X Door Instructions copy.indd

Transcription

X Door Instructions copy.indd
F U LL X DOOR
INSTAL L ATI ON
I NSTRU CTI ONS
A ssembly I nstructions
RH
•••••••••••••••••••••••••••••••••••••••••
6.1.2016
oG
l s EaR
H To
AN
FUL
L nX dDOHPOORaLr tEs S
I N S TA L L AT I O N
To o l s N e e d e d
If any of the slats have been damaged during shipping,
call us at 800-891-8312 and we will expedite a replacement slat. Lay out your Door parts according to the
illustration shown below to accurately identify which
part needs to be replaced, if any.
Drill with
Phillips
bit
Ratchet
with
7/16”
socket
I N S T RU C T I O N S
P a r ts In c lu d e d
Lay all parts out on a flat surface as shown here.
D1
C1
Description
A3
D1
A5
A1L
B1
B2
B2
B2
B2
B2
B2
B3
A4
A1R
Qty
A1 L
Side Stile, Left
1
A1 R
Side Stile, Right
1
A2
Bottom Rail
1
A3
Top Rail
1
A4
Diagonal Rail, full
1
A5
Diagonal Rail, partial
1
A6
Diagonal Rail, partial
1
B1
Left Side Slats
1
B2
Middle Slats
6*
B3
Right Side Slat
1
C1
1-1/4” Grabber Screws
15*
D1
6” Lag Bolts
4*
* Quantities will vary depending on
door size. All quantities in this
table are for an average single
Door size.
A6
D1
A2
D1
B2
tongue
All B2 Slats look like
this; a tongue and a
groove
groove
RH
•••••••••••••••••••••••••••••••••••••••••
HANGER HOLES
F ULL X DOOR
I N S TA L L AT I O N
I N S T RU C T I O N S
5”
5”
9”
RH
•••••••••••••••••••••••••••••••••••••••••
HANGER HOLES
F U LL X DOOR
I N S TA L L AT I O N
A ssembling Yo u r D o o r
We recommend a dry assembly. It is
recommended you not use glue or
adhesive of any kind.
PLEASE NOTE: These instructions
are specific to a particular door size and
type. Adjustments may be needed on
your part for changes in specifications
and measurements, as well as door types
that are different than these.
I N S T RU C T I O N S
1. Slide B3 slat to the right so it slips into the groove
2. Once all the B2 slats are together in position,
A3
A3
slide A2 up so the groove covers the bottom
tongues on the B2 slats.
of A1R stile. Continue sliding all B2 slats to the
right so the tongue along each slat’s right edge
slips into the groove along each slat’s left edge.
A1
L
B1 B2 B2
B2 B2 B2 B2 B3
A1
R
A2
A2
3. Slide slat A3 down to cover the tops of all
4.
Slide stile A1 L to the right.
5.
B slats.
A3
A1
L
RH
•••••••••••••••••••••••••••••••••••••••••
HANGER HOLES
F ULL X DOOR
I N S TA L L AT I O N
6.
Use the 6” Lag Bolts to fasten A1 L, A1 R,
and A2 and A3 together. Use your fingers and
a wrench to fasten the Lag Bolts, straight in,
avoid going in at an angle. Have someone
help keep the rails square as you install the
Lag Bolts.
7.
I N S T RU C T I O N S
Lay A4 over the top of all B slats.
Use a drill with a Phillips bit to
attach.
8.
Place slats A5 and A6 across all B
slats to form an X, corner to corner.
Use the 1-1/4” Grabber Screws to
attach.
A5
A4
A6
9.
Attach a Door Pull and your
Door is ready to hang.
RH
•••••••••••••••••••••••••••••••••••••••••