/90-91 dt:06-03-91
1385
Providing rechipcarpetting to the bad asphalted surface of 100'
road-Ch:2400 to 2700 mts.
BDA/EE/S/PW/WO/AE/330/90-91 dt:06-03-91
1386
Providing rechipcarpetting to the bad asphalted surface of 24th
main (after 15th cross ) J.P.Nagar, VI phase.
BDA/EE/S/PW/WO/AE/334/90-91 dt:06-03-91
1387
Providing rechipcarpetting to the bad asphalted surface of 100'
road-Ch:1000 to 1200 mts.
BDA/EE/S/PW/WO/AE/335/90-91 dt:06-03-91
1388
Providing protective work to road for giving approach to site no.218
& 219 of II block, III phase, BSK III stage.
BDA/EE/S/PW/WO/AE/338/90-91 dt:11-03-91
1389
Widening the Kanakapura road from BSK temple, Ch: 420 to
490mts.
Improvements to footpath and shoulder drain on ring road fron
Bannerghatta circle to Hosur road, Ch: 1300 to 1900 mts.
BDA/EE/S/PW/WO/AE/336/90-91 dt:14-03-91
1390
1391
BDA/EE/S/PW/WO/AE/
/90-91 dt:11-03-91
Widening the Kanakapura road from BSK temple, Ch: 700 to 770
mts.
Providing rechipcarpetting to the bad asphalted surface of 100'
road- Ch:2500 to 2650mts.
BDA/EE/S/PW/WO/AE/347/90-91 dt:06-03-91
Annual maintenance of borewell at Raghavendra block, pipe line,
block I & II, Ambhabhavani l/o and Avalahalli l/o in BSK III stage
(19 nos of hand pumps- borewells)
Maintenance of roads & drains at BSK III stage, III phase,
Channamanakere auchukut l/o(Part'B')
BDA/EE/S/PW/WO/AE/350/90-91 dt:06-03-91
1395
Providing rechipcarpetting to the bad asphalted surface of 100'
road- 15th cross,Ch:2350 to 2540mts.
BDA/EE/S/PW/WO/AE/361/90-91 dt:06-03-91
1396
Sinking 15omm dia borewell, Construction of platform and fixing
India Mark -II hand pumps at Nagendra block and Muneshwara
block, BSK III stage.
Repairs to roads damaged due to road cuttings done by BWSSB
for 8th & 9th cross road in EWS l/o in BTM II stage, I phase.
BDA/EE/S/PW/WO/AE/364/90-91 dt:12-03-91
Cleaning of Commercial Complex at BSK II stage for the period of
1991-92
Providing rechipcarpetting to the bad asphalted surface of 14th,
13th, 12th cross & 23rd main, J.P.Nagar , II pahse.
BDA/EE/S/PW/WO/AE/380/90-91 dt:04-04-91
1392
1393
1394
1397
1398
1399
1400
Providing rechipcarpetting to the bad asphalted surface of balance
length from 24th to 27th main of 17th cross in J.P.Nagar VI phase.
BDA/EE/S/PW/WO/AE/349/90-91 dt:06-03-91
BDA/EE/S/PW/WO/AE/360/90-91 dt:11-03-91
BDA/EE/S/PW/WO/AE/391/90-91 dt:04-04-91
BDA/EE/S/PW/WO/AE/387/90-91 dt:04-04-91
BDA/EE/S/PW/WO/AE/388/90-91 dt:04-04-91
1401
Providing rechipcarpetting to the bad asphalted surface of 100'
road- Ch:1600 to 1900 mts
BDA/EE/S/PW/WO/AE/389/90-91 dt:04-04-91
1402
Providing rechipcarpetting to the bad asphalted surface of 18th 'B'
main road, J.P.Nagar , II pahse.
BDA/EE/S/PW/WO/AE/390/90-91 dt:04-04-91
1403
Formation of additional sites in K.S.l/o-Retaining wall- Ch: 30 to
60mts.
Widening & improvements nto the 7th cross road of VI block, BSK
III stage, Ch:745 to 1020 mts.
BDA/EE/S/PW/WO/AE/397/90-91 dt:18-04-91
urgent repairs to 5th main road in Raghavendra block, BSK III
stage.
Providing barbed wire fencing to CA site & providing l/o boards at
RAVI HILL VIEW pvt l/o in BSK III stage.
BDA/EE/S/PW/WO/AE/401/90-91 dt:22-04-91
1407
Formation of l/o in Sy.No.54 & 56 of N.S.Palya and filling the
Irrigation well in BTM II stage, I phase.
BDA/EE/S/PW/WO/AE/403/90-91 dt:27-04-91
1408
Formation of EWS ., sites in K.S.l/o, I stage- Ch: 76m to 131 mts.
BDA/EE/S/PW/WO/AE/405/90-91 dt:17-05-91
1409
Construction of Gents & Ladies Toilet in the playground in CA site
No.19 of J.P.Nagr II phase, B'lore.
BDA/EE/S/PW/WO/AE/415/90-91 dt:27-06-91
1410
Construction of Dressing Room and Stores Romm to the play
ground in CA site No.19 of J.P.Nagar II phase, B'lore.
BDA/EE/S/PW/WO/AE/416/90-91 dt:27-06-91
1411
Rechipcarpetting the 50' road in III block, III phase, BSK III stage.
BDA/EE/S/PW/WO/AE/417/90-91 dt:24-06-91
1412
Rechipcarpetting the damaged balance portion of roads in I block,
III phase, BSK III stage.
BDA/EE/S/PW/WO/AE/418/90-91 dt:24-06-91
1413
Rechipcarpetting the 5th main in II bloc and 40', 4th cross in II & IV
block and improvements to 3rd cross road in II block , III phase,
BSK III stage.
Providing seating steps around the play ground in CA site No.19 of
J.P.Nagar II phase. B'lore, Ch:165m to 220mts.
BDA/EE/S/PW/WO/AE/419/90-91 dt:24-06-91
1404
1405
1406
1414
BDA/EE/S/PW/WO/AE/400/90-91 dt:22-04-91
BDA/EE/S/PW/WO/AE/402/90-91 dt:22-04-91
BDA/EE/S/PW/WO/AE/428/90-91 dt:01-08-91
1415
Construction of retaining wall to the rightside of sewage halla in
Gerehally at BSK III stage, Ch: 80 to 120 mts.
BDA/EE/S/PW/WO/2/90-91 dt:12-04-90
1416
Maintenance of roads and drains in Sy.No.15 of Kathriguppa at
BSK III stage.
Inter-Connecting slab drain to main SWD on eighter side of SWD
in Sy.No.8 to 14 of Gerehalli, BSK III stgae, I 'A' main road and
cross roads perpendicular to I 'A' main road.
BDA/EE/S/PW/WO/3/90-91 dt:16-04-90
1417
BDA/EE/S/PW/WO/4/90-91 dt:16-04-90
1418
1419
Inter-Connecting slab drain to main SWD on eighter side of SWD
in Sy.No.8 to 14 of Gerehalli, BSK III stgae, 4th cross, 5th cross
and cross roads.
Protection of layout formed in Sy.No.94 & 95 of Hosakerehalli in
5th main road at BSK III stage.
BDA/EE/S/PW/WO/5/90-91 dt:16-04-90
BDA/EE/S/PW/WO/6/90-91 dt:09-04-90
1420
Maintenance and improvements to missing link roads in BSK III
stage (From Vidyapeeta circle to BSK III stage.)
BDA/EE/S/PW/WO/7/90-91 dt:16-04-90
1421
Providing barbed wire fencing to CA site No.3 in favour of Ideal
Homes Co-operative HBCS ltd at Halagevaderahalli.
BDA/EE/S/PW/WO/8/90-91 dt:20-04-90
1422
Construction of culverts in Srinivasanagar I phase, BSK III stage
(10 Nos)
Interconnecting slab drain to main SWD on either side of SWD in
Sy.No.8 to 14 of Gerehally, BSK III stage, 5th 'C' cross road &
parallel to 5th 'C' cross.
Construction of retaining wall to the rightside of sewage halla in
Gerehally in BSK III stage, Ch: 120 to 160 mts.
BDA/EE/S/PW/WO/9/90-91 dt:25-04-90
1423
1424
BDA/EE/S/PW/WO/10/90-91 dt:24-04-90
BDA/EE/S/PW/WO/11/90-91 dt:24-04-90
1425
Providing concrete bed to the existing SWD in Madivala Dollar
scheme under BTM I stage, Ch: 240m to 305mts.
BDA/EE/S/PW/WO/12/90-91 dt:24-04-90
1426
Providing rechipcarpetting to roads in BSK III stage, III phase,V
Block, 1st and 2nd 'A' main roads, 1st A, B, C & 2nd cross roads.
BDA/EE/S/PW/WO/13/90-91 dt:24-04-90
1427
Providing asphalting the roads in BSK III stage, III phase, V block,
ist to 3rd main, 4th, 4th B and C cross roads.
BDA/EE/S/PW/WO/14/90-91 dt:25-04-90
1428
Construction of retaining wall and toe wall on the right bank of nala
near the bridge across 100' ring road at BSK III stage, Ch:14 to 34
mts.
Construction of retaining wall to the rightside of sewage halla in
Gerehally in BSK III stage, Ch: 0 to 40 mts.
BDA/EE/S/PW/WO/15/90-91 dt:05-05-90
1430
Providing concrete bed to the existing SWD in Madivala Dollar
scheme under BTM I stage, Ch: 305mts to 370 mts.
BDA/EE/S/PW/WO/18/90-91 dt:05-05-90
1431
Formation of corner site along 2nd cross in between site Nos. 111
to 114 in Sy.No.19 of Sarakki Dollar scheme in Sarakki IV phase.
BDA/EE/S/PW/WO/19/90-91 dt:11-05-90
1432
Formation of corner site along 2nd cross in between 7th & 8th main
in Sy.No.19 of Sarakki Dollar scheme in Sarakki IV phase.
BDA/EE/S/PW/WO/21/90-91 dt:11-05-90
1433
Formation of corner site along 2nd cross in between 3rd &5th main
in Sy.No.19 of Sarakki Dollar scheme in Sarakki IV phase.
BDA/EE/S/PW/WO/22/90-91 dt:11-05-90
1429
BDA/EE/S/PW/WO/17/90-91 dt:24-04-90
1434
Construction of masonry SWD (missing link at junction of
Bannerghatta road) & formation of layout in Sy.No.47/A, B & 48/5
& 6 of Tavarekere village under BTM scheme for missing Cg.
BDA/EE/S/PW/WO/23/90-91 dt:08-05-90
1435
Filling & cleaning the sites proposed for auction site Nos. 852,
853/A, 866, 853/B, 837, 850/A, 850/b & 851 in BTM II stage, I
phase.
Filling & cleaning the sites proposed for auction site Nos. 1508,
1509, 1510, 1511, 1534, 1535, 1536 & 1537. in BTM II stage, I
phase.
Filling the corner & intermediate sites of Dollar scheme in BTM II
stage, I phase, Bilakenahalli site Nos.740, 131, 130 & 135.
BDA/EE/S/PW/WO/24/90-91 dt:11-05-90
1436
1437
BDA/EE/S/PW/WO/25/90-91 dt:19-05-90
BDA/EE/S/PW/WO/26/90-91 dt:11-05-90
1438
Repairs to road by providing grouting and depression filling to 100'
road bithside from ch: 0 to 300 mts.
BDA/EE/S/PW/WO/27/90-91 dt:11-05-90
1439
Repairs to 100' road (North side) by providing asphalting concrete
in BTM II stage,I phase, Ch: 1590 mts.to 1680 mts.
BDA/EE/S/PW/WO/28/90-91 dt:11-05-90
1440
Repairs to 100' road (South side) by providing asphalting concrete
in BTM II stage,I phase, Ch: 1230 mts to 1410 mts.
BDA/EE/S/PW/WO/29/90-91 dt:11-05-90
1441
Repairs to 100' road (North side) by providing asphalting concrete
in BTM II stage,I phase, Ch: 1410 mts.to 1500 mts.
BDA/EE/S/PW/WO/30/90-91 dt:11-05-90
1442
Construction of retaining wall to the right side of sewage halla in
Gerehalli at BSK III stage- Ch: 160 mts to 200 mts.
BDA/EE/S/PW/WO/31/90-91 dt:09-05-90
1443
Repairs to Bannerghatta Circle in BTM II stage, I phase (South
Side)
Repairs to 100' road (North side) by providing asphalting concrete
in BTM II stage,I phase, Ch: 1320 mts to 1410 mts.
BDA/EE/S/PW/WO/32/90-91 dt:11-05-90
1444
BDA/EE/S/PW/WO/33/90-91 dt:11-05-90
1445
Repairs to 100' road (South side) by providing asphalting concrete
in BTM II stage,I phase, Ch: 1410 mts to 1500 mts.
BDA/EE/S/PW/WO/34/90-91 dt:11-05-90
1446
Repairs to 100' road (South side) by providing asphalting concrete
in BTM II stage,I phase, Ch: 1320 to 1410 mts.
BDA/EE/S/PW/WO/35/90-91 dt:11-05-90
1447
Repairs to 100' road (South side) by providing asphalting concrete
in BTM II stage,I phase, Ch: 1140 to 1230 mts.
BDA/EE/S/PW/WO/36/90-91 dt:11-05-90
1448
Repairs to 100' road (North side) by providing asphalting concrete
in BTM II stage,I phase, Ch: 1050 to 1140mts to 1230 mts.
BDA/EE/S/PW/WO/37/90-91 dt:11-05-90
1449
Repairs to 100' road (North side) by providing asphalting concrete
in BTM II stage,I phase, I main to 3rd main,Ch: 1050 to 1140mts.
BDA/EE/S/PW/WO/38/90-91 dt:11-05-90
1450
Repairs to 100' road (South side) by providing asphalting concrete
in BTM II stage,I phase, Ch: 1500 to 1590 mts.
BDA/EE/S/PW/WO/39/90-91 dt:11-05-90
1451
Repairs to 100' road (North side) by providing asphalting concrete
in BTM II stage,I phase, Ch: 1230 to 1320 mts.
BDA/EE/S/PW/WO/40/90-91 dt:11-05-90
1452
Repairs to 100' road (South side) by providing asphalting concrete
in BTM II stage,I phase, Ch: 1590 to 1680 mts.
BDA/EE/S/PW/WO/41/90-91 dt:11-05-90
1453
Repairs to 100' road (northern side) by providing asphalting
concrete in BTM II stage, I phase, Ch: 1500 to 1590 mts.
BDA/EE/S/PW/WO/42/90-91 dt:11-05-90
1454
Repairs to road by providing grouting and depression filling to 100'
road bothside from ch: 300 to 600mts.
BDA/EE/S/PW/WO/43/90-91 dt:11-05-90
1455
Repairs to 100' road (Southside) by providing asphalting concrete
in BTM II satge, I phase, Ch:1050 to 1140 mts.
BDA/EE/S/PW/WO/44/90-91 dt:11-05-90
1456
Repairs to road by providing grouting and depression filling to 100'
road bothside from ch:600 to 1000mts.
BDA/EE/S/PW/WO/45/90-91 dt:11-05-90
1457
Providing chipcarpetting to the remetalled surface in Sy.No.96, 96,
98 of Madivala Village under BTM I stage, 3rd cross road, I Phase.
BDA/EE/S/PW/WO/46/90-91 dt:11-05-90
1458
Providing chipcarpetting to the remetalled surface in Sy.No.96, 96,
98 of Madivala Village under BTM I stage, 4th cross road, I Phase.
BDA/EE/S/PW/WO/47/90-91 dt:11-05-90
1459
Construction of masonry SSM (Missing link) and formation of
layout in Sy.No.47/A, B & 48/5 & 6 of Tavarekere village under
BTM scheme for missing chainage.
Construction of culverts in Srinivasanagar II phase, BSK III stage
(11 Nos)
Construction of retaining wall and toe wall on right bank of nala
flowing adjacent to CA site of Dena Bank H.B.C.S., sites in BSK III
stage, Ch: 0 to 22 mts.
Construction of retaining wall to protect the road between 6th & 7th
main road from errosion by the nala running parallel to road in BSK
III stage, VII block, IV phase, Ch;0 to 30 mts.
BDA/EE/S/PW/WO/48/90-91 dt:08-05-90
Construction of retaining wall and toe wall on right bank of nala
flowing adjacent to CA site of Dena Bank H.B.C.S., sites in BSK III
stage, Ch: 22 mts to 44mts..
BDA/EE/S/PW/WO/53/90-91 dt:09-05-90
1460
1461
1462
1463
BDA/EE/S/PW/WO/50/90-91 dt:07-05-90
BDA/EE/S/PW/WO/51/90-91 dt:09-05-90
BDA/EE/S/PW/WO/52/90-91 dt:09-05-90
1464
Formation of sites in Sy.No.172/2B of Bilekanahalli, Dollar scheme
in IV & V cross roads at BTM II stage, I phase.
BDA/EE/S/PW/WO/53/A/90-91 dt:24-05-90
1465
Construction of retaining wall and toe wall on left bank of nala
flowing adjacent to CA site of Dena Bank H.B.C.S., sites in BSK III
stage, Ch: 22 mts to 44mts..
Construction of retaining wall to protect the road between 6th & 7th
main road from errosion by the nala running parallel to road in BSK
III stage, VII block, IV phase, Ch; 30 mts to 60mts.
BDA/EE/S/PW/WO/54/90-91 dt:09-05-90
1466
BDA/EE/S/PW/WO/55/90-91 dt:11-05-90
1467
Filling & levelling the auction corner sites in Jayanagar I block to IX
block, site No.2169A, I, 48A, 223 & 116A.
BDA/EE/S/PW/WO/56/90-91 dt:07-05-90
1468
Filling & levelling of the corner sites proposed for auction in BTM I
stage, I phase, Sy.No.4/2 of Tavarekere village.
BDA/EE/S/PW/WO/57/90-91 dt:07-05-90
1469
Providing chipcarpetting to remetalled surface on 20th main road
under BTM I stage.
Filling & cleaning the sites proposed for auction in BTM II stage, I
phase, site nos. 1179, 1164, 1128, 893, 892, 1040, 918 & 867.
BDA/EE/S/PW/WO/58/90-91 dt:08-05-90
1471
Providing concrete bed to the existing SWD in Madivala Dollar
scheme under BTM I stage, Ch: 370 mts to 435 mts.
BDA/EE/S/PW/WO/60/90-91 dt:09-05-90
1472
Providing chipcarpetting to remetalled surface to 8th cross (60'
wide) Ch.200 to 276mts & 17th main road at BTM I stage in
Sy.No.10 & 11 of Tavarekere.
Providing chipcarpetting to remetalled surface to 8th cross (60'
wide) at BTM I stage in Sy.No.10 & 11 of Tavarekere.Ch.0 to
200mts.
Filling the corner & intermediate sites of Dollar scheme in BTM II
stage, I phase, Bilakenahalli site No. 28 to 31.
BDA/EE/S/PW/WO/62/90-91 dt:11-05-90
Filling & cleaning the sites proposed for auction in BTM II stage, I
phase, site nos. 1538/A, 1538, 1539, 1371, 1400, 1401, 1430 &
1431.
Filling & cleaning the sites proposed for auction in BTM II stage, I
phase, site nos. 822, 823/A, 823/B, 836, 763, 777/A, 777, 778.
BDA/EE/S/PW/WO/65/A/90-91 dt:22-05-90
1477
Construction of retaining wall on the left bank of nala near the
Bridge across 100' ring road at BSK III stage, Ch: 29 mts.to 53 mts.
BDA/EE/S/PW/WO/67/90-91 dt:11-05-90
1478
Formation of balance portion of road between II & III cross in BTM
II stage, I phasa.
BDA/EE/S/PW/WO/68/90-91 dt:19-05-90
1470
1473
1474
1475
1476
BDA/EE/S/PW/WO/59/90-91 dt:22-05-90
BDA/EE/S/PW/WO/63/90-91 dt:11-05-90
BDA/EE/S/PW/WO/64/90-91 dt:11-05-90
BDA/EE/S/PW/WO/66/90-91 dt:11-05-90
1479
Providing barbed wire fencing to CA site No.1 in F/O Ideal Homes
Co-Operative HBCS Ltd at Halagevaderahalli.
BDA/EE/S/PW/WO/69/90-91 dt:10-05-90
1480
Construction of 1.0m vent lead off drain to the l/o in Sy.No.6/1,
13/1 & 14 of Gavipura, BSK III stage, Ch: 475 mts to 510 mts. mts.
BDA/EE/S/PW/WO/70/90-91 dt:22-05-90
1481
Formation of layout in Sy.No.96 of Madivala, IV cross road in BTM
II stage, I phase.
Filling & cleaning the sites proposed for auction in BTM II stage, I
phase, site nos.708, 689, 688, 645, 1, 47, 50 & 51.
BDA/EE/S/PW/WO/71/90-91 dt:19-05-90
Filling & cleaning the sites proposed for auction in BTM II stage, I
phase, site nos.151, 83, 160, 76, 69, 68, 62 & 45 (Bilekanahalli
Dollar scheme.)
Filling & cleaning the sites proposed for auction in BTM II stage, I
phase, site nos.48, 49, 313, 295, 364, 413, 453, 510, 585 & 642.
BDA/EE/S/PW/WO/73/90-91 dt:22-05-90
1482
1483
1484
BDA/EE/S/PW/WO/72/90-91 dt:22-05-90
BDA/EE/S/PW/WO/74/90-91 dt:24-05-90
1485
Filling & cleaning the sites proposed for auction in BTM II stage, I
phase, site nos. 1195, 1242, 1267, 1268, 1269, 1270 and 1271.
BDA/EE/S/PW/WO/75/90-91 dt:22-05-90
1486
Construction of masonry drain to lead off Storm water from drain in
KSRTC l/o, Sarakki II phase.
BDA/EE/S/PW/WO/76/90-91 dt:24-05-90
1487
Formation of sites in Sy.Nos, 56, 57 & 172 of Bilekanahalli VII
cross (Near tank) at BTM II stage, I phase.
BDA/EE/S/PW/WO/77/90-91 dt:24-05-90
1488
Construction of 1.0m vent lead off drain to the l/o in Sy.No.6/1,
13/1 & 14 of Gavipura, BSK III stage, Ch: 370 to 405 mts.
BDA/EE/S/PW/WO/78/90-91 dt:22-05-90
1489
Construction of 1.0m vent lead off drain to the l/o in Sy.No.6/1,
13/1 & 14 of Gavipura, BSK III stage, Ch: 405 mts to 440mts.
BDA/EE/S/PW/WO/79/90-91 dt:22-05-90
1490
Construction of 1.0m vent lead off drain to the l/o in Sy.No.6/1,
13/1 & 14 of Gavipura, BSK III stage, Ch: 440mts to 475 mts.
BDA/EE/S/PW/WO/80/90-91 dt:22-05-90
1491
Construction of 1.0m vent lead off drain to the l/o in Sy.No.6/1,
13/1 & 14 of Gavipura, BSK III stage, Ch: 580mts to 615 mts.
BDA/EE/S/PW/WO/81/90-91 dt:22-05-90
1492
Construction of 1.0m vent lead off drain to the l/o in Sy.No.6/1,
13/1 & 14 of Gavipura, BSK III stage, Ch: 545mts to 580 mts.
BDA/EE/S/PW/WO/82/90-91 dt:22-05-90
1493
Construction of 1.0m vent lead off drain to the l/o in Sy.No.6/1,
13/1 & 14 of Gavipura, BSK III stage, Ch: 510mts to 545 mts.
BDA/EE/S/PW/WO/83/90-91 dt:22-05-90
1494
Filling the corner and intermediate sites of Dollar scheme in BTM II
stage, I phase, Bilekanahalli, Site nos. 124, to 127 and 49 to 53.
BDA/EE/S/PW/WO/84/90-91 dt:22-05-90
1495
Improvements to ward office & park in CA site by providing Grill
compound with SS Masonry support in Sy.No.10 & 11 of
tavarekere Village under BTM I stage, I phase (Ch: 0 to 85 mts)
BDA/EE/S/PW/WO/85/90-91 dt:10-05-90
1496
Formation of sites in Sy.Nos, 56, 57 & 172 of Bilekanahalli near
SWD in BTM II stage, I phase.
BDA/EE/S/PW/WO/86/90-91 dt:24-05-90
1497
Filling the corner and intermediate sites of Dollar scheme in BTM II
stage, I phase, Bilekanahalli, Site nos. 137, 136 & 63.
BDA/EE/S/PW/WO/87/90-91 dt:22-05-90
1498
Filling the corner and intermediate sites of Dollar scheme in BTM II
stage, I phase, Bilekanahalli, Site nos. 79 to 82 and 152 to 156.
BDA/EE/S/PW/WO/88/90-91 dt:25-05-90
1499
Formation of sites in Sy.No.172 of Bilekanahalli, 7th cross behind
Bannerghatta road in BTM II stage, I phase.
BDA/EE/S/PW/WO/89/90-91 dt:22-05-90
1500
Providing barbed wire fencing to the l/o in Sy.No.47/AB2 of
Tavarekere Village under BTM scheme.
BDA/EE/S/PW/WO/90/89-90 dt:11-05-90.
1501
Formation of sites in Sy.No.172 of Bilekanahalli, Dollar scheme in
IV cross BTM II stage, I phase.
BDA/EE/S/PW/WO/90/90-91 dt:24-05-90
1502
Constructiopn of retaining wall & toe wall on the right bank of nala
near the bridge across 100' ring road at BSK III stage, Ch: 34 to 53
mts.
Filling the corner and intermediate sites of Dollar scheme in BTM II
stage, I phase, Bilekanahalli, Site nos. 36 to 40.
BDA/EE/S/PW/WO/91/90-91 dt:24-05-90
1504
Providing missing dust bins in Sarakki I & II phase.
BDA/EE/S/PW/WO/93/90-91 dt:24-05-90
1505
Formatiopn of l/o in Sy.No.26 of N.S.Palya facing 100' ring road in
BTM II stage, I phase, Ch: 0 to 300 mts.
BDA/EE/S/PW/WO/94/90-91 dt:24-05-90
1506
Filling the corner and intermediate sites of Dollar scheme in BTM II
stage, I phase, Bilekanahalli, Site nos. 146 to 150 and 84 to 87.
BDA/EE/S/PW/WO/95/90-91 dt:22-05-90
1507
Construction of culverts drains etc, in Sy.No.26 of N.S.Palya 100'
road in BTM II stage, I phase.
BDA/EE/S/PW/WO/96/90-91 dt:22-05-90
1508
Formatiopn of l/o in Sy.No.26 of N.S.Palya facing 100' ring road in
BTM II stage, I phase,
Formation of sites in Sy.Nos, 56, 57 & 172 of Bilekanahalli in III
cross at BTM II stage, I phase.
BDA/EE/S/PW/WO/97/90-91 dt:24-05-90
Construction of masonry lead off drain to formation of park & play
ground at 9th cross 80' road in Sarakki I phase.
BDA/EE/S/PW/WO/100/90-91 dt:24-05-90
1503
1509
1510
BDA/EE/S/PW/WO/92/90-91 dt:24-05-90
BDA/EE/S/PW/WO/98/90-91 dt:24-05-90
1511
1512
1513
1514
1515
1516
1517
1518
Formation of link road to connect 38th main road in Sarakki II
phase.
Providing rechipcarpetting to the remetalled surface in Sy.No.96,
97, 98 of Madivala village under BTM I sage, I phase, 2nd cross
road.
Construction of retaining wall on the left bank of nala near the
Bridge across 100' ring road at BSK III stage, Ch: 5 to 29 mts.
BDA/EE/S/PW/WO/101/90-91 dt:24-05-90
Removing & conveying debris earth drains on 100' ring road in
BTM II stage, I phase.
Providing bed treatment to SWD near waste weir in BTM II stage, I
phase.
Providing bed treatment to existing SWD at 100' road in BTM II
stage, I phase.
Providing concrete bed to existing SWD in MAdivala Dollar scheme
BTM I stage at junction point of service road.
BDA/EE/S/PW/WO/104/90-91 dt:29-05-90
BDA/EE/S/PW/WO/102/90-91 dt:22-05-90
BDA/EE/S/PW/WO/103/90-91 dt:24-05-90
BDA/EE/S/PW/WO/105/90-91 dt:29-05-90
BDA/EE/S/PW/WO/106/90-91 dt:29-05-90
BDA/EE/S/PW/WO/107/90-91 dt:08-05-90
Construction of SSM side drain in Sy.No.10 & 11 of Tavarekere
under BTM scheme.
Formation of road missing bits in BSK III stage, 7th block, 4th
phase, parallel to 100' ring road -Ch: 35.10 mts.to 76.20 mts.
BDA/EE/S/PW/WO/108/90-91 dt:24-05-90
1520
Formation of roads & drains to form sites in Sy.No.46/1 of Sarakki
Village, Sarakki II phase.
BDA/EE/S/PW/WO/110/90-91 dt:20-06-90
1521
Formation of road along the SWD in Sy.No.120 to the park in BSK
III stage adjacent to slum.
BDA/EE/S/PW/WO/111/90-91 dt:15-06-90
1522
Construction of Retaining wall to protect the CA site & levelling of
the balance portion in BSK III stage.
BDA/EE/S/PW/WO/112/90-91 dt:15-06-90
1523
Formation of sites to be auctioned in BSK II stage.
BDA/EE/S/PW/WO/113/90-91 dt:15-06-90
1524
Levelling of CA sites for playground in BSK III stage.
BDA/EE/S/PW/WO/114/90-91 dt:15-06-90
1525
Widening the road & construction of Masonry Box Drain in 8th
cross, BSK III stage,-Ch: 43 mts to 86 mts..
BDA/EE/S/PW/WO/115/90-91 dt:15-06-90
1526
Widening the road & construction of Masonry Box Drain in 8th
cross, BSK III stage,-Ch: 0 to 43 mts.
BDA/EE/S/PW/WO/116/90-91 dt:15-06-90
1527
Rechipcarpetting to balance portion of road in Padmanabhanagar
in BSK III stage.
Rechipcarpetting to roads in BSK III stage, 7th block, IV phase, Ist
to 4th main.
BDA/EE/S/PW/WO/117/90-91 dt:14-06-90
1519
1528
BDA/EE/S/PW/WO/109/90-91 dt:15-06-90
BDA/EE/S/PW/WO/118/90-91 dt:14-06-90
1529
Formation of road missing bits in BSK III stage, 7th block, 4th
phase, parallel to 100' ring road -Ch: 0 to 35.10 mts.
BDA/EE/S/PW/WO/119/90-91 dt:14-06-90
1530
Rechipcarpetting to balance portion of road connecting to VT bed
to Vidyapeeta circle in BSK III stage.
BDA/EE/S/PW/WO/120/90-91 dt:14-06-90
1531
Rechipcarpetting of 80' road which leads to Padmanabhanagar,
and balance portion of roads in Padmanabhanagar in BSK III
stage.
Rechipcarpetting to roads in BSK III stage, 7th block, IV phase, (IV
main to X main)
Construction of masonry lead off drain to formation of 30'x 40' sites
at sarakki VI phase-Ch; 0 to 60mts.
BDA/EE/S/PW/WO/121/90-91 dt:14-06-90
1534
Construction of masonry lead off drain to formation of 30'x 40' sites
at sarakki VI phase-Ch; 60 to 120mts.
BDA/EE/S/PW/WO/124/90-91 dt:19-06-90
1535
Construction of masonry lead off drain to formation of 30'x 40' sites
at sarakki VI phase-Ch; 120mts.to 180mts
BDA/EE/S/PW/WO/125/90-91 dt:19-06-90
1536
Construction of masonry lead off drain to formation of 30'x 40' sites
at sarakki VI phase-Ch; 180mts to 240mts.
BDA/EE/S/PW/WO/126/90-91 dt:19-06-90
1537
Filling the existing removed masonry drain to form 30'x40' sites in
Sarakki VI phase.
Construction of masonry retaining wall to protect road from
Errosion at 15th cross 100' road in Sarakki I phase-Ch: 0 to 35
mts.
Construction of masonry retaining wall to protect road from
Errosion at 15th cross 100' road in Sarakki I phase-Ch:35 mts to
70 mts.
Estimate for levelling the corner sites in Kumaraswamy l/o, I stage.
BDA/EE/S/PW/WO/127/90-91 dt:19-06-90
1532
1533
1538
1539
1540
BDA/EE/S/PW/WO/122/90-91 dt:14-06-90
BDA/EE/S/PW/WO/123/90-91 dt:19-06-90
BDA/EE/S/PW/WO/128/90-91 dt:19-06-90
BDA/EE/S/PW/WO/129/90-91 dt:19-06-90
BDA/EE/S/PW/WO/130/90-91 dt:15-06-90
1541
Widening of road and construction of Masonry Box drain in 8th
cross, BSK III stage-Ch: 86 to 129 mts.
BDA/EE/S/PW/WO/131/90-91 dt:20-06-90
1542
Formation of corner sites and maintenance and improvements to
balance portion of BSK III stage, VII Block, IV Phase.
BDA/EE/S/PW/WO/132/90-91 dt:20-06-90
1543
Construction of retaining wall to the rightside of sewage halla in
Gerehally at BSK III stage, Ch: 40 to 80 mts.
BDA/EE/S/PW/WO/133/90-91 dt:24-05-90
1544
Formation of park in BSK III stage, 7th block, 4th phase (Eastern
side)
Sinking of 150mm dia borewell to provide drinking water facility to
the residents of Srinivasanagar, BSK III stage- 5 Nos.
BDA/EE/S/PW/WO/134/90-91 dt:23-06-90
1545
BDA/EE/S/PW/WO/135/90-91 dt:14-06-90
1546
Formation of play ground in BSK III stage, 7th block, 4th
phase.(Western side)
Formation of additional sites (142/A & 191/A in BSK III stage, VII
Block, IV phase.
Construction of Cross drainage works in V phase extension in
Sy.No.17 & 19 of Sarakki layout.
BDA/EE/S/PW/WO/136/90-91 dt:21-06-90
1549
Providing barbed wire fencing to CA site No.8 in F/o Ideal Homes
Co-Operative HBCS at Halagevaderahally.
BDA/EE/S/PW/WO/140/90-91 dt:24-05-90
1550
Providing barbed wire fencing to CA site No.10 in F/o Ideal Homes
Co-Operative HBCS at Halagevaderahally.
BDA/EE/S/PW/WO/141/90-91 dt:24-05-90
1551
Formation of approach road to sites formed in Sy.No.10 of
Kathrihuppa from 80' main road through A.K.Colony in BSK III
stage.
Providing bed for SWD in Sy.No.17, 20 & 21 of Govipura in
Raghavendra block, BSK III stage- Ch: 540 mts to 700 mts.
BDA/EE/S/PW/WO/142/90-91 dt:24-05-90
1553
Formation of approach road from 9th cross of Avalahally l/o to
Mysore road in BSK III stage.
BDA/EE/S/PW/WO/144/90-91 dt:06-07-90
1554
Construction of missing link protection wall for the l/o in Sy.No.17,
20 & 21 of Gavipura in Raghavendra block, BSK III stage, Ch: 540
to 600mts(Western side)
Regrading of existing drain to avoid water stagnation in KAS
Officer's l/o in Sarakki IV phase.
BDA/EE/S/PW/WO/145/90-91 dt:06-07-90
1556
Construction of retaining wall to road formed in BSK III stage, 7th
block, 4th phase, Ch: 0 to 55 mts.
BDA/EE/S/PW/WO/147/90-91 dt:06-07-90
1557
Construction missing link masonry lead off drain to avod flooding &
water stagnation in playground at V.E.T School, Sarakki II phase.
BDA/EE/S/PW/WO/148/90-91 dt:23-06-90
1558
Providing rechipcarpetting to bad asphalted surface of 3rd 'A'
cross, 18th and 15th main road at Sarakki II phase.
BDA/EE/S/PW/WO/149/90-91 dt:06-07-90
1559
Providing rechipcarpetting to bad asphalted surface of remaining
portion of 80' road (9th cross) at Sarakki II phase.
BDA/EE/S/PW/WO/150/90-91 dt:06-07-90
1560
Providing rechipcarpetting to balance portion of 68th, 69th & 70th
cross of Kumaraswamy layout, I stage.
BDA/EE/S/PW/WO/151/90-91 dt:19-07-90
1561
Maintenance of Dollar scheme l/o in Sarakki IV phase.
BDA/EE/S/PW/WO/151/90-91 dt:06-07-90
1547
1548
1552
1555
BDA/EE/S/PW/WO/137/90-91 dt:21-06-90
BDA/EE/S/PW/WO/139/90-91 dt:23-06-90
BDA/EE/S/PW/WO/143/90-91 dt:06-07-90
BDA/EE/S/PW/WO/146/90-91 dt:23-06-90
1562
Maintenance & repairs to roads in Sy.No.134/2 , 121 & 122 of BSK
III stage, IV phase, VII block at BSK III stage.
BDA/EE/S/PW/WO/152/90-91 dt:06-07-90
1563
Providing rechipcarpetting to damaged portion of roads in
K.S.Layout II block, including repairs to road cuttings.
BDA/EE/S/PW/WO/153/90-91 dt:06-07-90
1564
Providing rechipcarpetting to slum area in front of site Nos.3239 to
3272 in K.S.l/o II stage.
BDA/EE/S/PW/WO/154/90-91 dt:06-07-90
1565
Providing rechipcarpetting to roads in the area where 200 slum
dwellers rehabilitated from Kumaraswamy Temple to K.S.Layout.
BDA/EE/S/PW/WO/155/90-91 dt:06-07-90
1566
Providing Rechipcarpetting to slum area where Southend and
Hanumanthanagar slum rehabilitated.
BDA/EE/S/PW/WO/156/90-91 dt:06-07-90
1567
Providing Rechipcarpetting to Service Roads in Kumaraswamy
layout- II stage.
Formation of road to form sites No.646/A to be auctioned in
Sarakki II phase.
Formation of balance length of roads near manjunatha slum in
Sy.No.15 of Kathriguppa, BSK III stage.
BDA/EE/S/PW/WO/157/90-91 dt:06-07-90
1570
Formation of missing bits of roads in Srinivasanagar I stage,
including repairs to culverts at BSK III stage.
BDA/EE/S/PW/WO/159/90-91 dt:06-07-90
1571
Maintenance of Kanakagruha Nirmana private layout.
BDA/EE/S/PW/WO/160/90-91 dt:19-07-90
1572
Formation of road connecting to Jaraganahally Pvt layout to
K.S.Layout including improvements to adjacent road.
BDA/EE/S/PW/WO/161/90-91 dt:19-07-90
1573
Formation of sites 20' X 25' and 20' X 30' in Sy.No.4, 41, 43 etc of
Govinayakanahalli in K.S.Layout.
BDA/EE/S/PW/WO/162/90-91 dt:19-07-90
1574
Maintenance of adjacent to slum in North-East portion of
Kumaraswamy layout- II stage.
Maintenance of Kumaraswamy layout I stage, where in 1000 EWS
Houses constructed including repairs to conservancy lines.
BDA/EE/S/PW/WO/163/90-91 dt:19-07-90
1568
1569
1575
BDA/EE/S/PW/WO/158/90-91 dt:06-07-90
BDA/EE/S/PW/WO/158/90-91 dt:06-07-90
BDA/EE/S/PW/WO/164/90-91 dt:06-07-90
1576
Maintenance of Srinivasanagar II stage area including repairs to
culverts and roads at BSK III stage (Sy.No.8 to 14 of Gerehalli)
BDA/EE/S/PW/WO/165/90-91 dt:19-07-90
1577
Maintenance of slum area rehabilitated in Eastern side of
K.S.layout -II srage.
Construction of retaining wall and toe wall on the left bank of nala
flowing adjacent to the CA site of Dena BAnk HBCS , BSK III
stage, Ch:0 to 22 mts.
BDA/EE/S/PW/WO/166/90-91 dt:19-07-90
1578
BDA/EE/S/PW/WO/167/90-91 dt:19-07-90
1579
Formation of site (EWS) near platform area in Kumaraswamy
layout (In the available land)
BDA/EE/S/PW/WO/168/90-91 dt:06-07-90
1580
Maintenance of BSK III satge in Sy.No.15, 120 & 10/14 of
Kathriguppa, BSK III stage.
Formation of approach road from Bannerghatta road to Sarakki IV
phase dollar scheme , Ch: 0 to 80 mts.
BDA/EE/S/PW/WO/169/90-91 dt:19-07-90
1582
Formation of approach road from Bannerghatta road to Sarakki IV
phase dollar scheme , Ch: 80 mts to 160 mts.
BDA/EE/S/PW/WO/171/90-91 dt:19-07-90
1583
Formation of roads & side drains in Sy.No.21 & 22 of Sunkenahally
at BSK III stage.
Security & maintenance of EWS Houses in Kumaraswamy layout II
stage.
Maintenance of slum area rehabilitated in Western side of
K.S.layout -II srage.
Maintenance of Srinivasanagar I stage area including repairs to
culverts and roads at BSK III stage (Sy.No.42 and 43 of Gavipura
and Sy.No.2 to 7 of Gerehalli)
Maintenance of 1000 EWS Houses in Kumaraswamy Layout II
stage.
MAintenance of Jayanagar HBCS Ltd, including repairs to drains.
BDA/EE/S/PW/WO/172/90-91 dt:19-07-90
1581
1584
1585
1586
1587
1588
BDA/EE/S/PW/WO/170/90-91 dt:19-07-90
BDA/EE/S/PW/WO/173/90-91 dt:19-07-90
BDA/EE/S/PW/WO/174/90-91 dt:19-07-90
BDA/EE/S/PW/WO/175/90-91 dt:19-07-90
BDA/EE/S/PW/WO/176/90-91 dt:19-07-90
BDA/EE/S/PW/WO/177/90-91 dt:19-07-90
1589
Improvements to B.S.Salb drain and culvert in the low level area
adjacent to EWS Houses in K.S.Layout -II stage.
BDA/EE/S/PW/WO/178/90-91 dt:19-07-90
1590
Formation of roads on the Eastern side of Kathriguppa main road
adjacent to ITI Colony at BSK III stage.
BDA/EE/S/PW/WO/179/90-91 dt:19-07-90
1591
Providing repairs to road cuttings portion in the area where model
houses are constructed in K.S.layout I block.
BDA/EE/S/PW/WO/180/90-91 dt:19-07-90
1592
Maintenance of borewell and providing IM-II hand pump in K.S.L/o
I & II stage (42 Nos of Borewells)
BDA/EE/S/PW/WO/182/90-91 dt:19-07-90
1593
Maintenance of borewells in Srinivasanagar I & II stage at BSK III
stage.
Formation of 100' road including providing side drains and footpath
improvement.
Providing Traffic Island at the junction of 100' ring road and 80'
road near Co-Operative Training College at BSK III stage.
BDA/EE/S/PW/WO/183/90-91 dt:19-07-90
1594
1595
1596
1597
Repairs to roads and drains for 16th main, 3rd and 4th cross at
Sarakki II pgase.
Formation of Balance portion of road behind Vidyapeeta layout at
BDA/EE/S/PW/WO/184/90-91 dt:19-07-90
BDA/EE/S/PW/WO/185/90-91 dt:19-07-90
BDA/EE/S/PW/WO/186/90-91 dt:06-07-90
BDA/EE/S/PW/WO/187/90-91 dt:19-07-90
BSK III stage.
1598
1599
1600
1601
1602
Repairs to roads & drains in Metropolitan HBCS 7th cross, road in
BTM II stage, I phase.
Repairs to roads & drains in Metropolitan HBCS 7th cross, road in
BTM II stage, I phase.
Repairs to roads & drains in Metropolitan HBCS 6th cross, road in
BTM II stage, I phase.
Cleaning of Commercial Complex at BSK II stage, for the period
1990-91.
Construction of slab culvert in Sy.No.8 to 14 of Gerehalli in II 'B'
Main, Srinivasanagar main valley in BSK III stage.
BDA/EE/S/PW/WO/188/90-91 dt:20-07-90
BDA/EE/S/PW/WO/189/90-91 dt:20-07-90
BDA/EE/S/PW/WO/190/90-91 dt:20-07-90
BDA/EE/S/PW/WO/191/90-91 dt:30-07-90
BDA/EE/S/PW/WO/192/90-91 dt:30-07-90
1603
MAintenance of roads & drains in I.T.I Layout , BSK III stage.
1604
Maintenance and improvements to 80' road in BSK III stage.
BDA/EE/S/PW/WO/194/90-91 dt:30-07-90
1605
Widening of road leading from Kathriguppa road to C.T.Atchukut in
BSK III stage.
Formation of approach road from Bannerghatta road to Sarakki IV
phase dollar scheme , Ch:160mts to 240 mts.
BDA/EE/S/PW/WO/195/90-91 dt:30-07-90
1607
Construction of Culverts and providing B.S.Slab drain at the
junction of Bannerghatta main road snd proposed new road.
BDA/EE/S/PW/WO/197/90-91 dt:30-07-90
1608
Improvements to 100' ring road by providing metalling on either
side of the newll constructed Bridge and adjacent to 80' road in
Sarakki I Phase(J.P.Nagar)
Annual maintenance , Repairs of Commercial Complex at BSK II
stage.
Formation of park & play ground at 9th cross, 80' road in Sarakki I
pahse.
Providing Aluminium partition for Computer chamber in R.O's
Office at Commercial Complex and special repairs and
maintenance to Commercial Complex at BSK II stage.
Providing l.o boards and Dust bins in CKA l/o in VI block and in IV
phase, Easat of Kathriguppa at BSK III stage.
BDA/EE/S/PW/WO/198/90-91 dt:08-11-90
1606
1609
1610
1611
1612
BDA/EE/S/PW/WO/193/90-91 dt:30-07-90
BDA/EE/S/PW/WO/196/90-91 dt:06-07-90
BDA/EE/S/PW/WO/200/90-91 dt: 21-11-90
BDA/EE/S/PW/WO/203/90-91 dt:03-01-91.
BDA/EE/S/PW/WO/204/90-91 dt:08-01-91.
BDA/EE/S/PW/WO/205/90-91 dt:14-01-91.
1613
Repairs to roads & culverts in l/o formed in Sy.No.94 and 95 of
Hosakerehalli, BSK III stage, 6th and 7th main road.(Part 'B")
BDA/EE/S/PW/WO/207/90-91 dt:28-01-91.
1614
Repairs to roads & culverts in l/o formed in Sy.No.94 and 95 of
Hosakerehalli, BSK III stage, 5th and8th main road.
BDA/EE/S/PW/WO/208/90-91 dt:28-01-91.
1615
Providing & fixing l/o name boards to BEML HBCS l/o,
Halagevaderahalli.
BDA/EE/S/PW/WO/209/90-91 dt:28-01-91.
1616
Formation of road in the area of site to be formed for weaker
section in Sy.No.13, 41 to 55 of Govinayakanahally-K.S.layout.
BDA/EE/S/PW/WO/215/90-91 dt:04-02-91.
1617
Formation of missing link road of 16th , 17th & 18th main roads at
Muneshwara block in BSK III stage.
BDA/EE/S/PW/WO/216/90-91 dt:04-02-91
1618
Improvements to 50' road in K.S.l/o , II stage.
BDA/EE/S/PW/WO/217/90-91 dt:04-02-91
1619
Repainting to l/o name boards in BTM scheme. (Dollar scheme l/o)
BDA/EE/S/PW/WO/223/90-91 dt:15-02-91
1620
Providing repairs to borewells in J.P.Nagar I & II phase, 64 nos
existing.
Providing Grrill work (M.S.Frame caging) to the l/o , boards and
missing cross boards in BTM I stage.
BDA/EE/S/PW/WO/225/90-91 dt:08-02-91
Annual maintenance of borewells in Nagendra & Muneshwara
block, BSK III stage.
Providing l/o boards and name boards in BTM II stage, I phase.
BDA/EE/S/PW/WO/226/90-91 dt:11-02-91
1624
Urgent repairs to roads in Sy.No.47/A1 & 2 and 48/5 & 6 of
Tavarekere village under BTM scheme for cross roads 40' wide.
BDA/EE/S/PW/WO/228/90-91 dt:21-02-91
1625
Formation of drains and improving the road from BSK temple to
Uttarahally village under BSK V stage, Ch: 900 to 1150 mts.
BDA/EE/S/PW/WO/232/90-91 dt:22-02-91
1626
Repairs to the bad portion of SWD in J.P.nagar II phase.
BDA/EE/S/PW/WO/233/90-91 dt:25-02-91
1627
Removal of silt and cleaning of jungle in J.P.Nagar, II phase
(Remaining roads)
Widening the Kanakapura road fron BSK Temple -Ch: 490 to 560
mts.
Providing BS slab drain from Sarakki main road to SWD in Sarakki
I phase.
Removing & resetting the slabs of culverts and removing silt in
J.P.Nagar I phase.
Providing rechipcarpetting to the bad asphalted surface of 100'
road- Ch: 1350 to 1700 mts.
BDA/EE/S/PW/WO/234/90-91 dt:25-02-91
1621
1622
1623
1628
1629
1630
1631
BDA/EE/S/PW/WO/224/90-91 dt:18-02-91
BDA/EE/S/PW/WO/227/90-91 dt:21-02-91
BDA/EE/S/PW/WO/235/90-91 dt:25-02-91
BDA/EE/S/PW/WO/237/90-91 dt:25-02-91
BDA/EE/S/PW/WO/238/90-91 dt:25-02-91
BDA/EE/S/PW/WO/240/90-91 dt:25-02-91
1632
Providing rechipcarpetting to the bad asphalted surface of 16th 'A',
22nd main, 4th & 5th cross of J.P.Nagar II phase.
BDA/EE/S/PW/WO/242/90-91 dt:25-02-91
1633
Providing rechipcarpetting to the bad asphalted surface of 18th ,
19th main & 12th cross, J.P.Nagar, I phase.
BDA/EE/S/PW/WO/243/90-91 dt:25-02-91
1634
Providing rechipcarpetting to the bad asphalted surface of 13th,
12th, 12th ';B' , 11th, 11th 'B', 11th'A' cross of J.P.Nagar II phase.
BDA/EE/S/PW/WO/244/90-91 dt:25-02-91
1635
Providing rechipcarpetting to the bad asphalted surface of 13th, 80'
road from 100' road to 13th cross in J.P.Nagar I Phase.
BDA/EE/S/PW/WO/246/90-91 dt:25-02-91
1636
Providing rechipcarpetting to the bad asphalted surface of
remaining portions of 80' road and 100' road (15th cross)
BDA/EE/S/PW/WO/247/90-91 dt:25-02-91
1637
Providing rechipcarpetting to the bad asphalted surface of 18th
cross, 19th main and 26th cross, J.P.Nagar, II phase.
BDA/EE/S/PW/WO/248/90-91 dt:25-02-91
1638
Repairs to roads & drains to Sarakki main road at J.P.Nagr I
phase.
Formation and drains for improving the road from BSK Temple to
Uttarahally village under BSK V stage, Ch: 650 to 900mts.
BDA/EE/S/PW/WO/249/90-91 dt:25-02-91
1639
BDA/EE/S/PW/WO/251/90-91 dt:27-02-91
1640
Estimate for culverts provided for improving the road from BSK
Temple to Uttarahally village under BSK V stage- Ch: 0 to 750 mts.
BDA/EE/S/PW/WO/252/90-91 dt:27-02-91
1641
BDA/EE/S/PW/WO/253/90-91 dt:27-02-91
1644
Estimate for culverts provided for improving the road from BSK
Temple to Uttarahally village under BSK V stage- Ch: 750 mts to
1500 mts..
Providing fencing the CA site in MICO ., Shramajeevi Karmikara,
HBCS I stage.
Removing & resetting the slabs of culverts and removing silt in
J.P.Nagar II phase.
Repairs to roads and drains in Anjanapura HBCS I & II Phase.
1645
Providing BS slab drain to 11th cross road at J.P.nagar II phase.
BDA/EE/S/PW/WO/257/90-91 dt:25-02-91
1646
Widening the Kanakapura road fron BSK Temple -Ch: 350 to 420
mts.
Formation and drains for improving the road from BSK Temple to
Uttarahally village under BSK V stage, Ch: 0 to 200 mts..
BDA/EE/S/PW/WO/258/90-91 dt:25-02-91
1642
1643
1647
1648
BDA/EE/S/PW/WO/254/90-91 dt:25-02-91
BDA/EE/S/PW/WO/255/90-91 dt:25-02-91
BDA/EE/S/PW/WO/256/90-91 dt:27-02-91
BDA/EE/S/PW/WO/259/90-91 dt:27-02-91
Raising the culverts across Sarakki main road to cross SWD in
J.P.Nagar I phase.
Removing silt from storm Water Drain in sy.no. 2 to 6 of madivala
in B.T.M scheme - Ch: 345Mtrs., to 635Mtrs
BDA/EE/S/PW/WO/260/90-91 dt:25-02-91
1650
Formation and drains for improving the road from BSK Temple to
Uttarahally village under BSK V stage, Ch: 200 to 400 mts.
BDA/EE/S/PW/WO/262/90-91 dt:27-02-91
1651
Widening the Kanakapura road from BSK Temple- Ch: 560 to 630
mts.
Filling of pot holes and levelling the road surface of the road from
BSK Temple to Uttarahally village under BSK V stage, Ch: 2 to 4
Kms.
BDA/EE/S/PW/WO/263/90-91 dt:27-02-91
1649
1652
BDA/EE/S/PW/WO/261/90-91 dt:25-02-91
BDA/EE/S/PW/WO/264/90-91 dt:27-02-91
1653
1654
1655
1656
1657
1658
Filling of pot holes and levelling the road surface of the road from
BSK Temple to Uttarahally village under BSK V stage, Ch: 0 to 2
Kms.
Removing the silt and resetting the slabs to drains in J.P.Nagar IV
phase.
Construction of lead off drain to avoid water stagnation in
J.P.nagar,VI phase, Ch: 0 to 110 mts.
BDA/EE/S/PW/WO/265/90-91 dt:25-02-91
Removing the silt and resetting the slabs to drains in J.P.Nagar VI
phase.
Urgent repairs to roads in Sy.No.47/A1 & 2 and 48/5 & 6 of
Tavarekere village under BTM scheme for 30' wide road.(Service
road)
Providing Traffic Island at BSK Temple Circle.
BDA/EE/S/PW/WO/268/90-91 dt:25-02-91
BDA/EE/S/PW/WO/266/90-91 dt:25-02-91
BDA/EE/S/PW/WO/267/90-91 dt:25-02-91
BDA/EE/S/PW/WO/269/90-91 dt:27-02-91
BDA/EE/S/PW/WO/270/90-91 dt:25-02-91
1659
Formation and drains for improving the road from BSK Temple to
Uttarahally village under BSK V stage, Ch: 1150 to 1425 mts.
BDA/EE/S/PW/WO/271/90-91 dt:25-02-91
1660
Widening the Kanakapura road from BSK Temple-Ch: 140 to 210
mts.
Providing side drains & construction of culverts for the approach
roads in 80' road connecting Vidyapeeta circle and 100' ring road,
Ch-460 to 975m in BSK III stage, (Part 'B')
BDA/EE/S/PW/WO/271/90-91 dt:25-02-91
1662
Maintenance of side drains and shoulder drains and cutting the
high berm in footpatg of 80' road connecting Vidyapeeta Circle and
100' Ring road in BSK III stage, Ch: 460 to 975 mts.(Part 'A')
BDA/EE/S/PW/WO/273/90-91 dt:02-03-91
1663
Removing silt from SWD in Sy.Nos. 92 to 6 of Madivala, BTM
scheme, Ch: 0 to 330 mts.
Formation of roads & improving the road fronm BSK Temple to
Uttarahalli village, under BSK V stage, Ch; 400 to 650mts.
BDA/EE/S/PW/WO/274/90-91 dt:27-02-91
Maintenance of side drains and shoulder drains and removing high
berms in footpath of 100' ring road from Ch:850 to 1315 mts in
BSK III stage, III phase.
Providing Rechipcarpetting to the bad asphalted surface of 37th
main, 16th & 17th cross (Between 37th & 35th main ), J.P.Nagar,
IV Phase.
Providing Rechipcarpetting to the bad asphalted surface of 18th
main, 4th , 6th & 7th cross ,J.P.Nagar,II Phase.
BDA/EE/S/PW/WO/280/90-91 dt:02-03-91
Providing Rechipcarpetting to the bad asphalted surface of 17th
main & cross in ,J.P.Nagar,II Phase.
BDA/EE/S/PW/WO/283/90-91 dt:27-02-91
1661
1664
1665
1666
1667
1668
BDA/EE/S/PW/WO/272/90-91 dt:27-02-91
BDA/EE/S/PW/WO/275/90-91 dt:27-02-91
BDA/EE/S/PW/WO/281/90-91 dt:27-02-91
BDA/EE/S/PW/WO/282/90-91 dt:27-02-91
1669
1670
Formation of road from 11th 'B' cross to 10th cross at Sarakki I
phase.
Providing missing name boards in J.P.nagar I and II phase.
BDA/EE/S/PW/WO/285/90-91 dt:27-02-91
BDA/EE/S/PW/WO/286/90-91 dt:27-02-91
1671
Urgent repairs to roads in Sy.No.47/A1 & 2 and 48/5 & 6 of
Tavarekere village under BTM scheme for 60' wide road.
BDA/EE/S/PW/WO/288/90-91 dt:27-02-91
1672
Providing Rechipcarpetting to the bad asphalted surface of 17th,
cross, and 5th to 10th main, J.P.Nagar, V Phase.
BDA/EE/S/PW/WO/289/90-91 dt:27-02-91
1673
Providing Rechipcarpetting to the bad asphalted surface of 17th,
18th and 19th cross in J.P.Nagar, V Phase.
BDA/EE/S/PW/WO/290/90-91 dt:27-02-91
1674
Urgent repairs to roads damaged roads due to road cutting in 6th &
7th cross roads in Sy.No.10 & 11 of Tavarekere Village, BTM
Scheme.
Urgent repairs to roads damaged roads due to road cutting in 13th,
14th &15th main in Sy.No.10 & 11 of Tavarekere Village, under
BTM I stage, I phase.
Repairs to errosion of bad of ventway of SWD in CKA l/o, BSK III
stage, Ch:715m to 763mts.
BDA/EE/S/PW/WO/294/90-91 dt:27-02-91
1677
Sinking of 150mm dia borewell , construction of platform and fixing
IM-II hand pump at BTM II stage, I phase (4 nos).
BDA/EE/S/PW/WO/297/90-91 dt:27-02-91
1678
Sinking of 150mm dia borewell , construction of platform and fixing
IM-II hand pump at BTM I stage, I phase (4 nos).
BDA/EE/S/PW/WO/298/90-91 dt:27-02-91
1679
Construction of lead off drain to protect water stagnation at site
no.6 & 7 in SBI, colony, J.P.Nagar, I phase.
BDA/EE/S/PW/WO/316/90-91 dt:27-02-91
1680
Urgent repairs to roads damaged due to rains and road cuttings in
Sy.No.34 of Madivala village in BTM I stage, I phase-Part 'B'
BDA/EE/S/PW/WO/332/90-91 dt:14-03-91
1681
Urgent repairs to roads damaged due to rains and road cuttings in
Sy.No.34 of Madivala village in BTM I stage, I phase-Part 'A'
BDA/EE/S/PW/WO/333/90-91 dt:14-03-91
1682
Providing protective works to road from giving approaches to site
nos.220 & 221 of II block, III phase, BSK III stage.
BDA/EE/S/PW/WO/339/90-91 dt:14-03-91
1683
Repairs to existing culvert and side drains in rehabilitated slum at
K.S.l/o, I & II stage.
Providing protective retaining wall at the junction of Vidyapeeta
road and I main road in CKA l/o, Ch: 0 yo 58 mts.
BDA/EE/S/PW/WO/340/90-91 dt:14-03-91
1675
1676
1684
1685
Providing Re-Painting to l/o boards, cross boards in BTM I stage
layout.
BDA/EE/S/PW/WO/295/90-91 dt:27-02-91
BDA/EE/S/PW/WO/296/90-91 dt:27-02-91
BDA/EE/S/PW/WO/341/90-91 dt:14-03-91
BDA/EE/S/PW/WO/342/90-91 dt:14-03-91
1686
Repairs to roads damaged roads due to road cutting by BWSSB
15th main road in MICO l/o, II stage in BTM l/o (Part 'A')
BDA/EE/S/PW/WO/343/90-91 dt:27-02-91
1687
Formation of additional sites in K.S.l/o-Retaining wall, Ch: 90 to
120 mts.
Providing protective work to road for giving approaches to site
nos.189 and 190 of I block, III phase, BSK III stage.
BDA/EE/S/PW/WO/344/90-91 dt:18-03-91
1688
BDA/EE/S/PW/WO/345/90-91 dt:18-03-91
1689
Providing chain -link to the play ground (CA site No.19) in
J.P.Nagar II phase, Ch: 0 to 70mts.
BDA/EE/S/PW/WO/352/90-91 dt:23-03-91
1690
Providing chain -link to the play ground (CA site No.19) in
J.P.Nagar II phase, Ch: 70 to 140 mts.
BDA/EE/S/PW/WO/353/90-91 dt:23-03-91
1691
Providing chain -link to the play ground (CA site No.19) in
J.P.Nagar II phase, Ch: 140 to 210 mts.
BDA/EE/S/PW/WO/354/90-91 dt:23-03-91
1692
Providing chain -link to the play ground (CA site No.19) in
J.P.Nagar II phase, Ch: 210 to 280 mts.
BDA/EE/S/PW/WO/355/90-91 dt:23-03-91
1693
Providing chain -link to the play ground (CA site No.19) in
J.P.Nagar II phase, Ch: 280 to 350 mts.
BDA/EE/S/PW/WO/356/90-91 dt:23-03-91
1694
Providing chain -link to the play ground (CA site No.19) in
J.P.Nagar II phase, Ch: 350 to 420 mts.
BDA/EE/S/PW/WO/357/90-91 dt:23-03-91
1695
Providing chain -link to the play ground (CA site No.19) in
J.P.Nagar II phase, Ch: 490 to 555 mts.
BDA/EE/S/PW/WO/358/90-91 dt:23-03-91
1696
Widening the Kanakapura road from BSK Temple- Ch: 770 to 840
mts.
Urgent repairs to roads in Sy.No.47/A1 & 2 and 48/5 & 6 of
Tavarekere village under BTM scheme for 30' wide road.(East End
'C' main and 36th 'B' cross)
Providing & fixing missing cross boards and repainting to existing
cross boards in BTM scheme I stage layout.
BDA/EE/S/PW/WO/359/90-91 dt:25-02-91
1697
1698
1699
1700
1701
BDA/EE/S/PW/WO/363/90-91 dt:27-02-91
BDA/EE/S/PW/WO/365/90-91 dt:25-02-91
Repairs to road damaged due to road cutting done by BWSSB, to
9th, 10th & 11th main in in MICO l/o, II stage, in BTM II stage, I
phase.
Repairs to road damaged due to road cutting done by BWSSB, in
MICO l/o, II stage, under BTM l/o
BDA/EE/S/PW/WO/366/90-91 dt:18-03-91
Providing Rechipcarpetting to the bad asphalted surface of 16th,
17th main, 4th & 5th cross, J.P.Nagar, II phase.
BDA/EE/S/PW/WO/368/90-91 dt:18-03-91
BDA/EE/S/PW/WO/367/90-91 dt:18-03-91
1702
Repairs to road damaged due to road cutting done by BWSSB, 5th
& 6th cross in MICO l/o, II stage in BTM l/o.
BDA/EE/S/PW/WO/369/90-91 dt:18-03-91
1703
Providing chain -link to the play ground (CA site No.19) in
J.P.Nagar II phase, Ch: 420 to490-mts.
BDA/EE/S/PW/WO/370/90-91 dt:23-03-91
1704
Widening the Kanakapura Road from BSK temple, Ch: 210m to
280 mts.
Formation and drains for improving the road from BSK temple to
Uttarahalli Village under BSK V stage- Ch: 1675 mts.to 1950 mts.
BDA/EE/S/PW/WO/371/90-91 dt:27-02-91
1705
BDA/EE/S/PW/WO/374/90-91 dt:23-03-91
1706
Formation and drains for improving the road from BSK temple to
Uttarahalli Village under BSK V stage- Ch: 1425m to 1675 mts.
BDA/EE/S/PW/WO/375/90-91 dt:23-03-91
1707
Repairs to errosion of bad of ventway of SWD in CKA l/o, BSK III
stage, Ch:667m to 715mts.
BDA/EE/S/PW/WO/376/90-91 dt:23-03-91
1708
Providing Rechipcarpetting to the bad asphalted surface of 19th
cross road in J.P.Nagar VI phase.
BDA/EE/S/PW/WO/393/90-91 dt:12-03-91
1709
Providing Rechipcarpetting to the bad asphalted surface of 17th
cross (Balance length) in J.P.Nagar VI phase.
BDA/EE/S/PW/WO/394/90-91 dt:12-03-91
1710
Formation of missing link road of 32nd main to newly formed and
allotted sites in sy.no.5 of Sarakki village.
BDA/EE/S/PW/WO/398/90-91 dt:20-03-91
1711
Providing Seating steps around the play ground in CA site No.19 of
J.P.Nagar II phase, B'lore, Ch: 165m to 220 mts.
BDA/EE/S/PW/WO/428/90-91 dt:01-08-91
1712
Providing Seating steps around the play ground in CA site No.19 of
J.P.Nagar II phase, B'lore, Ch: 400m to 435 mts.
BDA/EE/S/PW/WO/423/90-91 dt:01-08-91
1713
Providing Seating steps around the play ground in CA site No.19 of
J.P.Nagar II phase, B'lore, Ch: 365m to 400 mts.
BDA/EE/S/PW/WO/424/90-91 dt:01-08-91
1714
Providing Seating steps around the play ground in CA site No.19 of
J.P.Nagar II phase, B'lore, Ch: 330mts to 365m
BDA/EE/S/PW/WO/425/90-91 dt:01-08-91
1715
Providing Seating steps around the play ground in CA site No.19 of
J.P.Nagar II phase, B'lore, Ch: 275mts to 330mts
BDA/EE/S/PW/WO/426/90-91 dt:01-08-91
1716
Providing Seating steps around the play ground in CA site No.19 of
J.P.Nagar II phase, B'lore, Ch: 220mts to 275mts
BDA/EE/S/PW/WO/427/90-91 dt:01-08-91
1717
Providing Seating steps around the play ground in CA site No.19 of
J.P.Nagar II phase, B'lore, Ch: 110mts to 165mts
BDA/EE/S/PW/WO/429/90-91 dt:01-08-91
1718
Providing Seating steps around the play ground in CA site No.19 of
J.P.Nagar II phase, B'lore, Ch: 55mts to110mts
BDA/EE/S/PW/WO/430/90-91 dt:01-08-91
1719
Providing Seating steps around the play ground in CA site No.19 of
J.P.Nagar II phase, B'lore, Ch: 0 to 55mts
BDA/EE/S/PW/WO/431/90-91 dt:01-08-91
91-92
1720
Repairs to road cutting anf filling pits & ruts and depression filling
to the roads in VI block, II phase, BSK III stage, I st 'D' & 'E' cross
roads.
Widening & improvements to I main road in Channammanakere
auchukut l/o in BSK III stage, Ch: 0 to 390mts.
BDA/EE/S/PW/WO/AE/42/91-92 dt:05-07-91
Widening & improvements to 7th cross & of VI block, BSK III stage,
Ch: 390 to 745mts.
Repairs to damaged roads, drains & culverts in channammanakere
auchukut l/o in BSK III stage.
BDA/EE/S/PW/WO/AE/392/91-92 dt:11-04-91
Maintenance of roads & drains in East of Kathriguppa IV phase,
BSK III stage.
Formationm of EWS sites in K.S.l/o, I stage, Ch: 0 to 76 mts.
BDA/EE/S/PW/WO/AE/404/91-92 dt:06-05-91
1726
Sinking of 150mm dia borewell & construction of platform &
providing & fixing India Mark -II hand pump at BSK III stage, III
phase, III block & sy.No.109 of Kathriguppa, BSK III stage.
BDA/EE/S/PW/WO/AE/408/91-92 dt:03-06-91
1727
Urgent repairs to road damaged due to rain & road cuttings in
Sy.No.34 of Madivala Village in BTM I stage, I phase.
BDA/EE/S/PW/WO/AE/409/91-92 dt:18-05--91
1728
Sinking of borewell 140 to 149mm, fixing IM-II handing pump &
construction of platform in Srinivasanagar I Phase, Gerehalli
sy.No.8 to 14 and Kathriguppa village, BSK III satge.
Annual maintenance of Borewell in BSK III stage, III phase I to IV
th block.
Annual maintenance of Borewell in Kumaraswamy l/o I & II stage
(74 nos) from 01-04-91 to 31-03-91.
BDA/EE/S/PW/WO/AE/410/91-92 dt:03-06-91
1731
Annual maintenance of Borewell in BSK III stage, Srinivasanagar I
& II phase(78 nos) from 01-04-91 to 31-03-92.
BDA/EE/S/PW/WO/AE/413/91-92 dt:18-06--91
1732
Repairs to road cutting anf filling pits & ruts and depression filling
to the roads in Muneshwara block, BSK III stage, 17th main road.
BDA/EE/S/PW/WO/AE/420/91-92 dt:05-07--91
1733
Raising the road level and formation of I nain & Vidyapeeta road at
the junction in Channammanakere auchukut l/o in BSK III stage, III
phase.
BDA/EE/S/PW/WO/AE/422/91-92 dt:07-05-91
1721
1722
1723
1724
1725
1729
1730
BDA/EE/S/PW/WO/AE/378/91-92 dt:05-04-91
BDA/EE/S/PW/WO/AE/399/91-92 dt:19-04-91
BDA/EE/S/PW/WO/AE/406/91-92 dt:17-05-91
BDA/EE/S/PW/WO/AE/411/91-92 dt:03-06-91
BDA/EE/S/PW/WO/AE/412/91-92 dt:18-06--91
1734
BDA/EE/S/PW/WO/AE/432/91-92 dt:01-08-91
1736
Providing barbed wire fencing to CA site in New Timber Yard l/o , II
stage, BSK III stage.
Sinking of borewell 140 to 149mm, fixing IM-II handing pump &
construction of platform complete in N.S.Palya village. Under BTM
scheme.
Maintenance of borewells at Avalahalli village, BSK III stage.
1737
Repairs & maintenance of borewells in J.P.Nagar I to IV phase.
BDA/EE/S/PW/WO/AE/438/91-92 dt:01-08-91
1738
Maintenance of borewells at Hosakerehalli village, BSK III stage.
BDA/EE/S/PW/WO/AE/439/91-92 dt:01-08-91
1739
Maintenance of borewells in N.S.Palya village under BTM II stage,
I phase.
Maintenance of borewells for 1001-92 in BTM layout.
BDA/EE/S/PW/WO/AE/440/91-92 dt:01-08-91
1741
Construction of masonry drain around site No.1 & 20 in 100' ring
road and 80' road in BSK III stage, III phase, IV Block.
BDA/EE/S/PW/WO/AE/468/91-92 dt:30-08-91
1742
Providing l/o boards at newly acquired lands of Ittamadu Village.
BDA/EE/S/PW/WO/AE/469/91-92 dt:06-09-91
1743
Fencing the CA site No.3 in II block, III phase, BSK III stage.
BDA/EE/S/PW/WO/AE/471/91-92 dt:06-09-91
1744
Filling of ptholes, depression filling & camber correction to 100'
road from chaimage:1110m to 1315m in BSK III stage, III phase,
BDA/EE/S/PW/WO/AE/472/91-92 dt:06-09-91
1745
Formation of road in Govinayakanahalli (2nd cross road)
BDA/EE/S/PW/WO/AE/475/91-92 dt:30-08-91
1746
Formation of road in (Missing bits) in Manjunatha slum in BSK III
stage.
Formation of road in Govinayakanahalli (4th cross road)
BDA/EE/S/PW/WO/AE/478/91-92 dt:08-09-91
1735
1740
1747
BDA/EE/S/PW/WO/AE/436/91-92 dt:01-08-91
BDA/EE/S/PW/WO/AE/437/91-92 dt:01-08-91
BDA/EE/S/PW/WO/AE/441/91-92 dt:01-08-91
BDA/EE/S/PW/WO/AE/479/91-92 dt:30-08-91
1748
Filling of ptholes, depression filling & camber correction to 100'
road from chaimage:0 to 220m in BSK III stage, III phase,
BDA/EE/S/PW/WO/AE/490/91-92 dt:06-09-91
1749
Repairs to flood damage and prevention of Erossion of bed of
SWD in CKA, l/o, BSK III stage.
BDA/EE/S/PW/WO/AE/492/91-92 dt:30-08-91
1750
Improvements to roads in Sarakki Agrahara (14th 'A' main)
including re-chipcarpetting to damaged portion.
BDA/EE/S/PW/WO/AE/494/91-92 dt:06096666y7ujj-91
1751
Construction of Culverts in Srinivasanagar 2nd stage, BSK III
stage(7 Culverts)
Providing Rechipcarpetting to 4th 'A', 5th main & 9th, 10th & 11th
cross road in MICO layout I stage, for bad reaches & road cuttings
under BTM II stage, I phase.
Providing lead off drain culvert in Sy.No.120 of Kathriguppsa, BSK
III stage.
Repairs to road cuttings, potholes & patches in chipcarpetted
surface of roads in Sy.no.96, 97 of Madivala Village, BTM I stage, I
phase.
BDA/EE/S/PW/WO/AE/495/91-92 dt:3-09-91
1752
1753
1754
BDA/EE/S/PW/WO/AE/498/91-92 dt:06-09-91
BDA/EE/S/PW/WO/AE/499/91-92 dt:09-09-91
BDA/EE/S/PW/WO/AE/500/91-92 dt:06-09-91
1755
Improvements of roads in Sy.No.20/1B of Tavarekere, BTM I
stage, I phase, upto 9th main and cross roads.
BDA/EE/S/PW/WO/AE/501/91-92 dt:06-09-91
1756
Paving with B.S.slabs for lanes in sloping areas (The slum is
located on hillock.)
Repairs to road cuttings, potholes & patches in chipcarpetted
surface of roads and maintenance of side drains to 5th cross road
of BTM, II stage, I phase.
Repairs, pot holes filling, patches & damaged roads in MICO l/o, I
stage, bad reaches & road cuttings for 6th main & 2nd & 3rd cross
roads under BTM, II stage, I phase.
Urgent repairs to road cuttings & side drains & CD works in
sy.no.4/2 of Tavarekere (Part'A')
BDA/EE/S/PW/WO/AE/502/91-92 dt:09-09-91
1760
Improvements to Bus bay in Avalahalli layout in BSK III stage.
BDA/EE/S/PW/WO/AE/508/91-92 dt:09-09-91
1761
Construction of Culverts in Srinivasanagar 2nd stage, BSK III
stage(8 Culverts)
Potholes filling, road cutting and other improvements to the road
surface from Ch: 350m to 700m, leading to layout Sy.No.92 &93 of
Tavarekere, BTM, I stage, I phase.
Potholes filling, road cutting and other improvements to the road
surface from Ch:0 to 350m leading to layout Sy.No.92 &93 of
Tavarekere, BTM, I stage, I phase.
Providing masonry drain for disposing flood water alround the
Community Centre, at Avalahalli, BSK III stage.
BDA/EE/S/PW/WO/AE/510/91-92 dt:30-08-91
Rechipcarpetting to 29th main road due to road cutting, potholes
and depression filling etc., in BTM II stage, I phase-Ch:940m to
1410mts.
Metalling & improvements to road in Sy.NO.120 of Kathriguppa
approach road to bridge towards Western side.
BDA/EE/S/PW/WO/AE/529/91-92 dt:09-09-91
1757
1758
1759
1762
1763
1764
1765
1766
BDA/EE/S/PW/WO/AE/505/91-92 dt:09-09-91
BDA/EE/S/PW/WO/AE/506/91-92 dt:09-09-91
BDA/EE/S/PW/WO/AE/507/91-92 dt:09-09-91
BDA/EE/S/PW/WO/AE/525/91-92 dt:23-09-91
BDA/EE/S/PW/WO/AE/526/91-92 dt:23-09-91
BDA/EE/S/PW/WO/AE/527/91-92 dt:23-09-91
BDA/EE/S/PW/WO/AE/530/91-92 dt:23-09-91
1767
Flood damage- Rrepairs by protecting the damaged portion below
Hume pipe of the bridge across 100' ring road in BSK III stage.
BDA/EE/S/PW/WO/AE/531/91-92 dt:27-09-91
1768
Flood damage- Repairs & protective workd to D/S of the bridge to
prevent further damage and scour to SWD in BSK III stage.
BDA/EE/S/PW/WO/AE/532/91-92 dt:27-09-91
1769
Repairs to road cutting, potholes & patches in chipcarpetted
surface of the roads & maintenance of side drains to 3rd cross
road of BTM II stage, I phase.
Providing Rechipcarpetting to 7th main &12th cross road in MICO
layout I stage, for bad reaches & road cuttings under BTM II stage,
I phase.
BDA/EE/S/PW/WO/AE/533/91-92 dt:23-09-91
1770
BDA/EE/S/PW/WO/AE/534/91-92 dt:23-09-91
1771
Providing Rechipcarpetting to 6th main & 6th & 8th cross road in
MICO layout I stage, for bad reaches & road cuttings under BTM II
stage, I phase.
Repairs to potholes filling road cutting and re-chipcarpetting in K.S
l/o I stage.
Providing patch repairs & potholes filling to roads due to heavy rain
& road cutting in J.P.Nagar , IV phase.
BDA/EE/S/PW/WO/AE/535/91-92 dt:23-09-91
1774
Flood damage- Urgent repairs to collapsed wall of SWD from
Ch:288m to 305mts, in C.K.A l/o, BSK III stage, III phase.
BDA/EE/S/PW/WO/AE/544/91-92 dt:27-09-91
1775
Clearing the Garbage in the Dust Bins of J.P.Nagar II Phase,
House NO.800 to 2045
Paving the roads in Avalahally village BSK III stage 6th, 7th, and
14th roads
Improvements to formation of road and providing side drains at
Avalahalli 1st 13th and 14th roads
BDA/EE(S)/PW/WO/AE/77/91-92 DT 19.03.1992
Providing RCC name boards painting the name boards in
kumaraswamy layout II stage
Construction of cross Drainage works to the road from
Banashankari Temple to Uttrahalli ch 3000m to 4000Mtrs
BDA/EE(S)/AE/PW/WO/591/91-92 DT
05.12.1991
BDA/EE(S)/AE/PW/WO/652/91-92 DT
21.12.1991
1780
Maintenance of roads drains footpath and culverts etc., in
jayanagar HBCS and ITI Layout
BDA/EE(S)/AE/PW/WO/594/91-92 DT
01.12.1991
1781
Providing grill work to the corridor of commercial complex at BSK II
stage (Eastern wing)
Maintenance of roads, culverts in Sy No.8 to 10 of Gerehally
Srinivasanagar II Phase BSK III Stage
BDA/EE(S)/AE/PW/WO/593/91-92 DT
11.12.1991
BDA/EE(S)/AE/PW/WO/625/91-92 DT
11.12.1991
1783
Raising of compound to the garden of Commercial Complex and
providing grill work at BSK IInd Stage
BDA/EE(S)/636/91-92 DT 28.12.1991
1784
Improvements to road in sy No.17 of Kathriguppa BSK III Stage
BDA/EE(S)/628/91-92 DT 11.12.1991
1785
Improvements to formation of road and Providing side drains at
Avalahalli Village BSK III Stage, 3rd, 4th & 5th roads
BDA/EE(S)/AE/PW/WO/629/91-92 DT
11.12.1991
1786
Formation of road and Drains (Balance Length) in sy No.15 of
Kathriguppa BSK III Stage
Improvements to formation of roads and providing side drains in
Hosakerehalli village, Banashankari III Stage, 2, 3, 4, 5 & 6th roads
BDA/EE(S)/AE/PW/WO/627/91-92 DT
11.12.1991
BDA/EE(S)/AE/PW/640/91-92 DT 20.12.1991
Formation of Village roads Providing side drains culverts &
Improvements to road in N.S.Palya Village in B.T.M. Layout (Part
'A')
BDA/EE(S)/AE/PW/WO/633/91-92 DT
11.12.1991
1772
1773
1776
1777
1778
1779
1782
1787
1788
BDA/EE/S/PW/WO/AE/537/91-92 dt:30-09-91
BDA/EE/S/PW/WO/AE/542/91-92 dt:30-09-91
BDA/EE(S)/587/91-92 DT 05.12.1991
BDA/EE(S)/AE/PW/WO/592/91-92 DT
05.12.1991
1789
1790
1791
1792
1793
1794
1795
1796
1797
Sinking borewell 150mm dia fixing Im II hand pump and
Constructing platform complete in Kathriguppe village B.S.K. III
Stage, III Phase
Providing sinking of borewell fixing, Im II Hand pump and
constructing plat form in Srinivasanagar II Phase BSK III Stage (3
Nos)
Improvement and Formation of road Along SWD in sy no.17 of
Kathriguppa BSK III Stage
Formation of missing roads in the allotted sites in 7th block 4th
phase, BSK III stage
Improvements to the CA site in sy No.120 of Kathriguppa BSK III
Stage
Maintenance of roads and drains and Culverts footpath etc in sy
no.2 to of gerehally Srinivasanagar.
Pot hole filling the roads leading to Jeragenahally H.B.C.S. in
K.S.Layout I Stage
Patch repairs to roads in slums of Bhavaninagar Yarabnagar
BDA/EE(S)/632/91-92 DT 11.12.1991
BDA/EE(S)/630/91-92 DT 11.12.1991
BDA/EE(S)/AE/PW/WO/643/91-92 DT
20.12.1991
BDA/EE(S)/AE/PW/626/91-92 DT 11.12.1991
BDA/EE(S)/654/91-92 DT 21.12.1991
BDA/EE(S)/653/91-92 DT 21.12.1991
BDA/EE(S)/PW/WO/538/91-92 DT 08.10.1991
BDA/EE(S)/PW/WO/540/91-92 DT 08.10.1991
Repairs, pot holes filling, patches and damaged roads in MICO
Layout I Stage, bed reaches and road cuttings for 3rd & 4th cross
and 3rd 'A' and 4th 'A' main road
Providing re-chipcarpetting to 5th and 5th 'A' main roads and 5th
cross roads in MICO I stage, under BTM II Stage I Phase
BDA/EE(S)/PW/WO/539/91-92 DT 08.10.1991
1799
Patch repairs and potholes filling to 8th main road from 100' ring
road in J.P.nagar IV Phase
BDA/EE(S)/PW/WO/AE/543/91-92 DT
08.10.1991
1800
Improvements and providing Masonry culvert and regarding the
side drains and constructing the SSM., drain in BSK III stage, Pope
line Block II
Repairs to road cutting, filling pits and rutes & depression filling to
40' road by the side of K.E.B. office in II Phase, BSK III Stage
BDA/EE(S)/PW/WO/AE/536/91-92 DT
08.10.1991
BDA/EE(S)/PW/WO/AE/557/91-92 DT
21.10.1991
1802
Filling up of potholes depression filling and camber correction to
100' road from ch 560m to 790mtrs., in BSK III Stage, III Phase
BDA/EE(S)/PW/WO/AE/561/91-92 DT
12.11.1991
1803
Repairs to road cutting, pot holes, patches to chicapretted surface
of the road and maintainence of side drain in Maruthi HBCS in Sy
No.4/1 of Tavarekere to E to G main road
BDA/EE(S)/PW/WO/545/91-92 DT 14.10.1991
1804
Providing outain link fencing to CA site NO.13 at BTM II Stage from
ch 540 m to 560mts
Sinking borewell 150mm dia fixing Im-II hand pump and
constructing plat form complete in Madivala Village under BTM
BDA/EE(S)/551/91-92 DT 21.10.1991
1798
1801
1805
BDA/EE(S)/PW/WO/541/91-92 DT 08.10.1991
BDA/EE(S)/PW/WO/AE/555/91-92 DT
21.10.1991
Scheme (3 Nos)
1806
1807
1808
Sinking Borewell 150mm dia fixing Im-II hand pump and
constructing plat form complete in Tavarekere Village, under BTM
Scheme (3 Nos)
Annual maintenance of Borewell in Madivala village under BTM
Scheme
Repairs to Borewells at Tavarekere Village under BTM Scheme
BDA/EE(S)/PW/WO/AE/556/91-92 DT
21.10.1991
BDA/EE(S)/PW/WO/AE/554/91-92 DT
21.10.1991
BDA/EE(S)/PW/WO/AE/553/91-92 DT
21.10.1991
BDA/EE(S)/PW/WO/558/91-92 DT 04.11.1991
1809
Improvements to roads in Sy No.20/1B of Thavarekere Village
BTM I Stage for 8th, 8th A and 8th B Main Roads
1810
Formation of approach road to layout in Sy No.20/1A, 1B, and 21
of Ittamadu BSK IV Stage ch 0 to 150mts
BDA/EE(S)/PW/WO/AE/560/91-92 DT
12.11.1991
1811
Formation of approach road to layout in Sy No.20/1A, 1B, and 21
of Ittamadu BSK IV Stage ch 150 to 300mts
BDA/EE(S)/PW/WO/AE/559/91-92 DT
12.11.1991
1812
Construction of masonry protection wall (missing link) in Sy No.34
of Madivala Village adjucent to Dollar Scheme under BTM I Stage,
I Phase ch 83 to 151mts
Formation of approach linking road by connecting the newly
formed road and improvement to roads in BDA layout & for interior
village road of N.S.Palya under BTM Scheme (Part 'C')
BDA/EE(S)/PW/WO/AEE-2/565/91-92 DT
25.11.1991
Construction of masonry protection wall (missing link ) in Sy No.34
of Madivala Village adjacent to Dollar Scheme under BTM I Stage
Chainage 15 to 83mtrs
Construction of masonry protection wall (missing link) in Sy No.2 to
10 of Madivala Village under BTM I Stage, Chainage 151 to
219mtrs
Providing bed treatemnt to (Missing link) existing S.W.D. in Sy
No.34 of Madivala Village adjacent to Dollar Scheme under BTM I
Stage Chainage 15 to 83M
Improvements to road from old Madivala to temple ch 0 to 400mts
BDA/EE(S)/PW/WO/AE/568/91-92 DT
30.11.1991
1813
1814
1815
1816
1817
1818
Formation of Village roads, providing side drains culverts and
improvement to roads in N.S.Palya village in BTM layout (Part B)
1819
Improvements to roads in Sy No.56, 57 & 172 of Bilakarahally
Dollar Scheme under BTM II Stage I Phase, for 2nd 3rd main & Ist
cross road
BDA/EE(S)/PW/WO/AEE-2/585/91-92 DT
30.11.1991
BDA/EE(S)/PW/WO/AE/574/91-92 DT
30.11.1991
BDA/EE(S)/AE/575/91-92 DT 30.11.1991
BDA/EE(S)/AE/PW/WO/566/91-92 DT
25.11.1991
BDA/EE(S)/AE/PW/WO/564/91-92 DT
25.11.1991
BDA/EE(S)/AE/PW/WO/563/91-92 DT
25.11.1991
1820
Providing bed treatemnt to (Missing link) existing S.W.D. in Sy
No.34 of Madivala Village adjacent to Dollar Scheme under BTM I
Stage Chainage 83 to 151 Mts
Flood Damage urgent repairs to ventway of SWD at Ch 255M to
315M in CKA Layout BSK III Stage, III Phase
BDA/EE(S)/AE/PW/WO/634/91-92 DT
11.12.1991
1822
Widening of balance portion of 4th main road in Bilakanahalli Dollar
Scheme under BTM II stage, I Phase
BDA/EE(S)/AE/PW/WO/569/91-92 DT
30.11.1991
1823
Providing BS slab drain to link road between 2nd cross to 60' road
ch 678 to 936 mts main road leading to Jai Bheemanagar ch 0 to
50mts
Improvement to formation of roads and providing side drains at
Avalahally village BSK III stage, and 11th and 12th roads
BDA/EE(S)/AE/PW/WO/589/91-92 DT
05.12.1991
BDA/EE(S)/AE/PW/WO/572/91-92 DT
30.11.1991
1825
Providing boundary stones numbering stones in Bilakanahally
Dollar scheme BTM II stage, I Phase
BDA/EE(S)/AE/PW/WO/573/91-92 DT
30.11.1991
1826
Improvements to formation of road and providing side drain at
Hosakerehally village I main road
BDA/EE(S)/AE/PW/WO/576/91-92 DT
30.11.1991
1827
Filling of pot holes, depression filling and camber correction to 100'
ring road II Phase Banashankari III stage chainage 1315 to 1505
mtrs
Repairs to road cutting, pot holes and patches in chipcarpetted
surface of the roads to 22nd 24th and 25th main road in BTM II
stage, I Phase
Improvements to formation of roads and providing side drains of
Hosakerehalli village 7th, 8th, 9th, 10th and 11th roads
BDA/EE(S)/PW/578/91-92 DT 30.11.1991
1830
Construction of compound wall for BDA ward office building in
Kumaraswamy layout I stage
BDA/EE(S)/PW/581/91-92 DT 30.11.1991
1831
Metalling the roads of Hosakerehalli village, Banashankari II stage
I main road
Matalling the roads at Hosakerehalli village Banashankari III stage
2nd, 3rd, 4th to 11th roads
BDA/EE(S)/PW/WO/AE/583/91-92 DT
30.11.1991
BDA/EE(S)/PW/WO/AE/
/91-92 DT
Repairs to road cutting, pot holes and bad reaches in
Chipcarpetted surface of roads for 2nd, 2nd A 2nd B and 3rd cross
road in BHBCS layout under BTM II stage I Phase
Repairs to road cuttings, pot-holes and bad reaches on
chipcarpetted surface of roads for 2nd cross, 3rd, 4th and 5th main
roads in Vijaya Bank HBCS layout under BTM II Stage, I Phase
BDA/EE(S)/PW/580/91-92 DT 30.11.1991
1821
1824
1828
1829
1832
1833
1834
BDA/EE(S)/AE/PW/WO/570/91-92 DT
30.11.1991
BDA/EE(S)/PW/577/91-92 DT 30.11.1991
BDA/EE(S)/PW/WO/AE/582/91-92 DT
30.11.1991
BDA/EE(S)/PW/579/91-92 DT 30.11.1991
1835
Urgent repair to drain and flood damage to the road from BSK
templet to Uttarahalli ch 0 to 4Km
1836
Metalling the roads at Avalahally village BSK III stage
BDA/EE(S)/590/91-92 DT 05.12.1991
1837
Formation of roads drains culverts in Sy No.9 of Kathriguppa, BSK
III Stage
Construction of culverts in Sy No.10 of Kathriguppa, BSK III Stage
BDA/EE(S)/AE/PW/WO/647/91-92 DT
21.12.1991
BDA/EE(S)/AE/PW/WO/646/91-92 DT
21.12.1991
BDA/EE(S)/AE/PW/WO/645/91-92 DT
21.12.1991
1838
1839
Construction of masonary steps to approach to Sy No.10 (New
120) of Kathriguppa in BSK III Stage
1840
Removal of garbage in Kumaraswamy layout II stage
1841
Construction of masonary drain for seepage water in KAS and
Bank officers layout in Madiwala village (missing chainage) to lead
off upto Hosur road)
Rechipcarpetting the road leading to Jaraganahally HBCS in
Kumaraswamy Layout II Stage
1842
1843
BDA/EE(S)/PW/WO/AE/586/91-92 DT
05.12.1991
BDA/EE(S)/AE/PW/WO/642/91-92 DT
20.12.1991
BDA/EE(S)/651/91-92 DT 21.12.1991
BDA/EE(S)/AE/PW/WO/637/91-92 DT
20.12.1991
Repairs to pot holes filling road cutting and rechipcarpetting in
K.S.Layout II stage
Providing grill work to the corridor of commercial complex at BSK II
Stage (Western wing)
BDA/EE(S)/AE/PW/WO/671/91-92 DT
06.01.1991
BDA/EE(S)/AE/PW/WO/638/91-92 DT
20.12.1991
Maintenance of Roads, Drains, Footpath in Kumaraswamy Layout I
Stage
Maintenance of roads, culverts drains in Sy No.12, 13 and 14 of
Garahally, Srinivasangar II Phase BSK III Stage
BDA/EE(S)/AE/PW/WO/650/91-92 DT
21.12.1991
BDA/EE(S)/655/91-92 DT 21.12.1991
1847
Removal of Garbage in Kumaraswamy Layout I Stage
1848
Repairs to storm water Drain by the side of 4th, 6th and 7th block
at BSK III Stage, II Phase
BDA/EE(S)/PW/WO/AE/641/91-92 DT
20.12.1991
BDA/EE(S)/656/91-92 DT 21.12.1991
1849
Filling pot holes road cutting in 100' ring road near
Padmanabhanagar BSK III Stage
Repairs to roads and removing of silt in drains and providing
missing slabs in JP Nagar IV Phase
BDA/EE(S)/AE/PW/WO/639/91-92 DT
20.12.1991
BDA/EE(S)/AE/PW/WO/635/91-92 DT
20.12.1991
Construction of stage at the playground in Sy No.120 of
Kathriguppa, BSK III Stage
Construction of storm water drain in Kumaraswamy layout slum
from Gowdanapalya Tank ch 0 to 170Mtrs
BDA/EE(S)/AE/PW/WO/644/91-92 DT
21.12.1991
BDA/EE(S)/AE/PW/WO/669/91-92 DT
06.01.1992
Maintenance of Roads, Drains, Footpath in Kumaraswamy Layout
BDA/EE(S)/AE/PW/WO/649/91-92 DT
1844
1845
1846
1850
1851
1852
1853
II Stage
21.12.1991
1854
Maintenance of roads, Drains and Culverts, Footpath etc., in Sy
No.11 of Gerehalli, Srinivasanagar
BDA/EE(S)/AE/PW/WO/648/91-92 DT
21.12.1991
1855
Maintenance of roads, Culverts and drains etc., in BTM II Stage, I
Phase
Improvement to roads and drains in layout in Sy No.92, 93 of
Tavarekere BTM I Stage
Providing rechipcarpetting to 16th main road for bad reached and
road cuttings, depressions etc, in BTM II Stage I Phase
BDA/EE(S)/665/91-92 DT 02.01.1992
BDA/EE(S)/AE/PW/WO/659/91-92 DT
02.01.1992
BDA/EE(S)/AE/PW/WO/661/91-92 DT
02.01.1992
1858
Improvements of roads in Sy No.20/1 B of Tavarekere under BTM I
Stage, for 7th, 7th 'A' main road and 4th cross road
BDA/EE(S)/AE/PW/WO/677/91-92 DT
17.01.1992
1859
Clearing the garbage in the dust bins of private layout under BTM
Scheme.
Clearing the garbage in the dust bins of BTM Layout II Stage, I
Phase
Repairs to road cuttings, pot holes, patdhes on Chipcarpetted
surface of the roads in KEB layout and maintenance of side drains
4th to 7th main road
Improvement to SWD all slong sy No.17 of kathriguppa BSK III
Stage
Providing fencing to CA site 1, 5 and 19 and improvement to CA
site in I Phase Ideal Homes HBCS Layout
BDA/EE(S)/AE/PW/WO/666/91-92 DT
02.01.1992
BDA/EE(S)/AE/PW/WO/667/91-92 DT
02.01.1992
BDA/EE(S)/JE/PW/WO/662/91-92 DT 02.01.1992
1864
Repairs to road cutting and potholes and road sufface and
maintenance of side drains in Cauvery HBCS layout
BDA/EE(S)/AE/PW/WO/658/91-92 DT
02.01.1992
1865
Estimate for raising the road level and construction of Masonry
drain in low lying area of Kumaraswamy Layout II Stage Ch 3650
to 3700Mts
Providing BS slab drain to old madivala temple road from ch 0 to
460mts
Construction of Compound wall with barbed wire chainlink to
divisional stores at ward office in BSK II Stage
BDA/EE(S)/AE/PW/WO/660/91-92 DT
02.01.1992
1868
Providing cross drainage works to roads of Tavarekere Village
BDA/EE(S)/AE/PW/674/91-92 DT 08.01.1992
1869
Garbage cleaning in Vidyapeeta layout Sy No.120 of Kathriguppa
including 7th Block, 4th Phase
BDA/EE(S)/AE/PW/WO/673/91-92 DT
08.01.1992
1870
Providing barbed wire fencing to Sy No.17 BSK III Stage
BDA/EE(S)/AE/PW/WO/686/91-92 DT
23.01.1992
1856
1857
1860
1861
1862
1863
1866
1867
BDA/EE(S)/JE/PW/WO/664/91-92 DT 02.01.1992
BDA/EE(S)/3509/91-92 DT 09.12.1991
BDA/EE(S)/AE/PW/WO/672/91-92 DT
08.01.1992
BDA/EE(S)/675/91-92 DT 08.01.1992
1871
Pot hole filling and chipcarpetting road from Vidyapeeta to
Kathriguppa BSK III Stage (Pot Hole Filling)
BDA/EE(S)/AE/PW/WO/679/91-92 DT
17.01.1992
1872
Improvement to roads in Sy No.17 of Kathriguppa BSK III Stage
1873
Formation of layout in Sy No.32 of Marenahalli in Favour of
Scheduled caste (harijans) HBCS under J.P.Nagar II Phase, for
23rd main 'A' 6th cross & 6th B Cross
Formation of layout in Sy No.20/1A, 20/1B, 21 of Ittamadu Village
Approach road to Ittamadu BSK IV Stage, Ch 300 to 450mts
BDA/EE(S)/AE/PW/WO/676/91-92 DT
17.01.1992
BDA/EE(S)/AE/PW/WO/681/91-92 DT
17.01.1992
1874
1875
BDA/EE(S)/AE/PW/WO/678/91-92 DT
17.01.1992
Formation of layout in Sy No.32 of Marenahalli in Favour of
Scheduled caste (Harijans) HBCS under J.P.Nagar II Phase, for
8th cross, 7th cross and 6th B cross roads
Reairs to road and drains and providing missing slab to drain in
BTm I stage, I Phase Sy No.96 and 97 of Madivala
BDA/EE(S)/AE/PW/WO/680/91-92 DT
17.01.1992
1877
Formation of layout in Sy No.142 of N.S.Palya under BTM II Stage,
linking road to N.S.Palya Village road
BDA/EE(S)/AE/PW/WO/683/91-92 DT
17.01.1992
1878
Formation of layout in Sy No.142 of N.S.Palya under BTM II Stage,
continuing the existing I Stage, main road
BDA/EE(S)/AE/PW/WO/684/91-92 DT
23.01.1992
1879
Construction of CD works at road crossing of hosakerehalli village
BSK II Stage, 1st, 2nd, 3rd, 4th 5th, 6th and 11th roads
BDA/EE(S)/692/91-92 DT 31.01.1992
1880
Estimate for construction of CD works at road crossing of
Avalahalli village BSK III Stage, Ist, 2nd, 3rd, 4th, 6th, 7th, 11th,
12th and 14th roads
Maintenance of Sarakki dollar scheme layout
BDA/EE(S)/693/91-92 DT 31.01.1992
1876
1881
1882
Fencing of CA sites no.17 & 18 Improvements to CA sites in I
Phase Ideal Home's HBCS layout
1883
Construction of 7 Nos of Culverts in formation of Layout in Sy
No.32 of Marenahalli in Favour of Scheduled caste (Harizans)
HBCS under J.P.Nagar II Phase
Arranging power supply to 1000 EWS houses Supplying laying and
servicing (KEB Portion work) in 2nd stage Kumaraswamy layout
(Service main cable work)
Arranging power supply to 1000 EWS houses Supplying laying and
servicing (KEB Portion work) in 2nd stage Kumaraswamy layout
(Service main cable work)
Improvements to 24th main road from southern side of ring road
6th phase, J.P.Nagar (1st reach)
1884
1885
1886
BDA/EE(S)/682/91-92 DT 17.01.1992
BDA/EE(S)/AE/PW/WO/688/91-92 DT
23.01.1992
BDA/EE(S)/AE/PW/WO/706/91-92 DT
01.02.1992
BDA/EE(S)/AE/PW/WO/712/91-92 DT
01.02.1992
BDA/EE(S)/778/91-92 DT 23.03.1992
BDA/EE(S)/737/91-92 DT 21.02.1992
BDA/EE(S)/PW/WO/AE/750/91-92 DT
27.02.1992
1887
Removal of silt and repairs to culverts and drains and providing
missing slabs form 100' road to the end of sarakki VI Phase
BDA/EE(S)/PW/WO/AE/743/91-92 DT
27.02.1992
1888
Repairs to roads damaged due to heavy rains and road cutting
including filling the water stagnated area in VI Phase J.P.Nagar
BDA/EE(S)/PW/WO/AE/742/91-92 DT
27.02.1992
1889
Clearing the silt removing & resetting of BS slab drains and
culverts in J.P.nagar V Phase
BDA/EE(S)/PW/WO/AE/740/91-92 DT
27.02.1992
1890
Providing protective bed to the vent way of SWD from ch 80 to
140mts in CKA layout BSK III Stage III Phase (Flood damage
work)
Improvements to road behind vidyapeeta in Sy No.120 of
Kathriguppa BSK II Stage
Improvements to Akola Karnataka machi madivala sangha layout
in Sy No.120 of Kathriguppa BSK III Stage
BDA/EE(S)/PW/WO/AE/741/91-92 DT
27.02.1992
1893
Regarding the lead off drain towards SWD in V Phase J.P.Nagar
BDA/EE(S)/PW/WO/754/91-92 DT 28.02.1992
1894
Providing minor culverts at the crossing of roads in Kathriguppa
village for A B C D to K roads
BDA/EE(S)/PW/WO/AE/749/91-92 DT
27.02.1992
1895
Reconstructiion of retaining wall from ch 85 to 114mts and 126 to
135 mts on western side of SWD in CKA layout BSK III Stage,
(Flood damage work)
Maintenance and removal of silt of SWD in Sarakki Dollar Scheme
in J.P.Nagar V Phase Ch 0 to 345mts
BDA/EE(S)/PW/WO/AE/744/91-92 DT
27.02.1992
Metalling and asphalting to approach road to Manjunatha slum
from CT Bed
Repairs to roads damaged due to heavy rains and road cuttings
including filling the water stagnated area in V phase J.P.nagar
BDA/EE(S)/753/91-92 DT 28.02.1992
1891
1892
1896
1897
1898
1899
BDA/EE(S)/PW/WO/AE/751/91-92 DT
27.02.1992
BDA/EE(S)/PW/WO/AE/752/91-92 DT
28.02.1992
BDA/EE(S)/PW/WO/AE/766/a/91-92 DT
28.02.1992
BDA/EE(S)/747/91-92 DT 27.02.1992
Repairs to roads and drains and culverts in Avalahalli layout BSK
III Stage
Remetalling and Asphalting the Roads in Channammanakere
Atchkut layout BSK III Stage, III Phase, (Part 'A')
BDA/EE(S)/PW/WO/AE/767/91-92 DT
19.03.1992
1901
Remetalling and Asphalting the roads in Channammanakere
atchkut layout, BSK III Stage, III Phase (Part 'B')
BDA/EE(S)/PW/WO/AE/766/91-92 DT
19.03.1992
1902
Providing dust bins to private layout in BTM Scheme
1903
Estimate for the raising of the road level construction of Masonary
Drain in low lying area KS Layout II Stage
BDA/EE(S)/PW/WO/AE/770/91-92 DT
19.03.1992
BDA/EE(S)/782/91-92 DT 26.08.1991
1900
BDA/EE(S)/746/91-92 DT 27.02.1992
1904
Maintenance of roads in private layout under BTM Scheme
1905
Conducting contour survey for New Scheme BSK V Stage
1906
Improvements to roads by metalling to roads near 40 x 60 sites in
KS Layout II Stage and to roads of additional sites
BDA/EE(S)/774/91-92 DT 19.03.1992
1907
Removal of garbage in the dust bins of J.P.Nagar IV of VI Phase
BDA/EE(S)/AE/PW/773/91-92 DT 19.03.1992
1908
Repairs to road cuttings and shoulder drains and CD works in Sy
No.4/2 of Taverekere under BTM I Stage
BDA/EE(S)/AE/PW/WO/758/91-92 DT
18.03.1992
1909
Estimate for providing dust bins in BTM II Stage I Phase
BDA/EE(S)/776/91-92 DT 23.03.1992
1910
Providing ornamental grill to CA site No.7 (EWS) in BTM II Stage, I
Phase Ch 0 to 82mts
C.C.Bed to the vent way of SWD by the D/S side of Humepipe
Bridge of 100' ring road in CKT layout BSK III Stage ch 6.50 M to
78.50M .
B) ch 66.50Mtrs to 78.50Mtrs
BDA/EE(S)/AE/PW/WO/765/91-92 DT
19.03.1992
BDA/EE(S)/AE/PW/WO/779/91-92 DT
23.03.1992
Formation to roads in Sy No.17 (Sub No.121 and 122) in BSK III
Stage
Repairs to damaged portion of SWD and providing covering slabs
at crossings in J.P.nagar VI Phase
BDA/EE(S)/AE/PW/WO/780/91-92 DT
23.03.1992
BDA/EE(S)/AE/PW/WO/786/91-92 DT
26.03.1992
Improvements to roads by metalling to road near 40' x 60' sites in
KS Layout II Stage & to roads of Additional sites adjacent to CA
site near SWD
Balance length of SWD in BSK III Stage, Pipeline, I Block
Chainage 0M to 48mtrs
Filling of potholes and road cuttings to the road from BSK temple to
Uttarahalli from chainage 0 to 200mtrs
BDA/EE(S)/AE/PW/WO/781/91-92 DT
26.03.1992
1917
Fencing the acquired land in Arehally layout BSK IV Stage Part 'B'
1918
Chipcarpetting to EWS layout under BTM II Stage, I Phase, for 9th,
10th, 11th, 12th, 13th, 14th cross roads, 20th, 23rd, 24th main
between 16th & 24th main, 25th, 26th, 27th, main road and tank
shore road
Chipcarpetting to Tank shore road 5th, 6th, 7th, 8th, 9th, 10th,
cross road of layout in Sy No.84 of madivala village under BTM II
Stage, I Phase
Chipcarpetting to 29th main road due to road cutting, potholes,
depression filling in BTM layout 2nd stage, I phase
BDA/EE(S)/AE/PW/WO/785/91-92 DT
26.03.1992
BDA/EE(S)/AE/PW/WO/791/91-92 DT
26.03.1992
1911
1912
1913
1914
1915
1916
1919
1920
1921
Improvements to the park in BSK III Stage, 4th Phase, 7th block
BDA/EE(S)/AE/PW/WO/762/91-92 DT
18.03.1992
BDA/EE(S)/AE/764/91-92 DT 18.03.1992
BDA/EE(S)/AE/PW/WO/02/91-92 DT 01.04.1992
BDA/EE(S)/AE/PW/WO/796/91-92 DT
26.03.1992
BDA/EE(S)/AE/PW/WO/05/91-92 DT 01.04.1992
BDA/EE(S)/AE/PW/WO/794/91-92 DT
26.03.1992
BDA/EE(S)/AE/PW/WO/01/91-92 DT 01.04.1992
1922
Formation of layout in Sy No.83 of madivala under BTM II Stage Ist
Phase
Fencing of C.A.site No.2 & 14 & Improvements to CA sites in 1st
Phase, Ideal Homes HBCS BSK III Stage
BDA/EE(S)/AE/PW/WO/06/91-92 DT 01.04.1992
1924
Potholes filling, Depression filling to uttarahalli road from 2 to 4Km
BDA/EE(S)/AE/PW/WO/08/91-92 DT 01.04.1992
1925
Potholes filling road cuttings, Depression filling to the existing
metal surface balance portion of the main under BTM Layout
BDA/EE(S)/AE/PW/WO/41/91-92 DT 18.04.1992
1926
Providing layout Board & name Board to Ideal Homes HBCS
Layout 1st Stage, Kenchanahalli BSK IIIrd Stage
BDA/EE(S)/28/91-92 DT 18.04.1992
1927
Repairs & Maintenance to BDA Community Hall at BSK III Stage
BDA/EE(S)/AE/PW/WO/38/91-92 DT 18.04.1992
1928
Fencing the CA site in Layout in Sy No.4(P), 5(P), of Uttarahalli
67/2, 68/4 & 79/3 of Chikkalasandra and 12/3 to 6 of Arehally in
F/O Sri Anjeneyaswamy HBCS ltd
Feneing of park & Improvements to Park & Improvements to CA
site in II Phase, Ideal Houses in HBCS Layout in BSK IIIrd Stage.
BDA/EE(S)/AE/PW/WO/39/91-92 DT 18.04.1992
Construction of over room retaining wall to the proposed Dhobighat
at BTM II Stage
Construction of Shallow water Tank for the proposed Dobhighat at
BTM II Stage
Fencing of CA site No.12 and improvements to CA sites in Ist
Phase, Ideal Homes HBCS BSK III Stage
BDA/EE(S)/JB/PW/WO/18/91-92 DT 03.04.1992
1933
Annual maintenance of Commercial Complex at BSK II Stage
BDA/EE(S)/AE/PW/WO/09/91-92 DT 01.04.1992
1934
Formation of Approach Road to Dhobighat at BTM II Stage
BDA/EE(S)/JE/PW/WO/15/91-92 DT 03.04.1992
1935
Providing Repairs ro road Cuttings pot Holes and Patches on Road
Surface of the road to 2nd cross road in BTM Ist Stage/I Phase,
Bangalore
Providing masonry drain for the road at the junction of Vidyapeeta
road and I main road in Channammanakere Atchukut l/o to ease
the steep gradient in BSK III stage.
Providing Fencing in the CA Site and park in the layout in
Sy.No.112/2, 113/2 and 116 of Kathriguppa Village, BSK III stage
in f/o Kempegowda G.N.S.S. Limited.
Sinking borewell 140 to 149mm dia fixing IM-II hand pump and
constructing platform complete in IV, V & VI phase, J.P.Nagar
(3nos)
Sinking borewell 140 to 149mm dia fixing IM-II hand pump and
constructing platform complete in Sarakki I & II phase.
BDA/EE(S)/JE/PW/WO/14/91-92 DT 03.04.1992
1923
1929
1930
1931
1932
1936
1937
1938
1939
BDA/EE(S)/AE/PW/WO/07/91-92 DT 01.04.1992
BDA/EE(S)/JE/PW/WO/16/91-92 DT 03.04.1992
BDA/EE(S)/JE/PW/WO/17/91-92 DT 03.04.1992
BDA/EE(S)/AE/PW/WO/42/91-92 DT 18.04.1992
BDA/EE/S/PW/WO/337/91-92 dt:11-03-91.
BDA/EE/S/PW/WO/377/91-92 dt:05-04-91
BDA/EE/S/PW/WO/433/91-92 dt:01-08-91.
BDA/EE/S/PW/WO/434/91-92 dt:01-08-91.
1940
Sinking borewell 140 to 149mm dia fixing IM-II hand pump and
constructing platform complete in BTM II stage, I phase, (3nos)
BDA/EE/S/PW/WO/435/91-92 dt:01-08-91.
1941
Providing barbed wire fencing to CA site in VI th Block, BSK III
stage, III phase.
Providing protective work along the western side of 9th cross road
in Avalahalli l/o, BSK III stage.
BDA/EE/S/PW/WO/442/91-92 dt:08-08-91.
1942
1943
BDA/EE/S/PW/WO/443/91-92 dt:30-08-91.
Maintenance of roads & portions in Sy.No.15 of Kathriguppa in
BSK III stage.
Formation of link road and construction of minor culvert across
road in BSK III stage, III phase, IV Block.
BDA/EE/S/PW/WO/444/91-92 dt:30-08-91.
Construction of protective works to protect sital area in l/o formed
in Sy.No.95 & 95 of Hosakerehalli, BSK III stage, Ch:105m to
140m.
Repairs to potholes, road cuttings in the roads of Srinivasanagr, I &
II stage, BSK III stage.
BDA/EE/S/PW/WO/446/91-92 dt:30-08-91.
1947
Improvements & widening of road by the side of sri.raghavendra
swamy temple in raghavendra block, BSK III stage.
BDA/EE/S/PW/WO/448/91-92 dt:30-08-91.
1948
Sinking borewell 140 to 149mm dia fixing IM-II hand pump and
constructing platform complete in BTM II stage, I phase, (2nos)
BDA/EE/S/PW/WO/449/91-92 dt:30-08-91.
1949
Sinking borewell 140 to 149mm dia fixing IM-II hand pump and
constructing platform complete in Muneshwara block,BSK III stage.
BDA/EE/S/PW/WO/450/91-92 dt:30-08-91.
1950
BDA/EE/S/PW/WO/451/91-92 dt:30-08-91.
1951
Providing borewell in Sy.No.23 & 24 of Karisandra slum
(Cauverinagar slum) (3 nos)
Providing borewell with pumps in platform slums in K.S.l/o II stage.
1952
Sinking of 150mm dia borewell in Avalahalli Village.
BDA/EE/S/PW/WO/
1953
Sinking borewell 140 to 149mm dia fixing IM-II hand pump and
constructing platform complete in Hosakerehalli,BSK III stage.(2
nos)
Sinking borewell 140 to 149mm dia fixing IM-II hand pump and
constructing platform complete in Sarakki Village,.(3 nos)
BDA/EE/S/PW/WO/454/91-92 dt:30-08-91
1944
1945
1946
1954
1955
1956
1957
Sinking borewell 140 to 149mm dia fixing IM-II hand pump and
constructing platform complete in Hosakerehalli,BSK III stage.(3
nos)
Sinking borewell 140 to 149mm dia fixing IM-II hand pump and
constructing platform complete in Sarakki Agarahara and
Marenahalli palya.
Providing Borewells in Sy.No.7 of Karisandra slum (3 Nos)
BDA/EE/S/PW/WO/445/91-92 dt:30-08-91.
BDA/EE/S/PW/WO/447/91-92 dt:30-08-91.
BDA/EE/S/PW/WO/452/91-92 dt:30-08-91.
/91-92 dt:30-08-91.
BDA/EE/S/PW/WO/455/91-92 dt:30-08-91
BDA/EE/S/PW/WO/456/91-92 dt:30-08-91
BDA/EE/S/PW/WO/457/91-92 dt:30-08-91
BDA/EE/S/PW/WO/458/91-92 dt:30-08-91
1958
Maintenance of borewell at 4th, 6th & 7th blocks of II phase & in l/o
in Sy.No.95 & 96, 121 & 122 of Hosakerehalli, BSK III stage.
BDA/EE/S/PW/WO/459/91-92 dt:30-08-91
1959
Construction of cross drainage works to the approach road from
Kaderanahally village to Uttarahalli road, BSK III stage.
BDA/EE/S/PW/WO/460/91-92 dt:30-08-91
1960
Formation of sites by the side of SWD and covering the SWD in
BSK III stage, III phase, IV & II block
BDA/EE/S/PW/WO/461/91-92 dt:30-08-91
1961
Garbage cleaning in Srinivasanagar II phase Sy.No.2 to 14 of
Gerehalli, BSK III stage.
Garbage cleaning in Srinivasanagar I phase Sy.No.2 to 7 and 11 of
Gerehalli, BSK III stage.
BDA/EE/S/PW/WO/462/91-92 dt:30-08-91
Repairs to roads & side drains in Sy.No.11 & 12 of Ittamadu layout,
BSK III stage.
Repairs & providing side drains in Ittamadu layout, BSK III stage.
BDA/EE/S/PW/WO/464/91-92 dt:30-08-91
Providing protective work for Bridge approach in Avalahalli l/o, BSK
III stage.
Construction of lead of drain by the side of 100' ring road in CKA
layout, bSK III stage, Ch: 0 to 55 mts.
BDA/EE/S/PW/WO/466/91-92 dt:30-08-91
1962
1963
1964
1965
1966
BDA/EE/S/PW/WO/463/91-92 dt:30-08-91
BDA/EE/S/PW/WO/465/91-92 dt:30-08-91
BDA/EE/S/PW/WO/467/91-92 dt:30-08-91
1967
Improvements & formation of roads & providing side drains in
Kathriguppa Village , BSK III stage., A, B, C, D road.
BDA/EE/S/PW/WO/470/91-92 dt:30-08-91
1968
Formation of roads & culverts in Vinayakanagar.
BDA/EE/S/PW/WO/473/91-92 dt:30-08-91
1969
Formation of road in Govinayakanahalli ( 1st cross road.)
BDA/EE/S/PW/WO/474/91-92 dt:30-08-91
1970
Repairs to potholes, road cuttings in asphalted area, Vidyapeeta
road, Sy.No.120 of Kathriguppa, I.T.I Road.
BDA/EE/S/PW/WO/476/91-92 dt:30-08-91
1971
Repairs to pothole filling, raod cutting and rechipcarpetting the road
from BSK III stage to BSK II stage.
BDA/EE/S/PW/WO/477/91-92 dt:30-08-91
1972
Providing patch repairs and filling of potholes to 100' ring road- Ch:
1100 m to 1300 mts.
Repairs to damaged portion of road by rechipcarpetting & filling of
potholes & road cutting portions in pipeline parallel road in front of
slum in K.S.L/o., II stage.
Pothole filling & patch repairs to road from 1st main to 15th main in
Sy.No.7 of Kathriguppa slum.
BDA/EE/S/PW/WO/480/91-92 dt:30-08-91
Repairs to damaged portion of road by rechipcarpetting & filling of
potholes & road at portion near EWS Houses in K.S.L/o.
BDA/EE/S/PW/WO/483/91-92 dt:30-08-91
1973
1974
1975
BDA/EE/S/PW/WO/481/91-92 dt:30-08-91
BDA/EE/S/PW/WO/482/91-92 dt:30-08-91
1976
1977
1978
1979
1980
Repairs to road cuting, potholes & patches in chipcarpetted surface
of the roads and maintenance of side drains to 2nd cross road of
BTM II stage, I phase.
Repairs to road cuting, potholes & patches in chipcarpetted surface
of the roads from 19th to 21st main road in BTM II stage, I phase.
Repairs to road cuting, potholes & patches in chipcarpetted surface
of the roads and maintenance of side drains to 28th main road in
BTM II stage, I phase.
Providing rechipcarpetting to 4th, 5th, 6th & 8th cross & 8th main
road in MICO l/o I stage, for bad reaches and road cutting under
BTM II stage, I phase.
Providing chipcarpetting to 7th cross road in MICO l/o I stage for
bad reaches & road cutting under BTM II stage, I phase.
BDA/EE/S/PW/WO/484/91-92 dt:30-08-91
BDA/EE/S/PW/WO/485/91-92 dt:30-08-91
BDA/EE/S/PW/WO/486/91-92 dt:30-08-91
BDA/EE/S/PW/WO/487/91-92 dt:30-08-91
BDA/EE/S/PW/WO/488/91-92 dt:30-08-91
1981
Providing chipcarpetting to 7th cross road in MICO l/o I stage for
bad reaches & road cutting under BTM II stage, I phase.
BDA/EE/S/PW/WO/489/91-92 dt:30-08-91
1982
Repairs to road cuttings & filling up of ruts & pits and depression
filling to roads in BSK III stage, VI block ( I & II cross, II & IV main
road.)
Repairs to road cuttings & filling up of ruts & pits and depression
filling to roads in BSK III stage, V block , I & I'A' main road and I 'A'
& IV 'A' cross road.
Flood damage repairs & prevention of errosion of bed opf SWD in
CKA l/o, BSK III stage, from Ch: 440 to 465mts & 495 to 525mts.
BDA/EE/S/PW/WO/491/91-92 dt:30-08-91
1983
1984
BDA/EE/S/PW/WO/493/91-92 dt:30-08-91
BDA/EE/S/PW/WO/497/91-92 dt:30-08-91
1985
Formation of road, construction of culverts, drains in Bhavaninagar
slum attached to Karisandra slum.
BDA/EE/S/PW/WO/503/91-92 dt:30-08-91
1986
Construction of missing bit of masonry lead off drain by the left side
of 100; ring road in CKA l/o, BSK III stage, from Ch: 85 to 135mts.
BDA/EE/S/PW/WO/504/91-92 dt:30-08-91
1987
Formation of road in Govinayakanahalli ( 3rd cross road.)
BDA/EE/S/PW/WO/509/91-92 dt:30-08-91
1988
Repairs to road cuttings, pot holes on chipcarpetted surface of the
road & maintenance of side drains in Maruthi HBCS in Sy.No.4/1 of
Tavarekere 'A' to 'D' main road.
Providing metalling the roads at main road linking Kalidasa HBCS
& Timber yard l/o in BSK III stage.
BDA/EE/S/PW/WO/690/91-92 dt:23-01-92
1990
Fencing the park in K/s.layout II stage (CA No.13 Grill work)
BDA/EE/S/PW/WO/689/91-92 dt:24-01-92
1991
Repairs to road cuttings, pot holes , patches on chipcarpetted
surface of the road & maintenance of side drains in 27th main of
BTM II stgae, I phase.
BDA/EE/S/PW/WO/691/91-92 dt:31-01-92
1989
BDA/EE/S/PW/WO/687/91-92 dt:23-01-92
1992
Maintenance of roads and drains in Channammanakere Atchukut
layout, BSK III stage, III phase.
BDA/EE/S/PW/WO/694/91-92 dt:01-02-92
1993
Maintenance of road and drains in Poornapragna and
Siddivinayaka HBCS, BSK III stage.
BDA/EE/S/PW/WO/695/91-92 dt:01-02-92
1994
Improvements to platform slum in KS. layout II stage.
BDA/EE/S/PW/WO/697/91-92 dt:01-02-92
1995
Maintenance of roads and drains in KEB Employees HBCS &
Khadi Employees, HBCS, BSK III stage.
BDA/EE/S/PW/WO/696/91-92 dt:01-02-92
1996
Consruction of masonry drain to lead off drain water from
rehabilitated Hanumanthanagar shifted slum to SWD in KS layout
II stage.
Consruction of masonry drain to lead off drain water from
rehabilitated Hanumanthanagar shifted slum to SWD in KS layout
II stage.
Removal of garbage in the dust bins of pipe line block, 3 & 69 of
Gavipura in BSK III stage,coming under the jurisdiction of No.1
south sub division, BSK III stage,BDA
Removal of garbage in the dust bins of private layout coming under
the jurisdiction of No.1 south sub division, BSK III stage,BDA
BDA/EE/S/PW/WO/698/91-92 dt:01-02-92
1997
1998
1999
BDA/EE/S/PW/WO/699/91-92 dt:01-02-92
BDA/EE/S/PW/WO/700/91-92 dt:01-02-92
BDA/EE/S/PW/WO/701/91-92 dt:01-02-92
Sinking of borewell 150MM dia fixing IM-II hand punp and
constructing platform complete in Vinayakanagara 1st & 2nd main
road, BSK III stage, (3nos)
Sinking of borewell 150MM dia fixing IM-II hand punp and
constructing platform complete in Vinayakanagara 3rd & 4th main
road, BSK III stage, (3nos)
Sinking of borewell 150MM dia fixing IM-II hand punp and
constructing platform complete in K.s.layout - II stage(3nos)
BDA/EE/S/PW/WO/702/91-92 dt:24-01-92
2003
Formation of approach road to layout in Sy.No.20/1A, 20/1B & 21
of Ittamadu in BSK IV stage, Ch: 750 to 900mts
BDA/EE/S/PW/WO/705/91-92 dt:01-02-92
2004
Fencing to the CS site in Sy.No.94/1 of Kathriguppa in VI block,
BSk III stage, III phase.
Providing fencing & improvements to CA site in Telecom
Employees HBCS ltd, in Sy.No.40/2 of Avalahally.
BDA/EE/S/PW/WO/707/91-92 dt:01-02-92
2000
2001
2002
2005
BDA/EE/S/PW/WO/703/91-92 dt:31-01-92
BDA/EE/S/PW/WO/704/91-92 dt:31-01-92
BDA/EE/S/PW/WO/708/91-92 dt:01-02-92
2006
Providing layout boards & name boards to BEML employees
HBCS ltd, IV stage, Halagevaderahalli.
BDA/EE/S/PW/WO/709/91-92 dt:01-02-92
2007
Providing Grrilled compound to the park of College Teachers
HBCS in Sy.No.17 of BSK III stage.
BDA/EE/S/PW/WO/710/91-92 dt:01-02-92
2008
Filling of pot holes, depression filling & camber correction to 100'
ring road II phase, BSK III stage, Ch: 1825 to 2005 mts.
BDA/EE/S/PW/WO/711/91-92 dt:30-01-92
2009
Repairs to SWD in the layout formed in Sy.No.11 & 12 of Ittamadu
layout, BSK III stage.
Metalling to in Sy.no.17 of Kathriguppa, BSK III stage.
BDA/EE/S/PW/WO/713/91-92 dt:01-02-92
2011
Removal of garbage in the dust bins of BSK III stage, II phase, IV,
VI, VII block , Hosakerehalli layout, Sy.No.108 & 120 of
Hosakerehalli & Sy.No.11 & 12 of Ittamadu, BSK III stage.
BDA/EE/S/PW/WO/715/91-92 dt:01-02-92
2012
Removal of garbage in the dust bins of III phase, I to IV block ,
East of Kathriguppa layout, Channammanakere Atchukut L/o in
BSK III stage, under the jurisdiction of No.1 south sub division,
BDA/EE/S/PW/WO/716/91-92 dt:01-02-92
2013
Removal of garbage in the dust bins of Nagendra and raghavendra
Block (Reconvey scheme) in BSK III stage under the jurisdiction of
No.1 south sub division,
Removal of garbage in the dust bins of Muneshwara block &
A.K.colony, Avalahalli (Reconvey scheme) in BSK III stage under
the jurisdiction of No.1 south sub division,
Repairs to roads, drains & Culverts in VI block, BSK III stage, III
phase.
Providing dust bins to BEML Employees HBCS ltd, III stage,
Halagevaderahalli.
Providing layout boards and Road name boards to sri.
Anjaneyaswamy HBCS, ltd, Arehalli.
BDA/EE/S/PW/WO/717/91-92 dt:01-02-92
2018
Improvements to the drains in the Easternside of K.S.l/o-II stage.
BDA/EE/S/PW/WO/722/91-92 dt:01-02-92
2019
Formation of layout in BSK III stage, III phase, VI block in Sy.No.47
of Kathriguppa.
Repairs to road cuttings, pot holes , patches on chipcarpetted
surface of the road in KEB l/o & maintenance of side drains I to 3rd
main road.
Construction of CD works to cross roads connecting
Jayabheemanagar to 60' road of Madivala village & link road
between 20th main to 7th cross.
Filling up of potholes, patches, depression filling & camber
correction to 100' ring road from I cross of VII block, IV phase to I
cross of V block, III phase, Ch:220 to 300mts in BSK III stage, III
phase.
Repairs to roads damaged due to road cuttings & heavy rains,
filling stagnated areas in V phase, J.P.Nagar 16th & 17th cross
roads.
BDA/EE/S/PW/WO/723/91-92 dt:01-02-92
2010
2014
2015
2016
2017
2020
2021
2022
2023
BDA/EE/S/PW/WO/714/91-92 dt:01-02-92
BDA/EE/S/PW/WO/718/91-92 dt:01-02-92
BDA/EE/S/PW/WO/719/91-92 dt:01-02-92
BDA/EE/S/PW/WO/720/91-92 dt:01-02-92
BDA/EE/S/PW/WO/721/91-92 dt:01-02-92
BDA/EE/S/PW/WO/724/91-92 dt:24-01-92
BDA/EE/S/PW/WO/725/91-92 dt:24-01-92
BDA/EE/S/PW/WO/726/91-92 dt:01-02-92
BDA/EE/S/PW/WO/727/91-92 dt:21-12-92
2024
Repairs to 20th main at Deck slab in Sy.No.92 & 93- Formation of
approach road to Madivala (Northern side) under BTM scheme.
BDA/EE/S/PW/WO/728/91-92 dt:21-02-92
2025
Repairs to 20th main at Deck slab in Sy.No.92 & 93- Formation of
approach road to Madivala (Southern side) under BTM scheme.
BDA/EE/S/PW/WO/729/91-92 dt:21-02-92
2026
Fencing of CA site No.13 & improvements to CA sites in Ideal
Homes HBCS, I phase layout.
BDA/EE/S/PW/WO/730/91-92 dt:17-02-92
2027
Providing protection bed to the vent way of SWD from Ch:140 to
200mts in CKA l/o, BSK III stage, III phase, (flood damage work)
BDA/EE/S/PW/WO/732/91-92 dt:21-02-92
2028
Formation of approach road to layout in Sy.No.20/1A, 20/1B & 21
of Ittamadu in BSK IV stage, Ch: 600 TO 750MTS.
BDA/EE/S/PW/WO/733/91-92 dt:17-02-92
2029
Providing masonry drain for disposing the flood water alround the
Community centre at Avalahally, BSK III stage.
BDA/EE/S/PW/WO/734/91-92 dt:21-02-92
2030
Providing masonry wall with grill to the CA site in sy.no.15 of
Kathriguppa, BSK III stage.
Formation of approach road to layout in Sy.No.20/1A, 20/1B & 21
of Ittamadu in BSK IV stage, Ch: 450 To 600MTS.
BDA/EE/S/PW/WO/735/91-92 dt:19-02-92
2031
BDA/EE/S/PW/WO/736/91-92 dt:19-02-92
2032
Paving with B.S.slabs for lanes in Shopping areas ( The slum is
located in hillock) Northern side (Manjunatha slum)
BDA/EE/S/PW/WO/738/91-92 dt:01-02-92
2033
Improvements & formation of roads & providing side drains in
Kathriguppa Village for F,G,H, I & J roads, BSK III stage.
BDA/EE/S/PW/WO/739/91-92 dt:17-02-92
2034
Reconstruction of retaining wall from Ch:145 to 157 mts on the
Easternside and from Ch;135 to 145mts & 170 to 193 mts on the
Westernside of SWD in CKA l/o, BSK III stage. (Flood damage
work)
Cleaning the garbage in the dust bins of J.P.Nagar II pahse, House
No. 800 to 2045
Cleaning the garbage in the dust bins of J.P.Nagar I pahse, House
No.1 TO 1000
BDA/EE/S/PW/WO/745/91-92 dt:21-02-92
2035
2036
2037
2038
2039
92-93
Fencing of Dispensary & Improvements to CA sites in IInd Phase
Ideal Homes HBCS Layout BSK III Stage
Maintenance of Roads Drains Footpath etc., in 7th Block, 4th
Phase, BSK III stage
Pothole filling, path repairs, road cuttings to village approach road
from Bannerghatta road to N.S.Palya village, under BTM Scheme
BDA/EE/S/PW/WO/771/91-92 dt:17-02-92
BDA/EE/S/PW/WO/772/91-92 dt:17-02-92
BDA/EE(S)/AE/PW/WO/56/92-93 DT 18.04.1992
BDA/EE(S)/AE/PW/WO/55/92-93 DT 18.04.1992
BDA/EE(S)/AEE-2(S)/PW/WO/57/92-93 DT
18.04.1992
2040
Filling of ruts and pits of roads in IV block III Phase BSK III Stage
BDA/EE(S)/AE/PW/WO/91/92-93 DT 01.06.1992
2041
Improvement to K.A.S. officers layout CA site by providing
Chainlink fencing to North Western side under B.T.M. Scheme
chianage 71 to 142Mts
Formation of layout in Sy No.30 of N.S.palya under B.T.M. II
Stage, I Phase 14th cross road
BDA/EE(S)/AEE-2/PW/WO/49/92-93 DT
18.04.1992
2043
Providing fencing to CA site No.7 and improvements to CA site No.
in I Phase Ideal Homes HBCS Layout
BDA/EE(S)/AE/PW/WO/32/92-93 DT 18.04.1992
2044
Providing chain link fencing work to Playground and park CA site
No.11 at 12th cross in Mico layout under B.T.M. II Stage, I Phase,
South Western side chinage 0 to 71Mts
Providing chain link fencing works to CA site No.5 in mico layout
between 9th and 10th main and 4th and 5th cross under B.T.M.
layout souther side chinage 0 to 71mts
Remetallin 1, 2, 6, 5, 7, 8, 9, 10th & 11th mains in Srinivasanagar II
Phase BSK III Stage
Reconstruction of Retaining wall damaged sue to floods from ch
40mtrs., to 80mtrs in K.S.Layout II Stage
BDA/EE(S)/AEE-2/PW/WO/50/92-93 DT
18.04.1992
Improvements to approach road in Tavarekere village under BTM
layout
Fencing of CA site in 1 & 2 and improvements to CA site in II
Phase Ideal Homes HBCS Layout
BDA/EE(S)/AE/PW/WO/27/92-93 DT 18.04.1992
2042
2045
2046
2047
2048
2049
BDA/EE(S)/AE/PW/WO/40/92-93 DT 18.04.1992
BDA/EE(S)/AEE-2/PW/WO/44/92-93 DT
18.04.1992
BDA/EE(S)/AE/PW/WO/34/92-93 DT 18.04.1992
BDA/EE(S)/AE/PW/WO/36/92-93 DT 18.04.1992
BDA/EE(S)/AE/PW/WO/29/92-93 DT 18.04.1992
2050
Fencing of CA site No.10 & Improvements to CA sites in I Phase,
Ideal Homes HBCS BSK III Stage
BDA/EE(S)/AE/PW/WO/31/92-93 DT 18.04.1992
2051
Providing fencing to vacant land by the side KEB office BSK III
Stage, III Reach
Protective bed to the Vent way of SWD from ch 200 to 265Mtrs in
CKA layout BSK III Stage, III Phase (Flood damage work).
BDA/EE(S)/AE/PW/WO/43/92-93 DT 18.04.1992
2052
BDA/EE(S)/AE/PW/WO/67/92-93 DT 29.04.1992
2053
Fencing of CA site No.4 improvements to CA site in I Phase Ideal
homes HBCS BSK III Stage
BDA/EE(S)/AE/PW/WO/33/92-93 DT 18.04.1992
2054
Maintenance of Roads Culverts and Drains etc., in B.T.M. I Stage
I Phase Layout
Barbed wire fencing to park in CA No.14 of J.P.Nagar V Phase
BDA/EE(S)/AE/PW/WO/70/92-93 DT 29.04.1992
2055
2056
Construction of cross drainage works to the road from BSK Temple
to Uttarahalli Village from ch 2000 to 3000 mtrs
BDA/EE(S)/AE/PW/WO/73/92-93 DT 29.04.1992
BDA/EE(S)/25/92-93 DT 08.04.1992
2057
Providing Washing plat form by Providing retaining wall for
propossed Dhobighat at BTM II Stage
BDA/EE(S)/PW/WO/JE/19/92-93 DT 03.04.1992
2058
Estimate for Fencing of parks and improvements to CA site in II
Phase Ideal Homes HBCS Layout BSK III Stage
BDA/EE(S)/21/92-93 DT 03.04.1992
2059
Construction of balance length of storm water drain in westernside
of 9 cross in Avalahalli BSK III Stage
BDA/EE(S)/22/92-93 DT 03.04.1992
2060
Metalling to improve the road from BSK Temple to Uttarahalli from
chainage 2kms to 4 Kms
BDA/EE(S)/PW/WO/AE/10/92-93 DT 03.04.1992
2061
Fencing to CA site No.9 & 11 and improvements to CA site in I
Phase Ideal HBCS layout
Construction of Balance length of SWD in BSK III Stage, Pipe line I
Block Chainage 215 to 239M (Part-C: Chainage : 231M to 239Mtrs
BDA/EE(S)/PW/WO/AE/37/92-93 DT 18.04.1992
2062
2063
2064
2065
Fencing of Utility and Milk booth E sector of and park of F section
and Improvements to CA site in II Phase Ideal Homes HBCS
Layout in BSK III Stage
Sinking 140 to 149mm Dia Borewells constructing platforms and
fitting India Mark II Hand pumps to the slum area sy No.94 &95 of
Hosakerehalli BSk III Stage (3 Nos)
sinking borewells to the Kadirenahalli village under BSK III Stage
2066
Reconstruction of retaining wall damaged due to flood from
chainage 0 to 35 Mtrs in K.S. layout II Stage
2067
Construction of masonry drain and box drain to avoid water
stagnation and formation of road to link 21st and 20th main in
Marenahally village J.P.Nagar II Phase
Construction of masonry drain to avoid water stagnation in
Marenahalli village in between 21st main & 20th main J.P.Nagar II
Phase Ch 141 to 231 Mtrs
Construction of masonry drain and baxdrain to avoid water
stagnation in Marenahally village in between 21st and 20th main
J.P. Nagar II Phase (ch 40 to 141Mtr)
Maintenance of side drains and removing desilting to the 40 cross
roads Ist, 2nd, 3rd, 7th, 10th, 15th, 16th, 17th, 18th & 27th cross
roads of Ideal Homes HBCS BSK III Stage
Maintenance of roads drains in sy no.120 of Kathriguppa BSK III
Stage
Providing barbed wire fencing to open space in sy no.4 & 5 of
Govinayakanahalli, Kumaraswamy Layout II Stage
2068
2069
2070
2071
2072
BDA/EE(S)/PW/WO/AE/78/92-93 DT 22.05.1992
BDA/EE(S)/24/92-93 DT 08.04.1992
BDA/EE(S)/PW/WO/AE/118/92-93 DT
24.07.1992
BDA/EE(S)/PW/WO/AE/116/92-93 DT
24.07.1992
BDA/EE(S)/PW/WO/AE/112/92-93 DT
18.07.1992
BDA/EE(S)/114/92-93 DT 24.07.1992
BDA/EE(S)/120/92-93 DT 24.07.1992
BDA/EE(S)/113/92-93 DT 24.07.1992
BDA/EE(S)/94/92-93 DT 03.11.1992
BDA/EE(S)/117/92-93 DT 24.07.1992
BDA/EE(S)/PW/WO/AE/130/92-93 DT
24.07.1992
2073
2074
2075
2076
Providing R.C.C. slab covering to the storm water drain running
across 100' road in sarakki II & IV Phase Chainage 47Mtrs to 94
Mtrs
Improvements to ward office in C.A.site in Sy No.10 & 11 of
Tavarekere under BTM I Stage, I Phase ch 85M to 297Mtrs ( c)
chainage 226Mtrs., to 297Mtrs
Remetalling and chipcarpetting to the roads of the layout formed in
sy no.108 and 120 of Hosakerehalli, BSK III Stage, for 2nd & 3rd
main, and 4th cross roads (a) Part 'A'
Construction of bridge across the SWD linking I & II stage
Kumaraswamy layout IInd stage I crossing Bridge No.1
BDA/EE(S)/PW/WO/AE/119/92-93 DT
24.07.1992
BDA/EE(S)/PW/WO/AE/111/92-93 DT
02.07.1992
BDA/EE(S)/PW/WO/AE/107/92-93 DT
01.07.1992
BDA/EE(S)/104/92-93 DT 19.06.1992
2077
Construction of bridge across the SWD linking I & II stage
Kumaraswamy layout IInd stage I crossing bridge No.2
BDA/EE(S)/103/92-93 DT 19.06.1992
2078
Widening the 14th main road upto space housing society from
proposed KSRTC bus stop in Kumaraswamy layout II stage
BDA/EE(S)/AE/PW/WO/100/92-93 DT
11.06.1992
2079
Asphalting 2nd 5th and 6th main roads of Srinivasanagar BSK III
Stage (a) Part "A" 2nd main
BDA/EE(S)/AE/PW/WO/93/92-93 DT 05.06.1992
2080
Fencing of park (2) 'F' sector and Improvements in II Phase of
Ideal Home HBCS Layout
Repairs to road cutting, removing of silt in side drains in I block III
Phase, BSK II stage
Improvements to the side drain in the western side of
Kumaraswamy layout II stage
Modified Estimate for providing chain link fencing to the park in
BSK III Stage behind Vidyapeeta Sy No.120 (Northern side)
BDA/EE(S)/96/92-93 DT 05.06.1992
Formation of roads and culverts in sy no.13 of gerehalli BSK III
stage
Formation of roads and drains to the road from BSK temple to the
Uttarahalli from ch 2000m to 3000Mtrs
(a) ch
2000m to 2500Mtrs
Estimate for providing water tank watchman shed to the garden at
commercial complex at BSK II stage
BDA/EE(S)/PW/WO/AE/86/92-93 DT 26.05.1992
2087
Estimate for providing pump house pipe line to the Garden at
Commercial complex at BSK II stage
BDA/EE(S)/PW/WO/AE/88/92-93 DT 26.05.1992
2088
Providing fencing to the CA site (Park) in Kumaraswamy Layout II
stage chainage 80Mtrs to 310Mtrs
(a) ch 80Mtrs to
160Mtrs
BDA/EE(S)/PW/WO/AE/82/92-93 DT 26.05.1992
2081
2082
2083
2084
2085
2086
BDA/EE(S)/102/92-93 DT 26.06.1992
BDA/EE(S)/PW/WO/AE/90/92-93 DT 01.06.1992
BDA/EE(S)/PW/WO/AE/101/92-93 DT
11.06.1992
BDA/EE(S)/PW/WO/AE/92/92-93 DT 01.06.1992
BDA/EE(S)/PW/WO/AE/87/92-93 DT 26.05.1992
2089
Estimate for providing masonary drainnear low lying site 3735 to
3600 of K.S. Layout IInd stage
BDA/EE(S)/106/92-93 DT 01.07.1992
2090
Raising and desilting of SWD and Repairs to existing silk pattern
drain in the main road linking Kalidasa HBCS and Timber yard
layout in BSK III Stage
Formation of roads and drains to the road from BSK Temple to the
Uttarahalli from ch 3000m to 4000mtrs
BDA/EE(S)/PW/WO/AE/126/92-93 DT
24.07.1992
Remetalling and Asphalting of roads in KEB Employees HBCS ltd
BSK III stage
Improvements to rain damaged 80' road of Padmnabha Nagar
Circle to Bendee Circle
Formation of approach linking road by continuing the newly formed
road and improvements to roads in BDA layout and for interior
village road of N.S.Palya under B.T.M. Scheme (Part 'D')
BDA/EE(S)/PW/WO/AE/79/92-93 DT 26.05.1992
2091
2092
2093
2094
BDA/EE(S)/PW/WO/AE/75/92-93 DT 22.05.1992
BDA/EE(S)/76/92-93 DT 22.05.1992
BDA/EE(S)/PW/WO/AE/77/92-93 DT 22.05.1992
2095
Formation of abruptly ended roads in Kalidasa layout in sy no.21,
Kasaba Hobli, Bangalore North Taluk in BSK III stage
BDA/EE(S)/PW/WO/AE/71/92-93 DT 29.04.1992
2096
Construction of storm water drain (missing links) in srinivasanagar
BSK III Stage.
Repairs to road cutting potholes & patohes on road surface of the
road 29th main road BTM I stage I Phase
BDA/EE(S)/PW/WO/AE/83/92-93 DT 26.05.1992
2098
Remetalling and Chipcarpetting to roads in sy no.11 & 12 of
Ittamadu village layout BSK III stage
BDA/EE(S)/PW/WO/AE/68/92-93 DT 29.04.1992
2099
Providing layout name boards & cross boards to Ideal homes
HBCS layout- II stage in BSK III stage.
BDA/EE/S/PW/WO/115/92-93 dt:18-07-92
2100
Providing chain link fencing to CA site No.1 (Park) in J.P.nagar I
phase, 9th cross (Southern side)
BDA/EE/S/PW/WO/121/92-93 dt:23-07-92
2101
Providing chain link fencing to CA site No.1 (Park) in J.P.nagar I
phase, 9th cross (Eastern & Western side)
BDA/EE/S/PW/WO/122/92-93 dt:23-07-92
2102
Providing chain link fencing to CA site No.1 (Park) in J.P.nagar I
phase, 9th cross (Northern side)
BDA/EE/S/PW/WO/123/92-93 dt:23-07-92
2103
Construction of Masonry wall to protect CA site is located in a
Valley Sy.No.120 of Kathriguppa, BSK III stage, Bit No.I
BDA/EE/S/PW/WO/124/92-93 dt:23-07-92
2104
Construction of Masonry wall to protect CA site is located in a
Valley Sy.No.120 of Kathriguppa, BSK III stage, Bit No.II.
BDA/EE/S/PW/WO/125/92-93 dt:23-07-92
2097
BDA/EE(S)/PW/WO/AE/89/92-93 DT 26.05.1992
2105
Repairs to road cutting, pot holes on road surface & maintenance
of side drains in Bhuvanappa l/o
BDA/EE/S/PW/WO/128/92-93 dt:23-07-92
2106
Asphalting 80' road from Ch:350 to 460mts in Sy.No.117 of
Kathriguppa village, BSK III stage.
BDA/EE/S/PW/WO/129/92-93 dt:23-07-92
2107
Formation of l/o in Sy.No.30 of N.S.Palya under BTM , II stage, I
phase, 13th cross road.
Formation of l/o in Sy.No.30 of N.S.Palya under BTM , II stage, I
phase, 12th cross road.
Removal of silt in drains & repairs to footpath & side drains in
J.P.nagar II phase.
Remetalling & Asphalting the road in the layout in sy.no.109 of
Kathriguppa village, BSK III stage
BDA/EE/S/PW/WO/130/92-93 dt:01-09-92
2108
2109
2110
2111
BDA/EE/S/PW/WO/131/92-93 dt:01-09-92
BDA/EE/S/PW/WO/132/92-93 dt:23-07-92
BDA/EE/S/PW/WO/133/92-93 dt:23-07-92
Construction of Compound wall with chain link fencing to the park
in BSK III stage, beyond Vidyapeeta Sy.No.120 (Estimate No.1,
Southern side)
Providing levelling & filling the part of CA site No.12 to convert it
as Playground in K.S.l/o, II stage.
BDA/EE/S/PW/WO/136/92-93 dt:01-09-92
2113
Improvements to the drains in the Easternside of K.S.l/o-II stage.
BDA/EE/S/PW/WO/138/92-93 dt:17-08-92
2114
Improvements to the drains in the Westernside of K.S.l/o-II stage.
BDA/EE/S/PW/WO/139/92-93 dt:17-08-92
2115
Construction of balance length of SWD in BSK III stage, pipe line, I
block
Metalling to 5th 'A', 5th 'B', 6th, 7th, 8yh & 9th cross roads and 3rd,
4th, 5th, 6th & 7th main roads of Srinivasanagar, I phase at BSK III
stage.
Metalling to 5th 'A', 5th 'B', 6th, 7th, 8yh & 9th cross roads and 3rd,
4th, 5th, 6th & 7th main roads of Srinivasanagar, I phase at BSK III
stage.
Metalling to 5th 'A', 5th 'B', 6th, 7th, 8yh & 9th cross roads and 3rd,
4th, 5th, 6th & 7th main roads of Srinivasanagar, I phase at BSK III
stage.
Construction of Compound wall with M.S.Grill, balance length to
the park of College Teachers HBCS in Sy.No.17 of BSK III stage.
BDA/EE/S/PW/WO/140/92-93 dt:17-08-92
2112
2116
2117
2118
2119
BDA/EE/S/PW/WO/137/92-93 dt:17-08-92
BDA/EE/S/PW/WO/141/92-93 dt:17-08-92
BDA/EE/S/PW/WO/142/92-93 dt:17-08-92
BDA/EE/S/PW/WO/143/92-93 dt:17-08-92
BDA/EE/S/PW/WO/144/92-93 dt:23-07-92
2120
Consolidated estimate for providing Ornamental Grill fencing to CA
site in Sy.No.50 of Maranahalli village, J.P.Nagar II Phase.
BDA/EE/S/PW/WO/145/92-93 dt:23-07-92
2121
Providing fencing to the play Ground in (C.A.NO.12) Eastern side
of K.S.l/o II stage, Ch:om to 80mts
BDA/EE/S/PW/WO/146/92-93 dt:23-07-92
2122
Providing fencing to C.A site No.1, 2,3 (Below hightension line) 4,5
& 6 in BEML., Employees HBCS ltd IV stage in halagevaderahalli
BDA/EE/S/PW/WO/147/92-93 dt:23-07-92
2123
Formation of layout in Sy.No.30 of N.S.Palya, under BTM II stage,
1st phase, 13th & 14 th main & 13th cross road.
BDA/EE/S/PW/WO/148/92-93 dt:16-09-92
2124
Asphalting the roads in 7th block, 4th phase, 3rd stage, BSK ., (1st,
2nd, 3rd, 4th, 5th & 6th cross roads) (2) 4th, 5th and 6th cross
roads.
Providing RCC slab cover over SWD running across 100' road in
Sarakki II & IV phase-Ch: 0m to 47m.
BDA/EE/S/PW/WO/149/92-93 dt:23-07-92
Widening the I cross road in VII block, II phase, BSK III stage- Ch:0
to 76m (I Reach)
Fencing to KEB area & improvements to CA area in II phase of
Ideal Homes, HBCS l/o
Remetalling & Asphalting to the balance roads in BSK III stage, III
phase, III Block.
Cleaning of the Commercial Complex at BSK II stage for the year
1992-93.
Providing Fencing to CA site (Playground) in K.S.layout, II stage.Ch:260m to 305 mts.
Providing Fencing to CA site (Playground) in K.S.layout, II stage.Ch: 305 mts.to 350mts.
Providing levelling & filling the part of CA site No.12 to convert it as
Playground in K.S.l/o, II stage.
BDA/EE/S/PW/WO/151/92-93 dt:01-09-92
2133
Providing fencing to the playground (C.A. No.12) in Easternside of
K.S.L/o II stage-Ch:210m to 260mts.
BDA/EE/S/PW/WO/158/92-93 dt:09-09-92
2134
Construction of masonry drain and culverts in front of KSRTC, Bus
stand in K.S.L/o, I stage.
BDA/EE/S/PW/WO/161/92-93 dt:01-09-92
2135
Providing fencing to the playground in Easternside of K.S.l/o II
stage, Ch:160m to 210mts
Providing grill & improvements to the Commercial complex at BSK
II stage.
Formation of link road to K.S.l/o in between I & II stage at 71st
cross.
Providing fencing to the playground in K.S.l/o II stage, Ch-300m to
475mts, Western side.
BDA/EE/S/PW/WO/162/92-93 dt:09-09-92
2139
Remetalling to roads in Kumaraswamy layout II stage-Easternside
BDA/EE/S/PW/WO/166/92-93 dt:01-09-92
2140
Remetalling to roads in Kumaraswamy layout II stage-Westernside
BDA/EE/S/PW/WO/167/92-93 dt:01-09-92
2125
2126
2127
2128
2129
2130
2131
2132
2136
2137
2138
BDA/EE/S/PW/WO/150/92-93 dt:23-07-92
BDA/EE/S/PW/WO/152/92-93 dt:09-09-92
BDA/EE/S/PW/WO/153/92-93 dt:09-09-92
BDA/EE/S/PW/WO/154/92-93 dt:15-09-92
BDA/EE/S/PW/WO/155/92-93 dt:09-09-92
BDA/EE/S/PW/WO/156/92-93 dt:09-09-92
BDA/EE/S/PW/WO/157/92-93 dt:09-09-92
BDA/EE/S/PW/WO/163/92-93 dt:16-09-92
BDA/EE/S/PW/WO/164/92-93 dt:16-09-92
BDA/EE/S/PW/WO/165/92-93 dt:09-09-92
2141
Remetalling & chipcarpetting to the roads of BSK III stage, III
phase, V Block.
Providing masonry drain & culverts in the main linking Kalidasa
HBCS., and timber yard layout in BSK III stage., Northern side
(right), Ch: 0 to 80 mts.
Construction of additional accomodation in 1st floor North Block of
Commercial complex at BSK II stage.
BDA/EE/S/PW/WO/167/92-93 dt:17-10-92
2144
Providing aluminium partitions to shift the BDA, South Officers to
the 1st floor of the Complex at BSK II stage, West Block.
BDA/EE/S/PW/WO/170/92-93 dt:24-09-92
2145
Providing aluminium partitions to shift the BDA, South Officers to
the 1st floor of the Complex at BSK II stage, East Block.
BDA/EE/S/PW/WO/171/92-93 dt:24-09-92
2146
Providing aluminium partitions to shift the BDA, South Officers to
the 1st floor of the Complex at BSK II stage, West Block.
BDA/EE/S/PW/WO/172/92-93 dt:24-09-92
2147
Construction of CD across approach road to K.S l/o from
Uttarahalli road viz.,Gowdanapalya in K.S.l/o- I stage.
BDA/EE/S/PW/WO/173/92-93 dt:03-11-92
2148
Annual maintenance of the North Block of the Commercial complex
at BSK II stage.
Construction of 75mm width SSM drain by the side of l/o formed in
Sy.No.95, 96, 121 & 122 of Hosakerehally, BSK III stage, at site
No.988/c, 1231/J & CA site No.1
Construction of 75mm width SSM drain by the side of l/o formed in
Sy.No.95, 96, 121 & 122 of Hosakerehally, BSK III stage, at site
No.812 to 817.
Annual maintenance of the South Block of the Commercial
complex at BSK II stage.
providing chip carpetting around the Commercial Complex at BSK
II stage.
Chipcarpetting & Rechipcarpetting to the road from BSK temple to
Uttarahalli from 2 to 4 kms.
BDA/EE/S/PW/WO/173/92-93 dt:24-09-92
Construction of 75mm width SSM drain by the side of l/o formed in
Sy.No.95, 96, 121 & 122 of Hosakerehally, BSK III stage, at site
No.806 to 811
Providing masonry drain & culverts in the main linking Kalidasa
HBCS., and timber yard layout in BSK III stage., Southern side
(Left), Ch: 80 mts.to 150mts
Improvements to formation of roads & providing side drains at
Hosakerehalli village_12th to 16th roads,
BDA/EE/S/PW/WO/176/92-93 dt:17-11-92
Garbage clearance in 7th block, 4th phase at BSK III stage.
BDA/EE/S/PW/WO/178/92-93 dt:
2142
2143
2149
2150
2151
2152
2153
2154
2155
2156
2157
BDA/EE/S/PW/WO/168/92-93 dt:01-09-92
BDA/EE/S/PW/WO/169/92-93 dt:16-09-92
BDA/EE/S/PW/WO/174/92-93 dt:17-11-92
BDA/EE/S/PW/WO/175/92-93 dt:17-11-92
BDA/EE/S/PW/WO/174/92-93 dt:24-09-92
BDA/EE/S/PW/WO/175/92-93 dt:24-09-92
BDA/EE/S/PW/WO/176/92-93 dt:09-09-92
BDA/EE/S/PW/WO/177/92-93 dt:01-09-92
BDA/EE/S/PW/WO/177/92-93 dt:19-11-92
2158
Fencing the park by chain link in SSM wall in Ittamadu l/o formed in
Sy.No.11 & 12 of BSK III stage, Ch:150m to 225mts.
BDA/EE/S/PW/WO/178/92-93 dt:16-09-92
2159
Fencing the park by chain link in SSM wall in Ittamadu l/o formed in
Sy.No.11 & 12 of BSK III stage, Ch:0 to 75 mts.
BDA/EE/S/PW/WO/179/92-93 dt:16-09-92
2160
Filling up of open wells in K.S.l/o- II stage.
BDA/EE/S/PW/WO/179/92-93 dt:19-11-92
2161
Fencing the park by chain link in SSM wall in Ittamadu l/o formed in
Sy.No.11 & 12 of BSK III stage, Ch:75 to 150 mts.
BDA/EE/S/PW/WO/180/92-93 dt:16-09-92
2162
Repairs to roads & side drains by removing silt at drains, berm
cutting & filling the cuts & pits & depression filling to the road
cutting for the 3rd, 3rd 'A' & 4th cross in BSK III stage, III phase, V
block.
Formation of l/o in Sy.No.30 of N.S.Palya under BTM , II stage, I
phase, 18th cross road.
Reconstruction of retaining wall of main SWD from Ch:195m to
260m on R/s & from Ch;250m to 280m on L/s in
Channammanakere auchukut l/o , BSK.
Desilting in the main SWD in Channamanakere layout, BSK 3rd
stage, 3rd phase- Ch: 0 to 450 mts.
BDA/EE/S/PW/WO/180/92-93 dt:27-11-92
Repairs to roads & side drains by removing silt at drains, berm
cutting & filling the cuts & pits & depression filling to the road
cutting for the I & II main road & 4th cross road in BSK III stage, III
phase, V block.
Repairs to roads & side drains by removing silt at drains, berm
cutting & filling the cuts & pits & depression filling to the road
cutting for the 4th 'A', 4th'B', 4th 'C' cross roads and 3rd main in
BSK III stage, III phase, V block.
Repairs to roads & side drains & depression filling to road cutting
of VHBCS ltd., I phase 80' & 60' roads.(Double road)
BDA/EE/S/PW/WO/183/92-93 dt:16-09-92
2169
Repairs to roads & side drains & depression filling to road cutting
of VHBCS ltd., I phase 30' roads.
BDA/EE/S/PW/WO/186/92-93 dt:17-10-92
2170
Rechipcarpetting the 80' road from ch:460m to 575m, 30' & 40'
roads near Kathriguppa village, BSK III stage.
BDA/EE/S/PW/WO/187/92-93 dt:16-09-92
2171
Metalling to the balance portion of road for approaching
Bilekanahalli Dollar scheme in Sy.No.56, 57 (Tank shore road)
under BTM , II stage (Ch: 0 to 300mts) b).Ch:150m to 300mts.
BDA/EE/S/PW/WO/189/92-93 dt:21-10-92
2172
Metalling to roads at Hosakerehalli village, BSK III stage- 9th, 10,
14 to 16th cross roads.
BDA/EE/S/PW/WO/190/92-93 dt:21-10-92
2163
2164
2165
2166
2167
2168
BDA/EE/S/PW/WO/153/92-93 dt:16-09-92
BDA/EE/S/PW/WO/181/92-93 dt:03-10-92
BDA/EE/S/PW/WO/182/92-93 dt:03-10-92
BDA/EE/S/PW/WO/184/92-93 dt:16-09-92
BDA/EE/S/PW/WO/185/92-93 dt:17-10-92
2173
Providing chipcarpetting to 8th cross road (60' road) in BTM I
stage, I phase- Cg: 0 to 825 mts.
BDA/EE/S/PW/WO/193/92-93 dt:28-11-92
2174
Garbage clearance in Srinivasanagar II phase in Sy.No.2 to 14 of
Gerehally, BSK III stage..
BDA/EE/S/PW/WO/194/92-93 dt:28-11-92
2175
Garbage clearance in Srinivasanagar II phase in Sy.No.2 to 7 and
11 of Gerehally, BSK III stage..
BDA/EE/S/PW/WO/195/92-93 dt:28-11-92
2176
Maintenance of side drains & removing desilting to the I main, 2nd
main, 2nd 'A' cross, 12th, 13th cross road of Ideal Homes, I phase.
BDA/EE/S/PW/WO/196/92-93 dt:10-12-92
2177
Rechipcarpetting to road at Ist 'A' & 'B', 'C' cross road at IV block,
II- phase, BSK III stage.
BDA/EE/S/PW/WO/197/92-93 dt:10-12-92
2178
Depression filling, repairs to road , culverts to main roads & cross
roads of Avalahalli layout , from 1st main to 5th main.
BDA/EE/S/PW/WO/198/92-93 dt:10-12-92
2179
Formation of roads, repairs to roads of CA site of Shopping
Complex at Avalahalli., BSK III stage.
BDA/EE/S/PW/WO/199/92-93 dt:10-12-92
2180
Filling of ruts & pits, depression filling to damaged portion of 50'
road & rechipcarpetting from Munishwara block Bridge to entrance
of Avalahalli l/o- Ch: 300m to 600m
Improvements to shop site no.1 to 10 & 11 to 20 of Avalahalli l/o,
BSK III stage, Formation of roads, Drains & forming sites.
BDA/EE/S/PW/WO/200/92-93 dt:10-12-92
2181
BDA/EE/S/PW/WO/201/92-93 dt:10-12-92
2182
Providing masonry drain & culverts in the main linking Kalidasa
HBCS., and timber yard layout in BSK III stage.
BDA/EE/S/PW/WO/202/92-93 dt:10-12-92
2183
Providing & constructing lead off masonry drain from 15th cross of
Avalahally village, BSK III stage- Ch:130m to 195mts.
BDA/EE/S/PW/WO/203/92-93 dt:11-12-92
2184
Providing Compound wall with M.S.Grill to the park towards East &
Western side in VI Block, II phase, BSK III stage.
BDA/EE/S/PW/WO/204/92-93 dt:11-12-92
2185
Providing & constructing lead off masonry drain from 15th cross of
Avalahally village, BSK III stage- Ch:0m to 65mts.
BDA/EE/S/PW/WO/205/92-93 dt:11-12-92
2186
Providing & constructing lead off masonry drain from 15th cross of
Avalahally village, BSK III stage- Ch:65m to 130 mts.
BDA/EE/S/PW/WO/206/92-93 dt:11-12-92
2187
Filling up ruts & pits, Depression filling, Repairs to Road cuttings &
cgipcarpetting of 60' approach road to Avalahalli Village, BSK III
stage-Ch:0m to 100mts.
Providing covering slabs to SWD on 9th cross of Avalahalli l/o,
BSK III stage.
BDA/EE/S/PW/WO/207/92-93 dt:11-12-92
2188
BDA/EE/S/PW/WO/208/92-93 dt:11-12-92
2189
Improvements to 15th road of Avalahalli village, BSK 3rd stage.
BDA/EE/S/PW/WO/209/92-93 dt:11-12-92
2190
Asphalting to 14th road of Avalahalli village, BSK III stage.
BDA/EE/S/PW/WO/210/92-93 dt:11-12-92
2191
Providing RCC deck slab for crossing over SWD to shop site 1 to
10 of Avalahalli, BSK III stage.
BDA/EE/S/PW/WO/211/92-93 dt:11-12-92
2192
Construction of masonry drain & culverts at I'A' main road, VI
block, III phase, BSK III stage.
BDA/EE/S/PW/WO/212/92-93 dt:14-12-92
2193
Providing RCC deck slab for crossing over SWD to shop sites 11
to 20 of Avalahalli, BSK III stage.
BDA/EE/S/PW/WO/213/92-93 dt:14-12-92
2194
Depression filling, repairs to road cuttings to main road & cross
road of Avalahalli, BSK III stage, 6th to 9th main road.
BDA/EE/S/PW/WO/214/92-93 dt:14-12-92
2195
Providing protective bed to vent way to SWD in damaged portion &
Asphalting to main road in pipe line I block, BSK III stage.
BDA/EE/S/PW/WO/215/92-93 dt:14-12-92
2196
Filling of ruts & pits, depression filling, repairs to road cuttings &
chip carpetting of 60' approach road to Avalahalli village, BSK III
stage, Ch: 100m to 200 mts.
Providing covering slabs to SWD on 9th cross of Avalahalli l/o,
BSK III stage.(South of 5th main road.)
BDA/EE/S/PW/WO/216/92-93 dt:15-12-92
Improvements to roads & drains in Sy.No.21 of Gavipura, near
Raghavendra Swamy Temple & alround (Village improvements
scheme.)
Repairs to road cutting , roads & drains of Timber Yard l/o, BSK III
stage.
Removal of garbage in the dust bins of pipeline block I & II
(Reconvey scheme) of Gavipura in BSK III stage, under the
jurisdiction of No.1, South sub division, BDA.
Removal of garbage in the dust bins of Nagendra & Raghavendra
block (Reconvey scheme) in BSK III stage under the jurisdiction of
No.1, South sub division, BDA.
Metalling &Asphalting the road 6th main and 2nd cross in BSK III
stage in Nagendra Block.
BDA/EE/S/PW/WO/218/92-93 dt:15-12-92
Widening the I cross road in VII block, II phase, BSK III stageCh:76m to 151 mts.
Filling of ruts & pits, depression filling, repairs to road cuttings &
chip carpetting of 60' approach road to Avalahalli village, BSK III
stage, (From Ring road.)
Rechipcarpetting to road at 7th block, II phase, BSK III stage, 80'
Banjk colony road (Near Culvert portion.)
BDA/EE/S/PW/WO/223/92-93 dt:15-12-92
2197
2198
2199
2200
2201
2202
2203
2204
2205
BDA/EE/S/PW/WO/217/92-93 dt:15-12-92
BDA/EE/S/PW/WO/219/92-93 dt:15-12-92
BDA/EE/S/PW/WO/220/92-93 dt:15-12-92
BDA/EE/S/PW/WO/221/92-93 dt:15-12-92
BDA/EE/S/PW/WO/222/92-93 dt:15-12-92
BDA/EE/S/PW/WO/224/92-93 dt:15-12-92
BDA/EE/S/PW/WO/225/92-93 dt:15-12-92
2206
Providing masonry drain & culverts to 5th main road, VI block, II
phase, BSK III stage.
Repairs to road & side drainsby removing silt in drains & filling the
ruts & pits and depressions filling to road cuttings for 4th main, 1st
& 2nd cross in BSK III stage, III phase, V Block.
BDA/EE/S/PW/WO/226/92-93 dt:21-12-92
Construction of lead of drain to protect the road in VII block, II
phase in BSK III stage.
Construction of missing length of SWD to linking the Timber yard
l/o in BSK III stage.Ch:75m to 95 mts.
BDA/EE/S/PW/WO/229/92-93 dt:26-12-92
2210
Construction of missing length of SWD to linking the Timber yard
l/o in BSK III stage.Ch:55m to75 mts.
BDA/EE/S/PW/WO/231/92-93 dt:26-12-92
2211
Construction of Bridge across SWD in III main road to
Sri.Siddivinayaka HBCS ltd, to connect the existing road of
Srinivasanagar, BSK III stage.
Construction of balance length of SWD in Ittamadu l/o in Sy.No.11
& 12 of BSK III stage, Ch:0 to 28mts.
BDA/EE/S/PW/WO/232/92-93 dt:26-12-92
2207
2208
2209
2212
2213
2214
2215
2216
2217
BDA/EE/S/PW/WO/228/92-93 dt:21-12-92
BDA/EE/S/PW/WO/230/92-93 dt:26-12-92
BDA/EE/S/PW/WO/233/92-93 dt:26-12-92
Metalling to 2 'D' main road l/o in Sy.No.95,96, 121 & 122 of
Hosakerehalli, BSK III stage.
Construction of Bridge across SWD in I cross road of
Channammanakere Atchukut layout, BSK III stage.
BDA/EE/S/PW/WO/234/92-93 dt:26-12-92
Providing chain link fencing to C.A, No.4 earmarked for park &
construction of stenning wall to well in 29th main in BTM II stage, I
phase.
Urgent repairs to roads, side drains , shoulder drains & footpath
repairs in 80' road, Bank colony round at BSK III stage, II phase.
BDA/EE/S/PW/WO/236/92-93 dt:26-12-92
BDA/EE/S/PW/WO/235/92-93 dt:26-12-92
BDA/EE/S/PW/WO/237/92-93 dt:26-12-92
Construction of 75mm width SSM drain by the side of l/o formed in
Sy.No.95, 96, 121 & 122 of Hosakerehally, BSK III stage, at site
No.1142 to 1145, 1164 & 1165.
Chipcarpetting and other improvements of main roads of
Hosakerehalli village, Ch; 0 to 170 mts.
BDA/EE/S/PW/WO/238/92-93 dt:26-12-92
2219
Repairs to roads & drains filling the ruts & pits and road cuttings in
Anjaneya HBCS ltd, I phase.
BDA/EE/S/PW/WO/240/92-93 dt:26-12-92
2220
Maintenance of borewell in Srinivasanagar II phase of BSK III
stage.
Maintenance of borewell in K.S.l/o, I & II stage.
BDA/EE/S/PW/WO/241/92-93 dt:26-12-92
2218
2221
BDA/EE/S/PW/WO/239/92-93 dt:26-12-92
BDA/EE/S/PW/WO/242/92-93 dt:26-12-92
2222
Maintenance of borewell in Srinivasanagar I phase and
Vinayakanagar extn of BSK III stage.
BDA/EE/S/PW/WO/243/92-93 dt:26-12-92
2223
providing C.D.works to missing bits of cross roads at Hosakerehalli
village, BSK III stage, Part-B
BDA/EE/S/PW/WO/244/92-93 dt:26-12-92
2224
Sinking borewell 140 to 149mm dia, fixing IM II hand pump &
constructing platform complete in Avalahalli Village l/o, BSK III
stage, (4nos).
Rechipcarpetting road at 6th and 4th block of I cross road, II
phase, BSK III stage.
Construction of missing length of SWD to linking the Timber Yard
l/o in BSK III stage, Ch:35m to 55mts.
BDA/EE/S/PW/WO/245/92-93 dt:26-12-92
Construction of CD works to approach road from 100' ring road to
4th main road of layout in Sy.No.95, 96, 121 & 122 of
Hosakerehalli, BSK III stage.
Flood damage repairs to SWD at l/o in Sy.No.95, 96, 121 & 122 of
Hosakerehalli, BSK III stage.
BDA/EE/S/PW/WO/248/92-93 dt:26-12-92
2229
Providing chain link fencing to C.A site, East & South portions to
park in VII block, II phase, BSK III stage.
BDA/EE/S/PW/WO/250/92-93 dt:26-12-92
2230
Repairs to bad patches of 80' road from Bank Colony to 100' ring
road at BSK III stage.
Repairs to bad patches of 80' road between VI & VII block, II
phase, BSK III stage- Ch:0 to 280m
BDA/EE/S/PW/WO/251/92-93 dt:26-12-92
2232
Rectification of road cutting portion executed by BWSSB in Ideal
Homes HBCS , II phase.
BDA/EE/S/PW/WO/253/92-93 dt:26-12-92
2233
Repairs to bad patches of 80' road between VI & VII block, II
phase, BSK III stage- Ch: 280m to 560m
BDA/EE/S/PW/WO/254/92-93 dt:26-12-92
2234
Providing CD works along the main approach road in Ittamadu ,
BSK IV stage.
Providing Ornamental grill to the park below H.T Line in
K.S.Layout, II stage- Cg:127m to 202mts.
BDA/EE/S/PW/WO/255/92-93 dt:26-12-92
2236
Providing chain link fencing to the N/s.of C.A., site No.6,
earmarked for Shopping complex in BTM II stage, I phase.
BDA/EE/S/PW/WO/257/92-93 dt:01-01-93.
2237
Remetalling to the 10th & 14th cross road of BTM II stage, I phase.
BDA/EE/S/PW/WO/258/92-93 dt:01-01-93.
2238
Remetalling to tank shore road from Madivala village upto sy.No.84
in BTM II stage, I Phase.
BDA/EE/S/PW/WO/259/92-93 dt:01-01-93.
2225
2226
2227
2228
2231
2235
BDA/EE/S/PW/WO/246/92-93 dt:26-12-92
BDA/EE/S/PW/WO/247/92-93 dt:26-12-92
BDA/EE/S/PW/WO/249/92-93 dt:26-12-92
BDA/EE/S/PW/WO/252/92-93 dt:26-12-92
BDA/EE/S/PW/WO/256/92-93 dt:
2239
Providing chain link fencing to BDA land in Sy.No.62 of
Kathriguppa village layout in BSK III stage, IV phase, VII Block (I
Reach)
Remetalling to tank shore road from 100' ring road to Madivala
village in BTM II stage, I Phase.
BDA/EE/S/PW/WO/260/92-93 dt:02-01-93.
2241
Garbage clearance in Vinayakanagar of BSK III stage.
BDA/EE/S/PW/WO/262/92-93 dt:02-01-93.
2242
Providing chain link fencing to CA site in sy.No.34 of Madivala
under BTM I stage, I phase- Ch: 75 mts. to 150m II reach.
BDA/EE/S/PW/WO/263/92-93 dt:07-01-93.
2243
Providing chain link fencing to park in Maruthi HBCS under BTM
layout, Eastern side.
Providing protection wall along tank shore road from Ch:265 to
380m in BTM II stage, I phase.
BDA/EE/S/PW/WO/264/92-93 dt:07-01-93.
2245
Removal of Garbage in the dust bins of Muneshwara block,
reconvey scheme and A.K.colony, Avalahalli in BSK III stage.
BDA/EE/S/PW/WO/301/92-93 dt:22-01-93.
2246
Providing protection wall along tank shore road from Ch:255 to
810m in BTM II stage, I phase.
BDA/EE/S/PW/WO/266/92-93 dt:07-01-93.
2247
Re-chipcarpetting to roads of 7th block, II pgase, BSK III stage (I
main Road)
Providing chain link fencing to the N/s.of C.A., site No.2, at BTM II
stage, I phase.
Widening and formation of road linking I & II stage of K.S.L/o
BDA/EE/S/PW/WO/267/92-93 dt:07-01-93.
Remetalling to the roads in sy.No.84 of Madivala in BTM II stage, I
phase.
Providing fencing to the CA site (Park) in K.S.L/o II stage (Western
side), Ch: 375 to 450mts, CA site No.13
BDA/EE/S/PW/WO/270/92-93 dt:11-01-93.
2252
Filling of road cutting & depressions filling to the roads at l/o in
Sy.No.95,96, 121 & 122 of Hosakerehalli, BSK III stage.
BDA/EE/S/PW/WO/272/92-93 dt:11-01-93.
2253
Providing chain link fencing to CA site in sy.No.34 of Madivala
under BTM I stage, I phase, III reach - Ch: 150 mts. to 207m
BDA/EE/S/PW/WO/273/92-93 dt:11-01-93.
2254
Providing chain link fencing to W/S of CA No.2 of BTM II stage, I
phase.
Repairs to roads & drains in VI block, III phase, BSK III stage.
BDA/EE/S/PW/WO/274/92-93 dt:11-01-93.
Chipcarpetting and other improvements of main roads of
Hosakerehalli village, BSK III stage, Ch; 170 mts.to 340mts
BDA/EE/S/PW/WO/276/92-93 dt:11-01-93.
2240
2244
2248
2249
2250
2251
2255
2256
BDA/EE/S/PW/WO/261/92-93 dt:02-01-93.
BDA/EE/S/PW/WO/265/92-93 dt:07-01-93.
BDA/EE/S/PW/WO/268/92-93 dt:07-01-93.
BDA/EE/S/PW/WO/269/92-93 dt:07-01-93.
BDA/EE/S/PW/WO/271/92-93 dt:11-01-93.
BDA/EE/S/PW/WO/275/92-93 dt:11-01-93.
2257
Construction of balance length of SWD in Ittamadu l/o in Sy.No.11
& 12 of BSK III stage, Ch:18 to 36 mts.
BDA/EE/S/PW/WO/277/92-93 dt:11-01-93.
2258
Prtoviding chain link fencing to the S/S of CA site No.2 at BTM II
stage,I Phase.
Raising the bed of B.S.Slab drain in 6th & 7th 'A' cross road of
BTM II stage, I phase.
Remetalling & chipcarpetting to main approach road of Ittamadu,
BSK IV stage, entrance from Ring roaad.
BDA/EE/S/PW/WO/278/92-93 dt:11-01-93.
2261
Rechipcarpetting to the roads of l/o in Sy.No.95, 96 , 121 & 122 of
Hosakerehalli, BSK III satge, 4th main road.
BDA/EE/S/PW/WO/281/92-93 dt:16-01-93.
2262
Providing link road from layout in Sy.No.96 & 97 of Dollar scheme
in BTM I stage, I Phase.
BDA/EE/S/PW/WO/282/92-93 dt:16-01-93.
2263
Providing CD works to missing bits of cross road at Hosakerehally
village, BSK III stage, Part 'A'
BDA/EE/S/PW/WO/283/92-93 dt:16-01-93.
2264
Repairs to road cuttings, potholes in chipcarpetted surface of roads
& maintenance of side drains in 14th & 15th main road of BTM II
stage, I phase.
Repairs to road cuttings, potholes & chipcarpetting to 9th main, I &
IV cross roads in MICO layout, II stage under BTM II stage.
BDA/EE/S/PW/WO/284/92-93 dt:16-01-93.
2259
2260
2265
2266
BDA/EE/S/PW/WO/279/92-93 dt:11-01-93.
BDA/EE/S/PW/WO/280/92-93 dt:16-01-93.
BDA/EE/S/PW/WO/285/92-93 dt:16-01-93.
Providing Deck slab to the culverts in Cauvery layout under BTM
scheme.
Providing chain link fencing to the park in Bank Officers & Officials
l/o, BTM II stage, I pahse, II reach.
BDA/EE/S/PW/WO/286/92-93 dt:16-01-93.
2268
Improvements to park & providing Ornamental grill to the park in
Sy.No.10 & 11 of Tavarekare under BTM., I stage, I phase.
BDA/EE/S/PW/WO/288/92-93 dt:18-01-93.
2269
Fencing to CA site for park of layout in Sy.No.11 & 12 of Ittamadu,
BSK III stage.
Providing chipcarpetting to the metalled surface of roads in
Cauvery l/o under BTM scheme.
BDA/EE/S/PW/WO/289/92-93 dt:18-01-93.
2271
Construction of masonry drain (missing links) at Bilekanahally,
Dollarsscheme in BTM layout, II reach.
BDA/EE/S/PW/WO/291/92-93 dt:18-01-93.
2272
Providing Deck slab to culverts in Sy.No. 92, & 93 in Tavarekere in
BTM I stage, I phase.
Providing culverts to cross roads to link roads from Sy.No.96 & 97
of Madivala to Dollar scheme in BTM l/o.
BDA/EE/S/PW/WO/292/92-93 dt:18-01-93.
2267
2270
2273
BDA/EE/S/PW/WO/287/92-93 dt:18-01-93.
BDA/EE/S/PW/WO/290/92-93 dt:18-01-93.
BDA/EE/S/PW/WO/293/92-93 dt:18-01-93.
2274
2275
Providing chain link fencing to park in Maruthi HBCS under BTM
layout, Western side.
Construction of damaged portion of SED at Channammanakere
Auchukut l/o, BSK III stage- Ch;846m to 861mts
BDA/EE/S/PW/WO/294/92-93 dt:18-01-93.
BDA/EE/S/PW/WO/295/92-93 dt:18-01-93.
2276
Construction of damaged portion of SED at Channammanakere
Auchukut l/o, BSK III stage- Ch;861m to 876mts
BDA/EE/S/PW/WO/296/92-93 dt:18-01-93.
2277
Providing chipcarpetting to the balance portion of road in
Sy.No.20/1B of Tavarekere in BTM l/o.
BDA/EE/S/PW/WO/297/92-93 dt:18-01-93.
2278
Providing chipcarpetting to the link road from Sy.No.96,97 of
Madivala Dollar schene under BTM l/o
BDA/EE/S/PW/WO/298/92-93 dt:18-01-93.
2279
Construction of protectipn wall along tank shore road of Madivala
BTM II stage, I phase, Ch:85m to 170m
BDA/EE/S/PW/WO/299/92-93 dt:18-01-93.
2280
Providing metalling to approach road to l/o in Sy.No.92, 93 of
Tavarekerw under BTM I stage, I phase.
BDA/EE/S/PW/WO/300/92-93 dt:18-01-93.
2281
Removal of Garbage in the dust bins of Muneshwara block,
reconvey scheme and A.K.colony, Avalahalli in BSK III stage.
BDA/EE/S/PW/WO/301/92-93 dt:22-01-93.
2282
Removal of Garbage in the dust bins of private layout coming
under the jurisdiction of No.1 south sub division, BDA
BDA/EE/S/PW/WO/302/92-93 dt:22-01-93.
2283
Removal of Garbage in the dust bins of III phase, 1 to 6th block
East of Kathriguppa L/o., Channammanakere atchukut l/o in BSK
III stage.
Removal of Garbage in the dust bins of BSK III stage,II phase, IV,
VI, VII block, Hosakerehalli l/o in Sy.Nos.108 & 120 of HSK & l/o in
Sy.No.11 & 12 of Ittamadu, BSK III stage.
BDA/EE/S/PW/WO/303/92-93 dt:22-01-93.
2285
Maintenance of roads and drains and repairs to road cuttings in the
layout in Sy.Nos.101/1,3, 102, 105/2, 107/3 of Kathriguppa in
favour of Kempegowda, G.N.S.S.S Ltd in BSK III stage.
BDA/EE/S/PW/WO/305/92-93 dt:22-01-93.
2286
Remetalling & Asphalting to the road in East of Kathriguppa, 4th
phase, BSK III stage, B'lore.
BDA/EE/S/PW/WO/306/92-93 dt:22-01-93.
2287
Improvements & Asphalting the missing bits of road in Ittamadu
layout in Sy.No.11 & 12 of BSK III stage.
BDA/EE/S/PW/WO/307/92-93 dt:22-01-93.
2288
Providing chain link fencing to the C.A No.10 (Park) towrds WestNorth-East side in BSK III stage, II phase, IV block
BDA/EE/S/PW/WO/308/92-93 dt:22-01-93.
2284
BDA/EE/S/PW/WO/304/92-93 dt:22-01-93.
2289
Remetalling & chipcarpetting to main approach road of Ittamadu,
BSK IV stage, last road (Final reach)
BDA/EE/S/PW/WO/309/92-93 dt:22-01-93.
2290
Repairs to road cuttings & removal of silt in side drains in III block ,
III phase, BSK III stage.
BDA/EE/S/PW/WO/310/92-93 dt:22-01-93.
2291
Providing chipcarpetting to the metalled surface road in Sy.No.92 &
93 of Tavarekere under BTM I stage, I phase.
BDA/EE/S/PW/WO/311/92-93 dt:22-01-93.
2292
Formation of layout in sy.no. 58/5 of Yeddiyur , BSK II stage.
BDA/EE/S/PW/WO/312/92-93 dt:22-01-93.
2293
Sinking Borewell 140 to 149mm dia. fixing IM -II hand pump and
constructing platform complete in BSK III stage, 4 nos.
BDA/EE/S/PW/WO/313/92-93 dt:22-01-93.
2294
Fencing to C.A site No.16 and improvements to C.A.site in I phase,
Ideal Homes, H.B.C.S l/o.
BDA/EE/S/PW/WO/314/92-93 dt:22-01-93.
2295
Rechipcarpetting to the roads of layout in Sy.No.95, 96, 121 & 122
of Hosakerehalli, BSK III stage, 3rd main road.
BDA/EE/S/PW/WO/315/92-93 dt:22-01-93.
2296
Providing chipcarpetting to the roads at BSK III stage, II phase, VII
Block, I 'A' main, I'A' & 'C' cross roads.
BDA/EE/S/PW/WO/316/92-93 dt:22-01-93.
2297
Providing chain link fencing to the park in Bank Officers & Officials
l/o, BTM II stage, I pahse, I reach.
BDA/EE/S/PW/WO/317/92-93 dt:22-01-93.
2298
Filling of road cutting & depressions filling to the roads at BSK III
stage, II phase, IV Block.
Providing Rechipcarpetting to the roads at BSK III stage, II phase,
VII block, I main road.
Providing Rechipcarpetting to the roads at BSK III stage, II phase,
VII block, I 'B'main , I'C', 'G' and 'J' cross roads.
BDA/EE/S/PW/WO/318/92-93 dt:22-01-93.
2301
Construction of protection wall along tank shore road of Madivala,
BTM II stage, I phase, 170 to 255 mts.
BDA/EE/S/PW/WO/321/92-93 dt:22-01-93.
2302
Disposal of Garbage in kasturba slum in BSK III stage (Annual
maintenance)
Construction of masonry drain (missing links) at Bilekanahally,
Dollars layout, I reach.
Providing chain link fencing to CA site in sy.No.34 of Madivala
under BTM I stage, I phase- Ch:0 to 75 mts.
BDA/EE/S/PW/WO/323/92-93 dt:22-01-93.
2299
2300
2303
2304
2305
Providing dust bins to l/o in Sy.No.34 of Madivala Dollar scheme
under BTM l/o.
BDA/EE/S/PW/WO/319/92-93 dt:22-01-93.
BDA/EE/S/PW/WO/320/92-93 dt:22-01-93.
BDA/EE/S/PW/WO/324/92-93 dt:22-01-93.
BDA/EE/S/PW/WO/325/92-93 dt:22-01-93.
BDA/EE/S/PW/WO/326/92-93 dt:22-01-93.
2306
Repairs to road cuttings , pot holes & patches in chipcarpetted
surface of roads & maintenance of side drains in 13th main, 8th,
9th, 10th & 11th cross roads of BTM II stage, I Phase.
BDA/EE/S/PW/WO/327/92-93 dt:22-01-93.
2307
Providing Rechipcarpetting to the roads at BSK III stage, II phase,
VII block -I 'B' cross & Bank Colony road.
BDA/EE/S/PW/WO/328/92-93 dt:22-01-93.
2308
Formation of missing links in sy.No.10 & 11 of Tavarekere under
BTM I stage.
Formation of road from B'lore Kidney Foundation Hospital to the
Uttarahalli road.
Providing chain link fencing to the S/S of C.A site No.6 , earmarked
for shopping complex in BTM, II stage, I phase.
BDA/EE/S/PW/WO/329/92-93 dt:22-01-93.
2311
Providing chain link fencing to the E/S of C.A site No.6 , earmarked
for shopping complex in BTM, II stage, I phase.
BDA/EE/S/PW/WO/332/92-93 dt:22-01-93.
2312
Providing chain link fencing to the W/S of C.A site No.6 ,
earmarked for shopping complex in BTM, II stage, I phase.
BDA/EE/S/PW/WO/333/92-93 dt:22-01-93.
2313
Raising the bed of B.S.Slab drain from 16th to 29th main road of
BTM stage, I phase.
Providing metalling to the internal roads of K.S.layout , II stage,
(Linking road)
Remetalling to the 25th & 28th main road of BTM II stage, I phase.
BDA/EE/S/PW/WO/334/92-93 dt:22-01-93.
2316
Providing chain link fencing to the balance portion of park in Bank
Officers & Officials l/o, BTM II stage, I phase.
BDA/EE/S/PW/WO/337/92-93 dt:22-01-93.
2317
Providing chain link fencing toward West & North side to C.A site in
VII Block, II phase, BSK III stage.
BDA/EE/S/PW/WO/338/92-93 dt:22-01-93.
2318
Chipcarpetting to tank shore road from Madivala village upto
Sy.No.84 of Madivala BTM II stage, I phase, Ch:385mt to 770 mts.
BDA/EE/S/PW/WO/339/92-93 dt:22-01-93.
2319
Providing chain link fencing to CA No.6 at Padmanabhanagar of
Jayanagar HBCS, Kadirenahalli.
BDA/EE/S/PW/WO/340/92-93 dt:22-01-93.
2320
Providing chain link fencing to BDA land in Sy.No.62 , K.G.P l/o in
BSK III stage, IV phase, 7th block, B'lore.(II Block)
BDA/EE/S/PW/WO/341/92-93 dt:22-01-93.
2321
Formation of missing road & culverts in 7th block, 4th phase, BSK
III stage, B'lore.
Construction of protection wall along tank shore road of Madivala,
BTM II stage, I phase, Ch;0 to 85mts.
BDA/EE/S/PW/WO/343/92-93 dt:22-01-93.
2309
2310
2314
2315
2322
BDA/EE/S/PW/WO/330/92-93 dt:22-01-93.
BDA/EE/S/PW/WO/331/92-93 dt:22-01-93.
BDA/EE/S/PW/WO/335/92-93 dt:22-01-93.
BDA/EE/S/PW/WO/336/92-93 dt:22-01-93.
BDA/EE/S/PW/WO/344/92-93 dt:22-01-93.
2323
Chipcarpetting to tank shore road from 100' ring road to Madivala
Village- Ch:0 to 385 mts.
BDA/EE/S/PW/WO/345/92-93 dt:22-01-93.
2324
Repairs to road cuttings etc to l/o in Sy.No.4/2 of Maruthi HBCS
under BTM l/o.
Maintenance of roads, drains and culverts in BTM I stage, I phase.
BDA/EE/S/PW/WO/346/92-93 dt:22-01-93.
Providing chain link fencing to park in Maruthi H.B.C.S, under BTM
layout-Southern side.
Providing chain link fencing to park in Maruthi H.B.C.S, under BTM
layout-Northern side.
Construction of missing length of SWD to linking Timber yard l/o in
BSK III stage, Ch: 0 to 35 mts.
BDA/EE/S/PW/WO/348/92-93 dt:22-01-93.
2329
Fencing to C.A., (park) sites for private layout of Ideal Homes
HBCS II phase, (BSK III stage.)
BDA/EE/S/PW/WO/351/92-93 dt:22-01-93.
2330
Repairs to roads & side drains by removing silt in drains, filling the
ruts & pits & depression filling to the road cuttings for 5th, 6th cross
& 2nd 'B' main in BSK III stage, III phase, V Block.
BDA/EE/S/PW/WO/352/92-93 dt:22-01-93.
2331
Repairs to roads & side drains by removing silt in drains, filling the
ruts & pits & depression filling to the road cuttings for I cross, I 'A',
'B' & 'C' cross in BSK III stage, III phase, V Block.
BDA/EE/S/PW/WO/353/92-93 dt:22-01-93.
2332
Providing chain link fencing to the E/S of C.A., site No.2 at BTM II
stage, I phase.
Construction of the drains & culverts for widening of the Uttarahalli
road at Chikkalasandra village, under BSK V stage.
BDA/EE/S/PW/WO/354/92-93 dt:22-01-93.
2334
Construction of masonry drain at 3rd & 4th cross at layout in
Sy.No.95, 96, 121 of BSK III stage.
BDA/EE/S/PW/WO/356/92-93 dt:22-01-93.
2335
Construction and covering of storm water drain at Sy.No.11 & 12 of
Ittamadu layout (Near C.A. site) BSK III stage, Ch:0 to 60mts.
BDA/EE/S/PW/WO/357/A/92-93 dt:22-01-93.
2336
Construction and covering of storm water drain at Sy.No.11 & 12 of
Ittamadu layout (Near C.A. site) BSK III stage, Ch:60 to 120mts.
BDA/EE/S/PW/WO/357/B/92-93 dt:22-01-93.
2337
Construction and covering of storm water drain at Sy.No.11 & 12 of
Ittamadu layout (Near C.A. site) BSK III stage, Ch:140 to 200mts.
BDA/EE/S/PW/WO/357/C/92-93 dt:22-01-93.
2338
Construction of compound wall to the CA site No.2 in the layout
formed in Sy.No.95, 96 121 & 122 of Hosakerehalli, BSK III stage.
BDA/EE/S/PW/WO/358/92-93 dt:22-01-93.
2325
2326
2327
2328
2333
BDA/EE/S/PW/WO/347/92-93 dt:22-01-93.
BDA/EE/S/PW/WO/349/92-93 dt:22-01-93.
BDA/EE/S/PW/WO/350/92-93 dt:22-01-93.
BDA/EE/S/PW/WO/355/92-93 dt:22-01-93.
2339
Formation of park below H.T.Line in K.S.Layout , II stage by
providing Ornamental grill -Ch:52m to 127 mts.
BDA/EE/S/PW/WO/359/92-93 dt:22-01-93.
2340
Levelling the proposed park in K.S.Layout, II stage, below
H.T.Line.
Construction of stage in C.A. site (School & playground) at
K.S.Layout, 1st stage.
Providing layout boards, name boards and dust bins in BSK III
stage.
Construction of Anganwadi Kendra in C.A site No.2, Sy.No.95, 96,
121 & 122 of Hosakerehalli, BSK III stage. (Part'B')
BDA/EE/S/PW/WO/360/92-93 dt:22-01-93.
2341
2342
2343
BDA/EE/S/PW/WO/361/92-93 dt:22-01-93.
BDA/EE/S/PW/WO/362/92-93 dt:22-01-93.
BDA/EE/S/PW/WO/363/92-93 dt:
1993-94
2344
Garbage cleaning in Kumaraswamy Layout, I Stage
2345
Garbage cleaning in Kumaraswamy Layout, II Stage
2346
Garbage cleaning in I.T.I. Layout and sy No.120 of Kathriguppa
BSK III Stage
Garbage cleaning in Sy No.17, 121, 122, 134/2 of Kathriguppa and
surrounding area of Kathriguppa Main road upto S.W.D. in
Srinivasanagar.
Garbage clearance in 7th block IV Phase of BSK III Stage,
including Dena bank Layout from 01.05.1993 to 30.09.1993 (5
Months)
Garbage cleaning in Kumaraswamy Layout, I Stage, for the period
from 07-93 to 9-93 (3 Months)
2347
2348
2349
No:BDA/EE(S)/PW/WO/AE/01/93-94 dt
29.06.1993
No:BDA/EE(S)/PW/WO/AE/02/93-94 dt
29.06.1993
No:BDA/EE(S)/PW/WO/AE/03/93-94 dt
07.07.1993
No:BDA/EE(S)/PW/WO/AE/04/93-94 dt
07.07.1993
No:BDA/EE(S)/PW/WO/AE/13/5/93-94 dt
29.09.1993
No:BDA/EE(S)/PW/WO/AE/15/6/93-94 dt
13.10.1993
2350
Garbage cleaning in Kumaraswamy layout II Stage, for the period
from 7-93 to 9-93 (3 Months)
No:BDA/EE(S)/PW/WO/AE/14/7/93-94 dt
13.10.1993
2351
Garbage cleaning in slums in Kumaraswamy Layout II Stage,
slums for the period 7-93 to 9-93 (3 Months)
No:BDA/EE(S)/PW/WO/AE/16/8/93-94 dt
13.10.1993
2352
Cleaning of the Commercial complex at BSK II Stage, from Aprill
1993 to June 1993 ( 3 Months)
No:BDA/EE(S)/PW/WO/AE/10/93-94 dt
29.10.1993
2353
Garbage cleaning in BTM layout II Stage, I Phase (August 93 to
september 93)
Garbage cleaning in BTM layout II Stage, I Phase (October 93 to
Navember 93)
Garbage clearing in Kumaraswamy Layout II Stage Slums for the
month of October and November 1993
No:BDA/EE(S)/PW/WO/AE/11/93-94 dt
01.01.1994
No:BDA/EE(S)/PW/WO/AE/12/93-94 dt
01.01.1994
No:BDA/EE(S)/PW/WO/AE/13/93-94 dt
21.01.1994
2354
2355
2356
Garbage clearing in Kumaraswamy layout II stage for the month of
October and November 1993
No:BDA/EE(S)/PW/WO/AE/14/93-94 dt
21.01.1994
2357
Garbage clearing in Kumaraswamy Layout I Stage, for the month
of October and November 1993
No:BDA/EE(S)/PW/WO/AE/15/93-94 dt
21.01.1994
2358
Estimate for Garbage clearance in Radhakrishna Layout I, II, III
Stage, from 1.08.1993 to 30.11.1993
No:BDA/EE(S)/16/93-94 dt 02.02.1994
2359
Estimate for Garbage Clearing in Vinayakanagar BSK III Stage, I to
4th main in Sy No.22/1 and 22/2 of Gerehally for 3 months (from
01.09.1993 to 30.11.1993)
Estimate for Garbage Clearingin Vinayakanagar BSK III Stage I to
7th cross in Sy No.22/1 and 22/2 of Gerehally (for 3 months from
01.09.1993 to 30.11.1993)
Estimate for garbage clearance in Vinayakanagar Extension of
Banashankari III Stage, 2 months from 01.07.1993 to 31.08.1993
No:BDA/EE(S)/17/93-94 dt 02.02.1994
2360
2361
2362
2363
2364
Estimate for garbage clearance in Srinivasa Nagar I Phase, 6th to
9th cross in Sy No.2 to 7 and 11 of Gerehalli in BSK III Stage for 3
Months (From 01.09.1993 to 30.11.1993)
Estimate for Garbage clearance in Sreenivasanagar I phase, ist to
5th cross in Sy No.2 to 7 and 11 of Gerehally in BSK III Stage
(From 3 months from 01.09.1993 to 30.11.1993)
Estimate for Garbage clearing in Vinayakanagar, Extn of
Banashankari III Stage (2 Months from 01.05.1993 to 30.06.1993)
No:BDA/EE(S)/18/93-94 dt 02.02.1994
No:BDA/EE(S)/28/93-94 dt 02.02.1994
No:BDA/EE(S)/20/93-94 dt 02.02.1994
No:BDA/EE(S)/21/93-94 dt 02.02.1994
No:BDA/EE(S)/19/93-94 dt 02.02.1994
2365
Estimate for garbage clearing in Manjunathanagar slum from June
93 to Dec 93 (Second half Portion)
No:BDA/EE(S)/24/93-94 dt 04.02.1994
2366
Estimate for Garbage Clearance in Manjunathanagar slum from
June 93 to Dec 1993 (first half portion)
No:BDA/EE(S)/25/93-94 dt 04.02.1994
2367
Estimate for Removal of Garbage in BTM I Stage I Phase (June &
July 1993)
Estimate for removal of garbage in BTM Layout I Stage, I Phase
(Aug and Sept 1993)
Garbage clearance in 7th block IV Phase of BSK III Stage,
including Dena bank Layout from 01.10.1993 to 31.12.1993
No:BDA/EE(S)/26/93-94 dt 04.02.1994
2368
2369
No:BDA/EE(S)/27/93-94 dt 04.02.1994
No:BDA/EE(S)/PW/WO/AE/29/93-94 dt
04.02.1994
2370
Maintenance of Roads and Drains in Front and in between the
EWS houses in K.S. Layout I Stage (EWS Houses Nos.397 to 586)
No:BDA/EE(S)/PW/WO/AE/30/93-94 dt
09.02.1994
2371
Maintenance of Roads and Drains in Front and in between the
EWS houses in K.S. Layout I Stage (EWS Houses Nos.106 to 396)
No:BDA/EE(S)/PW/WO/AE/31/93-94 dt
09.02.1994
2372
Maintenance of Roads and Drains in Front and in between the
EWS houses in K.S. Layout I Stage (EWS Houses Nos.587 to 726)
No:BDA/EE(S)/PW/WO/AE/32/93-94 dt
09.02.1994
2373
Pothole filling to the road from BSK Temple to Uttarahalli from
Chainage 500mtrs to 1000 mtrs
No:BDA/EE(S)/PW/WO/AE/33/93-94 dt
01.03.1994
2374
Garbage cleaning in Srinivasanagar 4th cross to 6th cross & 2nd
cross BSK III Stage
Pothole filling to the road from BSK Temple to Uttarahalli from
Chainage 0mtrs to 50 mtrs
No:BDA/EE(S)/PW/WO/AE/34/93-94 dt
01.03.1994
No:BDA/EE(S)/PW/WO/AE/35/93-94 dt
01.03.1994
2376
Garbage cleaning in Kathriguppa main road left side 6th cross to
13th 'A' cross road BSK III Stage
No:BDA/EE(S)/PW/WO/AE/36/93-94 dt
01.03.1994
2377
Repairs to road cuttings , pot holes, patches and depression filling
to 1st main road (Viduapeeta road) in CKA layout from 1st cross to
2nd cross road.
Manufacturing, supplying & fixing name boards in formation of
layout in Sy.No.58/5 of Yeddiyur, BSK II stage.
BDA/EE/S/PW/WO/51/93-94 dt:30-03-94.
Removal of garbage for the period from 01-05-93 to 31-12-93 in
BSK III stage, 3rd phase, 1st to 6th block , eastern side of
Kathriguppa and Chanamanakere auchukut
Removal of garbage in private layout for the period from 01-05-93
to 31-12-93 under the jurisdiction of No.1 South sub division.
BDA/EE/S/PW/WO/53/93-94 dt:30-03-94.
2375
2378
2379
2380
BDA/EE/S/PW/WO/52/93-94 dt:30-03-94.
BDA/EE/S/PW/WO/54/93-94 dt:30-03-94.
Removal of garbage for the period from 01-05-93 to 31-12-93 in
BSK III stage, 2nd phase, 4,6 and 7th block , Hosakerehalli layout,
2nd phase, Sy.No.108 and 120 (part), Hosakerehalli, and Sy.No.11
& 12 of Ittamadu, and Kasturba slum.
Removal of garbage for the period from 01-05-93 to 31-12-93 ,
Munishwara layout (Reconvey) A.K.colony, Avalahalli, in BSK III
stage
Providing security arrangements to the commercial complex at
BSK II stage from 13-03-93 to 08-06-93
BDA/EE/S/PW/WO/55/93-94 dt:30-03-94.
2384
Providing security arrangements to the commercial complex at
BSK II stage from 20-12-92 to 12-03-93
BDA/EE/S/PW/WO/58/93-94 dt:30-03-94.
2385
Providing security arrangements to the commercial complex at
BSK II stage from 04-09-93 to 30-11-93
BDA/EE/S/PW/WO/59/93-94 dt:30-03-94.
2386
Providing security arrangements to the commercial complex at
BSK II stage from 09-06-93 to 03-09-93
BDA/EE/S/PW/WO/60/93-94 dt:30-03-94.
2381
2382
2383
94-95
BDA/EE/S/PW/WO/56/93-94 dt:30-03-94.
BDA/EE/S/PW/WO/57/93-94 dt:30-03-94.
2387
2388
Providing security arrangements to the Commercial Complex at
BSK II stage
Maintenance of roads and remetalling to 4th main and 1st cross in
between 4th and 6th main in Nagendra Block, BSK III stage.
BDA/EE/S/PW/WO/AE/151/94-95 dt:27-07-94
2389
Maintenance of roads and remetalling to 2nd main and 1st cross in
between 1stand 3rd main in Nagendra Block, BSK III stage.
BDA/EE/S/PW/WO/AE/152/94-95 dt:27-07-94
2390
Maintenance and removal of silt along the road side drains,
clearing the jungles along the road side and repairs to the roads of
BEML l/o 3rd stage.
Clearing the jungle along the road side and filling up the pot holes
using 40mm jelly and asphalting to the road cut portions of the
roads in BEML l/o, BSK III stage.
Garbage cleaning in Manjunatha Nagar, BSK III stage, 3, 4, and 5
sub road from 01-06-93 to 31-12-93.
BDA/EE/S/PW/WO/AE/153/94-95 dt:27-07-94
BDA/EE/S/PW/WO/AE/156/94-95 dt:27-07-94
2394
Garbage cleaning in Manjunatha Nagar, BSK III stage, II 'A' cross
to II 'C' cross.
Providing Borewells to KSRTC l/o in Chikkalasandra (Northt Block)
BDA/EE/S/PW/WO/AE/157/94-95 dt:27-07-94
2395
Providing Borewells to KSRTC l/o in Chikkalasandra (East Block)
BDA/EE/S/PW/WO/AE/158/94-95 dt:27-07-94
2396
Providing Borewells to KSRTC l/o in Chikkalasandra (West Block)
BDA/EE/S/PW/WO/AE/159/94-95 dt:27-07-94
2397
Providing Borewells in CA site No.1 in ISRO l/o of Bikasipura.
BDA/EE/S/PW/WO/AE/160/94-95 dt:27-07-94
2398
Providing Borewells in CA site No.2 in ISRO l/o of Bikasipura.
BDA/EE/S/PW/WO/AE/161/94-95 dt:27-07-94
2399
Providing Borewells in CA site No.3 in ISRO l/o of Bikasipura.
BDA/EE/S/PW/WO/AE/162/94-95 dt:27-07-94
2400
Providing Borewells in CA site No.4 in ISRO l/o of Bikasipura.
BDA/EE/S/PW/WO/AE/163/94-95 dt:27-07-94
2401
Providing Borewells in CA site No.5 in ISRO l/o of Bikasipura.
BDA/EE/S/PW/WO/AE/164/94-95 dt:27-07-94
2402
Maintenance and Removal of silt in existing SWD in 3rd phase, 4th
block of BSK 3rd stage.(Part-2)
BDA/EE/S/PW/WO/AE/165/94-95 dt:27-07-94
2403
Maintenance and Removal of silt in existing side drains of 3rd
phase, 4th block of BSK III stage (Part-1)
BDA/EE/S/PW/WO/AE/166/94-95 dt:27-07-94
2404
Maintenance of roads and drains and providing chipcarpetting in
Raghavendra layout, 12th main road of BSK III stage.
BDA/EE/S/PW/WO/AE/167/94-95 dt:27-07-94
2405
Chipcarpetting to 6th main & 1st cross road in between 2nd & 6th
main in Nagendra Block, BSK III stage.
BDA/EE/S/PW/WO/AE/168/94-95 dt:27-07-94
2406
Maintenanace of roads and Remetalling to 5th and 6th main roads
in Nagendra block in BSK III stage.
BDA/EE/S/PW/WO/AE/169/94-95 dt:27-07-94
2391
2392
2393
BDA/EE/S/PW/WO/AE/154/94-95 dt:27-07-94
BDA/EE/S/PW/WO/AE/155/94-95 dt:27-07-94
2407
Providing Chipcarpetting in Kathriguppa main road , Ch from
Vidyapeeta, 615 mts to 810 mts.
BDA/EE/S/PW/WO/AE/170/94-95 dt:27-07-94
2408
Providing Chipcarpetting in Kathriguppa main road , Ch from
Vidyapeeta, 420 mts to 615 mts.
BDA/EE/S/PW/WO/AE/171/94-95 dt:27-07-94
2409
Providing Chipcarpetting in Kathriguppa main road , Ch from
Vidyapeeta, 30m to 225mts.
BDA/EE/S/PW/WO/AE/172/94-95 dt:27-07-94
2410
Providing Chipcarpetting in Kathriguppa main road , Ch from
Vidyapeetacircle, 225mts to 420 mts.
BDA/EE/S/PW/WO/AE/173/94-95 dt:27-07-94
2411
Chipcarpetting to 10th & 11th main and 3rd cross in b/w, 11th &
10th main in Nagendra block, BSK III stage.
BDA/EE/S/PW/WO/AE/174/94-95 dt:01-08--94
2412
Remetalling to 3rd, 4th & 5th main road in Srinivasanagar 2nd
phase (In Sy.No.8 to 14 of Gerehalli), BSK III stage.
BDA/EE/S/PW/WO/AE/175/94-95 dt:01-08-94
2413
Remetalling to 2/A, 2/B main road & 6th cross road in
Srinivasanagar 2nd phase (In Sy.No.8 to 14 of Gerehalli), BSK III
stage.
Providing Asphalting in 12th main road of raghavendra layout of
BSK III stage.
Maintenance of roads and drains in Muneshwara block, 14, 15, 16
and 17 main roads of BSK III stage.
BDA/EE/S/PW/WO/AE/176/94-95 dt:01-08-94
Providing re-metalling to roads in Srinivasanagar II phase in
Sy.No.2 to 14 of Gerehally in BSK III stage, 9th main and 6th to 8th
cross road.
Providing re-metalling to roads in Srinivasanagar II phase in
Sy.No.2 to 14 of Gerehally in BSK III stage, 8th to 11th cross road.
BDA/EE/S/PW/WO/AE/179/94-95 dt:01-08-94
2414
2415
2416
2417
BDA/EE/S/PW/WO/AE/177/94-95 dt:01-08-94
BDA/EE/S/PW/WO/AE/178/94-95 dt:01-08-94
BDA/EE/S/PW/WO/AE/180/94-95 dt:01-08-94
2418
Providing Missing road cross boards and repainting the existing
cross boards at Srinivasanagar I and II phase.
BDA/EE/S/PW/WO/AE/181/94-95 dt:01-08-94
2419
Providing Garbage Dust-Bins to Srinivasanagar I and II phase in
BSk III stage.
Silt cleaning in Srinivasanagar II phase (In Sy.No.12 to 14 of
Gerehally) in BSK III stage, 1st and 2nd main road.
BDA/EE/S/PW/WO/AE/182/94-95 dt:01-08-94
2421
Silt cleaning in Srinivasanagar II phase (In Sy.No.12 to 14 of
Gerehally) in BSK III stage, 3rd, 4th and 5th main road.
BDA/EE/S/PW/WO/AE/184/94-95 dt:03-08-94
2422
Providing re-chipcarpetting to roads in Srinivasanagar II phase in
Sy.No.2 to 14 of Gerehally in BSK III stgae, 2/B main and 6th cross
road.
BDA/EE/S/PW/WO/AE/185/94-95 dt:05-08-94
2420
BDA/EE/S/PW/WO/AE/183/94-95 dt:03-08-94
2423
Providing re-chipcarpetting to roads in Srinivasanagar II phase in
Sy.No.2 to 14 of Gerehally in BSK III stgae, 2nd main road.
BDA/EE/S/PW/WO/AE/186/94-95 dt:05-08-94
2424
Providing chipcarpetting to roads in Srinivasanagar I phase (in
Sy.No.2 to 7 and 11 of Gerehally) in BSK III stage, 3rd cross road.
BDA/EE/S/PW/WO/AE/187/94-95 dt:05-08-94
2425
Providing chipcarpetting to roads in Srinivasanagar I phase (in
Sy.No.2 to 7 and 11 of Gerehally) in BSK III stage, 5th, 6th, 7th
cross road.
Providing chipcarpetting to roads in Srinivasanagar I phase (in
Sy.No.2 to 7 and 11 of Gerehally) in BSK III stage, 4th cross road.
BDA/EE/S/PW/WO/AE/188/94-95 dt:05-08-94
2427
Maintenance and providing Asphalting to 7, 8, 9, 10, 11 and 12
cross roads in Raghavendra layout of BSK III stage.
BDA/EE/S/PW/WO/AE/190/94-95 dt:09-08-94
2428
Improvement & providing Asphalting to Kasturba Colony main
road.
Maintenance of roads and filling up of ruts, pits and depression
filling to damaged portion of roads in Ideal Homes Co-Operative,
H.S.Ltd., I Phase, 1st to 11th cross and 43rd main road.
BDA/EE/S/PW/WO/AE/191/94-95 dt:09-08-94
2426
2429
BDA/EE/S/PW/WO/AE/189/94-95 dt:05-08-94
BDA/EE/S/PW/WO/AE/192/94-95 dt:05-08-94
2430
Maintenance of roads and filling up of ruts, pits and depression
filling to damaged portion of roads in Ideal Homes Co-Operative,
H.S.Ltd., I Phase, 15th to 18th cross and 9th main roads.
BDA/EE/S/PW/WO/AE/193/94-95 dt:05-08-94
2431
Maintenance of roads and filling up of ruts, pits and depression
filling to damaged portion of roads in Ideal Homes Co-Operative,
H.S.Ltd., I Phase, 9th to 17th main & 10th to 14th cross roads.
BDA/EE/S/PW/WO/AE/194/94-95 dt:05-08-94
2432
Maintenance of roads and filling up of ruts, pits and depression
filling to damaged portion of roads in Ideal Homes Co-Operative,
H.S.Ltd., I Phase, 18th to 24th 'A' cross and 18th to 35th main.
BDA/EE/S/PW/WO/AE/195/94-95 dt:05-08-94
2433
Maintenance of roads and filling up of ruts, pits and depression
filling to damaged portion of roads in Ideal Homes Co-Operative,
H.S.Ltd., I Phase, 25th cross and 36th to 42nd main road.
BDA/EE/S/PW/WO/AE/196/94-95 dt:05-08-94
2434
Filling up the pot holes and asphalting to the road cut portions of
the roads, removal of silt on either side and maintenance of roads
in 1st 'A', 'B' and 'C' cross roads. in 2nd phase, 4th block of BSK III
stage.
BDA/EE/S/PW/WO/AE/197/94-95 dt:09-08-94
2435
Filling up the pot holes and asphalting to the road cut portions of
the roads, removal of silt on either side and maintenance of roads
in 8th main road.in 2nd phase, 4th block of BSK III stage.
BDA/EE/S/PW/WO/AE/198/94-95 dt:09-08-94
2436
Filling up the pot holes and asphalting to the road cut portions of
the roads, removal of silt on either side and maintenance of roads
in 6th and 7th main roads of BSK III stage.
Filling up the pot holes and asphalting to the road cut portions of
the roads, removal of silt on either side and maintenance of roads
in 2nd phase. 6th block, 3rd 'A' and 'B' main roads of BSK III stage.
BDA/EE/S/PW/WO/AE/199/94-95 dt:09-08-94
2437
BDA/EE/S/PW/WO/AE/200/94-95 dt:09-08-94
Filling up the pot holes and asphalting to the road cut portions of
the roads, removal of silt on either side and maintenance of roads
in 2nd phase. 6th block, 1st 'E', 'F' and 'G' cross roads. of BSK III
stage.
Filling up the pot holes and asphalting to the road cut portions of
the roads, removal of silt on either side and maintenance of roads
in 2nd phase. 6th block, 1st 'A', 'B', 'C' and 'D' cross roads. of BSK
III stage.
Providing covering slab over existing lead off drain from Ch:50m to
250mts at Kasturba slum in BSK III stage.
BDA/EE/S/PW/WO/AE/201/94-95 dt:09-08-94
Providing re-chipcarpetting and improvement works on main road
of Kasturba colony.
Improvements to existing compound wall of Burial Ground at
Kasturba slum in BSK III stage,
BDA/EE/S/PW/WO/AE/204/94-95 dt:09-08-94
2443
Providing chain link ferncung to protect C.A Site No.1, (Playgrund)
in ISRO layout in Sy.No.1, 2 & 8 of Bikasipura, East wing.
BDA/EE/S/PW/WO/AE/206/94-95 dt:11-08-94
2444
Providing chain link fencing to protect CA site No.1 (Playground) in
ISRO Layout in Sy.No.1,2 & 8 of Bikasipura, WestWing.
BDA/EE/S/PW/WO/AE/207/94-95 dt:11-08-94
2445
Providing chain link fencing to protect CA site No.1 (Playground) in
ISRO Layout in Sy.No.1,2 & 8 of Bikasipura, North Wing.
BDA/EE/S/PW/WO/AE/208/94-95 dt:11-08-94
2446
Providing chain link fencing to protect CA site No.1 (Playground) in
ISRO Layout in Sy.No.1,2 & 8 of Bikasipura, South Wing.
BDA/EE/S/PW/WO/AE/209/94-95 dt:11-08-94
2447
Providing Asphalting in 4th and 5th cross roads of Nagendra
layout, BSK III stage.
Providing Asphalting in 3rd cross road , 4th and 5th main roads of
Nagendra layout, BSK III stage.
BDA/EE/S/PW/WO/AE/215/94-95 dt:11-08-94
2438
2439
2440
2441
2442
2448
BDA/EE/S/PW/WO/AE/202/94-95 dt:09-08-94
BDA/EE/S/PW/WO/AE/203/94-95 dt:09-08-94
BDA/EE/S/PW/WO/AE/205/94-95 dt:09-08-94
BDA/EE/S/PW/WO/AE/216/94-95 dt:11-08-94
2449
Providing Remetalling to roads in Vinayakanagar (In sy.No.22/1,
22/2 of Gerehally) in BSK III stage, 4th to 9th cross road.
BDA/EE/S/PW/WO/AE/217/94-95 dt:11-08-94
2450
Maintenance of roads, filling up of rits, pits to damaged portion of
roads in C.K.A.Layout in BSK III stage inbetween 5th cross and 8th
cross road.
Maintenance of roads, filling up of rits, pits to damaged portion of
roads in C.K.A.Layout in BSK III stage inbetween 8th cross and
11th cross road.
Providing chipcarpetting to 13th road of Avalahally Village, BSK III
satge.
Providing chipcarpetting to cross roads in K.S.Layout II satge EWS
Houses of I block from 3rd to 7th cross.
BDA/EE/S/PW/WO/AE/218/94-95 dt:19-08-94
2454
Re-Metalling to roads in K.S.Layout II satge of EWS Houses of II
block from 6th to 8th cross and 14th cross towards ISRO Layout.
BDA/EE/S/PW/WO/AE/224/94-95 dt:23-08-94
2455
Providing chipcarpetting to roads in K.S.Layout II satge, III block,
7th to 8th roads & cross roads.
BDA/EE/S/PW/WO/AE/225/94-95 dt:23-08-94
2456
Construction of culvert in K.S.Layout II stage (Eastern side) near
platform slum
Maintenance of roads, filling up of rits, pits to damaged portion of
roads in C.K.A.Layout in BSK III stage inbetween 3rd cross and 5th
cross road.
Construction of culvert in K.S.Layout II stage (Western side) near
shifted slum dwellers.
Providing Re-Chipcarpetting to Kathriguppa layout Sy.No.122 'A',
'B", "C', 'D' and 'E", BSK III stage.
BDA/EE/S/PW/WO/AE/226/94-95 dt:23-08-94
Construction of culverts in K.S.Layout II stage (Western side)
towars ISRO Layout.
Labour charges for providing Water Supply and Sanitary works to
the first floor of Commercial Complex , BSK II stage.
BDA/EE/S/PW/WO/AE/229/94-95 dt:23-08-94
2451
2452
2453
2457
2458
2459
2460
2461
2462
2463
2464
Repairs to flood damged portion of retaining wall of SWD in
K.S.Layout II stage.
Garbage cleaning in Sy.No.17, 121, 122 & 134/2 Kathriguppa amd
Manjunatha slum in BSK III stage (For the month of May) from 0105-94 to 31-05-94.
Garbage cleaning in K.S.Layout II stage from 01-05-94 to 31-05-94
(For the month of May)
BDA/EE/S/PW/WO/AE/219/94-95 dt:19-08-94
BDA/EE/S/PW/WO/AE/222/94-95 dt:22-08-94
BDA/EE/S/PW/WO/AE/223/94-95 dt:23-08-94
BDA/EE/S/PW/WO/AE/220/94-95 dt:19-08-94
BDA/EE/S/PW/WO/AE/227/94-95 dt:23-08-94
BDA/EE/S/PW/WO/AE/228/94-95 dt:19-08-94
BDA/EE/S/PW/WO/AE/230/94-95 dt:23-08-94
BDA/EE/S/PW/WO/AE/231/94-95 dt:19-08-94
BDA/EE/S/PW/WO/AE/232/94-95 dt:23-08-94
BDA/EE/S/PW/WO/AE/233/94-95 dt:23-08-94
Removal of garbage in BSK III stage, 2nd phase, 4, 6 and 7th
block, Hosakerehally l/o 2nd phase , Sy.No.108 and 120 (Part) and
Sy.No.11 and 12 of Ittamadu, Avalahally village and Kasturna
slum.
Garbage cleaning in K.S.Layout I stage from 01-05-94 to 31-05-94
(For the month of May)
BDA/EE/S/PW/WO/AE/234/94-95 dt:23-08-94
2467
Ornamental Grill and con struction of Retaining wall to flood
damaged portion of park in K.S.Layout II satge, brlow H.T.Line.
BDA/EE/S/PW/WO/AE/236/94-95 dt:23-08-94
2468
Improving the SWD in Hosakerehally Sy.No.95, 96 , 121 and 122 ,
BSK III stage. Ch: 0m to 33mts,
BDA/EE/S/PW/WO/AE/237/94-95 dt:26-08-94
2469
Improving the SWD in Hosakerehally Sy.No.95, 96 , 121 and 122 ,
BSK III stage. Ch: 33mts to 66 mts,
BDA/EE/S/PW/WO/AE/238/94-95 dt:26-08-94
2470
Maintenance of roads and drains in front and inbetween EWS
houses in K.S.Layout II stage E.W.S House Nos.719 to 887.
BDA/EE/S/PW/WO/AE/239/94-95 dt:26-08-94
2471
Providing Chain link fencing over the SSM wall alround the park in
Hosakerehally sy.No.108 (Part) and 120 , BSK III stage.Ch: 85m to
170mts.
Formation of road from Ring Road to Sy.NO.12/2A of Ittamadu
including providing side drains, metalling and construction of
culvert in BSK III stage.
Maintenance and repairs to Borewells in Sy.No.95,96, 121 and 122
of Hosakerehally & 5th block, 3rd phase at BSK III stage for the
period 1994-95.
Removal of silt in side drains of Ittamadu Village Sy.No.11 and
12 and Hosakerehally sy.No.108 (Part) and 120 , and Ittamadu
Sy.No.7, BSK III stage.
Removal of silt in side drains of Hosakerehally sy.No.108 (Part)
and 120 , BSK III stage.
BDA/EE/S/PW/WO/AE/240/94-95 dt:26-08-94
Providing Chain link fencing over the SSM wall alround the park in
Hosakerehally sy.No.108 (Part) and 120 , BSK III stage.Ch: 170m
to 255mts.
Providing Mosaic chairs in C.A Park and Playground in ISRO
Layout,of Bikasipura Sy.No.1,2 and 8.(Eastside)
BDA/EE/S/PW/WO/AE/245/94-95 dt:26-08-94
2478
Providing Mosaic chairs in C.A Park and Playground in ISRO
Layout,of Bikasipura Sy.No.1,2 and 8.(Westside)
BDA/EE/S/PW/WO/AE/247/94-95 dt:29-08-94
2479
Providing Borewell in 3rd phase, V block , 1'B' cross of BSK III
stage.
BDA/EE/S/PW/WO/AE/248/94-95 dt:29-08-94
2465
2466
2472
2473
2474
2475
2476
2477
BDA/EE/S/PW/WO/AE/235/94-95 dt:23-08-94
BDA/EE/S/PW/WO/AE/241/94-95 dt:26-08-94
BDA/EE/S/PW/WO/AE/242/94-95 dt:26-08-94
BDA/EE/S/PW/WO/AE/243/94-95 dt: -08-94
BDA/EE/S/PW/WO/AE/244/94-95 dt:26-08-94
BDA/EE/S/PW/WO/AE/246/94-95 dt:29-08-94
2480
Providing Chain link fencing over the SSM wall alround the park in
Hosakerehally sy.No.108 (Part) and 120 , BSK III stage.Ch: 255m
to 340mts.
Maintenanace of roads and side drains and depression filling to
damaged portion of roads inbetween 3rd and 4th cross road in V
block, III phase, BSK III stage.
Providing borewell in 3rd phase, 5th block of BSK 3rd stage- 1st 'A'
cross.road.
Providing borewell in Sy.No.95,96, 121 and 122 of Hosakerehalli
l/o of BSK 3rd stage.- 1st cross road.
BDA/EE/S/PW/WO/AE/249/94-95 dt:29-08-94
Providing borewell in 3rd phase, 5th block of BSK 3rd stage- 1st 'A'
cross. Road.
Providing Re-asphalting in Raghavendra l/o, of Srinagar Avalahalli main road , BSK III stage.
BDA/EE/S/PW/WO/AE/253/94-95 dt:29-08-94
2486
Maintenance of roads and drains of 18th, 19th and 20th main road
and 1st cross in Muneshwara block, BSK III stage.
BDA/EE/S/PW/WO/AE/255/94-95 dt:29-08-94
2487
Providing chain link fencing over SSM wall to the park in
Hosakerehalli sy.No.108 (Part) and 120 of BSK III stage.Ch:340m
to 425mts
Chipcarpetting to 3rd main road in Nagendra Block in BSK III
stage.
Chipcarpetting to 1st main road in nagendra Block in BSK III stage.
BDA/EE/S/PW/WO/AE/256/94-95 dt:30-08-94
2481
2482
2483
2484
2485
2488
2489
2490
2491
2492
2493
2494
BDA/EE/S/PW/WO/AE/250/94-95 dt:29-08-94
BDA/EE/S/PW/WO/AE/251/94-95 dt:29-08-94
BDA/EE/S/PW/WO/AE/252/94-95 dt:29-08-94
BDA/EE/S/PW/WO/AE/254/94-95 dt:29-08-94
BDA/EE/S/PW/WO/AE/257/94-95 dt:29-08-94
BDA/EE/S/PW/WO/AE/258/94-95 dt:29-08-94
Chipcarpetting to 4th main road in Nagendra Block in BSK III
stage.
Chipcarpetting to 2nd main road in nagendra Block in BSK III
stage.
Maintenance of roads and remetalling to 13rd main and 1st cross
inbetween 3rd and 4th main in Nagendra block, BSK III stage.
BDA/EE/S/PW/WO/AE/259/94-95 dt:29-08-94
Maintenance of roads and remetalling to 1st main in Nagendra
block, BSK III stage.
Providing 150mm dia borewell with IM -II hand pump in
Raghavendra block and Nagendra block at BSK III stage.
BDA/EE/S/PW/WO/AE/262/94-95 dt:29-08-94
BDA/EE/S/PW/WO/AE/260/94-95 dt:29-08-94
BDA/EE/S/PW/WO/AE/261/94-95 dt:29-08-94
BDA/EE/S/PW/WO/AE/264/94-95 dt:30-08-94
2495
Providing Asphalting in Hosakerehally sy.nO.95, 96, 121 and 122
of BSK III stage, 6th and 7th main roads.
BDA/EE/S/PW/WO/AE/265/94-95 dt:12-09-94
2496
Providing Asphalting in Hosakerehally l/o Sy.Nos., 95, 96,121 and
122 BSK III stage- 8 and 9th main roads.
BDA/EE/S/PW/WO/AE/266/94-95 dt:12-09-94
2497
Chipcarpetting to 5th main road in Nagendra block, BSK III stage.
BDA/EE/S/PW/WO/AE/267/94-95 dt:12-09-94
2498
2499
Providing chain link fencing over SSM wall to the park in
Hosakerehalli sy.No.108 (Part) and 120 of BSK III stage.Ch:0 to 85
mts.
Providing metalling to roads in Sy.No.84 of Madivala at BTM II
stage, I phase, 9th, 10th, 11th and 12th cross roads.
BDA/EE/S/PW/WO/AE/268/94-95 dt:12-09-94
BDA/EE/S/PW/WO/AE/269/94-95 dt:12-09-94
2500
Providing metalling to roads in Sy.No.84 of Madivala at BTM II
stage, I phase, 5th, 6th, 7th and 8th cross roads.
BDA/EE/S/PW/WO/AE/270/94-95 dt:12-09-94
2501
Providing metalling to roads in Sy.No.10 & 1 of Tavarekere at I
stage, I phase, 13th, 18th main and 7th cross roads,
BDA/EE/S/PW/WO/AE/271/94-95 dt:12-09-94
2502
Providing repairs to road cutting , pot holes and Rechipcarpetting
to 16th main road from 100' ring road upto 8th cross road in BTM I
stage, I phase.
Providing chain link fencing to CA site No.2 (Balance portion) in
BTM II stage layout.
Providing dust bins and removal of garbage in ISRO layout of
Bikasipura.
Improvement of footpath work in ISRO l/o main road (14th cross)
(Easternside road)
Providing Asphalting in Hosakerehally l/o Sy.Nos., 95, 96,121 and
122 BSK III stage- Construction of drains of 2 nos in 3rd cross
road and 7th and 9th main roads.
Removal of garbage in BSK III stage, 3rd phase, 1st to 6th block of
Kathriguppa layout.and C.K.A layout.
BDA/EE/S/PW/WO/AE/272/94-95 dt:12-09-94
2508
Providing metalling to missing roads in 7th block, 4th phase, BSK
III stage (Near Site No.307/A to 310 /A)
BDA/EE/S/PW/WO/AE/280/94-95 dt:12-09-94
2509
Providing chipcarpetting in sy.No.10 of Kathriguppa l/o, 5th main
road and cross road and A.K.Colony road of BSK III stage.
BDA/EE/S/PW/WO/AE/278/94-95 dt:12-09-94
2510
Construction of RCC deck slab culverts to missing roads in 7th
block, 4th phase, BSK III stage. (Near Site No,307/A, 310/A)
BDA/EE/S/PW/WO/AE/279/94-95 dt:12-09-94
2511
Providing Asphalting ti 12th and 13th main road of Nagendra l/o of
BSK III stage.
Removing the silt in existing SWD in 3rd phase , 5th block of BSK
III stage.
Maintenanace of roads and drains in 4th, 5th and 6th cross roads
of BSK III stage.
Maintenance of roads and side drains of 13th, 14th, 15th and 16th
main road , 1st, 2nd and 3rd cross roads in Muneshwara block of
BSK III stage.
BDA/EE/S/PW/WO/AE/281/94-95 dt:12-09-94
2503
2504
2505
2506
2507
2512
2513
2514
BDA/EE/S/PW/WO/AE/273/94-95 dt:12-09-94
BDA/EE/S/PW/WO/AE/274/94-95 dt:12-09-94
BDA/EE/S/PW/WO/AE/275/94-95 dt:12-09-94
BDA/EE/S/PW/WO/AE/276/94-95 dt:12-09-94
BDA/EE/S/PW/WO/AE/277/94-95 dt:12-09-94
BDA/EE/S/PW/WO/AE/282/94-95 dt:12-09-94
BDA/EE/S/PW/WO/AE/283/94-95 dt:12-09-94
BDA/EE/S/PW/WO/AE/285/94-95 dt:12-09-94
2515
Providing Rechipcarpetting in Kathriguppa Sy.No.134:2 l/o. 7th and
8th cross roads and 1st main road of BSK III stage.
2516
Construction of culverts in K.S.l/o II stage.(Western side)
BDA/EE/S/PW/WO/AE/287/94-95 dt:12-09-94
2517
Construction of culverts in K.S.l/o II stage.(Eastern side)
BDA/EE/S/PW/WO/AE/288/94-95 dt:12-09-94
2518
Maintenance of roads and side drains of 17th main road , 4th, 5th,
6th 7th and 8th cross roads in Muneshwara block, BSK III stage.
BDA/EE/S/PW/WO/AE/284/94-95 dt:12-09-94
2519
Providing Rechipcarpetting in rightside of Kathriguppa main road
Vinayakanagar, 8, 9, 10 cross roads and middle portion of
Manjunathanagar , BSK III stage.
Providing Rechipcarpetting in rightside of Kathriguppa main road
Vinayakanagar, 11 , 12 and 13 th cross roads and middle portion
of Manjunathanagar , BSK III stage.
Providing and fixing chain link fencing to protect C.A.NO.8 (Play
Ground) of ISRO Layout at Bikasipura-North side.
BDA/EE/S/PW/WO/AE/289/94-95 dt:19-09-94
2522
Providing and fixing chain link fencing to protect C.A.NO.8 (Play
Ground) of ISRO Layout at Bikasipura-West side.
BDA/EE/S/PW/WO/AE/292/94-95 dt:20-09-94
2523
Providing and fixing chain link fencing to protect C.A.NO.8 (Play
Ground) of ISRO Layout at Bikasipura-South side.
BDA/EE/S/PW/WO/AE/293/94-95 dt:20-09-94
2524
Providing and fixing chain link fencing to protect C.A.NO.8 (Play
Ground) of ISRO Layout at Bikasipura-Balance portion.
BDA/EE/S/PW/WO/AE/294/94-95 dt:20-09-94
2525
Re-Chipcarpetting in leftside of kathriguppa main roads of 1st,
1st'A', 2, 3rd 'A', 'B' and 'C' roads.
BDA/EE/S/PW/WO/AE/295/94-95 dt:20-09-94
2526
Remetalling of roads in Nagendra block, BSK III stage, 11th, 12th,
13th main & 1st cross between 6th and 13th main.
BDA/EE/S/PW/WO/AE/296/94-95 dt:20-09-94
2527
Providing Asphalting in Muneshwara layout , 2nd, 3rd, 4tg and 5th
cross roads of BSK III stage.
BDA/EE/S/PW/WO/AE/297/94-95 dt:20-09-94
2528
Remetalling of roads in Nagendra Block, BSk III stage, 7th to 10th
main roads.
Remetalling of roads in Nagendra Block, BSk III stage, 2nd to 5th
cross roads and 14th and 15th main roads.
BDA/EE/S/PW/WO/AE/298/94-95 dt:20-09-94
2530
Maintenance of roads and drains in front in between EWS houses
in Kumaraswamy layout II Stage EWS Houses nos 1 to 300
No:BDA/EE(S)/PW/WO/AE/37/94-95 dt
02.04.1994
2531
Maintenance of roads and drains in front in between EWS houses
in Kumaraswamy layout I Stage EWS Houses nos 727 to 902
No:BDA/EE(S)/PW/WO/AE/38/94-95 dt
02.04.1994
2520
2521
2529
BDA/EE/S/PW/WO/AE/286/94-95 dt:12-09-94
BDA/EE/S/PW/WO/AE/290/94-95 dt:20-09-94
BDA/EE/S/PW/WO/AE/291/94-95 dt:20-09-94
BDA/EE/S/PW/WO/AE/299/94-95 dt:20-09-94
2532
Maintenance of roads and drains in front in between EWS houses
in Kumaraswamy layout II Stage V Stage EWS Houses nos 903 to
1000 of I Stage 887 to 1000 of II Stage.
Maintenance of roads and drains in front in between EWS houses
in Kumaraswamy layout II Stage EWS Houses nos 503 to 718
No:BDA/EE(S)/PW/WO/AE/39/94-95 dt
04.04.1994
Garbage cleaning in BSK III Stage Sy No.17, 121, 122 & 134/2 &
College Teachers HBCS Layout (01.06.1993 to 31.12.1993) 7
Months
garbage cleaning in Sy No.10 A.K. Colony upto 13'A' cross of
Kathriguppa BSK III Stage, (01.06.1993 to 31.12.1993) 7 months
No:BDA/EE(S)/PW/WO/AE/41/94-95 dt
07.04.1994
Improvements to EWS house No.201 (Post office) in
Kumaraswamy Layout I Stage.
Maintenance of Roads and Drains in front of EWS houses in
K.S.Layout I Stage, EWS house Nos.1 to 105 and model house
nos 1 to 22
Maintenance of Roads and Drains in front and in between the EWS
houses in K.S.Layout II Stage, EWS House Nos 301 to 500
No:BDA/EE(S)/PW/WO/AE/43/94-95 dt
07.04.1994
No:BDA/EE(S)/PW/WO/AE/44/94-95 dt
07.04.1994
Pot hole filling and covering of road cuttings in Kumaraswamy
Layout I Stage
Repairs to road cuttings pot holes patches and Depression filling to
I main road (Vidyapeeta road) in CKA layout from 4th cross to 8th
cross road
Repairs to road cuttings, pot holes, patches and Depression filling
to approach road to CKA layout from 100' ring road to 1st cross
road
Repairs to road cuttings, pot holes, patches and Depression filling
to Ist main road (Vidypeeta road) in CKA layout, from 2nd cross to
4th cross road
Formation of corner sites in Channammanakere Achkat Layout
BSK III Stage III Phase (4th Cross road)
No:BDA/EE(S)/PW/WO/AE/40/94-95 dt
06.04.1994
No:BDA/EE(S)/PW/WO/AE/47/94-95 dt
07.04.1994
2544
Removal of garbage for the period from November and December
93 (2 months) in BTM layout II stage, 1st phase.
BDA/EE/S/PW/WO/1/94-95 dt:21-04-94.
2545
Removal of garbage for the period from November and December
93 (2 months) in private layout in BTM scheme.
BDA/EE/S/PW/WO/2/94-95 dt:21-04-94.
2546
Garbage cleaning in Kumaraswamy layout, I stage, II stage and
slum from 1st Dec.93 to 31st Dec.93 (One month)
BDA/EE/S/PW/WO/3/94-95 dt:27-04-94.
2547
Removal of garbage in Kumaraswamy layout, I stage for the period
from 1st Feb-94 to 31st Marcg 94 (2 months)
BDA/EE/S/PW/WO/4/94-95 dt:27-04-94.
2533
2534
2535
2536
2537
2538
2539
2540
2541
2542
2543
No:BDA/EE(S)/PW/WO/AE/40/94-95 dt
04.04.1994
No:BDA/EE(S)/PW/WO/AE/42/94-95 dt
07.04.1994
No:BDA/EE(S)/PW/WO/AE/45/94-95 dt
07.04.1994
No:BDA/EE(S)/PW/WO/AE/48/94-95 dt
07.04.1994
No:BDA/EE(S)/PW/WO/AE/49/94-95 dt
07.04.1994
No:BDA/EE(S)/PW/WO/AE/50/94-95 dt
07.04.1994
2548
Removal of garbage in Kumaraswamy layout, II stage for the
period from 1st Feb-94 to 31st Marcg 94 (2 months)
BDA/EE/S/PW/WO/5/94-95 dt:27-04-94.
2549
Silt clearing of side drains in main roads of Kumaraswamy layout I
& II stage main roads, Ch:848 to 1696 mts.
BDA/EE/S/PW/WO/6/94-95 dt:03-05-94.
2550
Removal of garbage in BTM II stage, I phase for the period from
1st Feb-94 to 31st March 94 (2 months)
BDA/EE/S/PW/WO/7/94-95 dt:05-05-94.
2551
Removal of garbage in private layout under BTM scheme for the
period from 1st Feb-94 to 31st Marcg 94 (2 months)
BDA/EE/S/PW/WO/8/94-95 dt:05-05-94.
2552
Removal of garbage in BTM I stage,I phase (December 1993.)
BDA/EE/S/PW/WO/9/94-95 dt:11-05-94.
2553
Removal of garbage in BTM I stage,I phase (October1993 &
December 1993.)
Garbage clearing in Sy.No.17, 121, 122 & 134/2 of Kathriguppa
and Manjunatha slum in BSK III stage from 01-02-94 to 30-04-94
(3 months)
Removal of garbage for the period 01-05-93 to 31-12-93 in BSK III
stage, Nagendra and Raghavendra 1st block (Reconvey)
BDA/EE/S/PW/WO/10/94-95 dt:11-05-94.
2554
2555
BDA/EE/S/PW/WO/11/94-95 dt:11-05-94.
BDA/EE/S/PW/WO/12/94-95 dt:11-05-94.
2556
Silt clearing of side drains in Kumaraswamy layout I & II stage
main roads, Ch:o to 848 mts.
BDA/EE/S/PW/WO/13/94-95 dt:11-05-94.
2557
Silt clearing of side drains in Kumaraswamy layout I stage main
roads, Ch:o to 1080 mts.
BDA/EE/S/PW/WO/14/94-95 dt:11-05-94.
2558
Asphalting to main road from kadirenahalli cross in Kumaraswamy
layout 1st and 2nd stage-Ch:0 to 280 mts.
BDA/EE/S/PW/WO/15/94-95 dt:11-05-94.
2559
Asphalting to main road from kadirenahalli cross in Kumaraswamy
layout 1st and 2nd stage-Ch: 280 mts to 560 mts..
BDA/EE/S/PW/WO/16/94-95 dt:11-05-94.
2560
Asphalting to main road from kadirenahalli cross in Kumaraswamy
layout 1st and 2nd stage-Ch: 560 mts to 840 mts..
BDA/EE/S/PW/WO/17/94-95 dt:11-05-94.
2561
Asphalting to main road from kadirenahalli cross in Kumaraswamy
layout 1st and 2nd stage-Ch: 840 mts to 1120 mts..
BDA/EE/S/PW/WO/18/94-95 dt:11-05-94.
2562
Asphalting to main road from kadirenahalli cross in Kumaraswamy
layout 1st and 2nd stage-Ch: 1120 mts to 1400 mts..
BDA/EE/S/PW/WO/19/94-95 dt:11-05-94.
2563
Asphalting to main road from kadirenahalli cross in Kumaraswamy
layout 1st and 2nd stage-Ch: 1400 mts to 1695 mts..
BDA/EE/S/PW/WO/20/94-95 dt:11-05-94.
2564
Asphalting to main road from 14th main towards ISRO layout in
Kumaraswamy layout, Ch: 0 to 300 mts
BDA/EE/S/PW/WO/21/94-95 dt:11-05-94.
2565
Asphalting to main road from 14th main towards ISRO layout in
Kumaraswamy layout, Ch: 300 to 600 mts
BDA/EE/S/PW/WO/22/94-95 dt:11-05-94.
2566
Asphalting to main road from 14th main towards ISRO layout in
Kumaraswamy layout, Ch: 600 to 900 mts
BDA/EE/S/PW/WO/23/94-95 dt:11-05-94.
2567
Asphalting to main road from 14th main towards ISRO layout in
Kumaraswamy layout, Ch: 900 to 1200 mts
BDA/EE/S/PW/WO/24/94-95 dt:11-05-94.
2568
Removal of garbage in BTM I stage,I phase (Feb 94 to March 94)
BDA/EE/S/PW/WO/25/94-95 dt:25-05-94.
2569
Removal of garbage in BTM II stage,I phase for the period of April
1994.
Remetalling to roads in Kumaraswamy layout II stage-site No.2900
to 3591
Garbage clearance in Radhakrishna layout I, II & III stage in BSK
III stage (From 01-02-94 to 30-04-94)
BDA/EE/S/PW/WO/26/94-95 dt:25-05-94.
2572
Garbage clearance in Srinivasanagar I, & II phase in BSK III stage
(From 01-02-93 to 31-12-93)
BDA/EE/S/PW/WO/29/94-95 dt:25-05-94.
2573
Garbage clearance in Vinayakanagar & Radhakrishna layout I, II &
III stage (From 01-02-93 to 31-12-93)
BDA/EE/S/PW/WO/30/94-95 dt:25-05-94.
2574
Garbage clearance in Vinayakanagar in sy.No.22/1 and 22/2 of
Gerehally in BSK III stage,from 01-02-94 to 30-04-94.
BDA/EE/S/PW/WO/31/94-95 dt:25-05-94.
2575
Garbage clearance in Srinivasanagar II phase in Sy.No.2to 14 of
Gerehalli in BSK III stage from 01-02-94 to 30--0494.Vinayakanagar in sy.No.22/1 and 22/2 of Gerehally in BSK III
stage,from 01-02-94 to 30-04-94.
Garbage clearance in Srinivasanagar I phase in Sy.No.2 to 7 & 11
of Gerehalli in BSK III stage from 01-02-94 to 30--04-94.
BDA/EE/S/PW/WO/32/94-95 dt:25-05-94.
2570
2571
2576
2577
2578
Chipcarpetting to Roads in Kumaraswamy layout, II stage, site
nos.2588 to 2868.
Repairs to road, filling the ruts, pits & depression filling to the
damaged portion of 80' road of Vidyapeeta in Kathriguppe in BSK
III stage, III phase , IV block, Ch: 230 m to 270mts & 350m to
975mts.
BDA/EE/S/PW/WO/27/94-95 dt:25-05-94.
BDA/EE/S/PW/WO/28/94-95 dt:25-05-94.
BDA/EE/S/PW/WO/33/94-95 dt:25-05-94.
BDA/EE/S/PW/WO/34/94-95 dt:25-05-94.
BDA/EE/S/PW/WO/35/94-95 dt:25-05-94.
Repairs to road, filling the ruts, pits & depression filling to the
damaged portion of 80' road of Vidyapeeta in Kathriguppe in BSK
III stage, III phase , IV block, Ch: 280 m to 575mts & 350m to
460mts.
Repairs to roads & side drains in II Block, III phase, BSK III stage.
BDA/EE/S/PW/WO/36/94-95 dt:25-05-94.
Repairs to road, filling the ruts, pits & depression filling to the
damaged portion of roads in Kadhi Commission Employees HBCS
Ltd, BSK III stage.
Chipcarpetting to Roads in Kumaraswamy layout, II stage, site
nos.2655to 2933.
Repairs to road, filling the ruts, pits & depression filling to the
damaged portion of 80' road of Vidyapeeta in Kathriguppe in BSK
III stage, III phase , IV block, Ch: 115 m to 230mts
BDA/EE/S/PW/WO/38/94-95 dt:25-05-94.
Repairs to road, filling the ruts, pits & depression filling to the
damaged portion of 80' road of Vidyapeeta in Kathriguppe in BSK
III stage, III phase , IV block, Ch:0 to 115 m
Annual maintenance of Borewells in BSK III phase, Muneshwara
block-(Hand Pump)
Annual maintenance of Borewells in K.G.P. Village, Government
school near K.G.P and A.K.colony- No of Borewells-3
BDA/EE/S/PW/WO/41/94-95 dt:25-05-94.
2587
Annual maintenance of Borewells in Sy.No.109 of Kathriguppa, I
block, III phase, BSK III stage, total no of borewells-3
BDA/EE/S/PW/WO/44/94-95 dt:25-05-94.
2588
Sinking of 150MM dia borewell for MIG, MS flats (12 Tenaments)
at BSK III stage, III phase, V Block under SFHS , Block-II
BDA/EE/S/PW/WO/45/94-95 dt:25-05-94.
2589
Annual maintenance of Borewells of Hosakerehalli Village- Total
No of Borewells-4
Annual maintenance of Borewells of Avalahalli layout & Kasturba
slum, Total No of Borewells-4
BDA/EE/S/PW/WO/46/94-95 dt:25-05-94.
2591
Annual maintenance of Borewells of Avalahalli layout & Kasturba
slum, Total No of Borewells-3
BDA/EE/S/PW/WO/48/94-95 dt:25-05-94.
2592
Annual maintenance of Borewells of Kasturba slum, Total No of
Borewells-4
Annual maintenance of Borewells in BSK 3rd phase, Raghavendra
layout, (Hand Pump)
Remetalling , chipcarpetting and providing culverts (wherever
necessary) to 2nd and 13th 'B' road of Avalahally, A.K.Colony in
BSK III stage.
BDA/EE/S/PW/WO/49/94-95 dt:25-05-94.
2579
2580
2581
2582
2583
2584
2585
2586
2590
2593
2594
BDA/EE/S/PW/WO/37/94-95 dt:25-05-94.
BDA/EE/S/PW/WO/39/94-95 dt:25-05-94.
BDA/EE/S/PW/WO/40/94-95 dt:25-05-94.
BDA/EE/S/PW/WO/42/94-95 dt:25-05-94.
BDA/EE/S/PW/WO/43/94-95 dt:25-05-94.
BDA/EE/S/PW/WO/47/94-95 dt:25-05-94.
BDA/EE/S/PW/WO/50/94-95 dt:25-05-94.
BDA/EE/S/PW/WO/101/94-95 dt:27-06-94.
2595
Providing Asphalting to KSRTC HBCS , Chikkalasandra village
1,2,7 and 8th cross roads.
BDA/EE/S/PW/WO/102/94-95 dt:27-06-94.
2596
Providing Asphalting to KSRTC HBCS , Chikkalasandra village 2nd
and 3rd main roads.
Providing Asphalting to KSRTC HBCS , Chikkalasandra village 4th
and 5th main roads.
Providing Asphalting to KSRTC HBCS , Chikkalasandra village 1st
main road.
Providing Asphalting to KSRTC HBCS , Chikkalasandra village 3rd
and 4th cross roads.
Providing Asphalting to the road joining from Padmanabhanagar
Kidney hospital to Uttarahalli road.
BDA/EE/S/PW/WO/103/94-95 dt:27-06-94.
2601
Widening of Uttarahalli road, near Chikkalasandra village and
providing asphalting to the damaged portion.
BDA/EE/S/PW/WO/108/94-95 dt:27-06-94.
2602
Removal of garbage for the period from 01-02-94 to 30-04-94 in
Nagendra and raghavendra layout, 1st block (Reconveyance ) in
BSK III stage.
Removal of garbage for the period from 01-05-93 to 31-12-93 in
pipeline 1st and 2nd block and raghavendra layout, in BSK III
stage.
Removal of garbage for the period from 01-02-94 to 30-04-94 in
pipeline 1st and 2nd block of BSK III stage and raghavendra
layout, II block in BSK III stage.
Silt cleaning in 8th & 9th main road of Srinivasanagar II phase in
Sy.No.2 to 14 of Gerehally in BSK III stage.
BDA/EE/S/PW/WO/109/94-95 dt:27-06-94.
2606
Silt cleaning in 6th & 7th main road of Srinivasanagar II phase in
Sy.No.2 to 14 of Gerehally in BSK III stage.
BDA/EE/S/PW/WO/113/94-95 dt:27-06-94.
2607
Improving the footpath work of 14/8 cross road in ISRO Layout
BDA/EE/S/PW/WO/114/94-95 dt:07-07-94.
2608
Annual maintenance of Commercial Complex at BSK II stage,
North Block for the year 1994-95.
BDA/EE/S/PW/WO/115/94-95 dt:08-07-94.
2609
Annual maintenance of Commercial Complex at BSK II stage,
South Block for the year 1994-95.
BDA/EE/S/PW/WO/116/94-95 dt:08-07-94.
2610
Improving the footpath work of 3rd main road of Bikasipura
Village, ISRO Layout.
Improving the footpath work of 3rd main road of Bikasipura
Village, ISRO Layout., North side road.
BDA/EE/S/PW/WO/117/94-95 dt:08-07-94.
2597
2598
2599
2600
2603
2604
2605
2611
BDA/EE/S/PW/WO/104/94-95 dt:27-06-94.
BDA/EE/S/PW/WO/105/94-95 dt:27-06-94.
BDA/EE/S/PW/WO/106/94-95 dt:27-06-94.
BDA/EE/S/PW/WO/107/94-95 dt:27-06-94.
BDA/EE/S/PW/WO/110/94-95 dt:27-06-94.
BDA/EE/S/PW/WO/111/94-95 dt:27-06-94.
BDA/EE/S/PW/WO/112/94-95 dt:27-06-94.
BDA/EE/S/PW/WO/118/94-95 dt:08-07-94.
2612
Providing metalling to 11th and 13th 'C' road of Avalahally Village,
A.K.Colony, BSK III stage, 11th road, 225 mts, 13th C road-50mts.
BDA/EE/S/PW/WO/119/94-95 dt:08-07-94.
2613
Providing chipcarpetting to 11th and 13th 'C' road of Avalahalli
Village, A.K.colony, BSK III stage.
BDA/EE/S/PW/WO/120/94-95 dt:08-07-94.
2614
Providing Remetalling to 3rd cross road of Avalahalli Village,
A.K.colony, BSK III stage, Ch:0 to 140 mts.
BDA/EE/S/PW/WO/121/94-95 dt:08-07-94.
2615
Providing chipcarpetting to 3rd cross road of Avalahalli Village,
A.K.colony, BSK III stage.
BDA/EE/S/PW/WO/122/94-95 dt:08-07-94.
2616
Removal of garbage for the periof from 01-02-94 to 30-04-94 in
BSK III stage, 2nd phase, 4,6,7th block, Hosakerehalli layout, 2nd
phase, Sy.no.108 and 120 (part) Hosakerehalli and Sy.No.11 and
12 Ittamadu, Avalahalli layout and Kasturba slum
Removal of garbage for the periof from 01-02-94 to 30-04-94 in
BSK III stage, 3rnd phase, 1 to 6th block, Kathriguppa layout and
Chennamanakere auchukut.
Removal of garbage for the periof from 01-02-94 to 30-04-94 under
the jurisdiction of No.1 South sub division.
BDA/EE/S/PW/WO/123/94-95 dt:11-07-94.
Removal of garbage for the periof from 01-02-94 to 30-04-94 in
BSK III stage, Munishwara layout (Reconvey) A.K.Colony,
Avalahalli.
Silt cleaning in Radhakrishna H.B.C.S., I and III stage in
Sy.No.62,63 & 71 of Kadirenahalli) in BSK III stage.
BDA/EE/S/PW/WO/126/94-95 dt:11-07-94.
2617
2618
2619
2620
BDA/EE/S/PW/WO/124/94-95 dt:11-07-94.
BDA/EE/S/PW/WO/125/94-95 dt:11-07-94.
BDA/EE/S/PW/WO/127/94-95 dt:11-07-94.
2621
Silt cleaning in Radhakrishna H.B.C.S.II stage (in Sy.No.45 & 46 of
Kadirenahalli) in BSK III stage.
BDA/EE/S/PW/WO/128/94-95 dt:11-07-94.
2622
Improving the vehicular traffic movement in BSK III stage, 3rd
phase, 4th block, 4th cross road , Ch: 230 mts to 390 mts.
BDA/EE/S/PW/WO/129/94-95 dt:11-07-94.
2623
Improving the vehicular traffic movement in BSK III stage, 3rd
phase, 4th block, 4th cross road , Ch: 390 mts to 500 mts.
BDA/EE/S/PW/WO/130/94-95 dt:11-07-94.
2624
Improving the vehicular traffic movement in BSK III stage, 3rd
phase, 4th block, 4th cross road , Ch: 522 mts to822 mts.
BDA/EE/S/PW/WO/131/94-95 dt:11-07-94.
2625
Improving the footpath works at BSK III stage, 3rd phase, 4th
block, 4th cross road , Ch: 522 mts to822 mts.
BDA/EE/S/PW/WO/132/94-95 dt:11-07-94.
2626
Improving the footpath works at BSK III stage, 3rd phase, 4th
block, 4th cross road , Ch: 0 mts to 230 mts.
BDA/EE/S/PW/WO/133/94-95 dt:11-07-94.
2627
Providing chain link fencing to C.A.site (Play Ground) in KSRTC
HBCS, Chikkalasandra village,.East block
BDA/EE/S/PW/WO/134/94-95 dt:20-07-94.
2628
Providing chain link fencing to C.A.site (Play Ground) in KSRTC
HBCS, Chikkalasandra village,.North block
BDA/EE/S/PW/WO/135/94-95 dt:20-07-94.
2629
Providing chain link fencing to C.A.site (Play Ground) in KSRTC
HBCS, Chikkalasandra village,.South block
BDA/EE/S/PW/WO/136/94-95 dt:20-07-94.
2630
Providing bituminous spray grouting and chipcarpetting to road
from BSK Temple to uttarahalli from chainage: 0 to 125 mts.
BDA/EE/S/PW/WO/137/94-95 dt:22-07-94.
2631
Providing bituminous spray grouting and chipcarpetting to road
from BSK Temple to uttarahalli from chainage: 125 to 250mts.
BDA/EE/S/PW/WO/138/94-95 dt:22-07-94.
2632
Providing bituminous spray grouting and chipcarpetting to road
from BSK Temple to uttarahalli from chainage: 250mts to 375mts.
BDA/EE/S/PW/WO/139/94-95 dt:22-07-94.
2633
Providing bituminous spray grouting and chipcarpetting to road
from BSK Temple to uttarahalli from chainage: 375mts to 500mts.
BDA/EE/S/PW/WO/140/94-95 dt:22-07-94.
2634
Providing bituminous spray grouting and chipcarpetting to road
from BSK Temple to uttarahalli from chainage: 500 mts to 625mts.
BDA/EE/S/PW/WO/141/94-95 dt:22-07-94.
2635
Providing bituminous spray grouting and chipcarpetting to road
from BSK Temple to uttarahalli from chainage: 625 mts to 750mts.
BDA/EE/S/PW/WO/142/94-95 dt:22-07-94.
2636
Providing bituminous spray grouting and chipcarpetting to road
from BSK Temple to uttarahalli from chainage: 750 mts to 875mts.
BDA/EE/S/PW/WO/143/94-95 dt:22-07-94.
2637
Providing bituminous spray grouting and chipcarpetting to road
from BSK Temple to uttarahalli from chainage: 875mts to 1000mts.
BDA/EE/S/PW/WO/144/94-95 dt:22-07-94.
2638
Providing bituminous spray grouting and chipcarpetting to road
from BSK Temple to uttarahalli from chainage: 1250 mts to
1375mts.
Providing bituminous spray grouting and chipcarpetting to road
from BSK Temple to uttarahalli from chainage: 1875 mts to
2000mts.
Removal of garbage for the periof from 01-07-94 to 31-12-94 in in
BSK Commercial Complex at BSK II stage.
BDA/EE/S/PW/WO/145/94-95 dt:22-07-94.
Removal of garbage for the periof from 01-01-94 to 30-06-94 in in
BSK Commercial Complex at BSK II stage.
BDA/EE/S/PW/WO/148/94-95 dt:23-07-94.
2639
2640
2641
BDA/EE/S/PW/WO/146/94-95 dt:22-07-94.
BDA/EE/S/PW/WO/147/94-95 dt:23-07-94.
2642
Removal of garbage for the periof from 01-07-93 to 30-09-93 in in
BSK Commercial Complex at BSK II stage.
BDA/EE/S/PW/WO/149/94-95 dt:23-07-94.
2643
Removal of garbage for the periof from 01-10-93 to 31-12-93 in in
BSK Commercial Complex at BSK II stage.
BDA/EE/S/PW/WO/150/94-95 dt:23-07-94.
2644
Annual maintenance of borewell in IV Block, III phase, BSK III
stage, Kathriguppa Village-No of borewells:3
BDA/EE/S/PW/WO/51/94-95 dt:25-05-94.
2645
Annual maintenance of borewell in IV VI and VII Block, II phase of
BSK III stage.No of borewells:5
BDA/EE/S/PW/WO/52/94-95 dt:25-05-94.
2646
Annual maintenance of borewell in BSK III phase, pipeline in
Hosakerehalli layout. (Hand Pump)
BDA/EE/S/PW/WO/53/94-95 dt:25-05-94.
2647
Annual maintenance of borewell in BSK III phase, Nagendra
layout (Hand Pump)
Filling of rits & pits, depression filling to damaged portion of 50'
road from PES College to Muneswara Block Bridge in BSK III
stage, Ch: 225 mts to 300mts.
Filling of rits & pits, depression filling to damaged portion of 50'
road from PES College to Muneswara Block Bridge in BSK III
stage, Ch: 0 mts to 75mts.
Filling of rits & pits, depression filling to damaged portion of 50'
road from PES College to Muneswara Block Bridge in BSK III
stage, Ch:75 mts to 150mts.
Filling of rits & pits, depression filling to damaged portion of 50'
road from PES College to Muneswara Block Bridge in BSK III
stage, Ch: 150 mts to 225mts.
Asphalting to roads in western side of Kumaraswamy layout , II
stage 40' roads-Ch:0 to 470 mts.
BDA/EE/S/PW/WO/54/94-95 dt:25-05-94.
2648
2649
2650
2651
2652
BDA/EE/S/PW/WO/55/94-95 dt:25-05-94.
BDA/EE/S/PW/WO/56/94-95 dt:25-05-94.
BDA/EE/S/PW/WO/57/94-95 dt:25-05-94.
BDA/EE/S/PW/WO/58/94-95 dt:25-05-94.
BDA/EE/S/PW/WO/59/94-95 dt:28-05-94.
2653
Asphalting to roads in western side of Kumaraswamy layout , II
stage 40' roads-Ch:470 to 500 mts.
BDA/EE/S/PW/WO/60/94-95 dt:28-05-94.
2654
Asphalting to roads in western side of Kumaraswamy layout , II
stage cross roads-Ch:0to 800 mts.
BDA/EE/S/PW/WO/61/94-95 dt:28-05-94.
2655
Asphalting to roads in Eastern side of Kumaraswamy layout , II
stage cross roads-Ch:0 to 800 mts.
BDA/EE/S/PW/WO/62/94-95 dt:28-05-94.
2656
Asphalting to roads in Eastern side of Kumaraswamy layout , II
stage 40' roads-Ch:0 to 470 mts.
BDA/EE/S/PW/WO/63/94-95 dt:28-05-94.
2657
Asphalting to roads in Eastern side of Kumaraswamy layout , II
stage 40' roads-Ch:470 to 700mts.
BDA/EE/S/PW/WO/64/94-95 dt:28-05-94.
2658
Repairs to road, filling the ruts, pits and depression filling to
damaged portion of 80' road in BSK III stage-Ch:15m to 47mts.
BDA/EE/S/PW/WO/65/94-95 dt:28-05-94.
2659
Repairs to road, filling the ruts, pits and depression filling to
damaged portion of 80' road in BSK III stage-Ch:166m to 206 mts.
BDA/EE/S/PW/WO/66/94-95 dt:28-05-94.
2660
Repairs to road, filling the ruts, pits and depression filling to
damaged portion of 80' road in BSK III stage-Ch:126m to 166 mts.
BDA/EE/S/PW/WO/67/94-95 dt:28-05-94.
2661
Repairs to road, filling the ruts, pits and depression filling to
damaged portion of 80' road in BSK III stage-Ch:47m to 86 mts.
BDA/EE/S/PW/WO/68/94-95 dt:28-05-94.
2662
Repairs to road, filling the ruts, pits and depression filling to
damaged portion of 80' road in BSK III stage-Ch:86 m to 126 mts.
BDA/EE/S/PW/WO/69/94-95 dt:28-05-94.
2663
Repairs to road, filling the ruts, pits and depression filling to
damaged portion of 80' road in BSK III stage-Ch:206m to 245mts.
BDA/EE/S/PW/WO/70/94-95 dt:28-05-94.
2664
Repairs to road, filling the ruts, pits and depression filling to
damaged portion of 80' road in BSK III stage-Southernside of the
Bridge.
Repairs to road, filling the ruts, pits and depression filling to
damaged portion of 80' road in BSK III stage-Ch:0 to 15 mts.
BDA/EE/S/PW/WO/71/94-95 dt:28-05-94.
Garbage clearance in Srinivasanagar Kathriguppa main road
lahshminarasimha H.B.C.S and sy.No.10 and A.K. Colony BSK III
stage fron 01-02-94 to 30-04-94
Providing chipvarpetting from BSK III stage Vidyapeeta circle to
SSM School road.Ch:0 to 145 mts.
BDA/EE/S/PW/WO/73/94-95 dt:14-06-94.
2668
Providing chipvarpetting from BSK III stage Vidyapeeta circle to
SSM School road.Ch:0 145 mts.to 405 mts.
BDA/EE/S/PW/WO/79/94-95 dt:22-06-94.
2669
Removal of garbage from 01-04-94 to 30-04-94 in private layout of
BTM layout.
Removal of garbage from 01-04-94 to 30-04-94 in 1st stage, 1st
phase of BTM layout.
Maintenance of Borewells in Kumaraswamy layout 1st stage and
slum for the period 01-06-93 to 31-03-94
BDA/EE/S/PW/WO/80/94-95 dt:22-06-94.
Maintenance of Borewells in Manjunatha slum in sy.no.15 and 120
of KGP, BSK III stage, (9nos of borewells) for the period 01-06-93
to 31-03-94
Maintenance of Borewells in Srinivasanagar II phase in 5th to 9th
main road (Sy.no.2 to 14 of Gerehally) BSK III stage, for the period
01-06-93 to 31-03-94
BDA/EE/S/PW/WO/83/94-95 dt:22-06-94.
2665
2666
2667
2670
2671
2672
2673
BDA/EE/S/PW/WO/72/94-95 dt:28-05-94.
BDA/EE/S/PW/WO/78/94-95 dt:22-06-94.
BDA/EE/S/PW/WO/81/94-95 dt:22-06-94.
BDA/EE/S/PW/WO/82/94-95 dt:22-06-94.
BDA/EE/S/PW/WO/84/94-95 dt:22-06-94.
2674
2675
2676
2677
2678
2679
Maintenance of Borewells in Srinivasanagar II phase in 3rd and 4th
main road (Sy.no.2 to 14 of Gerehally) BSK III stage, for the
period 01-06-93 to 31-03-94
Maintenance of Borewells in Vinayakanagar and Srinivasanagar I
phase (Sy.no.2 to7 & 11 of Gerehally) BSK III stage, (14 nos of
borewells) for the period 01-06-93 to 31-03-94
Maintenance of Borewells in Srinivasanagar II phase in 1st & 2nd
main road (Sy.no.2 to 14 of Gerehally) BSK III stage, for the
period 01-06-93 to 31-03-94
Maintenance of Borewells in Kumaraswamy layout, II stage for
the period 01-06-93 to 31-03-94
BDA/EE/S/PW/WO/85/94-95 dt:22-06-94.
Remetalling II, III cross road and VIII, IX, X main roads in
radhakrishna layout, II stage, (in sy No.45 & 46 of Kadirenahalli in
BSK III stage.
Remetalling I to 4th main roads in Radhakrishna layout, II stage,
(in sy No.45 & 46 of Kadirenahalli in BSK III stage.
BDA/EE/S/PW/WO/89/94-95 dt:23-06-94.
BDA/EE/S/PW/WO/86/94-95 dt:22-06-94.
BDA/EE/S/PW/WO/87/94-95 dt:22-06-94.
BDA/EE/S/PW/WO/88/94-95 dt:22-06-94.
BDA/EE/S/PW/WO/90/94-95 dt:23-06-94.
2680
Silt cleaning in I to IV cross road in Srinivasanagar II phase in
Sy.No.2 to 14 of Gerehalli, BSK III stage.
BDA/EE/S/PW/WO/91/94-95 dt:27-06-94.
2681
Remetalling to 4th main and 3rd cross roads in Vinayakanagar
layout in Sy.No.22/1 and 2 of Gerehalli in BSK III stage.
BDA/EE/S/PW/WO/92/94-95 dt:27-06-94.
2682
Garbage clearance in 7th block, 4th phase, BSK III stage including
Deena Bank layout from 01-01-94 to 30-04-94.
BDA/EE/S/PW/WO/93/94-95 dt:27-06-94.
2683
Remetalling to 1st, 2nd and 3rd main roads and 1st and 2nd cross
road in Vinayakanagar layout in Sy.No.22/1 and 2 of Gerehalli in
BSK III stage.
Silt cleaning in V to VII cross road in Srinivasanagar II phase in
Sy.No.2 to 14 of Gerehalli, BSK III stage.
BDA/EE/S/PW/WO/94/94-95 dt:27-06-94.
Remetalling & chipcarpetting to Road No.1 of Avalahally,
A.K.Colony in BSK III stage.
Chipcarpetting to main Road Nos .2, 3, 4 and 9th cross road of
Kathriguppa Sy.No.134:2, BSK III stage.
BDA/EE/S/PW/WO/96/94-95 dt:27-06-94.
2684
2685
2686
BDA/EE/S/PW/WO/95/94-95 dt:27-06-94.
BDA/EE/S/PW/WO/97/94-95 dt:27-06-94.
2687
Garbage clearaning in Kumaraswamy layout, II stage from 1st April
1994 to 30th April 1994 (One Month)
BDA/EE/S/PW/WO/98/94-95 dt:27-06-94.
2688
Garbage clearaning in Kumaraswamy layout, I stage from 1st April
1994 to 30th April 1994 (One Month)
BDA/EE/S/PW/WO/99/94-95 dt:27-06-94.
2689
Remetalling and chipcarpetting to 12th road of Avalahalli,
A.K.Colony, BSK III stage.
BDA/EE/S/PW/WO/100/94-95 dt:27-06-94.
2690
2691
2692
2693
2694
Formation of new layout at Arehalli village in Sy.No.17/2A of BSk
VI stage, Part 'B'
Filling the existing open well (in centre of the existing main
approach) and construction of culvert for new layout of Arehalli in
Sy.No.17/2A of BSK IV stage.
Remetalling to main approach road from Arehalli road to new
layout of Arehalli in Sy.No.17/2A of BSK IV stage, Ch:0m to
200mts.
Remetalling to main approach road from Arehalli road to new
layout of Arehalli in Sy.No.17/2A of BSK IV stage, Ch: 200mts.to
400mts.
Providing and fixing chain link fencing to protect C.A site No.8
(Play ground) of ISRO layout at Bikasipura-East side.
BDA/EE/S/PW/WO/300/94-95 dt:20-09-94.
BDA/EE/S/PW/WO/301/94-95 dt:20-09-94.
BDA/EE/S/PW/WO/302/94-95 dt:20-09-94.
BDA/EE/S/PW/WO/303/94-95 dt:20-09-94.
BDA/EE/S/PW/WO/304/94-95 dt:20-09-94.
2695
Formation of road & other improvement works to shop sites in C.A
sites at Avalahalli layout, BSK III stage, Road 'A'.
BDA/EE/S/PW/WO/305/94-95 dt:20-09-94.
2696
Formation of road & other improvement works to shop sites in C.A
sites at Avalahalli layout, BSK III stage, Road ''B'.
BDA/EE/S/PW/WO/306/94-95 dt:20-09-94.
2697
Providing covering slab and other improvements work to drain
ariund shop sites in CA site at Avalahalli layout, BSk III stage.
BDA/EE/S/PW/WO/307/94-95 dt:20-09-94.
2698
Providing chipcarpetting to the inner roads of shop sites in CA site
at Avalahalli layout, BSK III stage.
BDA/EE/S/PW/WO/308/94-95 dt:20-09-94.
2699
Construction of parking yard to shop sites in CA site at Avalahalli
layout, BSK III stage.
Filling ruts & pits,depression filling , repairs to road cutting &
Rechipcarpetting to 5th main road at Avalahalli l/o in BSK III stageCh: 0 to 45 mts.
Filling ruts & pits,depression filling , repairs to road cutting &
Rechipcarpetting to 5th main road at Avalahalli l/o in BSK III stageCh: 45 mts to 90 mts.
Chipcarpetting to 13th, 14th, 15th, 16th main road and 1st cross
road in Muneshwara block, BSK III stage.
BDA/EE/S/PW/WO/309/94-95 dt:20-09-94.
2700
2701
2702
BDA/EE/S/PW/WO/310/94-95 dt:20-09-94.
BDA/EE/S/PW/WO/311/94-95 dt:20-09-94.
BDA/EE/S/PW/WO/312/94-95 dt:20-09-94.
2703
Providing metalling to missing roads in 7th block, 4th phase, BSK
III stage (4th cross between 6th & 3rd main road.)
BDA/EE/S/PW/WO/313/94-95 dt:26-09-94.
2704
Repairs and maintenance to BDA Community hall at BSk II stage.
BDA/EE/S/PW/WO/314/94-95 dt:28-09-94.
2705
Providing Borewell in Kumaraswamy layout, I & II stage.
BDA/EE/S/PW/WO/315/94-95 dt:28-09-94.
2706
Providing Borewells on II and III main in 4th cross road of
Radhakrishna layout, II stage in BSK III stage.
BDA/EE/S/PW/WO/316/94-95 dt:28-09-94.
2707
Annual maintenance of Borewells in Sy,No.15 ,10 & 120 of
Kathriguppa and Manjunatha slum in BSK III stage from 01-041994 to 31-03-1995.
Providing new Borewell in Sy.No.134/2 of Kathriguppa, BSK III
stage.
Providing new Borewell in Sy.No.10 of Kathriguppa, BSK III stage.
BDA/EE/S/PW/WO/317/94-95 dt:28-09-94.
2710
Maintenance of Borewells in Srinivasanagar II phase at BSK III
stage from 01-04-94 to 31-03-95.
BDA/EE/S/PW/WO/320/94-95 dt:28-09-94.
2711
Maintenance of Borewells in Vinayakanagar & Srinivasanagar I
phase at BSK III stage from 01-04-94 to 31-03-95.
BDA/EE/S/PW/WO/321/94-95 dt:28-09-94.
2712
Maintenance of Borewells in Kumaraswamy layout I & II stage (36
nos of Borewells) from 01-04-94 to 31-03-95.
BDA/EE/S/PW/WO/322/94-95 dt:28-09-94.
2713
Providing Borewell in Srinivasanagar II phase in BSK III stage (In
Sy.No.8 to 14 of Gerehalli Village) in 1st 'A' main road, 4th main
road and 6th cross road.
Providing Borewell in Srinivasanagar II phase in BSK III stage (In
Sy.No.2 to 7 & 11 of Gerehalli Village) in 2nd 'A' main road, & 6th
main road.
Maintenance of roads filling the ruts and depression filling to
damaged portion of 2nd and 3rd cross roads in Anjaneya Swamy
H.B.C.S layout, BSK III stage.
Maintenance of roads filling the ruts and depression filling to
damaged portion of 4th main & 4th cross road in Anjaneya
Swamy H.B.C.S layout, BSK III stage.
Maintenance of roads filling the ruts and depression filling to
damaged portion of 1st, 3rd main road and 1st, 2nd and 3rd cross
roads in Sy.No.11 and 12 of Ittamadu layout in BSK III stage.
BDA/EE/S/PW/WO/323/94-95 dt:28-09-94.
2708
2709
2714
2715
2716
2717
BDA/EE/S/PW/WO/318/94-95 dt:28-09-94.
BDA/EE/S/PW/WO/319/94-95 dt:28-09-94.
BDA/EE/S/PW/WO/324/94-95 dt:28-09-94.
BDA/EE/S/PW/WO/325/94-95 dt:30-09-94.
BDA/EE/S/PW/WO/326/94-95 dt:30-09-94.
BDA/EE/S/PW/WO/327/94-95 dt:30-09-94.
2718
Maintenance of roads filling the ruts and depression filling to
damaged portion of 1st, and 1'A' cross road , 3rd A, 4th & 5th
main road in Anjaneya H.B.C.S Layout, BSK III stage.
BDA/EE/S/PW/WO/328/94-95 dt:30-09-94.
2719
Maintenance of roads filling the ruts and pits to damaged portion
of 1st cross and 2nd main in East of Kathriguppa Layout, BSK III
stage.
Maintenance of roads filling the ruts and pits to damaged portion
of 4th main and 2nd cross roads in East of Kathriguppa layout,
BSK III stage.
Maintenance of roads filling the ruts and pits to damaged portion
of roads inbetween 1st cross and 3rd cross roads in C.K.A layout ,
BSK III stage.
BDA/EE/S/PW/WO/329/94-95 dt:30-09-94.
2720
2721
BDA/EE/S/PW/WO/330/94-95 dt:30-09-94.
BDA/EE/S/PW/WO/331/94-95 dt:30-09-94.
2722
Maintenance of roads filling the ruts and pits to damaged portion
of I main road (Vidyapeeta main road) in C.K.A layout, BSK III
stage.
Maintenance of roads filling the ruts and pits and depression filling
to damaged portion of 2nd main in Sy.No.11 & 12 of Ittamadu
layout, BSK III stage.
Maintenance of roads filling the ruts and pits and depression filling
to damaged portion of 2nd main and 3rd main roads in Anjaneya
Swamy H.B.C.S Layout, BSK III stage.
Removal of garbage in BTM II stage, I phase for the month of
May.-1994.
Removal of garbage clearing in Srinivasanagar Kathriguppa main
road Lakshminarasimha HBCS and Sy.No.10, A.K.Colony of BSK
III stage for the month of May 1994.
BDA/EE/S/PW/WO/332/94-95 dt:30-09-94.
2727
Garbage cleaning in 7th block, 4th phase, BSK III stage, including
Dena Bank- for a period from 01-05-94 to 31-05-94.
BDA/EE/S/PW/WO/337/94-95 dt:10-10-94.
2728
Barbed wire fencing to CA sites and improvements to CA sites in
BEML, Employees HBCS, layout at Halagevaderahalli- CA site
No.4 and part of C.A site No.5
Barbed wire fencing to CA sites and improvements to CA sites in
BEML, Employees HBCS, layout at Halagevaderahalli- Balance
portiopn of CA site No.5
Barbed wire fencing to CA sites and improvements to CA sites in
BEML, Employees HBCS, layout at Halagevaderahalli- C.A site
No.6 & part of CA site No.5
Barbed wire fencing to CA sites and improvements to CA sites in
BEML, Employees HBCS, layout at Halagevaderahalli- C.A site
No.10
Barbed wire fencing to CA sites and improvements to CA sites in
BEML, Employees HBCS, layout at Halagevaderahalli- C.A site
No.11 (Part - 'A')
Barbed wire fencing to CA sites and improvements to CA sites in
BEML, Employees HBCS, layout at Halagevaderahalli- C.A site
No.11 (Part - 'B')
Barbed wire fencing to CA sites and improvements to CA sites in
BEML, Employees HBCS, layout at Halagevaderahalli- C.A site
No.11 (Part - ''C')
Barbed wire fencing to CA sites and improvements to CA sites in
BEML, Employees HBCS, layout at Halagevaderahalli- C.A site
No.13 (Part - 'A' )
BDA/EE/S/PW/WO/338/94-95 dt:30-09-94.
2723
2724
2725
2726
2729
2730
2731
2732
2733
2734
2735
BDA/EE/S/PW/WO/333/94-95 dt:30-09-94.
BDA/EE/S/PW/WO/334/94-95 dt:30-09-94.
BDA/EE/S/PW/WO/335/94-95 dt:10-10-94.
BDA/EE/S/PW/WO/336/94-95 dt:10-10-94.
BDA/EE/S/PW/WO/339/94-95 dt:30-09-94.
BDA/EE/S/PW/WO/340/94-95 dt:30-09-94.
BDA/EE/S/PW/WO/341/94-95 dt:30-09-94.
BDA/EE/S/PW/WO/342/94-95 dt:30-09-94.
BDA/EE/S/PW/WO/343/94-95 dt:30-09-94.
BDA/EE/S/PW/WO/344/94-95 dt:30-09-94.
BDA/EE/S/PW/WO/345/94-95 dt:30-09-94.
2736
2737
2738
2739
Barbed wire fencing to CA sites and improvements to CA sites in
BEML, Employees HBCS, layout at Halagevaderahalli- C.A site
No.13 (Part - 'B')
Formation of new layout at Arehalli village in Sy.No.17/2A of BSK
IV stage, Part ''A''
Metalling the new layout at Arehalli village in Sy.No.17/2A of BSk
IV stage.
Metalling and improvements to link road connecting K.S.Layout
and Padmanabhanagar through Uttarahalli road (North Wing)
BDA/EE/S/PW/WO/346/94-95 dt:30-09-94.
BDA/EE/S/PW/WO/347/94-95 dt:10-10-94.
BDA/EE/S/PW/WO/348/94-95 dt:10-10-94.
BDA/EE/S/PW/WO/349/94-95 dt:10-10-94.
2740
Metalling and improvements to link road connecting K.S.Layout
and Padmanabhanagar through Uttarahalli road (South Wing)
BDA/EE/S/PW/WO/350/94-95 dt:10-10-94.
2741
Improvement of road works in Sy.No.11 and 12 of Ittamadu , 2nd
main road of BSK III stage., Ch:0 to 176mts
BDA/EE/S/PW/WO/351/94-95 dt:18-10-94.
2742
Improvement of road works in Sy.No.11 and 12 of Ittamadu , 2nd
main road of BSK III stage., Ch:176mts to 330 mts.
BDA/EE/S/PW/WO/352/94-95 dt:18-10-94.
2743
Providing culverts in K.S.Layout, II stage for 30' and 20' roads.
BDA/EE/S/PW/WO/353/94-95 dt:18-10-94.
2744
Remetalling 5th and 6th main roads in Srinivasanagar I phase (In
Sy.No.42 and 43 of Gavipura) in BSK III stage.
BDA/EE/S/PW/WO/354/94-95 dt: .(No work Order
Copy)
2745
Providing remetalling to roads in Srinivasanagar I phase (In
Sy.No.42 & 43 of Gavipura) in BSK III stage, 2nd and 2nd 'A' main
road.
Providing remetalling to roads in Srinivasanagar I phase (In
Sy.No.42 & 43 of Gavipura) in BSK III stage, 3rd and 4th main
road.
Improvements of SWD in Sy.No.11 & 12 of Ittamadu village, BSK
III stage., Ch: 0 to 17 mts.
BDA/EE/S/PW/WO/355/94-95 dt: .(No work Order
Copy)
2748
Improvements of SWD in Sy.No.11 & 12 of Ittamadu village, BSK
III stage., Ch:17 mts. to 35 mts.
BDA/EE/S/PW/WO/358/94-95 dt: 26-10-94
2749
Providing rechipcarpetting to 'A' and 'B' roads in Sy.No.17 of
Banagiri village, of BSK III stage.
BDA/EE/S/PW/WO/359/94-95 dt: 26-10-94
2750
Providing rechipcarpetting to ''C', 'D', 'E', 'F' and 'G' roads in
Sy.No.17 of Banagiri village, of BSK III stage.
BDA/EE/S/PW/WO/360/94-95 dt: 26-10-94
2751
Providing rechipcarpetting to 1, 2, 3 and 4 main roads in Sy.No.10
of Kathriguppa, BSK III stage.
BDA/EE/S/PW/WO/361/94-95 dt: 26-10-94
2752
Providing Remetalling to roads in K.S.Layout, II stage.
BDA/EE/S/PW/WO/362/94-95 dt: 26-10-94
2746
2747
BDA/EE/S/PW/WO/356/94-95 dt: .(No work Order
Copy)
BDA/EE/S/PW/WO/357/94-95 dt: 26-10-94
2753
Providing Remetalling to roads in K.S.Layout, II stage towards
Govinayakanahally - Sy.No.50..
BDA/EE/S/PW/WO/363/94-95 dt: 26-10-94
2754
Providing Ornamental grill for missing link to park (No.13) on
Western side in K.S.Layout, II stage.
BDA/EE/S/PW/WO/364/94-95 dt: 26-10-94
2755
Removal of garbage from 01-05-94 to 31-05-94 in Muneshwara
block (Reconvey scheme) , A.K.Colony, (Avalahally), BSK III
stage.
Removal of garbage in private layout from 01-05-94 to 31-05-94
coming under the jurisdiction of No.1, South sub division.
BDA/EE/S/PW/WO/365/94-95 dt: 07-11-94
2757
Providing culverts in K.S.Layout II stage for 40' and 20' roads.
BDA/EE/S/PW/WO/367/94-95 dt: 08-11-94
2758
Removal of garbage in Nagendra and Raghavendra layout (1st
part) (Reconvey scheme) from 01-05-94 to 31-05-94 of BSK III
stage.
Removal of garbage in pipeline 1st and 2nd block and
Raghavendra layout 2nd block from 01-05-94 to 31-05-94, BSK III
stage.
Providing chipcarpetting to roads in Nagendra block, BSK III stage7th main road and 1st cross road.
BDA/EE/S/PW/WO/368/94-95 dt: 14-11-94
2756
2759
2760
BDA/EE/S/PW/WO/366/94-95 dt: 07-11-94
BDA/EE/S/PW/WO/369/94-95 dt: 14-11-94
BDA/EE/S/PW/WO/370/94-95 dt: 16-11-94
2761
Providing chipcarpetting to roads in Nagendra block, BSK III stage8th, 9th main and 2nd cross between 7th and 10th main road.
BDA/EE/S/PW/WO/371/94-95 dt: 16-11-94
2762
Repairs to the damaged portion of retaining wall near
Channamanakere Atchukut l/o, BSK III stage, Ch: 0 to 10 mts.
BDA/EE/S/PW/WO/372/94-95 dt: 16-11-94
2763
Repairs to the damaged portion of retaining wall near
Channamanakere Atchukut l/o, BSK III stage, Ch: 10 mts to 20
mts..
providing U-Shape drain and metalling of the widened portion of
road near K.S.R.T.C Dept. Compound wall at C.K.A l/o, BSK III
stage.
Providing metalling to rise the road from BSK temple to Uttarahalli
at Kadirenahalli cross.
Jungle clearance, berm cutting, resetting of side drains for disposal
of rain water in the road BSK temple to Uttarahalli from Ch: 0 to 1
Km.
Jungle clearance, berm cutting, resetting of side drains for disposal
of rain water in the road BSK temple to Uttarahalli from Ch: 1
Km.to 2Km.
Providing built up spray grouting and chipcarpetting for
improvements of the road from BSK temple to Uttarahally from
Ch;1000 to 1125 mts.
BDA/EE/S/PW/WO/373/94-95 dt: 16-11-94
2764
2765
2766
2767
2768
BDA/EE/S/PW/WO/374/94-95 dt: 16-11-94
BDA/EE/S/PW/WO/375/94-95 dt: 28-12-94
BDA/EE/S/PW/WO/376/94-95 dt: 28-12-94
BDA/EE/S/PW/WO/377/94-95 dt: 28-12-94
BDA/EE/S/PW/WO/378/94-95 dt: 28-12-94
2769
2770
2771
2772
2773
2774
Providing built up spray grouting and chipcarpetting for
improvements of the road from BSK temple to Uttarahally from
Ch;1125 mts. to 1250 mts.
Providing built up spray grouting and chipcarpetting for
improvements of the road from BSK temple to Uttarahally from
Ch;1375mts to 1500mts.
Providing built up spray grouting and chipcarpetting for
improvements of the road from BSK temple to Uttarahally from
Ch;1500mts to 1625 mts.
Providing built up spray grouting and chipcarpetting for
improvements of the road from BSK temple to Uttarahally from
Ch;1625 mts to 1750 mts.
Providing built up spray grouting and chipcarpetting for
improvements of the road from BSK temple to Uttarahally from
Ch;1750 mts to 1875 mts.
Providing chipcarpetting to damaged portion of road and approach
to the road from BSK temple to Uttarahalli from Ch:0 to 4 Km.
BDA/EE/S/PW/WO/379/94-95 dt: 28-12-94
BDA/EE/S/PW/WO/380/94-95 dt: 28-12-94
BDA/EE/S/PW/WO/381/94-95 dt: 28-12-94
BDA/EE/S/PW/WO/382/94-95 dt: 28-12-94
BDA/EE/S/PW/WO/383/94-95 dt: 28-12-94
BDA/EE/S/PW/WO/384/94-95 dt: 28-12-94
2775
Remetalling to balance length of roads in K.S.layout, II stage.
BDA/EE/S/PW/WO/385/94-95 dt: 28-12-94
2776
Remetalling to roads in K.S.Layout II stage-(Eastern side)
BDA/EE/S/PW/WO/386/94-95 dt: 28-12-94
2777
Repairs to the damaged portion of retaining wall near C.K.A l/o,
BSK III stage-Ch: 20m to 30 mts.
BDA/EE/S/PW/WO/387/94-95 dt: 28-12-94
2778
Repairs to the damaged portion of ventway in SWD, near C.K.A
l/o, BSK III stage-Ch: (Length 21 mts)
BDA/EE/S/PW/WO/388/94-95 dt: 28-12-94
2779
Repairs to the damaged portion of ventway in SWD, near C.K.A
l/o, BSK III stage-Ch: (Length 50 mts)
BDA/EE/S/PW/WO/389/94-95 dt: 28-12-94
2780
Garbage cleaning in Vinayakanagar in BSK III stage from 1st may
1994 to 31st may 1994.
BDA/EE/S/PW/WO/390/94-95 dt: 29-12-94
2781
Garbage cleaning in Srinivasanagar I phase in Sy.No.2 to 7 and 11
of Gerehally in BSK III stage- from 1st may 1994 to 31st may 1994.
BDA/EE/S/PW/WO/391/94-95 dt: 29-12-94
2782
Garbage cleaning in Srinivasanagar II phase in Sy.No.2 to 14 of
Gerehally in BSK III stage- from 1st may 1994 to 31st may 1994.
BDA/EE/S/PW/WO/392/94-95 dt: 29-12-94
2783
Garbage cleaning in Radhakrishna layout, I, II and III stage in BSK
III stage from 1st may 1994 to 31st may 1994.
BDA/EE/S/PW/WO/393/94-95 dt: 29-12-94
2784
Maintenance of Commercial complex from 01-12-93 to 30-09-94
BDA/EE/S/PW/WO/394/94-95 dt: 29-12-94
2785
Maintenance of road and filling up of ruts, pits and depression
filling to damaged portion of 12th cross road (approach road to
N.S.Palya under BTM layout.)
BDA/EE/S/PW/WO/395/94-95 dt: 01-03-95
2786
2787
2788
2789
2790
2791
2792
2793
Cleaning of the Commercial Complex at BSK II stage for the year
01-01-95 to 31-12-95.
Formation of two nos of sites 774/A, and 775/A in 2nd phase, 7th
block of BSK III stage.
Formation of two nos of sites 761/A, and 762/A in 2nd phase, 7th
block of BSK III stage.
95-96
BDA/EE/S/PW/WO/396/94-95 dt: 15-03-95
Garbage clearance inK.S.l/o, I stage from 01-01-1995 to 31-051995.
Garbage clearance inK.S.l/o, II stage from 01-01-1995 to 31-051995.
Removal of Garbage from 01-01-95 to 31-05-95 in BSK III stage, II
phase, 4, 6, & 7 block, Hosakerehalli layout and Sy.No.108 part
and 120 Hosakerehalli and Sy.No.11 & 12 of Ittamadu, Avalahalli
l/o and Kasturba slum.
Removal of Garbage in Sy.No.17, 121, 122 and 134/2 of
Kathriguppa and Manjunatha slum in BSK III stage from 01-01-95
to 31-05-95.
Removal of Garbage in private l/o in BTM I and II stage, I phase
from 01-01-95 to 31-05-95.
BDA/EE/S/PW/WO/01/95-96 dt:20-07-95
BDA/EE/S/PW/WO/397/94-95 dt: 15-03-95
BDA/EE/S/PW/WO/398/94-95 dt: 15-03-95
BDA/EE/S/PW/WO/02/95-96 dt:20-07-95
BDA/EE/S/PW/WO/03/95-96 dt:20-07-95
BDA/EE/S/PW/WO/04/95-96 dt:20-07-95
BDA/EE/S/PW/WO/05/95-96 dt:20-07-95
2794
Removal of Garbage in Radhakrishna I, II and III stage in BSK III
stage from 01-01-95 to 31-05-95.
BDA/EE/S/PW/WO/06/95-96 dt:20-07-95
2795
Removal of Garbage in BTM I stage, I Phase from 01-01-95 to 3105-95.
Removal of Garbage in private l/o coming under the jurisdiction of
No.1 South sub division from 01-01-95 to 31-05-95.
BDA/EE/S/PW/WO/07/95-96 dt:20-07-95
2797
Removal of Garbage in Munishwara l/o, BSK III stage (Reconvey
scheme) and A.K.Colony , Avalahally from 01-01-95 to 31-05-95.
BDA/EE/S/PW/WO/09/95-96 dt:21-07-95
2798
Removal of Garbage in Srinivasanagar, Kathriguppa main road,
Lakshminarasimha HBCS and Sy.No.10, A.K.Colony in BSK III
stage from 01-01-95 to 31-05-95.
Removal of Garbage in BTM II stage, I phase from 01-01-95 to 3105-95.
Removal of Garbage in BSK III stage, III phase 1 to 6 block, East
of Kathriguppa and C.H.A l/o from 01-01-95 to 31-05-95.
BDA/EE/S/PW/WO/10/95-96 dt:24-07-95
2796
2799
2800
2801
2802
Garbage clearance in Vinayakanagar in BSK III stage from 01-0195 to 31-05-95
Garbage clearance in Nagendra Block, BSK III stage from 01-0195 to 31-05-95
BDA/EE/S/PW/WO/08/95-96 dt:21-07-95
BDA/EE/S/PW/WO/11/95-96 dt:24-07-95
BDA/EE/S/PW/WO/12/95-96 dt:24-07-95
BDA/EE/S/PW/WO/13/95-96 dt:24-07-95
BDA/EE/S/PW/WO/14/95-96 dt:24-07-95
2803
Garbage clearance in Srinivasanagar II phase in Sy.No.2 to 14 of
Gerehalli in BSK III stage from 01-01-95 to 31-05-95
BDA/EE/S/PW/WO/15/95-96 dt:24-07-95
2804
Garbage clearance in Srinivasanagar I phase in Sy.No.2 to 7 and
11 of Gerehalli in BSK III stage from 01-01-95 to 31-05-95
BDA/EE/S/PW/WO/16/95-96 dt:24-07-95
2805
Garbage clearance in 7th block, IV phase of BSK III stage
including Deena Bank Layout from 01-01-95 to 31-05-95
BDA/EE/S/PW/WO/17/95-96 dt:24-07-95
2806
Conducting survey work for preparations of l/o plan in Sy.No's of
Hosakerehally and Gerehally village.
BDA/EE/S/PW/WO/21/95-96 dt:04-01-96
2807
Maintenance and repairs of borewells in EWS l/o, BTM II stage, I
phase.
Cutting & clearing thin jungle in Ideal Homes House Bldg CoOperative society, I Phase.
BDA/EE/S/PW/WO/22/95-96 dt:04-01-96
2808
2809
2810
96-97
Maintenance of roads and side drains in KEB layout, BTM I stage, I
phase.
Cleaning of Commercial Complex in BSK II stage, for the period
from 1st Jan 96 to 31st Dec 96.
BDA/EE/S/PW/WO/23/95-96 dt:13-03-96
BDA/EE/S/PW/WO/01/96-97dt:10-04-96
BDA/EE/S/PW/WO/08/96-97dt:14-08-96
2811
Improvements to Park at 16th main road in BTM II stage, I phase.
BDA/EE/S/PW/WO/09/96-97dt:22-08-96
2812
Re-Construction of Deck Slab Culvert across SWD at 2nd 'B' main
road, Srinivasanagar II phase, BSK III stage.
BDA/EE/S/PW/WO/15/96-97dt:09-10-96
2813
Maintenance of borewells at Kasturba slum, Avalahalli, BSK III
stage for 1996-97.
Removal of wet silt from drain inbetween culvert no.(1) to (3) in
Hosur road.
Formation of roads & drains to form BSK V stage l/o in Sy.No.6 of
Uttarahally , IV cross
Formation of roads & drains to form BSK V stage l/o in Sy.No.6 of
Uttarahally , 3rd cross road, and 1st and 2nd main roads.
BDA/EE/S/PW/WO/16/96-97dt: 05-11-96
2814
2815
2816
BDA/EE/S/PW/WO/20/96-97dt: 27-11-96
BDA/EE/S/PW/WO/22/96-97dt: 07-01-97
BDA/EE/S/PW/WO/23/96-97dt: 07-01-97
2817
Formation of roads & drains to form BSK V stage l/o in Sy.No.6 of
Uttarahally ,2nd main road.
BDA/EE/S/PW/WO/24/96-97dt: 07-01-97
2818
Formation of roads & drains to form BSK V stage l/o in Sy.No.9 of
Uttarahally .
Formation of roads & drains to form BSK V stage l/o in Sy.No.19 of
Uttarahally , 3rd and 4th cross roads..
BDA/EE/S/PW/WO/25/96-97dt: 07-01-97
2819
BDA/EE/S/PW/WO/26/96-97dt: 15-01-97(
2820
Removal of wet silt in SWD from Someshwara Slum along 100'
Ring road upto Hosur Road in BTM II stage, I Phase.
BDA/EE/S/PW/WO/27/96-97dt: 20-01-97
2821
Removal of wet silt from seepage drain from Madivala Tank Slluice
to Hosur road.
Removal of wet silt from Rajanala leading from Easternside of
Madiwala tank upto Hosur road.
BDA/EE/S/PW/WO/28/96-97dt: 20-01-97
2823
Removal of wet silt from Rajanala from Goyal foundation along
Sy.No.16 of Roopena Agrahara upto Hosur Road.
BDA/EE/S/PW/WO/30/96-97dt: 20-01-97
2824
Formation of roads and drains to form the BSK V stage l/o in
Sy.No.6 of uttarahally, I & II cross roads.
BDA/EE/S/PW/WO/31/96-97dt: 20-01-97
2825
Formation of roads and drains to form the BSK V stage l/o in
Sy.No.19 of uttarahally, I cross & part of 2nd cross roads.
BDA/EE/S/PW/WO/32/96-97dt: 29-01-97
2826
Formation of roads and drains to form the BSK V stage l/o in
Sy.No.19 of uttarahally, part of 2nd and 3rd cross .
BDA/EE/S/PW/WO/33/96-97dt: 04-02-97
2827
Formation of roads and drains to form the BSK V stage l/o in
Sy.No.6 of uttarahally, 3rd cross road.
BDA/EE/S/PW/WO/34/96-97dt: 04-02-97
2828
Providing Dust Bins in K.S.l/o , I stage.
BDA/EE/S/PW/WO/35/96-97dt: 25-02-97
2829
BDA/EE/S/PW/WO/36/96-97dt: 26-02-97
2830
Levelling and Lowering of CA site No.8 in Ideal Homes HBCS, I
Phase.
Rermoving debris in K.S.L/o, I stage.
BDA/EE/S/PW/WO/39/96-97dt: 13-03-97
2831
Rermoving debris in K.S.L/o, II stage.
BDA/EE/S/PW/WO/40/96-97dt: 13-03-97
2832
Formation of approach road to SFHS Buliding in BSK III stage, III
Phase, V Block.
Construction of Compound wall around SFHS Building in BSK III
stage, III phase, V Block.
BDA/EE/S/PW/WO/41/96-97dt: 13-03-97
Formation of roads and drains in Sy.No.250, 252, 253, 254 and
255 of Halagevaderahalli to form BSK V stage layout, 2nd main
road.(125 mts)
Formation of roads and drains in Sy.No.250, 252, 253, 254 and
255 of Halagevaderahalli to form BSK V stage layout, 3rd and 4th
cross roads.
Formation of roads and drains in Sy.No.250, 252, 253, 254 and
255 of Halagevaderahalli to form BSK V stage layout, 9th, 10th,
11th and 25th cross roads.
Formation of roads and drains in Sy.No.250, 252, 253, 254 and
255 of Halagevaderahalli to form BSK V stage layout, 26th, 27th
and 15th cross road.
BDA/EE/S/PW/WO/43/96-97dt: 13-03-97
2822
2833
2834
2835
2836
2837
BDA/EE/S/PW/WO/29/96-97dt: 20-01-97
BDA/EE/S/PW/WO/42/96-97dt: 13-03-97
BDA/EE/S/PW/WO/44/96-97dt: 13-03-97
BDA/EE/S/PW/WO/45/96-97dt: 13-03-97
BDA/EE/S/PW/WO/46/96-97dt: 13-03-97
2838
2839
2840
2841
2842
2843
2844
2845
Formation of roads and drains in Sy.No.250, 252, 253, 254 and
255 of Halagevaderahalli to form BSK V stage layout, 4th and 5th
cross road.
Formation of roads and drains in Sy.No.250, 252, 253, 254 and
255 of Halagevaderahalli to form BSK V stage layout, 16th, 17th
and 18th cross road.
Formation of roads and drains in Sy.No.250, 252, 253, 254 and
255 of Halagevaderahalli to form BSK V stage layout, 23rd and
25th cross road.
Formation of roads and drains in Sy.No.250, 252, 253, 254 and
255 of Halagevaderahalli to form BSK V stage layout, 2nd main
road.(100 mts)
a)Providing and laying flooring with 2.50 cms to 4cms, thick
.Thander blue slabs, SS Slabs and dadoing with white glazed tiles
of size 15cms x 15cms, for walls for the construction of
Dr.Ambedkar Community hall, Avalahalli layout, BSK III Stage,
Avalahall
Formation of roads and drains in Sy.No.250, 252, 253, 254 and
255 of Halagevaderahalli to form BSK 5th stage layout, 12th, 13th
and 14th cross roads.
Formation of roads and drains in Sy.No.250, 252, 253, 254 and
255 of Halagevaderahalli to form BSK 5th stage layout, 1st main
and 6th cross roads.
Providing water supply and sanitary facilities to Dr.Ambedkar
Community Hall at Avalahalli, BSK III stage.
BDA/EE/S/PW/WO/47/96-97dt: 13-03-97
BDA/EE/S/PW/WO/48/96-97dt: 13-03-97
BDA/EE/S/PW/WO/49/96-97dt: 13-03-97
BDA/EE/S/PW/WO/50/96-97dt: 13-03-97
a)BDA/EE/S/QT/WO/12/96-97 dt:06-09-96 with
ref to the notification no.BDA/EE/S/QT/89/95-96
dt:25/02/96
b). BDA/EE/S/
BDA/EE/S/PW/WO/51/96-97dt:13-03-97
BDA/EE/S/PW/WO/52/96-97dt:13-03-97
BDA/EE/S/PW/WO/53/96-97dt:13-03-97
2846
Cleaning of Commercial Complex in BSK II stage, for the period
from 1st Jan 97 to 31st Dec 97.
BDA/EE/S/PW/WO/54/96-97dt:13-03-97
2847
Formation of roads and drains in Sy.No.250, 252, 253, 254 and
255 of Halagevaderahalli to form BSK 5th stage layout, 2nd (Part)
and 3rd cross roads.
Formation of roads and drains in Sy.No.250, 252, 253, 254 and
255 of Halagevaderahalli to form BSK 5th stage layout, 1st and
2nd (Part) cross roads.
Formation of roads and drains in Sy.No.250, 252, 253, 254 and
255 of Halagevaderahalli to form BSK 5th stage layout, 19th, 20th,
21st and 22nd cross roads.
Formation of roads and drains in Sy.No.25 of Uttarahalli to form
BSK 5th stage layout-6th main and 12th cross roads.
BDA/EE/S/PW/WO/55/96-97dt:13-03-97
Formation of roads and drains in Sy.No.25 of Uttarahalli to form
BSK 5th stage layout-3rd main road.
BDA/EE/S/PW/WO/59/96-97dt:13-03-97
2848
2849
2850
2851
BDA/EE/S/PW/WO/56/96-97dt:13-03-97
BDA/EE/S/PW/WO/57/96-97dt:13-03-97
BDA/EE/S/PW/WO/58/96-97dt:13-03-97
2852
Formation of roads and drains in Sy.No.29 & 25 of Uttarahalli to
form BSK 5th stage layout-3rd main and 5th cross road.
BDA/EE/S/PW/WO/60/96-97dt:13-03-97
2853
Formation of roads and drains in Sy.No.29 of Uttarahalli to form
BSK 5th stage layout-4th main road.
BDA/EE/S/PW/WO/61/96-97dt:13-03-97
2854
Formation of roads and drains in Sy.No.30 of Uttarahalli to form
BSK 5th stage layout-1st main, 1st and 2nd cross road.
BDA/EE/S/PW/WO/62/96-97dt:13-03-97
2855
Formation of roads and drains in Sy.No.29 of Uttarahalli to form
BSK 5th stage layout-6th, 7th, 8th and 9th cross road.
BDA/EE/S/PW/WO/63/96-97dt:13-03-97
2856
Formation of roads and drains in Sy.No.29 & 25 of Uttarahalli to
form BSK 5th stage layout-3rd main , 3rd and 4th cross road.
BDA/EE/S/PW/WO/64/96-97dt:13-03-97
2857
Formation of roads and drains in Sy.No.29 of Uttarahalli to form
BSK 5th stage layout-4th main and 9th cross road.
BDA/EE/S/PW/WO/65/96-97dt:13-03-97
2858
Formation of roads and drains in Sy.No.25 of Uttarahalli to form
BSK 5th stage layout-10th and 11th cross road.
BDA/EE/S/PW/WO/66/96-97dt:13-03-97
2859
Formation of roads and drains in Sy.No.25 of Uttarahalli to form
BSK 5th stage layout-12th and 13th cross road.
BDA/EE/S/PW/WO/67/96-97dt:13-03-97
2860
Formation of roads and drains in Sy.No.25 of Uttarahalli to form
BSK 5th stage layout-12th cross and 5th main road.
BDA/EE/S/PW/WO/68/96-97dt:13-03-97
2861
Formation of roads and drains in Sy.No.25 of Uttarahalli to form
BSK 5th stage layout-4th main and 12th cross road.
BDA/EE/S/PW/WO/69/96-97dt:13-03-97
97-98
2862
2863
Supplying of Doors and Windows fixtures to the construction of
MIG/MS Flat at Block-I in BSK III stage, 3rd phase, 5th Block,
B'lore.
Providing protective work to the construction of MIG/MS Flat at
Block-I in BSK III stage, 3rd phase, 5th Block, B'lore.
BDA/EE/S/PW/WO/AE/05/97-98 dt:22-05-97
BDA/EE/S/PW/WO/AE/06/97-98 dt:22-05-97
2864
Providing and supplying of Dust Bins in Ideal Homes bldg., CoOperative society I and II phase at Kenchanahalli.
BDA/EE/S/PW/WO/AE/07/97-98 dt:22-05-97
2865
Formation of roads and drains to form BSK V stage l/o in Sy.No.14,
18, 19 and 61 of Vasanthapura Village and in Sy.No.10, 11, 12 &
15 of Bikasipura Village- 1st 'A' main road- Ch: 0 to 110mts.
BDA/EE/S/PW/WO/AE/08/97-98 dt:05-06-97
2866
Formation of roads and drains to form BSK V stage l/o in Sy.No.14,
18, 19 and 61 of Vasanthapura Village and in Sy.No.10, 11, 12 &
15 of Bikasipura Village- 1st 'A' main road- Ch: 110mts.to 220mts.
BDA/EE/S/PW/WO/AE/09/97-98 dt:05-06-97
2867
Formation of roads and drains to form BSK V stage l/o in Sy.No.14,
18, 19 and 61 of Vasanthapura Village and in Sy.No.10, 11, 12 &
15 of Bikasipura Village- 1st 'A' main road- Ch: 220mts to 330 mts..
BDA/EE/S/PW/WO/AE/10/97-98 dt:05-06-97
2868
Formation of roads and drains to form BSK V stage l/o in Sy.No.14,
18, 19 and 61 of Vasanthapura Village and in Sy.No.10, 11, 12 &
15 of Bikasipura Village- 2nd main road- Ch: 0 to 110 mts.
BDA/EE/S/PW/WO/AE/11/97-98 dt:05-06-97
2869
Formation of roads and drains to form BSK V stage l/o in Sy.No.14,
18, 19 and 61 of Vasanthapura Village and in Sy.No.10, 11, 12 &
15 of Bikasipura Village- 2nd main road- Ch:110 mts to 220 mts..
BDA/EE/S/PW/WO/AE/12/97-98 dt:05-06-97
2870
Formation of roads and drains to form BSK V stage l/o in Sy.No.14,
18, 19 and 61 of Vasanthapura Village and in Sy.No.10, 11, 12 &
15 of Bikasipura Village- Balance portion of 2nd main road- Ch:
220 mts to 273 mts and 11th cross road -Ch: 110 mts to 167
Formation of roads and drains to form BSK V stage l/o in Sy.No.14,
18, 19 and 61 of Vasanthapura Village and in Sy.No.10, 11, 12 &
15 of Bikasipura Village- 3rd main road-Ch:0 to 110 mts.
BDA/EE/S/PW/WO/AE/13/97-98 dt:05-06-97
2872
Formation of roads and drains to form BSK V stage l/o in Sy.No.14,
18, 19 and 61 of Vasanthapura Village and in Sy.No.10, 11, 12 &
15 of Bikasipura Village- 4th main road-Ch:0 to 110 mts.
BDA/EE/S/PW/WO/AE/15/97-98 dt:05-06-97
2873
Formation of roads and drains to form BSK V stage l/o in Sy.No.14,
18, 19 and 61 of Vasanthapura Village and in Sy.No.10, 11, 12 &
15 of Bikasipura Village- Balance portion of 2nd main road-Ch:110
mts to 169 mts and 4th main road. Ch: 110m to 167 mts..
Formation of roads and drains to form BSK V stage l/o in Sy.No.14,
18, 19 and 61 of Vasanthapura Village and in Sy.No.10, 11, 12 &
15 of Bikasipura Village- 5th main road- Ch: 0 to 90 mts.
BDA/EE/S/PW/WO/AE/16/97-98 dt:05-06-97
2871
2874
2875
Formation of roads and drains to form BSK V stage l/o in Sy.No.14,
18, 19 and 61 of Vasanthapura Village and in Sy.No.10, 11, 12 &
15 of Bikasipura Village- 5th main road- Ch: 90 mts.to 180mts.
BDA/EE/S/PW/WO/AE/14/97-98 dt:05-06-97
BDA/EE/S/PW/WO/AE/17/97-98 dt:05-06-97
BDA/EE/S/PW/WO/AE/18/97-98 dt:05-06-97
2876
Formation of roads and drains to form BSK V stage l/o in Sy.No.14,
18, 19 and 61 of Vasanthapura Village and in Sy.No.10, 11, 12 &
15 of Bikasipura Village- 5th main road- Ch: 180mts to 270 mts..
BDA/EE/S/PW/WO/AE/19/97-98 dt:05-06-97
2877
Formation of roads and drains to form BSK V stage l/o in Sy.No.14,
18, 19 and 61 of Vasanthapura Village and in Sy.No.10, 11, 12 &
15 of Bikasipura Village- 2nd main road- Ch: 0 to 100 mts.
BDA/EE/S/PW/WO/AE/20/97-98 dt:05-06-97
2878
Formation of roads and drains to form BSK V stage l/o in Sy.No.14,
18, 19 and 61 of Vasanthapura Village and in Sy.No.10, 11, 12 &
15 of Bikasipura Village- 2nd cross road- Ch: 100 mts to 200 mts..
BDA/EE/S/PW/WO/AE/21/97-98 dt:05-06-97
2879
Formation of roads and drains to form BSK V stage l/o in Sy.No.14,
18, 19 and 61 of Vasanthapura Village and in Sy.No.10, 11, 12 &
15 of Bikasipura Village- 6th cross road- Ch: 0 to 110 mts.
BDA/EE/S/PW/WO/AE/22/97-98 dt:05-06-97
2880
Formation of roads and drains to form BSK V stage l/o in Sy.No.14,
18, 19 and 61 of Vasanthapura Village and in Sy.No.10, 11, 12 &
15 of Bikasipura Village- 7th cross road- Ch: 0 to 110 mts.
BDA/EE/S/PW/WO/AE/23/97-98 dt:05-06-97
2881
Formation of roads and drains to form BSK V stage l/o in Sy.No.14,
18, 19 and 61 of Vasanthapura Village and in Sy.No.10, 11, 12 &
15 of Bikasipura Village- 8th cross road- Ch: 0 to 110 mts.
BDA/EE/S/PW/WO/AE/24/97-98 dt:05-06-97
2882
Formation of roads and drains to form BSK V stage l/o in Sy.No.14,
18, 19 and 61 of Vasanthapura Village and in Sy.No.10, 11, 12 &
15 of Bikasipura Village- 9th cross road- Ch: 0 to 110 mts.
BDA/EE/S/PW/WO/AE/25/97-98 dt:05-06-97
2883
Formation of roads and drains to form BSK V stage l/o in Sy.No.14,
18, 19 and 61 of Vasanthapura Village and in Sy.No.10, 11, 12 &
15 of Bikasipura Village- 10th cross road- Ch: 0 to 110 mts.
BDA/EE/S/PW/WO/AE/26/97-98 dt:05-06-97
2884
Formation of roads and drains to form BSK V stage l/o in Sy.No.14,
18, 19 and 61 of Vasanthapura Village and in Sy.No.10, 11, 12 &
15 of Bikasipura Village- 11th cross road- Ch: 0 to 110 mts.
BDA/EE/S/PW/WO/AE/27/97-98 dt:05-06-97
2885
Formation of roads and drains to form BSK V stage l/o in Sy.No.14,
18, 19 and 61 of Vasanthapura Village and in Sy.No.10, 11, 12 &
15 of Bikasipura Village- 12th cross road- Ch: 0 to 90 mts.
BDA/EE/S/PW/WO/AE/28/97-98 dt:05-06-97
2886
Formation of roads and drains to form BSK V stage l/o in Sy.No.14,
18, 19 and 61 of Vasanthapura Village and in Sy.No.10, 11, 12 &
15 of Bikasipura Village- 12th cross road- Ch: 90 mts to 180 mts..
BDA/EE/S/PW/WO/AE/29/97-98 dt:05-06-97
2887
Construction of RCC deck slab culvert at 6th main road near
Ganesha temple in Nagendra Block, BSK III stage (Earlier
sanctioned estimate for Rs.25,000.00- approved vide Commr order
No.8349, dt: 07-11-96 stands cancelled.)
Providing RCC Dust Bins near EWS Houses in K.S.L/o II stage.
BDA/EE/S/PW/WO/AE/31/97-98 dt:13-06-97
Providing barbed wire fencing to CA site No.36 in J.P.Nagar II
Phase.
Urgent repairs to damaged portion of O.R.R., from Kanakapura
road to Kamakya Complex from Ch:43.77 to 47.19 Km.
BDA/EE/S/PW/WO/AE/33/97-98 dt:26-07-97
Providing security arrangement to Commercial Complex at BSK II
stage, (From 01-04-97 to 31-03-98) (ON APPROVED
QUOTATION BASIS)
Urgent repairs to 100' Ring Road from Kamakya Complex to
Mysore road from ch: 47.19 to 50.99 Km.
BDA/EE/S/PW/WO/AE/35/97-98 dt:02-09-97
Formation of sites in Dr.Ambedkar Slum (100' Ring Road)
Hosakerehalli, BSK III stage.
Providing Dust Bins (Garbage Bins) in Srinivasanagar 1st and 2nd
phase under BSK III stage.
BDA/EE/S/PW/WO/AE/37/97-98 dt:12-09-97
Construction of damaged portion of SWD at Sarakki 4th phase,
Dollars layout.
Providing Boundary stones, Layout Name Boards, Cross Boards
for the New Layout formed in Sy.No.61 of Govinayakanahalli,
Kumaraswamy Layout, II stage.
Remetalling to damaged portion of Roads in Sarakki 4th phase,
Dollars layout.
Removal of silt in SWD adjacent to 3rd main and 4th cross roads in
Sarakki 4th phase, Dollars layout.
BDA/EE/S/PW/WO/AE/41/97-98 dt:20-11-97
2899
Repairs to damaged portion of Outer Ring road -New Bannerghatta
Road to Kanakapura road-Ch:40.80 to 43.77mts.
BDA/EE/S/PW/WO/AE/45/97-98 dt:01-12-97
2900
Rechipcarpetting to the roads in EWS layout in K.S.L/o II stage.
BDA/EE/S/PW/WO/AE/46/97-98 dt:04-12-97
2901
Metalling and Chipcarpetting to roads in New layout behind tank
Bund in K.S.l/o, II stage.
Metalling and Chipcarpetting to road cuttings and potholes filling in
ISRO layout, Bikasipura.
BDA/EE/S/PW/WO/AE/47/97-98 dt:04-12-97
2888
2889
2890
2891
2892
2893
2894
2895
2896
2897
2898
2902
BDA/EE/S/PW/WO/AE/32/97-98 dt:24-07-97
BDA/EE/S/PW/WO/AE/34/97-98 dt:28-08-97
BDA/EE/S/PW/WO/AE/36/97-98 dt:12-09-97
BDA/EE/S/PW/WO/AE/40/97-98 dt:03-11-97
BDA/EE/S/PW/WO/AE/42/97-98 dt:01-12-97
BDA/EE/S/PW/WO/AE/43/97-98 dt:01-12-97
BDA/EE/S/PW/WO/AE/44/97-98 dt:01-12-97
BDA/EE/S/PW/WO/AE/48/97-98 dt:09-01-98
2903
Construction of SSM SWD at Kasturba slum in BSK III stage.
BDA/EE/S/PW/WO/AE/49/97-98 dt:09-01-98
2904
Metalling to the roads the newly layout in Sy.No.61 of
Govinayakanahally in K.S.L/o, II stage.
BDA/EE/S/PW/WO/AE/50/97-98 dt:09-01-98
2905
Repairs to rpad cuttings & ruts and pits and chipcarpetting to 1st &
2nd main roads & 1st & IV cross roads at Sarakki IV phase, Dollars
layout.
Providing chain link fencing to CA site No.11 (park) at 26th main
road, 36th cross road, BSK II stage.
BDA/EE/S/PW/WO/AE/51/97-98 dt:09-01-98
Rechipcarpetting to the approach roads from outer ring road to
ISRO layout.
Formation of link road in between layout in sy.no.122 of
Kathriguppa and 4th phase, 7th block, BSK III stage.
BDA/EE/S/PW/WO/AE/53/97-98 dt:09-01-98
Removal of debris on 100' ring road at Mysore road junction.(Ch:
50-99)
Construction of Retaining wall to the flood damaged portion in
Sy.No.6 and 7 of Govinayakanahalli in K.S.L/o, II stage.
BDA/EE/S/PW/WO/AE/55/97-98 dt:09-01-98
2906
2907
2908
2909
2910
2911
2912
2913
2914
2915
2916
2917
2918
2919
2920
Supplying of Doors and Windows fixtures to the construction of
MIG/MS Flat at Block-II in BSK III stage, 3rd phase, 5th Block,
B'lore.
Providing protective work to the construction of MIG/MS Flat at
Block-II in BSK III stage, 3rd phase, 5th Block, B'lore.
BDA/EE/S/PW/WO/AE/52/97-98 dt:09-01-98
BDA/EE/S/PW/WO/AE/54/97-98 dt:09-01-98
BDA/EE/S/PW/WO/AE/56/97-98 dt:15-01-98
BDA/EE/S/PW/WO/AE/57/97-98 dt:15-01-98
BDA/EE/S/PW/WO/AE/58/97-98 dt:15-01-98
Chipcarpetting to 3rd main and 4th cross road (Part) in Sarakki IV
phase, Dollars layout.
Providing l/o name boards, cross boards and boundary stones in
Sy.No.6 of Marasandra village, BSK V stage.
BDA/EE/S/PW/WO/AE/59/97-98 dt:12-01-98
Providing dust bins to layout in Sy.No.121, 122, 134/2 and 10 and
17 of Kathriguppa and 4th phase, 7th block of Manjunatha slum in
BSK III stage, B'lore.
Removal of silt in SWD in Sarakki 4th phase, Dollars layout.(Main
SWD)
Construction of Bridge across SWD in Srinivasanagar I phase,
BSK III syage.
Proposed construction of culverts at approach road to Kasturba
slum.
BDA/EE/S/PW/WO/AE/61/97-98 dt:13-02-98
98-99
Repairs & Improvements to EWS Houses No.552 at K.S.L/o, I
stage.
Removal of debris on road at Sarakki IV phase, Dollars layout.
BDA/EE/S/PW/WO/AE/60/97-98 dt:11-02-98
BDA/EE/S/PW/WO/AE/62/97-98 dt:13-02-98
BDA/EE/S/PW/WO/AE/63/97-98 dt:19-02-98
BDA/EE/S/PW/WO/AE/64/97-98 dt:02-03-98
BDA/EE/S/PW/WO/01/98-99 dt:11-04-98
BDA/EE/S/PW/WO/02/98-99 dt:17-04-98
2921
Providing missing slab and removal of debris on 3rd main road
(Balance portion) in S.R.K., 4th phase, Dollars layout.
BDA/EE/S/PW/WO/03/98-99 dt:17-04-98
2922
Remetalling and removal of debris on 2nd main road (Balance
portion) in S.R.K IV phase, Dollars layout.
BDA/EE/S/PW/WO/04/98-99 dt:13-05-98
2923
Providing new cross boards and repainting to existing cross boards
in Nagendra Block, BSK III stage.
BDA/EE/S/PW/WO/05/98-99 dt:25-05-98
2924
Urgent repairs to pothole filling and road cuttings and re-chip
carpetting to roads in BSk III stage, IV Phase, 7th block (2nd, 3rd,
4th, 5th and 6th main road.)
Supplying of Doors and Window fixtures for the construction of
Dr.Ambedkar Community HAll at Avalahally L/o, BSK III stage.
BDA/EE/S/PW/WO/06/98-99 dt:23-11-98
2925
BDA/EE/S/PW/WO/08/98-99 dt:29-07-98
2926
Providing & fixing MS Gate to Dr.Ambedkar Community Hall at
Avalahalli l/o, BSK III stage.
BDA/EE/S/PW/WO/09/98-99 dt:29-07-98
2927
Repairs to existing barbed wire fencing & providing entrance gate
in CA site No.36 of J.P.Nagar II Phase.
BDA/EE/S/PW/WO/10/98-99 dt:24-10-98
2928
Fixing of new indicator stones to the sites and numbering to the
sites in J.P.Nagar 8th phase, Block 2 & 3.
BDA/EE/S/PW/WO/11/98-99 dt:06-11-98
2929
Providing Hume pipe dust bins at R.B.I Staff Co-Operative Housing
Society Ltd.. Kothanur Village, B'lore South Tq.
BDA/EE/S/PW/WO/13/98-99 dt:14-12-98
2930
Urgent repairs to Storm Water Drain in Nagendra Block , BSK III
Stage at I cross in front of House No.227
BDA/EE/S/PW/WO/14/98-99 dt:15-12-98
2931
Cleaning of Commercial complex in BSK II stage for the period
from 01-07-98 to 31-12-98.
BDA/EE/S/PW/WO/15/98-99 dt:18-12-98
2932
Providing barbed wire fencing to CA site Block 'A' near 24th main
road in BSK II stage.
Construction of balance portion of compound wall around SFHS
building in BSK III stage, III phase, 5th Block.
BDA/EE/S/PW/WO/16/98-99 dt:10-12-99
2933
2934
2935
99-2000
Providing cleaning & maintenance of BDA Commercial complex at
BSK II stage for the period from 01-01-99 to 30-06-99 (6 Months)
Supplying of materials for water supply works for the construction
of MIG/MS Flats at block-III in BSK III stage, 3rd phase, V block.
BDA/EE/S/PW/WO/18/98-99 dt:09-02-99
BDA/EE/S/PW/WO/AE/01/99-2000 dt:23-08-99
BDA/EE/S/PW/WO/AE/02/99-2000 dt:14-09-99
2936
2937
2938
2939
2940
2941
2942
2943
General maintenance and upkeep of Bilekanahally, Dollar layout,
BTM 2nd stage, I phase, (Period from 01-10-99 to 30-09-2000) for
one year
Providing and fixing New Indicator Stones, including painting and
lettering in J.P.Nagar 9th stage,III Block.
BDA/EE/S/PW/WO/AE/03/99-2000 dt:01-10-99
BDA/EE/S/PW/WO/AE/04/99-2000 dt:08-11-99
Providing and fixing New Indicator Stones, including painting and
lettering in J.P.Nagar 9th stage,II Block.
BDA/EE/S/PW/WO/AE/05/99-2000 dt:17-11-99
Providing security arrangements to BDA Commercial complex at
BSK II stage
Removal of garbage for the period from 01-01-99 to 31-12-99 in
Kasturba slum, coming under the jurisdiction of No.2 South sub
division.
Providing and fixing New Indicator Stones, including painting and
lettering in J.P.Nagar 9th stage,Block No.IV & V
BDA/EE/S/PW/WO/AE/06/99-2000 dt:09-12-99
Construction of open drain, Removal of outer Rockey crop and
protection works to the existing culvert at Kumaraswamy Layout, I
stage.
Providing and fixing layout name boards and available cross
boards in J.P.Nagar 8th phase, Block-III.
BDA/EE/S/PW/WO/AE/09/99-2000 dt:14-12-99
BDA/EE/S/PW/WO/AE/07/99-2000 dt:10-12-99
BDA/EE/S/PW/WO/AE/08/99-2000 dt:14-12-99
BDA/EE/S/PW/WO/AE/10/99-2000 dt:16-12-99
Levelling of C.B site at BSK II stage, C.T.Bed layout allotted to
Govt Kannada Primary School.
BDA/EE/S/PW/WO/AE/11/99-2000 dt:24-01-2000
Providing and fixing layout name boards and available cross
boards in J.P.Nagar 8th phase, Block-II
BDA/EE/S/PW/WO/AE/12/99-2000 dt:27-01-2000
Providing and fixing layout name boards and available cross
boards in J.P.Nagar 8th phase, Block-I
BDA/EE/S/PW/WO/AE/13/99-2000 dt:27-01-2000
Providing security arrangements to BDA ward Offices and BDA
stores at BSK II stage, BSK from 01-10-99 to 31-03-2000 for six
months.
Removal of garbage for the period from 01-01-2000 to 31-03-2000
in Kasturba slum, coming under the jurisdiction of No.2 South sub
division.
2000-01
BDA/EE/S/PW/WO/AE/14/99-2000 dt:26-02-2000
2949
Reconstruction of damaged culvert (At junvction of 4th main & 4th
cross road) in Sarakki IV phase, Dollars layout.
No work order copy
2950
providing dust bins and cross boards to Sarakki IV phase, Dollar
layout.
BDA/EE/S/PW/WO/02/2000-01 dt:15-05-01
2944
2945
2946
2947
2948
BDA/EE/S/PW/WO/AE/15/99-2000 dt:25-03-2000
2951
Providing security arrangements to BDA Commercial complex at
BSK II stage from 01-04-2000 to 31-03-2001 for one year.
BDA/EE/S/PW/WO/03/2000-01 dt:07-06-2000
2952
Filling of pit formed in site nos.65,66 & 67 of Bilekanahalli, Dollar
layout.
Providing barbed wire fencing to CA site No.2 of Markandaya
layout.
Providing security arrangements to BDA ward Office and BDA
stores at BSK II stage from 01-04-2000 to 30-09-2000 for six
months..
Removal of garbage for the period from 01-04-2000 to 30-09-2000
in Kasturba slum, BSK III stage.
BDA/EE/S/PW/WO/04/2000-01 dt:05-06-01
General maintenance and upkeep of Bilekanahally, Dollar layout,
BTM 2nd stage, I phase, (Period from 01-04-2000 to 31-03-2001)
for one year
Providing & fixing layout boards & cross boards in J.P.Nagar 9th
phase, Block V'A' & B'
Providing & fixing layout boards & cross boards in 7th & 7th'A'
block of J.P.Nagar 9th phase
BDA/EE/S/PW/WO/07/2000-01 dt:27-07-2000
providing dust bins and cross boards and repainting to existing
cross boards to Kasturba slum and Ambedkar slum in BSK III
stage..
Raising of protection wall of SWD and providing barbed wire
fencing over protection wall at eastern side of Ambedkar slum,
BSK III stage.
Fixing name boards for the information of General public in
Anjanapura township.
Providing barbed wire fencing to CA site / park in AG's Officers
HBCS layout, Uttarahalli hobli.
BDA/EE/S/PW/WO/10/2000-01 dt:24-10-2000 (
2963
Providing barbed wire fencing to the park in Poornapragna HBCS
layout, Uttarahalli hobli.
BDA/EE/S/PW/WO/14/2000-01 dt:12-02-2001
2964
Garbage clearance in Bilekanahally of Sarakki 4th phase, Dollar
layout.
Providing Deck slab to the SWD across 60' road at Block 7 ,
J.P.nagar 9th phase.
Removal of garbage in Sarakki 4th phase, Dollar layout period
from April 2001 to Sep 2001
BDA/EE/S/PW/WO/02/2001-02 dt:10-04-01
Removal of garbage in Kasturba slum and Ambedkar slum in BSK
III stage,
No work order copy
2953
2954
2955
2956
2957
2958
2959
2960
2961
2962
BDA/EE/S/PW/WO/04/2000-01 dt:04-09-01
BDA/EE/S/PW/WO/05/2000-01 dt:14-07-2000
BDA/EE/S/PW/WO/06/2000-01 dt:02-08-2000
BDA/EE/S/PW/WO/08/2000-01 dt:10-10-2000
BDA/EE/S/PW/WO/09/2000-01 dt:10-10-2000
BDA/EE/S/PW/WO/11/2000-01 dt:11-12-2000
BDA/EE/S/PW/WO/12/2000-01 dt:18-01-2001
BDA/EE/S/PW/WO/13/2000-01 dt:12-02-2001
2001-02
2965
2966
2967
BDA/EE/S/PW/WO/03/2001-02 dt:16-07-01
BDA/EE/S/PW/WO/05/2001-02 dt:05-10-01
2968
Providing barbed wire fencing to CA site in Sarakki 4th phase,
Dollar layout.
Formation of approach road to Sy.No.11/3 of Uttarahally, BSK V
stage, Ch.0 to 70m
Providing dust bins and removal of garbage in RBI layout under the
jurisdiction of No.2 south sub division.
BDA/EE/S/PW/WO/07/2001-02 dt:10-10-01
2971
Providing barbed wire fencing to CA site No.2 at layout ,
Sy.No.17/1, 27/1 & 27/2 of Avalahally, BSK III stage, Western side.
BDA/EE/S/PW/WO/11/2001-02 dt:21-01-02
2972
Providing barbed wire fencing to CA site No.1 at layout ,
Sy.No.17/1, 27/1 & 27/2 of Avalahally, BSK III stage, Western side.
BDA/EE/S/PW/WO/12/2001-02 dt:21-01-02
2973
Providing metalling and asphalting to newly formed corner and
intermediate sites proposed for auction in J.P.Nagar I phase at
Sarakki Village.
Providing barbed wire fencing to newly formed site no.2 to 7 of
layout in Sy.No.64 and 72, madivala, BTM II stage and adjacent to
Someshwara slum.
Providing barbed wire fencing to CA site in Ambedkar slum, BSK III
stage.
Demolition of B.C.Sheet shed and Compound wall for formation of
corner sites No.32 in J.P.nagar II phase (Site proposed for auction)
BDA/EE/S/PW/WO/13/2001-02 dt:06-02-02
2969
2970
2974
2975
2976
2977
2978
Construction of SSM lead off drain & providing RCC deck slab at
junction of road at newly formed corner & intermediate sites ,
J.P.nagar I phase at Sarakki Village.
Removal of debris / earth mounds on roads in layout formed in
Sy.No.58/5 of Yediyur Village, K.R.road, BSK II stage.
BDA/EE/S/PW/WO/08/2001-02 dt:22-11-01
BDA/EE/S/PW/WO/10/2001-02 dt:21-12-01
BDA/EE/S/PW/WO/14/2001-02 dt:06-02-02)
BDA/EE/S/PW/WO/15/2001-02 dt:06-02-02
BDA/EE/S/PW/WO/16/2001-02 dt:06-02-02
BDA/EE/S/PW/WO/17/2001-02 dt:06-02-02
BDA/EE/S/PW/WO/18/2001-02 dt:08-02-02
2979
Maintenance & repairs of flat No.LF-17/11 and MF-4/12 in BTM
SFHS area.
2002-2003
BDA/EE/S/PW/WO/19/2001-02 dt:27-03-02
2980
Providing barbed wire fencing to park in Bilekanahally, Dollar
layout, BTM II stage.
Providing metalling to newly formed roads at additional sites
formed in BSK III stgae, II phase beside SWD
BDA/EE/S/PW/WO/01/2002-03 dt:18-05-02
(Estimate copy)
BDA/EE/S/PW/WO/02/2002-03 dt:12-06-02
(Estimate copy)
2982
Works for repairs to Side drains, fixing boundary stones,
numbering to sites in Block 4 and 4'A' of J.P.Nagar 9th phase.
BDA/EE/S/PW/WO/29/2002-03 dt:27-06-2003.
(Estimate copy)
2983
Construction of culverts across 60 feet Roads in block II of
J.P.Nagar8th stage.
2003-2004
BDA/EE/S/PW/WO/33/2002-03 dt:01-08-2003.
(Estimate copy)
2981
2984
Maintenance of layout such as De-silting of drains, Resetting of
B.S.Slab, Fixing and painting of name boards in BSK V stgae in
Sy.No.5 & 6 of Bikasipura.
Maintenance of layout such as De-silting of drains, Resetting of
B.S.Slab, Fixing and painting of name boards in Sy.No.50 of
Govinayakanahally.
Providing dust bins and removal of Garbage in R.B.I layout under
the jurisdiction of No.2, Sub Division.
BDA/EE/S/PW/WO/73/2003-04 dt:02-06-2004. (
Providing B.S.Slab drain (Missing bits) and resetting the existing
side drain of approach road (Bank Officers layout) in J.P.nagar 9th
phase.
Providing barbed wire fencing to C.B Site in Sy.No.3 of Bikasipura,
BSK V stage.
Cleaning, Levelling and Demarking the sites to be auctioned in
BSK II stage and BSK III stage.
BDA/EE/S/PW/WO/57/2003-04 dt:01-12-2003.
Providing fencing to park area inbetween 2nd and 3rd main in
A.G.S. Layout, Arehally.
Formation of additional sites ( To be allotted as incentive sites) in
Kaariyanapalya, II Block, BSK VI stgae.
BDA/EE/S/PW/WO/61/2003-04 dt:30-01-2004.
2992
Providing RCC Deck slab over the existing SSM Drain for V and
VII main in Sy.NO.85 & 86 of Uttarahally, BSK V stage.
BDA/EE/S/PW/WO/63/2003-04 dt:19-02-2004.
2993
Construction of culverts across 60 feet Road andrepairs to side
drains to the road from Alahalli to block 4 of J.P.Nagar 9th phase.
BDA/EE/S/PW/WO/64/2003-04 dt:19-02-2004.
2994
Providing and fixing missing slab of side drain and fixing of
boundary stones and numbering of sites in Block I of J.P.Nagar 8th
stage.
Maintenance of layout such as De-silting of drains, Resetting of
B.S.Slab, Fixing and painting of name boards in BSK V stgae in
Sy.No.17 & 18 of Vasanthapura Village.
Maintenance of layout such as De-silting of drains, Resetting of
B.S.Slab, Fixing and painting of name boards in BSK V stgae in
Sy.No.3 of Bikasipura.
Providing RCC Deck slab over the existing SSM Drain for 1st cross
in Sy.NO.85 & 86 of Uttarahally, BSK V stage.
BDA/EE/S/PW/WO/66/2003-04 dt:17-03-2004.
2998
Consrtuction of Culverts and Providing fencing to BDA lands at
Further extension of Anjanapura.
BDA/EE/S/PW/WO/70/2003-04 dt:17-05-2004.
2999
Improvements to Road in Sy.No.80/2A of Kothanur Village in Block
III of J.P.Nagar 8th stage.
BDA/EE/S/PW/WO/71/2003-04 dt:17-05-2004.
2985
2986
2987
2988
2989
2990
2991
2995
2996
2997
BDA/EE/S/PW/WO/58/2003-04 dt:19-01-2004.
BDA/EE/S/PW/WO/56/2003-04 dt:10-11-2003.
BDA/EE/S/PW/WO/44/2003-04 dt:20-10-2003.
BDA/EE/S/PW/WO/60/2003-04 dt:19-01-2004.
BDA/EE/S/PW/WO/62/2003-04 dt:17-02-2004.
BDA/EE/S/PW/WO/67/2003-04 dt:20-02-2004.
BDA/EE/S/PW/WO/68/2003-04 dt:17-05-2004.
BDA/EE/S/PW/WO/69/2003-04 dt:17-05-2004.
3000
Maintenance of layout such as De-silting of drains, Resetting of
B.S.Slab, Fixing and painting of name boards in BSK V stgae in
Sy.No.85 & 86 of Uttarahalli.
Providing and fixing missing slab of side drain and fixing of
boundary stones and numbering of sites in Block II of J.P.Nagar
8th stage.
2004-05
BDA/EE/S/PW/WO/72/2003-04 dt:17-05-2004.
3002
Maintenance of layout such as construction of Culvert across 60'
road and repairs to side drains, providing cross boards and
boundary stones in Block 3 and 4 of J.P.Nagar 9th phase.
BDA/EE/S/PW/WO/5/2004-05 dt:08-07-2004.
3003
providing repairs and painting to MIG/MS.Flat No.2/5 in SFHS area
V block, BSK III stgae, Bangalore
BDA/EE/S/PW/WO/37/2004-05 dt:04-04-2005.
3004
providing repairs and painting to MIG/MS.Flat No.1/4 in SFHS area
, BSK III stage, V block, Bangalore.
BDA/EE/S/PW/WO/17/2004-05 dt:05-10-2004.
3005
Formation of 40 feet road in Sy.No.172/1, 172/2 of Kothanur
Village at 8th phase, 1st block, J.P.Nagar.
BDA/EE/S/PW/WO/18/2004-05 dt:03-11-2004.
(Estimate copy)
3006
Providing repairs to side drains, providing cross boards and
boundary stones in Block 1, 7th and 7th 'A' of J.P.Nagar 9th phase.
BDA/EE/S/PW/WO/20/2004-05 dt:10-11-2004.
(Estimate copy)
3007
Providing dust bins and removal of Garbage in R.B.I layout,
Kothanur under the jurisdiction of No.2, Sub Division.
BDA/EE/S/PW/WO/36/2004-05 dt:04-02-2005.
(Estimate copy)
3008
Providing fencing to BDA property in Sy.No.20 of Ganakal Village
(To avoid encroachment from Villagers) in Block XI.
BDA/EE/S/PW/WO/14/A/2004-05 dt:24-09-2004.
(Estimate copy)
3009
Raising the road parallel to SWD for effective drainage in Sy.No.5
& 6 of Bikasipura, BSK V stage.
BDA/EE/S/PW/WO/39/2004-05 dt:15-02-2005.
(Estimate copy)
3010
Maintenance of layout such as desilting of drains, resetting of BS
slab, fixing and painting of name boards in BSK V stage.
BDA/EE/S/PW/WO/22/2004-05 dt:07-12-2004.
(Estimate copy)
3011
Providing fencing to C.A site adjacent to Srinivasanagar colony to
avoid encroachment from slum dwellers in BSK VI stage.
BDA/EE/S/PW/WO/14/2004-05 dt:24-09-2004.
(Estimate copy)
3012
Providing fencing in Sy.No.26/5 at Lingadiranahalli village, Block-IV
3013
Providing urgent improvements to the existing culverts at junction
of approach road of Bharath HBCS & road at Sy.No.85 & 86 of
Uttarahalli, BSK V Stage.
Repairs to side drains, providing cross boards indicator stones to
Block 5th 'A' and 5th 'B' of J.P.Nagar 9th phase.
BDA/EE/S/PW/WO/23/2004-05 dt:08-12-2004.
(Estimate copy)
BDA/EE/S/PW/WO/6/2004-05 dt:08-07-2004.
(Estimate copy)
3001
3014
BDA/EE/S/PW/WO/65/2003-04 dt:17-03-2004.
BDA/EE/S/PW/WO/21/2004-05 dt:01-12-2004.
(Estimate copy)
3015
Providing Repairs to side drains, providing cross boards, Boundary
stones and numbering stones to Block 2 of J.P.Nagar 9th phase.
BDA/EE/S/PW/WO/7/2004-05 dt:19-07-2004.
(Estimate copy)
3016
Providing repairs and painting to MIG/MS flat No.1/11 in SFHS
area, BSK III stage, V Block.
BDA/EE/S/PW/WO/40/2004-05 dt:01-03-2005.
(Estimate copy)
3017
Works for regrading of berms & side drains to Konankunte road
upto Anjanapura township in J.P.Nagar 9th phase.
BDA/EE/S/PW/WO/3/2004-05 dt:08-07-2004.
(Estimate copy)
3018
Work for widening the road and providing metalling and B.S slab
drains to the stretch near Konankunte slum in J.P.Nagar 9th
phase.
Short term quotation cum Auction- Second call for Dismantling the
existing structure in Sy.No.32 of Channasandra Village, uttarahally
hobli, Bangalore South taluk, Bangalore.
Maintenance of layout such as desilting of drains, resetting of BS
slab, fixing and painting of name boards in BSK VI stage, Block IV..
BDA/EE/S/PW/WO/4/2004-05 dt:08-07-2004.
(Estimate copy)
3019
3020
BDA/EE/S/STQCA/T-13/A/2004-05 dt:10-092004. (Estimate copy & quotations.)
BDA/EE/S/PW/WO/38/2004-05 dt:08-02-2005.
(Estimate copy)
2005-06
3021
Providing improvements to roads & side drains in Block II of
j.P.nagar 9th phase, BDA Layout.
BDA/EE/S/PW/WO/01/2005-06 dt:03-05-2005.
(Estimate copy)
3022
Formation of roads, construction of B.S.slab drains & RCC Deck
slab culvert in Sy.No.169/5 of Kothanur, J.P.Nagr 8th phase, 1st
Block.
Removal of garbage at R.B.I Layout in Kothanur Village, Uttarahalli
hobli, Bangalore South taluk from 01.04.2005 to 30.09.2005.
BDA/EE/S/PW/WO/02/2005-06 dt:02-07-2005.
(Estimate copy)
3023
3024
3025
3026
3027
3028
BDA/EE/S/PW/WO/03/2005-06 dt:29-09-2005.
(Estimate copy)
Improvements to Water supply and sanitary system in BSK II stage
Complex.
Consultancy services for the improvements to road from ganesha
Temple to Kanakapura road via Jambusavari Dinne, (Total length5.45Kms) in Bangalore.
Consultancy services for the improvements to Kothanur main road
connecting to 100 feet Ring road in J.P.Nagar 5th phase and
ganesha temple Via Puttenahalli. (Total length-3.475 Kms) in
Bangalore.
Cleaning and maintenance works of BDA Offices/ complexes for
the period from 01.04.2005 to 30.09.2005
BDA/EE/S/PW/WO/04/2005-06 dt:08-12-2005.
(Estimate copy)
BDA/EE/S/PW/WO/05/2005-06 dt:01-02-2006.
Appointment of 3rd party for metalling to roads in BSK VI stage.
BDA/EE/S/PW/WO/08/ 09/10 /2005-06 dt:20-032006.
2006-07
BDA/EE/S/PW/WO/06/2005-06 dt:01-02-2006.
BDA/EE/S/PW/WO/07/2005-06 dt:01-03-2006.
3029
Cleaning thick jungle and desilting of drains in Sy.No.85 & 86 of
Uttarahalli in BSK V stage.
BDA/EE/S/PW/WO/01/2006-07 dt:25-07-2006.
3030
Appointment of 3rd party for raghuvanapalya
BDA/EE/S/PW/WO/02/2006-07 dt:08-08-2006.
3031
Removal of silt in SWD at the junction of 24th main and 17th cross
road in J.P.Nagar 5th & 6th phase in CMC Bommanahalli limits.
BDA/EE/S/PW/WO/03/2006-07 dt:01-09-2006.
3032
Construction of collapsed head wall (Northern side) of culvert
(span 3.10m) at 60 feet road at 4th block of 9th phase, J.P.Nagar.
BDA/EE/S/PW/WO/04/2006-07 dt:11-09-2006.
3033
Construction of collapsed head wall of (Eastern side) drain (storm
water drain) at 60 feet road of 4th block of 9th phase, J.P.Nagar.
BDA/EE/S/PW/WO/05/2006-07 dt:11-09-2006.
3034
Providing intensive emergent patch repairs to carriage way of
Kothanur main road connecting to 100 feet ring road in J.P.Nagar v
phase and Ganesha temple via Puttenahalli, (3.50 KM length of
road.)
Providing intensive emergent patch repairs to carriage way of road
from Puttenahalli, Kothanur Dinne, Jambo savari Dinne, via
Konankunte connecting to Kanakapura main road (5.50 KM length
of road.)
Appointment of 3rd party for metalling & asphalting to Sy.No.17 &
18 Of Vasanthapura.
Appointment of 3rd party for metalling & chipcarpetting to 18m, 9m
roads in Avalahalli in Sy.No.27/1, 27/2 of BSK III stage.
BDA/EE/S/PW/WO/06/2006-07 dt:11-09-2006.
3038
Appointment of 3rd party for metalling & asphalting in Sy.No.51 &
52 of Tavarekere, BTM layout I stage.
BDA/EE/S/PW/WO/10/2006-07 dt:10-01-2007.
3039
Construction of compound wall on the Northern side of BDA
Shopping Complex at BSK II stage.
BDA/EE/S/PW/WO/11/2006-07 dt:25-01-2007.
3035
3036
3037
BDA/EE/S/PW/WO/07/2006-07 dt:11-09-2006.
BDA/EE/S/PW/WO/08/2006-07 dt:05-01-2007.
BDA/EE/S/PW/WO/09/2006-07 dt:08-01-2007.
2007-2008
3040
Removal of debris & conveyance situated at Jaraganahalli, Sarakki
tank bund road at Puttenahalli road.
BDA/EE/S/PW/WO/01/2007-08 dt:04-05-2007.
3041
Improvements to sloped area of jaraganahalli, Sarakki lake Eastern
side, tank bund portion.
BDA/EE/S/PW/WO/02/2007-08 dt:04-05-2007.
3042
Appointment of 3rd party for asphalting in BSK VI stage.
BDA/EE/S/PW/WO/03/2007-08 dt:21-05-2007.
3043
Appointment of 3rd party for asphalting in BSK VI stage.
BDA/EE/S/PW/WO/04/2007-08 dt:21-05-2007.
3044
Appointment of 3rd party for asphalting in BSK VI stage.
BDA/EE/S/PW/WO/05/2007-08 dt:21-05-2007.
3045
Appointment of 3rd party for asphalting in BSK VI stage.
BDA/EE/S/PW/WO/06/2007-08 dt:25-06-2007.
3046
Appointment of 3rd party for asphalting in BSK VI stage.
BDA/EE/S/PW/WO/07/2007-08 dt:27-06-2007.
3047
Appointment of 3rd party for asphalting in BSK VI stage.
BDA/EE/S/PW/WO/08/2007-08 dt:02-07-2007.
3048
BDA/EE/S/PW/WO/09/2007-08 dt:04-07-2007.
3051
Appointment of 3rd party for construction of retaining wall in
Anjanapura.
Appointment of 3rd party for construction of SSM drain in FE of
Anjanapura.
Excavation of trial pits for conducting Foundation strength test for
Construction of 2nd floor building of BDA Commercial complex at
BSK 2nd stage, Bangalore.
Appointment of 3rd party for metalling in BSK VI stage.
3052
Appointment of 3rd party for metalling in BSK VI stage.
BDA/EE/S/PW/WO/13/2007-08 dt:01-08-2007
3053
Appointment of 3rd party for metalling in J.P.Nagar 8th phase,
Anjanapura & FE of Anjanapura.
BDA/EE/S/PW/WO/14/2007-08 dt:06-08-2007
3054
Appointment of 3rd party for metalling in J.P.Nagar 9th phase, &
Anjanapura.
Appointment of 3rd party for metalling in BSK VI stage,J.P.Nagar
9th phase, Anjanapura & FE of Anjanapura.
BDA/EE/S/PW/WO/15/2007-08 dt:06-08-2007
3056
Improvements to Ladies Toilet in Ground and First floor of BDA
Shopping Complex at BSK II stage.
BDA/EE/S/PW/WO/17/2007-08 dt:06-11-2007
3057
Appointment of 3rd party for formation in Ganakal
village,Gubbalala village,& Sy.No.90 of Hosakerehalli
BDA/EE/S/PW/WO/18/2007-08 dt:06-11-2007
3058
Appointment of third party for Construction of 2nd floor building of
BDA Commercial complex at BSK 2nd stage, Bangalore.
BDA/EE/S/PW/WO/19/2007-08 dt:24-12-2007.
3049
3050
3055
BDA/EE/S/PW/WO/10/2007-08 dt:03-07-2007.
BDA/EE/S/PW/WO/11/2007-08 dt:03-08-2007.
BDA/EE/S/PW/WO/12/2007-08 dt:27-07-2007
BDA/EE/S/PW/WO/16/2007-08 dt:20-08-2007
UGD & WATER SUPPLY
SL NO.
NAME OF THE WORK
FILE NO.
83-84
3059
3060
Providing UGD facilities to the layout in Sy.Nos.42 and 43 of
Gavipura village in BSK III stage.
File No.9
84-85
Providing eater supply facilities to the II phase of Vishwabharathi
HBCS, BSK III stage.
File No.2
85-86
3061
3062
3063
Providing UGD facilities to the layout in Sy.Nos.95, 121, 122 of
Hosakerehalli village , BSK III stage.
Providing UGD facilities to the layout in Sy.Nos.19 to 25 and part of
28 of Avalahally in BSK III stage.
Providing UGD facilities to the layout in Sy.Nos.6/1 and 7/2 of
Ittamadu village, Uttarahalli hobli,B'lore in favour of
Anjaneyaswamy HBCS.
File No.1
File No.5
File No.10
86-87
3064
3065
3066
3067
3070
3071
3072
3073
3074
3075
3076
3077
Providing UGD facilities to the layout formed by BDA in Sy.No.4 &
5 of N.S.Palya under BTM scheme.
Flie No.12
Providing water supply facilities to the sy.No.18 to 23., 25 to 28
and 30 to 32 of Kathriguppa village.
Flie No.29
Providing water supply facilities at Avalahally l/o in BSk III stage.
Flie No.30
Providing UGD facilities to Sy.No.5 to 8, 11 to 13 of Gavipura
village, BSK III stage (Pipeline area in Gavipura)
File No.7
87-88
Providing UGD facilities to the east of Kathriguppa layout in BSK III
stage, IV phase.
File No.3
Providing UGD facilities to the layout in Sy.Nos.11 & 12 of
Ittamadu village in BSK III stage.
File No.4
Providing UGD facilities to the New Timber Yard Layout in
Sy.No.43 of Avalahally in BSK III stage.
File No.6
Providing UGD facilities to the layout formed by BDA in Sy.No.4/2
of Tavarekere village under BTM scheme, B'lore.
Providing UGD facilities to the layout formed in southern side of
100' ring road between Bannerghatta road and Hosur road under
B.T.M scheme, II stgae, 1st phase, B'lore.in Sy.Nos.6/1 and 7/2 of
Ittamadu village, Uttarahalli hobli,B'lore in favour of Anja
File No.8
File No.11
Providing water supply facilities to Shakambarinagar l/o in I phase.
File No.21
Providing water supply facilities to Sy.No.40/2 of Avalahally, BSK
III satge in f/o Telecom HBCS.
File No.22
Providing water supply facilities to the l/o formed in Sy.No.34 of
Madivala in BTm scheme.
File No.25
3078
3079
3080
Providing water supply facilities to the l/o formed in Sy.No.54 of
N.S.Palya in BTM scheme.
Providing water supply facilities to the Sarakki l/o, II phase(Missing
bits)
File No.27
Providing water supply facilities to the l/o formed in Sy.No.83 to 88
of Kathriguppa, BSk III stage.
File No.28
File No.26
88-89
3081
3082
3083
3084
3085
Providing water supply facilities to Karisandra in BSK II stage.
File No.17
Providing water supply facilities to the l/o formed at Sy.No.122 of
kathriguppa, BSK III stage.
File No.19
Providing water supply facilities to the l/o formed at Sy.No.121 of
kathriguppa, BSK III stage.
File No.18
Providing water supply facilities to the l/o formed at Sy.No.62 of
kathriguppa, BSK III stage, Iv phase, VII block.
Providing water supply facilities to the Sy.No.11 and 12 of
Ittamadu village, BSk III stage.
File No.23
Providing Water supply facilities to modified layout in Sy.No.33, 41,
42, 45, 46 & 47 of Madivala under Dollar scheme in BTM scheme.
File No.24.
Providing Water supply facilities to the layout formed in Sy.No.4 &
5 of N.S.Palya in BTM scheme.
File No.55
File No.20
89-90
Providing Water supply facilities to the layout formed in Sy.No.4 /2
of Tavarekere under BTM scheme.
3086
3087
3088
3089
90-91
Providing water supply facilities to the missing link of newly formed
roads in K.S.l/o.
Providing water supply facilities to the site no.802 to 811 Sarakki I
phase,
Providing water supply facilities to BSK III satge, III phase, III
block.
Providing water supply facilities to thr l/o formed in Sy.No.109 of
Kathriguppa, BSk III satge.
File No.49
File No.31
File No.32
File No.34
File No.35
3090
3091
Providing UGD facilities to the road connecting C&D road to Road
E in Sy.No.11 & 12 of Ittamadu village, BSK III stage.
Providing UGD facilities from 10th cross to 14th cross, K.S l/o II
stage.
File No.39
Providing & laying 100mm dia CI main to missing bits along 47th
cross, 8th block, Jayanagar.
File No.33
91-92
3092
Providing UGD facilities (Missing bits) in BTM II stage, II phase.
File No.31
3093
Providing & laying 9" dia SW line at 90th road, K.S.l/o, II stage.
Providing UGD facilities to the layout formed by BDA in
Sy.Nos.20/1B of Tavarekere under BTM scheme.(Missing bits) in
BTM II stage, II phase.
File No.32
File No.33
3095
Providing UGD facilities to Avalahally, A.K.Colony, BSK III stage.
File No.35
3096
Providing UGD facilities to Ideal Homes HBCS l/o, II stage.
File No.36
3094
3097
3098
3099
3100
3101
3102
3103
3104
3105
3106
Providing UGD facilities to 13th and 14th cross , J.P.NAgar I
phase, 39th main (Misssing bits), B'lore.
Providing UGD facilities to 10th cross to 14th cross, K.S.L/o, II
stage.
Providing UGD facilities and water supply, Sy.No.17 & 19 of
Sarakki layout.
Providing UGD facilities to Bilekanahally Dollar scheme in
Sy.No.56, 57 and 172/2 of Bilekanahally, BTM II stage, I phase.
Providing UGD facilities to Sarakki village road village I phase.
92-93
Providing water supply facilities to Srinivasanagar II phase, II main,
BSK III stage.
Providing 150mm dia feeder main from 50' road to Avalahalli
village.
File No.37
File No.38
File No.40
File No.41
File No.42
File No.10
File No.11
Providing water supply to missing bit of I cross in I block, II main
road in III block, III phase, BSK III stage.
File No.12..
Providing water supply to missing bit in Sy.No.95, 96, 121 & 122 of
Hosakerehally, BSK III satge.
File No.8
Providing 150mm dia feeder main line and 100mm dia distribution
line in Arasu colony in Jayanagr 9th block.
File No.9
3107
3108
3109
3110
3111
3112
3113
3114
3115
Providing water supply facilities to 2D main road in Sy.No.95, 96,
121 & 122 of Hosakerehally, BSK III satge.
Providing water supply facilities to BTM II stage, I phase in
Sy.No.84 of Madivala.
Providing UGD facilities to 70th cross in K.S.l/o II satge (Missing
links)
File No.13
File No.16
Flie No.43
Providing UGD facilities to missing bits (3rd'A' cross) and near
Kathriguppa Bus stop in BSK III stage, III phase, II Block.
Flie No.44
Providing 100mm dia CI line as missing bits along 12th cross , 8th
main road , K.S.layout.
Flie No.45
Providing UGD facilities to Srinivasanagar II phase, BSK III stage,
Sy.No.8 to 14 of Gerehally.
Shifting of 900mm dia RCC Sewer sub main No.15 from BTM
layout, II stage, I Phase (MH No.10 to MH No.15 near)Madivala
Tank.
Providing UGD facilities to Sy.No.121 of Kathriguppa village, BSK
III stage.
Providing missing bits of 9" dia SW line and replacement of
existing 6" dia SW line to 9" dia SW line at 67th cross, K.S.L/o I
stage.
Flie No.46
Flie No.47
Flie No.48
Flie No.51.
3116
Providing sanitary facilities to Arasan slum in Jayanagar.
Flie No.52
3117
Providing UGD facilities to BSK III, IV & VII block, (Missing Bits)
Providing UGD facilities to the layout formed in Sy.No34 of
Madivala under BTM scheme.
Flie No.53
3118
Flie No.54
93-94
3119
3120
Proposed shifting of existing 9" dia sanitary line passing through
the site No.3637 at K.S.Layout, II stage.
Providing UGD facilities to layout formed in Sy.No.84 of Madivala,
BTM Layout.
File No.49
File No.50
94-95
3121
3122
3123
Providing water supply facilities to Ideal Homes Co-operative
building society in I & II phase in sector E, F and G in modified l/o.
Providing water supply facilities to the I phase of VHBCS,
Girinagar.
Deviation of 300mm dia S.W.linme running in site No.8,54 and 55
of Sy.No.85,86,87 of Madivala, BTM III stage, I phase.
File No.6
File No.7
File No.8
3124
3125
3126
Providing water supply facilities to the 5th cross , 29th main road,
BTM II stage, I phase.
File No.9
Providing UGD facilities to Sy.No.10 & 11 of Tavarekere , I phase, I
stage in BTM scheme.
Providing UGD facilities to 5th cross, 29th main, II stage, I phase,
BTM layout.
Fle No.56
Providing five nos of public taps to chamundipuram layout in
Sy.No.44, 50 to 56 and 61 of Sarakki village, J.P.Nagar I phase.
Fle No.54
Fle No.55
95-96
Providing water supply facilities to Sy.No.10 of BSK III stage,
Kathriguppa
Providing water supply facilities to BDA l/o in Sy.No.17/134-2, BSK
III stage, Kathriguppa.
File No.2
Water supply estimate (Missing bnits) in K.S.l/o II stage.
File No.4
Providing water supply facilities to the missing bits in II stage at
8th, 9th, 10th & 11th main roads of K.S.l/o
File No.5
3131
Providing UGD facilities to Sy.No.17/134-2 of BSK III stage.
File No.57
3132
Providing UGD facilities to Srinivasanagar.
Providing UGD facilities to missing bits along 100' outer ring road
from III main to Bridge across 100' ring road in Sy.No.95, 96, 121
and 122 of Hosakerehally, BSK III stage.
Providing UGD facilities to missing roads in I to V cross , II stage,
K.S.l/o.
File No.58
3127
3128
3129
3130
3133
3134
3135
3136
3137
3138
File No.3
File No.59
File No.60
Providing UGD facilities to Sy.No.11 & 12 of Ittamadu layout
(Missing bits) III stage, BSK along 100' ring road.
File No.61
Providing UGD facilities to the missing bits of 30th main and Tank
shore road of OO stage, I phase, BTM layout.
File No.62
Shifting of 700mm dia submain No.14 from Channamana Tank to
'V' valley (From MH No.18 to MH No.200 near Kamakya Theatre.)
File No.63
Providing water supply to the missing bits of 30th main road & tank
shore of BTM layout II stage, I Phase.
Providing water supply facilities to Sy.NO.17 of KGP, BSK III
stage.
File No.50
96-97
Providing water supply facilities to N.S.Palya, Bilekanahally, Dollar
scheme.
File No.52
File No.51
3139
3140
3141
3142
Providing UGD facilities to Sy.No.19 of Sarakki under Dollars
scheme, Sarakki IV phase.
providing UGD facilities to Sy.No.17/122 of Kathriguppa, BSK III
stage.
providing UGD facilities to Sy.No.17 of Kathriguppa, BSK III stage.
Providing UGD facilities to the Sy.No.19 of Sarakki under Dollars
scheme, Sarakki IV Phase.
Providing water supply facilities to the missing bits of
Kumaraswamy layout, II stage.
97-98
Providing UGD facilities to 7th and 8th main roads in BSK III
stage, 4th phase, 7th block.
Providing water supply facilities to missing bits at Kumaraswamy
layout II stage.
3143
98-99
Providing UGD facilities to the 8th, 9th, 10th & 11th main of
K.S.Layout, II stage.
File No.1
File No.65
File No.66
File No.64
File No.53
File No.67
File No.56
File No.1
INDEXING OF FILES (DEPARTMENTAL WORKS)
SL NO
Name of the work
work order no & date
96-97
3144
3145
3146
Providing chain link fencing to CA site No.19 (Park) in Ideal Homes
HBCS I phase at Kaderanahally.
Supplying of materials for water supply works for the construction
of MIG/MS flats at Block-II in BSK -III Stage, III Phase, V Block,
Bangalore.(Same file)
Supplying of materials for water supply works for the construction
of MIG/MS flats at Block-II in BSK -III Stage, III Phase, V Block,
Bangalore. (Same file)
BDA/EE(S)/134/96-97 dt:11-03-97
BDA/EE(S)/10/96-97 dt:22-08-96 (estimates,
tenders submitted by contractors, original tender
approval file.))
BDA/EE(S)/11/96-97 dt:22-08-96
3147
Providing MS Grilled compound on stone masonry wall with
M.S.gate to Dr.Ambedkar community hall at Avalahally layout in
BSK III Stage.b).Providing concrete flagging alround the premises
of Dr.Dr.Ambedkar community hall at Avalahally layout in BSK III
Stag
BDA/EE(S)/68/96-97 dt:24-01-97(Estimate copy)
3148
Providing security arrangements to BSK II Stage Commercial
complex from 01-04-96 to 31-03-97
BDA/EE(S)/Dept./ 113 /96-97 dt:11-08-97
(Estimate copy)
3149
a)Annual repairs and maintenance of commmercial complex at
BSK 2nd stage, Ground and First floor of North Block.
b)Annual repairs and maintenance of commmercial complex at
BSK 2nd stage, Ground and First floor of South Block
BDA/EE(S)/Dept./ 141 /96-97 dt:17-03-97
(Estimate copy)
97-98
3150
Formation of roads and drains in Sy.No.6 of Marasandra under
Banashankari V stage, Block-A.
BDA/EE(S)/Dept./ 66 /97-98 dt:21-10-97
(Estimate copy)
3151
Rechipcarpetting to Roads and desilting of drains in
Gurumurthappa slum in Kumaraswamy layout II stgae.
BDA/EE(S)/Dept./ 102 /97-98 dt:12-12-97
(Estimate copy)
3152
3153
Construction of size stone masonry storm water drain for discharge
of waste weir water from Madivala tank adjacent to 100' ring road Missing link in BTM II Stgae.
Improvements to existing outer ring road from Kanakapura road to
Padmanabhanagar, chainage 45.70 to 45.80kms near
Padmanabhanagar circle.
B).
Improvements to existing outer ring road from Kanakapura road to
P
BDA/EE(S)/Dept./ 39 /97-98 dt:20-05-07
(Estimate copy)
BDA/EE(S)/Dept./ 146 /97-98 dt:04-04-97
(Estimate copy)
Removal of silt from side drains, berm cutting in MICO-SKGNS
Layout, II Stage, Arakere Village.
BDA/EE(S)/Dept./ 21 /97-98 dt:17-05-97
(Estimate copy)
Maintenance and repairs of borewell in Ragigudda slum colony,
J.P.Nagar
Providing Rolling shutter to Room.No.5 in Commercial complex at
BSK II Stage.
BDA/EE(S)/Dept./ /97-98 dt:18-06-97 (Estimate
copy)
BDA/EE(S)/Dept./ 10 /97-98 dt:17-05-97
(Estimate copy)
3157
Repairs to road cuttings, pot holes, depression filling to damaged
portion of roads in MICO-SKGNSS Layout, Arakere II Stage.
BDA/EE(S)/Dept./ 19 /97-98 dt:27-06-97
(Estimate copy)
3158
Removal of garbage in MICO-SKGNS layout I and II stages
Arakere from 01-04-97 to 31-03-98.
BDA/EE(S)/Dept./ 31 /97-98 dt:17-04-97
(Estimate copy)
3154
3155
3156
3159
3160
Repairs to road cuttings, pot holes, depression filling to damaged
portion of roads in MICO-SKGNSS Layout, I stage at Arakere
Village.
Providing dustbins to MICO-SKGNS Layout I and II Stage at
Arakere Village.
98-99
BDA/EE(S)/Dept./ 34 /97-98 dt:17-04-97
(Estimate copy)
BDA/EE(S)/Dept./ 35 /97-98 dt:17-04-97
(Estimate copy)
3161
Repairs to road cuttings, pot holes, rits and pits and removal of silt
in side drains and bermsof roads in BTM SFHS area.
BDA/EE(S)/Dept./53/98-99 dt:19-12-98 (Estimate
copy)
3162
Removal of silt in main Storm water drain adjacent to Sarakki 4th
phase, Dollar layout, Chainage 815-1260M
BDA/EE(S)/Dept./22/98-99 dt:01-06-98 (Estimate
copy)
3163
Filling the site Nos.14,15,16,17, 50 & 51 in Sarakki, IV phase,
Dollars layout (Sites adjacent to PWD Ministers house.)
BDA/EE(S)/Dept./29/98-99 dt:17-10-98 (Estimate
copy)
3164
Providing barbed wire fencing to block No.4 and 6 in proposed
commercial layout in Sy.No.50, 51 and 52 of Tavarekere.
BDA/EE(S)/Dept./
copy)
/98-99 dt:15-09-98 (Estimate
3165
Providing barbed wire fencing to block No.5 in proposed
commercial layout in Sy.No.50, 51 and 52 of Tavarekere.
BDA/EE(S)/Dept./
copy)
/98-99 dt:15-09-98 (Estimate
3166
Removal of silt in side drains berm cutting and in SWD in
Bilekanahally Dollar Layout.
BDA/EE(S)/Dept./ 55 /98-99 dt:14-02-99
(Estimate copy)
3167
Removal of silt in main Storm water drain adjacent to Sarakki 4th
phase, Dollar layout, Chainage370 to 815 mts
BDA/EE(S)/Dept./ 22 /98-99 dt:01-06-98
(Estimate copy)
3168
99-2000
Formation of road and construction of slab drain and slab culvert in
Sy.No.38/1, & 38/2 of Kothanur village in J.P.nagar VIII stage,
Block -2
BDA/EE(S)/Dept./ /99-2000 dt:
(Estimate copy)
(Estimate
3169
Formation of road and drain in part of Sy.No.75 & 78 of Alahalli,
Block III of J.P.nagar 9th phase.
BDA/EE(S)/Dept./ /99-2000 dt:
copy)
3170
Formation of road and drain in part of Sy.No.5 & 9 of
Raghuvanapalya, J.P.Nagar IX phase.(Road No.1 to 4)
BDA/EE(S)/Dept./ /99-2000 dt:07-09-2000
(Estimate copy)
3171
Formation of layout in Sy.No.16/1 of Kothanur Village, J.P.Nagar
VIII stage, Block II.
BDA/EE(S)/Dept./ /99-2000 dt:07-09-2000
(Estimate copy)
3172
Formation of roads and drains in part of Sy.No.5 of
Raghuvanapalya Village, J.P.Nagar IX phase.
BDA/EE(S)/Dept./ 08 /99-2000 dt:
copy)
3173
3174
3175
3176
3177
Providing water supply facilities to the missing bits to the
Sy.No.60,61, 72 of Bilekanahalli and N.S.Palya under Dollar
scheme.
Formation of roads and construction of SSM Culverts to I & II main
roads in South side of 60' wide road and 3rd and 4th main road in
Sy.No.51 & 52 of Tavarekere.
Formation of roads and drains in Sy.No.99 of Arekeri Village,
J.P.Nagar IX stage layout.
Repairs to road cuttings, pot holes, ruts and pits and depression
filling and chipcarpetting to 5th cross road in Bilekanahalli, Dollars
layout.
Formation of road, Construction of slab drain and slab culvert in
Sy.No.42 & 43 of Kothanur Village, J.P.Nagar VIII stage, Block II
(Road No.11 & 12)
(Estimate
BDA/EE(S)/Dept./ 13 /99-2000 dt:29-0499(Estimate copy)
BDA/EE(S)/Dept./ /99-2000 dt:18-042000(Estimate copy)
BDA/EE(S)/Dept./ 26 /99-2000 dt:19-102000(Estimate copy)
BDA/EE(S)/Dept./ 30 /99-2000 dt:28-022000(Estimate copy)
BDA/EE(S)/Dept.//99-2000 dt:09-062000Estimate copy)
3178
3179
3180
3181
3182
3183
3184
3185
3186
3187
3188
3189
3190
3191
3192
Formation of road, Construction of slab drain and slab culvert in
Sy.No.20/25 & 22 of Kothanur Village, J.P.Nagar VIII stage, Block
II.
Formation of roads and drains in part of Sy.No.82 of Alahalli,
J.P.Nagar 9th phase.
Jungle clearing, removing and resetting of BS Slabs, providing new
missing slabs, fixing of boundary stone and name boards to old
formed layout in Sy.No.89, 90, 91 and 94 of Hosakerehally, BSK III
stage.
Formation of road, Construction of slab drain and slab culvert in
Sy.No.3 & 4 of Kothanur village, J.P.nagar VIII stage, Block-I rpad
No-1,2,3,4 & 5 .
Formation of roads and drains in Sy.No.171/1 of Kothanur Village,
J.P.Nagar VIII stage, Block-I.
Formation of roads and construction of slab drain and slab culvert
in Sy,No,42 & 43 of Kothanur Village, J.P.nagar 8th stgae, BlockII.(Road No.1,2 & 3)
Formation of l/o in Sy.No.9/2 of Marasandra village, Uttarahalli
hobli, BSK V stage.
Formation of additional sites in Sy.No.85 and 86 of Uttarahalli, BSK
V stage, BLock-B.
Formation of l/o in Sy.No.22 of Raghuvanapalya, J.P.nagar IX
stage.
Formation of roads & drains in Sy.No.14 and 90 of
Doddakallasandra in J.P.Nagar IX phase.
Filling the site in Sy.No.168 of Kothanur Village, J.P.nagar 8th
stage, Block-I
Formation of roads and drains in Sy.No.10 of Thippasandra village,
J.P.Nagar IX phase.
Formation of roads and drains, providing name boards and cross
boards in Sy.No.5 & 6 of Bikasipura, BSK V stage.
Formation of shop sites in Avalahally, BDA l/o, BSK III stage.
Filling & Levelling the deeper sites in Sy.No.9,10 & 11of
Vaddarapalya in BSK V stage.
BDA/EE(S)/Dept.//99-2000 dt:18-042000Estimate copy)
BDA/EE(S)/Dept./ /99-2000 dt: Estimate copy)
BDA/EE(S)/Dept./ /99-2000 dt:18.12.2000
Estimate copy)
BDA/EE(S)/Dept./ /99-2000 dt:02-06-2000
Estimate copy)
BDA/EE(S)/Dept./ /99-2000 dt:22-08-2000
Estimate copy)
BDA/EE(S)/Dept./ /99-2000 dt:22-08-2000
Estimate copy)
BDA/EE(S)/Dept./ /99-2000 dt:04-072000(Estimate copy)
BDA/EE(S)/Dept./ /99-2000 dt:10-05-2000
BDA/EE(S)/Dept./ /99-2000 dt:02-06-2000
BDA/EE(S)/Dept./ /99-2000 dt:05-05-2000
BDA/EE(S)/Dept./ /99-2000 dt:17-07-2000
BDA/EE(S)/Dept./ /99-2000 dt:
BDA/EE(S)/Dept./ 39 /99-2000 dt:11-01-2001
BDA/EE(S)/Dept./ 70 /99-2000 dt:15-04-2000
BDA/EE(S)/Dept./ /99-2000 dt:12-06-2000
3193
Formation of sites in Sy.No.60/4 and 58/5 of Yeddiyur village near
K.R.Road, BSK III stage.
BDA/EE(S)/Dept./ /99-2000 dt:24-04-2000
3194
Construction of RCC Deck slab culvert at 4th cross road and 3rd
main road in Sarakki 4th phase, Dollars l/o.
BDA/EE(S)/Dept./34 /99-2000 dt:19-12-2000
3195
Re-Construction of damaged culvert in Bilekanahally , Dollars
BDA/EE(S)/Dept./ /99-2000 dt:11-01-2000
layout.
3196
Formation of roads, drains in Sy.No.159/1 and 159/2 of Kothanur
village, J.P.Nagar 8th stage l/o.
BDA/EE(S)/Dept./ /99-2000 dt:03-04-2000
3197
Providing barbed wire fencing to protect BDA property near
K.R.Road in BSK II stage.
BDA/EE(S)/Dept./ /99-2000 dt:02-06-2000
3198
Desilting od SWD and removing and resetting of civering slab of
SWD with repairs and extend of SWD in Bilekanahally, Dollars l/o.
BDA/EE(S)/Dept./ /99-2000 dt:19-12-2000
3199
Painting to Toilets and corridor of Commercial complex, BSK II
stage.(North Block)
BDA/EE(S)/Dept./ /99-2000 dt:04-04-2000
3200
Providing cleaning & maintenance of BDa Commercial complex at
BSk II stage from 01-01-2000 to 31-12-2000.
BDA/EE(S)/Dept./55 /99-2000 dt:25-02-2000
3201
Urgent repairs to flood damaged portion of retaining wall of Swd
adjacent to Sarakki IV phase, Dollar l/o.
BDA/EE(S)/Dept./42 /99-2000 dt:14-12-99
3202
3203
Formation of l/o in Sy.No.9/2 of Marasandra village, Uttarahalli
hobli, BSK V stage.
Providing B.S Slabs to side drains site no stones cross boards in
sector -III of the l/o formed in Sy.No.9 , 10 & 11 of Vaddarapalya,
BSK V stage.
BDA/EE(S)/Dept./ /99-2000 dt:04-07-2000
BDA/EE(S)/Dept./53 /99-2000 dt:25-01-2000
3204
Construction of lead and drain in Sy.No.85 & 86 of Uttarahally at V
cross road of BSK V stage from Ch:300to 400mts.
BDA/EE(S)/Dept./35 /99-2000 dt:20-12-2000
3205
Formation of roads, drain, providing boundary stones, name
boards and cross boards in Sy.No.50 of Govinayakanahally in
K.S.l/o, II stage.
BDA/EE(S)/Dept./ /99-2000 dt:03-04-2000
3206
Formation of roads, drain, providing boundary stones, name
boards and cross boards in Sy.No3 of Bikasipura, BSK V stage.
BDA/EE(S)/Dept./29 /99-2000 dt15-11-2000
3207
Providing barbed wire fencing to BDa land adjacent to 100' ring
road in Sy.No.17 and 18 .
BDA/EE(S)/Dept./ /99-2000 dt:18-04-2000
3208
Formation of roads, drain, in Sy.No.90 to 91 of Doddakallasndra
village, J.P.Nagar 9th phase.
BDA/EE(S)/Dept./ /99-2000 dt:04-04-2000
3209
Construction of lead and drain in Sy.No.85 & 86 of Uttarahally atI
cross road of BSK V stage from Ch:0 to 100 mts.
BDA/EE(S)/Dept./ /99-2000 dt:11-08-2000
3210
3211
Formation of roads & construction of slab drain, in Sy.No.32/3,
32/4 and 32/5 of Kothanur village, J.P.Nhagar 8th stage, II block,
roads, E, F, G and H.
Formation of roads & construction of slab drain, in Sy.No.33 & 34
of Raghuvanapalya and 28 & 29 of Thippasandra in J.P.nagar 9th
phase.
BDA/EE(S)/Dept./ /99-2000 dt:25-03-2000
BDA/EE(S)/Dept./ /99-2000 dt:03-03-2000
3212
3213
3214
3215
Formation of roads & drains in Sy.No.10 & 11 of Thippasandra,
J.P.nagar 9th phase.
Providing B.S Slabs to side drains site no stones cross boards in
sector -I of the l/o formed in Sy.No.9 , 10 & 11 of Vaddarapalya,
BSK V stage.
Formation of roads & drains and replacing the damaged slabs &
providing boundary stones in II block, J.P.Nagar 9th phase, Road
No.6
Providing B.S Slabs to side drains site no stones cross boards in
sector -II of the l/o formed in Sy.No.9 , 10 & 11 of Vaddarapalya,
BSK V stage.
BDA/EE(S)/Dept./ /99-2000 dt:01-03-2000
BDA/EE(S)/Dept./51 /99-2000 dt:25-01-2000
BDA/EE(S)/Dept./ /99-2000 dt:01-03-2000
BDA/EE(S)/Dept./ 52 /99-2000 dt:25-01-2000
3216
Maintenance of roads and side drains and removal of debris in
roads in Sarakki 4th phase, Dollars l/o.
BDA/EE(S)/Dept./408 /99-2000 dt:
3217
Formation of roads & drains in Sy.No.38 of Raghuvanapalya and
Sy.No.26 & 27 of Alahally in J.P.Nagar , 9th phase.
BDA/EE(S)/Dept./ /99-2000 dt:03-03-2000
3218
Remetalling & chipcarpetting to balance portion of 3rd main road in
Sarakki 4th phase, Dollar l/.o.
BDA/EE(S)/Dept./409 /99-2000 dt:01-10-2000
Formation. remetalling and asphalting to balance portion of 28th
main road in Mysore Industrial Employees HBCS l/o in BTM II
stage, I phase.
Formation of l/o, roads, drains and fixing of slabs in Sy.No.171/3,
171/4 of Kothanur village, J.P.Nagar 8th phase, Block-I (30' wide
road.)
Formation of l/o, roads, drains and fixing of slabs in Sy.No.171/3,
171/4 of Kothanur village, J.P.Nagar 8th phase, Block-I (40' wide
road.)
Formation of l/o, roads, drains and fixing of slabs in Sy.No.171/3,
171/4 of Kothanur village, J.P.Nagar 8th phase, Block-I (80' wide
road.)
Formation of l/o, roads, drains and fixing of slabs in Sy.No.171/3,
171/4 of Kothanur village, J.P.Nagar 8th phase, Block-I (40' & 30'
wide road.)
BDA/EE(S)/Dept./ /99-2000 dt:20-01-2000
3224
Formation of roads & construction of slab drain, in Sy.No.32/3, of
Kothanur village, in J.P.Nhagar 8th stage,Roads-A, B,C and D.
BDA/EE(S)/Dept./ /99-2000 dt:25-03-2000
3225
Formation of 1st main & filling of new earth to old pits in Sy,No.85
& 86 of Uttarahally village, BSK V stage.
BDA/EE(S)/Dept./ /99-2000 dt:07-03-2000
3219
3220
3221
3222
3223
BDA/EE(S)/Dept./733 /99-2000 dt:01-10-2000
BDA/EE(S)/Dept./ /99-2000 dt:20-01-2000
BDA/EE(S)/Dept./ /99-2000 dt:20-01-2000
BDA/EE(S)/Dept./ /99-2000 dt:20-01-2000
2000-2001
3226
Sinking of borewell & providing Water Supply facilities to SFHS
Flats in BSK III Stage, III Phase, V Block.
BDA/EE(S)/06/2000-01 dt:15-09-2000
3227
Providing layout boards to layout in Sy.No.17/1 and 27/2 of
Avalahally, BSK III stage.
BDA/EE(S)/14/2000-01 dt:
3228
Levelling and construction of Hollow brick compound wall to park
No.17 & 18 of Ideal Homes HBCS, Rajeshwarinagar.
BDA/EE(S)/JE/23/2000-01 dt:30-10-2000
3229
Jungle clearing, removal of debris, opening of side drains,
removing and resetting of B.S.Slabs, fixing of boundary stones and
name boards to the formed layout in Sy.No.89, 90 , 91, 94 of
Hosakerehally, BSK III stage, (Road: G, H, I & J.)
BDA/EE(S)JE/30/2000-01 dt:14-12-2000
3230
Demolition of A.C.Sheet House and Compound wall and formation
of Industrial site No.44/A in J.P.Nagar 3rd phase, l/o.
BDA/EE(S)JE/ /2000-01 dt:21-05-2001
3231
Formation of roads and drains in the part of Sy.No.13 of
Thippasandra, B'lore.
BDA/EE(S)JE/40/2000-01 dt:17-01-2000
3232
Formation of 80' road continuity fron already formed layput 1st
stgae, Block to 2nd block(Link road) , J.P.Nagar VIII stage.
BDA/EE(S)/2000-01 dt:14-12-2000
3233
Formation of roads & construction of slab drain, slab culvert in
Sy.No.168 of Kothanur Village in J.P.nagar VIII stage, Block-I.
BDA/EE(S)/JE/2000-01 dt:13-04-2000
3234
Quotation for disposal of released materials of dismantaled SFHS
Godowns, BTM LAyout.
BDA/EE(S)/DM/Quotation/2000-01 dt:12-04-2001
3235
Formation of additional sites in BSK III stage, II phase, beside
SWD from 80' wode road to 4th main road.
BDA/EE(S)/Dept./ /2000-01 dt:18-042000Estimate copy)
3236
Formation of additional sites in BSK III stage, II phase, beside
SWD from 4th main to 60' wide road.
BDA/EE(S)/Dept./ /2000-01 dt:
copy)
3237
Providing chain link fencing to CA site in Telecom HBCS
Chikkalasandra, BSK V stage.
BDA/EE(S)/Dept./T-43 /2000-01 dt: 17-01-2001.
(Estimate copy)
3238
Formation of sites proposed for auction in BDA land available in
J.P.Nagar I phase at Sarakki village.
BDA/EE(S)/Dept./
(Estimate copy)
3239
Formation of roads and drains in Sy.No.91 and part of 82 of
Alahally village, J.P.Nagar 9th phase.
BDA/EE(S)/Dept./82 /2000-01 dt: 04-04-2000
(Estimate copy)
3240
Formation of road and construction of slab culvert in Sy.No.42 and
43 of Kothanur village in J.P.nagar VIII stage, Block -2
BDA/EE(S)/Dept./ 83 /2000-01 dt: 25-04-2001.
(Estimate copy)
3241
Formation of sites in bit of land available in Sy.No.64 & 72 of
Madivala, BTM II stage.
BDA/EE(S)/Dept./ 15 /2000-01 dt: (Estimate
copy)
3242
Construction of Lead and drain in Sy.No.85 & 86 of Uttarahally at
1st cross road of BSK V stage from Ch:100 to 200mts.
BDA/EE(S)/Dept./ 125 /2000-01 dt:25-08-2000
(Estimate copy)
(Estimate
/2000-01 dt: 18-06-2001.
3243
Filling of well in site No.703 & 704 (Sites to be auctioned) , BSK III
stage, II phase, 7th block.
BDA/EE(S)/Dept./ 115 /2000-01 dt:27-06-2000
(Estimate copy)
3244
Construction of SSM culverts and providing metallking to roads at
shop sites in Avalahally BDA l/o, BSK III stage.
BDA/EE(S)/Dept./ 116 /2000-01 dt:27-06-2000
(Estimate copy)
3245
Construction of slab drain in Arekere village in Sy.No100 in
J.P.Nagr IX stage.
BDA/EE(S)/Dept./ /2000-01 dt:30-11-2001
3246
Providing & fixing cross boards to the newly formed l/o in
J.P.Nagar IX phase, Block II and III .
BDA/EE(S)/Dept./ 37 /2000-01 dt:16-01-2001
3247
Providing chain link fencing to CA site No.A, park and playground
in RBI l/o.
Providing chain link
fencing to CA site No.B, park and playground in RBI l/o.
BDA/EE(S)/Dept./15 /2000-01 dt:24-04-2000
3248
Providing & fixing l/o boards and crosss boards in block II EWS
sector block II and I'A' of J.P.Nagar VIII stage.
BDA/EE(S)/Dept./38 /2000-01 dt:16-01-2001
3249
Formation of sites in BTM II stage, I phase.
BDA/EE(S)/Dept./128 /2000-01 dt:02-09-2000
3250
Demolition of old building in BDA land available for formation of
sites in J.P.Nagar 1st phase, at Sarakki village.
BDA/EE(S)/Dept./ /2000-01 dt21-05-2001
2001-02
3251
Providing & fixing of l/o boards and cross boards in Anjanapura
Township, Block III and III A.
BDA/EE(S)/Dept./
(Estimate copy)
/2001-02dt: 24-08-2001.
3252
Providing barbed wire fencing to CA site No.15, Kumaraswamy
layout I stage.
BDA/EE(S)/Dept./
(Estimate copy)
/2001-02dt: 11-09-2001.
3253
Formation of additional sites approach roads to connect ISRO
layout in Sy.No.3 of Bikasipura, BSK V stage.
BDA/EE(S)/Dept./
(Estimate copy)
/2001-02dt: 11-09-2001.
3254
Levelling of undeleted and unsectioned earthern surface of CA site
in MICO HBCS, BTM II stage.
BDA/EE(S)/Dept./
(Estimate copy)
/2001-02dt: 15-10-2001.
Providing barbed wire fencing to CA site No.2, Kumaraswamy
layout.
Providing Collapsible gates and entrance gate to BSK BDA
complex, BSK II stage.
Providing barbed wire fencing to park in Ag's layout at Arehally
village.
BDA/EE(S)/Dept./
(Estimate copy)
BDA/EE(S)/Dept./
(Estimate copy)
BDA/EE(S)/Dept./
(Estimate copy)
/2001-02dt: 08-05-2001.
3258
Metalling and Asphalting the roads in Sy.No.108(P) and 120 and
95, 96, 121 and 122 of Hosakerehalli, BSK III stage.
BDA/EE(S)/Dept./ 56 /2001-02dt: 10-092001(Estimate copy)
3259
Providing barbed wire fencing to CA site in Mico EHBCS, BTM II
stage.
BDA/EE(S)/Dept./ /2001-02dt: 15-10-2001
3255
3256
3257
/2001-02dt: 13-06-2001.
/2001-02dt: 22-12-2001
3260
Demolition of existing Vinayaka Temple and disposal of
accumulated debris in CA site in MICO EHBCS, BTM II stage.
BDA/EE(S)/Dept./ /2001-02dt: 15-10-2001
3261
Providing & fixinf l/o boards & cross boards in Block-5 and part of
block-5G Anjanapura Township.
BDA/EE(S)/Dept./ /2001-02dt: 24-08-2001.
3262
Providing & fixinf l/o boards & cross boards in Block-5 and part of
block-8 Anjanapura Township.
BDA/EE(S)/Dept./ /2001-02dt: 24-08-2001.
3263
Providing & fixinf l/o boards & cross boards in Block-5 and part of
block-7 Anjanapura Township.
BDA/EE(S)/Dept./ /2001-02dt: 24-08-2001.
3264
Providing & fixinf l/o boards & cross boards in Block-5 and part of
block-6 Anjanapura Township.
BDA/EE(S)/Dept./ /2001-02dt: 24-08-2001.
3265
Widening of reconstruction of the existing culvert on 60' road , 4th
'A' block, J.P.Nagar IX phase.
BDA/EE(S)/Dept./ /2001-02dt: 24-08-2001.
3266
Providing barbed wire fencing to the CA site in KAS Officer HBCS
l/o at Madiwala, BTM II stage.
BDA/EE(S)/Dept./ /2001-02dt: 15-05-2001.
3267
3268
Providng & fixing l/o boards and cross boards in Anjanapura
Township, Block IV.
Providng & fixing l/o boards and cross boards in Anjanapura
Township, Block 5-G.
BDA/EE(S)/Dept./ /2001-02dt: 24-08-2001.
BDA/EE(S)/Dept./ /2001-02dt: 24-08-2001.
3269
Jungle clearing, bertm cutting, formation of side drains for the road
from Kanakapura main road to J.P.Nagar IX phase.
BDA/EE(S)/Dept./ /2001-02dt:
3270
Providing & fixinf l/o boards and cross boards in Anjanapura
Township, Block II and II A.
BDA/EE(S)/Dept./ /2001-02 dt:24-08-2001.
3271
Providing barbed wire fencing to C.A site No.2 in Kumaraswamy
layout, I stage.(Balance portion)
BDA/EE(S)/Dept./ /2001-02 dt:29-10-2001.
3272
Providing & fixing l/o boards and crosws boards on Anjanapura
Township.
BDA/EE(S)/Dept./ /2001-02 dt:29-08-2001.
3273
Improvements to park in l/o in Sy.No.108 & 120 of Hosakerehalli
and Sy.No.7 of Ittamadu, BSK III stage.
BDA/EE(S)/Dept./ /2001-02 dt:16-06-2001.
3274
Providing chain link fencing to CA site (Park) in l/o in Sy.No.108 &
120 of Hosakerehalli and sy.No.7 of Ittamadu, BSK III stage.
BDA/EE(S)/Dept./ /2001-02 dt:16-06-2001.
3275
3276
Formation of additional sites in Sy.No.6 of Bikasipura, BSk V
stage.
Formation of additional sites in Sy.No.6 of Bikasipura, BSk V
stage.
2002-03
BDA/EE(S)/Dept./ /2001-02 dt:25-08-2001.
BDA/EE(S)/Dept./ /2001-02 dt:25-08-2001.
3277
3278
3279
3280
3281
3282
Asphalting to roads in Sy.No.58/5 of Yeddiyur , K.R.road, BSK III
stage.
Construction of deck slab culverts in Sy.No.58/5 of Yeddiyur,
K.R.rod, BSK III stage.
Providing barbed wire fencing to CA site No.10/A in K.S.l/o, I stage
BDA/EE(S)/Dept./ /2002-03dt: 08-07-2002.
Taking up of widening ofd existing road to 60' wide road adjacent
to K.P.t.C.L substation near Khodays glass factory.
BDA/EE(S)/Dept./ /2002-03dt:
Formation of 80' road I block, J.P.Nagar 8th stage in Sy.No.172 of
Kothanur Village.
Formation of 60' and 40' road in Sy.No.21/2 1nd 21/3 of Kothanur
village, J.P.nagar 8th stage, Block-II in lieu of formation of road,
Construction of slab drain in Sy.No.157/5 of Kothanur village,
J.P.Nagar 8th stage.
BDA/EE(S)/Dept./ 15 /2002-03dt: 05-08-2002.
BDA/EE(S)/Dept./ /2002-03dt: 08-07-2002.
BDA/EE(S)/Dept./ /2002-03dt:15-07-02.
BDA/EE(S)/Dept./ /2002-03dt:15-07-02.
Other Files
SL NO.
NAME OF THE FILE
FILE NO.
3283
File pertaining to private layout formed in Sy.No.88(P) and 97 (P)
of Kothanur village, Uttarahally Hobli. (m.S.Ramaiah City)
3284
Correspondence with Vigilance file
File NO.2
3285
File NO.3
3290
Errecting H.Y.Line in BDA Layout of J.P.Nagar VIII stage.
Providing metalling to the road in Block -III & III 'A' of Anjanapura
Township.
Providing metalling to the road in Block -II & II 'A' of Anjanapura
Township.
Providing metalling to the road in Block -IVof Anjanapura
Township.
Providing metalling to the roads in block V and part of Block V'G' of
Anjanapura layout.
Providing metalling to the roads in block V'G' of Anjanapura layout.
3291
Providing metalling to the roads in block VI of Anjanapura layout.
File NO.9 (Only estimate copy)
3292
Providing metalling to the roads in block VII of Anjanapura layout.
File NO.10 (Only estimate copy)
3293
Providing metalling to the roads in block VIII of Anjanapura layout.
File NO.11 (Only estimate copy)
3294
Construction of SWD at block-5 of Anjanapuralayout.
File NO.12 (Only estimate copy)
3295
Construction of SWD in Anjanapuralayout, from MR3 to block 1,
Ch: 0 to 135mts..
Construction of SWD in Anjanapuralayout, block-V'G', Ch;0 to 575
File NO.13 (Only estimate copy)
3286
3287
3288
3289
3296
File NO.1
File NO.4
File NO.5 (Only estimate copy)
File NO.6 (Only estimate copy)
File NO.7 (Only estimate copy)
File NO.8 (Only estimate copy)
File NO.14 (Only estimate copy)
mts.
3297
Formation of sites, roads and minor Cd's at proposed BSK 6th
stage, II phase in Kengeri hobli, B'lore South tq., Block VI to X.
3298
File pertains to Site Nos.10 and 11 formed in Sy.No.32 of
Marenahally, SC/ST , Private layout.
3299
BWSSB Correspindence File
File NO.17
Providing metalling to the roads in Block I of Anjanapura toenship.
PLAN LEDGERS
File NO.18
File NO.15 (Only estimate copy)
File No.16
PRIVATE LAYOUT
sl No.
3300
Period of the year
BDA/PL/EE(S)/KPA/1/79-80 dt:21-12-79 to PL/EE(S)/764/81-82
dt:30-03-82.Private Layout.
Plan sanction Ledger No
Plan sanction Ledger No.16
3301
BDA/PL/EE(S)/1/82-83 dt:03-04-82 to PL/EE(S)/151/84-85 dt:1308-84 Private Layout.
BDA/PL/EE(S)/152/84-85 dt:14-08-84 to PL/EE(S)/180/88-89
dt:17-02-89 Private Layout.
BDA/PL/EE(S)/181/88-89 dt:23-02-89 to PL/EE(S)/146/92-93
dt:02-03-92 Private Layout.
BDA/PL/EE(S)/147/92-93 dt:10-03-93 to PL/EE(S)/190/96-97 dt2702-97 Private Layout.
BDA LAYOUT
Plan sanction Ledger No.17
BDA/EE(S)/SRK I/ 1 / 81-82 dt:03-04-81 to BDA/EE(S)/SRK I/ 5
/92-93 dt:26-08-92.
BDA/EE(S)/SRK II / 1 / 80-81 dt:02-04-80 to BDA/EE(S)/SRK II
/56/84-85 dt:12-07-84.
BDA/EE(S)/SRK II /57 / 84-85 dt:17-07-84 to BDA/EE(S)/SRK II
/19/92-93 dt:02-12-92.
BDA/EE(S)/SRK III / 1 / 80-81 dt:01-04-80 to BDA/EE(S)/SRK III /
1 / 91-92 dt:23-01-92
BDA/EE(S)/SRK IV / 1 / 82-83 dt:03-04-82 to BDA/EE(S)/SRK IV
/03/96-97 dt:13-01-87
BDA/EE(S)/SRK VI / 1 / 80-81 dt:01-04-80 to BDA/EE(S)/SRK VI
/01/92-93 dt:21-04-92.
BDA/EE(S)/BSKII/1/80-81 dt:01-04-80 to EE(S)/BSK II / 275/ 82-83
dt:16-07-82
BDA/EE(S)/BSKII/276/82-83 dt:17-07-82 to EE(S)/BSK II / 4/ 85-86
dt:02-07-85
BDA/EE(S)/BSKIII/01/80-81 dt:08-04-80 to EE(S)/BSK III / 101/ 83-
Plan sanction Ledger No.02
3302
3303
3304
3305
3306
3307
3308
3309
3310
3311
3312
3313
Plan sanction Ledger No.18
Plan sanction Ledger No.19
Plan sanction Ledger No.20
Plan sanction Ledger No.03
Plan sanction Ledger No.04
Plan sanction Ledger No.05
Plan sanction Ledger No.07
Plan sanction Ledger No.08
Plan sanction Ledger No.11
Plan sanction Ledger No.12
Plan sanction Ledger No.13
84 dt:21-06-83.
3314
3315
3316
BDA/EE(S)/BSKIII/1/83-84 dt:23-06-83 to EE(S)/BSK III / 76/ 87-88
dt:01-02-88
BDA/EE(S)/BSKIII/77/87-88 dt:03--02-88 to EE(S)/BSK II / 03/ 9899 dt:10-06-98
BDA/EE(S)/KMR/01/82-83 dt:07-04-82 to BDA/EE(S)/KMR/04/9899 dt:10-06-98
Plan sanction Ledger No.14
Plan sanction Ledger No.15
Plan sanction Ledger No.23
TENDER FILES
Sl No
Name of the Work
Work Order No & Date
3317
81-82
Construction of Ground floor of the Commercial complex at BSK II
Stage.
All correspondence files of Tender work and
Sanctioned estimate enclosed.
Tender Notification No
BDA / EE S/ TEN / T-15/ 81-82 dt: 09-12-81(Original
tender files along with estimate.)
82-83
Construction of Economically Weaker section Houses in
Kumaraswamy layout II Stage.
BDA / EE S/ TEN / T-1/ 82-83 dt: 05-0682(Available records.)
3319
86-87
Formation of roads, in Harijan and Girijan private layout in Sarakki
II phase.
Tender documents submitted by the contracors
enclosed.
3320
88-89
Removal of garbage in pvt layout in favour of Jayanagar, HBCS,
Padmanabhanagar, BSK -II stage.
BDA/EE/S/ TND/ AE2/ W.O-1/ 88-89 dt:23-03-89
BDA / EE S/ TEN / T-6/ 88-89 dt: 06-01-89(Tenders
submitted by contractors & estimate)
3321
Providing chipvarpetting to 60' wide road , 16th main in BTM II
stage, I phase from 100' ring road.
BDA/EE/S/ TND/ AE2/ W.O-519/ 88-89 dt:26-1288
BDA / EE S/ TEN / T-2467/ 88-89 dt: 30-0788(Tenders submitted by contractors & estimate.)
3322
Rechipcarpetting the roads in MICO layout in BTM layout , B'lore.
BDA/EE/S/ TND/ AE2/ W.O-489/ 88-89 dt:28-1188
BDA / EE S/ TEN / T-435/ 88-89 dt: 01-0688(Tenders submitted by contractors & estimate.)
3323
Metalling the roads in Sy.No.102/2 of Madivala village-BTM
scheme.
BDA/EE/S/ TND/ AE2/ W.O-26/ 88-89 dt:31-0389
BDA / EE S/ TEN / T-6/ 88-89 dt: 06-01-89(Tenders
submitted by contractors & estimate.)
3324
Remetalling and chipcarpetting to roads in BTM II stage, I Phase
(20th, 21st main and 3rd cross)
BDA/EE/S/ TND/ AE2/ W.O-371/ 88-89 dt:16-0389
BDA / EE S/ TEN / T-1135/ 88-89 dt: 01-06-88,
Notification No.2((Tenders submitted by contractors
& estimate.)
3325
Chipcarpetting to 100' ring road from Ch:1010 to1315 mts in BSK
III stage.
BDA/EE/S/ TND/ AE2/ W.O-439/ 88-89 dt:03-1188
BDA / EE S/ TEN / T-4/ 88-89 dt: 30-07-88(Tenders
submitted by contractors & estimate.)
3318
3326
Chipcarpetting to 100' ring road from Ch:560 to 840 mts in BSK III
stage.
BDA/EE/S/ TND/ AE1/ W.O-440/ 88-89 dt:31-0188
BDA / EE S/ TEN / T-4/ 88-89 dt: 30-07-88(Tenders
submitted by contractors & estimate.)
3327
Formation of 40' road , 7th cross at Chanamanakere auchukut
layout in BSK III stage, III phase, (Widening metalling portion.)
BDA/EE/S/ TND/ AE1/ W.O-441/ 88-89 dt:15-1188
BDA / EE S/ TEN / T-1135/ 88-89 dt: 01-06-88,
Notification No.2((Tenders submitted by contractors
& estimate.)
3328
Remetalling and chipcarpetting to roads in BTM II stage, I Phase
(25th and 26th main ) B'lore.
BDA/EE/S/ TND/ AE1/ W.O-468/ 88-89 dt:17-1188
BDA / EE S/ TEN / T-1135/ 88-89 dt: 01-06-88,
Notification No.2((Tenders submitted by contractors
& estimate.)
3329
Remetalling and chipcarpetting to roads in BTM II stage, I Phase
(27th main road )
BDA/EE/S/ TND/ AE/ W.O-491/ 88-89 dt:05-1288
BDA / EE S/ TEN / T-1135/ 88-89 dt: 01-06-88,
Notification No.2((Tenders submitted by contractors
& estimate.)
3330
Remetalling and chipcarpetting to roads in BTM II stage, I Phase
(28th main road )
BDA/EE/S/ TND/ AE/ W.O-492/ 88-89 dt:05-1288
BDA / EE S/ TEN / T-1135/ 88-89 dt: 01-06-88,
Notification No.2((Tenders submitted by contractors
& estimate.)
3331
Remetalling and chipcarpetting to roads in BTM II stage, I Phase
(3B, 4B & 5B cross roads )
BDA/EE/S/ TND/ W.O-499/ 88-89 dt:28-11-88
BDA / EE S/ TEN / T-1135/ 88-89 dt: 01-06-88,
Notification No.2((Tenders submitted by contractors
)
3332
Remetalling and chipcarpetting the approach road in curve portion
in Kumaraswamy layout , near Dayanandasagar College.
BDA/EE/S/ TND/JE/ W.O-497/ 88-89 dt:01-12-88
BDA / EE S/ TEN / T-1135/ 88-89 dt: 01-06-88,
Notification No.2(Tenders submitted by contractors )
3333
Remetalling and chipcarpetting to roads in BTM II stage, I Phase
(13th, 14th and 15th main roads )
BDA/EE/S/ TND/ W.O-498/ 88-89 dt:28-11-88
BDA / EE S/ TEN / T-1135/ 88-89 dt: 01-06-88,
Notification No.2((Tenders submitted by contractors
& estimate. )
3334
Chipcarpetting to 100' road connecting Bannerghatta road and
Hosur road in BTM layout, Ch:950 to 1300 mts.
BDA/EE/S/ TND/ AE2/ W.O-469/ 88-89 dt:17-1188
BDA / EE S/ TEN / T-1135/ 88-89 dt: 01-06-88,
Notification No.2((Tenders submitted by contractors
& estimate )
3335
Metalling the roads in layout formed in Sy.No.66, 67, 68 of
Madivala in f/o .KSA-Officers , HBCS under BTM scheme.
BDA/EE/S/ TND/ W.O-500/ 88-89 dt:28-11-88
BDA / EE S/ TEN / T-1135/ 88-89 dt: 01-06-88,
Notification No.2((Tenders submitted by contractors
& estimate. )
3336
Remetalling and chipcarpetting to roads in BTM II stage, I Phase
(17th, 18th & 19th main roads)
BDA/EE/S/ TND/ AE2/ W.O-520/ 88-89 dt:26-1288
BDA / EE S/ TEN / T-1135/ 88-89 dt: 01-06-88,
Notification No.2((Tenders submitted by contractors
& estimate.)
3337
Remetalling and chipcarpetting to roads in BTM II stage, I Phase
(4th, 5th cross roads )
BDA/EE/S/ TND/ AE2/ W.O-521/ 88-89 dt:26-1288
BDA / EE S/ TEN / T-1135/ 88-89 dt: 01-06-88,
Notification No.2((Tenders submitted by contractors
& estimate. )
3338
Remetalling and chipcarpetting to roads in BTM II stage, I Phase
(30th main road 1st cross roads )
BDA/EE/S/ TND/ AE2/ W.O-522/ 88-89 dt:26-1288
BDA / EE S/ TEN / T-1135/ 88-89 dt: 01-06-88,
Notification No.2((Tenders submitted by contractors
& estimate. )
3339
Providing additional RCC Pipes culvert at the junction of Hosur
road and 100' ring road under BTM scheme (II call)
BDA/EE/S/ TND/ AE2/ W.O-619/ 88-89 dt:30-0189
BDA / EE S/ TEN / T-2467/ 88-89 dt: 30-07-88,
Notification No.4((Tenders submitted by contractors
& estimate. )
3340
Formation of layout in Sy.No.83/1, & 83/4 in Madivala village under
BTM layout.
BDA/EE/S/ TND/ DM/ W.O-725/ 88-89 dt:18-0389
BDA / EE S/ TEN / T-6/ 88-89 dt: 06-01-89(Tenders
submitted by contractors & estimate.)
89-90
Formation of site in Sy.No.41 of GovinayakanahallyKumaraswamy layout, II stage- Metallling only.
BDA/EE/S/ DM/ W.O-91/89-90 dt:08-05-89
BDA / EE S/ TEN / T-6/ 88-89 dt: 06-01-89(Tenders
submitted by contractors & estimate.)
3341
3342
Remetalling to the roads of EWS houses in Kumaraswamy layout
in block 'C' , House No.751 to 1000 , B'lore.
BDA/EE/S/ DM/ W.O-94/89-90 dt:08-05-89
BDA / EE S/ TEN / T-6/ 88-89 dt: 06-01-89(Tenders
submitted by contractors & estimate.)
3343
Metalling to approach road from 100' ring road to BDA layout in
Sy.No.4/2 of Tavarekere in BTM scheme.
BDA/EE/S/ DM/ W.O-95/89-90 dt:11-05-89
BDA / EE S/ TEN / T-2467/ 88-89 dt: 30-0788(Tenders submitted by contractors & estimate.)
3344
Remetalling to the roads of EWS houses in Kumaraswamy layout
in block 'A' , II stage. (from 1 to 300 houses)
BDA/EE/S/ DM/ W.O-102/89-90 dt:24-05-89
BDA / EE S/ TEN / T-6/ 88-89 dt: 06-01-89(Tenders
submitted by contractors & estimate.)
3345
Remetalling to the roads of EWS houses in Kumaraswamy layout
in block 'B' , II stage. (from 301 to 750 houses)
BDA/EE/S/ DM/ W.O-103/89-90 dt:24-05-89
BDA / EE S/ TEN / T-6/ 88-89 dt: 06-01-89(Tenders
submitted by contractors & estimate.)
3346
Construction of SWD in III cross road under BTM II stage, I phase.
BDA/EE/S/ DM/ W.O-107/89-90 dt:30-05-89
BDA / EE S/ TEN / T-03/ 89-90 dt: 09-0489(Tenders submitted by contractors & estimate.)
3347
Improvments to footpath, clearing side drains, desilting and
resetting shoulder drains etc., on 100' ring road, connecting
Bannerghatta road to Hosur road, in BTM layout,Ch:1800 to
2750mts.
Providing median to 100' ring road connecting Bannerghatta road
and Hosur road in BTM layout, Ch:650 to 1300 mts.
BDA/EE/S/ DM/ W.O-108/89-90 dt:30-05-89
BDA / EE S/ TEN / T-03/ 89-90 dt: 09-0489(Tenders submitted by contractors & estimate.)
BDA/EE/S/ DM/ W.O-131/89-90 dt:13-06-89
BDA / EE S/ TEN / T-07/ 88-89 dt: 23-0389(Tenders submitted by contractors & estimate.)
Providing median to 100' ring road connecting Bannerghatta road
and Hosur road in BTM layout, Ch:0 to 600 mts.
BDA/EE/S/ DM/ W.O-132/89-90 dt:13-06-89
BDA / EE S/ TEN / T-07/ 88-89 dt: 23-0389(Tenders submitted by contractors & estimate.)
3348
3349
3350
3351
Rechipcarpetting to100' ring road joining Bannerghatta road and
Hosur road from the junction of Hosur road in BTM layout, Ch:0 to
150 mts.
Rechipcarpetting to100' ring road connecting Bannerghatta road
and Hosur road in BTM layout, Ch:1580mts to 1900mts.
BDA/EE/S/ DM/ W.O-160/89-90 dt:27-06-89
BDA / EE S/ TEN / T-03/ 89-90 dt: 09-0489(Tenders submitted by contractors & estimate.)
BDA/EE/S/ DM/ W.O-161/89-90 dt:28-06-89
BDA / EE S/ TEN / T-03/ 89-90 dt: 09-0489(Tenders submitted by contractors & estimate.)
3352
Formation of roads and drains to AK colony at Avalahally layout in
BSK III stage, III cross road.
BDA/EE/S/ DM/ W.O-163/89-90 dt:26-06-89
BDA / EE S/ TEN / T-01/ 89-90 dt: 01-0489(Tenders submitted by contractors & estimate.)
3353
Formation of roads and drains to AK colony at Avalahally in BSK III
stage, II cross road.
BDA/EE/S/ DM/ W.O-166/89-90 dt:23-06-89
BDA / EE S/ TEN / T-01/ 89-90 dt: 01-0489(Tenders submitted by contractors & estimate.)
3354
Formation of roads and drains to AK colony at Avalahally in BSK III
stage, main roads, Ch:0 to 150mts.
BDA/EE/S/ DM/ W.O-167/89-90 dt:26-06-89
BDA / EE S/ TEN / T-01/ 89-90 dt: 01-0489(Tenders submitted by contractors & estimate.)
3355
Rechipcarpetting to100' ring road from Hosur road to Madivala
village (Joining Bannerghatta road from the junction of Hosur road
in BTM layout), Ch:450mts to 600mts.
Metalling to roads in Sy.No.17, 18 & 19 of Sarakki in favour of
K.A.S Officers, HBCS layout.
BDA/EE/S/ DM/ W.O-174/89-90 dt:30-06-89
BDA / EE S/ TEN / T-03/ 89-90 dt: 09-0489(Tenders submitted by contractors & estimate.)
BDA/EE/S/ DM/ W.O-92/89-90 dt:08-05-89
BDA / EE S/ TEN / T-06/ 88-89 dt: 06-0189(Tenders submitted by contractors & estimate.)
3357
Formation of roads and drains to A.K.Colony at Avalahalli in BSK
III stage, 4th cross road.
BDA/EE/S/ DM/ W.O-189/89-90 dt:23-06-89
BDA / EE S/ TEN / T-01/ 89-90 dt: 01-0489(Tenders submitted by contractors & estimate.)
3358
Formation of roads and drains to AK colony at Avalahally in BSK III
stage, - Approach road.
BDA/EE/S/ DM/ W.O-190/89-90 dt:23-06-89
BDA / EE S/ TEN / T-01/ 89-90 dt: 01-0489(Tenders submitted by contractors & estimate.)
3359
Improvments to footpath, clearing side drains, desilting and
resetting shoulder drains etc., on 100' ring road, connecting
Bannerghatta road to Hosur road, Ch:0 to 900 mts.
Construction of SWD in II cross road under BTM II stage, I phase.
BDA/EE/S/ DM/ W.O-191/89-90 dt:03-07-89
BDA / EE S/ TEN / T-03/ 89-90 dt: 09-0489(Tenders submitted by contractors & estimate.)
BDA/EE/S/ DM/ W.O-192/89-90 dt:03-07-89
BDA / EE S/ TEN / T-03/ 89-90 dt: 09-0489(Tenders submitted by contractors & estimate.)
3361
Rechipcarpetting to 80' road from Sy.No.95 of Kathriguppa to Ring
road in BSK III stage.
BDA/EE/S/ DM/ W.O-219/89-90 dt:11-07-89
BDA / EE S/ TEN / T-07/ 88-89 dt: 23-0389(Tenders submitted by contractors & estimate.)
3362
Remetalling and chipcarpetting to roads in BSK III stage, III phase,
III block.
BDA/EE/S/ DM/ W.O-220/89-90 dt:11-07-89
BDA / EE S/ TEN / T-07/ 88-89 dt: 23-0389(Tenders submitted by contractors & estimate.)
3363
Improvments to footpath, clearing side drains, desilting and
resetting shoulder drains etc., on 100' ring road, connecting
Bannerghatta road to Hosur road, Ch:900 to 1800 mts.
BDA/EE/S/ DM/ W.O-310/89-90 dt:08-08-89
BDA / EE S/ TEN / T-03/ 89-90 dt: 09-0489(Tenders submitted by contractors & estimate.)
3364
Construction of SWD at Dollar scheme layout in sy.No.172 of
Bilekanahally under BTM scheme.
BDA/EE/S/ AE/ TND/ W.O-341/89-90 dt:24-08-89
BDA / EO-III/ TND / T-126/ 89-90 dt: 19-0689(Tenders submitted by contractors & estimate.)
3356
3360
3365
Metalling to roads of A.K.Colony at Avalahally layout in BSK III
stage.
BDA/EE/S/ AE/ TND/ W.O-353/89-90 dt:23-08-89
BDA / EE(S)/ TND / T-12/ 89-90 dt: 05-0489(Tenders submitted by contractors & estimate.)
3366
Remetalling to 30' wide road in Sarakki V phase, 12th main road
and cross road at Sy.No.17 & 18 of Sarakki.
BDA/EE/S/ DM/ W.O-494/89-90 dt:18-09-89
BDA / EO-III/ TND / T-125/ 89-90 dt: 19-0689(Tenders submitted by contractors & estimate.)
3367
Formation ofprivate layout in Sy.No.19/1 and 12 of N.S.Palya in
favour of Bank colony society under BTM scheme.
BDA/EE/S/ AE/ TND/ W.O-499/89-90 dt:22-09-89
BDA / EE S/ TEN / T-12/ 89-90 dt: 05-0489(Tenders submitted by contractors & estimate.)
3368
Metalling to roads in Sy.No.6/1, 13/1 and 14 of Gavipura village in
BSK III stage, part-I
BDA/EE/S/ AE/ TND/ W.O-502/89-90 dt:23-09-89
BDA / EE S/ TEN / T-02/ 89-90 dt: 05-0489(Tenders submitted by contractors & estimate.)
3369
Providing rechipcarpetting to bad asphalted surface of 11th 'A'
cross road at Sarakki I phase.
BDA/EE/S/ AE/ TND/ W.O-505/89-90 dt:23-09-89
BDA / EO-III/ TND / T-290/ 89-90 dt: 22-0889(Tenders submitted by contractors & estimate.)
3370
Providing rechipcarpetting to bad asphalted surface of 29th main
road at Sarakki I phase.
BDA/EE/S/ AE/ TND/ W.O-519/89-90 dt:23-09-89
BDA / EO-III/ TND / T-290/ 89-90 dt: 22-0889(Tenders submitted by contractors & estimate.)
3371
Providing rechipcarpetting to bad asphalted surface at 37th and
38th cross road at J.P.nagar I phase.
BDA/EE/S/ AE/ TND/ W.O-520/89-90 dt:11-10-89
BDA / EO-III/ TND / T-290/ 89-90 dt: 22-0889(Tenders submitted by contractors & estimate.)
3372
Providing rechipcarpetting to bad asphalted surface of 26th, 27th
and 28th main road of Sarakki I phase.
BDA/EE/S/ AE/ TND/ W.O-521/89-90 dt:19-09-89
BDA / EO-III/ TND / T-290/ 89-90 dt: 22-0889(Tenders submitted by contractors & estimate.)
3373
Chipcarpetting to the roads in BSK III stage, 4th phase in East of
Kathriguppa.
BDA/EE/S/ AE/ TND/ W.O-548/89-90 dt:30-09-89
BDA / EO-III/ TND / T-290/ 89-90 dt: 22-0889(Tenders submitted by contractors & estimate.)
3374
Providing rechipcarpetting to bad asphalted surface of 32nd, 33rd
and 34th main road of Sarakki I phase.
BDA/EE/S/ AE/ TND/ W.O-555/89-90 dt:19-10-89
BDA / EO-III/ TND / T-290/ 89-90 dt: 22-0889(Tenders submitted by contractors & estimate.)
3375
Remetalling and chipcarpetting to roads in N.S.Palya under BTM
layout.
BDA/EE/S/ AE/ TND/ W.O-555- A/89-90 dt:25-1089
BDA / EO-III/ TND / T-126/ 89-90 dt: 19-0689(Tenders submitted by contractors & estimate.)
3376
Providing rechipcarpetting to bad asphalted surface of 25th main
road of Sarakki I phase.
BDA/EE/S/ AE/ TND/ W.O-573/89-90 dt:26-10-89
BDA / EO-III/ TND / T-290/ 89-90 dt: 22-0889(Tenders submitted by contractors & estimate.)
3377
Providing rechipcarpetting to bad asphalted surface of I cross and
5th main road in Avalahally layout, BSK III stage.
BDA/EE/S/ AE/ TND/ W.O-595/89-90 dt:25-10-89
BDA / EO-III/ TND / T-290/ 89-90 dt: 22-0889(Tenders submitted by contractors & estimate.)
3378
Providing rechipcarpetting to bad asphalted surface of 10th 'A'
cross road of Sarakki I phase.
BDA/EE/S/ AE/ TND/ W.O-640/89-90 dt:17-11-89
BDA / EO-III/ TND / T-290/ 89-90 dt: 22-0889(Tenders submitted by contractors & estimate.)
3379
Cleaning of Commercial complex at BSK II stage, BDA, Bangalore.
No work order copy.
BDA / EO-III/ TND / T-188/ 89-90 dt: 06-0789(Tenders submitted by contractors & estimate.)
3380
Formation of roads and drains to AK colony at Avalahally in BSK III
stage, V and V 'A' cross road.
BDA/EE/S/ AE/ TND/ W.O-648/89-90 dt:28-11-89
BDA / EE(S)/ TND / T-01/ 89-90 dt: 01-0489(Tenders submitted by contractors & estimate.)
3381
Providing rechipcarpetting to bad asphalted surface of 10th cross
road at Sarakki I phase.
BDA/EE/S/ AE/ TND/ W.O-652/89-90 dt:04-12-89
BDA / EO-III/ TND / T-290/ 89-90 dt: 22-0889(Tenders submitted by contractors & estimate.)
3382
Providing rechipcarpetting to bad asphalted surface of 30th and
31st main road at Sarakki I phase.
BDA/EE/S/ TND/ W.O-653/89-90 dt:06-12-89
BDA / EO-3/ TEN / T-291/ 89-90 dt: 22-0889(Tenders submitted by contractors .)
3383
Providing chipcarpetting to approach road to MICO shramajeevi
sangha layout at Sarakki IV phase adjacent
BDA/EE/S/ AE/TND/ W.O-654/89-90 dt:06-12-89
BDA / EO-3/ TEN / T-291/ 89-90 dt: 22-0889(Tenders submitted by contractors & estimate.)
3384
Reconstruction of damaged culverts at I and II main road of
Ittamadu village at BSK III stage, III phase.
BDA/EE/S/ AE/TND/ W.O-655/89-90 dt:29-11-89
BDA / EO-3/ TEN / T-125/ 89-90 dt: 19-0689(Tenders submitted by contractors & estimate.)
3385
Providing rechipcarpetting to bad asphalted surface of 11th 'B'
cross road at Sarakki I phase.
BDA/EE/S/ AE/TND/ W.O-656/89-90 dt:04-12-89
BDA / EO-3/ TEN / T-291/ 89-90 dt: 22-0889(Tenders submitted by contractors & estimate.)
3386
Providing rechipcarpetting to bad asphalted surface of 12th and
14th cross road at Sarakki I phase.
BDA/EE/S/ TND/ W.O-657/89-90 dt:04-12-89
BDA / EO-3/ TEN / T-291/ 89-90 dt: 22-0889(Tenders submitted by contractors & estimate.)
3387
Providing rechipcarpetting to bad asphalted surface of 11th cross
road at Sarakki I phase.
BDA/EE/S/ DM/ W.O-658/89-90 dt:04-12-89
BDA / EO-3/ TEN / T-291/ 89-90 dt: 22-0889(Tenders submitted by contractors & estimate.)
3388
Rechipcarpetting to 100' road from chainage 840mts to 1010mts
and 1620 to 1730 mts in BSK III stage, III phase.
BDA/EE/S/ DM/ W.O-670/89-90 dt:07-12-89
BDA / EO-3/ TEN / T-291/ 89-90 dt: 22-0889(Tenders submitted by contractors & estimate.)
3389
Providing rechipcarpetting to bad asphalted surface in
Ambabhavani layout in Sy.No.3 and 69 of Govipura, BSK III stage.
BDA/EE/S/ DM/ W.O-671/89-90 dt:07-12-89
BDA / EO-3/ TEN / T-291/ 89-90 dt: 22-0889(Tenders submitted by contractors & estimate.)
3390
Providing rechipcarpetting to bad asphalted surface of 13th 'A'
cross road at Sarakki I phase.
BDA/EE/S/ DM/ W.O-672/89-90 dt:16-12-89
BDA / EO-3/ TEN / T-290/ 89-90 dt: 22-0889(Tenders submitted by contractors & estimate.)
3391
Chipcarpetting over macadam surface of 80' road in Sy.No.83 to
88 of Kathriguppa at BSK III stage, III phase, V block.
BDA/EE/S/ DM/ W.O-674/89-90 dt:16-12-89
BDA / EO-3/ TEN / T-291/ 89-90 dt: 22-0889(Tenders submitted by contractors & estimate.)
3392
Metalling to 80' road from Vidyapeeta circle to 100' ring road in
Sy.No.117 of Kathriguppa, BSK III stage.
BDA/EE/S/ DM/ W.O-675/89-90 dt:16-12-89
BDA / EO-3/ TEN / T-291/ 89-90 dt: 22-0889(Tenders submitted by contractors & estimate.)
3393
Rechipcarpetting the 50' road inbetween I and II Block, BSK III
stage, III phase.
BDA/EE/S/ DM/ W.O-934/89-90 dt:14-02-90
BDA / EO-3/ TEN / T-290/ 89-90 dt: 22-0889(Tenders submitted by contractors & estimate.)
3394
Remetalling & asphalting to 30' roads in Avalahalli layout, BSK III
stage, part-II
BDA/EE/S/ W.O-22/ 89-90 dt03-04-89
BDA / EE S/ TEN / T-6/ 88-89 dt: 06-01-89(Tenders
submitted by contractors & estimate.)
3395
Chipcarpetting over Macadam surface of 100' ring road from
Ch:1730 to 2040 mts near Hosakerehalli, BSK III stage.
BDA/EE/S/ W.O-43/ 89-90 dt05-04-89
BDA / EE S/ TEN / T-6/ 88-89 dt: 06-01-89(Tenders
submitted by contractors & estimate.)
3396
Construction of First floor over the existing Ground floor of the
Commercial complex at BSK II Stage.
BDA/EE/S/ EM/ W.O-65/ 89-90 dt:23-06-89
BDA / EE S/ TEN / T-5/ 88-89 dt: 04-01-89
3397
Remetalling & asphalting to 30' roads in Avalahalli layout, BSK III
stage, part-I
BDA/EE/S/ EM/ W.O-99/ 89-90 dt:24-05-89
BDA / EE S/ TEN / T-6/ 88-89 dt: 06-01-89(Tenders
submitted by contractors & estimate.)
3398
Construction of Dr.Ambedkar Community hall in Avalahalli layout in
Banashankari III Stgae, Bangalore.
BDA/EE/S/ DM/ W.O-106/ 89-90 dt:31-05-89
BDA / EE S/ TEN / T-5/ 88-89 dt: 04-01-89(Original
tender files along with estimate.)
3399
Removal of garbage in BSK III stage, VII Block, IV phase.
BDA/EE/S/ DM/ W.O-109/ 89-90 dt:06-06-89
BDA / EE S/ TEN / T-6/ 88-89 dt: 06-01-89(Tenders
submitted by contractors )
3400
Providing medians to 100' ring road connecting Bannerghatta road
and Hosur road in BTM layout., Ch:2050mts to 2700mts.
BDA/EE/S/ DM/ W.O-153/ 89-90 dt:23-06-89
BDA / EE S/ TEN / T-7/ 88-89 dt: 23-03-89(Tenders
submitted by contractors )
3401
Rechipcarpetting to 100' ring road joining Bannerghatta road and
Hosur road from the junction of Hosur road in BTM layout,
Ch:150mts to 300mts.
Construction of SWD in Avalahalli layout in BSK III stage.
BDA/EE/S/DM/ W.O-156/ 89-90 dt:23-06-89
BDA / EE S/ TEN / T-3/ 89-90 dt: (Tenders
submitted by contractors & estimate.)
BDA/EE/S/ DM/ W.O-119/ 89-90 dt:12-06-89
BDA / EE S/ TEN / T-33/ 89-90 dt: 05-0489(Tenders submitted by contractors along with
estimate.)
3403
Formation of roads and drains to A.K.colony at Avalahalli layout in
BSK III stage, I cross road.
BDA/EE/S/ DM/ W.O-164/ 89-90 dt:23-06-89
BDA / EE S/ TEN / T-09/ 89-90 dt: 01-0489(Tenders submitted by contractors along with
estimate.)
3404
Formation of 40' road connecting 100' road and existing 40' road
on foreshore of Madivala Tank at B.T.M.layout.
BDA/EE/S/ DM/ W.O-215/ 89-90 dt:05-07-89
BDA / EE S/ TEN / T-3/ 89-90 dt: (Tenders
submitted by contractors )
3405
Providing medians to 100' ring road connecting Bannerghatta road
and Hosur road in BTM layout., Ch:1400mts to 2000mts.
BDA/EE/S/ DM/ W.O-228/ 89-90 dt:07-07-89
BDA / EE S/ TEN / T-7/ 88-89 dt:23-03-89 (Tenders
submitted by contractors )
3402
3406
3407
3408
3409
3410
Providing security arrangements in Kumaraswamy layout for the
year 89-90 from 01-11-89 to 31-03-90
Construction of SWD in this downstream side of the bridge by the
side of the 100' ring road near Hosakerehally in BSK III stage,
Ch:17 to 34 mts.
Construction of SWD in the Down Stream side of the Bridhe by the
side of 100' ring road near Hosakerehalli in BSK III stage, Ch:0 to
17mts.
Construction of SWD in the Down Stream side of the Bridhe by the
side of 100' ring road near Hosakerehalli in BSK III stage, Ch:34 to
51mts.
Construction of balance length of SWD in BSK III stage, I block ,
Ch:90 to 180 mts., Ch:90 to 180 mts (II call)
90-91
BDA/EE/S/ DM/ W.O-16/90-91 dt:05-05-90
BDA / EO-3/ TEN / T-255/ 89-90 dt: 13-0989(Tenders submitted by contractors & estimate.)
BDA/EE/S/ DM/ W.O-20/90-91 dt:23-05-90
BDA / EO-3/ TEN / T-486/ 89-90 dt: 01-0390(Tenders submitted by contractors & estimate.)
BDA/EE/S/ DM/ W.O-49/90-91 dt:23-05-90
BDA / EO-3/ TEN / T-486/ 89-90 dt: 01-0390(Tenders submitted by contractors & estimate.)
BDA/EE/S/ DM/ W.O-61/90-91 dt:23-05-90
BDA / EO-III/ TND / T-486/ 89-90 dt: 01-0390(Tenders submitted by contractors & estimate.)
BDA/EE/S/ AE/ W.O-206/90-91 dt:23-01-91
BDA / EO-III/ TND / T-487/ 89-90 dt: 01-0390(Tenders submitted by contractors & estimate.)
#VALUE!
91-92
BDA/EE/S/ TND/ W.O-382/91-92 dt:08-04-91
3411
Providing median to road connecting Kanakapura road and
Bannerghatta road in J.P.nagar Ch:700 to 1500mts.
3412
Providing median to road connecting Kanakapura road and
Bannerghatta road in J.P.nagar Ch:2200 to 3000mts.
BDA/EE/S/ TND/ W.O-383/91-92 dt:08-04-91
BDA / EM/EO-III/ TEN / T-362/90-91 dt: 15-0990(Tenders submitted by contractors & estimate.)
3413
Providing median to road connecting Kanakapura road and
Bannerghatta road in J.P.nagar Ch:0 to 700 mts.
BDA/EE/S/ TND/ W.O-384/91-92 dt:08-04-91
BDA / EM/EO-III/ TEN / T-362/90-91 dt: 15-0990(Tenders submitted by contractors & estimate.)
3414
Providing median to road connecting Kanakapura road and
Bannerghatta road in J.P.nagar Ch:1500 to 2200mts.
BDA/EE/S/ TND/ W.O-385/91-92 dt:08-04-91
BDA / EM/EO-III/ TEN / T-362/90-91 dt: 15-0990(Tenders submitted by contractors & estimate.)
3415
Providing median to 100' outer ring road from I main of BSK III
stage IV phase, VII block to Hosakerehally II phase in BSK III
stage.
Providing metalling to improve the roads from BSK temple to
Uttarahally village , Ch:0 to 2000mts.
BDA/EE/S/ TND/ W.O-414/91-92 dt:12-06-91
BDA / EM/EO-III/ TEN / T-361/90-91 dt: 15-0990(Tenders submitted by contractors & estimate.)
BDA/EE/S/ TND/ W.O-562/91-92 dt:25-11-91.
BDA / EM/EO-III/ TEN / T-2610/91-92 dt: 20-0991(Tenders submitted by contractors & estimate.)
BDA/EE/S/ TND/ W.O-769/91-92 dt:28-02-92
BDA / EM/EO-III/ TEN / T-117/91-92 dt: 31-1091(Tenders submitted by contractors & estimate
and Departmental work file.)
BDA/EE/S/ TND/ W.O-40/91-92 dt:28-11-91
BDA / EM/EO-III/ TEN / T-2610/91-92 dt: 20-0991(Tenders submitted by contractors & estimate )
BDA/EE/S/ TND/ W.O-657/91-92 dt:19-12-91
BDA / EO-III/ TEN / T-576/91-92 dt: 02-0591(Tenders submitted by contractors & estimate )
BDA/EE/S/ TND/ W.O-668/91-92 dt:06-01-92
BDA / EO-III/ TEN / T-117/91-92 dt: 31-1091(Tenders submitted by contractors & estimate )
BDA/EE/S/ TND/ W.O-571/91-92 dt:25-11-91
BDA /EM/ EO-III/ TEN / T-2610/91-92 dt: 20-0991(Tenders submitted by contractors & estimate )
3416
3417
Construction of slab dridge over SWD near Sy.No.134/2 of KGP to
connect BSK III stage and II stage.
3418
3419
3420
3421
Providing Rechipcarpetting and chipcarpetting to the road from
BSK temple to Uttarahally village road, Ch:0 to 2000mts
Providing Security arrangements round the clock to the
Commercial complex at BSK II stage, Bangalore.
Metalling and Asphalting to 50' ring road in Sy.No.17 of
kathriguppa, BSK III stage.
Formation of 80' road with metalling (missing length) and
asphalting from Padmanabhanagar circle to Bendre circle at BSK
V stage, Ch;0 to 386 mts)
BDA / EM/EO-III/ TEN / T-362/90-91 dt: 15-0990(Tenders submitted by contractors & estimate.)
92-93
3422
Providing and supplying Water supply Sanitary materials to 1st
floor, Commercial Complex, BSK II Stage, Bangalore.
BDA/EE/S/PW/W.O/AE/160/92-93 dt:16-09-92
BDA/EO-III /TND/ST /157/ 91-92 DT:21-12-91
3423
Remetalling to 3rd main, 2nd and I cross roads and construction of
RCC deck slab culvert in VII block, IV phase, BSK III stage.
BDA/EE/S/T/W.O/01 /93-94 dt:30-07-93
BDA/EM/EO-II/TEN/328/92-93 dt:16-03-93
3424
Providing Remetalling of internal roads in Kumaraswamy II stage.
BDA/EE/S/T/W.O/02 /93-94 dt:30-07-93
BDA/EM/EO-II/TEN/328/92-93 dt:16-03-93
93-94
3425
Remetalling to 5th, and I main roads and construction of RCC
Deck slab culvert (1 No) in VII block, IV phase, BSK III stage.
BDA/EE/S/T/W.O/03 /93-94 dt:30-07-93
BDA/EM/EO-II/TEN/328/92-93 dt:16-03-93
3426
Remetalling to 4th, II main roads and 3rd cross roads and
construction of RCC Deck slab culvert (1 No) in VII block, IV
phase, BSK III stage.
Formation of road linking I and II stages of Kumaraswamy layout
beyond Bridge across SWD near slum.
BDA/EE/S/T/W.O/04 /93-94 dt:30-07-93
BDA/EM/EO-II/TEN/328/92-93 dt:16-03-93
BDA/EE/S/T/W.O/05 /93-94 dt:12-08-93
BDA/EM/EO-II/TEN/328/92-93 dt:16-03-93
Construction of culvert across SWD in Kumaraswamy layout II
stage.
Asphalting to missing roads in 7th block, IV phase, BSK III stage
(4th & 6th major roads)
Remetalling to the internal roads in Kumaraswamy layout, II stage,
Site nos from 2887 to 3272.
BDA/EE/S/T/W.O/06 /93-94 dt:12-08-93
BDA/EM/EO-II/TEN/328/92-93 dt:16-03-93
BDA/EE/S/T/W.O/07 /93-94 dt:21-08-93
BDA/EM/EO-II/TEN/328/92-93 dt:16-03-93
BDA/EE/S/T/W.O/08 /93-94 dt:21-08-93
BDA/EM/EO-II/TEN/328/92-93 dt:16-03-93
3431
Remetalling to 5th, 6th, 7th , 8th & 9th main road of layout in
Sy.No.95, 96, 121 and 122 of Hosakerehally, BSK III stage.
BDA/EE/S/T/W.O/09 /93-94 dt:07-10-93
BDA/EM/EO-II/TEN/328/92-93 dt:16-03-93
3432
Remetalling to 6th main road and construction of one no of RCC
deck slab culvert in BSK III stage, IV phase, VII Block.
BDA/EE/S/T/W.O/10 /93-94 dt:06-11-93
BDA/EM/EO-II/TEN/328/92-93 dt:16-03-93
3433
Asphalting to missing roads in 7th block, IV phase, BSK III stage
(5th & I main roads)
Asphalting toroads in 7th block, IV phase, BSK III stage (I,II III
cross roads and missing length of main road)
BDA/EE/S/T/W.O/12 /93-94 dt:21-12-93
BDA/EM/EO-II/TEN/328/92-93 dt:16-03-93
BDA/EE/S/T/W.O/13 /93-94 dt:21-12-93
BDA/EM/EO-II/TEN/328/92-93 dt:16-03-93
3435
Asphalting to roads in 7th , 8th and 9th main roads of layout in
Sy.No.95, 96, 121 1nd 122 of Hosakerehally, BSK III stage.
BDA/EE/S/T/W.O/14 /93-94 dt:01-01-94
BDA/EM/EO-II/TEN/328/92-93 dt:16-03-93
3436
Asphalting to roads of layout formed in Sy.No.95, 96, 121 1nd 122
of Hosakerehally, BSK III stage.for 2nd A main and missing cross
roads.
Asphalting to roads of layout formed in Sy.No.95, 96, 121 1nd 122
of Hosakerehally, BSK III stage.for 2nd A main and missing cross
roads.
Repairs to road cutting, potholes and patches in chipcarpetted
surface of layout roads in Sy.No.54 of N.S.Palya under BTM II
stage.
Providing chipcarpetting to 3rd 'A' main , 4th cross and 2nd cross
(Balance portion) in Bilekanahally, Dollar scheme in BTM II stage,
I phase.
Providing chipcarpetting to 2nd, 3rd main and 2nd cross road in
Bilekanahally, Dollar scheme in BTM II stage, I phase.
BDA/EE/S/T/W.O/15 /93-94 dt:01-01-94
BDA/EM/EO-II/TEN/328/92-93 dt:16-03-93
BDA/EE/S/T/W.O/16 /93-94 dt:01-01-94
BDA/EM/EO-II/TEN/328/92-93 dt:16-03-93
BDA/EE/S/T/W.O/17/93-94 dt:11-02-94
BDA/EM/EO-II/TEN/328/92-93 dt:16-03-93
BDA/EE/S/T/W.O/18/93-94 dt:11-02-94
BDA/EM/EO-II/TEN/328/92-93 dt:16-03-93
BDA/EE/S/T/W.O/19/93-94 dt:11-02-94
BDA/EM/EO-II/TEN/328/92-93 dt:16-03-93
3427
3428
3429
3430
3434
3437
3438
3439
3440
3441
Providing chipcarpetting to 6th,
and 7th cross road in
Bilekanahally, Dollar scheme in BTM II stage, I phase.
BDA/EE/S/T/W.O/20/93-94 dt:11-02-94
BDA/EM/EO-II/TEN/328/92-93 dt:16-03-93
3442
Providing chipcarpetting to 9th main road (60' road) in BTM II
stage, I phase.
Formation of roads, drains and culverts in J.P.nagar IX phase of
Alahally Village, Bangalore South Taluk, Block 'F'
BDA/EE/S/T/W.O/21/93-94 dt:11-02-94
BDA/EM/EO-II/TEN/328/92-93 dt:16-03-93
BDA/EE/S/PD-II//W.O/71/93-94 dt:25-02-94
BDA/EM/EO-II/TEN/328/92-93 dt:16-03-93
3443
94-95
3444
Repairs to roads (Remetalling & Asphalting )in Sri.S.Ramarao Pvt
layout in BSK III stage.
BDA/EE/S/T/W.O/01/94-95 dt:31-05-94
BDA / EM/EO-II/ TEN / T-328/ 92-93 dt: 16-0398(Tender documents & Estimate)
3445
Garbage cleaning in vinayakanagar in BSK III stage from 01-06-94
to 31-12-94
BDA/EE/S/T/W.O/02/94-95 dt:08-06-94
BDA / EM/Garbage/Tender / T-1075/ 93-94 dt: 0703-94(Tender documents & Estimate)
3446
Removal of garbage in BTM II stage, I phase from 01-06-94 to 3112-94.
BDA/EE/S/T/W.O/03/94-95 dt:16-06-94
BDA / EM/Garbage/Tender / T-1075/ 93-94 dt: 0703-94(Tender documents & Estimate)
3447
Rewmoval of garbage in BSK III stage, III phase, Ito VI block in
Kathriguppa layout and Chanamanakere auchukut.
BDA/EE/S/T/W.O/04/94-95 dt:16-06-94
BDA / EM/Garbage/Tender / T-1075/ 93-94 dt: 0703-94(Tender documents & Estimate)
3448
Garbage cleaning in Srinivasanagar, Kathriguppa main road,
Lakshminarasimha HBCS and Sy.No.10 and A.K.Colony, BSK III
stage.
Clearance of garbage in Kumaraswamy layout II stage from 1-0694 to 31-12-94.
BDA/EE/S/T/W.O/05/94-95 dt:16-06-94
BDA / EM/Garbage/Tender / T-1075/ 93-94 dt: 0703-94(Tender documents & Estimate)
BDA/EE/S/T/W.O/06/94-95 dt:16-06-94
BDA / EM/Garbage/Tender / T-1075/ 93-94 dt: 0703-94(Tender documents & Estimate)
3450
Clearance of garbage in Kumaraswamy layout I stage from 1-0694 to 31-12-94.
BDA/EE/S/T/W.O/07/94-95 dt:16-06-94
BDA / EM/Garbage/Tender / T-1075/ 93-94 dt: 0703-94(Tender documents & Estimate)
3451
Clearance of garbage in Sy.No.17,121, 122 amd 134/2 of
Kathriguppa and Manjunatha slun in BSK III stage.
BDA/EE/S/T/W.O/08/94-95 dt:16-06-94
BDA / EM/Garbage/Tender / T-1075/ 93-94 dt: 0703-94(Tender documents & Estimate)
3452
Removal of garbage at BSK III stage, Hosakerehalli extn 2nd
stage, Sy.No.108 & 120 (portion) and Sy.No.11,12 of Ittamadu ,
Avalahalli extn, Kasturba slum.
Removal of garbage in BSK III stage, Munishwara layout
(Reconveyance scheme), A.K.colony, Avalahalli.
BDA/EE/S/T/W.O/09/94-95 dt:16-06-94
BDA / EM/Garbage/Tender / T-1075/ 93-94 dt: 0703-94(Tender documents & Estimate)
BDA/EE/S/T/W.O/10/94-95 dt:16-06-94 Tender
cancelled as per instruction of EM)
BDA / EM/Garbage/Tender / T-1075/ 93-94 dt: 0703-94(Tender documents & Estimate)
3454
Removal of garbage for the period from 01-06-1994 to 31-12-1994
at BTM layout, I phase, I stage
BDA/EE/S/T/W.O/11/94-95 dt:16-06-94
BDA / EM/Garbage/Tender / T-1075/ 93-94 dt: 0703-94(Tender documents & Estimate)
3455
Removal of garbage at private layout , comes under the jurisdiction
of No.1 South sub division.
BDA/EE/S/T/W.O/12/94-95 dt:16-06-94
BDA / EM/Garbage/Tender / T-1075/ 93-94 dt: 0703-94(Tender documents & Estimate)
3449
3453
3456
Removal of garbage in Radhakrishna I, II and II stage in BSK III
stage.
BDA/EE/S/T/W.O/13/94-95 dt:16-06-94
BDA / EM/Garbage/Tender / T-1075/ 93-94 dt: 0703-94(Tender documents & Estimate)
3457
Removal of garbage for the period from 01-06-1994 to 31-12-1994
in 7th block, IV phase, BSK III stage including Dena Bank layout.
BDA/EE/S/T/W.O/14/94-95 dt:18-06-94
BDA / EM/Garbage/Tender / T-1075/ 93-94 dt: 0703-94(Tender documents & Estimate)
3458
Removal of garbage for the period from 01-06-1994 to 31-12-1994
in Private layout in BTM I and II stages, I phase.
BDA/EE/S/T/W.O/15/94-95 dt:18-06-94
BDA / EM/Garbage/Tender / T-1075/ 93-94 dt: 0703-94(Tender documents & Estimate)
3459
Removal of garbage for the period from 01-06-1994 to 31-12-1994
in Srinivasanagar I phase in Sy.No.2 to 7 and 11 of Gerehalli in
BSK III stage.
Removal of garbage in Srinivasanagar II phase in Sy.No.2 to 14
of Gerehalli in BSK III stage.
BDA/EE/S/T/W.O/16/94-95 dt:28-06-94
BDA / EM/Garbage/Tender / T-1075/ 93-94 dt: 0703-94(Tender documents & Estimate)
BDA/EE/S/T/W.O/17/94-95 dt:28-06-94
BDA / EM/Garbage/Tender / T-1075/ 93-94 dt: 0703-94(Tender documents & Estimate)
3460
3461
Removal of garbage in BSK III stage pipeline, I and II block and
Raghavendra layout II block.
BDA/EE/S/T/W.O/18/94-95 dt:28-06-94
BDA / EM/Garbage/Tender / T-1075/ 93-94 dt: 0703-94(Tender documents & Estimate)
3462
Removal of garbage in Nagendra and Raghavendra layout , I
block (Reconveyance scheme)
BDA/EE/S/T/W.O/19/94-95 dt:28-06-94
BDA / EM/Garbage/Tender / T-1075/ 93-94 dt: 0703-94(Tender documents & Estimate)
3463
Providing Chipcarpetting to the 4th cross road of Bilekanahally,
Dollar scheme in BTM II stage, I phase.
BDA/EE/S/T/W.O/20/94-95 dt:28-06-94
BDA / EM/EO-II/ TEN / T-328/ 92-93 dt: 16-0393(Tender documents & Estimate)
3464
Providing Chipcarpetting to the 6th cross road and 4th main roads
between 4th and 6th cross in Bilekanahally, Dollar scheme in BTM
II stage, I phase.
Remetalling and Asphalting to 8th 'A' main and cross road in
Sy.No.62 of KGP in VII Block, IV phase, BSK III stage and
construction of (1) no RCC Deck Slab Culvert.
Providing Chipcarpetting of roads in kumaraswamy layout, II
Stage.
BDA/EE/S/T/W.O/21/94-95 dt:28-06-94
BDA / EM/EO-II/ TEN / T-328/ 92-93 dt: 16-0393(Tender documents & Estimate)
BDA/EE/S/T/W.O/22/94-95 dt:13-07-94
BDA / EM/EO-II/ TEN / T-328/ 92-93 dt: 16-0393(Tender documents & Estimate)
BDA/EE/S/T/W.O/23/94-95 dt:13-07-94
BDA / EM/EO-II/ TEN / T-328/ 92-93 dt: 16-0393(Tender documents & Estimate)
Foring and Asphalting the 80' road (Around park and playground)
in BSK III stage, III phase, V Block.
BDA/EE/S/T/W.O/24/94-95 dt:05-09-94
BDA / EM/EO-II/ TEN / T-328/ 92-93 dt: 16-0393(Tender documents & Estimate)
3465
3466
3467
95-96
3468
Removal of garbage at Kumaraswamy layout, II stage, period from
01-06-95 to 31-12-95
BDA/EE/S/T/W.O/01/95-96 dt:02-06-95
BDA / EO-I, II / TEN / T-1117:80/ 94-95 dt: 13-0295(Tender documents & Estimate)
3469
Removal of garbage for the period from 01-06-95 to 31-12-95 at
Kathriguppa sy.No.17,121, 122 & 134/1, Manjunatha slum, BSK
3rd stage.
Removal of garbage for the period from 01-06-95 to 31-12-95
under the jurisdiction of No.1 South sub division.
BDA/EE/S/T/W.O/02/95-96 dt:02-06-95
BDA / EO-I, II / TEN / T-1117:80/ 94-95 dt: 13-0295(Tender documents & Estimate)
BDA/EE/S/T/W.O/03/95-96 dt:02-06-95
BDA / EO-I, II / TEN / T-1117:80/ 94-95 dt: 13-0295(Tender documents & Estimate)
3470
3471
3472
3473
3474
Removal of garbage in BSK III stage, Munishwara layout
(Reconveyance scheme), A.K.colony, for the period from 01-06-95
to 31-12-95
Removal of garbage in BTM I stage, for the period from 01-06-95
to 31-12-95
BDA/EE/S/T/W.O/04/95-96 dt:02-06-95
BDA / EO-I, II / TEN / T-1117:80/ 94-95 dt: 13-0295(Tender documents & Estimate)
BDA/EE/S/T/W.O/05/95-96 dt:02-06-95
BDA / EO-I, II / TEN / T-1117:80/ 94-95 dt: 13-0295(Tender documents & Estimate)
Removal of garbage in BSK III stage, III phase, I ti VI block for the
period from 01-06-95 to 31-12-95, Kathriguppa layout and
Chanamanakere auchukut layout.
Removal of garbage for the period from 01-06-95 to 31-12-95 at
Srinivasanagar II phase, Gerehally Sy.No.2 to 14 , BSK III stage.
BDA/EE/S/T/W.O/06/95-96 dt:02-06-95
BDA / EO-I, II / TEN / T-1117:80/ 94-95 dt: 13-0295(Tender documents & Estimate)
BDA/EE/S/T/W.O/07/95-96 dt:02-06-95
BDA / EO-I, II / TEN / T-1117:80/ 94-95 dt: 13-0295(Tender documents & Estimate)
3475
Removal of garbage for the period from 01-06-95 to 31-12-95 in
BSK III stage, 7th block, 4th phase and Dena Bank layout.
BDA/EE/S/T/W.O/08/95-96 dt:02-06-95
BDA / EO-I, II / TEN / T-1117:80/ 94-95 dt: 13-0295(Tender documents & Estimate)
3476
Removal of garbage for the period from 01-06-95 to 31-12-95 in
BSK III stage, hosakerehalli, 2nd phase, Sy.No.108 and 120 (part)
and Sy.No.11, 12 Ittamadu, Avalahalli layout and Kasturba slum.
BDA/EE/S/T/W.O/09/95-96 dt:02-06-95
BDA / EO-I, II / TEN / T-1117:80/ 94-95 dt: 13-0295(Tender documents & Estimate)
3477
Removal of garbage for the period from 01-06-95 to 31-12-95 in
Vinayakanagar, BSK III stage, .
BDA/EE/S/T/W.O/10/95-96 dt:02-06-95
BDA / EO-I, II / TEN / T-1117:80/ 94-95 dt: 13-0295(Tender documents & Estimate)
3478
Removal of garbage for the period from 01-06-95 to 31-12-95 in I
phase, Kumaraswamy layout.
BDA/EE/S/T/W.O/11/95-96 dt:02-06-95
BDA / EO-I, II / TEN / T-1117:80/ 94-95 dt: 13-0295(Tender documents & Estimate)
3479
Removal of garbage for the period from 01-06-95 to 31-12-95 in
BTM II stage, I phase.
BDA/EE/S/T/W.O/12/95-96 dt:05-06-95
BDA / EO-I, II / TEN / T-1117:80/ 94-95 dt: 13-0295(Tender documents & Estimate)
3480
Removal of garbage for the period from 01-06-95 to 31-12-95 in
Nagendra block,BSK III stage.
BDA/EE/S/T/W.O/13/95-96 dt:08-06-95
BDA / EO-I, II / TEN / T-1117:80/ 94-95 dt: 13-0295(Tender documents & Estimate)
3481
Removal of garbage for the period from 01-06-95 to 31-12-95 in
Srinivasanagar I phase, Gerehalli Sy.No.2 to 7 and 11, BSK III
stage.
Removal of garbage for the period from 01-06-95 to 31-12-95 in
Srinivasanagar, Kathriguppa main road, Lakshminarasimha HBCS
and A.K.colony Sy.No.10.
Removal of garbage from 01-06-95 to 31-12-95 in private layout
of BTM I & II stage.
BDA/EE/S/T/W.O/14/95-96 dt:08-06-95
BDA / EO-I, II / TEN / T-1117:80/ 94-95 dt: 13-0295(Tender documents & Estimate)
BDA/EE/S/T/W.O/15/95-96 dt:08-06-95
BDA / EO-I, II / TEN / T-1117:80/ 94-95 dt: 13-0295(Tender documents & Estimate)
BDA/EE/S/T/W.O/16/95-96 dt:08-06-95
BDA / EO-I, II / TEN / T-1117:80/ 94-95 dt: 13-0295(Tender documents & Estimate)
3484
Removal of garbage from 01-06-95 to 31-12-95 in Radhakrishna
layout I, II and III stage.
BDA/EE/S/T/W.O/17/95-96 dt:05-07-95
BDA / EO-I, II / TEN / T-1117:80/ 94-95 dt: 13-0295(Tender documents & Estimate)
3485
Providing mini water supply scheme at Nagendra Block,BSK III
stage.
BDA/EE/S/T/W.O/18/95-96 dt:31-08-95
BDA / EO / TEN / T-12/ 94-95 dt: 10-04-95(Tender
documents & Estimate)
3482
3483
3486
Providing mini water supply scheme at Dhobhighatpipe line BlockII, BSK III stage.
BDA/EE/S/T/W.O/19/95-96 dt:31-08-95
BDA / EO / TEN / T-12/ 94-95 dt: 10-04-95(Tender
documents & Estimate)
3487
Providing mini water supply scheme for pipe line, block-II (weavers
Colony), BSK III stage.
BDA/EE/S/T/W.O/20/95-96 dt:31-08-95
BDA / EO / TEN / T-12/ 94-95 dt: 10-04-95(Tender
documents & Estimate)
3488
Supply, storage, erection, testing and commissioning and handing
over of power supply distribution system to KEB of K.S.R.T.C,
HBCS, Chikkalasandra on turn key basis.
Providing metalling to all arterial roads excluding 60' roads in
Sarakki 4th phase, Dollars layout.
BDA/EE/S/T/W.O/21/95-96 dt:07-10-95
BDA/EE/S/T/W.O/22/95-96 dt:03-01-96
BDA / EO/ TEN / T-62/ 95-96 dt: 18-10-95(Tender
documents & Estimate)
Reconstruction of SSM drain and improvements to the ventway
portion of drain at Channamanakere auchukut layout, BSK 3rd
stage
Chipcarpetting to roads in Radhakrishna layout II stage, BSK 3ed
stage.
BDA/EE/S/T/W.O/23/95-96 dt:11-01-96
BDA / EO/ TEN / T-64/ 95-96 dt: 08-11-95(Tender
documents & Estimate)
BDA/EE/S/T/W.O/24/95-96 dt:11-01-96
BDA / EO/ TEN / T-64/ 95-96 dt: 08-11-95(Tender
documents & Estimate)
3489
3490
3491
3492
Providing metalling to 60’ Roads and providing kerb stones,
shoulder drain etc., to all roads and providing cross boards ,
boundary stones etc., in Sarakki IV phase, Dollars layout.
BDA/EE/S/T/W.O/25/95-96 dt:12-01-96
BDA / EO/ TEN / T-62/ 95-96 dt: 18-10-95(Tender
documents & Estimate)
3493
Removal of garbage in Kumaraswamy layout, Ist stage, from 0801-96 to 31-12-96
BDA/EE/S/T/W.O/26/95-96 dt:18-01-96
BDA / EO-I, II / TEN / T-373 / 95-96 dt: 18-1195(Tender documents & Estimate)
3494
Removal of garbage in Radhakrishna layout, I , II and III stage.
BDA/EE/S/T/W.O/27/95-96 dt:18-01-96
BDA / EO-I, II / TEN / T-373 / 95-96 dt: 18-1195(Tender documents & Estimate)
3495
Removal of garbage in Nagender Block. BSK III stage.
BDA/EE/S/T/W.O/28/95-96 dt:18-01-96
BDA / EO-I, II / TEN / T-373 / 95-96 dt: 18-1195(Tender documents & Estimate)
3496
Removal of garbage for a pereiod from 8th Jan 96 to 31st Dec 96
in private layout coming under jurisdiction of BTM I & II stage.
BDA/EE/S/T/W.O/29/95-96 dt:18-01-96
BDA / EO-I, II / TEN / T-373 / 95-96 dt: 18-1195(Tender documents & Estimate)
3497
Removal of garbage for a period from 8th Jan 96 to 31st Dec 96 in
Vinayakanagar, BSK III stage.
BDA/EE/S/T/W.O/30/95-96 dt:18-01-96
BDA / EO-I, II / TEN / T-373 / 95-96 dt: 18-1195(Tender documents & Estimate)
3498
Removal of garbage for a period from 8th Jan 96 to 31st Dec 96 in
Srinivasanagar II phase in Sy.No.2 to 14 of Gerehally, BSK III
stage.
Removal of garbage for a period from 8th Jan 96 to 31st Dec 96 in
Kumaraswamy II stage.
BDA/EE/S/T/W.O/31/95-96 dt:18-01-96
BDA / EO-I, II / TEN / T-373 / 95-96 dt: 18-1195(Tender documents & Estimate)
BDA/EE/S/T/W.O/32/95-96 dt:18-01-96
BDA / EO-I, II / TEN / T-373 / 95-96 dt: 18-1195(Tender documents & Estimate)
Removal of garbage for a period from 8th Jan 96 to 31st Dec 96 in
Manjunatha slum, Kathriguppa village, Sy.No. 17,121, 122 and
134/2.
BDA/EE/S/T/W.O/33/95-96 dt:18-01-96
BDA / EO-I, II / TEN / T-373 / 95-96 dt: 18-1195(Tender documents & Estimate)
3499
3500
3501
Providing chain link fencing to CA site at 26th main inbetween 3rd
and 4th cross road in BTM II stage, I phase.
BDA/EE/S/T/W.O/34/95-96 dt:22-01-96
BDA / EO / TEN / T-66/ 95-96 dt: 22-11-95(Tender
documents & Estimate)
3502
Patching of potholes, ruts and other depression roads from
Banashankari temple to Uttarahally road, Ch: 0to 2kms.
BDA/EE/S/T/W.O/35/95-96 dt:18-01-96
BDA / EO / TEN / T-68/ 95-96 dt: 04-12-95(Tender
documents & Estimate)
3503
Remetalling & chipcarpetting to tankshore road in BTM II stage, I
phase.
BDA/EE/S/T/W.O/36/95-96 dt:18-01-96
BDA / EO / TEN / T-68/ 95-96 dt: 04-12-95(Tender
documents & Estimate)
3504
Removal of garbage for a period from 8th Jan 96 to 31st Dec 96 in
BTM II stage, I phase.
BDA/EE/S/T/W.O/37/95-96 dt:22-01-96
BDA / EO-I,II / TEN / T-373/ 95-96 dt: 18-1195(Tender documents & Estimate)
3505
Removal of garbage for a period from 8th Jan 96 to 31st Dec 96 in
BTM I stage, I phase.
BDA/EE/S/T/W.O/38/95-96 dt:22-01-96
BDA / EO-I,II / TEN / T-373/ 95-96 dt: 18-1195(Tender documents & Estimate)
3506
Emergent repairs to 16th main road in BTM II stage, I phase
layout.
BDA/EE/S/T/W.O/39/95-96 dt:23-01-96
BDA / EO-I,II / TEN / T-70/ 95-96 dt: 15-1295(Tender documents & Estimate)
3507
Rechipcarpetting to 50' road from 19th main to Avalahally layout
entrance and 19th main road in Muneshwara block, BSK III stage.
BDA/EE/S/T/W.O/40/95-96 dt:23-01-96
BDA / EO / TEN / T-68/ 95-96 dt: 04-12-95(Tender
documents & Estimate)
3508
Removal of garbage for the period from 08-01-96 to 31-12-96 in ,
Munishwara block (Reconveyance scheme), A.K.colony, in BSK III
stage.
Removal of garbage for the period from 08-01-96 to 31-12-96 in ,
Srinivasanagar I Phase in Sy.No.2 to 7 and 11 of Gerehally, BSK
III stage.
Desilting of drains on both sides of the roads from banashankari
temple to Uttarahally Road :Ch:0 to 2 Kms.
BDA/EE/S/T/W.O/41/95-96 dt:25-01-96
BDA / EO-I,II / TEN / T-373/ 95-96 dt: 18-1195(Tender documents & Estimate)
BDA/EE/S/T/W.O/42/95-96 dt:25-01-96
BDA / EO-I,II / TEN / T-373/ 95-96 dt: 18-1195(Tender documents & Estimate)
BDA/EE/S/T/W.O/43/95-96 dt:29-01-96
BDA / EO / TEN / T-68/ 95-96 dt: 04-12-95(Tender
documents & Estimate)
3511
Providing chipcarpetting and remetalling to bad reaches to length
of 60mts from Banashankari temple to uttarahally road, Ch; 0 to 2
kms
BDA/EE/S/T/W.O/44/95-96 (Tender cancelled &
work is taken in piece work) Piece work order
No.BDA/EE/S/PW/O7/96-97 dt:09-07-96
BDA / EO / TEN / T-68/ 95-96 dt: 04-12-95(Tender
documents & Estimate)
3512
Construction of culverts on both sides of the roads from BSK
temple to uttarahalli, Ch: 0to 2 kms.
BDA/EE/S/T/W.O/45/95-96 dt:06-02-96
BDA / EO / TEN / T-68/ 95-96 dt: 04-12-95(Tender
documents & Estimate)
3513
Repairs to road cutting, potholes and rechipcarpetting to roads in
Madivala, Dollars layout under BTM scheme.
BDA/EE/S/T/W.O/46/95-96 dt:09-02-96
BDA / EO / TEN / T-66/ 95-96 dt: 22-11-95(Tender
documents & Estimate)
3514
providing Remetalling and chipcarpetting to roads in Bilekanahalli,
Dollars layout under BTM scheme.
BDA/EE/S/T/W.O/47/95-96 dt:04-03-96
BDA / EO / TEN / T-66/ 95-96 dt: 22-11-95(Tender
documents & Estimate)
3515
Maintenance of Roads and side drains in S.Ramarao , Pvt layout,
BSK III stage.
BDA/EE/S/T/W.O/48/95-96 dt:22-03-96
BDA / EO / TEN / T-73/ 95-96 dt: 05-01-96(Tender
documents & Estimate)
3509
3510
96-97
3516
Providing rechipcarpetting to Vidyapeeta main
Channamanakere Achikut Layout in BSK III stgae.
in
BDA/EE/S/T/W.O/01/96-97 dt:02-04-96
BDA / EO/ TEN / T-73/ 95-96 dt: 05-01-96(Tender
documents & Estimate)
3517
providing Remetalling and chipcarpetting to roads in Sri.S.Rama
Rao, private layout in BSK III stage.
BDA/EE/S/T/W.O/02/96-97 dt:03-04-96
BDA / EO/ TEN / T-73/ 95-96 dt: 05-01-96(Tender
documents & Estimate)
3518
providing Remetalling and chipcarpetting to roads in Poornapragna
HBCS layout in Sy.No.108/1-2, 111/1-2 and 115/1 of Kathriguppa
village in BSk III stage.
providing chipcarpetting to roads in B.T.M., E.W.S., Layout,
between 26th and 29th main Roads.
BDA/EE/S/T/W.O/03/96-97 dt:03-04-96
BDA / EO/ TEN / T-73/ 95-96 dt: 05-01-96(Tender
documents & Estimate)
BDA/EE/S/T/W.O/04/96-97 dt:10-04-96
BDA / EO/ TEN / T-73/ 95-96 dt: 05-01-96(Tender
documents & Estimate)
3520
Levelling the playground between 19th and 20th main road in
BTM., II stage, I phase.
BDA/EE/S/T/W.O/05/96-97 dt:03-05-96
BDA / EO-II/ TEN / T-86/ 95-96 dt: 23-0296(Tender documents & Estimate)
3521
Maintenance of roads and side drains in MICO layout II stage at
BTM II stage.
BDA/EE/S/T/W.O/06/96-97 dt:03-05-96
BDA / EO-II/ TEN / T-86/ 95-96 dt: 23-0296(Tender documents & Estimate)
3522
Removing of silt from drains including shoulders drains and cutting
of berms and disposing off the excavated stuff in B.T.M., II stgae, I
phase.
Providing chain link fencing to balance portion of CA site no.(2)
(playground) in BTM II stgae, I phase.
BDA/EE/S/T/W.O/07/96-97 dt:03-05-96
BDA / EO-II/ TEN / T-86/ 95-96 dt: 23-0296(Tender documents & Estimate)
BDA/EE/S/T/W.O/08/96-97 dt:03-05-96
BDA / EO-II/ TEN / T-86/ 95-96 dt: 23-0296(Tender documents & Estimate)
3524
removing of silt from drains, cutting of berms and disposing off the
excavated stuff in Ideal Homes, HBCS I phase at Kenchanahally.
BDA/EE/S/T/W.O/09/96-97 dt:10-06-96
BDA / EO-II/ TEN / T-86/ 95-96 dt: 23-0296(Tender documents & Estimate)
3525
Road cutting and potholes filling and patch repairs to roads in Ideal
Homes HBCS., I phase at Kenchenahalli.
BDA/EE/S/T/W.O/10/96-97 dt:10-06-96
BDA / EO-II/ TEN / T-86/ 95-96 dt: 23-0296(Tender documents & Estimate)
3526
Patching for pot holes, ruts and repairs to road cutting in MICO
layout II stgae at BTM II stage.
BDA/EE/S/T/W.O/11/96-97 dt:10-06-96
BDA / EO-II/ TEN / T-86/ 95-96 dt: 23-0296(Tender documents & Estimate)
3527
Patching for pot holes, ruts and repairs to road in BTM II stgae , I
phase.
BDA/EE/S/T/W.O/12/96-97 dt:10-06-96
BDA / EO-II/ TEN / T-86/ 95-96 dt: 23-0296(Tender documents & Estimate)
3528
Chipcarpetting to I, II, III, IV cross boards, 3rd, 4th main roads, 'B',
'B', 'C', 'D' and 'E' roads in Sy.No.17 of Kathriguppa, BSK 3rd
stage.
Patching for pot holes, ruts and other depressions for roads in
ISRO layout at Bikasipura.
BDA/EE/S/T/W.O/16/96-97 dt:12-06-96
BDA / EO-II/ TEN / T-94/ 95-96 dt: 26-0396(Tender documents & Estimate)
BDA/EE/S/T/W.O/17/96-97 dt:12-06-96
BDA / EO-II/ TEN / T-94/ 95-96 dt: 26-0396(Tender documents & Estimate)
Patching for pot holes, ruts and repairs to road cutting in BTM I
stage, I phase.
BDA/EE/S/T/W.O/18/96-97 dt:12-06-96
BDA / EO-II/ TEN / T-94/ 95-96 dt: 26-0396(Tender documents & Estimate)
3519
3523
3529
3530
road
3531
Providing rechipcarpetting to roads of layout in Sy.No.20/1B of
Tavarekere, BTM I stage, I Phase.
BDA/EE/S/T/W.O/19/96-97 dt:24-06-96
BDA / EO-II/ TEN / T-94/ 95-96 dt: 26-0396(Tender documents & Estimate)
3532
Remetalling & chipcarpetting to Roads in Kempegowda HBCS
layout in Sy.No.112/2, 113/2 and 116 of Kathriguppa, BSK III
Stage.
Providing chain link fencing to park (C.A) in K.E.B., layout, under
B.T.M, scheme.
BDA/EE/S/T/W.O/20/96-97 dt:24-06-96
BDA / EO-II/ TEN / T-73/ 95-96 dt: 05-0196(Tender documents & Estimate)
BDA/EE/S/T/W.O/24/96-97 dt:26-06-96
BDA / EO-II/ TEN / T-94/ 95-96 dt: 26-0396(Tender documents & Estimate)
3534
Removal of silt, Berm cutting and disposal off the same and repairs
to shoulder drain in B.T.M. I stage, I phase.
BDA/EE/S/T/W.O/25/96-97 dt:26-06-96
BDA / EO-II/ TEN / T-94/ 95-96 dt: 26-0396(Tender documents & Estimate)
3535
Providing chain link fencing to balance portion of CA site.No.7 park
in BSK 3rd stage, 2nd phase, 7th block.
BDA/EE/S/T/W.O/26/96-97 dt:02-08-96
BDA / EO-II/ TEN / T-94/ 95-96 dt: 26-0396(Tender documents & Estimate)
3536
Formation of additional sites in Bilekanahalli, Dollars layout, under
B.T.M scheme
BDA/EE/S/T/W.O/27/96-97 dt:07-08-96
BDA / EO-II/ TEN / T-04/ 96-97 dt: 17-0596(Tender documents & Estimate)
3537
Formation of Road to additional sites formed in Sy.No.11 and 12 of
Ittamadu Layout, BSK III stage.
BDA/EE/S/T/W.O/30/96-97 dt:12-12-96
BDA / EO-II/ TEN / T-45/ 96-97 dt: 08-1096(Tender documents & Estimate)
3538
Construction of M.I.G. M/s Flats at BSK III Stage, III Phase, V
Block, Bangalore.
No work order copies
Original Estimation File and Tenders submitted by
the Contractors.
3539
Improvements to Road surface and storm water drain (leftout
portion) in kasturba slum in Avalahalli, BSK III stage.
BDA/EE/S/T/W.O/31/96-97 dt:12-12-96
BDA / EM / TEN / T-305/ 96-97 dt: 19-0996(Tender documents & Estimate)
3540
Chipcarpetting the roads in Vinayakanagar , BSK III stgae.
BDA/EE/S/T/W.O/32/96-97 dt:12-12-96
BDA / EO-II / TEN / T-42/ 96-97 dt: 28-0996(Tender documents & Estimate)
3541
Providing mini water supply scheme at Kasturba slum in Sy.No.17
of Avalahalli, BSK III Stage.
BDA/EE/S/T/W.O/34/96-97 dt:28-12-96
BDA / EM / TEN / T-305/ 96-97 dt: 19-0996(Tender documents & Estimate)
3542
Rechipcarpetting to roads and removal of silt from drains in
Yellamma Devi Slum in Kumaraswamy layout., II stage.
BDA/EE/S/T/W.O/35/96-97 dt:08-01-97
BDA / EM / TEN / T-305/ 96-97 dt: 19-0996(Tender documents & Estimate)
3543
Rechipcarpetting to 12th, 13th and 14th
Srinivasanagar, 2nd phase, BSK III stage.
BDA/EE/S/T/W.O/36/96-97 dt:28-01-97
BDA / EO-II / TEN / T-42/ 96-97 dt: 28-0996(Tender documents & Estimate)
3544
Improvements to roads in Manjunatha slum in BSK III stage.
BDA/EE/S/T/W.O/37/96-97 dt:28-01-97
BDA / EM / TEN / T-305/ 96-97 dt: 19-0996(Tender documents & Estimate)
3545
Improvements ro approach road in Manjunatha slum in BSK III
stage.
BDA/EE/S/T/W.O/38/96-97 dt:03-01-97
BDA / EM / TEN / T-305/ 96-97 dt: 19-0996(Tender documents & Estimate)
3546
Providing metalling to 1st main road in Sarakki 4th phase, Dollars
layout.
BDA/EE/S/T/W.O/39/96-97 dt:04-02-97
BDA / EO-II / TEN / T-64/ 96-97 dt: 18-1196(Tender documents & Estimate)
3533
main
roads
in
3547
Providing remetalling and Asphalting to the roads in Nagendra
block in BSK III Stage, (Missing link roads)
BDA/EE/S/T/W.O/40/96-97 dt:04-02-97
BDA / EO-II / TEN / T-64/ 96-97 dt: 18-1196(Tender documents & Estimate)
3548
Providing metalling to balance portion of I main and balance
portion of 2nd main road in Sarakki 4th phase, Dollars layout.
BDA/EE/S/T/W.O/41/96-97 dt:04-02-97
BDA / EO-II / TEN / T-64/ 96-97 dt: 18-1196(Tender documents & Estimate)
3549
Providing
chipcarpetting
BSK II stage.
BDA/EE/S/T/W.O/42/96-97 dt:07-02-97
BDA / EO-II / TEN / T-71/ 96-97 dt: 23-1296(Tender documents & Estimate)
3550
Providing chipcarpetting to main and cross
Srinivasanagar, ist phase, BSK III Stage, Bangalore.
in
BDA/EE/S/T/W.O/43/96-97 dt:07-02-97
BDA / EO-II / TEN / T-42/ 96-97 dt: 28-0996(Tender documents & Estimate)
3551
Providing Remetalling and chipcarpetting and cleaning of drains in
Manjunatha slum in BSK III stage.
BDA/EE/S/T/W.O/44/96-97 dt:07-02-97
BDA / EM / TEN / T-305/ 96-97 dt: 19-0996(Tender documents & Estimate)
3552
Providing Rechipcarpetting to 8th main, 60' road and Gokul Road
in BEML 3rd stgae layout.
BDA/EE/S/T/W.O/45/96-97 dt:13-03-97
BDA / EM / TEN / T-505/ 96-97 dt: 09-0196(Tender documents & Estimate)
3553
Rechipcarpetting to 60' road (Bus route) in BEML 4th stage latout.
BDA/EE/S/T/W.O/46/96-97 dt:13-03-97
BDA / EM / TEN / T-505/ 96-97 dt: 09-0196(Tender documents & Estimate)
3554
Maintenance of Roads and side drains in Kumaraswamy layout,
2nd stage
BDA/EE/S/T/W.O/48/96-97 dt:18-03-97
BDA / EM / TEN / T-420/ 96-97 dt: 25-1196(Tender documents & Estimate)
3555
Providing Asphalting to roads in Easstern side of Kumaraswamy
layout Ii stage, (Sy.Nos.6, 7 & 13 Of Govinayakanahalli.)
BDA/EE/S/T/W.O/49/96-97 dt:18-03-97
BDA / EM / TEN / T-420/ 96-97 dt: 25-1196(Tender documents & Estimate)
3556
Providing chipcarpetting to the roads from 8th main to 12th main
and missing bit roads near EWS house in Kumaraswamy layout, II
stage.
Formation of roads in Kumaraswamy layout, 2nd stage towards
ISRO layout.
BDA/EE/S/T/W.O/50/96-97 dt:29-03-97
BDA / EM / TEN / T-479/ 96-97 dt: 26-1296(Tender documents & Estimate)
BDA/EE/S/T/W.O/51/96-97 dt:29-03-97
BDA / EM / TEN / T-508/ 96-97 dt: 13-0197(Tender documents & Estimate)
3558
Formation of roads, drains and culverts for the proposed New
layout in Sy.No.15 of Govinayakanahalli in Kumaraswamy layout,
2nd stage.
97-98
BDA/EE/S/T/W.O/52/96-97 dt:29-03-97
BDA / EM / TEN / T-420/ 96-97 dt: 25-1196(Tender documents & Estimate)
3559
Providing chain link fencing to CA site )Park and Playground) in
Sarakki 4th phase, Dollars layout.
BDA/EE/S/T/W.O/01/97-98 dt:23-04-97
BDA / EM / TEN / T-479/ 96-97 dt: 26-1296(Tender documents & Estimate)
3560
Repairs to road cutting and pothole filling to damaged portion of
roads in Ideal homes, 2nd phase.
BDA/EE/S/T/W.O/02/97-98 dt:29-04-97
BDA / EM / TEN / T-479/ 96-97 dt: 26-1296(Tender documents & Estimate)
3561
Repairs to road cutting and pothole filling to damaged portion of
roads in BEML, 3rd stage.
BDA/EE/S/T/W.O/03/97-98 dt:29-04-97
BDA / EM / TEN / T-508/ 96-97 dt: 13-0197(Tender documents & Estimate)
3557
around BDA commercial complex at
roads
3562
Removal of garbage in Kumaraswamy layout, 2nd stage, from 1st
May 1997 to 31st December 97.
BDA/EE/S/T/W.O/03A/97-98 dt:30-04-97
BDA / EM/EO-I & II / TEN / T-590/ 96-97 dt: 01-0397(Tender documents & Estimate)
3563
Removal of garbage for the period from 01-05-97 to 31-12-97 in
BSK III stage, 4th phase, 7th block , layout formed in Sy.No.17,
121, 122 and 134/2 of Kathriguppa BSK III Stage, Manjunatha
slum and in jaraganahalli HBCS Layout.
Removal of garbage for the period from 01-05-97 to 31-12-97 in
Srinivasanagar 2nd phase, formed in Sy.No.2 to 14 of Gerehalli in
BSK III stage.
Removal of garbage for the period from 01-05-97 to 31-12-97 in
Vinayakanagar layout, BSK III stage.
BDA/EE/S/T/W.O/04/97-98 dt:30-04-97
BDA / EM/EO-I & II / TEN / T-590/ 96-97 dt: 01-0397(Tender documents & Estimate)
BDA/EE/S/T/W.O/05/97-98 dt:02-05-97
BDA / EM/EO-I & II / TEN / T-590/ 96-97 dt: 01-0397(Tender documents & Estimate)
BDA/EE/S/T/W.O/06/97-98 dt:02-05-97
BDA / EM/EO-I & II / TEN / T-590/ 96-97 dt: 01-0397(Tender documents & Estimate)
Removal of garbage for the period from 01-05-97 to 31-12-97 in
Srinivasanagar 1st phase, formed in Sy.No.2 to 7 and 11 of
Gerehalli in BSK III stage.
Removal of garbage for the period from 01-05-97 to 31-12-97 in
Srinivasanagar-Kathriguppa main road, AK colony, and layout
formed in Sy.No.10 of Kathriguppa, BSK III stage.
BDA/EE/S/T/W.O/07/97-98 dt:03-05-97
BDA / EM/EO-I & II / TEN / T-590/ 96-97 dt: 01-0397(Tender documents & Estimate)
BDA/EE/S/T/W.O/08/97-98 dt:03-05-97
BDA / EM/EO-I & II / TEN / T-590/ 96-97 dt: 01-0397(Tender documents & Estimate)
3568
Providing chipcarpetting toapproach roads from Uttarahalli main
road to Kumaraswamy layout, 2nd stage.
BDA/EE/S/T/W.O/09/97-98 dt:03-05-97
BDA / EM/ TEN / T-508/ 96-97 dt: 13-01-97(Tender
documents & Estimate)
3569
Removal of garbage for the period from 01-05-97 to 31-12-97 in
jurisdiction of No.1 South sub division private layouts- Ideal Homes
HBCS I and II stages, BNEML HBCS III , IV and V stages and
Kempegowda HBCS layout.
Removal of garbage for the period from 01-05-97 to 31-12-97 in
Radhakrishna HBCS Layout, I, II and III stages.
BDA/EE/S/T/W.O/10/97-98 dt:05-05-97
BDA / EM/EO-I & II / TEN / T-590/ 96-97 dt: 01-0397(Tender documents & Estimate)
BDA/EE/ S/ T/ W.O-1/ 97-98 dt:05-05-97
BDA / EM/EO-I & II / TEN / T-590/ 96-97 dt: 01-0397(Tender documents & Estimate)
3571
Removal of garbage in Kumaraswamy layout I stage from 01-05-97
to 31-12-97
BDA/EE/S/T/W.O/12/97-98 dt:13-05-97
BDA / EM/EO-I & II / TEN / T-590/ 96-97 dt: 01-0397(Tender documents & Estimate)
3572
Providing remetalling and Asphalting to 8th cross road in
Bilekanahalli , Dollars layout under B.T.M Scheme.
BDA/EE/S/T/W.O/13/97-98 dt:20-05-97
BDA / EM / TEN / T-508/ 96-97dt: 13-01-97(Tender
documents & Estimate)
3573
Providing Rechipcarpetting to roads in Kumaraswamy layout 1st
stage, 6th, 7th, 8th 9th , 10th and 15th cross roads.
BDA/EE/S/T/W.O/14/97-98 dt:20-05-97
BDA / EM / TEN / T-508/ 96-97dt: 13-01-97(Tender
documents & Estimate)
3574
a).Providing chipcarpetting and seal coat from Kadirenahalli Cross
upto 500 mtrs, in Kumaraswamy layout, 1st stage On approved
quotation basis)
b). Widening
the existing road from Kadirenahally cross
a)BDA/EE/S/QT/15/97-98
dt:28-05-97
B).BDA/EE/S/QT/16/97-98 dt:28-05-97
3564
3565
3566
3567
3570
.
QuotationNo.BDA/EE/S/Quotation/3910/96-97
dt:31-03-97
3575
Maintenance of Roads and side drains and improvements to roads
in Bilekanahalli, Dollars layout , BTM II stage, I Phase.
BDA/EE/ S/ T/ W.O-17/ 97-98 dt:02-06-97
BDA / EM / TEN / T-51/ 97-98 dt: 28-04-97(Tender
documents & Estimate)
3576
Asphalting to Roads in Sy.No.10 of Kathriguppa, BSK III stage.
BDA/EE/ S/ T/ W.O-18/ 97-98 dt:09-06-97
BDA / EM / TEN / T-31/ 97-98 dt: 19-04-97(Tender
documents & Estimate)
3577
Construction of SSM drain at I cross road in Bilekanahalli Dollars
Layout, unser B.T.m scheme.
BDA/EE/ S/ T/ W.O-19/ 97-98 dt:28-07-97
BDA / EM / TEN / T-136/ 97-98 dt: 21-0697(Tender documents & Estimate)
3578
Removal of silt from side drain, berm cutting in MICO shramajeevi
Karmikara Gruha Nirmana Sahakara Sangha Layout, I stage,
Arakere.
Asphalting to 7th, 8th, 9th cross roads and 1st to 4th main roads in
layout in Sy.No.17/134-2 of Kasthriguppa, BSK III stage.
BDA/EE/ S/ T/ W.O-20/ 97-98 dt:28-07-97
BDA / EM / TEN / T-98/ 97-98 dt: 31-05-97(Tender
documents & Estimate)
BDA/EE/ S/ T/ W.O-22/ 97-98 dt:14-08-97
BDA / EM / TEN / T-31/ 97-98 dt: 19-04-97(Tender
documents & Estimate)
3580
Providing metalling and chipcarpetting to balance portion of Road
in Bilekanahalli, Dollars layout under BTM II stage.
BDA/EE/ S/ T/ W.O-25/ 97-98 dt:04-09-97
BDA / EM / TEN / T-136/ 97-98 dt: 21-0697(Tender documents & Estimate)
3581
Asphalting to roads in layout in Sy.Nos 17/121 of Kathriguppa, 3rd
to 6th and 6th 'A' main roads and 5th cross roads in BSK III stage.
BDA/EE/ S/ T/ W.O-27/ 97-98 dt:22-09-97
BDA / EE(S) / TEN / T-31/ 97-98 dt: 19-0497(Tender documents & Estimate)
3582
Repairs to road cuttings and pot holes in Kumaraswamy layout I
stage.
BDA/EE/ S/ T/ W.O-28/ 97-98 dt:22-09-97
BDA / EE(S) / TEN / T-31/ 97-98 dt: 19-0497(Tender documents & Estimate)
3583
Construction of Deckslab culvert in front of GSI-Building ie., Road
starting from Kadirenahalli cross upto 500mtrs in Kumaraswamy I
stage.
Providing chain link fencing to CA site in MICO., Shramajeevi
Karmikara Gruha Nirmana Sahakara Sangha Limited, 1st stage,
Arakere Village.
Urgent repairs to missing road , 4th cross, near C.B Site in BSK III
Stage, 4th Phase, 7th Block.
BDA/EE/ S/ T/ W.O-29/ 97-98 dt:16-10-97
BDA / EM /EO-II/ TEN / T-136/ 97-98 dt: 21-0697(Tender documents & Estimate)
BDA/EE/ S/ T/ W.O-30/ 97-98 dt:22-10-97
BDA / EM / TEN / T-123/ 97-98 dt: 11-0697(Tender documents & Estimate)
BDA/EE/ S/ T/ W.O-41/ 97-98 dt:05-03-98
BDA / EM / TEN / T-470/ 97-98 dt: 14-0298(Tender documents & Estimate)
3586
Providing cross boards in Srinivasanagar I & II Phase in
Vinayakanagar, BSK III Stage.
BDA/EE/ S/ T/ W.O-42/ 97-98 dt:05-03-908
BDA / EM / TEN / T-478/ 97-98 dt: 14-0298(Tender documents & Estimate)
3587
Providing name boards, cross boards to the layout formed in
Sy.No.10 of Kathriguppa, Sy.No.17 of Kathriguppa, Manjunath
colony, and BSK III Stage, 4th Phase, 7th Block.
Pothole filling, depressing filling and chipcarpetting to 4th & 5th
main roads in Srinivasanagar, I Phase.
BDA/EE/ S/ T/ W.O-43/ 97-98 dt:05-03-98
BDA / EM / TEN / T-478/ 97-98 dt: 14-0298(Tender documents & Estimate)
BDA/EE/ S/ T/ W.O-44/ 97-98 dt:09-03-98
BDA / EM / TEN / T-456/ 97-98 dt: 05-0298(Tender documents & Estimate)
Pothole filling and Road cutting filling in Western Block of
Kumaraswamy Layout, I Stage.
BDA/EE/ S/ T/ W.O-45/ 97-98 dt:12-03-98
BDA / EM / TEN / T-478/ 97-98 dt: 14-0298(Tender documents & Estimate)
3579
3584
3585
3588
3589
3590
Desilting of drains and maintenance of roads in Southern Block of
Kumaraswamy I Stage.
BDA/EE/ S/ T/ W.O-46/ 97-98 dt:13-03-98
BDA / EM / TEN / T-478/ 97-98 dt: 14-0298(Tender documents & Estimate)
3591
Widening the existing road by the side of Dayanandasagar
College and in front of Telephone exchange in Kumaraswamy
layout.
Re-Chipcarpetting to Ist, 12th, 27th AND 42nd Cross and 9th, 19th
and 43rd Main roads in Ideal Homes, HBCS at kenchanahally.
BDA/EE/ S/ T/ W.O-47/ 97-98 dt:13-03-08
BDA / EM / TEN / T-437/ 97-98 dt: 23-0198(Tender documents & Estimate)
BDA/EE/ S/ T/ W.O-49/ 97-98 dt:20-03-08
BDA / EM / TEN / T-437/ 97-98 dt: 23-0198(Tender documents & Estimate)
Urgent repairs to damaged portion , remetalling and
rechipcarpetting to balance portion of roads inbetween 10th & 14th
main roads in Srinivasanagar, II Phase, BSK III Stage.
Improvements and chipcarpetting to the roads in Southend shifted
slum in Kumaraswamy layout II Stage, (Eastern side.)
BDA/EE/ S/ T/ W.O-50/ 97-98 dt:24-03-98
BDA / EM / TEN / T-456/ 97-98 dt: 05-0298(Tender documents & Estimate)
BDA/EE/ S/ T/ W.O-52/ 97-98 dt:27-03-08
BDA / EM / TEN / T-493/ 97-98 dt: 26-0298(Tender documents & Estimate)
Urgent repairs to damaged portion , remetalling and
rechipcarpetting to balance portion of roads inbetween 13th & 16th
main roads in Srinivasanagar, II Phase, BSK III Stage.
Remetalling and chipcarpetting to balance portion of roads, in
between 4th main & 9th main road in Srinivasanagar, I Phase, BSK
III Stage.
Formation of roads, drains & culverts in Sy.No.15,16, and 17 of
Doddakallasandra village (Govt land) J.P.Nagar IX Phase, RoadNo.9
Formation of roads & construction of slab drain, slab culvert in
sy.no.33 of Kothanur Village in J.P.Nagar VIII phase, road No.
1,2,3,6,7,8,9,10 & 'A' & 'B'
Metalling to the layout roads in block 'F' in J.P.Nagar IX Phase
layout road No.A,B,C,D,E,F,G &H
BDA/EE/ S/ T/ W.O-48/ 97-98 dt:19-03-98
BDA / EM / TEN / T-456/ 97-98 dt: 05-0298(Tender documents & Estimate)
3600
3601
3592
3593
3594
3595
3596
3597
3598
3599
3602
3603
3604
BDA/EE/ S/ T/ W.O-33/ 97-98 dt:02-02-98
BDA/EE/ PD/ T/ W.O-45/ 97-98 dt:10-03-98
BDA / EM / TEN / T-395/ 97-98 dt: 20-12-97
BDA/EE/ PD/ T/ W.O-27/ 97-98 dt:09-07-97
BDA / EM / TEN / T-51/ 97-98 dt: 28-04-97
BDA/EE/ PD-II / T/ W.O-67/ 97-98 dt:22-08-97
BDA / EM / TEN / T-123/ 97-98 dt: 11-06-97
Providing Metalling to the layout roads in block 'D' in J.P.Nagar IX
Phase layout road No.A,B,C,D,E,F,G &H
BDA/EE/ PD-II / T/ W.O-20/ 97-98 dt:16-04-97
BDA / EM / TEN / T-505/ 96-97 dt: 09-01-97
Providing metalling to the roads Nos.D,E,F & I in part of Sy.No.22,
23 and 24 of Kothanur Village, J.P.Nagar VIII Phase, Block-II,
Bangalore.
Formation of roads, drains & culverts in Sy.No.15,16, and 17 of
Doddakallasandra village (Govt land) J.P.Nagar IX Phase, RoadNo.1
Formation of roads, drains & culverts in Sy.No.15,16, and 17 of
Doddakallasandra village (Govt land) J.P.Nagar IX Phase, RoadNo.7
Formation of roads, drains & culverts in Sy.No.15,16, and 17 of
Doddakallasandra village (Govt land) J.P.Nagar IX Phase, RoadNos.11, 12 & 13.
BDA/EE/ PD-II / T/ W.O-42/ 97-98 dt:04-03-98
BDA / EM / TEN / T-318/ 97-98 dt: 28-10-97
BDA/EE/ PD-II / T/ W.O-34/ 97-98 dt:20-11-97
BDA / EM / TEN / T-223/ 97-98 dt: 22-08-97
BDA/EE/ PD-II / T/ W.O-39/ 97-98 dt:20-11-97
BDA / EM / TEN / T-225/ 97-98 dt: 23-08-97
BDA/EE/S/ PD-II / T/ W.O-47/ 97-98 dt:18-03-98
BDA / EM / TEN / T-395/ 97-98 dt: 20-12-97
3605
Formation of roads, drains & culverts in Sy.No.15,16, and 17 of
Doddakallasandra village (Govt land) J.P.Nagar IX Phase, RoadNos.19, 20, 21& 22.
Formation of roads, drains & culverts in Sy.No.15,16, and 17 of
Doddakallasandra village (Govt land) J.P.Nagar IX Phase, RoadNos.14 & 15.
Formation of roads, drains & culverts in Sy.No.15,16, and 17 of
Doddakallasandra village (Govt land) J.P.Nagar IX Phase, RoadNo.5
Formation of roads, drains & culverts in Sy.No.15,16, and 17 of
Doddakallasandra village (Govt land) J.P.Nagar IX Phase, RoadNo.3
Formation of roads, construction of slab drain, slab culverts in
Sy.No.25/2A & 25/2B of Kothanur Village in J.P.Nagar VIII Phase,
Block-II
Formation of roads, construction of slab drain, in balance land in
Sy.No.8 of Kothanur Village in J.P.Nagar VIII stage, Road
Nos.13,14,15,32,33 & 34.
Construction of retaining wall , metalling and chipcarpetting to the
balance portion of Roads in Manjunatha slum.
BDA/EE/S/ PD-II / T/ W.O-41/ 97-98 dt:02-03-98
BDA / EM / TEN / T-395/ 97-98 dt: 20-12-97
BDA/EE/S/ PD-II / T/ W.O-40/ 97-98 dt:02-03-98
BDA / EM / TEN / T-395/ 97-98 dt: 20-12-97
BDA/EE/S/ PD-II / T/ W.O-38/ 97-98 dt:20-11-97.
BDA / EM / TEN / T-225/ 97-98 dt: 23-08-97
BDA/EE/S/ PD-II / T/ W.O-36/ 97-98 dt:20-11-97.
BDA / EM / TEN / T-223/ 97-98 dt: 22-08-97
BDA/EE/S/ PD-II / T/ W.O-43/ 97-98 dt:04-03-98
BDA / EM / TEN / T-362/ 97-98 dt: 02-12-97
BDA/EE/S/ PD-II / T/ W.O-28/ 97-98 dt:24-07-97
BDA / EM / TEN / T-51/ 97-98 dt: 28-04-97
BDA/EE/S / T/ W.O-51/ 97-98 dt:27-03-98
BDA / EM / TEN / T-493/ 97-98 dt: 26-02-98
3612
Remetalling and chipcarpetting to additional layout in Sy.No.6 and
7 of Govinayakanahally in Kumaraswamy L/o II Stage.
BDA/EE/S / T/ W.O-53/ 97-98 dt:27-03-98
BDA / EM / TEN / T-437/ 97-98 dt: 23-01-98
3613
Providing chain link fencing and RCC Mosaic Benches to CA
site.No.07 in Kumaraswamy I stage.
BDA/EE/S / T/ W.O-31/ 97-98 dt:06-11-97
BDA / EM / TEN / T-98/ 97-98 dt: 31-05-97)Tenders
Submitted by the contractors & estimate)
3614
Providing barbed wire fencing to C.A Site in Sri.Anjaneyaswamy
HBCS layout at Chikkalasandra CA site No.3,4,5 and 6.
BDA/EE/S / T/ W.O-32/ 97-98 dt:19-11-97
BDA / EM / TEN / T-225/ 97-98 dt: 23-0897)Tenders Submitted by the contractors &
estimate)
3615
Remetalling and chipcarpetting to balance portion of roads, in
between 4th main & 9th main road in Srinivasanagar, I Phase, BSK
III Stage.
BDA/EE/S / T/ W.O-33/ 97-98 dt:02-02-98
BDA / EM / TEN / T-319/ 97-98 dt: 28-1097)Tenders Submitted by the contractors &
estimate)
3616
Asphalting to 2nd and 4th cross roads in BSK III Stage, 4th phase,
7th block.
BDA/EE/S / T/ W.O-34/ 97-98 dt:04-02-98
BDA / EM / TEN / T-31/ 97-98 dt: 19-04-97)Tenders
Submitted by the contractors & estimate)
3617
Providing metalling to Roads, Boundary Stones, Layout boards
and cross boards in Layout formed in Sy.No.250, 252, 253, 254
and 255 of Halagevaderahalli, BSK V Stage.
BDA/EE/S / T/ W.O-35/ 97-98 dt:17-02-98
BDA / EM / TEN / T-395/ 97-98 dt: 20-1297)Tenders Submitted by the contractors &
estimate)
3606
3607
3608
3609
3610
3611
3618
Formation of drains to the existing main road in layout formed in
Sy.No.250, 252, 253, 254 and 255 of Halagevaderahalli, BSK V
stage.
BDA/EE/S / T/ W.O-36/ 97-98 dt:17-02-98
BDA / EM / TEN / T-395/ 97-98 dt: 20-1297Tenders Submitted by the contractors & estimate)
3619
Remetalling and chipcarpetting to missing bits in Kumaraswamy
layout, II stage near ISRO Layout.
BDA/EE/S / T/ W.O-37/ 97-98 dt:17-02-98
BDA / EM / TEN / T-362/ 97-98 dt: 02-1297Tenders Submitted by the contractors & estimate)
3620
Remetalling and chipcarpetting to Roads in South end slum in
Kumaraswamy layout II stgae.(Western side)
BDA/EE/S / T/ W.O-38/ 97-98 dt:17-02-98
BDA / EM / TEN / T-362/ 97-98 dt: 02-1297Tenders Submitted by the contractors & estimate)
3621
Repairs and improvements works to road in Sy.No.17 of
Kathriguppa, BSK III stage.
BDA/EE/S / T/ W.O-39/ 97-98 dt:17-02-98
BDA / EM / TEN / T-478/ 97-98 dt: 14-0298Tenders Submitted by the contractors & estimate)
3622
Urgent repairs to damaged approaches for the Bridge at Manjunath
Slum.
BDA/EE/S / T/ W.O-40/ 97-98 dt:05-03-98
BDA / EM / TEN / T-478/ 97-98 dt: 14-0298Tenders Submitted by the contractors & estimate)
3623
98-99
3624
3625
3626
3627
Maintenance of roads & side drains & remetalling to roads in
Telecom, HBCS, Layout at Chikkalasandra Village, Uttarahalli
hobli,
Providing chipcarpetting to the roads in Telecom HBCS L/o at
Chikkalasandra Village, Uttarahally Hobli.
BDA/EE/S / T/ W.O-23/ 98-99 dt:22-07-98
BDA / EM / TEN / T-512/ 97-98 dt: 12-03-98
BDA/EE/S / T/ W.O-24/ 98-99 dt:22-07-98
BDA / EM / TEN / T-512/ 97-98 dt: 12-03-98
Formation of roads, construction of slab drains in Sy.No.16/3,
15/1A, 38/1, 38/2, 37/1A & 37/1B of Kothanur Village in J.P.Nagar
VIII stage, Block-II
Providing metalling to the roads, E,F,G,H & I in Sy.No.33 of
Kothanur Village, Block II of J.P.Nagar VIII Phase.
BDA/EE/S/ PD-II / T/ W.O-58/ 98-99 dt:15-05-98.
BDA / EM / TEN / T-456/ 97-98 dt: 05-02-98
BDA/EE/S/ PD-II / T/ W.O-67/ 98-99 dt:25-05-98.
BDA / EM / TEN / T-493/ 97-98 dt: 26-02-98
3628
Providing metalling to the roads A,B,C & D in Sy.No.33 of Kothanur
Village, Block II of J.P.Nagar VIII Phase.
BDA/EE/S/ PD-II / T/ W.O-66/ 98-99 dt:25-05-98.
BDA / EM / TEN / T-493/ 97-98 dt: 26-02-98
3629
Providing and fixing layout name boards, fixing cross boards
(available) in J.P.Nagar IX Phase layout
BDA/EE/S/ PD-II / T/ W.O-51/ 98-99 dt:15-04-98.
BDA / EM / TEN / T-478/ 97-98 dt: 14-02-98
3630
Formation of roads, construction of slab drains and slab culverts in
Sy.No.77/2 & 78/1 of Kothanur Village, J.P.Nagar VIII pahse.BlockIII, Road 'F'
BDA/EE/S/ PD-II / T/ W.O-65/ 98-99 dt:25-05-98.
BDA / EM / TEN / T-456/ 97-98 dt: 05-02-98
3631
Formation of roads, drains and culverts in Sy.No.89 of Alahalli
Village, J.P.Nagar IX Phase and road widening from Alahalli
Village to IV Block of J.P.Nagar IX Phase.
Formation of roads, Drains and culverts in Sy.No.73 and 74 of
Alahalli Village, J.P.Nagar IX Phase, Block-II
BDA/EE/S/ TEND/ W.O-38/ 98-99 dt:08-02-99.
BDA / EM /EO-II/ TEN / T-206/ 98-99 dt: 17-09-98
BDA/EE/S/ TEND/ W.O-197/ 98-99 dt:27-04-98.
BDA / EM /EO-II/ TEN / T-456/ 97-98 dt: 05-02-98
3633
Urgent repairs and construction of damaged portion of retaining
wall of SWD in Manjunatha Slum, BSK III Stage.
BDA/EE/S/ TEND/ W.O-43/ 98-99 dt:10-03-99.
BDA / EM /EO-II/ TEN / T-316/ 98-99 dt: 28-12-98
3634
Providing chipcarpetting to the roads in new layout in Sy.No.61 of
Govinayakanahalli in Kumaraswamy layout, II Stage.
BDA/EE/S/ TEND/ W.O-34/ 98-99 dt:30-10-98.
BDA / EM /EO-II/EE(S)/ TEN / T-80/ 98-99 dt: 3005-98
3635
Improvements and metalling to roads in Sy.No.54 of
Govinayakanahally in Kumaraswamy Layout, II Stage.
BDA/EE/S/ TEND/ W.O-01/ 98-99 dt:11-04-98.
BDA / EM // TEN / T-493/ 97-98 dt: 26-02-98
3636
Urgent repairs to road cuttings, pot holes, ruts and pits and
rechipcarpetting to damaged portion of 3rd and 4th cross roads in
Nagendra block, BSK III Stage.
Urgent repairs to road cuttings, pot holes, ruts and pits and
rechipcarpetting to damaged portion of 1st , 2nd and 3rd main
roads in Nagendra block, BSK III Stage.
Providing metalling to the roads , I, J, K & L in Sy.No.22, 23, 24 &
25/1 of Kothanur Village , Block II of J.P.Nagar VIII phase.
BDA/EE/S/ TEND/ W.O-06/ 98-99 dt:25-05-98.
BDA / EM / TEN / T-47/ 98-99 dt: 02-05-98
BDA/EE/S/ TEND/ W.O-07/ 98-99 dt:25-05-98.
BDA / EM / TEN / T-47/ 98-99 dt: 02-05-98
BDA/EE/S/ TEND/ W.O-32/98-99 dt:02-09-98.
BDA / EM / TEN / T-493/ 97-98 dt: 26-02-98
BDA/EE/S/ TEND/ W.O-41/98-99 dt:19-02-99.
BDA / EM / TEN / T-267/ 98-99 dt: 19-11-98
BDA/EE/S/ TEND/ W.O-39/98-99 dt:08-02-99.
BDA / EM / TEN / T-287/ 98-99 dt: 03-12-98
BDA/EE/S/ TEND/ W.O-03/98-99 dt:25-05-98.
BDA / EM / TEN / T-47/ 98-99 dt: 02-05-98
BDA/EE/S/ TEND/ W.O-30/98-99 dt:15-09-98.
BDA / EM / TEN / T-456/ 97-98dt: 05-02-98
3632
3637
3638
3639
3640
3641
3642
3643
3644
Formation of roads, Construction of slab Drain & Slab Culverts in
Sy.Nos.26 & 27 of Kothanur Village in J.P.Nagar VIII Phase, BlockII, road Nos.A, B,C, D, E, F, G & H.
Formation of Roads, Construction of Slab Drain and Slab Culverts
in Sy.No.20/6 of Kothanur Village, J.P.Nagar VIII Phase, Block-II,
80' Road.
Urgent repairs to road cuttings, pot holes, ruts and pits and
rechipcarpetting to damaged portion of 8th , 9th, 10th, 11th and
12th main roads in Nagendra block, BSK III Stage.
Formation of roads, Construction of slab drain and slab culvetrs in
Sy.No.77/2, 80/2 of Kothanur Village, J.P.Nagar VIII Phase, BlockIII, Road No.A,B,C & D.
Removal of garbage for the period from 01-01-98 to 30-09-98 in
Kumaraswamy layout II Stage.
Removal of garbage for the period from 01-01-98 to 30-09-98 in
Srinivasanagar II Phase, formed in Sy.No.2 to 14 of Gerehally ,
BSK III Stage.
BDA/EE/S/ TEND/ W.O-10/98-99 dt:29-05-98.
BDA/EE/S/ TEND/ W.O-13/98-99 dt:29-05-98.
BDA / EM / TEN / T-433/ 97-98dt: 18-01-98
Removal of garbage in the jurisdiction of No.1 Sub division (South)
Private Layouts in Ideal Homes, HBCS I and II Stages, BEML HBCS III, IV and V Stage and Kempegowda- HBCS Layout from
)1-01-98 to 30-09-98.
Removal of garbage for the period from 01-01-98 to 30-09-98 in
I.S.R.O Layout in Bikasipura.
BDA/EE/S/ TEND/ W.O-19/98-99 dt:04-06-98.
3647
Removal of garbage for the period from 01-01-98 to 30-09-98 in
Radhakrishna H.B.C.S layout I, II and III Stages.
BDA/EE/S/ TEND/ W.O-17/98-99 dt:01-06-98.
3648
Removal of garbage for the period from 01-01-98 to 30-09-98 in
MICO , S.K.G.N.S., Layout I and II Stage, Arakere.
BDA/EE/S/ TEND/ W.O-16/98-99 dt:01-06-98.
3649
Removal of garbage for the period from 01-01-98 to 30-09-98 in
Srinivasanagar- Kathriguppa main road AK Colony and layout
formed in Sy.No.10 of Kathriguppa, BSK III Stage.
BDA/EE/S/ TEND/ W.O-21/98-99 dt:08-06-98.
3650
Removal of garbage for the period from 01-01-98 to 30-09-98 in
Srinivasanagar- I Phase, in Sy.No 2 to 7 and ii of Gerehally, BSK
III Stage.
Removal of garbage for the period from 01-04-98 to 30-09-98 in
Kasturba slum coming under jurisdiction of No.1, South sub
division.
Maintenance of roads in K.S.R.T.C layout in Chikkalasandra
Village and in Bharath HBCS in Sy.No.17 & 18 of Uttarahally.
BDA/EE/S/ TEND/ W.O-22/98-99 dt:08-06-98.
3645
3646
3651
3652
BDA/EE/S/ TEND/ W.O-18/98-99 dt:01-06-98.
BDA / EM / TEN / T-433/ 97-98dt: 18-01-98
BDA/EE/S/ TEND/ W.O-14/98-99 dt:29-05-98.
BDA/EE/S/ TEND/ W.O-25/98-99 dt:22-07-98.
BDA / EM /EO-II/EE(S)/ TEN / T-512/ 97-98 dt: 1203-98
3653
Maintenance of roads in Radhakrishna HBCS, I, II, III Stage,
Kathriguppa & Kanaka HBCS, Kadirenahally.
BDA/EE/S/ TEND/ W.O-26/98-99 dt:22-07-98.
BDA / EM /EO-II/EE(S)/ TEN / T-512/ 97-98 dt: 1203-98
3654
Urgent repairs to road cutting, pot holes, ruts and pits and
damaged portion of roads in Jareganahally, HBCS Layout.
BDA/EE/S/ TEND/ W.O-28/98-99 dt:22-07-98.
BDA / EM /EO-II/EE(S)/ TEN / T-512/ 97-98 dt: 1203-98
3655
Providing RCC Deck Slab covering over the existing drain in front
of Site.No.218 & 219 of BSK III Stage, III phase, II Block.
BDA/EE/S/ TEND/ W.O-29/98-99 dt:26-08-98.
BDA / EM /EO-II/EE(S)/ TEN / T-145/ 98-99 dt: 2007-98
3656
Providing Cross boards / property boards and dust bins in
Jaragenahally HBCS Layout, at Kadirenahally.
BDA/EE/S/ TEND/ W.O-27/98-99 dt:22-07-98.
BDA / EM /EO-II/EE(S)/ TEN / T-512/ 97-98 dt: 1203-98
3657
Removal of garbage for the period from 01-01-98 to 30-09-98 in
BSK III Stage, 4th phase, 7th block, layout formed in Sy.No.17,
121, 122 & 134/2 of Kathriguppa, BSK III Stage, Manjunatha slum
and in Jaragenahally HBCS Layout.
Pothole filling and Road cutting filling to the Roads in
Kumaraswamy Layout, II Stage.
BDA/EE/S/ TEND/ W.O-11/98-99 dt:25-05-98.
3658
BDA/EE/S/ TEND/ W.O-02/98-99 dt:27-04-98.
BDA / EM / TEN / T-493/ 97-98 dt: 26-02-98
3659
Urgent repairs to road cuttings, potholes, ruts, pits and
rechipcarpetting to damaged portion of 4th & 5th main roads in
Nagendra block, BSK III Stage.
Urgent repairs to road cuttings, potholes, ruts, pits and
rechipcarpetting to damaged portion of 13th, 14th & 15th main
roads in Nagendra block, BSK III Stage.
Urgent repairs to road cuttings, potholes, ruts, pits and
rechipcarpetting to damaged portion of 1st, 2nd & 2nd 'A'cross
roads in Nagendra block, BSK III Stage.
Removal of garbage for the period from 01-01-98 to 30-09-98 in
Vinayakanagar layout at BSK III Stage.
BDA/EE/S/ TEND/ W.O-09/98-99 dt:25-05-98.
BDA / EM / TEN / T-47/ 97-98 dt: 02-05-98 (Tender
documents& Estimate)
BDA/EE/S/ TEND/ W.O-04/98-99 dt:25-05-98.
BDA / EM / TEN / T-47/ 97-98 dt: 02-05-98 (Tender
documents& Estimate)
BDA/EE/S/ TEND/ W.O-05/98-99 dt:25-05-98.
BDA / EM / TEN / T-47/ 97-98 dt: 02-05-98 (Tender
documents & Estimate)
BDA/EE/S/ TEND/ W.O-12/98-99 dt:29-05-98.
Estimate copy.
3663
Providing parking bay in front of Site.No.1761 to 1771 in
Kumaraswamy I stage.
BDA/EE/S/ TEND/ W.O-20/98-99 dt:08-06-98
BDA / EM /EO-II/ TEN / T-60/ 98-99 dt: 15-05-98
(Tender documents & Estimate)
3664
Urgent repairs to road cuttings, potholes, ruts, pits and formation of
road in College teachers HBCS in BSK III Stage.
BDA/EE/S/ TEND/ W.O-42/98-99 dt:19-02-99
BDA / EM /EO-II/ TEN / T-24/ 98-99 dt: 27-10-98
(Tender documents & Estimate)
3665
a)Construction of culverts, approach steps from ring road ,
protective work to SWD wall.
b) Improvements to existing
road drains, providing barbed wire fencing over SWD wall.
Urgent repairs to road cuttings, potholes, ruts, pits and
rechipcarpetting to damaged portion of 6th, & 7th main roads in
Nagendra Block, BSK III Stage.
Providing metalling to the roads M,N,O & P in Sy.No.20,22, 23 &
24 of Kothanur Village, Block -III of J.P.Nagar VIII Phase.
No work order copies
Estimate copies.
BDA/EE/S/ TEND/ W.O-08/98-99 dt:25-05-98
BDA / EE S/ TEN / T-47/ 98-99 dt: 02-05-98
(Tender documents & Estimate.)
BDA/EE/S/ TEND/ W.O-33/98-99 dt:07-09-98
BDA / EM /EO-II/ TEN / T-493/ 98-99 dt: 26-02-98
(Tender documents & estimate )
3660
3661
3662
3666
3667
3668
Formation of road and construction of slab drain in Sy.No.33 of
Kothanur Village, J.P.Nagar VIII phase, Block-I
BDA/EE/S/ TEND/ W.O-37/98-99 dt:16-12-98
BDA / EM /EO-II/ TEN / T-27/ 98-99dt: 23-11-98
(Tender documents & estimate )
3669
Removal of garbage for the period from 01-10-98 to 31-12-98 in
Vinayakanagar layout at BSK III Stage.
BDA/EE/S/T/ W.O-47/ 98-99 dt:24-03-99
Estimate copy.& work order
3670
Removal of garbage for the period from 01-10-98 to 31-12-98 in
Srinivasanagar II phase in Sy.No.2 to 14 of Gerehalli, BSK III
Stage.
Removal of garbage for the period from 01-10-98 to 31-12-98 in
jurisdiction of No.1 Sub-division, South, Layout Ideal Homes,
HBCS, BEML HBCS Layout.
Removal of garbage for the period from 01-10-98 to 31-12-98 in
BSK III Stage, 4th phase, 7th block formed in Sy.No.17,121,122
and 134/2 of KGP Manjunathanagar slum.
Removal of garbage for the period from 01-10-98 to 31-12-98 in
Kasturaba slum.
BDA/EE/S/ W.O-48/ 98-99 dt:24-03-99
Estimate copy.& work order
BDA/EE/S/T/ W.O-49/ 98-99 dt:24-03-99
Estimate copy.& work order
BDA/EE/S/T/ W.O-50/ 98-99 dt:24-03-99
Estimate copy.& work order
BDA/EE/S/T/ W.O-51/ 98-99 dt:24-03-99
Estimate copy.& work order
3671
3672
3673
3674
Removal of garbage for the period from 01-10-98 to 31-12-98 in
Kasturaba layout, II Stage.
BDA/EE/S/T/ W.O-52/ 98-99 dt:24-03-99
Estimate copy.& work order
3675
Repairs to road cuttings, pot holes, depression & re-chipcarpetting
to 6th cross road in Bilekanahally Dollar layout.
BDA/EE/S/T/ W.O-44/ 98-99 dt19-03-99
BDA / EM / TEN / T-341/ 98-99 dt:15-02-99 (Tender
documents submiited by the contractors, & estimate
) Sl.No.1
3676
Repairs to road cuttings portion (for laying water supply & sanitary
line) and chipcarpetting to 3rd main road in Bilekanahally, Dollars
layout.
BDA/EE/S/T/ W.O-45/ 98-99 dt19-03-99
BDA / EM / TEN / T-341/ 98-99 dt:15-02-99 (Tender
documents submiited by the contractors, & estimate
)Sl.No.2
3677
Repairs to road cuttings, pot holes, depression filling & rechipcarpetting to 7th cross road in Bilekanahally Dollar layout.
BDA/EE/S/T/ W.O-46/ 98-99 dt19-03-99
BDA / EM / TEN / T-341/ 98-99 dt:15-02-99 (Tender
documents submiited by the contractors, & estimate
)Sl.No.3
3678
Providing security arrangements for BDA Complex & Offices for
the period 01--03-99 to 31-03-2000-BSK Shopping complex-South
Division.
Removal of garbage for the period from 01-10-98 to 31-12-98 in
Srinivasanagar I phase in Sy.No.2 to 7 & 11 of Gerehally, BSK III
stage.
Removal of garbage for the period from 01-10-98 to 31-12-98 in
Srinivasanagar, kathriguppa main road , B.K.colony, and layout
formed in Sy.No.10 of Kathriguppa, BSK III Stage. I phase in
Sy.No.2 to 7 & 11 of Gerehally, BSK III stage.
Formation of 60' wide road in Sy.No.50, 51 and 52 of Tavarekere,
B'lore.
3679
3680
3681
99-2000
BDA/EE/S/T/ W.O-01/ 99-2000 dt15-04-99
BDA/EM/EO/Ten/T-343/98-99 dt:16-021998(estimate copy)
BDA/EE/S/T/ W.O-02/ 99-2000 dt02-04-99
No Notification (estimate copy)
BDA/EE/S/T/ W.O-03/ 99-2000 dt02-04-99
No Notification (estimate copy)
BDA/EE/S/T/ W.O-04/ 99-2000 dt04-02-2000
BDA/EM/EO-II/TEN/T-206/98-1999 dt:17-091998(estimate copy).
3682
Repairs to side drains and providing side drains at missing places
and construction of culverts in raghuvanapalya slum, BSK III stage.
BDA/EE/S/T/ W.O-04/ 99-2000 dt18-04-99
BDA/EM/TEN/T-316/98-1999 dt:28-121998.(estimate copy)
3683
Urgent repairs and construction of retaining wall in Sy.No.17 of
Kathriguppa, BSK III stage.
BDA/EE/S/T/ W.O-05/ 99-2000 dt13-05-99
BDA/EM/EO-II/TEN/T-387/98-1999 dt:31-031999(estimate copy).
3684
Formation of Roads, drains and culverts in Sy.No.10 & 15 (part) of
Alahally in J.P.Nagar IX phase, I block, Road No.A,B,C,D,E, F, G,
H&I
Formation of Roads, and construction of slab drain and slab culvert
in Sy.No.171 of Kothanur Village in J.P.Nagar VIII phase, I block.
BDA/EE/S/T/ W.O-06/ 99-2000 dt08-06-99
3685
3686
Providing cleaning & maintenance of BDA commercial complex at
BSK II stage for the perod from 01-07-99 to 31-12-99 (6 Months)
BDA/EE/S/T/ W.O-07/ 99-2000 dt08-06-99
BDA/EE/South/ T-10/99-2000 dt:13-07-1999
BDA/EM/EO-II/TEN/T-368/98-1999 dt:17-031999(estimate copy).
BDA/EM/EO-II/TEN/T-368/98-1999 dt:17-031999(estimate copy).
BDA/EM/EO-II/TEN/T-24/99-1999 dt:11-051999(estimate copy).
3687
Formation of 50' road connecting to ISRO and Athamadarshini in
Kumaraswamy Layout, II stage.
BDA/EE/South/ T-11/99-2000 dt:09-08-1999
BDA/EM/EO-II/TEN/T-44/99-1999 dt:03-061999(estimate copy& tenders submitted by
contractors).
Formation of layout in Sy.No.13/2B of Arehalli in BSK IV stage.
BDA/EE/South/ T-14/99-2000 dt:22-11-1999
BDA/EM/EO-II/TEN/T-120/99-1999 dt:19-081999(estimate copy& tenders submitted by
contractors).).
3688
3689
3690
3691
3692
Removal of garbage cleaning in Kumaraswamy layout I stage from
01-10-98 to 31-12-98
Construction of culverts and protection work to existing SWD,
retaining wall and improvements to approach road by providing
steps to Dr.Ambedkar slum, BSK III Stage.
BDA/EE/South/ T-15/99-2000 dt:08-12-1999
BDA/EE/S/T/ W.O-56/ 99-2000 dt19-04-99
BDA/EM/TEN/T-244/98-1999 dt:30-101998.Sl.No.1.Tenders dubmitted by the contractors
Metalling to Roads E, M, N, O, P, Q, R, S and T in Sy.No.87 of
Kothanur Village in J.P.Nagar VIII Phase, III Block.
BDA/EE/South/ T-55/99-2000 dt:09-04-1999
BDA/EM/TEN/T-316/98-1999 dt:28-12-1998.
Formation of Roads, drains and culverts in Sy.No.78, 79 & 82 of
Alahally Village & III block to IV block link road in J.P.Nagar IX
phase.
BDA/EE/South/ T-08/99-2000 dt:24-06-1999
BDA/EM/TEN/T-10/99-2000dt:09-04-1999
2000-2001
3693
No Copy
BDA/EM/EO-II/TEN/T-71/2000-01 dt:23-062000.(estimate & tenders submitted by contractors).
Providing metalling to road in J.P.Nasgar 9th phase, III block.
Site.No.263 to 325 .
BDA/EE/South/ T-O1/2000-2001 dt:26-04-2000
BDA/EM/TEN/T-256/99-2000 dt:24-022000.(estimate & tenders submitted by contractors).
Providing metalling to road nos.1 to 6 in Sy.No.80/2A of Kothanur
Village, J.P.Nagar VIII Stage, Block-III
BDA/EE/South/ T-O2/2000-2001 dt:10-05-2000
BDA/EM/TEN/T-256/99-2000 dt:24-022000.(estimate & tenders submitted by contractors).
Providing metalling to road 1,2,3,4,5,6 & 7 in Sy.No.15,16, 37 & 38
of Kothanur Village, J.P.Nagar VIII stage,Block-II
BDA/EE/South/ T-O3/2000-2001 dt:15-05-2000
BDA/EM/TEN/T-256/1999-00 dt:24-022000.(estimate & tenders submitted by contractors).
Providing metalling to road in Sy.No.9, 10 & 11 of Vaddarapalya,
BSK 5th stage, 80' road, I cross road & 9th to 11th main road.
BDA/EE/South/ T-O5/2000-2001 dt:15-06-2000
BDA/EM/TEN/T-12/2000-01 dt:12-042000.(estimate & tenders submitted by contractors).
Remetalling & chipcarpetting to I cross, 3rd crodd road and 5th
main road and 10th main road in SRK IV phase, Dollar layout.
3694
3695
3696
3697
3698
Providing metalling to road in Sy.No.9, 10 & 11 of Vaddarapalya,
BSK 5th stage, 8th 'A', 9to 12th main road.
BDA/EE/South/ T-O5/2000-2001 dt:07-09-2000
BDA/EM/TEN/T-71/2000-01 dt:23-062000.(estimate & tenders submitted by contractors).
Providing metalling to road in Sy.No.9, 10 & 11 of Vaddarapalya,
BSK 5th stage, 80' road , Ist to 3rd cross road and 7th main road.
BDA/EE/South/ T-O6/2000-2001 dt:16-06-2000
BDA/EM/TEN/T-12/2000-01 dt:12-042000.(estimate & tenders submitted by contractors).
Providing metalling to road in Sy.No.9, 10 & 11 of Vaddarapalya,
BSK 5th stage, 80' road , Ist & 2nd cross road , Ist and 2nd main
road.
BDA/EE/South/ T-O7/2000-2001 dt:15-06-2000
BDA/EM/TEN/T-12/2000-01 dt:12-042000.(estimate & tenders submitted by contractors).
Providing metalling to road in Sy.No.A,B,C,D,E,F,G, in Sy.No.17/1
of Kothanur Village, J.P.Nagar VIII stage, I block.
BDA/EE/South/ T-O8/2000-2001 dt:02-07-2000
BDA/EM/TEN/T-294/99-2000 dt:22-032000(estimate & tenders submitted by contractors).
Providing metalling to road in Sy.No.89 and to widening the road
from Alahalli village to IV block, J.P.Nagar IX phase.
BDA/EE/South/ T-09/2000-2001 dt:04-07-2000
BDA/EM/EO-II/TEN/T-256/99-2000 dt:24-022000.(estimate & tenders submitted by contractors).
Construction of SWD for flow of sewage water near C.B. site.No.10
in Ideal Home HBCS, layout, I stage.
BDA/EE/South/ T-10/2000-2001 dt:12-07-2000
BDA/EM/TEN/T-12/2000-01 dt:12-042000.(estimate & tenders submitted by contractors).
Providing metalling to 80' wide road and cross road in Sy.No.20 &
22 of Kothanur Village in J.P.Nagar, VIII stage, II block.
BDA/EE/South/ T-11/2000-2001 dt:12-07-2000
BDA/EM/TEN/EO-II/T-294/1999-00 dt:22-03-2000.
Providing metalling to roads in Sy.No/.9, 10 & 11 of Vaddarapalya,
BSK V stage.
BDA/EE/South/ T-12/2000-2001 dt:19-10-2000
BDA/EM/TEN/T-71/2000-01 dt:23-062000.(estimate & tenders submitted by contractors).
Pothole filling and chipvarpetting to 2nd, 3rd, 3A and 4th main
roads and 1st to 4th cross road in Bilekanahalli, Dollars layout
under BTM 2nd stage.
BDA/EE/South/ T-13/2000-2001 dt:16-06-2000
BDA/EM/TEN/EO-II/T-294/1999-00 dt:22-032000.(estimate & tenders submitted by contractors).
Remetalling & chipcarpetting to 7th & 8th main road in Sarakki IV
phase, Dollar layout.
BDA/EE/South/ T-15/2000-2001 dt:05-10-2000
BDA/EM/TEN/T-71/2000-01 dt:23-062000.(estimate & tenders submitted by contractors).
Providing metalling to roads in Sy.No/.9, 10 & 11 of Vaddarapalya,
BSK V stage.(3rd to 5th main & 7th cross)
BDA/EE/South/ T-15/2000-2001 dt:19-10-2000
BDA/EM/TEN/T-71/2000-01 dt:23-062000.(estimate & tenders submitted by contractors).
3699
3700
3701
3702
3703
3704
3705
3706
3707
3708
3709
Construction of SSM culverts at junction of roads inbetween 1st &
7th main road in Sy.No.9,10,& 11 of Vaddarapalya, BSK V stage.
BDA/EE/South/ T-16/2000-2001 dt:05-10-2000
BDA/EM/TEN/T-105/2000-01 dt:21-072000.(estimate & tenders submitted by contractors).
Providing remetalling & chipcarpetting to 2nd cross road in Sarakki
IV phase, Dollars layout.
BDA/EE/South/ T-16/2000-2001 dt:19-10-2000
BDA/EM/TEN/T-71/2000-01 dt:23-062000.(estimate & tenders submitted by contractors).
Providing barbed wire fencing and development of park behind
Atma darshan yogashram in Kumaraswamy layout I stage.
BDA/EE/South/ T-18/2000-2001 dt:19-10-2000
BDA/EM/TEN/EO-II/T-31/2000-01 dt:05-052000(estimate & tenders submitted by contractors).
Construction of Culverts across the roads in 7th & 7th 'A'block of
Raghuvanapalya, J.P.nagar IX phase.
BDA/EE/South/ T-19/2000-2001 dt:23-09-2000
BDA/EM/TEN/T-105/2000-01 dt:21-072000.(estimate & tenders submitted by contractors).
Providing metalling & chipcarpetting to 4th main & 5th cross road,
Sarakki, IV phase, Dollar layout.
BDA/EE/South/ T-22/2000-2001 dt:02-11-2000
BDA/EM/TEN/T-71/2000-01 dt:23-062000.(estimate & tenders submitted by contractors).
Providing metalling to roads in Sy.No/.9, 10 & 11 of Vaddarapalya,
BSK V stage.(2nd to 7th cross road and 8th main road.)
BDA/EE/South/ T-23/2000-2001 dt:10-10-2000
BDA/EM/TEN/T-71/2000-01 dt:23-062000.(estimate & tenders submitted by contractors).
Providing chipcarpetting to 9th main & balance portion of 4th cross
road in Sarakki IV phase, Dollar layout.
BDA/EE/South/ T-24/2000-2001 dt:18-10-2000
BDA/EM/TEN/T-71/2000-01 dt:23-062000.(estimate & tenders submitted by contractors).
Providing metalling to roads in Sy.No/.9, 10 & 11 of Vaddarapalya,
BSK V stage, 6th to 8th main road & 3rd to 7th cross road.
BDA/EE/South/ T-25/2000-2001 dt:26-10-2000
BDA/EM/TEN/T-71/2000-01 dt:23-062000.(estimate & tenders submitted by contractors).
Providing remetalling & chipcarpetting to 1st, 2nd & 6th main road
Sarakki IV phase, Dollars layout.
No Copy
BDA/EM/TEN/T-71/2000-01 dt:23-062000.(estimate & tenders submitted by contractors).
Construction of culverts across the roads in layout formed in
Sy.No.32/3, 32/4 & 32/5 of Kothanur Village, J.P.nagar VIII stage.
BDA/EE/South/ T-25/2000-2001 dt:21-10-2000
Work order on quotation-BDA/EE/S/dt:20-07-2000
Construction of culverts in Sy.No.50 of Govinayakanahalli,
Kumaraswamy layout.
BDA/EE/South/ T-29/2000-2001 dt:10-11-2000
BDA/EM/TEN/T-105/2000-01 dt:21-072000.(estimate & tenders submitted by contractors).
3710
3711
3712
3713
3714
3715
3716
3717
3718
3719
3720
Formation of road continuity from already formed road layout II
block to I block in J.P.Nagar VIII stage.
3721
3722
3723
3724
3725
3726
3727
3728
3729
3730
3731
3732
Formation of sites, roads, BS Slab drains and construction of CD
works for proposed Banashankari VI stage, 2nd phase layout in
B'lore South Tq, Block.No.6
Formation of sites, roads, BS Slab drains and construction of CD
works for proposed Banashankari VI stage, 2nd phase layout in
B'lore South Tq, Block.No.7
Formation of sites, roads, BS Slab drains and construction of CD
works for proposed Banashankari VI stage, 2nd phase layout in
B'lore South Tq, Block.No.8
Formation of sites, roads, BS Slab drains and construction of CD
works for proposed Banashankari VI stage, 2nd phase layout in
B'lore South Tq, Block.No.9
Formation of sites, roads, BS Slab drains and construction of CD
works for proposed Banashankari VI stage, 2nd phase layout in
B'lore South Tq, Block.No.10
Cutting & clearing jungle, removal of silt in side drains & berms in
1st, 2nd, 3rd main road and 1st cross road in Sarakki IV phase,
Dollars layout.
Cutting & clearing jungle, providing site boundary stones &
numbering stones to corner & intermediate sites proposed for
auction in Sarakki IV phase, Dollars layout.
Repairs to road cutting potholes filling, filling up ruts & pits,
depression filling and rechipcarp[etting to damaged portion of 3rd
main , 1st main and 1st cross road in SRK IV phase, Dollar layout.
BDA/EE/South/ T-31/2000-2001 dt:11-01-2001
BDA/EM/TEN/T-178/2000-01 dt:13-102000.(estimate & tenders submitted by contractors).
BDA/EE/S/JE/TEN/W.O/32/2000-01 dated: 1212-2001
BDA/EM/TEN/EO-II/T-18/2001-02 dt:27-10-2001.
BDA/EE/S/JE/TEN/W.O/33/2000-01 dated: 1212-2001
BDA/EM/TEN/EO-II/T-18/2001-02 dt:27-10-2001.
BDA/EE/S/JE/TEN/W.O/34/2000-01 dated: 1212-2001
BDA/EM/TEN/EO-II/T-18/2001-02 dt:27-10-2001.
BDA/EE/S/JE/TEN/W.O/35/2000-01 dated: 1212-2001
BDA/EM/TEN/EO-II/T-18/2001-02 dt:27-10-2001.
BDA/EE/S/JE/TEN/W.O/36/2000-01 dated: 1212-2001
BDA/EM/TEN/EO-II/T-18/2001-02 dt:27-10-2001.
BDA/EE/S/JE/TEN/W.O/37/2000-01 dated: 0803-2001
BDA/EE/S/JE/TEN/W.O/38/2000-01 dated: 0803-2001
BDA/EE/S/JE/TEN/W.O/39/2000-01 dated: 0803-2001
Providing Metalling to roads in b,b,1,2,3,4,5 & 6 of Kothanur Village
in 1st block of J.P.Nagar 8th stage.
BDA/EE/S/JE/TEN/W.O/40/2000-01 dated: 1203-2001
Construction of damaged culvert and providing RCC deck slab at
the junction of 2nd cross and 3rd main, 9th main & 4th cross, 3rd
cross & 3rd main, 7th main & 4th cross, 6th main & 4th cross and
8th main & 4th cross road in Sarakki IV phase, Dollar layout.
ReConstruction of damaged culvert and providing RCC deck slab
at the junction of 9th main road & 4th cross road in Sarakki IV
phase, Dollar layout.
ReConstruction of damaged culvert and providing RCC deck slab
at the junction of 3rd cross road and 3rd main road in Sarakki IV
phase, Dollar layout.
BDA/EE/S/JE/TEN/W.O/41/2000-01 dated: 2003-2001
BDA/EM/TEN/EO-II/T-293/A/2000-01 dt:08-022001.(estimate copy)
BDA/EM/TEN/EO-II/T-293/A/2000-01 dt:08-022001.(estimate copy)
BDA/EM/TEN/EO-II/T-293/2000-01 dt:08-022001.(estimate copy)
BDA/EM/EO-II/TEN/T-178/2000-01 dt:13-10-2000.
BDA/EM/TEN/T-266/2000-01 dt:09-012001.(Tenders & estimate)
Only estimate copy
Only estimate copy
3733
3734
3735
3736
3737
3738
3739
3740
3741
3742
3743
3744
3745
3746
3747
3748
ReConstruction of damaged culvert and providing RCC deck slab
at the junction of 7th main road & 4th cross road in Sarakki IV
phase, Dollar layout.
ReConstruction of damaged culvert and providing RCC deck slab
at the junction of 6th main road & 4th cross road in Sarakki IV
phase, Dollar layout.
ReConstruction of damaged culvert and providing RCC deck slab
at the junction of 8th main road & 4th cross road in Sarakki IV
phase, Dollar layout.
Formation of sites, roads, BS Slab drains and construction of CD
works for proposed Banashankari VI stage, 1st phase layout in
B'lore South Tq, Block.No.5
Formation of sites, roads, BS Slab drains and construction of CD
works for proposed Banashankari VI stage, 1st phase layout in
B'lore South Tq, Block.No.4
Formation of sites, roads, BS Slab drains and construction of CD
works for proposed Banashankari VI stage, 1st phase layout in
B'lore South Tq, Block.No.3
Formation of sites, roads, BS Slab drains and construction of CD
works for proposed Banashankari VI stage, 1st phase layout in
B'lore South Tq, Block.No.2
Formation of sites, roads, BS Slab drains and construction of CD
works for proposed Banashankari VI stage, 1st phase layout in
B'lore South Tq, Block.No.1
Improvements to approach road from Khodays glass factory
junction to J.P.Nagar 8th stage, I & II block, raghuvanapalya
J.P.Nagar 9th stage.
Only estimate copy
Only estimate copy
Only estimate copy
BDA/EE/S/JE/TEN/W.O/30/2000-01 dated: 2911-2001
BDA/EM/TEN/EO-II/T-9/2001-02 dt:27-08-2001.
BDA/EE/S/JE/TEN/W.O/29/2000-01 dated: 2911-2001
BDA/EM/TEN/EO-II/T-9/2001-02 dt:27-08-2001.
BDA/EE/S/JE/TEN/W.O/28/2000-01 dated: 2911-2001
BDA/EM/TEN/EO-II/T-9/2001-02 dt:27-08-2001.
BDA/EE/S/JE/TEN/W.O/27/2000-01 dated: 2911-2001
BDA/EM/TEN/EO-II/T-9/2001-02 dt:27-08-2001.
BDA/EE/S/JE/TEN/W.O/26/2000-01 dated: 2911-2001
BDA/EM/TEN/EO-II/T-9/2001-02 dt:27-08-2001.
BDA/EE/S/JE/TEN/W.O/42/2000-01 dated: 3003-2001
BDA/EM/EO-II/TEN/T-280/2000-01 dt:24-01-2001.
Construction of culverts across 30', 40' & 60' roads in Sy.No.85 &
86 of Uttarahalli, BSK V stage.
BDA/EE/S/JE/TEN/W.O/44/2000-01 dated: 2901-2001
BDA/EE/S/JE/TEN/W.O/45/2000-01 dated: 0902-2001
BDA/EM/EO-II/TEN/T-178/2000-01 dt:13-10-2000.
Improvements to existing road from Kanakapura, Bangalore NH
(Konankunte Cross) to J.P.Nagar 8th & 9th phase.
BDA/EE/S/JE/TEN/W.O/47/2000-01 dated: 0902-2001
BDA/EM/EO-II/TEN/T-178/2000-01 dt:13-10-2000.
Formation of layout, metalling, Culverts & Chain link fencing at
Kumaraswamy layout, I stage.
BDA/EE/S/JE/TEN/W.O/48/2000-01 dated: 0902-2001
BDA/EM/EO-II/TEN/T-178/2000-01 dt:13-10-2000.
Installations of Vinyl sign board of 2 nos to the BSK BDA Complex.
Providing Metalling to road in Anjanapura township-Block VI
Providing Metalling to road in Anjanapura township-Block V-G
Providing Metalling to road in Anjanapura township-Block- IV
2001-02
BDA/EE/S/JE/TEN/W.O/48/2001-02 dated: 0402-2002
BDA/EE/S/JE/TEN/W.O/47/2001-02 dated: 0402-2002
BDA/EE/S/JE/TEN/W.O/45/2001-02 dated: 04-
work order on quotation-BDA/EE/S/dt:19-01-2001
BDA/EM/TEN/T-348/2001-02 dt:07-11-2001.
BDA/EM/TEN/T-348/2001-02 dt:07-11-2001.
BDA/EM/TEN/T-348/2001-02 dt:07-11-2001.
02-2002
3749
3750
3751
3752
3753
3754
3755
Providing Metalling to road in Anjanapura township-Block- II
Providing Metalling to road in Anjanapura township-Block- III & III
A.
Providing Metalling to road in Anjanapura township-Block- VII
Providing Metalling to road in Anjanapura township-Block- I
Providing Metalling to road in Anjanapura township-Block- V & VG
Providing Metalling to road in Anjanapura township-Block- VIII
Construction of Lead off drain in Sy.No.85 & 86 of Uttarahalli
Village, BSK V Stage, 4th main and 7th main road, Bangalore.
3756
Construction of Storm Water Drain and lead off drains in BSK VI
Stage, Block I & II
3757
Providing metalling to roads in Sy.No.50 of Govinayakanahalli,
Kumaraswamy Layout, Bangalore.
3758
3759
3760
3761
3762
3763
3764
3765
3766
Providing metalling to roads in Sy.No.17/1, 27/1 & 27/2 of
Avalahally, BSK III Stage.
Formation of additional sites in layout land in Kumaraswamy
layout.
Providing Sanitary facilities to Yediyur Village K.R.road, BSK II
Stage.
Improvements to approach road from 100' ring road to Ambedkar
slum in BSK III Stage.
BDA/EE/S/JE/TEN/W.O/43/2001-02
02-2002
BDA/EE/S/JE/TEN/W.O/44/2001-02
02-2002
BDA/EE/S/JE/TEN/W.O/49/2001-02
02-2002
BDA/EE/S/JE/TEN/W.O/42/2001-02
02-2002
BDA/EE/S/JE/TEN/W.O/46/2001-02
02-2002
BDA/EE/S/JE/TEN/W.O/50/2001-02
02-2002
BDA/EE/S/JE/TEN/W.O/22/2001-02
09-2001
dated: 04dated: 04dated: 04dated: 04dated: 04dated: 04-
BDA/EM/TEN/T-348/2001-02 dt:07-11-2001.
BDA/EM/TEN/T-348/2001-02 dt:07-11-2001.
BDA/EM/TEN/T-348/2001-02 dt:07-11-2001.
BDA/EM/TEN/T-348/2001-02 dt:07-11-2001.
BDA/EM/TEN/T-348/2001-02 dt:07-11-2001.
BDA/EM/TEN/T-348/2001-02 dt:07-11-2001.
dated: 28BDA/EM/TEN/T-101/2001-02 dt:11-06-2001.
BDA/EE/S/JE/TEN/W.O/04/2002-03dated: 12-062002
BDA/EE/S/JE/TEN/W.O/31/2001-02dated: 04-122001
19-12-
BDA/EM/TEN/T-24/2002-03 dt:09-04-2002.
BDA/EM//TEN/T-257/2001-02dt:20-09-2001.
Construction of SSM Culverts and lead off drain in layout in
Sy.No.17/1, 27/1 & 27/2 of Avalahally, BSK III Stage.
BDA/EE/S/JE/TEN/W.O/37/2001-02dated:
2001
BDA/EE/S/JE/TEN/W.O/15/2001-02dated:
2001
BDA/EE/S/JE/TEN/W.O/20/2001-02dated:
2001
BDA/EE/S/JE/TEN/W.O/16/2001-02dated:
2001
BDA/EE/S/JE/TEN/W.O/24/2001-02dated:
2001
Formation of Foot path and shoulder drains to 60' Road in
Sy.No.85 & 86 of Uttarahalli Bsk V Stage, Bangalore.
BDA/EE/S/JE/TEN/W.O/23/2001-02dated: 18-102001
BDA/EM/TEN/T-101/2001-02 dt:11-06-2001.
Construction of culverts across roads II, IIIA and H Block and
providing metalling the roads I, II and III block for J.P.Nagar IX
Phase.
Construction of culverts across roads IV, IVA and VII Block and
metalling the roads of IV, IVA and VII block for J.P.Nagar IX
Phase.
Construction of Culverts in I, IA, II , II EWS Sector and III Block of
J.P.Nagar VIII Stage.
BDA/EE/S/JE/TEN/W.O/13/2001-02dated: 11-072001
BDA/EM/TEN/T-53/2001-02 dt:04-05-2001.
BDA/EE/S/JE/TEN/W.O/11/2001-02dated: 11-072001
BDA/EM/TEN/T-53/2001-02 dt:04-05-2001.
27-0719-0920-08-
BDA/EM/TEN/T-257/2001-02 dt:20-09-2001.
BDA/EM/TEN/T-106/2001-02 dt:14-06-2001.
BDA/EM/TEN/T-106/2001-02 dt:14-06-2001.
BDA/EM/TEN/T-106/2001-02 dt:14-06-2001.
19-10-
BDA/EE/S/JE/TEN/W.O/12/2001-02dated: 11-072001
BDA/EM/TEN/T-101/2001-02 dt:11-06-2001.
BDA/EM/TEN/T-53/2001-02 dt:04-05-2001.
3767
3768
3769
3770
3771
3772
3773
3774
3775
3776
3777
Construction of culverts across roads at V, VA, VB Block and
metalling the roads of V, VA, VB and VII B Block, J.P.Nagar IX
Phase Layout.
Providing metalling to roads in Sy.No.85 & 86 of Uttarahalli, BSK V
Stage, Bangalore.
Construction of masonry lead off drain for the additional sites in
BSK III Stage, II Phase.
Formation of sites in Sy.No.17/1, 27/1 and 27/2 of Avalahally
Village, BSK III Stage.
Providing water supply facilities to layout in Sy.No.50 of
Govinayakanahally in Kumaraswamy layout, Bangalore.
Providing Sanitary facilities to lSy.No.58/5 of Yeddiyur Village, BSK
II Stage.
Construction of culverts at junction of roads in between 8th and
12th main road in Sy.No.9, 10 and 11 of Vaddarapalya, BSK V
stage.
Construction of Storm water drain at Anjanapura township, Block I,
V and VG
Formation of sites to be proposed for auction in BSK III Stage in
Hosakerehalli Sy.No.108 & 120.
Providing alling and asphalting to internal roads of Ambedkar slum,
BSK III Stage.
Formation of shop sites in CA site adjacent to 100' ring road in
BTM II stage, I phase.
BDA/EE/S/JE/TEN/W.O/15/2001-02dated: 06-082001
BDA/EE/S/JE/TEN/W.O/25/2001-02dated:
2001
BDA/EE/S/JE/TEN/W.O/18/2001-02dated:
2001
BDA/EE/S/JE/TEN/W.O/10/2001-02dated:
2001
BDA/EE/S/JE/TEN/W.O/40/2001-02dated:
2001
26-1105-0916-06-
BDA/EM/TEN/T-101/2001-02 dt:11-06-2001.
BDA/EM/TEN/T-180/2001-02 dt:01-08-2001.
BDA/EM/TEN/T-53/2001-02 dt:04-05-2001.
16-06BDA/EM/TEN/T-101/2001-02 dt:11-06-2001.
BDA/EE/S/JE/TEN/W.O/19/2001-02dated: 19-092001
BDA/EE/S/JE/TEN/W.O/38/2001-02dated: 28-122001
BDA/EE/S/JE/TEN/W.O/41/2001-02dated: 31-012002
BDA/EE/S/TEN/W.O/09/2001-02dated:
08-062001
BDA/EE/S/TEN/W.O/17/2001-02dated:
2001
Tender cancelled
BDA/EM/TEN/T-53/2001-02 dt:04-05-2001.
20-08-
BDA/EM/TEN/T-106/2001-02 dt:14-06-2001.
BDA/EM/TEN/T-101/2001-02 dt:11-06-2001.
BDA/EM/TEN/T-349/2001-02 dt:07-11-2001.
BDA/EM/TEN/T-30/2001-02 dt:20-04-2001.
BDA/EM/TEN/T-106/2001-02 dt:14-06-2001.
BDA/EM/TEN/T-16/2001-02 dt:11-04-2001.
2002-03
3778
formation of sites, roads, side drains and construction of CD works
in Anjanapura Township and further Extension of Anjanapura
layout, Uttarahally Hobli, Bangalore South taluk (Package-1to 6).
3779
3780
3781
Formation of sites, roads, side drains and construction of CD works
in BSK VI Stage III phase, Uttarahalli hobli, Bangalore South taluk,
Package-I
Formation of sites, roads, side drains and construction of CD works
in BSK VI Stage III phase, Uttarahalli hobli, Bangalore South taluk,
Package-II
Formation of sites, roads, side drains and construction of CD works
in BSK VI Stage III phase, Uttarahalli hobli, Bangalore South taluk,
Package-III
(1)BDA/EE(S)/JE/TEN/WO/12/2002-03 dt:29-072002. (2).BDA/EE(S)/JE/TEN/WO/13/2002-03
dt:29-07-2002
(3).BDA/EE(S)/JE/TEN/WO/14/2002-03 dt:29-072002.(4).BDA/EE(S)/JE/TEN/WO/15/2002-03
dt:29-07-2002.
(5).BDA/EE(S)/JE/TEN/WO/16/2002-03 dt:29-072002(6).BDA/EE
BDA/EM/TEN/T-294/2002-03 Dt:09-07-2002
BDA/EE(S)/JE/TEN/WO/08/2002-03 dt:29-072002
BDA/EM/TEN/T-295/2002-03 Dt:09-07-2002
BDA/EE(S)/JE/TEN/WO/09/2002-03 dt:29-072002
BDA/EM/TEN/T-295/2002-03 Dt:09-07-2002
BDA/EE(S)/JE/TEN/WO/10/2002-03 dt:29-072002
BDA/EM/TEN/T-295/2002-03 Dt:09-07-2002
3782
3783
3784
3785
3786
3787
3788
3789
3790
3791
3792
3793
3794
3795
3796
3797
Formation of sites, roads, side drains and construction of CD works
in BSK VI Stage III phase, Uttarahalli hobli, Bangalore South taluk,
Package-IV
Formation of sites, roads, BS Slab drains, construction of CD
works , etc, proposed for BSK VI stgae III phase Block XI in
Bangalore Siuth taluk.
Providing Asphalting to newly formed roads in Sy.No.50 of
Govinayakanahalli
BDA/EE(S)/JE/TEN/WO/11/2002-03 dt:29-072002
BDA/EM/TEN/T-295/2002-03 Dt:09-07-2002
BDA/EE(S)/JE/TEN/WO/3/2002-03 dt:12-06-2002
BDA/EM/TEN/T-23/2002-03 Dt:09-04-2002
BDA/EE(S)/JE/TEN/WO/51/2002-03 dt:22-042002
BDA/EM/TEN/T-449/2001-02 Dt:19-12-2001
Depression filling pot hole filling and repairs to damaged portion of
roads in B.G's officers HBCS Layout Arehally.
BDA/EE(S)/JE/TEN/WO/02/2002-03 dt:05-062002
BDA/EM/TEN/T-609/2001-02 Dt:19-03-2002
Urgent repairs to road cuttings pot holes and depression filling to
damaged portion of roads in R.B.I Layout.
Construction of Storm Water Drain and lead off drains in BSK VI
Stage, Block I to V
Construction of Storm Water Drain and lead off drains in BSK VI
Stage, Block I to V
BDA/EE(S)/JE/TEN/WO/07/2002-03 dt:13-062002
BDA/EM/TEN/T-609/2001-02 Dt:19-03-2002
No work order copies
Original File
No work order copies
Original File
Construction of Storm water drain in Further extension of
Anjanapura.
Construction of Lead Off Drain and Storm Water Drain in
Banashankari VI Stage, Block XI and extended area of Block III &
IV.
2003-04
BDA/EE(S)/AE/TEN/WO/35/2003-04 dt:01-082003
BDA/EM/TEN/T-25/2003-04 Dt:22-04-2003
BDA/EE(S)/AE/TEN/WO/34/2003-04 dt:01-082003
BDA/EM/TEN/T-25/2003-04 Dt:22-04-2003 Sl.No.2
Construction of Box culverts 6.0 x 3.0m in road.No.MR3 at
chainage 280 Mtrs in Block I of Anjanapura Township.
BDA/EE(S)/AE/TEN/WO/40/2003-04 dt:12-082003
BDA/EM/TEN/T-27/2003-04 Dt:22-04-2003 Sl.No.10
Construction of Storm Water Drain between Sy.No.22,23, 24 & 25
of Kothanur Village, Block II, J.P.Nagar VIII Phase.
BDA/EE(S)/AE/TEN/WO/37/2003-04 dt:01-082003
BDA/EM/TEN/T-27/2003-04 Dt:22-04-2003 Sl.No.3
Providing Asphalting the approach road from Kanakapura Road to
Anjanapura via Konanakunte in J.P.Nagar IX Phase.
BDA/EE(S)/AE/TEN/WO/54/2003-04 dt:05-122003
BDA/EM/TEN/T-700/2002-03 Dt:07-03-2003
BDA/EE(S)/AE/TEN/WO/32/2003-04 dt:21-072003
BDA/EM/TEN/T-27/2003-04 Dt:22-04-2003
BDA/EE(S)/AE/TEN/WO/42/2003-04 dt:21-082003
BDA/EM/TEN/T-27/2003-04 Dt:22-04-2003
BDA/EE(S)/AE/TEN/WO/26/2003-04 dt:01-082003
BDA/EM/TEN/T-27/2003-04 Dt:22-04-2003
BDA/EE(S)/AE/TEN/WO/39/2003-04 dt:08-082003
BDA/EM/TEN/T-27/2003-04 Dt:22-04-2003
Construction of Storm Water Drain between Sy.No. 25 of Kothanur
Village,and RaghuvanapalyaVillage, Block II of J.P.Nagar VIII
Phase.
Construction of Lead off drain in Block III 'A' of Anjanapura
township.
Construction of Storm Water Drain between Sy.No. 21, 27 & 28 of
Kothanur , Block II of J.P.Nagar VIII Phase.
Construction of Storm Water Drain in BlockIA, II EWS Block II of
J.P.Nagar VIII Phase.
3798
3799
3800
3801
3802
3803
3804
3805
3806
BDA/EE(S)/AE/TEN/WO/27/2003-04 dt:01-072003
BDA/EM/TEN/T-31/2003-04 Dt:23-04-2003
BDA/EE(S)/JE/TEN/WO/3/2003-04 dt:14-05-2003
BDA/EM/TEN/T-663/2002-03 Dt:23-01-2003
BDA/EE(S)/JE/TEN/WO/4/2003-04 dt:14-05-2003
BDA/EM/TEN/T-663/2002-03 Dt:23-01-2003
BDA/EE(S)/AE/TEN/WO/31/2003-04 dt:21-072003
BDA/EM/TEN/T-27/2003-04 Dt:22-04-2003
Providing metalling to approach roads from Khoday Glass factory
to Gottigere Road , J.P.Nagar VIII Phase.
BDA/EE(S)/AE/TEN/WO/30/2003-04 dt:21-072003
BDA/EM/TEN/T-27/2003-04 Dt:22-04-2003
Construction of Culverts, BS Slab Drain to the Approach Road
from khodays Glass Factory to Gottigere Village Road in J.P.Nagar
VIII Phase.
BDA/EE(S)/AE/TEN/WO/38/2003-04 dt:06-082003
BDA/EM/TEN/T-27/2003-04 Dt:22-04-2003
Providing Asphalting to road from Khodays Glass factory to
Gottigere Road in J.P.Nagar VIII Phase.
BDA/EE(S)/AE/TEN/WO/55/2003-04 dt:05-122003
BDA/EM/TEN/T-27/2003-04 Dt:22-04-2003
Construction of Culverts across the Roads formed in Sy.No.36, 41
& 42 of Raghuvanapalya in Block VII of J.P.Nagar IX Phase.
BDA/EE(S)/AE/TEN/WO/28/2003-04 dt:01-072003
BDA/EM/TEN/T-31/2003-04 Dt:23-04-2003
Consultancy services for mapping and preparation of GIS, in the
digital format, with survey number boundaries, and all
topographical features detailed at scale 1:2000, for the purpose of
planning, development and management of sites and services of
Banash
BDA/EE(S)/AE/TEN/WO/41/2003-04 dt:12-082003
BDA/EM/TEN/T-120/2003-04 Dt:10-07-2003
Providing metalling to the Roads formed in Sy.No.36,41, & 42 of
Raghuvanapalya in Block VII of J.P.Nagar IX Phase.
a) Construction of Storm Water Drain in Block 3 & 4, of
J.P.Nagar 9th Phase.(same)
b) Construction of Storm Water Drain in Block 4 & 4A, of
J.P.Nagar 9th Phase.(same)
Construction of Storm Water Drain between Sy.No.8/4 & 8/5 of
Kothanur Village and Regional park block 1A, J.P.Nagar VIII
Phase.
2004-2005
BDA/EE/S/AE/TEN/W.O/01/2003-04 dated: 0306-2004
BDA/EM/TEN/T-249/2003-04 DT 28-10-2003
BDA/EE/S/AE/TEN/W.O/02/2004-05 dated: 2906-2004
BDA/EM/TEN/T-331/2003-2004 DT 06-2-04
No.8
Construction of culverts in Sy.No.5 & 6 of Bikasipura, BSK V
Stage.
BDA/EE/S/AE/TEN/W.O/08/2004-05 dated: 2607-2004
BDA/EM/TEN/T-331/2003-2004
Sl.No.3
Construction of Storm Water Drain in Sy.No.3 of Bikasipura, BSK V
Stage.
BDA/EE/S/AE/TEN/W.O/09/2004-05 dated: 3007-2004
BDA/EM/TEN/T-331/2003-2004 DT 06-2-04
No.5
Sl
3810
Construction of Storm Water Drain in Sy.No.5 & 6 of Bikasipura,
BSK V Stage.
BDA/EE/S/AE/TEN/W.O/10/2004-05 dated: 3007-2004
BDA/EM/TEN/T-331/2003-2004 DT 06-2-04
No.4
Sl
3811
Construction of culverts in Sy.No.3 of Bikasipura, BSK V Stage.
BDA/EE/S/AE/TEN/W.O/12/2004-05 dated: 0609-2004
BDA/EM/TEN/T-331/2003-2004 DT 06-2-04 Sl.No.6
3807
3808
3809
Formation of approach Road from Uttarahally main Road via
Raithakarmikara Gruha Nirmana Sahakarasanga pvt layouts to
BSK VI Stage, Block I & II.
Formation of additional sites in Banashankari VI Stage, VII Block.
DT
Sl
06-02-04
Formation of sites in Sy.No.33/4 of N.S.Palya Village, Begur Hobli,
Bangalore South Taluk.
BDA/EE/S/AE/TEN/W.O/11/2004-05 dated: 1309-2004
BDA/EM/TEN/T-22/2004-2005 DT 12-05-04 Sl.No.1
3812
Providing Barbed wire fencing to C.A Site in Sy.No.9, 10 & 11 of
Vaddarapalya in BSK V Stage
BDA/EE/S/AE/TEN/W.O/13/B/2004-05 dated: 2309-2004
BDA/EM/TEN/T-331/2003-2004 DT 06-2-04 Sl.No.1
3813
Providing Metalling to Roads in Sy.No.5 & 6 of Bikasipura.,BSK V
Stgae.
Providing Metalling to Roads in Sy.No.17 & 18 of Vasanthapura
Village, BSK V Stage.
BDA/EE/(S)AE/TEN/W.O/16/2004-05
10-2004
dated:05-
BDA/EM/TEN/T-331/2003-2004 DT 06-2-04Sl.No.7
3814
Formation of Roads, B.S.Slab Drains and Construction of CD
works for formation of additional sites in BSK VI Stage, X Phase.
BDA/EE/(S)AE/TEN/W.O/12/2004-05
03-2005
dated:16-
BDA/EM/TEN/T-217/2004-2005DT
Sl.No.1
3815
Providing metalling to the roads I,IA, II and II EWS sector of
th
J.P.Nagar 8 phase.
BDA/EE/(S)AE/TEN/W.O/19/2004-05
11-2004
2005-2006
dated:10-
BDA/EM/TEN/T-53/01-02 DT 04-05-01Sl.No.3
3816
Providing Fencing in Sy.No.8 of Ganakal Village (Gunduthopu)
dated:30-
BDA/EM/TEN/T-337/04-05 DT 18-02-05 Sl.No.1
3817
Construction of Lead Off Drain in V Block of Banashankari VI
Stage.
Providing Re-Metalling and Asphalting to 24m Road.No.MR1 in
Anjanapura Layout.
Providing Re-Metalling and Asphalting to 18m Road.No.MR8 and
24m Road No.MR3 in Anjanapura Layout
BDA/EE/(S)AE/TEN/W.O/01/2005-06
04-2005
BDA/EE/(S)AE/TEN/W.O/02/2005-06
05-2005
BDA/EE/(S)AE/TEN/W.O/03/2005-06
10-2005
BDA/EE/(S)AE/TEN/W.O/04/2005-06
10-2005
dated:27-
BDA/EM/TEN/T-335/04-05 DT 18-02-05 Sl.No.1
dated:28-
BDA/EM/TEN/T-70 / 05-06 DT 25-05-05 Sl.No.4
dated:28-
BDA/EM/TEN/T-70 / 05-06 DT 25-05-05 Sl.No.2
Providing Re-Metalling and Asphalting to 18m Road.No.MR9 in
Anjanapura Layout..
Providing Re-Metalling and Asphalting to 24m Road.No.MR2 in
Anjanapura Layout.
Providing Re-Metalling and Asphalting to 18m Road.No.MR5 and
24m Road No.MR4 & MR6 in Anjanapura Layout.
BDA/EE/(S)AE/TEN/W.O/05/2005-06
10-2005
BDA/EE/(S)AE/TEN/W.O/06/2005-06
11-2005
BDA/EE/(S)AE/TEN/W.O/07/2005-06
11-2005
dated:28-
BDA/EM/TEN/T-70 / 05-06 DT 25-05-05 Sl.No.1
dated:07-
BDA/EM/TEN/T-70 / 05-06 DT 25-05-05 Sl.No.3
dated:07-
BDA/EM/TEN/T-70 / 05-06 DT 25-05-05 Sl.No.5
Formation of Sites, Roads, B.S.Slab Drain, Lead off Drain &
Construction of CD works in Sy.No.86/2 (p), 1/1 (p), 1/2 (p) & 2 (p)
of Thalaghattapura Village in Further Extension of BSK VI Stage,
IV ‘T’ Block.
Formation of additional sites in Sy.No.1/3A of Gublala village and
Sy.No.20/1, 2 & 3 of Thurahalli in FE of BSK VI Stage, IV H Block.
BDA/EE/(S)AE/TEN/W.O/08/2005-06
11-2005
dated:09-
BDA/EM/TEN/T-38 / 05-06 DT 22-08-05 Sl.No.5
Formation of sites, roads, BS Slab drains, construction of culverts
and storm water drain in Sy.No.38/2 & 38/3 of Thurahalli Village in
BSK VI Stage, II Block.
Formation of sites in Sy.No.64 of Hemmigepura Village, BSK VI
Stage, IX Block
BDA/EE/(S)AE/TEN/W.O/10/2005-06
11-2005
dated:16-
BDA/EM/TEN/T-38 / 05-06 DT 22-08-05 Sl.No.2
BDA/EE/(S)AE/TEN/W.O/11/2005-06
11-2005
dated:16-
BDA/EM/TEN/T-38 / 05-06 DT 22-08-05 Sl.No.3
3818
3819
3820
3821
3822
3823
3824
3825
3826
17-11-04
Tender cancelled.
3827
Formation of sites, roads, side drains and construction of CD works
in Sy.No.13/1B of Ganakal Village in BSK VF Stage, XI Block.
BDA/EE/(S)AE/TEN/W.O/12/2005-06
11-2005
dated:21-
BDA/EM/TEN/T-38 / 05-06 DT 22-08-05 Sl.No.1
3828
Construction of Culverts at 2nd , 3rd main Road & 4th cross Road in
Sy.No.17/1, 27/1 and 27/2 of Avalahalli, BSK III Stage
BDA/EE/(S)AE/TEN/W.O/13/2005-06
12-2005
dated:06-
BDA/EM/TEN/T-51 / 05-06 DT 24-09-05 Sl.No.1
3829
Special Repairs and maintenance of B.D.A Commercial Complex
at BSK II Stage.
Providing Remetalling and Asphalting to 18m & 24m Roads in
Anjanapura Lauout, V’G’ Block.
BDA/EE/(S)AE/TEN/W.O/14/2005-06
12-2005
BDA/EE/(S)AE/TEN/W.O/15/2005-06
01-06
dated:26-
BDA/EM/TEN/T-50 / 05-06 DT 24-09-05 Sl.No.1
dated:09-
BDA/EM/TEN/T-184 / 05-06 DT 19-07-05 Sl.No.1
Formation of 60’ wide Road in Sy.No.64/4 (p), 62, 57/1, 57/2, &
57/1B & 58 in Thalaghattapura Village in Further Extension of BSK
VI Stage, IV ‘T’ Block.
Improvements to Road from Ganesha Temple to Kanakapura
Road at Konankunte cross via Jambusavari Dinne.
BDA/EE/(S)AE/TEN/W.O/16/2005-06 dated:0602-06
(Half work done
and file closed due to litigation.)
BDA/EE/(S)/TEN/W.O/17/2005-06 dated:18-0306
BDA/EM/TEN/T-55/ 05-06 DT 09-11-2005 Sl.No.1
Remetalling and Asphalting in Sy.No.85 & 86 of Uttarahalli BSK V
Stage.
Providing Metalling to 100’ Road in IV Block of BSK VI Stage.
BDA/EE/(S)/AE/TEN/W.O/18/2005-06
03-06
BDA/EE/(S)/AE/TEN/W.O/19/2005-06
03-06
dated:08-
BDA/EM/TEN/T-55/ 05-06 DT 09-11-2005 Sl.No.2
dated:13-
BDA/EE (S) /TEN/T-61/ 05-06 DT 07-12-2005
Sl.No.2
3835
Providing Metalling to 80’ & 60’ Roads in Block I & II of BSK VI
Stage.
BDA/EE/(S)/AE/TEN/W.O/20/2005-06
03-06
dated:13-
BDA/EE (S) /TEN/T-61/ 05-06 DT 07-12-2005
Sl.No.1
3836
Providing Metalling to 60’ Roads in Block V of BSK VI Stage.
BDA/EE/(S)/AE/TEN/W.O/21/2005-06
03-06
dated:13-
BDA/EE (S) /TEN/T-61/ 05-06 DT 07-12-2005
Sl.No.3
3837
Providing Metalling to 30mts & 18mts wide Roads in Block X of
BSK VI Stage.
BDA/EE/(S)/AE/TEN/W.O/22/2005-06
03-06
dated:13-
BDA/EE (S) /TEN/T-61/ 05-06 DT 07-12-2005
Sl.No.8
3838
Providing Metalling to 80’ & 60’ Roads in Block XI of BSK VI Stage.
BDA/EE/(S)/AE/TEN/W.O/23/2005-06
03-06
dated:15-
BDA/EE (S) /TEN/T-61/ 05-06 DT 07-12-2005
Sl.No.9
3839
Providing Metalling to 30mts & 18mts Road in Block VI of BSK VI
Stage.
BDA/EE/(S)/AE/TEN/W.O/24/2005-06
03-06
dated:15-
BDA/EE (S) /TEN/T-61/ 05-06 DT 07-12-2005
Sl.No.4
3840
Providing Metalling to 30mts , 18mts & 12mts Road in Block VIII of
BSK VI Stgae.
BDA/EE/(S)/AE/TEN/W.O/25/2005-06
03-06
dated:15-
BDA/EE (S) /TEN/T-61/ 05-06 DT 07-12-2005
Sl.No.6
3841
Providing Metalling to 30mts , 18mts & 12mts Road in Block VII of
BSK VI Stage
BDA/EE/(S)/AE/TEN/W.O/26/2005-06
03-06
dated:15-
BDA/EE (S) /TEN/T-61/ 05-06 DT 07-12-2005
Sl.No.5
3842
Providing Remetalling & Asphalting to Roads in Sy.No.9, 10 & 11
of
Vaddarapalya, BSK V Stage.
BDA/EE/(S)/AE/TEN/W.O/27/2005-06
03-06
dated:15-
BDA/EM
Sl.No.10
3830
3831
3832
3833
3834
BDA/EM/TEN/T-532/ 05-06 DT 25-01-2006 Sl.No.5
/TEN/T-61/
05-06
DT
07-12-2005
3843
Providing Metalling to 80’ & 60’ Roads in Block
Stage.
III of BSK VI
BDA/EE/(S)/AE/TEN/W.O/28/2005-06
03-06
dated:15-
BDA/EM /TEN/T-437/ 05-06 DT 07-12-2005 Sl.No.1
3844
Providing Metalling to 30mts & 18mts Road in Block IX of BSK VI
Stage
BDA/EE/(S)/AE/TEN/W.O/29/2005-06
03-06
dated:16-
BDA/EE (S) /TEN/T-61/ 05-06 DT 07-12-2005
Sl.No.7
2006-2007
3845
Improvements to Kothanur main road connecting 100’ ring road in
th
J.P.Nagar 5 Phase and Ganesha Temple via Puttenahalli. (3.50
Km length) (Part ‘A’- Formation of Road and Construction of
Drain.)
BDA/EE/(S)/AE/TEN/W.O/01/2006-07
04-06
dated:17-
BDA/EM /TEN/T-648/ 05-06 DT 21-03-06 Sl.No.1
3846
Cleaning and Maintenance including removal and disposal of
Garbage of premises, building corridor and floor area of Office
Building, general Toilets andOfficers toilets of BDA in Bangalore for
the year 2006-2007 as detailed in the terms and conditions o
Formation of Sites, B.S.SlaB Srains, Construction of Culverts and
Storm Water Drain in Sy.No.29, 30, 31, 32 & 36 of
Raghuvanapalya, J.P.Nagar IX Phase, Block VII.
Improvements to Roads, Side Drains and Cleaning of Jungle in
Block IV and V of Anjanapura Layout.
BDA/EE/(S)/AE/TEN/W.O/02/2006-07
05-06
dated:06-
BDA/EE/S /TEN/T-237/ 05-06 DT 08-08-2005
3849
3850
3847
BDA/EE/(S)//TEN/W.O/03/2006-07
2006
dated:27-07-
BDA/EE(S) /TEN/T-20/ 06-07 DT 07-04-06 Sl.No.1
BDA/EE/(S)//TEN/W.O/04/2006-07
2006
dated:01-09-
BDA/EE(S) /TEN/T-10/ 06-07 DT 17-05-06 Sl.No.1
Providing Remetalling and Asphalting to Roads in Sy.No.5 & 6 of
Bikasipura and Sy.No.17 & 18 of Vasanthapura in BSK V Stage.
BDA/EE/(S)//TEN/W.O/05/2006-07
2006
dated:28-12-
BDA/EE(S) /TEN/T-59/ 06-07 DT 06-10-06 Sl.No.2
Cleaning and Maintenance including removal and disposal of
Garbage of premises, building corridor and floor area of Office
Building, general Toilets and Officers toilets of BDA in Bangalore
for the year 2006-2007 as detailed in the terms and conditions of
Dismantling and Reconstruction of SSM Compound wall in the
premises of BWSSB GLSR at Kothanur Dinne, J.P.Nagar VIII
Phase.
Improvements to Kothanur main road connecting 100ft Ring Road
in J.P.Nagar 5th Phase and Ganesha Temple via Puttenahalli (3.50
Km length) ( Part-B- Strengthening and Asphalting.)
BDA/EE/(S)//TEN/W.O/06/2006-07
2006
dated:28-12-
BDA/EE(S)
Sl.No.1
BDA/EE/(S)//TEN/W.O/07/2006-07
2007
dated:03-01-
BDA/EE(S) /TEN/T-59/ 06-07 DT 06-10-06 Sl.No.3
BDA/EE/(S)//TEN/W.O/08/2006-07
2007
dated:03-01-
BDAEM /TEN/T-188/ 06-07 DT 04-07-06
3853
Remetalling & Chipcarpetting to 18m, 9m & 7.62m wide Roads in
Avalahalli in Sy.No.27/1 and 27/2 of BSK III Stage.
BDA/EE/(S)//TEN/W.O/09/2006-07
2007
dated:03-01-
BDA/EE(S) /TEN/T-59/ 06-07 DT 06-10-06 Sl.No.1
3854
Remetalling, Asphalting and Improvements to Roads in Layout
formed in Sy.No.51 & 52 of Tavarekere, BTM Layout I Stage.
BDA/EE/(S)//TEN/W.O/10/2006-07
2007
dated:05-01-
BDA/EE(S) /TEN/T-33/ 06-07 DT 17-08-06 Sl.No.1
3848
3851
3852
/TEN/T-73/
06-07
DT
08-11-2006
3855
Cleaning and Maintenance including removal and disposal of
Garbage of premises, building corridor and floor area of Office
Building, general Toilets and Officers toilets of BDA in Bangalore
for the year 2006-2007 as detailed in the terms and conditions o
BDA/EE/(S)/PF/11/2006-07 dated:16-03-2007
With
ref
to
the
Work
Order
No.BDA/EE/S/TEN/W.O/02/06-07 dt:06-05-06
2007-2008
3856
Providing Asphalting to 24m and 18m Roads in Block I, II & XI of
BSK VI Stage.
BDA/EE/S/TEN/W.O/ 01/07-08 dt:14-05-07
BDA/EE(S)/TEN/T-93/2006-07 DT:19-01-07 Sl.No.1
3857
. Providing Asphalting to 30m, 24m & 18m Roads in Block III & IV
of BSK VI Stage.
BDA/EE/S/TEN/W.O/ 02/07-08 dt:14-05-07
BDA/EE(S)/TEN/T-93/2006-07 DT:19-01-07 Sl.No.2
3858
Providing Asphalting to Roads in Block V of BSK VI Stage.
BDA/EE/S/TEN/W.O/ 03/07-08 dt:14-05-07
BDA/EE(S)/TEN/T-93/2006-07 DT:19-01-07 Sl.No.3
3859
Providing Asphalting to 30m, 18m & 12m Roads in Block VI & VII
of BSK VI Stage.
BDA/EE/S/TEN/W.O/ 04/07-08 dt:14-05-07
BDA/EE(S)/TEN/T-93/2006-07 DT:19-01-07 Sl.No.4
3860
Providing Asphalting to 30m, 18m & 12m Roads in Block VIII & IX
of BSK VI Stage.
BDA/EE/S/TEN/W.O/ 05/07-08 dt:14-05-07
BDA/EE(S)/TEN/T-93/2006-07 DT:19-01-07 Sl.No.5
3861
Providing Asphalting to 30m & 12m Roads in Block X of BSK VI
Stage.
BDA/EE/S/TEN/W.O/ 06/07-08 dt:14-05-07
BDA/EE(S)/TEN/T-93/2006-07 DT:19-01-07 Sl.No.6
3862
Providing Metalling to Internal Roads in Block I of BSK VI Stage.
BDA/EE/S/TEN/W.O/ 07/07-08 dt:25-06-07
BDA/EE(S)/TEN/T-01/2007-08
(Sl.No.1)
DT:04-04-07
3863
Providing Metalling to Internal Roads in Block VIII of BSK VI Stage.
BDA/EE/S/TEN/W.O/ 08/07-08 dt:25-06-07
BDA/EE(S)/TEN/T-01/2007-08
(Sl.No.2)
DT:04-04-07
3864
Providing Metalling to Internal Roads in Block IX of BSK VI Stage.
BDA/EE/S/TEN/W.O/ 09/07-08 dt:25-06-07
BDA/EE(S)/TEN/T-01/2007-08
(Sl.No.3)
DT:04-04-07
3865
Providing Metalling to Internal Roads in Block XI of BSK VI Stage.
BDA/EE/S/TEN/W.O/ 10/07-08 dt:25-06-07
BDA/EE(S)/TEN/T-01/2007-08
07(Sl.No.4)
DT:04-04-
3866
BDA/EE/S/TEN/W.O/ 11/07-08 dt:27-06-07
BDA/EE(S)/TEN/T-01/2007-08
(Sl.No.6)
DT:04-04-07
3867
Construction of SSM Drain along 60’ road joining to Block V’G’ of
Further Extension of Anjanapura&Construction of Culverts across
the existing Road.
Construction of Retaining wall in Block I of Anjanapura.
BDA/EE/S/TEN/W.O/12/07-08 dt:16-07-07
BDA/EM/TEN/T-01/2007-08 DT:04-04-07 (Sl.No.5)
3868
Providing Metalling to Internal Roads in Block III of BSK VI Stage.
BDA/EE/S/TEN/W.O/13/07-08 dt:16-07-07
BDA/EE(S)/TEN/T-50/2007-08
(Sl.No.2)
DT:21-04-07
3869
Providing Metalling to Internal Roads in Block VI of BSK VI Stage.
BDA/EE/S/TEN/W.O/14/07-08 dt:19-07-07
BDA/EE(S)/TEN/T-50/2007-08
(Sl.No.5)
3870
Providing Metalling to Internal Roads in Block X of BSK VI Stage.
BDA/EE/S/TEN/W.O/15/07-08 dt:19-07-07
BDA/ EM /TEN/T-50/2007-08 DT:21-04-07 (Sl.No.7)
3871
Providing Metalling to Internal Roads in Block VII of BSK VI Stage.
BDA/EE/S/TEN/W.O/16/07-08 dt:19-07-07
BDA/ EM /TEN/T-50/2007-08 DT:21-04-07 (Sl.No.6)
3872
Providing Metalling to Internal Roads in Block II of BSK VI Stage.
BDA/EE/S/TEN/W.O/17/07-08 dt:19-07-07
BDA/ EM /TEN/T-50/2007-08 DT:21-04-07 (Sl.No.1)
3873
Providing Re-Metalling & Asphalting to Internal Roads in Block I, III
& III ‘A’ of Anjanapura township.
BDA/EE/S/TEN/W.O/18/07-08 dt:23-07-07
BDA/EM /TEN/T-52/2007-08 DT:21-04-07. (Sl.No.1)
3874
Providing Re-Metalling & Asphalting to Roads in Block
J.P.Nagar IX Phase..
of
BDA/EE/S/TEN/W.O/19/07-08 dt:25-07-07
BDA/EM /TEN/T-51/2007-08 DT:21-04-07. (Sl.No.4)
3875
Improvements to Internal Roads in Block IV, IV ‘A’ & IV EWS of
J.P.Nagar IX Phase.
BDA/EE/S/TEN/W.O/20/07-08 dt:25-07-07
BDA/EM /TEN/T-51/2007-08 DT:21-04-07. (Sl.No.5)
3876
Providing Re-Metalling & Asphalting to Internal Roads in Block VI
& VII of Anjanapura township.
BDA/EE/S/TEN/W.O/21/07-08 dt:25-07-07
BDA/EM /TEN/T-52/2007-08 DT:21-04-07. (Sl.No.4)
3877
Providing Re-Metalling & Asphalting to Internal Roads in Block VIII
of Anjanapura township.
BDA/EE/S/TEN/W.O/22/07-08 dt:25-07-07
BDA/EM /TEN/T-52/2007-08 DT:21-04-07. (Sl.No.5)
3878
Improvements to 40’, 60’ and 80’ Roads in Block IX, X and XI &
Re-Metalling, Asphalting to Roads 18m & 24m Roads (For Balance
Portion) in V’G’Block of Further Extension of Anjanapura.
BDA/EE/S/TEN/W.O/23/07-08 dt:25-07-07
BDA/EM /TEN/T-52/2007-08 DT:21-04-07. (Sl.No.6)
3879
Providing Re-Metalling & Asphalting to Internal Roads of 12m, 9m,
6m in V’G’Block of Further Extension of Anjanapura.
BDA/EE/S/TEN/W.O/24/07-08 dt:25-07-07
BDA/EM /TEN/T-52/2007-08 DT:21-04-07. (Sl.No.7)
3880
Providing Metalling to Internal Roads in Block V of BSK VI Stage.
BDA/EE/S/TEN/W.O/25/07-08 dt:25-07-07
BDA/EM /TEN/T-50/2007-08 DT:21-04-07. (Sl.No.4)
3881
Cleaning and Maintenance including removal and disposal of
Garbage of premises, building corridor and floor area of Office
Building, general Toilets and Officers toilets of BDA in Bangalore
for the year 2007-2008 as detailed in the terms and conditions
Providing Re-Metalling and Asphalting to Roads in Block II of
J.P.Nagar VIII Phase.
BDA/EE/S/TEN/W.O/26/07-08 dt:01-08-07
BDA/EE(S) /TEN/T-03/2007-08 DT:02-05-07.
BDA/EE/S/TEN/W.O/27/07-08 dt:17-08-07
BDA/EM /TEN/T-51/2007-08 DT:21-04-07. (Sl.No.2)
BDA/EE/S/TEN/W.O/28/07-08 dt:17-08-07
BDA/EM /TEN/T-51/2007-08 DT:21-04-07. (Sl.No.6)
3882
3883
III
Improvements to Internal Roads in Block VII and VII A of J.P.Nagar
IX Phase.
DT:21-04-07
3884
Providing Re-Metalling and Asphalting to Internal Roads in Block
IV & V of Anjanapura Township.
BDA/EE/S/TEN/W.O/29/07-08 dt:17-08-07
BDA/EM /TEN/T-52/2007-08 DT:21-04-07. (Sl.No.3)
3885
Providing Re-Metalling and Asphalting to Roads in Block I, II, V ‘A’
& V ‘B’of J.P.Nagar IX Phase.
BDA/EE/S/TEN/W.O/30/07-08 dt:17-08-07
BDA/EM /TEN/T-51/2007-08 DT:21-04-07. (Sl.No.3)
3886
Providing Re-Metalling and Asphalting to Internal Roads in Block II
& II ‘A’ of Anjanapura Township.
BDA/EE/S/TEN/W.O/31/07-08 dt:17-08-07
BDA/EM /TEN/T-52/2007-08 DT:21-04-07. (Sl.No.2)
3887
Providing Re-Metalling and Asphalting to Roads in Block I, I’A’, II ,
II of EWS and III of J.P.Nagar VIII Phase.
BDA/EE/S/TEN/W.O/32/07-08 dt:17-08-07
BDA/EM /TEN/T-51/2007-08 DT:21-04-07. (Sl.No.1)
3888
Providing Metalling to Internal Roads in Block No.IV of BSK VI
Stgae.
BDA/EE/S/TEN/W.O/33/07-08 dt:24-08-07
BDA/EM /TEN/T-50/2007-08 DT:21-04-07. (Sl.No.3)
3889
Restricting the Vehicular Parking in the premises of BDA Shopping
Complex at BSK II Stage, Bangalore.
BDA/EE/S/TEN/W.O/34/07-08 dt:25-10-07
Schedule of Appendix 'A' & 'B'
3890
Construction of 2 floor of BDA Shopping Complex building at
BSK II Stage, Bangalore.
Construction of Bridge across Storm Water Drain at Sy.No.90 of
Hosakerehalli, BSK III Stage.
BDA/EE/S/TEN/W.O/35/07-08 dt:29-10-07
BDA/EM /TEN/T-61/2007-08 DT:23-04-07.
BDA/EE/S/TEN/W.O/36/07-08 dt:12-11-07
BDA/EE(S)
(Sl.No.2)
3892
Formation of 80 feet Road ( Balance Portion ) in Gubbalala Village,
BSK VI StageFE, IV "H' Block
BDA/EE/S/TEN/W.O/37/07-08 dt:12-11-2007.
BDA/EE(S) /TEN/T-05/2007-08 DT:06-08-07.
3893
Formation of layout in Sy.No. 13/1D, 13/1E & 13/3 of Ganakal
Village in Block XI of BSK VI Stage.
BDA/EE/S/TEN/W.O/38/07-08 dt:12-11-07
BDA/EE(S) /TEN/T-06/2007-08 DT:01-09-07
3894
Formation of Roads, BS Slab Drain and Construction of CD Works
in Sy.No.90 of Hosakerehalli, BSK III Stage
BDA/EE/S/TEN/W.O/39/07-08 dt:19-11-07
BDA/EE(S)
(Sl.No.1)
3891
sl no
3895
3896
3897
3898
nd
EIRL & WORk SLIP
Name of work
Approval to Authority note to the wprkslip / EIRL and extension of
time to Re-Metalling & Asphalting to 18m & 24m roads in Block 1
to 8 of Anjanapura layout.
Approval to the Work Slip, EIRL & extension of time for the work of
Remetalling & Asphalting to 18m roads MR-5, 24m road MR4 and
MR6 in Anjanapura layout.
Approval to the Work Slip, EIRL & extension of time for the work of
Remetalling & Asphalting to 24m road no.MR1 in Anjanapura
layout.
Approval to the Work Slip, EIRL & extension of time for the work of
Remetalling & Asphalting to 24m road no.MR2 in Anjanapura
Authority Note No
Authority Note No.78/06
Authority Note No.78/06
Authority Note No.78/06
Authority Note No.78/06
/TEN/T-8
/TEN/T-8
/2007-08
/2007-08
DT:19-09-07.
DT:19-09-07.
layout.
3899
Approval to the Work Slip, EIRL & extension of time for the work of
Remetalling & Asphalting to 18m road no.MR9 in Anjanapura
layout.
Approval to the Work Slip, EIRL & extension of time for the work of
Remetalling & Asphalting to 18m road no.MR8 and 24m road
no.MR3 in Anjanapura layout.
Approval to the Work Slip, EIRL & extension of time for the work of
Remetalling & Asphalting to 18m road no.MR8 and 24m roads in
Anjanapura layout, Block VG
Approval to extension of time and EIRL for the work of providing
metalling and re-chipcarpetting to approach road from Kanakapura
road-Bangalore road upto block V via Bank Officers layout.
Authority Note No.78/06
3903
Approval to the estiimate for the formation of Further extension of
BSK VI stage layout, Package I to VIII.
Authority Note No.247/03
3904
Approval to tenders for the work of metalling the roads at
Anjanapura township Block I to VIII.
Authority Note No.27/02
3905
Providing Remetalling and Asphalting to 18m and 24m roads in
Anjanapura Township.
Approval to workslip, EIRL & extension of time for the work of
construction SWD in Anjanapura Township in Block I, V and VG.
Authority Note No.48/05
3900
3901
3902
3906
Authority Note No.78/06
Authority Note No.78/06
Authority Note No.11/06
Authority Note No.143/03
Tender Documents Submitted by the Contractors (Rejected)
Sl no
Name of the work
3907
Formation of sites, roads and minor CD's for proposed Anjanapura
Township in Uttarahalli hobli, Bangalore south block-IV
3908
Notification No
Name of the Contractor
2000-01
BDA/EM/TEN/T-320/2000-2001 dt:01-03-2001
K.Gpoal Raju
Formation of sites, roads and minor CD's for proposed Anjanapura
Township in Uttarahalli hobli, Bangalore south block-IV
BDA/EM/TEN/T-320/2000-2001 dt:01-03-2001
V.K.Gopal
3909
Formation of sites, roads and minor CD's for proposed Anjanapura
Township in Uttarahalli hobli, Bangalore south block-IV
BDA/EM/TEN/T-320/2000-2001 dt:01-03-2001
B.G.Channappa
3910
Formation of sites, roads and minor CD's for proposed Anjanapura
Township in Uttarahalli hobli, Bangalore south block-IV
BDA/EM/TEN/T-320/2000-2001 dt:01-03-2001
L.Radhakrishna
3911
Formation of sites, roads and minor CD's for proposed Anjanapura
Township in Uttarahalli hobli, Bangalore south block-IV
BDA/EM/TEN/T-320/2000-2001 dt:01-03-2001
G.N.Krishna
3912
Formation of sites, roads and minor CD's for proposed Anjanapura
Township in Uttarahalli hobli, Bangalore south block-IV
BDA/EM/TEN/T-320/2000-2001 dt:01-03-2001
N.Suresh
3913
Formation of sites, roads and minor CD's for proposed Anjanapura
Township in Uttarahalli hobli, Bangalore south block-IV
BDA/EM/TEN/T-320/2000-2001 dt:01-03-2001
Sree Manjunatha constructions
3914
Formation of sites, roads and minor CD's for proposed Anjanapura
Township in Uttarahalli hobli, Bangalore south block-IV
BDA/EM/TEN/T-320/2000-2001 dt:01-03-2001
Parichitha constructions
3915
Formation of sites, roads and minor CD's for proposed Anjanapura
Township in Uttarahalli hobli, Bangalore south block-IV
BDA/EM/TEN/T-320/2000-2001 dt:01-03-2001
Nijaguna Land Developers & Builders
3916
Formation of sites, roads and minor CD's for proposed Anjanapura
Township in Uttarahalli hobli, Bangalore south block-V
BDA/EM/TEN/T-320/2000-2001 dt:01-03-2001
L.Radhakrishna
3917
Formation of sites, roads and minor CD's for proposed Anjanapura
Township in Uttarahalli hobli, Bangalore south block-V
BDA/EM/TEN/T-320/2000-2001 dt:01-03-2001
D.Prabhulingaswamy
3918
Formation of sites, roads and minor CD's for proposed Anjanapura
Township in Uttarahalli hobli, Bangalore south block-V
BDA/EM/TEN/T-320/2000-2001 dt:01-03-2001
P.S.Krupakar
3919
Formation of sites, roads and minor CD's for proposed Anjanapura
Township in Uttarahalli hobli, Bangalore south block-V
BDA/EM/TEN/T-320/2000-2001 dt:01-03-2001
M/s.Jayram Associates
3920
Formation of sites, roads and minor CD's for proposed Anjanapura
Township in Uttarahalli hobli, Bangalore south block-V
BDA/EM/TEN/T-320/2000-2001 dt:01-03-2001
K.Gopal Raju
3921
Formation of sites, roads and minor CD's for proposed Anjanapura
Township in Uttarahalli hobli, Bangalore south block-VIII
BDA/EM/TEN/T-320/2000-2001 dt:01-03-2001
K.Damodar
3922
Formation of sites, roads and minor CD's for proposed Anjanapura
Township in Uttarahalli hobli, Bangalore south block-VIII
BDA/EM/TEN/T-320/2000-2001 dt:01-03-2001
J.P.Radhakrishna
3923
Formation of sites, roads and minor CD's for proposed Anjanapura
Township in Uttarahalli hobli, Bangalore south block-VIII
BDA/EM/TEN/T-320/2000-2001 dt:01-03-2001
Sree Manjunatha constructions
3924
Formation of sites, roads and minor CD's for proposed Anjanapura
Township in Uttarahalli hobli, Bangalore south block-VIII
BDA/EM/TEN/T-320/2000-2001 dt:01-03-2001
Lakshman
3925
Formation of sites, roads and minor CD's for proposed Anjanapura
Township in Uttarahalli hobli, Bangalore south block-VIII
BDA/EM/TEN/T-320/2000-2001 dt:01-03-2001
M.H.Sudarshan Reddy
3926
Formation of sites, roads and minor CD's for proposed Anjanapura
Township in Uttarahalli hobli, Bangalore south block-I
BDA/EM/TEN/T-320/2000-2001 dt:01-03-2001
Reddy Veeranna & co
3927
Formation of sites, roads and minor CD's for proposed Anjanapura
Township in Uttarahalli hobli, Bangalore south block-I
BDA/EM/TEN/T-320/2000-2001 dt:01-03-2001
Lakshman
3928
Formation of sites, roads and minor CD's for proposed Anjanapura
Township in Uttarahalli hobli, Bangalore south block-I
BDA/EM/TEN/T-320/2000-2001 dt:01-03-2001
Munirathna
3929
Formation of sites, roads and minor CD's for proposed Anjanapura
Township in Uttarahalli hobli, Bangalore south block-I
BDA/EM/TEN/T-320/2000-2001 dt:01-03-2001
Sri.Balaji Constructions
3930
Formation of sites, roads and minor CD's for proposed Anjanapura
Township in Uttarahalli hobli, Bangalore south block-II
BDA/EM/TEN/T-320/2000-2001 dt:01-03-2001
Sree Manjunatha constructions
3931
Formation of sites, roads and minor CD's for proposed Anjanapura
Township in Uttarahalli hobli, Bangalore south block-II
BDA/EM/TEN/T-320/2000-2001 dt:01-03-2001
G.N.Krishna
3932
Formation of sites, roads and minor CD's for proposed Anjanapura
Township in Uttarahalli hobli, Bangalore south block-II
BDA/EM/TEN/T-320/2000-2001 dt:01-03-2001
L.Radhakrishna
3933
Formation of sites, roads and minor CD's for proposed Anjanapura
Township in Uttarahalli hobli, Bangalore south block-II
BDA/EM/TEN/T-320/2000-2001 dt:01-03-2001
J.P.Radhakrishna
3934
Formation of sites, roads and minor CD's for proposed Anjanapura
Township in Uttarahalli hobli, Bangalore south block-II
BDA/EM/TEN/T-320/2000-2001 dt:01-03-2001
G.Chandre Gowda
3935
Formation of sites, roads and minor CD's for proposed Anjanapura
Township in Uttarahalli hobli, Bangalore south block-II
BDA/EM/TEN/T-320/2000-2001 dt:01-03-2001
B.G.Chandrappa
3936
Formation of sites, roads and minor CD's for proposed Anjanapura
Township in Uttarahalli hobli, Bangalore south block-III
BDA/EM/TEN/T-320/2000-2001 dt:01-03-2001
M/s.Parichitha Constructions
3937
Formation of sites, roads and minor CD's for proposed Anjanapura
Township in Uttarahalli hobli, Bangalore south block-III
BDA/EM/TEN/T-320/2000-2001 dt:01-03-2001
G.N.Krishna
3938
Formation of sites, roads and minor CD's for proposed Anjanapura
Township in Uttarahalli hobli, Bangalore south block-III
BDA/EM/TEN/T-320/2000-2001 dt:01-03-2001
K.Gopal Raju
3939
Formation of sites, roads and minor CD's for proposed Anjanapura
Township in Uttarahalli hobli, Bangalore south block-III
BDA/EM/TEN/T-320/2000-2001 dt:01-03-2001
J.Bapuji
3940
Formation of sites, roads and minor CD's for proposed Anjanapura
Township in Uttarahalli hobli, Bangalore south block-III
BDA/EM/TEN/T-320/2000-2001 dt:01-03-2001
L.Radhakrishna
3941
Formation of sites, roads and minor CD's for proposed Anjanapura
Township in Uttarahalli hobli, Bangalore south block-VI
BDA/EM/TEN/T-320/2000-2001 dt:01-03-2001
Sree Manjunatha constructions
3942
Formation of sites, roads and minor CD's for proposed Anjanapura
Township in Uttarahalli hobli, Bangalore south block-VI
BDA/EM/TEN/T-320/2000-2001 dt:01-03-2001
M.H.Sudarshan Reddy
3943
Formation of sites, roads and minor CD's for proposed Anjanapura
Township in Uttarahalli hobli, Bangalore south block-VI
BDA/EM/TEN/T-320/2000-2001 dt:01-03-2001
D.Prabhulingaswamy
3944
Formation of sites, roads and minor CD's for proposed Anjanapura
Township in Uttarahalli hobli, Bangalore south block-VI
BDA/EM/TEN/T-320/2000-2001 dt:01-03-2001
N.C.Nagaraj
3945
Formation of sites, roads and minor CD's for proposed Anjanapura
Township in Uttarahalli hobli, Bangalore south block-VI
BDA/EM/TEN/T-320/2000-2001 dt:01-03-2001
C.Ashok Kumar
3946
Formation of sites, roads and minor CD's for proposed Anjanapura
Township in Uttarahalli hobli, Bangalore south block-VI
BDA/EM/TEN/T-320/2000-2001 dt:01-03-2001
C.G.Chandrappa
3947
Formation of sites, roads and minor CD's for proposed Anjanapura
Township in Uttarahalli hobli, Bangalore south block-VI
BDA/EM/TEN/T-320/2000-2001 dt:01-03-2001
Lakshman
3948
Formation of sites, roads and minor CD's for proposed Anjanapura
Township in Uttarahalli hobli, Bangalore south block-VI
BDA/EM/TEN/T-320/2000-2001 dt:01-03-2001
Jagadeesha
3949
Formation of sites, roads and minor CD's for proposed Anjanapura
Township in Uttarahalli hobli, Bangalore south block-VI
BDA/EM/TEN/T-320/2000-2001 dt:01-03-2001
K.Gopal Raju
3950
Formation of sites, roads and minor CD's for proposed Anjanapura
Township in Uttarahalli hobli, Bangalore south block-VII
BDA/EM/TEN/T-320/2000-2001 dt:01-03-2001
Lakshman
3951
Formation of sites, roads and minor CD's for proposed Anjanapura
Township in Uttarahalli hobli, Bangalore south block-VII
BDA/EM/TEN/T-320/2000-2001 dt:01-03-2001
J.Chengama Naidu
3952
Formation of sites, roads and minor CD's for proposed Anjanapura
Township in Uttarahalli hobli, Bangalore south block-VII
BDA/EM/TEN/T-320/2000-2001 dt:01-03-2001
C.G.Chandrappa
3953
Formation of sites, roads and minor CD's for proposed Anjanapura
Township in Uttarahalli hobli, Bangalore south block-VII
BDA/EM/TEN/T-320/2000-2001 dt:01-03-2001
K.Damodar
3954
Formation of sites, roads and minor CD's for proposed Anjanapura
Township in Uttarahalli hobli, Bangalore south block-VII
BDA/EM/TEN/T-320/2000-2001 dt:01-03-2001
R.M.Naidu
3955
Formation of sites, roads , BS slab drains & construction of CD
works etc for the proposed at BSK VI stage, 1st phase, layout in
Bangalore South tq, Block-I
Formation of sites, roads , BS slab drains & construction of CD
works etc for the proposed at BSK VI stage, 1st phase, layout in
Bangalore South tq, Block-I
Formation of sites, roads , BS slab drains & construction of CD
works etc for the proposed at BSK VI stage, 1st phase, layout in
Bangalore South tq, Block-I
2001-02
BDA/EM/TEN/EO-II/T-9/2001-02 dt:27-08-2001
B.G.Channappa
BDA/EM/TEN/EO-II/T-9/2001-02 dt:27-08-2001
L.Radhakrishna
BDA/EM/TEN/EO-II/T-9/2001-02 dt:27-08-2001
Lakshman
3956
3957
3958
3959
3960
3961
3962
3963
3964
3965
3966
3967
3968
3969
3970
3971
Formation of sites, roads , BS slab drains & construction of CD
works etc for the proposed at BSK VI stage, 1st phase, layout in
Bangalore South tq, Block-II
Formation of sites, roads , BS slab drains & construction of CD
works etc for the proposed at BSK VI stage, 1st phase, layout in
Bangalore South tq, Block-II
Formation of sites, roads , BS slab drains & construction of CD
works etc for the proposed at BSK VI stage, 1st phase, layout in
Bangalore South tq, Block-II
Formation of sites, roads , BS slab drains & construction of CD
works etc for the proposed at BSK VI stage, 1st phase, layout in
Bangalore South tq, Block-III
Formation of sites, roads , BS slab drains & construction of CD
works etc for the proposed at BSK VI stage, 1st phase, layout in
Bangalore South tq, Block-III
Formation of sites, roads , BS slab drains & construction of CD
works etc for the proposed at BSK VI stage, 1st phase, layout in
Bangalore South tq, Block-III
Formation of sites, roads , BS slab drains & construction of CD
works etc for the proposed at BSK VI stage, 1st phase, layout in
Bangalore South tq, Block-III
Formation of sites, roads , BS slab drains & construction of CD
works etc for the proposed at BSK VI stage, 1st phase, layout in
Bangalore South tq, Block-III
Formation of sites, roads , BS slab drains & construction of CD
works etc for the proposed at BSK VI stage, 1st phase, layout in
Bangalore South tq, Block-III
Formation of sites, roads , BS slab drains & construction of CD
works etc for the proposed at BSK VI stage, 1st phase, layout in
Bangalore South tq, Block-III
Formation of sites, roads , BS slab drains & construction of CD
works etc for the proposed at BSK VI stage, 1st phase, layout in
Bangalore South tq, Block-III
Formation of sites, roads , BS slab drains & construction of CD
works etc for the proposed at BSK VI stage, 1st phase, layout in
Bangalore South tq, Block-V
Formation of sites, roads , BS slab drains & construction of CD
works etc for the proposed at BSK VI stage, 1st phase, layout in
Bangalore South tq, Block-V
Formation of sites, roads , BS slab drains & construction of CD
works etc for the proposed at BSK VI stage, 1st phase, layout in
Bangalore South tq, Block-V
BDA/EM/TEN/EO-II/T-9/2001-02 dt:27-08-2001
D.Prabhulingaswamy
BDA/EM/TEN/EO-II/T-9/2001-02 dt:27-08-2001
M/s.Parichitha Constructions
BDA/EM/TEN/EO-II/T-9/2001-02 dt:27-08-2001
Lakshman
BDA/EM/TEN/EO-II/T-9/2001-02 dt:27-08-2001
D.Prabhulingaswamy
BDA/EM/TEN/EO-II/T-9/2001-02 dt:27-08-2001
G.N.Krishna
BDA/EM/TEN/EO-II/T-9/2001-02 dt:27-08-2001
P.S.Rajanna
BDA/EM/TEN/EO-II/T-9/2001-02 dt:27-08-2001
B.G.Channappa
BDA/EM/TEN/EO-II/T-9/2001-02 dt:27-08-2001
Larsen & Tourbo Limited
BDA/EM/TEN/EO-II/T-9/2001-02 dt:27-08-2001
P.S.Krupakar
BDA/EM/TEN/EO-II/T-9/2001-02 dt:27-08-2001
Lakshman
BDA/EM/TEN/EO-II/T-9/2001-02 dt:27-08-2001
K.Damodar
BDA/EM/TEN/EO-II/T-9/2001-02 dt:27-08-2001
L.Radhakrishna
BDA/EM/TEN/EO-II/T-9/2001-02 dt:27-08-2001
G.N.Krishna
BDA/EM/TEN/EO-II/T-9/2001-02 dt:27-08-2001
D.Prabhulingaswamy
3972
3973
3974
3975
3976
3977
3978
3979
3980
3981
3982
3983
3984
3985
Formation of sites, roads , BS slab drains & construction of CD
works etc for the proposed layout at BSK VI stage, 2nd phase,
Bangalore South tq, Block-VII
Formation of sites, roads , BS slab drains & construction of CD
works etc for the proposed layout at BSK VI stage, 2nd phase,
Bangalore South tq, Block-VII
Formation of sites, roads , BS slab drains & construction of CD
works etc for the proposed layout at BSK VI stage, 2nd phase,
Bangalore South tq, Block-VII
Formation of sites, roads , BS slab drains & construction of CD
works etc for the proposed layout at BSK VI stage, 2nd phase,
Bangalore South tq, Block-IX
Formation of sites, roads , BS slab drains & construction of CD
works etc for the proposed layout at BSK VI stage, 2nd phase,
Bangalore South tq, Block-IX
Formation of sites, roads , BS slab drains & construction of CD
works etc for the proposed layout at BSK VI stage, 2nd phase,
Bangalore South tq, Block-IX
Formation of sites, roads , BS slab drains & construction of CD
works etc for the proposed layout at BSK VI stage, 2nd phase,
Bangalore South tq, Block-VI
Formation of sites, roads , BS slab drains & construction of CD
works etc for the proposed layout at BSK VI stage, 2nd phase,
Bangalore South tq, Block-VI
Formation of sites, roads , BS slab drains & construction of CD
works etc for the proposed layout at BSK VI stage, 2nd phase,
Bangalore South tq, Block-VI
Formation of sites, roads , BS slab drains & construction of CD
works etc for the proposed layout at BSK VI stage, 2nd phase,
Bangalore South tq, Block-VI
Formation of sites, roads , BS slab drains & construction of CD
works etc for the proposed layout at BSK VI stage, 2nd phase,
Bangalore South tq, Block-VIII
Formation of sites, roads , BS slab drains & construction of CD
works etc for the proposed layout at BSK VI stage, 2nd phase,
Bangalore South tq, Block-VIII
Formation of sites, roads , BS slab drains & construction of CD
works etc for the proposed layout at BSK VI stage, 2nd phase,
Bangalore South tq, Block-VIII
Formation of sites, roads , BS slab drains & construction of CD
works etc for the proposed layout at BSK VI stage, 2nd phase,
Bangalore South tq, Block-VIII
BDA/EM/TEN/EO-II/T-18/2001-02 dt:27-10-2001
Larsen & Tourbo Limited
BDA/EM/TEN/EO-II/T-18/2001-02 dt:27-10-2001
B.G.Chandrappa
BDA/EM/TEN/EO-II/T-18/2001-02 dt:27-10-2001
Lakshman
BDA/EM/TEN/EO-II/T-18/2001-02 dt:27-10-2001
B.G.Channappa
BDA/EM/TEN/EO-II/T-18/2001-02 dt:27-10-2001
Lakshman
BDA/EM/TEN/EO-II/T-18/2001-02 dt:27-10-2001
Larsen & Tourbo Limited
BDA/EM/TEN/EO-II/T-18/2001-02 dt:27-10-2001
D.Prabhulingaswamy
BDA/EM/TEN/EO-II/T-18/2001-02 dt:27-10-2001
B.G.Channappa
BDA/EM/TEN/EO-II/T-18/2001-02 dt:27-10-2001
Lakshman
BDA/EM/TEN/EO-II/T-18/2001-02 dt:27-10-2001
Larsen & Tourbo Limited
BDA/EM/TEN/EO-II/T-18/2001-02 dt:27-10-2001
B.G.Channappa
BDA/EM/TEN/EO-II/T-18/2001-02 dt:27-10-2001
Lakshman
BDA/EM/TEN/EO-II/T-18/2001-02 dt:27-10-2001
The Mysore Construction Company
BDA/EM/TEN/EO-II/T-18/2001-02 dt:27-10-2001
Reddy Veeranna & co
3986
3987
3988
3989
3990
3991
3992
3993
3994
3995
3996
3997
Formation of sites, roads, BS slab drains and construction of CD
works for proposed BSK 6th stage, 1st phase, B'lore South Taluk.,
Block-IV
Formation of sites, roads, BS slab drains and construction of CD
works for proposed BSK 6th stage, 1st phase, B'lore South Taluk.,
Block-IV
Formation of sites, roads, BS slab drains and construction of CD
works for proposed BSK 6th stage, 1st phase, B'lore South Taluk.,
Block-IV
Formation of sites, roads, BS slab drains and construction of CD
works for proposed BSK 6th stage, 1st phase, B'lore South Taluk.,
Block-IV
Formation of sites, roads, BS slab drains and construction of CD
works for proposed BSK 6th stage, 1st phase, B'lore South Taluk.,
Block-IV
Formation of sites, roads, BS slab drains and construction of CD
works for proposed BSK 6th stage, 1st phase, B'lore South Taluk.
BDA/EM/TEN/EO-II/T-09/2001-02 dt:27-08-2001
B.G.Channappa
BDA/EM/TEN/EO-II/T-09/2001-02 dt:27-08-2001
L.Radhakrishna
BDA/EM/TEN/EO-II/T-09/2001-02 dt:27-08-2001
D.Prabhulingaswamy
BDA/EM/TEN/EO-II/T-09/2001-02 dt:27-08-2001
Satish V.Guttedar
BDA/EM/TEN/EO-II/T-09/2001-02 dt:27-08-2001
Larsen & Tourbo Limited
BDA/EM/TEN/EO-II/T-09/2001-02 dt:27-08-2001
Ramky Engineers Pvt Ltd
Formation of sites, roads, BS slab drains and construction of CD
works for proposed layout at BSK 6th stage, 2nd phase in B'lore
South Taluk- Block X.
Formation of sites, roads, BS slab drains and construction of CD
works for proposed layout at BSK 6th stage, 2nd phase in B'lore
South Taluk- Block X.
Formation of sites, roads, BS slab drains and construction of CD
works for proposed layout at BSK 6th stage, 2nd phase in B'lore
South Taluk- Block X.
Construction of Storm Water Drain in Anjanapura township, BlockI, V and V'G'
Construction of Storm Water Drain in Anjanapura township, BlockI, V and V'G'
Construction of Storm Water Drain in Anjanapura township, BlockI, V and V'G'
BDA/EM/TEN/EO-II/T-18/2001-02 dt:27-10-2001
L.Radhakrishna
BDA/EM/TEN/EO-II/T-18/2001-02 dt:27-10-2001
Lakshman
BDA/EM/TEN/EO-II/T-18/2001-02 dt:27-10-2001
G.N.Krishna
BDA/EM/TEN/T-349/2001-02 dt:0711-2001
B.G.Channappa
BDA/EM/TEN/T-349/2001-02 dt:0711-2001
Sanz Constructions Pvt Ltd
BDA/EM/TEN/T-349/2001-02 dt:0711-2001
Lakshman
2002-03
3998
3999
4000
Formation of sites, roads, BS slab drains and construction of CD
works for proposed BSK 6th stage, 3rd phase, Block XI in B'lore
South Taluk.
Formation of sites, roads, BS slab drains and construction of CD
works for proposed BSK 6th stage, 3rd phase, Block XI in B'lore
South Taluk.
Formation of sites, roads, BS slab drains and construction of CD
works for proposed BSK 6th stage, 3rd phase, Block XI in B'lore
South Taluk.
BDA/EM/TEN/T-23/2002-2003 dt:09-04-2002
Larsen & Tourbo Limited
BDA/EM/TEN/T-23/2002-2003 dt:09-04-2002
T.Shiva Kumar
BDA/EM/TEN/T-23/2002-2003 dt:09-04-2002
Sanz Constructions Pvt Ltd
4001
4002
4003
4004
4005
Formation of sites, roads, BS slab drains and construction of CD
works for proposed BSK 6th stage, 3rd phase, Block XI in B'lore
South Taluk.
Formation of sites, roads, BS slab drains and construction of CD
works for proposed BSK 6th stage, 3rd phase, Block XI in B'lore
South Taluk.
Formation of sites, roads, BS slab drains and construction of CD
works for proposed BSK 6th stage, 3rd phase, Block XI in B'lore
South Taluk.
Formation of sites, roads, BS slab drains and construction of CD
works for proposed BSK 6th stage, 3rd phase, Block XI in B'lore
South Taluk.
Providing Asphalting to the approach road from Kanakapura road
to Anjanapura via Konankunte in J.P.Nagar IX Phase.
BDA/EM/TEN/T-23/2002-2003 dt:09-04-2002
Lakshman
BDA/EM/TEN/T-23/2002-2003 dt:09-04-2002
The Mysore Construction Company
BDA/EM/TEN/T-23/2002-2003 dt:09-04-2002
Veeranna & Co
BDA/EM/TEN/T-23/2002-2003 dt:09-04-2002
D.Prabhulingaswamy
BDA/EM/TEN/T-700/2002-2003 dt:07-03-2003
Somashekar reddy
4006
Providing Asphalting to the approach road from Kanakapura road
to Anjanapura via Konankunte in J.P.Nagar IX Phase.
BDA/EM/TEN/T-700/2002-2003 dt:07-03-2003
N.Muralidhar
4007
Providing Asphalting to the approach road from Kanakapura road
to Anjanapura via Konankunte in J.P.Nagar IX Phase.
BDA/EM/TEN/T-700/2002-2003 dt:07-03-2003
S.R.Ravishankar
4008
Providing metalling, construction of culverts, widening and
strengthening the approach road from Kanakapura road to
Anjanapura via Konankunte in J.P.Nagar IX phase.
Providing metalling, construction of culverts, widening and
strengthening the approach road from Kanakapura road to
Anjanapura via Konankunte in J.P.Nagar IX phase.
Providing metalling, construction of culverts, widening and
strengthening the approach road from Kanakapura road to
Anjanapura via Konankunte in J.P.Nagar IX phase.
Providing metalling, construction of culverts, widening and
strengthening the approach road from Kanakapura road to
Anjanapura via Konankunte in J.P.Nagar IX phase.
Providing metalling, construction of culverts, widening and
strengthening the approach road from Kanakapura road to
Anjanapura via Konankunte in J.P.Nagar IX phase.
Providing metalling, construction of culverts, widening and
strengthening the approach road from Kanakapura road to
Anjanapura via Konankunte in J.P.Nagar IX phase.
Providing metalling, construction of culverts, widening and
strengthening the approach road from Kanakapura road to
Anjanapura via Konankunte in J.P.Nagar IX phase.
Providing metalling, construction of culverts, widening and
strengthening the approach road from Kanakapura road to
Anjanapura via Konankunte in J.P.Nagar IX phase.
BDA/EM/TEN/T-700/2002-2003 dt:07-03-2003
A.Krishnappa
BDA/EM/TEN/T-700/2002-2003 dt:07-03-2003
R.C.Basavaraju
BDA/EM/TEN/T-700/2002-2003 dt:07-03-2003
B.J.Nagaendra Kumar
BDA/EM/TEN/T-700/2002-2003 dt:07-03-2003
M.Shivashankar
BDA/EM/TEN/T-700/2002-2003 dt:07-03-2003
P.S.Kumar
BDA/EM/TEN/T-700/2002-2003 dt:07-03-2003
J.P.Radhakrishna
BDA/EM/TEN/T-700/2002-2003 dt:07-03-2003
H.Narasimha Murthy
BDA/EM/TEN/T-700/2002-2003 dt:07-03-2003
H.K.Ravi Kumar
4009
4010
4011
4012
4013
4014
4015
4016
BDA/EM/TEN/T-700/2002-2003 dt:07-03-2003
R.Shivashankarbabu
BDA/EM/TEN/T-700/2002-2003 dt:07-03-2003
G.V.Patel
4018
Providing metalling, construction of culverts, widening and
strengthening the approach road from Kanakapura road to
Anjanapura via Konankunte in J.P.Nagar IX phase.
Providing metalling, construction of culverts, widening and
strengthening the approach road from Kanakapura road to
Anjanapura via Konankunte in J.P.Nagar IX phase.
Formation of approach road to 5th A Block of J.P.Nagar IX Phase.
BDA/EM/TEN/T-663/2002-2003 dt:23-01-2003
A.Krishnappa
4019
Formation of approach road to 5th A Block of J.P.Nagar IX Phase.
BDA/EM/TEN/T-663/2002-2003 dt:23-01-2003
D.Prabhulingaswamy
4020
Formation of approach road to 5th A Block of J.P.Nagar IX Phase.
BDA/EM/TEN/T-663/2002-2003 dt:23-01-2003
B.J.Nagaendra Kumar
4021
Formation of approach road to 5th A Block of J.P.Nagar IX Phase.
BDA/EM/TEN/T-663/2002-2003 dt:23-01-2003
R.A.Muralidhar
4022
Formation of approach road to 5th A Block of J.P.Nagar IX Phase.
BDA/EM/TEN/T-663/2002-2003 dt:23-01-2003
B.N.Mallikarjuna
4023
Formation of approach road to 5th A Block of J.P.Nagar IX Phase.
BDA/EM/TEN/T-663/2002-2003 dt:23-01-2003
B.S.Shivakumar
4024
Formation of approach road to 5th A Block of J.P.Nagar IX Phase.
BDA/EM/TEN/T-663/2002-2003 dt:23-01-2003
P.S.Krupakar
4025
Formation of approach road to 5th A Block of J.P.Nagar IX Phase.
BDA/EM/TEN/T-663/2002-2003 dt:23-01-2003
K.S.Manjunath
4026
Construction of Storm Water Drain and Lead off drain in BSK 6th
stage, Block-III, IV & V.
Construction of Storm Water Drain and Lead off drain in BSK 6th
stage, Block-I & II.
Construction of Storm Water Drain and Lead off drain in BSK 6th
stage, Block-I & II.
Construction of Storm Water Drain and Lead off drain in BSK 6th
stage, Block-I & II.
Construction of Storm Water Drain and Lead off drain in BSK 6th
stage, Block-I & II.
Construction of Storm Water Drain and Lead off drain in BSK 6th
stage, Block-I & II.
Construction of Storm Water Drain and Lead off drain in BSK 6th
stage, Block-I & II.
Construction of Storm Water Drain and Lead off drain in BSK 6th
stage, Block-III, IV & V.
Construction of Storm Water Drain and Lead off drain in BSK 6th
stage, Block-III, IV & V.
Construction of Storm Water Drain and Lead off drain in BSK 6th
stage, Block-III, IV & V.
Construction of Storm Water Drain and Lead off drain in BSK 6th
stage, Block-III, IV & V.
Construction of Storm Water Drain and Lead off drain in BSK 6th
stage, Block-III, IV & V.
Construction of Storm Water Drain and Lead off drain in BSK 6th
stage, Block-III, IV & V.
BDA/EM/TEN/T-24/2002-2003 dt:09-04-2002
Ramky Engineers Pvt Ltd
BDA/EM/TEN/T-24/2002-2003 dt:09-04-2002
Reddy Veeranna & co
BDA/EM/TEN/T-24/2002-2003 dt:09-04-2002
Siddhartha Civil Works Ltd.
BDA/EM/TEN/T-24/2002-2003 dt:09-04-2002
Ramky Engineers Pvt Ltd
BDA/EM/TEN/T-24/2002-2003 dt:09-04-2002
Sanz Constructions Pvt Ltd
BDA/EM/TEN/T-24/2002-2003 dt:09-04-2002
Swathi constructions
BDA/EM/TEN/T-24/2002-2003 dt:09-04-2002
R.Maheswara Naidu,
BDA/EM/TEN/T-24/2002-2003 dt:09-04-2002
R.Maheswara Naidu,
BDA/EM/TEN/T-24/2002-2003 dt:09-04-2002
K.J.Vishwanath
BDA/EM/TEN/T-24/2002-2003 dt:09-04-2002
H.N.Nanjappa
BDA/EM/TEN/T-24/2002-2003 dt:09-04-2002
Sanz Constructions Pvt Ltd
BDA/EM/TEN/T-24/2002-2003 dt:09-04-2002
K.Gopal Raju
BDA/EM/TEN/T-24/2002-2003 dt:09-04-2002
G.Chandre Gowda
4017
4027
4028
4029
4030
4031
4032
4033
4034
4035
4036
4037
4038
4039
Construction of Storm Water Drain and Lead off drain in BSK 6th
stage, Block-III, IV & V.
Construction of Storm Water Drain and Lead off drain in BSK 6th
stage, Block-III, IV & V.
Construction of Storm Water Drain and Lead off drain in BSK 6th
stage, Block-III, IV & V.
Construction of Storm Water Drain and Lead off drain in BSK 6th
stage, Block-III, IV & V.
Construction of Storm Water Drain and Lead off drain in BSK 6th
stage, Block-III, IV & V.
Construction of Storm Water Drain and Lead off drain in BSK 6th
stage, Block-VI, VII, VIII, IX and X
BDA/EM/TEN/T-24/2002-2003 dt:09-04-2002
R.Subba Raju
BDA/EM/TEN/T-24/2002-2003 dt:09-04-2002
The Mysore Construction Company
BDA/EM/TEN/T-24/2002-2003 dt:09-04-2002
Siddhartha Civil Works Ltd.
BDA/EM/TEN/T-24/2002-2003 dt:09-04-2002
Reddy Veeranna & co
BDA/EM/TEN/T-24/2002-2003 dt:09-04-2002
Rangaswamy
BDA/EM/TEN/T-24/2002-2003 dt:09-04-2002
K.Gopal Raju
4045
Construction of Storm Water Drain and Lead off drain in BSK 6th
stage, Block-VI, VII, VIII, IX and X
BDA/EM/TEN/T-24/2002-2003 dt:09-04-2002
Reddy Veeranna & co
4046
Construction of Storm Water Drain and Lead off drain in BSK 6th
stage, Block-VI, VII, VIII, IX and X
BDA/EM/TEN/T-24/2002-2003 dt:09-04-2002
The Mysore Construction Company
4047
Construction of Storm Water Drain and Lead off drain in BSK 6th
stage, Block-VI, VII, VIII, IX and X
BDA/EM/TEN/T-24/2002-2003 dt:09-04-2002
R.Subba Raju
4048
Construction of Storm Water Drain and Lead off drain in BSK 6th
stage, Block-VI, VII, VIII, IX and X
BDA/EM/TEN/T-24/2002-2003 dt:09-04-2002
Sanz Constructions Pvt Ltd
4049
Construction of Storm Water Drain and Lead off drain in BSK 6th
stage, Block-VI, VII, VIII, IX and X
BDA/EM/TEN/T-24/2002-2003 dt:09-04-2002
B.J.Nagendra Kumar
4050
Construction of Storm Water Drain and Lead off drain in BSK 6th
stage, Block-VI, VII, VIII, IX and X
BDA/EM/TEN/T-24/2002-2003 dt:09-04-2002
R.Maheshwara Naidu
4051
Construction of Storm Water Drain and Lead off drain in BSK 6th
stage, Block-VI, VII, VIII, IX and X
BDA/EM/TEN/T-24/2002-2003 dt:09-04-2002
Ramky Engineers Pvt Ltd
4052
Formation of sites, roads, side drains & construction of CD works
in BSK VI stage, III phase, B'lore South taluk, Package-II
BDA/EM/TEN/T-137/2002-2003 dt:24-05-2002
D.Prabhulingaswamy
4053
Formation of sites, roads, side drains & construction of CD works
in BSK VI stage, III phase, B'lore South taluk, Package-II
BDA/EM/TEN/T-137/2002-2003 dt:24-05-2002
K.Gopal Raju
4054
Formation of sites, roads, side drains & construction of CD works
in BSK VI stage, III phase, B'lore South taluk, Package-II
BDA/EM/TEN/T-137/2002-2003 dt:24-05-2002
The Mysore Construction Company
4055
Formation of sites, roads, side drains & construction of CD works
in BSK VI stage, III phase, B'lore South taluk, Package-II
BDA/EM/TEN/T-137/2002-2003 dt:24-05-2002
K.Gopal Raju
4040
4041
4042
4043
4044
4056
Formation of sites, roads, side drains & construction of CD works
in BSK VI stage, III phase, B'lore South taluk, Package-II
BDA/EM/TEN/T-137/2002-2003 dt:24-05-2002
L.Radhakrishna
4057
Formation of sites, roads, side drains & construction of CD works
in BSK VI stage, III phase, B'lore South taluk, Package-II
BDA/EM/TEN/T-137/2002-2003 dt:24-05-2002
B.G.Channappa
4058
Formation of sites, roads, side drains & construction of CD works
in BSK VI stage, III phase, B'lore South taluk, Package-II
BDA/EM/TEN/T-137/2002-2003 dt:24-05-2002
Somashekar reddy
4059
Formation of sites, roads, side drains & construction of CD works
in BSK VI stage, III phase, B'lore South taluk, Package-II
BDA/EM/TEN/T-137/2002-2003 dt:24-05-2002
G.N.Krishna
4060
Formation of sites, roads, side drains & construction of CD works
in BSK VI stage, III phase, B'lore South taluk, Package-II
BDA/EM/TEN/T-137/2002-2003 dt:24-05-2002
GVPR Engineers Ltd.
4061
Formation of sites, roads, side drains & construction of CD works
in BSK VI stage, III phase, B'lore South taluk, Package-II
BDA/EM/TEN/T-137/2002-2003 dt:24-05-2002
Reddy Veeranna & co
4062
Formation of sites, roads, side drains & construction of CD works
in Anjanapura Township and further extension of Anjanapura
layout, Uttarahalli hobli, Bangalore South Taluk, Package-I
BDA/EM/TEN/T-137/2002-2003 dt:24-05-2002
Lakshman
4063
Formation of sites, roads, side drains & construction of CD works
in Anjanapura Township and further extension of Anjanapura
layout, Uttarahalli hobli, Bangalore South Taluk, Package-I
BDA/EM/TEN/T-137/2002-2003 dt:24-05-2002
The Mysore Construction Company
4064
Formation of sites, roads, side drains & construction of CD works
in Anjanapura Township and further extension of Anjanapura
layout, Uttarahalli hobli, Bangalore South Taluk, Package-I
BDA/EM/TEN/T-137/2002-2003 dt:24-05-2002
L.Radhakrishna
4065
Formation of sites, roads, side drains & construction of CD works
in Anjanapura Township and further extension of Anjanapura
layout, Uttarahalli hobli, Bangalore South Taluk, Package-I
BDA/EM/TEN/T-137/2002-2003 dt:24-05-2002
B.G.Channappa
4066
Formation of sites, roads, side drains & construction of CD works
in Anjanapura Township and further extension of Anjanapura
layout, Uttarahalli hobli, Bangalore South Taluk, Package-I
BDA/EM/TEN/T-137/2002-2003 dt:24-05-2002
K.Damodar
4067
Formation of sites, roads, side drains & construction of CD works
in Anjanapura Township and further extension of Anjanapura
layout, Uttarahalli hobli, Bangalore South Taluk, Package-I
BDA/EM/TEN/T-137/2002-2003 dt:24-05-2002
D.Prabhulingaswamy
4068
Formation of sites, roads, side drains & construction of CD works
in Anjanapura Township and further extension of Anjanapura
layout, Uttarahalli hobli, Bangalore South Taluk, Package-IV
BDA/EM/TEN/T-137/2002-2003 dt:24-05-2002
K.Gopal Raju
4069
Formation of sites, roads, side drains & construction of CD works
in Anjanapura Township and further extension of Anjanapura
layout, Uttarahalli hobli, Bangalore South Taluk, Package-IV
BDA/EM/TEN/T-137/2002-2003 dt:24-05-2002
L.Radhakrishna
4070
Formation of sites, roads, side drains & construction of CD works
in Banashankari VI stage, III phase, Bangalore South
Taluk.Package-I
Formation of sites, roads, side drains & construction of CD works
in Banashankari VI stage, III phase, Bangalore South
Taluk.Package-I
Formation of sites, roads, side drains & construction of CD works
in Banashankari VI stage, III phase, Bangalore South
Taluk.Package-I
Formation of sites, roads, side drains & construction of CD works
in Banashankari VI stage, III phase, Bangalore South
Taluk.Package-I
Formation of sites, roads, side drains & construction of CD works
in Banashankari VI stage, III phase, Bangalore South
Taluk.Package-I
Formation of sites, roads, side drains & construction of CD works
in Banashankari VI stage, III phase, Bangalore South
Taluk.Package-I
Formation of sites, roads, side drains & construction of CD works
in Anjanapura Township and further extension of Anjanapura
layout, Uttarahalli hobli, Bangalore South Taluk, Package-II
BDA/EM/TEN/T-137/2002-2003 dt:24-05-2002
Reddy Veeranna & co
BDA/EM/TEN/T-137/2002-2003 dt:24-05-2002
GVPR Engineers Ltd.
BDA/EM/TEN/T-137/2002-2003 dt:24-05-2002
G.N.Krishna
BDA/EM/TEN/T-137/2002-2003 dt:24-05-2002
L.Radhakrishna
BDA/EM/TEN/T-137/2002-2003 dt:24-05-2002
Sanz Constructions Pvt Ltd
BDA/EM/TEN/T-137/2002-2003 dt:24-05-2002
The Mysore Construction Company
BDA/EM/TEN/T-137/2002-2003 dt:24-05-2002
Lakshman
4071
4072
4073
4074
4075
4076
4077
Formation of sites, roads, side drains & construction of CD works
in Anjanapura Township and further extension of Anjanapura
layout, Uttarahalli hobli, Bangalore South Taluk, Package-II
BDA/EM/TEN/T-137/2002-2003 dt:24-05-2002
D.Prabhulingaswamy
4078
Formation of sites, roads, side drains & construction of CD works
in Anjanapura Township and further extension of Anjanapura
layout, Uttarahalli hobli, Bangalore South Taluk, Package-II
BDA/EM/TEN/T-137/2002-2003 dt:24-05-2002
M/S.Siddhartha Civil works pvt ltd.
4079
Formation of sites, roads, side drains & construction of CD works
in Anjanapura Township and further extension of Anjanapura
layout, Uttarahalli hobli, Bangalore South Taluk, Package-II
BDA/EM/TEN/T-137/2002-2003 dt:24-05-2002
L.Radhakrishna
4080
Formation of sites, roads, side drains & construction of CD works
in Anjanapura Township and further extension of Anjanapura
layout, Uttarahalli hobli, Bangalore South Taluk, Package-II
BDA/EM/TEN/T-137/2002-2003 dt:24-05-2002
Haigreeva Engineering company
4081
Formation of sites, roads, side drains & construction of CD works
in Anjanapura Township and further extension of Anjanapura
layout, Uttarahalli hobli, Bangalore South Taluk, Package-II
BDA/EM/TEN/T-137/2002-2003 dt:24-05-2002
Sanz Constructions Pvt Ltd
4082
Formation of sites, roads, side drains & construction of CD works
in Anjanapura Township and further extension of Anjanapura
layout, Uttarahalli hobli, Bangalore South Taluk, Package-II
BDA/EM/TEN/T-137/2002-2003 dt:24-05-2002
The Mysore Construction Company
4083
Formation of sites, roads, side drains & construction of CD works
in Anjanapura Township and further extension of Anjanapura
layout, Uttarahalli hobli, Bangalore South Taluk, Package-III
BDA/EM/TEN/T-137/2002-2003 dt:24-05-2002
D.Prabhulingaswamy
4084
Formation of sites, roads, side drains & construction of CD works
in Anjanapura Township and further extension of Anjanapura
layout, Uttarahalli hobli, Bangalore South Taluk, Package-III
BDA/EM/TEN/T-137/2002-2003 dt:24-05-2002
P.J.Baby & Co
4085
Formation of sites, roads, side drains & construction of CD works
in Anjanapura Township and further extension of Anjanapura
layout, Uttarahalli hobli, Bangalore South Taluk, Package-III
BDA/EM/TEN/T-137/2002-2003 dt:24-05-2002
L.Radhakrishna
4086
Formation of sites, roads, side drains & construction of CD works
in Anjanapura Township and further extension of Anjanapura
layout, Uttarahalli hobli, Bangalore South Taluk, Package-III
BDA/EM/TEN/T-137/2002-2003 dt:24-05-2002
Sanz Constructions Pvt Ltd
4087
Construction of lead off drains and protective works in 5th A block,
J.P.Nagar IX phase.
Construction of lead off drains and protective works in 5th A block,
J.P.Nagar IX phase.
Construction of lead off drains and protective works in 5th A block,
J.P.Nagar IX phase.
Construction of lead off drains and protective works in 5th A block,
J.P.Nagar IX phase.
Formation of sites, roads, side drains, construction of CD works
and storm water drain in Balance portion of layout in
Vaddarapalya, BSK V stage.
Formation of sites, roads, side drains, construction of CD works
and storm water drain in Balance portion of layout in
Vaddarapalya, BSK V stage.
BDA/EM/TEN/T-663/2002-2003 dt:23-01-2003
R.Shivashankarbabu
BDA/EM/TEN/T-663/2002-2003 dt:23-01-2003
H.Humar Swamy
BDA/EM/TEN/T-663/2002-2003 dt:23-01-2003
D.Prabhulingaswamy
BDA/EM/TEN/T-663/2002-2003 dt:23-01-2003
N.Kemparaj
BDA/EM/TEN/T-62-A/2002-2003 dt:22-05-2003
V.K.Gopal
BDA/EM/TEN/T-62-A/2002-2003 dt:22-05-2003
D.Prabhulingaswamy
4088
4089
4090
4091
4092
4093
4094
4095
4096
4097
4098
4099
4100
4101
4102
Formation of sites, roads, side drains, construction of CD works
and storm water drain in Balance portion of layout in
Vaddarapalya, BSK V stage.
Formation of sites, roads, side drains, construction of CD works
and storm water drain in Balance portion of layout in
Vaddarapalya, BSK V stage.
Formation of sites, roads, side drains, construction of CD works
and storm water drain in Balance portion of layout in
Vaddarapalya, BSK V stage.
Formation of sites, roads, side drains and construction of CD works
in Gottigere village for Block XII at Further extension of Anjanapura
layout.
Formation of sites, roads, side drains and construction of CD works
in Gottigere village for Block XII at Further extension of Anjanapura
layout.
Formation of sites, roads, side drains and construction of CD works
in Gottigere village for Block XII at Further extension of Anjanapura
layout.
Formation of sites, roads, side drains and construction of CD works
in Gottigere village for Block XII at Further extension of Anjanapura
layout.
Formation of sites, roads, side drains and construction of CD works
in Gottigere village for Block XII at Further extension of Anjanapura
layout.
Formation of sites, roads, side drains and construction of CD works
in Gottigere village for Block XII at Further extension of Anjanapura
layout.
Providing remetalling and chipcarpetting to approach road from
Block V to Anjanapura layout in J.P.Nagar IX phase.
BDA/EM/TEN/T-62-A/2002-2003 dt:22-05-2003
M/s.Prashanth Builders
BDA/EM/TEN/T-62-A/2002-2003 dt:22-05-2003
H.N.Nanjappa
BDA/EM/TEN/T-62-A/2002-2003 dt:22-05-2003
S.Mahesh
BDA/EM/TEN/T-162/2002-2003 dt:08-08-2003
H.Narasimha Murthy
BDA/EM/TEN/T-162/2002-2003 dt:08-08-2003
B.G.Channappa
BDA/EM/TEN/T-162/2002-2003 dt:08-08-2003
D.Prabhulingaswamy
BDA/EM/TEN/T-162/2002-2003 dt:08-08-2003
Lakshman
BDA/EM/TEN/T-162/2002-2003 dt:08-08-2003
V.K.Gopal
BDA/EM/TEN/T-162/2002-2003 dt:08-08-2003
Parichitha constructions
BDA/EM/TEN/T-663/2002-2003 dt:23-01-2003
C.G.Chandrappa
4103
Providing remetalling and chipcarpetting to approach road from
Block V to Anjanapura layout in J.P.Nagar IX phase.
BDA/EM/TEN/T-663/2002-2003 dt:23-01-2003
J.P.Radhakrishna
4104
Providing remetalling and chipcarpetting to approach road from
Block V to Anjanapura layout in J.P.Nagar IX phase.
BDA/EM/TEN/T-663/2002-2003 dt:23-01-2003
P.R.Mallikarjuna
4105
Providing remetalling and chipcarpetting to approach road from
Block V to Anjanapura layout in J.P.Nagar IX phase.
BDA/EM/TEN/T-663/2002-2003 dt:23-01-2003
D.Prabhulingaswamy
4106
Providing remetalling and chipcarpetting to approach road from
Block V to Anjanapura layout in J.P.Nagar IX phase.
BDA/EM/TEN/T-663/2002-2003 dt:23-01-2003
R.Shivashankarbabu
4107
Providing remetalling and chipcarpetting to approach road from
Block V to Anjanapura layout in J.P.Nagar IX phase.
BDA/EM/TEN/T-663/2002-2003 dt:23-01-2003
A.Krishnappa
4108
Providing remetalling and chipcarpetting to approach road from
Block V to Anjanapura layout in J.P.Nagar IX phase.
BDA/EM/TEN/T-663/2002-2003 dt:23-01-2003
S.Mahesh
4109
Construction of SWD at block No.3 and 4 of J.P.Nagar 9th phase.
BDA/EM/TEN/T-663/2002-2003 dt:23-01-2003
R.Shivashankarbabu
4110
Construction of SWD at block No.3 and 4 of J.P.Nagar 9th phase.
BDA/EM/TEN/T-663/2002-2003 dt:23-01-2003
B.G.Channappa
4111
Construction of SWD at block No.3 and 4 of J.P.Nagar 9th phase.
BDA/EM/TEN/T-663/2002-2003 dt:23-01-2003
A.V.Srinivas
4112
Construction of SWD at block No.3 and 4 of J.P.Nagar 9th phase.
BDA/EM/TEN/T-663/2002-2003 dt:23-01-2003
B.J.Nagendra Kumar
4113
Construction of SWD at block No.3 and 4 of J.P.Nagar 9th phase.
BDA/EM/TEN/T-663/2002-2003 dt:23-01-2003
A.Krishnappa
4114
Construction of SWD at block No.3 and 4 of J.P.Nagar 9th phase.
BDA/EM/TEN/T-663/2002-2003 dt:23-01-2003
D.Prabhulingaswamy
4115
Construction of SWD at block No.3 and 4 of J.P.Nagar 9th phase.
BDA/EM/TEN/T-663/2002-2003 dt:23-01-2003
N.C.Nagaraj
4116
Construction of SWD at block No.3 and 4 of J.P.Nagar 9th phase.
BDA/EM/TEN/T-663/2002-2003 dt:23-01-2003
J.P.Radhakrishna
4117
Construction of SWD at block No.3 and 4 of J.P.Nagar 9th phase.
BDA/EM/TEN/T-663/2002-2003 dt:23-01-2003
B.S.Rakesh
4118
Construction of SWD at block No.3 and 4 of J.P.Nagar 9th phase.
BDA/EM/TEN/T-663/2002-2003 dt:23-01-2003
D.V.Sridhar
4119
BDA/EM/TEN/T-663/2002-2003 dt:23-01-2003
C.G.Chandrappa
BDA/EM/TEN/T-663/2002-2003 dt:23-01-2003
B.S.Rakesh
BDA/EM/TEN/T-663/2002-2003 dt:23-01-2003
D.Prabhulingaswamy
BDA/EM/TEN/T-663/2002-2003 dt:23-01-2003
K.S.Manjunath
BDA/EM/TEN/T-663/2002-2003 dt:23-01-2003
R.Hari Rao
4124
Providing metalling and rechipcarpetting to approach road from
Kanakapura road-Bangalore road upto Block V via Bank Officers
Layout.
Providing metalling and rechipcarpetting to approach road from
Kanakapura road-Bangalore road upto Block V via Bank Officers
Layout.
Providing metalling and rechipcarpetting to approach road from
Kanakapura road-Bangalore road upto Block V via Bank Officers
Layout.
Providing metalling and rechipcarpetting to approach road from
Kanakapura road-Bangalore road upto Block V via Bank Officers
Layout.
Providing metalling and rechipcarpetting to approach road from
Kanakapura road-Bangalore road upto Block V via Bank Officers
Layout.
Construction of SWD at Block 4, 4th A of J.P.Nagar 9th phase.
BDA/EM/TEN/T-663/2002-2003 dt:23-01-2003
R.Shivashankarbabu
4125
Construction of SWD at Block 4, 4th A of J.P.Nagar 9th phase.
BDA/EM/TEN/T-663/2002-2003 dt:23-01-2003
K.R.Kumar
4126
Construction of SWD at Block 4, 4th A of J.P.Nagar 9th phase.
BDA/EM/TEN/T-663/2002-2003 dt:23-01-2003
G.A.Sudarshan
4127
Construction of SWD at Block 4, 4th A of J.P.Nagar 9th phase.
BDA/EM/TEN/T-663/2002-2003 dt:23-01-2003
D.Prabhulingaswamy
4128
Construction of SWD at Block 4, 4th A of J.P.Nagar 9th phase.
BDA/EM/TEN/T-663/2002-2003 dt:23-01-2003
A.Krishnappa
4129
Construction of SWD at Block 4, 4th A of J.P.Nagar 9th phase.
BDA/EM/TEN/T-663/2002-2003 dt:23-01-2003
M.R.Girish
4130
Construction of SWD at Block 4, 4th A of J.P.Nagar 9th phase.
BDA/EM/TEN/T-663/2002-2003 dt:23-01-2003
G.V.Patel
4131
Construction of SWD at Block 4, 4th A of J.P.Nagar 9th phase.
BDA/EM/TEN/T-663/2002-2003 dt:23-01-2003
K.S.Manjunath
4120
4121
4122
4123
4132
Construction of SWD at Block 4, 4th A of J.P.Nagar 9th phase.
BDA/EM/TEN/T-663/2002-2003 dt:23-01-2003
B.K.Keshav Murthy
4133
Construction of SWD at Block 4, 4th A of J.P.Nagar 9th phase.
BDA/EM/TEN/T-663/2002-2003 dt:23-01-2003
P.S.Rajanna
4134
Construction of SWD at Block 4, 4th A of J.P.Nagar 9th phase.
BDA/EM/TEN/T-663/2002-2003 dt:23-01-2003
B.J.Nagendra Kumar
4135
Construction of Minor Bridges (Two) for the approach road at
Sy.No.14 of Doddakallasandra in J.P.Nagar IX phase.
BDA/EM/TEN/T-663/2002-2003 dt:23-01-2003
D.Prabhulingaswamy
4136
Construction of Minor Bridges (Two) for the approach road at
Sy.No.14 of Doddakallasandra in J.P.Nagar IX phase.
BDA/EM/TEN/T-663/2002-2003 dt:23-01-2003
K.Gopal Raju
4137
Construction of Minor Bridges (Two) for the approach road at
Sy.No.14 of Doddakallasandra in J.P.Nagar IX phase.
BDA/EM/TEN/T-663/2002-2003 dt:23-01-2003
Yoganand
BDA/EM/TEN/T-331/2003-2004 dt:06-02-2004
B.J.Nagaendra Kumar
BDA/EM/TEN/T-331/2003-2004 dt:06-02-2004
R.Anil Kumar
BDA/EM/TEN/T-331/2003-2004 dt:06-02-2004
A.Raghavendra
BDA/EM/TEN/T-331/2003-2004 dt:06-02-2004
R.Shivashankarbabu
BDA/EM/TEN/T-331/2003-2004 dt:06-02-2004
B.Ramesh
4143
Construction of Culverts in Sy.No.5 & 6 of Bikasipura, BSK V
stage.
Construction of Culverts in Sy.No.5 & 6 of Bikasipura, BSK V
stage.
Construction of Culverts in Sy.No.5 & 6 of Bikasipura, BSK V
stage.
Construction of Culverts in Sy.No.5 & 6 of Bikasipura, BSK V
stage.
Construction of Culverts in Sy.No.5 & 6 of Bikasipura, BSK V
stage.
Formation of additional sites in BSK VI stage,VII block.
BDA/EM/TEN/T-331/2003-2004 dt:06-02-2004
Yoganand
4144
Formation of additional sites in BSK VI stage,VII block.
BDA/EM/TEN/T-331/2003-2004 dt:06-02-2004
B.J.Nagendra Kumar
4145
Formation of additional sites in BSK VI stage,VII block.
BDA/EM/TEN/T-331/2003-2004 dt:06-02-2004
Mahadev .P
4146
Formation of additional sites in BSK VI stage,VII block.
BDA/EM/TEN/T-331/2003-2004 dt:06-02-2004
N.Kemparaj
4147
Formation of additional sites in BSK VI stage,VII block.
BDA/EM/TEN/T-331/2003-2004 dt:06-02-2004
B.Ramesh
4148
Construction of SWD in Sy.No.3 of Bikasipura, BSK V stage.
BDA/EM/TEN/T-331/2003-2004 dt:06-02-2004
Yoganand
4149
Construction of SWD in Sy.No.3 of Bikasipura, BSK V stage.
BDA/EM/TEN/T-331/2003-2004 dt:06-02-2004
Veeranna Gowda
4150
Construction of SWD in Sy.No.3 of Bikasipura, BSK V stage.
BDA/EM/TEN/T-331/2003-2004 dt:06-02-2004
G.Nandeesh
4151
Construction of SWD in Sy.No.3 of Bikasipura, BSK V stage.
BDA/EM/TEN/T-331/2003-2004 dt:06-02-2004
B.J.Nagendra Kumar
4152
Construction of SWD in Sy.No.3 of Bikasipura, BSK V stage.
BDA/EM/TEN/T-331/2003-2004 dt:06-02-2004
G.Ganesh
4153
Construction of SWD in Sy.No.3 of Bikasipura, BSK V stage.
BDA/EM/TEN/T-331/2003-2004 dt:06-02-2004
B.K.Keshav Murthy
4154
Construction of SWD in Sy.No.3 of Bikasipura, BSK V stage.
BDA/EM/TEN/T-331/2003-2004 dt:06-02-2004
R.Shivashankarbabu
4155
Construction of SWD in Sy.No.3 of Bikasipura, BSK V stage.
BDA/EM/TEN/T-331/2003-2004 dt:06-02-2004
M.R.Girish
4156
Construction of SWD in Sy.No.3 of Bikasipura, BSK V stage.
BDA/EM/TEN/T-331/2003-2004 dt:06-02-2004
P.S.Rajanna
2003-04
4138
4139
4140
4141
4142
4157
4158
4159
4160
4161
4162
4163
4164
4165
4166
4167
4168
4169
4170
4171
4172
4173
4174
4175
Construction of SWD in Sy.No.3 of Bikasipura, BSK V stage.
BDA/EM/TEN/T-331/2003-2004 dt:06-02-2004
G.V.Patel
Construction of lead off drains and Storm Water drains in BSK 6th
stage, Block XI and extended area of Block III & IV.
BDA/EM/TEN/T-25/2003-2004 dt:22-04-2002
D.Prabhulingaswamy
Construction of lead off drains and Storm Water drains in BSK 6th
stage, Block XI and extended area of Block III & IV.
BDA/EM/TEN/T-25/2003-2004 dt:22-04-2002
R.Maheswara Naidu, Engineers & Contractors
Construction of lead off drains and Storm Water drains in BSK 6th
stage, Block XI and extended area of Block III & IV.
BDA/EM/TEN/T-25/2003-2004 dt:22-04-2002
N.Jairaj Shetty, Proprietor, For Diggers (INDIA)
Construction of lead off drains and Storm Water drains in BSK 6th
stage, Block XI and extended area of Block III & IV.
BDA/EM/TEN/T-25/2003-2004 dt:22-04-2002
Sanz Constructions Pvt Ltd
Construction of lead off drains and Storm Water drains in BSK 6th
stage, Block XI and extended area of Block III & IV.
BDA/EM/TEN/T-25/2003-2004 dt:22-04-2002
H.Narasimha Murthy
Condtruction of Storm Water Drain in Further Extension of
Anjanapura.
Condtruction of Storm Water Drain in Further Extension of
Anjanapura.
Condtruction of Storm Water Drain in Further Extension of
Anjanapura.
Condtruction of Storm Water Drain in Further Extension of
Anjanapura.
Condtruction of Storm Water Drain in Further Extension of
Anjanapura.
Condtruction of Storm Water Drain in Further Extension of
Anjanapura.
Condtruction of Storm Water Drain in Further Extension of
Anjanapura.
Condtruction of Storm Water Drain in Further Extension of
Anjanapura.
Condtruction of Storm Water Drain in Further Extension of
Anjanapura.
Condtruction of Storm Water Drain in Further Extension of
Anjanapura.
Condtruction of Storm Water Drain in Further Extension of
Anjanapura.
Formation of approach road from Uttarahally main road via Raitha
Karmikara Gruha Nirmana Sahakara Sangha Private layout to BSK
VI Stage, Block I & II.
Formation of approach road from Uttarahally main road via Raitha
Karmikara Gruha Nirmana Sahakara Sangha Private layout to BSK
VI Stage, Block I & II.
BDA/EM/TEN/T-25/2003-2004 dt:22-04-2002
K.V.Shetty & Co.
BDA/EM/TEN/T-25/2003-2004 dt:22-04-2002
R.Jayaram Reddy
BDA/EM/TEN/T-25/2003-2004 dt:22-04-2002
M/s.P.J.Baby & Co.
BDA/EM/TEN/T-25/2003-2004 dt:22-04-2002
Rangaswamy
BDA/EM/TEN/T-25/2003-2004 dt:22-04-2002
N.Srinivas Murthy
BDA/EM/TEN/T-25/2003-2004 dt:22-04-2002
N.Jairaj Shetty, Proprietor, For Diggers (INDIA)
BDA/EM/TEN/T-25/2003-2004 dt:22-04-2002
D.Prabhulingaswamy
BDA/EM/TEN/T-25/2003-2004 dt:22-04-2002
R.Maheswara Naidu, Engineers & Contractors
BDA/EM/TEN/T-25/2003-2004 dt:22-04-2002
G.N.Krishna
BDA/EM/TEN/T-25/2003-2004 dt:22-04-2002
H.Narasimha Murthy
BDA/EM/TEN/T-25/2003-2004 dt:22-04-2002
Sanz Constructions Pvt Ltd
BDA/EM/TEN/T-26/2003-2004 dt:22-04-2003
S.Mahesh
BDA/EM/TEN/T-26/2003-2004 dt:22-04-2003
D.Prabhulingaswamy
4176
4177
4178
4179
4180
4181
4182
Formation of approach road from Uttarahally main road via Raitha
Karmikara Gruha Nirmana Sahakara Sangha Private layout to BSK
VI Stage, Block I & II.
Formation of approach road from Uttarahally main road via Raitha
Karmikara Gruha Nirmana Sahakara Sangha Private layout to BSK
VI Stage, Block I & II.
Mapping and preparation of GIS in the digital format with cadastral
Survey number boundaries and all topographical features detailed
at scale 1:2000, for the purpose of planning, development,
formation of sites and services of BSK VI stage further extensi
Mapping and preparation of GIS in the digital format with cadastral
Survey number boundaries and all topographical features detailed
at scale 1:2000, for the purpose of planning, development,
formation of sites and services of BSK VI stage further extensi
Mapping and preparation of GIS in the digital format with cadastral
Survey number boundaries and all topographical features detailed
at scale 1:2000, for the purpose of planning, development,
formation of sites and services of BSK VI stage further extensi
Mapping and preparation of GIS in the digital format with cadastral
Survey number boundaries and all topographical features detailed
at scale 1:2000, for the purpose of planning, development,
formation of sites and services of BSK VI stage further extensi
Mapping and preparation of GIS in the digital format with cadastral
Survey number boundaries and all topographical features detailed
at scale 1:2000, for the purpose of planning, development,
formation of sites and services of BSK VI stage further extensi
BDA/EM/TEN/T-26/2003-2004 dt:22-04-2003
V.K.Gopal
BDA/EM/TEN/T-26/2003-2004 dt:22-04-2003
G.N.Krishna
BDA/EM/TEN/T-120/2003-2004 dt:10-07-2003
Stup consultants (P) Ltd.
BDA/EM/TEN/T-120/2003-2004 dt:10-07-2003
Indian Resorce Information & Management
Technologies Ltd.
BDA/EM/TEN/T-120/2003-2004 dt:10-07-2003
Span consultants Pvt Ltd.
BDA/EM/TEN/T-120/2003-2004 dt:10-07-2003
Guideline Surveys
BDA/EM/TEN/T-120/2003-2004 dt:10-07-2003
Niketan Consultants
Cataloguing and indexing of records as envisaged under section 4(1) (a) of the Right to information Act 2005
LIST OF PLAN SANCTIONED FILES DURING THE YEAR 84-85 IN EE(S) DIVISION
SL
NO.
1
SITE
NO.
750
2
562
NAME OF THE LAYOUT
DIMENSION
APPLICANT NAME
SANCTION EE NO/DATE
KUMARA SWAMY LAYOUT II STAGE
40' X 25'
P.GOVINDA NAIR
BDA/EE(S)/PL/17/84-85 DT 07.01.1985
B.T.M. II STAGE, I PHASE
30' X 40'
M.VELUSWAMY
BDA/EE(S)/PL/7/84-85 DT 14.03.1985
3
534
SARAKKI II PHASE
30' X 40'
KSHAMA NARASIMHAN
BDA/EE(S)/PL/8/84-85 DT 25.09.1984
4
154
SARAKKI I PHASE
30' X 40'
R.CHANNEGOWDA
BDA/EE(S)/PL/9/84-85 DT 26.10.1984
5
120
ITI H.B.C.S., KATHARIGUPPA
60' X 40'
K.R.RAJAGOPAL
BDA/EE(S)/PL/ /84-85 DT 06.08.1984
6
109
B.S.K. III STAGE, II PHASE, IV BLOCK
61' X 40'
A.V.ANANTHA PADMANABHA RAO
BDA/EE(S)/PL/537/84-85 DT 03.12.1986
7
1671
SARAKKI II PHASE
60' X 40'
A.NARASIMHA MURTHY
BDA/EE(S)/PL/97/84-85 DT 25.06.1984
Cataloguing and indexing of records as envisaged under section 4(1) (a) of the Right to information Act 2005
LIST OF PLAN SANCTIONED FILES DURING THE YEAR 85-86 IN EE(S) DIVISION
SL
NO.
8
SITE
NO.
136
NAME OF THE LAYOUT
DIMENSION
APPLICANT NAME
SANCTION EE NO/DATE
B.S.K. III STAGE, AVALAHALLY
50' X 30'
G.PERUMAL
BDA/EE(S)/PL/412/85-86 DT 03.12.1985
9
323
B.S.K. III STAGE, CHANAMANAKERE ACHUKATU
LAYOUT
POORNA PRAJAN H.B.C.S., KATHARIGUPPA
42' X 57'
A.SATHYNARAYANA
BDA/EE(S)/PL/45/85-86 DT 13.12.1985
10
45
40' X 60'
P.RAMACHANDRA
BDA/EE(S)/PL/14/85-86 DT 28.05.1985
11
304
B.S.K. III STAGE, CHANAMANAKERE ACHUKATU
LAYOUT
B.T.M. II STAGE
60' X 39'
T.R.SEETHARAMAN
BDA/EE(S)/PL/44/85-86 DT 13.12.1985
12
285
40' X 30'
K.S.SURYANARAYANA
BDA/EE(S)/PL/39/85-86 DT 27.12.1985
13
1624
SARAKKI II PHASE
30' X 50'
B.LAKSHMIPATHY
BDA/EE(S)/PL/14/85-86 DT 20.07.1985
14
825
B.T.M.LAYOUT
30' X 40'
D.S.SREENATHAN
BDA/EE(S)/PL/12/85-86 DT 24.06.1985
15
1732
SARAKKI II PHASE
30' X 40'
NAGABHUSHAN
BDA/EE(S)/PL/5/85-86 DT 22.05.1985
16
1513
SARAKKI II PHASE
40' X 60'
A.V.RANGANATHA IYENGAR
BDA/EE(S)/PL/7/85-86 DT 31.07.1985
17
178
SREENIVASA NAGAR, B.S.K. I STAGE
30' X 41'
H.R.MANGALA
BDA/EE(S)/PL/19/85-86 DT 25.09.1995
Cataloguing and indexing of records as envisaged under section 4(1) (a) of the Right to information Act 2005
LIST OF PLAN SANCTIONED FILES DURING THE YEAR 86-87 IN EE(S) DIVISION
SL
NO.
18
SITE
NO.
663
NAME OF THE LAYOUT
DIMENSION
APPLICANT NAME
SANCTION EE NO/DATE
B.T.M. II STAGE, I PHASE
60' X 40'
P.DEVENDRA KARKERA
BDA/EE(S)/PL/22/86-87 DT 23.12.1986
19
1264
SARAKKI II PHASE
60' X 40'
K.SHANMUGAM
BDA/EE(S)/PL/29/86-87 DT 27.11.1986
20
511
B.S.K. III STAGE, III PHASE, III BLOCK
60' X 40'
D.BETARAYASWAMY
BDA/EE(S)/PL/43/86-87 DT 13.11.1986
21
79
RAMA RAO LAYOUT, B.S.K. III STAGE,
40' X 60'
KOLAR SRIPATHI RAO
BDA/EE(S)/PL/126/86-87 DT 21.01.1987
22
270
N.S.PALYA MICO H.B.C.S.
60' X 40'
JOSEPH LOIS
BDA/EE(S)/PL/146/86-87 DT 05.03.1987
23
108
ITI H.B.C.S., KATHARIGUPPA
60' X 40'
NAGAMANI SRIDHAR
BDA/EE(S)/PL/95/86-87 DT 07.11.1986
24
30
SRI.RADHAKRISHNA H.B.C.S., KADIRENAHALLI
60' X 40'
LATHA ANAND
BDA/EE(S)/PL/90/86-87 DT 25.08.1986
25
287
N.S.PALYA MICO H.B.C.S.
60' X 40'
P.CHANDRA SHEKHAR PILLAY
BDA/EE(S)/PL/102/86-87 DT 12.11.1986
26
1
K.S.R.T.C. H.B.C.S.
45' X 50'
H.N.NANJAPPA
BDA/EE(S)/PL/142/86-87 DT 20.02.1987
27
448
N.S.PALYA MICO H.B.C.S.
60' X 41'
A.N.GOSWAMY
BDA/EE(S)/PL/91/86-87 DT 30.10.1986
28
18
KENCHENAHALLI H.B.C.S.
59' X 42'
D.MALATHI
BDA/EE(S)/PL/117/86-87 DT 30.12.1987
29
183
JAYANAGARA H.B.C.S., PADMANABHA NAGAR
40' X 77'
T.K.TARA BAI
BDA/EE(S)/PL/128/86-87 DT 23.01.1987
30
A.R.GOPALASWAMY LAYOUT, SARAKKI
90' X 40'
SHAMALA SHETTY
BDA/EE(S)/PL/136/86-87 DT 12.02.1987
31
11, 12,
13
24/ 38/1
JAYANAGAR H.B.C.S., KADIRENAHALLI
50' X 40'
P.S.SUBBA RAO
BDA/EE(S)/PL/116/86-87 DT 30.12.1986
32
171
N.S.PALYA MICO H.B.C.S.
40' X 30'
S.HARISH JUDAU
BDA/EE(S)/PL/112/86-87 DT 29.12.1986
33
7
KENCHENAHALLI H.B.C.S.
30' X 40'
N.V.RAMESH
BDA/EE(S)/PL/124/86-87 DT 21.01.1987
34
65
JAYANAGARA H.B.C.S., PADMANABHA NAGAR
40' X 60'
S.SUNDAR NAIK
BDA/EE(S)/PL/118/86-87 DT 09.01.1987
35
49
KENCHENAHALLI H.B.C.S.
60' X 40'
K.G.VIJAYA KUMAR
BDA/EE(S)/PL/89/86-87 DT 28.10.1986
36
43
K.S.R.T.C. H.B.C.S.
60' X 40'
K.KRISHNAIAH NAIDU
BDA/EE(S)/PL/125/86-87 DT 21.01.1987
37
176
VISWABHARATHI H.B.C.S., GIRINAGAR
58' X 40'
N.MALLIKARJUNA
BDA/EE(S)/PL/103/86-87 DT 19.11.1986
38
167
KENCHENAHALLI H.B.C.S.
40' X 51'
T.J.GOPALA KRISHNA
BDA/EE(S)/PL/106/86-87 DT 26.11.1986
39
2398
KUMARA SWAMY LAYOUT II STAGE
60' X 40'
K.N.MADHAVAN
BDA/EE(S)/PL/12/86-87 DT 05.03.1987
40
378
VISWABHARATHI H.B.C.S., GIRINAGAR
18.30 X 9.87
SRI LAKSXMI
BDA/EE(S)/PL/130/86-87 DT 30.01.1987
41
13
SRI ANJANEYA SWAMY H.B.C.S., ETTMADU SY NOS
60' X 40'
K.N.NAGARAJ
BDA/EE(S)/PL/92/86-87 DT 06.11.1986
42
19
N.S.PALYA MICO H.B.C.S.
60' X 44'
H.S.SOMASUNDARA RAO
BDA/EE(S)/PL/121/86-87 DT 14.01.1987
43
28/ 38/1
JAYANAGARA H.B.C.S., PADMANABHA NAGAR
40' X 50'
D.A.SHUBHAKARA SHETTY
BDA/EE(S)/PL/144/86-87 DT 24.02.1987
44
187
KENCHENAHALLI H.B.C.S.
53' X 37'
M.N.RAMACHANDRA MURTHY
BDA/EE(S)/PL/96/86-87 DT 07.11.1986
45
704
KEMPEGOWDA H.B.C.S., KATHRIGUPPA
60' X 40'
V.ANANDA
BDA/EE(S)/PL/129/86-87 DT 24.01.1987
46
11
N.S.PALYA MICO H.B.C.S.
60' X 40'
H.SIDDAPPA
BDA/EE(S)/PL/104/86-87 DT 22.11.1986
47
720
KEMPEGOWDA H.B.C.S., KATHRIGUPPA
61' X 40'
CHANNABASAVANNA C SHETTAR
BDA/EE(S)/PL/145/86-87 DT 25.02.1987
48
412
N.S.PALYA MICO H.B.C.S.
40' X 64'
K.K.SATHYANARAYAN
BDA/EE(S)/PL/140/86-87 DT 16.02.1987
49
141
KENCHENAHALLI H.B.C.S.
59' X 39'
B.D.BHASKARA RAO
BDA/EE(S)/PL/97/86-87 DT 11.11.1986
50
1232
B.S.K. III STAGE, II PHASE, HOSAKEREHALLI
60' X 40'
P.G.SATHYANARAYANA SHETTY
BDA/EE(S)/PL/41/86-87 DT 31.10.1986
51
1207
B.T.M. II STAGE, I PHASE
60' X 40'
DATTATRY M.N.
BDA/EE(S)/PL/24/86-87 DT 28.01.1987
52
62
SARAKKI II PHASE
60' X 45'
B.N.SHUBHA
BDA/EE(S)/PL/39/86-87 DT 16.02.1987
53
817
SARAKKI II PHASE
70' X 40'
S.N.KAMALAMMA
BDA/EE(S)/PL/40/86-87 DT 21.02.1987
54
2403
KUMARA SWAMY LAYOUT II STAGE
61' X 40'
B.K.VISWANATH
BDA/EE(S)/PL/8/86-87 DT 19.11.1986
55
1713
KUMARA SWAMY LAYOUT II STAGE
60' X 40'
K.S.SIREESH
BDA/EE(S)/PL/9/86-87 DT 28.11.1986
56
273
N.S.PALYA MICO H.B.C.S.
50' X 40'
J.BORALINGAIAH
BDA/EE(S)/PL/151/86-87 DT 09.03.1987
57
704
B.T.M. II STAGE, I PHASE
60' X 40'
M.G.PRAKASH
BDA/EE(S)/PL/21/86-87 DT 05.12.1986
58
59
762
236 &
237
SARAKKI I PHASE
63' X 40'
C.MANIYALLAPPA
BDA/EE(S)/PL/3/86-87 DT 27.11.1996
SARAKKI I PHASE
59' X 40'
K.H.MOHAN
BDA/EE(S)/PL/4/86-87 DT 27.11.1986
60
25
SARAKKI V PHASE
60' X 40'
DESAI RAMA RAO
BDA/EE(S)/PL/3/86-87 DT 07.01.1987
61
1268
SARAKKI II PHASE
60' X 40'
S.RAMESH
BDA/EE(S)/PL/36/86-87 DT 03.02.1987
62
581
SARAKKI VI PHASE
60' X 40'
S.RAMA CHANDRAN
BDA/EE(S)/PL/4/86-87 DT 28.12.1986
63
1531
SARAKKI II PHASE
65' X 40'
N.V.RAGHURAM
BDA/EE(S)/PL/32/86-87 DT 11.12.1986
64
701
SARAKKI II PHASE
47' X 62'
B.K.MURALIDHARA RAO
BDA/EE(S)/PL/30/86-87 DT 03.12.1986
65
573
B.S.K. III STAGE, III PHASE, III BLOCK
60' X 40'
K.CHANDRA SHEKARA UPADHYA
BDA/EE(S)/PL/65/86-87 DT 20.02.1987
66
554
B.S.K. III STAGE, II PHASE, III BLOCK
60' X 39'
PATTABHI GOWDA
BDA/EE(S)/PL/66/86-87 DT 21.02.1987
67
577
B.S.K. III STAGE, II PHASE, III BLOCK
65' X 45'
T.R.NAGARAJ
BDA/EE(S)/PL/42/86-87 DT 06.11.1986
68
443
B.S.K. III STAGE, II PHASE, III BLOCK
60' X 40'
H.C.SRIKANTAIAH
BDA/EE(S)/PL/62/86-87 DT 06.02.1987
69
102
B.S.K. III STAGE, ITTUMADU SY NOS
63' X 40'
G.KAMALASHWARAN
BDA/EE(S)/PL/48/86-87 DT 05.12.1986
70
320
B.S.K. III STAGE, III PHASE, II BLOCK
60' X 40'
K.S.NARAYANA
BDA/EE(S)/PL/56/86-87 DT 21.01.1987
71
289
60' X 40'
K.KALINGA NAVADA
BDA/EE(S)/PL/67/86-87 DT 21.02.1987
72
38
B.S.K. III STAGE, CHANAMANAKERE ACHUKATU
LAYOUT
B.S.K. III STAGE, III PHASE, III BLOCK
18.50 X 12.20
SUMATHEENDRA R NADIGA
BDA/EE(S)/PL/64/86-87 DT 20.02.1987
73
437
B.T.M. II STAGE, I PHASE
60' X 40'
C.PRASANNA SIMHA RAO
BDA/EE(S)/PL/26/86-87 DT 16.02.1987
74
257
B.S.K. III STAGE, III PHASE, II BLOCK
59' X 40'
N.S.IYANGAR
BDA/EE(S)/PL/58/86-87 DT 24.01.1987
75
159
B.S.K. III STAGE, I BLOCK, PIPE LINE
60' X 40'
K.NARASIMHAIAH
BDA/EE(S)/PL/60/86-87 DT 28.01.1987
76
413
B.S.K. III STAGE, II BLOCK, III PHASE
60' X 40'
HANUMANTHIAH
BDA/EE(S)/PL/47/86-87 DT 27.11.1986
77
262
B.S.K. III STAGE, III PHASE, II BLOCK
60' X 40'
C.J.ABDUL AREEZ KHAN
BDA/EE(S)/PL/45/86-87 DT 19.11.1986
78
168
B.S.K. III STAGE, III PHASE, I BLOCK
60' X 40'
B.PANDU
BDA/EE(S)/PL/53/86-87 DT 21.01.1987
79
181
B.S.K. III STAGE, III PHASE, KATHRIGUPPA
57' X 40'
M.BASAVANNA
BDA/EE(S)/PL/54/86-87 DT 21.01.1987
80
277
B.S.K. III STAGE, III PHASE, II BLOCK
60' X 40'
R.MANJUNATH
BDA/EE(S)/PL/46/86-87 DT 19.11.1986
81
125
VISWABHARATHI H.B.C.S., GIRINAGAR
60' X 40'
M.H.VASU
BDA/EE(S)/PL/101/86-87 DT 11.11.1986
82
935
SARAKKI II PHASE
60' X 40'
V.KANTHARAJU
BDA/EE(S)/PL/31/86-87 DT 04.12.1986
KENCHENAHALLI H.B.C.S.
50' X 40'
A.SHESHADRI
BDA/EE(S)/PL/94/86-87 DT 06.11.1986
83
442/C
84
250
N.S.PALYA MICO H.B.C.S.
60' X 40'
K.G.KRISHNA MURTHY
BDA/EE(S)/PL/141/86-87 DT 19.02.1987
85
280
JAYANAGAR H.B.C.S., KADIRENAHALLI
45' X 70'
V.L.RAMA MURTHY
BDA/EE(S)/PL/138/86-87 DT 16.02.1987
86
114
VISWABHARATHI H.B.C.S., GIRINAGAR
39' X 60'
B.K.DRUVA RAO
BDA/EE(S)/PL/99/86-87 DT 10.11.1986
87
1798
KUMARA SWAMY LAYOUT II STAGE
60' X 40'
A.SHANTHARAM
BDA/EE(S)/PL/11/86-87 DT 24.01.1987
88
44
B.T.M. I STAGE, I PHASE
60' X 40'
DIVAKAR RAMA KRISHNA SHETTY
BDA/EE(S)/PL/25/86-87 DT 16.02.1997
89
105
B.S.K. III STAGE, II PHASE, IV BLOCK
74' X 38'
VIJAYA JAGANATH
BDA/EE(S)/PL/52/86-87 DT 14.01.1987
90
502
B.S.K. III STAGE, III PHASE, II BLOCK
60' X 40'
M.N.PUTTANNAIAH
BDA/EE(S)/PL/31/86-87 DT 12.01.1987
91
66
VISHYA BANK H.B.C.S., TAVAREKERE
60' X 31'
K.JAYARAMAIAH
BDA/EE(S)/PL/100/86-87 DT 21.10.1986
92
707
SARAKKI II PHASE
60' X 40'
P.K.RAMACHANDRA RAO
BDA/EE(S)/PL/45/86-87 DT 24.03.1987
93
1204
B.T.M. II STAGE, I PHASE
60' X 40'
G.V.RATHNAIAH SETTY
BDA/EE(S)/PL/19/86-87 DT 19.11.1986
94
399
SARAKKI II PHASE
58' X 46'
G.V.MURTHY
BDA/EE(S)/PL/27/86-87 DT 11.11.1986
95
808
SARAKKI I PHASE
40' X 60'
G.R.VIMALA
BDA/EE(S)/PL/5/86-87 DT 15.12.1986
96
1165
B.S.K. III STAGE, HOSAKEREHALLI SY NOS
40' X 60'
M.H.KHATIBI
BDA/EE(S)/PL/55/86-87 DT 21.01.1987
97
675
B.T.M. II STAGE, I PHASE
60' X 40'
N.SRINIVASAN
BDA/EE(S)/PL/20/86-87 DT 02.12.1986
98
49
N.S.PALYA MICO H.B.C.S.
60' X 40'
SURYANARAYANA RAO
BDA/EE(S)/PL/27/86-87 DT 20.02.1987
99
702
SARAKKI II PHASE
60' X 40'
K.G.VENKATACHALPATHY
BDA/EE(S)/PL/44/86-87 DT 19.03.1987
100
47
B.T.M. I STAGE, I PHASE
60' X 40'
G.L.GOPALA KRISHNA
BDA/EE(S)/PL/29/86-87 DT 07.03.1987
101
1200
B.T.M. II STAGE, I PHASE
60' X 40'
C.NARAYANA
BDA/EE(S)/PL/28/86-87 DT 05.03.1987
102
698
KEMPEGOWDA H.B.C.S., KATHRIGUPPA
60' X 40'
M.SREEVATSA
BDA/EE(S)/PL/123/86-87 DT 21.01.1987
103
56
RAMA RAO LAYOUT
60' X 40'
K.M.RAMA SWAMY
BDA/EE(S)/PL/149/86-87 DT 05.03.1987
104
187
B.S.K. III STAGE, IV PHASE, VII BLOCK
57' X 39'
B.R.RAGHUNATH
BDA/EE(S)/PL/44/86-87 DT 13.11.1986
105
420
MICO SKGNS ARAKERE
19.68 X 12.20
R.RANGAPPA
BDA/EE(S)/PL/155/86-87 DT 19.03.1987
106
39
SARAKKI IV PHASE
60' X 40'
B.NARASIMHAIAH
BDA/EE(S)/PL/2/86-87 DT 24.03.1987
107
81
RAMA RAO LAYOUT
60' X 40'
D.RAMA BAI
BDA/EE(S)/PL/139/86-87 DT 16.02.1987
VISWABHARATHI H.B.C.S., GIRINAGAR
56' X 40'
A.BALAKRISHNAN
BDA/EE(S)/PL/93/86-87 DT 06.11.1986
ANJANEYA SWAMY H.B.C.S., B.S.K. III STAGE
67' X 40'
G.S.SHATHYANARAYANA RAO
BDA/EE(S)/PL/111/86-87 DT 25.11.1986
BDA/EE(S)/PL/98/86-87 DT 11.11.1986
108
125/F
109
52
110
283
VISWABHARATHI H.B.C.S., GIRINAGAR
60' X 40'
111
498
N.S.PALYA MICO H.B.C.S.
60' X 40'
S.ALMA RAM & S.VENKATESHA
MURTHY
PHILIP R LAZARA
112
1004
B.S.K. III STAGE, III PHASE, III BLOCK
60' X 40'
M.KRISHNA MURTHY RAO
BDA/EE(S)/PL/59/86-87 DT 24.01.1987
113
1255
SARAKKI II PHASE
15.24 X 12.19
K.N.SAROJA
BDA/EE(S)/PL/42/86-87 DT 12.03.1987
114
162
VISWABHARATHI H.B.C.S., GIRINAGAR
58' X 40'
T.K.SHILAJA
BDA/EE(S)/PL/153/86-87 DT 13.03.1987
115
321
B.S.K. III STAGE, III PHASE, II BLOCK
60' X 40'
K.SWARNAMBA
BDA/EE(S)/PL/50/86-87 DT 07.01.1987
116
754
SARAKKI I PHASE
60' X 45'
K.SATHYANARAYANA
BDA/EE(S)/PL/8/86-87 DT 26.03.1987
117
369
VISWABHARATHI H.B.C.S., GIRINAGAR
60' X 40'
M.VENUGOPAL RAO
BDA/EE(S)/PL/156/86-87 DT 26.03.1987
118
1737
KUMARA SWAMY LAYOUT II STAGE
61' X 41'
S.CHIDANANDA BILAGI
BDA/EE(S)/PL/10/86-87 DT 15.12.1986
119
44
SARAKKI II PHASE
61' X 41'
KUSUM BAGA
BDA/EE(S)/PL/33/86-87 DT 16.12.1986
120
761
SARAKKI I PHASE
60' X 43'
S.N.RAGHUNATH
BDA/EE(S)/PL/2/86-87 DT 31.10.1986
121
255
SARAKKI V PHASE
60' X 40'
P.S.KRISHNA RAO
BDA/EE(S)/PL/4/86-87 DT 12.02.1987
122
609
SARAKKI II PHASE
70' X 40'
B.S.SUDHA
BDA/EE(S)/PL/35/86-87 DT 01.01.1987
123
570
N.S.PALYA MICO H.B.C.S.
60' X 40'
LOLAKHA NAZEER
BDA/EE(S)/PL/152/86-87 DT 10.03.1987
BDA/EE(S)/PL/120/86-87 DT 07.01.1987
124
1359
SARAKKI I PHASE
90' X 70'
K.SHIVA KUMAR
BDA/EE(S)/PL/7/86-87 DT 21.03.1987
125
27
PAPAS COLLEGE KATHRUGUPPE ROAD
65' X 40'
G.C.VENKATARAJU
BDA/EE(S)/PL/147/86-87 DT 05.03.1987
126
371
VISWABHARATHI H.B.C.S., GIRINAGAR
60' X 40'
H.N.DWARAKANATH
BDA/EE(S)/PL/110/86-87 DT 12.12.1986
127
29
VISWABHARATHI H.B.C.S., GIRINAGAR
60' X 51'
P.SRINIVASA MAIYA
BDA/EE(S)/PL/115/86-87 DT 30.12.1986
128
41
POORNA PRAGNA H.B.C.S., KATHARIGUPPA
60' X 40'
SOMAMMA
BDA/EE(S)/PL/143/86-87 DT 21.02.1987
129
8
POORNA PRAGNA H.B.C.S., B.S.K. III STAGE
60' X 40'
CHAMANKE GOWDA
BDA/EE(S)/PL/127/86-87 DT 22.01.1987
130
695
B.S.K. III STAGE, II PHASE, VII BLOCK
60' X 40'
T.K. KEMPAIAH
BDA/EE(S)/PL/70/86-87 DT 19.03.1987
131
1005
B.S.K. III STAGE, III PHASE, III BLOCK
60' X 40'
K.T.VIJAYA KUMAR
BDA/EE(S)/PL/71/86-87 DT 24.03.1987
132
608
SARAKKI II PHASE
70' X 40'
H.P.SHIVARAMA REDDY
BDA/EE(S)/PL/25/86-87 DT 31.10.1986
133
1095
TAVAREKERE SY NOS
58' X 38'
PUTTA SWAMY
BDA/EE(S)/PL/31/86-87 DT 21.03.1987
134
48
B.S.K. III STAGE, III PHASE, IV BLOCK
40' X 60'
T.SHANTHARAJAIAH
BDA/EE(S)/PL/57/86-87 DT 22.01.1987
135
20
A.R.GOPAL SWAMY LAYOUT, J.P.NAGAR
A.G.KRISHNA SWAMY
BDA/EE(S)/PL/131/86-87 DT 28.01.1987
136
149
SARAKKI II PHASE
P.KRISHNA BHAT
BDA/EE(S)/PL/26/86-87 DT 11.11.1986
137
263
N.S.PALYA MICO H.B.C.S.
PARAMASHIVAIAH
BDA/EE(S)/PL/137/86-87 DT 16.02.1987
138
11
B.S.K. III STAGE, III PHASE, V BLOCK
T.R.GOVINDAIAH
BDA/EE(S)/PL/172/86-87 DT 04.08.1987
45' X 72'
Cataloguing and indexing of records as envisaged under section 4(1) (a) of the Right to information Act 2005
LIST OF PLAN SANCTIONED FILES DURING THE YEAR 87-88 IN EE(S) DIVISION
SL
NO.
139
SITE
NO.
725
140
12
NAME OF THE LAYOUT
DIMENSION
APPLICANT NAME
SANCTION EE NO/DATE
KENCHENAHALLI H.B.C.S.
46' X 44'
PUTTAHARIYAPPA
BDA/EE(S)/PL/54/87-88 DT 31.10.1987
B.S.K. III STAGE
50' X 32'
A.SACHIDANANDA
BDA/EE(S)/PL/81/87-88 DT 16.03.1988
141
150
ARKERE MICO LAYOUT
60' X 40'
S.KHURSHEED AHMED
BDA/EE(S)/PL/38/87-88 DT 10.07.1987
142
705
B.S.K. III STAGE, III PHASE, VII BLOCK
58' X 40'
M.DASAPPA
BDA/EE(S)/PL/34/87-88 DT 25.04.1987
143
19
SARAKKI VI PHASE
60' X 40'
BDA/EE(S)/PL/3/87-88 DT 26.11.1989
144
227
GIRINAGAR H.B.C.S.
52' X 55'
A.D.AJIT PRASAD & A.D.KRISHNA
PRAKASH
S.V.ADKOLI
145
32
B.T.M. LAYOUT H.B.C.S.
59' X 40'
N.JAYAKIRANAIAH
BDA/EE(S)/PL/107/87-88 DT 11.12.1987
146
40
SARAKKI II PHASE
18.29 X 13.72
K.R.ACHARYA
BDA/EE(S)/PL/56/87-88 DT 17.03.1988
147
802
KENCHENAHALLI H.B.C.S.
58' X 43'
U.P.AGHROM
BDA/EE(S)/PL/93/87-88 DT 20.11.1987
148
124
B.S.K. III STAGE, III PHASE, I BLOCK
40' X 60'
C.SINGARAM
BDA/EE(S)/PL/61/87-88 DT 21.11.1987
N.S.PALYA MICO H.B.C.S.
40' X 60'
SHANTI BABU
BDA/EE(S)/PL/91/87-88 DT 09.11.1987
N.S.PALYA MICO H.B.C.S.
40' X 60'
SHAMALA S GIRI
BDA/EE(S)/PL/67/87-88 DT 07.10.1987
BANNERGHATTA ROAD
36' X 60'
H.N.RAMAPRAKASH
BDA/EE(S)/PL/101/87-88 DT 01.12.1987
149
433/A
BDA/EE(S)/PL/96/87-88 DT 26.11.1987
150
235
151
40
152
288
JAYANAGAR H.B.C.S., KADIRENAHALLI
40' X 61'
B.KRISHNA MURTHY
BDA/EE(S)/PL/113/87-88 DT 7.12.1987
153
572
N.S.PALYA MICO H.B.C.S.
60' X 40'
THEJAVATHI SHIVALINGAIAH
BDA/EE(S)/PL/34/87-88 DT 02.07.1987
154
52
B.S.K. III STAGE, III PHASE, I BLOCK
40' X 65'
R.V.SRINIVASA MURTHY
BDA/EE(S)/PL/59/87-88 DT 20.11.1987
155
360
B.S.K. III STAGE, II PHASE, III BLOCK
59' X 40'
K.ARASAIAH
BDA/EE(S)/PL/62/87-88 DT 26.11.1987
156
16
KMRSL, H.B.C.S.
36' X 60'
G.H.VARADARAJU
BDA/EE(S)/PL/140/87-88 DT 22.03.1988
157
27
B.S.K. III STAGE, III PHASE, V BLOCK
39' X 61'
DR.KENCHAPPA
BDA/EE(S)/PL/40/87-88 DT 02.09.1988
JAYANAGAR H.B.C.S., KADIRENAHALLI
40' X 50'
NAGARAJU
BDA/EE(S)/PL/132/87-88 DT 04.03.1988
B.S.K. III STAGE, III PHASE, II BLOCK
40' X 61'
SIDDALINGAIAH
BDA/EE(S)/PL/89/87-88 DT 25.02.1988
53' X 40'
ANANTHA SHAYANA K.N.
BDA/EE(S)/PL/53/87-88 DT 02.11.1987
59' X 40'
C.G.UMA V RAM
BDA/EE(S)/PL/54/87-88 DT 02.11.1987
45' X 75'
G.GANGA RAJU
BDA/EE(S)/PL/32/87-88 DT 31.10.1987
158
1538/1
159
317
160
71
161
273
B.S.K. III STAGE, CHANAMANAKERE ACHUKATU
LAYOUT
B.S.K. III STAGE, III PHASE, III BLOCK
162
673
SARAKKI II PHASE
163
733
KEMPEGOWDA H.B.C.S., KATHRIGUPPA
61' X 40'
N.PRABHAVATHI
BDA/EE(S)/PL/99/87-88 DT 01.12.1987
164
471
N.S.PALYA MICO H.B.C.S.
41' X 60'
R.HONNANNI
BDA/EE(S)/PL/101/87-88 DT 01.12.1987
165
1134
B.T.M. SY NOS
40' X 60'
M.A.PONNAPPA
BDA/EE(S)/PL/7/87-88 DT 03.06.1987
166
59
B.S.K.III STAGE, III PHASE, IV BLOCK
39' X 59'
K.ANANDARAMA NOVADA
BDA/EE(S)/PL/86/87-88 DT 20.02.1988
167
757
SARAKKI I PHASE
39' X 60'
M.S.RAMA MURTHY
BDA/EE(S)/PL/17/87-88 DT 09.02.1988
168
1116
B.S.K. III STAGE, HOSAKEREHALLI SY NOS
40' X 60'
H.G.PRABHAKARA
BDA/EE(S)/PL/24/87-88 DT 02.07.1988
169
9
N.S.PALYA MICO H.B.C.S.
40' X 60'
M.GOWRAMMA
BDA/EE(S)/PL/35/87-88 DT 02.07.1987
170
15
B.S.K. III STAGE, II PHASE, IV BLOCK
40' X 60'
J.B.MADHUSUDHANA
BDA/EE(S)/PL/85/87-88 DT 20.02.1988
171
1085
B.T.M. I STAGE, I PHASE
60' X 40'
MARTHANDA
BDA/EE(S)/PL/5/87-88 DT 28.05.1987
172
322
51' X 45'
YADA CHANDRA PRASAD
BDA/EE(S)/PL/31/87-88 DT 10.07.1987
173
167
B.S.K. III STAGE, CHANAMANAKERE ACHUKATU
LAYOUT
B.S.K. III STAGE, AVALAHALLY
60' X 40'
D.VEERA BHASKAR
BDA/EE(S)/PL/36/87-88 DT 30.07.1987
174
829
B.S.K. III STAGE, II PHASE, VII BLOCK
37' X 60'
G.D.VELU
BDA/EE(S)/PL/26/87-88 DT 31.05.1988
175
388
VISWABHARATHI H.B.C.S., GIRINAGAR
40' X 58'
H.N.BALAKRISHNA
BDA/EE(S)/PL/122/87-88 DT 03.02.1988
176
177
N.S.PALYA MICO H.B.C.S.
40' X 60'
S.BABU PHUTANE
BDA/EE(S)/PL/108/87-88 DT 11.12.1987
177
196
JAYANAGAR H.B.C.S., KADIRENAHALLI
40' X 60'
R.V.KATAYANI
BDA/EE(S)/PL/88/87-88 DT 03.07.1987
178
56
B.S.K. III STAGE, III PHASE, IV BLOCK
59' X 39'
R.MADAIAH
BDA/EE(S)/PL/65/87-88 DT 07.12.1987
179
805
SARAKKI I PHASE
40' X 60'
K.INDIRA BAI
BDA/EE(S)/PL/11/87-88 DT 26.11.1987
180
591
SARAKKI I PHASE
45' X 60'
Y.N.RAMESH
BDA/EE(S)/PL/12/87-88 DT 26.11.1987
181
46
SARAKKI II PHASE
45' X 60'
N.S.NAGABHUSHAN
BDA/EE(S)/PL/35/87-88 DT 20.11.1987
182
151
B.S.K. III STAGE, II PHASE, IV BLOCK
72' X 40'
K.R.NAGARAJ
BDA/EE(S)/PL/22/87-88 DT 31.10.1987
183
427
B.S.K. III STAGE, II PHASE, III BLOCK
40' X 60'
H.C.KRISHNA MURTHY
BDA/EE(S)/PL/56/87-88 DT 09.11.1987
184
139
B.O.O., H.B.C.S., TAVAREKERE
40' X 60'
K.SRINIVASA MURTHY
BDA/EE(S)/PL/86/87-88 DT 02.11.1987
185
303
SARAKKI II PHASE
60' X 45'
B.KRISHNAPPA
BDA/EE(S)/PL/85/87-88 DT 31.11.1987
186
1288
SARAKKI II PHASE
40' X 60'
C.S.RAMACHANDRA
BDA/EE(S)/PL/33/87-88 DT 09.11.1987
187
306
SARAKKI II PHASE
40' X 60'
UMADEVI S.
BDA/EE(S)/PL/3/87-88 DT 17.11.1987
188
397
B.S.K. III STAGE, III PHASE, II BLOCK
40' X 60'
TULASIDAR
BDA/EE(S)/PL/66/87-88 DT 07.12.1987
189
84
SRI.RADHAKRISHNA H.B.C.S., KADIRENAHALLI
45' X 40'
C.H.SRINIVASA MURTHY
BDA/EE(S)/PL/82/87-88 DT 24.11.1987
190
18
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
60' X 40'
T.RAMACHANDRA
BDA/EE(S)/PL/102/87-88 DT 07.12.1987
191
655
B.T.M. II STAGE
60' X 40'
R.KALYANI
BDA/EE(S)/PL/12/87-88 DT 17.07.1987
192
1731
KUMARA SWAMY LAYOUT II STAGE
40' X 60'
JAYARAMA
BDA/EE(S)/PL/23/87-88 DT 25.02.1988
193
866
KENCHENAHALLI H.B.C.S.
69' X 40'
C.SREEMATHI
BDA/EE(S)/PL/130/87-88 DT 25.02.1988
194
384
VISWABHARATHI H.B.C.S., GIRINAGAR
60' X 40'
B.S.VINODA
BDA/EE(S)/PL/26/87-88 DT 11.06.1987
195
71
B.T.M. III STAGE, III PHASE, III BLOCK
60' X 40'
CHOODA MANIYAMMA
BDA/EE(S)/PL/6/87-88 DT 16.04.1987
196
384
VISWABHARATHI H.B.C.S., GIRINAGAR
60' X 40'
B.S.VINODA
BDA/EE(S)/PL/1/87-88 DT 02.04.1987
197
241
N.S.PALYA MICO H.B.C.S.
60' X 40'
M.VIJAYA KUMAR
BDA/EE(S)/PL/39/87-88 DT 14.041987
198
19
B.S.K. II STAGE, HOSAKERE HALLY
18.30 X 12.20
K.S.VENKATAKRISHNAPPA
BDA/EE(S)/PL/50/87-88 DT 27.10.1987
199
21
SARAKKI IV PHASE
60' X 40'
C.V.SARASWATHI
BDA/EE(S)/PL/2/87-88 DT 19.09.1987
200
842
KENCHENAHALLI H.B.C.S.
44' X 53'
N.S.RAVIKUMAR
BDA/EE(S)/PL/73/87-88 DT 17.10.1987
201
9
B.S.K. III STAGE
59' X 40'
V.B.BAGAL
BDA/EE(S)/PL/65/87-88 DT 19.09.1987
202
585
N.S.PALYA MICO H.B.C.S.
40' X 60'
K.CHANDRA KALA S PAI
BDA/EE(S)/PL/72/87-88 DT 17.10.1987
203
13
B.S.K. III STAGE, III PHASE, V BLOCK
40' X 60'
S.RAMAMANI
BDA/EE(S)/PL/49/87-88 DT 17.10.1987
204
164
B.S.K. III STAGE, I PHASE
40' X 60'
DR.R.RAMACHANDRA
BDA/EE(S)/PL/46/87-88 DT 26.09.1987
205
37
SARAKKI II PHASE
45' X 61'
T.VISWANATH
BDA/EE(S)/PL/28/87-88 DT 07.10.1987
206
1
SRI ANJANEYA SWAMY H.B.C.S., B.S.K. III STAGE
40' X 60'
HON SEERETORY
BDA/EE(S)/PL/74/87-88 FY 19.10.1987
207
1110
B.T.M. SCHEME TAVAREKERE
64' X 40'
G.VENKATARAMANAPPA
BDA/EE(S)/PL/15/87-88 DT 19.09.1987
208
659
KENCHENAHALLI H.B.C.S.
70' X 45'
S.P.BALAJI SINGH
BDA/EE(S)/PL/66/87-88 DT 28.09.1987
209
233
B.S.K. III STAGE, III PHASE, II BLOCK
60' X 40'
B.C.SUDHAMA
BDA/EE(S)/PL/47/87-88 DT 28.09.1987
210
677
SARAKKI II PHASE
45' X 76'
T.V.NAGARAJ GUPTA
BDA/EE(S)/PL/30/87-88 DT 17.10.1987
211
43
SARAKKI II PHASE
62' X 39'
MOHAN KUMAR
BDA/EE(S)/PL/29/87-88 DT 08.10.1987
212
55
SRI ANJANEYA SWAMY H.B.C.S., B.S.K. III STAGE
36' X 67'
B.S.RANGA SHAYI
BDA/EE(S)/PL/69/87-88 DT 07.10.1987
213
1405
SARAKKI II PHASE
40' X 70'
H.NAGAPPA
BDA/EE(S)/PL/8/87-88 DT 27.10.1987
214
46
B.T.M. I STAGE, I PHASE
40' X 60'
M.S.UDAYA SHANKAR
BDA/EE(S)/PL/18/87-88 DT 24.10.1987
PAPAS COLLEGE KANANAKAPURA ROAD
70' X 55'
N.A.LEELA
BDA/EE(S)/PL/77/87-88 DT 19.10.1987
215
16 & 17
216
451
N.S.PALYA MICO H.B.C.S.
60' X 41'
R.BALASUBRAMANIAN
BDA/EE(S)/PL/75/87-88 DT 19.10.1987
217
122
VISWABHARATHI H.B.C.S., GIRINAGAR
40' X 60'
SHIVARAM D KULKARNI
BDA/EE(S)/PL/76/87-88 DT 19.10.1987
218
248
B.S.K. III STAGE, III PHASE, II BLOCK
40' X 60'
T.R.PRAKASH
BDA/EE(S)/PL/48/87-88 DT 08.10.1987
219
258
SUBEDAR PALYA H.B.C.S., SARAKKI
45' X 60'
B.A.SHYAMALA
BDA/EE(S)/PL/68/87-88 DT 07.10.1987
220
16
A.R.GOPALA SWAMY LAYOUT
60' X 40'
R.S.VIJAYALAKSHMI
BDA/EE(S)/PL/64/87-88 DT 19.09.1987
221
77
B.T.M. I STAGE, I PHASE
40' X 60'
S.T.KRISHNA SWAMY
BDA/EE(S)/PL/17/87-88 DT 07.10.1987
222
1202
B.T.M. I STAGE, I PHASE
60' X 40'
APPAKANDU RAMA SUBBA REDDY
BDA/EE(S)/PL/16/87-88 DT 19.09.1987
223
703
B.T.M. II STAGE, I PHASE
40' X 60'
MAJ T NAGAPPA
BDA/EE(S)/PL/20/87-88 DT 29.10.1987
224
1592
SARAKKI II PHASE
60' X 40'
K.S.RAO
BDA/EE(S)/PL/27/87-88 DT 19.09.1987
225
403
SARAKKI II PHASE
58' X 45'
S.RAMACHANDRA
BDA/EE(S)/PL/23/87-88 DT 19.09.1987
226
187
JAYANAGAR H.B.C.S., KADIRENAHALLI
79' X 40'
C.P.GEETHA
BDA/EE(S)/PL/81/87-88 DT 29.10.1987
227
309
50' X 45'
R.BALASUBRAMANIAN
BDA/EE(S)/PL/44/87-88 DT 19.09.1987
228
30
B.S.K. III STAGE, CHANAMANAKERE ACHUKATU
LAYOUT
SARAKKI II PHASE
39' X 59'
G.SUGANTHA LAKSHMI
BDA/EE(S)/PL/2/87-88 DT 19.09.1987
229
346
N.S.PALYA MICO H.B.C.S.
60' X 40'
SHARADA VASUDEVI
BDA/EE(S)/PL/70/87-88 DT 07.10.1987
230
755
SARAKKI II PHASE
45' X 60'
C.R.SURESH
BDA/EE(S)/PL/107/87-88 DT 28.03.1988
231
876
SARAKKI II PHASE
45' X 65'
N.G.RAMAN
BDA/EE(S)/PL/51/87-88 DT 09.02.1988
232
2611
KUMARA SWAMY LAYOUT II STAGE
40' X 60'
M.RANGA SWAMY
BDA/EE(S)/PL/24/87-88 DT 24.03.1988
233
67
B.T.M. II STAGE, I PHASE
40' X 60'
T.M.A.SHIVAMURTHY
BDA/EE(S)/PL/34/87-88 DT 28.03.1988
234
38
B.T.M. II STAGE, I PHASE
40' X 60'
M.BALAKRISHNAN
BDA/EE(S)/PL/33/87-88 DT 24.03.1988
235
50
KAVERI H.B.C.S., TAVAREKERE SY NOS
40' X 60'
M.L.ASWATHAPPA
BDA/EE(S)/PL/142/87-88 DT 25.03.1988
236
45
B.T.M. LAYOUT, N.S.PALYA
40' X 60'
LAKSHMINARAYANA
BDA/EE(S)/PL/30/87-88 DT 09.03.1988
237
31
NIMHAN'S H.B.C.S. TAVAREKERE
40' X 59'
P.J.MARY KUTTY GEORGE
BDA/EE(S)/PL/138/87-88 DT 09.03.1988
238
448
SARAKKI II PHASE
45' X 67'
CHANDRA
BDA/EE(S)/PL/57/87-88 DT 22.03.1988
239
465
N.S.PALYA MICO H.B.C.S.
40' X 60'
H.MALLAIAH
BDA/EE(S)/PL/139/87-88 DT 22.02.1988
240
275
VISWABHARATHI H.B.C.S., GIRINAGAR
40' X 60'
B.S.MALIKARJUNA SASTRY
BDA/EE(S)/PL/129/87-88 DT 25.02.1988
241
404
SARAKKI II PHASE
45' X 58'
T.S.VEERABHADRAIAH
BDA/EE(S)/PL/54/87-88 DT 25.02.1988
242
165
B.S.K. III STAGE, III PHASE, I BLOCK
40' X 60'
H.V.SHANKARAIAH
BDA/EE(S)/PL/99/87-88 DT 22.03.1988
243
62
RAMA RAO LAYOUT
40' X 60'
B.S.MADAVA SHARMA
BDA/EE(S)/PL/145/87-88 DT 22.03.1988
244
28
BHARATH H.B.C.S., UTTARAHALLI SY NOS
65' X 40'
NANJAIAH
BDA/EE(S)/PL/83/87-88 DT 31.10.1987
245
67
B.S.K. III STAGE, III PHASE, I BLOCK
40' X 61'
C.PUSPA
BDA/EE(S)/PL/98/87-88 DT 10.03.1988
246
383
JAYANAGAR H.B.C.S., KADIRENAHALLI
40' X 60'
B.K.SHIVARAMAIAH
BDA/EE(S)/PL/153/87-88 DT 04.03.1988
247
11
B.S.K. III STAGE, III PHASE, VI BLOCK
49' X 79'
K.S.NAGARAJAN
BDA/EE(S)/PL/82/87-88 DT 09.02.1988
248
32
N.S.PALYA MICO H.B.C.S.
40' X 60'
V.CHAYA SETTY
BDA/EE(S)/PL/105/87-88 DT 11.12.1987
249
247
B.S.K. III STAGE, III PHASE, II BLOCK
40' X 60'
A.RAMADEVI
BDA/EE(S)/PL/68/87-88 DT 22.12.1987
250
461
N.S.PALYA MICO H.B.C.S.
60' X 40'
J.DAVID PRABAGARAN
BDA/EE(S)/PL/111/87-88 DT 16.12.1987
251
71
SARAKKI II PHASE
43' X 60'
A.T.R.IYENGAR
BDA/EE(S)/PL/47/87-88 DT 01.02.1988
252
1240
B.T.M. II STAGE, I PHASE
40' X 60'
M.S.BASAVARAJ
BDA/EE(S)/PL/24/87-88 DT 20.01.1988
253
310
MICO SKGNS ARAKERE
40' X 51'
H.S.VISWANATHAIAH
BDA/EE(S)/PL/118/87-88 DT 06.01.1988
254
629
SARAKKI I PHASE
45' X 62'
LATA U KAMATH
BDA/EE(S)/PL/7/87-88 DT 09.11.1987
255
130
VISWABHARATHI H.B.C.S., GIRINAGAR
40' X 57'
S.JAYALAKSHMI
BDA/EE(S)/PL/120/87-88 DT 01.02.1989
256
1399
SARAKKI I PHASE
40' X 70'
M.V.SANDHYA
BDA/EE(S)/PL/14/87-88 DT 06.01.1988
257
270
B.S.K. III STAGE, III PHASE, II BLOCK
60' X 40'
B.E.RAMACHANDRAN
BDA/EE(S)/PL/71/87-88 DT 23.01.1983
258
353
B.S.K. III STAGE
40' X 60'
S.SURYANARAYANA RAO
BDA/EE(S)/PL/69/87-88 DT 30.12.1987
259
51
B.S.K. III STAGE, III PHASE, I BLOCK
40' X 65'
N.A.SRIKANTA SASTRY
BDA/EE(S)/PL/74/87-88 DT 01.02.1988
260
45
SARAKKI IV PHASE
40' X 60'
LEELA M KANEKAL
BDA/EE(S)/PL/3/87-88 DT 28.05.1987
261
267
N.S.PALYA MICO H.B.C.S.
60' X 40'
P.SHARADA
BDA/EE(S)/PL/44/87-88 DT 17.07.1987
262
20
MARENAHALLY
75' X 43'
D.N.JAYADEVA
BDA/EE(S)/PL/89/87-88 DT 09.11.1987
263
143
KENCHENAHALLI H.B.C.S.
57' X 36'
RADHA D KASHYAP
BDA/EE(S)/PL/135/87-88 DT 07.03.1988
JAYANAGAR H.B.C.S., KADIRENAHALLI
44' X 60'
K.RANGA SWAMY
BDA/EE(S)/PL/137/87-88 DT 09.03.1988
SARAKKI II PHASE
60' X 40'
S.A.NAGARAJ
BDA/EE(S)/PL/2/87-88 DT 15.06.1987
N.S.PALYA MICO H.B.C.S.
60' X 41'
R.RAJASHEKARAN
BDA/EE(S)/PL/22/87-88 DT 08.06.1987
KSRTC H.B.C.S. N.S.PALYA
60' X 40'
VASANTHI S AITHAL
BDA/EE(S)/PL/45/87-88 DT 25.07.1987
SARAKKI I PHASE
40' X 70'
M.A. SADIQ
BDA/EE(S)/PL/108/87-88 DT 28.03.1988
B.S.K. III STAGE, III PHASE, III BLOCK
60' X 40'
B.C.SHIVA KUMAR
BDA/EE(S)/PL/28/87-88 DT 10.07.1987
264
59/41
265
22
266
496
267
17
268
1408
269
56
270
556
SARAKKI II PHASE
60' X 40'
P.VENKATARAMANA
BDA/EE(S)/PL/26/87-88 DT 14.09.1987
271
1246
SARAKKI II PHASE
50' X 40'
K.S.NATARAJ
BDA/EE(S)/PL/19/87-88 DT 17.07.1987
272
45
SRI.ANJANEYA SWAMY H.B.C.S., ITTMADU
66' X 36'
E.R.MANJUNATHA
BDA/EE(S)/PL/49/87-88 DT 01.08.1987
273
274
50
1/C
SARAKKI III PHASE
18.30 X 10.98
K.RAMA KRISHNA
BDA/EE(S)/PL/52/87-88 DT 11.08.1987
VISWABHARATHI H.B.C.S., GIRINAGAR
40' X 60'
B.N.NARASIMHA MURTHY
BDA/EE(S)/PL/134/87-88 DT 07.03.1988
N.S.PALYA MICO H.B.C.S.
43' X 60'
SYED NAJULLA
BDA/EE(S)/PL/59/87-88 DT 04.09.1987
B.S.K. III STAGE, III PHASE, III BLOCK
61' X 40'
SACHIDANANDA MURTHY
BDA/EE(S)/PL/17/87-88 DT 06.06.1987
275
5
276
44
277
672
B.T.M. II STAGE, I PHASE
40' X 60'
S.MADESHA
BDA/EE(S)/PL/32/87-88 DT 22.03.1988
278
671
KENCHENAHALLI H.B.C.S.
37' X 60'
K.S.KUSUMALATHA
BDA/EE(S)/PL/50/87-88 DT 01.08.1987
279
5
N.S.PALYA MICO H.B.C.S.
40' X 60'
S.G.HIRANYA BHATTA
BDA/EE(S)/PL/27/87-88 DT 09.02.1988
280
251
B.S.K. III STAGE, III PHASE, II BLOCK
40' X 60'
R.L.KANTHAMMA
BDA/EE(S)/PL/67/87-88 DT 11.12.1987
TIMBER MERCHANTS H.B.C.S., SARAKKI
41' X 54'
R.N.VIJAYA SIMHA
BDA/EE(S)/PL/62/87-88 DT 11.01.1987
B.S.K. III STAGE, II PHASE, VI BLOCK
40' X 57'
B.K.SADASHIVA
BDA/EE(S)/PL/78/87-88 DT 03.02.1988
SARAKKI II PHASE
45' X 60'
D.S.UMAKANTH
BDA/EE(S)/PL/45/87-88 DT 01.02.1988
B.S.K. III STAGE, CHANAMANAKERE ACHUKATU
LAYOUT
SARAKKI II PHASE
40' X 60'
D.BAADKAR PRABHAKAR
BDA/EE(S)/PL/92/87-88 DT 25.02.1988
40' X 61'
N.V.LALITHA
BDA/EE(S)/PL/50/87-88 DT 04.02.1988
281
33 & 34
282
303
283
65
284
285
285
76
286
450
N.S.PALYA MICO H.B.C.S.
60' X 41'
K.D.GUDDE GOWDA
BDA/EE(S)/PL/17/87-88 DT 25.05.1987
287
632
SARAKKI I PHASE
45' X 60'
H.S.SUMANTH
BDA/EE(S)/PL/15/87-88 DT 01.02.1988
288
371
62' X 40'
C.NAGESH
BDA/EE(S)/PL/30/87-88 DT 10.07.1987
289
298
B.S.K. III STAGE, CHANAMANAKERE ACHUKATU
LAYOUT
B.S.K. III STAGE, CHANAMANAKERE ACHUKATU
LAYOUT
SARAKKI II PHASE
60' X 40'
NARAYANA MURTHY
BDA/EE(S)/PL/18/87-88 DT 06.06.1987
60' X 40'
K.R.SUBBA RAO
BDA/EE(S)/PL/14/87-88 DT 22.06.1987
290
690/H
291
19
B.S.K. III STAGE, III PHASE, V BLOCK
60' X 39'
M.R.SHANTHAPPA
BDA/EE(S)/PL/14/87-88 DT 26.05.1987
292
43
B.T.M. I STAGE, I PHASE
40' X 60'
H.H.RANGANATHA BHATTA
BDA/EE(S)/PL/8/87-88 DT 04.06.1987
293
1014
B.S.K. III STAGE, III PHASE, III BLOCK
40' X 60'
M.RAMA SWAMY
BDA/EE(S)/PL/10/87-88 DT 18.05.1987
294
168
B.S.K. III STAGE, AVALAHALLY
60' X 40'
S.P.ANANTHARAJAIAH
BDA/EE(S)/PL/25/87-88 DT 03.07.1987
295
229
B.S.K. III STAGE, NAGENDRA BLOCK
52' X 44'
M.S.PADMA
BDA/EE(S)/PL/31/87-88 DT 24.08.1987
296
9
B.S.K. III STAGE, III PHASE, III BLOCK
79' X 49'
V.NAGARATHNA
BDA/EE(S)/PL/26/87-88 DT 04.07.1987
297
707
B.T.M. II STAGE, I PHASE
60' X 40'
B.ABDUL RAHIM KHAN
BDA/EE(S)/PL/13/87-88 DT 05.08.1987
298
696
B.S.K. III STAGE, II PHASE, III BLOCK
60' X 40'
R.Y.DHARVADKAR
BDA/EE(S)/PL/35/87-88 DT 30.07.1987
299
346
B.S.K. III STAGE, II PHASE, VI BLOCK
40' X 60'
G.R.DIVAKAR NAIK
BDA/EE(S)/PL/102/87-88 DT 28.03.1988
300
367
B.S.K. III STAGE, II PHASE, III BLOCK
59' X 40'
C.S.M. SRINIVASAN
BDA/EE(S)/PL/37/87-88 DT 05.08.1987
301
72
N.S.PALYA MICO H.B.C.S.
40' X 60'
N.KANTHARAJU
BDA/EE(S)/PL/28/87-88 DT 22.02.1988
302
6
N.S.PALYA MICO H.B.C.S.
60' X 40'
A.K.MANJUMDAR & B.G.GEETHA
BDA/EE(S)/PL/4/87-88 DT 15.05.1987
303
261
SUBEDAR PALYA H.B.C.S., SARAKKI
45' X 60'
URMILA BADAMI
BDA/EE(S)/PL/97/87-88 DT 26.11.1987
304
31
BANNERGHATTA ROAD
60' X 36'
K.L.N.SHENOI
BDA/EE(S)/PL/56/87-88 DT 20.08.1987
305
1274
SARAKKI II PHASE
40' X 60'
MADHURA KRISHNA MURTHY
BDA/EE(S)/PL/36/87-88 DT 21.11.1987
306
77
RAMA RAO LAYOUT
40' X 65'
M.KRISHNA
BDA/EE(S)/PL/114/87-88 DT 30.12.1987
307
647
B.T.M. II STAGE
40' X 60'
V.N.GANAPAYYA
BDA/EE(S)/PL/23/87-88 DT 31.12.1987
308
300
SARAKKI II PHASE
40' X 60'
S.G.PADMALATHA
BDA/EE(S)/PL/42/87-88 DT 18.01.1988
309
263
N.S.PALYA MICO H.B.C.S.
59' X 39'
PARAMASHIVAIAH
BDA/EE(S)/PL/115/87-88 DT 30.12.1987
310
73
SRI.RADHAKRISHNA H.B.C.S., KADIRENAHALLI
40' X 70'
S.L.KRISHNAMURTHY RAO
BDA/EE(S)/PL/117/87-88 DT 31.12.1987
311
1284
SARAKKI II PHASE
40' X 60'
AMRITLAL PURSSTTAN THAKRAR
BDA/EE(S)/PL/43/87-88 DT 18.01.1988
312
5
B.S.K. III STAGE, II PHASE
60' X 40'
K.S.NAGARAJA RAO
BDA/EE(S)/PL/1/87-88 DT 01.04.1987
313
22
VISWABHARATHI H.B.C.S., GIRINAGAR
40' X 60'
SHIVARAM D KULKARNI
BDA/EE(S)/PL/95/87-88 DT 26.11.1987
314
7
S.B.I. COLONY SARAKKI LAYOUT
44' X 60'
B.S.SUBBA RAO
BDA/EE(S)/PL/106/87-88 DT 11.12.1987
315
679
KEMPEGOWDA H.B.C.S., KATHRIGUPPA
40' X 60'
T.J.BADARI PRASAD
BDA/EE(S)/PL/111/87-88 DT 16.12.1987
316
1607
SARAKKI II PHASE
40' X 60'
B.N.NANJE GOWDA
BDA/EE(S)/PL/40/87-88 DT 04.01.1988
317
268
SARAKKI II PHASE
45' X 60'
R.MANIEKAM
BDA/EE(S)/PL/46/87-88 DT 01.02.1988
318
15
N.S.PLAYA SY NOS
70' X 60'
K.V.LAKSHMISHS
BDA/EE(S)/PL/21/87-88 DT 16.12.1987
319
1109
TAVAREKERE SY NOS
40' X 64'
U.SHANTH KUMAR
BDA/EE(S)/PL/22/87-88 DT 16.12.1987
320
676
BOMMASANDRA III STAGE, II PHASE, III BLOCK
40' X 60'
N.S.SAROJA
BDA/EE(S)/PL/70/87-88 DT 31.12.1987
321
698
B.S.K. III STAGE, II PHASE, VII BLOCK
40' X 60'
SUMAN L NAYAK
BDA/EE(S)/PL/75/87-88 DT 01.02.1988
322
371
B.S.K. III STAGE, II PHASE, VI BLOCK
59' X 40'
KEMPE GOWDA
BDA/EE(S)/PL/2/87-88 DT 01.04.1987
323
120
B.S.K. III STAGE, II PHASE, IV BLOCK
60' X 40'
H.R.SUNANDA MANI
BDA/EE(S)/PL/22/87-88 DT 24.06.1987
324
76
MICO SKGNS ARAKERE
33' X 90'
M.L.VARADARAJ
BDA/EE(S)/PL/32/87-88 DT 25.06.1987
325
149
SARAKKI II PHASE
72' X 45'
P.K.BHAT
BDA/EE(S)/PL/17/87-88 DT 27.06.1987
326
10
B.S.K. III STAGE, II PHASE, IV BLOCK
60' X 40'
H.S.MADHAVA RAO
BDA/EE(S)/PL/41/87-88 DT 02.09.1987
327
161
B.S.K. III STAGE, III PHASE, I BLOCK
60' X 40'
R.RAJASHEKAR
BDA/EE(S)/PL/27/87-88 DT 04.07.1987
328
694
B.T.M. I PHASE, II STAGE
60' X 40'
K.T.BHASKAR
BDA/EE(S)/PL/10/87-88 DT 02.07.1987
329
728
KEMPEGOWDA H.B.C.S., KATHRIGUPPA
61' X 40'
K.NARAYANAPPA
BDA/EE(S)/PL/29/87-88 DT 23.06.1987
330
1591
SARAKKI II PHASE
60' X 40'
H.F.NAIKAR
BDA/EE(S)/PL/15/87-88 DT 25.06.1987
331
877
SARAKKI II PHASE
45' X 65'
UMA MANOHAR BHOSEKAR
BDA/EE(S)/PL/2/87-88 DT 02.04.1987
332
259
KSRTC H.B.C.S., SARAKKI III PHASE
60' X 40'
MOHAMMED IMTIAZUDDIN
BDA/EE(S)/PL/30/87-88 DT 24.06.1987
333
400
SARAKKI II PHASE
58' X 45'
V.NARASIMHA PRASAD
BDA/EE(S)/PL/41/87-88 DT 06.01.1988
334
387
B.S.K. III STAGE, III PHASE, V BLOCK
60' X 40'
M.G.HARI RAO
BDA/EE(S)/PL/29/87-88 DT 10.07.1987
335
1415
SARAKKI I PHASE
40' X 60'
SYED UMER FARAUQ
BDA/EE(S)/PL/13/87-88 DT 11.12.1987
336
595
SARAKKI II PHASE
40' X 60'
B.ASWATHANARAYANA SETTY
BDA/EE(S)/PL/39/87-88 DT 07.12.1987
JAYANAGARA H.B.C.S., PADMANABHA NAGAR
40' X 60'
K.V.NARAYANA SWAMY
BDA/EE(S)/PL/109/87-88 DT 16.12.1987
VISWABHARATHI H.B.C.S., GIRINAGAR
60' X 40'
K.C.SHEKAR
BDA/EE(S)/PL/47/87-88 DT 25.07.1987
337
338
65/41
27
339
841
SARAKKI II PHASE
40' X 70'
K.R.L.SHETTY
BDA/EE(S)/PL/1/87-88 DT 02.04.1987
340
504
SARAKKI II PHASE
60' X 40'
H.S.SRINIVASA RAO
BDA/EE(S)/PL/13/87-88 DT 15.06.1987
341
1096
TAVAREKERE SY NOS
58' X 31'
B.K.CHANDRA SHEKAR
BDA/EE(S)/PL/14/87-88 DT 14.09.1987
342
1584
SARAKKI II PHASE
60' X 40'
K.VAGEESH
BDA/EE(S)/PL/8/87-88 DT 28.05.1987
343
755
B.S.K. III STAGE, VII BLOCK
42' X 60'
G.M.BHUTRA
BDA/EE(S)/PL/8/87-88 DT 30.04.1987
344
503
SARAKKI II PHASE
60' X 40'
NAGABHUSHANA
BDA/EE(S)/PL/24/87-88 DT 11.09.1987
345
22
SRINIVASA NAGAR II PHASE, B.S.K. III STAGE
40' X 56'
G.CHANDRA
BDA/EE(S)/PL/84/87-88 DT 11.2.1986
346
569
N.S.PALYA MICO H.B.C.S.
60' X 40'
HAJIM TABASSUM & M.A.RAWOOF
BDA/EE(S)/PL/42/87-88 DT 16.07.1987
347
59
B.S.K. III STAGE, III PHASE, I BLOCK
63' X 40'
MAUREEN LOBO
BDA/EE(S)/PL/43/87-88 DT 15.09.1987
348
84
SRI.RADHAKRISHNA H.B.C.S., KADIRENAHALLI
40' X 45'
C.H.SRINIVASA MURTHY
BDA/EE(S)/PL/51/87-88 DT 24.08.1987
349
308
SRINIVASA NAGAR II PHASE, B.S.K. III STAGE
40' X 60'
KEMPAMMA
BDA/EE(S)/PL/1/87-88 DT 08.04.1987
350
101
B.S.K. III STAGE, ITTUMADU SY NOS
62' X 40'
M.J.RAMAPRIYA
BDA/EE(S)/PL/51/87-88 DT 27.10.1987
351
1288
SARAKKI II PHASE
45' X 67'
K.V.PRAKASH
BDA/EE(S)/PL/34/87-88 DT 09.11.1987
352
942
SARAKKI II PHASE
18.10 X 12.00
L.S.PRABHAKARA
BDA/EE(S)/PL/11/87-88 DT 06.06.1987
353
709
IDEAL HOMES H.B.C.S., KENCHENAHALLI
53' X 46'
T.V.SUBRAMANIAM
BDA/EE(S)/PL/25/87-88 DT 11.06.1987
354
29
B.T.M. III STAGE, I PHASE
77' X 50'
T.NARAYANA
BDA/EE(S)/PL/6/87-88 DT 03.06.1987
355
1415
SARAKKI I PHASE
12.19 X 18.29
SYED UMER FARAUQ
BDA/EE(S)/PL/7/87-88 DT 14.07.1987
356
666
SARAKKI II PHASE
45' X 80'
V.SUNDARA RAO
BDA/EE(S)/PL/31/87-88 DT 29.10.1987
357
726
KEMPEGOWDA H.B.C.S., KATHRIGUPPA
61' X 40'
A.B.SHYAMACHAR
BDA/EE(S)/PL/54/87-88 DT 20.08.1987
358
227
N.S.PALYA MICO H.B.C.S.
60' X 40'
J.SRINIVASA IYER
BDA/EE(S)/PL/31/87-88 DT 25.06.1987
359
120
VISWABHARATHI H.B.C.S., GIRINAGAR
61' X 40'
PUSPHA NAGESH
BDA/EE(S)/PL/21/87-88 DT 04.06.1987
360
1407
SARAKKI I PHASE
21.34 X 12.19
G.V.JAGADISH
BDA/EE(S)/PL/5/87-88 DT 02.07.1987
361
891
362
49
363
99/A
SARAKKI II PHASE
70' X 45'
P.N.H.SUBRAMANIAM
BDA/EE(S)/PL/21/87-88 DT 25.07.1987
B.S.K. III STAGE, III PHASE, IV BLOCK
12.10 X 18.15
H.R.SURESH
BDA/EE(S)/PL/90/87-88 DT 25.02.1988
B.S.K. III STAGE, II PHASE, III BLOCK
60' X 40'
G.V.LAXMINARAYANAPPA
BDA/EE(S)/PL/19/87-88 DT 08.06.1987
B.T.M. II STAGE
40' X 60'
N.SADASIVAIAH
BDA/EE(S)/PL/29/87-88 DT 07.03.1988
364
686
365
45
SARAKKI II PHASE
45' X 61'
S.R.SWAMY
BDA/EE(S)/PL/55/87-88 DT 07.03.1988
366
428
SARAKKI II PHASE
45' X 60'
K.C.SREEKANTAIAH
BDA/EE(S)/PL/48/87-88 DT 03.02.1988
367
507
SARAKKI II PHASE
40' X 60'
P.PANDURANGAIAH
BDA/EE(S)/PL/44/87-88 DT 01.02.1988
368
278
SARAKKI II PHASE
45' X 61'
H.G.RAMANATH
BDA/EE(S)/PL/53/87-88 DT 24.02.1988
369
581
KEMPEGOWDA H.B.C.S., KATHRIGUPPA
40' X 60'
A.N.RAMACHANDRA
BDA/EE(S)/PL/126/87-88 DT 09.02.1988
370
311
N.S.PALYA MICO H.B.C.S.
60' X 40'
K.APRAMEYAN
BDA/EE(S)/PL/41/87-88 DT 14.07.1987
371
650
B.T.M. II STAGE
60' X 40'
N.K.SRINIVASA MURTHY
BDA/EE(S)/PL/11/87-88 DT 14.07.1987
372
269
VISWABHARATHI H.B.C.S., GIRINAGAR
39' X 60'
H.S.GURURAJ
BDA/EE(S)/PL/13/87-88 DT 16.05.1987
373
804
SARAKKI I PHASE
64' X 40'
Y.K.MUDDU KRISHNA
BDA/EE(S)/PL/2/87-88 DT 15.05.1987
374
520
B.S.K. III STAGE, III PHASE, III BLOCK
60' X 40'
G.R.RATHNA
BDA/EE(S)/PL/9/87-88 DT 15.05.1987
375
457
B.S.K. III STAGE, II PHASE, VI BLOCK
61' X 40'
M.P.DAMODARU
BDA/EE(S)/PL/4/87-88 DT 10.04.1987
376
325
B.S.K. III STAGE, II PHASE, III BLOCK
40' X 60'
K.N.MURTHY
BDA/EE(S)/PL/88/87-88 DT 24.02.1988
377
315
B.S.K. III STAGE, II PHASE, VI BLOCK
57' X 40'
K.VENUGOPAL GUPTA
BDA/EE(S)/PL/91/87-88 DT 25.02.1988
378
761
SARAKKI I PHASE
60' X 43'
S.N.RAGHUNATH
BDA/EE(S)/PL/4/87-88 DT 11.06.1987
379
135
B.S.K. III STAGE, II PHASE, IV BLOCK
60' X 40'
S.P.SHARMA
BDA/EE(S)/PL/38/87-88 DT 20.08.1987
380
710
SARAKKI II PHASE
60' X 40'
SITHALAKSHMI JAYARAMAN
BDA/EE(S)/PL/18/87-88 DT 02.04.1987
381
35
SARAKKI II PHASE
61' X 45'
M.MURUGANANTHAN
BDA/EE(S)/PL/6/87-88 DT 28.05.1987
382
710
KEMPEGOWDA H.B.C.S., KATHRIGUPPA
40' X 60'
V.NARAYANA
BDA/EE(S)/PL/136/87-88 DT 07.03.1988
383
1178
B.T.M. II STAGE
40' X 60'
R.KRISHNAJI RAO
BDA/EE(S)/PL/26/87-88 DT 09.02.1988
384
1314
SARAKKI II PHASE
40' X 70'
B.LAKSHMIPATHY
BDA/EE(S)/PL/12/87-88 DT 15.06.1987
385
18
SIDDAVINAYAKA H.B.C.S.
40' X 60'
C.S.GOVINDARAJ
BDA/EE(S)/PL/58/87-88 DT 03.09.1987
386
762
B.S.K. III STAGE, II PHASE, VII BLOCK
40' X 60'
K.VENKATARAMAPPA
BDA/EE(S)/PL/97/87-88 DT 10.03.1988
B.S.K. III STAGE, III PHASE, III BLOCK
40' X 60'
N.BRAHMADEVAIAH
BDA/EE(S)/PL/101/87-88 DT 28.03.1988
SARAKKI II PHASE
40' X 60'
NEELA PATEL
BDA/EE(S)/PL/31/87-88 DT 26.11.1987
387
571/A
388
1283
389
143
B.S.K. III STAGE, II PHASE, IV BLOCK
60' X 40'
M.NAGARAJ
BDA/EE(S)/PL/76/87-88 DT 01.02.1988
390
316
B.S.K. III STAGE, III PHASE, II BLOCK
40' X 60'
M.SUSAIRAJ
BDA/EE(S)/PL/79/87-88 DT 03.02.1988
391
179
MICO SKGNS ARAKERE
40' X 65'
H.NAGANNA
BDA/EE(S)/PL/92/87-88 DT 20.11.1987
392
184
B.S.K. III STAGE, AVALAHALLY
40' X 60'
K.B.SUDARSHAN
BDA/EE(S)/PL/100/87-88 DT 26.03.1988
393
659
SARAKKI II PHASE
60' X 40'
G.S.VAIDYA
BDA/EE(S)/PL/22/87-88 DT 08.09.1987
394
56
SRI.ANJANEYA SWAMY H.B.C.S.
64' X 36'
H.L.SUBRAMANYA
BDA/EE(S)/PL/94/87-88 DT 21.11.1987
395
636
SARAKKI II PHASE
60' X 40'
HOMBE GOWDA
BDA/EE(S)/PL/10/87-88 DT 04.01.1987
396
654
B.T.M. II STAGE
60' X 40'
D.S.MURALI KRISHNA
BDA/EE(S)/PL/1/87-88 DT 01.04.1987
397
501
B.S.K. III STAGE, III PHASE, II BLOCK
60' X 40'
B.PRAKASH
BDA/EE(S)/PL/32/87-88 DT 17.07.1987
398
13
SARAKKI II PHASE
60' X 40'
P.KRISHNA SWAMY
BDA/EE(S)/PL/1/87-88 DT 26.05.1987
399
6
SARAKKI IV PHASE
40' X 60'
C.KHUSHEEDA KHANUM
BDA/EE(S)/PL/3/87-88 DT 23.03.1988
400
670
B.T.M. II STAGE
40' X 60'
K.G.ESWARAN
BDA/EE(S)/PL/19/87-88 DT 29.10.1987
401
1269
SARAKKI II PHASE
40' X 60'
K.PADMAVATHY
BDA/EE(S)/PL/49/87-88 DT 03.02.1988
402
730
KEMPEGOWDA H.B.C.S., KATHRIGUPPA
60' X 40'
M.V.GALIMATH
BDA/EE(S)/PL/63/87-88 DT 11.09.1987
JAYANAGAR H.B.C.S., KADIRENAHALLI
40' X 51'
M.S.RAJU
BDA/EE(S)/PL/60/87-88 DT 09.09.1987
SARAKKI II PHASE
40' X 61'
M.S.V.RAJA
BDA/EE(S)/PL/59/87-88 DT 28.03.1988
403
404
19 38/1
113
405
75
B.T.M. (N.S.PALYA)
40' X 60'
K.VENKATARAM
BDA/EE(S)/PL/25/87-88 DT 01.02.1988
406
54
SARAKKI INDUSTRIAL LAYOUT
45' X 33'
VITTA BHIMAIAH SETTY
BDA/EE(S)/PL/319/87-88 DT 19.06.1987
407
631
SARAKKI II PHASE
45' X 62'
E.R.JAVARAPPA
BDA/EE(S)/PL/19/87-88 DT 20.02.1988
408
20
MARENAHALLI, J.P.NAGAR II PHASE
75' X 43'
D.M.JAYADEVA
BDA/EE(S)/PL/104/87-88 DT 11.12.1987
409
155
65' X 40'
B.K.RAMAMURTHY
BDA/EE(S)/PL/95/87-88 DT 26.11.1987
410
43
B.S.K. III STAGE, III PHASE, III BLOCK
40' X 61'
B.CHANNA BASAVAIAH
BDA/EE(S)/PL/58/87-88 DT 20.11.1987
411
339
N.S.PALYA MICO H.B.C.S.
40' X 60'
D.A.SUBBAIAH
BDA/EE(S)/PL/79/87-88 DT 28.10.1987
412
16
JAYANAGARA H.B.C.S., PADMANABHA NAGAR
30' X 40'
N.NAGARAJU
BDA/EE(S)/PL/320/87-88 DT 25.02.1988
413
345
B.S.K. III STAGE, II PHASE, III BLOCK
40' X 60'
S.P.SHANBEGUM
BDA/EE(S)/PL/77/87-88 DT 03.02.1988
414
150
B.S.K. III STAGE, III PHASE, I BLOCK
44' X 60'
H.SIDDAPPA
BDA/EE(S)/PL/33/87-88 DT 18.07.1987
415
425
SARAKKI II PHASE
45' X 60'
S.NAGAPPA
BDA/EE(S)/PL/7/87-88 DT 28.05.1987
Cataloguing and indexing of records as envisaged under section 4(1) (a) of the Right to information Act 2005
LIST OF PLAN SANCTIONED FILES DURING THE YEAR 88-89 IN EE(S) DIVISION
SL
NO.
416
SITE
NO.
811
NAME OF THE LAYOUT
DIMENSION
APPLICANT NAME
SANCTION EE NO/DATE
SARAKKI II PHASE
68' X 40'
P.R.UMA
BDA/EE(S)/PL/18/88-89 DT 30.03.1989
417
1434
B.T.M. II STAGE I PHASE
60' X 40'
GAYATHRI SEN
BDA/EE(S)/PL/47/88-89 DT 30.03.1989
418
1092
SARAKKI II PHASE
40' X 60'
V.N.PUROHIT
BDA/EE(S)/PL/67/88-89 DT 30.03.1989
419
58
K.A.S. OFFICERS, H.B.C.S., MADIWALA
40' X 60'
C.R.CHIKKAMUTT
BDA/EE(S)/PL/01/88-89 DT 29.03.1989
420
715
SARAKKI II PHASE
45' X 60'
ARUNA RAO
BDA/EE(S)/PL/68/88-89 DT 31.03.1989
421
246
ARKERE MICO LAYOUT
50' X 47'
B.SUBBA RAO
BDA/EE(S)/PL/202/88-89 DT 29.03.1989
422
306
B.S.K. III STAGE II PHASE VI BLOCK
40' X 57'
S.A.MANJUNATH
BDA/EE(S)/PL/116/88-89 DT 27.03.1989
423
47
N.S.PALYA MICO H.B.C.S.
40' X 60'
T.SRIRAMAN
BDA/EE(S)/PL/44/88-89 DT 27.03.1989
KADIRENAHALLI HBCS
50' X 40'
RAJU
BDA/EE(S)/PL/198/88-89 DT 27.03.1989
SARAKKI K.S.R.T.C., H.B.C.S.
43' X 50'
KEMA VENKATESH
BDA/EE(S)/PL/203/88-89 DT 29.03.1989
424
98/41
425
275
426
19
K.A.S. OFFICERS, H.B.C.S., MADIWALA
43' X 57'
M.DODDAPPA
BDA/EE(S)/PL/199/88-89 DT 27.03.1989
427
9
K.A.S. OFFICERS, H.B.C.S., MADIWALA
40' X 62'
M.K.SHANKARALINGE GOWDA
BDA/EE(S)/PL/200/88-89 DT 27.03.1989
428
1166
B.T.M. II STAGE I PHASE
40' X 60'
H.R.RAMESH CHANDRA
BDA/EE(S)/PL/43/88-89 DT 04.03.1989
429
64
CHENNAMMANAKERE ACHUKAT B.S.K. III STAGE
53' X 40'
M.SHANKARA RAO
BDA/EE(S)/PL/115/88-89 DT 21.03.1989
430
460
N.S.PALYA MICO H.B.C.S.
60' X 40'
C.K.NARAYANA MURTHY
BDA/EE(S)/PL/197/88-89 DT 21.03.1989
431
57
B.S.K. III STAGE, III PHASE, VI BLOCK
40' X 60'
T.R.RAMASWAMY REDDY
BDA/EE(S)/PL/114/88-89 DT 17.03.1989
432
1413
SARAKKI I PHASE
60' X 40'
LAKKAMMA
BDA/EE(S)/PL/16/88-89 DT 21.03.1989
KENCHENAHALLI H.B.C.S.
70' X 43'
G.RAMAKRISHNA
BDA/EE(S)/PL/196/88-89 DT 21.03.1989
KUMARASWAMY LAYOUT II STAGE
60' X 40'
B.N.SAMPATH KUMAR
BDA/EE(S)/PL/23/88-89 DT 08.02.1989
433
477/D
434
2534
435
305
SARAKKI II PHASE
45' X 60'
B.R.SRINIVASA SINGH
BDA/EE(S)/PL/66/88-89 DT 21.03.1989
436
810
SARAKKI I PHASE
64' X 40'
DR.SMITA SUBBASAYAPPA
BDA/EE(S)/PL/17/88-89 DT 21.03.1989
437
2
HOSAKERE HALLI B.S.K. III STAGE
60' X 40'
B.S.SRIDHARA MURTHY
BDA/EE(S)/PL/112/88-89 DT 17.03.1989
438
239
N.S.PALYA MICO H.B.C.S.
40' X 59'
SUREKH MAHADEV
BDA/EE(S)/PL/195/88-89 DT 17.03.1989
439
20
B.G.ROAD BHARATH H.B.C.S.
40' X 60'
NIRMALA NAGARAJ
BDA/EE(S)/PL/194/88-89 DT 17.03.1989
440
456
B.S.K. III STAGE II PHASE VI BLOCK
40' X 60'
D.V.LAKSHMIPATHY
BDA/EE(S)/PL/110/88-89 DT 09.03.1989
441
279
SARAKKI II PHASE
40' X 60'
B.S.SWARNALTHA
BDA/EE(S)/PL/65/88-89 DT 09.03.1989
442
228
B.S.K. III STAGE, III PHASE, II BLOCK
40' X 60'
K.R.GANAPATHY
BDA/EE(S)/PL/113/88-89 DT 17.03.1989
443
14
TAVAREKERE H.B.C.S.
60' X 40'
RAHATUMMISA
BDA/EE(S)/PL/170/88-89 DT 30.01.1989
444
226
B.T.M. II STAGE I PHASE
46' X 45'
S.VASANTHA
BDA/EE(S)/PL/45/88-89 DT 27.03.1989
445
1014
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
60' X 40'
T.R.RAMASWAMY
BDA/EE(S)/PL/1/88-89 DT 01.04.1989
446
241
GIRINAGAR H.B.C.S.
60' X 40'
P.HARIDASACHAR
BDA/EE(S)/PL/98/88-89 DT 03.10.1988
447
793
KENCHENAHALLI H.B.C.S.
60' X 38'
A.S.DAYAKAR
DA/EE(S)/PL/135/88-89 DT 17.12.1988
448
260
GIRINAGAR H.B.C.S.
60' X 40'
SHARADAJAYAGOVINDA
BDA/EE(S)/PL/178/88-89 DT 13.02.1989
449
626
SARAKKI VI PHASE
39' X 60'
CHAND BEGAM
BDA/EE(S)/PL/8/88-89 DT 16.02.1989
450
138
KENCHENAHALLI H.B.C.S.
40' X 60'
K.RAMACHANDRA
BDA/EE(S)/PL/177/88-89 DT 10.02.1989
451
48/A
B.S.K. III STAGE, II PHASE, IV BLOCK
60' X 40'
M.MOHAN SHARMA
BDA/EE(S)/PL/35/88-89 DT 25.06.1988
452
82/41
PADMANABHANAGAR H.B.C.S.
45' X 51'
M.GADDE GOWDA
BDA/EE(S)/PL/136/88-89 DT 20.12.1988
453
1085
SARAKKI II PHASE
61' X 40'
K.S.UMADEVI
BDA/EE(S)/PL/50/88-89 DT 30.12.1988
454
1196
B.T.M. II STAGE I PHASE
60' X 40'
GANGADARA RAO
BDA/EE(S)/PL/4/88-89 DT 16.04.1988
455
193
B.S.K.III STAGE, KATHRUGUPPE
54' X 39'
K.RAJARAM
BDA/EE(S)/PL/16/88-89 DT 02.05.1988
456
306
KADIRENAHALLI HBCS
50' X 44'
JAYARAMA MURTHY
BDA/EE(S)/PL/188/88-89 DT 28.02.1989
457
222
N.S.PALYA MICO H.B.C.S.
40' X 59'
A.RAVINDRA RAO
BDA/EE(S)/PL/24/88-89 DT 24.05.1988
458
57
SRI ANJANEYA SWAMY H.B.C.S., ETTMADU SY NOS
65' X 36'
K.S.SUBBASWAMY
BDA/EE(S)/PL/13/88-89 DT 16.04.1988
459
7
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
75' X 40'
M.S.RNGANATHA RAO
BDA/EE(S)/PL/76/88-89 DT 17.06.1989
460
21
JAYANAGAR H.B.C.S.
70' X 30'
R.INDRAMMA
BDA/EE(S)/PL/37/88-89 DT 15.06.1988
461
262
MICO H.B.C.S.
60' X 40'
N.RUKMINAMMA
BDA/EE(S)/PL/53/88-89 DT 12.07.1988
462
1746
KMRSL II STAGE
40' X 61'
K.GOPALA RAO & SHASHIKALA
BDA/EE(S)/PL/19/88-89 DT 16.01.1989
463
572
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
40' X 60'
AMANULLA
BDA/EE(S)/PL/162/88-89 DT 18.01.1989
464
45
B.S.K. III STAGE, III PHASE, I BLOCK
61' X 40'
M.B.JAYARAJU
BDA/EE(S)/PL/29/88-89 DT 09.06.1988
465
1178
B.T.M. II STAGE, I PHASE
40' X 60'
R.KRISHNOJI RAO
BDA/EE(S)/PL/35/88-89 DT 06.02.1989
466
187
JAYANAGARA H.B.C.S., PADMANABHA NAGAR
76' X 40'
C.P.GEETHA
BDA/EE(S)/PL/176/88-89 DT 08.02.1989
467
706
SARAKKI II PHASE
40' X 60'
RAMDULAHARI MITTAL
BDA/EE(S)/PL/24/88-89 DT 18.08.1988
468
265
B.S.K. III STAGE, III PHASE, V BLOCK
39' X 59'
JAYALAKSHMI KRISHNA MURTHY
BDA/EE(S)/PL/96/88-89 DT 11.01.1989
469
136
B.O.O. H.B.C.S., TAVAREKERE
51' X 60'
VICE CHAIRMAN
BDA/EE(S)/PL/41/88-89 DT 21.06.1988
470
48
N.R.COLONY B.S.K. III STAGE, III PHASE, I BLOCK
62' X 40'
L.NAGARAJ
BDA/EE(S)/PL/21/88-89 DT 13.05.1988
471
1202
B.T.M. II STAGE, I PHASE
60' X 40'
RAMA SUBBA REDDY
BDA/EE(S)/PL/20/88-89 DT 29.10.1988
472
7
TIMBER MERCHANTS H.B.C.S., SARAKKI
45' X 58'
ALEEM AHAMED
BDA/EE(S)/PL/113/88-89 DT 11.11.1988
473
1301
SARAKKI II PHASE
60' X 40'
M.K. RAVEENDRANATHA
BDA/EE(S)/PL/37/88-89 DT 27.10.1988
474
196
IDEAL HOME H.B.C.S.
61' X 40'
N.KRISHNA MURTHY
BDA/EE(S)/PL/30/88-89 DT 06.06.1988
475
112
ITI H.B.C.S., KATHARIGUPPA
40' X 60'
K.GOPALA KRISHNA MURTHY
BDA/EE(S)/PL/181/88-89 DT 23.02.1989
476
90
ITI H.B.C.S., KATHARIGUPPA
40' X 60'
H.N.NARAYANA RAO
BDA/EE(S)/PL/139/88-89 DT 22.12.1988
477
484
SARAKKI II PHASE
45' X 67'
GAJALAKSHMI
BDA/EE(S)/PL/48/88-89 DT 17.12.1988
SARAKKI II PHASE
40' X 60'
K.V.CHALAPATHY
BDA/EE(S)/PL/2/88-89 DT 04.04.1988
B.S.K. III STAGE, III PHASE, IV BLOCK
79' X 49'
M.BHASKAR RAO
BDA/EE(S)/PL/27/88-89 DT 01.06.1988
VISWABHARATHI H.B.C.S., GIRINAGAR
40' X 60'
B.N.SUBRAMANYA
BDA/EE(S)/PL/185/88-89 DT 24.02.1989
SARAKKI II PHASE
40' X 60'
RANGANATHA
BDA/EE(S)/PL/18/88-89 DT 12.07.1988
478
1534/E
479
36
480
295
481
1746
482
161
ARAKERE MICO S.K.G.M.S.
35' X 65'
K.S.MOHAN
BDA/EE(S)/PL/49/88-89 DT 08.07.1988
483
563
B.E.M.L. H.B.C.S.
39' X 60'
K.P.TUKARAMA RAO
BDA/EE(S)/PL/59/88-89 DT 22.07.1988
484
1293
SARAKKI II PHASE
60' X 64'
M.A.RAMA CHANDRA
BDA/EE(S)/PL/19/88-89 DT 12.07.1988
485
565
B.S.K. III STAGE, III PHASE, VI BLOCK
58' X 40'
A.V.HABBU
BDA/EE(S)/PL/39/88-89 DT 18.07.1988
486
110
MARUTHI H.B.C.S., TAVAREKERE
40' X 60'
LALITHAMMA
BDA/EE(S)/PL/163/88-89 DT 19.01.1989
487
38
B.S.K. III STAGE, III PHASE, VI BLOCK
18.50 X 12.20
SUMATEENDRA R NADIG
BDA/EE(S)/PL/38/88-89 DT 06.07.1988
488
674
B.T.M. II STAGE, I PHASE
40' X 60'
B.PUTTA SHAMA CHARI
BDA/EE(S)/PL/15/88-89 DT 12.08.1988
489
840
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
40' X 60'
C.V.PARTHA SARATHY
BDA/EE(S)/PL/66/88-89 DT 16.08.1988
490
2539
KUMARA SWAMY LAYOUT II STAGE
55' X 40'
M.R.PANDIT ARADHYA
BDA/EE(S)/PL/3/88-89 DT 06.06.1988
491
844
KENCHENAHALLI H.B.C.S.
56' X 43'
H.S.RAGHAVENDRA RAO
BDA/EE(S)/PL/62/88-89 DT 06.08.1988
492
12
N.S.PALYA MICO H.B.C.S.
40' X 60'
M.T.SRINIVASA IYENGAR
BDA/EE(S)/PL/10/88-89 DT 22.06.1988
493
53
SRI ANJANEYA SWAMY H.B.C.S., ETTMADU SY NOS
40' X 61'
VENKATALAKSHMAMMA
BDA/EE(S)/PL/141/88-89 DT 26.12.1988
494
129
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
40' X 60'
D.V.SRINIVASAN
BDA/EE(S)/PL/184/88-89 DT 24.02.1989
495
653
B.S.K. III STAGE, II PHASE, VII BLOCK
60' X 40'
L.S.SHARADA
BDA/EE(S)/PL/108/88-89 DT 04.03.1989
496
1231
B.T.M. II STAGE, I PHASE
40' X 60'
B.VISWANATH
BDA/EE(S)/PL/42/88-89 DT 04.03.1989
497
198
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
40' X 60'
C.S.SELVANAYAGAM
BDA/EE(S)/PL/172/88-89 DT 30.01.1989
KUMARA SWAMY LAYOUT II STAGE
40' X 60'
A.N.SUBRAMANYAM
BDA/EE(S)/PL/1/88-89 DT 12.04.1988
BHARATH H.B.C.S., UTTARAHALLI SY NOS
40' X 65'
C.P.SUDHA
BDA/EE(S)/PL/16/88-89 DT 19.04.1988
498
2571/A
499
26
500
122
B.S.K. III STAGE, II PHASE, IV BLOCK
59' X 40'
S.R.KRISHNA MURTHY
BDA/EE(S)/PL/6/88-89 DT 05.04.1988
501
314
B.S.K. III STAGE, IV PHASE, VII BLOCK
40' X 60'
UMAMANI
BDA/EE(S)/PL/5/88-89 DT 04.04.1988
502
42
B.T.M. I STAGE, I PHASE
40' X 60'
K.SESHADRI
BDA/EE(S)/PL/1/88-89 DT 02.04.1988
503
145
SARAKKI II PHASE
45' X 72'
BRIG K.C.VASUNDRA
BDA/EE(S)/PL/6/88-89 DT 16.04.1988
504
353
KENCHENAHALLI H.B.C.S.
90' X 37'
GP CAPT. T.D.THAMIAH
BDA/EE(S)/PL/4/88-89 DT 04.04.1988
505
46
B.T.M. LAYOUT, N.S.PALYA
40' X 60'
V.N.DIVA KUMAR
BDA/EE(S)/PL/5/88-89 DT 16.04.1988
506
266
MICO SKGNS ARAKERE
50' X 56'
SANNAJAVARAIAH
BDA/EE(S)/PL/12/88-89 DT 16.04.1988
507
686
B.S.K. III STAGE, II PHASE, VII BLOCK
58' X 40'
K.V.KASTURI
BDA/EE(S)/PL/8/88-89 DT 16.04.1988
508
740
JAYANAGAR H.B.C.S., KADIRENAHALLI
55' X 40'
H.RAVINDRA REDDY
BDA/EE(S)/PL/2/88-89 DT 04.04.1988
509
20
510
582
511
99-C
B.S.K. III STAGE, HOSAKEREHALLI SY NOS
40' X 60'
H.V.SHIVARUDRAPPA
BDA/EE(S)/PL/1/88-89 DT 02.04.1988
SARAKKI II PHASE
40' X 60'
M.S.KRISHNA MURTHY
BDA/EE(S)/PL/7/88-89 DT 16.04.1988
KENCHENAHALLI H.B.C.S.
50' X 64'
N.SRIDHAR
BDA/EE(S)/PL/18/88-89 DT 21.04.1988
512
17
JAYANAGAR H.B.C.S., KADIRENAHALLI
45' X 70'
LAXMI SOMASUNDAR
BDA/EE(S)/PL/17/88-89 DT 19.04.1988
513
726
KEMPEGOWDA H.B.C.S., KATHRIGUPPA
40' X 61'
A.B.SHYAMACHAR
BDA/EE(S)/PL/11/88-89 DT 16.04.1988
514
449
SARAKKI II PHASE
45' X 65'
C.KANNAN
BDA/EE(S)/PL/5/88-89 DT 13.04.1988
515
274
N.S.PALYA MICO H.B.C.S.
40' X 50'
B.SHARADA
BDA/EE(S)/PL/7/88-89 DT 08.04.1988
516
14
B.T.M. I STAGE, TAVAREKERE SY NOS
40' X 50'
S.R.ACHARYA
BDA/EE(S)/PL/2/88-89 DT 05.04.1988
517
1199
B.T.M. II STAGE, I PHASE
40' X 60'
N.SOMASHEKARA
BDA/EE(S)/PL/3/88-89 DT 13.04.1988
518
25
N.S.PALYA MICO H.B.C.S.
60' X 67'
BDA/EE(S)/PL/10/88-89 DT 13.04.1988
519
502
JAYANAGAR H.B.C.S., KADIRENAHALLI
40' X 60'
RAJENDRA KUMAR & SANJAY
KUMAR
S.SAVITHRI
520
24
N.S.PALYA MICO H.B.C.S.
40' X 60'
M.RAMA KRISHNA
BDA/EE(S)/PL/8/88-89 DT 13.04.1988
521
601
SARAKKI II PHASE
40' X 62'
SHANTHA KARANTH
BDA/EE(S)/PL/4/88-89 DT 08.04.1988
522
454
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
40' X 60'
R.ARAVAMUDHAN
BDA/EE(S)/PL/3/88-89 DT 04.04.1988
523
31
B.S.K. III STAGE, III PHASE, V BLOCK
59' X 39'
BIPIN CHANDRA R SHAH
BDA/EE(S)/PL/7/88-89 DT 12.04.1988
524
589
B.S.K. III STAGE, II PHASE, VI BLOCK
45' X 65'
D.R.SATHYANARAYANA
BDA/EE(S)/PL/9/88-89 DT 18.04.1988
525
429
N.S.PALYA MICO H.B.C.S.
40' X 60'
P.L.CHANDRA KANTH
BDA/EE(S)/PL/14/88-89 DT 16.04.1988
526
848
KENCHENAHALLI H.B.C.S.
40' X 56'
D.MOHAN
BDA/EE(S)/PL/15/88-89 DT 18.04.1988
527
144
B.O.O., H.B.C.S., TAVAREKERE
40' X 60'
VICE CHAIRMAN
BDA/EE(S)/PL/6/88-89 DT 04.04.1988
528
1277
SARAKKI II PHASE
40' X 60'
V.L.UMADEVI MURTHY
BDA/EE(S)/PL/3/88-89 DT 04.04.1988
529
76
SARAKKI II PHASE
45' X 60'
T.V.PARATHASARTHY
BDA/EE(S)/PL/5/88-89 DT 26.08.1988
530
240
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
39' X 60'
M.N.BHEEMA RAO
BDA/EE(S)/PL/90/88-89 DT 23.09.1988
BDA/EE(S)/PL/9/88-89 DT 13.04.1988
531
811
532
14
533
573/D
SARAKKI II PHASE
40' X 68'
P.R.UMA
BDA/EE(S)/PL/6/88-89 DT 06.09.1988
ITI H.B.C.S., KATHARIGUPPA
40' X 60'
K.C.SURYANARAYANA RAO
BDA/EE(S)/PL/87/88-89 DT 17.09.1988
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
40' X 60'
A.HAMPANNA
BDA/EE(S)/PL/86/88-89 DT 17.09.1988
POORNA PRAJAN H.B.C.S., KATHARIGUPPA
40' X 60'
SARALA RANGANATHAN
BDA/EE(S)/PL/88/88-89 DT 17.09.1988
534
70
535
176
B.S.K. III STAGE, AVALAHALLY
40' X 60'
K.K.VISWANATH
BDA/EE(S)/PL/55/88-89 DT 21.09.1988
536
279
VISWABHARATHI H.B.C.S., GIRINAGAR
40' X 60'
PRESCILLA MENDONELLA
BDA/EE(S)/PL/81/88-89 DT 05.09.1988
537
283
N.S.PALYA MICO H.B.C.S.
40' X 60'
N.S.DEVUDU NARASIMHA SASTRY
BDA/EE(S)/PL/71/88-89 DT 26.08.1988
538
172
VISWABHARATHI H.B.C.S., GIRINAGAR
40' X 60'
H.A.RAMAMOHANA GUPTA
BDA/EE(S)/PL/69/88-89 DT 18.08.1988
539
43
KSRTC H.B.C.S. SARAKKI
40' X 60'
K.KRISHNAMA NAIDU
BDA/EE(S)/PL/70/88-89 DT 26.08.1988
540
158
B.O.O., H.B.C.S., TAVAREKERE
40' X 60'
VICE CHAIRMAN
BDA/EE(S)/PL/72/88-89 DT 26.08.1988
541
498
SARAKKI II PHASE
40' X 60'
INDER RAJ
BDA/EE(S)/PL/25/88-89 DT 26.08.1988
542
1990
SARAKKI II PHASE
40' X 64'
P.HARINADHA BABU
BDA/EE(S)/PL/26/88-89 DT 29.08.1988
543
37
B.T.M. II STAGE, I PHASE
40' X 60'
N.S.DE
BDA/EE(S)/PL/16/88-89 DT 13.09.1988
544
35
BANNERAGHATTA ROAD
60' X 36'
KUSHALAVATHI
BDA/EE(S)/PL/93/88-89 DT 26.09.1988
545
531
B.S.K. III STAGE, II PHASE, VI BLOCK
45' X 65'
DR|| H.V.MUGOLUR
BDA/EE(S)/PL/48/88-89 DT 29.08.1988
546
472
B.S.K. III STAGE, II PHASE, III BLOCK
40' X 60'
CHIKKAVEERAPPA
BDA/EE(S)/PL/50/88-89 DT 07.09.1988
547
10
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
40' X 85'
L.V.VISWA MURTHY
BDA/EE(S)/PL/80/88-89 DT 05.09.1988
548
885
SARAKKI II PHASE
45' X 65'
H.A.CHENGAPPA
BDA/EE(S)/PL/29/88-89 DT 13.09.1988
549
437
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
40' X 60'
V.SUBRAMANYA
BDA/EE(S)/PL/76/88-89 DT 01.09.1988
550
500
B.S.K. III STAGE, III PHASE, II BLOCK
40' X 60'
V.T.VADAVI
BDA/EE(S)/PL/53/88-89 DT 17.09.1988
551
1689
SARAKKI II PHASE
40' X 60'
N.MANIKYAM
BDA/EE(S)/PL/27/88-89 DT 01.09.1988
552
1104
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
60' X 40'
PRAMODA THIRTHA
BDA/EE(S)/PL/92/88-89 DT 26.09.1988
553
594
SARAKKI II PHASE
41' X 60'
KAMALESH KUMARI
BDA/EE(S)/PL/30/88-89 DT 17.09.1988
554
252
N.S.PALYA MICO H.B.C.S.
60' X 50'
N.H.NATARAJAN
BDA/EE(S)/PL/84/88-89 DT 07.09.1988
555
3592
KMRSL II STAGE
40' X 60'
K.THIMMA REDDY
BDA/EE(S)/PL/15/88-89 DT 23.09.1988
556
2583
KMRSL II STAGE
40' X 60'
N.M.LAKSHMINARAYANA RAO
BDA/EE(S)/PL/14/88-89 DT 13.09.1988
557
172
MICO SKGNS ARAKERE
40' X 65'
G.RANGANATHAN
BDA/EE(S)/PL/79/88-89 DT 05.09.1988
558
2402
KMRSL II STAGE
40' X 60'
CHIKKA MAHADEVA
BDA/EE(S)/PL/16/88-89 DT 26.09.1988
559
379
B.S.K. III STAGE, II PHASE, VI BLOCK
58' X 40'
S.KISHORE
BDA/EE(S)/PL/58/88-89 DT 26.09.1988
560
8
TIMBER MERCHANTS H.B.C.S., SARAKKI
45' X 60'
QAMER AFRAZ
BDA/EE(S)/PL/83/88-89 DT 07.09.1988
561
245
B.S.K. III STAGE, VI BLOCK
62' X 40'
S.R.GURUMURTHY
BDA/EE(S)/PL/57/88-89 DT 23.09.1988
562
32
NIMHAN'S H.B.C.S. TAVAREKERE
40' X 59'
N.JANAKIRAMAIAH
BDA/EE(S)/PL/77/88-89 DT 05.09.1988
563
36
B.S.K. III STAGE, III PHASE, VI BLOCK
40' X 61'
P.L.CHANDRA KANTH
BDA/EE(S)/PL/52/88-89 DT 17.09.1988
564
637
JAYANAGAR H.B.C.S., KADIRENAHALLI
40' X 60'
S.INDIRAMMA
BDA/EE(S)/PL/78/88-89 DT 05.09.1988
565
134
VISWABHARATHI H.B.C.S., GIRINAGAR
40' X 60'
M.R.VIJAYA GOPALA DAS
BDA/EE(S)/PL/75/88-89 DT 01.09.1988
566
12
B.S.K. III STAGE, ITTUMADU SY NOS
40' X 60'
C.A.MUTTAPPA
BDA/EE(S)/PL/49/88-89 DT 05.09.1988
567
625
SARAKKI II PHASE
45' X 60'
T.KRISHNA
BDA/EE(S)/PL/4/88-89 DT 26.08.1988
568
57
JAYANAGARA H.B.C.S., PADMANABHA NAGAR
40' X 60'
P.R.LAKSHMI NARAYANA
BDA/EE(S)/PL/74/88-89 DT 01.09.1988
569
185
B.S.K. III STAGE, IV PHASE, VII BLOCK
57' X 39'
H.S.CHANDRAKALA RAJANNA
BDA/EE(S)/PL/51/88-89 DT 17.09.1988
570
75
SARAKKI II PHASE
45' X 60'
M.S.SRIVATSAN
BDA/EE(S)/PL/7/88-89 DT 12.09.1988
571
36
JAYANAGARA H.B.C.S., PADMANABHA NAGAR
40' X 60'
V.SAMPATH RAJA
BDA/EE(S)/PL/85/88-89 DT 12.09.1988
572
369
B.S.K. III STAGE, BEHIND VIDYAPEETA
40' X 60'
USHA N RAO
BDA/EE(S)/PL/54/88-89 DT 17.09.1988
573
1517
SARAKKI II PHASE
40' X 60'
R.LAKSHMANA REDDY
BDA/EE(S)/PL/28/88-89 DT 05.09.1988
RAMA RAO LAYOUT
50' X 60'
DR|| J.VASANTHA KUMARI
BDA/EE(S)/PL/82/88-89 DT 06.09.1988
574
70/1
575
401
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
40' X 60'
B.VENKATACHALAPATHY
BDA/EE(S)/PL/89/88-89 DT 23.09.1988
576
504
B.S.K. III STAGE, III PHASE, II BLOCK
40' X 60'
T.RAJESWARI
BDA/EE(S)/PL/79/88-89 DT 29.11.1988
577
888
SARAKKI II PHASE
45' X 70'
K.KRISHNAIAH
BDA/EE(S)/PL/43/88-89 DT 28.11.1988
578
512
B.S.K. III STAGE, III PHASE, III BLOCK
40' X 60'
N.SUNDARESHA
BDA/EE(S)/PL/78/88-89 DT 29.11.1988
579
73
B.T.M. II STAGE, I PHASE
40' X 60'
N.N.KUMAR
BDA/EE(S)/PL/28/88-89 DT 03.12.1988
580
32
SARAKKI VI PHASE
40' X 60'
S.CHANDRA MOHAN
BDA/EE(S)/PL/4/88-89 DT 02.12.1988
581
144
VISWABHARATHI H.B.C.S., GIRINAGAR
40' X 60'
DILSHAD SRINIVASAN
BDA/EE(S)/PL/120/88-89 DT 28.11.1988
582
430
N.S.PALYA MICO H.B.C.S.
40' X 59'
PRATHIBHA
BDA/EE(S)/PL/129/88-89 DT 03.12.1988
583
661
B.T.M. II STAGE, I PHASE
40' X 60'
JAYAMMA NARAYANA
BDA/EE(S)/PL/29/88-89 DT 03.12.1988
584
15
ITI H.B.C.S., KATHARIGUPPA
40' X 60'
SAMBA MURTHY
BDA/EE(S)/PL/121/88-89 DT 28.11.1988
585
260
N.S.PALYA MICO H.B.C.S.
40' X 60'
K.S.SADASHIVA RAO
BDA/EE(S)/PL/128/88-89 DT 03.12.1988
586
1010
B.T.M. I STAGE, I BLOCK, I PHASE
40' X 60'
B.R.RAMAKUMAR
BDA/EE(S)/PL/27/88-89 DT 02.12.1988
587
438
B.S.K. III STAGE, II PHASE, VI BLOCK
40' X 60'
K.L.MADAN MOHAN KUMAR
BDA/EE(S)/PL/84/88-89 DT 01.12.1988
588
1345
SRINIVASA NAGAR II PHASE, B.S.K. III STAGE
39' X 58'
Y.K.VENKATESHAPPA
BDA/EE(S)/PL/76/88-89 DT 28.11.1988
KENCHENAHALLI H.B.C.S.
45' X 61'
C.S.ARUNA BAI
BDA/EE(S)/PL/126/88-89 DT 01.12.1988
26' X 54'
H.V.KRISHNA MURTHY
BDA/EE(S)/PL/82/88-89 DT 29.11.1988
40' X 60'
RUKUMINI SRIKANTAN
BDA/EE(S)/PL/25/88-89 DT 28.11.1988
589
648/C
590
73
591
71
B.S.K. III STAGE, CHANAMANAKERE ACHUKATU
LAYOUT
B.T.M. II STAGE, I PHASE
592
77
SARAKKI I PHASE
45' X 60'
G.N.SUNDARA RAJAN
BDA/EE(S)/PL/12/88-89 DT 28.11.1988
593
393
JAYANAGARA H.B.C.S., PADMANABHA NAGAR
40' X 60'
M.N.SUMITRA
BDA/EE(S)/PL/123/88-89 DT 29.11.1988
594
62
B.S.K. III STAGE, III PHASE, I BLOCK
40' X 60'
V.RAMACHANDRAN
BDA/EE(S)/PL/80/88-89 DT 29.11.1988
JAYANAGARA H.B.C.S., PADMANABHA NAGAR
40' X 50'
M.R.RAMAKRISHNAN
BDA/EE(S)/PL/124/88-89 DT 29.11.1988
B.S.K. III STAGE, III PHASE, III BLOCK
40' X 60'
GANGAPPA NARASAPPA TUMKUR
BDA/EE(S)/PL/81/88-89 DT 29.11.1988
595
596
76/41
997
597
688
KEMPEGOWDA H.B.C.S., KATHRIGUPPA
40' X 60'
G.S.KUMAR
BDA/EE(S)/PL/125/88-89 DT 29.11.1988
598
1815
KUMARA SWAMY LAYOUT II STAGE
40' X 60'
MURAGESH MUDALIAR
BDA/EE(S)/PL/10/88-89 DT 06.07.1988
599
571
B.S.K. III STAGE, III PHASE, III BLOCK
40' X 60'
S.NARAYANA
BDA/EE(S)/PL/73/88-89 DT 16.11.1988
600
1803
KUMARA SWAMY LAYOUT II STAGE
40' X 60'
K.R.VIJAYENDRA
BDA/EE(S)/PL/18/88-89 DT 26.12.1988
601
1401
SARAKKI I PHASE
40' X 70'
NARAYANA SUBRAYA HEGDE
BDA/EE(S)/PL/20/88-89 DT 01.06.1988
602
83
DOLLAR SCHEME B.T.M. LAYOUT
40' X 60'
B.R.NAGENDRA
BDA/EE(S)/PL/32/88-89 DT 16.01.1989
603
163
B.S.K. III STAGE, III PHASE, I BLOCK
40' X 60'
K.LALITHA
BDA/EE(S)/PL/88/88-89 DT 14.12.1988
604
138
ITI H.B.C.S., KATHARIGUPPA
87' X 45'
B.MAHABALESWAR
BDA/EE(S)/PL/159/88-89 DT 13.01.1989
605
115
B.S.K. III STAGE, III PHASE, I BLOCK
40' X 60'
M.GOPALA KRISHNAN
BDA/EE(S)/PL/69/88-89 DT 29.10.1988
KENCHENAHALLI H.B.C.S.
68' X 52'
H.V.J.VASISTA
BDA/EE(S)/PL/51/88-89 DT 12.07.1988
606
474/C
607
671
B.S.K. III STAGE, II PHASE, VII BLOCK
40' X 60'
C.S.PRAKASH
BDA/EE(S)/PL/30/88-89 DT 09.06.1988
608
388
SARAKKI II PHASE
45' X 60'
UMARAM
BDA/EE(S)/PL/33/88-89 DT 07.10.1988
609
17
N.S.PALYA MICO H.B.C.S.
40' X 60'
P.K.NAGARAJA RAO
BDA/EE(S)/PL/30/88-89 DT 14.12.1988
610
999
B.S.K. III STAGE, III PHASE, III BLOCK
40' X 60'
V.GOVINDARAJU
BDA/EE(S)/PL/99/88-89 DT 19.01.1989
611
188
B.S.K. III STAGE, IV PHASE, VII BLOCK
57' X 39'
G.NARAYANAMA
BDA/EE(S)/PL/25/88-89 DT 24.05.1988
612
115
SARAKKI IV PHASE
40' X 65'
M.HUSSAIN SHARIFF
BDA/EE(S)/PL/1/88-89 DT 24.05.1988
613
28
B.O.O., H.B.C.S., TAVAREKERE
40' X 50'
VICE CHAIRMAN
BDA/EE(S)/PL/158/88-89 DT 13.01.1989
614
76
RAMA RAO LAYOUT
40' X 64'
K.LAKSHMAMMA
BDA/EE(S)/PL/48/88-89 DT 08.07.1988
SARAKKI II PHASE
40' X 60'
C.VENUGOPAL
BDA/EE(S)/PL/16/88-89 DT 25.06.1988
615
1534/G
616
262
KENCHENAHALLI H.B.C.S.
60' X 40'
H.V.VIJAYA KUMAR
BDA/EE(S)/PL/27/88-89 DT 31.05.1988
617
574
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
40' X 60'
B.KRISHNA RAO SINDHE
BDA/EE(S)/PL/127/88-89 DT 03.12.1988
618
1684
SARAKKI II PHASE
40' X 60'
A.V.SRIDHAR
BDA/EE(S)/PL/32/88-89 DT 03.10.1988
619
239
B.S.K. III STAGE, III PHASE, II BLOCK
40' X 60'
M.THANGAVELU
BDA/EE(S)/PL/100/88-89 DT 25.01.1989
620
56
B.S.K. III STAGE, IV PHASE, VII BLOCK
40' X 60'
A.RADHURAM
BDA/EE(S)/PL/67/88-89 DT 29.10.1988
621
304
SUBEDAR PALYA H.B.C.S., SARAKKI
45' X 60'
NANJUNDAIAH
BDA/EE(S)/PL/112/88-89 DT 11.11.1988
622
242
KSRTC H.B.C.S. SARAKKI
40' X 60'
HANUMANTHA RAO
BDA/EE(S)/PL/117/88-89 DT 18.11.1988
623
283
SARAKKI II PHASE
45' X 60'
R.SRINIVASAN
BDA/EE(S)/PL/36/88-89 DT 27.10.1988
624
406
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
40' X 60'
R.CHIKKANNA
BDA/EE(S)/PL/105/88-89 DT 27.10.1988
625
39
B.T.M. I STAGE, I PHASE
40' X 60'
N.K.MALATHI
BDA/EE(S)/PL/7/88-89 DT 09.05.1988
626
260
SUBEDAR PALYA H.B.C.S., SARAKKI
45' X 60'
H.B.DEVENDRA SWAMY
BDA/EE(S)/PL/173/88-89 DT 01.02.1989
627
432
SARAKKI II PHASE
40' X 60'
M.A.GOPINATH
BDA/EE(S)/PL/32/88-89 DT 13.01.1989
628
1197
B.T.M. II STAGE, I PHASE
40' X 60'
P.JAYARAMU REDDY
BDA/EE(S)/PL/41/88-89 DT 01.03.1989
629
741
JAYANAGAR H.B.C.S., KADIRENAHALLI
55' X 40'
S.NAGESH
BDA/EE(S)/PL/45/88-89 DT 03.10.1988
630
1239
B.T.M. II STAGE, I PHASE
40' X 60'
C.G.NAGAPPA
BDA/EE(S)/PL/13/88-89 DT 30.07.1988
631
36
NIMHAN'S H.B.C.S. TAVAREKERE
40' X 60'
MIRNAZIR AHMED
BDA/EE(S)/PL/60/88-89 DT 29.07.1988
632
758
SARAKKI I PHASE
43' X 60'
S.A.NANJUNDA SWAMY
BDA/EE(S)/PL/3/88-89 DT 18.08.1988
633
68
S.RAMA RAO LAYOUT
40' X 60'
JAYAMMA
BDA/EE(S)/PL/68/88-89 DT 17.08.1988
634
248
B.S.K. III STAGE, III PHASE, II BLOCK
40' X 60'
T.R.PRAKASH
BDA/EE(S)/PL/45/88-89 DT 01.08.1988
635
735
SARAKKI II PHASE
40' X 60'
VELLORE NARASIMHA
BDA/EE(S)/PL/23/88-89 DT 10.08.1988
636
39
KAVERI H.B.C.S., TAVAREKERE SY NOS
40' X 61'
N.HAMSAVENI & BABY
BDA/EE(S)/PL/153/88-89 DT 06.01.1989
637
375
JAYANAGARA H.B.C.S., PADMANABHA NAGAR
71' X 45'
M.P.GAYATHRIDEVI
BDA/EE(S)/PL/145/88-89 DT 30.12.1988
638
699
KENCHENAHALLI H.B.C.S.
60' X 40'
S.VIJAYA LAKSHMI
BDA/EE(S)/PL/183/88-89 DT 24.02.1989
639
1021
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
40' X 60'
B.N.SADANANDA
BDA/EE(S)/PL/193/88-89 DT 13.03.1989
640
856
KENCHENAHALLI H.B.C.S.
51 X 46'
ANJU S IDANI
BDA/EE(S)/PL/132/88-89 DT 13.12.1988
641
48/B
B.S.K. III STAGE, II PHASE, IV BLOCK
40' X 60'
MUKUNDA NAIK
BDA/EE(S)/PL/22/88-89 DT 13.05.1988
642
478
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
40' X 60'
JAYAPRAKASH S.
BDA/EE(S)/PL/179/88-89 DT 13.02.1989
643
581
SARAKKI VI PHASE
40' X 60'
PRABHAVATHI S RAO
BDA/EE(S)/PL/7/88-89 DT 24.01.1989
644
2002
SARAKKI II PHASE
40' X 60'
INBAVELU
BDA/EE(S)/PL/41/88-89 DT 16.12.1988
645
731
KENCHENAHALLI H.B.C.S.
54' X 37'
R.SRINIVASA RAO
BDA/EE(S)/PL/63/88-89 DT 06.08.1988
646
2548
KUMARA SWAMY LAYOUT II STAGE
61' X 40'
K.T.VENKATESH
BDA/EE(S)/PL/20/88-89 DT 19.01.1989
647
1730
KUMARA SWAMY LAYOUT II STAGE
40' X 62'
N.K.NARAYAN
BDA/EE(S)/PL/21/88-89 DT 04.02.1989
648
33
ANJANEYA SWAMY H.B.C.S., B.S.K. III STAGE
36' X 61'
K.S.NAVANEETHA
BDA/EE(S)/PL/140/88-89 DT 23.12.1988
649
792
KENCHENAHALLI H.B.C.S.
62' X 40'
T.SHARADA
BDA/EE(S)/PL/156/88-89 DT 11.01.1989
650
2537
KUMARA SWAMY LAYOUT II STAGE
40' X 61'
K.JAYALAKSHMI
BDA/EE(S)/PL/25/88-89 DT 27.02.1989
651
510
B.S.K. III STAGE, III PHASE, III BLOCK
40' X 60'
S.V.MURULIDHAR
BDA/EE(S)/PL/31/88-89 DT 15.06.1988
652
17
ITI H.B.C.S., KATHARIGUPPA
40' X 60'
C.N.SRINIVASA MURTHY
BDA/EE(S)/PL/138/88-89 DT 21.12.1988
653
285
MICO SKGNS ARAKERE
50' X 40'
G.S.VISHNU MURTHY
BDA/EE(S)/PL/182/88-89 DT 24.02.1989
654
41
ITI H.B.C.S., KATHARIGUPPA
40' X 59'
G.YOGANANDSIMHA
BDA/EE(S)/PL/39/88-89 DT 17.06.1988
655
410
SARAKKI II PHASE
58' X 45'
K.MYTHILI RAJAGOPAL
BDA/EE(S)/PL/63/88-89 DT 22.02.1989
656
1678
SARAKKI II PHASE
40' X 60'
T.BHEEMAPPA
BDA/EE(S)/PL/20/88-89 DT 18.07.1988
657
739
KENCHENAHALLI H.B.C.S.
62' X 38'
SUDHA SOMASHEKAR
BDA/EE(S)/PL/58/88-89 DT 20.07.1988
658
264
KSRTC H.B.C.S., SARAKKI III PHASE
40' X 60'
S.NAGARAJA
BDA/EE(S)/PL/175/88-89 DT 06.02.1989
659
122
MAMTHA H.B.C.S., TAVAREKERE
20.11 X 12.19
ANURADHA PADMANABHAM
BDA/EE(S)/PL/106/88-89 DT 29.10.1988
660
235
B.S.K. III STAGE, III PHASE, II BLOCK
40' X 60'
A.M.GANAPATHY
BDA/EE(S)/PL/40/88-89 DT 20.07.1988
661
14
VISWABHARATHI H.B.C.S., GIRINAGAR
56' X 40'
I.R.PRAKASH & I.R.N.PRASAD
BDA/EE(S)/PL/52/88-89 DT 12.07.1988
662
579
B.S.K. III STAGE, KATHARIGUPPE SY NOS
40' X 60'
C.L.RAMA SANJEEVA
BDA/EE(S)/PL/91/88-89 DT 15.12.1988
663
134
VISWABHARATHI H.B.C.S., GIRINAGAR
37' X 62'
M.R.VIJAYA GOPALA DAS
BDA/EE(S)/PL/91/88-89 DT 23.09.1988
664
673
B.T.M. II STAGE, I PHASE
40' X 60'
G.RAMACHANDRA
BDA/EE(S)/PL/24/88-89 DT 22.11.1988
KENCHENAHALLI H.B.C.S.
61' X 50'
K.S.INDIRA
BDA/EE(S)/PL/38/88-89 DT 17.06.1988
665
473/A
666
675
B.T.M. II STAGE, I PHASE
40' X 60'
N.SRINIVASALU
BDA/EE(S)/PL/12/88-89 DT 08.07.1988
667
313
B.S.K. III STAGE, II PHASE, VI BLOCK
40' X 57'
K.S.CHINNAPPA
BDA/EE(S)/PL/74/88-89 DT 17.11.1988
668
37
SRI ANJANEYA SWAMY H.B.C.S., ITTAMADU VILLAGE
60' X 36'
A.ANANTHANARASIMHA CHAR
BDA/EE(S)/PL/110/88-89 DT 07.11.1988
669
1412
SARAKKI I PHASE
40' X 60'
N.RAJAGOPAL
BDA/EE(S)/PL/11/88-89 DT 22.11.1988
670
1
KSRTC H.B.C.S. SARAKKI
45' X 50'
H.N.NANJAPPA
BDA/EE(S)/PL/109/88-89 DT 07.11.1988
671
672
B.S.K. III STAGE, II PHASE, VII BLOCK
40' X 60'
SRI.K.CHANNAPPA
BDA/EE(S)/PL/72/88-89 DT 11.11.1988
672
288
SARAKKI II PHASE
45' X 61'
N.V.SRINIVASAN
BDA/EE(S)/PL/41/88-89 DT 11.11.1988
673
99
B.S.K. III STAGE, III PHASE, V BLOCK
61' X 39'
G.SRINIVASA
BDA/EE(S)/PL/56/88-89 DT 23.09.1988
674
28
N.S.PALYA MICO H.B.C.S.
40' X 60'
S.PURANDARA DAS
BDA/EE(S)/PL/111/88-89 DT 07.11.1988
675
15
MARUTHI H.B.C.S.
40' X 60'
N.BHEEMA RAO
BDA/EE(S)/PL/55/88-89 DT 18.07.1988
676
656
SARAKKI II PHASE
45' X 61'
P.N.SRIVATSA
BDA/EE(S)/PL/39/88-89 DT 07.11.1988
677
291
60' X 40'
ANIL KUMAR
BDA/EE(S)/PL/65/88-89 DT 15.10.1988
678
54
B.S.K. III STAGE, CHANAMANAKERE ACHUKATU
LAYOUT
B.S.K. III STAGE, III PHASE, VI BLOCK
40' X 60'
A.V.VARADARAJAN
BDA/EE(S)/PL/70/88-89 DT 29.10.1988
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
40' X 60'
P.R.PRATAP
BDA/EE(S)/PL/116/88-89 DT 11.11.1988
SARAKKI I PHASE
45' X 60'
N.V.SHANKAR
BDA/EE(S)/PL/2/88-89 DT 18.07.1988
679
191/C
680
73
681
421
B.S.K. III STAGE, II PHASE, VI BLOCK
40' X 60'
S.C.RAJANNA
BDA/EE(S)/PL/42/88-89 DT 22.07.1988
682
431
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
40' X 60'
G.R.ANANTHARAMA
BDA/EE(S)/PL/147/88-89 DT 03.01.1989
683
92
SARAKKI II PHASE
40' X 62'
S.N.PADMARAJ
BDA/EE(S)/PL/12/88-89 DT 25.05.1988
684
52
B.S.K. III STAGE, III PHASE, VI BLOCK
60' X 40'
M.SREEKANTA SWAMY
BDA/EE(S)/PL/47/88-89 DT 12.08.1988
685
511
B.S.K. III STAGE, II PHASE, VI BLOCK
40' X 61'
S.N.VIJAYA LAKSHMI
BDA/EE(S)/PL/59/88-89 DT 26.09.1988
686
3587
KUMARA SWAMY LAYOUT II STAGE
40' X 60'
V.MURULIGOPAL
BDA/EE(S)/PL/22/88-89 DT 08.02.1989
687
696
KENCHENAHALLI H.B.C.S.
60' X 59'
N.S.KRISHNA IYANGAR
BDA/EE(S)/PL/61/88-89 DT 01.08.1988
688
61
POORNA PRAJAN H.B.C.S., KATHARIGUPPA
59' X 40'
VIJAYA LAXMI
BDA/EE(S)/PL/19/88-89 DT 26.04.1988
689
80
SARAKKI II PHASE
40' X 61'
S.BALASUBRAMANYAN
BDA/EE(S)/PL/13/88-89 DT 06.06.1988
690
65
JAYANAGAR H.B.C.S., KADIRENAHALLI
40' X 60'
K.V.NARAYANA SWAMY
BDA/EE(S)/PL/20/88-89 DT 26.04.1988
691
668
KENCHENAHALLI H.B.C.S.
37' X 60'
H.R.MADHAVA RAO
BDA/EE(S)/PL/33/88-89 DT 13.06.1988
692
478
SARAKKI II PHASE
65' X 45'
V.VARADE GOWDA
BDA/EE(S)/PL/38/88-89 DT 29.10.1988
693
299
60' X 40'
C.SUBRAMANIAN
BDA/EE(S)/PL/71/88-89 DT 29.10.1988
694
794
B.S.K. III STAGE, CHANAMANAKERE ACHUKATU
LAYOUT
KENCHENAHALLI H.B.C.S.
54' X 40'
P.LEELAVATHI
BDA/EE(S)/PL/168/88-89 DT 24.01.1989
695
233
B.S.K. III STAGE, III PHASE, II BLOCK
40' X 60'
B.C.SUDHAMA
BDA/EE(S)/PL/97/88-89 DT 11.01.1989
696
28
MICO SKGNS ARAKERE
40' X 60'
S.PURANDARA DAS
BDA/EE(S)/PL/43/88-89 DT 25.06.1988
697
790
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
40' X 60'
G.S.SATYA PRAKASH
BDA/EE(S)/PL/115/88-89 DT 11.11.1988
698
291
JAYANAGAR H.B.C.S., KADIRENAHALLI
61' X 35'
SHAHEW AKBAR
BDA/EE(S)/PL/165/88-89 DT 21.01.1989
KENCHENAHALLI H.B.C.S.
64' X 45'
LAKSHMI C BALAKI
BDA/EE(S)/PL/47/88-89 DT 08.07.1988
B.T.M. II STAGE, I PHASE
40' X 60'
L.MUNASWAMY NAIDU
BDA/EE(S)/PL/34/88-89 DT 24.01.1989
699
324/B
700
1228
701
717
SARAKKI II PHASE
40' X 60'
R.SRIDHAR
BDA/EE(S)/PL/40/88-89 DT 11.11.1988
702
696
KEMPEGOWDA H.B.C.S., KATHRIGUPPA
40' X 60'
L.S.VIJAYA KUMAR
BDA/EE(S)/PL/45/88-89 DT 30.06.1988
703
184
VISWABHARATHI H.B.C.S., GIRINAGAR
40' X 60'
H.V.KRISHNAMURTHY
BDA/EE(S)/PL/119/88-89 DT 22.11.1988
704
1797
KMRSL II STAGE
40' X 60'
K.JAYADEVA
BDA/EE(S)/PL/17/88-89 DT 22.11.1988
705
28
PAPAS COLLEGE KANANAKAPURA ROAD
65' X 40'
K.S.SHESHADRI
BDA/EE(S)/PL/54/88-89 DT 18.07.1988
IDEAL HOMES H.B.C.S
56' X 45'
H.C.RAJASHEKARAIAH
BDA/EE(S)/PL/34/88-89 DT 13.06.1988
706
344/D
707
1088
B.T.M. I STAGE, I PHASE
40' X 60'
L.BHAKTA PRASAD
BDA/EE(S)/PL/11/88-89 DT 22.06.1988
708
351
N.S.PALYA MICO H.B.C.S.
40' X 60'
RAMA KRISHNA RAJU
BDA/EE(S)/PL/23/88-89 DT 07.05.1988
709
193
B.S.K. III STAGE, KATHARIGUPPE SY NOS
54' X 39'
K.RAJARAM
BDA/EE(S)/PL/93/88-89 DT 20.12.1988
710
675
SARAKKI II PHASE
45' X 76'
T.S.ANANTHA PADMANABHA SETTY
BDA/EE(S)/PL/14/88-89 DT 08.06.1988
711
53/41
JAYANAGAR H.B.C.S., KADIRENAHALLI
40' X 60'
PRAVEEN C NAVALLI
BDA/EE(S)/PL/192/88-89 DT 10.03.1989
712
291/A
KENCHENAHALLI H.B.C.S.
57' X 50'
K.S.RAMA RAO
BDA/EE(S)/PL/99/88-89 DT 03.10.1988
713
20
KSRTC H.B.C.S., SARAKKI III PHASE
37' X 60'
T.G.RAJAN
BDA/EE(S)/PL/32/88-89 DT 08.06.1988
714
52
B.S.K. III STAGE, III PHASE, I BLOCK
40' X 65'
R.V.SRINIVASA MURTHY
BDA/EE(S)/PL/89/88-89 DT 14.12.1988
715
183
B.S.K. III STAGE, AVALAHALLY
40' X 60'
K.S.VEERENDRA KUMAR
BDA/EE(S)/PL/62/88-89 DT 03.10.1988
716
390
B.S.K. III STAGE, II PHASE, VI BLOCK
40' X 60'
DR.S.B.CHANNAPPA
BDA/EE(S)/PL/90/88-89 DT 14.12.1988
717
437
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
40' X 60'
V.SUBRAMANYAM
BDA/EE(S)/PL/160/88-89 DT 16.01.1989
718
1182
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
39' X 60'
P.S.PRABHAKAR
BDA/EE(S)/PL/100/88-89 DT 04.10.1988
719
166
B.O.O. H.B.C.S. MADIWALA
40' X 60'
VICE CHAIRMAN
BDA/EE(S)/PL/101/88-89 DT 13.10.1988
720
525
B.S.K. III STAGE, II PHASE, VI BLOCK
45' X 65'
H.N.N.MURTHY
BDA/EE(S)/PL/60/88-89 DT 26.09.1988
721
386
B.S.K. III STAGE, III PHASE, V BLOCK
40' X 60'
P.ARUMUGAM
BDA/EE(S)/PL/92/88-89 DT 16.12.1988
SARAKKI II PHASE
40' X 60'
B.T.GUNDU RAO
BDA/EE(S)/PL/34/88-89 DT 13.10.1988
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
40' X 60'
L.R.BHAJARAJ
BDA/EE(S)/PL/97/88-89 DT 03.10.1988
KALIDASA LABOURES H.B.C.S., GAVIPURA
60' X 40'
S.M.RAMAPPA
BDA/EE(S)/PL/103/88-89 DT 21.10.1988
SARAKKI I PHASE
40' X 60'
M.MAHADEVAIAH
BDA/EE(S)/PL/8/88-89 DT 23.09.1988
POORNA PRAGNA H.B.C.S., KATHARIGUPPA
54' X 37'
S.N.PRAHLADA RAO
BDA/EE(S)/PL/166/88-89 DT 24.01.1989
TAVAREKERE SY NOS
40' X 60'
T.P.VIJAYA
BDA/EE(S)/PL/39/88-89 DT 21.02.1989
N.S.PALYA MICO H.B.C.S.
40' X 60'
M.DAYANANDA RAO
BDA/EE(S)/PL/189/88-89 DT 04.03.1989
722
1534/B
723
1018
724
8
725
1419
726
76
727
1007
728
458
729
242
N.S.PALYA MICO H.B.C.S.
60' X 40'
P.S.HARIHARAN
BDA/EE(S)/PL/133/88-89 DT 14.12.1988
730
1402
SARAKKI I PHASE
40' X 70'
RAJANNA
BDA/EE(S)/PL/13/88-89 DT 23.12.1988
731
2523
KUMARA SWAMY LAYOUT II STAGE
60' X 40'
A.S.MURTHY & SHOBHA MURTHY
BDA/EE(S)/PL/8/88-89 DT 25.06.1988
732
697
KEMPEGOWDA H.B.C.S., KATHRIGUPPA
40' X 60'
B.UMADEVI
BDA/EE(S)/PL/174/88-89 DT 06.02.1989
733
11
SIDDAVINAYAKA H.B.C.S.
40' X 60'
K.S.SRINATH
BDA/EE(S)/PL/5/88-89 DT 04.04.1988
734
580
KEMPEGOWDA H.B.C.S., KATHRIGUPPA
40' X 60'
K.RAMANNA
BDA/EE(S)/PL/50/88-89 DT 12.07.1988
735
24
SARAKKI I PHASE
18.29 X 13.72
H.DINESH NAYAK
BDA/EE(S)/PL/9/88-89 DT 27.10.1988
736
390
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
60' X 40'
C.PRABHUDEVA
BDA/EE(S)/PL/114/88-89 DT 11.11.1988
737
65
N.S.PALYA B.T.M. LAYOUT
40' X 60'
M.L.GURURAJA RAO
BDA/EE(S)/PL/22/88-89 DT 07.11.1988
B.S.K. III STAGE, NAGENDRA BLOCK
50' X 49'
H.S.VENKATARAMU
BDA/EE(S)/PL/107/88-89 DT 01.03.1989
B.T.M. I STAGE, I PHASE
40' X 60'
G.VAIDYANATHAN
BDA/EE(S)/PL/9/88-89 DT 01.06.1988
SARAKKI I PHASE
40' X 70'
K.A.PURANIK
BDA/EE(S)/PL/10/88-89 DT 17.11.1988
JAYANAGAR H.B.C.S., KADIRENAHALLI
40' X 60'
C.D.VIJAYA KUMARI
BDA/EE(S)/PL/11/88-89 DT 08.07.1988
SARAKKI II PHASE
40' X 60'
C.RAMAIAH
BDA/EE(S)/PL/61/88-89 DT 04.02.1989
SRINIVASA NAGAR II PHASE, B.S.K. III STAGE
65' X 31'
VENKATAMMA
BDA/EE(S)/PL/68/88-89 DT 29.10.1988
738
317 &
318
739
78
740
1406
741
64/41
742
1276
743
13
744
593
SARAKKI VI PHASE
40' X 60'
USHA VAJAPEYI
BDA/EE(S)/PL/324/88-89 DT 02.02.1989
745
1584
SARAKKI II PHASE
40' X 60'
K.VAGESH
BDA/EE(S)/PL/21/88-89 DT 01.08.1988
746
2607
KUMARA SWAMY LAYOUT II STAGE
40' X 60'
T.M.GOPALAKRISHNA
BDA/EE(S)/PL/24/88-89 DT 10.02.1989
747
581
N.S.PALYA MICO H.B.C.S.
39' X 60'
P.RAMASWAMY
BDA/EE(S)/PL/28/88-89 DT 01.06.1988
748
577
SARAKKI I PHASE
40' X 60'
H.S.VISWANTHA RAO
BDA/EE(S)/PL/55/88-89 DT 24.01.1989
749
17
IDEAL HOMES H.B.C.S., KENCHENAHALLI
62' X 41'
N.K.UMAKANTH
BDA/EE(S)/PL/57/88-89 DT 20.07.1988
750
63
SARAKKI II PHASE
45' X 60'
M.D.MAHADEV
BDA/EE(S)/PL/42/88-89 DT 11.11.1988
751
879
N.S.PALYA SY NOS
53' X 63'
S.N.SAVITHRI
BDA/EE(S)/PL/46/88-89 DT 30.03.1989
752
675
B.T.M. II STAGE, I PHASE
40' X 60'
N.SRINIVASALU
BDA/EE(S)/PL/26/88-89 DT 28.11.1988
753
41
JAYANAGAR H.B.C.S., KADIRENAHALLI
70' X 36'
MUNIR AHAMED
BDA/EE(S)/PL/190/88-89 DT 09.03.1989
754
2561
KUMARA SWAMY LAYOUT II STAGE
40' X 60'
A.S.RAMAKRISHNA RAO
BDA/EE(S)/PL/12/88-89 DT 01.08.1988
755
588
SARAKKI VI PHASE
40' X 60'
A.K.S.RAO
BDA/EE(S)/PL/1/88-89 DT 09.06.1988
756
524
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
39' X 60'
S.G.PRAKASH RAO
BDA/EE(S)/PL/67/88-89 DT 16.08.1988
757
1804
KUMARA SWAMY LAYOUT II STAGE
40' X 60'
B.R.SATISH CHANDRA
BDA/EE(S)/PL/9/88-89 DT 05.07.1988
758
538
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
40' X 60'
B.S.SATHYANARAYANA
BDA/EE(S)/PL/44/88-89 DT 30.06.1988
759
179
B.S.K. III STAGE, AVALAHALLY
40' X 60'
S.SWAMINATHAN
BDA/EE(S)/PL/83/88-89 DT 01.12.1988
760
717
SARAKKI VI PHASE
40' X 60'
K.R.LAKSHMIKANTAN
BDA/EE(S)/PL/5/88-89 DT 06.12.1988
761
383
B.S.K. III STAGE, II PHASE, VI BLOCK
40' X 59'
B.S.SATHYANARAYANA
BDA/EE(S)/PL/24/88-89 DT 13.05.1988
762
487
MICO H.B.C.S.
41' X 60'
B.N.BHAGAVAN
BDA/EE(S)/PL/40/88-89 DT 20.06.1988
763
1868
KUMARA SWAMY LAYOUT II STAGE
58' X 40'
D.NARASIMHAN
BDA/EE(S)/PL/6/88-89 DT 15.06.1988
JAYANAGARA H.B.C.S., PADMANABHA NAGAR
55' X 40'
K.RAMADEVI
BDA/EE(S)/PL/96/88-89 DT 03.10.1988
VISWABHARATHI H.B.C.S., GIRINAGAR
40' X 61'
S.N.SHYALAJA
BDA/EE(S)/PL/25/88-89 DT 24.05.1988
JAYANAGARA H.B.C.S., PADMANABHA NAGAR
45' X 70'
INDIRA SHIVASWAMY
BDA/EE(S)/PL/134/88-89 DT 14.12.1988
764
765
252 &
253
12/D
766
27
767
455
B.S.K. III STAGE, II PHASE, VI BLOCK
40' X 60'
N.S.NATARAJ
BDA/EE(S)/PL/105/88-89 DT 20.02.1989
768
132
SARAKKI II PHASE
45' X 70'
C.A.SHAMA SUNDAR
BDA/EE(S)/PL/46/88-89 DT 14.12.1988
769
77
B.S.K. III STAGE, III PHASE, VI BLOCK
39' X 60'
K.RAMAKRISHNA
BDA/EE(S)/PL/85/88-89 DT 06.12.1988
SARAKKI II PHASE
79' X 40'
S.RACHAIAH
BDA/EE(S)/PL/49/88-89 DT 26.12.1988
770
1316/F
771
253
SARAKKI V PHASE
62' X 61'
B.K.PUTTA SWAMY
BDA/EE(S)/PL/1/88-89 DT 03.10.1988
772
505
B.S.K. III STAGE, III PHASE, II BLOCK
40' X 60'
H.R.SATYANARAYANA
BDA/EE(S)/PL/94/88-89 DT 10.01.1989
773
770
IDEAL HOMES H.B.C.S., KENCHENAHALLI
61' X 37'
M.BADARIPRASAD
BDA/EE(S)/PL/186/88-89 DT 28.02.1989
774
180
IDEAL HOMES H.B.C.S., KENCHENAHALLI
58' X 35'
MAJAR D JAYARAMAIAH
BDA/EE(S)/PL/191/88-89 DT 09.03.1989
775
167
K.E.B. H.B.C.S., B.G. ROAD
43' X 66'
P.SHANTHARAJ
BDA/EE(S)/PL/107/88-89 DT 29.10.1988
776
48
B.T.M. II STAGE, I PHASE
40' X 60'
G.P.KRISHNAPPA
BDA/EE(S)/PL/21/88-89 DT 29.10.1988
777
166
K.E.B. H.B.C.S., B.G. ROAD
41' X 53'
PADMA RAJANNA
BDA/EE(S)/PL/118/88-89 DT 18.11.1988
778
408
B.S.K. III STAGE, III PHASE, II BLOCK
40' X 60'
N.SOMA SHEKAR
BDA/EE(S)/PL/41/88-89 DT 22.07.1988
779
682
IDEAL HOMES H.B.C.S., KENCHENAHALLI
60' X 37'
JOHIR MARKARENAS
BDA/EE(S)/PL/108/88-89 DT 29.10.1988
780
577
B.S.K. III STAGE, KATHARIGUPPE SY NOS
40' X 62'
M.SHANTHAMMA
BDA/EE(S)/PL/75/88-89 DT 17.11.1988
781
1111
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
60' X 39'
A.NARAYANA SWAMY
BDA/EE(S)/PL/104/88-89 DT 27.10.1988
782
174
MICO SKGNS ARAKERE
40' X 65'
A.P.RAO
BDA/EE(S)/PL/46/88-89 DT 04.07.1988
783
251
SARAKKI V PHASE
40' X 60'
K.R.KESHAVA IYENGAR
BDA/EE(S)/PL/4/88-89 DT 09.03.1989
784
76
B.E.M.L. H.B.C.S.
40' X 60'
P.VENUGOPAL
BDA/EE(S)/PL/36/88-89 DT 15.06.1988
785
680
B.T.M. II STAGE, I PHASE
60' X 40'
M.S.HARISH
BDA/EE(S)/PL/40/88-89 DT 28.02.1989
786
497
SARAKKI II PHASE
40' X 60'
H.D.MARISWAMY
BDA/EE(S)/PL/59/88-89 DT 01.02.1989
787
5
B.S.K. III STAGE, II PHASE, IV BLOCK
60' X 40'
K.S.NAGARAJA RAO
BDA/EE(S)/PL/64/88-89 DT 14.10.1988
788
1
VISWABHARATHI H.B.C.S., GIRINAGAR
40' X 60'
INDIRA MURALI
BDA/EE(S)/PL/35/88-89 DT 15.06.1988
789
1114
TAVAREKERE SY NOS
39' X 62'
V.V.SUBRAMANYAM
BDA/EE(S)/PL/6/88-89 DT 02.05.1988
790
131
SARAKKI II PHASE
13.11 X 21.64
K.M.MOGUL
BDA/EE(S)/PL/58/88-89 DT 30.01.1989
791
1109
TAVAREKERE SY NOS
40' X 64'
V.SHARATH KUMAR
BDA/EE(S)/PL/18/88-89 DT 13.10.1988
792
877
SRINIVASA NAGAR II PHASE, B.S.K. III STAGE
42' X 71'
B.SHANKARA
BDA/EE(S)/PL/17/88-89 DT 03.05.1988
793
367
IDEAL HOMES H.B.C.S., KENCHENAHALLI
40' X 57'
M.S.ANANDA RAO
BDA/EE(S)/PL/149/88-89 DT 03.01.1989
794
1
KAS OFFICERS H.B.C.S. SARAKKI
40' X 60'
B.V.KULKARNI
BDA/EE(S)/PL/137/88-89 DT 21.12.1988
795
47/B
B.S.K. III STAGE, II PHASE, IV BLOCK
40' X 60'
M.C.LATHA SARATHY
BDA/EE(S)/PL/63/88-89 DT 13.10.1988
B.T.M. I STAGE, I PHASE
40' X 60'
L.BHAKTA PRASAD
BDA/EE(S)/PL/37/88-89 DT 10.02.1989
796
1088
797
103
SRI.ANJANEYA SWAMY H.B.C.S., ITTMADU
47' X 42'
C.V.SATYANARAYANA RAO
BDA/EE(S)/PL/171/88-89 DT 30.01.1989
798
560
SARAKKI II PHASE
40' X 60'
D.MADAIAH
BDA/EE(S)/PL/22/88-89 DT 10.08.1988
799
439
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
40' X 60'
B.S.BODIGER
BDA/EE(S)/PL/157/88-89 DT 13.01.1989
800
75
B.S.K. III STAGE, III PHASE, VI BLOCK
61' X 40'
G.SUDHAKARA
BDA/EE(S)/PL/98/88-89 DT 16.01.1989
801
773
IDEAL HOMES H.B.C.S., KENCHENAHALLI
45' X 51'
P.VENKATESH
BDA/EE(S)/PL/180/88-89 DT 16.02.1989
802
64
RAMA RAO LAYOUT
40' X 60'
R.P.S.RAO
BDA/EE(S)/PL/64/88-89 DT 06.08.1988
803
17
NIMHAN'S H.B.C.S. TAVAREKERE
40' X 60'
D.SUKUMARI AMMA
BDA/EE(S)/PL/102/88-89 DT 17.10.1988
804
248
KSRTC H.B.C.S., SARAKKI III PHASE
60' X 26'
B.KESHAVA MURTHY
BDA/EE(S)/PL/148/88-89 DT 03.01.1989
805
573
B.S.K. III STAGE, III PHASE, III BLOCK
40' X 60'
N.ACHUTHARAJU
BDA/EE(S)/PL/87/88-89 DT 06.12.1988
806
13
N.S.PALYA SY NOS
40' X 60'
M.S.SURESH
BDA/EE(S)/PL/38/88-89 DT 16.02.1989
807
767
SARAKKI I PHASE
43' X 60'
C.SRIKANTA SHARMA
BDA/EE(S)/PL/14/88-89 DT 13.02.1989
808
137
B.S.K. III STAGE, III PHASE, I BLOCK
40' X 60'
A.K.PRABHAKARA & SUCHITA
BDA/EE(S)/PL/95/88-89 DT 11.01.1989
809
607
SARAKKI II PHASE
40' X 68'
PUTTADASEGOWDA
BDA/EE(S)/PL/51/88-89 DT 03.01.1989
810
149
IDEAL HOMES H.B.C.S., KENCHENAHALLI
56' X 43'
C.RAMACHANDRA
BDA/EE(S)/PL/169/88-89 DT 24.01.1989
811
456
SARAKKI II PHASE
45' X 65'
N.SRINIVASAN
BDA/EE(S)/PL/54/88-89 DT 20.01.1989
812
697
B.T.M. II STAGE, I PHASE
40' X 60'
H.RAJANNA
BDA/EE(S)/PL/31/88-89 DT 11.01.1989
813
409
SARAKKI II PHASE
44' X 59'
V.KUMAR
BDA/EE(S)/PL/53/88-89 DT 18.01.1989
814
601-D
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
40' X 60'
K.N.SRINIVASAIAH
BDA/EE(S)/PL/154/88-89 DT 07.01.1989
815
44 & 45
B.S.K. III STAGE, NAGENDRA BLOCK
45' X 50'
VENKATE GOWDA
BDA/EE(S)/PL/106/88-89 DT 24.02.1989
SARAKKI VI PHASE
40' X 60'
SHEELA KRISHNA
BDA/EE(S)/PL/6/88-89 DT 23.12.1988
816
21
817
782
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
40' X 60'
R.KUMARASWAMY MODALIAR
BDA/EE(S)/PL/152/88-89 FY 05.01.1989
818
4
B.S.K. III STAGE, II PHASE, IV BLOCK
40' X 60'
N.S.RAGHAVENDRA RAO
BDA/EE(S)/PL/12/88-89 DT 26.04.1988
819
821
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
40' X 60'
C.LARADU SWAMY
BDA/EE(S)/PL/161/88-89 DT 18.01.1989
820
821
236 &
237
503
SARAKKI I PHASE
40' X 59'
K.H.MOHAN
BDA/EE(S)/PL/1/88-89 DT 06.06.1988
B.S.K. III STAGE, III PHASE, II BLOCK
40' X 60'
L.CHANDRA MURTHY
BDA/EE(S)/PL/20/88-89 DT 13.05.1988
822
887
SARAKKI II PHASE
43' X 70'
SUCHITRA SAMPATH
BDA/EE(S)/PL/11/88-89 DT 24.05.1988
823
199
IDEAL HOMES H.B.C.S., KENCHENAHALLI
55' X 41'
G.T.KRISHNA MURTHY
BDA/EE(S)/PL/144/88-89 DT 30.12.1988
824
22
R.K. H.B.C.S., KADIRENAHALLI SY NOS
40' X 70'
K.V.USHA
BDA/EE(S)/PL/146/88-89 DT 03.01.1989
825
161
N.S.PALYA MICO H.B.C.S.
40' X 60'
H.S.CHANDRA MOHAN
BDA/EE(S)/PL/167/88-89 DT 24.01.1989
826
85
SRI.RADHAKRISHNA H.B.C.S., KADIRENAHALLI
70' X 32'
B.N.JAYA GOWRI
BDA/EE(S)/PL/151/88-89 DT 05.01.1989
827
51
B.T.M. III STAGE, I PHASE
40' X 60'
GURURAJA RAO
BDA/EE(S)/PL/8/88-89 DT 19.05.1988
828
18
KALIDASA LABOURES H.B.C.S., SRINAGARA
40' X 60'
G.LAKSHMIPATHY
BDA/EE(S)/PL/150/88-89 DT 03.01.1989
829
351
B.S.K. III STAGE, VIDYAPEETA
40' X 60'
M.N.SATHYA KUMAR
BDA/EE(S)/PL/15/88-89 DT 26.04.1988
830
775
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
55' X 60'
K.V.RAMA KRISHNA RAO
BDA/EE(S)/PL/131/88-89 DT 06.12.1988
831
130
B.S.K. III STAGE, II PHASE, IV BLOCK
40' X 59'
NEELA J.D. SOUZA
BDA/EE(S)/PL/28/88-89 DT 01.06.1988
832
184
B.S.K. III STAGE, II PHASE, KATHRUGUPPE
57' X 38'
B.A.RANGA SWAMY
BDA/EE(S)/PL/18/88-89 DT 05.05.1988
833
B.S.K. III STAGE, II PHASE
43' X 60'
T.DAKSHINA MURTHY
BDA/EE(S)/PL/2/88-89 DT 02.04.1988
834
274 &
275
236
B.S.K. III STAGE, II PHASE, VI BLOCK
60' X 40'
K.NAGARAJA
BDA/EE(S)/PL/13/88-89 DT 26.04.1988
835
69
JAYANAGAR H.B.C.S., KADIRENAHALLI
68' X 30'
RASHEEDA BEGUM
BDA/EE(S)/PL/130/88-89 DTG 06.12.1988
836
620
SARAKKI II PHASE
44' X 63'
V.S.AITHAL
BDA/EE(S)/PL/35/88-89 DT 13.10.1988
B.S.K. III STAGE, III PHASE, III BLOCK
40' X 60'
N.BRAHMADEVAIAH
BDA/EE(S)/PL/23/88-89 DT 13.05.1988
B.S.K. II STAGE, III PHASE, VI BLOCK
60' X 40'
G.SUDHAKARA
BDA/EE(S)/PL/3/88-89 DT 04.04.1988
837
838
571/A
75
839
235
N.S.PALYA MICO H.B.C.S.
40' X 60'
SHYAMALA S GINI
BDA/EE(S)/PL/26/88-89 DT 31.05.1988
840
445
N.S.PALYA MICO H.B.C.S.
60' X 46'
SUMITRA G PRABHU
BDA/EE(S)/PL/22/88-89 DT 02.05.1988
VISWABHARATHI H.B.C.S., GIRINAGAR
60' X 40'
K.SANJEEVA RAO
BDA/EE(S)/PL/31/88-89 DT 08.06.1988
MARUTHI H.B.C.S., TAVAREKERE
46' X 60'
H.SATHYANARAYANA
BDA/EE(S)/PL/21/88-89 DT 02.05.1988
KUMARA SWAMY LAYOUT II STAGE
59' X 39'
P.VEERAI GOWDA
BDA/EE(S)/PL/2/88-89 DT 26.04.1988
SARAKKI I PHASE
45' X 60'
ANNAIAH
BDA/EE(S)/PL/15/88-89 DT 04.03.1989
KUMARA SWAMY LAYOUT II STAGE
18.50 X 12.20
P.C.CHATTERJEE
BDA/EE(S)/PL/ /88-89 DT 27.08.1988
B.S.K. III STAGE, III PHASE, VI BLOCK
78' X 50'
B.PANDARINATHA RAO
BDA/EE(S)/PL/46/88-89 DT 06.08.1988
N.S.PALYA MICO H.B.C.S.
40' X 60'
S.SREEKANTESWARA
BDA/EE(S)/PL/14/88-89 DT 30.07.1988
B.S.K. III STAGE, III PHASE, IV BLOCK
40' X 60'
C.S.NITYANANDA
BDA/EE(S)/PL/32/88-89 DT 15.06.1988
841
12/E
842
16
843
2556
844
620
845
2409
846
8
847
56
848
320
849
650/B
IDEAL HOMES H.B.C.S., KENCHENAHALLI
50' X 70'
M.RAMACHANDRA
BDA/EE(S)/PL/1/88-89 DT 04.04.1988
850
C.A.-27
JAYANAGAR IV BLOCK
45' X 60'
SECRETORY
BDA/EE(S)/PL/226/88-89 DT 11.11.1988
851
574
SARAKKI II PHASE
40' X 60'
SUMITRA
BDA/EE(S)/PL/44/88-89 DT 02.12.1988
852
613
SARAKKI II PHASE
45' X 61'
G.SAMPATHIKUMARI
BDA/EE(S)/PL/8/88-89 DT 16.04.1988
853
JAYANAGARA H.B.C.S., PADMANABHA NAGAR
42' X 57'
D.L.VISWANATHA
BDA/EE(S)/PL/122/88-89 DT 28.11.1988
854
248 &
149
1270
SARAKKI II PHASE
40' X 60'
VENKATARAJU
BDA/EE(S)/PL/1/88-89 DT 04.04.1988
855
547
B.S.K. III STAGE, II PHASE, VI BLOCK
59' X 40'
A.S.JAYADEVA
BDA/EE(S)/PL/33/88-89 DT 17.06.1988
856
155
N.S.PALYA MICO H.B.C.S.
40' X 60'
V.BALA KRISHNA
BDA/EE(S)/PL/164/88-89 DT 19.01.1989
857
8
S.B.I. COLONY , J.P.NAGAR I PHASE
45' X 60'
M.V.SHANKAR
BDA/EE(S)/PL/73/88-89 DT 29.08.1988
858
766
SARAKKI I PHASE
43' X 60'
A.S.VISHNU BHARATH
BDA/EE(S)/PL/16/88-89 DT 03.02.1988
859
499
SARAKKI II PHASE
40' X 62'
N.AMITKUMAR
BDA/EE(S)/PL/9/88-89 DT 19.05.1988
Cataloguing and indexing of records as envisaged under section 4(1) (a) of the Right to information Act 2005
LIST OF PLAN SANCTIONED FILES DURING THE YEAR 89-90 IN EE(S) DIVISION
SL
NO.
860
NAME OF THE LAYOUT
DIMENSION
APPLICANT NAME
SANCTION EE NO/DATE
79
SARAKKI II PHASE
40' x 61'
M.K.GOPALAKRISHNA
BDA/EE(S)/PL/69/89-90 DT 05.04.1989
861
37
KENCHENAHALLI H.B.C.S.
40' X 49'
H.S.ANNAPOORAN
BDA/EE(S)/PL/7/89-90 DT 11.04.1989
862
14
B.T.M. LAYOUT TAVAREKERE SY NOS
50' X 40'
S.R.ACHARYA
BDA/EE(S)/PL/3/89-90 DT 11.04.1989
863
678
KENCHENAHALLI H.B.C.S.
59' X 37'
L.LALITHA BAI
BDA/EE(S)/PL/8/89-90 DT 11.04.1989
864
367
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
57' X 39'
M.S.ANANDA RAO
BDA/EE(S)/PL/9/89-90 DT 11.04.1989
865
11
SARAKKI II PHASE
45' X 60'
C.S.RADHAKRISHNA
BDA/EE(S)/PL/17/89-90 DT 15.04.1989
866
679
B.T.M. II STAGE I PHASE
60' X 40'
P.K.MANUEL
BDA/EE(S)/PL/1/89-90 DT 11.04.1989
867
658
B.T.M. II STAGE I PHASE
60' X 40'
I.JAYAKUMARIPRAMILA
BDA/EE(S)/PL/2/89-90 DT 11.04.1989
868
447
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
64' X 40'
T.KRISHNA
BDA/EE(S)/PL/2/89-90 DT 01.04.1989
869
1088
B.T.M. I STAGE I PHASE
60' X 40'
L.BHAKTAPRASAD
BDA/EE(S)/PL/04/89-90 DT 11.04.1989
870
577
B.S.K. III STAGE SY NOS KATARIGUPPA
63' X 40'
M.SHANTHAMMA
BDA/EE(S)/PL/04/89-90 DT 06.04.1989
871
326
N.S.PALYA MICO H.B.C.S.
40' X 60'
M.ANNAYYAPPA
BDA/EE(S)/PL/06/89-90 DT 05.04.1989
872
289
B.S.K. III STAGE, IV PHASE, VII BLOCK
80' X 46'
DR.D.K.VENKATARAMAN
BDA/EE(S)/PL/03/89-90 DT 05.04.1989
KENCHENAHALLI H.B.C.S.
45' X 48'
C.N.ACHARYA
BDA/EE(S)/PL/4/89-90 DT 01.04.1989
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
40' X 60'
K.R.RAMACHANDRA RAO
BDA/EE(S)/PL/3/89-90 DT 01.04.1989
HOSAKERE HALLI B.S.K. III STAGE
60' X 40'
SYED EJAS RAZXI
BDA/EE(S)/PL/01/89-90 DT 01.04.1989
KUMARASWAMY LAYOUT II STAGE
40' X 50'
K.BHOJARAJA NAIK
BDA/EE(S)/PL/2/89-90 DT 08.05.1989
873
SITE
NO.
481/B
874
436
875
17
876
1831
877
176
N.S.PALYA MICO H.B.C.S.
40' X 60'
V.YATHIRAJ
BDA/EE(S)/PL/56/89-90 DT 02.06.1989
878
335
N.S.PALYA MICO H.B.C.S.
60' X 40'
T.PRAHLADA NAIDU
BDA/EE(S)/PL/63/89-90 DT 03.06.1989
879
493
KADIRENAHALLI HBCS
45' X 60'
S.KRISHNA SWAMY
BDA/EE(S)/PL/158/89-90 DT 18.10.1989
880
3588
KUMARASWAMY LAYOUT II STAGE
60' X 40'
M.N.NAGARAJA
BDA/EE(S)/PL/10/89-90 DT 18.10.1989
881
568
B.S.K. III STAGE, NAGENDRA BLOCK
40' X 60'
S.RATHNA
BDA/EE(S)/PL/13/89-90 DT 31.05.1989
882
393
B.S.K. III STAGE, III PHASE, V BLOCK
60' X 40'
S.SHIVAPPA
BDA/EE(S)/PL/107/89-90 DT 28.03.1990
883
766
B.S.K. III STAGE, III PHASE
40' X 60'
S.R.NAGARAJ
BDA/EE(S)/PL/15/89-90 DT 12.06.1989
SARAKKI II PHASE
60' X 40'
G.R.NAIR
BDA/EE(S)/PL/03/89-90 DT 17.05.1989
HOSAKERE HALLI B.S.K. III STAGE
60' X 40'
K.VISWANATH
BDA/EE(S)/PL/99/89-90 DT 15.03.1990
N.S.PALYA MICO H.B.C.S.
40' X 60'
K.R.SUDHARSHAN RAO
BDA/EE(S)/PL/112/89-90 DT 05.08.1989
B.S.K. III STAGE, MUNESWARA BLOCK
57' X 38'
SHIVANNA
BDA/EE(S)/PL/75/89-90 DT 27.01.1990
N.S.PALYA MICO H.B.C.S.
61' X 40'
SURENDRA
BDA/EE(S)/PL/239/89-90 DT 17.01.1990
GIRINAGAR H.B.C.S.
40' X 58'
K.GANESH ADIGA
BDA/EE(S)/PL/38/89-90 DT 16.05.1989
884
1603/A
885
10
886
820
887
1499
888
787
889
11
890
681
KENCHENAHALLI H.B.C.S.
61' X 37'
SUNDRA RAO
BDA/EE(S)/PL/74/89-90 DT 17.06.1989
891
708
N.S.PALYA MICO H.B.C.S.
19.51 X 12.19
M.VIDYA SHANKAR
BDA/EE(S)/PL/51/89-90 DT 26.05.1989
892
1115
B.T.M. I STAGE I PHASE
62' X 38'
POORNIMA KINI
BDA/EE(S)/PL/36/89-90 DT 30.03.1990
893
397
SARAKKI II PHASE
60' X 45'
FAREED AHAMMED
BDA/EE(S)/PL/54/89-90 DT 28.03.1990
894
112
B.S.K.III STAGE, KATHRUGUPPE
60' X 40'
K.GOPALAKRISHNA MURTHY
BDA/EE(S)/PL/79/89-90 DT 21.06.1989
895
935
SARAKKI II PHASE
60' X 40'
V.KANTHARAJU
BDA/EE(S)/PL/30/89-90 DT 17.11.1989
896
304
N.S.PALYA MICO H.B.C.S.
40' X 60'
S.RAJAMANI
BDA/EE(S)/PL/126/89-90 DT 22.08.1989
897
496
JAYANAGAR H.B.C.S., KADIRENAHALLI
40' X 60'
SUDHA R RAO
BDA/EE(S)/PL/281/89-90 DT 30.03.1990
898
572
N.S.PALYA MICO H.B.C.S.
40' X 60'
THEJAVATHI SHIVALINGAIAH
BDA/EE(S)/PL/204/89-90 DT 12.12.1989
899
900
121
268/A
TAVAREKERE
40' X 61'
SATHYANAYAR
BDA/EE(S)/PL/92/89-90 DT 17.07.1989
SARAKKI V PHASE
40' X 62'
K.V.VEERAPPA
BDA/EE(S)/PL/6/89-90 DT 21.06.1989
901
293
SARAKKI II PHASE
45' X 60'
K.PRABHU
BDA/EE(S)/PL/47/89-90 DT 05.03.1990
902
604
B.S.K. III STAGE, KATHARIGUPPE SY NOS
40' X 60'
KRISHNAMMA
BDA/EE(S)/PL/88/89-90 DT 05.03.1990
903
283
B.S.K. III STAGE, IV PHASE, VII BLOCK
46' X 80'
THULASI DEVI
BDA/EE(S)/PL/90/89-90 DT 05.03.1990
904
1086
SARAKKI II PHASE
65' X 40'
C.B.NADEGOWDA
BDA/EE(S)/PL/46/89-90 DT 05.03.1990
905
403
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
40' X 60'
R.RAVINDRANATH
BDA/EE(S)/PL/168/89-90 DT 27.10.1989
906
1061
KUMARA SWAMY LAYOUT I STAGE
60' X 40'
R.SUMITRA BAI
BDA/EE(S)/PL/19/89-90 DT 19.02.1990
907
286
SARAKKI II PHASE
45' X 61'
V.DORESWAMY
BDA/EE(S)/PL/35/89-90 DT 23.12.1989
908
156
SARAKKI II PHASE
45' X 65'
H.ANANTHA BHATTA
BDA/EE(S)/PL/52/89-90 DT 23.03.1990
909
34
N.S.PALYA MICO H.B.C.S.
40' X 60'
R.SUNDARA RAJAN
BDA/EE(S)/PL/166/89-90 DT 25.10.1989
910
159
N.S.PALYA MICO H.B.C.S.
40' X 59'
C.S.SUBBANNA
BDA/EE(S)/PL/254/89-90 DT 02.02.1990
911
119
VISWABHARATHI H.B.C.S., GIRINAGAR
40' X 60'
B.SRIRAMULU NAIDU
BDA/EE(S)/PL/162/89-90 DT 20.10.1989
912
46
B.T.M. I STAGE, I PHASE
40' X 60'
M.S.UDAYA SHANKAR
BDA/EE(S)/PL/9/89-90 DT 30.06.1989
913
119
SARAKKI II PHASE
43' X 60'
KULSUM ABDUL HUSSAIN
BDA/EE(S)/PL/37/89-90 DT 06.01.1990
914
570
B.S.K. III STAGE, KATHARIGUPPE SY NOS
40' X 63'
V.GIRIJA
BDA/EE(S)/PL/65/89-90 DT 06.01.1990
915
B.S.K. III STAGE, I BLOCK, PIPE LINE
45' X 60'
RUDREGOWDA
BDA/EE(S)/PL/5/89-90 DT 15.04.1989
916
245 &
246
163
ARAKERE MICO S.K.G.M.S.
40' X 60'
H.R.KRISHNA PRASAD
BDA/EE(S)/PL/203/89-90 DT 12.12.1989
917
268
SARAKKI II PHASE
45' X 60'
MANICKAM
BDA/EE(S)/PL/38/89-90 DT 09.01.1990
918
1694
SARAKKI II PHASE
10.05 X 16.05
N.GEETHA
BDA/EE(S)/PL/27/89-90 DT 12.09.1989
KENCHENAHALLI H.B.C.S.
70' X 50'
T.S.SRINIVASA
BDA/EE(S)/PL/235/89-90 DT 11.01.1990
SARAKKI V PHASE
40' X 60'
FAYAZAHAMED SIDDIP
BDA/EE(S)/PL/9/89-90 DT 27.01.1990
919
920
649/C
16
921
575
SARAKKI VI PHASE
40' X 60'
B.ANASUYA
BDA/EE(S)/PL/16/89-90 DT 05.02.1990
922
498
JAYANAGAR H.B.C.S., KADIRENAHALLI
40' X 60'
M.MUNIVENKATAPPA
BDA/EE(S)/PL/247/89-90 DT 27.01.1990
923
103
KENCHENAHALLI H.B.C.S.
47' X 49'
LEELA GOPINATH
BDA/EE(S)/PL/81/89-90 DT 24.06.1989
924
363
B.S.K. III STAGE, II PHASE, VI BLOCK
40' X 60'
S.SUBRAMANYA
BDA/EE(S)/PL/46/89-90 DT 17.11.1989
925
145
SARAKKI II PHASE
40' X 60'
K.C.VASUNDHARA
BDA/EE(S)/PL/14/89-90 DT 17.07.1989
926
274
N.S.PALYA MICO H.B.C.S.
40' X 60'
MANOHAR AIMAN
BDA/EE(S)/PL/77/89-90 DT 17.06.1989
927
1581
SARAKKI II PHASE
60' X 39'
C.BHARATH BHUSHAN
BDA/EE(S)/PL/29/89-90 DT 17.11.1989
928
721
SARAKKI II PHASE
60' X 40'
Y.N.RAMAKRISHNAIAH
BDA/EE(S)/PL/25/89-90 DT 02.09.1989
929
17
TIMBER MERCHANTS H.B.C.S., SARAKKI
30' X 71'
V.SRINIVASA
BDA/EE(S)/PL/180/89-90 DT 17.11.1989
930
86
B.T.M. I STAGE, I PHASE
60' X 40'
RAGHAVENDRA BILIYA
BDA/EE(S)/PL/15/89-90 DT 02.09.1989
931
152
N.S.PALYA MICO H.B.C.S.
40' X 60'
G.ANANTHA KRISHNAN
BDA/EE(S)/PL/87/89-90 DT 30.06.1989
932
932
N.S.PALYA MICO H.B.C.S.
60' X 63'
BDA/EE(S)/PL/84/89-90 DT 28.06.1989
933
70
B.T.M. II STAGE, I PHASE
40' X 60'
N.V.JAGANATHA RAO & SMT ASHA J
RAO
H.K.SRINIVASAIAH
934
394
B.S.K. III STAGE, III PHASE, V BLOCK
40' X 60'
B.SHIVAPPA & LALITHAMBA
BDA/EE(S)/PL/19/89-90 DT 03.07.1989
935
919
N.S.PALYA MICO H.B.C.S.
40' X 60'
HARISHCHANDRA & PRAMILA
BDA/EE(S)/PL/287/89-90 DT 31.03.1990
936
797
KENCHENAHALLI H.B.C.S.
42' X 58'
T.V.ARAMADHAN
BDA/EE(S)/PL/241/89-90 DT 22.01.1990
937
1157
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
40' X 60'
M.PALAVI
BDA/EE(S)/PL/40/89-90 DT 16.05.1989
938
416
SARAKKI II PHASE
45' X 58'
H.V.RANGANATH
BDA/EE(S)/PL/11/89-90 DT 19.06.1989
939
365
B.S.K. III STAGE, II PHASE, VI BLOCK
40' X 60'
H.K.SREEDHARA MURTHY
BDA/EE(S)/PL/10/89-90 DT 29.04.1989
940
905
N.S.PALYA MICO H.B.C.S.
40' X 60'
N.R.NARAYANA SWAMY
BDA/EE(S)/PL/170/89-90 DT 06.11.1989
941
925
N.S.PALYA MICO H.B.C.S.
12.19 X 18.29
S.SURYANARAYANA
BDA/EE(S)/PL/171/89-90 DT 06.11.1989
942
194
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
40' X 60'
NARAYANA
BDA/EE(S)/PL/177/89-90 DT 09.11.1989
BDA/EE(S)/PL/12/89-90 DT 15.07.1989
943
247
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
60' X 38'
N.R.ASWATHA NARAYANA
BDA/EE(S)/PL/45/89-90 DT 17.05.1989
944
17
B.O.O.H.B.C.S. MADIWALA
40' X 60'
P.S.BALLAMMA
BDA/EE(S)/PL/130/89-90 DT 25.08.1989
945
33
VISWABHARATHI H.B.C.S., GIRINAGAR
40' X 60'
L.S.RADHA
BDA/EE(S)/PL/85/89-90 DT 28.06.1989
946
241
SARAKKI V PHASE
40' X 60'
B.K. SRINIVASAN
BDA/EE(S)/PL/7/89-90 DT 28.06.1989
947
245
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
39' X 60'
H.S.KRISHNA MURTHY
BDA/EE(S)/PL/5/89-90 DT 05.04.1989
948
744
KENCHENAHALLI H.B.C.S.
60' X 35'
RAMANANDA BALIGA
BDA/EE(S)/PL/169/89-90 DT 02.11.1989
949
3
JAYANAGAR H.B.C.S., KADIRENAHALLI
21.12 X 13.72
MUNILAKKAMMA
BDA/EE(S)/PL/140/89-90 DT 08.09.1989
950
608
B.S.K. III STAGE, II PHASE, VII BLOCK
45' X 60'
B.G.SHANTHAPPA
BDA/EE(S)/PL/25/89-90 DT 19.07.1989
951
21
B.S.K. III STAGE, III PHASE, VI BLOCK
25.00 X 10.80
BDA/EE(S)/PL/31/89-90 DT 05.08.1989
952
160
B.S.K. III STAGE, III PHASE, I BLOCK
40' X 60'
PRABHAKARA UDUPI &
RAMANANDA ACHAR
K.V.BHASKAR
953
527
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
39' X 60'
P.R.LAKSHMINARAYANA
BDA/EE(S)/PL/263/89-90 DT 06.03.1990
954
1415
SARAKKI I PHASE
40' X 60'
SYED UMER FAROOQ
BDA/EE(S)/PL/10/89-90 DT 15.12.1989
955
928
N.S.PALYA MICO H.B.C.S.
40' X 60'
BUDDANNA
BDA/EE(S)/PL/193/89-90 DT 28.11.1989
956
761
N.S.PALYA MICO H.B.C.S.
39' X 60'
H.S.NAGARAJ
BDA/EE(S)/PL/194/89-90 DT 28.11.1989
957
3598
KUMARA SWAMY LAYOUT II STAGE
40' X 60'
C.ESWARAPPA
BDA/EE(S)/PL/13/89-90 DT 18.12.1989
958
1131
B.T.M. I STAGE, TAVAREKERE SY NOS
55' X 56'
S.JAGANATH
BDA/EE(S)/PL/20/89-90 DT 18.12.1989
959
22
KSRTC H.B.C.S. SARAKKI
40' X 60'
P.GOPINATH
BDA/EE(S)/PL/181/89-90 DT 17.11.1989
960
579
KEMPEGOWDA H.B.C.S., KATHRIGUPPA
40' X 60'
K.KANNAIYYA LAL
BDA/EE(S)/PL/175/89-90 DT 09.11.1989
961
37
TELECOM EMPLOYEES H.B.C.S., AVALAHALLI
63' X 32'
N.A.NAGARAJA SETTY
BDA/EE(S)/PL/44/89-90 DT 17.05.1989
962
421
N.S.PALYA MICO H.B.C.S.
12.10 X 18.10
KANTHAMMA
BDA/EE(S)/PL/226/89-90 DT 03.01.1990
963
40
ITI H.B.C.S., KATHARIGUPPA
40' X 59'
K.CHANDRA RAO
BDA/EE(S)/PL/223/89-90 DT 30.12.1989
MICO SKGNS ARAKERE
43' X 50'
N.G.UMAMANI
BDA/EE(S)/PL/230/89-90 DT 04.01.1990
964
132 &
133
BDA/EE(S)/PL/93/89-90 DT 06.03.1990
965
471/A
KENCHENAHALLI H.B.C.S.
50' X 62'
SHANTHA RUDRAMUNI
BDA/EE(S)/PL/227/89-90 DT 03.01.1990
B.S.K. II STAGE, YADIYUR
40' X 60'
M.NANJUNDAIAH
BDA/EE(S)/PL/40/89-90 DT 02.09.1989
966
2
967
532
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
40' X 60'
RANGASWAMY
BDA/EE(S)/PL/29/89-90 DT 28.04.1989
968
906
N.S.PALYA MICO H.B.C.S.
18.59 X 12.19
T.P.SHIVASHANKAR
BDA/EE(S)/PL/53/89-90 DT 26.05.1989
969
340
N.S.PALYA MICO H.B.C.S.
40' X 60'
CHANDRA SHEKHARA
BDA/EE(S)/PL/220/89-90 DT 26.12.1989
970
48
B.S.K. III STAGE, III PHASE, VI BLOCK
59' X 40'
M.M.BELLIAPPA
BDA/EE(S)/PL/63/89-90 DT 30.12.1989
971
719
KEMPEGOWDA H.B.C.S., KATHRIGUPPA
40' X 61'
G.RAGHUNATHA
BDA/EE(S)/PL/84/89-90 DT 31.03.1990
972
101
B.S.K. III STAGE, ITTUMADU SY NOS
63' X 40'
M.J.RAMA PRIYA
BDA/EE(S)/PL/71/89-90 DT 11.01.1990
973
187
MICO SKGNS ARAKERE
40' X 65'
H.MANJUNATH
BDA/EE(S)/PL/215/89-90 DT 18.12.1989
974
4
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
64' X 40'
S.DHANASHKOTE
BDA/EE(S)/PL/69/89-90 DT 14.06.1989
975
652
SARAKKI II PHASE
45' X 61'
K.SHESHAPPA
BDA/EE(S)/PL/55/89-90 DT 30.03.1990
976
413
SARAKKI II PHASE
45' X 58'
G.N.V.ARADHYA
BDA/EE(S)/PL/5/89-90 DT 22.05.1989
977
755
SARAKKI III PHASE
44' X 60'
K.KRISHNA SHET
BDA/EE(S)/PL/1/89-90 DT 28.11.1989
978
75
SRI.RADHAKRISHNA H.B.C.S., KADIRENAHALLI
40' X 39'
L.C.S.RAMACHANDRA
BDA/EE(S)/PL/54/89-90 DT 26.05.1989
979
58
B.S.K. III STAGE, IV PHASE, VII BLOCK
40' X 60'
N.S.HALLA
BDA/EE(S)/PL/79/89-90 DT 01.03.1990
980
228
VISWABHARATHI H.B.C.S., GIRINAGAR
38' X 54'
KRISHNARAJA KHANDIGE
BDA/EE(S)/PL/245/89-90 DT 27.01.1990
981
444
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
40' X 67'
A.R.SHIVASWAMY
BDA/EE(S)/PL/243/89-90 DT 22.01.1990
982
778
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
40' X 60'
K.N.SRINIVASA
BDA/EE(S)/PL/233/89-90 DT 06.01.1990
983
2568
KUMARA SWAMY LAYOUT II STAGE
40' X 60'
VINCENT SALDANA
BDA/EE(S)/PL/17/89-90 DT 07.02.1990
984
7
KENCHENAHALLI H.B.C.S.
63' X 40'
V.H.BALAN
BDA/EE(S)/PL/119/89-90 DT 10.08.1989
985
276
KENCHENAHALLI H.B.C.S.
42' X 61'
M.RAMACHANDRA
BDA/EE(S)/PL/184/89-90 DT 21.11.1989
986
1249
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
40' X 59'
K.V.RAMAMURTHY
BDA/EE(S)/PL/110/89-90 DT 05.08.1989
987
594
J.P.NAGAR II PHASE
40' X 60'
KAMLESH KUMARI
BDA/EE(S)/PL/36/89-90 DT 03.01.1990
988
17
SARAKKI IV PHASE
40' X 60'
T.RANGARAJAN
BDA/EE(S)/PL/3/89-90 DT 11.01.1990
989
56
B.S.K. III STAGE, III PHASE, IV BLOCK
39' X 59'
R.MADAIAH
BDA/EE(S)/PL/67/89-90 DT 09.01.1990
990
2578
KUMARA SWAMY LAYOUT II STAGE
40' X 60'
P.SURENDRA KUMAR
BDA/EE(S)/PL/16/89-90 DT 07.02.1990
991
703
B.T.M. II STAGE, I PHASE
40' X 60'
T.NAGARAJA
BDA/EE(S)/PL/29/89-90 DT 07.02.1990
992
133
SARAKKI II PHASE
45' X 71'
N.RAMA RAO
BDA/EE(S)/PL/6/89-90 DT 24.05.1989
993
763
KENCHENAHALLI H.B.C.S.
38' X 59'
FRANCINA KOWIN
BDA/EE(S)/PL/164/89-90 DT 23.10.1989
994
894
N.S.PALYA MICO H.B.C.S.
15.84 X 12.19
G.SRINIVASAMURTHY
BDA/EE(S)/PL/65/89-90 DT 03.06.1989
995
224
KENCHENAHALLI H.B.C.S.
39' X 55'
R.N.VENKATASUBBA RAO
BDA/EE(S)/PL/244/89-90 DT 22.01.1990
996
1417
SARAKKI I PHASE
40' X 60'
B.N.VITTAL
BDA/EE(S)/PL/3/89-90 DT 26.05.1989
997
40
SRI.ANJANEYA SWAMY H.B.C.S., ITTMADU
61' X 36'
S.HIRANNAIAH
BDA/EE(S)/PL/58/89-90 DT 2.06.1989
998
298
JAYANAGAR H.B.C.S., KADIRENAHALLI
45' X 50'
N.MUNISWAMY
BDA/EE(S)/PL/159/89-90 DT 18.10.1989
999
1716
KUMARA SWAMY LAYOUT II STAGE
40' X 60'
K.SATHYANARAYANA
BDA/EE(S)/PL/8/89-90 DT 19.07.1989
1000
85
SARAKKI II PHASE
40' X 62'
H.S.PRABHAKAR
BDA/EE(S)/PL/15/89-90 DT 19.07.1989
1001
312
B.S.K. III STAGE, IV PHASE, VII BLOCK
59' X 40'
S.M.RAMA RAO
BDA/EE(S)/PL/23/89-90 DT 15.07.1989
1002
83
B.T.M. I STAGE, I PHASE
40' X 60'
M.B.BEERAIAH
BDA/EE(S)/PL/18/89-90 DT 12.12.1989
1003
118
B.S.K. III STAGE, II PHASE, IV BLOCK
40' X 60'
K.V.RAO
BDA/EE(S)/PL/47/89-90 DT 17.11.1989
1004
12
TIMBER MERCHANTS H.B.C.S., SARAKKI
40' X 64'
V.T.SHARFUNMISA
BDA/EE(S)/PL/182/89-90 DT 17.11.1989
1005
5
MARUTHI H.B.C.S.
40' X 60'
SYED ALTAF
BDA/EE(S)/PL/75/89-90 DT 17.06.1989
1006
775
N.S.PALYA MICO H.B.C.S.
40' X 61'
NAZEER AHMED SHANFF
BDA/EE(S)/PL/165/89-90 DT 25.10.1989
1007
93
B.O.O. H.B.C.S. B.T.M. LAYOUT
40' X 60'
BDA/EE(S)/PL/172/89-90 DT 06.11.1989
1008
2014
SARAKKI II PHASE
75' X 43'
NANDAVAR RAVINDRANATH
SHENOY
M.M.KINI
BDA/EE(S)/PL/4/89-90 DT 17.05.1989
1009
311
SARAKKI V PHASE
40' X 60'
K.SATHYANARAYANA
BDA/EE(S)/PL/5/89-90 DT 26.05.1989
1010
394
JAYANAGAR H.B.C.S., KADIRENAHALLI
40' X 60'
G.SHARADAMMA
BDA/EE(S)/PL/156/89-90 DT 22.09.1989
1011
965
N.S.PALYA MICO H.B.C.S.
40' X 60'
T.H.ANJANAPPA
BDA/EE(S)/PL/59/89-90 DT 02.06.1989
1012
800
KENCHENAHALLI H.B.C.S.
42' X 58'
A.S.BHARGAVI
BDA/EE(S)/PL/67/89-90 DT 13.06.1989
1013
777
N.S.PALYA MICO H.B.C.S.
40' X 61'
A.R.VIRUPAKSHA
BDA/EE(S)/PL/32/89-90 DT 29.04.1989
1014
332
B.S.K. III STAGE, II PHASE, VI BLOCK
40' X 60'
H.C.KSHETRA PALAIAH
BDA/EE(S)/PL/39/89-90 DT 02.09.1989
1015
111
ITI H.B.C.S., KATHARIGUPPA
40' X 60'
B.N.RANGANATHA RAO
BDA/EE(S)/PL/138/89-90 DT 02.09.1989
1016
1088
SARAKKI II PHASE
40' X 71'
C.R.VIJAYALAKSHMI
BDA/EE(S)/PL/26/89-90 DT 02.09.1989
1017
471/A
KENCHENAHALLI H.B.C.S.
63' X 50'
SHANTHA RUDRAMUNI
BDA/EE(S)/PL/131/89-90 DT 29.08.1989
1018
1231/F
B.S.K. III STAGE, HOSAKEREHALLI SY NOS
40' X 60'
K.S.CHANDRASENA
BDA/EE(S)/PL/51/89-90 DT 15.12.1989
1019
47
KAVERI H.B.C.S., TAVAREKERE SY NOS
40' X 60'
R.SHOBHA
BDA/EE(S)/PL/217/89-90 DT 18.12.1989
1020
430
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
40' X 60'
S.GNANA PRAKASH
BDA/EE(S)/PL/198/89-90 DT 01.12.1989
1021
432
B.S.K. III STAGE, II PHASE, VI BLOCK
60' X 40'
A.S.KRISHNA SASTRY
BDA/EE(S)/PL/70/89-90 DT 11.01.1990
1022
1719
KUMARA SWAMY LAYOUT II STAGE
40' X 60'
G.N.SACHIDANANDA MURTHY
BDA/EE(S)/PL/12/89-90 DT 18.12.1989
1023
457
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
40' X 60'
K.D.SOMANNA
BDA/EE(S)/PL/209/89-90 DT 15.12.1989
1024
458
B.S.K. III STAGE, II PHASE, VI BLOCK
40' X 60'
K.GOVINDA SETTY
BDA/EE(S)/PL/49/89-90 DT 01.12.1989
1025
140
KENCHENAHALLI H.B.C.S.
58' X 37'
H.L.DAKSHAYINI
BDA/EE(S)/PL/145/89-90 DT 15.09.1989
1026
1249
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
40' X 60'
K.V.RAMA MURTHY
BDA/EE(S)/PL/197/89-90 DT 01.12.1989
1027
212
KENCHENAHALLI H.B.C.S.
40' X 60'
T.N.SUBBAIAHA
BDA/EE(S)/PL/149/89-90 DT 19.09.1989
1028
25
RAMA RAO LAYOUT
40' X 60'
K.S.JAGADISH
BDA/EE(S)/PL/142/89-90 DT 15.09.1989
1029
305
60' X 37'
N.SURYANARAYANA
BDA/EE(S)/PL/54/89-90 DT 18.12.1989
1030
27
B.S.K. III STAGE, CHANAMANAKERE ACHUKATU
LAYOUT
BANNERGHATTA ROAD
40' X 60'
AKKU BAI
BDA/EE(S)/PL/28/89-90 DT 27.04.1989
1031
804
SARAKKI I PHASE
64' X 40'
Y.K.MUDDUKRISHNA
BDA/EE(S)/PL/9/89-90 DT 22.11.1989
1032
624
SARAKKI II PHASE
60' X 54'
A.VENKATESHAN
BDA/EE(S)/PL/33/89-90 DT 28.11.1989
1033
673
B.T.M. II STAGE, I BLOCK
40' X 60'
G.RAMACHANDRA
BDA/EE(S)/PL/30/89-90 DT 19.02.1990
1034
911
N.S.PALYA MICO H.B.C.S.
19.81 X 12.19
N.N.H.MAHESWARI
BDA/EE(S)/PL/66/89-90 DT 13.06.1989
1035
90
POORNA PRAJAN H.B.C.S., KATHARIGUPPA
50' X 48'
K.M.NEELAKANTAN ELAYATH
BDA/EE(S)/PL/36/89-90 DT 08.05.1989
1036
910
N.S.PALYA MICO H.B.C.S.
19.81 X 13.41
H.C.NARASIMHAIAH
BDA/EE(S)/PL/31/89-90 DT 29.04.1989
1037
120
KENCHENAHALLI H.B.C.S.
40' X 60'
K.SHELVAM IYENGAR
BDA/EE(S)/PL/167/89-90 DT 27.10.1989
1038
282
JAYANAGAR H.B.C.S., KADIRENAHALLI
45' X 70'
M.SRINIVASA
BDA/EE(S)/PL/113/89-90 DT 05.08.1989
1039
434
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
40' X 60'
T.PRABHAKARA RAO
BDA/EE(S)/PL/72/89-90 DT 15.06.1989
1040
81
B.S.K. III STAGE, III PHASE, VI BLOCK
62' X 40'
D.GOVINDA
BDA/EE(S)/PL/44/89-90 DT 09.11.1989
1041
621
SARAKKI I PHASE
40' X 60'
V.S.MUKUNDA
BDA/EE(S)/PL/8/89-90 DT 02.11.1989
1042
266
KSRTC H.B.C.S. N.S.PALYA
40' X 60'
BILLAPPA
BDA/EE(S)/PL/125/89-90 DT 19.08.1989
1043
170
VISWABHARATHI H.B.C.S., GIRINAGAR
40' X 59'
M.R.KRISHNA SWAMY
BDA/EE(S)/PL/148/89-90 DT 16.09.1989
1044
593
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
40' X 60'
T.GOVINDAIAH
BDA/EE(S)/PL/132/89-90 DT 29.08.1989
1045
51
B.O.O. H.B.C.S. MADIWALA
40' X 60'
PARVATHI VASUDEVAN
BDA/EE(S)/PL/258/89-90 DT 08.02.1990
1046
748
KENCHENAHALLI H.B.C.S.
56' X 35'
L.VENKOBA RAO
BDA/EE(S)/PL/35/89-90 DT 05.05.1989
1047
2506
KUMARA SWAMY LAYOUT II STAGE
40' X 60'
K.SANJEEVA SHASTRY
BDA/EE(S)/PL/20/89-90 DT 24.02.1990
1048
1113
B.T.M. LAYOUT, TAVAREKERE SY NOS
39' X 61'
K.NITYANANDAM
BDA/EE(S)/PL/5/89-90 DT 21.04.1989
1049
885
N.S.PALYA MICO H.B.C.S.
40' X 59'
RADHA KRISHNA HOLLA
BDA/EE(S)/PL/71/89-90 DT 15.06.1989
1050
1211
B.T.M. II STAGE, I PHASE
40' X 60'
M.S.SUBBALAKSHMAMMA
BDA/EE(S)/PL/32/89-90 DT 24.02.1990
1051
222
B.S.K. III STAGE, II PHASE, VI BLOCK
62' X 40'
K.S.NAGALAKSHMAMMA
BDA/EE(S)/PL/86/89-90 DT 24.02.1990
1052
221
B.O.O., H.B.C.S., TAVAREKERE
40' X 65'
JAYALAKSHMI KOWKAR
BDA/EE(S)/PL/252/89-90 DT 02.02.1990
1053
1000
B.S.K. III STAGE, HOSAKEREHALLI SY NOS
40' X 60'
R.P.DAMBAL
BDA/EE(S)/PL/76/89-90 DT 27.01.1990
1054
579
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
40' X 60'
M.KRISHNA MURTHY
BDA/EE(S)/PL/199/89-90 DT 01.12.1989
1055
225
B.S.K. III STAGE, II PHASE, VI BLOCK
60' X 40'
S.K.SUDHINDRA
BDA/EE(S)/PL/9/89-90 DT 29.04.1989
1056
415
N.S.PALYA MICO H.B.C.S.
64' X 40'
JANAKI RAVI
BDA/EE(S)/PL/257/89-90 DT 08.02.1990
1057
502
JAYANAGAR H.B.C.S., KADIRENAHALLI
40' X 60'
S.SAVITHRI
BDA/EE(S)/PL/240/89-90 DT 18.01.1990
1058
533
B.S.K. III STAGE, II PHASE, VI BLOCK
45' X 64'
P.N.VASANTHA KUMAR
BDA/EE(S)/PL/35/89-90 DT 19.08.1989
1059
1100
B.T.M. I STAGE, I PHASE, TAVAREKERE SY NOS
72' X 28'
H.NATESH NAYAK
BDA/EE(S)/PL/8/89-90 DT 24.06.1989
1060
73
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
40' X 60'
B.K.SUBHASH CHANDRA BOSE
BDA/EE(S)/PL/92/89-90 DT 12.07.1989
1061
11
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
94' X 40'
S.V.SOMASHEKHARAIAH
BDA/EE(S)/PL/33/89-90 DT 29.04.1989
1062
384
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
60' X 32'
T.V.SHAMACHAR
BDA/EE(S)/PL/246/89-90 DT 27.01.1990
1063
567
B.S.K. III STAGE, II PHASE, VI BLOCK
58' X 40'
K.S.CHANDRA SHEKHAR
BDA/EE(S)/PL/81/89-90 DT 03.02.1990
1064
225
N.S.PALYA MICO H.B.C.S.
40' X 60'
S.CHAYAPATHY
BDA/EE(S)/PL/258/89-90 DT 31.03.1990
1065
431
N.S.PALYA MICO H.B.C.S.
40' X 60'
K.R.KUMAR
BDA/EE(S)/PL/196/89-90 DT 01.12.1989
1066
40
K.A.S. OFFICERS B.T.M. LAYOUT
40' X 60'
ARAVIND G RISHABUD
BDA/EE(S)/PL/222/89-90 DT 28.12.1989
1067
29
S.RAMA RAO LAYOUT
40' X 60'
S.ANANTHA RAJU
BDA/EE(S)/PL/133/89-90 DT 30.08.1989
1068
496
N.S.PALYA MICO H.B.C.S.
40' X 60'
R.RAJASHEKHARAN
BDA/EE(S)/PL/238/89-90 DT 17.01.1990
1069
63
B.S.K. III STAGE, AVALAHALLY
40' X 70'
G.S.VEERABHADRAPPA
BDA/EE(S)/PL/55/89-90 DT 23.12.1989
1070
563
B.S.K. III STAGE, II PHASE, VI BLOCK
40' X 59'
A.S.MOHAN
BDA/EE(S)/PL/60/89-90 DT 23.12.1989
1071
21
B.S.K. III STAGE, III PHASE, VI BLOCK
25.00 X 10.80
BDA/EE(S)/PL/43/89-90 DT 18.10.1989
1072
947
N.S.PALYA MICO H.B.C.S.
41' X 60'
1073
602
B.S.K. III STAGE, KATHARIGUPPE SY NOS
40' X 60'
PRABHAKARA UDUPI &
RAMANANDA ACHAR
K.K.HARIHARAN & RADHA
HARIHARAN
M.S.BHAGYA RAO
1074
488
B.S.K. III STAGE, II PHASE, VI BLOCK
36' X 58'
KAMALA MAHADEVAN
BDA/EE(S)/PL/41/89-90 DT 05.09.1989
BDA/EE(S)/PL/202/89-90 DT 12.12.1989
BDA/EE(S)/PL/12/89-90 DT 26.05.1989
1075
1288
SARAKKI II PHASE
40' X 60'
C.S.RAMA CHANDRA
BDA/EE(S)/PL/18/89-90 DT 22.07.1989
1076
53
B.O.O., H.B.C.S., TAVAREKERE
40' X 60'
R.S.MYTHILI
BDA/EE(S)/PL/118/89-90 DT 10.08.1989
1077
809
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
40' X 60'
S.RAMALINGAPPA
BDA/EE(S)/PL/135/89-90 DT 30.08.1989
1078
1201
B.T.M. II STAGE, I PHASE
40' X 60'
FRANCIS
BDA/EE(S)/PL/27/89-90 DT 17.01.1990
1079
763
N.S.PALYA MICO H.B.C.S.
39' X 60'
M.BOLEGOWDA
BDA/EE(S)/PL/251/89-90 DT 02.02.1990
1080
482
N.S.PALYA MICO H.B.C.S.
40' X 60'
RAJENDRA RAMANATH BHAT
BDA/EE(S)/PL/95/89-90 DT 17.07.1989
1081
784
N.S.PALYA MICO H.B.C.S.
40' X 61'
L.S.RAMA MURTHY
BDA/EE(S)/PL/212/89-90 DT 15.12.1989
1082
185
MICO SKGNS ARAKERE
65' X 37'
G.SUNDARESHAN
BDA/EE(S)/PL/139/89-90 DT 05.09.1989
1083
689
KENCHENAHALLI H.B.C.S.
59' X 37'
K.RAMANATHAN
BDA/EE(S)/PL/144/89-90 DT 15.09.1989
1084
740
KENCHENAHALLI H.B.C.S.
40' X 62'
J.MEENA KASHI
BDA/EE(S)/PL/27/89-90 DT 22.04.1989
1085
645
SARAKKI II PHASE
50' X 60'
R.V.CHARI & CHANDRA CHARI
BDA/EE(S)/PL/7/89-90 DT 01.06.1989
1086
35
B.O.O. H.B.C.S. MADIWALA
40' X 60'
R.LAKSHMAN
BDA/EE(S)/PL/250/89-90 DT 01.02.1990
1087
525
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
39' X 60'
N.RAGHAVAENDRA
BDA/EE(S)/PL/124/89-90 DT 19.08.1989
1088
292
SARAKKI V PHASE
40' X 60'
N.SHARADAMMA
BDA/EE(S)/PL/8/89-90 DT 09.11.1989
1089
1144
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
39' X 60'
NORMAN BOWARD
BDA/EE(S)/PL/176/89-90 DT 09.11.1989
1090
53
B.T.M. II STAGE, I PHASE
40' X 60'
L.SIDDAIAH
BDA/EE(S)/PL/26/89-90 DT 17.01.1990
1091
84
DOLLAR SCHEME B.T.M. LAYOUT
40' X 60'
S.R.NAGARAJA
BDA/EE(S)/PL/17/89-90 DT 06.11.1989
1092
107
SARAKKI II PHASE
42' X 60'
SYED ABDUL WAJID
BDA/EE(S)/PL/34/89-90 DT 12.12.1989
1093
823
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
40' X 60'
K.S.SHAMA SUNDAR
BDA/EE(S)/PL/174/89-90 DT 09.11.1989
1094
69
POORNA PRAJAN H.B.C.S., KATHARIGUPPA
40' X 60'
S.P.SATISH
BDA/EE(S)/PL/173/89-90 DT 06.11.1989
1095
254
KENCHENAHALLI H.B.C.S.
40' X 60'
M.S.ADIGA
BDA/EE(S)/PL/255/89-90 DT 05.02.1990
1096
52
RAMA RAO LAYOUT
40' X 60'
T.NARASIMHA PRABHU
BDA/EE(S)/PL/261/89-90 DT 26.02.1990
1097
59
B.S.K. III STAGE, III PHASE, VI BLOCK
40' X 60'
N.V.GOPALAIAH
BDA/EE(S)/PL/ /89-90 DT 27.12.1989
1098
86
B.T.M. I STAGE, I PHASE
40' X 60'
RAGHAVENDRA BILIYA
BDA/EE(S)/PL/10/89-90 DT 05.07.1989
1099
35
RAMA RAO LAYOUT
40' X 60'
G.R.DORESWAMY
BDA/EE(S)/PL/89/89-90 DT 06.07.1989
1100
795
KENCHENAHALLI H.B.C.S.
54' X 39'
N.R.MANGALA JYOTHI
BDA/EE(S)/PL/137/89-90 DT 02.09.1989
1101
16
KALIDASA H.B.C.S., SRINAGARA
60' X 40'
H.A.PRASANNACHARI
BDA/EE(S)/PL/19/89-90 DT 15.04.1989
1102
130
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
40' X 60'
S.V.RAJASHEKHARAIAH
BDA/EE(S)/PL/34/89-90 DT 29.04.1989
1103
623
SARAKKI VI PHASE
39' X 60'
M.V.INDIRA
BDA/EE(S)/PL/10/89-90 DT 31.07.1989
1104
2530
KUMARA SWAMY LAYOUT II STAGE
59' X 40'
N.C.VASUDEVAN
BDA/EE(S)/PL/15/89-90 DT 27.01.1990
1105
2406
KUMARA SWAMY LAYOUT II STAGE
40' X 60'
D.V.CHANDRA SHEKAR
BDA/EE(S)/PL/7/89-90 DT 10.07.1989
1106
503
B.S.K. III STAGE, III PHASE, II BLOCK
40' X 60'
L.CHANDRA MURTHY
BDA/EE(S)/PL/38/89-90 DT 01.09.1989
1107
1090
SARAKKI II PHASE
74' X 40'
R.NEELAKANTAN
BDA/EE(S)/PL/31/89-90 DT 21.11.1989
1108
298
JAYANAGAR H.B.C.S., KADIRENAHALLI
45' X 50'
N.MUNISWAMY
BDA/EE(S)/PL/216/89-90 DT 18.12.1989
1109
60
JAYANAGAR H.B.C.S., KADIRENAHALLI
40' X 50'
SYED NAZEER AHAMED
BDA/EE(S)/PL/136/89-90 DT 02.09.1989
KENCHENAHALLI H.B.C.S.
60' X 49'
A.S.PRABHAKAR
BDA/EE(S)/PL/186/89-90 DT 21.11.1989
1110
100/A
1111
596
N.S.PALYA MICO H.B.C.S.
40' X 60'
K.S.ANANTHARAMAN
BDA/EE(S)/PL/213/89-90 DT 18.12.1989
1112
61
KENCHENAHALLI H.B.C.S.
40' X 60'
DR.T.NARASIMHAN
BDA/EE(S)/PL/234/89-90 DT 09.01.1990
1113
108
B.S.K. III STAGE, HOSAKEREHALLI SY NOS
40' X 60'
DR.V.SOMASHEKAR
BDA/EE(S)/PL/21/89-90 DT 03.07.1989
1114
628
SARAKKI VI PHASE
39' X 60'
V.J.ALEXANDER
BDA/EE(S)/PL/12/89-90 DT 18.10.1989
1115
418
KENCHENAHALLI H.B.C.S.
60' X 40'
K.SATHYANARAYAN RAO
BDA/EE(S)/PL/185/89-90 DT 21.11.1989
1116
681
B.T.M. II STAGE
40' X 60'
H.JAYARAM
BDA/EE(S)/PL/21/89-90 DT 20.12.1989
1117
1108
B.T.M. LAYOUT, TAVAREKERE SY NOS
19.50 X 12.10
ALICE JOSEPH
BDA/EE(S)/PL/19/89-90 DT 18.12.1989
1118
39
SARAKKI VI PHASE
40' X 60'
BALAPPA REDDY
BDA/EE(S)/PL/14/89-90 DT 18.12.1989
1119
10
B.T.M. II STAGE, I PHASE
50' X 77'
B.R.KRISHNA RAO
BDA/EE(S)/PL/23/89-90 DT 26.12.1989
1120
34
B.S.K. III STAGE, III PHASE, VI BLOCK
18.00 X 18.00
S.KRISHNA MURTHY
BDA/EE(S)/PL/48/89-90 DT 28.11.1989
1121
99
B.O.O. H.B.C.S. B.T.M. LAYOUT
40' X 60'
B.KIRAN HALLA
BDA/EE(S)/PL/187/89-90 DT 22.11.1989
1122
58
SRI.ANJANEYA SWAMY H.B.C.S., ITTMADU
61' X 36'
H.N.LAKSHMINARASIMHAIAH
BDA/EE(S)/PL/218/89-90 DT 23.12.1989
1123
278
N.S.PALYA MICO H.B.C.S.
40' X 60'
M.R.REVATHI
BDA/EE(S)/PL/189/89-90 DT 22.11.1989
1124
469
N.S.PALYA MICO H.B.C.S.
41' X 60'
R.KESHAVA MURTHY
BDA/EE(S)/PL/203/89-90 DT 12.12.1989
1125
1742
SARAKKI II PHASE
43' X 60'
K.N.UDAYA SHANKAR KARANTH
BDA/EE(S)/PL/13/89-90 DT 01.07.1990
1126
480
N.S.PALYA MICO H.B.C.S.
41' X 60'
M.HARIKESHAVALU NAIDU
BDA/EE(S)/PL/100/89-90 DT 19.07.1989
1127
72
RAMA RAO LAYOUT
60' X 40'
K.S.SATHYANATH
BDA/EE(S)/PL/103/89-90 DT 27.07.1989
1128
405
VISWABHARATHI H.B.C.S., GIRINAGAR
40' X 60'
B.K.MANDANNA
BDA/EE(S)/PL/99/89-90 DT 19.07.1989
1129
61
B.O.O. H.B.C.S. MADIWALA
40' X 60'
NARAYANA K.S.
BDA/EE(S)/PL/104/89-90 DT 27.07.1989
1130
730
SARAKKI II PHASE
40' X 60'
RAMAPPA
BDA/EE(S)/PL/17/89-90 DT 22.07.1989
1131
453
SARAKKI II PHASE
45' X 65'
K.DORAISAMI
BDA/EE(S)/PL/19/89-90 DT 22.07.1989
1132
627
SARAKKI VI PHASE
39' X 60'
C.RAVEENDRANATH
BDA/EE(S)/PL/3/88-89 DT 29.10.1988
1133
416
SRINIVASA NAGAR II PHASE, B.S.K. III STAGE
37' X 51'
C.R.GOPINATH
BDA/EE(S)/PL/83/89-90 DT 19.02.1990
1134
776
KENCHENAHALLI H.B.C.S.
57' X 62'
V.PRAKASH
BDA/EE(S)/PL/143/89-90 DT 15.09.1989
1135
1337
SRINIVASA NAGAR II PHASE, B.S.K. III STAGE
40' X 58'
R.ANANDA RAO
BDA/EE(S)/PL/24/89-90 DT 19.07.1989
1136
440
B.S.K. III STAGE, II PHASE, VI BLOCK
17.80 X 10.00
M.A.MANJUNATHA SETTY
BDA/EE(S)/PL/52/89-90 DT 15.12.1989
1137
1709
KUMARA SWAMY LAYOUT II STAGE
40' X 60'
J.S.RAVI SHANKAR
BDA/EE(S)/PL/11/89-90 DT 15.12.1989
1138
246
K.S.R.T.C. H.B.C.S. N.S.PALYA
40' X 60'
T.RANGA RAO
BDA/EE(S)/PL/146/89-90 DT 15.09.1989
1139
530
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
40' X 60'
G.JANARDHANAIAH
BDA/EE(S)/PL/86/89-90 DT 29.06.1989
1140
51
N.S.PALYA MICO H.B.C.S.
40' X 60'
N.S.R.K.SHARMA
BDA/EE(S)/PL/200/89-90 DT 01.12.1989
1141
63
S.RAMA RAO LAYOUT
40' X 60'
S.R.V.KAMATH
BDA/EE(S)/PL/288/89-90 DT 31.03.1990
1142
914
N.S.PALYA MICO H.B.C.S.
40' X 60'
K.N.KRISHNA MURTHY
BDA/EE(S)/PL/224/89-90 DT 30.12.1989
1143
1317
SARAKKI II PHASE
40' X 70'
J.S.EZEKIL & M.D.EZEKIL
BDA/EE(S)/PL/43/89-90 DT 27.01.1990
1144
11
SRI.ANJANEYA SWAMY H.B.C.S., ITTMADU
40' X 60'
T.RAJARAM
BDA/EE(S)/PL/191/89-90 DT 28.11.1989
1145
328
N.S.PALYA MICO H.B.C.S.
40' X 60'
M.SHANKAR & LAKSHMI SHANKAR
BDA/EE(S)/PL/188/89-90 DT 22.11.1989
1146
1206
B.T.M. II STAGE, I PHASE
40' X 60'
RAGHU
BDA/EE(S)/PL/22/89-90 DT 26.12.1989
1147
271
B.S.K. III STAGE, III PHASE, II BLOCK
40' X 60'
S.NAGESWARAN
BDA/EE(S)/PL/59/89-90 DT 23.12.1989
1148
1514
SARAKKI II PHASE
40' X 60'
A.V.SRINIDHI
BDA/EE(S)/PL/32/89-90 DT 28.11.1989
1149
628
B.S.K. III STAGE, II PHASE, VII BLOCK
40' X 60'
N.V.PRAKASH GUPTA
BDA/EE(S)/PL/82/89-90 DT 05.02.1990
1150
3
B.S.K. III STAGE, III PHASE, VI BLOCK
49' X 79'
B.NARAYANA
BDA/EE(S)/PL/61/89-90 DT 26.12.1989
1151
1503
MUNESWARA BLOCK B.S.K. III STAGE
59' X 39'
M.K.RANGA RAO
BDA/EE(S)/PL/84/89-90 DT 19.02.1990
1152
31
SARAKKI IV PHASE
40' X 60'
H.M.HUCHEGOWDA
BDA/EE(S)/PL/2/89-90 DT 06.11.1989
1153
838
SARAKKI II PHASE
40' X 70'
BDA/EE(S)/PL/45/89-90 DT 05.03.1990
1154
769
N.S.PALYA MICO H.B.C.S.
40' X 60'
BOGADI GUNDANNA KUMARA
SWAMY
C.K.VENKATARAMAN
BDA/EE(S)/PL/88/89-90 DT 30.06.1989
1155
555
SARAKKI II PHASE
13.41 X 18.29
GEETHA S RAO
BDA/EE(S)/PL/21/89-90 DT 29.07.1989
1156
749
KENCHENAHALLI H.B.C.S.
55' X 35'
H.G.HANUMANTHARAYAPPA
BDA/EE(S)/PL/101/89-90 DT 27.07.1989
1157
58
POORNA PRAGNA H.B.C.S., KATHARIGUPPA
40' X 60'
L.NARAYANA
BDA/EE(S)/PL/160/89-90 DT 19.10.1989
1158
315
B.S.K. III STAGE, II PHASE, VI BLOCK
40' X 57'
K.VENUGOPAL GUPTA
BDA/EE(S)/PL/28/89-90 DT 28.07.1989
1159
448
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
40' X 64'
T.A.MOHAN RAO
BDA/EE(S)/PL/262/89-90 DT 06.03.1990
1160
17
B.S.K. III STAGE, GERAHALLI
40' X 61'
T.VENKATESH
BDA/EE(S)/PL/27/89-90 DT 27.07.1989
1161
1741
SARAKKI II PHASE
43' X 60'
B.D.RAGHAVENDRA
BDA/EE(S)/PL/10/89-90 DT 12.06.1989
1162
1293
SARAKKI II PHASE
64' X 60'
M.A.RAMACHANDRA
BDA/EE(S)/PL/8/89-90 DT 03.06.1989
1163
1252
SARAKKI II PHASE
40' X 50'
M.K.SINGLACHAR
BDA/EE(S)/PL/28/89-90 DT 25.10.1989
1164
367
B.S.K. III STAGE, II PHASE, VI BLOCK
60' X 40'
S.M.SRINIVASAN
BDA/EE(S)/PL/91/89-90 DT 06.03.1990
1165
726
J.P.NAGAR II PHASE
60' X 40'
V.VASANTHA KUMARI
BDA/EE(S)/PL/44/89-90 DT 9.02.1990
1166
11
KAS OFFICERS B.T.M. LAYOUT
15.24 X 13.20
K.PARVATHI THIMMAIAH
BDA/EE(S)/PL/150/89-90 DT 20.09.1989
1167
12
KAS OFFICERS B.T.M. LAYOUT
15.39 X 13.20
K.V.NANJUNDE GOWDA
BDA/EE(S)/PL/151/89-90 DT 20.09.1989
1168
50
JAYANAGAR H.B.C.S., KADIRENAHALLI
40' X 60'
B.S.SURESH CHANDRA
BDA/EE(S)/PL/161/89-90 DT 20.10.1989
1169
64
B.S.K. III STAGE, AVALAHALLY
40' X 70'
S.IKRAMULLA MAHAMOOD
BDA/EE(S)/PL/69/89-90 DT 11.01.1990
1170
69
B.T.M. II STAGE, I PHASE
40' X 60'
UBEDULLA KHAN
BDA/EE(S)/PL/31/89-90 DT 19.02.1990
VISWABHARATHI H.B.C.S., GIRINAGAR
40' X 60'
C.S.VENKATESHAN
BDA/EE(S)/PL/48/89-90 DT 24.05.1989
B.S.K. III STAGE, IV PHASE, VII BLOCK
40' X 60'
K.KASI
BDA/EE(S)/PL/73/89-90 DT 18.01.1990
N.S.PALYA B.T.M. LAYOUT
40' X 60'
S.SREEKANTESWARAN
BDA/EE(S)/PL/25/89-90 DT 17.01.1990
1171
12/F
1172
313
1173
56
1174
410
SARAKKI II PHASE
58' X 45'
K.MYTHILI RAJAGOPAL
BDA/EE(S)/PL/40/89-90 DT 17.01.1990
1175
959
IDEAL HOMES H.B.C.S., KENCHENAHALLI
55' X 45'
MANJULA
BDA/EE(S)/PL/236/89-90 DT 15.01.1990
1176
979
N.S.PALYA MICO H.B.C.S.
38' X 60'
K.V.MADHUSUDAN
BDA/EE(S)/PL/178/89-90 DT 17.11.1989
1177
574
B.S.K. III STAGE, II PHASE, VI BLOCK
64' X 41'
C.HANUMANTHAPPA
BDA/EE(S)/PL/100/89-90 DT 15.03.1990
1178
453
SARAKKI II PHASE
45' X 65'
BDA/EE(S)/PL/48/89-90 DT 07.03.1990
JAYANAGAR H.B.C.S., KADIRENAHALLI
68' X 38'
DORAISWAMY & CHANDRA
DORAISWAMY
P.G.SUNITHA
1179
561/2
BDA/EE(S)/PL/249/89-90 DT 01.02.1990
1180
397
B.S.K. III STAGE, III PHASE, II BLOCK
40' X 60'
TULASI DAS
BDA/EE(S)/PL/94/89-90 DT 15.03.1990
1181
943
IDEAL HOMES H.B.C.S., KENCHENAHALLI
40' X 60'
S.RAGHAVAIAH
BDA/EE(S)/PL/265/89-90 DT 15.03.1990
1182
1091
SARAKKI II PHASE
76' X 40'
K.RAGHUNATHA NAIK
BDA/EE(S)/PL/50/89-90 DT 15.03.1990
1183
37
SRI.ANJANEYA SWAMY H.B.C.S., ITTMADU
60' X 36'
B.RAJANNA
BDA/EE(S)/PL/268/89-90 DT 19.03.1990
1184
595
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
40' X 60'
S.SACHIDANANDA MURTHY
BDA/EE(S)/PL/267/89-90 DT 19.03.1990
1185
1008
1186
387
1187
1231/H
B.T.M. I STAGE, I PHASE
40' X 60'
B.GOPALAPPA
BDA/EE(S)/PL/35/89-90 DT 23.03.1990
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
68' X 40'
H.N.SEETHARAMAIAH
BDA/EE(S)/PL/274/89-90 DT 23.03.1990
B.S.K. III STAGE, HOSAKEREHALLI SY NOS
40' X 60'
G.S.YAMUANA
BDA/EE(S)/PL/101/89-90 DT 19.03.1990
1188
515
B.S.K. III STAGE, III PHASE, III BLOCK
40' X 60'
H.S.RAMACHANDRA
BDA/EE(S)/PL/98/89-90 DT 15.03.1990
1189
126
B.S.K. III STAGE, III PHASE, I BLOCK
40' X 60'
MUNIYAPPA
BDA/EE(S)/PL/96/89-90 DT 15.03.1990
1190
MUNESWARA BLOCK B.S.K. III STAGE
60' X 44'
K.SHARADA BAI
BDA/EE(S)/PL/72/89-90 DT 18.01.1990
1191
1468 &
1469
284
IDEAL HOMES H.B.C.S., KENCHENAHALLI
40' X 60'
K.S.CHANDRA SHEKHARAN
BDA/EE(S)/PL/190/89-90 DT 22.11.1989
1192
392
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
64' X 40'
Y.S.GURUPRASAD
BDA/EE(S)/PL/70/89-90 DT 14.06.1989
IDEAL HOMES H.B.C.S., KENCHENAHALLI
50' X 61'
SHYLARAJU
BDA/EE(S)/PL/39/89-90 DT 16.05.1989
1193
290/B
1194
735
IDEAL HOMES H.B.C.S., KENCHENAHALLI
58' X 37'
B.A.POONACHA
BDA/EE(S)/PL/256/89-90 DT 05.02.1990
1195
650
B.S.K. III STAGE, II PHASE, VII BLOCK
40' X 60'
K.N.PANDU
BDA/EE(S)/PL/77/89-90 DT 27.01.1990
1196
909
N.S.PALYA MICO H.B.C.S.
64' X 40'
H.RAMACHANDRA
BDA/EE(S)/PL/271/89-90 DT 19.03.1990
JAYANAGAR H.B.C.S., KADIRENAHALLI
45' X 51'
M.S.KAMATH
BDA/EE(S)/PL/273/89-90 DT 23.03.1990
JAYANAGAR H.B.C.S., KADIRENAHALLI
45' X 71'
A.B.SUNANDA
BDA/EE(S)/PL/276/89-90 DT 23.03.1990
BDA/EE(S)/PL/106/89-90 DT 23.03.1990
1197
71/41
1198
11
1199
SRINIVASA NAGAR II PHASE, B.S.K. III STAGE
45' X 60'
1200
156 &
157
1204
SARAKKI II PHASE
34' X 60'
S.VENKATARAMAN & JYOTHI
RAMAN
M.S.SEETHARAMA RAO
1201
1316/A
SARAKKI II PHASE
47' X 54'
B.K.V.MURTHY
BDA/EE(S)/PL/51/89-90 DT 19.03.1990
BDA/EE(S)/PL/53/89-90 DT 23.03.1990
1202
575
SARAKKI VI PHASE
40' X 60'
B.ANASUYA
BDA/EE(S)/PL/17/89-90 DT 23.03.1990
1203
205
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
40' X 81'
K.B.DESHMUKH
BDA/EE(S)/PL/270/89-90 DT 19.03.1990
IDEAL HOMES H.B.C.S., KENCHENAHALLI
50' X 63'
D.S.PANDURANGA
BDA/EE(S)/PL/259/89-90 DT 08.02.1990
B.S.K. III STAGE, HOSAKEREHALLI SY NOS
40' X 60'
PRAKASH S DESHAPANDE
BDA/EE(S)/PL/85/89-90 DT 19.02.1990
B.S.K. III STAGE, AVALAHALLY
40' X 60'
V.GOVINDAIAH
BDA/EE(S)/PL/95/89-90 DT 15.03.1990
1204
98/C
1205
6
1206
171
1207
184
B.S.K. III STAGE, IV PHASE, VII BLOCK
40' X 59'
S.H.RAMACHANDRA
BDA/EE(S)/PL/97/89-90 DT 15.03.1990
1208
560
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
39' X 60'
S.BABU RAO
BDA/EE(S)/PL/248/89-90 DT 29.01.1990
1209
936
N.S.PALYA MICO H.B.C.S.
18.29 X 12.19
MEENA MIGALNI
BDA/EE(S)/PL/284/89-90 DT 09.03.1990
1210
147
B.S.K. III STAGE, II PHASE, IV BLOCK
39' X 71'
K.V.PRABHAKARA RAO
BDA/EE(S)/PL/45/89-90 DT 09.11.1989
1211
18
SARAKKI VI PHASE
40' X 60'
S.R.PADMA PRIYA
BDA/EE(S)/PL/15/89-90 DT 02.02.1990
1212
65
53' X 40'
L.M.NIRANJANA MURTHY
BDA/EE(S)/PL/78/89-90 DT 29.01.1990
1213
122
B.S.K. III STAGE, CHANAMANAKERE ACHUKATU
LAYOUT
VISWABHARATHI H.B.C.S., GIRINAGAR
40' X 60'
SHIVARAM D KULKARNI
BDA/EE(S)/PL/272/89-90 DT 19.03.1990
1214
14
SARAKKI IV PHASE
40' X 60'
S.RAMASWAMY
BDA/EE(S)/PL/1/89-90 DT 28.08.1989
B.S.K. III STAGE, HOSAKEREHALLI SY NOS
40' X 60'
C.JAYABALAN
BDA/EE(S)/PL/56/89-90 DT 23.12.1989
1215
1231/J
1216
263
B.S.K. III STAGE, III PHASE, V BLOCK
18.00 X 12.00
K.M.THIMMAPPA
BDA/EE(S)/PL/62/89-90 DT 28.12.1989
1217
192
B.S.K. III STAGE, KATHARIGUPPE SY NOS
39' X 59'
D.V.VENKATA SUBRAMANYAM
BDA/EE(S)/PL/58/89-90 DT 23.12.1989
1218
89
B.S.K. III STAGE, III PHASE, VI BLOCK
40' X 60'
N.S.NARASIMHA SWAMY
BDA/EE(S)/PL/2/89-90 DT 05.04.1989
1219
116
B.S.K. III STAGE, II PHASE IV BLOCK
40' X 60'
SARVAMANGALA
BDA/EE(S)/PL/108/89-90 DT 30.03.1990
1220
60
B.S.K. III STAGE, III PHASE, IV BLOCK
59' X 32'
T.KARUNAKARA SETTY
BDA/EE(S)/PL/33/89-90 DT 10.08.1989
1221
169
B.S.K. III STAGE, AVALAHALLY
60' X 40'
R.E.LALITHA
BDA/EE(S)/PL/68/89-90 DT 09.01.1990
1222
1998
SARAKKI II PHASE
50' X 65'
B.T.ASHOK
BDA/EE(S)/PL/24/89-90 DT 22.08.1989
1223
75
N.S.PALYA B.T.M. LAYOUT
40' X 60'
K.VENKATARAM
BDA/EE(S)/PL/11/89-90 DT 05.07.1989
1224
143
VISWABHARATHI H.B.C.S., GIRINAGAR
40' X 60'
LAKSHMI NARAYANA RAO
BDA/EE(S)/PL/26/89-90 DT 25.04.1989
1225
30
N.S.PALYA MICO H.B.C.S.
40' X 60'
R.KRISHNA MURTHY
BDA/EE(S)/PL/225/89-90 DT 30.12.1989
1226
627
SARAKKI I PHASE
45' X 62'
P.J.PREMKUMAR
BDA/EE(S)/PL/6/89-90 DT 19.08.1989
1227
25
SARAKKI VI PHASE
40' X 60'
S.USHARANI
BDA/EE(S)/PL/13/89-90 DT 22.11.1989
1228
64
KAVERI H.B.C.S. B.T.M. LAYOUT
40' X 54'
S.A.GEETHA JAYANNA
BDA/EE(S)/PL/117/89-90 DT 10.08.1989
1229
174
B.S.K. III STAGE, AVALAHALLY
40' X 60'
SUSHILA
BDA/EE(S)/PL/74/89-90 DT 22.01.1990
1230
6
K.A.S. OFFICERS H.B.C.S. MADIWALA
40' X 60'
M.S.UMESH CHANDRA
BDA/EE(S)/PL/121/89-90 DT 10.08.1989
1231
809
IDEAL HOMES H.B.C.S., KENCHENAHALLI
55' X 43'
M.BALAN
BDA/EE(S)/PL/13/89-90 DT 15.04.1989
1232
1298
SARAKKI II PHASE
40' X 60'
A.N.MANJULA
BDA/EE(S)/PL/22/89-90 DT 08.08.1989
1233
33
POORNA PRAGNA H.B.C.S., KATHARIGUPPA
40' X 60'
B.A.PANKAJAKSHI
BDA/EE(S)/PL/179/89-90 DT 17.11.1989
1234
819
N.S.PALYA
40' X 60'
G.D.NARASIMAHA MURTHY
BDA/EE(S)/PL/163/89-90 DT 23.10.1989
1235
137
IDEAL HOMES H.B.C.S., KENCHENAHALLI
57' X 37'
Y.LAKSHMI NARASAIAH
BDA/EE(S)/PL/154/89-90 DT 22.09.1989
1236
881
N.S.PALYA MICO H.B.C.S.
40' X 62'
P.S.VARADARAJA IYANGAR
BDA/EE(S)/PL/73/89-90 DT 15.06.1989
1237
754
SARAKKI I PHASE
45' X 60'
K.SATHYANARAYANA
BDA/EE(S)/PL/4/89-90 DT 24.06.1989
IDEAL HOMES H.B.C.S., KENCHENAHALLI
56' X 48'
T.S.VISWESWARAIAH
BDA/EE(S)/PL/52/89-90 DT 26.05.1989
1238
94/A
1239
474
SARAKKI II PHASE
45' X 63'
VINOD KUMAR DOGRA
BDA/EE(S)/PL/41/89-90 DT 17.01.1990
1240
937
N.S.PALYA MICO H.B.C.S.
40' X 60'
M.RAJENDRA PRASAD
BDA/EE(S)/PL/24/89-90 DT 25.04.1989
1241
1140
B.S.K. III STAGE, HOSAKEREHALLI SY NOS
40' X 60'
C.PREMALATHA
BDA/EE(S)/PL/57/89-90 DT 23.12.1989
1242
52
B.O.O. H.B.C.S. MADIWALA
40' X 60'
K.G.BHAT
BDA/EE(S)/PL/50/89-90 DT 26.05.1989
1243
807
N.S.PALYA MICO H.B.C.S.
40' X 61'
J.R.SATHYANARAYANA RAO
BDA/EE(S)/PL/22/89-90 DT 24.04.1989
1244
1670
SARAKKI II PHASE
40' X 60'
VIMALA
BDA/EE(S)/PL/20/89-90 DT 28.07.1989
1245
501
B.S.K. III STAGE, II PHASE, VI BLOCK
36' X 59'
S.N.UGRAPPA
BDA/EE(S)/PL/20/89-90 DT 03.07.1989
1246
84
SARAKKI II PHASE
42' X 62'
M.A.NANJUNDA SWAMY
BDA/EE(S)/PL/42/89-90 DT 22.01.1990
1247
1194
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
40' X 60'
P.C.RAGUNATHAN
BDA/EE(S)/PL/157/89-90 DT 03.10.1989
1248
183
IDEAL HOMES H.B.C.S., KENCHENAHALLI
55' X 36'
P.G.SUBRAMANYAM
BDA/EE(S)/PL/60/89-90 DT 02.06.1989
1249
35
SARAKKI VI PHASE
40' X 60'
D.S.ANASUYA
BDA/EE(S)/PL/11/89-90 DT 20.09.1989
1250
814
N.S.PALYA MICO H.B.C.S.
30' X 50'
K.JAYARAM
BDA/EE(S)/PL/23/89-90 DT 21.04.1989
1251
16
SARAKKI I PHASE
45' X 60'
VEENA MALLIK & ROHIT MALLIK
BDA/EE(S)/PL/7/89-90 DT 29.08.1989
1252
298
SUBEDARPALYA H.B.C.S., SARAKKI
18.28 X 13.72
ANIL AGARAWAL
BDA/EE(S)/PL/282/89-90 DT 31.03.1990
1253
805
N.S.PALYA MICO H.B.C.S.
40' X 61'
B.G.BALAKRISHNA
BDA/EE(S)/PL/286/89-90 DT 31.03.1990
1254
19
B.O.O. H.B.C.S. MADIWALA
40' X 60'
K.AMARESWARA RAO
BDA/EE(S)/PL/46/89-90 DT 17.05.1989
ITI H.B.C.S., KATHARIGUPPA
40' X 60'
S.MADHAVI
BDA/EE(S)/PL/43/89-90 DT 16.05.1989
VISWABHARATHI H.B.C.S., GIRINAGAR
40' X 60'
D.VASUDEVA RAO
BDA/EE(S)/PL/232/89-90 DT 06.01.1990
BO-H.B.C.S.
40' X 60'
VICE CHAIRMAN
BDA/EE(S)/PL/242/89-90 DT 22.01.1990
SARAKKI I PHASE
50' X 70'
PREMA H REDDY
BDA/EE(S)/PL/2/89-90 DT 05.05.1989
1255
90/2
1256
247
1257
59
1258
1365
1259
726
KEMPEGOWDA H.B.C.S., KATHRIGUPPA
40' X 61'
T.N.PANDARINATH
BDA/EE(S)/PL/68/89-90 DT 13.06.1989
1260
104
B.T.M. DOLLAR SCHEME MADIWALA
40' X 60'
K.SUSHEELA MURTHY
BDA/EE(S)/PL/6/89-90 DT 28.04.1989
1261
900
N.S.PALYA MICO H.B.C.S.
56' X 40'
C.S.SUBRAMANIAN
BDA/EE(S)/PL/90/89-90 DT 10.07.1989
1262
148
BANK OFFICERS H.B.C.S., B.G.ROAD
41' X 60'
VICE CHAIRMAN
BDA/EE(S)/PL/20/89-90 DT 21.04.1989
1263
7
TELECOM H.B.C.S., CHIKKALASANDRA
44' X 60'
V.SURENDRA BABU
BDA/EE(S)/PL/102/89-90 DT 27.07.1989
1264
806
N.S.PALYA MICO H.B.C.S.
40' X 61'
B.T.RANGARAJU
BDA/EE(S)/PL/82/89-90 DT 24.06.1989
1265
178
B.S.K. III STAGE, III PHASE, I BLOCK
40' X 60'
PUTTAMMA
BDA/EE(S)/PL/53/89-90 DT 15.12.1989
1266
9
S.B.I. H.B.C.S. SAT SARAKKI
45' X 60'
B.R.SEETHARAMAPPA SETTY
BDA/EE(S)/PL/206/89-90 DT 12.12.1989
1267
576
B.S.K. III STAGE, KATHARIGUPPE SY NOS
63' X 40'
Y.V.S.MURTHY
BDA/EE(S)/PL/16/89-90 DT 21.06.1989
1268
267
KSRTC H.B.C.S., SARAKKI III PHASE
40' X 60'
P.SHARADA
BDA/EE(S)/PL/201/89-90 DT 04.12.1989
1269
39
N.S.PALYA MICO H.B.C.S.
40' X 60'
S.NAGARAJA
BDA/EE(S)/PL/153/89-90 DT 22.09.1989
1270
48
BANNERAGHATTA ROAD
90' X 40'
YASIMINEHASAN
BDA/EE(S)/PL/192/89-90 DT 28.11.1989
1271
552
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
59' X 40'
A.GIRIJAMBA
BDA/EE(S)/PL/211/89-90 DT 15.12.1989
IDEAL HOMES H.B.C.S., KENCHENAHALLI
56' X 43'
T.S.VISWESWARAIAH
BDA/EE(S)/PL/207/89-90 DT 15.12.1989
1272
94/A
1273
162
SRINIVASA NAGAR II PHASE, B.S.K. III STAGE
33' X 87'
D.R.KRISHNA MURTHY
BDA/EE(S)/PL/105/89-90 DT 23.03.1990
1274
84
B.T.M. I STAGE, I PHASE
40' X 60'
C.P.DAYANANDA
BDA/EE(S)/PL/13/89-90 DT 28.07.1989
1275
705
N.S.PALYA MICO H.B.C.S.
63' X 40'
BASAVARAJA
BDA/EE(S)/PL/283/89-90 DT 31.03.1990
1276
1271
SARAKKI II PHASE
60' X 37'
M.M.KINI
BDA/EE(S)/PL/9/89-90 DT 12.06.1989
1277
40
VISWABHARATHI H.B.C.S., GIRINAGAR
40' X 60'
C.S.GURURAJA
BDA/EE(S)/PL/21/89-90 DT 24.04.1989
1278
2575
KUMARA SWAMY LAYOUT II STAGE
40' X 60'
BASAVARAJA VALI
BDA/EE(S)/PL/5/89-90 DT 06.06.1989
1279
52
SARAKKI II PHASE
45' X 61'
K.NARENDRA KUMAR
BDA/EE(S)/PL/1/89-90 DT 21.04.1989
1280
369
IDEAL HOMES H.B.C.S., KENCHENAHALLI
40' X 60'
M.REKHA
BDA/EE(S)/PL/12/89-90 DT 15.04.1989
1281
1126
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
40' X 60'
SHYAM TUKARAM KATAVATE
BDA/EE(S)/PL/210/89-90 DT 15.12.1989
IDEAL HOMES H.B.C.S., KENCHENAHALLI
50' X 57'
N.R.SAYARAM
BDA/EE(S)/PL/266/89-90 DT 19.03.1990
B.S.K. III STAGE, III PHASE, II BLOCK
40' X 60'
DEVENDRA KUMAR
BDA/EE(S)/PL/104/89-90 DT 23.03.1990
1282
650/D
1283
276
1284
30
KEMPEGOWDA H.B.C.S., KATHRIGUPPA
53' X 45'
N.SRIKANTAN
BDA/EE(S)/PL/275/89-90 DT 23.03.1990
1285
1221
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
63' X 44'
M.PHILOMEN RAJU
BDA/EE(S)/PL/269/89-90 DT 19.03.1990
1286
501
SARAKKI II PHASE
40' X 60'
C.S.VENKATARAMAN
BDA/EE(S)/PL/16/89-90 DT 19.07.1989
1287
585
N.S.PALYA MICO H.B.C.S.
40' X 60'
AFZAL KAZI & SHAHEEUKAZI
BDA/EE(S)/PL/78/89-90 DT 17.06.1989
1288
1210
B.T.M. II STAGE, I PHASE
40' X 60'
M.ANANDA KUMAR
BDA/EE(S)/PL/7/89-90 DT 03.06.1989
1289
138
B.S.K. III STAGE, II PHASE, IV BLOCK
40' X 60'
H.K.INDIRA
BDA/EE(S)/PL/89/89-90 DT 05.03.1990
B.S.K. III STAGE, HOSAKEREHALLI SY NOS
40' X 60'
A.NIRMALA BAI
BDA/EE(S)/PL/42/89-90 DT 03.10.1989
1290
990/A
1291
342
B.S.K. III STAGE, II PHASE, VI BLOCK
40' X 60'
M.YAGNESWARA RAO
BDA/EE(S)/PL/97/89-90 DT 28.06.1989
1292
265
VISWABHARATHI H.B.C.S., GIRINAGAR
40' X 60'
K.B.AHALYAMMA
BDA/EE(S)/PL/134/89-90 DT 30.08.1989
1293
917
N.S.PALYA MICO H.B.C.S.
40' X 60'
M.M.MOHAN & M.PREETHI MOHAN
BDA/EE(S)/PL/14/89-90 DT 15.07.1989
1294
907
N.S.PALYA MICO H.B.C.S.
62' X 40'
H.NAGARAJA
BDA/EE(S)/PL/129/89-90 DT 25.08.1989
1295
12
ITI H.B.C.S., KATHARIGUPPA
50' X 58'
M.V.KRISHNA MURTHY
BDA/EE(S)/PL/128/89-90 DT 23.08.1989
1296
574
B.S.K. III STAGE, KATHARIGUPPE SY NOS
60' X 40'
M.K.GANAPATHY
BDA/EE(S)/PL/32/89-90 DT 05.08.1989
1297
276
VISWABHARATHI H.B.C.S., GIRINAGAR
60' X 40'
GEETHA BHAT
BDA/EE(S)/PL/120/89-90 DT 10.08.1989
1298
52
POORNA PRAGNA H.B.C.S., KATHARIGUPPA
40' X 60'
B.B.RAJARAM
BDA/EE(S)/PL/98/89-90 DT 19.07.1989
1299
913
N.S.PALYA MICO H.B.C.S.
40' X 60'
RAGHAVENDRA RAO & U.B.GEETHA
BDA/EE(S)/PL/111/89-90 DT 05.08.1989
1300
15
MARUTHI H.B.C.S., TAVAREKERE
40' X 60'
N.BHEEMA RAO
BDA/EE(S)/PL/106/89-90 DT 27.07.1989
1301
733
N.S.PALYA MICO H.B.C.S.
51' X 66'
S.G.NAGARAJ
BDA/EE(S)/PL/109/89-90 DT 31.07.1989
1302
967
N.S.PALYA MICO H.B.C.S.
39' X 60'
CHANNA BASAVAIAH
BDA/EE(S)/PL/115/89-90 DT 08.08.1989
1303
2587
KUMARA SWAMY LAYOUT II STAGE
40' X 60'
G.C.BHEEMESH
BDA/EE(S)/PL/9/89-90 DT 04.08.1989
1304
117
VISWABHARATHI H.B.C.S., GIRINAGAR
40' X 60'
M.K.VARADARAJAN
BDA/EE(S)/PL/280/89-90 DT 30.03.1990
1305
41
POORNA PRAGNA H.B.C.S., KATHARIGUPPA
40' X 60'
R.LAKSHMI
BDA/EE(S)/PL/221/89-90 DT 26.12.1989
1306
25
BHARATH H.B.C.S., N.S.PALYA
40' X 65'
B.PADMA
BDA/EE(S)/PL/228/89-90 DT 03.01.1990
1307
171
IDEAL HOMES H.B.C.S., KENCHENAHALLI
54' X 34'
SANJEEVA M SUBEDAR
BDA/EE(S)/PL/279/89-90 DT 30.03.1990
1308
1000
IDEAL HOMES H.B.C.S., KENCHENAHALLI
48' X 60'
RANGANATHAN
BDA/EE(S)/PL/278/89-90 DT 30.03.1990
1309
13
B.S.K. III STAGE, III PHASE, V BLOCK
40' X 60'
S.RAMAMANI
BDA/EE(S)/PL/26/89-90 DT 27.07.1989
1310
38
BANK OFFICERS H.B.C.S.
40' X 60'
SRIPATHI BHAT K.
BDA/EE(S)/PL/114/89-90 DT 08.08.1989
1311
159
VISWABHARATHI H.B.C.S., GIRINAGAR
40' X 60'
S.RAGHAVAN
BDA/EE(S)/PL/37/89-90 DT 12.05.1989
1312
390
VISWABHARATHI H.B.C.S., GIRINAGAR
60' X 40'
R.V.SHAMA RAO
BDA/EE(S)/PL/42/89-90 DT 16.05.1989
1313
162
N.S.PALYA MICO H.B.C.S.
39' X 60'
M.SRINIVASA
BDA/EE(S)/PL/107/89-90 DT 27.07.1989
1314
671
B.T.M. II STAGE, I PHASE
40' X 60'
R.S.MAHESWARAPPA
BDA/EE(S)/PL/14/89-90 DT 04.08.1989
1315
7
K.A.S. OFFICERS H.B.C.S. MADIWALA
40' X 60'
J.ASWATH
BDA/EE(S)/PL/108/89-90 DT 31.07.1989
1316
551
B.S.K. III STAGE, II PHASE, VI BLOCK
60' X 40'
P.R.MALLIKARJUNA
BDA/EE(S)/PL/92/89-90 DT 06.03.1990
1317
5
K.E.B. H.B.C.S., B.G. ROAD
43' X 60'
K.P.PILLAI
BDA/EE(S)/PL/141/89-90 DT 14.09.1989
1318
949
N.S.PALYA MICO H.B.C.S.
40' X 62'
K.MADHAVAKINI & NIRMALA M KINI
BDA/EE(S)/PL/116/89-90 DT 08.08.1989
1319
1096
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
40' X 60'
VIJAYANAND NARAYANA NAIK
BDA/EE(S)/PL/219/89-90 DT 26.12.1989
1320
23
KALIDASA LABOURES H.B.C.S., SRINAGARA
40' X 60'
D.S.GURURAJA
BDA/EE(S)/PL/10/89-90 DT 15.04.1989
1321
680
B.T.M. II STAGE, I PHASE
40' X 60'
M.S.HARISH
BDA/EE(S)/PL/16/89-90 DT 15.09.1989
1322
174
VISWABHARATHI H.B.C.S., GIRINAGAR
59' X 40'
SATHYALAKSHMI
BDA/EE(S)/PL/208/89-90 DT 15.12.1989
1323
1584
SARAKKI II PHASE
40' X 60'
K.VAGESH
BDA/EE(S)/PL/2/89-90 DT 08.05.1989
1324
129
ITI H.B.C.S., KATHARIGUPPA
60' X 45'
C.A.VEDAVYASA RAO
BDA/EE(S)/PL/195/89-90 DT 28.11.1989
1325
11
POORNA PRAGNA H.B.C.S., B.S.K. III STAGE
40' X 60'
N.NARASIMHA MURTHY
BDA/EE(S)/PL/229/89-90 DT 03.01.1990
1326
355
N.S.PALYA MICO H.B.C.S.
40' X 60'
V.M.SINGARAYAN
BDA/EE(S)/PL/260/89-90 DT 24.02.1990
1327
2
B.T.M. LAYOUT, MADIWALA
40' X 60'
B.L.RADHAKRISHNA
BDA/EE(S)/PL/28/89-90 DT 27.01.1990
JAYANAGAR H.B.C.S., KADIRENAHALLI
12.19 X 17.98
T.J.MANJULA
BDA/EE(S)/PL/105/89-90 DT 27.07.1989
1328
26/41
1329
762
SARAKKI I PHASE
43' X 60'
C.MUNIYALLAPPA
BDA/EE(S)/PL/1/89-90 DT 21.04.1989
1330
102
B.S.K. III STAGE, ITTAMADU VILLAGE
40' X 63'
G.KAMALESWARAN
BDA/EE(S)/PL/22/89-90 DT 06.07.1989
1331
1515
SARAKKI II PHASE
40' X 60'
K.RAMAKRISHNA
BDA/EE(S)/PL/23/89-90 DT 10.08.1989
1332
731
N.S.PALYA MICO H.B.C.S.
45' X 66'
MARUTHI & SHASHIKALA
BDA/EE(S)/PL/55/89-90 DT 29.05.1989
1333
269
N.S.PALYA MICO H.B.C.S.
40' X 59'
KRISHNAIAH
BDA/EE(S)/PL/122/89-90 DT 10.08.1989
1334
810
IDEAL HOMES H.B.C.S., KENCHENAHALLI
43' X 54'
CHITRA SWAMINATHAN
BDA/EE(S)/PL/61/89-90 DT 02.06.1989
Cataloguing and indexing of records as envisaged under section 4(1) (a) of the Right to information Act 2005
LIST OF PLAN SANCTIONED FILES DURING THE YEAR 90-91 IN EE(S) DIVISION
SL
NO.
1335
SITE
NO.
NAME OF THE LAYOUT
DIMENSION
APPLICANT NAME
SANCTION EE NO/DATE
27
BIKASIPURA SPACE EMPLOYEES HBCS
60' X 40'
S.MOHAN
BDA/EE(S)/PL/121/90-91 DT 03.11.1990
1336
869
BIKASIPURA SPACE EMPLOYEES HBCS
60' X 40'
P.RAMALINGAM
BDA/EE(S)/PL/152/90-91 DT 03.11.1990
1337
618
BIKASIPURA SPACE EMPLOYEES HBCS
60' X 40'
K.SUBRAMANIAM
BDA/EE(S)/PL/153/90-91 DT 03.11.1990
1338
146
BIKASIPURA SPACE EMPLOYEES HBCS
60' X 40'
B.S.NATARAJA
BDA/EE(S)/PL/154/90-91 DT 03.11.1990
1339
248
N.S.PALYA MICO H.B.C.S.
60' X 40'
L.L.KUMAR
BDA/EE(S)/PL/155/90-91 DT 03.11.1990
1340
523
B.E.M.L., H.B.C.S.
60' X 39'
PRAMILA SHANTHAKUMARI
BDA/EE(S)/PL/156/90-91 DT 03.11.1990
1341
815
N.S.PALYA MICO H.B.C.S.
60' X 40'
LILY THERESA & JOSEPH K RAJIV
BDA/EE(S)/PL/157/90-91 DT 03.11.1990
1342
465
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
60' X 40'
H.K.GURURAJA RAO
BDA/EE(S)/PL/158/90-91 DT 06.11.1990
1343
427
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
60' X 40'
V.S.SRIPADA RAO
BDA/EE(S)/PL/159/90-91 DT 06.11.1990
1344
29
B.S.K. III STAGE, POORNA PVAJNA H.B.C.S.
60' X 40'
K.N.UMAJI RAO
BDA/EE(S)/PL/160/90-91 DT 06.11.1990
1345
41
BIKASIPURA SPACE EMPLOYEES HBCS
60' X 40'
C.SRIDHAR
BDA/EE(S)/PL/161/90-91 DT 08.11.1990
1346
548
BIKASIPURA SPACE EMPLOYEES HBCS
60' X 40'
S.SREERAMA MURTHY
BDA/EE(S)/PL/162/90-91 DT 08.11.1990
1347
183
KENCHENAHALLI H.B.C.S.
18.29 X 12.19
S.J.SUDHEER
BDA/EE(S)/PL/163/90-91 DT 08.11.1990
1348
501
KENCHENAHALLI H.B.C.S.
45' X 60'
M.PRASAD
BDA/EE(S)/PL/164/90-91 DT 08.11.1990
1349
483
N.S.PALYA MICO H.B.C.S.
40' X 60'
P.S.GUNASHEKARAN
BDA/EE(S)/PL/165/90-91 DT 08.11.1990
1350
123
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
60' X 40'
S.NATARAJAN
BDA/EE(S)/PL/167/90-91 DT 09.11.1990
1351
49
TAVAREKERE H.B.C.S.
60' X 38'
P.PAUL SOMAN
BDA/EE(S)/PL/168/90-91 DT 09.11.1990
1352
14
BIKASIPURA SPACE EMPLOYEES HBCS
60' X 40'
S.N.SEETHALAKSHMI
BDA/EE(S)/PL/169/90-91 DT 19.11.1990
1353
865
BIKASIPURA SPACE EMPLOYEES HBCS
60' X 40'
D.L.SHIROLIKAR
BDA/EE(S)/PL/170/90-91 DT 19.11.1990
1354
250
BIKASIPURA SPACE EMPLOYEES HBCS
60' X 40'
SANJAY DAS GUPTA
BDA/EE(S)/PL/171/90-91 DT 19.11.1990
1355
248
BIKASIPURA SPACE EMPLOYEES HBCS
40' X 60'
M.S.S.PRABHU
BDA/EE(S)/PL/172/90-91 DT 19.11.1990
1356
541
BIKASIPURA SPACE EMPLOYEES HBCS
60' X 40'
A.V.PAKKI
BDA/EE(S)/PL/173/90-91 DT 19.11.1990
1357
196
KENCHENAHALLI H.B.C.S.
N.KRISHNA MURTHY
BDA/EE(S)/PL/174/90-91 DT 19.11.1990
1358
287
KENCHENAHALLI H.B.C.S.
(38+43)/2 X
(58+61)/2
40' X 60'
ANAND N KOTIAN
BDA/EE(S)/PL/175/90-91 DT 19.11.1990
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
60' X 40'
K.SIDDAIAH
BDA/EE(S)/PL/176/90-91 DT 19.11.1990
1359
573/F
1360
896
N.S.PALYA MICO H.B.C.S.
53' X 40'
A.T.HANUMANTHAPPA
BDA/EE(S)/PL/177/90-91 DT 22.11.1990
1361
696
BIKASIPURA SPACE EMPLOYEES HBCS
60' X 40'
K.H.LEELAVATHI
BDA/EE(S)/PL/178/90-91 DT 22.11.1990
1362
245
BIKASIPURA SPACE EMPLOYEES HBCS
60' X 40'
K.V.SREENIVASAIAH
BDA/EE(S)/PL/179/90-91 DT 22.11.1990
1363
429
BIKASIPURA SPACE EMPLOYEES HBCS
60' X 40'
A.K.KRISHNAPRASAD
BDA/EE(S)/PL/180/90-91 DT 22.11.1990
1364
264
BIKASIPURA SPACE EMPLOYEES HBCS
60' X 40'
S.C.DURGAD
BDA/EE(S)/PL/181/90-91 DT 22.11.1990
1365
243
BIKASIPURA SPACE EMPLOYEES HBCS
60' X 55'
M.K.PADMANABHAM
BDA/EE(S)/PL/182/90-91 DT 22.11.1990
1366
17
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
60' X 40'
PRABHAKAR KULAKARNI
BDA/EE(S)/PL/183/90-91 DT 22.11.1990
1367
1090
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
60' X 40'
CHANNAVEERA DEVARU
BDA/EE(S)/PL/184/90-91 DT 22.11.1990
1368
43
B.S.K. III STAGE, H.B.C.S.
40' X 60'
B.V.DAYANANDA
BDA/EE(S)/PL/185/90-91 DT 23.11.1990
1369
697
BIKASIPURA SPACE EMPLOYEES HBCS
60' X 40'
ARSHAD ALI
BDA/EE(S)/PL/186/90-91 DT 29.11.1990
1370
778
N.S.PALYA MICO H.B.C.S.
60' X 40'
MUNIYAPPA
BDA/EE(S)/PL/187/90-91 DT 29.11.1990
1371
148
BIKASIPURA SPACE EMPLOYEES HBCS
60' X 40'
V.R.PRATAP
BDA/EE(S)/PL/188/90-91 DT 29.11.1990
1372
1115
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
60' X 39'
M.V.MOHAN
BDA/EE(S)/PL/189/90-91 DT 29.11.1990
1373
6
BIKASIPURA SPACE EMPLOYEES HBCS
60' X 40'
P.S.GOEL
BDA/EE(S)/PL/190/90-91 DT 29.11.1990
1374
221
BIKASIPURA SPACE EMPLOYEES HBCS
21.40 X 12.19
B.L.AGARWAL
BDA/EE(S)/PL/191/90-91 DT 29.11.1990
1375
244
BIKASIPURA SPACE EMPLOYEES HBCS
60' X 40'
LAKSHMINARAYAN MOLILAL
BDA/EE(S)/PL/192/90-91 DT 29.11.1990
1376
235
BIKASIPURA SPACE EMPLOYEES HBCS
60' X 40'
O.P.SAPRA
BDA/EE(S)/PL/193/90-91 DT 29.11.1990
KADIRENAHALLI HBCS
60' X 40'
K.SURYA NARAYANA SHASTHRY
BDA/EE(S)/PL/194/90-91 DT 01.12.1990
1377
66/41
1378
105
KENCHENAHALLI H.B.C.S.
51' X 47'
BHAGEERAMMA
BDA/EE(S)/PL/195/90-91 DT 05.12.1990
1379
13
B.E.M.L., H.B.C.S.
88' X 40'
B.S.SUBBARAO
BDA/EE(S)/PL/196/90-91 DT 05.12.1990
1380
604
BIKASIPURA SPACE EMPLOYEES HBCS
18.29 X 12.19
M.C.RAGHU
BDA/EE(S)/PL/197/90-91 DT 11.12.1990
1381
776
N.S.PALYA MICO H.B.C.S.
61' X 40'
SIDDAPPA
BDA/EE(S)/PL/198/90-91 DT 11.12.1990
1382
33
N.S.PALYA MICO H.B.C.S.
40' X 60'
V.VENUGOPAL
BDA/EE(S)/PL/199/90-91 DT 12.12.1990
1383
48
KADIRENAHALLI HBCS
60' X 40'
H.J.RAGHUNATH
BDA/EE(S)/PL/200/90-91 DT 12.12.1990
1384
1832
KUMARASWAMY LAYOUT II STAGE
53' X 40'
S.RAJAGOPALAN
BDA/EE(S)/PL/1/90-91 DT 19.04.1990
1385
2593
KUMARASWAMY LAYOUT II STAGE
60' X 40'
DR.ARUNARUDRAPPA
BDA/EE(S)/PL/2/90-91 DT 25.05.1990
1386
2554/A
KUMARASWAMY LAYOUT II STAGE
60' X 40'
K.MURALIDHARA RAO
BDA/EE(S)/PL/3/90-91 DT 26.06.1990
1387
18/4
KUMARASWAMY LAYOUT II STAGE
60' X 40'
A.LAKSHMAJI RAO
BDA/EE(S)/PL/4/90-91 DT 27.06.1990
1388
3589
KUMARASWAMY LAYOUT II STAGE
60' X 40'
M.ALAMELU
BDA/EE(S)/PL/5/90-91 DT 26.07.1990
1389
2552
KUMARASWAMY LAYOUT II STAGE
40' X 62'
T.S.HARISH
BDA/EE(S)/PL/6/90-91 DT 26.07.1990
1390
2510
KUMARASWAMY LAYOUT II STAGE
60' X 40'
B.N.KRISHNA MURTHY
BDA/EE(S)/PL/7/90-91 DT 21.08.1990
1391
2584
KUMARASWAMY LAYOUT II STAGE
60' X 40'
A.C.CHANDRAPRASAD
BDA/EE(S)/PL/8/90-91 DT 24.09.1990
1392
2581
KUMARASWAMY LAYOUT II STAGE
60' X 40'
C.T.NARAYANA
BDA/EE(S)/PL/9/90-91 DT 25.09.1990
1393
2561
KUMARASWAMY LAYOUT II STAGE
40' X 60'
A.S.RAMAKRISHNA RAO
BDA/EE(S)/PL/10/90-91 DT 08.10.1990
1394
552
KUMARASWAMY LAYOUT II STAGE
40' X 60'
SANTHANAM
BDA/EE(S)/PL/11/90-91 DT 03.11.1990
1395
1065
KUMARASWAMY LAYOUT II STAGE
60' X 40'
S.LAKSHMINARAYANA
BDA/EE(S)/PL/12/90-91 DT 29.11.1990
1396
3600
KUMARASWAMY LAYOUT II STAGE
60' X 40'
SRINIVASACHARI
BDA/EE(S)/PL/13/90-91 DT 01.12.1990
1397
1744
KUMARASWAMY LAYOUT II STAGE
60' X 40'
SHASHIKUMAR
BDA/EE(S)/PL/14/90-91 DT 28.01.1991
1398
2568
KUMARASWAMY LAYOUT II STAGE
40' X 60'
VINCENT SLDHANA
BDA/EE(S)/PL/15/90-91 DT 01.02.1991
1399
2539
KUMARASWAMY LAYOUT II STAGE
40' X
(58.6+55.2)/2
M.R.PANDITAVADHYA
BDA/EE(S)/PL/16/90-91 DT 01.02.1991
1400
2548
KUMARASWAMY LAYOUT II STAGE
40' X 61'
K.T.VENKATESH
BDA/EE(S)/PL/17/90-91 DT 05.02.1991
1401
1872
KUMARASWAMY LAYOUT II STAGE
60' X 40'
JAGANNATHAN
BDA/EE(S)/PL/18/90-91 DT 08.02.1991
1402
1825
KUMARASWAMY LAYOUT II STAGE
53' X 40'
G.PARVATHAMMA
BDA/EE(S)/PL/19/90-91 DT 22.02.1991
1403
2590
KUMARASWAMY LAYOUT II STAGE
60' X 40'
E.ANJALINE HEMALATHA
BDA/EE(S)/PL/20/90-91 DT 16.03.1991
1404
1708
KUMARASWAMY LAYOUT II STAGE
60' X 40'
T.S.SHADAKSHARA SWAMY
BDA/EE(S)/PL/21/90-91 DT 25.03.1991
1405
107
B.S.K. III STAGE V BLOCK
60' X 39'
V.VENUGOPAL
BDA/EE(S)/PL/98/90-91 DT 01.03.1991
KENCHENAHALLI H.B.C.S.
51' X 45
M.MAYA
BDA/EE(S)/PL/7/90-91 DT 21.04.1990
KEMPEGOWDA HBCS B.S.K. III STAGE
54' X 39'
SABITA
BDA/EE(S)/PL/130/90-91 DT 27.09.1990
KENCHENAHALLI H.B.C.S.
60' X 40'
M.S.RAMANATHAN
BDA/EE(S)/PL/06/90-91 DT 19.04.1990
1406
344/A
1407
39
1408
918
1409
19
SARAKKI I PHASE
60' X 45'
S.N.RAMACHANDRA RAO
BDA/EE(S)/PL/8/90-91 DT 03.01.1991
1410
1412
SARAKKI I PHASE
40' X 60'
N.RAJAGOPALA
BDA/EE(S)/PL/9/90-91 DT 22.02.1991
1411
40
SARAKKI IV PHASE
60' X 40'
MIRZA ROBBIN BAIG
BDA/EE(S)/PL/4/90-91 DT 11.07.1990
1412
13
SARAKKI IV PHASE
59' X 40'
Y.J.VISWANATHA REDDY
BDA/EE(S)/PL/5/90-91 DT 29.11.1990
1413
35
SARAKKI IV PHASE
40' X 65'
S.MOHAMMED GHOSE PEER
BDA/EE(S)/PL/7/90-91 DT 22.02.1991
1414
756
SARAKKI III PHASE
60' X 30'
PERSI G.G. PHAKEERA
BDA/EE(S)/PL/1/90-91 DT 26.06.1990
1415
578
SARAKKI I PHASE
45' X 62'
C.S.RANGA SWAMY
BDA/EE(S)/PL/1/90-91 DT 24.05.1990
1416
585
SARAKKI I PHASE
62' X 45'
P.K.VENKATACHALAPATHY
BDA/EE(S)/PL/2/90-91 DT 17.08.1990
1417
1420
SARAKKI I PHASE
60' X 40'
M.S.AVADHANARI
BDA/EE(S)/PL/3/90-91 DT 03.09.1990
1418
629
SARAKKI I PHASE
62' X 45'
LATHA U KAMATH
BDA/EE(S)/PL/4/90-91 DT 20.10.1990
1419
43
N.S.PALYA MICO H.B.C.S.
40' X 60'
N.RAJAGOPALA GUPTA
BDA/EE(S)/PL/101/90-91 DT 25.08.1990
1420
37
SRI ANJANEYA SWAMY H.B.C.S., ETTMADU SY NOS
36' X 60'
B.RAJANNA
BDA/EE(S)/PL/02/90-91 DT 25.08.1990
1421
475
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
60' X 40'
N.SHIVASWAMY
BDA/EE(S)/PL/103/90-91 DT 03.09.1990
1422
386
KADIRENAHALLI HBCS
61' X 40'
S.G.ARUN
BDA/EE(S)/PL/104/90-91 DT 03.09.1990
1423
798
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
40' x 61'
G.K.VELU
BDA/EE(S)/PL/105/90-91 DT 03.09.1990
1424
29
TAVAREKERE H.B.C.S.
40' X 58'
J.PAPANNA
BDA/EE(S)/PL/106/90-91 DT 03.09.1990
1425
808
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
43' X 60'
NARAYANA GUDIGARA
BDA/EE(S)/PL/107/90-91 DT 03.09.1990
1426
248
KENCHENAHALLI H.B.C.S.
61' X 36'
K.RATHNAKARA RAO
BDA/EE(S)/PL/108/90-91 DT 03.09.1990
1427
40
BIKASIPURA SPACE EMPLOYEES HBCS
60' X 40'
T.L.DHANABALAN
BDA/EE(S)/PL/108/90-91 DT 21.03.1991
1428
899
B.T.M. LAYOUT MICO H.B.C.S. N.S.PALYA
56' X 40'
K.KRISHNA
BDA/EE(S)/PL/109/90-91 DT 21.03.1991
KENCHENAHALLI H.B.C.S.
61' X 50'
R.C.SINGHAL
BDA/EE(S)/PL/109/90-91 DT 10.08.1990
N.S.PALYA MICO H.B.C.S.
60' X 40'
S.DASAPPA
BDA/EE(S)/PL/110/90-91 DT 10.09.1990
KENCHENAHALLI H.B.C.S.
57' X 54'
S.G.RAMA MURTHY
BDA/EE(S)/PL/111/90-91 DT 10.09.1990
KADIRENAHALLI HBCS
18.29 X 12.19
G.V.ARKESH
BDA/EE(S)/PL/112/90-91 DT 10.09.1990
1429
1430
1431
99/B
924
436/B
1432
54
1433
902
N.S.PALYA MICO H.B.C.S.
58' X 40'
PUTTARAMU
BDA/EE(S)/PL/113/90-91 DT 10.09.1990
1434
670
KENCHENAHALLI H.B.C.S.
60' X 37'
ANASEEYA
BDA/EE(S)/PL/114/90-91 DT 19.09.1990
1435
685
KENCHENAHALLI H.B.C.S.
61' X 37'
C.S.KUMAR
BDA/EE(S)/PL/115/90-91 DT 19.09.1990
1436
264
KENCHENAHALLI H.B.C.S.
58' X 46'
PADMA NARASINGA RAO
BDA/EE(S)/PL/116/90-91 DT 19.09.1990
1437
747
KENCHENAHALLI H.B.C.S.
57' X 35'
INDIRA
BDA/EE(S)/PL/117/90-91 DT 19.09.1990
1438
12
KENCHENAHALLI H.B.C.S.
61' X 35'
SUDHA VISWANATH
BDA/EE(S)/PL/118/90-91 DT 19.09.1990
1439
2
VIDHYAPEETA BALAJI H.B.C.S.
40' X 48'
P.VENKATARAMANA
BDA/EE(S)/PL/119/90-91 DT 19.09.1990
1440
159
KENCHENAHALLI H.B.C.S.
60' X 39'
H.G.ANITHA
BDA/EE(S)/PL/120/90-91 DT 22.09.1990
1441
1020
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
60' X 40'
G.N.RAMACHANDRA
BDA/EE(S)/PL/121/90-91 DT 22.09.1990
KENCHENAHALLI H.B.C.S.
50' X 40'
PAPANNA
BDA/EE(S)/PL/122/90-91 DT 22.09.1990
B.T.M. BANNERAGHATTA ROAD LAYOUT
60' X 40'
S.M.AZEEM MOHIYUDDIM
BDA/EE(S)/PL/123/90-91 DT 22.09.1990
1442
1443
450/B
21
1444
191/1
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
40' X 60'
J.Y.SAMPATH KUMAR
BDA/EE(S)/PL/124/90-91 DT 22.09.1990
B.S.K. III STAGE LAKSHMINARASIMHA H.B.C.S.
40' X 50'
THOMAS SARTO
BDA/EE(S)/PL/125/90-91 DT 25.09.1990
1445
9
1446
204
SARAKKI K.S.R.T.C., H.B.C.S.
40' X 60'
B.S.JAYACHANDRA
BDA/EE(S)/PL/126/90-91 DT 25.09.1990
1447
296
KENCHENAHALLI H.B.C.S.
40' X 60'
T.KRISHNA KUMAR
BDA/EE(S)/PL/127/90-91 DT 25.09.1990
1448
984
KENCHENAHALLI H.B.C.S.
40' X 60'
M.R.VASUNDRA
BDA/EE(S)/PL/128/90-91 DT 26.09.1990
KADIRENAHALLI HBCS
40' X 60'
PREMA G JAYARAM
BDA/EE(S)/PL/129/90-91 DT 27.09.1990
KADIRENAHALLI HBCS
40' X 60'
LATHA VASUKI
BDA/EE(S)/PL/131/90-91 DT 27.09.1990
1449
58/41
1450
39
1451
264
SARAKKI SUBEDAR PALYA H.B.C.S.
60' X 45'
P.PRAKASH SHETTY
BDA/EE(S)/PL/132/90-91 DT 27.09.1990
1452
289
KADIRENAHALLI HBCS
40' X 61'
N.N.NEHRU
BDA/EE(S)/PL/133/90-91 DT 08.10.1990
1453
322
N.S.PALYA MICO H.B.C.S.
60' X 40'
BDA/EE(S)/PL/134/90-91 DT 20.10.1990
1454
768
N.S.PALYA MICO H.B.C.S.
40' X 60'
T.SRINIVASA MURTHY & SMT
SHARADA SRINIVASA MURTHY
JAYAM NARAYAN
BDA/EE(S)/PL/135/90-91 DT 20.10.1990
N.S.PALYA MICO H.B.C.S.
40' X 60'
U.S.SINGH
BDA/EE(S)/PL/136/90-91 DT 20.10.1990
1455
971/6
1456
785
N.S.PALYA MICO H.B.C.S.
61' X 40'
P.T.BHASHYAM & SMT B.RUKMINI
BDA/EE(S)/PL/137/90-91 DT 20.10.1990
1457
412
KENCHENAHALLI H.B.C.S.
40' X 61'
H.SHIVARAMA KRISHNAN
BDA/EE(S)/PL/138/90-91 DT 22.10.1990
1458
176
KENCHENAHALLI H.B.C.S.
60' X 40'
E.N.SAMBASHIVAN
BDA/EE(S)/PL/139/90-91 DT 22.10.1990
1459
177
KENCHENAHALLI H.B.C.S.
40' X 60'
E.N.VIMALA
BDA/EE(S)/PL/140/90-91 DT 22.10.1990
1460
642
KADIRENAHALLI HBCS
40' X 60'
ASHOK C NAVALLI
BDA/EE(S)/PL/141/90-91 DT 22.10.1990
1461
466
N.S.PALYA MICO H.B.C.S.
40' X 60'
D.BHARATH
BDA/EE(S)/PL/142/90-91 DT 23.10.1990
1462
153
KENCHENAHALLI H.B.C.S.
43' X 46'
P.KRISHNA BHAT
BDA/EE(S)/PL/143/90-91 DT 25.10.1990
1463
492
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
40' X 60'
NANJUNDA SWAMY
BDA/EE(S)/PL/144/90-91 DT 25.10.1990
1464
844
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
60' X 40'
S.V.SHIVAJI RAO
BDA/EE(S)/PL/145/90-91 DT 25.10.1990
1465
50
B.S.K. III STAGE POORNA PRAJNA H.B.C.S.
40' X 60'
S.SUBBARAYA HEBBAR
BDA/EE(S)/PL/146/90-91 DT 25.10.1990
1466
176
ARKERE MICO LAYOUT
40' X 65'
M.S.VISWANATH
BDA/EE(S)/PL/147/90-91 DT 30.10.1990
1467
878
N.S.PALYA MICO H.B.C.S.
64' X 45'
BDA/EE(S)/PL/148/90-91 DT 03.11.1990
1468
57
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
40' X 60'
N.NANJUNDAIAH &
SMT.PUSHPALATHA
S.I.INAMDAR
1469
260
BIKASIPURA SPACE EMPLOYEES HBCS
40' X 60'
S.GUNDU RAO
BDA/EE(S)/PL/150/90-91 DT 03.11.1990
1470
43
N.S.PALYA MICO H.B.C.S.
40' X 60'
N.RAJAGOPALA GUPTA
BDA/EE(S)/PL/101/90-91 DT 25.08.1990
1471
567
B.S.K. III STAGE, III PHASE, III BLOCK
40' X 60'
R.RAMAPPA
BDA/EE(S)/PL/51/90-91 DT 03.09.1990
1472
264
B.S.K. III STAGE, III PHASE, II BLOCK
40' X 60'
K.KRISHNA PRASAD
BDA/EE(S)/PL/52/90-91 DT 03.09.1990
1473
546
B.S.K. III STAGE, KATHARIGUPPE SY NOS
40' X 60'
USHA DEVI
BDA/EE(S)/PL/53/90-91 DT 10.09.1990
1474
626
B.S.K. III STAGE, II PHASE, VII BLOCK
40' X 60'
J.J.RAMAIAH
BDA/EE(S)/PL/54/90-91 DT 10.09.1990
1475
570
B.S.K. III STAGE, KATHARIGUPPE SY NOS
40' X 62'
V.GIRIJA
BDA/EE(S)/PL/55/90-91 DT 19.09.1990
1476
251
B.S.K. III STAGE, III PHASE, II BLOCK
40' X 60'
R.L.KANTHAMMA
BDA/EE(S)/PL/56/90-91 DT 20.09.1990
B.S.K. III STAGE, HOSAKEREHALLI SY NOS
40' X 60'
K.GNANA PRAKASH
BDA/EE(S)/PL/57/90-91 DT 22.09.1990
1477
1231/B
BDA/EE(S)/PL/149/90-91 DT 03.11.1990
1478
235
B.S.K. III STAGE, III PHASE, II BLOCK
40' X 60'
A.M.GANAPATHY
BDA/EE(S)/PL/58/90-91 DT 25.09.1990
1479
90
B.S.K. III STAGE, III PHASE, VI BLOCK
11.20 X 18.00
SARASWATHI ASWATHARAM
BDA/EE(S)/PL/59/90-91 DT 27.09.1990
1480
119
B.S.K. III STAGE, II PHASE, IV BLOCK
12.20 X 18.30
R.S.MURULIDHARA
BDA/EE(S)/PL/60/90-91 DT 27.09.1990
1481
398
B.S.K. III STAGE, II PHASE, VI BLOCK
60' X 40'
P.BATHNILAL
BDA/EE(S)/PL/61/90-91 DT 27.09.1990
1482
524
B.S.K. III STAGE, II PHASE, VI BLOCK
45' X 65'
K.ANANTHARAMAN
BDA/EE(S)/PL/62/90-91 DT 08.10.1990
1483
10
B.S.K. III STAGE, III PHASE, V BLOCK
39' X 61'
M.N.KARIYAPPA
BDA/EE(S)/PL/63/90-91 DT 12.10.1990
1484
356
B.S.K. III STAGE, VIDHYAPEETA
40' X 60'
M.N.JAYA PRAKASH
BDA/EE(S)/PL/64/90-91 DT 22.10.1990
1485
374
B.S.K. III STAGE, II PHASE, VI BLOCK
59' X 40'
DR.R.SRIVATSA
BDA/EE(S)/PL/65/90-91 DT 25.10.1990
1486
727
B.S.K. III STAGE, II PHASE, VII BLOCK
40' X 58'
CHIKKARAUGAIAH
BDA/EE(S)/PL/66/90-91 DT 29.10.1990
1487
728
B.S.K. III STAGE, II PHASE, VII BLOCK
17.80 X 12.20
N.SATHYANARAYANA
BDA/EE(S)/PL/67/90-91 DT 19.11.1990
1488
1489
121
1231/D
B.S.K. III STAGE, II PHASE, IV BLOCK
60' X 40'
H.V.RAMESH
BDA/EE(S)/PL/68/90-91 DT 29.11.1990
B.S.K. III STAGE, HOSAKEREHALLI SY NOS
18.30 X 12.20
RAJENDRA BAGALODI
BDA/EE(S)/PL/69/90-91 DT 29.11.1990
B.S.K. III STAGE, GERE HALLI
45' X 60'
T.NARASIMHAN
BDA/EE(S)/PL/70/90-91 DT 05.12.1990
1490
1659
1491
667
B.S.K. III STAGE, II PHASE, VII BLOCK
38' X 60'
A.N.SUDARSHAN
BDA/EE(S)/PL/75/90-91 DT 15.12.1990
1492
114
B.S.K. III STAGE, III PHASE, I BLOCK
40' X 60'
N.THIMMAPPA
BDA/EE(S)/PL/73/90-91 DT 13.12.1990
1493
70
B.S.K. III STAGE, III PHASE, VI BLOCK
40' X 60'
G.C.DEVENDRAPPA
BDA/EE(S)/PL/74/90-91 DT 13.12.1990
1494
85
B.S.K. III STAGE, III PHASE, VI BLOCK
40' X 60'
SRINIVASAIAH
BDA/EE(S)/PL/72/90-91 DT 13.12.1990
1495
149
B.S.K. III STAGE, III PHASE, I BLOCK
40' X 60'
V.RAMAKRISHNA
BDA/EE(S)/PL/71/90-91 DT 12.12.1990
B.S.K. III STAGE, HOSAKEREHALLI SY NOS
40' X 60'
G.S.YAMUNA
BDA/EE(S)/PL/76/90-91 DT 19.12.1990
1496
1231/H
1497
15
B.S.K. III STAGE, II PHASE, IV BLOCK
40' X 60'
S.B.MADHUSUDAN
BDA/EE(S)/PL/77/90-91 DT 19.12.1990
1498
65
B.S.K. III STAGE, III PHASE, I BLOCK
40' X 63'
MANORAMA KAUSAL
BDA/EE(S)/PL/78/90-91 DT 19.12.1990
1499
245
B.S.K. III STAGE, III PHASE, II BLOCK
40' X 60'
K.NARAYANAN
BDA/EE(S)/PL/79/90-91 DT 24.12.1990
1500
57
B.S.K. III STAGE, III PHASE, I BLOCK
40' X 62'
MULLIKARJUNAIAH
BDA/EE(S)/PL/80/90-91 DT 28.12.1990
1501
172
B.S.K. III STAGE, AVALAHALLI
40' X 60'
S.MALATHI
BDA/EE(S)/PL/81/90-91 DT 03.01.1991
1502
45
B.S.K. III STAGE, III PHASE, VI BLOCK
40' X 61'
T.MARILINGANNA
BDA/EE(S)/PL/82/90-91 DT 03.01.1991
1503
580
B.S.K. III STAGE, II PHASE, VI BLOCK
45' X 64'
K.R.MURTHY
BDA/EE(S)/PL/83/90-91 DT 16.01.1991
1504
73
B.S.K. III STAGE, III PHASE, VI BLOCK
59' X 40'
K.SURESH
BDA/EE(S)/PL/84/90-91 DT 21.01.1991
1505
990
B.S.K. III STAGE, II PHASE, VII BLOCK
40' X 60'
LAKSHMINARAYANA CHAR
BDA/EE(S)/PL/85/90-91 DT 23.01.1991
B.S.K. III STAGE, HOSAKEREHALLI SY NOS
40' X 60'
C.JAYABALAN
BDA/EE(S)/PL/86/90-91 DT 23.01.1991
1506
1231/J
1507
706
B.S.K. III STAGE, II PHASE, VII BLOCK
12.20 X 17.90
M.SAILEELA & M.PRABHAKARA
BDA/EE(S)/PL/87/90-91 DT 23.01.1991
1508
145
B.S.K. III STAGE, II PHASE, IV BLOCK
45' X 55'
H.C.ASWATHA
BDA/EE(S)/PL/88/90-91 DT 23.01.1991
1509
56
B.S.K. III STAGE, IV PHASE, VII BLOCK
40' X 60'
A.RAGHURAM
BDA/EE(S)/PL/89/90-91 DT 23.01.1991
1510
1142
1511
13
1512
356
1513
65
1514
574
1515
59/B
B.S.K. III STAGE, II PHASE, VII BLOCK
40' X 60'
SHIVANNA SHETTY
BDA/EE(S)/PL/90/90-91 DT 23.01.1991
B.S.K. III STAGE, HOSAKEREHALLI SY NOS
40' X 60'
P.A.MOHAN
BDA/EE(S)/PL/91/90-91 DT 23.01.1991
B.S.K. III STAGE, II PHASE, VI BLOCK
40' X 59'
S.B.SHANKARA RAO
BDA/EE(S)/PL/92/90-91 DT 28.01.1991
B.S.K. III STAGE, CHANAMANAKERE ACHUKATU
LAYOUT
B.S.K. III STAGE, KATHARIGUPPE SY NOS
40' X 55'
L.M.NIRANJANA MURTHY
BDA/EE(S)/PL/93/90-91 DT 04.02.1991
40' X 60'
M.K.GANAPATHY
BDA/EE(S)/PL/94/90-91 DT 16.02.1991
B.S.K. III STAGE, III PHASE, VI BLOCK
40' X 60'
V.KADIRAPPA
BDA/EE(S)/PL/95/90-91 DT 21.02.1991
B.S.K. III STAGE, III PHASE, VI BLOCK
24.40 X 15.00
S.N.ANEGUNDI
BDA/EE(S)/PL/96/90-91 DT 22.02.1991
1516
13
1517
318
B.S.K. III STAGE, IV PHASE, VII BLOCK
40' X 60'
S.BHASKARACHAR
BDA/EE(S)/PL/97/90-91 DT 28.02.1991
1518
257
B.S.K. III STAGE, III PHASE, II BLOCK
40' X 59'
N.S.IYENGAR
BDA/EE(S)/PL/99/90-91 DT 01.03.1991
1519
317
B.S.K. III STAGE, IV PHASE, VII BLOCK
40' X 60'
Y.A.SUBRAMANAYA
BDA/EE(S)/PL/100/90-91 DT 02.03.1991
1520
313
B.S.K. III STAGE, IV PHASE, VII BLOCK
40' X 60'
K.KASI
BDA/EE(S)/PL/101/90-91 DT 06.03.1991
1521
9
B.S.K. III STAGE, ITTUMADU SY NOS
40' X 60'
M.MUNIRAJU
BDA/EE(S)/PL/102/90-91 DT 12.03.1991
1522
B.S.K. III STAGE, RAGHAVENDRA BLOCK
44' X 56'
B.G.LAKSHMANA RAO
BDA/EE(S)/PL/103/90-91 DT 13.03.1991
1523
833 &
834
171
B.S.K. III STAGE, AVALAHALLI
40' X 60'
V.GOVINDAIAH
BDA/EE(S)/PL/104/90-91 DT 19.03.1991
1524
10
B.S.K. III STAGE, ITTUMADU SY NOS
40' X 60'
M.S.RAMAIAH
BDA/EE(S)/PL/105/90-91 DT 19.03.1991
1525
684
B.S.K. III STAGE, II PHASE, VII BLOCK
40' X 59'
S.VIJAYA RAGHAVAN
BDA/EE(S)/PL/106/90-91 DT 19.03.1991
1526
210
B.S.K. III STAGE, GERE HALLI
45' X 53'
A.N.MURTHY
BDA/EE(S)/PL/110/90-91 DT 27.03.1991
1527
454
B.S.K. III STAGE, II PHASE, VI BLOCK
40' X 60'
N.R.GURU NAGARAJA
BDA/EE(S)/PL/107/90-91 DT 20.03.1991
1528
1164
B.T.M. II STAGE, I PHASE
12.69 X 18.41
BDA/EE(S)/PL/29/90-91 DT 25.03.1991
1529
76
B.T.M. II STAGE, I PHASE
42' X 58'
1530
8
N.S.PALYA MICO H.B.C.S.
40' X 60'
T.N.S.KARTHIKEYAN &
SMT.R.MANGARKASSI
DR.RAVI RAGHAVAN & PADMINI
RAGHAVAN
C.RAJAMANICKAM
BDA/EE(S)/PL/24/90-91 DT 03.01.1991
1531
1102
B.T.M. LAYOUT TAVAREKERE SY NOS
28' X 68'
B.L.VIJAYDEV
BDA/EE(S)/PL/25/90-91 DT 07.01.1991
BDA/EE(S)/PL/23/90-91 DT 19.12.1990
1532
672
B.T.M. II STAGE, I PHASE
40' X 60'
S.MAHESH
BDA/EE(S)/PL/26/90-91 DT 01.02.1991
1533
660
B.T.M. II STAGE, I PHASE
40' X 60'
H.T.THIMME GOWDA
BDA/EE(S)/PL/27/90-91 DT 05.02.1991
1534
60
N.S.PALYA MICO H.B.C.S.
40' X 60'
A.L.VENKATASWAMY
BDA/EE(S)/PL/28/90-91 DT 22.02.1991
1535
1015
B.T.M. I STAGE, I PHASE
12.19 X 18.26
GIRISH KASARAVALLI
BDA/EE(S)/PL/12/90-91 DT 31.08.1990
1536
1448
B.T.M. II STAGE, I PHASE
40' X 60'
R.KUMARA SWAMY
BDA/EE(S)/PL/13/90-91 DT 03.09.1990
1537
57
B.T.M. I STAGE
40' X 60'
A.VINCENT AMBROSE
BDA/EE(S)/PL/14/90-91 DT 22.10.1990
1538
1165
B.T.M. I STAGE, I PHASE, TAVAREKERE SY NOS
40' X 60'
C.NEELAKANTA
BDA/EE(S)/PL/15/90-91 DT 22.10.1990
1539
48
B.T.M. I STAGE, I PHASE
40' X 60'
L.KRISHNA MURTHY
BDA/EE(S)/PL/16/90-91 DT 06.11.1990
1540
1012
B.T.M. I STAGE, I PHASE
40' X 60'
KULDIP RAI
BDA/EE(S)/PL/17/90-91 DT 09.11.1990
1541
107
B.T.M. LAYOUT, MADIWALA
46' X 47'
M.R.HAMIDULLAH SHAHOO
BDA/EE(S)/PL/18/90-91 DT 22.11.1990
1542
83
B.T.M. I STAGE, I PHASE
40' X 60'
M.B.BEERAIAH
BDA/EE(S)/PL/19/90-91 DT 23.11.1990
1543
65
B.T.M. II STAGE N.S.PALYA
40' X 60'
M.L.GURURAJA RAO
BDA/EE(S)/PL/20/90-91 DT 23.11.1990
B.T.M. II STAGE, I PHASE
40' X 60'
T.S.SHIVA KUMAR
BDA/EE(S)/PL/21/90-91 DT 12.12.1990
1544
73/A
1545
1205
B.T.M. II STAGE, I PHASE
40' X 60'
B.K.SHIVARAMU
BDA/EE(S)/PL/22/90-91 DT 12.12.1990
1546
46
B.T.M. I STAGE, I PHASE
40' X 60'
M.S.UDAYA SHANKAR
BDA/EE(S)/PL/2/90-91 DT 19.04.1990
1547
691
B.T.M. II STAGE, I PHASE
40' X 60'
V.JAGANNATHAN
BDA/EE(S)/PL/3/90-91 DT 30.04.1990
1548
1008
B.T.M. I STAGE, I PHASE
40' X 60'
B.GOPALAPPA
BDA/EE(S)/PL/4/90-91 DT 18.05.1990
1549
705
B.T.M. II STAGE, I PHASE
40' X 60'
R.LOGANATHAN
BDA/EE(S)/PL/5/90-91 DT 30.05.1990
1550
652
B.T.M. II STAGE, I PHASE
40' X 60'
M.C.CHELUVARAYAPPA
BDA/EE(S)/PL/6/90-91 DT 30.05.1990
1551
649
B.T.M. II STAGE
40' X 60'
M.R.DONGRE
BDA/EE(S)/PL/7/90-91 DT 14.06.1990
1552
653
B.T.M. II STAGE
40' X 60'
DEVAMMA
BDA/EE(S)/PL/9/90-91 DT 09.07.1990
1553
685
B.T.M. II STAGE, I PHASE
40' X 60'
P.S.RAGHUNATHA RAO
BDA/EE(S)/PL/10/90-91 DT 03.08.1990
1554
1112
B.T.M. LAYOUT TAVAREKERE SY NOS
39' X 60'
VINCENT FELIX
BDA/EE(S)/PL/11/90-91 DT 25.08.1990
1555
89
B.T.M. LAYOUT DOLLAR SCHEME
23.46 X 15.24
N.NEELAMMA
BDA/EE(S)/PL/1/90-91 DT 06.04.1990
1556
46
BIKASIPURA SPACE EMPLOYEES HBCS
40' X 60'
A.R.CHANDRA SHEKAR
BDA/EE(S)/PL/252/90-91 DT 16.01.1991
1557
794
N.S.PALYA MICO H.B.C.S.
40' X 60'
M.CHANDRAPPA
BDA/EE(S)/PL/300/90-91 DT 05.02.1991
1558
498
BIKASIPURA SPACE EMPLOYEES HBCS
40' X 60'
D.P.JAGANNATH
BDA/EE(S)/PL/299/90-91 DT 05.02.1991
1559
277
N.S.PALYA MICO H.B.C.S.
40' X 60'
BDA/EE(S)/PL/298/90-91 DT 05.02.1991
1560
54
N.S.PALYA MICO H.B.C.S.
40' X 60'
JASWINDER KAUR & BALWINDER
KAUR
V.K.MALHOTRA
1561
197
BIKASIPURA SPACE EMPLOYEES HBCS
40' X 60'
S.SIDDALINGA SWAMY
BDA/EE(S)/PL/296/90-91 DT 04.02.1991
1562
502
BIKASIPURA SPACE EMPLOYEES HBCS
40' X 60'
M.KALAIVANI
BDA/EE(S)/PL/295/90-91 DT 04.02.1991
1563
305
BIKASIPURA SPACE EMPLOYEES HBCS
40' X 60'
SRINIVASA ACHARYA
BDA/EE(S)/PL/291/90-91 DT 01.02.1991
1564
1
BIKASIPURA SPACE EMPLOYEES HBCS
18.99 X 17.80
AGARWAL
BDA/EE(S)/PL/29090-91DT 31.01.1991
1565
265
BIKASIPURA SPACE EMPLOYEES HBCS
40' X 60'
K.T.RAMAPRASAD
BDA/EE(S)/PL/294/90-91 DT 04.02.1991
1566
850
BIKASIPURA SPACE EMPLOYEES HBCS
40' X 60'
L.P.RAO
BDA/EE(S)/PL/293/90-91 DT 01.02.1991
1567
485
BIKASIPURA SPACE EMPLOYEES HBCS
60' X 61'
A.V.SHASHIDHARA
BDA/EE(S)/PL/292/90-91 DT 01.02.1991
1568
44
BIKASIPURA SPACE EMPLOYEES HBCS
40' X 60'
V.DATTAGURU
BDA/EE(S)/PL/251/90-91 DT 16.01.1991
1569
32
BIKASIPURA SPACE EMPLOYEES HBCS
18.29 X 12.19
CHIMALAPATHI KAMESWARA RAO
BDA/EE(S)/PL/259/90-91 DT 31.01.1991
1570
698
BIKASIPURA SPACE EMPLOYEES HBCS
40' X 60'
DR.M.H.BALAKRISHNAIAH
BDA/EE(S)/PL/288/90-91 DT 31.01.1991
1571
11
BIKASIPURA SPACE EMPLOYEES HBCS
40' X 60'
N.N.KRISHNAN
BDA/EE(S)/PL/287/90-91 DT 31.01.1991
1572
428
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
40' X 60'
S.JAGADEESH
BDA/EE(S)/PL/286/90-91 DT 29.01.1991
1573
868
BIKASIPURA SPACE EMPLOYEES HBCS
40' X 60'
NARAYANA SWAMY
BDA/EE(S)/PL/255/90-91 DT 21.01.1991
1574
238
BIKASIPURA SPACE EMPLOYEES HBCS
12.19 X 18.29
A.KRISHNAN
BDA/EE(S)/PL/278/90-91 DT 28.01.1991
1575
237
BIKASIPURA SPACE EMPLOYEES HBCS
40' X 60'
K.S.R.MUKTIPAL
BDA/EE(S)/PL/279/90-91 DT 28.01.1991
BDA/EE(S)/PL/297/90-91 DT 04.02.1991
1576
232
BIKASIPURA SPACE EMPLOYEES HBCS
13.02 X 18.30
NAGESWARA RAO MARELLA
BDA/EE(S)/PL/253/90-91 DT 17.01.1991
1577
31
BIKASIPURA SPACE EMPLOYEES HBCS
40' X 60'
B.R.RAMAMURTHY
BDA/EE(S)/PL/282/90-91 DT 28.01.1991
1578
9
BIKASIPURA SPACE EMPLOYEES HBCS
40' X 60'
G.PADMANABHAN
BDA/EE(S)/PL/281/90-91 DT 28.01.1991
1579
199
BIKASIPURA SPACE EMPLOYEES HBCS
40' X 60'
NAGABHUSHANAM
BDA/EE(S)/PL/280/90-91 DT 28.01.1991
1580
866
BIKASIPURA SPACE EMPLOYEES HBCS
18.29 X 12.19
R.A.KATTI
BDA/EE(S)/PL/285/90-91 DT 29.01.1991
1581
19
JAYANAGAR H.B.C.S., KADIRENAHALLI
45' X 69'
M.R.RAMSAY
BDA/EE(S)/PL/284/90-91 DT 29.01.1991
1582
33
BIKASIPURA SPACE EMPLOYEES HBCS
40' X 60'
MUNAGAVALASA MURULI MOHAN
BDA/EE(S)/PL/283/90-91 DT 28.01.1991
1583
270
BIKASIPURA SPACE EMPLOYEES HBCS
40' X 60'
C.D.SRIDHARA
BDA/EE(S)/PL/254/90-91 DT 21.01.1991
1584
234
BIKASIPURA SPACE EMPLOYEES HBCS
40' X 60'
K.VIJAYA PRAKASH RAO
BDA/EE(S)/PL/256/90-91 DT 21.01.1991
1585
35
BIKASIPURA SPACE EMPLOYEES HBCS
40' X 60'
J.M.SHASTRY
BDA/EE(S)/PL/276/90-91 DT 28.01.1991
1586
200
BIKASIPURA SPACE EMPLOYEES HBCS
40' X 60'
S.VENKATESWARA RAO
BDA/EE(S)/PL/275/90-91 DT 28.01.1991
1587
38
RAMA RAO LAYOUT, B.S.K. III STAGE,
40' X 60'
G.R.KRISHNA MURTHY
BDA/EE(S)/PL/272/90-91 DT 23.01.1991
1588
239
BIKASIPURA SPACE EMPLOYEES HBCS
40' X 60'
D.VEERABHADRA RAO
BDA/EE(S)/PL/277/90-91 DT 28.01.1991
1589
152
KENCHENAHALLI H.B.C.S.
39' X 60'
S.GANESHAN
BDA/EE(S)/PL/271/90-91 DT 23.01.1991
1590
16
BIKASIPURA SPACE EMPLOYEES HBCS
40' X 60'
N.C.BHAT
BDA/EE(S)/PL/273/90-91 DT 24.01.1991
1591
839
BIKASIPURA SPACE EMPLOYEES HBCS
40' X 60'
S.K.SHIVAKUMAR
BDA/EE(S)/PL/274/90-91 DT 25.01.1991
1592
838
BIKASIPURA SPACE EMPLOYEES HBCS
40' X 60'
C.L.NAGENDRA
BDA/EE(S)/PL/268/90-91 DT 23.01.1991
1593
848
BIKASIPURA SPACE EMPLOYEES HBCS
40' X 60'
T.G.K. MURTHY
BDA/EE(S)/PL/267/90-91 DT 23.01.1991
1594
255
BIKASIPURA SPACE EMPLOYEES HBCS
40' X 60'
G.S.SEETHARAMAN
BDA/EE(S)/PL/266/90-91 DT 23.01.1991
1595
847
BIKASIPURA SPACE EMPLOYEES HBCS
40' X 60'
T.V.CHANDRA
BDA/EE(S)/PL/265/90-91 DT 23.01.1991
1596
441
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
60' X 87'
BABU VISWANATH
BDA/EE(S)/PL/270/90-91 DT 23.01.1991
1597
26
BIKASIPURA SPACE EMPLOYEES HBCS
40' X 60'
S.KALYANARAMAN
BDA/EE(S)/PL/269/90-91 DT 23.01.1991
1598
217
BIKASIPURA SPACE EMPLOYEES HBCS
40' X 60'
V.K.LAKSHMEESHA
BDA/EE(S)/PL/262/90-91 DT 23.01.1991
1599
159
KENCHENAHALLI H.B.C.S.
60' X 40'
H.G.ANITHA
BDA/EE(S)/PL/260/90-91 DT 23.01.1991
1600
617
BIKASIPURA SPACE EMPLOYEES HBCS
40' X 60'
H.N.PRASAD
BDA/EE(S)/PL/264/90-91 DT 23.01.1991
1601
219
BIKASIPURA SPACE EMPLOYEES HBCS
40' X 78'
M.S.NAGARAJ
BDA/EE(S)/PL/263/90-91 DT 23.01.1991
1602
432
BIKASIPURA SPACE EMPLOYEES HBCS
40' X 60'
M.S.PRAHALLADA SHARMA
BDA/EE(S)/PL/261/90-91 DT 23.01.1991
1603
3
BIKASIPURA SPACE EMPLOYEES HBCS
40' X 60'
DR.SURENDRA PAL
BDA/EE(S)/PL/257/90-91 DT 21.01.1991
1604
59
ITI H.B.C.S., KATHARIGUPPA
56' X 40'
M.CHENGAIAH
BDA/EE(S)/PL/258/90-91 DT 21.01.1991
1605
60
SRI.ANJANEYA SWAMY H.B.C.S., CHIKALLASANDRA
36' X 60'
BANASHANKARAMMA
BDA/EE(S)/PL/259/90-91 DT 21.01.1991
1606
214
B.O.O. H.B.C.S. MADIWALA
65' X 40'
B.V.KUMARA SWAMY
BDA/EE(S)/PL/5/90-91 DT 19.04.1990
1607
901
N.S.PALYA MICO H.B.C.S.
57' X 40'
T.G.GEORGE
BDA/EE(S)/PL/2/90-91 DT 05.04.1990
1608
838
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
40' X 60'
T.CHANDRA SHEKHARA SHETTY
BDA/EE(S)/PL/4/90-91 DT 06.04.1990
1609
710
KEMPEGOWDA H.B.C.S., KATHRIGUPPA
40' X 60'
V.NARAYANA
BDA/EE(S)/PL/3/90-91 DT 05.04.1990
ITI H.B.C.S., KATHARIGUPPA
35' X 60'
P.K.DWARAKANATH
BDA/EE(S)/PL/301/90-91 DT 05.02.1991
1610
85/1
1611
195
BIKASIPURA SPACE EMPLOYEES HBCS
40' X 60'
V.MAHADEVAN
BDA/EE(S)/PL/302/90-91 DT 07.02.1991
1612
220
BIKASIPURA SPACE EMPLOYEES HBCS
40' X 78'
N.S.GOPINATH
BDA/EE(S)/PL/303/90-91 DT 07.02.1991
1613
623
BIKASIPURA SPACE EMPLOYEES HBCS
40' X 60'
H.RAVINDRA RAO
BDA/EE(S)/PL/304/90-91 DT 11.02.1991
1614
131
BIKASIPURA SPACE EMPLOYEES HBCS
40' X 50'
ARAVIND S BADAMI
BDA/EE(S)/PL/305/90-91 DT 15.02.1991
1615
619
BIKASIPURA SPACE EMPLOYEES HBCS
40' X 60'
N.VISWANATHA
BDA/EE(S)/PL/306/90-91 DT 15.02.1991
1616
918
N.S.PALYA MICO H.B.C.S.
40' X 60'
BDA/EE(S)/PL/307/90-91 DT 16.02.1991
1617
1020
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
40' X 60'
VEERAPPA K AMIN & SMT
KALAPOORVA V AMIN
G.N.RAMACHANDRA
BDA/EE(S)/PL/308/90-91 DT 21.02.1991
1618
426
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
40' X 60'
J.R.VISWESVVARA RAO
BDA/EE(S)/PL/309/90-91 DT 21.02.1991
1619
880
N.S.PALYA MICO H.B.C.S.
62' X 40'
NASSEEA JAVEED
BDA/EE(S)/PL/310/90-91 DT 22.02.1991
1620
567
BIKASIPURA SPACE EMPLOYEES HBCS
40' X 60'
V.SREEDHARA MURTHY
BDA/EE(S)/PL/311/90-91 DT 22.02.1991
1621
194
BIKASIPURA SPACE EMPLOYEES HBCS
40' X 60'
RAJU ALLER
BDA/EE(S)/PL/312/90-91 DT 22.02.1991
1622
829
KENCHENAHALLI H.B.C.S.
69' X 42'
V.JAYALAKSHMI
BDA/EE(S)/PL/313/90-91 DT 22.02.1991
1623
715
BIKASIPURA SPACE EMPLOYEES HBCS
40' X 60'
RANJEETH SINGH RAWATH
BDA/EE(S)/PL/314/90-91 DT 22.02.1991
1624
43
BIKASIPURA SPACE EMPLOYEES HBCS
40' X 60'
K.USHA
BDA/EE(S)/PL/315/90-91 DT 27.02.1991
1625
695
N.S.PALYA MICO H.B.C.S.
40' X 60'
DR.K.SATHYANARAYANA
BDA/EE(S)/PL/316/90-91 DT 27.02.1991
1626
732
N.S.PALYA MICO H.B.C.S.
45' X 66'
M.CHIKKARAMAIAH
BDA/EE(S)/PL/317/90-91 DT 27.02.1991
1627
817
N.S.PALYA MICO H.B.C.S.
40' X 60'
G.NIRMALA DEVI
BDA/EE(S)/PL/318/90-91 DT 27.02.1991
1628
519
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
39' X 60'
V.K.L.N.PRASAD
BDA/EE(S)/PL/319/90-91 DT 27.02.1991
1629
13
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
88' X 40'
B.R.SUBBA RAO
BDA/EE(S)/PL/320/90-91 DT 27.02.1991
1630
1
BIKASIPURA SPACE EMPLOYEES HBCS
18.30 X 15.55
V.K.AGARWAL
BDA/EE(S)/PL/321/90-91 DT 27.02.1991
1631
852
BIKASIPURA SPACE EMPLOYEES HBCS
47' X 60'
B.S.NATARAJU
BDA/EE(S)/PL/322/90-91 DT 27.02.1991
1632
226
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
39' X 60'
B.K.DATTATRI
BDA/EE(S)/PL/323/90-91 DT 27.02.1991
1633
146
KENCHENAHALLI H.B.C.S.
39' X 60'
M.V.SHIVARAMA MURTHY
BDA/EE(S)/PL/324/90-91 DT 28.02.1991
1634
51
JAYANAGAR H.B.C.S., KADIRENAHALLI
40' X 60'
D.R.SRINIVASAN
BDA/EE(S)/PL/325/90-91 DT 01.03.1991
1635
266
BIKASIPURA SPACE EMPLOYEES HBCS
40' X 60'
S.AKILA
BDA/EE(S)/PL/326/90-91 DT 01.03.1991
JAYANAGAR H.B.C.S., KADIRENAHALLI
40' X 50'
V.C.BALACHANDRA RAO
BDA/EE(S)/PL/327/90-91 DT 04.03.1991
1636
17/38/1
1637
300
BIKASIPURA SPACE EMPLOYEES HBCS
40' X 60'
V.KRISHNA MURTHY
BDA/EE(S)/PL/328/90-91 DT 06.03.1991
1638
34
BIKASIPURA SPACE EMPLOYEES HBCS
40' X 60'
K.V.GOVINDA
BDA/EE(S)/PL/329/90-91 DT 06.02.1991
1639
156
VISWABHARATHI H.B.C.S., GIRINAGAR
40' X 60'
H.S.AKSHARA KUMAR
BDA/EE(S)/PL/330/90-91 DT 06.03.1991
1640
129
ITI H.B.C.S., KATHARIGUPPA
45' X 60'
VEDAVYASA RAO
BDA/EE(S)/PL/331/90-91 DT 07.03.1991
1641
840
BIKASIPURA SPACE EMPLOYEES HBCS
40' X 60'
S.KRISHNA MURTHY
BDA/EE(S)/PL/333/90-91 DT 07.03.1991
1642
202
BIKASIPURA SPACE EMPLOYEES HBCS
40' X 60'
V.JAYARAMAN
BDA/EE(S)/PL/334/90-91 DT 07.03.1991
1643
114
BIKASIPURA SPACE EMPLOYEES HBCS
40' X 52'
E.K.KUTTY
BDA/EE(S)/PL/335/90-91 DT 08.03.1991
1644
308
BIKASIPURA SPACE EMPLOYEES HBCS
40' X 60'
K.PONNAPPAN
BDA/EE(S)/PL/336/90-91 DT 08.03.1991
1645
942
N.S.PALYA MICO H.B.C.S.
40' X 60'
BHUJANGA SHAYANA
BDA/EE(S)/PL/337/90-91 DT 08.03.1991
1646
940
N.S.PALYA MICO H.B.C.S.
40' X 60'
M.R.SHIVAJI RAO
BDA/EE(S)/PL/338/90-91 DT 08.03.1991
1647
403
VISWABHARATHI H.B.C.S., GIRINAGAR
40' X 60'
R.VENKATA SUBBAIAH
BDA/EE(S)/PL/339/90-91 DT 08.03.1991
1648
9
BANNERGATTA ROAD
40' X 60'
K.SEETHRAMA MUTHAMA
BDA/EE(S)/PL/340/90-91 DT 08.03.1991
1649
431
BIKASIPURA SPACE EMPLOYEES HBCS
40' X 60'
SHRIDATTA DIXIT
BDA/EE(S)/PL/341/90-91 DT 13.03.1991
1650
853
BIKASIPURA SPACE EMPLOYEES HBCS
40' X 60'
T.S.KRISHNA MURTHY
BDA/EE(S)/PL/342/90-91 DT 13.03.1991
1651
843
BIKASIPURA SPACE EMPLOYEES HBCS
40' X 60'
M.N.SATHYANARAYAN
BDA/EE(S)/PL/343/90-91 DT 13.03.1991
1652
65
JAYANAGAR H.B.C.S., KADIRENAHALLI
40' X 61'
S.SURENDRA NAIK
BDA/EE(S)/PL/344/90-91 DT 13.03.1991
1653
467
KENCHENAHALLI H.B.C.S.
46' X 65'
MALATHI SUBRAMANYA
BDA/EE(S)/PL/345/90-91 DT 13.03.1991
1654
30
KAS OFFICERS, MADIWALA
40' X 60'
SRIDHAR G HEGDE
BDA/EE(S)/PL/346/90-91 DT 13.03.1991
1655
41
ITI H.B.C.S., KATHARIGUPPA
40' X 59'
G.YOGANARASIMHA
BDA/EE(S)/PL/347/90-91 DT 13.03.1991
1656
844
BIKASIPURA SPACE EMPLOYEES HBCS
40' X 60'
K.R.SREEDHARA MURTHY
BDA/EE(S)/PL/348/90-91 DT 16.03.1991
1657
841
BIKASIPURA SPACE EMPLOYEES HBCS
40' X 60'
R.K.RAJANGAM
BDA/EE(S)/PL/349/90-91 DT 16.03.1991
1658
231
BIKASIPURA SPACE EMPLOYEES HBCS
61' X 32'
V.SAMBASHIVA RAO
BDA/EE(S)/PL/350/90-91 DT 16.03.1991
1659
842
BIKASIPURA SPACE EMPLOYEES HBCS
40' X 60'
M.G.CHANDRASHEKHAR
BDA/EE(S)/PL/351/90-91 DT 16.03.1991
1660
517
BIKASIPURA SPACE EMPLOYEES HBCS
40' X 60'
R.C.MAHAJAN
BDA/EE(S)/PL/352/90-91 DT 16.03.1991
1661
240
BIKASIPURA SPACE EMPLOYEES HBCS
40' X 60'
M.V.RAJYALAKSHMI
BDA/EE(S)/PL/353/90-91 DT 18.03.1991
1662
607
BIKASIPURA SPACE EMPLOYEES HBCS
40' X 60'
NAGESH UPADHYAYA
BDA/EE(S)/PL/354/90-91 DT 18.03.1991
1663
738
BIKASIPURA SPACE EMPLOYEES HBCS
40' X 60'
B.M.KUSHA
BDA/EE(S)/PL/355/90-91 DT 18.03.1991
1664
5
BIKASIPURA SPACE EMPLOYEES HBCS
40' X 60'
N.R.RAMALINGAM
BDA/EE(S)/PL/356/90-91 DT 18.03.1991
1665
545
BIKASIPURA SPACE EMPLOYEES HBCS
40' X 60'
S.NARASIMHA MURTHY
BDA/EE(S)/PL/357/90-91 DT 18.03.1991
1666
98
B.O.O. H.B.C.S. MADIWALA
40' X 60'
M.P.MALYA
BDA/EE(S)/PL/358/90-91 DT 18.03.1991
1667
187
B.O.O. H.B.C.S. MADIWALA
88' X 38'
T.A.P.SHENOY
BDA/EE(S)/PL/359/90-91 DT 18.03.1991
1668
591
N.S.PALYA MICO H.B.C.S.
40' X 60'
M.VENUGOPALA MURTHY
BDA/EE(S)/PL/360/90-91 DT 18.03.1991
1669
492
BIKASIPURA SPACE EMPLOYEES HBCS
40' X 60'
A.PURUSHOTHAMAN
BDA/EE(S)/PL/361/90-91 DT 20.03.1991
1670
235
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
40' X 60'
P.RAMA MURTHY
BDA/EE(S)/PL/362/90-91 DT 20.03.1991
1671
1177
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
40' X 60'
V.A.SHOK KUMAR
BDA/EE(S)/PL/363/90-91 DT 20.03.1991
1672
810
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
40' X 60'
T.R.VISWANATH
BDA/EE(S)/PL/364/90-91 DT 20.03.1991
1673
976
N.S.PALYA MICO H.B.C.S.
40' X 60'
MURUDIAH
BDA/EE(S)/PL/365/90-91 DT 20.03.1991
1674
905
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
40' X 61'
C.SHASHIDHARA
BDA/EE(S)/PL/366/90-91 DT 26.03.1991
1675
261
BIKASIPURA SPACE EMPLOYEES HBCS
60' X 40'
K.SITAMAHALAKSHMI
BDA/EE(S)/PL/367/90-91 DT 26.03.1991
1676
590
BIKASIPURA SPACE EMPLOYEES HBCS
18.29 X 12.19
V.KESHAVARAJU
BDA/EE(S)/PL/368/90-91 DT 26.03.1991
1677
74
POORNA PRAJAN H.B.C.S., KATHARIGUPPA
40' X 60'
K.RAMACHANDRA RAO
BDA/EE(S)/PL/369/90-91 DT 26.03.1991
1678
713
N.S.PALYA MICO H.B.C.S.
69' X 40'
ABDUL NAJIOL
BDA/EE(S)/PL/370/90-91 DT 30.03.1991
1679
855
BIKASIPURA SPACE EMPLOYEES HBCS
40' X 60'
J.RAMACHANDRAN
BDA/EE(S)/PL/371/90-91 DT 30.03.1991
SARAKKI II PHASE
61' X 46'
K.S.SHETTY
BDA/EE(S)/PL/64/90-91 DT 25.03.1991
1680
690/P
1681
486
SARAKKI II PHASE
40' X 59'
B.N.SHREE
BDA/EE(S)/PL/65/90-91 DT 27.03.1991
1682
505
SARAKKI II PHASE
40' X 60'
BDA/EE(S)/PL/40/90-91 DT 22.10.1990
1683
611/B
SARAKKI II PHASE
40' X 74'
PRANAB KUMAR ADHIKARI &
KOUSHIKI ADHIKARI
NANDA GOPAL
1684
1534/I
SARAKKI II PHASE
50' X 79'
SARASWATHI
BDA/EE(S)/PL/42/90-91 DT 29.10.1990
SARAKKI II PHASE
40' X 60'
A.NAGARAJA RAO
BDA/EE(S)/PL/43/90-91 DT 30.10.1990
1685
506
BDA/EE(S)/PL/41/90-91 DT 29.10.1990
1686
422
1687
1740
1688
1534/D
JAYAPRAKASH NARAYANA NAGAR II BLOCK
45' X 60'
S.JAYANNA
BDA/EE(S)/PL/44/90-91 DT 03.11.1990
SARAKKI II PHASE
40' X 60'
GIRIJA S RAO
BDA/EE(S)/PL/45/90-91 DT 06.11.1990
SARAKKI II PHASE
40' X 60'
PUSHPA MURTHY
BDA/EE(S)/PL/46/90-91 DT 16.11.1990
1689
127
SARAKKI II PHASE
45' X 72'
T.SHARADA
BDA/EE(S)/PL/47/90-91 DT 19.11.1990
1690
449
SARAKKI II PHASE
45' X 65'
C.KANNAN
BDA/EE(S)/PL/48/90-91 DT 13.12.1990
1691
470
SARAKKI II PHASE
60' X 30'
P.V.RAMANA RAO
BDA/EE(S)/PL/49/90-91 DT 24.12.1990
1692
1418
SARAKKI II PHASE
40' X 60'
C.N.RAJAPPA SHETTY
BDA/EE(S)/PL/50/90-91 DT 24.12.1990
1693
471
SARAKKI II PHASE
40' X 60'
P.V.LALITHAMMA
BDA/EE(S)/PL/51/90-91 DT 16.01.1991
1694
1676
SARAKKI II PHASE
40' X 60'
G.B.KOUSHIK
BDA/EE(S)/PL/52/90-91 DT 17.01.1991
1695
88
SARAKKI II PHASE
40' X 62'
M.S.VARADARAJ
BDA/EE(S)/PL/53/90-91 DT 21.01.1991
1696
450
SARAKKI II PHASE
67' X 45'
N.VIMALA MURTHY
BDA/EE(S)/PL/54/90-91 DT 24.01.1991
1697
429
SARAKKI II PHASE
45' X 60'
K.M.HANDYAL
BDA/EE(S)/PL/55/90-91 DT 05.02.1991
1698
45
SARAKKI II PHASE
45' X 61'
S.R.SWAMY
BDA/EE(S)/PL/56/90-91 DT 07.02.1991
1699
89
SARAKKI II PHASE
40' X 62'
K.S.SATHAYANARAYANA SETTY
BDA/EE(S)/PL/57/90-91 DT 07.02.1991
1700
69
SARAKKI II PHASE
45' X 60'
S.H.BASAVARAJAIAH
BDA/EE(S)/PL/58/90-91 DT 22.02.1991
1701
151
SARAKKI II PHASE
42' X 70'
LATHA SWAMY
BDA/EE(S)/PL/59/90-91 DT 27.02.1991
1702
1281
SARAKKI II PHASE
40' X 60'
T.MANJUNATHA CHATRA
BDA/EE(S)/PL/60/90-91 DT 01.03.1991
1703
669
SARAKKI II PHASE
18.29 X 12.19
N.VISWANATHA
BDA/EE(S)/PL/61/90-91 DT 07.03.1991
1704
388
SARAKKI II PHASE
45' X 60'
UMARAM
BDA/EE(S)/PL/62/90-91 DT 19.03.1991
1705
1318
SARAKKI II PHASE
40' X 70'
N.C.GOWDA
BDA/EE(S)/PL/63/90-91 DT 21.03.1991
1706
437
SARAKKI II PHASE
40' X 60'
NIRANJAN A GANDHI
BDA/EE(S)/PL/4/90-91 DT 21.04.1990
1707
391
SARAKKI II PHASE
45' X 60'
A.V.JAYACHANDRA PRAKASH
BDA/EE(S)/PL/5/90-91 DT 21.04.1990
1708
666
SARAKKI II PHASE
80' X 45'
K.SUNDHARA RAO
BDA/EE(S)/PL/1/90-91 DT 05.04.1990
1709
710
SARAKKI II PHASE
40' X 60'
R.SITALAKSHMI JAYARAMAN
BDA/EE(S)/PL/2/90-91 DT 05.04.1990
1710
653
SARAKKI II PHASE
45' X 61'
K.SADANANDA
BDA/EE(S)/PL/3/90-91 DT 19.04.1990
1711
2005
SARAKKI II PHASE
40' X 60'
DR.M.GEETHAMANI
BDA/EE(S)/PL/6/90-91 DT 24.04.1990
1712
458
SARAKKI II PHASE
60' X 40'
BHARATHI MURALI
BDA/EE(S)/PL/7/90-91 DT 30.04.1990
1713
1321
SARAKKI II PHASE
40' X 70'
M.NARAYANAPPA
BDA/EE(S)/PL/8/90-91 DT 09.05.1990
SARAKKI II PHASE
40' X 60'
H.P.CHAKRAPANI
BDA/EE(S)/PL/9/90-91 DT 10.05.1990
1714
690/C
1715
429
SARAKKI II PHASE
45' X 60'
K.M.HANDYAL
BDA/EE(S)/PL/10/90-91 DT 24.05.1990
1716
1302
SARAKKI II PHASE
40' X 60'
K.MANI
BDA/EE(S)/PL/11/90-91 DT 24.05.1990
1717
492
SARAKKI II PHASE
40' X 59'
V.S.HARI
BDA/EE(S)/PL/12/90-91 DT 25.05.1990
1718
631
SARAKKI II PHASE
40' X 60'
J.RAGHURAM
BDA/EE(S)/PL/13/90-91 DT 04.06.1990
1719
718
SARAKKI II PHASE
40' X 60'
K.L.JAYANTH
BDA/EE(S)/PL/14/90-91 DT 06.07.1990
1720
1276
SARAKKI II PHASE
40' X 60'
C.RAMAIAH
BDA/EE(S)/PL/15/90-91 DT 16.07.1990
1721
709
SARAKKI II PHASE
40' X 60'
K.RAMACHANDRAYYA
BDA/EE(S)/PL/16/90-91 DT 16.07.1990
1722
2002
SARAKKI II PHASE
40' X 60'
INBAVELU
BDA/EE(S)/PL/17/90-91 DT 23.07.1990
1723
1291
SARAKKI II PHASE
40' X 60'
V.RADHAKRISHNAN
BDA/EE(S)/PL/18/90-91 DT 26.07.1990
1724
2006
SARAKKI II PHASE
40' X 60'
B.KRISHNA
BDA/EE(S)/PL/19/90-91 DT 09.08.1990
1725
159
SARAKKI II PHASE
45' X 65'
M.M.HARISH
BDA/EE(S)/PL/20/90-91 DT 17.08.1990
1726
1532
SARAKKI II PHASE
62' X 40'
A.K.MANIKYAVELU
BDA/EE(S)/PL/21/90-91 DT 17.08.1990
1727
927
SARAKKI II PHASE
40' X 60'
M.S.NAGARAJA RAO
BDA/EE(S)/PL/22/90-91 DT 17.08.1990
1728
1739
SARAKKI II PHASE
40' X 60'
RADHA A KUMAR
BDA/EE(S)/PL/23/90-91 DT 25.08.1990
1729
1677
SARAKKI II PHASE
40' X 60'
RESHMA UMESH
BDA/EE(S)/PL/24/90-91 DT 03.09.1990
1730
932/A
SARAKKI II PHASE
40' X 60'
B.S.NARASIMHAN
BDA/EE(S)/PL/25/90-91 DT 03.09.1990
1731
1209
SARAKKI II PHASE
40' X 60'
M.PULLAPPA
BDA/EE(S)/PL/26/90-91 DT 10.09.1990
1732
129
SARAKKI II PHASE
45' X 71'
H.CHIKKANNA
BDA/EE(S)/PL/27/90-91 DT 10.09.1990
1733
1088
SARAKKI II PHASE
40' X 69'
C.R.VIJAYA LAXMI
BDA/EE(S)/PL/28/90-91 DT 10.09.1990
1734
937
SARAKKI II PHASE
40' X 60'
B.G.SIDDARAMAPPA
BDA/EE(S)/PL/29/90-91 DT 10.09.1990
1735
277
SARAKKI II PHASE
45' X 61'
SAMUEL THOMAS
BDA/EE(S)/PL/30/90-91 DT 10.08.1990
1736
76
SARAKKI II PHASE
40' X 61'
N.V.LALITHA
BDA/EE(S)/PL/31/90-91 DT 10.09.1990
1737
836
SARAKKI II PHASE
40' X 70'
J.ANTHIKAD
BDA/EE(S)/PL/32/90-91 DT 19.09.1990
1738
844
SARAKKI II PHASE
40' X 70'
K.NARASIMHAN
BDA/EE(S)/PL/33/90-91 DT 22.09.1990
1739
1087
SARAKKI II PHASE
20.42 X 12.19
T.KENCHAIAH
BDA/EE(S)/PL/34/90-91 DT 22.09.1990
1740
1272
SARAKKI II PHASE
40' X 62'
T.ISAC
BDA/EE(S)/PL/35/90-91 DT 25.09.1990
1741
109
SARAKKI II PHASE
40' X 61'
KRISHNA URS
BDA/EE(S)/PL/36/90-91 DT 25.09.1990
1742
426
SARAKKI II PHASE
45' X 60'
BDA/EE(S)/PL/37/90-91 DT 27.09.1990
1743
702
SARAKKI II PHASE
40' X 60'
RAHAMATH ALIKHAN & RAHAMATH
UNNISA
K.G.VENKATACHALPATHY
1744
1997
SARAKKI II PHASE
45' X 63'
DR|| SURESH RAO AVOOR
BDA/EE(S)/PL/39/90-91 DT 10.10.1990
1745
479
B.S.K. III STAGE, II PHASE, VI BLOCK
59' X 40'
B.SREEDHARA RAO
BDA/EE(S)/PL/1/90-91 DT 05.04.1990
1746
523
B.S.K. III STAGE, II PHASE, VI BLOCK
65' X 45'
K.BALAKRISHNA
BDA/EE(S)/PL/2/90-91 DT 19.04.1990
1747
692
B.S.K. III STAGE, II PHASE, VII BLOCK
18.40 X 12.20
N.S.ASWATHA NARAYANA SETTY
BDA/EE(S)/PL/3/90-91 DT 24.04.1990
1748
1233
B.S.K. III STAGE, HOSAKEREHALLI SY NOS
40' X 60'
P.NAGARAJU
BDA/EE(S)/PL/4/90-91 DT 24.04.1990
1749
59
B.S.K. III STAGE, IV PHASE, VII BLOCK
40' X 60'
SUMATHI BAILUR
BDA/EE(S)/PL/5/90-91 DT 05.02.1990
1750
302
B.S.K. III STAGE, II PHASE, VI BLOCK
57' X 40'
T.C.MOHAN
BDA/EE(S)/PL/6/90-91 DT 30.04.1990
1751
767
B.S.K. III STAGE, II PHASE, VII BLOCK
40' X 60'
M.MUNESWARACHARI
BDA/EE(S)/PL/7/90-91 DT 30.04.1990
BDA/EE(S)/PL/38/90-91 DT 27.09.1990
1752
131
1753
3
1754
520
1755
54/B
B.S.K. III STAGE, III PHASE, I BLOCK
40' X 60'
K.SHANKARAN
BDA/EE(S)/PL/8/90-91 DT 08.05.1990
B.S.K. III STAGE, HOSAKEREHALLI SY NOS
40' X 60'
T.SRINIVASAN
BDA/EE(S)/PL/9/90-91 DT 10.05.1990
B.S.K. III STAGE, II PHASE, IV BLOCK
55' X 63'
M.NAGARAJ
BDA/EE(S)/PL/10/90-91 DT 10.05.1990
B.S.K. III STAGE, III PHASE, IV BLOCK
40' X 60'
L.KRISHNA NAIK
BDA/EE(S)/PL/11/90-91 DT 15.05.1990
1756
647
B.S.K. III STAGE, II PHASE, VII BLOCK
40' X 60'
T.K.SRINIVASA MURTHY
BDA/EE(S)/PL/12/90-91 DT 18.05.1990
1757
121
B.S.K. III STAGE, II PHASE, IV BLOCK
59' X 40'
H.V.RAMESH
BDA/EE(S)/PL/13/90-91 DT 18.05.1990
1758
408
B.S.K. III STAGE, II PHASE, VI BLOCK
40' X 60'
K.S.SHELAVADI
BDA/EE(S)/PL/14/90-91 DT 18.05.1990
1759
566
B.S.K. III STAGE, III PHASE, III BLOCK
40' X 60'
P.SATHYANARAYANA
BDA/EE(S)/PL/15/90-91 DT 18.05.1990
1760
100
B.S.K. III STAGE, III PHASE, V BLOCK
61' X 39'
K.KAUSALYA BAI
BDA/EE(S)/PL/16/90-91 DT 18.05.1990
1761
559
B.S.K. III STAGE, II PHASE, VI BLOCK
58' X 38'
H.V.VENKATESH
BDA/EE(S)/PL/17/90-91 DT 18.05.1990
1762
572
B.S.K. III STAGE, II PHASE, VI BLOCK
40' X 62'
V.BALASUBRAMANYAM
BDA/EE(S)/PL/18/90-91 DT 24.05.1990
1763
465
B.S.K. III STAGE, II PHASE, VI BLOCK
40' X 60'
CHAMPA BAI A SETTUR
BDA/EE(S)/PL/19/90-91 DT 25.05.1990
1764
326
B.S.K. III STAGE, IV PHASE, VII BLOCK
40' X 59'
A.YASHODA
BDA/EE(S)/PL/20/90-91 DT 26.05.1990
1765
547
B.S.K. III STAGE, KATHARIGUPPE SY NOS
40' X 60'
B.RAMESH
BDA/EE(S)/PL/21/90-91 DT 26.05.1990
B.S.K. III STAGE, III PHASE, III BLOCK
40' X 60'
M.SATHYANARAYANA
BDA/EE(S)/PL/22/90-91 DT 28.05.1990
1766
568/A
1767
423
B.S.K. III STAGE, II PHASE, VI BLOCK
40' X 60'
GOPALAKRISHNA
BDA/EE(S)/PL/23/90-91 DT 30.05.1990
1768
47
B.S.K. III STAGE, III PHASE, VI BLOCK
30' X 59'
P.A.RAO
BDA/EE(S)/PL/24/90-91 DT 04.06.1990
1769
2
B.S.K. III STAGE, AVALAHALLY
40' X 60'
B.S.SRIDHARA MURTHY
BDA/EE(S)/PL/25/90-91 DT 04.06.1990
1770
12
B.S.K. III STAGE, II PHASE, IV BLOCK
40' X 60'
A.N.NAGESH
BDA/EE(S)/PL/26/90-91 DT 06.06.1990
1771
172
B.S.K. III STAGE, AVALAHALLY
40' X 60'
S.MALATHI
BDA/EE(S)/PL/27/90-91 DT 08.06.1990
1772
249
B.S.K. III STAGE, III PHASE, II BLOCK
40' X 60'
G.NAGABHUSHANA RAO
BDA/EE(S)/PL/28/90-91 DT 20.06.1990
1773
188
B.S.K. III STAGE, KATHARIGUPPE SY NOS
39' X 57'
G.NARAYANAMMA
BDA/EE(S)/PL/29/90-91 DT 26.06.1990
1774
168
B.S.K. III STAGE, AVALAHALLY
40' X 60'
S.P.ANANTHARAJAIAH
BDA/EE(S)/PL/30/90-91 DT 26.06.1990
1775
13
B.S.K. III STAGE, HOSAKEREHALLI SY NOS
40' X 60'
D.A.MOHAN
BDA/EE(S)/PL/31/90-91 DT 26.06.1990
1776
651
B.S.K. III STAGE, III PHASE, VII BLOCK
40' X 60'
M.R.NARAYAN
BDA/EE(S)/PL/32/90-91 DT 03.07.1990
1777
74
B.S.K. III STAGE, III PHASE, VI BLOCK
60' X 40'
K.A.HONAPPA & SMT.K.M.SAROJA
BDA/EE(S)/PL/33/90-91 DT 03.07.1990
1778
50
B.S.K. III STAGE, III PHASE, VI BLOCK
60' X 40'
P.VARGHEESE HATHEEV
BDA/EE(S)/PL/34/90-91 DT 09.07.1990
1779
137
B.S.K. III STAGE, II PHASE, IV BLOCK
40' X 60'
B.MANJUNATH
BDA/EE(S)/PL/35/90-91 DT 11.07.1990
1780
823
B.S.K. III STAGE, II PHASE, VII BLOCK
37' X 60'
NITYANANDA
BDA/EE(S)/PL/36/90-91 DT 26.07.1990
1781
352
B.S.K. III STAGE, BEHIND VIDYAPEETA
40' X 60'
SHANKAR M HEGDE
BDA/EE(S)/PL/38/90-91 DT 03.08.1990
1782
678
B.S.K. III STAGE, II PHASE, VII BLOCK
40' X 60'
K.RAMACHANDRA KAMATH
BDA/EE(S)/PL/39/90-91 DT 03.08.1990
1783
1005
B.S.K. III STAGE, HOSAKEREHALLI SY NOS
40' X 60'
T.MANOHARA RAO
BDA/EE(S)/PL/40/90-91 DT 09.08.1990
1784
63
54' X 40'
T.K.SURYANARAYANA
BDA/EE(S)/PL/41/90-91 DT 10.08.1990
1785
58
B.S.K. III STAGE, CHANAMANAKERE ACHUKATU
LAYOUT
B.S.K. III STAGE, III PHASE, IV BLOCK
39' X 59'
A.K.NAGARAJ
BDA/EE(S)/PL/42/90-91 DT 10.08.1990
1786
519
B.S.K. III STAGE, III PHASE, III BLOCK
40' X 60'
S.S.MURTHY
BDA/EE(S)/PL/43/90-91 DT 10.08.1990
1787
1010
B.S.K. III STAGE, III PHASE, III BLOCK
40' X 60'
MANGALA NAGABHUSHAN
BDA/EE(S)/PL/44/90-91 DT 10.08.1990
B.S.K. III STAGE, III PHASE, VI BLOCK
59' X 40'
B.V.VEERANNA
BDA/EE(S)/PL/45/90-91 DT 21.08.1990
1788
59/C
1789
490
B.S.K. III STAGE, II PHASE, VI BLOCK
58' X 40'
C.PADMANABHA
BDA/EE(S)/PL/46/90-91 DT 25.08.1990
1790
102
B.S.K. III STAGE, ITTUMADU SY NOS
63' X 40'
G.KAMALESWARAN
BDA/EE(S)/PL/47/90-91 DT 25.08.1990
1791
309
B.S.K. III STAGE, II PHASE, VI BLOCK
57' X 40'
A.H.RAVIKUMAR
BDA/EE(S)/PL/48/90-91 DT 25.08.1990
1792
277
B.S.K. III STAGE, III PHASE, V BLOCK
61' X 39'
J.THIMMAIAH
BDA/EE(S)/PL/49/90-91 DT 03.09.1990
1793
152
B.S.K. III STAGE, III PHASE, I BLOCK
40' X 60'
SYED GHOUSE
BDA/EE(S)/PL/50/90-91 DT 03.09.1990
1794
8
KSRTC H.B.C.S. SARAKKI
40' X 60'
K.LAKSHMINARAYANA SWAMY
BDA/EE(S)/PL/51/90-91 DT 06.06.1990
1795
731
KENCHENAHALLI H.B.C.S.
54' X 37'
DR|| USHA S DESAI
BDA/EE(S)/PL/52/90-91 DT 08.06.1990
1796
218
B.O.O. H.B.C.S. MADIWALA
40' X 65'
B.N.HEGDE
BDA/EE(S)/PL/53/90-91 DT 08.06.1990
1797
218
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
40' X 60'
B.SHASHIDHARA RAO
BDA/EE(S)/PL/54/90-91 DT 08.06.1990
1798
373
VISWABHARATHI H.B.C.S., GIRINAGAR
40' X 60'
S.R.GOVINDARAJ
BDA/EE(S)/PL/55/90-91 DT 08.06.1990
KENCHENAHALLI H.B.C.S.
50' X 67'
S.R.LAKSHMI
BDA/EE(S)/PL/56/90-91 DT 14.06.1990
1799
651/B
1800
114
KENCHENAHALLI H.B.C.S.
60' X 38'
N.K.GARUDADWAJANI
BDA/EE(S)/PL/57/90-91 DT 20.06.1990
1801
504
JAYANAGAR H.B.C.S., KADIRENAHALLI
40' X 60'
D.V.KRISHNAN
BDA/EE(S)/PL/58/90-91 DT 26.06.1990
1802
811
N.S.PALYA MICO H.B.C.S.
40' X 60'
H.SRINIVASA
BDA/EE(S)/PL/59/90-91 DT 26.06.1990
1803
26
KAS OFFICERS, MADIWALA
13.20 X 16.00
P.S.VASTRAD
BDA/EE(S)/PL/60/90-91 DT 26.06.1990
1804
474
N.S.PALYA MICO H.B.C.S.
41' X 60'
SHANTHA
BDA/EE(S)/PL/61/90-91 DT 26.06.1990
1805
786
N.S.PALYA MICO H.B.C.S.
40' X 61'
NANDI KESHAVAN
BDA/EE(S)/PL/62/90-91 DT 27.06.1990
1806
33
ITI H.B.C.S., KATHARIGUPPA
40' X 50'
C.S.BADRINATH
BDA/EE(S)/PL/63/90-91 DT 27.06.1990
1807
332
KENCHENAHALLI H.B.C.S.
40' X 60'
ARSHIA KHANAM
BDA/EE(S)/PL/64/90-91 DT 30.06.1990
1808
115
KENCHENAHALLI H.B.C.S.
60' X 44'
R.SRIKANTAN
BDA/EE(S)/PL/65/90-91 DT 30.06.1990
1809
916
N.S.PALYA MICO H.B.C.S.
40' X 60'
N.RAMAKRISHNA & SMT R USHA
BDA/EE(S)/PL/66/90-91 DT 30.06.1990
1810
30
NIMHAN'S H.B.C.S. TAVAREKERE
40' X 58'
C.D.MARIA KUTTY
BDA/EE(S)/PL/67/90-91 DT 02.07.1990
1811
314
N.S.PALYA MICO H.B.C.S.
40' X 60'
PARVEEZ TAZ
BDA/EE(S)/PL/68/90-91 DT 03.07.1990
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
40' X 61'
S.SANTOSH KUMAR
BDA/EE(S)/PL/69/90-91 DT 03.07.1990
1812
1093/A
1813
394
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
76' X 40'
JOSEPH ANTHONY
BDA/EE(S)/PL/70/90-91 DT 03.07.1990
1814
818
KENCHENAHALLI H.B.C.S.
57' X 47'
N.M.DHARANI
BDA/EE(S)/PL/71/90-91 DT 09.07.1990
1815
36
B.O.O. H.B.C.S. MADIWALA
40' X 60'
DR|| BALASUBRAMANYAM
BDA/EE(S)/PL/72/90-91 DT 11.07.1990
1816
55
POORNA PRAJAN H.B.C.S., KATHARIGUPPA
60' X 40'
S.GOPINATH
BDA/EE(S)/PL/73/90-91 DT 16.07.1990
1817
789
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
40' X 60'
L.K.ANANTHA NARAYANA
BDA/EE(S)/PL/74/90-91 DT 16.07.1990
1818
59
JAYANAGAR H.B.C.S., KADIRENAHALLI
44' X 60'
K.RANGA SWAMY
BDA/EE(S)/PL/75/90-91 DT 16.03.1990
1819
448
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
64' X 40'
T.A.MOHAN RAO
BDA/EE(S)/PL/76/90-91 DT 16.07.1990
1820
1020
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
60' X 40'
RAMACHANDRA
BDA/EE(S)/PL/77/90-91 DT 16.07.1990
1821
955
N.S.PALYA MICO H.B.C.S.
38' X 62'
NANJALINGAPPA
BDA/EE(S)/PL/78/90-91 DT 23.07.1990
1822
344
KENCHENAHALLI H.B.C.S.
56' X 43'
A.SRINIVASA MURTHY
BDA/EE(S)/PL/79/90-91 DT 23.07.1990
1823
921
N.S.PALYA MICO H.B.C.S.
40' X 60'
BDA/EE(S)/PL/80/90-91 DT 26.07.1990
1824
857
KENCHENAHALLI H.B.C.S.
46' X 42'
YOGANARASIMHA SETTY &
H.V.PADMAVATHI
T.V.SRIDHARA
BDA/EE(S)/PL/81/90-91 DT 26.07.1990
1825
12/E
VISWABHARATHI H.B.C.S., GIRINAGAR
40' X 60'
K.SANJEEVA RAO
BDA/EE(S)/PL/82/90-91 DT 26.07.1990
1826
JAYANAGAR H.B.C.S., KADIRENAHALLI
43' X 50'
BASAVARAJU
BDA/EE(S)/PL/83/90-91 DT 26.07.1990
1827
264 &
265
303
N.S.PALYA MICO H.B.C.S.
40' X 60'
R.SADASIVAN
BDA/EE(S)/PL/84/90-91 DT 31.07.1990
1828
255
KENCHENAHALLI H.B.C.S.
40' X 60'
K.PRAKASH BABU
BDA/EE(S)/PL/85/90-91 DT 31.07.1990
1829
40
B.O.O. H.B.C.S. B.T.M. LAYOUT
40' X 60'
D.KRISHNA MURTHY
BDA/EE(S)/PL/86/90-91 DT 31.07.1990
1830
237
N.S.PALYA MICO H.B.C.S.
40' X 60'
R.SRIDHAR
BDA/EE(S)/PL/87/90-91 DT 31.07.1990
1831
352
N.S.PALYA MICO H.B.C.S.
40' X 60'
B.RANGA SWAMAIAH
BDA/EE(S)/PL/88/90-91 DT 01.08.1990
1832
931
KENCHENAHALLI H.B.C.S.
40' X 60'
A.HANUMANTHA REDDY
BDA/EE(S)/PL/89/90-91 DT 03.08.1990
1833
709
N.S.PALYA MICO H.B.C.S.
19.81 X 12.19
JOSEPH D MELLO
BDA/EE(S)/PL/90/90-91 DT 17.08.1990
KENCHENAHALLI H.B.C.S.
40' X 50'
PAPANNA
BDA/EE(S)/PL/91/90-91 DT 17.08.1990
KENCHENAHALLI H.B.C.S.
40' X 60'
K.R.CHENCHULAKSHMI
BDA/EE(S)/PL/92/90-91 DT 17.08.1990
1834
450/B
1835
122
1836
58
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
40' X 60'
K.L.SETTURAMA LINGA MURTHY
BDA/EE(S)/PL/93/90-91 DT 17.08.1990
1837
703
KEMPEGOWDA H.B.C.S., KATHRIGUPPA
40' X 60'
SUBHADRA BAI
BDA/EE(S)/PL/94/90-91 DT 17.08.1990
1838
500
JAYANAGAR H.B.C.S., KADIRENAHALLI
45' X 60'
R.SREE RAGHAVAN
BDA/EE(S)/PL/95/90-91 DT 21.08.1990
1839
726
KENCHENAHALLI H.B.C.S.
49' X 43'
N.SHEKHARAPPA
BDA/EE(S)/PL/96/90-91 DT 21.08.1990
1840
45
MICO SKGNS ARAKERE
50' X 79'
G.V.NAGARATHNA
BDA/EE(S)/PL/97/90-91 DT 21.08.1990
1841
766/A
N.S.PALYA MICO H.B.C.S.
60' X 33'
D.GEORGE ROBER
BDA/EE(S)/PL/98/90-91 DT 25.08.1990
1842
573/A
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
40' X 60'
H.S.NAGENDRAIAH
BDA/EE(S)/PL/99/90-91 DT 25.08.1990
1843
720
KEMPEGOWDA H.B.C.S., KATHRIGUPPA
40' X 61'
C.C.SHETTAR
BDA/EE(S)/PL/100/90-91 DT 25.08.1990
1844
1212
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
40' X 60'
L.AMJAD ALI KHAN
BDA/EE(S)/PL/48/90-91 DT 04.06.1990
1845
472
N.S.PALYA MICO H.B.C.S.
41' X 60'
A.VENKOBA RAO
BDA/EE(S)/PL/47/90-91 DT 04.06.1990
1846
1143
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
39' X 60'
P.LINGAIAH
BDA/EE(S)/PL/49/90-91 DT 04.06.1990
1847
268
BIKASIPURA SPACE EMPLOYEES HBCS
40' X 60'
LATHA BAI
BDA/EE(S)/PL/227/90-91 DT 27.12.1990
1848
538
BIKASIPURA SPACE EMPLOYEES HBCS
40' X 60'
H.G.PREMA SUDHAMANI
BDA/EE(S)/PL/226/90-91 DT 27.12.1990
1849
271
BIKASIPURA SPACE EMPLOYEES HBCS
40' X 60'
P.LAKSHMINARASIMHAN
BDA/EE(S)/PL/224/90-91 DT 27.12.1990
1850
37
BIKASIPURA SPACE EMPLOYEES HBCS
40' X 60'
M.R.SRINIVASAN
BDA/EE(S)/PL/223/90-91 DT 27.12.1990
1851
695
BIKASIPURA SPACE EMPLOYEES HBCS
40' X 60'
G.SHIVANNA
BDA/EE(S)/PL/222/90-91 DT 27.12.1990
1852
856
KENCHENAHALLI H.B.C.S.
46' X 53'
ANJU S IDWANI
BDA/EE(S)/PL/219/90-91 DT 24.12.1990
1853
225
N.S.PALYA MICO H.B.C.S.
40' X 60'
S.CHAYAPATHY
BDA/EE(S)/PL/220/90-91 DT 24.12.1990
1854
231
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
39' X 60'
R.SHIVA PRAKASH
BDA/EE(S)/PL/221/90-91 DT 24.12.1990
1855
18
TELECOM H.B.C.S., CHIKKALASANDRA
40' X 53'
P.V.RAJAN
BDA/EE(S)/PL/217/90-91 DT 19.12.1990
1856
354
KENCHENAHALLI H.B.C.S.
40' X 60'
M.H.VENKATA REDDY
BDA/EE(S)/PL/216/90-91 DT 19.12.1990
1857
214
BIKASIPURA SPACE EMPLOYEES HBCS
40' X 60'
S.K.SIMHA
BDA/EE(S)/PL/218/90-91 DT 19.12.1990
1858
864
BIKASIPURA SPACE EMPLOYEES HBCS
40' X 60'
R.S.EKKUNDI
BDA/EE(S)/PL/214/90-91 DT 19.12.1990
1859
113
KENCHENAHALLI H.B.C.S.
42' X 61'
T.M.KRISHNA RAO
BDA/EE(S)/PL/213/90-91 DT 19.12.1990
1860
2
KSRTC H.B.C.S. CHIKKALLASANDRA
40' X 32'
BDA/EE(S)/PL/215/90-91 DT 19.12.1990
1861
936
N.S.PALYA MICO H.B.C.S.
40' X 60'
SURESH VEERABHADRAIAH
SULLADMATH
MEENA MIGALNI
BDA/EE(S)/PL/42/90-91 DT 25.05.1990
1862
540
BIKASIPURA SPACE EMPLOYEES HBCS
40' X 60'
C.B.SATHE
BDA/EE(S)/PL/212/90-91 DT 15.12.1990
1863
1357
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
64' X 30'
P.SATHYANARAYANA
BDA/EE(S)/PL/211/90-91 DT 15.12.1990
1864
211
BIKASIPURA SPACE EMPLOYEES HBCS
12.19 X 18.19
M.SUDHAKAR
BDA/EE(S)/PL/208/90-91 DT 15.12.1990
1865
205
JAYANAGAR H.B.C.S., KADIRENAHALLI
40' X 60'
T.R.SHASHIKALA
BDA/EE(S)/PL/210/90-91 DT 15.12.1990
1866
208
BIKASIPURA SPACE EMPLOYEES HBCS
60' X 40'
G.N.RAGHUNATH
BDA/EE(S)/PL/209/90-91 DT 15.12.1990
1867
344
KENCHENAHALLI H.B.C.S.
40' X 60'
V.C.SHIROL
BDA/EE(S)/PL/38/90-91 DT 25.05.1990
1868
874
KENCHENAHALLI H.B.C.S.
56' X 40'
G.K.SADASHIVA
BDA/EE(S)/PL/250/90-91 DT 16.01.1991
1869
13
BIKASIPURA SPACE EMPLOYEES HBCS
40' X 60'
P.VASU
BDA/EE(S)/PL/201/90-91 DT 12.12.1990
1870
309
SARAKKI V PHASE
40' X 60'
V.K.RAJU
BDA/EE(S)/PL/4/90-91 DT 09.11.1990
1871
24
J.P.NAGAR IV PHASE
40' X 60'
I.P.LOKENDRA
BDA/EE(S)/PL/1/90-91 DT 24.04.1990
1872
267
SARAKKI V PHASE
40' X 60'
D.R.PRABHAKAR
BDA/EE(S)/PL/5/90-91 DT 17.01.1991
1873
268
SARAKKI V PHASE
40' X 60'
K.A.C.APPAJI
BDA/EE(S)/PL/6/90-91 DT 28.01.1991
1874
13
SARAKKI V PHASE
40' X 60'
P.KRISHNA SWAMY
BDA/EE(S)/PL/7/90-91 DT 08.02.1991
1875
28
SARAKKI I PHASE
18.30 X 13.70
PATRIC LOBO
BDA/EE(S)/PL/5/90-91 DT 23.11.1990
1876
624
SARAKKI I PHASE
45' X 60'
BHARATHI A NAIK
BDA/EE(S)/PL/6/90-91 DT 01.12.1990
1877
18
SARAKKI V PHASE
40' X 60'
LAKIR HUSSAIN MACCI
BDA/EE(S)/PL/3/90-91 DT 25.05.1990
1878
653
N.S.PALYA MICO H.B.C.S.
40' X 60'
PREMANAND
BDA/EE(S)/PL/14/90-91 DT 26.04.1990
1879
131
VISWABHARATHI H.B.C.S., GIRINAGAR
40' X 60'
T.H.ANANTHA KRISHNA
BDA/EE(S)/PL/15/90-91 DT 30.04.1990
1880
36
KAS OFFICERS, MADIWALA
40' X 60'
H.V.PRASWANATH
BDA/EE(S)/PL/16/90-91 DT 02.05.1990
1881
171
N.S.PALYA MICO H.B.C.S.
39' X 59'
RAMESH K MODY
BDA/EE(S)/PL/17/90-91 DT 03.05.1990
1882
1105
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
40' X 60'
T.BEERANNA
BDA/EE(S)/PL/234/90-91 DT 03.01.1991
1883
236
BIKASIPURA SPACE EMPLOYEES HBCS
40' X 60'
M.R.THYAGARAJ
BDA/EE(S)/PL/242/90-91 DT 11.01.1991
1884
185
KENCHENAHALLI H.B.C.S.
60' X 40'
LALITHA J PURANIK
BDA/EE(S)/PL/243/90-91 DT 11.01.1991
1885
403
KENCHENAHALLI H.B.C.S.
57' X 47'
G.R.HIRIYANNAIAH
BDA/EE(S)/PL/244/90-91 DT 11.01.1991
1886
40
JAYANAGAR H.B.C.S., KADIRENAHALLI
60' X 43'
SALAMMA
BDA/EE(S)/PL/235/90-91 DT 03.01.1991
1887
8
KAS OFFICERS, MADIWALA
43' X 55'
AZEZULLA BAIG
BDA/EE(S)/PL/240/90-91 DT 07.01.1991
1888
150
BIKASIPURA SPACE EMPLOYEES HBCS
40' X 60'
P.RAJENDRA PRASAD
BDA/EE(S)/PL/241/90-91 DT 07.01.1991
1889
496
BIKASIPURA SPACE EMPLOYEES HBCS
61' X 40'
A.A.BOKIL
BDA/EE(S)/PL/233/90-91 DT 03.01.1991
1890
272
KENCHENAHALLI H.B.C.S.
40' X 60'
ACHUTA NAYAK
BDA/EE(S)/PL/238/90-91 DT 03.01.1991
1891
918
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
40' X 60'
B.S.SUDARSHANA DHARA
BDA/EE(S)/PL/239/90-91 DT 03.01.1991
1892
152
BIKASIPURA SPACE EMPLOYEES HBCS
40' X 60'
N.SRINIVASA MURTHY
BDA/EE(S)/PL/206/90-91 DT 13.12.1990
1893
845
KENCHENAHALLI H.B.C.S.
53' X 45'
S.SRINIVASA
BDA/EE(S)/PL/205/90-91 DT 12.12.1990
1894
688
KENCHENAHALLI H.B.C.S.
59' X 37'
K.S.SHEKHAR
BDA/EE(S)/PL/204/90-91 DT 12.12.1990
1895
695
KEMPEGOWDA H.B.C.S., KATHRIGUPPA
40' X 60'
C.B.RAMANNA
BDA/EE(S)/PL/203/90-91 DT 12.12.1990
1896
846
BIKASIPURA SPACE EMPLOYEES HBCS
40' X 60'
N.PRAHLADA RAO
BDA/EE(S)/PL/202/90-91 DT 12.12.1990
1897
8
BIKASIPURA SPACE EMPLOYEES HBCS
40' X 60'
K.K.KURIAN
BDA/EE(S)/PL/236/90-91 DT 03.01.1991
1898
645
N.S.PALYA MICO H.B.C.S.
40' X 60'
BDA/EE(S)/PL/237/90-91 DT 03.01.1991
1899
223
BIKASIPURA SPACE EMPLOYEES HBCS
40' X 70'
MOHAMMED QUDRATULLAH
SHARIFF
ANNIC NELSON
BDA/EE(S)/PL/232/90-91 DT 28.12.1990
1900
JAYANAGAR H.B.C.S., KADIRENAHALLI
50' X 42'
BASAVARAJU
BDA/EE(S)/PL/229/90-91 DT 27.12.1990
1901
264 &
265
307
N.S.PALYA MICO H.B.C.S.
46' X 60'
R.KODANDA PANI
BDA/EE(S)/PL/230/90-91 DT 28.12.1990
1902
473/D
KENCHENAHALLI H.B.C.S.
50' X 70'
N.K.GOPAL
BDA/EE(S)/PL/231/90-91 DT 28.12.1990
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
40' X 60'
R.DEEN DAYALAN
BDA/EE(S)/PL/228/90-91 DT 27.12.1990
1903
1200
1904
45
BIKASIPURA SPACE EMPLOYEES HBCS
40' X 60'
N.S.SAVALAGI
BDA/EE(S)/PL/225/90-91 DT 27.12.1990
1905
206
JAYANAGAR H.B.C.S., KADIRENAHALLI
18.28 X 12.57
T.R.NAGARATHNA
BDA/EE(S)/PL/207/90-91 DT 15.12.1990
1906
572
SARAKKI VI PHASE
40' X 60'
SHANTHA
BDA/EE(S)/PL/8/90-91 DT 28.02.1991
1907
294
SARAKKI V PHASE
40' X 60'
N.NARAYANA MURTHY
BDA/EE(S)/PL/1/90-91 DT 24.04.1990
1908
724
SARAKKI VI PHASE
60' X 40'
MANJULA PRABHAKAR
BDA/EE(S)/PL/2/90-91 DT 31.05.1990
1909
722
SARAKKI VI PHASE
40' X 60'
B.V.NAGARAJ
BDA/EE(S)/PL/3/90-91 DT 06.08.1990
1910
17
SARAKKI VI PHASE
40' X 60'
J.P.SAHADEVA
BDA/EE(S)/PL/4/90-91 DT 06.08.1990
1911
629
SARAKKI VI PHASE
60' X 39'
BDA/EE(S)/PL/5/90-91 DT 19.09.1990
1912
630
SARAKKI VI PHASE
39' X 60'
S.VITTALA SETTY & LAKSHMI V
SETTY
C.K.SHESHADRI
BDA/EE(S)/PL/1/90-91 DT 18.05.1990
1913
32
B.O.O. H.B.C.S. MADIWALA
40' X 60'
M.VASUDEVA MAIYA
BDA/EE(S)/PL/13/90-91 DT 26.04.1990
1914
20
A.R.GOPALA SWAMY LAYOUT, J.P.NAGAR
21' X 91'
A.G.KRISHNA SWAMY
BDA/EE(S)/PL/8/90-91 DT 21.04.1990
1915
586
SARAKKI VI PHASE
40' X 60'
SIDDAGANGANNA
BDA/EE(S)/PL/6/90-91 DT 01.12.1990
KENCHENAHALLI H.B.C.S.
60' X 50'
K.M.MANJULA
BDA/EE(S)/PL/246/90-91 DT 11.01.1991
BIKASIPURA SPACE EMPLOYEES HBCS
40' X 60'
N.GUNASHEKHARAN
BDA/EE(S)/PL/247/90-91 DT 16.01.1991
KENCHENAHALLI H.B.C.S.
54' X 58'
P.S.THANDAVA MURTHY
BDA/EE(S)/PL/248/90-91 DT 16.01.1991
SARAKKI I PHASE
44' X 60'
M.S.RAMA MURTHY
BDA/EE(S)/PL/7/90-91 DT 12.12.1990
1916
135/A
1917
1918
25
437/A
1919
756
1920
21
POORNA PRAJAN H.B.C.S., KATHARIGUPPA
40' X 60'
S.RAMESH
BDA/EE(S)/PL/10/90-91 DT 24.04.1990
1921
29
S.RAMA RAO LAYOUT
40' X 60'
S.ANANTHA RAJU
BDA/EE(S)/PL/27/90-91 DT 15.05.1990
1922
297
KENCHENAHALLI H.B.C.S.
40' X 60'
MATHEW GEORGE
BDA/EE(S)/PL/28/90-91 DT 15.05.1990
1923
37
POORNA PRAJAN H.B.C.S., KATHARIGUPPA
40' X 60'
RAJALAKSHMI
BDA/EE(S)/PL/29/90-91 DT 15.05.1990
1924
9
POORNA PRAJAN H.B.C.S., KATHARIGUPPA
40' X 60'
K.N.RAJAGOPAL
BDA/EE(S)/PL/32/90-91 DT 14.05.1990
1925
19
JAYANAGAR H.B.C.S., KADIRENAHALLI
45' X 69'
M.R.RAMSAY
BDA/EE(S)/PL/31/90-91 DT 15.05.1990
KENCHENAHALLI H.B.C.S.
57' X 43'
REVATHI NAGESH
BDA/EE(S)/PL/30/90-91 DT 15.05.1990
TELECOM H.B.C.S., CHIKKALASANDRA
47' X 40'
C.R.SHETTY
BDA/EE(S)/PL/35/90-91 DT 24.05.1990
1926
1927
94/B
5
1928
1135
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
40' X 60'
KRISHNA NAYAKA
BDA/EE(S)/PL/34/90-91 DT 24.05.1990
1929
791
N.S.PALYA MICO H.B.C.S.
40' X 60'
K.PARTHASARATHY & P.USHA
BDA/EE(S)/PL/33/90-91 DT 24.05.1990
1930
764
N.S.PALYA MICO H.B.C.S.
61' X 39'
C.SAHADEVA RAO
BDA/EE(S)/PL/36/90-91 DT 25.05.1990
1931
188
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
40' X 60'
GANAPATHY RAO GHATKE
BDA/EE(S)/PL/39/90-91 DT 25.05.1990
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
40' X 60'
E.RAMANJANEYALU
BDA/EE(S)/PL/37/90-91 DT 25.05.1990
1932
601/A
1933
495
N.S.PALYA MICO H.B.C.S.
41' X 60'
K.PRAKASH
BDA/EE(S)/PL/40/90-91 DT 25.05.1990
1934
265
KSRTC H.B.C.S. SARAKKI
40' X 60'
V.CHALAPATHY
BDA/EE(S)/PL/41/90-91 DT 25.05.1990
1935
290
JAYANAGAR H.B.C.S., KADIRENAHALLI
40' X 61'
S.SARASWATHI
BDA/EE(S)/PL/43/90-91 DT 28.05.1990
1936
2
JAYANAGAR H.B.C.S., KADIRENAHALLI
30' X 69'
M.R.ANEEL
BDA/EE(S)/PL/21/90-91 DT 08.05.1990
1937
809
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
40' X 60'
S.RAMALINGAPPA
BDA/EE(S)/PL/20/90-91 DT 08.05.1990
1938
62
B.O.O. H.B.C.S. MADIWALA
40' X 60'
G.K.BHAT
BDA/EE(S)/PL/44/90-91 DT 28.05.1990
JAYANAGAR H.B.C.S., KADIRENAHALLI
67' X 39'
DEVANAND
BDA/EE(S)/PL/22/90-91 DT 08.05.1990
VISWABHARATHI H.B.C.S., GIRINAGAR
40' X 59'
R.S.VIJAYA
BDA/EE(S)/PL/45/90-91 DT 30.05.1990
POORNA PRAJAN H.B.C.S., KATHARIGUPPA
40' X 60'
BDA/EE(S)/PL/23/90-91 DT 08.05.1990
SUBEDAR PALYA H.B.C.S., SARAKKI
45' X 60'
S.SREEDHARA MURTHY &
S.SUBRAMANYA
SUBHADRAMMA
BDA/EE(S)/PL/46/90-91 DT 30.05.1990
JAYANAGAR H.B.C.S., KADIRENAHALLI
40' X 50'
V.C.SAMBA MURTHY
BDA/EE(S)/PL/24/90-91 DT 08.05.1990
MICO SKGNS ARAKERE
50' X 43'
J.RANGACHARI
BDA/EE(S)/PL/25/90-91 DT 08.05.1990
KENCHENAHALLI H.B.C.S.
40' X 60'
K.JANARDHANA SHASTRY
BDA/EE(S)/PL/26/90-91 DT 08.05.1990
1939
4, 61/2
1940
244
1941
19
1942
302
1943
80/41
1944
149
1945
69
1946
732
JAYANAGAR H.B.C.S., KADIRENAHALLI
49' X 40'
M.P.PRASANNADEVI
BDA/EE(S)/PL/18/90-91 DT 03.05.1990
1947
761
N.S.PALYA MICO H.B.C.S.
39' X 60'
B.S.SANDHYA
BDA/EE(S)/PL/19/90-91 DT 03.05.1990
1948
8
KANAKA H.B.C.S, KADIRENAHALLY
45' X 54'
B.K.RAJU
BDA/EE(S)/PL/50/90-91 DT 04.06.1990
1949
29
KENCHENAHALLI H.B.C.S.
70' X 40'
NANDA JAGADEESH
BDA/EE(S)/PL/249/90-91 DT 16.01.1991
1950
800
N.S.PALYA MICO H.B.C.S.
61' X 40'
H.A.GOPALA RAO
BDA/EE(S)/PL/01/90-91 DT 03.04.1990
1951
780
N.S.PALYA MICO H.B.C.S.
40' X 61'
A.N.BABU RAO & RAJANI BABU RAO
BDA/EE(S)/PL/12/90-91 DT 26.04.1990
1952
59
POORNA PRAGNA H.B.C.S., KATHARIGUPPA
40' X 60'
K.VENKATESHA MURTHY
BDA/EE(S)/PL/9/90-91 DT 24.04.1990
1953
139
ITI H.B.C.S., KATHARIGUPPA
85' X 45'
H.V.SWARNAMBA
BDA/EE(S)/PL/11/90-91 DT 24.04.1990
1954
305
SARAKKI V PHASE
40' X 60'
S.NARAYANA RAO
BDA/EE(S)/PL/8/90-91 DT 07.03.1991
IDEAL HOMES H.B.C.S., KENCHENAHALLI
50' X 60'
K.P.NARASIMHA MURTHY
BDA/EE(S)/PL/245/90-91 DT 11.01.1991
SARAKKI I PHASE
18.00 X 13.67
SURESH KUMAR AGARWAL
BDA/EE(S)/PL/2/90-91 DT 25.05.1990
SARAKKI IV PHASE
40' X 60'
PRABHAKAR
BDA/EE(S)/PL/3/90-91 DT 05.07.1990
B.S.K. III STAGE, SRINIVASA NAGAR II PHASE
40' X 84'
M.LAKKANNA
BDA/EE(S)/PL/37/90-91 DT 03.08.1990
S.B.I. H.B.C.S. AT SARAKKI
44' X 60'
B.S.SUBBA RAO
BDA/EE(S)/PL/332/90-91 DT 07.03.1991
SARAKKI V PHASE
40' X 60'
P.S.KRISHNA KUMAR
BDA/EE(S)/PL/2/90-91 DT 08.05.1990
1955
134/A
1956
1
1957
18
1958
939 &
940
1959
7
1960
255
Cataloguing and indexing of records as envisaged under section 4(1) (a) of the Right to information Act 2005
LIST OF PLAN SANCTIONED FILES DURING THE YEAR 91-92 IN EE(S) DIVISION
SL
NO.
1961
SITE
NO.
639
NAME OF THE LAYOUT
DIMENSION
APPLICANT NAME
SANCTION EE NO/DATE
SARAKKI II PHASE
60' X 40'
NARASIMHA NAIDU
BDA/EE(S)/PL/24/91-92 DT 30.10.1991
1962
935
SARAKKI II PHASE
40' X 60'
V.KANTARAJU
BDA/EE(S)/PL/25/91-92 DT 04.11.1991
1963
452
SARAKKI II PHASE
64' X 45'
ARUNA N REDDY
BDA/EE(S)/PL/30/91-92 DT 27.12.1991
1964
1514
SARAKKI II PHASE
45' X 72'
H.M.SUJAYA MANJULA
BDA/EE(S)/PL/20/91-92 DT 27.09.1991
1965
1530
SARAKKI II PHASE
13.42 X 20.11
B.A.HONNAPPA
BDA/EE(S)/PL/21/91-92 DT 27.09.1991
1966
1084
SARAKKI II PHASE
60' X 40'
P.KUMARAJ & SMT VASANTHA
BDA/EE(S)/PL/27/91-92 DT 21.11.1991
1967
897
SARAKKI II PHASE
45' X 70'
B.K.SRINIVASAN
BDA/EE(S)/PL/26/91-92 DT 11.11.1991
1968
487
SARAKKI II PHASE
40' X 60'
V.S.NAGARATHNA
BDA/EE(S)/PL/28/91-92 DT 09.12.1991
1969
2007
SARAKKI II PHASE
57' X 41'
SMT.SHAHEEN MECCI
BDA/EE(S)/PL/29/91-92 DT 17.12.1991
SARAKKI II PHASE
14.00 X 13.00
N.LAXMIVENUGOPAL
BDA/EE(S)/PL/40/91-92 DT 11.03.1992
1970
432/A
1971
634
SARAKKI II PHASE
60' X 40'
R.N.RAMAIAH
BDA/EE(S)/PL/42/91-92 DT 20.03.1992
1972
1526
SARAKKI II PHASE
40' X 60'
PUTTAMADAIAH
BDA/EE(S)/PL/41/91-92 DT 11.03.1992
1973
1992
SARAKKI II PHASE
40' X 64'
H.R.S.RAO
BDA/EE(S)/PL/45/91-92 DT 30.03.1992
1974
939
SARAKKI II PHASE
40' X 60'
BADANAIAH
BDA/EE(S)/PL/43/91-92 DT 20.03.1992
B.T.M. I STAGE I PHASE
60' X 40'
B.LOKESH
BDA/EE(S)/PL/29/91-92 DT 17.01.1992
1975
77/B
1976
105
B.T.M. I STAGE I PHASE
40' X 60'
SHAMALA CHANDRA
BDA/EE(S)/PL/16/91-92 DT 05.09.1991
1977
696
B.T.M. I STAGE I PHASE
18.29 X 12.19
KEMPAIAH
BDA/EE(S)/PL/10/91-92 DT 18.06.1991
1978
1111
B.T.M. I STAGE I PHASE TAVAREKERE
19.50 X 13.00
JAN MOHAMAD AHAMAD
BDA/EE(S)/PL/33/91-92 DT 11.03.1992
1979
1242
B.T.M. I STAGE I PHASE
63' X 50'
M.SRINIVASA
BDA/EE(S)/PL/9/91-92 DT 12.06.1991
1980
885
SARAKKI III PHASE
45' X 70'
G.A.SOMASHEKHARAIAH
BDA/EE(S)/PL/1/91-92 DT 23.01.1992
1981
624
SARAKKI I PHASE
45' X 60'
BHARATHI A NAIK
BDA/EE(S)/PL/1/91-92 DT 27.04.1991
1982
617
SARAKKI I PHASE
45' X 60'
K.N.NAGENDRA PRASAD
BDA/EE(S)/PL/2/91-92 DT 29.04.1991
1983
1414
SARAKKI I PHASE
72' X 42'
MANJUNATHA CHATRA
BDA/EE(S)/PL/3/91-92 DT 03.09.1991
1984
763
SARAKKI I PHASE
60' X 43'
NANJUNDESWARA GUPTA
BDA/EE(S)/PL/4/91-92 DT 03.09.1991
1985
620
SARAKKI I PHASE
45' X 60'
ANNAIAH
BDA/EE(S)/PL/5/91-92 DT 07.01.1992
1986
230
B.S.K. III STAGE, III PHASE, II BLOCK
40' X 79'
J.K.SRINIVASA MURTHY
BDA/EE(S)/PL/56/91-92 DT 29.10.1991
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
40' X 60'
K.MADHAVA
BDA/EE(S)/PL/222/91-92 DT 07.01.1992
1987
193/B
1988
177
B.O.O., H.B.C.S., TAVAREKERE
60' X 52'
VICE CHAIRMAN
BDA/EE(S)/PL/225/91-92 DT 17.01.1992
1989
656
KENCHENAHALLI H.B.C.S.
45' X 70'
B.M.ANNEGOWDA
BDA/EE(S)/PL/224/91-92 DT 07.01.1992
1990
157
BIKASIPURA SPACE EMPLOYEES HBCS
40' X 60'
R.AJITH KUMAR
BDA/EE(S)/PL/203/91-92 DT 27.12.1991
1991
595
BIKASIPURA SPACE EMPLOYEES HBCS
40' X 60'
S.CHANDRA SHEKHAR
BDA/EE(S)/PL/205/91-92 DT 27.12.1991
KENCHENAHALLI H.B.C.S.
44' X 42'
B.K.KRISHNAIAH
BDA/EE(S)/PL/223/91-92 DT 07.01.1992
1992
90/2A
1993
694
N.S.PALYA MICO H.B.C.S.
45' X 60'
K.USHARANI
BDA/EE(S)/PL/236/91-92 DT 20.01.1992
1994
173
B.O.O., H.B.C.S., TAVAREKERE
40' X 60'
VICE CHAIRMAN
BDA/EE(S)/PL/235/91-92 DT 20.01.1992
1995
910
N.S.PALYA MICO H.B.C.S.
13.41 X 19.80
H.C.NARSIMHAIAH
BDA/EE(S)/PL/213/91-92 DT 03.01.1992
1996
356
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
55' X 40'
B.VENKATA RAO
BDA/EE(S)/PL/219/91-92 DT 07.01.1992
1997
513
BIKASIPURA SPACE EMPLOYEES HBCS
40' X 60'
AMMINI WARRIER
BDA/EE(S)/PL/214/91-92 DT 03.01.1992
1998
4
B.S.K. III STAGE, KATHARIGUPPE SY NOS
71' X 60'
B.H.MADHAVA MURTHY
BDA/EE(S)/PL/215/91-92 DT 03.01.1992
1999
395
KADIRENAHALLI HBCS
49' X 60'
V.R.SUNDARA RAJAN
BDA/EE(S)/PL/216/91-92 DT 03.01.1992
2000
228
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
38' X 60'
VASANTHA SHANBHOG
BDA/EE(S)/PL/217/91-92 DT 04.01.1992
2001
475
N.S.PALYA MICO H.B.C.S.
41' X 60'
M.R.LAKSHMINARAYANA
BDA/EE(S)/PL/218/91-92 DT 04.01.1992
KENCHENAHALLI H.B.C.S.
56' X 54'
K.V.MADHAVAN
BDA/EE(S)/PL/220/91-92 DT 07.01.1992
2002
439/D
2003
686
KENCHENAHALLI H.B.C.S.
37' X 61'
K.VEERARAGHAVAN
BDA/EE(S)/PL/221/91-92 DT 07.01.1992
2004
258
GIRINAGAR H.B.C.S.
40' X 60'
S.G.SOMASHEKHARA RAO
BDA/EE(S)/PL/246/91-92 DT 29.01.1992
2005
16
B.S.K. III STAGE, KATHARIGUPPE SY NOS
40' X 60'
B.K.SHESHADRI
BDA/EE(S)/PL/245/91-92 DT 28.01.1992
2006
5
SARAKKI H.B.C.S.
40' X 60'
MOHAMMED RAHAMATULLA
BDA/EE(S)/PL/244/91-92 DT 24.01.1992
2007
178
B.O.O., H.B.C.S., TAVAREKERE
41' X 60'
VICE CHAIRMAN
BDA/EE(S)/PL/241/91-92 DT 24.01.1992
2008
176
B.O.O., H.B.C.S., TAVAREKERE
60' X 55'
VICE CHAIRMAN
BDA/EE(S)/PL/240/91-92 DT 24.01.1992
2009
978
N.S.PALYA MICO H.B.C.S.
34' X 60'
FAROOV AHAMED SHARIFF
BDA/EE(S)/PL/239/91-92 DT 22.01.1992
2010
883
N.S.PALYA MICO H.B.C.S.
60' X 40'
BDA/EE(S)/PL/238/91-92 DT 22.01.1992
2011
372
KADIRENAHALLI HBCS
21.94 X 13.71
JOE VOUBAN & SMT N
PREMALATHA
K.NAGARATHNAMMA
BDA/EE(S)/PL/237/91-92 DT 22.01.1992
2012
232
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
39' X 60'
KRISHNA MURTHY
BDA/EE(S)/PL/249/91-92 DT 05.02.1992
2013
687
B.S.K. III STAGE, KATHARIGUPPE SY NOS
12.19 X 18.29
KRISHORE KUMAR D NIRALA
BDA/EE(S)/PL/248/91-92 DT 05.02.1992
2014
174
B.O.O., H.B.C.S., TAVAREKERE
60' X 60'
VICE CHAIRMAN
BDA/EE(S)/PL/243/91-92 DT 24.01.1992
2015
715
B.S.K. III STAGE, KATHARIGUPPE SY NOS
18.28 X 12.20
K.VENUGOPAL RAO
BDA/EE(S)/PL/247/91-92 DT 29.01.1992
2016
608
BIKASIPURA SPACE EMPLOYEES HBCS
40' X 60'
B.R.GUZER PRASAD
BDA/EE(S)/PL/227/91-92 DT 18.01.1992
2017
518
BIKASIPURA SPACE EMPLOYEES HBCS
40' X 60'
S.HIREYANNA
BDA/EE(S)/PL/228/91-92 DT 18.01.1992
2018
1166
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
40' X 60'
K.V.PRABHAKARA SHETTY
BDA/EE(S)/PL/229/91-92 DT 18.01.1992
2019
14
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
98' X 40'
K.BHANUPRAKASH
BDA/EE(S)/PL/230/91-92 DT 18.01.1992
2020
908
N.S.PALYA MICO H.B.C.S.
63' X 40'
S.R.GOPALA SWAMY & TULASAMMA
BDA/EE(S)/PL/231/91-92 DT 20.01.1992
2021
170
B.O.O., H.B.C.S., TAVAREKERE
40' X 60'
VICE CHAIRMAN
BDA/EE(S)/PL/232/91-92 DT 20.01.1992
2022
171
B.O.O., H.B.C.S., TAVAREKERE
40' X 60'
VICE CHAIRMAN
BDA/EE(S)/PL/233/91-92 DT 20.01.1992
2023
172
B.O.O., H.B.C.S., TAVAREKERE
40' X 60'
VICE CHAIRMAN
BDA/EE(S)/PL/234/91-92 DT 20.01.1992
KENCHENAHALLI H.B.C.S.
64' X 50'
B.K.SUMA
BDA/EE(S)/PL/226/91-92 DT 17.01.1992
2024
100/D
2025
735
BIKASIPURA SPACE EMPLOYEES HBCS
40' X 60'
KRISHNA VENI RAMAN
BDA/EE(S)/PL/209/91-92 DT 03.01.1992
2026
175
N.S.PALYA MICO H.B.C.S.
18.29 X 12.19
SUSHEELA PRAKASH
BDA/EE(S)/PL/210/91-92 DT 03.01.1992
2027
227
BIKASIPURA SPACE EMPLOYEES HBCS
76' X 40'
B.N.BALIGA
BDA/EE(S)/PL/211/91-92 DT 03.01.1992
KADIRENAHALLI HBCS
59' X 43'
S.M.APPAJI
BDA/EE(S)/PL/212/91-92 DT 03.01.1992
GIRINAGAR H.B.C.S.
40' X 60'
S.RAGHU
BDA/EE(S)/PL/250/91-92 DT 05.02.1992
KENCHENAHALLI H.B.C.S.
47' X 51'
K.S.SHIVARAM
BDA/EE(S)/PL/283/91-92 DT 12.03.1992
2028
29/41
2029
23
2030
826
2031
39
B.S.K. III STAGE, KATHARIGUPPE SY NOS
40' X 60'
A.SUSAINATHAN
BDA/EE(S)/PL/284/91-92 DT 12.03.1992
2032
177
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
80' X 40'
SHANTHARAMA REDDY
BDA/EE(S)/PL/285/91-92 DT 12.03.1992
2033
253
SARAKKI SUBEDAR PALYA H.B.C.S.
60' X 48'
JAWAHARLAL MITTAL
BDA/EE(S)/PL/286/91-92 DT 12.03.1992
2034
247
BIKASIPURA SPACE EMPLOYEES HBCS
40' X 60'
DR.R.SUNDAR
BDA/EE(S)/PL/287/91-92 DT 18.03.1992
2035
499
BIKASIPURA SPACE EMPLOYEES HBCS
40' X 60'
M.P.PATIL
BDA/EE(S)/PL/288/91-92 DT 18.03.1992
2036
603
BIKASIPURA SPACE EMPLOYEES HBCS
40' X 60'
V.R.KATTI
BDA/EE(S)/PL/289/91-92 DT 18.03.1992
2037
439
BIKASIPURA SPACE EMPLOYEES HBCS
40' X 60'
G.NAGENDRA RAO
BDA/EE(S)/PL/290/91-92 DT 19.03.1992
2038
158
BIKASIPURA SPACE EMPLOYEES HBCS
40' X 60'
ANTHONY PAUL KOOLA
BDA/EE(S)/PL/29/91-92 DT 20.03.1992
KADIRENAHALLI HBCS
12.95 X 21.48
R.SAROJAMMA
BDA/EE(S)/PL/293/91-92 DT 20.03.1992
KADIRENAHALLI HBCS
21.03 X 7.51
V.R.SUBBU
BDA/EE(S)/PL/294/91-92 DT 20.03.1992
2039
14/C
2040
1
2041
266
KENCHENAHALLI H.B.C.S.
40' X 60'
T.V.SATHYA PRAKASH
BDA/EE(S)/PL/295/91-92 DT 20.03.1992
2042
244
KENCHENAHALLI H.B.C.S.
63' X 30'
SUDHA IYENGAR
BDA/EE(S)/PL/296/91-92 DT 27.03.1992
2043
920
KENCHENAHALLI H.B.C.S.
40' X 60'
C.S.SEETHA
BDA/EE(S)/PL/297/91-92 DT 27.03.1992
2044
56
KAVERI H.B.C.S., TAVAREKERE SY NOS
60' X 40'
P.K.JOSEPH
BDA/EE(S)/PL/298/91-92 DT 30.03.1992
2045
300
BIKASIPURA SPACE EMPLOYEES HBCS
60' X 40'
V.KRISHNA MURTHY
BDA/EE(S)/PL/299/91-92 DT 30.03.1992
2046
735
BIKASIPURA SPACE EMPLOYEES HBCS
60' X 40'
KRISHNA VENI RAMAN
BDA/EE(S)/PL/300/91-92 DT 30.03.1992
2047
286/B
KENCHENAHALLI H.B.C.S.
41' X 80'
S.R.MUDDI
BDA/EE(S)/PL/301/91-92 DT 30.03.1992
2048
6/L
GIRINAGAR H.B.C.S.
62' X 40'
SHASHI REKHA PANIRAJ
BDA/EE(S)/PL/270/91-92 DT 11.03.1992
2049
906
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
40' X 61'
B.PRAKASH
BDA/EE(S)/PL/271/91-92 DT 11.03.1992
2050
345
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
32' X 54'
MOHAMMAD ABDUL SALAM
BDA/EE(S)/PL/272/91-92 DT 11.03.1992
2051
448
BIKASIPURA SPACE EMPLOYEES HBCS
51' X 36'
T.R.FRANCIS
BDA/EE(S)/PL/273/91-92 DT 11.03.1992
2052
31
N.S.PALYA MICO H.B.C.S.
40' X 60'
KRISHNAN KUTTY
BDA/EE(S)/PL/274/91-92 DT 11.03.1992
2053
176
KENCHENAHALLI H.B.C.S.
40' X 60'
E.N.RAMACHANDRAN
BDA/EE(S)/PL/275/91-92 DT 11.03.1992
2054
199
N.S.PALYA MICO H.B.C.S.
64' X 55'
M.R.CHANDRA
BDA/EE(S)/PL/276/91-92 DT 11.03.1992
2055
427
N.S.PALYA MICO H.B.C.S.
40' X 54'
SYED HUSSAIN AHAMED
BDA/EE(S)/PL/277/91-92 DT 11.03.1992
2056
76
B.S.K. III STAGE, KATHARIGUPPE SY NOS
40' X 64'
K.LAKSHMAMMA
BDA/EE(S)/PL/275/91-92 DT 11.03.1992
2057
34
N.S.PALYA MICO H.B.C.S.
40' X 60'
R.SUNDARA RAJAN
BDA/EE(S)/PL/279/91-92 DT 11.03.1992
2058
970
KENCHENAHALLI H.B.C.S.
40' X 60'
BOMMANNA CHANNABASAPPA
BDA/EE(S)/PL/281/91-92 DT 12.03.1992
2059
75
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
40' X 60'
A.VIKRAM
BDA/EE(S)/PL/282/91-92 DT 12.03.1992
2060
702
N.S.PALYA MICO H.B.C.S.
37' X 62'
C.NATARAJAN
BDA/EE(S)/PL/251/91-92 DT 06.02.1992
2061
43
KADIRENAHALLI HBCS
40' X 60'
VIJAYA NATARAJ
BDA/EE(S)/PL/252/91-92 DT 06.02.1992
2062
773
KENCHENAHALLI H.B.C.S.
51' X 50'
D.VENKATESH
BDA/EE(S)/PL/253/91-92 DT 06.02.1992
2063
507
KADIRENAHALLI HBCS
40' X 60'
V.V.SURYA NARAYANA
BDA/EE(S)/PL/254/91-92 DT 22.02.1992
2064
65
SRI ANJANEYA SWAMY H.B.C.S., ETTMADU SY NOS
36' X 60'
B.VENKATESHAIAH
BDA/EE(S)/PL/255/91-92 DT 22.02.1992
2065
526
BIKASIPURA SPACE EMPLOYEES HBCS
40' X 60'
B.GNANESHWAR RAO
BDA/EE(S)/PL/256/91-92 DT 22.02.1992
2066
130
GIRINAGAR H.B.C.S.
40' X 57'
S.JAYALAKSHMI
BDA/EE(S)/PL/257/91-92 DT 22.02.1992
2067
28
B.S.K. III STAGE, KATHARIGUPPE SY NOS
40' X 60'
J.R.SREEPADA RAO
BDA/EE(S)/PL/258/91-92 DT 22.02.1992
2068
4
KENCHENAHALLI H.B.C.S.
57' X 41'
D.SHANKAR KUMAR
BDA/EE(S)/PL/259/91-92 DT 22.02.1992
2069
799
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
61' X 41'
ASHOK
BDA/EE(S)/PL/260/91-92 DT 22.02.1992
2070
1236
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
50' X 60'
Y.RAJESWARA RAO
BDA/EE(S)/PL/263/91-92 DT 27.02.1992
2071
560
B.S.K. III STAGE, KATHARIGUPPE SY NOS
40' X 60'
K.SUBRAMANYA BHAT
BDA/EE(S)/PL/264/91-92 DT 11.03.1992
2072
441
BIKASIPURA SPACE EMPLOYEES HBCS
40' X 60'
M.NEELAKANTA REDDY
BDA/EE(S)/PL/265/91-92 DT 11.03.1992
2073
154
ARKERE MICO LAYOUT
40' X 65'
S.SRIDHAR & ARCHANA SRIDHAR
BDA/EE(S)/PL/266/91-92 DT 11.03.1992
2074
886
N.S.PALYA MICO H.B.C.S.
59' X 40'
NAVEEDA KHANAM
BDA/EE(S)/PL/267/91-92 DT 11.03.1992
2075
524
BIKASIPURA SPACE EMPLOYEES HBCS
40' X 60'
Y.S.RAJAN
BDA/EE(S)/PL/268/91-92 DT 11.03.1992
GIRINAGAR H.B.C.S.
61' X 40'
K.N.SUNEETHA
BDA/EE(S)/PL/269/91-92 DT 11.03.1992
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
40' X 60'
K.S.MADHAVA RAO
BDA/EE(S)/PL/208/91-92 DT 03.01.1992
2076
2077
281/A
701
2078
1098
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
40' X 60'
R.VASUDEVARAJU
BDA/EE(S)/PL/207/91-92 DT 27.12.1991
2079
164
BIKASIPURA SPACE EMPLOYEES HBCS
52' X 40'
RAMA G KRISHNA
BDA/EE(S)/PL/206/91-92 DT 27.12.1991
2080
82
B.O.O., H.B.C.S., TAVAREKERE
49' X 48'
VICE CHAIRMAN
BDA/EE(S)/PL/64/91-92 DT 28.07.1992
2081
195
KENCHENAHALLI H.B.C.S.
40' X 60'
P.GOPALA KRISHNA
BDA/EE(S)/PL/201/91-92 DT 20.12.1991
2082
530
BIKASIPURA SPACE EMPLOYEES HBCS
40' X 60'
R.S.MATHUR
BDA/EE(S)/PL/4712/91-92 DT 27.12.1991
2083
46
SARAKKI H.B.C.S.
41' X 51'
N.SHESHA GIRI RAO
BDA/EE(S)/PL/202/91-92 DT 27.12.1991
2084
74
B.T.M. I STAGE, I PHASE
59' X 40'
RANJANI NARASIMHAN
BDA/EE(S)/PL/30/91-92 DT 29.01.1992
2085
2583
KUMARASWAMY LAYOUT II STAGE
40' X 60'
N.M.LAKSHMINARAYANA RAO
BDA/EE(S)/PL/1/91-92 DT 09.04.1991
2086
2531
KUMARASWAMY LAYOUT II STAGE
59' X 60'
V.S.SHETTY
BDA/EE(S)/PL/2/91-92 DT 23.04.1991
2087
2558
KUMARASWAMY LAYOUT II STAGE
39' X 60'
SRINIVASA SHETTY
BDA/EE(S)/PL/3/91-92 DT 25.04.1991
2088
2394
KUMARASWAMY LAYOUT II STAGE
60' X 40'
A.DAKSHINA MURTHY
BDA/EE(S)/PL/4/91-92 DT 02.05.1991
2089
541
KUMARASWAMY LAYOUT II STAGE
60' X 40'
M.D.DEVEGOWDA
BDA/EE(S)/PL/5/91-92 DT 20.05.1991
2090
2590
KUMARASWAMY LAYOUT II STAGE
40' X 60'
E.ANJALINE HEMALATHA
BDA/EE(S)/PL/6/91-92 DT 03.07.1991
2091
541
KUMARASWAMY LAYOUT II STAGE
40' X 60'
M.D.DEVEGOWDA
BDA/EE(S)/PL/7/91-92 DT 06.08.1991
2092
2406
KUMARASWAMY LAYOUT II STAGE
40' X 60'
D.V.CHANDRASHEKAR
BDA/EE(S)/PL/8/91-92 DT 07.08.1991
2093
2401
KUMARASWAMY LAYOUT II STAGE
12.25 X 18.85
D.N.RAJENDRA
BDA/EE(S)/PL/9/91-92 DT 17.08.1991
2094
547
KUMARASWAMY LAYOUT II STAGE
40' X 60'
G.P.VEERABHADRAIAH
BDA/EE(S)/PL/10/91-92 DT 03.09.1991
2095
1801
KUMARASWAMY LAYOUT II STAGE
40' X 60'
N.B.GURU MURTHY
BDA/EE(S)/PL/19/91-92 DT 03.09.1991
2096
1863
KUMARASWAMY LAYOUT II STAGE
39' X 60'
H.C.PARTHASARATHY
BDA/EE(S)/PL/12/91-92 DT 03.09.1991
2097
1829
KUMARASWAMY LAYOUT II STAGE
40' X 53'
SARASWATHAMMA
BDA/EE(S)/PL/13/91-92 DT 11.10.1991
2098
2548
KUMARASWAMY LAYOUT II STAGE
40' X 61'
K.T.VENKATESH
BDA/EE(S)/PL/14/91-92 DT 11.11.1991
2099
1706
KUMARASWAMY LAYOUT II STAGE
43' X 59'
M.N.KAMATH
BDA/EE(S)/PL/15/91-92 DT 17.01.1992
2100
3588
KUMARASWAMY LAYOUT II STAGE
40' X 60'
M.N.NAGARAJA
BDA/EE(S)/PL/16/91-92 DT 18.01.1992
2101
531
KUMARASWAMY LAYOUT II STAGE
40' X 60'
K.NAGENDRA
BDA/EE(S)/PL/17/91-92 DT 11.03.1992
2102
299
B.S.K. III STAGE, II PHASE, VI BLOCK
40' X 57'
RAMACHANDRA HEGDE
BDA/EE(S)/PL/1/91-92 DT 03.04.1991
2103
534
B.S.K. III STAGE, II PHASE, VI BLOCK
64' X 45'
S.SIDDALINGA SWAMY
BDA/EE(S)/PL/2/91-92 DT 06.04.1991
B.S.K. III STAGE, HOSAKEREHALLI SY NOS
40' X 60'
RAJENDRA BAGALODI
BDA/EE(S)/PL/3/91-92 DT 09.04.1991
2104
1231/D
2105
292
B.S.K. III STAGE, IV PHASE, VII BLOCK
80' X 46'
G.JANARDHANAM
BDA/EE(S)/PL/4/91-92 DT 23.04.1991
2106
194
B.S.K. III STAGE, III PHASE, I BLOCK
50' X 78'
P.S.GURUPRASAD
BDA/EE(S)/PL/5/91-92 DT 23.04.1991
2107
345
B.S.K. III STAGE, II PHASE, VI BLOCK
40' X 60'
S.P.SHANBHOUGE
BDA/EE(S)/PL/6/91-92 DT 24.04.1991
B.S.K. III STAGE, II PHASE, VI BLOCK
40' X 60'
G.N.NARASIMHA SWAMY
BDA/EE(S)/PL/7/91-92 DT 24.04.1991
2108
465/A
2109
241
B.S.K. III STAGE, III PHASE, II BLOCK
40' X 59'
K.V.SRINIVASA RAO
BDA/EE(S)/PL/8/91-92 DT 25.04.1991
2110
603
B.S.K. III STAGE, KATHARIGUPPE SY NOS
40' X 60'
K.MANJUNATHA
BDA/EE(S)/PL/9/91-92 DT 25.04.1991
2111
135
B.S.K. III STAGE, GAVIPURA SY NOS
40' X 60'
K.V.SUNANDA
BDA/EE(S)/PL/10/91-92 DT 25.04.1991
2112
132
B.S.K. III STAGE, III PHASE, I BLOCK
40' X 60'
K.LINGA KUMAR
BDA/EE(S)/PL/11/91-92 DT 27.04.1991
2113
193
B.S.K. III STAGE, KATHARIGUPPE SY NOS
41' X 59'
K.RAJARAM
BDA/EE(S)/PL/12/91-92 DT 06.05.1991
2114
70
57' X 40'
G.M.NARAYANA SWAMY
BDA/EE(S)/PL/13/91-92 DT 06.05.1991
2115
655
B.S.K. III STAGE, CHANAMANAKERE ACHUKATU
LAYOUT
B.S.K. III STAGE, II PHASE, VII BLOCK
40' X 60'
PILLAPPA
BDA/EE(S)/PL/14/91-92 DT 13.05.1991
2116
552
B.S.K. III STAGE, II PHASE, VI BLOCK
45' X 61'
C.S.MAHADEVAN
BDA/EE(S)/PL/15/91-92 DT 13.05.1991
2117
21
B.S.K. III STAGE, III PHASE, IV BLOCK
45' X 80'
USHACHANDRASHEKAR
BDA/EE(S)/PL/16/91-92 DT 20.05.1991
2118
14
B.S.K. III STAGE, II PHASE, IV BLOCK
60' X 40'
S.UMA
BDA/EE(S)/PL/17/91-92 DT 25.05.1991
2119
994
B.S.K. III STAGE, III PHASE, III BLOCK
40' X 60'
B.SATHYANARAYANA
BDA/EE(S)/PL/18/91-92 DT 25.05.1991
2120
807
B.S.K. III STAGE, II PHASE, VII BLOCK
76' X 50'
B.N.VENKATESH MURTHY
BDA/EE(S)/PL/19/91-92 DT 31.05.1991
2121
490
B.S.K. III STAGE, II PHASE, VI BLOCK
58' X 40'
A.T.SNEHA
BDA/EE(S)/PL/20/91-92 DT 31.05.1991
2122
568/A
B.S.K. III STAGE, III PHASE, III BLOCK
40' X 60'
M.SATHYANARAYANA
BDA/EE(S)/PL/21/91-92 DT 31.05.1991
2123
566
B.S.K. III STAGE, III PHASE, III BLOCK
40' X 60'
P.SATHYANARAYANA
BDA/EE(S)/PL/22/91-92 DT 18.06.1991
2124
547
B.S.K. III STAGE, II PHASE, VI BLOCK
60' X 37'
K.L.SUBHASH
BDA/EE(S)/PL/23/91-92 DT 18.06.1991
2125
277
B.S.K. III STAGE, III PHASE, V BLOCK
39' X 62'
J.THIMMAIAH
BDA/EE(S)/PL/24/91-92 DT 25.06.1991
2126
236
B.S.K. III STAGE, III PHASE, II BLOCK
40' X 60'
SHANTHALAKSHMAMMA
BDA/EE(S)/PL/25/91-92 DT 27.06.1991
2127
322
B.S.K. III STAGE, IV PHASE, VII BLOCK
40' X 60'
P.KANCHANA
BDA/EE(S)/PL/26/91-92 DT 27.06.1991
2128
290
B.S.K. III STAGE, IV PHASE, VII BLOCK
46' X 80'
A.N.MURTHY
BDA/EE(S)/PL/27/91-92 DT 29.07.1991
2129
539
B.S.K. III STAGE, II PHASE, VI BLOCK
45' X 60'
INDUMATHI PRASANNA KUMAR
BDA/EE(S)/PL/28/91-92 DT 30.07.1991
2130
306
B.S.K. III STAGE, II PHASE, VI BLOCK
40' X 57'
S.A.MANJUNATH
BDA/EE(S)/PL/29/91-92 DT 02.08.1991
2131
485
B.S.K. III STAGE, III PHASE, II BLOCK
60' X 43'
P.G.SUBRAMANYA SHASHTRY
BDA/EE(S)/PL/30/91-92 DT 02.08.1991
2132
319
B.S.K. III STAGE, III PHASE, II BLOCK
18.00 X 11.89
JYOTHI K JADHAV
BDA/EE(S)/PL/31/91-92 DT 02.08.1991
2133
156
B.S.K. III STAGE, III PHASE, I BLOCK
40' X 60'
S.SAMPANGI
BDA/EE(S)/PL/32/91-92 DT 02.08.1991
2134
427
B.S.K. III STAGE, II PHASE, VI BLOCK
18.37 X 12.20
R.SUKANYA
BDA/EE(S)/PL/33/91-92 DT 05.08.1991
2135
682
B.S.K. III STAGE, III PHASE, III BLOCK
18.50 X 19.20
BDA/EE(S)/PL/34/91-92 DT 07.08.1991
2136
515
B.S.K. III STAGE, III PHASE, III BLOCK
40' X 60'
RAMESH KUMAR & SMT
R.K.LEELAVATHI
H.S.RAMACHANDRA
BDA/EE(S)/PL/35/91-92 DT 07.08.1991
2137
345
B.S.K. III STAGE, II PHASE, VI BLOCK
40' X 60'
S.P.SHANBHOG
BDA/EE(S)/PL/36/91-92 DT 07.08.1991
B.S.K. III STAGE, HOSAKEREHALLI SY NOS
40' X 60'
K.GNANA PRAKASH
BDA/EE(S)/PL/37/91-92 DT 08.08.1991
2138
1231/B
2139
326
B.S.K. III STAGE, IV PHASE, VII BLOCK
59' X 40'
A.YASHODA
BDA/EE(S)/PL/38/91-92 DT 08.08.1991
2140
685
B.S.K. III STAGE, II PHASE, VII BLOCK
40' X 59'
K.ANANDA RAO
BDA/EE(S)/PL/49/91-92 DT 17.09.1991
2141
129
B.S.K. III STAGE, III PHASE, I BLOCK
40' X 60'
K.S.SHYLAMMA
BDA/EE(S)/PL/48/91-92 DT 10.09.1991
2142
322
B.S.K. III STAGE, II PHASE, VI BLOCK
40' X 60'
M.K.KRISHNA GOWDA
BDA/EE(S)/PL/47/91-92 DT 07.09.1991
2143
114
B.S.K. III STAGE, III PHASE, I BLOCK
40' X 60'
N.THIMMAPPA
BDA/EE(S)/PL/46/91-92 DT 05.09.1991
2144
705
B.S.K. III STAGE, II PHASE, VII BLOCK
40' X 58'
M.GOPALA KUTIAN
BDA/EE(S)/PL/45/91-92 DT 05.09.1991
2145
13
B.S.K. III STAGE, II PHASE, IV BLOCK
40' X 60'
K.RAJANNA
BDA/EE(S)/PL/44/91-92 DT 03.09.1991
2146
281
B.S.K. III STAGE, IV PHASE, VII BLOCK
46' X 80'
A.ANANDA RAO
BDA/EE(S)/PL/43/91-92 DT 03.09.1991
2147
57
B.S.K. III STAGE, III PHASE, IV BLOCK
40' X 60'
T.R.RAMASWAMY REDDY
BDA/EE(S)/PL/42/91-92 DT 03.09.1991
2148
349
B.S.K. III STAGE, II PHASE, VI BLOCK
40' X 60'
T.P.GOSKAN
BDA/EE(S)/PL/41/91-92 DT 03.09.1991
2149
653
B.S.K. III STAGE, II PHASE, VII BLOCK
40' X 60'
L.S.SHARADA
BDA/EE(S)/PL/40/91-92 DT 03.09.1991
2150
50
B.S.K. III STAGE, III PHASE, VI BLOCK
40' X 60'
P.VARGHEESE MATHIEW
BDA/EE(S)/PL/39/91-92 DT 27.08.1991
2151
564
B.S.K. III STAGE, NAGENDRA BLOCK
37' X 60'
PARVATHAMMA
BDA/EE(S)/PL/50/91-92 DT 01.10.1991
2152
30
GIRI NAGAR I PHASE
36' X 60'
G.SUBRAMANIAN
BDA/EE(S)/PL/188/91-92 DT 30.11.1991
2153
877
N.S.PALYA MICO H.B.C.S.
40' X 65'
B.M.GOWTHAM
BDA/EE(S)/PL/189/91-92 DT 30.11.1991
2154
12
KADIRENAHALLI HBCS
45' X 70'
H.KAVITHA
BDA/EE(S)/PL/190/91-92 DT 30.11.1991
2155
556
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
39' X 60'
H.K. SRINIVASA MURTHY
BDA/EE(S)/PL/191/91-92 DT 07.12.1991
2156
57
B.T.M. LAYOUT, MADIWALA
40' X 60'
MOHAMMED RAFIC AHAMED
BDA/EE(S)/PL/192/91-92 DT 07.12.1991
2157
280
BIKASIPURA SPACE EMPLOYEES HBCS
40' X 60'
RAJ KUMAR SWMUEL
BDA/EE(S)/PL/193/91-92 DT 07.12.1991
2158
928
N.S.PALYA MICO H.B.C.S.
40' X 60'
BUDDANNA
BDA/EE(S)/PL/194/91-92 DT 07.12.1991
2159
320
N.S.PALYA MICO H.B.C.S.
40' X 60'
SHOBANA PURUSHOTHAMAN
BDA/EE(S)/PL/195/91-92 DT 07.12.1991
2160
32
ITTMADU
40' X 70'
B.S.N.HARI & B.N.SURENDRA
BDA/EE(S)/PL/196/91-92 DT 12.12.1991
N.S.PALYA MICO H.B.C.S.
45' X 60'
N.V.GAYATHRI
BDA/EE(S)/PL/197/91-92 DT 17.12.1991
2161
297/A
2162
1226
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
40' X 60'
N.VIJAYALAKSHMI
BDA/EE(S)/PL/198/91-92 DT 20.12.1991
2163
672
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
43' X 50'
R.KRISHNAN
BDA/EE(S)/PL/199/91-92 DT 20.12.1991
2164
699
BIKASIPURA SPACE EMPLOYEES HBCS
40' X 60'
S.K. CHAKRA BORTY
BDA/EE(S)/PL/200/91-92 DT 20.12.1991
2165
472
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
40' X 60'
S.JAYAPRAKASH
BDA/EE(S)/PL/177/91-92 DT 21.11.1991
2166
758
N.S.PALYA MICO H.B.C.S.
40' X 60'
IQUBALUNNISA
BDA/EE(S)/PL/178/91-92 DT 21.11.1991
2167
58
POORNA PRAJAN H.B.C.S., KATHARIGUPPA
40' X 60'
L.NARAYANA
BDA/EE(S)/PL/179/91-92 DT 21.11.1991
2168
433
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
46' X 60'
P.RAMAN
BDA/EE(S)/PL/180/91-92 DT 25.11.1991
2169
881
BIKASIPURA SPACE EMPLOYEES HBCS
40' X 60'
S.R.K.CHANDRA SHEKAR
BDA/EE(S)/PL/181/91-92 DT 25.11.1991
2170
36
JAYANAGAR H.B.C.S., KADIRENAHALLI
40' X 60'
S.RAJESWARI
BDA/EE(S)/PL/182/91-92 DT 26.11.1991
2171
272
VISWABHARATHI H.B.C.S., GIRINAGAR
40' X 60'
GAYATRI S GUPTA
BDA/EE(S)/PL/163/91-92 DT 26.11.1991
2172
30
JAYANAGAR H.B.C.S., KADIRENAHALLI
45' X 70'
SHIVASHANKARAPPA
BDA/EE(S)/PL/184/91-92 DT 26.11.1991
2173
1035
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
60' X 33'
A.M.POONNAPPA
BDA/EE(S)/PL/185/91-92 DT 30.11.1991
2174
43
BIKASIPURA SPACE EMPLOYEES HBCS
40' X 60'
K.USHA
BDA/EE(S)/PL/186/91-92 DT 30.11.1991
2175
827
KENCHENAHALLI H.B.C.S.
44' X 53'
SRINIVASAN NATARAJAN
BDA/EE(S)/PL/187/91-92 DT 30.11.1991
2176
912
N.S.PALYA MICO H.B.C.S.
18.29 X 12.19
B.V.KUDUVA & VEENA V KUDUVA
BDA/EE(S)/PL/167/91-92 DT 18.11.1991
2177
469
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
60' X 45'
S.LAKSHMI PATHY
BDA/EE(S)/PL/168/91-92 DT 18.11.1991
2178
53
KAVERI H.B.C.S., TAVAREKERE SY NOS
40' X 60'
A.S.ASHOK KUMAR
BDA/EE(S)/PL/169/91-92 DT 18.11.1991
2179
216
BIKASIPURA SPACE EMPLOYEES HBCS
40' X 60'
N.V.VIGNESAN
BDA/EE(S)/PL/170/91-92 DT 18.11.1991
2180
495
BIKASIPURA SPACE EMPLOYEES HBCS
40' X 60'
S.P.CHANNABASAPPA
BDA/EE(S)/PL/171/91-92 DT 18.11.1991
2181
14
NIMHAN'S H.B.C.S. TAVAREKERE
40' X 60'
S.RAMACHANDRA
BDA/EE(S)/PL/172/91-92 DT 18.11.1991
2182
12
NIMHAN'S H.B.C.S. TAVAREKERE
40' X 60'
M.SRINIVASA
BDA/EE(S)/PL/173/91-92 DT 18.11.1991
2183
46
S.B.I. H.B.C.S., SARAKKI
30' X 76'
B.S.VENKATA NARASAIAH
BDA/EE(S)/PL/174/91-92 DT 18.11.1991
2184
95
S.RAMA RAO LAYOUT, KATTARIGUPPA
58' X 40'
DR.G.SRINIVAS
BDA/EE(S)/PL/175/91-92 DT 21.11.1991
2185
281
KENCHENAHALLI H.B.C.S.
57' X 40'
Y.NARAYANA BHAT
BDA/EE(S)/PL/176/91-92 DT 21.11.1991
2186
333
N.S.PALYA MICO H.B.C.S.
40' X 60'
MARY M OLLAPALLY
BDA/EE(S)/PL/162/91-92 DT 11.11.1991
2187
278
BIKASIPURA SPACE EMPLOYEES HBCS
40' X 60'
A.MOHAMMAD ALI
BDA/EE(S)/PL/163/91-92 DT 14.11.1991
2188
262
KENCHENAHALLI H.B.C.S.
40' X 60'
MALA RAO
BDA/EE(S)/PL/164/91-92 DT 14.11.1991
2189
491
N.S.PALYA MICO H.B.C.S.
40' X 60'
KALAMMA
BDA/EE(S)/PL/165/91-92 DT 14.11.1991
2190
17
SRI.SIDDIVINAYAKA H.B.C.S., KATHRIGUPPA
40' X 60'
H.RAMA CHANDRA
BDA/EE(S)/PL/166/91-92 DT 14.11.1991
2191
9
NIMHAN'S H.B.C.S. TAVAREKERE
40' X 60'
VIJAYA SHANKAR MURTHY
BDA/EE(S)/PL/157/91-92 DT 30.10.1991
2192
35
N.S.PALYA MICO H.B.C.S.
40' X 60'
R.S.SABHAPATHY
BDA/EE(S)/PL/158/91-92 DT 11.11.1991
2193
247
KENCHENAHALLI H.B.C.S.
40' X 60'
K.S.VENKATESH
BDA/EE(S)/PL/160/91-92 DT 11.11.1991
2194
644
N.S.PALYA MICO H.B.C.S.
40' X 60'
P.RAMADAS
BDA/EE(S)/PL/161/91-92 DT 11.11.1991
2195
850
BIKASIPURA SPACE EMPLOYEES HBCS
40' X 60'
L.P.RAO
BDA/EE(S)/PL/159/91-92 DT 11.11.1991
2196
185
KENCHENAHALLI H.B.C.S.
56' X 39'
P.RAJU
BDA/EE(S)/PL/151/91-92 DT 30.10.1991
2197
866
BIKASIPURA SPACE EMPLOYEES HBCS
40' X 60'
R.A.KATTI
BDA/EE(S)/PL/152/91-92 DT 30.10.1991
2198
973
N.S.PALYA MICO H.B.C.S.
40' X 60'
A.S.VENKATARAMA CHAR
BDA/EE(S)/PL/153/91-92 DT 30.10.1991
2199
53
K.A.S. OFFICERS H.B.C.S. SY NOS, MADIWALA
40' X 60'
MALLA KARJAN
BDA/EE(S)/PL/154/91-92 DT 30.10.1993
2200
16
POORNA PRAJAN H.B.C.S., KATHARIGUPPA
40' X 60'
K.P.PREMA
BDA/EE(S)/PL/155/91-92 DT 30.10.1991
2201
37
K.A.S. OFFICERS H.B.C.S. SY NOS, MADIWALA
40' X 60'
M.P.BALIGAR
BDA/EE(S)/PL/156/91-92 DT 30.10.1991
2202
141
B.S.K. III STAGE, II PHASE, IV BLOCK
40' X 60'
M.R.RAMA SWAMY
BDA/EE(S)/PL/51/91-92 DT 09.10.1991
2203
441
B.S.K. III STAGE, II PHASE, VI BLOCK
40' X 60'
D.MAHADEVAIAH
BDA/EE(S)/PL/52/91-92 DT 11.10.1991
2204
50
B.S.K. III STAGE, III PHASE, IV BLOCK
40' X 60'
B.MARAGATHAVALLI
BDA/EE(S)/PL/53/91-92 DT 16.10.1991
2205
376
B.S.K. III STAGE, II PHASE, VI BLOCK
59' X 43'
K.S.NAGALINGA PRASAD
BDA/EE(S)/PL/54/91-92 DT 16.10.1991
2206
312
B.S.K. III STAGE, III PHASE, II BLOCK
60' X 41'
V.GIRIJAMMA
BDA/EE(S)/PL/55/91-92 DT 16.10.1991
2207
230
B.S.K. III STAGE, III PHASE, II BLOCK
40' X 60'
J.K.SRINIVASA MURTHY
BDA/EE(S)/PL/56/91-92 DT 29.10.1991
2208
347
B.S.K. III STAGE, II PHASE, VI BLOCK
40' X 60'
P.R.RAMASWAMY
BDA/EE(S)/PL/57/91-92 DT 11.11.1991
2209
19
B.S.K. III STAGE, HOSAKEREHALLI SY NOS
40' X 60'
K.S.VENKATA KRISHNAPPA
BDA/EE(S)/PL/58/91-92 DT 11.11.1991
2210
317
B.S.K. III STAGE, III PHASE, II BLOCK
40' X 61'
SIDDALINGAIAH
BDA/EE(S)/PL/59/91-92 DT 11.11.1991
2211
757
B.S.K. III STAGE, II PHASE, VII BLOCK
12.20 X 18.40
R.ANANTH
BDA/EE(S)/PL/60/91-92 DT 18.11.1991
2212
355
B.S.K. III STAGE, II PHASE, VI BLOCK
40' X 60'
K.R.S. MURTHY
BDA/EE(S)/PL/61/91-92 DT 18.11.1991
2213
452
B.S.K. III STAGE, II PHASE, VI BLOCK
40' X 61'
R.BALAMANI
BDA/EE(S)/PL/62/91-92 DT 18.11.1991
2214
100
B.S.K.III STAGE, ITTAMADU
62' X 40'
KRISHNAMMA RAJU
BDA/EE(S)/PL/63/91-92 DT 18.11.1991
2215
57
B.S.K. III STAGE, III PHASE, VI BLOCK
36' X 59'
DR.PAVITRA VADAVI
BDA/EE(S)/PL/64/91-92 DT 18.11.1991
2216
66
B.S.K. III STAGE, III PHASE, I BLOCK
40' X 63'
N.A.NAYAK
BDA/EE(S)/PL/65/91-92 DT 21.11.1991
2217
573
B.S.K. III STAGE, KATHARIGUPPE SY NOS
19.50 X 12.20
BDA/EE(S)/PL/66/91-92 DT 23.11.1991
2218
72
B.S.K. III STAGE, III PHASE, VI BLOCK
18.20 X 12.50
D.K.NAGARAJ & SMT SHYALAJA
NAGARAJ
G.SAROJAMMA
BDA/EE(S)/PL/67/91-92 DT 26.11.1991
2219
808
B.S.K. III STAGE, II PHASE, VII BLOCK
15.20 X 24.10
S.M.PANCHAGHATTI
BDA/EE(S)/PL/68/91-92 DT 26.11.1991
2220
234
B.S.K. III STAGE, II PHASE, VI BLOCK
60' X 35'
HIRALAL HASSARANI
BDA/EE(S)/PL/69/91-92 DT 30.11.1991
2221
183
B.S.K. III STAGE, IV PHASE EAST OF KATTARIGUPPA
54' X 39'
C.GANJENDRAN
BDA/EE(S)/PL/70/91-92 DT 07.12.1991
2222
497
B.S.K. III STAGE, II PHASE, VI BLOCK
40' X 59'
K.ANAND
BDA/EE(S)/PL/71/91-92 DT 07.12.1991
B.S.K. III STAGE, II PHASE, VI BLOCK
40' X 60'
S.GURURAJA
BDA/EE(S)/PL/72/91-92 DT 07.12.1991
B.S.K. III STAGE, III PHASE, III BLOCK
40' X 60'
UMA MANI N.
BDA/EE(S)/PL/73/91-92 DT 12.12.1991
B.S.K. III STAGE, III PHASE, IV BLOCK
40' X 60'
B.H.VARADARAJU
BDA/EE(S)/PL/74/91-92 DT 20.12.1991
B.S.K. III STAGE, HOSAKEREHALLI SY NOS
56' X 40'
M.V.BHAGYA
BDA/EE(S)/PL/75/91-92 DT 26.12.1991
B.S.K. III STAGE, III PHASE, II BLOCK
19.80 X 13.70
C.L.SHANTHA KUMARI
BDA/EE(S)/PL/76/91-92 DT 27.12.1991
B.S.K. III STAGE, HOSAKEREHALLI SY NOS
40' X 60'
B.SHIVANNA
BDA/EE(S)/PL/77/91-92 DT 03.01.1992
2223
245/C
2224
2225
314
53/B
2226
1234
2227
588
2228
14
2229
232
B.S.K. III STAGE, II PHASE, VI BLOCK
40' X 61'
H.B.SUDARSHAN KUMAR
BDA/EE(S)/PL/78/91-92 DT 03.01.1992
2230
60
B.S.K. III STAGE, III PHASE, VI BLOCK
59' X 39'
K.KASTURI
BDA/EE(S)/PL/79/91-92 DT 03.01.1992
2231
106
B.S.K. III STAGE, III PHASE, V BLOCK
39' X 60'
JAYALAXMI
BDA/EE(S)/PL/80/91-92 DT 03.01.1992
2232
320
B.S.K. III STAGE, II PHASE, VI BLOCK
40' X 60'
M.C.RADHAKRISHNAN
BDA/EE(S)/PL/81/91-92 DT 04.01.1992
2233
296
B.S.K. III STAGE, III PHASE, V BLOCK
59' X 40'
SUBHASH CHAND
BDA/EE(S)/PL/82/91-92 DT 20.01.1992
2234
569
B.S.K. III STAGE, KATHARIGUPPE SY NOS
40' X 60'
H.M.HANUMANTHARAJU
BDA/EE(S)/PL/83/91-92 DT 24.01.1992
2235
66
B.S.K. III STAGE, AVALAHALLI SY NOS
41' X 51'
M.RAGHAVENDRA PRABHU
BDA/EE(S)/PL/84/91-92 DT 28.01.1992
2236
350
B.S.K. III STAGE, II PHASE, VI BLOCK
14.40 X 18.20
H.L.SUNIL
BDA/EE(S)/PL/85/91-92 DT 01.02.1992
2237
295
B.S.K. III STAGE, IV PHASE, VII BLOCK
47' X 81'
DR.M.R.HEBBAN
BDA/EE(S)/PL/86/91-92 DT 05.02.1992
2238
402
B.S.K. III STAGE, III PHASE, II BLOCK
40' X 60'
A.DHANALAKSHMI
BDA/EE(S)/PL/87/91-92 DT 21.02.1992
2239
559
B.S.K. III STAGE, II PHASE, VI BLOCK
59' X 37'
H.V.VENKATESH
BDA/EE(S)/PL/88/91-92 DT 24.02.1992
B.S.K. III STAGE, III PHASE, VI BLOCK
59' X 40'
N.SRINIVASA MURTHY
BDA/EE(S)/PL/89/91-92 DT 24.02.1992
2240
59/A
2241
991
B.S.K. III STAGE, II PHASE, VII BLOCK
60' X 40'
L.SHIVARAM
BDA/EE(S)/PL/91/91-92 DT 10.03.1992
2242
758
B.S.K. III STAGE, II PHASE, VII BLOCK
60' X 40'
C.SUBRAMANIAN
BDA/EE(S)/PL/92/91-92 DT 11.03.1992
2243
65
B.S.K. III STAGE, III PHASE, I BLOCK
40' X 63'
MANORAMA KAUSAL
BDA/EE(S)/PL/93/91-92 DT 11.03.1992
2244
106
B.S.K. III STAGE, II PHASE, IV BLOCK
72' X 39'
GEETHA GOVIND
BDA/EE(S)/PL/94/91-92 DT 12.03.1992
2245
378
B.S.K. III STAGE, II PHASE, VI BLOCK
40' X 59'
P.JAYAMMA
BDA/EE(S)/PL/95/91-92 DT 18.03.1992
2246
239
B.S.K. III STAGE, III PHASE, II BLOCK
40' X 60'
M.THANGAVELU
BDA/EE(S)/PL/96/91-92 DT 18.03.1992
2247
231
B.S.K. III STAGE, II PHASE, VI BLOCK
40' X 61'
A.SRINIVASA
BDA/EE(S)/PL/97/91-92 DT 20.03.1992
2248
122
B.S.K. III STAGE, III PHASE, V BLOCK
40' X 60'
B.K.NARAYAN
BDA/EE(S)/PL/98/91-92 DT 24.03.1992
2249
322
B.S.K. III STAGE, CHANAMANAKERE ACHUKATU
LAYOUT
45' X 55'
M.N.YADAVENDRA PRASAD
BDA/EE(S)/PL/99/91-92 DT 26.03.1992
2250
28
B.S.K. III STAGE, III PHASE, VI BLOCK
49' X 80'
ASHOK S NAIK
BDA/EE(S)/PL/100/91-92 DT 26.03.1992
2251
954
N.S.PALYA MICO H.B.C.S.
38' X 62'
R.CHANDRA MOHAN
BDA/EE(S)/PL/1/91-92 DT 01.04.1991
2252
256
KENCHENAHALLI H.B.C.S.
60' X 41'
C.VISWANATHA NAIR
BDA/EE(S)/PL/2/91-92 DT 01.04.1991
2253
288
N.S.PALYA MICO H.B.C.S.
40' X 60'
SHIVA SHANKAR
BDA/EE(S)/PL/3/91-92 DT 01.04.1991
2254
290/A
KENCHENAHALLI H.B.C.S.
61' X 49'
SENGODA GOWNDER
BDA/EE(S)/PL/4/91-92 DT 03.04.1991
2255
404
KENCHENAHALLI H.B.C.S.
59' X 40'
DR.S.KODANDAPANI
BDA/EE(S)/PL/5/91-92 DT 03.04.1991
2256
119
KENCHENAHALLI H.B.C.S.
55' X 44'
GANGANNA
BDA/EE(S)/PL/6/91-92 DT 03.04.1991
2257
63
POORNA PRAJAN H.B.C.S., KATHARIGUPPA
40' X 60'
P.S.PUTTARAYA
BDA/EE(S)/PL/7/91-92 DT 03.04.1991
2258
22
NIMHAN'S H.B.C.S. TAVAREKERE
60' X 40'
M.C.MARY
BDA/EE(S)/PL/8/91-92 DT 06.04.1991
2259
547
BIKASIPURA SPACE EMPLOYEES HBCS
40' X 60'
P.NATARAJAN
BDA/EE(S)/PL/9/91-92 DT 06.04.1991
2260
599
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
40' X 60'
B.S.PRATAP SINGH
BDA/EE(S)/PL/10/91-92 DT 09.04.1991
2261
62
POORNA PRAJAN H.B.C.S., KATHARIGUPPA
40' X 60'
S.RANGA VITTAL
BDA/EE(S)/PL/11/91-92 DT 09.04.1991
2262
14
POORNA PRAJAN H.B.C.S., KATHARIGUPPA
40' X 60'
K.BHARATHI BAI
BDA/EE(S)/PL/12/91-92 DT 12.04.1991
2263
713
KEMPEGOWDA H.B.C.S., KATHRIGUPPA
40' X 60'
S.VADIVU
BDA/EE(S)/PL/13/91-92 DT 23.04.1991
2264
201
JAYANAGAR H.B.C.S., KADIRENAHALLI
40' X 60'
P.S.CHATURVEDI
BDA/EE(S)/PL/14/91-92 DT 23.04.1991
2265
210
BIKASIPURA SPACE EMPLOYEES HBCS
40' X 60'
P.PRABHAKARA RAO
BDA/EE(S)/PL/15/91-92 DT 23.04.1991
2266
283
BIKASIPURA SPACE EMPLOYEES HBCS
40' X 60'
A.K.GUPTA
BDA/EE(S)/PL/16/91-92 DT 23.04.1991
2267
223
B.O.O. H.B.C.S. MADIWALA
40' X 65'
JYOTSNA REBELLO
BDA/EE(S)/PL/17/91-92 DT 23.04.1991
2268
522
BIKASIPURA SPACE EMPLOYEES HBCS
40' X 60'
H.S.VASUDEVA MURTHY
BDA/EE(S)/PL/18/91-92 DT 25.04.1991
2269
228
BIKASIPURA SPACE EMPLOYEES HBCS
64' X 40'
LALITHA RAVINDRAN
BDA/EE(S)/PL/19/91-92 DT 27.04.1991
KENCHENAHALLI H.B.C.S.
50' X 64'
N.SRIDHAR
BDA/EE(S)/PL/20/91-92 DT 29.04.1991
2270
99/C
2271
579
BIKASIPURA SPACE EMPLOYEES HBCS
60' X 39'
T.Y.MANAGOLI
BDA/EE(S)/PL/21/91-92 DT 29.04.1991
2272
460
N.S.PALYA MICO H.B.C.S.
40' X 60'
C.K.NARAYANA MURTHY
BDA/EE(S)/PL/22/91-92 DT 29.04.1991
2273
931
KENCHENAHALLI H.B.C.S.
40' X 60'
HANUMANTHA REDDY
BDA/EE(S)/PL/23/91-92 DT 02.05.1991
2274
20
ITI H.B.C.S., KATHARIGUPPA
35' X 60'
S.R.KRISHNA MURTHY
BDA/EE(S)/PL/24/91-92 DT 02.05.1991
2275
1232
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
40' X 59'
S.V.SATHYA MURTHY
BDA/EE(S)/PL/25/91-92 DT 02.05.1991
2276
8
2277
523
2278
2279
2280
2281
2282
K.E.B. H.B.C.S, B.G.ROAD
43' X 60'
HEMA DIVAKAR
BDA/EE(S)/PL/26/91-92 DT 03.05.1991
BIKASIPURA SPACE EMPLOYEES HBCS
40' X 60'
H.S.RAMADAS
BDA/EE(S)/PL/27/91-92 DT 03.05.1991
70
KENCHENAHALLI H.B.C.S.
40' X 60'
B.V.CHANDRAMOULI
BDA/EE(S)/PL/28/91-92 DT 04.05.1991
4
KENCHENAHALLI H.B.C.S.
78' X 40'
M.S.R.IYENGAR
BDA/EE(S)/PL/29/91-92 DT 04.05.1991
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
40' X 60'
C.MAHADEVAIAH
BDA/EE(S)/PL/30/91-92 DT 04.05.1991
BIKASIPURA SPACE EMPLOYEES HBCS
40' X 60'
S.AKILA
BDA/EE(S)/PL/31/91-92 DT 04.05.1991
KENCHENAHALLI H.B.C.S.
60' X 50'
RUKUMINI GANESHAPPA
BDA/EE(S)/PL/32/91-92 DT 06.05.1991
KSRTC H.B.C.S. SARAKKI
45' X 50'
LEELA NAGARAJ
BDA/EE(S)/PL/33/91-92 DT 07.05.1991
191/D
266
311/B
2283
19
2284
185
JAYANAGAR H.B.C.S., KADIRENAHALLI
40' X 76'
S.R.VATSALA
BDA/EE(S)/PL/34/91-92 DT 09.05.1991
2285
717
KENCHENAHALLI H.B.C.S.
44' X 47'
V.VINUTHA KUMARI
BDA/EE(S)/PL/35/91-92 DT 09.05.1991
2286
858
BIKASIPURA SPACE EMPLOYEES HBCS
40' X 60'
DR.H.R.SRINATHA
BDA/EE(S)/PL/36/91-92 DT 13.05.1991
2287
1188
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
40' X 60'
G.R.MARISWAMY
BDA/EE(S)/PL/37/91-92 DT 13.05.1991
2288
627
BIKASIPURA SPACE EMPLOYEES HBCS
40' X 60'
K.SURYANARAYANA SHARMA
BDA/EE(S)/PL/38/91-92 DT 13.05.1991
2289
265
KENCHENAHALLI H.B.C.S.
40' X 60'
S.M.JAGADEESH PRASAD
BDA/EE(S)/PL/39/91-92 DT 14.05.1991
2290
374
JAYANAGAR H.B.C.S., KADIRENAHALLI
45' X 71'
J.V.SANDHYA
BDA/EE(S)/PL/41/91-92 DT 14.05.1991
2291
915
N.S.PALYA MICO H.B.C.S.
40' X 60'
M.HARIHARA SUBRAMANYAM
BDA/EE(S)/PL/40/91-92 DT 14.05.1991
2292
443
N.S.PALYA MICO H.B.C.S.
40' X 60'
J.V.MADHAVAN
BDA/EE(S)/PL/42/91-92 DT 20.05.1991
2293
817
N.S.PALYA MICO H.B.C.S.
40' X 60'
G.NIRMALA DEVI
BDA/EE(S)/PL/43/91-92 DT 20.05.1991
N.S.PALYA MICO H.B.C.S.
40' X 60'
S.R.PILLY
BDA/EE(S)/PL/44/91-92 DT 25.05.1991
2294
733/A
2295
30
ITI H.B.C.S., KATHARIGUPPA
40' X 50'
D.C.KRISHNA MURTHY
BDA/EE(S)/PL/45/91-92 DT 29.05.1991
2296
41
KAS OFFICERS, MADIWALA
40' X 60'
R.B.ZALKI
BDA/EE(S)/PL/46/91-92 DT 29.05.1991
2297
124
N.S.PALYA MICO H.B.C.S.
40' X 72'
GANGAIAH
BDA/EE(S)/PL/47/91-92 DT 29.05.1991
2298
496
JAYANAGAR H.B.C.S., KADIRENAHALLI
40' X 60'
SUDHA R RAO
BDA/EE(S)/PL/48/91-92 DT 29.05.1991
2299
11
KENCHENAHALLI H.B.C.S.
40' X 55'
SHYAMALA RAO
BDA/EE(S)/PL/49/91-92 DT 31.05.1991
2300
275
JAYANAGAR H.B.C.S., KADIRENAHALLI
45' X 70'
PAPAMMA & CHILDERN
BDA/EE(S)/PL/50/91-92 DT 31.05.1991
2301
933
SARAKKI II PHASE
60' X 40'
K.N.SATHYANARAYANA
BDA/EE(S)/PL/37/91-92 DT 24.02.1992
2302
1528
SARAKKI II PHASE
44' X 60'
N.SATHYAVATHI
BDA/EE(S)/PL/38/91-92 DT 27.02.1992
2303
290
SARAKKI II PHASE
61' X 45'
PRESIDENT
BDA/EE(S)/PL/35/91-92 DT 21.02.1992
2304
2000
SARAKKI II PHASE
37' X 60'
B.B.GANDHI
BDA/EE(S)/PL/34/91-92 DT 22.01.1992
SARAKKI II PHASE
40' X 60'
B.KANTHARAJA URS
BDA/EE(S)/PL/33/91-92 DT 07.01.1992
2305
432/E
2306
1083
SARAKKI II PHASE
41' X 60'
LALITHA SHEKHAR
BDA/EE(S)/PL/31/91-92 DT 27.12.1991
2307
47
SARAKKI II PHASE
45' X 60'
D.V.CHAYAPATHY
BDA/EE(S)/PL/32/91-92 DT 27.12.1991
2308
280
SARAKKI II PHASE
12.80 X 18.40
NITYANANDA R. & B.N.MURTHY
BDA/EE(S)/PL/39/91-92 DT 11.03.1992
2309
707
SARAKKI II PHASE
40' X 60'
DR.K.D.PHADKE
BDA/EE(S)/PL/9/91-92 DT 25.06.1991
2310
1319
SARAKKI II PHASE
70' X 40'
G.RAJAPPA
BDA/EE(S)/PL/10/91-92 DT 27.06.1991
2311
321
SARAKKI II PHASE
53' X 70'
M.NARAYANAPPA
BDA/EE(S)/PL/11/91-92 DT 28.06.1991
2312
658
SARAKKI II PHASE
37' X 82'
R.BALASUBRAMANIAN
BDA/EE(S)/PL/12/91-92 DT 03.07.1991
2313
71
SARAKKI II PHASE
43' X 60'
A.T.R.IYANGAR
BDA/EE(S)/PL/13/91-92 DT 05.07.1991
2314
146
SARAKKI II PHASE
45' X 72'
P.S.M.SUNDARAM
BDA/EE(S)/PL/14/91-92 DT 05.07.1991
2315
1743
SARAKKI II PHASE
61' X 40'
JAYANTH D RAI
BDA/EE(S)/PL/15/91-92 DT 12.07.1991
2316
147
SARAKKI II PHASE
45' X 70'
G.RAJ NARAYAN
BDA/EE(S)/PL/16/91-92 DT 27.07.1991
2317
846
SARAKKI II PHASE
44' X 70'
G.LAKSHMI NARASHIMHAN
BDA/EE(S)/PL/17/91-92 DT 27.07.1991
2318
156
SARAKKI II PHASE
40' X 65'
H.ANANTHA BHATTA
BDA/EE(S)/PL/18/91-92 DT 09.07.1991
2319
638
SARAKKI II PHASE
40' X 60'
R.AMBIGA
BDA/EE(S)/PL/1/91-92 DT 03.04.1991
2320
1511
SARAKKI II PHASE
60' X 60'
SHARADAMMA
BDA/EE(S)/PL/2/91-92 DT 05.09.1991
2321
1511
SARAKKI II PHASE
60' X 60'
SHARADAMMA
BDA/EE(S)/PL/2/91-92 DT 06.04.1991
2322
452
SARAKKI II PHASE
64' X 45'
ARUNA N.REDDY
BDA/EE(S)/PL/3/91-92 DT 23.04.1991
2323
1425
SARAKKI II PHASE
40' X 76'
SREEDHAR RAJU
BDA/EE(S)/PL/4/91-92 DT 25.04.1991
2324
818
SARAKKI II PHASE
40' X 70'
SHEELA
BDA/EE(S)/PL/5/91-92 DT 03.05.1991
2325
1688
SARAKKI II PHASE
40' X 60'
B.M.SUDHA
BDA/EE(S)/PL/6/91-92 DT 16.05.1991
2326
106
SARAKKI II PHASE
40' X 60'
YAMUNA BAI L DEVARISHI
BDA/EE(S)/PL/7/91-92 DT 29.05.1991
2327
40
SARAKKI II PHASE
45' X 60'
K.R.ACHARYA
BDA/EE(S)/PL/8/91-92 DT 25.06.1991
2328
130
ITI H.B.C.S., KATHARIGUPPA
32' X 60'
L.D.RODRIGUES
BDA/EE(S)/PL/101/91-92 DT 08.08.1991
2329
18
BIKASIPURA SPACE EMPLOYEES HBCS
40' X 60'
S.CHANDRA SHEKHAR
BDA/EE(S)/PL/102/91-92 DT 24.08.1991
2330
162
BIKASIPURA SPACE EMPLOYEES HBCS
40' X 60'
U.PRABHAKARAN
BDA/EE(S)/PL/103/91-92 DT 03.09.1991
2331
726
BIKASIPURA SPACE EMPLOYEES HBCS
40' X 60'
ARAVIND KUMAR SOOD
BDA/EE(S)/PL/104/91-92 DT 03.09.1991
2332
26
RAMA RAO LAYOUT
40' X 60'
B.S.SHANTHARAM
BDA/EE(S)/PL/105/91-92 DT 03.09.1991
2333
491
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
40' X 60'
MANOHARAMMA
BDA/EE(S)/PL/106/91-92 DT 03.09.1991
2334
5
KAS OFFICERS, MADIWALA
40' X 60'
K.H.GOPALAKRISHNE GOWDA
BDA/EE(S)/PL/107/91-92 DT 03.09.1991
2335
19
KSRTC H.B.C.S. SARAKKI
18.30 X 12.20
BDA/EE(S)/PL/108/91-92 DT 03.09.1991
MICO SKGNS ARAKERE
40' X 50'
SUDHA KRIPANIDHI & DR||
KRIPANIDHI
R.SARDAR & S.SATHAJPASHA
POORNA PRAJAN H.B.C.S., KATHARIGUPPA
40' X 60'
S.VIDYASHANKAR
BDA/EE(S)/PL/110/91-92 DT 03.09.1991
2336
52/1
BDA/EE(S)/PL/109/91-92 DT 03.09.1991
2337
30
2338
704
BIKASIPURA SPACE EMPLOYEES HBCS
40' X 60'
I.NANDANA
BDA/EE(S)/PL/111/91-92 DT 03.09.1991
2339
731
BIKASIPURA SPACE EMPLOYEES HBCS
40' X 60'
M.N.KRISHNA MURTHY
BDA/EE(S)/PL/112/91-92 DT 03.09.1991
2340
279
KENCHENAHALLI H.B.C.S.
40' X 60'
KUSUM SARIN
BDA/EE(S)/PL/113/91-92 DT 03.09.1991
2341
676
KENCHENAHALLI H.B.C.S.
56' X 38'
D.RAJUBABU
BDA/EE(S)/PL/114/91-92 DT 03.09.1991
2342
581
N.S.PALYA MICO H.B.C.S.
39' X 60'
P.RAMA SWAMY
BDA/EE(S)/PL/115/91-92 DT 03.09.1991
2343
616
BIKASIPURA SPACE EMPLOYEES HBCS
40' X 60'
T.SATHYANARAYANA
BDA/EE(S)/PL/116/91-92 DT 03.09.1991
2344
876
BIKASIPURA SPACE EMPLOYEES HBCS
40' X 60'
C.S.PRASAD
BDA/EE(S)/PL/117/91-92 DT 05.09.1991
2345
439
BIKASIPURA SPACE EMPLOYEES HBCS
40' X 60'
G.NAGENDRA RAO
BDA/EE(S)/PL/118/91-92 DT 05.09.1991
2346
69
B.O.O. H.B.C.S. MADIWALA
40' X 62'
SHANKARA S SHETTY
BDA/EE(S)/PL/119/91-92 DT 05.09.1991
2347
158
N.S.PALYA MICO H.B.C.S.
40' X 60'
GANESH SRINIVASAN
BDA/EE(S)/PL/119/91-92 DT 05.09.1991
2348
26
KENCHENAHALLI H.B.C.S.
40' X 60'
P.A.DHANANJAYA RAO
BDA/EE(S)/PL/121/91-92 DT 05.09.1991
2349
661
KENCHENAHALLI H.B.C.S.
45' X 70'
H.V.K.MURTHY
BDA/EE(S)/PL/122/91-92 DT 05.09.1991
2350
1236
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
32' X 60'
Y.RAJESWARA RAO
BDA/EE(S)/PL/123/91-92 DT 09.09.1991
2351
728
KENCHENAHALLI H.B.C.S.
44' X 55'
A.RAMA MURTHY
BDA/EE(S)/PL/124/91-92 DT 10.09.1991
2352
860
N.S.PALYA MICO H.B.C.S.
39' X 50'
KRISHNOJI RAO
BDA/EE(S)/PL/125/91-92 DT 10.09.1991
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
40' X 60'
B.SHIVA SHANKARAIAH
BDA/EE(S)/PL/126/91-92 DT 17.09.1991
2353
191/E
2354
615
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
60' X 37'
D.SUBRAMANYA NAIK
BDA/EE(S)/PL/127/91-92 DT 26.09.1991
2355
814
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
40' X 60'
D.JAYAPPA
BDA/EE(S)/PL/128/91-92 DT 26.09.1991
2356
589
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
40' X 60'
K.VISWANATH
BDA/EE(S)/PL/129/91-92 DT 26.09.1991
2357
242
VISWABHARATHI H.B.C.S., GIRINAGAR
60' X 40'
B.R.SURESH
BDA/EE(S)/PL/130/91-92 DT 26.09.1991
2358
31
K.S.R.T.C. H.B.C.S., CHIKKALLASANDRA
40' X 55'
PRAHALLDA RAO R DESHPANDE
BDA/EE(S)/PL/131/91-92 DT 26.09.1991
2359
581
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
36' X 60'
B.S.ASWATHANARAYANA
BDA/EE(S)/PL/132/91-92 DT 26.09.1991
KEMPEGOWDA H.B.C.S., KATHRIGUPPA
40' X 60'
A.V.SURYANARAYANA SWAMY
BDA/EE(S)/PL/133/91-92 DT 01.10.1991
2360
583/A
2361
299
BIKASIPURA SPACE EMPLOYEES HBCS
49' X 48'
S.VENUGOPALAN
BDA/EE(S)/PL/134/91-92 DT 01.10.1991
2362
521
BIKASIPURA SPACE EMPLOYEES HBCS
40' X 60'
B.K.PADMANABHA
BDA/EE(S)/PL/135/91-92 DT 01.10.1991
2363
13
KSRTC H.B.C.S. SARAKKI
40' X 60'
NAGALAKSHMI
BDA/EE(S)/PL/136/91-92 DT 01.10.1991
2364
636
JAYANAGAR H.B.C.S., KADIRENAHALLI
60' X45'
K.V.USHA
BDA/EE(S)/PL/137/91-92 DT 01.10.1991
2365
217
KENCHENAHALLI H.B.C.S.
40' X 60'
K.S.SHANKAR
BDA/EE(S)/PL/138/91-92 DT 01.10.1991
2366
284
N.S.PALYA MICO H.B.C.S.
40' X 60'
H.R.YOGENDRA
BDA/EE(S)/PL/139/91-92 DT 01.10.1991
2367
49
KSRTC H.B.C.S. SARAKKI
36' X 60'
K.R.SHANKAR
BDA/EE(S)/PL/140/91-92 DT 01.10.1991
2368
266
VISWABHARATHI H.B.C.S., GIRINAGAR
40' X 60'
C.S.KARNIK
BDA/EE(S)/PL/141/91-92 DT 09.10.1991
KENCHENAHALLI H.B.C.S.
56' X 44'
DR|| H.NARAYANA
BDA/EE(S)/PL/142/91-92 DT 09.10.1991
COLLEGE TEACHER'S H.B.C.S., B.S.K. III STAGE
50' X 37'
C.S.VIJAYA LAKSHMI
BDA/EE(S)/PL/143/91-92 DT 11.10.1991
2369
345/D
2370
22
2371
356
N.S.PALYA MICO H.B.C.S.
60' X 41'
LAKSHMI KRISHNA SHASTRY
BDA/EE(S)/PL/144/91-92 DT 11.10.1991
2372
641
N.S.PALYA MICO H.B.C.S.
59' X 40'
S.K.MOHIDEEN
BDA/EE(S)/PL/145/91-92 DT 11.10.1991
2373
498
BIKASIPURA SPACE EMPLOYEES HBCS
40' X 60'
D.P.JAGANATHA
BDA/EE(S)/PL/146/91-92 DT 15.10.1991
2374
40
POORNA PRAJAN H.B.C.S., KATHARIGUPPA
40' X 60'
M.N.RAMANATH
BDA/EE(S)/PL/147/91-92 DT 22.10.1991
2375
62
ITI H.B.C.S., KATHARIGUPPA
40' X 56'
L.PRAKASH
BDA/EE(S)/PL/148/91-92 DT 23.10.1991
2376
14
RAMA RAO LAYOUT
60' X 51'
H.R.NAGENDRA
BDA/EE(S)/PL/149/91-92 DT 23.10.1991
2377
843
KENCHENAHALLI H.B.C.S.
53' X 44'
R.N.SUNDARA RAMA
BDA/EE(S)/PL/150/91-92 DT 24.10.1991
2378
520
BIKASIPURA SPACE EMPLOYEES HBCS
40' X 60'
VYASDEO PRASAD
BDA/EE(S)/PL/51/91-92 DT 31.05.1991
2379
435
BIKASIPURA SPACE EMPLOYEES HBCS
40' X 60'
R.JAGATH JYOTHI
BDA/EE(S)/PL/52/91-92 DT 31.05.1991
2380
906
N.S.PALYA MICO H.B.C.S.
40' X 62'
LEELA PRABHAKAR
BDA/EE(S)/PL/53/91-92 DT 31.05.1991
2381
295
VISWABHARATHI H.B.C.S., GIRINAGAR
40' X 60'
B.N.SUBRAMANYA
BDA/EE(S)/PL/54/91-92 DT 31.05.1991
2382
29
POORNA PRAJAN H.B.C.S., KATHARIGUPPA
40' X 60'
K.N.UMA JI RAO
BDA/EE(S)/PL/56/91-92 DT 05.06.1991
2383
672
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
50' X 48'
R.KRISHNAN
BDA/EE(S)/PL/57/91-92 DT 05.06.1991
2384
150
ITI H.B.C.S., KATHARIGUPPA
40' X 80'
B.S.KRISHANA MURTHY
BDA/EE(S)/PL/58/91-92 DT 05.06.1991
2385
700
N.S.PALYA MICO H.B.C.S.
62' X 36'
M.SRINIVASAN
BDA/EE(S)/PL/59/91-92 DT 12.06.1991
2386
538
BIKASIPURA SPACE EMPLOYEES HBCS
40' X 60'
H.G.PREMA SUDHAMANI
BDA/EE(S)/PL/60/91-92 DT 12.06.1991
2387
196
JAYANAGAR H.B.C.S., KADIRENAHALLI
40' X 60'
R.V.KATYAYINI
BDA/EE(S)/PL/61/91-92 DT 18.06.1991
2388
95
RAMA RAO LAYOUT
57' X 40'
DR|| G.SRINIVASA
BDA/EE(S)/PL/62/91-92 DT 18.06.1991
2389
1193
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
40' X 60'
K.C.RAMAN
BDA/EE(S)/PL/63/91-92 DT 18.06.1991
2390
392
VISWABHARATHI H.B.C.S., GIRINAGAR
40' X 60'
K.RAMACHANDRA BHAT
BDA/EE(S)/PL/64/91-92 DT 22.06.1991
2391
452
N.S.PALYA MICO H.B.C.S.
12.50 X 18.50
BDA/EE(S)/PL/65/91-92 DT 22.06.1991
2392
7/E
VISWABHARATHI H.B.C.S., GIRINAGAR
60' X 40'
T.M.ADIGA & SMT JAYALAKSHMI
ADIGA
K.MANJUNATH
2393
75/41
JAYANAGAR H.B.C.S., KADIRENAHALLI
50' X 40'
INDUMATHI SWAMY
BDA/EE(S)/PL/68/91-92 DT 22.06.1991
2394
287/B
KENCHENAHALLI H.B.C.S.
82' X 41'
A.RAMASWAMY
BDA/EE(S)/PL/69/91-92 DT 25.06.1991
BDA/EE(S)/PL/66/91-92 DT 22.06.1991
2395
11
K.E.B. H.B.C.S, B.G.ROAD
40' X 60'
NARASARAJU
BDA/EE(S)/PL/70/91-92 DT 27.06.1991
2396
171
KENCHENAHALLI H.B.C.S.
40' X 60'
V.N.NANDA KUMAR
BDA/EE(S)/PL/71/91-92 DT 27.06.1991
2397
901
N.S.PALYA MICO H.B.C.S.
37' X 62'
R.LINGAPPA
BDA/EE(S)/PL/72/91-92 DT 27.06.1991
2398
546
BIKASIPURA SPACE EMPLOYEES HBCS
40' X 60'
K.KALYANARAMAN
BDA/EE(S)/PL/73/91-92 DT 27.06.1991
2399
494
BIKASIPURA SPACE EMPLOYEES HBCS
40' X 60'
K.SADASHIVAM
BDA/EE(S)/PL/74/91-92 DT 27.06.1991
2400
56
SRI.ANJANEYA H.B.C.S., ITTUMADU, B.S.K. III STAGE
36' X 64'
H.L.SUBRAMANYA
BDA/EE(S)/PL/75/91-92 DT 28.06.1991
2401
217
B.O.O. H.B.C.S. MADIWALA
40' X 65'
M.K.SHANTHARAMAN
BDA/EE(S)/PL/76/91-92 DT 03.07.1991
2402
1169
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
40' X 60'
BASAVARASAPPA
BDA/EE(S)/PL/77/91-92 DT 04.07.1991
2403
250
KENCHENAHALLI H.B.C.S.
40' X 60'
A.B.MURALIDHARA
BDA/EE(S)/PL/78/91-92 DT 04.07.1991
2404
29
BIKASIPURA SPACE EMPLOYEES HBCS
40' X 60'
K.RAVINDRANATH
BDA/EE(S)/PL/79/91-92 DT 05.07.1991
2405
393
VISWABHARATHI H.B.C.S., GIRINAGAR
40' X 60'
GOVINDA BHAT MARAKIVI
BDA/EE(S)/PL/55/91-92 DT 31.05.1991
2406
12
BIKASIPURA SPACE EMPLOYEES HBCS
40' X 60'
R.BHAGYALAKSHMI
BDA/EE(S)/PL/80/91-92 DT 05.07.1991
2407
868
BIKASIPURA SPACE EMPLOYEES HBCS
40' X 60'
NARAYANA SWAMY
BDA/EE(S)/PL/81/91-92 DT 06.07.1991
2408
193
MICO SKGNS ARAKERE
40' X 65'
NAGESH V RAO
BDA/EE(S)/PL/82/91-92 DT 06.07.1991
2409
796
KENCHENAHALLI H.B.C.S.
42' X 58'
MAHESH KUMAR SHAH
BDA/EE(S)/PL/83/91-92 DT 08.07.1991
2410
1166
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
40' X 60'
K.V.PRABHAKARA SHETTY
BDA/EE(S)/PL/84/91-92 DT 09.07.1991
2411
930
N.S.PALYA MICO H.B.C.S.
40' X 60'
NANDAN M NALIKANI
BDA/EE(S)/PL/85/91-92 DT 11.07.1991
2412
740
BIKASIPURA SPACE EMPLOYEES HBCS
40' X 60'
K.BADARI NARAYANA
BDA/EE(S)/PL/86/91-92 DT 20.07.1990
2413
JAYANAGAR H.B.C.S., KADIRENAHALLI
62' X 50'
M.JAGANNATH & M.T.SRINATH
BDA/EE(S)/PL/87/91-92 DT 25.07.1991
2414
316 &
317
217
BIKASIPURA SPACE EMPLOYEES HBCS
40' X 60'
V.K.LAKSHMEESHA
BDA/EE(S)/PL/88/91-92 DT 27.07.1991
2415
965
N.S.PALYA MICO H.B.C.S.
40' X 60'
M.RAMAYEE
BDA/EE(S)/PL/89/91-92 DT 27.07.1991
2416
264
KENCHENAHALLI H.B.C.S.
58' X 46'
PADMA NARASINGA RAO
BDA/EE(S)/PL/90/91-92 DT 29.07.1991
2417
231
BIKASIPURA SPACE EMPLOYEES HBCS
51' X 61'
V.SAMBASHIVA RAO
BDA/EE(S)/PL/91/91-92 DT 02.08.1991
2418
502
BIKASIPURA SPACE EMPLOYEES HBCS
40' X 60'
M.KALAIVANI
BDA/EE(S)/PL/92/91-92 DT 02.08.1991
2419
887
N.S.PALYA MICO H.B.C.S.
57' X 40'
G.M.SRINIVAS
BDA/EE(S)/PL/93/91-92 DT 02.08.1991
2420
848
BIKASIPURA SPACE EMPLOYEES HBCS
40' X 60'
T.G.K.MURTHY
BDA/EE(S)/PL/94/91-92 DT 02.08.1991
2421
189
MICO SKGNS ARAKERE
40' X 65'
K.RAMAKRISHNA KINI
BDA/EE(S)/PL/95/91-92 DT 03.08.1991
2422
230
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
39' X 60'
K.VENKATA SWAMY
BDA/EE(S)/PL/96/91-92 DT 03.08.1991
2423
178
KENCHENAHALLI H.B.C.S.
35' X 58'
B.ABHAYAMBAL
BDA/EE(S)/PL/97/91-92 DT 06.08.1991
VISWABHARATHI H.B.C.S., GIRINAGAR
40' X 60'
C.S.VENKATESHAN
BDA/EE(S)/PL/98/91-92 DT 07.08.1991
JAYANAGAR H.B.C.S., KADIRENAHALLI
70' X 45'
V.VASANTHARAM
BDA/EE(S)/PL/99/91-92 DT 07.08.1991
2424
12/F
2425
376
2426
22
POORNA PRAJAN H.B.C.S., KATHARIGUPPA
40' X 60'
N.C.PARTHASARATHY
BDA/EE(S)/PL/100/91-92 DT 08.08.1991
2427
32
SARAKKI IV PHASE
40' X 60'
T.SURYANARAYANA
BDA/EE(S)/PL/1/91-92 DT 22.01.1992
2428
25
SARAKKI V PHASE
40' X 60'
DESAI RAMA RAO
BDA/EE(S)/PL/3/91-92 DT 07.09.1991
2429
590
SARAKKI VI PHASE
40' X 60'
R.MUNIRAMU & R.RAMESH
BDA/EE(S)/PL/4/91-92 DT 30.10.1991
2430
629
SARAKKI VI PHASE
39' X 60'
18.20 X 19.30
S.VITTALA SETTY & LAKSHMI V
SETTY
G.SATHYANRAYANA
2431
570
SARAKKI VI PHASE
2432
722
2433
269
2434
60
2435
111
2436
1135
2437
47
2438
BDA/EE(S)/PL/3/91-92 DT 24.10.1991
BDA/EE(S)/PL/6/91-92 DT 11.03.1992
SARAKKI VI PHASE
40' X 60'
B.V.NAGARAJ
BDA/EE(S)/PL/5/91-92 DT 29.01.1992
SARAKKI V PHASE
40' X 60'
J.SHANTHA
BDA/EE(S)/PL/2/91-92 DT 03.09.1991
B.T.M. II STAGE, I PHASE
40' X 58'
S.H.KHADRI
BDA/EE(S)/PL/23/91-92 DT 11.11.1991
DOLLAR SCHEME B.T.M. LAYOUT
40' X 60'
B.G.CHANDRA SHEKAR
BDA/EE(S)/PL/22/91-92 DT 24.10.1991
B.T.M. I STAGE, TAVAREKERE SY NOS
40' X 60'
V.RAMANATH
BDA/EE(S)/PL/35/91-92 DT 23.03.1992
B.T.M. II STAGE
40' X 60'
S.A.SREENIVASA MURTHY
BDA/EE(S)/PL/18/91-92 DT 08.10.1991
105
B.T.M. I STAGE, I PHASE
40' X 60'
SHAMALA CHANDRA
BDA/EE(S)/PL/25/91-92 DT 18.11.1991
2439
41
B.T.M. I STAGE, I PHASE
40' X 60'
K.NARAYANA
BDA/EE(S)/PL/36/91-92 DT 23.03.1992
2440
50
N.S.PALYA B.T.M. LAYOUT
40' X 60'
B.R.RAJAN
BDA/EE(S)/PL/34/91-92 DT 18.03.1992
2441
42
B.T.M. II STAGE, I PHASE, MADIWALA
40' X 60'
L.HANUMANTHAIAH
BDA/EE(S)/PL/28/91-92 DT 07.01.1992
2442
79
B.T.M. I STAGE, I PHASE
40' X 60'
K.M.UMESH CHANDRA
BDA/EE(S)/PL/26/91-92 DT 26.11.1991
2443
3
N.S.PALYA B.T.M. LAYOUT
40' X 60'
G.DEVANANDA
BDA/EE(S)/PL/19/91-92 DT 11.10.1991
2444
175
B.O.O., H.B.C.S., TAVAREKERE
60' X 57'
VICE CHAIRMAN
BDA/EE(S)/PL/242/91-92 DT 24.01.1992
2445
42
B.T.M. II STAGE, I PHASE
40' X 60'
S.A.JAGADISHA KUMAR
BDA/EE(S)/PL/6/91-92 DT 20.05.1991
2446
1518
SARAKKI III PHASE
40' X 60'
L.S.VEDAPUSHPA
BDA/EE(S)/PL/22/91-92 DT 27.09.1991
2447
615
SARAKKI II PHASE
45' X 61'
V.SURESH BABU
BDA/EE(S)/PL/23/91-92 DT 09.10.1991
2448
1512
SARAKKI II PHASE
40' X 60'
H.T.SHIVAPRAKASH
BDA/EE(S)/PL/44/91-92 DT 24.03.1992
2449
289
SARAKKI V PHASE
40' X 60'
J.RAMA
BDA/EE(S)/PL/1/91-92 DT 05.06.1991
2450
594
SARAKKI VI PHASE
11.27 X 18.28
SAVITRAMMA
BDA/EE(S)/PL/2/91-92 DT 27.09.1991
2451
720
SARAKKI VI PHASE
40' X 60'
B.V.SHESHADRI
BDA/EE(S)/PL/1/91-92 DT 10.04.1991
2452
29
B.T.M. II STAGE, I PHASE
15.24 X 23.48
T.NARAYANA
BDA/EE(S)/PL/37/91-92 DT 26.03.1992
2453
1087
B.T.M. LAYOUT
40' X 60'
MRS A SUMITRA
BDA/EE(S)/PL/27/91-92 DT 04.01.1992
2454
339
N.S.PALYA MICO H.B.C.S.
40' X 60'
D.A.SUBBAIAH
BDA/EE(S)/PL/67/91-92 DT 22.06.1991
2455
1444
B.T.M. II STAGE, I PHASE
66' X 40'
BDA/EE(S)/PL/12/91-92 DT 29.07.1991
2456
1990
SARAKKI II PHASE
40' X 64'
A.V.SRINIVASA MURTHY &
SMT.LATHA S MURTHY
P.HARINATHA BABU
2457
1177
B.T.M. LAYOUT, TAVAREKERE SY NOS
12.19 X 9.14
B.J.MANJULLA
BDA/EE(S)/PL/ /91-92 DT 01.04.1991
2458
1102
B.T.M. LAYOUT (EWS)
6.00 X 9.00
S.RAJALAKSHMI
BDA/EE(S)/PL/692/91-92 DT 21.11.1991
2459
570
B.S.K. III STAGE, II PHASE, VI BLOCK
60' X 40'
K.N.SWDAMYA SETTY
BDA/EE(S)/PL/ /91-92 DT 16.03.1992
BDA/EE(S)/PL/36/91-92 DT 24.02.1992
Cataloguing and indexing of records as envisaged under section 4(1) (a) of the Right to information Act 2005
LIST OF PLAN SANCTIONED FILES DURING THE YEAR 92-93 IN EE(S) DIVISION
SL
NO.
2460
SITE
NO.
1295
NAME OF THE LAYOUT
DIMENSION
APPLICANT NAME
SANCTION EE NO/DATE
SARAKKI II PHASE
40' X 60'
J.N.GURUMURTHY
BDA/EE(S)/PL/16/92-93 DT 04.11.1992
2461
485
SARAKKI II PHASE
58' X 51'
HARINAKSHI
BDA/EE(S)/PL/11/92-93 DT 06.08.1992
SARAKKI II PHASE
75' X 50'
PADMAVATI JAYARAM
BDA/EE(S)/PL/10/92-93 DT 01.08.1992
2462
447/D
2463
1691
SARAKKI II PHASE
40' X 60'
M.SRINIVASAN
BDA/EE(S)/PL/19/92-93 DT 02.12.1992
2464
93
SARAKKI II PHASE
62' X 40'
RABIYABEGAM
BDA/EE(S)/PL/12/92-93 DT 06.08.1992
2465
107
SARAKKI II PHASE
42' X 60'
SYED ABDUL WAFID
BDA/EE(S)/PL/01/92-93 DT 10.04.1992
2466
627
SARAKKI II PHASE
60' X 40'
SHESHAGIRI RAO
BDA/EE(S)/PL/4/92-93 DT 11.05.1992
2467
928
SARAKKI II PHASE
40' X 60'
K.RANGA SWAMY
BDA/EE(S)/PL/2/92-93 DT 29.04.1992
2468
383
B.S.K. III STAGE, III PHASE, V BLOCK
60' X 40'
BRAMHA CHITANYA
BDA/EE(S)/PL/51/92-93 DT 13.10.1992
2469
128
B.S.K. III STAGE, III PHASE, I BLOCK
60' X 40'
T.R.KRISHNAN
BDA/EE(S)/PL/52/92-93 DT 17.10.1992
2470
167
B.S.K. III STAGE AVALAHALLI
40' X 60'
D.VEENABHASKAR
BDA/EE(S)/PL/53/92-93 DT 17.10.1992
2471
248
B.S.K. III STAGE, NAGENDRA BLOCK
80' X 30'
SARASWATIRAJ
BDA/EE(S)/PL/54/92-93 DT 19.10.1992
2472
511
B.S.K. III STAGE, III PHASE, III BLOCK
60' X 40'
D.BYATARAYASWAMY
BDA/EE(S)/PL/55/92-93 DT 30.10.1992
2473
819
B.S.K. III STAGE, II PHASE, VII BLOCK
60' X 37'
V.R.RAO
BDA/EE(S)/PL/56/92-93 DT 12.11.11992
2474
537
B.S.K. III STAGE, II PHASE, VI BLOCK
64' X 45'
M.DEVAMMA & M.VANI
BDA/EE(S)/PL/57/92-93 DT 18.11.1992
2475
28
B.S.K. III STAGE, III PHASE, V BLOCK
60' X 38'
B.BHASKAR RAO
BDA/EE(S)/PL/58/92-93 DT 24.11.1992
2476
263
B.S.K. III STAGE, III PHASE, II BLOCK
40' X 60'
M.LAKSHMIPATHY
BDA/EE(S)/PL/59/92-93 DT 26.11.1992
2477
60
B.S.K. III STAGE SY NOS KATARIGUPPA
80' X 30'
M.NARAYANA ADIGA
BDA/EE(S)/PL/60/92-93 DT 28.11.1992
2478
190
B.S.K. III STAGE, IV PHASE, VII BLOCK
40' X 62'
SAMPANGI RAMA REDDY
BDA/EE(S)/PL/61/92-93 DT 02.12.1992
2479
66
B.S.K. III PHASE, III STAGE, VI BLOCK
36' X 60'
K.SEETHALAKSHMI
BDA/EE(S)/PL/62/92-93 DT 14.12.1992
2480
565
B.S.K. III PHASE, II STAGE, VI BLOCK
41' X 58'
A.V.HABBU
BDA/EE(S)/PL/63/92-93 DT 15.12.1992
2481
340
B.S.K. III PHASE, II STAGE, VI BLOCK
59' X 48'
B.P.VISWANATHA
BDA/EE(S)/PL/64/92-93 DT 18.12.1992
2482
82
B.S.K. III PHASE, III STAGE, VI BLOCK
40' X 60'
MOYIMADDIN MEBRI
BDA/EE(S)/PL/65/92-93 DT 23.12.1992
B.S.K. III PHASE, III STAGE, VI BLOCK
40' X 59'
B.V.VEERANNA
BDA/EE(S)/PL/66/92-93 DT 26.12.1992
2483
59/C
2484
536
B.S.K. III PHASE, II STAGE, VI BLOCK
64' X 45'
T.K.KARIYAPPA
BDA/EE(S)/PL/67/92-93 DT 01.01.1993
2485
315
B.S.K. III PHASE, IV STAGE, VII BLOCK
40' X 60'
K.RAMAREDDY
BDA/EE(S)/PL/68/92-93 DT 02.01.1993
2486
B.S.K. III STAGE, NAGENDRA BLOCK
80' X 30'
A.S.CHOODAMMA
BDA/EE(S)/PL/69/92-93 DT 07.01.1993
2487
438 &
455
692
B.S.K. III PHASE, II STAGE, VII BLOCK
40' X 60'
JOSEPH N JOSHNA
BDA/EE(S)/PL/70/92-93 DT 07.01.1993
2488
188
B.S.K. III PHASE, IV STAGE, VII BLOCK
60' X 40'
R.INDUMATI
BDA/EE(S)/PL/71/92-93 DT 11.01.1993
2489
753
B.S.K. III PHASE, II STAGE, VII BLOCK
60' X 40'
NYASNIDISA
BDA/EE(S)/PL/74/92-93 DT 19.01.1993
2490
79
HOSAKERE HALLI B.S.K. III STAGE
60' X 40'
S.R.BASAVARAJU
BDA/EE(S)/PL/75/92-93 DT 01.02.1993
2491
433
B.S.K. III PHASE, II STAGE, VI BLOCK
40' X 60'
S.VENKATANARASIMHAN
BDA/EE(S)/PL/76/92-93 DT 02.02.1993
2492
105
B.S.K. III PHASE, II STAGE, IV BLOCK
22.55 X 10.97
VIJAYA JAGANATH
BDA/EE(S)/PL/77/92-93 DT 02.02.1993
2493
439
B.S.K. III PHASE, II STAGE, VI BLOCK
60' X 36'
KONNAMMA
BDA/EE(S)/PL/78/92-93 DT 18.02.1993
2494
668
B.S.K. III PHASE, II STAGE, VII BLOCK
60' X 40'
L.HONNAYA
BDA/EE(S)/PL/79/92-93 DT 18.02.1993
2495
1163
HOSAKERE HALLI B.S.K. III STAGE
60' X 38'
A.S.VELAMANI
BDA/EE(S)/PL/80/92-93 DT 25.02.1993
2496
58
B.S.K. III PHASE, III STAGE, I BLOCK
40' X 60'
N.NARASIMHA MURTHY
BDA/EE(S)/PL/81/92-93 DT 25.02.1993
2497
111
B.S.K. III PHASE, II STAGE, IV BLOCK
40' X 60'
N.A.PRASAD
BDA/EE(S)/PL/82/92-93 DT 25.02.1993
2498
132
B.S.K. III PHASE, III STAGE, V BLOCK
62' X 40'
G.GOVINDDAS & MANSUKHLAL
BDA/EE(S)/PL/83/92-93 DT 05.03.1993
2499
86
B.S.K. III PHASE, III STAGE, VI BLOCK
61' X 40'
M.SHUBHA
BDA/EE(S)/PL/84/92-93 DT 16.03.1993
2500
377
CHENNAMMANAKERE ACHUKAT B.S.K. III STAGE
62' X 40'
P.RUKMANGADA RAO
BDA/EE(S)/PL/85/92-93 DT 22.03.1993
2501
GAVIPURA B.S.K. I STAGE
42' X 60'
G.S.SEETAMMA
BDA/EE(S)/PL/86/92-93 DT 26.03.1993
2502
103 &
104
1411
SARAKKI I PHASE
60' X 40'
J.N.SWAMY
BDA/EE(S)/PL/1/92-93 DT 07.05.1992
2503
71
SARAKKI I PHASE
45' X 60'
SREEMATHI RANGANATHAM
BDA/EE(S)/PL/2/92-93 DT 25.05.1992
2504
632
SARAKKI I PHASE
45' X 60'
H.S.SUMATHI
BDA/EE(S)/PL/3/92-93 DT 11.06.1992
2505
632
SARAKKI I PHASE
60' X 45'
H.S.SUMATH
BDA/EE(S)/PL/4/92-93 DT 30.07.1992
2506
586
SARAKKI I PHASE
62' X 45'
USHA CHARULU & VENKATESH
BDA/EE(S)/PL/5/92-93 DT 26.08.1992
2507
671
B.T.M. II STAGE
40' X 60'
MUNESWARAPPA
BDA/EE(S)/PL/21/92-93 DT 13.02.1993
2508
1
B.S.K. III STAGE, ALAHALLI LAYOUT
49' X 50'
R.MAYURA
BDA/EE(S)/PL/73/92-93 DT 19.01.1993
2509
382
B.S.K. III STAGE, III PHASE, V BLOCK
40' X 60'
N.R.SHESHADRI
BDA/EE(S)/PL/72/92-93 DT 18.01.1993
2510
1163
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
48' X 60'
K.SRINIVAS
BDA/EE(S)/PL/86/92-93 DT 14.09.1992
2511
482
KENCHENAHALLI H.B.C.S.
40' X 60'
MITHILI PADMANABHAN
BDA/EE(S)/PL/85/92-93 DT 14.09.1992
2512
564
KENCHENAHALLI H.B.C.S.
40' X 60'
K.V.VASUDEVA MURTHY
BDA/EE(S)/PL/84/92-93 DT 14.09.1992
2513
161
B.O.O., H.B.C.S., TAVAREKERE
60' X 45'
VICE CHAIRMAN
BDA/EE(S)/PL/83/92-93 DT 04.09.1992
2514
32
N.S.PALYA MICO H.B.C.S.
40' X 60'
V.CHAYAPATHI
BDA/EE(S)/PL/82/92-93 DT 01.09.1992
2515
18
40' X 60'
T.UNNIKRISHNAN
BDA/EE(S)/PL/81/92-93 DT 26.08.1992
2516
168
B.D.A. III STAGE, SRI.LAKSHMINARASIMHAIAH
H.B.C.S.
KENCHENAHALLI H.B.C.S.
40' X 60'
RADHA JAYARAM
BDA/EE(S)/PL/80/92-93 DT 26.08.1992
2517
276
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
49' X 58'
MANAKAL SUNDARESH SHANKAR
BDA/EE(S)/PL/79/92-93 DT 26.08.1992
2518
568
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
40' X 60'
T.V.PRABHAKARA GUPTA
BDA/EE(S)/PL/78/92-93 DT 26.08.1992
2519
938
N.S.PALYA MICO H.B.C.S.
40' X 60'
BDA/EE(S)/PL/63/92-93 DT 28.07.1992
2520
700
BIKASIPURA SPACE EMPLOYEES HBCS
40' X 60'
P.JKARIYAS MEHEJES & JULIYAT
MEHEJES
K.K.GOSWAMY
2521
7
KALIDASA EMPLOYEES HBCS, GAVIPURA
40' X 60'
SAROJA
BDA/EE(S)/PL/66/92-93 DT 31.07.1992
SRI ANJANEYA SWAMY H.B.C.S., ETTMADU SY NOS
40' X 62'
M.R.RAMAKRISHNAN
BDA/EE(S)/PL/62/92-93 DT 27.07.1992
2522
14/A
BDA/EE(S)/PL/65/92-93 DT 31.07.1992
2523
377
KENCHENAHALLI H.B.C.S.
17.08 X 11.88
V.K.ADIKESHAVAN
BDA/EE(S)/PL/76/92-93 DT 26.08.1992
2524
892
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
40' X 60'
P.GOPALA KRISHNA
BDA/EE(S)/PL/77/92-93 DT 26.08.1992
2525
150
B.O.O., H.B.C.S., TAVAREKERE
40' X 60'
VICE CHAIRMAN
BDA/EE(S)/PL/92/92-93 DT 01.10.1992
2526
705
KEMPEGOWDA HBCS B.S.K. III STAGE
40' X 60'
R.S.HANUMANTHARAYAPPA
BDA/EE(S)/PL/93/92-93 DT 09.10.1992
2527
862
BIKASIPURA SPACE EMPLOYEES HBCS
40' X 60'
P.SOORAYYA
BDA/EE(S)/PL/94/92-93 DT 09.10.1992
2528
188
KENCHENAHALLI H.B.C.S.
12.95 X 18.29
L.BABUKAMATH
BDA/EE(S)/PL/95/92-93 DT 14.10.1992
2529
113
B.O.O., H.B.C.S., TAVAREKERE
40' X 60'
VICE CHAIRMAN
BDA/EE(S)/PL/96/92-93 DT 14.10.1992
2530
196
BIKASIPURA SPACE EMPLOYEES HBCS
40' X 60'
TARSING
BDA/EE(S)/PL/97/92-93 DT 17.10.1992
2531
582
B.S.K. III STAGE, KATHARIGUPPE SY NOS
60' X 40'
V.PRAKASH
BDA/EE(S)/PL/98/92-93 DT 17.10.1992
2532
1025
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
40' X 60'
GANGADHARAYYA
BDA/EE(S)/PL/99/92-93 DT 21.10.1992
2533
424
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
40' X 60'
B.SEETHARAM RAO
BDA/EE(S)/PL/100/92-93 DT 21.10.1992
2534
10
KALIDASA EMPLOYEES HBCS, GAVIPURA
40' X 60'
B.C.GIRIJAVATHI
BDA/EE(S)/PL/67/92-93 DT 03.08.1992
2535
702
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
40' X 60'
N.KRISHNAMURTHY RAO
BDA/EE(S)/PL/68/92-93 DT 06.08.1992
2536
344
N.S.PALYA MICO H.B.C.S.
40' X 60'
SHINDHAR PAL KWAR
BDA/EE(S)/PL/69/92-93 DT 06.08.1992
2537
189
KENCHENAHALLI H.B.C.S.
40' X 60'
P.RAMACHANDRA SHARMA
BDA/EE(S)/PL/70/92-93 DT 07.08.1992
2538
32
B.S.K. III STAGE
40' X 61'
SHARADHA KRISHNA MURTHY
BDA/EE(S)/PL/58/92-93 DT 20.07.1992
2539
152
B.O.O., H.B.C.S., TAVAREKERE
40' X 60'
VICE CHAIRMAN
BDA/EE(S)/PL/71/92-93 DT 07.08.1992
2540
30
B.O.O. H.B.C.S., MADIWALA
40' X 60'
K.SUNDRA RAO
BDA/EE(S)/PL/51/92-93 DT 08.07.1992
KADIRENAHALLI HBCS
45' X 60'
B.S.VENKATARAM
BDA/EE(S)/PL/52/92-93 DT 13.07.1992
2541
60/41C
2542
45
KADIRENAHALLI HBCS
40' X 60'
SHANTHASHASHTRI P.A.
BDA/EE(S)/PL/53/92-93 DT 16.07.1992
2543
68
B.O.O., H.B.C.S., TAVAREKERE
17.38 X 12.20
VICE CHAIRMAN
BDA/EE(S)/PL/54/92-93 DT 16.07.1992
2544
1184
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
39' X 60'
D.UMESH BHAT
BDA/EE(S)/PL/55/92-93 DT 16.07.1992
2545
1034
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
40' X 60'
SATYANARAYANA
BDA/EE(S)/PL/56/92-93 DT 20.07.1992
2546
804
N.S.PALYA MICO H.B.C.S.
40' X 60'
P.SUDHAKARA SHETTY
BDA/EE(S)/PL/57/92-93 DT 20.07.1992
2547
37
B.S.K. III STAGE, KATHARIGUPPE SY NOS
40' X 60'
P.KALYANI
BDA/EE(S)/PL/74/92-93 DT 25.08.1992
2548
507
BIKASIPURA SPACE EMPLOYEES HBCS
40' X 60'
G.S.RAVEENDRANATH
BDA/EE(S)/PL/75/92-93 DT 26.08.1992
2549
361
KENCHENAHALLI H.B.C.S.
40' X 60'
SHASHIKALA S LALSANGI
BDA/EE(S)/PL/72/92-93 DT 14.08.1992
2550
637
KADIRENAHALLI HBCS
40' X 60'
S.INDIRAMMA
BDA/EE(S)/PL/73/92-93 DT 21.08.1992
2551
2534
KUMARASWAMY LAYOUT II STAGE
40' X 60'
B.M.SAMPATH KUMAR
BDA/EE(S)/PL/13/92-93 DT 10.03.1993
2552
2611
KUMARASWAMY LAYOUT II STAGE
40' X 60'
M.RANGASWAMY
BDA/EE(S)/PL/9/92-93 DT 17.11.1992
2553
2580
KUMARASWAMY LAYOUT II STAGE
40' X 60'
M.L.RAMAKRISHNA REDDY
BDA/EE(S)/PL/10/92-93 DT 19.11.1992
2554
2399
KUMARASWAMY LAYOUT II STAGE
40' X 61'
H.LINGAYYA
BDA/EE(S)/PL/11/92-93 DT 15.12.1992
2555
927
KUMARASWAMY LAYOUT II STAGE
21.10 X 12.10
K.RAMASWAMY
BDA/EE(S)/PL/12/92-93 DT 18.12.1992
2556
2405
KUMARASWAMY LAYOUT II STAGE
40' X 60'
G.S.MANI
BDA/EE(S)/PL/1/92-93 DT 10.04.1992
2557
1722
KUMARASWAMY LAYOUT II STAGE
35' X 62'
PRAKASH R BALLAL
BDA/EE(S)/PL/2/92-93 DT 21.04.1992
2558
1710
KUMARASWAMY LAYOUT II STAGE
40' X 60'
A.GOPALAN
BDA/EE(S)/PL/3-/92-93 DT 11.06.1992
2559
553
KUMARASWAMY LAYOUT II STAGE
61' X 45'
S.GURUPRASAD
BDA/EE(S)/PL/4/92-93 DT 14.07.1992
2560
1770
KUMARASWAMY LAYOUT II STAGE
40' X 60'
N.SAROJA NARASIMHAIAH
BDA/EE(S)/PL/5/92-93 DT 21.08.1992
2561
2387
KUMARASWAMY LAYOUT II STAGE
40' X 60'
H.D.KRISHNA NAIK
BDA/EE(S)/PL/6/92-93 DT 24.08.1992
2562
1553
KUMARASWAMY LAYOUT II STAGE
41' X 48'
BDA/EE(S)/PL/7/92-93 DT 22.09.1992
2563
55
B.O.O. H.B.C.S. B.T.M. LAYOUT
10.67 X 18.30
H.S.SUNDARARAJAN &
K.N.MANGALA GOWRI
VICE CHAIRMAN
BDA/EE(S)/PL/87/92-93 DT 22.09.1992
2564
571
BIKASIPURA SPACE EMPLOYEES HBCS
42' X 60'
V.RANGANATHAN
BDA/EE(S)/PL/88/92-93 DT 22.09.1992
2565
1179
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
39' X 60'
V.K.SUBRAMANYA
BDA/EE(S)/PL/89/92-93 DT 25.09.1992
2566
6
SARAKKI KAS OFFICERS H.B.C.S.
40' X 60'
R.SRINIVASA
BDA/EE(S)/PL/90/92-93 DT 28.09.1992
2567
209
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
40' X 60'
K.S.MADHAVAN NAIR
BDA/EE(S)/PL/91/92-93 DT 28.09.1992
2568
160
B.O.O., H.B.C.S., TAVAREKERE
45' X 60'
VICE CHAIRMAN
BDA/EE(S)/PL/60/92-93 DT 20.07.1992
2569
795
KENCHENAHALLI H.B.C.S.
39' X 55'
N.R.MANGALA JYOTHI
BDA/EE(S)/PL/61/92-93 DT 20.07.1992
2570
917
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
40' X 71'
R.S.MURTHY
BDA/EE(S)/PL/59/92-93 DT 20.07.1992
2571
450
B.S.K. III STAGE, II PHASE, VI BLOCK
10.30 X 18.30
M.S.VISWANATH
BDA/EE(S)/PL/11/92-93 DT 18.05.1992
2572
605
B.S.K. III STAGE, KATHARIGUPPE SY NOS
40' X 60'
G.RAMASWAMY REDDY
BDA/EE(S)/PL/09/92-93 DT 13.05.1992
2573
230
B.S.K. III STAGE, III PHASE, II BLOCK
40' X 79'
J.K.SRINIVASA MURTHY
BDA/EE(S)/PL/8/92-93 DT 12.05.1992
2574
22
SRINIVASANAGAR I STAGE
60' X 56'
G.CHANDRA
BDA/EE(S)/PL/7/92-93 DT 07.05.1992
2575
410
B.S.K. III STAGE, III PHASE, II BLOCK
40' X 60'
M.S.NANJUNDAIAH
BDA/EE(S)/PL/6/92-93 DT 29.04.1992
2576
89
B.S.K. III STAGE, III PHASE, VI BLOCK
40' X 62'
N.S.NARASIMHA SWAMY
BDA/EE(S)/PL/5/92-93 DT 24.04.1992
2577
377
B.S.K. III STAGE, II PHASE, VI BLOCK
58' X 42'
C.G.ARUN
BDA/EE(S)/PL/4/92-93 DT 24.04.1992
2578
108
B.S.K. III STAGE, II PHASE, IV BLOCK
37' X 68'
S.REDDY GOWDA
BDA/EE(S)/PL/3/92-93 DT 24.04.1992
2579
290
B.S.K. III STAGE, IV PHASE, VII BLOCK
46' X 80'
A.N.MURTHY
BDA/EE(S)/PL/2/92-93 DT 21.04.1992
2580
1501
SRINIVASANAGAR I STAGE
40' X 60'
G.S.VIJAYAMMA
BDA/EE(S)/PL/1/92-93 DT 03.04.1992
2581
512
B.S.K. III STAGE, II PHASE, VI BLOCK
24.30 X 15.20
VEERANNAALVALLI
BDA/EE(S)/PL/14/92-93 DT 21.05.1992
2582
451
B.S.K. III STAGE, II PHASE, VI BLOCK
40' X 60'
M.P.DAMODARA
BDA/EE(S)/PL/13/92-93 DT 19.05.1992
2583
97
B.S.K. III STAGE, III PHASE, V BLOCK
40' X 60'
PRIYAVRATHA
BDA/EE(S)/PL/12/92-93 DT 19.05.1992
2584
460
B.S.K. III STAGE, II PHASE, VI BLOCK
33' X 61'
K.RAMA MURTHY
BDA/EE(S)/PL/19/92-93 DT 17.06.1992
2585
305
40' X 60'
N.SURYANARAYANA
BDA/EE(S)/PL/18/92-93 DT 11.06.1992
2586
561
B.S.K. III STAGE, CHANAMANAKERE ACHUKATU
LAYOUT
B.S.K. III STAGE, II PHASE, VI BLOCK
40' X 61'
L.HONNAIAH
BDA/EE(S)/PL/17/92-93 DT 01.06.1992
2587
1065
B.S.K. III STAGE, RAGHAVENDRA BLOCK
38' X 60'
A.LAKSHMAMA
BDA/EE(S)/PL/16/92-93 DT 30.05.1992
2588
759
B.S.K. III STAGE, II PHASE, VII BLOCK
40' X 60'
SHIVACHAND PARASRAMPURIA
BDA/EE(S)/PL/15/92-93 DT 25.05.1992
2589
180
B.S.K. IV STAGE, III PHASE, VII BLOCK
40' X 60'
KEMPAIAH
BDA/EE(S)/PL/31/92-93 DT 20.07.1992
2590
B.S.K. III STAGE, CHANAMANAKERE ACHUKATU
LAYOUT
B.S.K. III STAGE, II PHASE, VI BLOCK
36' X 79'
R.PADMAVATI & G.RANGANATH
BDA/EE(S)/PL/30/92-93 DT 20.07.1992
2591
259 &
260
495
11.10 X 17.70
K.K.SURESH
BDA/EE(S)/PL/29/92-93 DT 16.07.1992
2592
3
B.S.K. III STAGE, II PHASE, IV BLOCK
40' X 60'
H.B.NARASIMHA RAO
BDA/EE(S)/PL/28/92-93 DT 15.07.1992
2593
285
B.S.K. III STAGE, IV PHASE, VII BLOCK
46' X 80'
A.H.RAMA RAO
BDA/EE(S)/PL/27/92-93 DT 13.07.1992
2594
58
B.S.K. III STAGE, III PHASE, III BLOCK
39' X 56'
M.SULOCHANA SRI PADA RAO
BDA/EE(S)/PL/26/92-93 DT 06.07.1992
2595
449
B.S.K. III STAGE, II PHASE, VI BLOCK
33' X 60'
D.TIRUNAVAKTARA SUMODALIYAR
BDA/EE(S)/PL/25/92-93 DT 06.07.1992
B.S.K. III STAGE, II PHASE, VII BLOCK
57' X 38'
B.SRIKANTAYYA
BDA/EE(S)/PL/24/92-93 DT 27.06.1992
B.S.K. III STAGE, III PHASE, II BLOCK
18.10 X 10.10
B.K.SHIVARAM
BDA/EE(S)/PL/23/92-93 DT 27.06.1992
B.S.K. III STAGE, II PHASE, IV BLOCK
40' X 60'
PREMA THYAGARAJAN
BDA/EE(S)/PL/22/92-93 DT 20.06.1992
40' X 62'
K.N.DHANANJAYA
BDA/EE(S)/PL/21/92-93 DT 20.06.1992
40' X 60'
RAMA VIJAYA SIMHA
BDA/EE(S)/PL/20/92-93 DT 19.06.1992
79' X 50'
S.M.PANCHAVATTI
BDA/EE(S)/PL/33/92-93 DT 31.07.1992
2596
672/A
2597
2598
403
7/A
2599
372
2600
319
B.S.K. III STAGE, CHANAMANAKERE ACHUKATU
LAYOUT
B.S.K. III STAGE, II PHASE, VI BLOCK
2601
808
B.S.K. III STAGE, II PHASE, VII BLOCK
2602
131
B.S.K. III STAGE, AVALAHALLI
51' X 53'
BDA/EE(S)/PL/32/92-93 DT 20.07.1992
40' X 60'
P.S.HARIRAO & SMT
P.H.JAYALAKSHMI
SYED ANFUNNISA
2603
116
B.S.K. III STAGE, III PHASE, I BLOCK
2604
141
B.S.K. III STAGE, II PHASE, IV BLOCK
40' X 60'
M.R.RAMASWAMY
BDA/EE(S)/PL/50/92-93 DT 09.10.1992
2605
606
B.S.K. III STAGE, KATHARIGUPPE SY NOS
60' X 40'
B.R.JAYARAMARAJ ARAS
BDA/EE(S)/PL/49/92-93 DT 01.10.1992
2606
10
B.S.K. III STAGE, III PHASE, V BLOCK
39' X 61'
KARIYAPPA M.N.
BDA/EE(S)/PL/48/92-93 DT 25.09.1992
2607
302
B.S.K. III STAGE, CHANAMANAKERE ACHUKATU
LAYOUT
B.S.K. III STAGE, III PHASE, VI BLOCK
40' X 60'
T.A.SRINIVASA RAO
BDA/EE(S)/PL/47/92-93 DT 18.09.1992
2608
83
40' X 60'
M.K.NAGARAJU
BDA/EE(S)/PL/46/92-93 DT 16.09.1992
2609
150
B.S.K. III STAGE, III PHASE, I BLOCK
44' X 60'
H.SIDDAPPA
BDA/EE(S)/PL/45/92-93 DT 03.09.1992
2610
79
B.S.K. III STAGE, III PHASE, VI BLOCK
46' X 58'
BDA/EE(S)/PL/44/92-93 DT 01.09.1992
2611
19
B.S.K. III STAGE, III PHASE, VI BLOCK
79' X 50'
C.R.RAMAMURTHY &
C.R.SATYAMURTHY
C.CHANDRA
BDA/EE(S)/PL/43/92-93 DT 26.08.1992
2612
429
B.S.K. III STAGE, II PHASE, VI BLOCK
61' X 36'
M.S.HASMA TARA
BDA/EE(S)/PL/42/92-93 DT 25.08.1992
2613
17
B.S.K. III STAGE, III PHASE, III BLOCK
40' X 60'
B.R.CHAYA
BDA/EE(S)/PL/41/92-93 DT 14.08.1992
2614
179
B.S.K. III STAGE, AVALAHALLI
40' X 60'
S.SWAMYNATHAN
BDA/EE(S)/PL/40/92-93 DT 14.08.1992
2615
123
B.S.K. III STAGE, III PHASE, V BLOCK
57' X 59'
A.H.RAMA RAO
BDA/EE(S)/PL/39/92-93 DT 14.08.1992
2616
94
B.S.K. III STAGE, III PHASE, III BLOCK
50' X 61'
SUDHA R RAO
BDA/EE(S)/PL/38/92-93 DT 14.08.1992
2617
185
B.S.K. III STAGE, III PHASE, I BLOCK
50' X 73'
S.SAMPATH
BDA/EE(S)/PL/37/92-93 DT 06.08.1992
2618
58
B.S.K. III STAGE, III PHASE, I BLOCK
40' X 60'
NARASIMHA SWAMY
BDA/EE(S)/PL/35/92-93 DT 03.08.1992
2619
515
B.S.K. III STAGE, III PHASE, III BLOCK
40' X 60'
H.S.RAMACHANDRA
BDA/EE(S)/PL/36/92-93 DT 03.08.1992
2620
194
B.S.K. III STAGE, KATHARIGUPPE SY NOS
51' X 42'
MADANI N HEGDE
BDA/EE(S)/PL/34/92-93 DT 31.07.1992
2621
84
B.T.M. I STAGE, I PHASE
40' X 60'
C.P.DAYANANDA
BDA/EE(S)/PL/3/92-93 DT 23.04.1992
2622
1237
B.T.M. II STAGE, I PHASE
40' X 60'
BALAKRISHNA BHAT
BDA/EE(S)/PL/23/92-93 DT 25.02.1993
2623
863
BIKASIPURA SPACE EMPLOYEES HBCS
40' X 60'
V.NAGESH
BDA/EE(S)/PL/101/92-93 DT 21.10.1992
BDA/EE(S)/PL/10/92-93 DT 13.05.1992
2624
38
B.O.O., H.B.C.S., TAVAREKERE
54' X 51'
VICE CHAIRMAN
BDA/EE(S)/PL/102/92-93 DT 23.10.1992
2625
12
KENCHENAHALLI H.B.C.S.
49' X 44'
P.S.NARAYANA PRASAD
BDA/EE(S)/PL/103/92-93 DT 28.10.1992
2626
1
MICO SKGNS ARAKERE
50' X 58'
B.R.NARAYANA MURTHY
BDA/EE(S)/PL/104/92-93 DT 30.10.1992
K.A.S. OFFICERS TAVAREKERE SY NOS
40' X 50'
VICE CHAIRMAN
BDA/EE(S)/PL/105/92-93 DT 30.10.1992
2627
33-A
2628
163
BIKASIPURA SPACE EMPLOYEES HBCS
40' X 60'
V.RAJU
BDA/EE(S)/PL/106/92-93 DT 04.11.1992
2629
937
N.S.PALYA MICO H.B.C.S.
40' X 60'
M.RAJENDRA PRASAD
BDA/EE(S)/PL/107/92-93 DT 05.11.1992
2630
1146
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
39' X 60'
DR|| H.CHANDRAKANTH
BDA/EE(S)/PL/108/92-93 DT 09.11.1992
2631
374
VISWABHARATHI H.B.C.S., GIRINAGAR
40' X 59'
G.V.B.MURTHY
BDA/EE(S)/PL/109/92-93 DT 10.11.1992
2632
9
B.O.O., H.B.C.S., TAVAREKERE
40' X 60'
VICE CHAIRMAN
BDA/EE(S)/PL/110/92-93 DT 10.11.1992
2633
1153
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
39' X 60'
DR|| K.L.SUSHILA RANI
BDA/EE(S)/PL/111/92-93 DT 11.11.1992
2634
7
KENCHENAHALLI H.B.C.S.
44' X 47'
N.V.RAMESH
BDA/EE(S)/PL/112/92-93 DT 17.11.1992
2635
46
MICO SKGNS ARAKERE
50' X 50'
M.S.BALACHANDRA
BDA/EE(S)/PL/113/92-93 DT 18.11.1992
2636
489
BIKASIPURA SPACE EMPLOYEES HBCS
40' X 60'
S.K.DUTTA
BDA/EE(S)/PL/114/92-93 DT 18.11.1992
2637
760
KENCHENAHALLI H.B.C.S.
60' X 40'
S.N.VISWANATHAN
BDA/EE(S)/PL/115/92-93 DT 19.11.1992
KENCHENAHALLI H.B.C.S.
56' X 54'
M.R.KRISHNAMURTHY
BDA/EE(S)/PL/116/92-93 DT 25.11.1992
2638
439/C
2639
673
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
40' X 60'
G.R.SRINATH RAO
BDA/EE(S)/PL/117/92-93 DT 26.11.1992
2640
885
N.S.PALYA MICO H.B.C.S.
40' X 59'
R.M.VENKATACHALAM
BDA/EE(S)/PL/118/92-93 DT 03.12.1992
2641
381
VISWABHARATHI H.B.C.S., GIRINAGAR
40' X 60'
VARUNI A PRAKASH
BDA/EE(S)/PL/119/92-93 DT 10.12.1992
2642
479
KENCHENAHALLI H.B.C.S.
40' X 60'
H.S.RANGAMMA
BDA/EE(S)/PL/120/92-93 DT 10.12.1992
2643
12
SRI.BALAJI H.B.C.S., B.S.K. III STAGE
78' X 27'
A.S.RANGASWAMY
BDA/EE(S)/PL/121/92-93 DT 14.12.1992
2644
41
B.O.O. H.B.C.S. B.T.M. LAYOUT
40' X 60'
PAL LOBO
BDA/EE(S)/PL/122/92-93 DT 18.12.1992
2645
603
BIKASIPURA SPACE EMPLOYEES HBCS
40' X 60'
V.R.KATTI
BDA/EE(S)/PL/123/92-93 DT 01.01.1993
2646
762
N.S.PALYA MICO H.B.C.S.
39' X 60'
K.S.VISWANATHAN
BDA/EE(S)/PL/124/92-93 DT 07.01.1993
2647
783
N.S.PALYA MICO H.B.C.S.
40' X 61'
S.VINOD
BDA/EE(S)/PL/125/92-93 DT 11.01.1993
2648
928
N.S.PALYA MICO H.B.C.S.
40' X 60'
BUDDANNA
BDA/EE(S)/PL/126/92-93 DT 16.01.1993
2649
128
B.O.O., H.B.C.S., TAVAREKERE
40' X 58'
VICE CHAIRMAN
BDA/EE(S)/PL/127/92-93 DT 16.01.1993
B.O.O., H.B.C.S., TAVAREKERE
40' X 60'
VICE CHAIRMAN
BDA/EE(S)/PL/128/92-93 DT 23.01.1993
2650
11-A
2651
1038
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
40' X 60'
Y.SUDARSHANA
BDA/EE(S)/PL/129/92-93 DT 23.01.1993
2652
695
BIKASIPURA SPACE EMPLOYEES HBCS
40' X 60'
G.SHIVANNA
BDA/EE(S)/PL/130/92-93 DT 25.01.1993
2653
12
SIDDIVINAYAKA H.B.C.S., KATHARIGUPPA
60' X 40'
VIJENDRA N RAO
BDA/EE(S)/PL/131/92-93 DT 02.02.1993
2654
443
BIKASIPURA SPACE EMPLOYEES HBCS
40' X 60'
H.S.ANANTHARAMA REDDY
BDA/EE(S)/PL/132/92-93 DT 04.02.1993
2655
816
KENCHENAHALLI H.B.C.S.
52' X 60'
G.R.JANHAVI
BDA/EE(S)/PL/133/92-93 DT 05.02.1993
2656
259
VISWABHARATHI H.B.C.S., GIRINAGAR
40' X 60'
H.V.ANANTHA RAMU
BDA/EE(S)/PL/134/92-93 DT 05.02.1993
2657
58
B.O.O. H.B.C.S. MADIWALA
40' X 60'
S.GEETHA
BDA/EE(S)/PL/135/92-93 DT 05.02.1993
2658
346
KENCHENAHALLI H.B.C.S.
40' X 60'
S.M.KARUR
BDA/EE(S)/PL/136/92-93 DT 11.02.1993
2659
585
BIKASIPURA SPACE EMPLOYEES HBCS
40' X 60'
S.N.RAJENDRAN
BDA/EE(S)/PL/137/92-93 DT 16.02.1993
2660
528
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
39' X 60'
D.SUDHAKARA
BDA/EE(S)/PL/138/92-93 DT 18.02.1993
2661
206
BIKASIPURA SPACE EMPLOYEES HBCS
40' X 60'
VEENA R PRASAD
BDA/EE(S)/PL/139/92-93 DT 18.02.1993
2662
162
BIKASIPURA SPACE EMPLOYEES HBCS
40' X 60'
U.PRABHAKARAN
BDA/EE(S)/PL/140/92-93 DT 22.02.1993
2663
1720
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
46' X 45'
REVANNA
BDA/EE(S)/PL/141/92-93 DT 23.02.1993
2664
490
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
40' X 60'
U.GOPAL
BDA/EE(S)/PL/142/92-93 DT 23.02.1993
2665
775
N.S.PALYA MICO H.B.C.S.
40' X 61'
NAJEER AHAMAD SHARIPH
BDA/EE(S)/PL/143/92-93 DT 23.02.1993
2666
1673
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
40' X 60'
M.S.GANESHAN
BDA/EE(S)/PL/144/92-93 DT 24.02.1993
2667
878
BIKASIPURA SPACE EMPLOYEES HBCS
40' X 60'
L.T.RAMESH
BDA/EE(S)/PL/145/92-93 DT 28.02.1993
2668
2669
90
475/B
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
40' X 60'
K.KODANDAPANI
BDA/EE(S)/PL/146/92-93 DT 02.03.1993
KENCHENAHALLI H.B.C.S.
82' X 40'
M.T.PUTTASWAMY
BDA/EE(S)/PL/147/92-93 DT 10.03.1993
2670
976
KENCHENAHALLI H.B.C.S.
18.29 X 14.63
H.R.NAGARATHNAMMA
BDA/EE(S)/PL/149/92-93 DT 11.03.1993
2671
199
KENCHENAHALLI H.B.C.S.
41' X 55'
G.T.KRISHNAMURTHY
BDA/EE(S)/PL/150/92-93 DT 12.03.1993
2672
693
N.S.PALYA MICO H.B.C.S.
18.29 X 13.72
M.R.RANGANATHA
BDA/EE(S)/PL/151/92-93 DT 22.03.1993
2673
287
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
45' X 53'
M.SAYIKUMAR
BDA/EE(S)/PL/152/92-93 DT 29.03.1993
2674
75
SRI.S.RAM RAO LAYOUT, B.S.K. III STAGE
40' X 60'
H.S.GANESH
BDA/EE(S)/PL/153/92-93 DT 31.03.1993
2675
703
BIKASIPURA SPACE EMPLOYEES HBCS
40' X 60'
H.A.CHANDRA SHEKHARA
BDA/EE(S)/PL/1/92-93 DT 01.04.1992
2676
726
KENCHENAHALLI H.B.C.S.
43' X 50'
N.SHANKARAPPA
BDA/EE(S)/PL/2/92-93 DT 03.04.1992
2677
20
N.S.PALYA MICO H.B.C.S.
40' X 60'
NIRMALA NAGARAJ
BDA/EE(S)/PL/4/92-93 DT 03.04.1992
2678
643
N.S.PALYA MICO H.B.C.S.
40' X 60'
KAMALA RAMAN
BDA/EE(S)/PL/5/92-93 DT 10.04.1992
2679
72
POORNA PRAJAN H.B.C.S., KATHARIGUPPA
40' X 60'
M.NAGARAJA SHARMA
BDA/EE(S)/PL/6/92-93 DT 10.04.1992
2680
799
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
40' X 60'
ASHOK
BDA/EE(S)/PL/7/92-93 DT 10.04.1992
2681
954
N.S.PALYA MICO H.B.C.S.
38' X 62'
R.CHANDRA MOHAN
BDA/EE(S)/PL/8/92-93 DT 21.04.1992
2682
36
POORNA PRAJAN H.B.C.S., KATHARIGUPPA
40' X 60'
K.N.RAJALAKSHMI
BDA/EE(S)/PL/9/92-93 DT 21.04.1992
2683
140
VISWABHARATHI H.B.C.S., GIRINAGAR
40' X 60'
L.G.JOSHI
BDA/EE(S)/PL/10/92-93 DT 21.04.1992
2684
220
B.O.O. H.B.C.S. MADIWALA
40' X 65'
P.PADMAKAR
BDA/EE(S)/PL/11/92-93 DT 21.04.1992
2685
453
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
40' X 60'
K.V.RAGHUNATHA SHARMA
BDA/EE(S)/PL/12/92-93 DT 24.04.1992
2686
4
KENCHENAHALLI H.B.C.S.
53' X 41'
D.SHANKAR KUMAR
BDA/EE(S)/PL/12/92-93 DT 21.04.1992
2687
301
BIKASIPURA SPACE EMPLOYEES HBCS
40' X 60'
H.G.SATHYANARAYANA
BDA/EE(S)/PL/13/92-93 DT 29.04.1992
2688
279
KENCHENAHALLI H.B.C.S.
58' X 40'
P.SUSHEELA SHARMA
BDA/EE(S)/PL/14/92-93 DT 29.04.1992
2689
29
NIMHAN'S H.B.C.S. TAVAREKERE
40' X 58'
J.PAPANNA
BDA/EE(S)/PL/15/92-93 DT 29.04.1992
2690
521
BIKASIPURA SPACE EMPLOYEES HBCS
40' X 60'
B.K.PADMANABHA
BDA/EE(S)/PL/16/92-93 DT 29.04.1992
2691
337
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
57' X 50'
B.N.SRINIVASA RAO
BDA/EE(S)/PL/17/92-93 DT 29.04.1992
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
40' X 60'
M.S.MANI
BDA/EE(S)/PL/18/92-93 DT 06.05.1992
N.S.PALYA MICO H.B.C.S.
64' X 60'
M.C.RAMAKRISHNA
BDA/EE(S)/PL/19/92-93 DT 07.05.1992
2692
470/A
2693
57
2694
383
JAYANAGAR H.B.C.S., KADIRENAHALLI
40' X 60'
KRISHNA MURTHY
BDA/EE(S)/PL/20/92-93 DT 11.05.1992
2695
580
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
40' X 60'
S.V.GOPALAPPA
BDA/EE(S)/PL/21/92-93 DT 13.05.1992
2696
1105
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
40' X 60'
T.BEERANNA
BDA/EE(S)/PL/22/92-93 DT 13.05.1992
2697
255
KSRTC H.B.C.S. SARAKKI
40' X 60'
N.SRINIVASA RAO
BDA/EE(S)/PL/23/92-93 DT 13.05.1992
2698
698
KEMPEGOWDA H.B.C.S., KATHRIGUPPA
40' X 60'
BDA/EE(S)/PL/24/92-93 DT 15.05.1992
2699
220
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
40' X 60'
MEENAKSHI & T.S.DATISHBABU &
T.S.SRINIVASA &
T.S.NARAYANAKUMAR
B.S.K.ASWATHANARAYANA RAO
2700
278
KENCHENAHALLI H.B.C.S.
60' X 42'
S.LALITHA
BDA/EE(S)/PL/26/92-93 DT 21.05.1992
2701
834
BIKASIPURA SPACE EMPLOYEES HBCS
60' X 54'
M.K.RAVINDRAN
BDA/EE(S)/PL/27/92-93 DT 21.05.1992
2702
579
BIKASIPURA SPACE EMPLOYEES HBCS
59' X 39'
T.Y.MANAGOLI
BDA/EE(S)/PL/28/92-93 DT 21.05.1992
2703
502
N.S.PALYA MICO H.B.C.S.
46' X 60'
K.M.PRASANNA KUMAR
BDA/EE(S)/PL/29/92-93 DT 23.05.1992
2704
642
N.S.PALYA MICO H.B.C.S.
40' X 60'
M.VENKATESH
BDA/EE(S)/PL/30/92-93 DT 23.05.1992
2705
102
ITI H.B.C.S., KATHARIGUPPA
40' X 60'
B.A.DORAISWAMY
BDA/EE(S)/PL/31/92-93 DT 23.05.1992
2706
10
BIKASIPURA SPACE EMPLOYEES HBCS
40' X 60'
M.MANJUNATHA NAYAK
BDA/EE(S)/PL/32/92-93 DT 23.05.1992
2707
527
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
39' X 60'
A.S.JAGANNATHA RAO
BDA/EE(S)/PL/33/92-93 DT 11.06.1992
2708
180
KENCHENAHALLI H.B.C.S.
40' X 60'
H.R.GOPALA
BDA/EE(S)/PL/33/92-93 DT 08.06.1992
2709
253
BIKASIPURA SPACE EMPLOYEES HBCS
40' X 60'
K.BALAKRISHNAN
BDA/EE(S)/PL/34/92-93 DT 11.06.1992
2710
644
N.S.PALYA MICO H.B.C.S.
40' X 60'
P.RAMADOIAN
BDA/EE(S)/PL/35/92-93 DT 11.06.1992
2711
87
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
38' X 59'
G.MARUTHI
BDA/EE(S)/PL/36/92-93 DT 11.06.1992
BDA/EE(S)/PL/25/92-93 DT 20.05.1992
2712
594
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
40' X 60'
N.B.GOVINDA
BDA/EE(S)/PL/37/92-93 DT 11.06.1992
2713
29
N.S.PALYA MICO H.B.C.S.
60' X 40'
LAJWANTHI L ASRANI
BDA/EE(S)/PL/38/92-93 DT 17.06.1992
2714
378
JAYANAGARA H.B.C.S., PADMANABHA NAGAR
35' X 70'
S.R.SRINIVASA MURTHY
BDA/EE(S)/PL/39/92-93 DT 19.06.1992
2715
213
B.O.O. H.B.C.S. MADIWALA
40' X 65'
USHA K RAO
BDA/EE(S)/PL/40/92-93 DT 20.06.1992
2716
264
KENCHENAHALLI H.B.C.S.
46' X 58'
PADMA NARASIMHA RAO
BDA/EE(S)/PL/41/92-93 DT 23.06.1992
2717
188
KENCHENAHALLI H.B.C.S.
40' X 60'
L.B.KAMATH
BDA/EE(S)/PL/42/92-93 DT 26.06.1992
2718
242
KENCHENAHALLI H.B.C.S.
40' X 60'
SHYAMALA RAI
BDA/EE(S)/PL/43/92-93 DT 26.06.1992
2719
882
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
40' X 60'
B.DWARAKA NATH
BDA/EE(S)/PL/44/92-93 DT 26.06.1992
2720
56
SRI.ANJANEYA H.B.C.S., ITTUMADU, B.S.K. III STAGE
36' X 64'
H.L.SUBRAMANYA
BDA/EE(S)/PL/45/92-93 DT 08.07.1992
2721
39
BIKASIPURA SPACE EMPLOYEES HBCS
18.29 X 18.29
C.K.ABRAHAM
BDA/EE(S)/PL/45/92-93 DT 26.06.1992
2722
762
KENCHENAHALLI H.B.C.S.
39' X 60'
MIKREYI SATHYADEV
BDA/EE(S)/PL/46/92-93 DT 26.06.1992
2723
230
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
39' X 60'
K.VENKATA SWAMY
BDA/EE(S)/PL/47/92-93 DT 26.06.1992
2724
384
VISWABHARATHI H.B.C.S., GIRINAGAR
40' X 60'
T.S.VINOBA
BDA/EE(S)/PL/48/92-93 DT 30.06.1992
KENCHENAHALLI H.B.C.S.
50' X 64'
B.K.SUMA
BDA/EE(S)/PL/49/92-93 DT 04.07.1992
SARAKKI IV PHASE
40' X 60'
V.S.HEGDE
BDA/EE(S)/PL/4/92-93 DT 17.06.1992
B.T.M. LAYOUT II STAGE, II PHASE
18.74 X 9.44
S.N.RAMAKRISHNA & R.PUSHPA
BDA/EE(S)/PL/10/92-93 DT 26.08.1992
SARAKKI V PHASE
40' X 60'
V.S.RAJAGOPAL
BDA/EE(S)/PL/1/92-93 DT 11.06.1992
2725
100/D
2726
22
2727
1179
2728
298
2729
15
B.T.M. LAYOUT BANNERAGHATTA ROAD
40' X 60'
V.N.GOVINDARAJAN
BDA/EE(S)/PL/5/92-93 DT 29.04.1992
2730
13
N.S.PALYA MICO H.B.C.S.
40' X 60'
M.S.SURESH
BDA/EE(S)/PL/2/92-93 DT 21.04.1992
B.T.M. DOLLAR SCHEME MADIWALA
47' X 40'
D.R.KRISHNAN
BDA/EE(S)/PL/1/92-93 DT 021.04.1992
2731
86/D
2732
24
SARAKKI VI PHASE
40' X 60'
A.V.AMARNATH
BDA/EE(S)/PL/1/92-93 DT 21.04.1992
2733
59
N.S.PALYA MICO H.B.C.S.
40' X 60'
P.VIJAYARAGHAVAN
BDA/EE(S)/PL/8/92-93 DT 28.07.1992
2734
2735
58
17.68 X 12.19
JAREEN BEGAM
BDA/EE(S)/PL/25/92-93 DT 29.03.1993
B.T.M. II STAGE, I PHASE, MADIWALA SY NOS
40' X 60'
BDA/EE(S)/PL/24/92-93 DT 19.03.1993
2736
97
SARAKKI II PHASE
40' X 61'
B.M.KANTHA RAJU & SELINA
KANTHA RAJU
M.MADHURAO
2737
587
SARAKKI II PHASE
40' X 60'
S.NAGAMANI
BDA/EE(S)/PL/7/92-93 DT 10.07.1992
2738
135
SARAKKI II PHASE
43' X 71'
M.C.NAGARATHNA
BDA/EE(S)/PL/8/92-93 DT 10.07.1992
2739
1587
SARAKKI II PHASE
43' X 60'
P.SHOBHA SHENAI
BDA/EE(S)/PL/9/92-93 DT 28.07.1992
2740
452
SARAKKI II PHASE
45' X 64'
ARUNA N REDDY
BDA/EE(S)/PL/5/92-93 DT 11.06.1992
SARAKKI II PHASE
37' X 103'
H.S.CHANDRIKA
BDA/EE(S)/PL/17/92-93 DT 09.11.1992
SARAKKI II PHASE
40' X 60'
N.KRISHNA MURTHY
BDA/EE(S)/PL/18/92-93 DT 17.11.1992
SARAKKI II PHASE
35' X 60'
M.NAGESH
BDA/EE(S)/PL/13/92-93 DT 26.08.1992
2741
2742
2743
38/B
B.T.M. II STAGE, I PHASE, MADIWALA SY NOS
1635/A
1588
433/A
BDA/EE(S)/PL/6/92-93 DT 08.07.1992
2744
1206
SARAKKI II PHASE
40' X 60'
G.V.SHESHAGIRI
BDA/EE(S)/PL/14/92-93 DT 09.10.1992
2745
1090
SARAKKI II PHASE
40' X 74'
R.NEELAKANTAN
BDA/EE(S)/PL/3/92-93 DT 29.04.1992
2746
1995
SARAKKI II PHASE
45' X 65'
S.NAGARAJ
BDA/EE(S)/PL/15/92-93 DT 13.10.1992
2747
1228
B.T.M. II STAGE, I PHASE
40' X 60'
L.MUNISWAMY NAIDU
BDA/EE(S)/PL/7/92-93 DT 18.05.1992
2748
47
B.T.M. II STAGE
40' X 60'
S.A.SRINIVASA MURTHY
BDA/EE(S)/PL/6/92-93 DT 06.05.1992
2749
81
B.T.M. I STAGE, I PHASE, DOLLAR SCHEME
73' X 29'
V.CHANDRA SHEKHAR
BDA/EE(S)/PL/4/92-93 DT 24.04.1992
2750
12
SARAKKI IV PHASE
52' X 61'
KASTURI DESIAPPA
BDA/EE(S)/PL/2/92-93 DT 07.04.1992
2751
3
SARAKKI IV PHASE
18.30 X 12.20
V.JAYASHREE
BDA/EE(S)/PL/1/92-93 DT 01.04.1992
2752
2
SARAKKI IV PHASE
40' X 60'
ISHARATH UNNIS
BDA/EE(S)/PL/3/92-93 DT 23.05.1992
2753
732
JAYANAGAR H.B.C.S., KADIRENAHALLI
40' X 51'
M.P.PRASANNA DEVI
BDA/EE(S)/PL/3/92-93 DT 03.04.1992
2754
129
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
40' X 60'
D.V.SRINIVASAN
BDA/EE(S)/PL/148/92-93 DT 10.03.1993
Cataloguing and indexing of records as envisaged under section 4(1) (a) of the Right to information Act 2005
LIST OF PLAN SANCTIONED FILES DURING THE YEAR 93-94 IN EE(S) DIVISION
SL
NO.
2755
SITE
NO.
NAME OF THE LAYOUT
DIMENSION
APPLICANT NAME
SANCTION EE NO/DATE
60
B.O.O., H.B.C.S., TAVAREKERE
VICE CHAIRMAN
BDA/EE(S)/PL/29/93-94 DT 21.06.1993
2756
81
B.T.M. DALAR CITY MADIWALA
(42'+49')/2 X
(54'+60')/2
67' X 40'
V.CHANDRASHEKAR
BDA/EE(S)/PL/8/93-94 DT 22.06.1993
2757
73
SRI ANJANEYA SWAMY H.B.C.S., ETTMADU SY NOS
62' X 40'
B.T.MOHAN KRISHNA
BDA/EE(S)/PL/30/93-94 DT 21.06.1993
2758
1557
B.T.M. II STAGE I PHASE
35' X 66'
R.NARAYANA
BDA/EE(S)/PL/07/93-94 DT 18.06.1993
2759
26
B.S.K.III STAGE, KATHRUGUPPE
60' X 40'
T.JAGADEESHAN
BDA/EE(S)/PL/11/93-94 DT 14.05.1993
2760
1
B.T.M. II STAGE I PHASE
35' X 60'
G.S.MANMATHA & K.M.IYANGAR
BDA/EE(S)/PL/9/93-94 DT 26.06.1993
2761
1026
B.S.K. III STAGE, III PHASE, III BLOCK
43' X 62'
K.MANJUNATHIAH
BDA/EE(S)/PL/30/93-94 DT 07.10.1993
2762
489
B.S.K. III STAGE, III PHASE, II BLOCK
60' X 40'
RAMAKRISHNA IYENGAR
BDA/EE(S)/PL/29/93-94 DT 07.10.1993
2763
1005
B.S.K. III STAGE, III PHASE, III BLOCK
40' X 60'
K.T.VIJAYAKUMAR
BDA/EE(S)/PL/28/93-94 DT 23.09.1993
2764
314
B.S.K. III STAGE, IV PHASE, VII BLOCK
40' X 60'
N.UMAMANI
BDA/EE(S)/PL/27/93-94 DT 14.09.1993
2765
1317
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
51' X 42'
K.S.SHANKARAMMA
BDA/EE(S)/PL/132/93-94 DT 01.02.1994
2766
766
B.S.K. III STAGE, II PHASE, VII BLOCK
40' X 60'
S.R.NAGARAJ
BDA/EE(S)/PL/26/93-94 DT 13.09.1993
2767
367
B.S.K. III STAGE, II PHASE, VI BLOCK
40' X 59'
C.S.M.SRINIVASAN
BDA/EE(S)/PL/25/93-94 DT 30.08.1992
2768
236
B.S.K. III STAGE, III PHASE, II BLOCK
40' X 60'
V.SRINIVASAN & SHARADHA
BDA/EE(S)/PL/24/93-94 DT 30.08.1993
2769
364
B.S.K. III STAGE, II PHASE, VI BLOCK
18.30 X 12.20
VANAJAKSHI
BDA/EE(S)/PL/23/93-94 DT 30.08.1993
2770
308
55' X 42'
N.CHANDRASHEKAR
BDA/EE(S)/PL/22/93-94 DT 19.08.1993
2771
603
B.S.K. III STAGE, CHANAMANAKERE ACHUKATU
LAYOUT
B.S.K. III STAGE, KATHARIGUPPE SY NOS
40' X 60'
K.MANJUNATH
BDA/EE(S)/PL/21/93-94 DT 19.08.1993
2772
53
B.S.K. III STAGE, III PHASE, I BLOCK
61' X 40'
C.K.RAMAMURTHY
BDA/EE(S)/PL/20/93-94 DT 19.08.1993
2773
562
B.S.K. III STAGE, II PHASE, VI BLOCK
40' X 59'
K.ANANTHA KANTHRI
BDA/EE(S)/PL/19/93-94 DT 19.08.1993
2774
188
B.S.K. III STAGE, IV PHASE, VII BLOCK
40' X 60'
R.INDUMATI
BDA/EE(S)/PL/18/93-94 DT 19.08.1993
2775
202
B.S.K. III STAGE, III PHASE, VI BLOCK
39' X 62'
M.G.KRISHNAMURTHY
BDA/EE(S)/PL/17/93-94 DT 30.07.1993
2776
378
B.S.K. III STAGE, II PHASE, VI BLOCK
40' X 59'
DR.M.PREMAYOGI
BDA/EE(S)/PL/16/93-94 DT 30.07.1993
2777
183
B.S.K. III STAGE, IV PHASE, VII BLOCK
40' X 60'
C.SHANKARA KRISHNA
BDA/EE(S)/PL/15/93-94 DT 24.07.1993
2778
111
B.S.K. III STAGE, III PHASE, V BLOCK
60' X 39'
G.PRAKASH
BDA/EE(S)/PL/14/93-94 DT 12.07.1993
B.S.K. III STAGE, NAGENDRA BLOCK
45' X 50'
VENKATEGOWDA
BDA/EE(S)/PL/13/93-94 DT 07.07.1993
B.S.K. III STAGE, III PHASE, V BLOCK
39' X 50'
B.S.NAGARAJ
BDA/EE(S)/PL/1/93-94 DT 01.04.1993
2779
44 & 45
2780
34
2781
313
B.S.K. III STAGE, IV PHASE, VII BLOCK
40' X 60'
K.KASI
BDA/EE(S)/PL/10/93-94 DT 05.05.1993
2782
406
B.S.K. III STAGE, III PHASE, II BLOCK
18.30 X 12.40
M.N.JAYARAM
BDA/EE(S)/PL/11/93-94 DT 25.05.1993
2783
389
B.S.K. III STAGE, II PHASE, VI BLOCK
60' X 40'
G.N.PRASHANTH
BDA/EE(S)/PL/12/93-94 DT 24.06.1993
2784
1678
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
60' X 44'
K.KRISHNA MURTHY
BDA/EE(S)/PL/131/93-94 DT 27.01.1994
2785
536
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
60' X 40'
K.MALLIKARJUNA SHETTY
BDA/EE(S)/PL/130/93-94 DT 20.01.1994
KENCHENAHALLI H.B.C.S.
51' X 55'
SHARADHA KRISHNAN
BDA/EE(S)/PL/129/93-94 DT 20.01.1994
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
40' X 60'
K.N.RAMAMURTHY
BDA/EE(S)/PL/128/93-94 DT 20.01.1994
SRI ANJANEYA SWAMY H.B.C.S., ETTMADU SY NOS
36' X 60'
H.VASANTHA KUMAR
BDA/EE(S)/PL/126/93-94 DT 19.01.1994
GIRINAGAR H.B.C.S.
60' X 40'
SANJEEV RAO
BDA/EE(S)/PL/141/93-94 DT 15.02.1994
2786
96/A
2787
894
2788
35
2789
125/D
2790
40
SRI ANJANEYA SWAMY H.B.C.S., ETTMADU SY NOS
36' X 61'
S.HIRIYANNAIAH
BDA/EE(S)/PL/142/93-94 DT 17.02.1994
2791
98
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
40' X 60'
PUTTASWAMYGOWDA
BDA/EE(S)/PL/120/93-94 DT 17.01.1994
2792
321
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
60' X 50'
K.NARAHARI
BDA/EE(S)/PL/121/93-94 DT 17.01.1994
2793
173
KENCHENAHALLI H.B.C.S.
57' X 38'
JAMUNA VALLAL
BDA/EE(S)/PL/122/93-94 DT 17.01.1994
2794
771
N.S.PALYA MICO H.B.C.S.
40' X 60'
SAVITRI CHELLAPPA
BDA/EE(S)/PL/123/93-94 DT 17.01.1994
2795
897
KENCHENAHALLI H.B.C.S.
48' X 45'
Y.N.NRASIMHA MURTHY
BDA/EE(S)/PL/124/93-94 DT 17.01.1994
2796
402
KENCHENAHALLI H.B.C.S.
50' X 52'
N.KRISHNA MURTHY
BDA/EE(S)/PL/125/93-94 DT 19.01.1994
2797
625
BIKASIPURA SPACE EMPLOYEES HBCS
40' X 60'
C.V.RAJARAMAN
BDA/EE(S)/PL/136/93-94 DT 08.02.1994
2798
758
KENCHENAHALLI H.B.C.S.
62' X 39'
BDA/EE(S)/PL/137/93-94 DT 08.02.1994
2799
517
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
60' X 41'
SAMPATH S IYANGAR & JYOTIRMAYI
SAMPATH S IYANGAR
R.P.PUSHPARAJ
BDA/EE(S)/PL/138/93-94 DT 11.02.1994
2800
139
GIRINAGAR H.B.C.S.
60' X 40'
C.V.JAYALAKSHMI
BDA/EE(S)/PL/139/93-94 DT 11.02.1994
2801
923
N.S.PALYA MICO H.B.C.S.
60' X 40'
C.S.GOPALAKRISHNA
BDA/EE(S)/PL/140/93-94 DT 11.02.1994
2802
13
45' X 45'
C.R.PATIL
BDA/EE(S)/PL/133/93-94 DT 03.02.1994
2803
1200
B.S.K. III STAGE, RADHAKRISHNA H.B.C.S.,
KADIRENAHALLI
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
40' X 60'
B.K.SHANTHA
BDA/EE(S)/PL/134/93-94 DT 03.02.1994
2804
56
SRI ANJANEYA SWAMY H.B.C.S., ETTMADU SY NOS
36' X 64'
H.L.SUBRAMANYA
BDA/EE(S)/PL/135/93-94 DT 04.02.1994
2805
1009
B.S.K. III STAGE, III PHASE, III BLOCK
60' X 43'
K.M.SEETALAKSHMI
BDA/EE(S)/PL/38/93-94 DT 19.10.1993
2806
55
B.S.K. III STAGE, III PHASE, I BLOCK
59' X 43'
RUKMINIYAMMA
BDA/EE(S)/PL/39/93-94 DT 27.10.1993
2807
540
B.S.K. III STAGE, II PHASE, VI BLOCK
63' X 45'
PREMA R RAO
BDA/EE(S)/PL/33/93-94 DT 07.10.1993
2808
301
B.S.K. III STAGE, II PHASE, VI BLOCK
40' X 50'
M.R.KALAVATI
BDA/EE(S)/PL/34/93-94 DT 07.10.1993
2809
209
B.S.K. III STAGE, III PHASE, II BLOCK
79' X 50'
V.M.KULAKARNI
BDA/EE(S)/PL/35/93-94 DT 12.10.1993
2810
296
18.28 X 12.18
G.S.GAY
BDA/EE(S)/PL/36/93-94 DT 18.10.1993
2811
318
B.S.K. III STAGE, CHANAMANAKERE ACHUKATU
LAYOUT
B.S.K. III STAGE, III PHASE, VII BLOCK
40' X 60'
G.S.BHASKARACHAR
BDA/EE(S)/PL/37/93-94 DT 18.10.1993
2812
631
B.S.K. III STAGE, II PHASE, VII BLOCK
40' X 59'
K.NARAYANAN
BDA/EE(S)/PL/32/93-94 DT 07.10.1993
2813
233
B.S.K. III STAGE, II PHASE, VI BLOCK
35' X 60'
T.V.SOORYANARAYANA
BDA/EE(S)/PL/31/93-94 DT 07.10.1993
2814
148
B.S.K. III STAGE, II PHASE, VI BLOCK
40' X 39'
KHURSHID BEGAM
BDA/EE(S)/PL/41/93-94 DT 28.10.1993
2815
394
B.S.K. III STAGE, II PHASE, VI BLOCK
60' X 40'
D.RAJASHREE
BDA/EE(S)/PL/42/93-94 DT 28.10.1993
2816
715
B.S.K. III STAGE, II PHASE, VII BLOCK
40' X 60'
V.SRINIVASACHAR
BDA/EE(S)/PL/43/93-94 DT 29.10.1993
2817
1351
SRINIVASANAGAR II STAGE, B.S.K. III STAGE
40' X 60'
G.ANNAYYA
BDA/EE(S)/PL/44/93-94 DT 02.11.1993
2818
323
B.S.K. III STAGE, III PHASE, II BLOCK
60' X 40'
B.M.HALLIDASAPPA
BDA/EE(S)/PL/45/93-94 DT 08.11.1993
2819
752
B.S.K. III STAGE, II PHASE, VII BLOCK
18.30 X 12.79
BDA/EE(S)/PL/46/93-94 DT 08.11.1993
B.S.K. III STAGE, III PHASE, II BLOCK
60' X 40'
S.RAMACHANDRA ACHARYA & SRI
GOPALAKRISHNA
DR.R.SRINIVASAN
2820
406/A
BDA/EE(S)/PL/47/93-94 DT 03.12.1993
2821
155
B.S.K. III STAGE, III PHASE, IV BLOCK
45' X 37'
RAJKUMAR
BDA/EE(S)/PL/48/93-94 DT 10.12.1993
2822
23
B.S.K. III STAGE, III PHASE, VI BLOCK
48' X 80'
G.SEETARAMAIAH
BDA/EE(S)/PL/49/93-94 DT 10.12.1993
2823
176
GIRINAGAR H.B.C.S.
40' X 58'
N.MALLIKARJUNA
BDA/EE(S)/PL/115/93-94 DT 05.01.1994
2824
1702
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
40' X 59'
B.S.SURESH
BDA/EE(S)/PL/114/93-94 DT 05.01.1994
2825
492
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
60' X 40'
C.SHIVANNA
BDA/EE(S)/PL/113/93-94 DT 05.01.1994
2826
601
B.S.K. III STAGE, KATHARIGUPPE SY NOS
40' X 60'
DR.ASHA BENAKAPPA
BDA/EE(S)/PL/50/93-94 DT 16.12.1993
2827
444
B.S.K. III STAGE, II PHASE, VI BLOCK
40' X 60'
NIRMALAVARMA & SUNILVARMA
BDA/EE(S)/PL/51/93-94 DT 20.12.1993
2828
43
B.S.K. III STAGE, III PHASE, I BLOCK
56' X 61'
S.PUBBA AARODA
BDA/EE(S)/PL/52/93-94 DT 20.12.1993
2829
198
B.S.K. III STAGE, III PHASE, I BLOCK
79' X 28'
S.LEPAKSHA
BDA/EE(S)/PL/53/93-94 DT 20.12.1993
2830
110
B.S.K. III STAGE, II PHASE, IV BLOCK
40' X 59'
K.A.RAVEENDRANATHA
BDA/EE(S)/PL/54/93-94 DT 20.12.1993
2831
155
B.S.K. III STAGE, III PHASE, I BLOCK
40' X 60'
M.N.KAMBE GOWDA
BDA/EE(S)/PL/64/93-94 DT 17.01.1994
2832
20
B.S.K. III STAGE, III PHASE, I BLOCK
54' X 40'
A.V.SRIRAM
BDA/EE(S)/PL/65/93-94 DT 01.02.1994
2833
309
B.S.K. III STAGE, II PHASE, VI BLOCK
40' X 57'
A.M.RAVIKUMAR
BDA/EE(S)/PL/66/93-94 DT 07.02.1994
2834
151
B.S.K. III STAGE, III PHASE, I BLOCK
40' X 60'
H.V.SATYANARAYANA RAO
BDA/EE(S)/PL/67/93-94 DT 07.02.1994
2835
63
B.S.K. III STAGE, ALAHALLI LAYOUT
40' X 60'
G.S.VEERABHADRAPPA
BDA/EE(S)/PL/68/93-94 DT 11.02.1994
2836
307
52' X 42'
D.S.RAJASHEKARA
BDA/EE(S)/PL/69/93-94 DT 15.02.1994
2837
19
B.S.K. III STAGE, CHANAMANAKERE ACHUKATU
LAYOUT
B.S.K. III STAGE, III PHASE, V BLOCK
40' X 60'
M.R.SHANTAPPA
BDA/EE(S)/PL/55/93-94 DT 23.12.1993
2838
185
B.S.K. III STAGE, III PHASE, VII BLOCK
12.19 X 18.29
N.N.SWAMY
BDA/EE(S)/PL/56/93-94 DT 04.01.1994
2839
391
B.S.K. III STAGE, II PHASE, VI BLOCK
43' X 61'
M.S.SUNDARAJ & SMT J.GAYATRI
BDA/EE(S)/PL/57/93-94 DT 04.01.1994
2840
136
B.S.K. III STAGE, II PHASE, IV BLOCK
60' X 40'
S.NARASIMHAN
BDA/EE(S)/PL/58/93-94 DT 05.01.1994
2841
117
B.S.K. III STAGE, III PHASE, I BLOCK
60' X 40'
KRISHNAMMA
BDA/EE(S)/PL/59/93-94 DT 05.01.1994
2842
225
B.S.K. III STAGE, III PHASE, II BLOCK
40' X 60'
D.SARASWATHI BAI
BDA/EE(S)/PL/60/93-94 DT 05.01.1994
2843
1146
HOSAKERE HALLI B.S.K. III STAGE
39' X 62'
K.SHASHIREKHA
BDA/EE(S)/PL/61/93-94 DT 17.01.1994
2844
683
B.S.K. III STAGE, III PHASE, III BLOCK
63' X 60'
ANITHAJAGADEESH
BDA/EE(S)/PL/62/93-94 DT 17.01.1994
2845
323
42' X 55'
A.SATHYANARAYANA
BDA/EE(S)/PL/63/93-94 DT 17.01.1994
2846
434
B.S.K. III STAGE, CHANAMANAKERE ACHUKATU
LAYOUT
B.S.K. III STAGE, II PHASE, VI BLOCK
60' X 40'
G.S.PRASAD
BDA/EE(S)/PL/40/93-94 DT 27.10.1993
2847
775
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
55' X 60'
K.V.RAMAKRISHNA RAO
BDA/EE(S)/PL/143/93-94 DT 19.02.1994
KENCHENAHALLI H.B.C.S.
40' X 50'
A.SHESHADRI
BDA/EE(S)/PL/144/93-94 DT 24.02.1994
B.S.K. III STAGE, KATHARIGUPPE SY NOS
57' X 39'
C.NARAYANAMMA
BDA/EE(S)/PL/71/93-94 DT 18.03.1994
B.T.M. I STAGE, I PHASE, TAVAREKERE SY NOS
18.29 X 12.19
M.L.MEENAKUMARI
BDA/EE(S)/PL/17/93-94 DT 07.10.1993
SRI.RADHAKRISHNA H.B.C.S., KADIRENAHALLI
67' X 40'
GAYITRIDEVI ESWARI PRASAD
BDA/EE(S)/PL/81/93-94 DT 18.10.1993
GIRINAGAR H.B.C.S.
40' X 60'
DR.RAGHUNATHA SHARMA
BDA/EE(S)/PL/80/93-94 DT 11.10.1993
N.S.PALYA MICO H.B.C.S.
40' X 60'
BDA/EE(S)/PL/145/93-94 DT 01.03.1994
BDA/EE(S)/PL/62/93-94 DT 30.08.1993
2848
442/C
2849
188
2850
1166
2851
36
2852
141
2853
2854
106
B.O.O., H.B.C.S., TAVAREKERE
40' X 60'
B.K.RAMAPRAKASH & HARINI
RAMAPRAKASH
VICE CHAIRMAN
2855
865
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
40' X 58'
T.S.SUDARSHAN
BDA/EE(S)/PL/63/93-94 DT 10.09.1993
GIRINAGAR H.B.C.S.
40' X 60'
BDA/EE(S)/PL/64/93-94 DT 10.09.1993
B.S.K. III STAGE, KATHARIGUPPE SY NOS
40' X 60'
NAGAMANIRAMESH & S.SHANKAR
& M.N.SUBRAMANYA & S.SRIKANTA
SWAMY
K.S.SATYANATH
2856
805/A
1/E
2857
72
2858
143
KENCHENAHALLI H.B.C.S.
60' X 37'
USHARAMESH
BDA/EE(S)/PL/66/93-94 DT 13.09.1993
2859
472
B.S.K. III STAGE, II PHASE, VI BLOCK
40' X 60'
CHIKAVEERAPPA
BDA/EE(S)/PL/70/93-94 DT 16.03.1994
KENCHENAHALLI H.B.C.S.
62' X 50'
S.K.NAGENDRAN
BDA/EE(S)/PL/119/93-94 DT 05.01.1994
KENCHENAHALLI H.B.C.S.
74' X 40'
C.SRIMATHI
BDA/EE(S)/PL/118/93-94 DT 05.01.1994
2860
2861
97/C
866
BDA/EE(S)/PL/65/93-94 DT 10.09.1993
2862
11
B.S.K. III STAGE, KATHARIGUPPE SY NOS
40' X 60'
M.NARASIMHA MURTHY
BDA/EE(S)/PL/117/93-94 DT 05.01.1994
2863
525
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
39' X 60'
N.RAGHAVENDRA
BDA/EE(S)/PL/116/93-94 DT 05.01.1994
KENCHENAHALLI H.B.C.S.
59' X 48'
K.JAYAMMA
BDA/EE(S)/PL/82/93-94 DT 18.10.1993
2864
479/A
2865
135
B.O.O., H.B.C.S., TAVAREKERE
56' X 60'
VICE CHAIRMAN
BDA/EE(S)/PL/83/93-94 DT 19.10.1993
2866
156
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
40' X 60'
G.BASAVARAJU
BDA/EE(S)/PL/84/93-94 DT 21.10.1993
2867
783
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
40' X 60'
K.BASAVARAJU
BDA/EE(S)/PL/45/93-94 DT 17.07.1993
2868
263
KENCHENAHALLI H.B.C.S.
40' X 60'
H.L.SRIPAD PRAKASH
BDA/EE(S)/PL/26/93-94 DT 14.06.1993
2869
970
KENCHENAHALLI H.B.C.S.
40' X 60'
SANGAMESH B KALYANI
BDA/EE(S)/PL/50/93-94 DT 21.07.1993
2870
5
GIRINAGAR H.B.C.S.
57' X 64'
L.A.BALAJI BABU
BDA/EE(S)/PL/60/93-94 DT 24.08.1993
2871
6
SRI ANJANEYA SWAMY H.B.C.S., ETTMADU SY NOS
60' X 43'
BORAYYA
BDA/EE(S)/PL/61/93-94 DT 24.08.1993
2872
1275
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
40' X 60'
M.M.JOYAPPA
BDA/EE(S)/PL/55/93-94 DT 19.08.1993
2873
723
BIKASIPURA SPACE EMPLOYEES HBCS
40' X 60'
BETTASWAMY
BDA/EE(S)/PL/93/93-94 DT 08.11.1993
2874
879
N.S.PALYA MICO H.B.C.S.
63' X 40'
BDA/EE(S)/PL/56/93-94 DT 09.08.1993
2875
266
KENCHENAHALLI H.B.C.S.
59' X 45'
P.S.JAYAPRAKASH &
SMT.P.S.JYOTHI
C.M.NARAYANA SHASHTRI
2876
835
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
40' X 60'
N.R.UMESH
BDA/EE(S)/PL/58/93-94 DT 19.08.1993
2877
223
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
40' X 60'
S.MANJUNATH
BDA/EE(S)/PL/59/93-94 DT 19.08.1993
2878
154
GIRINAGAR H.B.C.S.
40' X 60'
T.S.KRISHNA RAO
BDA/EE(S)/PL/151/93-94 DT 07.03.1994
2879
34
KAVERI H.B.C.S., TAVAREKERE SY NOS
40' X 60'
SWARNALATHA RABART
BDA/EE(S)/PL/150/93-94 DT 04.03.1994
2880
118
JARAGANAHALLI H.B.C.S., KADIRENAHALLI
40' X 50'
SHAMEEMYUSUPH
BDA/EE(S)/PL/149/93-94 DT 02.03.1994
2881
366
KENCHENAHALLI H.B.C.S.
57' X 36'
SUSHILA
BDA/EE(S)/PL/148/93-94 DT 02.03.1994
2882
504
KENCHENAHALLI H.B.C.S.
40' X 60'
N.PUSHPAMALA
BDA/EE(S)/PL/147/93-94 DT 02.03.1994
2883
536
BIKASIPURA SPACE EMPLOYEES HBCS
40' X 60'
A.PREMAVATHI
BDA/EE(S)/PL/146/93-94 DT 01.03.1994
BDA/EE(S)/PL/57/93-94 DT 19.08.1993
2884
168
ARKERE MICO LAYOUT
40' X 65'
M.R.NAGARAJ
BDA/EE(S)/PL/94/93-94 DT 08.11.1993
2885
33
SRI ANJANEYA SWAMY H.B.C.S., ETTMADU SY NOS
36' X 61'
K.S.NAVANEETHA
BDA/EE(S)/PL/95/93-94 DT 08.11.1993
2886
4
KALIDASA EMPLOYEES HBCS, GAVIPURA
40' X 60'
V.GANESHA BABU
BDA/EE(S)/PL/96/93-94 DT 08.11.1993
2887
982
KENCHENAHALLI H.B.C.S.
40' X 60'
V.PRABHA
BDA/EE(S)/PL/97/93-94 DT 08.11.1993
2888
1088
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
40' X 60'
H.K.LAKSHMINARASIMHAIAH
BDA/EE(S)/PL/98/93-94 DT 08.11.1993
2889
1347
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
40' X 60'
C.V.RAVEENDRA
BDA/EE(S)/PL/99/93-94 DT 30.11.1993
2890
123
GIRINAGAR H.B.C.S.
40' X 60'
YOGANARASIMHA
BDA/EE(S)/PL/100/93-94 DT 30.11.1993
2891
1
B.O.O., H.B.C.S., TAVAREKERE
51' X 60'
VICE CHAIRMAN
BDA/EE(S)/PL/88/93-94 DT 30.10.1993
2892
1097
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
40' X 60'
C.P.PRABHUDEVA
BDA/EE(S)/PL/89/93-94 DT 02.11.1993
2893
559
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
39' X 60'
NAGESWARAN
BDA/EE(S)/PL/90/93-94 DT 02.11.1993
2894
694
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
40' X 59'
S.PARAMESWARAIAH
BDA/EE(S)/PL/54/93-94 DT 19.08.1993
2895
521
B.S.K. III STAGE, KATHARIGUPPE SY NOS
40' X 60'
R.PARIMALA
BDA/EE(S)/PL/79/93-94 DT 11.10.1993
2896
588
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
40' X 60'
A.V.VIVEKANANDA
BDA/EE(S)/PL/92/93-94 DT 06.11.1993
2897
710
N.S.PALYA MICO H.B.C.S.
40' X 68'
BDA/EE(S)/PL/104/93-94 DT 10.12.1993
GIRINAGAR H.B.C.S.
40' X 60'
ABRAHAM VENGAMATTIL DEVID &
PRAMILA ABRAHAM
A.SATHISH
2898
7/B
BDA/EE(S)/PL/105/93-94 DT 10.12.1993
2899
35
SRI.RADHAKRISHNA H.B.C.S., KADIRENAHALLI
40' X 67'
NINGAMMA
BDA/EE(S)/PL/106/93-94 DT 10.12.1993
2900
32
SRI.RADHAKRISHNA H.B.C.S., KADIRENAHALLI
40' X 60'
N.G.SRIHARI
BDA/EE(S)/PL/103/93-94 DT 10.12.1993
2901
561
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
40' X 60'
H.D.SHARMA
BDA/EE(S)/PL/107/93-94 DT 20.12.1993
2902
67
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
40' X 60'
RAJANNA
BDA/EE(S)/PL/108/93-94 DT 20.12.1993
2903
258
BIKASIPURA SPACE EMPLOYEES HBCS
40' X 60'
MOHAMAD THAPHASRUDDIN
BDA/EE(S)/PL/111/93-94 DT 27.12.1993
2904
972
KENCHENAHALLI H.B.C.S.
40' X 60'
S.R.SRINIVASA
BDA/EE(S)/PL/110/93-94 DT 23.12.1993
2905
974
N.S.PALYA MICO H.B.C.S.
18.29 X 12.19
SWAMYA
BDA/EE(S)/PL/109/93-94 DT 20.12.1993
2906
52
2907
2908
2909
B.S.K. III STAGE, KATHARIGUPPE SY NOS
67' X 40'
DIVAKARA RAO
BDA/EE(S)/PL/112/93-94 DT 05.01.1994
569
BIKASIPURA SPACE EMPLOYEES HBCS
40' X 60'
B.RAVINARAYAN BHAT
BDA/EE(S)/PL/159/93-94 DT 30.03.1994
309
BIKASIPURA SPACE EMPLOYEES HBCS
40' X 60'
V.J.DIVAKAR
BDA/EE(S)/PL/158/93-94 DT 29.03.1994
KENCHENAHALLI H.B.C.S.
80' X 49'
SUVARNA
BDA/EE(S)/PL/51/93-94 DT 24.07.1993
320/D
2910
1698
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
40' X 56'
H.M.NANJUNDA MURTHY
BDA/EE(S)/PL/52/93-94 DT 30.07.1993
2911
573
BIKASIPURA SPACE EMPLOYEES HBCS
40' X 62'
S.A.NATHAPPA REDDY
BDA/EE(S)/PL/53/93-94 DT 06.08.1993
2912
572
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
40' X 60'
SUBHASH ATHMARAM MAHAJAN
BDA/EE(S)/PL/152/93-94 DT 16.03.1994
2913
862
KENCHENAHALLI H.B.C.S.
50' X 41'
T.PADMANABHA ADIGA
BDA/EE(S)/PL/153/93-94 DT 16.03.1994
2914
726
KENCHENAHALLI H.B.C.S.
50' X 44'
N.SHEKARAPPA
BDA/EE(S)/PL/154/93-94 DT 16.03.1994
2915
198
BIKASIPURA SPACE EMPLOYEES HBCS
40' X 60'
K.TYAGARAJAN
BDA/EE(S)/PL/155/93-94 DT 18.03.1994
2916
114
KENCHENAHALLI H.B.C.S.
60' X 38'
N.K.GARUDADHWAJAN
BDA/EE(S)/PL/150/93-94 DT 18.03.1994
GIRINAGAR H.B.C.S.
40' X 60'
H.S.SEETHARAM
BDA/EE(S)/PL/157/93-94 DT 23.03.1994
2917
295/A
2918
214
KENCHENAHALLI H.B.C.S.
40' X 60'
H.L.BHAKTHA PRASAD
BDA/EE(S)/PL/25/93-94 DT 14.06.1993
2919
48
N.S.PALYA MICO H.B.C.S.
40' X 60'
B.C.RANGASWAMY
BDA/EE(S)/PL/28/93-94 DT 11.02.1994
2920
875
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
59' X 40'
K.RAJENDRA PRASAD
BDA/EE(S)/PL/24/93-94 DT 14.06.1993
2921
699
KENCHENAHALLI H.B.C.S.
40' X 59'
P.S.VIJAYALAKSHMI
BDA/EE(S)/PL/14/93-94 DT 25.05.1993
2922
175
ARKERE MICO LAYOUT
40' X 65'
VIJAYALAKSHMI NARAYANA JOYISH
BDA/EE(S)/PL/102/93-94 DT 10.12.1993
2923
277
BIKASIPURA SPACE EMPLOYEES HBCS
40' X 60'
T.DEELIP KUMAR
BDA/EE(S)/PL/101/93-94 DT 10.12.1993
2924
19
KADIRENAHALLI HBCS
40' X 60'
GOVINDAMMA
BDA/EE(S)/PL/69/93-94 DT 22.09.1993
2925
1
B.S.K. III STAGE, KATHARIGUPPE SY NOS
28' X 59'
T.TIMAMMA
BDA/EE(S)/PL/74/93-94 DT 07.10.1993
2926
174
ARKERE MICO LAYOUT
65' X 40'
A.P.RAO
BDA/EE(S)/PL/75/93-94 DT 07.10.1993
KENCHENAHALLI H.B.C.S.
50' X 63'
K.S.K.SHARMA
BDA/EE(S)/PL/76/93-94 DT 07.10.1993
2927
99/A
2928
1149
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
39' X 60'
R.C.KESHAVAN
BDA/EE(S)/PL/77/93-94 DT 07.10.1993
2929
56
B.S.K. III STAGE, KATHARIGUPPE SY NOS
40' X 60'
SUVARNA
BDA/EE(S)/PL/78/93-94 DT 08.10.1993
2930
151
GIRINAGAR H.B.C.S.
40' X 60'
DEVAKAR KIVAR
BDA/EE(S)/PL/67/93-94 DT 13.09.1991
2931
144
B.O.O., H.B.C.S., TAVAREKERE
46' X 60'
VICE CHAIRMAN
BDA/EE(S)/PL/70/93-94 DT 07.10.1993
2932
28
40' X 60'
K.R.SRIPADA RAO
BDA/EE(S)/PL/71/93-94 DT 07.10.1993
2933
1341
POORNAPRAGNA HBCS, B.S.K. III STAGE,
KATHARIGUPPE
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
40' X 60'
YALLAPPAVNNIGERI
BDA/EE(S)/PL/72/93-94 DT 07.10.1993
2934
571
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
40' X 60'
I.S.JAYASHANKAR
BDA/EE(S)/PL/87/93-94 DT 30.10.1993
2935
871
BIKASIPURA SPACE EMPLOYEES HBCS
40' X 60'
S.UMAKUMARI
BDA/EE(S)/PL/86/93-94 DT 27.10.1993
2936
24
SRI.RADHAKRISHNA H.B.C.S., KADIRENAHALLI
40' X 70'
RAGHUNATH GOPAL PATRACHARI
BDA/EE(S)/PL/85/93-94 DT 21.10.1993
2937
884
N.S.PALYA MICO H.B.C.S.
59' X 40'
K.RAGHAVENDRA RAO
BDA/EE(S)/PL/73/93-94 DT 07.10.1993
2938
905
KENCHENAHALLI H.B.C.S.
68' X 58'
G.SAYIRAM
BDA/EE(S)/PL/68/93-94 DT 14.09.1993
2939
1824
KUMARASWAMY LAYOUT II STAGE
40' X 53'
KRISHNAPPA
BDA/EE(S)/PL/9/93-94 DT 20.12.1993
2940
3839
KUMARASWAMY LAYOUT II STAGE
40' X 60'
SHARADHA BALIGA
BDA/EE(S)/PL/10/93-94 DT 23.12.1993
2941
2572
KUMARASWAMY LAYOUT II STAGE
40' X 60'
B.SATHISH
BDA/EE(S)/PL/11/93-94 DT 01.02.1994
2942
2611
KUMARASWAMY LAYOUT II STAGE
40' X 60'
M.RANGASWAMY
BDA/EE(S)/PL/12/93-94 DT 03.02.1994
2943
2570
KUMARASWAMY LAYOUT II STAGE
40' X 59'
R.YALLAYYA
BDA/EE(S)/PL/2/93-94 DT 06.05.1993
2944
2391
KUMARASWAMY LAYOUT II STAGE
40' X 60'
A.SHIVALINGAM
BDA/EE(S)/PPL/3/93-94 DT 11.05.1993
2945
2555
KUMARASWAMY LAYOUT II STAGE
40' X 60'
A.KRISHNAN
BDA/EE(S)/PL/4/93-94 DT 20.05.1993
2946
2407
KUMARASWAMY LAYOUT II STAGE
12.20 X 18.30
N.SHYAM RAO
BDA/EE(S)/PL/5/93-94 DT 04.06.1993
2947
1726
KUMARASWAMY LAYOUT II STAGE
40' X 60'
S.V.SRINIVASA MURTHY
BDA/EE(S)/PL/6/93-94 DT 24.07.1993
2948
2579
KUMARASWAMY LAYOUT II STAGE
40' X 60'
S.N.VISWANATH
BDA/EE(S)/PL/7/93-94 DT 30.07.1993
2949
1065
KUMARASWAMY LAYOUT II STAGE
40' X 60'
S.LAKSHMINARAYANA
BDA/EE(S)/PL/8/93-94 DT 19.08.1993
2950
1
B.T.M. I STAGE, I PHASE MADIWALA SY NOS
40' X 60'
M.CHANDRAPPA
BDA/EE(S)/PL/18/93-94 DT 07.10.1993
2951
1212
B.T.M. II STAGE, I PHASE
40' X 60'
K.KRISHNA
BDA/EE(S)/PL/30/93-94 DT 17.02.1994
2952
1165
B.T.M. I STAGE, I PHASE, TAVAREKERE SY NOS
40' X 60'
C.NEELAKANTA
BDA/EE(S)/PL/31/93-94 DT 19.02.1994
2953
60
B.T.M. LAYOUT, MADIWALA
40' X 58'
S.H.KHADRI
BDA/EE(S)/PL/32/93-94 DT 19.02.1994
2954
1445
B.T.M. II STAGE, I PHASE, MADIWALA SY NOS
40' X 60'
J.JANARDHANA
BDA/EE(S)/PL/34/93-94 DT 01.03.1994
2955
48/B
B.T.M. I STAGE, I PHASE
17.98 X 12.19
V.J.NARAYANA GOWDA
BDA/EE(S)/PL/35/93-94 DT 01.03.1994
2956
163 &
164
B.T.M. II STAGE, I PHASE, MADIWALA SY NOS
34' X 79'
R.GOPINATH
BDA/EE(S)/PL/36/93-94 DT 02.03.1994
B.T.M. II STAGE, I PHASE
40' X 60'
S.A.SRINIVASA MURTHY
BDA/EE(S)/PL/37/93-94 DT 04.03.1994
2957
47
2958
1138
B.T.M. I STAGE, I PHASE, TAVAREKERE SY NOS
40' X 60'
B.V.SHYLA
BDA/EE(S)/PL/38/93-94 DT 25.03.1994
2959
1228
B.T.M. I STAGE, I PHASE, TAVAREKERE SY NOS
53' X 46'
BDA/EE(S)/PL/13/93-94 DT 07.08.1993
2960
38
B.T.M. II STAGE, I PHASE, MADIWALA SY NOS
40' X 60'
VENKATESH K BASAPUR &
VIJAYALAKSHMI
D.GOPALA KRISHNA
2961
1168
B.T.M. I STAGE, I PHASE
40' X 60'
D.N.RAVISHNKAR
BDA/EE(S)/PL/15/93-94 DT 30.08.1993
2962
56
B.T.M. I STAGE, I PHASE
57' X 60'
M.SUJAYA & J.M.UMA MAHESH
BDA/EE(S)/PL/16/93-94 DT 07.10.1993
2963
1139
B.T.M. I STAGE, I PHASE, TAVAREKERE SY NOS
40' X 60'
M.NARAYANA
BDA/EE(S)/PL/19/93-94 DT 18.10.1993
2964
93
B.T.M. DALARS SKIM MADIWALA
50' X 78'
DR|| JAYAPRAKASH NARAYAN
BDA/EE(S)/PL/20/93-94 DT 30.10.1993
2965
1011
B.T.M. I STAGE, I PHASE, TAVAREKERE SY NOS
40' X 60'
G.V.NEELAKSHI
BDA/EE(S)/PL/21/93-94 DT 02.11.1993
2966
1439
B.T.M. II STAGE, I PHASE, MADIWALA SY NOS
40' X 60'
BDA/EE(S)/PL/22/93-94 DT 04.11.1993
2967
80
B.T.M. I STAGE, I PHASE
40' X 60'
AJITHKUMAR SHETTY & VANITA A
SHETTY
M.MUNISWAMAYYA
2968
29
B.T.M. II STAGE, I PHASE
50' X 77'
T.NARAYANA
BDA/EE(S)/PL/24/93-94 DT 10.12.1993
2969
1040
B.T.M. I STAGE, I PHASE, TAVAREKERE SY NOS
18.28 X 9.14
MESARS CENARA BANK
BDA/EE(S)/PL/25/93-94 DT 17.01.1994
2970
693
B.T.M. II STAGE, I PHASE
61' X 39'
BRIGADIER P MADAN
BDA/EE(S)/PL/27/93-94 DT 10.02.1994
B.T.M. DALARS SKIM MADIWALA
40' X 60'
K.KANDASWAMY
BDA/EE(S)/PL/29/93-94 DT 15.02.1994
2971
86/A
BDA/EE(S)/PL/14/93-94 DT 30.08.1993
BDA/EE(S)/PL/23/93-94 DT 10.12.1993
2972
74
N.S.PALYA MICO H.B.C.S.
40' X 60'
LAKSHMAIAH
BDA/EE(S)/PL/33/93-94 DT 21.02.1994
2973
130
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
40' X 60'
Y.K.NAGENDRA NATH
BDA/EE(S)/PL/18/93-94 DT 04.06.1993
2974
2
H.B.C.S. CHIKKALASANDRA
60' X 40'
S.V.SLLADMATH
BDA/EE(S)/PL/23/93-94 DT 10.06.1993
2975
96
B.O.O. H.B.C.S., TAVAREKERE
40' X 60'
VICE CHAIRMAN
BDA/EE(S)/PL/38/93-94 DT 29.06.1993
2976
677
KENCHENAHALLI H.B.C.S.
38' X 53'
SHARADVAKKALLI
BDA/EE(S)/PL/19/93-94 DT 04.06.1993
2977
948
N.S.PALYA MICO H.B.C.S.
40' X 60'
USMAN KHAN
BDA/EE(S)/PL/17/93-94 DT 01.06.1993
2978
915
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
53' X 40'
A.R.MANJUNATH
BDA/EE(S)/PL/47/93-94 DT 17.07.1993
2979
30
KSRTC H.B.C.S. CHIKKALLASANDRA
40' X 60'
GURULINGAIAH
BDA/EE(S)/PL/46/93-94 DT 17.07.1993
2980
1007
KENCHENAHALLI H.B.C.S.
73' X 50'
C.G.SHASHIKALA
BDA/EE(S)/PL/39/93-94 DT 30.06.1993
2981
698
N.S.PALYA MICO H.B.C.S.
64' X 36'
K.VASANTHI
BDA/EE(S)/PL/22/93-94 DT 10.06.1993
2982
228
VISWABHARATHI H.B.C.S., GIRINAGAR
34' X 54'
KRISHNA RAJA KANDIGE
BDA/EE(S)/PL/32/93-94 DT 22.06.1993
2983
1436
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
60' X 40'
N.RANGANNA
BDA/EE(S)/PL/34/93-94 DT 24.06.1993
2984
730
N.S.PALYA MICO H.B.C.S.
51' X 61'
BDA/EE(S)/PL/20/93-94 DT 05.06.1993
2985
1233
B.T.M. II STAGE, I PHASE
40' X 60'
SHANKARA SASTRY & USHA
SHANKAR
AYAPPA KAVERIYAPPA
2986
1233
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
40' X 59'
P.S.N.SWAMY
BDA/EE(S)/PL/48/93-94 DT 17.07.1993
2987
124
B.O.O., H.B.C.S., TAVAREKERE
40' X 60'
VICE CHAIRMAN
BDA/EE(S)/PL/49/93-94 DT 21.07.1993
SRI.ANJANEYA SWAMY H.B.C.S., ITTMADU
40' X 62'
C.JAYASHREE
BDA/EE(S)/PL/41/93-94 DT 02.07.1993
POORNA PRAGNA H.B.C.S., KATHARIGUPPA
40' X 60'
J.R.RAMAMURTHY
BDA/EE(S)/PL/33/93-94 DT 24.06.1993
SRI.ANJANEYA SWAMY H.B.C.S., ITTMADU
40' X 62'
A.GHEETHA
BDA/EE(S)/PL/40/93-94 DT 02.07.1993
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
60' X 40'
G.SRINIVASAMURTHY
BDA/EE(S)/PL/36/93-94 DT 29.06.1993
2988
72/A
2989
2990
42
72/B
BDA/EE(S)/PL/10/93-94 DT 29.06.1993
2991
574
2992
72
SRI.ANJANEYA SWAMY H.B.C.S., ITTMADU
40' X 62'
H.C.NARENDRA
BDA/EE(S)/PL/31/93-94 DT 21.06.1993
2993
271
IDEAL HOMES H.B.C.S., KENCHENAHALLI
40' X 60'
SUBBARAYAN PRASANNA
BDA/EE(S)/PL/28/93-94 DT 18.06.1993
2994
1400
2995
765
2996
39
2997
670
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
46' X 59'
K.SETURAMAN
BDA/EE(S)/PL/37/93-94 DT 29.06.1993
N.S.PALYA MICO H.B.C.S.
39' X 61'
B.RAMAREDDY
BDA/EE(S)/PL/44/93-94 DT 13.07.1993
KAVERI H.B.C.S., TAVAREKERE SY NOS
40' X 61'
LOKANATH
BDA/EE(S)/PL/12/93-94 DT 19.05.1993
IDEAL HOMES H.B.C.S., KENCHENAHALLI
37' X 60'
ANNASUYA
BDA/EE(S)/PL/42/93-94 DT 07.07.1993
Cataloguing and indexing of records as envisaged under section 4(1) (a) of the Right to information Act 2005
LIST OF PLAN SANCTIONED FILES DURING THE YEAR 94-95 IN EE(S) DIVISION
SL
NO.
2998
SITE
NO.
761
NAME OF THE LAYOUT
DIMENSION
APPLICANT NAME
SANCTION EE NO/DATE
IDEAL HOMES H.B.C.S., KENCHENAHALLY
60' X 39'
V.S.PRASAD
BDA/EE(S)/PL/135/94-95 DT09.02.1995
2999
1
N.S.PALYA MICO H.B.C.S.
51' X 43'
K.V.PRABHUDEVA
BDA/EE(S)/PL/03/94-95 DT 15.04.1994
3000
1132
B.T.M. LAYOUT TAVAREKERE SY NOS
55' X 40'
M.GOPICHAND
BDA/EE(S)/PL/02/94-95 DT 06.04.1994
3001
677
B.T.M. II STAGE I PHASE
40' X 60'
V.RAMADAS
BDA/EE(S)/PL/01/94-95 DT 02.04.1994
3002
1107
B.T.M. I STAGE, I PHASE, TAVAREKERE SY NOS
10.80 X 19.50
K.PRASANNAKSHI
BDA/EE(S)/PL/04/94-95 DT 18.04.1994
3003
1042
B.T.M. I STAGE, I PHASE, TAVAREKERE SY NOS
61' X 40'
JARJ VINAY
BDA/EE(S)/PL/06/94-95 DT 03.04.1994
3004
59
B.T.M. II STAGE
60' X 40'
B.H.GANGADHAR
BDA/EE(S)/PL/05/94-95 DT 22.04.1994
3005
81
B.T.M. I STAGE, I PHASE
60' X 40'
M.MUNIRAJU
BDA/EE(S)/PL/07/94-95 DT 25.05.1994
3006
1201
B.T.M. II STAGE, I PHASE
60' X 40'
PRANSIS
BDA/EE(S)/PL/08/94-95 DT 25.05.1994
3007
1233
B.T.M. II STAGE
40' X 60'
AIYANNA KAVERIYAPPA
BDA/EE(S)/PL/23/94-95 DT 22.03.1995
3008
706
B.T.M. II STAGE, I PHASE
40' X 60'
R.BHYANJANAPPA
BDA/EE(S)/PL/24/94-95 DT 24.03.1995
3009
74
B.T.M. LAYOUT
40' X 60'
LAKSHMAYYA
BDA/EE(S)/PL/74/94-95 DT 06.03.1995
3010
1136
B.T.M. I STAGE, I PHASE, TAVAREKERE SY NOS
17.31 X 17.47
BDA/EE(S)/PL/20/94-95 DT 17.01.1995
3011
64
B.T.M. II STAGE
40' X 60'
JAN MOHAMMED AHMED
MERCHANT
K.SRINIVASA MURTHY
BDA/EE(S)/PL/19/94-95 DT 17.01.1995
3012
648
B.T.M. II STAGE
40' X 60'
DR.NAGARAJ
BDA/EE(S)/PL/17/94-95 DT 29.12.1994
3013
66
B.T.M.II STAGE, I PHASE
40' X 60'
C.V.PADMAVATHAMMA
BDA/EE(S)/PL/18/94-95 DT 16.01.1995
3014
1040
B.T.M. I STAGE, I PHASE, TAVAREKERE SY NOS
17.28 X 9.70
CENARA BANK
BDA/EE(S)/PL/09/94-95 DT 13.06.1994
3015
61
B.T.M. I STAGE, 2 PHASE
40' X 60'
COLONEL CRS.BAHADVR
BDA/EE(S)/PL/10/94-95 DT 28.06.1994
3016
700
B.T.M.II STAGE
40' X 60'
B.NARASIMHAIAH
BDA/EE(S)/PL/11/94-95 DT 28.06.1994
3017
1113
B.T.M. I STAGE, I PHASE, TAVAREKERE SY NOS
39' X 61'
K.NITYANANDA
BDA/EE(S)/PL/12/94-95 DT 13.07.1994
3018
104
B.S.K. III STAGE, III PHASE, V BLOCK
39' X 62'
A.SADASHIVAM
BDA/EE(S)/PL/13/94-95 DT 13.06.1994
3019
72
B.T.M. II STAGE
45' X 60'
BDA/EE(S)/PL/14/94-95 DT 23.09.1994
3020
1239
B.T.M. II STAGE
40' X 60'
S.S.SUNAWALA & SMT PAMELA
SUNAWALA
C.G.NAGAPPA
3021
1009
B.T.M. I STAGE
40' X 60'
R.V.SATYAMURTHY
BDA/EE(S)/PL/16/94-95 DT 29.12.1994
3022
433
B.S.K. III STAGE, II PHSE, VIII BLOCK
40' X 61'
S.VENKATANARASIMHAN
BDA/EE(S)/PL/64/94-95 DT 27.03.1995
3023
10
B.T.M. III STAGE, III PHASE, I BLOCK
38' X 62'
G.VIJAYA
BDA/EE(S)/PL/63/94-95 DT 25.03.1995
3024
530
B.S.K. III STAGE, II PHASE, I BLOCK
44' X 65'
M.GOPALASWAMY
BDA/EE(S)/PL/62/94-95 DT 24.03.1995
3025
602
B.S.K. III STAGE, KATHARIGUPPE SY NOS
40' X 60'
M.N.BHAGYA RAO
BDA/EE(S)/PL/61/94-95 DT 18.03.1995
3026
122
B.S.K. III STAGE, III PHASE, IV BLOCK
40' X 60'
S.R.KRISHNA MURTHY
BDA/EE(S)/PL/60/94-95 DT 18.03.1995
3027
664
B.S.K. III STAGE, II PHASE, VII BLOCK
40' X 60'
T.V.GURUNATH
BDA/EE(S)/PL/59/94-95 DT 14.03.1995
3028
723
B.S.K. III STAGE, II PHASE, VII BLOCK
40' X 58'
S.A.SHASHIDHAR
BDA/EE(S)/PL/57/94-95 DT 17.02.1995
3029
313
B.S.K. III STAGE, IV PHASE, VII BLOCK
40' X 60'
BDA/EE(S)/PL/56/94-95 DT 13.02.1995
3030
328
B.S.K. III STAGE, II PHASE, VI BLOCK
45' X 65'
P.SHYAM SUNDHAR & SMT
SUMITRA SHYAM SUNDHAR
KHEDHAR KALIDAS
BDA/EE(S)/PL/55/94-95 DT 13.02.1995
3031
323
B.S.K. III STAGE, IV PHASE, VII BLOCK
40' X 60'
MAHAMAD BEGAM
BDA/EE(S)/PL/51/94-95 DT 27.01.1995
3032
227
B.S.K. III STAGE, III PHASE, II BLOCK
40' X 60'
B.N.RAMEGOWDA
BDA/EE(S)/PL/52/94-95 DT 28.01.1995
3033
147
B.S.K. III STAGE, III PHASE, I BLOCK
61' X 40'
T.M.MAYACHAR
BDA/EE(S)/PL/53/94-95 DT 03.02.1995
BDA/EE(S)/PL/15/94-95 DT 15.11.1994
3034
1715
KUMARASWAMY LAYOUT II STAGE
40' X 60'
B.K.VENKOBA RAO
BDA/EE(S)/PL/1/94-95 DT 05.05.1994
3035
3599
KUMARASWAMY LAYOUT II STAGE
40' X 60'
B.G.UPADHYAY
BDA/EE(S)/PL/2/94-95 DT 18.05.1994
3036
2538
KUMARASWAMY LAYOUT II STAGE
58' X 40'
B.S.BALAJI
BDA/EE(S)/PL/3/94-95 DT 22.08.1994
3037
3600
KUMARASWAMY LAYOUT II STAGE
40' X 60'
M.SRINIVASA CHAR
BDA/EE(S)/PL/4/94-95 DT 02.09.1994
3038
3843
KUMARASWAMY LAYOUT II STAGE
40' X 60'
V.V.MALLED
BDA/EE(S)/PL/5/94-95 DT 22.09.1994
3039
1064
KUMARASWAMY LAYOUT II STAGE
40' X 60'
NEEDAMBUS VYASARAYA
BDA/EE(S)/PL/6/94-95 DT 10.10.1994
3040
1830
KUMARASWAMY LAYOUT II STAGE
39' X 53'
R.S.N.MURTHY
BDA/EE(S)/PL/7/94-95 DT 20.10.1994
3041
2541
KUMARASWAMY LAYOUT II STAGE
16.00 X 11.09
MEJAR SRI T SHREESHA
BDA/EE(S)/PL/8/94-95 DT 19.12.1994
3042
2508
KUMARASWAMY LAYOUT II STAGE
40' X 60'
D.A.KALPANA
BDA/EE(S)/PL/1876/94-95 DT 03.01.1995
3043
2390
KUMARASWAMY LAYOUT II STAGE
60' X 39'
BHANUMATI
BDA/EE(S)/PL/10/94-95 DT 27.01.1995
3044
2538
KUMARASWAMY LAYOUT II STAGE
40' X 61'
B.S.BALAJI
BDA/EE(S)/PL/11/94-95 DT 09.02.1995
3045
1810
KUMARASWAMY LAYOUT II STAGE
40' X 60'
V.R.RAGHAVENDRA
BDA/EE(S)/PL/12/94-95 DT 18.02.1995
3046
2406
KUMARASWAMY LAYOUT II STAGE
40' X 60'
D.V.CHANDRASHEKAR
BDA/EE(S)/PL/13/94-95 DT 18.02.1995
3047
109
B.S.K. III STAGE, III PHASE, V BLOCK
40' X 60'
K.SAVITRAMMA
BDA/EE(S)/PL/1/94-95 DT 02.04.1994
3048
318
B.S.K. III STAGE, III PHASE, VI BLOCK
60' X 39'
SAVITA N RAO
BDA/EE(S)/PL/2/94-95 DT 04.04.1994
3049
1142
B.S.K. III STAGE, II PHASE, HOSAKEREHALLI
40' X 60'
SHIVANNA SHETTY
BDA/EE(S)/PL/3/94-95 DT 19.04.1994
3050
541
B.S.K. III STAGE, KATHARIGUPPE SY NOS
40' X 60'
B.R.VINAY
BDA/EE(S)/PL/4/94-95 DT 22.04.1994
3051
655
B.S.K. III STAGE, II PHASE, VII BLOCK
40' X 60'
G.K.PILLAPPA
BDA/EE(S)/PL/5/94-95 DT 04.05.1994
3052
13
B.S.K. III STAGE, III PHASE, IV BLOCK
40' X 60'
K.RAJANNA
BDA/EE(S)/PL/6/94-95 DT 07.05.1994
3053
1145
B.S.K. III STAGE, HOSAKEREHALLI SY NOS
38' X 54'
H.V.VENKATACHALAPATHI
BDA/EE(S)/PL/7/94-95 DT 07.05.1994
3054
276
B.S.K. III STAGE, III PHASE, V BLOCK
18.20 X 12.06
M.NARAYANA
BDA/EE(S)/PPL/8/94-95 DT 07.05.1994
B.S.K. III STAGE, HOSAKEREHALLI SY NOS
40' X 60'
M.S.PUTTARAJU
BDA/EE(S)/PL/9/94-95 DT 07.05.1994
3055
1231/C
3056
3057
146
1231-K
B.S.K. III STAGE, III PHASE, I BLOCK
61' X 29'
K.PUTTARAMAIAH
BDA/EE(S)/PL/10/94-95 DT 10.05.1994
B.S.K. III STAGE, HOSAKEREHALLI SY NOS
40' X 60'
H.S.SIDDAPPA
BDA/EE(S)/PL/11/94-95 DT 25.05.1994
B.S.K. III STAGE, KATHARIGUPPE SY NOS
40' X 60'
K.S.GOPINATH
BDA/EE(S)/PL/14/94-95 DT 13.06.1994
SRINIVASANAGAR II STAGE, B.S.K. III STAGE
40' X 60'
G.S.VIJAYAMMA
BDA/EE(S)/PL/15/94-95 DT 17.06.1994
3058
20
3059
1501
3060
336
B.S.K. III STAGE, II PHASE, VI BLOCK
59' X 51'
BASAVARAJAYYA
BDA/EE(S)/PL/16/94-95 DT 28.06.1994
3061
344
B.S.K. III STAGE, II PHASE, VI BLOCK
40' X 60'
M.S.GANESH RAO
BDA/EE(S)/PL/17/94-95 DT 07.07.1994
3062
515
B.S.K. III STAGE, II PHASE, VI BLOCK
24.40 X 15.15
PRAMILA JOSHAY
BDA/EE(S)/PL/18/94-95 DT 11.07.1994
3063
770
B.S.K. III STAGE, II PHASE, VII BLOCK
40' X 63'
N.KRISHNAIAH
BDA/EE(S)/PL/19/94-95 DT 12.07.1994
3064
18
B.S.K. III STAGE, II PHASE, IV BLOCK
40' X 60'
K.P.BHAT
BDA/EE(S)/PL/20/94-95 DT 02.08.1994
3065
281
B.S.K. III STAGE, III PHASE, V BLOCK
30' X 66'
S.KODANDARAMA
BDA/EE(S)/PL/21/94-95 DT 23.08.1994
3066
655
B.S.K. III STAGE, II PHASE, VII BLOCK
40' X 60'
J.K.PILLAPPA
BDA/EE(S)/PL/22/94-95 DT 29.08.1994
3067
65
B.S.K. III STAGE, AVALAHALLI
41' X 69'
SRI LATHA VIDHYANATH
BDA/EE(S)/PL/23/94-95 DT 05.09.1994
3068
47
B.S.K. III STAGE, III PHASE, IV BLOCK
60' X 36'
S.PHARAPH
BDA/EE(S)/PL/24/94-95 DT 05.09.1994
B.S.K. III STAGE, III PHASE, II BLOCK
52' X 60'
R.SRINIVASAN
BDA/EE(S)/PL/25/94-95 DT 17.09.1994
3069
406/A
3070
541
B.S.K. III STAGE, II PHASE, VI BLOCK
41' X 62'
G.PRASANNA
BDA/EE(S)/PL/27/94-95 DT 20.09.1994
3071
1011
B.S.K. III STAGE, III PHASE, III BLOCK
40' X 60'
H.PARUSHARAM
BDA/EE(S)/PL/28/94-95 DT 22.09.1994
3072
143
B.S.K. III STAGE, III PHASE, I BLOCK
40' X 60'
SULTAN MOLLIYUDDIN
BDA/EE(S)/PL/29/94-95 DT 26.09.1994
3073
633
B.S.K. III STAGE, II PHASE, VII BLOCK
49' X 38'
RAMA KRISHNA RAO V.
BDA/EE(S)/PL/30/94-95 DT 26.09.1994
3074
752
B.S.K. III STAGE, II PHASE, VII BLOCK
60' X 44'
BDA/EE(S)/PL/31/94-95 DT 26.09.1994
3075
327
B.S.K. III STAGE, II PHASE, VI BLOCK
40' X 59'
S.RAMACHANDRA ACHARYA & SRI
GOPALAKRISHNA
K.V.APPAYYA
3076
61
B.S.K. III STAGE, IV PHASE, VII BLOCK
40' X 60'
K.RAMANANDA UPADHYAY
BDA/EE(S)/PL/33/94-95 DT 19.10.1994
B.S.K. III STAGE, ITTUMADU SY NOS
24.38 X 12.76
S.GURUMURTHY
BDA/EE(S)/PL/34/94-95 DT 26.10.1994
3077
1/A
BDA/EE(S)/PL/32/94-95 DT 01.10.1994
3078
261
B.S.K. III STAGE, III PHASE, II BLOCK
40' X 60'
K.S.MANJUNATH
BDA/EE(S)/PL/35/94-95 DT 15.11.1994
3079
281
B.S.K. III STAGE, III PHASE, V BLOCK
30' X 66'
BDA/EE(S)/PL/36/94-95 DT 18.11.1994
3080
623
B.S.K. III STAGE, II PHASE, VII BLOCK
32' X 61'
R.V.MADHAVARAO &
R.V.SHANMUGAM
A.N.VIMALA
3081
330
B.S.K. III STAGE, II PHASE, VI BLOCK
40' X 59'
B.L.SRINATH
BDA/EE(S)/PL/38/94-95 DT 19.11.1994
3082
339
B.S.K. III STAGE, II PHASE, VI BLOCK
59' X 56'
MANGALA GOPAL
BDA/EE(S)/PL/39/94-95 DT 09.12.1994
3083
182
B.S.K. III STAGE, IV PHASE, VII BLOCK
40' X 60'
R.V.MIRJI
BDA/EE(S)/PL/40/94-95 DT 12.12.1994
3084
189
B.S.K. III STAGE, KATHARIGUPPE SY NOS
57' X 40'
T.RAMACHANDRA RAO
BDA/EE(S)/PL/41/94-95 DT 23.12.1994
3085
605
B.S.K. III STAGE, KATHARIGUPPE SY NOS
40' X 60'
G.RAMA SWAMY REDDY
BDA/EE(S)/PL/42/94-95 DT 23.12.1994
3086
1001
B.S.K. III STAGE, III PHASE, III BLOCK
63' X 45'
PRATHIBHA PAI
BDA/EE(S)/PL/43/94-95 DT 29.12.1994
3087
697
B.S.K. III STAGE, II PHASE, VII BLOCK
60' X 40'
P.S.SWAMY & P.S.HEMAVATI
BDA/EE(S)/PL/44/94-95 DT 03.01.1995
3088
477
B.S.K. III STAGE, II PHASE, VI BLOCK
40' X 60'
B.R.KESHAVA MURTHY
BDA/EE(S)/PL/45/94-95 DT 03.01.1995
3089
783
B.S.K. II STAGE, II PHASE, VII BLOCK
40' X 60'
G.R.VASANTHA KUMAR
BDA/EE(S)/PL/46/94-95 DT 05.01.1995
3090
109
B.S.K. II STAGE, II PHASE, IV BLOCK
60' X 40'
N.RAMESH
BDA/EE(S)/PL/47/94-95 DT 16.01.1995
3091
184
B.S.K. III STAGE, KATHARIGUPPE SY NOS
40' X 56'
B.A.RANGASWAMY
BDA/EE(S)/PL/48/94-95 DT 16.01.1995
3092
607
B.S.K. III STAGE, III PHASE, VII BLOCK
40' X 60'
B.R.BALAKRISHNA
BDA/EE(S)/PL/49/94-95 DT 17.01.1995
3093
142
B.S.K. III STAGE, II PHASE, IV BLOCK
40' X 60'
Y.K.INDIRA
BDA/EE(S)/PL/50/94-95 DT 21.01.1995
3094
339
KENCHENAHALLI H.B.C.S.
40' X 60'
HANUMANTHA RAO
BDA/EE(S)/PL/12/94-95 DT 27.04.1995
3095
515
KENCHENAHALLI H.B.C.S.
40' X 60'
C.R.SEETHARAM
BDA/EE(S)/PL/51/94-95 DT 08.07.1994
3096
405
KENCHENAHALLI H.B.C.S.
59' X 40'
H.K.BALASUBRAMANYA
BDA/EE(S)/PL/52/94-95 DT 11.07.1994
VISWABHARATHI H.B.C.S., GIRINAGAR
40' X 57'
B.PASHUPATHY DUBEY
BDA/EE(S)/PL/53/94-95 DT 11.07.1994
3097
1/A
BDA/EE(S)/PL/37/94-95 DT 19.11.1994
3098
1274
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
40' X 60'
S.NEELAKANTAPPA
BDA/EE(S)/PL/54/94-95 DT 12.07.1994
3099
731
KEMPEGOWDA H.B.C.S., KATHRIGUPPA
40' X 60'
S.R.PANDURANGA
BDA/EE(S)/PL/55/94-95 DT 13.07.1994
3100
776
KENCHENAHALLI H.B.C.S.
57' X 62'
U.PRAKASH
BDA/EE(S)/PL/56/94-95 DT 19.07.1994
3101
18
LAKSHMINARASIMHA H.B.C.S., B.S.K. III STAGE
40' X 60'
T.UNNIKRISHNAN
BDA/EE(S)/PL/57/94-95 DT 19.07.1994
3102
74
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
40' X 60'
Y.RAGHAVUDU
BDA/EE(S)/PL/58/94-95 DT 19.07.1994
3103
738
KENCHENAHALLI H.B.C.S.
60' X 38'
MONIKA MANHOTRA
BDA/EE(S)/PL/59/94-95 DT 19.07.1994
3104
31
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
40' X 60'
J.A.HARIPRAKASH
BDA/EE(S)/PL/60/94-95 DT 22.07.1994
3105
29
POORNA PRAJAN H.B.C.S., KATHARIGUPPA
40' X 60'
K.N.UMAJI RAO
BDA/EE(S)/PL/61/94-95 DT 26.07.1994
3106
23
SRI.RADHAKRISHNA H.B.C.S., KADIRENAHALLI
40' X 70'
R.SUGUNA
BDA/EE(S)/PL/62/94-95 DT 26.07.1996
K.E.B. H.B.C.S, B.G.ROAD
43' X 60'
DR|| B.ASHA LATHA
BDA/EE(S)/PL/63/94-95 DT 27.07.1994
VISWABHARATHI H.B.C.S., GIRINAGAR
40' X 60'
DAKSHAYINI
BDA/EE(S)/PL/64/94-95 DT 30.07.1994
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
40' X 60'
E.BALARAM
BDA/EE(S)/PL/65/94-95 DT 02.08.1994
BHARATH H.B.C.S., UTTARAHALLI SY NOS
50' X 40'
BDA/EE(S)/PL/66/94-95 DT 06.08.1994
N.S.PALYA MICO H.B.C.S.
40' X 60'
C.S.RAVINDRANATH &
C.S.UMAGOWRI
G.VENKATASWAMY
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
62' X 40'
M.POORNA RAJ
BDA/EE(S)/PL/68/94-95 DT 06.08.1994
VISWABHARATHI H.B.C.S., GIRINAGAR
30' X 55'
LEELAVATHI M SINGH
BDA/EE(S)/PL/69/94-95 DT 06.08.1994
3107
B-7
3108
32
3109
771
3110
3
3111
730/A
BDA/EE(S)/PL/67/94-95 DT 06.08.1994
3112
181
3113
18
3114
150
KENCHENAHALLI H.B.C.S.
42' X 56'
S.K.ANANTH
BDA/EE(S)/PL/70/94-95 DT 11.08.1994
3115
722
BIKASIPURA SPACE EMPLOYEES HBCS
40' X 60'
K.V.R.CHARI
BDA/EE(S)/PL/71/94-95 DT 25.08.1994
3116
181
KENCHENAHALLI H.B.C.S.
58' X 36'
H.HANUMANTHA RAY
BDA/EE(S)/PL/72/94-95 DT 27.08.1994
3117
126
KENCHENAHALLI H.B.C.S.
52' X 45'
H.SHANKAR
BDA/EE(S)/PL/73/94-95 DT 27.08.1994
3118
191
BHARATH H.B.C.S., UTTARAHALLI SY NOS
40' X 60'
DR|| M.C.HULLATTI
BDA/EE(S)/PL/74/94-95 DT 02.09.1994
3119
503
BIKASIPURA SPACE EMPLOYEES HBCS
40' X 60'
V.L.SWAMYNATHAN
BDA/EE(S)/PL/75/94-95 DT 03.09.1994
3120
250
KENCHENAHALLI H.B.C.S.
62' X 32'
LINGEGOWDA
BDA/EE(S)/PL/76/94-95 DT 05.09.1994
3121
1195
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
40' X 60'
Y.PARAMESWARA
BDA/EE(S)/PL/77/94-95 DT 07.09.1994
3122
437
BIKASIPURA SPACE EMPLOYEES HBCS
40' X 60'
M.J.RAJASHEKHARAN
BDA/EE(S)/PL/78/94-95 DT 07.09.1994
3123
180
BHARATH H.B.C.S., UTTARAHALLI SY NOS
40' X 60'
B.H.CHITRA
BDA/EE(S)/PL/79/94-95 DT 07.09.1994
3124
778
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
40' X 60'
GANAPATHI S HEGADE
BDA/EE(S)/PL/80/94-95 DT 14.09.1994
3125
173
VISWABHARATHI H.B.C.S., GIRINAGAR
59' X 40'
LEELARAO
BDA/EE(S)/PL/81/94-95 DT 15.09.1994
3126
852
KENCHENAHALLI H.B.C.S.
53' X 45'
S.SUBRAMANYA
BDA/EE(S)/PL/82/94-95 DT 17.09.1994
3127
435
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
40' X 60'
R.KANNAN
BDA/EE(S)/PL/83/94-95 DT 20.09.1994
3128
93 & 94
SRI.RADHAKRISHNA H.B.C.S., KADIRENAHALLI
45' X 60'
N.S.BALAKRISHNA
BDA/EE(S)/PL/84/94-95 DT 21.09.1994
3129
313-A
BHARATH H.B.C.S., UTTARAHALLI SY NOS
40' X 60'
K.M.USHA ANAND
BDA/EE(S)/PL/85/94-95 DT 26.09.1994
KENCHENAHALLI H.B.C.S.
48' X 60'
DR|| DEELIP
BDA/EE(S)/PL/86/94-95 DT 26.09.1994
3130
1000
3131
698
BIKASIPURA SPACE EMPLOYEES HBCS
40' X 60'
DR|| M.H.BALAKRISHNAIAH
BDA/EE(S)/PL/87/94-95 DT 30.09.1994
3132
607
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
40' X 60'
P.SRIKANTA
BDA/EE(S)/PL/88/94-95 DT 01.10.1994
K.E.B. H.B.C.S, B.G.ROAD
43' X 60'
CHARALOBI SHANTHAKUMARI
BDA/EE(S)/PL/89/94-95 DT 01.10.1994
3133
B-3
3134
140
B.O.O., H.B.C.S., TAVAREKERE
40' X 60'
VICE CHAIRMAN
BDA/EE(S)/PL/70/94-95 DT 22.08.1994
3135
266
VISWABHARATHI H.B.C.S., GIRINAGAR
40' X 60'
C.S.KARTHIK
BDA/EE(S)/PL/91/94-95 DT 11.10.1994
3136
1315
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
50' X 60'
K.NAGARAJ
BDA/EE(S)/PL/92/94-95 DT 11.10.1994
3137
239
KENCHENAHALLI H.B.C.S.
40' X 60'
S.R.SUNDARA MURTHY
BDA/EE(S)/PL/93/94-95 DT 11.10.1994
3138
574
KEMPEGOWDA H.B.C.S., KATHRIGUPPA
40' X 60'
B.SHIVALIGAPPA
BDA/EE(S)/PL/94/94-95 DT 12.10.1994
3139
372
BHARATH H.B.C.S., UTTARAHALLI SY NOS
40' X 60'
VIJAYA
BDA/EE(S)/PL/95/94-95 DT 19.10.1994
3140
467
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
40' X 60'
SHASHIKUMAR PALARAJ
BDA/EE(S)/PL/96/94-95 DT 19.10.1994
3141
302
BIKASIPURA SPACE EMPLOYEES HBCS
40' X 60'
GIRIDHAR R JOSHI
BDA/EE(S)/PL/97/94-95 DT 24.10.1994
3142
1424
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
40' X 60'
K.NAGARAJAPPA
BDA/EE(S)/PL/98/94-95 DT 24.10.1994
3143
393
VISWABHARATHI H.B.C.S., GIRINAGAR
40' X 60'
GOVINDA BHAT
BDA/EE(S)/PL/99/94-95 DT 26.10.1994
3144
596
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
40' X 60'
KAMALA ANAND
BDA/EE(S)/PL/100/94-95 DT 14.11.1994
3145
303
BIKASIPURA SPACE EMPLOYEES HBCS
40' X 60'
G.C.SRIDHAR
BDA/EE(S)/PL/102/94-95 DT 17.11.1994
3146
64
B.O.O. H.B.C.S. MADIWALA
40' X 60'
C.THIRUVENGADAM
BDA/EE(S)/PL/103/94-95 DT 17.11.1994
VISWABHARATHI H.B.C.S., GIRINAGAR
50' X 61'
MANJULA
BDA/EE(S)/PL/104/94-95 DT 15.11.1994
3147
6/E
3148
729
BIKASIPURA SPACE EMPLOYEES HBCS
40' X 60'
S.SUBBAIAH
BDA/EE(S)/PL/105/94-95 DT 18.11.1994
3149
21
KALIDAS COLONY H.B.C.S., GIRINAGAR
40' X 60'
S.R.NAGARATHNAMMA
BDA/EE(S)/PL/106/94-95 DT 23.11.1994
3150
696
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
60' X 39'
L.N.DESAYI
BDA/EE(S)/PL/107/94-95 DT 26.11.1994
3151
42
SRI.ANJANEYA SWAMY H.B.C.S., CHIKALLASANDRA
67' X 44'
K.LATHA
BDA/EE(S)/PL/108/94-95 DT 26.11.1994
3152
678
KEMPEGOWDA H.B.C.S., KATHRIGUPPA
40' X 60'
B.V.PRABHAKAR MURTHY
BDA/EE(S)/PL/109/94-95 DT 12.12.1994
3153
1320
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
60' X 40'
K.B.VEERABHADRAPPA
BDA/EE(S)/PL/110/94-95 DT 12.12.1994
3154
594
BIKASIPURA SPACE EMPLOYEES HBCS
40' X 60'
S.RAMALINGAM
BDA/EE(S)/PL/111/94-95 DT 12.12.1994
3155
168
BHARATH H.B.C.S., UTTARAHALLI SY NOS
40' X 60'
S.T.SHANTHANNA
BDA/EE(S)/PL/113/94-95 DT 16.12.1994
3156
176
BHARATH H.B.C.S., UTTARAHALLI SY NOS
40' X 60'
H.SHASHIDHAR
BDA/EE(S)/PL/114/94-95 DT 16.12.1994
3157
400
KENCHENAHALLI H.B.C.S.
46' X 50'
S.G.SADASHIVA
BDA/EE(S)/PL/117/94-95 DT 29.12.1994
3158
36
RAMA RAO LAYOUT
40' X 60'
M.BHAGYA
BDA/EE(S)/PL/118/94-95 DT 03.01.1995
3159
174
MICO SKGNS ARAKERE
40' X 65'
A.P.RAO
BDA/EE(S)/PL/119/94-95 DT 03.01.1995
3160
714
BIKASIPURA SPACE EMPLOYEES HBCS
40' X 60'
C.H.V.RAGHAVA RAO
BDA/EE(S)/PL/121/94-95 DT 16.01.1995
3161
856
BIKASIPURA SPACE EMPLOYEES HBCS
40' X 60'
J.RAJA
BDA/EE(S)/PL/120/94-95 DT 09.01.1995
3162
1012
KENCHENAHALLI H.B.C.S.
60' X 39'
N.A.BHIMAIAH
BDA/EE(S)/PL/122/94-95 DT 16.01.1995
3163
69
JARAGANAHALLY H.B.C.S., KADIRENAHALLY
68' X 30'
RASHID BEGAM
BDA/EE(S)/PL/123/94-95 DT 20.01.1995
3164
41
B.O.O. H.B.C.S. MADIWALA
40' X 60'
PUNL LOBO
BDA/EE(S)/PL/124/94-95 FY 20.01.1995
3165
31
SRI.ANJANEYA SWAMY H.B.C.S., ITTMADU
36' X 60'
S.NARASIMHAIAH
BDA/EE(S)/PL/125/94-95 DT 20.01.1995
3166
767
N.S.PALYA MICO H.B.C.S.
40' X 60'
3167
873
BIKASIPURA SPACE EMPLOYEES HBCS
3168
346-D
BDA/EE(S)/PL/126/94-95 DT 21.01.1995
40' X 60'
JAGAJITH SINGH
BHAGAVANTHAKAR
K.V.VENKATACHARI
KENCHENAHALLI H.B.C.S.
61' X 41'
D.S.RADHIKA
BDA/EE(S)/PL/128/94-95 DT 21.01.1995
BDA/EE(S)/PL/127/94-95 DT 21.01.1995
3169
507
KEMPEGOWDA H.B.C.S., KATHRIGUPPA
60' X 42'
D.V.LEELAVATHI
BDA/EE(S)/PL/129/94-95 DT 27.01.1995
3170
208
BHARATH H.B.C.S., UTTARAHALLI SY NOS
40' X 60'
KAVITA LOKESH
BDA/EE(S)/PL/130/94-95 DT 28.01.1995
3171
1191
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
40' X 60'
PONNURU J.V.K.S.PRAKASHA RAO
BDA/EE(S)/PL/131/94-95 DT 28.01.1995
3172
10
SIDDIVINAYAKA H.B.C.S., KATHARIGUPPA
40' X 60'
B.BHASKAR SOMAYAJI
BDA/EE(S)/PL/132/94-95 DT 28.01.1995
3173
1453
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
40' X 60'
K.BALASUBRAMANI
BDA/EE(S)/PL/133/94-95 DT 02.02.1995
3174
822
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
40' X 60'
P.L.RAVEENDRA SHARMA
BDA/EE(S)/PL/134/94-95 DT 04.02.1995
3175
296
KENCHENAHALLI H.B.C.S.
40' X 60'
G.KRISHNAKUMAR
BDA/EE(S)/PL/136/94-95 DT 09.02.1995
3176
768
KENCHENAHALLI H.B.C.S.
61' X 37'
P.VIMALA
BDA/EE(S)/PL/137/94-95 DT 16.02.1995
3177
12
SIDDIVINAYAKA H.B.C.S., KATHARIGUPPA
32' X 60'
V.S.RAO
BDA/EE(S)/PL/138/94-95 DT 18.02.1995
3178
628
BIKASIPURA SPACE EMPLOYEES HBCS
40' X 60'
MALLACHARI P.
BDA/EE(S)/PL/139/94-95 DT 21.02.1995
3179
812
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
40' X 60'
P.S.SUDARSHAN
BDA/EE(S)/PL/140/94-95 DT 23.02.1995
3180
871
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
40' X 56'
G.V.SHIVALINGAIAH
BDA/EE(S)/PL/141/94-95 DT 23.02.1995
3181
114
RAMA RAO LAYOUT
39' X 60'
L.M.SHYAMALADEVI
BDA/EE(S)/PL/142/94-95 DT 23.02.1995
3182
1092
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
40' X 60'
B.S.SHIVAKUMAR
BDA/EE(S)/PL/143/94-95 DT 10.03.1995
3183
1236
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
27' X 60'
Y.RAJESWARA RAO
BDA/EE(S)/PL/144/94-95 DT 10.03.1995
3184
1034
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
40' X 60'
B.JAVAREGOWDA
BDA/EE(S)/PL/145/94-95 DT 14.03.1995
VISWABHARATHI H.B.C.S., GIRINAGAR
40' X 60'
K.N.CHANDRASHEKRA SETTY
BDA/EE(S)/PL/146/94-95 DT 14.03.1995
3185
1/D
3186
190
B.O.O. H.B.C.S. MADIWALA
40' X 60'
K.S.RAMACHANDRA BHAT
BDA/EE(S)/PL/147/94-95 DT 15.03.1995
3187
130
B.O.O., H.B.C.S., TAVAREKERE
40' X 60'
VICE CHAIRMAN
BDA/EE(S)/PL/148/94-95 DT 18.03.1995
3188
717
BIKASIPURA SPACE EMPLOYEES HBCS
40' X 60'
S.RAVINDRAN
BDA/EE(S)/PL/149/94-95 DT 23.03.1995
3189
787
N.S.PALYA MICO H.B.C.S.
40' X 61'
SURENDRA
BDA/EE(S)/PL/150/94-95 DT 23.03.1995
VISWABHARATHI H.B.C.S., GIRINAGAR
58' X 40'
V.UMAKANTHA RAO
BDA/EE(S)/PL/1/94-95 DT 04.04.1994
N.S.PALYA MICO H.B.C.S.
40' X 61'
NANDI KESHAVAN
BDA/EE(S)/PL/2/94-95 DT 06.04.1994
KAVERI H.B.C.S., TAVAREKERE SY NOS
40' X 60'
M.HEMAVATHI
BDA/EE(S)/PL/3/94-95 DT 06.04.1994
3190
7/G
3191
3192
786
54/A
3193
592
BIKASIPURA SPACE EMPLOYEES HBCS
41' X 61'
Y.K.VENKATESH
BDA/EE(S)/PL/4/94-95 DT 08.04.1994
3194
1712
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
52' X 40'
C.RAVIKUMAR
BDA/EE(S)/PL/5/94-95 DT 08.04.1994
3195
952
KENCHENAHALLI H.B.C.S.
40' X 60'
GEETHA
BDA/EE(S)/PL/6/94-95 DT 08.04.1994
3196
43
SRI.ANJANEYA H.B.C.S., ITTUMADU, B.S.K. III STAGE
64' X 36'
N.V.SRINIVASA
BDA/EE(S)/PL/7/94-95 DT 08.04.1994
B.O.O. H.B.C.S. MADIWALA
33' X 58'
VICE CHAIRMAN
BDA/EE(S)/PL/8/94-95 DT 08.04.1994
3197
128/A
3198
874
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
59' X 40'
B.VENKATESH MURTHY
BDA/EE(S)/PL/8/94-95 DT 18.04.1994
3199
526
BIKASIPURA SPACE EMPLOYEES HBCS
40' X 60'
B.GANESHWAR RAO
BDA/EE(S)/PL/10/94-95 DT 18.04.1994
3200
1238
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
62' X 40'
K.M.NARASIMHA MURTHY
BDA/EE(S)/PL/11/94-95 DT 22.04.1994
3201
404
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
40' X 60'
K.G.SRINIVASA
BDA/EE(S)/PL/12/94-95 DT 22.04.1994
3202
650
N.S.PALYA MICO H.B.C.S.
40' X 60'
MUNESHYADAV
BDA/EE(S)/PL/13/94-95 DT 22.04.1994
3203
130
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
40' X 60'
Y.K.NAGENDRA NATH
BDA/EE(S)/PL/14/94-95 DT 22.04.1994
3204
150
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
40' X 59'
K.NAGARAJA RAO
BDA/EE(S)/PL/15/94-95 DT 22.04.1994
3205
965
N.S.PALYA MICO H.B.C.S.
40' X 60'
M.RAMAYI
BDA/EE(S)/PL/16/94-95 DT 22.04.1994
3206
90
POORNA PRAJAN H.B.C.S., KATHARIGUPPA
48' X 50'
K.M.NEELAKANTA ILAYAK
BDA/EE(S)/PL/17/94-95 DT 27.04.1994
3207
701
N.S.PALYA MICO H.B.C.S.
37' X 62'
R.LINGAPPA
BDA/EE(S)/PL/18/94-95 DT 27.04.1994
3208
362
KENCHENAHALLI H.B.C.S.
71' X 37'
V.R.GOWRISHANKAR
BDA/EE(S)/PL/19/94-95 DT 27.04.1994
3209
169
B.O.O. H.B.C.S. B.T.M. LAYOUT
43' X 60'
VICE CHAIRMAN
BDA/EE(S)/PL/20/94-95 DT 28.04.1994
3210
156
MICO SKGNS ARAKERE
40' X 65'
R.JAYASIMHA
BDA/EE(S)/PL/21/94-95 DT 30.04.1994
3211
870
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
40' X 60'
C.VEERABHADRAIAH
BDA/EE(S)/PL/22/94-95 DT 03.05.1994
3212
370
VISWABHARATHI H.B.C.S., GIRINAGAR
40' X 60'
T.S.SRIDHAR
BDA/EE(S)/PL/23/94-95 DT 03.05.1994
3213
475
KENCHENAHALLI H.B.C.S.
62' X 50'
RAMA
BDA/EE(S)/PL/24/94-95 DT 03.05.1994
3214
538
KENCHENAHALLI H.B.C.S.
40' X 60'
RATHNA
BDA/EE(S)/PL/25/94-95 DT 06.05.1994
3215
343/D
KENCHENAHALLI H.B.C.S.
54' X 42'
N.CHANDRAIAH
BDA/EE(S)/PL/26/94-95 DT 07.05.1994
3216
474/C
KENCHENAHALLI H.B.C.S.
73' X 49'
B.R.PRASANNA
BDA/EE(S)/PL/27/94-95 DT 07.05.1994
3217
702
N.S.PALYA MICO H.B.C.S.
37' X 62'
C.NATARAJAN
BDA/EE(S)/PL/28/94-95 DT 10.05.1994
3218
404
VISWABHARATHI H.B.C.S., GIRINAGAR
40' X 60'
R.RANGARAO
BDA/EE(S)/PL/29/94-95 DT 10.05.1994
3219
435
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
40' X 60'
R.KANNAN
BDA/EE(S)/PL/30/94-95 DT 10.05.1994
3220
379
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
45' X 50'
N.V.KRUPAKAR
BDA/EE(S)/PL/31/94-95 DT 10.05.1994
3221
16
SRI.RADHAKRISHNA H.B.C.S., KADIRENAHALLI
40' X 60'
R.S.JAYA
BDA/EE(S)/PL/32/94-95 DT 13.05.1994
3222
105
B.O.O., H.B.C.S., TAVAREKERE
60' X 40'
VICE CHAIRMAN
BDA/EE(S)/PL/33/94-95 DT 20.05.1994
3223
881
N.S.PALYA MICO H.B.C.S.
40' X 62'
P.S.VARADARAJ IYANGAR
BDA/EE(S)/PL/34/94-95 DT 20.05.1994
3224
614
BIKASIPURA SPACE EMPLOYEES HBCS
40' X 60'
K.L.VALLIYAPPAN
BDA/EE(S)/PL/35/94-95 DT 20.05.1994
3225
371
VISWABHARATHI H.B.C.S., GIRINAGAR
40' X 60'
H.N.DWARAKA NATH
BDA/EE(S)/PL/36/94-95 DT 07.06.1994
3226
1014
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
40' X 60'
T.RAMASWAMY
BDA/EE(S)/PL/37/94-95 DT 07.06.1994
3227
918
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
78' X 40'
H.B.MALLIKARJUNAIAH
BDA/EE(S)/PL/38/94-95 DT 07.06.1994
3228
1015
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
40' X 60'
G.R.GUNDARAO
BDA/EE(S)/PL/39/94-95 DT 08.06.1994
3229
626
BIKASIPURA SPACE EMPLOYEES HBCS
40' X 60'
VARUGANTI RAMA RAO
BDA/EE(S)/PL/40/94-95 DT 17.06.1994
3230
4
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
40' X 60'
C.G.APPAJI
BDA/EE(S)/PL/41/94-95 DT 17.06.1994
3231
966
N.S.PALYA MICO H.B.C.S.
39' X 60'
UMA JAYAKUMAR
BDA/EE(S)/PL/42/94-95 DT 17.06.1994
3232
184
VISWABHARATHI H.B.C.S., GIRINAGAR
40' X 60'
H.V.KRISHNAMURTHY
BDA/EE(S)/PL/43/94-95 DT 18.06.1994
3233
266
KENCHENAHALLI H.B.C.S.
40' X 60'
MEERA RAJESH
BDA/EE(S)/PL/44/94-95 DT 18.06.1994
3234
62
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
40' X 60'
N.PRABHAKAR
BDA/EE(S)/PL/45/94-95 DT 18.06.1994
3235
782
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
40' X 60'
R.KUMARA SWAMY MODALIYAR
BDA/EE(S)/PL/46/94-95 DT 18.06.1994
3236
712
KEMPEGOWDA H.B.C.S., KATHRIGUPPA
40' X 61'
D.H.VIJAYA
BDA/EE(S)/PL/47/94-95 DT 27.06.1994
3237
221
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
40' X 60'
MOHAMMAD AMANULLA
BDA/EE(S)/PL/48/94-95 DT 01.07.1994
3238
1711
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
69' X 40'
ASHA PRASAD
BDA/EE(S)/PL/49/94-95 DT 01.07.1994
3239
1324
HALAGEVADERAHALLI B.E.M.L., H.B.C.S.
60' X 40'
G.NARASIMHA MURTHY
BDA/EE(S)/PL/50/94-95 DT 01.07.1994
3240
484
B.S.K. III STAGE, KATHARIGUPPE SY NOS
V.N.KUMAR & V.N.SRIDHAR
BDA/EE(S)/PL/
/94-95 DT 06.01.1995
Cataloguing and indexing of records as envisaged under section 4(1) (a) of the Right to information Act 2005
LIST OF PLAN SANCTIONED FILES DURING THE YEAR 95-96 IN EE(S) DIVISION
SL
NO.
3241
SITE
NO.
1733
NAME OF THE LAYOUT
DIMENSION
APPLICANT NAME
SANCTION EE NO/DATE
KUMARASWAMY LAYOUT II STAGE
40' X 61'
S.RAMACHANDRAN
BDA/EE(S)/PL/15/95-96 DT 16.05.1995
3242
1817
KUMARASWAMY LAYOUT II STAGE
42' X 45'
B.A.RAMESH
BDA/EE(S)/PL/16/95-96 DT 07.11.1995
3243
2398
KUMARASWAMY LAYOUT II STAGE
40' X 60'
N.MADHAVAN
BDA/EE(S)/PL/17/95-96 DT 04.01.1996
3244
2545
KUMARASWAMY LAYOUT II STAGE
65' X 37'
C.V.RAMACHANDRA REDDY
BDA/EE(S)/PL/18/95-96 DT 02.03.1996
3245
401
B.S.K. III STAGE, II PHASE, VI BLOCK
40' X 60'
N.K.MANJURAJ
BDA/EE(S)/PL/33/95-96 DT 23.09.1995
3246
411
B.S.K. III STAGE, III PHASE, VI BLOCK
40' X 60'
K.P.ADISHESHA
BDA/EE(S)/PL/32/95-96 DT 21.09.1995
3247
514
B.S.K. III STAGE, III PHASE, III BLOCK
57' X 52'
SUDHARAMESH & R.RAMESH
BDA/EE(S)/PL/31/95-96 DT 21.09.1995
3248
666
B.S.K. III STAGE, II PHASE, VII BLOCK
40' X 60'
P.NAGES