Stockless Production From Push to Pull Their idea
Transcription
Stockless Production From Push to Pull Their idea
Stockless Production From Push to Pull Their idea behind the change was: • At HP there was in 1983 a division which wanted to make a change over from Push to Pull. • It was the Greely Colorada Division • They made Disc Units • Their goal was to get a batch quantity of one piece Out of balance Scrap 1 Unreliable deliveries 2 The Film Stockless Production What did they try to realize at HP: • Advantages: ⇓ Inventory ⇓ Lead time ⇓ Space ⇓ Work on hand ⇓ Rework Be a were of the problems in this simulated production line. Don’t look only to the working procedures. Watch to the people themselves. Write down all what you find remarkable. • Effects: ⇑ Quality ⇑ Productivity ⇑ Involvement 3 Performance-Indicators 1 Produce and Package the Box Halve a box Box with sticker Box with wire stich Sticker on box To sticker To Stitch Tape it 4 Method Push Measurement 6 pieces Space Pull 3 pieces Pull 1 piece Work on Hand Cycle time Lead time Rework To Pack Quality Problems Box in the Box 5 6 © CoLogic/ Hessel Visser [email protected] 1 Performance-Indicators 2 Method Push Measurement 6 pieces Space 2 tables Pull 3 pieces Performance-Indicators 3 Pull 1 piece Method Push Measurement 6 pieces Space 2 tables Pull 3 pieces 2 tables Pull 1 piece 1 tables Work on Hand 30 pieces Work on Hand 30 pieces 12 pieces 4 pieces Cycle time Lead-time Rework 3:17 minute Cycle time Lead-time Rework 3:17 minute 1:40 minute Quality Problems Hidden Quality Problems Hidden 26 pieces 26 pieces 0:19 minute 10 pieces 3 pieces Visible 7 The “fixed-position stop system” Results at HP Subject Inventory Space Before 2,8 months 4000 m2 After 1,2 months 2000m2 Work on Hand 5 days 2,5 days Productivity 115% 100% 8 9 10 ANDONS 11 12 © CoLogic/ Hessel Visser [email protected] 2 13 14 15 16 17 18 © CoLogic/ Hessel Visser [email protected] 3 19 20 Conceptual diagram of the kanban system Toyota Production System Source: http://www.toyota.co.jp/en/vision/production_system/index.html 21 22 23 24 © CoLogic/ Hessel Visser [email protected] 4