Hazard Mitigation Plan Draft
TABLE OF CONTENTS
PROJECT SUMMARY................................................................................................................... I.II-I.III
SECTION 1 .......................................................................................................................................1.1-1.13
INTRODUCTION ............................................................................................................................................
SECTION 2 .......................................................................................................................................2.1-2.22
WSU CAMPUS, COMMUNITY, AND KEY FACILITY PROFILES .......................................................................
SECTION 3 .......................................................................................................................................3.1-3.86
HAZARD INVENTORY AND VULNERABILITY ASSESSMENT ...........................................................................
SECTION 4 .......................................................................................................................................4.1-4.56
PLAN GOALS AND ACTION ITEMS ................................................................................................................
SECTION 5 .........................................................................................................................................5.1-5.5
PLAN OVERSIGHT ........................................................................................................................................
SECTION 6 .......................................................................................................................................6.1-6.10
PLAN IMPLEMENTATION & MAINTENANCE..................................................................................................
APPENDICES................................................................................................................................. A.1-F.15
ƒ•Š‹‰–‘–ƒ–‡‹˜‡”•‹–›ʹͲͲͺ
”‡Ǧ‹•ƒ•–‡”ŽŽǦƒœƒ”†•‹–‹‰ƒ–‹‘Žƒ
Washington State University All-Hazards Mitigation Plan
Project Summary
Washington State University (hereafter, WSU) is threatened by a number of different types of
natural, technological, and societal, or man-made, hazards. These hazards endanger the health and
safety of the population of the WSU community, jeopardize its economic vitality, and imperil the
quality of its environment. Due to the importance of avoiding or minimizing the vulnerabilities to
such hazards, institutional representatives from WSU, statewide, have joined together with
associated stakeholders to create the WSU Hazard Mitigation Planning Committee (hereafter,
HMPC) to undertake a comprehensive planning process that has culminated in the publication of
this document: “The Washington State University All-Hazards Mitigation Plan.”
The multidisciplinary Planning Team from WSU has been tasked with building the All-Hazards
Mitigation Plan. The team consists of two project co-leaders: Christopher Tapfer, the WSU
Emergency Management Coordinator from the WSU Office of Business and Finance, and
Michael Gaffney, the Associate Director of the Division of Governmental Studies and Services
(DGSS). Additional staff from the Office of Business and Finance includes Lana Redman,
Finance and Budget Manager; Victoria Murray, Executive Director of Budget and Resource
Planning; and Richard Heath, Senior Associate Vice-President. Staff from DGSS includes
Christina Sanders, Research Coordinator; Eversley Linley, Project Assistant; Julie Lusby,
Finance and Budget Coordinator; Maggie Cronin, Student Researcher; William Budd,
Environmental Planning Specialist and Professor; and Nicholas P. Lovrich, C.O. Johnson
Distinguished Professor of Political Science.
The plan looks at WSU as it is; a single entity with many parts. The planning effort has been
conducted through the coordinated, cooperative effort of WSU personnel from across the state.
Table PS.1 (below) lists the WSU units, along with associated stakeholders, participating as
planning partners for the project.
ƒ‰‡‹Ǥ‹
ƒ•Š‹‰–‘–ƒ–‡‹˜‡”•‹–›ʹͲͲͺ
”‡Ǧ‹•ƒ•–‡”ŽŽǦƒœƒ”†•‹–‹‰ƒ–‹‘Žƒ
1
College of Pharmacy, represented by Pat Ager
2
College of Nursing, represented by Frank Beahan
3
College of Engineering and Architecture, represented by Miles Pepper
4
College of Agriculture, Human, and Natural Resource Sciences, represented by Pete
Jacoby
5
College of Education, represented by Lynn Buckley
6
College of Veterinary Medicine, represented by Mike Malcolm
7
College of Business, represented by Darlene Russell-Neunherz
8
College of Liberal Arts, represented by Paul Phillip
9
Provost’s Office, represented by Ken Vreeland
10
Office of Business Affairs, represented by Rich Heath
11
Office of Student Affairs, represented by Bob Tattershall
12
Office of the Controller and Business Services, represented by Barry Johnston
13
Office of Capital Planning and Development, represented by Keith Bloom
14
Office of the Executive Director of Planning and Budgeting, represented by Deborah
Carlson
15
Office of Grant and Research Development, represented by Dan Nordquist
16
Office of the Campus Veterinarian, represented by Steve Russell
17
Office of Research Compliance, represented by Dave Clark
18
Facilities Operations, represented by Ev Davis
19
Radiation Safety Office, represented by Steve Eckberg
20
Environmental Health and Safety, represented by Dwight Hagihara
21
WSU Police, represented by Steve Hansen
22
Information Technology, represented by Dave Ostrom
23
Emergency Management Office, represented by Christopher Tapfer
24
Division of Governmental Studies and Services, represented by Michael Gaffney
25
School of Biological Sciences, represented by Carolyn Emerson
26
WSU Extension, represented by John Winder
27
WSU-Spokane, represented by Jon Schad
28
WSU-Vancouver, represented by Dave Stephenson
29
WSU-Tri-Cities, represented by Dallas Barnes
30
Thurston County Extension Office, represented by Cliff Moore
31
Puyallup Research and Extension Center, represented by Jon Newkirk
32
Mt. Vernon Research and Extension Center, represented by Deborah Inglis
33
Wenatchee Research Center, represented by Craig Root
Table PS.1: WSU HMPC Planning Partners
ƒ‰‡‹Ǥ‹‹
”‡’ƒ”‡†›ǣˆˆ‹…‡‘ˆ—•‹‡••ƒ†‹ƒ…‡
†–Š‡‹˜‹•‹‘‘ˆ
‘˜‡”‡–ƒŽ–—†‹‡•ƒ†‡”˜‹…‡•
WSU has also engaged the communities in which the university is present in the mitigation
planning process. WSU has undertaken efforts in each of the nine State of Washington Homeland
Security Regions to solicit opinions and recommendations regarding mitigation issues and the
action items identified within the plan.
The planning team has conducted detailed studies to identify the hazards threatening the
campuses and site locations of WSU and to estimate the relative risks posed to its community by
those hazards. This information has been used to prioritize planning efforts in assessing the
vulnerabilities of the facilities and properties of WSU, and the impacts of future disasters
involving those hazards. With these vulnerabilities identified, the HMPC has worked to identify,
justify, and prioritize specific action items that WSU will use to avoid or minimize these
vulnerabilities.
The proposed action items that reduce the impacts of future disasters are called, interchangeably,
mitigation initiatives or action items throughout this document. Mitigation initiatives have been
developed, and will continue to be developed, by the HMPC for implementation whenever the
resources and opportunities to do so become available. The completion of this plan is essentially
done through implementation of the mitigation initiatives included in the plan, and with each
effort, the HMPC will continue to help make the participating units more resistant to the human
and economic costs of future disasters.
This document details the work that has been done over the past 24 months by the WSU planning
team and HMPC; to develop the planning organization, undertake the needed technical analyses,
and coordinate the mitigation initiatives that have been proposed. The draft plan has been
reviewed and approved by the participating HMPC members. The Board of Regents of WSU will
also review, approve, and adopt the plan on behalf of the institution as a whole. The procedures
for these operations are delineated within the plan.
This plan will continue to be updated and expanded in the future to ensure it addresses: changing
conditions within the university, experiences on disasters that do occur, and any changes in the
characteristics of the hazards that threaten the campuses and facilities, statewide. The updating
process and future editions of the mitigation plan issued will also be used to continue to inform
and involve the general public, and other interested groups, to fully participate in making WSU
more resistant to the impacts of future disasters.
ƒ‰‡‹Ǥ‹‹‹
ƒ•Š‹‰–‘–ƒ–‡‹˜‡”•‹–›ʹͲͲͺ
”‡Ǧ‹•ƒ•–‡”ŽŽǦƒœƒ”†•‹–‹‰ƒ–‹‘Žƒ
Section 1
Introduction
The purpose of this all-hazard mitigation plan is to assist Washington State University
(WSU) in reducing its risk from natural and man-made or technological hazards. This is
done through identifying resources, information, and strategies for risk reduction at its
campuses, research stations, and other key facilities, statewide. The plan will also help
guide and coordinate mitigation activities for the university system.
Although it is impossible to predict exactly when disasters might occur, or to the extent
they might affect the campuses and other WSU sites, the university can minimize losses
from hazards. This can be done through deliberate planning and collaboration within
the university community, in cooperation with the county and city governments where
each of the WSU sites are located, as well as the State of Washington Emergency
Management Division.
A natural disaster occurs when a natural hazard impacts people or property and creates
adverse conditions within a community. Typical natural hazards include: floods,
earthquakes, coastal erosion, tsunami, volcanic eruption, severe winter storm,
windstorm, drought, and wildfire. This plan includes the natural hazards that have been
identified that could directly affect key WSU-owned facilities in each of their locations,
statewide. They are:
Severe Winter Weather
Wildland Fires
Storm Surge/Tsunami
High Winds
Lightning
Hail
Earthquakes
Drought
Diseases
Volcanic Activity
Flooding
Landslides/Erosion
(Note: this list was compiled from research of existing data as well as through
surveying personnel at each WSU campus and facility to determine which hazards are
of most concern at each location. Many responses listed “Loss of electrical service” and
“major fires-urban” as natural events, as natural events can cause both. Others listed
them as man-made or technological hazards as both originate from human activity. We
have chosen to list them both as man-made/technological hazards as they derive from
human activity. Power loss is a major concern of WSU personnel, statewide, as loss of
power can affect critical research and operations at any campus or facility.)
Additionally, this plan will include the man-made hazards that can affect WSU
facilities. These man-made hazards can impact even those areas that are normally less
vulnerable to natural hazards. For the purpose of this document, “man-made hazards”
are technological hazards and terrorism.
The term, “technological hazards” refers to the origins of incidents that can arise from
human activities such as the manufacture, transportation, storage, and use of hazardous
materials. For the sake of simplicity, this document assumes that technological
emergencies are accidental and that their consequences are unintended.
ƒ‰‡ͳǤͳ
ƒ•Š‹‰–‘–ƒ–‡‹˜‡”•‹–›ʹͲͲͺ
”‡Ǧ‹•ƒ•–‡”ŽŽǦƒœƒ”†•‹–‹‰ƒ–‹‘Žƒ
The term “terrorism” refers to intentional, criminal, and malicious acts. There is no
single, universally accepted definition of terrorism, and it can be interpreted in many
ways. For the purposes of this document, “terrorism” refers to the use of Weapons of
Mass Destruction (WMD), including biological, chemical, nuclear, and radiological
weapons; arson, incendiary, explosive, and armed attacks; industrial sabotage and
intentional hazardous materials releases; and “cyber terrorism.”
Within these general categories, however, there are many variations. Particularly in the
area of biological and chemical weapons, there are a wide variety of agents and ways
for them to be disseminated. These man-made hazards are distinct from natural hazards
primarily in that they originate from human activity. In contrast, while the risks
presented by natural hazards may be increased or decreased as a result of human
activity, they are not inherently human-induced. The technological hazards and terrorist
activities that have been identified and could affect WSU facilities, statewide, are:
Hazardous Materials Releases Crime/Terrorism
Radiological Incidents
Major Fires-Urban
Economic Crisis
Employment Crisis
Loss of Electrical Service
Loss of Water/Sewer/Gas Service
Telecomm System Failure
(This list of man-made/technological hazards has been derived from research of existing plans
and information as well as surveying of WSU personnel at campuses and facilities around the
state.)
Please note Section 3-the Hazard Inventory and Vulnerability Assessment-will go into
these hazards in much more detail. Also note that not all of these natural or manmade/technological hazards were identified as significant concerns for all campuses and
facilities.
WSU's All-Hazard Mitigation Plan
In 2000, Congress passed the Disaster Mitigation Act (DMA 2000), and the President
of the United States signed it. Under this Act, rules published in 44 CFR, Part 201.6, it
states that communities and tribal governments must complete Federal Emergency
Management Agency-approved hazard mitigation plans by December 31, 2004 in order
to be eligible for certain federal assistance programs, such as the Hazard Mitigation
Grant Program (HMGP). Not only are states and communities eligible for funding
under DMA 2000, but so are state agencies such as WSU.
In 2005, FEMA selected WSU through a Pre-Disaster Mitigation Program (PDM)
proposal, submitted on its behalf by the State of Washington Emergency Management
Division (WSEMD) of the Washington State Military Department as the managing
agency for this program for the State of Washington, to develop a, “Washington State
University Statewide All-Hazard Mitigation Plan” that meets the criteria of a 322
ALL HAZARD PLAN (per 44 CFR Section 201.6).
Development of the successful application for this program and the responsibility for
creation of all aspects of the plan, including the hazard inventory and vulnerability
assessment, the process for public input and the plan, itself, is a shared project between
the WSU Office of Business and Finance and the WSU Division of Governmental
Studies and Services (DGSS). Although the primary efforts for all aspects of the
ƒ‰‡ͳǤʹ
”‡’ƒ”‡†›ǣˆˆ‹…‡‘ˆ—•‹‡••ƒ†‹ƒ…‡
†–Š‡‹˜‹•‹‘‘ˆ
‘˜‡”‡–ƒŽ–—†‹‡•ƒ†‡”˜‹…‡•
planning process rest with these two university offices, the statewide nature of the
project and the diversity of the WSU colleges, divisions, departments, areas and units
that make up WSU has made this a shared project involving many parts if the
university.
Significant assistance has been provided by the WSU Office of Grant and Research
Development, the WSU Office of Capital Planning and Development, the College of
Agriculture and Human and Natural Resources (CAHNRS) and the staff of the three
WSU regional campuses: Spokane, Tri-Cities, and Vancouver.
The purpose of the WSU’s natural hazard mitigation plan is to reduce or eliminate
impacts to the campus from natural and technological disasters. Engaging in mitigation
activities provides the university with a number of benefits including:
x
Reduced vulnerability to future hazard events, specifically reduced loss
of life, property, essential services, critical facilities, and economic
hardship;
x
Reduced short-term and long-term recovery and reconstruction costs;
x
Faster resumption of university functions, including education, research,
and business systems;
x
Increased cooperation and communication within the community
through the planning process, and;
x
Increased potential for state and federal funding, for mitigation and
recovery projects.
This all-hazard mitigation plan is non-regulatory in nature, meaning that it does not set
forth any new policy. Rather, it is designed to help build a foundation and a vision for
enhanced coordination and collaboration among university departments and
administrative units, to prepare for and reduce the risks posed by natural and
technological hazards. To be successful, mitigation practices must be integrated into
current and future university plans, policies, and practices.
Integrated Emergency Management
Mitigation is only one of the four phases of what is commonly referred to as the,
"disaster cycle." The traditional emergency management profession, and FEMA, both
refer to the phases of the cycle as prepare, respond, recover, and mitigate (Figure 11). The phases of this cycle should be integrated to create a comprehensive approach to
risk reduction. Although described as separate phases, each phase is tied to the other. It
is helpful to think of the disaster cycle as a simple equation: every risk or vulnerability
mitigated today reduces the overall exposure, which decreases the pressure on the
response side of the disaster cycle and lowers the recovery costs from future events.
ƒ‰‡ͳǤ͵
ƒ•Š‹‰–‘–ƒ–‡‹˜‡”•‹–›ʹͲͲͺ
”‡Ǧ‹•ƒ•–‡”ŽŽǦƒœƒ”†•‹–‹‰ƒ–‹‘Žƒ
Figure 1-1: The Disaster Cycle
Mitigation
All-hazard mitigation is defined as a method to reduce or eliminate loss of life and/or
property, and injuries resulting from natural and technological hazards through short
and long-term activities. Mitigation strategies may range in scope and size; however, no
matter the size, effective mitigation activities have the potential to reduce the
vulnerability and/or exposure to risk and impact of natural and technological disasters.
Example strategies include projects such as seismically retrofitting a building, moving
power lines underground, non-structurally retrofitting labs and offices, providing
security for stored hazardous materials, and additional security for research projects that
may be vulnerable to terrorist activity.
Preparedness
Preparedness refers to activities, programs, and systems developed in advance of a
disaster designed to build and enhance capabilities at an individual and campus level in
order to support the response to, and recovery from, disasters. Example strategies might
include developing awareness and outreach campaigns targeted toward students,
faculty, staff and visitors, as well as reviewing and improving current emergency
procedures.
ƒ‰‡ͳǤͶ
”‡’ƒ”‡†›ǣˆˆ‹…‡‘ˆ—•‹‡••ƒ†‹ƒ…‡
†–Š‡‹˜‹•‹‘‘ˆ
‘˜‡”‡–ƒŽ–—†‹‡•ƒ†‡”˜‹…‡•
Response
Response begins as soon as a disaster event occurs. Response is the provision of search
and rescue, medical services, access control, and repairing and restoring communication
and data systems during a crisis. A coordinated response plan can help reduce
casualties, damage, and recovery time. Examples include emergency operations plans,
and business continuity plans and procedures for the university.
Recovery
Recovery operations provide for basic needs to aid in restoring the community. There
are two stages in the recovery phase. During the first stage, infrastructure is examined,
and repairs are conducted to restore water, power, communication, and other utilities.
The second stage includes returning to normal functions, and addressing future
disasters. The process of recovery can take months or years to accomplish, depending
upon the disaster event.
Emergency Management Plans
To effectively reduce risk, all phases of the disaster cycle need to be carefully
evaluated, and plans need to be developed to provide guidance for each. Crucial plans
include: (1) Pre-disaster Mitigation Plan; (2) Comprehensive Emergency Management
Plan; (3) Unit Emergency Response Plan; (4) Continuance of Operations Plan; and (5)
Post Disaster Recovery Plan. As WSU enhances its emergency management system, it
will need to develop this entire compilation of plans and a management strategy to
make sure they stay current and integrated over time.
Pre-Disaster All-Hazards Mitigation Plan
This plan is designed to assist the university in reducing its risk to natural and
technological hazards by identifying resources, information, and strategies for risk
reduction. This plan provides a foundation to lower risk by outlining methods to
mitigate risk throughout each major campus and facility, statewide. This plan will work
in concert with the state, local city, and county mitigation plans (where they exist and as
appropriate) to increase the disaster resistance and resiliency of the area.
Comprehensive Emergency Management Plan (CEMP)
The CEMP is designed to provide an overall management tool to facilitate timely,
effective, efficient, and coordinated emergency response to disaster situations. The
CEMP is critical for the first few days after a disaster event. Lines of communication,
critical infrastructure, and means of identifying emergency procedures are all outlined
in this plan. The WSU CEMP has been updated in 2007.
Unit Emergency Response Plans
Due to the complexity of WSU as a statewide institution, most emergency response
planning, specific to the wide variety of needs of the units and to their mission within
the university, takes place at the unit level. Per WSU Business Policies and Procedures
ƒ‰‡ͳǤͷ
ƒ•Š‹‰–‘–ƒ–‡‹˜‡”•‹–›ʹͲͲͺ
”‡Ǧ‹•ƒ•–‡”ŽŽǦƒœƒ”†•‹–‹‰ƒ–‹‘Žƒ
(BPPM) 50.39 and Executive Order #25, all units are directed to prepare and maintain
Emergency Response Plans per the standards established by the WSU Emergency
Management Office.
Continuance of Operations Planning
Continuance of Operations Planning (COOP) is designed to identify the mission-critical
and essential functions of the university and establish a framework to maintain those
functions during short and long-term emergency situations. Additionally, COOP
provides a framework for prioritizing and restoring these functions after a disaster. The
university began the COOP process by establishing a planning template for units to use
in identifying the mission-critical and essential functions of their unit in order to serve as
the basis for a unit plan. This process started in 2006 with a goal of completion by 2008.
Post-Disaster Recovery Plan
A post-disaster recovery plan, paired with a mitigation plan, can help to break the cycle
of increasing disaster costs by planning for stronger, smarter redevelopment processes
before the disaster occurs. This plan provides guidance for post-disaster redevelopment
policies and procedures before the event so that sustainable redevelopment actions can
be taken quickly. As the completion of the University All-Hazards Mitigation Plan and
the COOP process takes place, priority will shift to using the information from these
plans to develop an overall university recovery strategy consistent with the University
All-Hazards Mitigation Plan.
Mitigation Plan Methodology
The information used to formulate this plan was drawn from a variety of
sources. WSU Business and Finance and the Division of Governmental Studies and
Service hazard mitigation project staff (hereafter referred to as the Mitigation Planning
Team or MPT) performed the following tasks to develop the plan:
x
Organized the Mitigation Planning Team (MPT) consisting of project co-leader
Christopher Tapfer, the WSU Emergency Management Coordinator and
member of the WSU Office of Business and Finance staff. The WSU Division
of Governmental Studies and Services (DGSS) staff includes Michael Gaffney,
Associate Director of DGSS and the other project co-leader; Christina Sanders,
Research Coordinator; Eversley Linley, Project Assistant; Maggie Cronin,
Student Researcher; William Budd, Environmental Planning Specialist and
Professor, Nicholas P. Lovrich, C.O. Johnson Distinguished Professor of
Political Science. Additionally, Lana Redman of the Office of Business and
Finance and Julie Lusby of DGSS provided financial management support for
the project. Other administrative assistance came from Victoria Murray,
Executive Director of Budget and Resource Planning and Richard Heath,
Senior Associate Vice-President both of the Office of Business and Finance.
ƒ‰‡ͳǤ͸
”‡’ƒ”‡†›ǣˆˆ‹…‡‘ˆ—•‹‡••ƒ†‹ƒ…‡
†–Š‡‹˜‹•‹‘‘ˆ
‘˜‡”‡–ƒŽ–—†‹‡•ƒ†‡”˜‹…‡•
x
Formed the Hazard Mitigation Planning Committee (HMPC): The HMPC,
organized in spring 2006, consists of representatives from 33 Colleges, Offices,
Departments and Administrative units from across the entire spectrum of WSU.
This committee guided the development of the plan, specifically focusing on its
purpose, goals, and action items. HMPC members represent the following
units:
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
25.
26.
27.
28.
29.
30.
31.
32.
33.
College of Pharmacy, represented by Pat Ager
College of Nursing, currently vacant
College of Engineering and Architecture, represented by Miles Pepper
College of Agriculture, Human, and Natural Resource Sciences,
represented by Pete Jacoby
College of Education, represented by Lynn Buckley
College of Veterinary Medicine, represented by Mike Malcolm
College of Business, represented by Darlene Russell-Neunherz
College of Liberal Arts, represented by Paul Phillip
Provost’s Office, represented by Ken Vreeland
Office of Business Affairs, represented by Rich Heath
Office of Student Affairs, represented by Bob Tattershall
Office of the Controller and Business Services, represented by Barry
Johnston
Office of Capital Planning and Development, represented by Keith Bloom
Office of the Executive Director of Planning and Budgeting, represented
by Deborah Carlson
Office of Grant and Research Development, represented by Dan
Nordquist
Office of the Campus Veterinarian, represented by Steve Russell
Office of Research Compliance, represented by Dave Clark
Facilities Operations, represented by Ev Davis
Radiation Safety Office, represented by Steve Eckberg
Environmental Health and Safety, represented by Dwight Hagihara
WSU Police, represented by Steve Hansen
Information Technology, represented by Dave Ostrom
Emergency Management Office, represented by Christopher Tapfer
Division of Governmental Studies and Services, represented by Michael
Gaffney
School of Biological Sciences, represented by Carolyn Emerson
WSU Extension, represented by John Winder
WSU-Spokane, represented by Jon Schad
WSU-Vancouver, represented by Dave Stephenson
WSU-Tri-Cities, currently vacant
Thurston County Extension Office, represented by Cliff Moore
Puyallup Research and Extension Center, represented by Jon Newkirk
Mt. Vernon Research and Extension Center, represented by Deborah
Inglis
Wenatchee Research Center, represented by Craig Root
ƒ‰‡ͳǤ͹
ƒ•Š‹‰–‘–ƒ–‡‹˜‡”•‹–›ʹͲͲͺ
”‡Ǧ‹•ƒ•–‡”ŽŽǦƒœƒ”†•‹–‹‰ƒ–‹‘Žƒ
x
Surveyed and polled HMPC members: The MPT solicited input from
HMPC members to better understand the current hazards and those
concerns that could be mitigated on each campus. This information was
used in forming the project’s mission and objectives as well as the
Committee’s Operating Procedures and Principles. Additionally, the
Committee reviewed and approved strategies and action items
developed for the plan.
x
Researched university characteristics: The MPT researched
characteristics of the university that are important to understand when
developing mitigation strategies. (See Section 2)
x
Developed the hazard inventory and vulnerability assessment (HIVA):
With assistance from the Office of Capital Planning and Development,
the Division of Governmental Studies and Services members of the
MPT prepared the survey instrument, worked with the identified WSU
units across the state to collect the information, and verified the
information received compared to existing plans and hazard information
for the affected areas to develop a comprehensive risk assessment that
describes the University’s vulnerability to natural disasters. (See Section
3)
x
Created goals and action items: With the participation of the HMPC,
goals and action items were developed. (See Section 4)
NOTE:
Due to the unique nature of the hazard mitigation planning process involving units
scattered over all thirty-nine counties of the state of Washington, we have used a
different methodology than has been typically found in the development of multijurisdictional plans for a county or single jurisdictional plans used by other colleges or
universities. Our approach, by necessity, has been to look at WSU, statewide as the
single entity it is, but as one situated in many different physical locations. The
distributed nature of WSU has also necessitated a unique organizational structure to our
HMPC. Members of the committee represent key units at the primary campus, the
regional campuses, the individual research stations, as well as the extension and other
institutional outreach units in each county. Consequently, physical meetings of the
committee were not feasible. To accomplish the necessary review and input process
demanded of this planning process, we chose to use technology to aid in the process by
using institutional closed-circuit television, email, and specialized websites to
communicate with the committee members. This process has allowed us to include all
parts of WSU in the process without excessive costs to the planning grant budget or
creating excessive burdens due to travel that otherwise would have decreased
participation by the committee. This process WSU has utilized may very well be unique
but could serve as a model for other institutions with multiple campuses and locations
scattered over a large geographical region.
ƒ‰‡ͳǤͺ
”‡’ƒ”‡†›ǣˆˆ‹…‡‘ˆ—•‹‡••ƒ†‹ƒ…‡
†–Š‡‹˜‹•‹‘‘ˆ
‘˜‡”‡–ƒŽ–—†‹‡•ƒ†‡”˜‹…‡•
Committee Activities and Public Involvement and Outreach during
Plan Development
The Two “Publics” of the Plan Development Process
During plan development, public participation, mainly through involvement by the
HMPC, input from WSU students, staff and open public meetings across the state was
incorporated into the plan development process. The scattered nature of the campuses
and units to be included in this plan also necessitated modifications of the public input
process. The HMPC determined it was necessary to receive input from two "publics"
regarding hazard mitigation goals and objectives, natural and man-made or
technological hazards, and the vulnerability to those hazards that WSU is subject to, as
well as input on hazard mitigation strategies and action items. The first "public" is the
students, faculty, staff, adjunct personnel, and affiliated stakeholders that make up the
university community. The HMPC considered this group to be the primary "public" for
input on the development of the hazard inventory and vulnerability assessment, as well
as mitigation measures and priorities. This group was reached via a survey sent to all
faculty and staff plus a selected sample of WSU students as well as information on the
mitigation planning process available on each campus, in which the hazard mitigation
project was explained and input from the campus, was solicited. The second "public"
that the HMPC focused on was the administrators, emergency response personnel and
the general citizens in the Washington State Homeland Security regions surrounding
WSU locations and facilities, statewide. These "stakeholders" were reached through the
public informational sessions in each of the nine Homeland Security regions in the
state.
The Outreach and Engagement Process
The planning team used a multi-mode approach to outreach and engagement for this project.
The goal of this approach was to obtain feedback and information from a broad array of
interested parties in order to augment and validate the data, materials and proposals
contained in the (developing) draft plan. To that end, the planning team made presentations
regarding the on-going planning project in various public forums, used distance technology
(web links and statewide video broadcasts), and conducted “public” outreach sessions over
the course of this planning project. These efforts were primarily focused on two stakeholder
groups, with more general public input solicited on the draft plan near the end of the project.
The two primary “publics” from which input and feedback were solicited by the planning
team were 1) “Internal” stakeholders representing faculty, staff and students – especially
knowledgeable managers, administrators and leaders in the various WSU locations, and 2)
“Informed External” stakeholders comprising emergency managers, planners, emergency
responders and representatives of state, local and tribal government agencies as well as
industry representatives associated with Local Emergency Planning Committees and the
general public were invited to participate in this process.
ƒ‰‡ͳǤͻ
ƒ•Š‹‰–‘–ƒ–‡‹˜‡”•‹–›ʹͲͲͺ
”‡Ǧ‹•ƒ•–‡”ŽŽǦƒœƒ”†•‹–‹‰ƒ–‹‘Žƒ
A Timeline and Listing of Hazard Mitigation Planning Committee and Public Outreach
Activities
x
January-March, 2006: WSU Hazard Mitigation Planning Committee
(HMPC) formed;
x
March, 2006: HMPC surveyed about natural/technological disaster
concerns and current practices;
x
March, 2006: SharePoint site established for interchange of information
by the HMPC via computer;
x
March, 2006: WSU “Extension Engaged” interactive statewide
television system used to reach out to all WSU Extension personnel,
statewide to present the WSU Hazard Mitigation Project, as well as to
enlist their participation in the project;
x
April, 2006: Regular project update for all HMPC Members begin;
x
May, 2006: HMPC establishes mission and objectives for WSU Hazard
Mitigation Project;
x
September, 2006: Initial site hazard survey process at WSU locations
statewide begins:
x
November, 2006: HMPC establishes final operating procedures and
principles for the hazard mitigation planning process and how the plan
will be reviewed, approved, modified, implemented, and updated;
x
April, 2007: Hazard survey goes out, statewide, to all WSU staff and
faculty, plus a random selection of WSU students (about 33%) to
ascertain their concerns regarding natural and technological/man-made
hazards;
x
May, 2007: WSU Hazard Mitigation Planning website established for
public review of planning information, plan documents and also for
public input;
x
August, 2007: HMPC begins review and provides input on sections of
the plan as they are drafted.
x
September-December, 2007: HMPC continues to provide input and
provide recommendations for changes to sections of the plan. HMPC
approves final draft;
x
December, 2007: Formal process of public outreach through meetings
and presentations in the nine Homeland Security Regions in Washington
take place (see more information below).
ƒ‰‡ͳǤͳͲ
”‡’ƒ”‡†›ǣˆˆ‹…‡‘ˆ—•‹‡••ƒ†‹ƒ…‡
†–Š‡‹˜‹•‹‘‘ˆ
‘˜‡”‡–ƒŽ–—†‹‡•ƒ†‡”˜‹…‡•
Other Statewide WSU Hazard Mitigation Planning Process Awareness Activities
Conference and Association Presentations:
Western Regional Institute for Community Oriented Public Safety (Jan 11 & Aug 3, 2006)
Washington State Emergency Management Association Conference (May 23-25, 2006)
Washington LEPC/SERC/TERC Annual Conference (May 9/10, 2006)
Individual LEPC Meetings (Feb 8, June 18 & 29, November 29, 2007)
Partners In Emergency Preparedness Conference (April 18/19, 2006 & April 10/11, 2007)
Washington Community Safety Summit (September 25-27, 2007)
Association of Criminal Justice Societies (March 15, 2007)
Washington Association of Sheriffs and Police Chiefs (May 23-25, 2006)
Other Internal WSU Awareness Activities:
E-mail notifications and updates to Extension Directors and Planning Committee (quarterly)
Annual County Extension Directors Meetings (Jan. 19, ’06, March 6, Nov. 14, 2007)
Extension District Directors Meeting Presentations (Jan. 26, June 12, Nov. 28, 2007)
WSU Location site visits (Spokane, Vancouver, Olympia, Wenatchee, Mt. Vernon, Puyallup,
Stephenson, Moses Lake, Tri-Cities, Walla Walla, Yakima, and Seattle)
Final “public” Outreach on the Draft Plan:
Public meetings were held in each of the nine Washington Homeland Security Regions. County
and incorporated city (plus rural fire district) representatives of Law, Fire, EMS, Planning and
Emergency Management as well as the general public were invited to attend these sessions, or to
provide feedback on the draft plan available on the planning project website. Events were held
on the following dates:
Region 1 – December 17, 2007 – Mt. Vernon
Region 2 – December 14, 2007 – Bremerton
Region 3 – December 18, 2007 – Lacey
Region 4 – December 11, 2007 – Vancouver
Region 5 – December 18, 2007 – Puyallup
Region 6 – December 12, 2007 – Seattle
ƒ‰‡ͳǤͳͳ
ƒ•Š‹‰–‘–ƒ–‡‹˜‡”•‹–›ʹͲͲͺ
”‡Ǧ‹•ƒ•–‡”ŽŽǦƒœƒ”†•‹–‹‰ƒ–‹‘Žƒ
Region 7 – December 19, 2007 – Ephrata
Region 8 – December 20, 2007 – Yakima
Region 9 – December 3, 2007 – Spokane
Among the important elements of feedback, input and validating which were obtained through
these various outreach processes are several key items:
The planning teams’ identification of four “hazards of primary statewide concern” was
appropriate. Severe Storm, Utilities Service Interruption, Hazardous Materials Incidents and
Crime/Disorder were confirmed as issues of concern by every commentator who addressed this
issue. Many commentators also confirmed that there are “regionally specific” hazards of concern
which should be noted and addressed in the WSU plan. These include Tsunami (Pacific coastal
areas), Earthquake (Puget Sound fault zones), Wildland Fire (Northeastern Washington), and
Volcanic Activity (Mts. Rainier and St. Helens areas).
Consistently, protection of research and continuity of operations were identified as significant
issues for nearly every WSU location, with interruption of electrical power and
communication/computer connectivity the primary concerns.
Another consistent indication from the public input and awareness activities was the focus of
WSU’s efforts should be on the “soft side” of hazard mitigation, focusing on non-structural
mitigation issues. Some attention and priority needs to be given to buildings and infrastructure
(seismic refits, code upgrades, etc.), particularly to meet identified risks from “regional hazards,”
but the primary need for WSU system-wide is to address planning; increase response capacity;
enhance safety and security; and address continuity of operations issues.
Plan Organization
This plan is divided into six sections and appendices, which provide specific
information and resources to assist in understanding the hazard-specific issues facing
the university. The sections are as follows:
Section 1: Introduction
The Introduction describes the purpose of the plan and how the plan fits into a
comprehensive emergency management system that will help reduce risk from
natural and man-made hazards.
Section 2: WSU Campus, Community, and Key Facility Profiles
This section describes each of WSU’s campuses, research stations, and other
significant facilities, statewide including the demographic, economic, and
research characteristics. Additionally, it includes information about each site’s
infrastructure and critical facilities.
ƒ‰‡ͳǤͳʹ
”‡’ƒ”‡†›ǣˆˆ‹…‡‘ˆ—•‹‡••ƒ†‹ƒ…‡
†–Š‡‹˜‹•‹‘‘ˆ
‘˜‡”‡–ƒŽ–—†‹‡•ƒ†‡”˜‹…‡•
Section 3: Hazard Inventory and Vulnerability Assessment (HIVA)
The HIVA identifies hazards affecting each of the campuses, research stations,
and significant facilities; assessing their vulnerabilities. This section includes
information about the identified hazards, their history on campus, and analysis of
site’s risk to each hazard.
Section 4: Goals and Action Items
This section provides information on the processes used to develop the goals and
action items in the plan. It also presents the Goals and Action Item Matrix, which
is the overall framework for each campus, research station and significant site’s
natural/technological hazard mitigation strategies.
Section 5: Plan Oversight
The Plan Oversight explains the management structure of the plan.
Section 6: Plan Implementation and Maintenance
The Plan Implementation and Maintenance provides information on the
implementation, monitoring and evaluation of the plan.
Appendices:
Information in the appendices enhances the information and research presented in the
sections of the Plan.
ƒ‰‡ͳǤͳ͵
ƒ•Š‹‰–‘–ƒ–‡‹˜‡”•‹–›ʹͲͲͺ
”‡Ǧ‹•ƒ•–‡”ŽŽǦƒœƒ”†•‹–‹‰ƒ–‹‘Žƒ
Section 2
WSU Campus, Community, and Key Facility Profiles
The purpose of this campus and community profile is to provide the context in which
current and future all-hazards disaster mitigation activities are, and will be,
implemented. This section provides a broad perspective, brief history, and description
of the makeup and development of each WSU community.
The Pullman Community
Pullman, Washington is located in an area known as the Palouse; a place rich in history,
dating back more than 10,000 years. Native Americans were first here, followed by
Lewis and Clark, who passed through nearly two centuries ago on their journey to the
mouth of the Columbia. The Palouse area covers some 10,000 square miles of
northwestern Idaho and southeastern Washington, and is also known as one of the
world’s top producers of wheat, lentils, barley, and dry peas.
Pullman’s 26,590 residents are a mix of WSU students, faculty, and staff along with
families and individuals employed in education, agriculture, government, retail, trade
technology, and services. Pullman is situated on four hills—Sunnyside, Pioneer,
College, and Military—that divide the city into four, nearly equal quarters.
Pullman offers much to visitors, students, and those seeking a lifestyle that combines a
beautiful rural setting with the benefits of a renowned research university. Among the
traits that distinguish the community: a wide range of cultural and community activities,
excellent public schools and healthcare services, a low crime rate, and a lack of traffic
jams and air pollution. The outdoor recreation possibilities in the area are exceptional,
including hiking, camping, mountain biking, snow skiing, fishing, boating, and rafting.
The Pullman climate is dry and clear for much of the year, with generally temperate
weather conditions. Precipitation, in the form of rain and snow, averages about 20
inches annually. The midsummer months are often marked by long periods of warm,
sunny days and clear, cool nights. The warmest month is August, with an average daily
maximum temperature of 82 degrees, while January is the coldest month with an
average daily minimum temperature of 23 degrees.
ƒ‰‡ʹǤͳ
ƒ•Š‹‰–‘–ƒ–‡‹˜‡”•‹–›ʹͲͲͺ
”‡Ǧ‹•ƒ•–‡”ŽŽǦƒœƒ”†•‹–‹‰ƒ–‹‘Žƒ
Pullman is located within Whitman County which has an area of 2,151 square
miles. The large university population distorts an otherwise relatively small
population base; with the student population accounting for about 40 percent of
the county’s population.
Whitman County age group percentages are different from the state as a whole
because of the presence of WSU. Percentage wise, the age groups of 15-19 and
20-24 are much larger than those of the state. The median age in Whitman
County is 24.6 years versus 34.6 years, throughout the state. The county terrain is
a combination of flat lands and rolling hills. Elevations range from 1,100 to 3,400
feet; at higher elevations are Tekoa Mountain and a number of prominent rock
formations such as Bald Butte, Steptoe Butte, and Kamiak Butte.
The Snake River defines the county’s winding southern border with Columbia,
Asotin, and Garfield Counties. Along this border lies the Snake River Canyon, a
2,000-foot deep swath through the Palouse hills. The county’s single largest body
of water is Rock Lake, located in the northwest corner. Among the county’s
major tributaries are the Palouse River, Rock Creek, Cottonwood Creek, Pleasant
Valley Creek, and Union Flat Creek. The county’s eastern boundary is with the
state of Idaho.
WSU Pullman
Founded in 1890 as the state’s land-grant research university, WSU today has campuses
in Pullman, Spokane, Tri-Cities, Vancouver, and a university relations office in Seattle.
WSU Pullman is a dynamic center of higher education, research, and culture located in
southeastern Washington. It sits upon 1,875 acres (the campus core on 620 acres), and
is one of the country’s top public research universities, having ten colleges, as well as a
graduate school. The colleges include Agriculture, Human, and Natural Resource
Sciences; Business; Education; Engineering and Architecture; Honors; Liberal Arts;
Nursing; Pharmacy; Sciences; and Veterinary Medicine. The university is known for
research strengths in diverse areas such as biotechnology, reproductive biology, shock
physics, viticulture, sleep, wood technology, computer chips, and advertising’s impact
on healthy decision-making.
ƒ‰‡ʹǤʹ
”‡’ƒ”‡†›ǣˆˆ‹…‡‘ˆ—•‹‡••ƒ†‹ƒ…‡
†–Š‡‹˜‹•‹‘‘ˆ
‘˜‡”‡–ƒŽ–—†‹‡•ƒ†‡”˜‹…‡•
Student, Faculty, and Staff Population
In 2006, WSU Pullman’s enrollment was almost 19,000 students, with 16,620
undergraduates and 2,070 professional and graduate students. The overwhelming
majority of all students (15,326 or 82 percent) are Washington State residents.
Approximately six percent (1,119) of the student body consists of international students,
representing 87 countries. The multicultural enrollment, students identifying themselves
as African American, Asian American/Pacific Islander, Chicano/Latino or Native
American, is 14.1 percent (2,635) of the student population. The average age for all
students on campus is 24 years old. WSU Pullman employs over 4,300 personnel, of
which 37 percent (1,619) are faculty. Non-resident students and faculty on all WSU
campuses may not be aware of the potential natural hazards threatening university
grounds nor will they have a local support network, which will make these students
more dependent on the campus facilities for assistance.
Figure 2-1: People at WSU Pullman
ƒ‰‡ʹǤ͵
ƒ•Š‹‰–‘–ƒ–‡‹˜‡”•‹–›ʹͲͲͺ
”‡Ǧ‹•ƒ•–‡”ŽŽǦƒœƒ”†•‹–‹‰ƒ–‹‘Žƒ
The Spokane Community
Spokane is home to some 195,500 residents, though there are nearly 418,000 residents
in the metropolitan area. Spokane is located in the heart of the Inland Northwest, and it
serves as a shopping, entertainment, and medical hub for an area that includes eastern
Washington, eastern Oregon, north Idaho, western Montana, and southern portions of
Alberta and British Columbia, Canada. Spokane is the second largest city in
Washington State and the biggest city between Seattle, Washington and Minneapolis,
Minnesota.
WSU Spokane
As one of the three WSU urban campuses, WSU Spokane serves the metropolitan
Spokane area and the Inland Northwest. Situated on 48 acres, WSU Spokane offers the
educational, scientific, economic, and cultural benefits that accrue from access to the
services and programs of a major public land-grant research institution. Located
immediately adjacent to the heart of Spokane’s downtown, along the scenic Spokane
River, WSU Spokane offers graduate and baccalaureate completion programs as well as
advanced professional studies in an urban research campus. WSU began offering
courses in Spokane in the 1920s and established WSU Spokane in 1989.
WSU Spokane works collaboratively with communities to enhance quality of life
through an intentional and sustained effort to create, interpret, apply, and disseminate
knowledge, thereby serving as a model for a world-class urban campus in a regional
city. Instruction, research, and public-service activities focus on the health sciences and
biomedical development, design disciplines, education, as well as social, behavioral,
and policy sciences. New facilities at the Riverpoint campus house classrooms with the
latest technology; wet and dry labs, studios, a library, and computer labs.
WSU Spokane is located within Spokane County. Spokane County has an area of
1,763 square miles and a population of approximately 431,027 people, making it the
largest county in eastern Washington.
Spokane County’s terrain is varied. The northern area of the county is forested and
rugged as it runs up against the foothills of the Colville National Forest. The southeast
area of the county is home to the fertile Palouse hills, while the southwest area of the
county is populated by channeled rock outcroppings and large lakes. Much of this
region of the county is part of the Turnbull National Wildlife Refuge.
ƒ‰‡ʹǤͶ
”‡’ƒ”‡†›ǣˆˆ‹…‡‘ˆ—•‹‡••ƒ†‹ƒ…‡
†–Š‡‹˜‹•‹‘‘ˆ
‘˜‡”‡–ƒŽ–—†‹‡•ƒ†‡”˜‹…‡•
The county has two major rivers: the Little Spokane River, which flows south from
Pend Oreille County to the Spokane River in the center of the county. From Idaho, the
Spokane River flows west into central Spokane County and the city of Spokane. The
river turns to the northwest, joining the Little Spokane River, and eventually emptying
into the Columbia River.
Spokane County is the economic hub of the area known as the Inland Northwest. It has
a strong and diversified manufacturing sector, a wholesale trade and finance sector
that, among its other functions, services a large agricultural community, and a strong
retail trade and services sector. The city of Spokane is the retail trade and services hub,
and a regional center for arts and entertainment. The county has a vibrant
manufacturing base in industries such as food and wood processing, printing and
publishing, primary metals, electrical equipment and computers, and transportation
equipment. The county also serves as a resource center for manufacturing sectors
across the Inland Northwest through its network of financial and other business
services.
Intercollegiate College of Nursing
Also located in Spokane, but at another WSU campus, is the Intercollegiate College of
Nursing (ICN). The ICN is the first and largest public/private nursing education
consortium in the United States. The ICN is comprised of four schools – Eastern
Washington University (EWU), Gonzaga University (GU), Whitworth College, and
WSU. As an institution shared in common by these public and private educational
entities, the ICN supports the mission and goals of each of its consortium members.
Student Population
In 2006, the WSU Spokane’s attendance was over 1,500 students, with 931
undergraduates and 604 professional and graduate students. The overwhelming majority
of all students (1,290 or 84 percent) are Washington State residents. Approximately two
percent (36) of the student body consists of international students representing 14
countries. The multicultural enrollment, students identifying themselves as African
American, Asian American/Pacific Islander, Chicano/Latino or Native American, is
11.9 percent (183) of the student population. The average age for all students on campus
is 30 years old. WSU Spokane employs almost 400 personnel, of which 58 percent
(213) are faculty.
ƒ‰‡ʹǤͷ
ƒ•Š‹‰–‘–ƒ–‡‹˜‡”•‹–›ʹͲͲͺ
”‡Ǧ‹•ƒ•–‡”ŽŽǦƒœƒ”†•‹–‹‰ƒ–‹‘Žƒ
Figure 2-2: People at WSU Spokane
The Tri-Cities Community
The Tri-Cities is a metropolitan area consisting of three individual cites: Kennewick,
Pasco, and Richland. Together, the Tri-Cities share a population of around 150,000.
Kennewick, the largest community with a population of over 60,000, is one of the
fastest growing cities in Washington. Kennewick is also the retail hub of southeastern
Washington and northeastern Oregon. Pasco, a bustling community of approximately
47,000, is the largest city in the million-acre Columbia Basin Irrigation Project and
home to Sacajawea State Park. The Park honors the Native American guide of Lewis
and Clark who camped in the area during their westward expedition. Richland, with a
current population of about 44,000, began as a small farming community, but the
building of the country’s first nuclear reactor in the 1940s at the Hanford Site changed
the complexity of the city. The Hanford Site continues to play a major role in the TriCities’ economy and is very important for the science and technology communities
worldwide.
WSU Tri-Cities
WSU’s involvement in the Tri-Cities area dates to the mid-20th century when Extension
programs began operating as part of the university’s land-grant mission. The urban
campus, established in 1989, originally provided upper-division undergraduate and
ƒ‰‡ʹǤ͸
”‡’ƒ”‡†›ǣˆˆ‹…‡‘ˆ—•‹‡••ƒ†‹ƒ…‡
†–Š‡‹˜‹•‹‘‘ˆ
‘˜‡”‡–ƒŽ–—†‹‡•ƒ†‡”˜‹…‡•
graduate study opportunities, research, and public service to the community. WSU TriCities is now a full four-year university offering courses from the freshman level on
through graduate school. WSU Tri-Cities offers approximately 30 different degrees.
WSU Tri-Cities sits on 200 acres adjacent to the Pacific Northwest National
Laboratory, one of the United States Department of Energy's (DOE) multi-program
national laboratories. Additionally, the campus is in close proximity to the DOE’s
Hanford Site; the Hanford Reach is the last free-flowing stretch of the Columbia River
in the United States and was designated as a national monument by President Clinton in
June of 2000.
The Tri-Cities campus is located within Benton County. Benton County covers an area
of 1,703 square miles and has an approximate population of 142,475. Three quarters of
Benton County’s population lives in its incorporated cities.
The terrain of the county is generally basin and valley bottomland with some upland
plateaus. Elevations vary from about 300 feet above sea level to more than 3,000 feet in
the higher reaches of the Rattlesnake Hills in western Benton County. Three rivers
dominate Benton County – the Columbia, the Snake, and the Yakima rivers. The area of
their confluence is near Kennewick and Richland. The Horse Heaven Hills, southwest
of the urban area, is where the rivers converge to form Lake Wallula, upstream from
McNary Dam on the Columbia river. The rivers give this area its most enduring
character – abundant water for both irrigation and energy, a major transportation
intersection, and a major recreational resource.
Benton County’s economy is heavily dependent upon operations at the U.S. Department
of Energy’s Hanford Site as well as on agriculture, food processing, and related
industries. Hanford accounts for 22 percent of non-farm employment in Benton County.
In comparison, aircraft manufacturing accounts for only seven percent of non-farm
employment in King, Snohomish and Island counties in the Puget Sound region, where
Boeing maintains a large manufacturing presence.
Student Population
In 2006, the WSU Tri-Cities attendance was almost 1,200 students, with 798
undergraduates and 346 professional and graduate students. Almost all of the students
(1,064 or 93 percent) are Washington State residents. Approximately three percent (32)
of the student body consists of international students representing 15 countries. The
ƒ‰‡ʹǤ͹
ƒ•Š‹‰–‘–ƒ–‡‹˜‡”•‹–›ʹͲͲͺ
”‡Ǧ‹•ƒ•–‡”ŽŽǦƒœƒ”†•‹–‹‰ƒ–‹‘Žƒ
multicultural enrollment, students identifying themselves as African American, Asian
American/Pacific Islander, Chicano/Latino or Native American, is 8.5 percent (97) of
the student population. The average age for all students on campus is 32 years old.
WSU Tri-Cities employs 170 personnel, of which 41 percent (69) are faculty.
Figure 2-3: People at WSU Tri-Cities
The Vancouver Community
Vancouver shares its name with the British sailor and explorer, Captain George
Vancouver. The city sits on the north bank of the Columbia River across from Portland,
Oregon, and is less than 90 miles from the Pacific Ocean. Because of its strategic
location, for much of the 19th century, Fort Vancouver was the center of British
dominion over the Oregon Territory and the heart of fur trading in the Pacific
Northwest. Vancouver is currently home to almost 160,000 people and combines the
excitement of a major metropolitan area with small-town charm and abundant
recreational opportunities, such as the spectacular Columbia River Gorge National
Scenic Area, the Mount Saint Helens National Volcanic Monument, and Mount Hood.
ƒ‰‡ʹǤͺ
”‡’ƒ”‡†›ǣˆˆ‹…‡‘ˆ—•‹‡••ƒ†‹ƒ…‡
†–Š‡‹˜‹•‹‘‘ˆ
‘˜‡”‡–ƒŽ–—†‹‡•ƒ†‡”˜‹…‡•
WSU Vancouver
WSU began offering courses in southwest Washington in 1983 as part of the Southwest
Washington Joint Center for Education. In 1989, the university formally established
WSU Vancouver as an urban campus of the state's land-grant institution. Additionally,
the Salmon Creek campus opened in 1996.
The campus of WSU Vancouver is located at 14204 NE Salmon Creek Avenue in
Vancouver. The 351-acre campus, located ten miles north of the Columbia River, is
comprised of nine buildings, as well as bicycle and pedestrian trails, an outdoor
amphitheater, a magnificent fountain, dedicated sculptures, a 200-seat lecture hall, art
galleries, a fitness center, outdoor sport court, coffee bar, and cafeteria. WSU
Vancouver is a premier, non-residential research university with access to the breadth
and depth of resources for the WSU system. Both the research unit in the area and the
campus serve the citizens of Vancouver, as well as the larger communities of Clark
County and all of southwestern Washington and northwestern Oregon.
WSU Vancouver is located within Clark County, one of the smallest in the state
(628 square miles). Clark County is the third most densely populated county in
the state at 549 people per square mile. Just over half of its residents live in cities.
Vancouver is the largest city within the county, and the fourth largest in the state,
with a population of 137,500; it more than tripled in size during the 1990’s,
primarily due to annexations.
Clark County is part of a geologic depression stretching from the Willamette
Valley to the Puget Sound. To the south and west, the Columbia River separates
Clark County from the state of Oregon. To its north is the Lewis River, which
separates it from Cowlitz County; to its east are the Cascade Range and Skamania
County.
The county rises from low elevations along the Columbia through the terraces and
bench lands formed by previous forks of the river to foothills 3,000 feet above sea
level in the northeastern reach of the county. The East Fork of the Lewis River
flows through the middle of the county, while the Washougal River and Lacamas
Creek flow through the southeast before emptying into the Columbia.
Manufacturing was one of the keys to Clark County’s economic boom in the early and
mid 1990’s; the county benefited greatly from Portland, Oregon’s fast-growing Silicon
Forest of high-tech industries. While high-tech is not the only story in Clark County, it
ƒ‰‡ʹǤͻ
ƒ•Š‹‰–‘–ƒ–‡‹˜‡”•‹–›ʹͲͲͺ
”‡Ǧ‹•ƒ•–‡”ŽŽǦƒœƒ”†•‹–‹‰ƒ–‹‘Žƒ
will continue to be the home for high-tech expansion in the future. Pulp, paper, and
primary metals will continue to provide employment opportunities even after a decade
of restructuring. Residential and commercial construction has been strong for several
years. Retail trade and services jobs greatly expanded during the 1990’s, despite
Portland’s sales tax advantage
Student Population
In 2006, the WSU Vancouver’s attendance was almost 2,000 students, with 1,487
undergraduates and 474 graduate students. The Vancouver campus now enrolls
freshman and is a full four-year university experience for its students. The vast majority
of all students (1,706 or 87 percent) are Washington State residents. Approximately one
percent (13) of the student body consists of international students representing 11
countries. The multicultural enrollment, students identifying themselves as African
American, Asian American/Pacific Islander, Chicano/Latino or Native American, is 7.2
percent (141) of the student population. The average age for all students on campus is
32 years old. WSU Vancouver employs 248 personnel, of which 50 percent (124) are
faculty.
Figure 2-4: People at WSU Vancouver
The Puget Sound Community
The Puget Sound region is home to the majority of Washington State citizens
(approximately 4,000,000) who live in the bustling cities and suburbs which extend
north to Stanwood and south to Olympia. Most Puget Sound communities are located
ƒ‰‡ʹǤͳͲ
”‡’ƒ”‡†›ǣˆˆ‹…‡‘ˆ—•‹‡••ƒ†‹ƒ…‡
†–Š‡‹˜‹•‹‘‘ˆ
‘˜‡”‡–ƒŽ–—†‹‡•ƒ†‡”˜‹…‡•
on either side of the north-south Interstate 5 (I-5) corridor that serves as the major
traffic thoroughfare for the state. Seattle, Washington’s largest city, lies in the center of
the Puget Sound region and sits between Elliot Bay and Lake Washington. Across the
Puget Sound are Bainbridge Island, the Kitsap Peninsula, and Olympic Peninsula. To
the east, and across Lake Washington, is Seattle's close neighbor, Bellevue.
The Puget Sound area offers a rich variety of vacation, recreational, and holiday
pursuits including big-city life, island retreats, cozy bed and breakfasts, romantic
country inns, and first-class resorts. There are plenty of sightseeing, hiking, kayaking,
and boating activities to help one stay in shape and wish for a longer Puget Sound
holiday.
WSU West
WSU West is the west side of Washington State relations and advancement office,
serving the greater Puget Sound region. The office provides a full array of services,
including, but not limited to: development, communications, marketing, legislative
affairs, alumni networking, special events, and student recruitment. WSU West is
engaged in raising private support, mobilizing public support, and recruiting
outstanding students to the various WSU campuses.
WSU West provides comprehensive communications and media relations support to
raise the stature and visibility of WSU in the Puget Sound region. Additionally, the
office plans several annual “Faculty Firesides” that bring outstanding university faculty
to the Puget Sound region to interview with regional news organizations and speak at
alumni gatherings, service clubs, and public schools.
As a division of WSU West, the WSU Foundation strives to advance the teaching,
research, and public service endeavors of WSU by generating private contributions to
supplement the institution's state and federal revenues. The foundation is the conduit
through which gifts and endowment income flow to provide immediate and long-term
support for the university and all its programs.
WSU West is located within King County. King County stretches 2,128 square miles,
and is the most densely populated county in the state, with 789 people per square mile.
Thirty-two percent of residents live in Seattle alone, the largest city in the county, the
state, and the Pacific Northwest. King County also is home to the Muckleshoot Indian
Tribe with a reservation near Auburn, and the Snoqualmie Indian Tribe, in the eastern
portion of the county.
ƒ‰‡ʹǤͳͳ
ƒ•Š‹‰–‘–ƒ–‡‹˜‡”•‹–›ʹͲͲͺ
”‡Ǧ‹•ƒ•–‡”ŽŽǦƒœƒ”†•‹–‹‰ƒ–‹‘Žƒ
King County has a diverse topography. Beaches, pasture lands, and ski trails are
accessible within an hour’s drive, with the elevation ranging from sea level to 6,270 feet
at Snoqualmie’s summit. The western part of the county, where the vast majority of the
population has settled, is an alluvial plain near sea level. In the east are the Cascade
Mountains. A substantial portion of eastern King County is in the Mount BakerSnoqualmie National Forest. Except for the northern boundary, shared with Snohomish
County, each of King County’s boundaries reflects geographic contours. The eastern
boundary closely follows the Pacific Crest National Scenic Trail – the crest of the
Cascade Range – and separates King from Chelan, Kittitas, and Yakima counties. Pierce
County and the White River make up King County’s southern boundary, while the
western county faces Puget Sound. Vashon and Maury Islands in Puget Sound are part
of King County.
Major rivers in King County include the Snoqualmie, White, Green, and Cedar rivers,
all of which flow out of the Cascades through the county. The largest lakes are Lake
Washington, which surrounds Mercer Island east of Seattle, and Lake Sammamish, east
of Bellevue. Lake Washington is the state’s second largest lake, second only to Lake
Chelan. Lake Washington is likely the highest quality lake in such close proximity to a
major city in the nation.
King County has evolved from a resource-based economy centered principally in forest
products and manufacturing, into an increasingly diversified export base with significant
orientation in high-tech industry, services, and trade, serving broad national and
worldwide markets. Increasingly greater exports of finished goods and services
originating in King County, such as commercial aircraft and computer software, are
exported overseas, particularly to Europe and the far east. The county is home to the
Boeing Company, the world’s largest producer of commercial airliners, and Microsoft,
the world’s largest software company.
WSU West Employees
WSU West has approximately 23 employees serving a broad range of university related
functions. The employees serve as admission counselors, outreach specialists, extension
agents, marketing coordinators, and gift planners.
WSU Extension
WSU Extension is the “front door” to the university, by extending non-credit education
and degree opportunities to people and communities throughout the state. WSU
Extension builds the capacity of individuals, organizations, businesses and
ƒ‰‡ʹǤͳʹ
”‡’ƒ”‡†›ǣˆˆ‹…‡‘ˆ—•‹‡••ƒ†‹ƒ…‡
†–Š‡‹˜‹•‹‘‘ˆ
‘˜‡”‡–ƒŽ–—†‹‡•ƒ†‡”˜‹…‡•
communities, empowering them to find solutions for local issues and to improve their
quality of life. Recognized for its accessible, learner-centered, relevant, high quality and
unbiased educational programs, WSU Extension collaborates with communities to
create a culture of life-long learning. By engaging people, organizations, and
communities, WSU Extension advances the knowledge, economic well-being, and
quality of life by fostering inquiry, learning, and the application of research. Due to the
wide variety of physical environments, population demographics, and economic bases
in the state, there is a broad range of educational and teaching programs offered by the
individual county extension offices (see Figure 2-5 below).
WSU Extension Locations and Other Facilities
County
County
Population** City Location
Employees***
Other WSU Facilities
WSU Lind Dryland
Research Unit (9)
Adams
17,300
Ephrata
5
Asotin
21,100
Asotin
4
Benton
160,000
Kennewick
7
Chelan
70,100
Wenatchee
4
Clallam
67,800
Port Hadlock
6
Clark
403,500
Brush Prairie
17
Columbia
4,100
Dayton
2
Cowlitz
96,800
North Kelso
6
Douglas*
35,700
Wenatchee
5
Ferry
7,500
Republic
4
Franklin*
64,200
Kennewick
7
Garfield
2,400
Pomeroy
3
Grant
80,600
Ephrata
8
Grays Harbor
70,400
Elma
16
Island
77,200
Coupeville
9
Jefferson
28,200
Port Hadlock
11
WSU North Olympic
Peninsula LC (3)
King
1,835,300
Renton
41
WSU West (10)
Kitsap
234,400
Bremerton
8
Kittitas
37,400
Ellensburg
6
WSU Tri-Cities (1300),
Prosser IARU (81)
WSU North Central
Washington LC (3), WSU
WTFREC (46), Colockum
R&E Unit (3)
WSU North Olympic
Peninsula Learning Center
(3)
WSU Vancouver (2700),
WSU VREU (7)
WSU Cowlitz and
Wahkiakum LC (3)
WSU Grays Harbor and
Pacific Learning Center (3)
ƒ‰‡ʹǤͳ͵
ƒ•Š‹‰–‘–ƒ–‡‹˜‡”•‹–›ʹͲͲͺ
”‡Ǧ‹•ƒ•–‡”ŽŽǦƒœƒ”†•‹–‹‰ƒ–‹‘Žƒ
County
County
Population** City Location
Employees***
Other WSU Facilities
Klickitat
19,800
Goldendale
3
WSU Klickitat Learning
Center (1)
Lewis
72,900
Chehalis
6
Lincoln
10,200
Ritzville
4
Mason
53,100
Shelton
10
Okanogan
39,800
Okanogan
4
Pacific
21,500
South Bend
3
Pend Oreille
12,300
Newport
5
Pierce
773,500
Tacoma
24
San Juan
15,700
Friday Harbor
7
Colville Indian Res.
Program (2)
WSU Long Beach
Research Unit (3)
Pierce County Salishan
Learning Center (3), WSU
Puyallup R&EC (97)
Skagit, Island, and San
Juan LC (2), WSU NW
REC (18)
Skagit
113,100
Mount Vernon
15
Skamania
10,600
Stevenson
3
Snohomish
671,800
Everett
16
Spokane
443,800
Spokane Valley
38
WSU Spokane (1400)
Stevens
42,100
Colville
5
Thurston
231,100
Lacey
13
NE Washington LC (1)
SESRC (8), Liaison (5),
Energy Program (53)
Wahkiakum
3,900
Cathlamet
5
Walla Walla
57,900
Walla Walla
6
Whatcom
184,300
Bellingham
14
Whitman
42,800
Colfax
4
Yakima
Figure 2-5
231,800
Yakima
16
Notes:
* Primary operations for this county extension office are located in the adjacent county.
** 2006 estimates from Washington State Office of Financial Management.
*** Faculty and assistants only
(See attached map for specific locations)
ƒ‰‡ʹǤͳͶ
”‡’ƒ”‡†›ǣˆˆ‹…‡‘ˆ—•‹‡••ƒ†‹ƒ…‡
†–Š‡‹˜‹•‹‘‘ˆ
‘˜‡”‡–ƒŽ–—†‹‡•ƒ†‡”˜‹…‡•
WSU Southeast
Washington LC (3)
WSU Pullman (22,000)
South Central Washington
LC (2)
WSU Extension began over a century ago, when thousands flocked to farmer's institutes
and demonstration trains, staged by the Washington Experiment Station, to hear about
the latest research conducted at the state's new land-grant college in Pullman. It was
soon apparent that there was a real need to apply newfound facts to local conditions. In
1913, a year ahead of federal legislation authorizing the present extension system, the
Washington State government authorized a Bureau of Farm Development,
headquartered at Washington State College (now WSU Pullman), and provided for the
appointment and maintenance of agricultural experts across the state. The pioneering
extension educators established a philosophy that's still relevant today: "helping farmers
to help themselves." Currently, the WSU Extension Centers are operated by the College
of Agriculture, Human and Natural Resource Sciences (CAHNRS). Although WSU
Extension offices are located in each of the 39 counties of Washington State, there are
two extension energy programs, as well as five main Agricultural Research and
Extension Centers located in: Long Beach, Mount Vernon, Prosser, Puyallup, and
Wenatchee.
WSU Extension Energy Program
The WSU Energy Program (WSU EP) is a self-supported department within the
university’s Extension service. The goal of the WSU EP is to provide unmatched energy
services, products, education, and information. There are two WSU EP locations: one in
Olympia, and the other in Spokane. The WSU EP has a budget of about $6 million and
a combined staff of 60 employees.
WSU Long Beach Research and Extension Unit
Located in a prime location, where the inland waterways of the Columbia River empty
into the Pacific Ocean, Long Beach has a long and storied history as a transportation
hub for export goods, especially salmon and oysters. Decades of overharvesting almost
ruined both fisheries and, as a result, the region turned to cranberry farming for its
supplemental source of income. Cranberries have been so successful, that the Long
Beach Peninsula now grows approximately one-third of Washington’s total cranberry
crop.
The WSU Long Beach Research and Extension Unit (WSU LBREU) was founded in
1924. Originally known as the Cranberry-Blueberry Experiment Station of the State
College of Washington, the WSU LBREU currently serves as a cranberry research and
extension facility, a south Pacific County extension office, and a broad-based ecosystem
research and education facility.
ƒ‰‡ʹǤͳͷ
ƒ•Š‹‰–‘–ƒ–‡‹˜‡”•‹–›ʹͲͲͺ
”‡Ǧ‹•ƒ•–‡”ŽŽǦƒœƒ”†•‹–‹‰ƒ–‹‘Žƒ
In 1992, the buildings and land were sold to The Pacific Coast Cranberry Research
Foundation, a non-profit foundation organized to promote cranberry research in the
Pacific Northwest. The partnership between the public and private sectors of the
industry has proven to be a very successful model for ways in which a land grant
university can continue to serve the needs of a small agricultural commodity group,
while facing budget deficits. Growers from around the Pacific Northwest region have
volunteered many hours to renovate and expand cranberry beds, establish a cranberry
museum and walking farm tour, and improve the overall facilities.
WSU Mount Vernon Northwestern Research and Extension Center
Mount Vernon is located in the Skagit Valley of northwestern Washington, midway
between Seattle, Washington and Vancouver, B.C., Canada. The region is well known
for its scenic beauty (especially the tulip festival each spring), the Cascade Mountain
Range, and Puget Sound. This area supports a diverse agriculture industry, including
dairy and livestock, as well as the production of over 60 fresh markets and processing
crops on approximately 100,000 acres.
Established in 1947, the Mount Vernon Northwestern Research and Extension Center
(WSU NWREC) has a long tradition of serving western Washington’s agricultural and
horticultural communities. Today, WSU NWREC encompasses over 130 acres of land
and around 18,000 square feet of laboratory, office, and greenhouse space. There are
research and extension programs in fruit horticulture, small fruit horticulture, vegetable
pathology, vegetable seed pathology and weed science, that address the varied and
complex needs of a diverse plant industry.
The main objectives of the faculty and staff at WSU NWREC are to solve plant-related
problems, and develop cost-effective and environmentally-sound plant production
practices based directly on results from experimental research trials. Faculty and staff
diligently work to educate stakeholders at workshops, field days, demonstration gardens
and web-based materials. WSU NWREC receives support from the allied agricultural
and horticultural industries, small farmers, and garden enthusiasts. Preservation of open
space and farmland in an urbanizing environment is a key issue for the region.
WSU Prosser Irrigated Agriculture Research and Extension Center
Prosser, located in the Yakima Valley, is bordered by the Rattlesnake Hills to the north,
and the Horse Heaven Hills to the south, with the Yakima River flowing through the
north side of the city. The local economy centers on agriculture; concord and wine
grapes, apples, cherries, hops, asparagus, corn, wheat, and processing plants. Prosser is
ƒ‰‡ʹǤͳ͸
”‡’ƒ”‡†›ǣˆˆ‹…‡‘ˆ—•‹‡••ƒ†‹ƒ…‡
†–Š‡‹˜‹•‹‘‘ˆ
‘˜‡”‡–ƒŽ–—†‹‡•ƒ†‡”˜‹…‡•
known as the “birthplace of the Washington wine industry,” for its growing number of
local wineries.
The WSU Prosser Irrigated Agriculture Research and Extension Center (WSU IAREC)
is a focal point for the university. An estimated two-thirds of agricultural production in
the state comes from irrigated land, making such research a vital interest for
Washington’s economy.
Prior to the start of the 20th century, sagebrush and other drought-tolerant, but
commercially unviable plants prevailed in the Yakima Valley. In 1919, the Washington
State legislature established a WSU Extension center in Prosser to assist the local
farmers with the challenges of irrigated farming.
Almost 80 years later, the WSU IAREC is still pioneering new and better developments
in irrigated agriculture. From its original staff of two, an animal scientist and an
agronomist, IAREC has led the way in pioneering research that continues today. There
are now 23 research and extension scientists and faculty associated with WSU at
IAREC. In many respects, IAREC functions like a large academic department, but one
that includes faculty and staff trained in a variety of disciplines. Seven academic
departments from WSU College of Agricultural, Human and Natural Resource Sciences
have faculty members or important programs located at the Center. Interdisciplinary
research develops rapidly in this environment, as well as interagency work among
representatives of the USDA-ARS, WSDA, EPA, and the WSU Agricultural Research
Center and Extension.
Local farmers have taken advantage of the results of the WSU IAREC research and
transformed the arid basin of the southeastern portion of Washington State into one of
the most fertile and productive regions in the world. The state’s economy benefits from
more than $3 billion of annual revenue generated by more than 60 irrigated crops.
WSU Puyallup Research and Extension Center
The city of Puyallup is situated at the foot of scenic Mount Rainier in the Puget Sound
region. In its early years, Puyallup was an agricultural community relying on hops,
berries, and flowers. Over time, the city has gained prominence as a regional
commercial and service center for eastern Pierce County. Puyallup continues to serve its
residents and neighbors with a strong, diversified economy.
ƒ‰‡ʹǤͳ͹
ƒ•Š‹‰–‘–ƒ–‡‹˜‡”•‹–›ʹͲͲͺ
”‡Ǧ‹•ƒ•–‡”ŽŽǦƒœƒ”†•‹–‹‰ƒ–‹‘Žƒ
Located within fifty miles of more than 60% of the state's population, the WSU
Puyallup Extension and Research Center has played a vital role in Washington for over
a century, providing high quality research, extension and instruction programs. These
programs support technological innovation, food production, natural resource
stewardship, youth development, human nutrition, and community enhancement. As an
integral part of the College of Agricultural, Human and Natural Resource Sciences, and
Extension, the Center is a lifelong learning campus for students, alumni and the public.
There has been, and continues to be, a large and varied international presence including
students, graduate students, post-doctorates, faculty and staff. The Center's 125 faculty,
staff and graduate students from 11 academic departments address complex biological,
ecological, and social issues.
The 160-acre main campus is comprised of laboratories and offices, state-of-the-art
greenhouses, a Master Gardener demonstration garden, 6 acres of certified organic
farmland, and several acres of agricultural and natural resource plots. There are an
additional 160 acres of research plots including turf grass, berry breeding and disease,
and poplar research at WSU Puyallup's Farm 5.
A division of the WSU PREC is the Center for Sustaining Agriculture and Natural
Resources (CSANR). The CSANR aids in the development of agriculture and natural
resource management approaches that are economically viable, environmentally sound,
and socially acceptable. As a university center devoted to sustainability, CSANR is
uniquely positioned to leverage the resources of the land grant university and
communities in Washington State. Some of the Center's current activities include:
biologically intensive agriculture and organic farming, climate friendly farming, and
community capacity building and conflict resolution.
WSU Vancouver Research and Extension Unit
Originally constructed in 1926, the Clark County Poor Farm was designed to house the
elderly who did not have the appropriate means to support themselves. In 1949, the
Clark County Commissioners deeded 80 acres of the Poor Farm to WSU for use as an
agricultural research facility. Currently, the WSU Vancouver Research and Extension
Unit (WSU VREU) houses the southwestern Washington Research Unit, which has
served as the research base for Klickitat, Clark, Cowlitz, Wahkiakum, and Lewis
counties.
Research since 1949 has included work with a wide range of crops including tree fruits,
vegetables, forages, small grains, ornamentals, Christmas trees, and berry crops. Many
significant discoveries have been made at the WSU VREU over the years. During the
ƒ‰‡ʹǤͳͺ
”‡’ƒ”‡†›ǣˆˆ‹…‡‘ˆ—•‹‡••ƒ†‹ƒ…‡
†–Š‡‹˜‹•‹‘‘ˆ
‘˜‡”‡–ƒŽ–—†‹‡•ƒ†‡”˜‹…‡•
1980s, the focus of faculty at the research unit became small fruit crops, including
strawberries, red raspberries, blueberries, and cranberries. In recent years, these four
crops have represented up to $45 million in revenue in Washington State.
The rise of technology has changed the type of research conducted at WSU VREU,
although the goal of serving the people of Washington State has remained the same.
The Unit’s scientists have traveled the world in search of new information, new plants,
and new relationships with other researchers and institutions. WSU VREU was the first
WSU Extension Unit to obtain an Organic Food Producer Certification.
WSU Wenatchee Tree Fruit Research and Extension Center
Wenatchee is located in the center of Washington State, nestled between the Cascade
Mountains and the Columbia River. Sustained by nearly 300 days of sunshine a year,
Wenatchee is world famous for its apple, pear, and cherry orchards. Awarded the 2003
Great American Street Award by the National Trust for Historic Prevention,
Wenatchee’s downtown is a mix of cultural activities and outdoor experiences.
In 1937, the state legislature created a bill to establish a tree fruit experiment station in
Wenatchee as a part of Washington State College (now WSU). The initial land purchase
was made in October of 1937 and included a farmhouse and 15 acres of orchard.
Subsequent land acquisitions increased the size of the main WSU Wenatchee Tree Fruit
Research and Extension Center (WSU WTFREC) research campus to 102 acres with an
additional 92 acres located 12 miles north, in Douglas County.
Principal physical facilities at the TFREC include the following:
x
The F. L. Overley Laboratory: located at 1100 North Western
Avenue, Wenatchee, and is the Center's headquarters and houses
most of the WSU researchers, including laboratories for
horticulture, plant physiology, soil science, entomology and plant
pathology.
x
The USDA Tree Fruit Research Laboratory: located immediately to
the west of the Overley building with offices, laboratories and fruit
storages for USDA research in plant pathology, plant physiology
and postharvest horticulture.
ƒ‰‡ʹǤͳͻ
ƒ•Š‹‰–‘–ƒ–‡‹˜‡”•‹–›ʹͲͲͺ
”‡Ǧ‹•ƒ•–‡”ŽŽǦƒœƒ”†•‹–‹‰ƒ–‹‘Žƒ
x
Other major facilities: include an entomology laboratory building,
entomology greenhouses, soils-horticulture laboratory and
greenhouses, USDA plant pathology laboratory, and USDA fruit
packing building, plus a number of service shops, heating plants,
storage buildings and residences.
Washington State is the national leader in production of apples, pears, and sweet
cherries producing more than half (52 percent) of all apples, 45 percent of sweet
cherries, and 38 percent of all pears. The primary mission of the WSU WTFREC is to
develop new knowledge and technology through innovative research. The research and
educational programs of the WSU WTFREC have contributed substantially to the
growth, stability and present stature of Washington’s tree fruit industry.
WSU Learning Centers
WSU Learning Centers (WSU LC) are a division of the university’s Extension program.
In recent years, WSU has undertaken additional efforts to increase access for placebound adult learners by building three branch campuses (Spokane, Tri-Cities, and
Vancouver), establishing the interactive classroom system (WHETS), and launching the
Distance Degree Program. Created in July of 1996, the WSU LC combines the "hightech" delivery methods of distance education and the "high-touch" approach of on-site
staff. Each WSU LC reflects the educational needs of the area it serves and places a
premium on assuring quality education and responsive student services. There are ten
WSU LC’s located throughout the state: Cowlitz and Wahkiakum (Longview); Grays
Harbor and Pacific (Aberdeen); Klickitat (Goldendale); North Central Washington
(Wenatchee); North Olympic Peninsula (Port Hadlock); Northeast Washington
(Colville); Pierce County at Salishan (Tacoma); Skagit, Island and San Juan (Mount
Vernon); South Central Washington (Yakima); and Southeast Washington (Walla
Walla).
WSU Cowlitz and Wahkiakum Learning Center
WSU’s Cowlitz and Wahkiakum Learning Center is located on the Lower Columbia
College campus in Longview, Cowlitz County. Cowlitz County is home to nearly
100,000 people and is known as the gateway to the Mount Saint Helens Volcanic
Monument. A region once heavily invested in timber harvesting, the area has seen a
boom in tourism since Mount Saint Helen’s eruption in 1980.
WSU Grays Harbor and Pacific Learning Center
WSU’s Grays Harbor and Pacific Learning Center is located on the Grays Harbor
College Campus in Aberdeen, Grays Harbor County. Grays Harbor has a population of
over 70,000 and is the home to the Quinault Indian Reservation. Known as the gateway
to the Pacific Ocean and the Olympic Peninsula, the local economy has long been
reliant on its natural resource base.
ƒ‰‡ʹǤʹͲ
”‡’ƒ”‡†›ǣˆˆ‹…‡‘ˆ—•‹‡••ƒ†‹ƒ…‡
†–Š‡‹˜‹•‹‘‘ˆ
‘˜‡”‡–ƒŽ–—†‹‡•ƒ†‡”˜‹…‡•
WSU Klickitat Learning Center
WSU’s Klickitat Learning Center is located inside the WorkSource in Goldendale,
Klickitat County. WorkSource is a joint state government, education, and business
venture utilized to address Washington residents’ employment needs. Klickitat County
is sparsely populated with approximately ten inhabitants per square mile. Similar to
many rural counties, much of the employment of Klickitat County is based on natural
resource economies.
WSU North Central Washington Learning Center
Situated in Wenatchee, Chelan County, the WSU North Central Washington Learning
Center serves the residents of Chelan, Douglas and Okanogan Counties. Approximately
90 percent of Chelan County is located within the Wenatchee National Forest. The
county is also home to Lake Chelan, the third deepest lake in the United States. Many of
Chelan County’s approximately 70,000 residents work in the tree fruit industry.
WSU North Olympic Peninsula Learning Center
The WSU North Olympic Peninsula Learning Center serves the residents of Clallam
and Jefferson Counties and is located in Port Hadlock, Jefferson County. Around 75
percent of Jefferson County is within the Olympic National Park and the Olympic
National Forest. Due to the aging of the county’s population and the loss of many young
residents, the local economic focus has shifted from timber to service related industries.
Additionally, the WSU Jefferson County Extension office is located in the same
building as the learning center.
WSU Northeast Washington Learning Center
Helping the residents of Ferry, Stevens, and Pend Oreille counties, the WSU Northeast
Learning Center can be found in Colville, Stevens County. Stevens County is home to
part of the Spokane Indian Reservation, the Colville National Forest, and Roosevelt
Lake on the Columbia River. With a population of greater than 40,000 residents,
government agencies, and lumber and wood processing companies are the county’s
largest employers. Additionally, the WSU Stevens County Extension office is located in
the same building as the learning center.
WSU Pierce County Salishan Learning Center
The WSU Pierce County Learning Center at Salishan is located in a public housing
development owned by the Housing Authority of the city of Tacoma. WSU is the only
land-grant university in the United States with a learning center situated within a
ƒ‰‡ʹǤʹͳ
ƒ•Š‹‰–‘–ƒ–‡‹˜‡”•‹–›ʹͲͲͺ
”‡Ǧ‹•ƒ•–‡”ŽŽǦƒœƒ”†•‹–‹‰ƒ–‹‘Žƒ
housing development. Pierce County is one of Washington’s most populous with
approximately 750,000 people. Services and trade sectors account for almost 66 percent
of the county’s employment.
WSU Skagit, Island, and San Juan Learning Center
The WSU Skagit, Island, and San Juan Learning Center are situated in Mount Vernon,
Skagit County. Skagit County is home to two Indian Reservations: the Swinomish and
the Upper Skagit. The county has over 100,000 residents and the population for the
county has doubled in the past 30 years. Agriculture, fishing, wood products, and
international trade comprise the base of one of the state’s fastest growing economies.
WSU South Central Washington Learning Center
The WSU South Central Washington Learning Center can be found on the Yakima
Valley Community College campus, in Yakima County. Yakima County is home to part
of the reservation for the Confederated Tribes of the Yakama Nation. Thirty-three
percent of the county’s approximately 225,000 residents are of Hispanic origin.
Additionally, agriculture is Yakima County’s leading employer, accounting for 25
percent of all jobs.
WSU Southeast Washington Learning Center
WSU’s Southeast Washington Learning Center is located on the Walla Walla
Community College campus, in Walla Walla County. More than half of Walla Walla
County’s approximately 55,000 residents live in the city of Walla Walla. The county is
home to the Blue Mountains, as well as the Walla Walla and Touchet Rivers. The
county’s broad economic base includes agriculture, manufacturing, higher education,
and tourism.
ƒ‰‡ʹǤʹʹ
”‡’ƒ”‡†›ǣˆˆ‹…‡‘ˆ—•‹‡••ƒ†‹ƒ…‡
†–Š‡‹˜‹•‹‘‘ˆ
‘˜‡”‡–ƒŽ–—†‹‡•ƒ†‡”˜‹…‡•
Section 3
Hazard Inventory and Vulnerability Assessment
Hazard Mitigation Plan
Washington State University’s land grant status places WSU in the unique position of
conducting a hazard inventory and vulnerability assessment (HIVA) for multiple assets
and facilities throughout the state of Washington. While the university functions overall
as a single-jurisdictional unit, with its main campus located in Pullman, the complex
nature of the WSU system requires many of the same elements of data acquisition and
data management as a multi-jurisdiction planning process.
The risk assessment contained in this plan utilizes factual information regarding
hazardous threats to the various WSU locations to inform decision making on how best
to reduce the risk of future hazardous events and to aid in the planning of mitigation
projects to reduce the potential damage caused by unavoidable hazardous events. Data
for the HIVA for WSU locations has been compiled using a data triangulation approach
which incorporates information from WSU and many other existing sources, including
existing plans such as local and county emergency plans; county hazard mitigation
plans – where they exist – and the state hazard mitigation plan. The core staff on this
planning project worked in conjunction with key members of WSU’s public (faculty
and staff from various WSU locations) on development of a questionnaire that was
distributed to each significant WSU site across the state. The purposes of the
questionnaire were to obtain general information regarding every such WSU location
and operation, to gain a better understanding of the hazards that might impact these
WSU locations, and to obtain an estimate of the level of risk which is posed by these
hazards from the people who are in each facility on a daily basis. The questionnaire
targeted three broad areas of concern: buildings & structures, WSU operations (e.g.
research, volunteer programs, teaching), and people. A descriptive profile for each
WSU site included in this plan was created using the information thus gathered – to
serve as a starting point for the WSU Hazard Mitigation Planning Group (comprised of
WSU faculty and staff) to identify potential vulnerabilities to future disasters.
Completed responses were received from 55 WSU locations. Site visits and other
measures were used to supplement this information, so that more than 70 WSU
locations were included in this plan.
In addition to the information garnered from existing plans and from state, federal and
commercial data sources, as well as from these questionnaires, a short web-based
survey was administered to WSU faculty, staff and students. An email drawing the
ƒ‰‡͵Ǥͳ
ƒ•Š‹‰–‘–ƒ–‡‹˜‡”•‹–›ʹͲͲͺ
”‡Ǧ‹•ƒ•–‡”ŽŽǦƒœƒ”†•‹–‹‰ƒ–‹‘Žƒ
attention of WSU personnel to the survey opportunity was sent to all 5,564 faculty and
staff with working email addresses as well as a random sample of 7,043 WSU students
with working email addresses. A total of 2,786 faculty and staff and 1,494 WSU
students completed, or partially completed, the survey questionnaire between April 6
and May 5, 2007. This provided another perspective on the HIVA process which was
incorporated into the final planning product.
Data gathered directly from WSU personnel at the identified locations via the mail
survey and on-site contacts were entered into a software program (Mitigation 20/20)
designed specifically for hazard inventory, vulnerability assessment and mitigation
planning. The program uses integrated modules and has the capacity for management
of data for multi-location entities such as WSU. Data from the online surveys for
faculty and staff were compiled and stored using MS Access and SPSS software
packages. A SharePoint website was constructed to provide ongoing input and feedback
opportunities for the WSU Hazard Mitigation Planning Group. In addition, members of
the core planning team conducted site visits and “public” events in each of the nine
Homeland Security Regions within Washington to present information about the
process and the draft plan and provide a final opportunity for input to members of the
WSU public as well as local government and emergency planning representatives,
including Local Emergency Planning Committee members.
A more detailed
description of this outreach and engagement process is contained elsewhere in this
document.
Data Analysis
Analysis of the data compiled included comparison and triangulation of the multiple
sources utilized. One of those sources, SHELDUS (Spatial Hazard Events and Losses
Database for the United States) is a county level hazard data set for the entire country
covering 18 natural hazard events which include information on the beginning date,
location, property losses, crop losses, injuries and fatalities that affected each county.
The database contains over 400,000 records for the period between 1960 and 2005. A
comparison of information from county plans, the state plan, the WSU HIVA
questionnaire responses, and the additional historical information available via access to
the SHELDUS database provided researchers with a full and descriptive picture of each
of the WSU locations regarding experienced hazards, potential future hazard events and
probable impacts over time.
Hazard Inventory
This section of the plan contains a hazards inventory which describes natural and
technological (human-made) hazards which can potentially impact the people,
ƒ‰‡͵Ǥʹ
”‡’ƒ”‡†›ǣˆˆ‹…‡‘ˆ—•‹‡••ƒ†‹ƒ…‡
†–Š‡‹˜‹•‹‘‘ˆ
‘˜‡”‡–ƒŽ–—†‹‡•ƒ†‡”˜‹…‡•
operations, and facilities of WSU. Such an inventory is the foundation of effective
emergency management and identifies the hazards that WSU should mitigate against,
prepare for, respond to, and be able to recover from, in order to minimize the effects of
such disasters and emergencies.
WSU’s many locations throughout the state have historically experienced significant
impacts from natural hazards including severe winter storms, high winds, flooding,
wildland fires, earthquakes, and volcanoes. Beyond natural hazards, there are
technological hazards, including hazardous materials incidents, crime and disorder
(broadly defined to include prosecutable terrorist activity and unrest, such as bombing,
destruction of commercial and research property and other illegal activity with
environmental consequences), and loss of power. All of these require assessment and
evaluation by the university in order to organize resources and plan so that potential
losses can be prevented or minimized.
From 1956 to 1998, the state of Washington qualified for 35 Presidential Major Disaster
Declarations. These include 27 floods; the 1998 city of Kelso residential landslide; the
1994 El Nino disrupting salmon migration; the 1991 wildland fires in the Pend Oreille,
Spokane, Stevens, and Whitman counties; the 1993 Inaugural Day windstorm; the 1986
Spokane dam failure; the 1980 Mount Saint Helens eruption; the 1965 Puget Sound
earthquake; and, the 1962 Columbus Day windstorm. During the term of this planning
project, additional events severe enough to result in a declaration have occurred –
reinforcing the focus on severe storms. In addition to the Presidential Major Disaster
Declarations, many events have occurred that resulted in severe impacts to the state,
counties, and cities, as well as to businesses and individuals. WSU has holdings within
or near the areas of impact for each of these events. In order to organize the Hazard
Inventory, this section is broken down into discussions of the WSU facilities located in
each of the 9 Homeland Security Regions.
Hazard Identification: By Region/County & WSU Location
Hazards are identified below by WSU location, within each county and Homeland
Security Region. To identify and understand the hazards in any jurisdiction it is
necessary to understand some basic facts regarding variables such as the geography,
weather, or unique characteristics of the various areas. To that end, a brief synopsis is
provided for each county, grouped according to Washington Homeland Security Region
(HS Region). With few exceptions, respondents to the questionnaire at the various
WSU locations listed crime, severe storms, utilities interruption and hazardous
materials incidents as being within their top listed concerns.
ƒ‰‡͵Ǥ͵
ƒ•Š‹‰–‘–ƒ–‡‹˜‡”•‹–›ʹͲͲͺ
”‡Ǧ‹•ƒ•–‡”ŽŽǦƒœƒ”†•‹–‹‰ƒ–‹‘Žƒ
Hazard Definitions
Hazardous Materials:
Materials that pose a potential risk to life, health, property or the broader
environment when released; this is due to their chemical, physical, or
biological nature. A release may occur by spilling, leaking, emitting toxic
vapors, or any other process that enables the material to escape its container,
enter the environment, and create a potential hazard. The hazardous material
can be explosive, flammable, combustible, corrosive, reactive, poisonous,
toxic, biological agent, and radioactive. WSU has conducted a number of
field observation studies at the county and reservation level which confirm
the need to include hazardous materials incidents in this mitigation planning
effort.
Crime and Disorder:
Characteristics of crime and disorder, as used in this plan, range from the mundane
such as burglary or illegal drug manufacturing, to assaults with weapons that may
occur in communities. This broad category also covers the more focused events,
such as riots, protests, or criminal acts like arson which target university facilities for
political or ideological reasons rather than for illegal gain. This category is broader
and more inclusive than one might think. Activity which might also be classified as
terrorism, civil unrest, protest, campus shooting or any number of other misdeeds
may also appropriately be identified (and are herein) as criminal activities. Any such
activity can be both a hazard for the university and/or a crime, and some may pose
additional risks, such as illegal drug manufacturing that also poses a hazardous
chemical risk. Because all such events are man-caused, share similar impacts and
may be mitigated against in similar fashion, they are aggregated for analysis in this
Plan. For purposes of this Plan, this category includes any incident that disrupts a
community where intervention is required to maintain public order of safety. A
prime example of this sort of hazard would be the WSU student riots in Pullman in
1998. Because much of the conduct which renders this activity a hazard for purposes
of this planning project is usually also criminal conduct, events such as this are
included in the description and discussion of Crime and Disorder.
Earthquake:
The sudden release of stored geologic energy; most earthquakes occur along a
fracture within the earth, called a fault. The shaking caused by this sudden shift is
often very small, but occasionally large earthquakes produce very strong ground
shaking. It is this strong shaking and its consequences – ground failure, landslides,
and liquefaction – that damages buildings and structures and may put university
people, operations and structures at risk.
Flooding:
Characteristics include a general and temporary condition of partial or complete
inundation of normally dry land area from overflow of inland or tidal waters,
ƒ‰‡͵ǤͶ
”‡’ƒ”‡†›ǣˆˆ‹…‡‘ˆ—•‹‡••ƒ†‹ƒ…‡
†–Š‡‹˜‹•‹‘‘ˆ
‘˜‡”‡–ƒŽ–—†‹‡•ƒ†‡”˜‹…‡•
unusual and rapid accumulation or runoff of surface waters from any source,
mudflow, collapse or subsidence of land along a body of water as a result of erosion
or undermining caused by waves or currents of water. There are 3 typical types of
flooding found in the Northwest, coastal, riverine, or storm water. Riverine and
coastal processes result first in flooding by high water levels from heavy
precipitation into rivers and streams, or by winds or barometric high tides in the
large lakes and ocean, and second by erosion from channel migration of rivers and
streams.
Infestation/Disease:
Outbreaks of disease that affect or threaten to affect a significant portion of a
population in a relatively short period of time can have serious consequences within
Washington communities and particularly for WSU. Although usually referring to a
human contagious disease, this category of events can also affect domestic and wild
animals as well as cultivated crops, ornamental or other desirous plants, and timber.
Diseases are usually introduced into an area from remote regions and inflict
devastation because there is no natural or induced immunity. Examples from recent
Washington experience include Bovine Spongiform Encephalopathy (BSE or “Mad
Cow” disease) and Avian Influenza.
Landslide:
The sliding movement of masses of loosened rock and soil down a hillside or slope.
Landslides may be caused by any number of conditions, and are experienced in a
variety of topographies. Mitigation for landslides includes both structural responses
and planning/location decisions.
Utilities Interruption:
Characteristics include loss of gas, sewer, water and/or electrical service. A lengthy
interruption of any of these utilities can have significant negative impact on WSU
facilities, operations and research. However, because loss of electrical service poses
the highest risk - particularly to protection of research and continuity of operations the primary focus in this document will be on electrical service. This plan also
includes loss of computer interconnectivity and internet access within this category.
Major Fire – Urban:
Although severe, multi-structure fires are rare, there are WSU locations where under
the right conditions, a larger urban fire could occur, such as the commercial and
industrialized areas or residential structures along the urban wildland interfaces that
mark many WSU communities. Single structure fires occur, but due to
improvements in building codes and fire protection services, these too are relatively
uncommon and are well addressed in current building codes and planning
requirements.
ƒ‰‡͵Ǥͷ
ƒ•Š‹‰–‘–ƒ–‡‹˜‡”•‹–›ʹͲͲͺ
”‡Ǧ‹•ƒ•–‡”ŽŽǦƒœƒ”†•‹–‹‰ƒ–‹‘Žƒ
Major Fire – Wildland:
Major wildland fire is the uncontrolled destruction of forested or non-agricultural
lands by wildfires, caused by natural or human-made events. Wildfires occur
primarily in undeveloped areas characterized by forest, range or brush lands.
Radiological Incident:
Radiological hazard results from the uncontrolled release of radioactive material
that can harm people or damage the environment. Washington State has a particular
history with radiological releases affecting local jurisdictions due to the presence of
the Hanford facility in Southeaster Washington. This facility, first opened during
World War II, has had a history of (alleged) releases and leakage – creating a class
of affected persons known as “downwinders.” The continued operation of the
Hanford Site poses unique risks for communities and WSU facilities which might be
impacted by a release – such as the WSU Tri-Cities campus. The presence of a
small research reactor on the Pullman Campus imposes some risk from this hazard
in that region, as well.
Severe storm/hail/high winds/lightening:
An atmospheric disturbance manifested in strong winds, rain, snow, or other
precipitation, and often accompanied by thunder or lightning which has significant
impact on human activity, population, infrastructure or the environment. Nearly all
destructive local storms occur from November through April when the jet stream is
over the western United States and Pacific low pressure systems are more frequent.
The trajectory of those lows determines their effect locally. The more southerly ones
bring heavy rains while the more northerly ones bring cold air and the potential for
snow and ice. Any winter storm, regardless of its trajectory, can generate high
winds. Generally, winds above about thirty miles per hour can cause widespread
damage and those above about fifty miles per hour can be disastrous. High winds of
short duration, such as tornadoes, micro-bursts, and strong gusts from thunderstorms
can also be destructive, though generally not as widespread.
Storm surge, Tsunami:
A tsunami is a series of high and powerful waves “tidal wave”) usually caused by
earthquakes. Underwater volcanic eruptions and landslides can also generate
tsunamis. Although largely a phenomenon of the world’s oceans, land-locked,
fresh-water tsunamis have been experienced in large lakes and reservoirs.
Terrorism:
Terrorism is defined as the use of force or violence against persons or property in
violation of the criminal laws of the United States for political or ideological ends or
for purposes of intimidation, coercion, or ransom. Terrorists often use threats to
create fear among the public; try to convince citizens that their government is
powerless to prevent terrorism, and try to get publicity for causes. A terrorist attack
can take any of several forms depending on the technological means available to the
ƒ‰‡͵Ǥ͸
”‡’ƒ”‡†›ǣˆˆ‹…‡‘ˆ—•‹‡••ƒ†‹ƒ…‡
†–Š‡‹˜‹•‹‘‘ˆ
‘˜‡”‡–ƒŽ–—†‹‡•ƒ†‡”˜‹…‡•
terrorist; the nature of the political issue motivating the attack, and the points of
weakness of terrorist targets. Bombings are the most frequently used terrorist
method in the United States. Other possibilities include attacks upon transportation
facilities, utilities, or other public services, or an incident involving chemical or
biological agents.
Transportation:
Transportation systems in Washington state include road, air, rail, and maritime.
Use of these systems and supporting transportation vehicles create the opportunity
for accidents, emergencies, and disasters. Transportation hazards are both natural
and human caused. Disruption of the transportation infrastructure often occurs as a
result of other hazard activity, and can have significant affect on the health, safety
and economy of the region impacted by the loss of access accompanying such
disruption. For WSU, just as for many communities in the state, loss of ready
replacement for small on-scene stocks of food, medicine or other necessary supplies
because transportation routes have been closed is a particularly troublesome
potential impact from hazard events.
Volcanic Activity:
A volcano is a vent in the earth's crust through which magma (molten rock), rock
fragments, gases, and ashes are ejected from the earth's interior. A volcanic
mountain is created over time by the accumulation of these erupted products on the
earth's surface.
Drought:
Drought is a condition of climatic dryness that causes a reduction in soil
moisture and water below the threshold necessary to sustain plant, human and
animal life. This hazard type is distinguished by gradual on-set and longterm impact. It is also a compounding factor for other hazards, particularly
wildland fire.
The following discussion addresses more specific assessment of risk from the hazard types
listed above as they may impact WSU facilities and operations. The discussion is organized
by Washington Homeland Security Region for convenience in analysis. The primary
hazards associated with all nine Homeland Security Regions are flooding; hazardous
materials, crime and disorder, and utility service interruption. Specifics concerning these
and other hazards of more localized concern are discussed by Homeland Security Region
and by county below.
ƒ‰‡͵Ǥ͹
ƒ•Š‹‰–‘–ƒ–‡‹˜‡”•‹–›ʹͲͲͺ
”‡Ǧ‹•ƒ•–‡”ŽŽǦƒœƒ”†•‹–‹‰ƒ–‹‘Žƒ
Homeland Security Region 1
Homeland Security Region 1 includes Whatcom, Skagit, Snohomish, San Juan and
Island Counties. Each of the counties is home to a WSU County Extension office. In
addition there is a Learning Center at Mt. Vernon as well as a Research and Extension
Unit in Skagit County, also located in Mt. Vernon.
Whatcom County
Whatcom County's northern border is the international boundary
with British Columbia. The county has a total area of 2,504 square
miles, with a population of 185,953. Of the 2,504 square miles,
15.34% is water, including Lake Whatcom, which empties into
Bellingham Bay by way of Whatcom Creek. Whatcom County is an
extension of the Fraser Valley of British Columbia, which is
essentially the lowland delta plain of the Fraser River. The highest
point in the county is volcanic Mount Baker at 10,778 feet above sea
level.
Skagit County
Skagit County covers an area of 1,735 sq. miles, with a population of
115,700. Mount Vernon is the largest city in the county. The western portion
of Skagit County includes a broad delta and floodplain, both of which
extend inland through the rich and fertile Skagit Valley. The county includes
some of the islands on the leeward edge of the San Juan Archipelago,
notably Fidalgo Island. The eastern two-thirds of the county are rugged,
heavily wooded and dominated by the Cascade Mountains. The Skagit River
is the dominant river in the county; originating in the northeastern part of the
county, running through the Skagit Valley and emptying into Puget Sound
near Mt. Vernon. Skagit County is home to two oil refineries which process
Alaskan crude oil and transship the refined product via marine, rail and
highway.
Snohomish County
Covering 2,090 square miles, Snohomish County has a population of
669,887 and is located on the Puget Sound between Skagit County
(to the north) and King County (to the south). Its topography can
range from saltwater beaches, rolling hills and rich river bottom
farmlands in the west, to dense forest and alpine wilderness in the
mountainous east. Glacier Peak, at 10,541 feet, is the highest point in
Snohomish County and one of the highest in Washington State.
Sixty-eight percent of the county land area is forest, eighteen percent
is rural, nine percent is urban/city, and five percent is agricultural.
ƒ‰‡͵Ǥͺ
”‡’ƒ”‡†›ǣˆˆ‹…‡‘ˆ—•‹‡••ƒ†‹ƒ…‡
†–Š‡‹˜‹•‹‘‘ˆ
‘˜‡”‡–ƒŽ–—†‹‡•ƒ†‡”˜‹…‡•
San Juan County
Consisting of 176 named islands and reefs (up to 743 at low tides),
San Juan is the smallest of Washington's 39 counties with
approximately 175 square miles of land area and a population in 2006
of 15,298. The county is approximately 71% water. The largest
islands in the county are San Juan, Orcas, Lopez, and Shaw. The
highest point in the county is Mount Constitution on Orcas Island at
2,407 feet above sea level.
Island County
The final county in this region is Island County, with a population of
81,489 in 2006. The county has a total area of 517 square miles;
59.71% of this is water. Its name reflects the fact that it consists of
two large islands, Whidbey and Camano, and seven smaller islands
(Baby, Ben Ure, Deception, Kalamut, Minor, Smith, and Strawberry).
Identified Hazards for Homeland Security Region 1
The Island county emergency plan indicates that there is a history of severe storms
that have adversely impacted island services and the economy, as well as having
caused large property losses. These storms have also raised concerns for the safety
of WSU facilities within the county. In addition to the four hazards listed above,
WSU respondents to the HIVA questionnaire in Island County indicated flooding
and tsunami rank high on their list of concerns.
Many coastal areas of Island County are vulnerable to tidal flooding. The risk of a
flood occurring in any one year is relatively high while the magnitude of any
particular flood is influenced by the geography of the islands affected. Floods have
caused loss of life and damage to structures, crops, land, flood control structures,
roads, and utilities.
Hazardous material spills and releases, as well as the effects of illegal dumping and
disposal also continue to be of concern in Island County. The greatest danger from
illegal dumping and disposal, however, is assigned to spills from bulk fuel trucks
and the possibility of offshore dumping and/or spills as there are no major
thoroughfares or railways in the county. Approximately 60 tankers per year transit
the Strait of Juan de Fuca to deliver crude oil to the refineries east of Island County,
making oil spills a particular risk for this county.
ƒ‰‡͵Ǥͻ
ƒ•Š‹‰–‘–ƒ–‡‹˜‡”•‹–›ʹͲͲͺ
”‡Ǧ‹•ƒ•–‡”ŽŽǦƒœƒ”†•‹–‹‰ƒ–‹‘Žƒ
Skagit, Snohomish and San Juan counties are also susceptible to earthquakes. The
Puget Sound area is in a high-risk zone. A subduction zone earthquake, which is a
geological possibility in this region, could produce an event with a magnitude as
large as 8.5 on the Richter scale. The potential damage from such a large earthquake
is extremely high.
Whatcom County has also experienced significant impacts from natural hazards
including floods, forest fires, and earthquakes. Although respondents from
Whatcom County did indicate that their highest concerns were for crime, utility
outages, hazardous materials incidents, and the effects of severe storms; the county
plan also discusses the potential for volcanic activity. The Cascade Range of the
Pacific Northwest has more than a dozen potentially active volcanoes. Cascade
volcanoes can erupt explosively. Historic records indicate that an average of two
such eruptions occur each century. The two most recent eruptions were Mount St.
Helens, Washington (1980-1986) and Lassen Peak, California (1914-1917). There
are five active volcanoes in Washington State (Mount Baker, Glacier Peak, Mount
Rainier, Mount Adams and Mount St. Helens) several of which could potentially
impact WSU facilities and operations in Homeland Security Region 1.
Region 1 - Historical Hazardous Event Record
Date
2/28/2001
5/1965
2/2001
1/1964 – 5/1964
Spring, 1966
6/1967 – 8/1967
1/1973 – 8/1973
10/1976 – 9/1977
6/2003 – 9/2003
3/10/2005
3/10/2005
3/10/2005
5/19/2005
5/18/2005
4/27/2004
5/1980
10/1962
County
Clallam
Snohomish
Snohomish
Island
Island
Island
Island
Island
Island
Skagit
Snohomish
Whatcom
Snohomish
Snohomish
Whatcom
Snohomish
Snohomish
Injuries
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
0
0
0
0
0
0
n/a
n/a
ƒ‰‡͵ǤͳͲ
”‡’ƒ”‡†›ǣˆˆ‹…‡‘ˆ—•‹‡••ƒ†‹ƒ…‡
†–Š‡‹˜‹•‹‘‘ˆ
‘˜‡”‡–ƒŽ–—†‹‡•ƒ†‡”˜‹…‡•
Fatalities
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
0
0
0
0
0
0
n/a
n/a
Event
Earthquake
Earthquake
Earthquake
Drought
Drought
Drought
Drought
Drought
Drought
Drought
Drought
Drought
Hail
High Wind / Tornado
High Wind/ Tornado
Volcano
Flooding
Region 1 - Historical Hazardous Event Record
Date
12/1964
12/1975
12/1977
12/1979
11/1986
11/1990
12/1990
11/1995–12/1995
1/1996 – 2/1996
3/1997
11/2003
12/1996 – 1/1997
County
Snohomish
Snohomish
Snohomish
Snohomish
Snohomish
Snohomish
Snohomish
Snohomish
Snohomish
Snohomish
Snohomish
Snohomish
Injuries
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
Fatalities
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
Event
Flooding
Flooding
Flooding
Flooding
Flooding
Flooding
Flooding
Flooding
Flooding
Flooding
Flooding
Severe Storm
Homeland Security Region 2
Homeland Security Region 2 includes Clallam, Jefferson and Kitsap counties. Each of
the counties is home to a WSU County Extension office. There is also a WSU Learning
Center at Port Hadlock.
Clallam County
Located on the North Olympic Peninsula, the county's land area is 1,752
square miles with 200 miles of Pacific Ocean coastline. The population
according to the U.S Census Bureau in 2006 was 70,400. There are three
incorporated communities within the county: Port Angeles, Sequim and
Forks. Historically abundant in natural resource industries, Clallam
county’s main industries include marine services, forest resources,
agriculture and tourism.
Jefferson County
Covering an area of 1,808 square miles, the 2006 population, according to
the U.S Census Bureau, was 29,279. The county is bounded on the west by
the Pacific Ocean and on the east by Hood Canal and Puget Sound. The
Olympic Mountains run north to south through the middle of the county.
The highest peak is Mount Olympus at 7,965 feet. The western shoreline of
Jefferson County is an array of tidelands and rocky beaches. The county’s
three principal rivers, the Hoh, Queets and Clearwater meet the Pacific
Ocean at the county’s western edge.
ƒ‰‡͵Ǥͳͳ
ƒ•Š‹‰–‘–ƒ–‡‹˜‡”•‹–›ʹͲͲͺ
”‡Ǧ‹•ƒ•–‡”ŽŽǦƒœƒ”†•‹–‹‰ƒ–‹‘Žƒ
Kitsap
Kitsap County is located along the western shore of the central Puget
Sound region across the sound from Seattle. The county contains a total land
area of 393 square miles. Kitsap County is physically connected only to
Mason County by virtue of a land bridge at its southwest corner. Kitsap
county ranks 36th in size among Washington counties but is the 2nd most
densely populated county in the state, with a population of 240,604. Kitsap
County is home to significant US Navy facilities at Naval Base Kitsap,
located at Bremerton, Keyport and Bangor. These facilities host a portion of
the nuclear submarine fleet and a naval shipyard.
Identified Hazards
Clallam and Kitsap county WSU respondents were among the few who listed
earthquake and disease/infestation among their top hazard concerns. This is partly
due to the fact that the Nisqually Earthquake, which took place in 2001, is recent
enough that it still remains on the minds of much of the population. County planners
indicated that the probability of a future quake is moderate. However, depending on
the magnitude of the damages resulting from a future event, a quake could be
devastating to WSU property, facilities and operations.
Disease/infestation is not addressed in the Clallam or Kitsap county plans. The fact
that WSU respondents from both counties expressed concern in this area is likely
due to the fact that during the time of the survey administration the possibility of a
pandemic flu was an active issue of concern. In addition, both counties are
surrounded by water on three sides and have several ports within their boundaries
which could potentially increase their vulnerability to a disease outbreak.
All four of the WSU county locations within this region indicated that flooding
related to severe storms is the most frequently occurring hazard they encounter, with
some amount of flooding taking place on an annual basis.
Region 2 - Historical Hazardous Event Record
Date
2/28/2001
3/10/2005
3/10/2005
County
Clallam
Clallam
Jefferson
Injuries
n/a
0
0
ƒ‰‡͵Ǥͳʹ
”‡’ƒ”‡†›ǣˆˆ‹…‡‘ˆ—•‹‡••ƒ†‹ƒ…‡
†–Š‡‹˜‹•‹‘‘ˆ
‘˜‡”‡–ƒŽ–—†‹‡•ƒ†‡”˜‹…‡•
Fatalities
n/a
0
0
Event
Earthquake
Drought
Drought
Region 2 - Historical Hazardous Event Record
Date
3/10/2005
1986
1997
1979
1990
1995
1996 – 1997
2003
1986
1997
1979
1990
1995
1996 – 1997
2003
1951
1998
1999
2000
2001
2002
2003
1994
County
Kitsap
Clallam
Clallam
Clallam
Clallam
Clallam
Clallam
Clallam
Clallam
Clallam
Clallam
Clallam
Clallam
Clallam
Clallam
Clallam
Clallam
Clallam
Clallam
Clallam
Clallam
Clallam
Clallam
Injuries
0
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
Fatalities
0
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
Event
Drought
Flooding
Flooding
Flooding
Flooding
Flooding
Flooding
Flooding
Severe Storm
Severe Storm
Severe Storm
Severe Storm
Severe Storm
Severe Storm
Severe Storm
Wildland Fire
Urban Fire
Urban Fire
Urban Fire
Urban Fire
Urban Fire
Urban Fire
Landslide
Homeland Security Region 3
Homeland Security Region 3 includes Grays Harbor, Mason, Thurston, Pacific and
Lewis counties. Each of the counties has a WSU County Extension office. In addition,
there is a Learning Center located in Grays Harbor, an Extension Energy Program
facility, a branch of the Social and Economic Sciences Research Center, and a WSU
government liaison office located in Thurston County and a small Cranberry Research
and Extension Center located in Pacific county.
Grays Harbor County
With an area of 1,191 square miles, the 2006 population, according to the
U.S Census Bureau, was 71,587. More than 90 percent of the county is
forest. Two large bays – Grays Harbor and Willapa Harbor – dominate the
coastal region of the county. Inland, the terrain shifts from river lowlands
and rolling hills in the south to the Olympic Mountains in the north. The
ƒ‰‡͵Ǥͳ͵
ƒ•Š‹‰–‘–ƒ–‡‹˜‡”•‹–›ʹͲͲͺ
”‡Ǧ‹•ƒ•–‡”ŽŽǦƒœƒ”†•‹–‹‰ƒ–‹‘Žƒ
economy of Grays Harbor County has long been reliant on its natural
resource base. During the 1980’s and 1990’s that base dwindled
significantly due to industry restructuring, modernization and environmental
concerns.
Thurston County
Covering 727 square miles at the south end of the Puget Sound, Thurston
County is roughly 60 miles south of Seattle. The U.S Census Bureau 2006
population was 234,670. Thurston County is characterized by a diverse
landscape, contributing to the risk for natural hazards associated with the
various terrain, weather, and soil conditions.
Pacific County
Covers an area of 1,224 square miles and is located in the southwest
corner of the state. The population in 2006 was 21,735. The county
borders the ocean and Willapa Bay on its western side and the mouth
of the Columbia River to the south. The economy of the county is
based largely on the tourist industry, logging, lumber, manufacturing,
seafood harvesting and some farming.
Lewis County
Located in southwestern Washington, Lewis County is about 90 miles south
of Seattle. It covers 2,435.5 square miles and is one of the more rapidly
growing counties in the state. The population according to the U.S Census
Bureau was 73,585 in 2006. It borders Mount Rainier National park on the
northeast side, and has a major interstate highway (I-5) running north/south
through the county.
Mason County
Bounded by the Olympic Mountains to the west and situated along the
shores of southern Puget Sound on the Kitsap Peninsula, Mason County is
961 square miles in size. The population according to the U.S Census
Bureau was 55,951 in 2006.
ƒ‰‡͵ǤͳͶ
”‡’ƒ”‡†›ǣˆˆ‹…‡‘ˆ—•‹‡••ƒ†‹ƒ…‡
†–Š‡‹˜‹•‹‘‘ˆ
‘˜‡”‡–ƒŽ–—†‹‡•ƒ†‡”˜‹…‡•
Identified Hazards
Hazards identified in these counties again are in large part related to severe storms,
but there is also an emphasis of concern on flooding. The Thurston county plan
mentions four types of flooding that can occur: river or stream building floods, flash
floods, tidal floods, and groundwater flooding. Flooding regularly occurs along one
or more of the county's waterways every year. Grays Harbor county extension also
indicated that high winds are a concern. WSU locations within Grays Harbor
County are in the southwest area putting them in fairly close proximity to the ocean,
with a history and current concern for tsunami events.
The Nisqually earthquake in 2001 had an impact on all of the counties within this
region. Earthquakes ranked high as a future concern, both by the WSU respondents
to the HIVA questionnaire and by the counties as reflected in their planning
documents. The Thurston county plan mentions a high probability of occurrence of
another damaging earthquake sometime in the next 25 years and notes that the
Nisqually quake was not the largest earthquake event possible in the Puget Sound
region. Damage from the 1949, 1965, and 2001 earthquakes indicate that a large
earthquake could have a catastrophic impact on the county, suggesting high
vulnerability. Since 1962, there have been 17 federally declared disasters in this
region.
In responding to the HIVA questionnaire, WSU personnel in Lewis County also
included volcanic activity as a concern. Although there are no known active
volcanoes within the county, the area was significantly impacted by the eruption of
Mt. St. Helens. One long-term impact was seen in a decline in tourism which is a
major factor in the region’s economy. As a result, volcanic activity was rated as a
strong concern for WSU facilities in Lewis County.
Region 3 - Historical Hazardous Event Record
Date
2/28/2001
3/10/2005
3/10/2005
3/10/2005
3/10/2005
10/15/2003
5/27/2004
3/27/1980
County
Thurston
Grays Harbor
Mason
Pacific
Thurston
Thurston
Thurston
Lewis
Injuries
0
0
0
0
0
0
0
0
Fatalities
.33
0
0
0
0
0
0
14.25
Event
Earthquake
Drought
Drought
Drought
Drought
High Wind / Tornado
High Wind / Tornado
Volcano
ƒ‰‡͵Ǥͳͷ
ƒ•Š‹‰–‘–ƒ–‡‹˜‡”•‹–›ʹͲͲͺ
”‡Ǧ‹•ƒ•–‡”ŽŽǦƒœƒ”†•‹–‹‰ƒ–‹‘Žƒ
Homeland Security Region 4
Homeland Security Region 4 includes Wahkiakum, Cowlitz, Skamania and Clark
counties. Each of these counties is home to a WSU County Extension office. In
addition there is a Learning Center serving Wahkiakum and Cowlitz counties located
in Longview and the WSU Vancouver branch campus, as well as a Research and
Extension Center located in Clark County.
Wahkiakum County
The 3rd smallest county in Washington, Wahkiakum County was created
by the territorial legislature in 1854. According to the 2006 U.S. Census, the
Wahkiakum county population was 4,026. This county was the site of the
first WSU Agriculture Extension Agent appointed in 1914.
Cowlitz County
With an area of 1,139 square miles, the county is the 12th most populous
county in the state with a population of 99,905. Nearly three of every five
residents live in incorporated areas. Longview, with a population of 35,100,
is the largest city and is home to one third of the county population. Castle
Rock, Kalama, Kelso, and Woodland, are the other population centers in the
county. Cowlitz County is nestled up against the Cascade Mountains, with
much of the hilly areas of the county reaching elevations of about 1,000 feet.
With about 85 percent of Cowlitz County in forest, logging and lumber
industries have historically been the foundation of the local economy.
Skamania County
Located in southwestern Washington, Skamania County is 45 miles east of
Portland, Oregon and Vancouver, Washington. The county consists of 1,672
square miles of very diverse landscape including the Columbia River Gorge,
a national forest, and vast wilderness areas. The population according to the
U.S Census Bureau in 2006 was 10,833. During the term of this project
Skamania experienced a significant landslide event which caused
considerable private property and environmental damage.
ƒ‰‡͵Ǥͳ͸
”‡’ƒ”‡†›ǣˆˆ‹…‡‘ˆ—•‹‡••ƒ†‹ƒ…‡
†–Š‡‹˜‹•‹‘‘ˆ
‘˜‡”‡–ƒŽ–—†‹‡•ƒ†‡”˜‹…‡•
Clark County
At 628 square miles, Clark County is physically one of the smallest in the
state. For most of the 1990s, Clark County was the fastest growing county
in the state, and among the top 50 fastest growing in the nation. Its
population grew nearly 60 percent in the decade, compared to 21 percent for
the state as a whole. Four out of every five new residents in the 1990s
moved into the county. According to the 2006 U.S. Census Bureau the
population was 412,938.
Identified Hazards
The concerns among WSU personnel within the county offices and WSU entities in
Homeland Security Region 4 are consistent with those of other counties along the
coast and major rivers. Flooding resulting from severe storms is viewed as a major
hazard. Local information based on county plans and questionnaire responses
indicates that flooding from the overflow of the Columbia River, ravine flooding
occurring mostly in the floodplains and shallow flooding, or ponding in sink areas
are the most common types of flooding experienced in the past. In 1995, Clark
County experienced severe flooding. A total of 30 people were evacuated from their
property, 35 homes were flooded and 20 roadways were closed. All rivers in the
county including the Columbia River were affected. The event additionally resulted
in shallow flooding in areas distant from rivers and streams.
Because of the topography of this area traveling can become difficult on roads in
steep areas when snowy or icy. Forested areas combined with high winds can create
a potential for downed trees blocking roadways, which is a challenge for emergency
responders attempting to assist members of the sizeable rural population in this
Homeland Security Region.
Earthquake risk is also of serious concern in this region. The two main earthquake
event types that could affect this area are the Cascadia Subduction Zone and
Portland Hills Fault Zone earthquakes. Surface ruptures from the known faults
within the northeastern portion of the region are assumed to be very rare; however
the potential for widespread damage caused by broad, regional shaking still places a
large area at risk. A principal concern is damage to infrastructure such as
transportation routes, communications systems and necessary facilities.
ƒ‰‡͵Ǥͳ͹
ƒ•Š‹‰–‘–ƒ–‡‹˜‡”•‹–›ʹͲͲͺ
”‡Ǧ‹•ƒ•–‡”ŽŽǦƒœƒ”†•‹–‹‰ƒ–‹‘Žƒ
Region 4 - Historical Hazardous Event Record
Date
5/18/1980
3/10/2005
3/10/2005
4/13/2003
4/21/2004
4/5/1972
5/31/1997
5/11/2000
6/6/2004
3/27/1980
3/27/1980
3/27/1980
County
Skamania
Cowlitz
Wahkiakum
Cowlitz
Clark
Clark
Clark
Clark
Cowlitz
Clark
Cowlitz
Skamania
Injuries
0
0
0
1
0
300
0
0
0
0
0
0
Fatalities
32
0
0
0
0
6
0
0
0
14.25
14.25
14.25
Event
Earthquake
Drought
Drought
Hail
Hail
High Wind / Tornado
High Wind / Tornado
High Wind / Tornado
High Wind / Tornado
Volcano
Volcano
Volcano
Homeland Security Region 5
Homeland Security Region 5 consists solely of Pierce County. Pierce County is home
to a county Extension office, a Learning Center and a Research and Extension Center.
Pierce County
Has an area of 1,675 square miles, with a population in 2006 of 766,878.
The topography of Pierce County runs from sea level along its Puget Sound
exposure to more than 14,410 feet at the summit of Mount Rainier. The
service and trade sectors represent the largest parts of the county’s economy,
accounting for about two-thirds of employment. The county has a significant
military presence with Fort Lewis and McChord Air Force Base.
Identified Hazards
WSU Puyallup respondents from the R& E Center in Pierce County indicated that
heavy rain and windstorms take place annually starting in approximately November.
Loss of utility service, including power and phone lines continues to be a problem
for their facilities as does flooding. WSU farms in the area are situated along river
valleys and other flood prone areas, making the amount of infrastructure at risk from
flooding significant. During severe rain storms in the winter of 2005 the WSU
Puyallup facility experienced three flood-caused power outages resulting in a loss of
research trials and samples. WSU locations in Pierce County have also been
ƒ‰‡͵Ǥͳͺ
”‡’ƒ”‡†›ǣˆˆ‹…‡‘ˆ—•‹‡••ƒ†‹ƒ…‡
†–Š‡‹˜‹•‹‘‘ˆ
‘˜‡”‡–ƒŽ–—†‹‡•ƒ†‡”˜‹…‡•
experiencing increased crime in the form of gang activity, break-ins and theft of
costly building supplies and tools. Another significant risk for the Puyallup
Research and Extension Facility is from volcanic activity. The Center is located on
a lahar evacuation route, and is designated by the county plan as an evacuation
point.
Concerns over the possible effects of a major earthquake in the Puget Sound basin
area have resulted in earthquakes being ranked high as a hazard for WSU in Pierce
County. It is difficult to identify any part of the WSU presence or surrounding
community that is not at risk during an earthquake. People, buildings, emergency
services, hospitals, transportation systems, pipelines, and water and wastewater
utilities are susceptible to the effects of an earthquake. In addition, electric and
natural gas utilities and dams have the potential for severe damage.
Region 5 - Historical Hazardous Event Record
Date
2/28/2001
3/10/05
5/17/2005
6/23/1996
5/31/1997
6/27/2001
County
Pierce
Pierce
Pierce
Pierce
Pierce
Pierce
Injuries
0
0
0
0
0
0
Fatalities
.33
0
0
0
0
0
Event
Earthquake
Drought
Hail
High Wind / Tornado
High Wind / Tornado
High Wind / Tornado
Homeland Security Region 6
Homeland Security Region 6 is synonymous with King county. King County is home
to a WSU County Extension office and the WSU West facility in downtown Seattle.
King County
Covers over 2,128 square miles, and has a population in excess of 1.8
million. It is both the most populous county in the state and the most densely
populated (817 people per square mile). Thirty two percent of King county
residents live in Seattle, the largest city in Washington state. The next three
largest cities in King county are Bellevue, Federal Way, and Kent.
Identified Hazards
WSU King County HIVA questionnaire respondents indicated, in addition to the
previously mentioned top four hazards (severe storm, crime, hazardous materials
ƒ‰‡͵Ǥͳͻ
ƒ•Š‹‰–‘–ƒ–‡‹˜‡”•‹–›ʹͲͲͺ
”‡Ǧ‹•ƒ•–‡”ŽŽǦƒœƒ”†•‹–‹‰ƒ–‹‘Žƒ
incident, and utilities outage), earthquake and flooding as serious hazard concerns.
The amount of precipitation received in King County varies geographically. Seattle
receives an average of 37 inches of precipitation annually. In contrast, Enumclaw
receives 55 inches and Snoqualmie/North Bend area experiences an annual average
61 inches of precipitation. Most of this precipitation comes in the form of rain in the
lowlands between October and early May. Substantial snowfall occurs in the
Cascades during the same time frames. One of the most common impacts from
severe weather is the loss of commercial and residential power.
King County is geographically located in the Pacific “Ring of Fire” series of active
volcanoes. The same geological events that result in volcanic activity also generate
notable earthquakes. A significant number of active fault lines have been identified
in the central Puget Sound area of Seattle and King County. Thousands of minor
earthquake events occur in the greater Puget Sound Region on an annual basis.
Neither the King County plan nor WSU personnel listed tsunami, or
disease/infestation as a high-ranking hazard potential. King County does include
some discussion of tsunami, stating in part that since Elliott Bay and Puget Sound
are shallow, there is less water to displace; therefore, a resulting tsunami would be
slower and have less volume than those generated in the deep ocean. Puget Sound's
steeply sloping sea beds tend to increase the chance that a tsunami will break on the
shore however, thus potentially enhancing a tsunami's destructiveness. Follow-up
discussions as part of the outreach and engagement efforts of this planning project
indicate that concern for disease impacts should be included in discussions of the
hazards facing this region.
Region 6 - Historical Hazardous Event Record
Date
4/29/1965
2/28/2001
2001
3/10/05
9/28/1962
12/12/1969
1972
1975
1977 –1979
1986
1986
County
King
King
King
King
King
King
King
King
King
King
King
Injuries
0
0
0
0
0
1
n/a
n/a
n/a
n/a
n/a
Fatalities
7
.33
0
0
0
0
n/a
n/a
n/a
n/a
n/a
ƒ‰‡͵ǤʹͲ
”‡’ƒ”‡†›ǣˆˆ‹…‡‘ˆ—•‹‡••ƒ†‹ƒ…‡
†–Š‡‹˜‹•‹‘‘ˆ
‘˜‡”‡–ƒŽ–—†‹‡•ƒ†‡”˜‹…‡•
Event
Earthquake
Earthquake
Drought
Drought
High Wind / Tornado
High Wind / Tornado
Flooding
Flooding
Flooding
Flooding
Flooding
Region 6 - Historical Hazardous Event Record
Date
1/1990
11/1990
12/1990
2/1996
4/1997
1/1993
1/1996
1/1997
11/1999
2/28/2002
04/2002
10/2003
1993
1995
12/14/1999
05/2001
County
King
King
King
King
King
King
King
King
King
King
King
King
King
King
King
Injuries
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
Fatalities
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
1/2000 – 12/2002
King
n/a
n/a
10/2002
King
3
10
Event
Flooding
Flooding
Flooding
Flooding
Flooding
Severe Storm
Severe Storm
Severe Storm
Civil Disturbance
Civil Disturbance
Civil Disturbance
Civil Disturbance
Terrorism; Explosive / Skinheads
Terrorism; Explosive / Unknown
Terrorism; Explosive / Ahmed Ressam
Terrorism; Incendiary / ALF
Terrorism; Biological White Powder /
Misc Individuals
Terrorism; Fire Arms / John Allen,
Muhammad & John Lee Malvo
Homeland Security Region 7
Homeland Security Region 7 includes Okanogan, Chelan, Douglas, Grant and
Kittitas counties. Each of the counties is home to a WSU County Extension office. In
addition there is a Learning Center and a Tree Fruit Research and Extension Center in
Chelan County.
Chelan County
Has an area of 2,915 square miles, with a population just over 71,000. The
majority of people in the county reside in Wenatchee, its largest city. Other
cities include Cashmere, Leavenworth, Chelan, and Entiat. About 90 percent
of the county is managed in the Wenatchee National Forest. Much of the
county is dense, rugged, mountainous terrain.
ƒ‰‡͵Ǥʹͳ
ƒ•Š‹‰–‘–ƒ–‡‹˜‡”•‹–›ʹͲͲͺ
”‡Ǧ‹•ƒ•–‡”ŽŽǦƒœƒ”†•‹–‹‰ƒ–‹‘Žƒ
Douglas County
Located close to the geographical center of Washington State, Douglas
County lies on the northern edge of the Columbia Basin in the shelter of the
Cascade Mountains to the west. It is bordered on the north and west by the
Columbia River and on the east by Banks Lake and Sun Lake. Douglas
County has approximately 155 river miles of shoreline along the Columbia
River. The topography ranges from lowland areas along the Columbia River
corridor to a high point on Badger Mountain with an approximate elevation
of 4,100 feet. The population as of 2006 was 35,772 according to the U.S.
Census Bureau.
Grant County
Predominantly rural, with a mild climate, and in close proximity to the
Columbia River. The population in 2006 was 82,612 according to the U.S.
Census Bureau. The area contains an extensive network of waterways,
coulees, canals, and lakes. Grand Coulee Dam is located on the Columbia
River within Grant County; it is now the 3rd largest concrete dam for
hydropower production.
Kittitas County
Has an area of 2,308 square miles and is located east of the Cascade Range
in the geographic center of the state. The county is bounded in the north by
Chelan County, to the south by Yakima County, and to the west by Grant
County. Kittitas County ranks eighth in size among Washington counties.
The terrain in the county’s northwest is rugged and heavily forested
wilderness. However, at higher elevations there are a series of major rivers
that transport precipitation and snow-melt out of the Cascades and into the
valley. Extending from the Cascade Range are the Wenatchee Mountains,
which run the length of the county’s northern border. The population as of
2006 was 37,189.
Okanogan County
Located in North Central Washington, Okanogan County is bordered on
the north by British Columbia, Canada, the Columbia River to the south, the
Cascade Mountains to the west, and Ferry County to the east. The county
covers 5,281 square miles, making it the largest county in Washington. Only
30% of the land within the county is in private ownership, with the balance
state and federal land. The Colville Indian Reservation, located in the
southeast corner of the county, occupies approximately 700 acres of the
ƒ‰‡͵Ǥʹʹ
”‡’ƒ”‡†›ǣˆˆ‹…‡‘ˆ—•‹‡••ƒ†‹ƒ…‡
†–Š‡‹˜‹•‹‘‘ˆ
‘˜‡”‡–ƒŽ–—†‹‡•ƒ†‡”˜‹…‡•
county. Agriculture and forestry are the major industries in the area. The
population as of 2006 was 40,040.
Identified Hazards
All of the WSU personnel responding from this region cited hazard concerns related
to effects of severe storms at the top of their rankings. Chelan County Extension,
and Okanogan County Extension also ranked urban fire as a concern. Both areas
are heavily forested and the county plans within this region suggest a moderate
probability and risk of a large wildland or wildland-urban interface fire occurring;
and some accompanying risk to people and property as a result of such a fire. An
increasing number of homes are being built in the urban/rural fringe due to a
growing population and the desire of some to live in rural or isolated areas or on
hillsides with scenic views. Development continues to expand further and further
into traditional open space lands. Particular concern for such an event is reported by
the Tree Fruit Research and Extension Center. A sizeable fire could wipe out not
only the experimental orchards, but the buildings located there, containing research
labs and invaluable research samples and records.
The Grant County Extension office is located within the county courthouse. They
expressed some concern related to a possible incident/civil disturbance related to the
courthouse or jail. Their additional hazard concerns again related mostly to the
possibility of flooding because of severe storms.
The emergency plan for Douglas County identifies flooding from storm events as
the most common hazard. The most serious of floods occur as rain-on-snow events,
often compounded by frozen ground. In the eastern portion of the county where the
WSU Extension office is located however, the flooding may be more limited to
spring runoff events due to surrounding mountainous regions. Flooding was also the
greatest hazard concern for the WSU facility in Kittitas County.
Region 7 - Historical Hazardous Event Record
Date
2/28/2001
1977
1977
2001
2003 – 2004
8/1/1984
County
King
Douglas
Grant
Grant
Douglas
Chelan
Injuries
0
n/a
n/a
n/a
n/a
0
Fatalities
.33
n/a
n/a
n/a
n/a
0
Event
Earthquake
Drought
Drought
Drought
Drought
Hail
ƒ‰‡͵Ǥʹ͵
ƒ•Š‹‰–‘–ƒ–‡‹˜‡”•‹–›ʹͲͲͺ
”‡Ǧ‹•ƒ•–‡”ŽŽǦƒœƒ”†•‹–‹‰ƒ–‹‘Žƒ
Region 7 - Historical Hazardous Event Record
Date
8/6/1991
7/8/1993
7/11/1993
5/16/1994
6/21/1997
5/4/2005
6/26/1982
7/9/1995
7/5/1997
7/22/2000
7/21/1997
1980
1925
1942
5/1948 – 06/1948
1957
3/1957
1972
5/1972 – 06/1972
3/1989
11/1990
1993
1995
11/1995 - 12/1995
1996
12/1996
1996-1997
1997
1/1949
1/1950
County
Chelan
Chelan
Chelan
Chelan
Chelan
Grant
Okanogan
Okanogan
Okanogan
Okanogan
Okanogan
Douglas
Chelan
Chelan
Chelan
Grant
Douglas
Douglas
Chelan
Douglas
Chelan
Douglas
Douglas
Chelan
Douglas
Chelan
Grant
Douglas
Grant
Chelan
Injuries
0
0
0
0
0
0
0
0
0
0
0
n/a
0
0
0
n/a
n/a
n/a
0
n/a
0
n/a
n/a
0
n/a
0
n/a
n/a
n/a
n/a
1/13/1950
10/1950
3/1956
12/1968
3/1972
6/1972
8/1979
1/1983
3/1988
Grant
Chelan
Chelan
Chelan
Chelan
Chelan
Chelan
Chelan
Chelan
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
ƒ‰‡͵ǤʹͶ
”‡’ƒ”‡†›ǣˆˆ‹…‡‘ˆ—•‹‡••ƒ†‹ƒ…‡
†–Š‡‹˜‹•‹‘‘ˆ
‘˜‡”‡–ƒŽ–—†‹‡•ƒ†‡”˜‹…‡•
Fatalities
0
0
0
0
0
0
0
0
0
0
0
n/a
14
8
1
n/a
n/a
n/a
4
n/a
0
n/a
n/a
0
n/a
0
n/a
n/a
n/a
n/a
Several
dozen(?)
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
Event
Hail
Hail
Hail
Hail
Hail
Hail
Hail
Hail
Hail
Hail
High Wind / Tornado
Volcano
Flooding
Flooding
Flooding
Flooding
Flooding
Flooding
Flooding
Flooding
Flooding
Flooding
Flooding
Flooding
Flooding
Flooding
Flooding
Flooding
Severe Storm
Severe Storm
Severe Storm
Severe Storm
Severe Storm
Severe Storm
Severe Storm
Severe Storm
Severe Storm
Severe Storm
Severe Storm
Region 7 - Historical Hazardous Event Record
Date
1/1996
12/1996 – 1/1997
1/1997
1970
July 14, 1987
1988
1992
1994
8/2-3/1996
1998
2001
2001
August 1967
August 6, 1974
May 1992
November 18,
1993
January 27, 1994
July 1996
1998
August 1999
February 2000
County
Chelan
Grant
Chelan
Chelan
Grant
Chelan
Chelan
Chelan
Grant
Douglas
Chelan
Okanogan
Chelan
Chelan
Chelan
Injuries
n/a
n/a
n/a
0
n/a
0
n/a
n/a
n/a
n/a
n/a
n/a
0
2
2
Fatalities
n/a
n/a
n/a
0
n/a
1
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
Event
Severe Storm
Severe Storm
Severe Storm
Wildland Fire
Wildland Fire
Wildland Fire
Wildland Fire
Wildland Fire
Wildland Fire
Wildland Fire
Wildland Fire
Wildland Fire
Hazardous Materials
Hazardous Materials
Hazardous Materials
Chelan
Chelan
Chelan
Grant
Chelan
Chelan
0
3
3
n/a
0
0
n/a
n/a
n/a
2
n/a
n/a
Hazardous Materials
Hazardous Materials
Hazardous Materials
Hazardous Materials
Hazardous Materials
Hazardous Materials
Homeland Security Region 8
Homeland Security Region 8 includes Yakima, Klickitat, Benton, Franklin and
Walla Walla Counties. Each of the counties is home to a WSU County Extension
office. In addition there are Learning Centers located in Yakima, Klickitat, and Walla
Walla Counties as well as the WSU Tri-Cities branch campus and a Research and
Extension Center located at Prosser in Benton County.
Yakima County
Has an area of 4,296 square miles, with a population in 2006 of 233,105.
Two of every five residents is a racial or ethnic minority, with people of
Hispanic origin making up a third of the county’s population. Yakima is the
largest city, followed by Sunnyside and Toppenish. The county also is home
to the Confederated Tribes of the Yakama Nation; the tribe’s reservation
covers portions of Yakima and Klickitat Counties. More than 4.5 percent
ƒ‰‡͵Ǥʹͷ
ƒ•Š‹‰–‘–ƒ–‡‹˜‡”•‹–›ʹͲͲͺ
”‡Ǧ‹•ƒ•–‡”ŽŽǦƒœƒ”†•‹–‹‰ƒ–‹‘Žƒ
of the population of Yakima County is Native American. The county’s
terrain varies from mountain peaks to fertile river valleys. Terrain in the
western parts of the county is mountainous and densely timbered.
Klickitat County
Covers an area of 1,880 square miles and, according to the U.S. Census
Bureau, had a 2006 population of approximately 20,335. Klickitat County
contains three cities: Goldendale, White Salmon, and Bingen. The county is
one of the least densely populated in the state, with just over 10 residents per
square mile.
Benton County
Has an area of 1,703 square miles, and its population in 2006 was 159,463.
Three of every four people in Benton County live in incorporated areas.
Kennewick and Richland, the two largest cities, have 38 and 26 percent of
the total county population, respectively. The terrain generally is basin and
valley bottomland with upland plateaus. The US Department of Energy’s
Hanford Nuclear Reservation is located almost entirely within Benton
County, and looms large in the identified concerns regarding hazards and
risks for WSU personnel in that area.
Franklin County
Also situated in the south-central area of the state, Franklin County,
together with Benton County, contains the Tri-Cities metro area. Franklin
County is bordered on the west by the Columbia River and on the south and
east by the Snake River. The natural shrub-steppe landscape is composed
predominately of bunchgrass and sagebrush. There is little rainfall, but the
soils are extremely fertile. The population as of 2006 was 66,570 according
to the U.S. Census Bureau.
Walla Walla County
Has an area of 1,271 square miles, and its population in 2006 was 57,721.
More than half of Walla Walla County’s population lives in the city of
Walla Walla. College Place, Prescott and Waitsburg are the other major
population centers in the county. About one in six people in the county is of
Hispanic origin, and about one in six is 65 years of age or older. The
county’s terrain is diverse. The western part of the county is flat grasslands,
while the central part of the county has gentle, rolling hills. The lowest
ƒ‰‡͵Ǥʹ͸
”‡’ƒ”‡†›ǣˆˆ‹…‡‘ˆ—•‹‡••ƒ†‹ƒ…‡
†–Š‡‹˜‹•‹‘‘ˆ
‘˜‡”‡–ƒŽ–—†‹‡•ƒ†‡”˜‹…‡•
elevations in the county are in the west, where the land descends to 340 feet
above sea level at the banks of the Columbia River.
Identified Hazards
Wildland and urban fires were both listed as concerns by WSU county and research
center personnel in this region. WSU Tri-Cities expressed fairly low concern for
potential loss from most natural hazards, largely due to the fact that they are not a
residential campus, and perhaps because the focus is on the proximity of the
Hanford Nuclear Site. There are large areas of Benton County that are subject to
wildfire. Areas exposed to wildfires are those undeveloped areas with natural
vegetation, including rangelands, natural areas, and undeveloped hillsides. New
development of homes and other structures is encroaching onto agricultural and
natural areas and therefore continually expanding the wildland-urban interface.
Three WSU facilities are located in these potential fire prone areas. The Benton
County plan indicates that all of the municipalities are exposed to wildfire at their
wildland-urban interfaces. The risk from wildfire is high in the interface and
intermix communities. There is a medium fire risk within the cities and urban
growth areas. The wildfire risk to the remainder of the exposed areas of the county is
medium. In addition, drought conditions and/or strong winds can raise the fire risk
to high for all of Benton County.
Homeland Security Region 8 is an area of the state that is known for experiencing
very strong winds. Some of these strong wind events can become very intense. The
most damaging types of wind events typically are of longer durations and occur
during the winter months. WSU locations in Yakima, Klickitat and Benton
Counties all ranked strong winds high as a hazard concern. Because this situation is
not new to the area, WSU structures for the most part have been built to withstand
strong winds.
Klickitat and Benton County respondents both indicated that their areas are
vulnerable to drought, despite their proximity to the Yakima and Columbia Rivers
and extensive irrigation networks. Well over half of the county land is in agricultural
use; most of that amount is dry crop and rangeland.
Region 8 – Historical Hazardous Event Record
Date
10/1976 – 9/1977
2001
County
Franklin
Franklin
Injuries
n/a
n/a
Fatalities
n/a
n/a
Event
Drought
Drought
ƒ‰‡͵Ǥʹ͹
ƒ•Š‹‰–‘–ƒ–‡‹˜‡”•‹–›ʹͲͲͺ
”‡Ǧ‹•ƒ•–‡”ŽŽǦƒœƒ”†•‹–‹‰ƒ–‹‘Žƒ
8/6/1991
6/27/2001
6/27/2001
2/1956
3/1979
12/1976 – 2/1997
1/1949
1/1950
12/1996 – 1/1997
Walla Walla
Walla Walla
Yakima
Franklin
Franklin
Franklin
Franklin
Franklin
Franklin
0
0
0
n/a
n/a
n/a
n/a
n/a
n/a
0
0
0
n/a
n/a
n/a
n/a
n/a
n/a
Hail
Hail
Hail
Flooding
Flooding
Flooding
Severe Storm
Severe Storm
Severe Storm
Homeland Security Region 9
Homeland Security Region 9 encompasses Ferry, Stevens, Pend Oreille, Lincoln,
Spokane, Adams, Whitman, Garfield, Columbia and Asotin Counties, essentially
the eastern region of Washington State. Each of the counties is home to a WSU County
Extension office. Additionally, the main WSU campus, as well as a Research and
Extension Center, are located in Whitman County, a Learning Center is located in
Stevens County.
Adams County
A predominantly rural county located in the southeastern area of the state.
The county measures 1,925 square miles, ranking it 14th in size among the
39 counties with a population of 16,887. Approximately two-thirds of the
population of Adams County lives in rural areas. Agriculture is the main
industry, including dry-land wheat farming, irrigated apple orchards, and
field crops (primarily potatoes). The vegetable- and fruit-processing
industry, especially potato processing and French fry manufacturing,
provides most of the county's industrial employment.
Asotin County
Located in extreme southeastern Washington, the county is part of the
Lewiston-ID-Clarkston-WA Metropolitan Statistical Area, which includes
all of Nez Perce (Idaho) and Asotin Counties. As of 2006, the population
was 21,247. The county seat is located in Asotin, and its largest city is
Clarkston.
ƒ‰‡͵Ǥʹͺ
”‡’ƒ”‡†›ǣˆˆ‹…‡‘ˆ—•‹‡••ƒ†‹ƒ…‡
†–Š‡‹˜‹•‹‘‘ˆ
‘˜‡”‡–ƒŽ–—†‹‡•ƒ†‡”˜‹…‡•
Columbia County
Also located in extreme southeastern Washington, Columbia County has a
population of 4,087 (in 2006). The county is one of the most sparsely
populated in Washington. At 868.8 square miles, it is physically the ninthsmallest county in the state. It is bordered by Whitman County and the
Snake River to the north, Walla Walla County to the west, Garfield
County to the east, and the Oregon state line to the south. Agriculture and
food processing dominate the economy of the county, with manufacturing
and government representing the majority of the county’s nonagricultural
employment. Dayton is the largest town and county seat.
Ferry County
Ferry County is 2,257 square miles in size, with a 2006 census population
of 7,560, having a density of 3.3 per square mile; the lowest of all
Washington counties. The Colville National Forest and the Colville Indian
Reservation occupy large tracts of land within the county. Historically,
Ferry County’s economy was based on mining, timber, and agriculture.
Today there is little mining, and timber and agriculture have declined in
importance.
Garfield County
Located in southeastern Washington, Garfield County has a population of
2,223, making it the least populated of Washington's 39 counties; a 7.3
percent decrease from the 2000 census reports. Agriculture has long
dominated Garfield County’s economy with farms occupying two-thirds of
the land in the county. At 710.5 square miles, Garfield County is the
seventh smallest county in the state. It is bordered by Columbia County to
the west, Asotin County to the east, and the Snake River to the north. The
Oregon state line marks Garfield County’s southern border. The northern
part of the county is a fertile plain; farther south elevations rise to the Blue
Mountains near the Oregon state line.
Lincoln County
Located in northeast Washington, in a region historically known as Big
Bend Country, the county measures 2311.2 square miles in size; making it
seventh largest among Washington's 39 counties. As of 2006, Lincoln
County had 10,376 residents. Dryland agriculture is the dominant industry
within the county. Since the early 1980s non-agricultural employment has
grown steadily. Lincoln County still has a substantial beef cattle industry.
ƒ‰‡͵Ǥʹͻ
ƒ•Š‹‰–‘–ƒ–‡‹˜‡”•‹–›ʹͲͲͺ
”‡Ǧ‹•ƒ•–‡”ŽŽǦƒœƒ”†•‹–‹‰ƒ–‹‘Žƒ
Pend Oreille County
The population of Pend Oreille County, according to the 2006 U.S.
Census Bureau, was 12,951. There are 55 lakes, thousands of acres of
forest, and mountains that climb to heights of 7,300 feet within the
county. Pend Oreille County’s average annual precipitation ranges
from 24 to 30 inches.
Spokane County
Spokane County covers an area of 1,763 square miles, with a 2006
population of 446,706 according to the U.S Census Bureau. The northern
part of the county is rugged, forest land that extends up against the foothills
of the Colville National Forest. Mount Spokane is the highest point in the
county at 5,878 feet. The southeastern area of the county is home to the rich
and fertile Palouse Hills. The southwestern parts of the county are channeled
rock outcroppings and lakes. Much of the southwestern region is part of the
Turnbull National Wildlife Refuge.
Stevens County
Covers over 2,468 square miles and, according to the Census Bureau, had a
2006 population of 42,632. The northern half of Stevens County is dense,
rugged, mountainous terrain that makes up much of the Colville National
Forest. Interspersed throughout this high country are numerous lakes. In the
south, mountains give way to forested foothills and to drier hills and valleys,
dotted with low-lying vegetation. Mining, primary and fabricated metals,
and industrial machinery manufacture provide a significant portion of the
county’s economy, however the largest industries are lumber and wood
processing.
Whitman County
Covers 2,151 square miles and, according to the 2006 U.S. Census Bureau,
had a population of 39,838. WSU accounts for about 40 percent of the
county’s population. The dominant landscape form is a combination of flat
land and rolling hills. The elevation of Whitman County ranges from 1,100
to 3,400 feet. The higher elevations are located in the Tekoa Mountains.
Other than education, agriculture is the main industry in Whitman County,
the top producer of wheat in the state.
ƒ‰‡͵Ǥ͵Ͳ
”‡’ƒ”‡†›ǣˆˆ‹…‡‘ˆ—•‹‡••ƒ†‹ƒ…‡
†–Š‡‹˜‹•‹‘‘ˆ
‘˜‡”‡–ƒŽ–—†‹‡•ƒ†‡”˜‹…‡•
Identified Hazards
Region 9 experiences severe storms including thunderstorms, dust storms, and
blizzards on a fairly regular basis. In past events severe weather itself has not
necessarily been a major problem in these areas, however secondary hazards, such
as flooding due to heavy rain, immobility and loss of utilities cause most damage and
service delays during and after a severe weather event. Roads may become
impassable due to ice or snow, power lines may be downed due to high winds, and
other services, such as water or phone, may not operate without power.
Flooding is a natural feature of the climate, topography, and hydrology of eastern
Washington State. Floods in these areas result primarily from heavy rains, bodies of
water overflowing their banks; structural failure of dams and levees; accumulation
of runoff surface water; and erosion of a shoreline.
The potential for a severe earthquake in the eastern counties is low, however in the
event of a larger earthquake, people, buildings, emergency services, hospitals,
transportation, dams, and electric, natural gas, water and sewer utilities would all be
susceptible. The probability is low for this type of event in these counties; however
the higher probability of earthquakes in western Washington makes it likely that the
eastern counties would be indirectly impacted by such events as a place for holding
casualties as well as people evacuating from the west.
Another natural hazard regularly experienced by the counties in the north of this
region is wildfire. Northeastern Washington, of which HS Region 9 is a significant
part, is often present on the annual list of areas most severely hit by forest and range
fires. In addition to disruption of normal transportation and economic activity during
fire events, this hazard has long-term impact on the economic vitality of some areas
within this region due to the destruction of economic resource bases.
Region 9 – Historical Hazardous Event Record
Date
3/10/2005
6/27/2001
6/15/1999
7/16/2005
7/24/1991
5/31/1997
4/27/2000
County
Lewis
Adams
Garfield
Pend Oreille
Spokane
Spokane
Spokane
Injuries
0
0
0
0
0
0
0
Fatalities
0
0
0
0
0
0
0
Event
Drought
Hail
Hail
Hail
Hail
Hail
Hail
ƒ‰‡͵Ǥ͵ͳ
ƒ•Š‹‰–‘–ƒ–‡‹˜‡”•‹–›ʹͲͲͺ
”‡Ǧ‹•ƒ•–‡”ŽŽǦƒœƒ”†•‹–‹‰ƒ–‹‘Žƒ
Region 9 – Historical Hazardous Event Record
Date
9/16/2003
7/16/2005
8/12/2005
4/27/2001
8/4/2004
1/16/2000
4/5/1972
5/31/1997
5/31/1997
8/14/1980
7/21/1997
2001
County
Spokane
Spokane
Spokane
Whitman
Whitman
Columbia
Lincoln
Lincoln
Spokane
Stevens
Stevens
Ferry
Injuries
10
0
0
0
0
0
1
0
0
0
0
n/a
Fatalities
0
0
0
0
0
0
0
0
0
0
0
n/a
Event
Hail
Hail
Hail
Hail
Hail
High Wind / Tornado
High Wind / Tornado
High Wind / Tornado
High Wind / Tornado
High Wind / Tornado
High Wind / Tornado
Wildland fire
Assessing Vulnerability: Identifying Assets
This risk assessment section includes a description of WSU’s statewide
vulnerability to hazards, as described previously. This section includes an
overall summary of each of the hazards and their impacts on the WSU
community. The plan describes WSU vulnerability in terms of: the types and
numbers of existing and future building, the infrastructures and critical facilities
that are exposed to hazards, or located in the identified risk areas. Critical
facilities are those of significant importance because they are necessary for the
protection of personnel or the continuity of operations, emergency response or
are essential to facilitate and sustain necessary life support systems.
Three main objectives addressed, pertaining to risk assessment, include the
following:
x
An overall summary description of WSU’s vulnerability to the
hazards, including identification and mapping of risk and asset
attributes;
x
The potential impacts of the hazards on WSU, statewide; and
x
Identification of the types and numbers of building, infrastructure
and critical facilities in the hazard area.
ƒ‰‡͵Ǥ͵ʹ
”‡’ƒ”‡†›ǣˆˆ‹…‡‘ˆ—•‹‡••ƒ†‹ƒ…‡
†–Š‡‹˜‹•‹‘‘ˆ
‘˜‡”‡–ƒŽ–—†‹‡•ƒ†‡”˜‹…‡•
Map 3.7.1a
Source: Washington Military Department 2004.
Map 3.7.1b: An in-depth view of WSU locations across the state.
Source: Washington State University Extensions 2006.
ƒ‰‡͵Ǥ͵͵
ƒ•Š‹‰–‘–ƒ–‡‹˜‡”•‹–›ʹͲͲͺ
”‡Ǧ‹•ƒ•–‡”ŽŽǦƒœƒ”†•‹–‹‰ƒ–‹‘Žƒ
The following lists various locations set forth above:
x
4 Major Campuses: Pullman, Vancouver, Tri-Cities, Spokane;
x
1 Urban Facility: WSU West Seattle;
x
6 Major Agricultural Research & Extension Centers: Wenatchee
TFREC,
Mt. Vernon, Puyallup, Prosser, Lind, Long Beach;
x
10 Learning Centers: North Olympic Peninsula; Grays Harbor and
Pacific; Cowlitz and Wahkiakum; Skagit, Island and San Juan;
Pierce County at Salishan; North Central Washington; South
Central Washington; Klickitat; Northeast Washington; and
Southeast Washington
x
39 County Extension Offices: Adams County, Asotin County,
Benton
County, Clallam County, Clark County, Chelan County,
Columbia County, Cowlitz County, Douglas County, Ferry
County, Franklin County, Garfield County, Grant County, Gray
Harbor County, Island County, Jefferson County, King County,
Kitsap County, Kittitas County, Klickitat County, Lewis County,
Lincoln County, Mason County, Okanogan County, Pacific
County, Pend Oreille County, Pierce County, San Juan County,
Skagit County, Skamania County, Snohomish County, Spokane
County, Stevens County, Thurston County, Wahkiakum County,
Walla Walla County, Whatcom County, Whitman County, and
Yakima County.
The following links provide more in-depth information regarding the daily
operations of each location mentioned above:
http://www.about.wsu.edu/statewide/
http://ext.wsu.edu/locations/
http://learningcenters.wsu.edu/map.html
Avalanche
An avalanche occurs when a layer of snow loosens and slides down hill at high
velocity. It is estimated that in the past century, avalanches have killed more
than 190 people in Washington. One infamous example occurred in 1910, when
enormous avalanches hit two trains trapped high on Stevens Pass, killing 96
people. Currently, it is estimated that avalanches kill 1 to 2 individuals each year
in Washington State.
ƒ‰‡͵Ǥ͵Ͷ
”‡’ƒ”‡†›ǣˆˆ‹…‡‘ˆ—•‹‡••ƒ†‹ƒ…‡
†–Š‡‹˜‹•‹‘‘ˆ
‘˜‡”‡–ƒŽ–—†‹‡•ƒ†‡”˜‹…‡•
The following 13 counties containing WSU personnel and facilities are most
vulnerable to avalanches:
Region 1: Skagit County, Whatcom County;
Region 3: Lewis County;
Region 4: Skamania County;
Region 7: Chelan County, Kittitas County, Okanogan County;
Region 8: Yakima County;
Region 9: Asotin County, Ferry County, Garfield County,
Stevens County, Pend Oreille County
Map 3.7.2a (below) provides a geographic view of the areas of the state and
WSU locations, as well as major transportation routes that might be affected by
avalanche.
Map 3.7.2a
Source: Washington Military Department – Emergency Management Division 2004.
ƒ‰‡͵Ǥ͵ͷ
ƒ•Š‹‰–‘–ƒ–‡‹˜‡”•‹–›ʹͲͲͺ
”‡Ǧ‹•ƒ•–‡”ŽŽǦƒœƒ”†•‹–‹‰ƒ–‹‘Žƒ
Drought
Drought is defined as a prolonged period of dryness severe enough to reduce
soil moisture, water and snow levels below the minimums necessary for
sustaining plant and animal, environmental, and economic systems. Droughts
are a natural part of the climate cycle. In the past century, the state of
Washington has experienced a number of significant drought episodes, including
several that lasted for more than a single season; 1928 to 1932, 1992 to 1994,
and 1996 to 1997.
Unlike most states, Washington has a statutory definition of drought (Revised
Code of Washington Chapter 43.83B.400). According to state law, an area is in
a drought condition when: The water supply for the area is below 75 percent of
normal and, water uses and users in the area will likely incur undue hardships
because of the water shortage.
Drought can have a widespread impact on the environment and the economy,
depending upon severity. Although it typically does not result in loss of life or
traumatic damage to property, as do other natural disasters, it can, however,
have significant impact on WSU’s Major Agricultural and Extension Research
Centers across the state.
The National Drought Mitigation Center at the University of Nebraska-Lincoln
uses three categories to describe likely drought impacts:
x
Agricultural – Drought threatens crops that rely on natural
precipitation;
x
Water supply – Drought threatens supplies of water for irrigated
crops and for communities; and
x
Fire hazard – Drought increases the threat of wildfires from dry
conditions in forests and rangelands.
Map 3.7.3a (below) provide a statewide breakdown which allows assessment of
WSU facilities and personnel that may be affected by prolonged drought.
Based on this vulnerability assessment, three regions [7, 8 & 9] incorporating 10
counties are most vulnerable to prolonged drought activity. The central
geographic region of the state is the area most susceptible to prolonged drought
occurrences:
Region 7: Chelan County, Douglas County, Grant County,
Kittitas County, Okanogan County;
Region 8: Benton County, Franklin County, Klickitat County,
Yakima County; and
Region 9: Adam County.
ƒ‰‡͵Ǥ͵͸
”‡’ƒ”‡†›ǣˆˆ‹…‡‘ˆ—•‹‡••ƒ†‹ƒ…‡
†–Š‡‹˜‹•‹‘‘ˆ
‘˜‡”‡–ƒŽ–—†‹‡•ƒ†‡”˜‹…‡•
WSU facilities in these counties are thus at risk – indirectly, for the most
part – from drought occurrences.
Map 3.7.3a
Source: Washington Military Department – Emergency Management Division 2004.
Earthquake
An earthquake is the sudden release of stored energy by an abrupt movement of
the earth, usually along a fracture within the earth, called a fault. Occasionally
large earthquakes produce very strong ground-shaking. It is this strong shaking
and its consequences – ground failure, landslides, liquefaction – that damages
buildings and structures, upsetting the regional economy.
Washington, especially the Puget Sound basin, has a history of frequent
earthquakes. More than 1,000 earthquakes occur in the state each year.
Annually, a dozen or more are strong enough that people feel the ground
shaking; occasionally, earthquakes cause damage. Large earthquakes in 1946
(magnitude 5.8), 1949 (magnitude 7.1), and 1965 (magnitude 6.5) have killed 15
people and caused more than $200 million (1984 dollars) in damage throughout
several counties. The state has experienced at least 20 damaging events in the
last 125 years. The Nisqually quake of 2001 is the most recent example of the
type of impact which might occur from an earthquake in this Cascadia Zone.
All 9 regions involving WSU personnel and facilities are susceptible to
earthquake activity at some level, although some more than others. Based on the
vulnerability assessment, 24 of the 39 countries are sufficiently susceptible to
earthquake activity for inclusion as a concern in this plan:
ƒ‰‡͵Ǥ͵͹
ƒ•Š‹‰–‘–ƒ–‡‹˜‡”•‹–›ʹͲͲͺ
”‡Ǧ‹•ƒ•–‡”ŽŽǦƒœƒ”†•‹–‹‰ƒ–‹‘Žƒ
Region 1: Island County, San Juan County, Skagit County,
Snohomish
County, Whatcom County;
Region 2: Clallam County, Jefferson County, Kitsap County;
Region 3: Gray Harbor County, Lewis County, Mason County,
Pacific
County, Thurston County;
Region 4: Clark County, Cowlitz County, Wahkiakum County;
Region 5: Pierce County;
Region 6: King County;
Region 7: Chelan County, Kittitas County;
Region 8: Benton County, Walla Walla County, Yakima County;
Franklin County and Klickitat County
Region 9: Spokane County.
Map 3.7.4a (below) shows the counties hosting WSU locations most at-risk and
vulnerable to earthquake activity. An extensive number of WSU locations in the
western part of the state are vulnerable to earthquake activity.
Map 3.7.4a
Source: Washington Military Department – Emergency Management Division.
ƒ‰‡͵Ǥ͵ͺ
”‡’ƒ”‡†›ǣˆˆ‹…‡‘ˆ—•‹‡••ƒ†‹ƒ…‡
†–Š‡‹˜‹•‹‘‘ˆ
‘˜‡”‡–ƒŽ–—†‹‡•ƒ†‡”˜‹…‡•
Figure 3.7.4b (below) provides a graphical representation of major fault zones
off the coast of Washington, as well as the major subduction zone in the Pacific
Ocean that is a catalyst to major earthquake activity, potentially affecting many
WSU locations.
Map 3.7.4b
Source: United States Geological Survey2002.
ƒ‰‡͵Ǥ͵ͻ
ƒ•Š‹‰–‘–ƒ–‡‹˜‡”•‹–›ʹͲͲͺ
”‡Ǧ‹•ƒ•–‡”ŽŽǦƒœƒ”†•‹–‹‰ƒ–‹‘Žƒ
Map 3.7.4c (below) depicts the potential for the most severe ground-shaking that
will occur at depths of 15 to 60 miles. The red indicates the most severe shaking,
while the blue represents less severe ground-shaking. However, the largest
events typically occur between depths of 25 to 40 miles.
Map3.7.4cSource:UnitedStatesGeologicalSurvey,2002.
ƒ‰‡͵ǤͶͲ
”‡’ƒ”‡†›ǣˆˆ‹…‡‘ˆ—•‹‡••ƒ†‹ƒ…‡
†–Š‡‹˜‹•‹‘‘ˆ
‘˜‡”‡–ƒŽ–—†‹‡•ƒ†‡”˜‹…‡•
Flooding
Floods cause loss of life and damage to structures, crops, land, flood control
structures, roads, and utilities. Floods also cause erosion and landslides, and can
transport debris and toxic products that cause secondary damage. Flood damage
in Washington State exceeds damage by all other natural hazards; hence it could
potentially be very costly to WSU locations statewide.
There have been 28 Presidential Major Disaster Declarations for floods in
Washington State, from 1956 through October of 2003. Every county has
received a at least one Presidential Disaster Declaration for flooding since 1970.
While not every flood creates enough damage to merit such a declaration, many
which do not qualify for formal declaration are nonetheless sufficiently severe to
warrant intervention by local, state or federal authorities. December 2007 saw
yet another series of severe storms and accompanying flooding hit the counties
in Homeland Security Regions 3 and 4.
The magnitude of most floods in Washington depends upon particular
combinations of intensity and duration of rainfall, pre-existing soil conditions,
area of a basin, elevation of the rain or snow level, and amount of snow-pack.
Man-made changes to a basin also can affect the size of floods.
Although floods can happen at any time during the year, there are typical
seasonal patterns for flooding in Washington State, based on the variety of
natural processes that cause floods:
x
Heavy rainfall on wet or frozen ground, before a snow pack has
accumulated, typically causing fall and early winter floods;
x
Rainfall combined with melting of the low-elevation snowpack,
typically causing winter and early spring floods;
x
Late spring floods in Eastern Washington primarily resulting from
melting of the snowpack; and
x
Thunderstorms typically causing flash floods during the summer
in Eastern Washington. On rare occasions, thunderstorms
embedded in winter-like rainstorms cause flash floods in Western
Washington.
ƒ‰‡͵ǤͶͳ
ƒ•Š‹‰–‘–ƒ–‡‹˜‡”•‹–›ʹͲͲͺ
”‡Ǧ‹•ƒ•–‡”ŽŽǦƒœƒ”†•‹–‹‰ƒ–‹‘Žƒ
Map 3.7.5a (below) provides information on the 100-year riverine flood hazard
areas in Washington. Many of these are proximate to WSU facilities or
operations.
Map 3.7.5a
Source: Department of Interior – United States Geological Survey 1998.
Twelve 12 of the 39 counties with WSU personnel and facilities are vulnerable
to flooding occurrences:
Region 1: Skagit County, Snohomish County, Whatcom County;
Region 3: Gray Harbor County, Lewis County, Mason County,
Pacific
County, Thurston County;
Region 4: Clark County, Cowlitz County;
Region 5: Pierce County; and
Region 6: King County.
ƒ‰‡͵ǤͶʹ
”‡’ƒ”‡†›ǣˆˆ‹…‡‘ˆ—•‹‡••ƒ†‹ƒ…‡
†–Š‡‹˜‹•‹‘‘ˆ
‘˜‡”‡–ƒŽ–—†‹‡•ƒ†‡”˜‹…‡•
Map 3.7.5b: A geographical visual description of the WSU locations that are susceptible to flooding
Source: Washington Military Department – Emergency Management Division 2004.
Map 3.7.5c (below) shows the frequency of major flooding occurrences, from 1956 to the present
year, which have affected counties containing WSU locations.
Map 3.7.5c
Source: Washington Military Department – Emergency Management Division 2004.
ƒ‰‡͵ǤͶ͵
ƒ•Š‹‰–‘–ƒ–‡‹˜‡”•‹–›ʹͲͲͺ
”‡Ǧ‹•ƒ•–‡”ŽŽǦƒœƒ”†•‹–‹‰ƒ–‹‘Žƒ
Landslide
Landslide is the movement of rock, soil and debris down a hillside or slope.
Landslides take lives; destroy homes, businesses, and public buildings; interrupt
transportation; undermine bridges; derail train cars; cover marine habitat; and,
damage utilities.
Landslide includes a wide range of ground movement, such as falling rocks,
deep failure of slopes, and shallow debris flows. Ground failures that result in
landslides occur when gravity overcomes the strength of a slope. While gravity
is the primary reason for a landslide, there can be other contributing factors,
including:
x
Saturation, Erosion; Stress from earthquake, or Volcanic eruptions
x
Topography of a slope – its shape, size, degree of slope and
drainage;
x
Excess weight: from accumulation of rain or snow, from
stockpiling of rock or ore, from waste piles, or from man-made
structures; and
x
Human action, such as construction, logging or road building that
disturbs soils and slopes.
30 of the 39 Washington counties are vulnerable to landslide activity. The
following jurisdictions have the greatest vulnerability to landslides, based on
descriptions of events and damages described above, as well as information
from landslide experts from the Washington Department of Natural Resources
and the U.S. Geologic Survey.
Region 1: Island County, San Juan County, Skagit County,
Snohomish County, Whatcom County;
Region 2: Clallam County, Jefferson County, Kitsap County;
Region 3: Gray Harbor County, Lewis County, Mason County,
Pacific County, Thurston County;
Region 4: Clark County, Cowlitz County, Skamania County;
Region 5: Pierce County;
Region 6: King County;
Region 7: Chelan County, Kittitas County, Okanogan County;
Region 8: Klickitat County, Walla Walla County, Yakima
County; and
Region 9: Asotin County, Columbia County, Ferry County,
Garfield County, Lincoln County, Stevens County.
Maps 3.7.6a and 3.7.6b (below) show the counties (and associated WSU
locations) most at-risk and vulnerable to landside activity.
ƒ‰‡͵ǤͶͶ
”‡’ƒ”‡†›ǣˆˆ‹…‡‘ˆ—•‹‡••ƒ†‹ƒ…‡
†–Š‡‹˜‹•‹‘‘ˆ
‘˜‡”‡–ƒŽ–—†‹‡•ƒ†‡”˜‹…‡•
Map 3.7.6a: An extensive number of WSU locations on the western side of the state are vulnerable to
landslide activity. Source: Washington Military Department – Emergency Management Division 2004.
Map 3.7.6b
Source: Washington State Emergency Management Hazards technology Program 2003.
ƒ‰‡͵ǤͶͷ
ƒ•Š‹‰–‘–ƒ–‡‹˜‡”•‹–›ʹͲͲͺ
”‡Ǧ‹•ƒ•–‡”ŽŽǦƒœƒ”†•‹–‹‰ƒ–‹‘Žƒ
Wild Fire
The season for wildland fire in Washington State usually begins in early May
and generally ends in late September, although fires have occurred in every
month of the year. The length of the fire season can be expanded due to drought,
snowpack, and local weather conditions. The early and late occurrence of the
fire season is generally linked to human activities, although lightning causes
most of the fires during the peak period of July to early September.
Loss caused by a wildland fire can include the destruction of timber, damage to
wildlife habitat, scenic vistas, and watersheds; and increased vulnerability to
flooding due to the destruction of watersheds. Consequently, wildland fire can
affect an extensive number of WSU facilities and personnel located across the
state associated with research and educational development.
The Washington agencies respond to more than 1,000 wildland fires per year
across the state and about 70 percent occur in Eastern Washington, making
WSU facilities and personnel in that area particularly vulnerable. Wildland fires
can spread to more than 100,000 acres and larger, lasting up to several months
depending on a variety of factors.
34 counties within the 9 regions are susceptible to severe wildfire occurrences:
Region 1: San Juan County, Skagit County, Snohomish County
Whatcom County;
Region 2: Clallam County, Jefferson County, Kitsap County;
Region 3: Lewis County, Mason County, Pacific County
Thurston County;
Region 4: Clark County, Cowlitz County, Skamania County,
Wahkiakum County;
Region 5: Pierce County;
Region 6: King County;
Region 7: Chelan County, Kittitas County; Okanogan County,
Region 8: Benton County, Klickitat County, Walla Walla
County, Yakima County; and
Region 9: Adams County, Asotin County, Columbia County,
Ferry County, Garfield County, Lincoln County, Pend Oreille
County, Spokane County; Stevens County, Whitman County.
ƒ‰‡͵ǤͶ͸
”‡’ƒ”‡†›ǣˆˆ‹…‡‘ˆ—•‹‡••ƒ†‹ƒ…‡
†–Š‡‹˜‹•‹‘‘ˆ
‘˜‡”‡–ƒŽ–—†‹‡•ƒ†‡”˜‹…‡•
Map 3.7.7a: A geographical view of the counties containing WSU locations that are vulnerable to major
wildfire occurrences.
Source: Washington Department of Natural Resource 2002.
Resources:
x
x
x
x
x
x
Washington
State
Emergency
Management
Division;
http://emd.wa.gov/
Washington
State
Patrol,
Fire
Protection
Bureau;
http://www.wsp.wa.gov/fire/fservise.htm
Washington State Department of Natural Resources, Resource
Protection Division; http://www.wa.gov/dnr/htdocs/rp/rp/html
Bureau of Indian Affairs; http://www.doi.gov/bureau-indianaffairs.html
National Weather Service; http://www.nws.noaa.gov/
United States Forest Service; http://www.fs.fed.us/
Hazard Risk Summary
Based on the data collected, tables 3.7.8a and 3.7.8b (below) provide a
summation of the types of hazard which are most likely to impact WSU
locations – set forth by county. These tables are based upon the top eight
identified hazards from the HIVA process.
ƒ‰‡͵ǤͶ͹
ƒ•Š‹‰–‘–ƒ–‡‹˜‡”•‹–›ʹͲͲͺ
”‡Ǧ‹•ƒ•–‡”ŽŽǦƒœƒ”†•‹–‹‰ƒ–‹‘Žƒ
County
HAZARD TYPE (Identified as Significant)
Avalanche
Adams
Asotin
Benton
Chelan
Clallam
Clark
Columbia
Cowlitz
Douglas
Ferry
Franklin
Garfield
Grant
Gray
Island
Jefferson
King
Kitsap
Kittitas
Klickitat
Lewis
Lincoln
Mason
Okanogan
Pacific
Pend
Pierce
San Juan
Skagit
Skamania
Snohomish
Spokane
Stevens
Thurston
Wahkiaku
Walla
Whatcom
Whitman
Yakima
TOTAL
Drought
Earthquake
Flooding
Landslide
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
30
34
39
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
13
10
24
12
Table 3.7.8a
ƒ‰‡͵ǤͶͺ
”‡’ƒ”‡†›ǣˆˆ‹…‡‘ˆ—•‹‡••ƒ†‹ƒ…‡
†–Š‡‹˜‹•‹‘‘ˆ
‘˜‡”‡–ƒŽ–—†‹‡•ƒ†‡”˜‹…‡•
Wildfire
Severe
Storms
Volcanic
Activity
TOTAL
Vulnerability
x
3
4
4
7
4
6
3
6
2
4
2
4
2
4
3
4
6
4
6
5
7
3
5
5
5
3
6
4
7
6
6
3
4
6
3
4
7
2
7
14
176
x
x
x
x
x
x
x
x
x
x
x
x
x
Source: Washington State Hazardous Mitigation Plan 2004
County (and WSU Location)
Number Of
Hazardous Events
TOTAL
Table 3.7.8b
7
6
5
4
3
2
Chelan
Clark
Mason
Asotin
Adams
Douglas
Cowlitz
King
Okanogan
Benton
Columbia
Franklin
Lewis
Kittitas
Pacific
Clallam
Island
Grant
Skagit
Klickitat
Ferry
Lincoln
Whitman
Whatcom
Pierce
Garfield
Pend Oreille
Yakima
Skamania
Gray Harbor
Spokane
Snohomish
Kitsap
Wahkiakum
Thurston
Jefferson
San Juan
Stevens
6
8
3
WallaWalla
11
7
4
Severe Storms
Washington State University statewide is vulnerable to severe weather. A severe storm
is an atmospheric disturbance that results in one or more of the following phenomena:
strong winds and large hail, thunderstorms, tornados, rain, snow, and/or other mixed
precipitation. Loss of utilities such as electrical power and other infrastructure,
including transportation, are usually impacted by a severe storm. Consequently, many
of these interruptions in association with extreme weather can create a domino effect.
Generally, severe storms move into the state of Washington from the Pacific Ocean and
usually advance eastward.
Based on the National Weather Service definitions, the following are considered at the
top of the list for major severe storms affecting Washington state locations and its
personnel across the state.
High Winds
Conditions of high winds are associated with storms having perpetual winds
between 40 and 58 mph or greater, lasting in excess of one hour; not caused directly
by thunderstorms.
ƒ‰‡͵ǤͶͻ
ƒ•Š‹‰–‘–ƒ–‡‹˜‡”•‹–›ʹͲͲͺ
”‡Ǧ‹•ƒ•–‡”ŽŽǦƒœƒ”†•‹–‹‰ƒ–‹‘Žƒ
The following counties containing WSU locations, personnel and facilities are most
vulnerable to high wind incidents:
Region 1: Island County, San Juan County, Skagit County, Snohomish
County, Whatcom County;
Region 2: Clallam County; Jefferson County, Kitsap County;
Region 3: Gray Harbor County, Lewis County, Mason County, Pacific
County, Thurston County;
Region 4: Clark County, Cowlitz County, Skamania County;
Region 5: Pierce County;
Region 6: King County;
Region 7: Kittitas County;
Region 8: Benton County, Walla Walla County; and
Region 9: Columbia County.
Map 3.7.9a (below) provides a geographical view of the counties containing WSU
locations affected by high wind occurrences.
Map 3.7.9a
Source: Washington Military Department – Emergency Management Division 2004.
ƒ‰‡͵ǤͷͲ
”‡’ƒ”‡†›ǣˆˆ‹…‡‘ˆ—•‹‡••ƒ†‹ƒ…‡
†–Š‡‹˜‹•‹‘‘ˆ
‘˜‡”‡–ƒŽ–—†‹‡•ƒ†‡”˜‹…‡•
Table 3.7.9b: Counties/WSU locations vulnerable to high winds (shaded counties = most vulnerable).
Source: Washington State Hazardous Mitigation Plan 2004
ƒ‰‡͵Ǥͷͳ
ƒ•Š‹‰–‘–ƒ–‡‹˜‡”•‹–›ʹͲͲͺ
”‡Ǧ‹•ƒ•–‡”ŽŽǦƒœƒ”†•‹–‹‰ƒ–‹‘Žƒ
Severe Thunderstorm
A severe thunderstorm is a storm that produces winds of 58 mph or greater or threequarter inch or larger hail.
The following Washington State University locations, personnel and facilities are most
vulnerable to severe thunderstorm occurrences:
Region 7: Chelan County, Douglas County, Grant County Kittitas
County, Okanogan County;
Region 8: Benton County, Franklin County, Klickitat County, Walla
Walla County Yakima County; and
Region 9: Adams County, Asotin County, Columbia County, Ferry
County, Garfield County, Lincoln County, Pend Oreille
County, Spokane County, Whitman County.
Map 3.7.10a (below) provides a geographical view of the counties containing WSU
locations affected by severe thunderstorms.
Map 3.7.10a
Source: Washington Military Department – Emergency Management Division 2004.
ƒ‰‡͵Ǥͷʹ
”‡’ƒ”‡†›ǣˆˆ‹…‡‘ˆ—•‹‡••ƒ†‹ƒ…‡
†–Š‡‹˜‹•‹‘‘ˆ
‘˜‡”‡–ƒŽ–—†‹‡•ƒ†‡”˜‹…‡•
Table 3.7.10b: Counties/WSU locations vulnerable to severe thunder storms (shaded = most vulnerable).
Source: Washington State Hazardous Mitigation Plan 2004
ƒ‰‡͵Ǥͷ͵
ƒ•Š‹‰–‘–ƒ–‡‹˜‡”•‹–›ʹͲͲͺ
”‡Ǧ‹•ƒ•–‡”ŽŽǦƒœƒ”†•‹–‹‰ƒ–‹‘Žƒ
Winter Storm
A Winter Storm is a storm with significant snowfall, ice, and/or freezing rain. Heavy
snowfall is defined as 4 inches or more in a 12-hour period, or 6 or more inches in a
24-hour period in non-mountainous areas; 12 inches or more in a 12-hour period or
18 inches or more in a 24-hour period in mountainous areas.
The following WSU locations, personnel and facilities are most vulnerable to winter
storm activity:
Region 1: Skagit County, Snohomish County;
Region 3: Mason County, Thurston County;
Region 4: Clark County, Cowlitz County, Skamania County;
Region 5: Pierce County;
Region 6: King County;
Region 7: Chelan County, Douglas County, Grant County, Kittitas
County; Okanagan County;
Region 8: Franklin County, Walla Walla County, Yakima County; and
Region 9: Garfield County, Spokane County.
Map 3.7.11a (below) provides a geographical view of the counties containing WSU
locations affected by winter storms.
Map 3.7.11a
Source: Washington Military Department – Emergency Management Division 2004.
ƒ‰‡͵ǤͷͶ
”‡’ƒ”‡†›ǣˆˆ‹…‡‘ˆ—•‹‡••ƒ†‹ƒ…‡
†–Š‡‹˜‹•‹‘‘ˆ
‘˜‡”‡–ƒŽ–—†‹‡•ƒ†‡”˜‹…‡•
Table 3.7.11b: Counties/WSU locations most vulnerable to winter storms (shaded = most vulnerable).
Source: Washington State Hazardous Mitigation Plan 2004
ƒ‰‡͵Ǥͷͷ
ƒ•Š‹‰–‘–ƒ–‡‹˜‡”•‹–›ʹͲͲͺ
”‡Ǧ‹•ƒ•–‡”ŽŽǦƒœƒ”†•‹–‹‰ƒ–‹‘Žƒ
Blizzards
A blizzard is a storm with considerable falling and/or blowing snow combined with
sustained winds or frequent gusts of 35 mph or greater that frequently reduces
visibility to less than one-quarter mile
The following WSU locations, personnel and facilities are most vulnerable to blizzard
incidents:
Region 1: Whatcom County;
Region 4: Clark County, Skamania County;
Region 7: Douglas County, Grant County, Kittitas County, Okanogan
County;
Region 8: Walla Walla County; and
Region 9: Adams County, Asotin County, Ferry County, Garfield
County, Lincoln County, Pend Oreille County, Stevens County,
Whitman County.
Map 3.7.12a (below) provides a geographical view of the counties containing WSU
locations most vulnerable to blizzard occurrences.
Map 3.7.12a
Source: Washington Military Department – Emergency Management Division 2004.
ƒ‰‡͵Ǥͷ͸
”‡’ƒ”‡†›ǣˆˆ‹…‡‘ˆ—•‹‡••ƒ†‹ƒ…‡
†–Š‡‹˜‹•‹‘‘ˆ
‘˜‡”‡–ƒŽ–—†‹‡•ƒ†‡”˜‹…‡•
Table 3.7.12b: Counties/WSU locations vulnerable to blizzards (shaded counties = most vulnerable).
Source: Washington State Hazardous Mitigation Plan 2004
ƒ‰‡͵Ǥͷ͹
ƒ•Š‹‰–‘–ƒ–‡‹˜‡”•‹–›ʹͲͲͺ
”‡Ǧ‹•ƒ•–‡”ŽŽǦƒœƒ”†•‹–‹‰ƒ–‹‘Žƒ
Dust Storm
A storm of dust and debris blown by wind gusts of at least 35 mph, or caused by a
downburst from a dry thunderstorm, that reduces visibility to less than one-quarter
mile.
The following counties containing WSU personnel, facilities and locations are most
vulnerable to dust storm occurrences:
Region 7: Douglas County, Grant County;
Region 8: Benton County, Franklin County, Walla Walla County
Yakima County; and
Region 9: Adams County; Columbia County, Lincoln County, Spokane
County, Whitman County.
Map 3.7.13a (below) provides a geographical view of the counties/WSU locations
affected by dust storm occurrences.
Map 3.7.13a
Source: Washington Military Department – Emergency Management Division 2004.
ƒ‰‡͵Ǥͷͺ
”‡’ƒ”‡†›ǣˆˆ‹…‡‘ˆ—•‹‡••ƒ†‹ƒ…‡
†–Š‡‹˜‹•‹‘‘ˆ
‘˜‡”‡–ƒŽ–—†‹‡•ƒ†‡”˜‹…‡•
Table 3.7.13b: Counties/WSU locations vulnerable to dust storms (shaded counties = most vulnerable).
Source: Washington State Hazardous Mitigation Plan 2004
ƒ‰‡͵Ǥͷͻ
ƒ•Š‹‰–‘–ƒ–‡‹˜‡”•‹–›ʹͲͲͺ
”‡Ǧ‹•ƒ•–‡”ŽŽǦƒœƒ”†•‹–‹‰ƒ–‹‘Žƒ
Coastal Flooding
Flooding in coastal areas may be caused by storm surges, astronomical high tides, or
a combination of both.
The following counties containing WSU personnel, facilities and locations are
vulnerable to coastal flooding incidents:
Region 1: Island County, San Juan County, Skagit County, Snohomish
County, Whatcom County;
Region 2: Clallam County; Jefferson County, Kitsap County;
Region 3: Gray Harbor County, Pacific County, Thurston County;
Region 5: Pierce County; and
Region 6: King County.
Map 3.7.14a (below) provides a geographic description view of the counties/WSU
locations that could be affected.
Map 3.7.14a
Source: Washington Military Department – Emergency Management Division 2004.
ƒ‰‡͵Ǥ͸Ͳ
”‡’ƒ”‡†›ǣˆˆ‹…‡‘ˆ—•‹‡••ƒ†‹ƒ…‡
†–Š‡‹˜‹•‹‘‘ˆ
‘˜‡”‡–ƒŽ–—†‹‡•ƒ†‡”˜‹…‡•
Table 3.7.14b:
vulnerable).
Counties/WSU locations vulnerable to coastal flooding (shaded counties = most
Source: Washington State Hazardous Mitigation Plan 2004
ƒ‰‡͵Ǥ͸ͳ
ƒ•Š‹‰–‘–ƒ–‡‹˜‡”•‹–›ʹͲͲͺ
”‡Ǧ‹•ƒ•–‡”ŽŽǦƒœƒ”†•‹–‹‰ƒ–‹‘Žƒ
Tornado
The tornado is defined as violent rotating columns of air that are in contact with the
ground, and usually develop from severe thunderstorms. The WSU locations in
counties with sever thunderstorms are most vulnerable to experiencing a tornado.
The following WSU locations, personnel and facilities are vulnerable to a tornado
occurrence.
Region 1: Snohomish County;
Region 3: Gray Harbor County, Pacific County;
Region 4: Clark County, Cowlitz County;
Region 5: Pierce County;
Region 6: King County;
Region 7: Grant County, Okanogan County;
Region 8: Benton County, Franklin County, Klickitat County, Walla
Walla County, Yakima County; and
Region 9: Adams County, Asotin County, Columbia County, Garfield
County, Lincoln County, Pend Oreille County, Spokane County,
Stevens County, Whitman County.
Map 3.7.15a (below) provides a geographic description view of the counties containing
WSU locations that could be affected.
Map 3.7.15a
Source: Washington Military Department – Emergency Management Division 2004.
ƒ‰‡͵Ǥ͸ʹ
”‡’ƒ”‡†›ǣˆˆ‹…‡‘ˆ—•‹‡••ƒ†‹ƒ…‡
†–Š‡‹˜‹•‹‘‘ˆ
‘˜‡”‡–ƒŽ–—†‹‡•ƒ†‡”˜‹…‡•
Table 3.7.15b: Counties/WSU locations vulnerable to tornadoes (shaded = most vulnerable).
Source: Washington State Hazardous Mitigation Plan 2004
ƒ‰‡͵Ǥ͸͵
ƒ•Š‹‰–‘–ƒ–‡‹˜‡”•‹–›ʹͲͲͺ
”‡Ǧ‹•ƒ•–‡”ŽŽǦƒœƒ”†•‹–‹‰ƒ–‹‘Žƒ
Based on the data collected, tables 3.7.16a and 3.7.16b (below) provide a summation of
in counties containing WSU personnel and facilities most vulnerable to severe storms.
6
Walla Walla
Yakima
5
Grant
4
Adams
Benton
Clark
Columbia
Douglas
Garfield
Lincoln
Okanogan
Pierce
Snohomish
Spokane
Whitman
Kittitas
WSU Locations
Types of
Storm
Impacting
3
Asotin
Cowlitz
Franklin
Gray Harbor
King
Kitsap
Pacific
Pend Oreille
Skagit
Skamania
Thurston
Whatcom
2
Clallam
Ferry
Island
Jefferson
Klickitat
Mason
San Juan
Stevens
1
Chelan
Lewis
Wahkiakum
Table 3.7.16a: Cumulative Severe Storm Vulnerability (based on seven identified storm types)
COUNTY
STORM EVENT VULNERABILITY
High
Wind
Adams
Asotin
Benton
Chelan
Clallam
Clark
Columbia
Cowlitz
Douglas
Ferry
Franklin
Garfield
Grant
Gray Harbor
Island
Jefferson
King
Kitsap
Kittitas
Klickitat
Lewis
Lincoln
Mason
Okanogan
Pacific
Winter
Storm
Blizzard
x
x
x
x
x
x
x
Dust
Storm
Thunder
Storm
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
TOTAL
x
x
x
4
3
4
1
2
4
4
3
4
2
3
4
5
3
2
2
3
3
4
2
1
4
2
4
3
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
ƒ‰‡͵Ǥ͸Ͷ
”‡’ƒ”‡†›ǣˆˆ‹…‡‘ˆ—•‹‡••ƒ†‹ƒ…‡
†–Š‡‹˜‹•‹‘‘ˆ
‘˜‡”‡–ƒŽ–—†‹‡•ƒ†‡”˜‹…‡•
Tornado
x
x
x
x
x
x
x
x
x
x
Coastal
Flooding
x
x
x
x
COUNTY
STORM EVENT VULNERABILITY
High
Wind
Pend Oreille
Pierce
San Juan
Skagit
Skamania
Snohomish
Spokane
Stevens
Thurston
Wahkiakum
Walla Walla
Whatcom
Whitman
Yakima
TOTAL
Winter
Storm
Blizzard
Dust
Storm
Thunder
Storm
x
x
x
x
x
x
x
x
x
x
x
Coastal
Flooding
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
23
18
16
11
19
x
x
Tornado
TOTAL
x
x
x
x
3
4
2
3
3
4
4
2
3
1
6
3
4
6
23
124
x
x
x
x
x
x
x
x
x
Table 3.7.16b: Severe Storms (based on seven events
13
Source: Washington State Hazardous Mitigation Plan 2004
Technological and Man-caused Hazards
The following are technological and man-caused hazards that can threaten Washington
State University personnel and facilities statewide. This category of hazards is of
particular importance to many WSU facilities, and includes a number of types of
hazard. The “all hazards” approach adopted by the planning team allowed an
assessment of risk from these types of hazard which indicates that this category of
hazard yields three of the top four hazards of concern to WSU personnel statewide
(Crime/Disorder, Utilities Interruption, and Hazardous Materials events).
Crime and Disorder
This category is a combination of several hazards. The first is “ordinary crime” (theft,
burglary, assault) as experienced by individuals and communities across America – and
which also occur with frequency on college campuses and which impact WSU facilities,
operations and personnel. The second is “civil disorder” such as protest and riot – events
for which colleges in general, and WSU in particular are often targets. The WSU
Pullman student riots of 1999 are a prime example of this type of hazard. The third
category is “terrorism” which the planning team has expanded to include events such as
the 2006 Virginia Tech shooting incident. WSU has experience with terrorist activity,
too – having been struck by domestic, environmental terrorists in protest of research
activity involving animals. The mitigation response to these threats carries common
elements, a factor which influenced the aggregation into a single category for analysis.
Crime Prevention Through Environmental Design (CPTED), improved safety and
ƒ‰‡͵Ǥ͸ͷ
ƒ•Š‹‰–‘–ƒ–‡‹˜‡”•‹–›ʹͲͲͺ
”‡Ǧ‹•ƒ•–‡”ŽŽǦƒœƒ”†•‹–‹‰ƒ–‹‘Žƒ
security, and implementation of warning systems are typical efforts to reduce the impact
of crime, disorder and terrorism.
Civil Disorder/Disturbance
The State of Washington has witnessed a number of riots, including race riots in the
1960’s; protests against the Vietnam War in the 1970’s; abortion clinic
demonstrations in the 1980’s; civil disturbances and allegations of police brutality in
the 1990’ssuch as the World Trade Organization (WTO) in December of 1999.
WSU has been impacted, directly and indirectly, by many of these same events.
Student riots (Pullman, 1999) are but one facet of this category of hazard. The
concentration of young people on a college campus makes the potential for this sort
of activity high for the WSU campuses – particularly the residential campus at
Pullman.
Terrorism
Terrorism can be state sponsored or the outgrowth of a frustrated, extremist
fringe of polarized and/or minority groups of people. The experience of WSU
with terrorism has been with domestic, environmentally-focused groups.
Both the Earth Liberation Front and the Animal Liberation Front have
attacked WSU animal research facilities, causing significant damage. As
public argument increases over such research activities as genetic
manipulation, cloning, and animal research, the potential for such terrorist
activity also increases.
Hazardous Materials
Hazardous materials are those, which, because of their chemical, physical, or
biological nature, pose a potential risk to life, health, or property when released. A
release may occur by spilling, leaking, emitting toxic vapors, or any other process
that enables the material to escape its container, enter the environment, and create a
potential hazard. The hazard can be explosive, flammable, combustible, corrosive,
reactive, poisonous, toxic, biological agent, and radioactive.
WSU facilities are generally at risk from events involving hazardous materials
stored, generated or transported by others. Many WSU facilities are additionally at
risk from events involving hazardous materials stored, generated on in transport
to/from those facilities. WSU Spokane, for instance is particularly vulnerable to
rail-transport hazardous materials due to the proximity of rail lines to that campus.
WSU Pullman is particularly vulnerable to a chlorine event because of its oncampus water treatment plant.
ƒ‰‡͵Ǥ͸͸
”‡’ƒ”‡†›ǣˆˆ‹…‡‘ˆ—•‹‡••ƒ†‹ƒ…‡
†–Š‡‹˜‹•‹‘‘ˆ
‘˜‡”‡–ƒŽ–—†‹‡•ƒ†‡”˜‹…‡•
The Washington State Department of Ecology reported 3,988 confirmed hazardous
material spills in 1999, in counties where WSU personnel and facilities are located.
The continuing increase in responses to clandestine methamphetamine labs is of
particular concern. Hazardous materials include chemical hazards found in every
county across Washington State.
WSU policies and emergency plans are potentially impacted by 46 Local Emergency
Planning Committees (LEPC). These LEPC's, in concert with their respective local
emergency management offices, conduct hazard identification, vulnerability
analysis, and risk assessment activities for their jurisdictions. Federal and state
statutes require LEPC's to develop and maintain emergency response plans based on
the volumes and types of substances found in, or transported through, their districts.
Local Hazard
Local hazards occur in counties where WSU locations are present, but
may or may not have a significant impact on all sites within the state.
Hazardous chemicals such as ammonia, chlorine, propane, and others,
are heavily used for various agricultural and manufacturing processes
at many locations throughout the state. Nearly every community has a
chemical hazard or a hazardous material transportation system that
should be included in public education and emergency planning.
Image 3.7.25a This photo illustrates the risk posed by proximity of hazardous materials transport
mechanisms to the Pullman campus – in particular to student housing.
ƒ‰‡͵Ǥ͸͹
ƒ•Š‹‰–‘–ƒ–‡‹˜‡”•‹–›ʹͲͲͺ
”‡Ǧ‹•ƒ•–‡”ŽŽǦƒœƒ”†•‹–‹‰ƒ–‹‘Žƒ
Map 3.7.25a (below) provides a geographic view of counties having ammonia incidents
between 1993 and 2001, in which WSU locations have facilities and personnel.
Map 3.7.25a
Source: Hazardous Substances Emergency Events Surveillance Program Office of Environmental Health and
Safety Washington State Department of Health.
The number of hazardous materials events, substances released, victims and
deaths for the years 1993 through 2001 are shown in Table 8. An increase in the
number of events, particularly fixed-facility events, has been seen over the last
three years. This increase is primarily related to clandestine drug lab activity in
Washington State. The average number of victims per year for 1998-2001 was
23% less than what occurred during the 1993-97 period (413/year vs. 536/year).
The average number of victims per event 1 for 1998-2001 (928) was 30% lower
than during the 1993-1997 period (1,325). Figure 9 illustrates these trends.
Student injuries in 2001 were very high primarily because of two events. The
first event occurred when a release of fumes from a paper manufacturing facility
affected an elementary school that was downwind. Fifty-two children
experienced nausea, respiratory irritation and dizziness. The second incident
involved the deliberate discharge of pepper spray in a high school. The fumes
spread through the ventilation system, sickening 30 students.
Expressed as victims per 1000 events for ease of comparison.
ƒ‰‡͵Ǥ͸ͺ
”‡’ƒ”‡†›ǣˆˆ‹…‡‘ˆ—•‹‡••ƒ†‹ƒ…‡
†–Š‡‹˜‹•‹‘‘ˆ
‘˜‡”‡–ƒŽ–—†‹‡•ƒ†‡”˜‹…‡•
Number
Standardized Substance Name
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
Frequency
Ammonia
186
Sulfuric Acid
80
Solvent NOS
75
Hydrochloric Acid
72
Paint or Coating NOS
70
Ethylene Glycol
61
Sulfur Dioxide
58
Chlorine
50
Sodium Hydroxide
49
Ephedrine
46
Total
747
Table 3.7.25b: The 10 most frequently released substances, 1998-2001.
Type of event
Fixed facility
Transportation
Year
No. of events
%
No. of events
%
Total no.
of events
1998
278
70
118
30
396
1999
317
75
106
25
423
2000
319
73
120
27
439
2001
388
74
134
26
522
Total
1302
73
478
27
1780
Table 3.7.25c: Number of events meeting the surveillance definition, by year and type of event, hazardous
substances emergency events observation, Washington State, 1998-2001.
ƒ‰‡͵Ǥ͸ͻ
ƒ•Š‹‰–‘–ƒ–‡‹˜‡”•‹–›ʹͲͲͺ
”‡Ǧ‹•ƒ•–‡”ŽŽǦƒœƒ”†•‹–‹‰ƒ–‹‘Žƒ
Fixed facilities areas of involvement
All other areas*
11%
Stora ge above
ground
17%
Transport within
facility
5%
Other
6%
Process vessel
10%
Indoor, nonindustrial, non-living
7%
Outdoor, nonfarming or industrial
10%
Indoor, nonindustrial residence
8%
Anc illary process
equipment
8%
Piping
9%
Material handling
9%
*Includes transformer or capacitor, dump/waste areas, heating/cooling for building, outdoor farming or
industrial area, laboratory, storage below ground, secondary contamination and unknown.
Figure 3.7.25a: Areas of fixed facilities involved in events, hazardous substances emergency events
observations, Washington State, 1998-2001.
Types of transportation involved in HSEES events
Water Air
2%
Rail 4%
11%
Pipeline
1%
Ground
82%
Figure 3.7.25b: Distribution of transportation-related events, by type of transport, hazardous substances
emergency events observations, Washington State, 1998-2001.
ƒ‰‡͵Ǥ͹Ͳ
”‡’ƒ”‡†›ǣˆˆ‹…‡‘ˆ—•‹‡••ƒ†‹ƒ…‡
†–Š‡‹˜‹•‹‘‘ˆ
‘˜‡”‡–ƒŽ–—†‹‡•ƒ†‡”˜‹…‡•
Illegal
activity
Unknown
Improper
dumping
Maintenance
Beyond human
control
Other
Improper mixing
Human error
Electrical
problems
Startup/
shutdown
System upset
Improper
loading
Equipment failure
Figure 3.7.25c: Factors reported as contributing to the occurrence of fixed-facility events, hazardous
substances emergency events observations, Washington State, 1998-2001.
County
Adams
Asotin
Benton
Chelan
Clallam
Clark
Columbia
Cowlitz
Douglas
Franklin
Garfield
Grant
Grays Harbor
Island
Jefferson
King
Type of Event
Fixed facility
No. of events
5
2
99
25
8
75
3
74
6
17
0
27
22
0
6
352
%
<1
<1
8
2
<1
6
<1
6
<1
1
0
2
2
0
<1
27
Transportation
No. of events
6
0
18
1
0
16
3
11
0
13
1
10
16
1
0
189
%
1
0
4
<1
0
3
1
2
0
3
<1
2
3
<1
0
40
Total no. of Events
11
2
117
26
8
91
6
85
6
30
1
37
38
1
6
541
ƒ‰‡͵Ǥ͹ͳ
ƒ•Š‹‰–‘–ƒ–‡‹˜‡”•‹–›ʹͲͲͺ
”‡Ǧ‹•ƒ•–‡”ŽŽǦƒœƒ”†•‹–‹‰ƒ–‹‘Žƒ
Type of Event
Fixed facility
Transportation
County
No. of events
%
No. of events
%
Total no. of Events
Kitsap
24
2
5
1
29
Kittitas
4
<1
3
1
7
Klickitat
3
<1
0
0
3
Lewis
16
1
3
1
19
Lincoln
3
<1
1
<1
4
Mason
3
<1
4
1
7
Okanogan
6
<1
2
<1
8
Pacific
4
<1
2
<1
6
Pend Oreille
2
<1
0
0
2
Pierce
107
8
44
9
151
San Juan
2
<1
0
0
2
Skagit
61
5
9
2
70
Skamania
3
<1
0
0
3
Snohomish
79
6
29
6
108
Spokane
98
8
38
8
136
Stevens
2
<1
5
1
7
Thurston
27
2
13
3
40
Wahkiakum
1
<1
1
<1
2
Walla Walla
9
<1
4
1
13
Whatcom
62
5
5
1
67
Whitman
9
<1
15
3
24
Yakima
56
4
10
2
66
Total
1302
100
478
100
1780
Table 3.7.25d: Shows the number of events meeting the surveillance definition, by county, with a WSU
presence and type of event, hazardous observation emergency events surveillance, Washington State, 19982001.
No. of
substances
released
Type of event
Fixed facility
No.
events
1
2
3
4
•5
Total
All events
Transportation
%
No. of
substances
No.
events
%
No. of
substances
No.
events
%
No. of
substances
1169
60
37
21
15
90%
5%
3%
2%
1%
1169
120
111
84
150
447
16
9
3
3
94%
3%
2%
<1%
<1%
447
32
27
12
15
1616
76
46
24
18
91%
4%
3%
1%
1%
1616
152
138
96
165
1302
100%*
1632
478
100%*
533
1780
100%*
2165
* Percentage totals may not add up to 100% due to rounding.
Table 3.7.25e: Shows the distribution of the number of substances released, by type of event,
hazardous substances emergency events observation, Washington State, 1998-2001.
ƒ‰‡͵Ǥ͹ʹ
”‡’ƒ”‡†›ǣˆˆ‹…‡‘ˆ—•‹‡••ƒ†‹ƒ…‡
†–Š‡‹˜‹•‹‘‘ˆ
‘˜‡”‡–ƒŽ–—†‹‡•ƒ†‡”˜‹…‡•
Type of event
Fixed facility
All events
Transportation
Substance category
No. of
substances
(%)
No. of
substances
(%)
No. of
substances
(%)
Acids
174
(11%)
69
(13%)
243
(11%)
Ammonia
163
(10%)
34
(6%)
197
(9%)
Bases
37
(2%)
42
(8%)
79
(4%)
Chlorine
52
(3%)
2
(<1%)
54
(2%)
Mixtures*
112
(7%)
31
(6%)
143
(7%)
Other inorganic
substances
324
(20%)
81
(15%)
405
(19%)
Other substances
381
(23%)
138
(26%)
519
(24%)
Paints and dyes
68
(4%)
23
(4%)
91
(4%)
Pesticides
79
(5%)
27
(5%)
106
(5%)
Polychlorinated
biphenyls
30
(2%)
1
(<1%)
31
(1%)
Volatile organic
compounds
210
(13%)
84
(16%)
294
(14%)
Total
1630
532
2162
* Mixtures of substances from different categories.
Table 3.7.25f: Distribution of the number of substances released, by substance category and type of
event. Hazardous substances emergency events observation, Washington State, 1998-2001.
Number
of
Victims
1
2
3
4
5
>6
Total
Type of events
Fixed facility
Events (%) Victims
288 (55%)
288
96 (18%)
192
42 (8%)
126
25 (5%)
100
16 (3%)
80
53 (10%)
668
520
1454
Transportation
Events (%)
63 (66%)
14 (15%)
7 (7%)
3 (3%)
4 (4%)
5 (5%)
96
All events
Victims
63
28
21
12
20
55
199
Events (%)
351 (57%)
110 (18%)
49 (8%)
28 (5%)
20 (3%)
58 (9%)
616
Victims
351
220
147
112
100
723
1653
Table 3.7.25g: Distribution of the number of victims, by type of event, hazardous substances emergency
events observation, Washington State, 1998-2001.
ƒ‰‡͵Ǥ͹͵
ƒ•Š‹‰–‘–ƒ–‡‹˜‡”•‹–›ʹͲͲͺ
”‡Ǧ‹•ƒ•–‡”ŽŽǦƒœƒ”†•‹–‹‰ƒ–‹‘Žƒ
Substance category
Acids
Ammonia
Bases
Chlorine
Mixtures
Other inorganic
substances
Other, not otherwise
specified
Paints and dyes
Pesticides
Polychlorinated
biphenyls
Volatile organic
compounds
Total*
Total releases
Percent of
total
No.
releases
243
11
197
9
79
4
54
2
143
7
405
19
Releases with victims
Percent of
all releases
No.
with victims
111
15
79
10
19
3
35
5
63
8
132
17
Percentage of
releases in
substance category
46
40
24
65
44
33
519
24
179
24
34
91
106
31
4
5
1
8
36
0
1
5
0
9
34
0
294
14
96
13
33
2162
100
758
100
35
*Total exceeds total number of events because events at which more than one substance was released were counted more than once.
Table 3.7.25h: Number of substances released in all events and events with victims, by
substance category, hazardous substances emergency events observation, Washington State,
19982001.
Radiological
Radiological hazard is the uncontrolled release of radioactive material that can harm
people or damage the environment. In Washington State, there have been no
radiological releases affecting WSU personnel and research as well as local
jurisdictions from any nuclear power generating system.
As with Hazardous Materials, WSU has both internal and external concerns
regarding radiological hazards. WSU operates a radiological research facility on the
Pullman campus:
ƒ‰‡͵Ǥ͹Ͷ
”‡’ƒ”‡†›ǣˆˆ‹…‡‘ˆ—•‹‡••ƒ†‹ƒ…‡
†–Š‡‹˜‹•‹‘‘ˆ
‘˜‡”‡–ƒŽ–—†‹‡•ƒ†‡”˜‹…‡•
Risk Analysis Summary for the Washington State University Nuclear Radiation Center
The U.S. Nuclear Regulatory Agency (U.S. NRC) bears oversight responsibility for nuclear
reactor facilities in the United States. Both commercial power reactors and research reactors
must submit documentation to the U.S. NRC that describes potential emergency scenarios, along
with consequence analysis. The Washington State University Nuclear Radiation Center
(WSU/NRC) most recently submitted a Safety Analysis Report (SAR) to the U.S. NRC in 2002,
as part of the license renewal process. Scenarios that were examined in the 2002 SAR include
x
x
x
x
x
x
x
x
Loss of electrical power
Earthquake
Mishandling or malfunction of equipment
Mishandling or malfunction of fuel
Experiment malfunction
Loss of coolant
Loss of coolant accompanied by fuel cladding failure
Commercial aircraft crash into the building
The standard that is applied to each scenario is whether the results of the incident could adversely
impact the health or safety of the public. Actions must be taken or protective systems put in place
to protect the health and safety of the public for all credible accident scenarios.
ƒ‰‡͵Ǥ͹ͷ
ƒ•Š‹‰–‘–ƒ–‡‹˜‡”•‹–›ʹͲͲͺ
”‡Ǧ‹•ƒ•–‡”ŽŽǦƒœƒ”†•‹–‹‰ƒ–‹‘Žƒ
The Maximum Hypothetical Accident (MHA) is the “worst-case” scenario, i.e. the worst thing
that could credibly happen in a research reactor facility. Some scenarios that are exceptionally
unlikely, such as a meteor crash into the building, are not considered in MHA analysis due to the
exceedingly low probability of the event actually taking place. The MHA for the WSU research
reactor is a loss of coolant accompanied by a single element fuel cladding failure. If the physical
protection systems can assure the health and safety of the public under MHA conditions, it can be
concluded that all accidents that are less severe than the MHA will also not endanger the heath
and safety of the public. Some scenarios and their consequences, including the MHA, are
described below. The descriptions in this document are summaries of the analyses submitted to
the U.S. NRC.
Facility Description
The Dodgen Research Facility houses the Washington State University Nuclear Radiation Center.
The WSU/NRC operates a one-million watt TRIGA research nuclear reactor, partially
manufactured by General Atomics of San Diego, California. TRIGA is an acronym for Training,
Research, Isotope (production), General Atomics. The TRIGA reactor design was engineered
specifically to be very stable in operation and highly resistant to failure, even under very adverse
conditions. The Dodgen Research Facility building was designed specifically as a nuclear reactor
operations facility. As a result, the building is designed and built to protect the nuclear reactor
from challenges arising from either forces of nature or of human origin, and to protect the health
and safety of the public in the event of unanticipated problems.
Numerous safety systems are tied into the reactor control systems, and are capable of quickly and
safely shutting down the reactor. Conditions of the license granted to Washington State
University stipulate that the reactor must be capable of being shut down from full power
operation less than two seconds after input of a trouble signal. All of the safety systems are
checked for proper operation before the reactor may begin operation. Thus, under any
permissible condition of operation, at any time during operation, the reactor is capable of being
taken from full power to full shutdown in less than two seconds.
Building Isolation Systems
Air ventilation for the reactor facility is provided by an independent air handling system that is
monitored and controlled from the reactor control room. The air handling system can be quickly
shut down and all dampers closed either manually, through reactor operator input, or
automatically by reactor safety systems; either method of ventilation management can be used to
isolate the interior of the reactor facility from the surrounding environment. The ventilation
system isolation mode is designed to protect the environment from contamination by containing
ƒ‰‡͵Ǥ͹͸
”‡’ƒ”‡†›ǣˆˆ‹…‡‘ˆ—•‹‡••ƒ†‹ƒ…‡
†–Š‡‹˜‹•‹‘‘ˆ
‘˜‡”‡–ƒŽ–—†‹‡•ƒ†‡”˜‹…‡•
within the building any airborne radioactive materials that could be released due to a combined
loss of coolant and fuel failure scenario. A high level of redundancy is provided by multiple
independent radiation detector systems. The detector system alarm is linked to building
ventilation, and would trigger a complete shutdown and isolation of reactor room ventilation, thus
containing any released radioactive materials within the facility.
Loss of Electrical Power
A loss of electrical power to the Dodgen Research Facility will cause alarm condition and system
trips that will immediately shutdown the reactor. No further action is necessary to place the
reactor in a safe condition. A loss of electrical power does not present any hazard to the reactor,
the facility, or to the health and safety of the public.
Earthquake
The geologic record of earthquake activity in the Eastern Washington region shows that an
earthquake of 5.7 magnitude is expected about once every 100 years, with the center (due to fault
locations) being located about 100 km from the reactor site, which would significantly attenuate
ground acceleration in the vicinity of the reactor. There is no known reason to anticipate an
earthquake of sufficiently great magnitude which could cause significant damage to the Dodgen
Research Facility. The reactor facility is equipped with a seismic detector to sense earth
movements. A signal from the seismic detector will immediately shut down the reactor.
Occasionally a heavy truck (e.g. golf course construction traffic) will cause sufficient ground
vibration to provide a false positive signal to the system, leading to reactor shutdown.
Emergency shutdown from a seismic switch trip is accomplished in less than two seconds.
Mishandling or Malfunction of Equipment; Mishandling or Malfunction of Fuel
Most mishandling or equipment malfunctions will cause a default condition of reactor shutdown.
The reactor fuel and control systems are engineered to withstand (with a large safety margin) the
most vigorously challenging condition that could result from mishandling, malfunction, or
intentional sabotage of reactor control systems. The worst-case scenario would be an intentional
sabotage intended to cause extreme overpowering of the reactor. However, inherent physical
characteristics of reactor design would prevent damage to the reactor under any possible
operating condition, ruling out intentional sabotage as a possible means by which the reactor
could be damaged.
A fuel failure (e.g. loss of cladding integrity) would not lead to environmental contamination or
jeopardize the health and safety of the public. Most radioactive materials that could be released
due to a fuel failure would be retained in the reactor coolant. A small amount could be
ƒ‰‡͵Ǥ͹͹
ƒ•Š‹‰–‘–ƒ–‡‹˜‡”•‹–›ʹͲͲͺ
”‡Ǧ‹•ƒ•–‡”ŽŽǦƒœƒ”†•‹–‹‰ƒ–‹‘Žƒ
transferred into the reactor pool room surroundings, but would be immediately sensed by detector
systems. The detector systems are capable of independently triggering the building ventilation
isolation mode, preventing release of radioactive material into the environment.
There are no credible equipment or fuel failure scenarios that would jeopardize the health and
safety of the public or the environment.
Experiment Malfunction
Safety aspects of all experiments are carefully reviewed before the work is performed and worstcase scenarios for experiment malfunction are considered. No experiments are permitted which
could lead to reactor damage in the event of a failure or malfunction of the experiment. As a
result, a complete, worst-case experiment malfunction has no adverse health or safety
consequences for the public or the environment.
Loss of Coolant
The WSU reactor containment pool contains 77,000 gallons of water. A loss of coolant due to a
beam port failure (e.g. caused by earthquake or sabotage) would require at least fifteen minutes
for the pool to drain. Detectors and alarm systems measure coolant level, and send an alarm
signal upon a relatively small decrease in coolant level. The reactor shut-down mechanisms can
take the reactor from full power to a complete shut-down condition in less than two seconds—
much faster than the coolant can be removed from the pool, even in the event of a complete beam
port failure. As a result, no damage to the reactor would result in the case of a loss of coolant
accident.
Coolant water is held in a very pure state by constantly passing it through a purification system,
and water chemistry conditions are continually monitored. The coolant water purification system
maintains the coolant water purity to a standard that is considerably better than the municipal
water supply. Contaminant levels in the coolant water are usually so low, that a person could
drink the water without harm. As a result, a loss of coolant water would not be expected to
release harmful amounts of radioactivity into the environment.
Loss of Coolant Accompanied by Fuel Cladding Failure
The MHA for the WSU nuclear reactor is a breach of the fuel cladding integrity of one irradiated
nuclear fuel rod, in air. The only way such an event could take place is a fuel cladding failure
occurring along with a loss of coolant accident—either event alone is exceedingly unlikely. A
ƒ‰‡͵Ǥ͹ͺ
”‡’ƒ”‡†›ǣˆˆ‹…‡‘ˆ—•‹‡••ƒ†‹ƒ…‡
†–Š‡‹˜‹•‹‘‘ˆ
‘˜‡”‡–ƒŽ–—†‹‡•ƒ†‡”˜‹…‡•
loss of coolant alone will not produce a fuel cladding failure. No mechanism for the combined
loss of coolant/fuel cladding failure is postulated is the consequence analysis—it is simply
assumed to occur. Natural forces in the Palouse region (fire, tornado, earthquake) are not
sufficiently powerful to cause both a release of cooling water and a fuel rupture, but such a set of
events could perhaps be caused by an extremely powerful earthquake—although the Palouse
region is not subject to powerful earthquakes.
The default condition for building ventilation is isolation mode under conditions that would result
from either a loss of coolant or uncontrolled movement of radioactive materials in the facility. A
shift of building systems into isolate mode would restrict movement of radioactive materials into
the environment. The building isolation system is sufficiently effective that there would be no
danger to a person standing at the site boundary. If there is no danger at the Dodgen Research
Facility site boundary after an MHA, there is certainly no danger at greater distances, such as at
WSU, the city of Pullman or the Palouse region.
Commercial Aircraft Crash
There are two criteria that are applied to aircraft accident evaluation
1. The probability of an aircraft initiated radiological accident
2. The maximum credible consequences of an aircraft initiated radiological release
Statistical analysis is used to determine the likelihood of an airplane crash into a nuclear facility,
in the present case, the Washington State University Nuclear Radiation Center. If the probability
is found to be less than one in ten million per year, the event can be considered to be ruled out on
the basis of improbability. Secondly, a consequence analysis of an aircraft crash may show that
the effects of the incident are inconsequential, even if such an event were to take place. Analysis
of both criteria has shown that the WSU nuclear reactor facility meets both requirements, making
an aircraft initiated radiological release not credible.
Accidental aircraft crash probability is determined as the product of three independent
probabilities: the number of annual movements of aircraft in the flight pattern (the west approach
that goes over WSU), the crash probability per movement in the flight pattern, and the effective
target area of the structure of interest. The conservative assumption is made that all takeoff and
landings at the Pullman-Moscow Regional Airport use the west approach. Using historical data,
one can predict that there would be 5 × 10-8 crashes per year; put another way, one could expect
the Nuclear Radiation Center to be accidentally hit by an aircraft about once every twenty million
years.
ƒ‰‡͵Ǥ͹ͻ
ƒ•Š‹‰–‘–ƒ–‡‹˜‡”•‹–›ʹͲͲͺ
”‡Ǧ‹•ƒ•–‡”ŽŽǦƒœƒ”†•‹–‹‰ƒ–‹‘Žƒ
Statistical analysis applies to random incidents but not to intentional acts, such as a person of
malevolent intent intentionally crashing an aircraft into a building. Due to the need to protect the
health and safety of the public, the building and reactor pool was designed to withstand a
tremendous amount of force, i.e. it was designed to not fail in the case of an unexpected incident.
The reactor is surrounded by a large amount of high-strength reinforced concrete. The reactor
containment and building structure is sufficiently robust (the exact thickness, placement, and
composition of structural barriers will not be discussed in this document for security reasons) that
the probability of full structural penetration by a heavy aircraft at full flight speed is exceedingly
small. In other words, structural analysis has shown that it is overwhelmingly likely that the
reactor protection systems can withstand a direct hit by a commercial aircraft at full flight speed.
Other Scenarios (such as terrorist attack by persons with firearms)
Scenarios for possible attack have been examined by the WSU/NRC, in cooperation with a team
of experts from Sandia National Laboratories, with oversight and review by the U.S. NRC. The
results of the security analyses are classified and federal law prohibits public release of the
information; discussion of the information is limited to individuals who have undergone security
screening and have need-to-know. As a result, security systems and procedures that are in place
to respond to any attacks on the facility may not be discussed in this document. However, it may
be unambiguously stated that the U.S. NRC has examined the security systems and procedures,
and has determined that they provide sufficient protection and response for credible attack
scenarios.
Conclusions
Exhaustive consequence analysis has been done examining many different possible accidental or
intentional scenarios. The worst case scenario, the Maximum Hypothetical Accident involving a
loss of coolant accompanied by a fuel cladding breach, does not lead to significant releases of
radioactive material from the Dodgen Research Facility—just the opposite, in the case of the
MHA, the facility will contain radioactive releases to the point that there is no hazard to the
health and safety of the public. The reactor protection systems are sufficiently robust to protect
against fire, earthquake, mishandling of equipment, mishandling of nuclear fuel, experiment
malfunction, loss of coolant, loss of electrical power, attack by armed persons, and aircraft crash
(whether accidental or intentional).
There are no credible scenarios that could result in a release of radioactivity of sufficient
magnitude to cause harm to the health and/or safety of the public.
ƒ‰‡͵ǤͺͲ
”‡’ƒ”‡†›ǣˆˆ‹…‡‘ˆ—•‹‡••ƒ†‹ƒ…‡
†–Š‡‹˜‹•‹‘‘ˆ
‘˜‡”‡–ƒŽ–—†‹‡•ƒ†‡”˜‹…‡•
WSU is also at some limited risk from outside radiological sources – primarily related to the
Hanford Nuclear Site in southeastern Washington:
History and Probability of Occurrence
The likelihood of an accident causing the release of radiation to reach
WSU personnel and agricultural products in Counties near the Hanford
facility (Benton, Franklin, Walla Walla, Grant), with sufficient
concentration, is low. The probability of a major release of radiation
affecting WSU personnel and research in the next 25 years is also low.
Vulnerability
The U.S. Nuclear Regulatory Commission (NRC) requires hazard
assessments and emergency plans for radiological hazards. They are
based on scientific data to estimate the radiation that may escape off
the Hanford site. They require Emergency Planning Zones (EPZ) for
both Plume Exposure Pathways and Ingestion Planning Zone (IPZ).
Both the USDOE Hanford and Energy Northwest have made these
assessments and identified specific hazards for each facility, released
scenarios and consequences in areas where planning is required.
The IPZ is planned when exposure to a passing cloud, or plume, of the
radiation would result in direct contact inhalation of the radiation. A
10-mile radius (Map 3.7.26a below; in red) from nuclear facilities
defines this area.
The Ingestion Planning Zone (50 Mile IPZ) is an area (Map
3.7.26a; in yellow) expected to be contaminated with radiation
when dispersal of the radiation to various internal organs
following eating or drinking of contaminated food or water.
ƒ‰‡͵Ǥͺͳ
ƒ•Š‹‰–‘–ƒ–‡‹˜‡”•‹–›ʹͲͲͺ
”‡Ǧ‹•ƒ•–‡”ŽŽǦƒœƒ”†•‹–‹‰ƒ–‹‘Žƒ
Map 3.7.26a: Yellow area - 50 Mile IPZ; Red area - 10 Mile EPZ
Source: Walla Walla County Emergency - Management Department, October 2003.
In the worse case scenario, an event at Hanford or Energy Northwest
which might affect WSU personnel and research is a release of
radioactive material from Hanford, which would be carried by the
wind. Livestock, open water storage, and crops in the IPZ would be
contaminated. Controls would be necessary to prevent farm produce
that may be contaminated from being used for human consumption.
Risk Rating
Although there is little likelihood that such an event will occur, the
economic consequences will be high. The overall risk rating for this
hazard is rated at medium. The threat is great enough to warrant
modest effort to prepare for, respond to, recover from, and mitigate
against this hazard. This hazard should be included in the county's
emergency management training and exercise program.
System-wide Hazard Assessment and Prioritization:
Table 3.7.26a (below) is a summation and triangulation of data from various
sources, ranking the top 5 hazardous events in Washington State as they might apply
to WSU.
ƒ‰‡͵Ǥͺʹ
”‡’ƒ”‡†›ǣˆˆ‹…‡‘ˆ—•‹‡••ƒ†‹ƒ…‡
†–Š‡‹˜‹•‹‘‘ˆ
‘˜‡”‡–ƒŽ–—†‹‡•ƒ†‡”˜‹…‡•
Washington
State –Hazard
Events
Occurrences
1900 - 2005
Washington
Military
Department
Emergency
Management
Division
FEMA
History of
Major
Disasters in
Washington
State 19562007
Washington
State – 19002005 Hazard
Events
Deaths
Project
HIVA
Survey
Sheldus
1960-2005
WSU Staff,
Faculty &
Students
Survey
Severe
Winter
Storms
High Winds
Winter
Storms
Flooding
Earthquake
Flooding/
Snowmelt
Avalanches
High
Winds
Winter
Weather
High Winds
Severe Storms
Flooding
Severe
Storms
Wildfire
Earthquake
Thunder
Storms
Hazardous
materials
Spills
High Winds
Severe Storms
Landslide/
Mudslide
High Winds
Loss of
Electrical
Severe
Storms
Earthquakes
Earthquakes
Wildland Fire
Heavy
Rainfall
Winter
Weather
Crime
Flooding
Infestation/
Disease
Drought
Tsunami
High Winds
Flooding
Flooding
/Major
Fire Urban
Hail Storms/
Lightning
Terrorist
Wild Fire
Volcano
Tidal Surge
Landslides
Hazardous
Materials
Coastal
Drought
Winter
Weather
Landslide
Earthquake
Heavy
Rainfall
Major Fire
-Wildland
Landslides
Wildfire
Landslides
Avalanches
Fire
_
Volcanic
Activity
Avalanches
Flooding
Avalanches
Drought
Volcano
_
Table 3.7.26a: Hazardous events ranking, based on triangulation
Hazard Inventory and Vulnerability (HIVA) Matrix
These data have been used to cross-validate and inform the planning teams’ HIVA
results, and are used in conjunction with other factors to identify the geographic
location (by county) of WSU facilities which represent the highest priority need for
hazard mitigation planning and activity.
Criteria:
x
WSU Population at risk (employee, student and affiliates)
à High Number = 1000 people and above
à Medium Number = 15 people and above
à Low Number = Below 15 people
ƒ‰‡͵Ǥͺ͵
ƒ•Š‹‰–‘–ƒ–‡‹˜‡”•‹–›ʹͲͲͺ
”‡Ǧ‹•ƒ•–‡”ŽŽǦƒœƒ”†•‹–‹‰ƒ–‹‘Žƒ
x
Property Value (based on WSU valuation of facilities)
à High Value = Value above 50 Million Dollars
à Medium Value = One Million Dollars and above
à Low Value = Below One Million Dollars
x
Vulnerability of WSU Locations – (Based on vulenrability and historic
exposure to 8 Hazardous Events)
à High = 6 or More Events
à Medium = 4 or More
à Low = 3 and Below
x
Final HIVA Vulnerability Matrix Analysis
à High = 2 and 3
à Medium = 1
à Low = 0
The Categorical Analysis Matrix shown in table 3.7.26b (below) provides an
assessment of WSU population, property value, and assessed vulnerability to natural
and man-made hazards. For ease of application, each of those categories was divided
into high, medium and low rankings, which were then summed, with that sum also
ranked as the final criteria for this matrix evaluation. These summary rankings can be
used to establish the priority of each WSU facility in terms of need for hazard
mitigation planning and activity. The rankings are reflected in the color map which
follows – which is displayed at the county level but is reflective of analysis of WSU
facilities.
WSU Locations
by County
Adams
Asotin
Benton
Chelan
Clallam
Clark
Columbia
Cowlitz
Douglas
Ferry
Franklin
Garfield
Grant
Gray Harbor
Island
Jefferson
King
Kitsap
Kittitas
Klickitat
Population
Property
Value
Hazardous
Events
Medium
Low
High
Medium
Medium
High
Low
Medium
Low
Low
Low
Low
Medium
Medium
Low
Medium
Medium
Low
Low
Low
High
Low
High
High
Low
High
Low
Low
Low
Medium
Low
Low
Low
Low
Low
Low
High
Low
High
Low
Low
Medium
Medium
High
Medium
High
Low
High
Low
Medium
Low
Medium
Low
Medium
Low
Medium
High
Medium
High
Medium
ƒ‰‡͵ǤͺͶ
”‡’ƒ”‡†›ǣˆˆ‹…‡‘ˆ—•‹‡••ƒ†‹ƒ…‡
†–Š‡‹˜‹•‹‘‘ˆ
‘˜‡”‡–ƒŽ–—†‹‡•ƒ†‡”˜‹…‡•
Number of
‘High’
1
0
2
2
0
3
0
1
0
0
0
0
0
0
0
0
2
0
2
0
Final HIVA
Analysis
Medium
Low
High
High
Low
High
Low
Medium
Low
Low
Low
Low
Low
Low
Low
Low
High
Low
High
Low
WSU Locations
by County
Lewis
Lincoln
Mason
Okanogan
Pacific
Pend Oreille
Pierce
San Juan
Skagit
Skamania
Snohomish
Spokane
Stevens
Thurston
Wahkiakum
Walla Walla
Whatcom
Whitman
Yakima
Population
Property
Value
Hazardous
Events
Low
Low
Low
Low
Low
Low
High
Low
High
Low
Medium
High
Low
Medium
Low
Medium
Medium
High
Medium
Low
Low
Low
Low
Low
Low
High
Low
High
Low
Low
High
Medium
High
Low
Low
Medium
High
Medium
High
Low
Medium
Medium
Medium
Low
High
Medium
High
High
High
Low
Medium
High
Low
Medium
High
Low
High
11
13
Number of ‘High’ 6
Occurrences
Table 3.7.26b – HIVA Matrix
Number of
‘High’
Final HIVA
Analysis
1
0
0
0
0
0
3
0
3
1
1
2
0
2
0
0
1
2
1
Medium
Low
Low
Low
Low
Low
High
Low
High
Medium
Medium
High
Medium
High
Low
Low
Medium
High
Medium
30
10
Source: Washington State Hazardous Mitigation Plan 2004, WSU Capital Planning 2007, WSU Extensions 2007.
Graph 3.7.26a (below) provides a breakdown of the WSU HIVA Matrix, based on
population, property and facility values, and the locations most vulnerable to hazardous
events.
WSU HIVA Matrix Analysis Rating 2007
3.5
3
M a t rix R a t in g
2.5
2
Matrix Rating
1.5
1
0.5
Adam s
A s o ti n
B e n to n
C h e la n
C la lla m
C la rk
C o lu m b ia
C o w l i tz
D o u g la s
F e rry
F ra n k lin
G r a fi e l d
G ra n t
G a ry H a rb o r
Is l a n d
J e ffe r s o n
K in g
K i ts a p
K i tti ta s
K l i c k i ta t
L e w is
L in c o ln
M ason
O kanogan
P a c i fi c
P e n d O re ille
P ie rc e
S an Juan
S k a g it
S k a m a n ia
S n o h o m is h
Spokane
S te v e n s
T h u r s to n
W a h k ia k u m
W a lla W a lla
W h a tc o m
W h i tm a n
Y a k im a
0
WSU Locations
Graph 3.7.26a: HIVA Matrix, 2007
ƒ‰‡͵Ǥͺͷ
ƒ•Š‹‰–‘–ƒ–‡‹˜‡”•‹–›ʹͲͲͺ
”‡Ǧ‹•ƒ•–‡”ŽŽǦƒœƒ”†•‹–‹‰ƒ–‹‘Žƒ
This prioritization is reflected in the sections of this plan which follow.
ƒ‰‡͵Ǥͺ͸
”‡’ƒ”‡†›ǣˆˆ‹…‡‘ˆ—•‹‡••ƒ†‹ƒ…‡
†–Š‡‹˜‹•‹‘‘ˆ
‘˜‡”‡–ƒŽ–—†‹‡•ƒ†‡”˜‹…‡•
Section 4
Plan Goals and Action Items
This section introduces the goal and action item framework for the Washington State
University All-Hazards Mitigation Plan. The framework consists of three parts Mission, Goals, and Action Items. This section will be organized to address these three
elements for WSU, statewide. As needed and appropriate, additional focus will be
placed separately on each of the regional campuses: Pullman, Spokane, Tri-Cities and
Vancouver; on each major research stations: Puyallup, Mt. Vernon, Prosser, and
Wenatchee; and on other research stations: Learning Centers, and Extension offices.
Mission
The mission statement is a philosophical or value statement that answers the question
“Why develop a plan?” In short, the mission states the purpose and defines the primary
function of the All-Hazards Mitigation Plan. It is broad enough that it need not change
unless the WSU environment changes.
WSU Mission Statement
As a public, land-grant and research institution of distinction, Washington
State University enhances the intellectual, creative, and practical abilities of
the individuals, institutions, and communities that we serve by fostering
learning, inquiry, and engagement.
All-Hazard Mitigation Planning Mission Statement
The purpose of the Washington State University All-Hazards Mitigation Plan
is to protect life and assist the university in achieving its mission by
enhancing safety, resistance and resilience to disaster while being better
prepared to protect lives, critical functions, intellectual property, and the
physical campuses. To fulfill this mission, the university must be able to
provide a safe environment for students, staff, faculty, visitors and animals at
its campuses and units, and must be able to recover quickly from any disaster
that might jeopardize its functioning.
ƒ‰‡ͶǤͳ
ƒ•Š‹‰–‘–ƒ–‡‹˜‡”•‹–›ʹͲͲͺ
”‡Ǧ‹•ƒ•–‡”ŽŽǦƒœƒ”†•‹–‹‰ƒ–‹‘Žƒ
Goals
Goals are intended to represent the general ends toward which the All-Hazards
Mitigation Plan is directed. Goals identify how WSU intends to work toward mitigating
risk from natural, man-made, and technological hazards. The goals are guiding
principles for the specific recommendations outlined in the action items. They do not
specify how the university is to achieve the level of performance.
Goals of the WSU Hazard Mitigation Plan:
1. Identify and reduce the risk posed by all hazards, both natural and manmade, to personnel, intellectual property, and facilities at the physical
campuses and key unit locations, statewide.
2. Enhance the resiliency of teaching, research, extension/outreach
programs, and administrative services at all key institutional sites.
3. Enhance emergency preparedness, response and recovery capabilities at
all institutional locations.
4. Increase awareness through enhanced and engaged communication
throughout WSU and with our stakeholders to promote risk reduction
activities through the education and outreach programs and services of the
university.
5. Integrate risk management reduction strategies into university plans,
policies and practices to help guide the university into the future.
6. Establish and maintain accountability methods including benchmarks to
ensure plan implementation progress and further development of
mitigation practices at all university campuses and unit sites.
7. Continue to establish and enhance external partnerships with local, state,
and federal government and private entities to further mitigation efforts.
Action Items
The action items are detailed recommendations for activities that the university and its
partners could engage in to reduce risk from natural, man-made and technological
disasters. To implement these specific recommendations/activities, the university may
seek state, federal, or other outside funding.
WSU is pleased to note that after the extensive analysis accomplished in the HIVA
process, only a few potential structural mitigation actions have been identified. The
majority of projects that WSU would hope to accomplish to mitigate risk will be nonstructural in nature but will still require considerable planning and funding to
ƒ‰‡ͶǤʹ
”‡’ƒ”‡†›ǣˆˆ‹…‡‘ˆ—•‹‡••ƒ†‹ƒ…‡
†–Š‡‹˜‹•‹‘‘ˆ
‘˜‡”‡–ƒŽ–—†‹‡•ƒ†‡”˜‹…‡•
accomplish due to the size and complexity of the institution and the issues to be
addressed.
The matrix lists each of the goals of the WSU All-Hazards Mitigation Plan and the
action items developed to meet those goals from the development of the HIVA for each
included location, statewide.
The matrix includes the action item; primary
campuses/facilities for this action item (although the action item may apply to other
areas as well once the project commences); probable coordinating organization;
probable internal partners; probable external partners; and the basic cost/benefit
analysis (as described below).
Specific
General
Figure 4-1: Level of Specificity: Mission, Goals & Action Items
ƒ‰‡ͶǤ͵
ƒ•Š‹‰–‘–ƒ–‡‹˜‡”•‹–›ʹͲͲͺ
”‡Ǧ‹•ƒ•–‡”ŽŽǦƒœƒ”†•‹–‹‰ƒ–‹‘Žƒ
Methodology
The plan goals and action items were developed through an analysis of the issues
identified in the risk assessment, Hazard Mitigation Committee and stakeholder input,
and background research on the disasters that could affect the university at the various
locations around the state. Hazard Mitigation Committee members approved on May
23, 2006, the mission statement and goals for the plan. A mission statement and seven
goals were developed. Beginning on November 13, 2007 Hazard Mitigation Committee
members and stakeholders considered action items. Following these discussions the
lists of action items to be included in the planning document were developed.
Benefit/Cost Review
The WSU plan includes an action plan of prioritized initiatives to mitigate all-hazards
as identified in the HIVA. Section 201.6.c.3iii of 44CFR requires the prioritization of
the action plan to emphasize the extent to which benefits are maximized according to a
cost/benefit review of the proposed projects and their associated costs. This process
weighed the estimated benefits of a project versus the estimated costs to establish a
parameter to be used in the prioritization of a project. This benefit/cost review was
qualitative; that is, it did not include the level of detail required by FEMA for project
grant eligibility under the Hazard Mitigation Grant Program (HMGP) and Pre-Disaster
Mitigation (PDM) grant program. This qualitative approach was used because projects
may not be implemented for up to 10 years, and the associated costs and benefits could
change dramatically in that time.
Each project was assessed by assigning subjective ratings (high, medium, and low) to
its costs and benefits, as follows:
x
COSTS
–
High: Existing funding levels are not adequate to cover the
costs of the proposed project, and implementation would
require an increase in revenue through an alternative source
(for example, funding requests to the state legislature, grants,
or other external support).
–
Medium: The project could be implemented with existing
funding but would require a re-apportionment of the budget
or a budget amendment, or the cost of the project would
have to be spread over multiple years.
– Low: The project could be funded under the existing
budget. The project is part of or can be part of an existing,
ongoing program.
ƒ‰‡ͶǤͶ
”‡’ƒ”‡†›ǣˆˆ‹…‡‘ˆ—•‹‡••ƒ†‹ƒ…‡
†–Š‡‹˜‹•‹‘‘ˆ
‘˜‡”‡–ƒŽ–—†‹‡•ƒ†‡”˜‹…‡•
x
BENEFITS
–
High: Project will have an immediate impact on the
reduction of risk exposure to life and property.
–
–
Medium: Project will have a long-term impact on the
reduction of risk exposure to life and property or will
provide an immediate reduction in the risk exposure to
property.
–
– Low: Long-term benefits of the project are difficult to
quantify in the short term.
Using this approach, projects with positive benefit versus cost ratios (such as high over
high, high over medium, medium over low, etc.) are considered cost-beneficial and are
prioritized accordingly.
For many of the initiatives identified in the action plans, WSU may seek financial
assistance under FEMA’s HMGP or PDM programs. Both of these programs require
detailed benefit/cost analysis as part of the application process. These analyses will be
performed when funding applications are prepared, using the FEMA model process.
WSU is committed to implementing mitigation strategies with benefits that exceed
costs. For projects not seeking financial assistance from grant programs that require this
sort of analysis, the university reserves the right to define “benefits” according to
parameters that meet its needs and the goals and objectives of this plan.
ƒ‰‡ͶǤͷ
ƒ•Š‹‰–‘–ƒ–‡‹˜‡”•‹–›ʹͲͲͺ
”‡Ǧ‹•ƒ•–‡”ŽŽǦƒœƒ”†•‹–‹‰ƒ–‹‘Žƒ
ACTION ITEM MATRIX FOR WSU ALL-HAZARDS PREDISASTER HAZARD MITIGATION PLAN
Action Item
Description
Primary WSU
Facilities
Coordinating
Organization
Internal
Partners
External
Partners
Cost/Ben
efit
Goal 1: Identify and reduce the risk posed by all hazards, both natural and man- made, to personnel,
intellectual property and facilities at the physical campuses and key unit locations, statewide.
All Campuses, Hazard
Capital
FEMA, State
Low/
1.1 Develop
proposals and
All Research
Mitigation
Planning and
of Washington
High
secure funding Centers
Sub-committee Development,
EMD,
to complete
of the
Office of
Contracted
mitigation
Emergency
Business and
Engineers
projects for
Management
Finance,
each campus
Committee
Presidents
and location,
Office
statewide. As
appropriate,
seek support
from FEMA
for projects
that qualify for
FEMA Hazard
Mitigation
Project
funding.
1.2
Review
hazardous
materials
inventory
procedures for
all campuses
and facilities.
Review
security
procedures for
all hazardous
materials.
Identify
mitigation
strategies for
hazardous
materials
security.
All Campuses,
All Research
Centers
Environmental
Health and
Safety,
Campus Police
and/or campus
security,
Radiation
Safety Office,
Office of
Research
Assurances
ƒ‰‡ͶǤ͸
”‡’ƒ”‡†›ǣˆˆ‹…‡‘ˆ—•‹‡••ƒ†‹ƒ…‡
†–Š‡‹˜‹•‹‘‘ˆ
‘˜‡”‡–ƒŽ–—†‹‡•ƒ†‡”˜‹…‡•
Office of
Research,
Facilities
Operations, all
WSU units
that maintain
hazardous
materials
inventories
State of
Washington,
Counties and
other local
jurisdictions at
each affected
WSU locality.
Medium/
High
1.3
Implement a
detailed
security
analysis and
develop a
Security
Master Plan
for all
campuses and
units,
statewide.
Puyallup,
Wenatchee,
Mt. Vernon
Research
Centers,
Instructional
Campuses
WSU Police
with
cooperation of
other campus
security
services at all
campuses and
facilities
Office of
Business and
Finance,
Facilities
Operations,
Office of
Research
Security
Planning
Contractors,
local law
enforcement in
each locality,
Washington
Anti-Terrorism
Taskforce and
fusion center
(WJAC)
High/
High
e.g. Puyallup
gang-related
activity
mitigation.
1.4
Continue
redundancy
planning for
Information
Technology
systems and
service.
Improve and
“harden” the
system
infrastructure
at each
campus/facilit
y to ensure
continuance of
operation and
limit system
vulnerability.
Pullman
Campus, Other
instructional
campuses
Office of the
Vice President
for
Information
Systems and
Chief
Information
Officer
All WSU
Divisions,
Colleges units,
departments
and units,
WSU Cyber
criminology
and Digital
Forensics
Initiative
Communicatio
ns and services
providers such
as Kroll On
Track
1.5
Assessment by
qualified
engineers of
the structural
vulnerability
of all
buildings,
statewide, to
the primary
hazards
identified in
the HIVA for
each campus
Pullman,
Prosser,
Mt.Vernon,
Puyallup,
Wenatchee
Capital
Planning and
Development
Facilities
Operations,
College of
Engineering
and
Architecture
FEMA, State
of Washington
EMD,
Contracted
Engineers,
County
Planners
High/
High
High/
High
ƒ‰‡ͶǤ͹
ƒ•Š‹‰–‘–ƒ–‡‹˜‡”•‹–›ʹͲͲͺ
”‡Ǧ‹•ƒ•–‡”ŽŽǦƒœƒ”†•‹–‹‰ƒ–‹‘Žƒ
or facility
location.
Develop a
system-wide
strategy to
review and
update existing
non-structural
mitigation
practices and,
as needed,
develop new
non-structural
mitigation
practices for
all campuses
and units.
Instructional
Campuses,
Research
Centers,
Learning
Centers,
Extension
Offices
Hazard
Mitigation
Sub-committee
of the
Emergency
Management
Committee
Environmental
Health and
Safety, other
WSU units as
appropriate
Local
Emergency
Management
Agencies and
Planning
Committees
(LEPCs),
Local Police,
Fire/EMS
agencies, State
Emergency
Management
Department
(SERC)
1.7
Identify and
develop
campus and
facility tree
inventory for
the facilities
identified in
the HIVA with
vulnerability to
windstorm
damage to
keep trees
from
threatening
lives, property
and
infrastructure.
Wenatchee,
Vancouver,
Pullman
Facilities
Operations
College of
Agriculture,
Human and
Resource
Sciences,
WSU
Extension,
Landscape
Architecture
Department
FEMA, State
of Washington,
Counties and
other local
jurisdictions at
each affected
WSU locality.
Low/
Medium
1.8
Identify and
develop
flooding
mitigation
projects for the
facilities
identified in
the HIVA (Mt.
Vernon,
Puyallup,
Long
Mt. Vernon,
Puyallup,
Long Beach,
Vancouver
Capital
Planning &
Development
Office of
Business and
Finance,
College of
Agriculture,
Human and
Resource
Sciences,
WSU
Extension
FEMA, NOAA
State of
Washington,
Counties and
other local
jurisdictions at
each affected
WSU locality
Medium/
Medium
ƒ‰‡ͶǤͺ
”‡’ƒ”‡†›ǣˆˆ‹…‡‘ˆ—•‹‡••ƒ†‹ƒ…‡
†–Š‡‹˜‹•‹‘‘ˆ
‘˜‡”‡–ƒŽ–—†‹‡•ƒ†‡”˜‹…‡•
Low/
Medium
1.6
Beach/Pacific
County) with
vulnerability to
this hazard.
1.9
Identify and
develop
volcanic
eruption
related
mitigation
projects for the
facilities
identified in
the HIVA with
vulnerability to
this hazard
Vancouver,
Puyallup
Capital
Planning &
Development
Office of
Business and
Finance,
College of
Agriculture,
Human and
Resource
Sciences,
WSU
Extension
FEMA, State
of Washington,
Counties and
other local
jurisdictions at
each affected
WSU locality.
Medium/
Medium
Goal 2: Enhance the resiliency of teaching, research, extension/outreach programs, and administrative
services at all key institutional sites.
2.1
Develop a
comprehensive
continuance of
operations plan
at each campus
and key
facility,
statewide, as
part of an
overall
institutional
business
continuity
plan.
All Campuses,
All Research
Centers
Office of
Business and
Finance/
Hazard
Mitigation
Sub-committee
of the
Emergency
management
Committee
Presidents
Office, all
WSU Units
State of
Washington
Legislature
Medium/
High
2.2
Develop postdisaster
recovery plans
at each campus
and key
facility,
statewide.
All Campuses,
All Research
Centers
Office of
Business and
Finance/Hazar
d Mitigation
Sub-committee
of the
Emergency
Management
Committee
Presidents
Office, all
WSU units
Local City and
County
emergency
services &
LEPCs, State
of Washington
EMD
Medium/
High
ƒ‰‡ͶǤͻ
ƒ•Š‹‰–‘–ƒ–‡‹˜‡”•‹–›ʹͲͲͺ
”‡Ǧ‹•ƒ•–‡”ŽŽǦƒœƒ”†•‹–‹‰ƒ–‹‘Žƒ
2.3
Enhance
institutional
capabilities to
provide the
majority of
nonLaboratory
courses via
Distance
Learning to
maintain
educational
continuity
during
disasters
Pullman,
Vancouver,
Tri-Cities and
Spokane
Provost’s
Office
Office of
Distance and
Professional
Education,
Colleges
Academic
Deans,
Extension,
Information
Technology
N/A
High/
High
Goal 3: Enhance emergency preparedness, response and recovery capabilities at all institutional locations.
3.1
Enhance
Emergency
Management
capabilities at
all campus and
facilities by
developing or
improving
emergency
response
contingency
plans for the
hazards
identified in
the HIVA as
well as other
potential
common
emergencies
All Campuses,
All Research
Centers
Emergency
Management
Office
Office of
Business and
Finance, each
campus or unit
administration
Local
Emergency
Management
agencies, local
Police,
FIRE/EMS
agencies
Low/
High
3.2
Enhance
emergency
warning and
notification
capabilities for
all institutional
campuses and
facilities,
All Campuses,
All Research
Centers
Office of
Business and
Finance,
Emergency
Management
Office
Information
Technology,
Facilities
Operations,
Emergency
Management
Committee
Local city and
county
emergency
service, local
media outlets
Medium/
High
ƒ‰‡ͶǤͳͲ
”‡’ƒ”‡†›ǣˆˆ‹…‡‘ˆ—•‹‡••ƒ†‹ƒ…‡
†–Š‡‹˜‹•‹‘‘ˆ
‘˜‡”‡–ƒŽ–—†‹‡•ƒ†‡”˜‹…‡•
statewide.
3.3
Improve
Emergency
Management
capabilities at
all campuses
and facilities
by ensuring
two-way radio
communicatio
ns are
interoperable
with local
emergency
response and
management
agencies as
well as
adequate to
campus or
facility
emergency
needs.
All Campuses,
All Research
Centers
Emergency
Management
Office
Office of
Business and
Finance, each
campus or unit
administration
FEMA, State
of Washington
EMD, Local
Emergency
Management
agencies, local
Police,
Fire/EMS
agencies, WSP
Communicatio
ns
Interoperability
Project
Medium/
High
3.4
Increase
Campus Police
and/or Security
Staff
capabilities for
all locations
through
acquisition of
additional
personnel and
resources.
All Campuses,
All Research
Centers
Office of
Business and
Finance
Campus and
unit
administration,
Criminal
Justice
Department
Local law
enforcement,
WASPC,
private security
firms.
High/
High
3.5
Improve
security at all
crucial and
vulnerable
facilities by the
addition of
closed-circuit
security
camera
systems
Pullman,
Vancouver,
Spokane and
Tri-Cities +
Research
Centers
Campus Police
and/or Security
at each
campus,
CAHNRS and
Extension
administration
for other sites
Office of
Business and
finance, Deans
of CAHNRS
and Extension
Local law
enforcement,
private security
firms
High/
High
ƒ‰‡ͶǤͳͳ
ƒ•Š‹‰–‘–ƒ–‡‹˜‡”•‹–›ʹͲͲͺ
”‡Ǧ‹•ƒ•–‡”ŽŽǦƒœƒ”†•‹–‹‰ƒ–‹‘Žƒ
3.6
Support
emergency
response
capabilities at
each campus
and facility by
development
of Campus
Emergency
Response
Team (CERT)
of trained
volunteers
capable of
assisting in
response to
disasters
Pullman,
Vancouver,
Spokane
Emergency
Management
Office
Office of
Business and
Finance,
Campus Police
and/or
Security,
Environmental
Health &
Safety, Human
Resource
Services,
Associated
Students of
WSU at each
campus
Local law
enforcement,
local
Fire/EMW
agencies
Low/
Medium
3.7
Expand
emergency
response
capabilities at
each Research
Center,
Extension
Office and
Learning
Center by
instituting an
Extension
Disaster
Preparation
and Response
Program
Research
Centers,
Learning
Centers,
Extension
Offices
Emergency
Management
Office,
Extension
Disaster
Preparedness
Committee
Extension
Administrative
Team, EH&S,
WSU Police
Local Fire and
Police, Local
CERT
Programs
Medium/
Medium
Goal 4: Increase awareness through enhanced and engaged communication throughout WSU and with our
stakeholders to promote risk reductions through the education and outreach programs of the
university.
4.1
Integrate an
awareness
campaign for
all students,
faculty, and
staff regarding
the natural and
man-made
hazards
All Campuses,
All Research
Centers
WSU
Emergency
Management
Office/Univers
ity Relations
ƒ‰‡ͶǤͳʹ
”‡’ƒ”‡†›ǣˆˆ‹…‡‘ˆ—•‹‡••ƒ†‹ƒ…‡
†–Š‡‹˜‹•‹‘‘ˆ
‘˜‡”‡–ƒŽ–—†‹‡•ƒ†‡”˜‹…‡•
Each campus
or unit
administration,
Residence
Life,
Associated
Students of
WSU at each
campus,
Local
Emergency
Management
agencies, local
Police,
Fire/EMS
agencies
Low/
Medium
identified in
the HIVA and
what they can
do to reduce
their risk at
each campus
or facility
location,
statewide.
Campus Police
and/or Security
4.2
Develop an
outreach and
education
strategy for
faculty and
staff on
reducing the
risk to personal
spaces, work
spaces,
intellectual
property and
animals
involved in
research or in
the care of the
institution (e.g.
non-structural
mitigation
strategies and
practices)
All Campuses,
All Research
Centers
Environmental
Health and
Safety,
Radiation
Safety Office,
Office of
Research
Assurances,
Office of
Intellectual
property
Administration
, Office of the
Campus
Veterinarian
Provost’s
Office,
Emergency
Management
Office, each
campus or unit
administration,
Campus Police
and/or
Security,
Human
Resource
Services
Federal
Regulatory
agencies, Local
Emergency
Management
agencies, local
Police,
Fire/EMS
agencies
Low/
Medium
4.3
Develop
training and
outreach
materials as
well as provide
training to
institutional
decision
makers
(President,
Senior Staff,
Deans,
Directors and
Department
Heads) on
integrating
mitigation into
Pullman,
Vancouver,
Spokane and
Tri-Cities
Environmental
Health and
Safety,
Radiation
Safety Office,
Office of
Research
Assurances
President’s
Office,
Provost’s
Office, each
campus or unit
administration,
Local
Emergency
Management
agencies, State
of Washington
EMD
Low/
Medium
ƒ‰‡ͶǤͳ͵
ƒ•Š‹‰–‘–ƒ–‡‹˜‡”•‹–›ʹͲͲͺ
”‡Ǧ‹•ƒ•–‡”ŽŽǦƒœƒ”†•‹–‹‰ƒ–‹‘Žƒ
all campus and
unit practices
throughout
WSU
4.4
4.5
Develop an
outreach and
education
strategy for
visitors of all
types to WSU
focusing on
what they
should do if an
emergency
occurs while
they are on
campus or at a
WSU facility,
what
emergency
resources are
available to
them and what
actions they
can take to
mitigate the
effect of a
disaster on
them while at
WSU facilities
(campus
visitations,
athletic events,
camps, cultural
or
entertainment
events, etc.)
Develop an
outreach and
education
strategy for
WSU
Extension to
provide
mitigation
education to
the residents of
the state of
Washington as
part of the
Extension’s
mission of
service to the
state
All Campuses,
All Research
Centers
WSU Visitor
Center/WSU
Emergency
Management
Emergency
Management
Committee,
each campus or
unit
administration,
Campus Police
and/or
Security,
Environmental
Health and
Safety,
Residence
Life,
Conferences
and Institutes,
Athletic
Department,
Alumni
Foundation,
CAHNRS and
Extension,
units hosting
camps
Local
Emergency
Management
agencies, local
Police,
Fire/EMS
agencies,
Media outlets
Low/
Medium
Extension
Locations
WSU
Extension
Administrative
Team and
Disaster
Preparedness
Committee
Division of
Governmental
Studies and
Services,
CAHNRS,
University
Relations,
State of
Washington
EMD, Local
County and
City
Emergency
management
agencies, Local
Police,
Fire/EMS
agencies,
Extension
Disaster
Education
Medium/
Medium
ƒ‰‡ͶǤͳͶ
”‡’ƒ”‡†›ǣˆˆ‹…‡‘ˆ—•‹‡••ƒ†‹ƒ…‡
†–Š‡‹˜‹•‹‘‘ˆ
‘˜‡”‡–ƒŽ–—†‹‡•ƒ†‡”˜‹…‡•
Network
Goal 5: Integrate risk reduction strategies into university plans, policies and practices to help guide the
university into the future
5.1
Develop a
system-wide
strategy to
implement risk
reduction
practices into
all existing and
future campus
renewal and
development
projects.
All Campuses,
All Research
Centers
Capital
Planning &
Development
Hazard
Mitigation
Sub-committee
of the
Emergency
Management
Committee,
Office of
Business and
Finance,
Facilities
Operations
FEMA, State
of Washington
EMD,
Low/
High
5.2
Include
mitigation
practices and
requirements
in the WSU
Comprehensiv
e Emergency
Management
Plan as well as
all College,
Division,
Department or
Unit
emergency
response plans
as appropriate
.
All Campuses,
All Research
Centers
Emergency
Management
Office
Hazard
Mitigation
Sub-committee
of the
Emergency
Management
Committee,
Office of
Business and
Finance,
President’s
office,
provost’s
Office,
Administration
of Colleges,
Divisions,
Departments
and Units
FEMA, State
of Washington
EMD, other
Federal and
State Agencies
Low/
High
5.3
Include
mitigation
practices and
requirements
as an element
of all business
operations for
the university
as appropriate
All Campuses,
All Research
Centers
Business
Services
Hazard
Mitigation
Sub-committee
of the
Emergency
Management
Committee,
Office of
State Auditor’s
Office
Low/
Medium
ƒ‰‡ͶǤͳͷ
ƒ•Š‹‰–‘–ƒ–‡‹˜‡”•‹–›ʹͲͲͺ
”‡Ǧ‹•ƒ•–‡”ŽŽǦƒœƒ”†•‹–‹‰ƒ–‹‘Žƒ
Business and
Finance,
Administration
of campuses
and other units,
statewide
5.4
Include nonstructural risk
reduction and
mitigation
practices and
requirements
in routine
university
inspections
requirements
All Campuses,
All Research
Centers
Environmental
Health and
Safety,
Radiation
Safety Office,
WSU Fire
Marshal and
Office of
Research
Assurances
Hazard
Mitigation
Sub-committee
of the
Emergency
Management
Committee,
Office of
Business and
Finance,
Administration
of campuses
and other units,
statewide
Local Fire
Marshal
Offices, Local
Fire/EMS
agencies, local
Law
Enforcement
agencies
Low/
Medium
5.5
Include nonstructural risk
reduction and
mitigation
practices and
requirements
in operational
and emergency
plans specific
to large
athletic and
entertainment
events on
campus where
large numbers
of people will
gather.
Instructional
Campuses
WSU Fire
Marshal/Envir
on-mental
Health and
Safety,
Campus Police
and/or
Security,
Office of
Emergency
Management
WSU
Athletics,
WSU Campus
Involvement,
CUB,
Coliseum,
Emergency
Management
Committee,
Office of
Business and
Finance,
Admin. of
campuses and
other units,
statewide
Local
Fire/EMS
agencies, Local
Law
Enforcement
agencies
Low/
Medium
Goal 6: Establish and maintain accountability methods including benchmarks to ensure plan
implementation progress and further development of mitigation practices at all university
campuses and unit sites.
6.1
Establish a
Hazard
Mitigation
SubCommittee of
Pullman
Office of
Business and
Finance
ƒ‰‡ͶǤͳ͸
”‡’ƒ”‡†›ǣˆˆ‹…‡‘ˆ—•‹‡••ƒ†‹ƒ…‡
†–Š‡‹˜‹•‹‘‘ˆ
‘˜‡”‡–ƒŽ–—†‹‡•ƒ†‡”˜‹…‡•
Emergency
Management
Committee,
Chancellor’s
office at each
Local
emergency
management
agencies
Low/
High
6.2
6.3
the WSU
Emergency
Management
Committee to
oversee
mitigation
activities on
the WSUPullman
campus and to
provide advice
and assistance
to the regional
campuses and
other units
throughout the
state in
overseeing
their mitigation
activities per
the action
items
identified in
this document
Appoint or hire
an Emergency
Management
Coordinator
for each
campus or
major facility
to coordinate
all emergency
management
and mitigation
efforts with the
Emergency
Management
Office at the
WSU-Pullman
campus
Hire a
Business
Continuity and
Resumption
Specialist to
coordinate all
continuance of
operations
planning
efforts for
WSU,
statewide,
within the
Emergency
regional
campus,
CAHNRS
Dean,
Extension
Dean
Major
Facilities
Office of
Business and
Finance
Chancellor’s
office at each
regional
campus,
CAHNRS
Dean,
Extension
Dean
N/A
Medium/
High
All Campuses,
All Research
Centers
Office of
Business and
Finance
President’s
Office,
Chancellor’s
office at each
regional
campus,
CAHNRS
Dean,
Extension
Dean
State of
Washington
Office of
Information
Systems
Business
Continuity
Office
High/
High
ƒ‰‡ͶǤͳ͹
ƒ•Š‹‰–‘–ƒ–‡‹˜‡”•‹–›ʹͲͲͺ
”‡Ǧ‹•ƒ•–‡”ŽŽǦƒœƒ”†•‹–‹‰ƒ–‹‘Žƒ
Management
Office at the
WSU-Pullman
campus
6.4
6.5
Begin
discussions
with other state
colleges and
universities
regarding
jointly hiring a
Mitigation
Specialist to
advise and
direct each of
the campuses
on mitigation
activities as
well as to
identify
sources of
funding for
mitigation
projects and
assist
institutions in
applying for
such funds for
projects.
Identify
sources for
service
learning
opportunities
to provide
training on
implementing
and
maintaining
the WSU AllHazards
Mitigation
Plan
Pullman
Office of
Business and
Finance
President’s
Office,
Chancellor’s
office at each
regional
campus,
CAHNRS
Dean,
Extension
Dean
Other state
supported
colleges and
universities,
HEC Board
Low/
Low
Instructional
Campuses
Hazard
Mitigation
SubCommittee/Ce
nter for Civic
Engagement
Emergency
Management
Committee,
Provost’s
Office,
Chancellor’s
office at each
regional
campus,
CAHNRS
Dean,
Extension
Dean
FEMA,
Washington
State EMD,
Local
Emergency
Management
offices
Low/
Low
Appropriate
Academic
Units and
Internship
Coordinators
(e.g. Foley
Institute)
ƒ‰‡ͶǤͳͺ
”‡’ƒ”‡†›ǣˆˆ‹…‡‘ˆ—•‹‡••ƒ†‹ƒ…‡
†–Š‡‹˜‹•‹‘‘ˆ
‘˜‡”‡–ƒŽ–—†‹‡•ƒ†‡”˜‹…‡•
Goal 7: Continue to establish and enhance external partnerships with local, state, federal government and
private entities to further mitigation efforts
7.1
Enhance
partnerships
with other state
colleges and
universities in
Washington;
local City and
County Hazard
Mitigation
Planning
entities; the
State of
Washington
EMD Hazard
Mitigation
Planning
Office; FEMA
Hazard
Mitigation
Planning
Offices and
other local
emergency
management
agencies to
work
collaboratively
on mitigation
planning,
project and
activities
throughout the
state.
All Campuses,
All Research
Centers
Emergency
Management
Office
Hazard
Mitigation
SubCommittee of
the Emergency
Management
Committee,
Chancellor’s
office at each
regional
campus,
CAHNRS
Dean,
Extension
Dean,
Extension
Directors and
Disaster
Preparedness
Committee
Other state
colleges and
universities;
local City and
County Hazard
Mitigation
Planning
entities; the
State of
Washington
EMD Hazard
Mitigation
Planning
Office; FEMA
Hazard
Mitigation
Planning
Offices and
other local
emergency
management
agencies
Low/
Medium
ƒ‰‡ͶǤͳͻ
ƒ•Š‹‰–‘–ƒ–‡‹˜‡”•‹–›ʹͲͲͺ
”‡Ǧ‹•ƒ•–‡”ŽŽǦƒœƒ”†•‹–‹‰ƒ–‹‘Žƒ
Action Items
The action items are detailed recommendations for activities that the university and its
partners could engage in to reduce risk to all identified hazards. The action items
address the issues identified in the risk assessment, along with the values identified in
the planning process. To facilitate implementation, each action item is described in a
worksheet which includes information on rationale, ideas for implementation,
coordinating organizations, internal/external partners, timelines, and plan goals.
Please note the following:
x The Five Year Mitigation Cycle, referred to below, is the period that
this plan, in its current form, will be in effect. Although the plan
requires regular and annual updates/revisions, the entire planning
process will undergo a full-scale review five years after the plan has
been approved.
x Accomplishing all identified action items in this plan is contingent on
acquiring adequate funding support from internal or external sources.
x Coordinating organizations, internal/external partners are identified in
this document as possibilities only. As the plan is implemented and
action items are addressed, the university will determine the unit’s onpoint to manage the project and appropriate internal/external partners to
assist.
The action items address the issues identified in the risk assessment and the values
identified in the planning process. To facilitate implementation, each action item is
described in a worksheet including information on rationale, ideas for implementation,
coordinating organizations, internal/external partners, timelines, and plan goals.
Rationale
Each action item includes a summary of the critical issues that the item will
address. Issues were identified from a number of sources, including
participants of the planning process, noted deficiencies in campus capability,
and the risk assessment.
Ideas for Implementation
The ideas for implementation offer a transition from theory to practice. This
component of the action items is dynamic, as some ideas may not be feasible
and new ideas can be added during the plan maintenance process (For more
information on plan implementation and evaluation refer to Section 5) .
Coordinating Organization
The coordinating organization is the group on campus that is willing and able
to organize resources, find appropriate funding, and oversee activity
implementation, monitoring, and evaluation.
ƒ‰‡ͶǤʹͲ
”‡’ƒ”‡†›ǣˆˆ‹…‡‘ˆ—•‹‡••ƒ†‹ƒ…‡
†–Š‡‹˜‹•‹‘‘ˆ
‘˜‡”‡–ƒŽ–—†‹‡•ƒ†‡”˜‹…‡•
Internal Partners
Internal partners are groups within the university that may be able to assist in
the implementation of action items by providing relevant resources to the
coordinating organization.
External Partners
External partner organizations can assist the coordinating organization in
implementing the action items in various functions and may include local,
regional, state, or federal agencies, as well as local and regional public and
private sector organizations.
The internal and external partner organizations listed are potential partners
recommended by the project steering committee, but were not necessarily
contacted during the development of the plan. The coordinating organization
should contact the identified partner organizations to see if they are capable
of and interested in participation.
Timeline
Action items include both short and long-term activities. Each action item
includes an estimate of the timeline for implementation. Short-term action
items are activities that may be implemented with existing resources and
authorities within one or two years. Long-term action items may require new
or additional resources and/or authorities, and may take between two and
five years to implement.
1.1 Develop proposals and secure funding to complete mitigation projects for each campus and
location, statewide. As appropriate, seek support from FEMA for projects that qualify for
FEMA Hazard Mitigation Project funding.
Rationale
WSU will not be able to accomplish all of these mitigation tasks with
internal funding alone. External support will be needed for continued
progress during the 5 year cycle of this plan. Other sources, such as funding
from the State of Washington legislature, could be a possibility; all potential
sources need to be identified for continued progress on these projects.
Ideas for Implementation
Work closely with the WSU Office of Grants and Research Development for
public and private sources of funding to accomplish the items identified in
the action plan.
ƒ‰‡ͶǤʹͳ
ƒ•Š‹‰–‘–ƒ–‡‹˜‡”•‹–›ʹͲͲͺ
”‡Ǧ‹•ƒ•–‡”ŽŽǦƒœƒ”†•‹–‹‰ƒ–‹‘Žƒ
Coordinating Organization
The WSU Hazard Mitigation Sub-Committee is the likely coordinating
organization for this action item as it will have broad representation from all
parts of the university.
Internal Partners
Office of Grant and Research Development, Capital Planning and
Development, Office of Business and Finance, the President’s Office and
any other campus, college or department that may be able to support
mitigation projects.
External Partners
External partners include FEMA, DOJ, Washington State EMD, State of
Washington Legislature, as well as other public and private organizations.
Possible Timeline
As the parameters for each project are developed, and the costs identified,
sources to support the project must be identified and pursued as well. This is
high priority, and needs to be accomplished in parallel with all project
development.
Plan Goal Addressed
Identify and reduce the risk posed by all hazards, both natural and manmade, to personnel, intellectual property and facilities at the physical
campuses and key unit locations, statewide.
1.2 Review hazardous materials inventory procedures for all campuses and facilities. Review
security procedures for all hazardous materials. Identify mitigation strategies for hazardous
materials security.
Rationale
Hazardous materials management is a potential problem on all campus and
research centers. While existing policies and procedures are designed to
prevent hazardous materials from becoming a hazard, the potential exists for
significant problems to occur. New regulations proposed by DHS could lead
to a full review of all existing management procedures, as well as identifying
additional procedures to aid in the mitigation of threats from hazardous
materials releases at WSU facilities. Potential security issues need to be
identified, and mitigation strategies established.
Ideas for Implementation
A full scale inventory of all hazardous materials, in large quantities, that
could be considered potentially dangerous should take place throughout the
WSU system. Procedures for use and disposal of these materials also need to
ƒ‰‡ͶǤʹʹ
”‡’ƒ”‡†›ǣˆˆ‹…‡‘ˆ—•‹‡••ƒ†‹ƒ…‡
†–Š‡‹˜‹•‹‘‘ˆ
‘˜‡”‡–ƒŽ–—†‹‡•ƒ†‡”˜‹…‡•
be reviewed. Where possible, alternate materials or procedures (that could
accomplish the same tasks as current hazardous materials) should be
identified. Existing security for hazardous materials needs to be reviewed
and additional strategies for securing any potentially dangerous quantity of
such materials developed.
Coordinating Organization
WSU Office of Environmental Health and Safety is currently responsible for
developing policy and procedures for most hazardous materials on campuses
and at research stations. The Radiation Safety Office is responsible for
managing radioactive materials used in academic and research programs.
The Office of Research Assurances is responsible for monitoring and
managing biological materials used in research. WSU Police would advise
on security issues.
Internal Partners
The Office of Research under the WSU Provost’s Office would be a key
partner as would CAHNRS and WSU Extension. Facilities Operations would
also be a key partner, as would the units that maintain and use hazardous
materials in their research and academic programs.
External Partners
External partners are the local and state regulatory agencies where WSU is
located, statewide, as well as local response agencies and Haz-Mat teams.
Possible Timeline
This is an important and critical task that should be accomplished as soon as
possible in the first year of the 5 year cycle.
Plan Goal Addressed
Identify and reduce the risk posed by all hazards, both natural and manmade, to personnel, intellectual property and facilities at the physical
campuses and key unit locations, statewide.
1.3 Implement a detailed security analysis, and develop a Security Master Plan for all campuses
and units, statewide.
Rationale
Across the board, the physical security of facilities and personnel safety
issues are concerns of all levels of the WSU community. Acts of
environmental and animal-related terrorism have occurred at the Pullman
campus and the Puyallup Research Center, impacting vital research. Acts of
vandalism, theft and destruction of vital resources occurs throughout WSU
ƒ‰‡ͶǤʹ͵
ƒ•Š‹‰–‘–ƒ–‡‹˜‡”•‹–›ʹͲͲͺ
”‡Ǧ‹•ƒ•–‡”ŽŽǦƒœƒ”†•‹–‹‰ƒ–‹‘Žƒ
facilities, statewide, on a regular basis. The focused awareness of a possible
shooting on college campuses follows in the wake of the Virginia Tech
tragedy. Information Technology systems are vulnerable to attack by
cybercriminals. The nature of a university campus makes industrial or
military-type security methodologies antithetical. A full review and analysis
of the security issues affecting each of WSU’s facilities is absolutely
essential for an overall Security Master Plan to be developed. It is from this
plan appropriate funding can be sought in order to accomplish the identified
methods of improving safety and security.
Ideas for Implementation
WSU internal resources are currently not up to the task of a full-scale
security analysis. This would be a task for a contracted vendor specializing in
this type of work. The process would be system-wide, starting with the most
vulnerable campuses and facilities in the system.
Coordinating Organization
WSU Police and other security services for WSU facilities, statewide, would
coordinate this effort along with the security planning vendor. These efforts
would be coordinated with the vendor by the Office of Business and Finance
in cooperation with the leaders on each campus or for each facility.
Internal Partners
Internal partners would include Facilities Operations, the Office of Research,
the College of Agriculture, Human and Natural Resource Sciences
(CAHNRS) and WSU Extension.
External Partners
The scope of this project would require significant financial investment.
Grants may be necessary from FEMA, the Department of Justice or other
federal agency. Possible support could come from the State Legislature.
Other potential external partners would be the Security Planning vendors,
local law enforcement agencies and the Washington Anti-Terrorism
Taskforce and Fusion Center (WJAC).
Possible Timeline
WSU personnel and institutional leaders from around the state have
identified security as a critical issue. This task should be expedited and
accomplished within the first year of the five year mitigation planning cycle.
Plan Goal Addressed
Identify and reduce the risk posed by all hazards, both natural and manmade, to personnel, intellectual property and facilities at the physical
campuses and key unit locations, statewide.
ƒ‰‡ͶǤʹͶ
”‡’ƒ”‡†›ǣˆˆ‹…‡‘ˆ—•‹‡••ƒ†‹ƒ…‡
†–Š‡‹˜‹•‹‘‘ˆ
‘˜‡”‡–ƒŽ–—†‹‡•ƒ†‡”˜‹…‡•
1.4 Continue redundancy planning for Information Technology systems and service. Improve
and “harden” the system infrastructure at each campus/facility to ensure continuance of
operation and limit system vulnerability.
Rationale
Information Technology (IT) is one of the most vulnerable systems at WSU
campuses and facilities. IT is subject to cyber terrorist attacks as well as local
and regional infrastructure failures. Due to the critical nature of IT in the
operations of all functions within the WSU system, a failure for any length of
time can have severe and costly impacts to instruction, operations and
research. Due to the expense of these systems few redundancies exist, a
minor problem can quickly turn into a major system failure. Careful and
thoughtful mitigation planning can make the outcome of a prospective failure
of IT from any cause less of an impact to the daily functioning of the
university.
Ideas for Implementation
Research and data already exists as to the vulnerabilities of these systems,
and what to do about it. The main objective to implement mitigation is
funding from either state or external sources.
Coordinating Organization
The logical coordinating organization is the Office of the Vice President for
Information Systems.
Internal Partners
Internal partners include all of WSU, statewide, WSU Cyber Criminology
and Digital Forensics Initiative.
External Partners
External partners include commercial communications systems and services
providers and vendors, as well as the Washington State Office of Information
Services.
Possible Timeline
This is another priority issue, and elements of the project should start
immediately. Completion within the first two years of the 5 year cycle is
recommended.
Plan Goal Addressed
Identify and reduce the risk posed by all hazards, both natural and manmade, to personnel, intellectual property and facilities at the physical
campuses and key unit locations, statewide.
ƒ‰‡ͶǤʹͷ
ƒ•Š‹‰–‘–ƒ–‡‹˜‡”•‹–›ʹͲͲͺ
”‡Ǧ‹•ƒ•–‡”ŽŽǦƒœƒ”†•‹–‹‰ƒ–‹‘Žƒ
1.5 Assessment by qualified engineers of the structural vulnerability of all buildings, statewide,
to the primary hazards identified in the HIVA for each campus or facility location.
Rationale
The university currently maintains over 12,248,000 square feet of facility
space at the four campuses, major research stations and other key facilities,
statewide. These facilities vary in age from the 1890’s to buildings presently
under construction. With an estimated replacement value (structural only, not
including land values or contents of facilities) of approximately
$2,118,825,000, any significant damage to these facilities would create a
huge impact to the state. Add the potential losses to lives, critical research
and other property, the necessity of a full and thorough assessment of the
structural vulnerability to all types of natural and man-made hazards
becomes clear.
Ideas for Implementation
This assessment could be done in stages starting with the oldest and/or most
vulnerable buildings as identified in the HIVA. Some aspects of this
assessment could be accomplished by in-house engineering staff with the
appropriate qualifications. Other aspects may require contracted services
with private consulting engineers. Assistance could be provided by students
of the College of Engineering and Architecture, gaining vital experience in
an internship or service-learning role.
Coordinating Organization
The Capital Planning and Development Office of WSU is the logical
coordinating office for this project as the status of current and future
facilities, campus planning and future development is a key part of their
mission for the institution.
Internal Partners
The Office of Business and Finance would be the leader in acquiring funding
to support this comprehensive assessment. Assistance with the project could
come from Facilities Operations and possible involvement, as indicated,
from the College of Engineering and Architecture. The leaders of the College
of Agriculture, Human and Natural Resource Sciences (CAHNRS) and WSU
Extension would play a significant role as most institutional facilities
external to the main and regional campuses are under their purview.
External Partners
As this would be a very significant and expensive project, it would be
necessary to seek funding from multiple sources including Hazard Mitigation
Project Grants from FEMA that WSU would be eligible for with the
successful completion of this Pre-Disaster All-Hazards Mitigation Plan,
ƒ‰‡ͶǤʹ͸
”‡’ƒ”‡†›ǣˆˆ‹…‡‘ˆ—•‹‡••ƒ†‹ƒ…‡
†–Š‡‹˜‹•‹‘‘ˆ
‘˜‡”‡–ƒŽ–—†‹‡•ƒ†‡”˜‹…‡•
coordinated through the State of Washington Emergency Management
Division. This project may also need support from allocated funds by the
state legislature.
Possible Timeline
This would likely be a multi-year project. If funding is to be sought from
FEMA, the starting date would depend on a successful application for grant
funding support via the competitive application process.
Plan Goal Addressed
Identify and reduce the risk posed by all hazards, both natural and manmade, to personnel, intellectual property and facilities at the physical
campuses and key unit locations, statewide.
1.6 Develop a system-wide strategy to review and update existing non-structural mitigation
practices and, as needed, develop new non-structural mitigation practices for all campuses
and units.
Rationale
WSU has a number of policies, procedures, protocols and guidelines
established for a variety of management practices. These operating
guidelines may have been developed by specific units for their own needs or
by departments within the university such as Environmental Health and
Safety that are tasked with regulatory development and enforcement for the
university as a whole. Many of these guidelines specify practices that would
effectively mitigate non-structural hazards that could affect various units
within the institution or entire campuses. Currently, due to so many units and
departments that are involved in this process, there is no overarching strategy
to catalog, review and update these non-structural migration (NSM)
guidelines. Once all existing guidelines are identified, establishing additional
guidelines to address specific NSM issues that would focus on specific
hazards as identified in the HIVA can be developed.
Ideas for Implementation
Survey all WSU units, statewide to ascertain and catalog all existing nonstructural mitigation guidelines as a starting point to developing an
overarching set of NSM guidelines for the WSU system as a whole. These
guidelines could be tailored to specific local hazards as identified in this
document. These efforts could be coordinated in each WSU location with
local Emergency Management, LEPC’s, and emergency response units etc.
to build on and expand upon local knowledge of best practices.
ƒ‰‡ͶǤʹ͹
ƒ•Š‹‰–‘–ƒ–‡‹˜‡”•‹–›ʹͲͲͺ
”‡Ǧ‹•ƒ•–‡”ŽŽǦƒœƒ”†•‹–‹‰ƒ–‹‘Žƒ
Coordinating Organization
The newly established Hazard Mitigation Sub-Committee of the WSU
Emergency Management Committee would be the appropriate body to
coordinate this project throughout the WSU system.
Internal Partners
Environmental Health and Safety has personnel at all campuses and at many
of the research units. These personnel could serve as local clearinghouses to
aid in collecting information on existing procedures and guidelines for NSM
as well as assisting in surveying the campus or unit as to what additional
NSM guidelines are needed. Other internal partners, by necessity would
include the Deans and Directors for all colleges, divisions, departments and
units as they would assist in full compliance with this activity.
External Partners
This project would have costs associated with it; support from appropriate
grant programs may be necessary. More likely, though, this would be
established as an institutional funded project which may require legislative
budgeting. Specific data and knowledge of local effective NSM methods
could be derived from Emergency Management Offices, Police, Fire
Services, LEPC’s etc. in each locale of WSU.
Possible Timeline
This task could be accomplished in about six months with the appropriate
administrative and financial support. As a priority item it should be
accomplished as soon as possible to maximize potential impact on
mitigation.
Plan Goal Addressed
Identify and reduce the risk posed by all hazards, both natural and manmade, to personnel, intellectual property and facilities at the physical
campuses and key unit locations, statewide.
1.7 Identify and develop campus and facility tree inventory for the facilities identified in the
HIVA with vulnerability to windstorm damage to keep trees from threatening lives,
property and infrastructure.
Rationale
WSU has experienced damage to facilities at multiple locations in the past
from windstorms that caused trees to damage buildings and other facilities.
The potential exists for tree-caused damages at most WSU locations,
statewide. While there is little need for major structural mitigation, the HIVA
uniformly identified high winds and the damage caused by them as a major
hazard concern.
ƒ‰‡ͶǤʹͺ
”‡’ƒ”‡†›ǣˆˆ‹…‡‘ˆ—•‹‡••ƒ†‹ƒ…‡
†–Š‡‹˜‹•‹‘‘ˆ
‘˜‡”‡–ƒŽ–—†‹‡•ƒ†‡”˜‹…‡•
Ideas for Implementation
The trees on each campus or facility should be inventoried and assessed for
condition and for the potential to cause damage by qualified experts.
Coordinating Organization
Facilities Operations is responsible for maintaining the grounds and plants on
all WSU facilities, statewide. Facilities Operations has personnel qualified to
assess both the trees and their potential for causing damage to facilities.
Internal Partners
CAHNRS, WSU Extension, the WSU Landscape Architecture Department
are all possible partners in this process.
External Partners
FEMA, the state of Washington and local Emergency Management and
Response organizations in each affected WSU locality.
Possible Timeline
This assessment could take place relatively quickly if done by in-house
personnel. Due to the potential for damage the project should take place in
the first year or two of the five year cycle.
Plan Goal Addressed
Identify and reduce the risk posed by all hazards, both natural and manmade, to personnel, intellectual property and facilities at the physical
campuses and key unit locations, statewide.
1.8 Identify and develop flooding mitigation projects for the facilities identified in the HIVA
(Mt. Vernon, Puyallup, and Long Beach/Pacific County) with vulnerability to this hazard.
Rationale
The HIVA for this project has identified specific locations within the WSU
system that are subject to possible flooding issues. Two of these sites are
major research and education centers for the university with significant
human and functional resources in place. Flooding to some degree has taken
place at these sites in the past. So far, no significant losses have taken place.
Ideas for Implementation
A full assessment of the potential flooding impacts needs to be accomplished
for these and other potential flooding vulnerable sites in the WSU system.
This assessment will drive the development of effective mitigation strategies
for each site.
ƒ‰‡ͶǤʹͻ
ƒ•Š‹‰–‘–ƒ–‡‹˜‡”•‹–›ʹͲͲͺ
”‡Ǧ‹•ƒ•–‡”ŽŽǦƒœƒ”†•‹–‹‰ƒ–‹‘Žƒ
Coordinating Organization
WSU Capital Planning and Development is the logical organization to
coordinate the study of potential flooding impacts and the development of
effective mitigation strategies that are fiscally sound and environmentally
feasible.
Internal Partners
The indicated research stations are all under CAHNRS with WSU Extension
affiliated. The Hazard Mitigation Sub-Committee of the Emergency
Management Committee can also provide input and support. The Office of
Business and Finance would cooperate in seeking funding sources for
identified projects.
External Partners
Funding for mitigation projects identified may need to come from FEMA.
Other partners could be the local jurisdictions where each identified site is
located.
Possible Timeline
The assessment phase for this project needs to begin within the first year of
the 5 year cycle. It is anticipated that it will take an indefinite time and
possibly multiple applications to FEMA for mitigation funding in order to
accomplish mitigation strategies, once full assessment has taken place.
Plan Goal Addressed
Identify and reduce the risk posed by all hazards, both natural and manmade, to personnel, intellectual property and facilities at the physical
campuses and key unit locations, statewide.
1.9 Identify and develop volcanic eruption related mitigation projects for the facilities identified
in the HIVA with vulnerability to this hazard
Rationale
The HIVA has identified two facilities with a high degree of vulnerability to
volcanic hazards due to their location, but as the Mt. St. Helens eruptions of
1980 has taught us, many other parts of the state are vulnerable as well, to
some degree. The Puyallup Research and Education Center is identified with
a vulnerability to lahars emanating from Mt. Rainier. The Vancouver
Campus has a 35 mile line of sight view of Mt. St. Helens with associated
vulnerabilities there as well.
Ideas for Implementation
Structural mitigation may be applicable for the most vulnerable facilities,
such as Puyallup and Vancouver, and an assessment by trained engineers
ƒ‰‡ͶǤ͵Ͳ
”‡’ƒ”‡†›ǣˆˆ‹…‡‘ˆ—•‹‡••ƒ†‹ƒ…‡
†–Š‡‹˜‹•‹‘‘ˆ
‘˜‡”‡–ƒŽ–—†‹‡•ƒ†‡”˜‹…‡•
would be appropriate. Non-structural mitigation procedures and policies can
be developed for other facilities in the state that might become affected
primarily by ash in a volcanic eruption. These need to be developed in the
areas most likely to be affected.
Coordination Organization
WSU Capital Planning and Development is the logical organization to
oversee the potential structural mitigation issues. The WSU Hazard
Mitigation Sub-Committee is the most appropriate organization to identify
and oversee the development of non-structural mitigation strategies.
Internal Partners
CAHNRS oversees most of the locations outside of the regional campuses
and will need to be a partner in this process along with the WSU extension
office. The Regional Campuses all need to be involved as do the Office of
Business and Finance.
External Partners
FEMA resources may be of assistance. State and local government and
Emergency Management organizations in the affected locales should be
consulted.
Possible Timeline
This is a lower priority project and should be completed by the end of the 5
year cycle. The project should only be few months in duration.
Plan Goal Addressed
Identify and reduce the risk posed by all hazards, both natural and manmade, to personnel, intellectual property and facilities at the physical
campuses and key unit locations, statewide.
2.1 Develop a comprehensive continuance of operations plan at each campus and key facility,
statewide, as part of an overall institutional business continuity plan.
Rationale
If WSU is to be resilient and adapt to a major emergency situation caused by
natural or man-made hazards, then mitigation through comprehensive
planning and preparation to provide for the continuity of operations at each
campus or facility is a critical necessity.
Ideas for Implementation
Beginning at the unit level of the university, identification of the mission
critical functions of those units and a complete analysis of what is needed to
accomplish the maintenance of those functions needs to take place. Unit
ƒ‰‡ͶǤ͵ͳ
ƒ•Š‹‰–‘–ƒ–‡‹˜‡”•‹–›ʹͲͲͺ
”‡Ǧ‹•ƒ•–‡”ŽŽǦƒœƒ”†•‹–‹‰ƒ–‹‘Žƒ
plans need to be combined into a department plan; department plans need to
be combined into college/division plans; and, the college/division plans need
to be combined into a comprehensive university plan with guidelines.
Coordinating Organization
The Emergency Management Committee would drive this process at each of
the campuses and units throughout the state.
Internal Partners
The leadership of the university from the top down, through the colleges,
divisions, departments and units coordinating with their safety committees
and other internal planning functions need to recognize the value of a
continuity of operation planning and to emphasize the need within each of
their areas of responsibility.
External Partners
The state of Washington legislature could assist in driving the necessity of
this project by mandating the need for continuity of operations planning for
all state agencies and state-funded organizations. Local emergency
management and response units can be consulted. Key vendors and
contractors that supply goods and services to WSU campuses and facilities
need to be part of the process.
Possible Timeline
This is a priority issue and should be accomplished in the first year of the 5
year cycle.
Plan Goal Addressed
Enhance the resiliency of teaching, research, extension/outreach programs,
and administrative services at all key institutional sites.
2.2
Develop post-disaster recovery plans at each campus and key facility, statewide.
Rationale
Partnering with the need for continuity of operations plans, the university
needs to emphasize the need for post-disaster recovery planning to restore
WSU back to full operations as quickly as possible following a major
disaster. Planning and preparations in advance will allow the university to
mitigate the impact of a disaster and allow the university to restore
academics, research and public service back to pre-disaster levels quickly
with minimum disruption.
ƒ‰‡ͶǤ͵ʹ
”‡’ƒ”‡†›ǣˆˆ‹…‡‘ˆ—•‹‡••ƒ†‹ƒ…‡
†–Š‡‹˜‹•‹‘‘ˆ
‘˜‡”‡–ƒŽ–—†‹‡•ƒ†‡”˜‹…‡•
Ideas for Implementation
Each campus or facility will prepare a disaster recovery plan addressing the
potential impacts of the key hazards as identified in this plan’s HIVA
section. These plans will be crafted broadly enough that the less likely
hazards that could affect campuses and facilities would also be included.
Resources would be identified that could be acquired and stockpiled to
enable campuses and facilities to recover more quickly.
Coordinating Organization
The WSU Emergency Management Committee and the Hazard Mitigation
Sub-Committee would be the logical coordinating organizations for this
project.
Internal Partners
Like the continuity of operations project, the leadership of the university
from the top down, through the colleges, divisions, departments and units
coordinating with their safety committees and other internal planning
functions need to recognize the value of post-disaster recovery planning and
to emphasize the need within each of their areas of responsibility.
External Partners
University emergency response units, local emergency management and
emergency responders, LEPC’s and the state of Washington EMD are all
likely partners in this project.
Possible Timeline
Like the continuity of operations project, this task should be completed
quickly. It is recommended that it be accomplished in the first two years of
the 5 year cycle.
Plan Goal Addressed
Enhance the resiliency of teaching, research, extension/outreach programs,
and administrative services at all key institutional sites.
2.3 Enhance institutional capabilities to provide the majority of non-Laboratory courses via
Distance Learning to maintain educational continuity during disasters
Rationale
The primary function of a university is education. Any major disaster will
disrupt this function. A disruption could have disastrous long term academic,
research and financial effects that would severely affect the ability of the
university to fully recover. These impacts can be mitigated if the educational
mission can be maintained, enhancing long distance learning capabilities by
offering the majority of non-laboratory courses online.
ƒ‰‡ͶǤ͵͵
ƒ•Š‹‰–‘–ƒ–‡‹˜‡”•‹–›ʹͲͲͺ
”‡Ǧ‹•ƒ•–‡”ŽŽǦƒœƒ”†•‹–‹‰ƒ–‹‘Žƒ
Ideas for Implementation
A taskforce should be established within the university to address this issue,
a strategy developed to incorporate improvements, and expansion to the
existing Distance Learning Program as part of both a continuity of operations
and disaster recovery program. This is to mitigate the effects of a major
disaster on the long term viability of the institution and the funding found to
expand the program as quickly as possible.
Coordinating Organization
The WSU Provost’s Office is the logical organization to coordinate this
project as all academic programs are under their purview.
Internal Partners
The Office of Distance and Professional Education, the Deans of the
Colleges, the Chancellors of the Regional Campuses, WSU Office of the
Vice President for Information Systems and WSU Extension are all likely
partners for this project.
External Partners
External partners would be other northwest colleges and universities.
Possible Timeline
The expansion of distance learning capabilities has many benefits to the
university and should be pursued as quickly as possible. The strategy on how
to proceed should be developed quickly, within the first years of the 5 year
cycle, with implementation taking place as rapidly as budget and
development of courses permits.
Plan Goal Addressed
Enhance the resiliency of teaching, research, extension/outreach programs,
and administrative services at all key institutional sites.
3.1 Enhance Emergency Management capabilities at all campus and facilities by developing or
improving emergency response contingency plans for the hazards identified in the HIVA as
well as other potential common emergencies
Rationale
Although general emergency planning and preparedness have been mandated
for all units within the WSU system, planning to meet specific contingencies
and to address the identified hazards in the HIVA of this document has
lagged behind. The development of specific contingency plans to address
ƒ‰‡ͶǤ͵Ͷ
”‡’ƒ”‡†›ǣˆˆ‹…‡‘ˆ—•‹‡••ƒ†‹ƒ…‡
†–Š‡‹˜‹•‹‘‘ˆ
‘˜‡”‡–ƒŽ–—†‹‡•ƒ†‡”˜‹…‡•
these hazards as a mitigation strategy has the benefit of simplicity and will be
cost effective.
Ideas for Implementation
Provide all WSU campuses and units statewide with copies of this Predisaster All-Hazards Mitigation Plan and emphasize the need to review the
specific hazards information that has been established for each campus and
unit. Develop procedures for each of the campuses and units to prepare
contingency plans specifically to address planning and preparedness for
disasters caused by these hazards, as well as localized mitigation strategies
consistent with this overall mitigation plan.
Coordinating Organization
The WSU Emergency Management Office is the logical coordinating
organization for this process.
Internal Partners
Office of Business and Finance, the President’s Office, the leadership and
administration of each WSU campus, facility and unit, statewide.
External Partners
External partners include local emergency management offices, local law
enforcement, and local fire and EMS.
Possible Time Line
This is mostly a regulatory mitigation process and should be able to be
implemented relatively quickly with an expectation of completion within the
first year of the five year cycle.
Plan Goal Addressed
Enhance emergency preparedness, response and recovery capabilities at all
institutional locations.
3.2 Enhance emergency warning and notification capabilities for all institutional campuses and
facilities, statewide.
Rationale
Adequate warning and notification of active or imminent emergency
situations allows university personnel to provide for their own safety and
make the best decisions possible on how to protect themselves and what they
should do in response to the emergency facing them. Expanding these
capabilities at each WSU location around the state increases our ability to
ƒ‰‡ͶǤ͵ͷ
ƒ•Š‹‰–‘–ƒ–‡‹˜‡”•‹–›ʹͲͲͺ
”‡Ǧ‹•ƒ•–‡”ŽŽǦƒœƒ”†•‹–‹‰ƒ–‹‘Žƒ
mitigate the potential damage to personnel and resources from a variety of
potential crisis situations.
Ideas for Implementation
Follow the lead of the main Pullman campus in developing as many
emergency contact methods as possible. Each regional campus, research
center and other location also needs to commit the time and resources to
include themselves in the statewide Crisis Communication System and to
identify what other methods would be most effective to reach their personnel
with emergency warnings and notifications.
Coordinating Organization
The Emergency Management Office of the Office of Business and Finance is
the logical choice to coordinate this effort.
Internal Partners
Information Technology, Facilities Operations, the Emergency Management
Committee, CAHNRS, WSU Extension and the Chancellor’s Offices of the
regional campuses would be the likely partners for this project.
External Partners
External partners include contractors, service vendors, local emergency
management, emergency responders, and local media outlets. Also included
would be FEMA, DOJ, and DHS.
Possible Timeline
Much of this project can be accomplished in a short time with the appropriate
resources made available. This should be easily accomplished during the first
year of the 5 year cycle.
Plan Goal Addressed
Enhance emergency preparedness, response and recovery capabilities at all
institutional locations.
3.3 Improve Emergency Management capabilities at all campuses and facilities by ensuring
two-way radio communications are interoperable with local emergency response and
management agencies as well as adequate to campus or facility emergency needs.
Rationale
Inadequate communications continues to be
external emergency responders at WSU
personnel need to be able to communicate
coordinate response and to ensure the
ƒ‰‡ͶǤ͵͸
”‡’ƒ”‡†›ǣˆˆ‹…‡‘ˆ—•‹‡••ƒ†‹ƒ…‡
†–Š‡‹˜‹•‹‘‘ˆ
‘˜‡”‡–ƒŽ–—†‹‡•ƒ†‡”˜‹…‡•
a critical issue for internal and
locations, statewide. Campus
with emergency responders to
safety of campus personnel.
Communications systems need to meet federal standards and provide
coverage in even remote WSU locations around the state. Adequate
emergency communications as part of this mitigation strategy will have longterm and broad-reaching potential impact.
Ideas for Implementation
Acquire adequate funding support to ensure acquisition of the latest state-ofof-the-art portable radio systems and “gateway” systems to integrate with
local established emergency response communications. As necessary, and as
a benefit to both WSU facilities and local emergency responders, cooperate
in developing joint proposals to acquire communications systems that meet
current federal requirements.
Coordinating Office
The WSU Emergency Management Office is the logical coordinating office
for this project.
Internal Partners
Facilities Operations, CAHNRS, WSU Extension, leaders and administrators
of each WSU unit, statewide are logical internal partners.
External Partners
Local law enforcement, local Fire and EMS, local emergency management
offices, WSP Communications, FEMA, DHS, DOJ, and state of Washington
EMD are logical external partners.
Possible Time Line
This will be a long term, complicated project that will require considerable
external funding in order to accomplish. The goal will be to complete this
task by the end of the five year cycle.
Plan Goal Addressed
Enhance emergency preparedness, response and recovery capabilities at all
institutional locations.
3.4 Increase Campus Police and/or Security Staff capabilities for all locations through
acquisition of additional personnel and resources.
Rationale
Campus and facility safety and security issues are of high importance to
WSU personnel, statewide. From concerns regarding campus shooters to the
security of potentially controversial research, WSU personnel want to see
more done to mitigate the potential for harm to themselves and their work.
ƒ‰‡ͶǤ͵͹
ƒ•Š‹‰–‘–ƒ–‡‹˜‡”•‹–›ʹͲͲͺ
”‡Ǧ‹•ƒ•–‡”ŽŽǦƒœƒ”†•‹–‹‰ƒ–‹‘Žƒ
WSU Pullman and WSU Vancouver have campus police departments with
commissioned officers; WSU Spokane has its own security force. WSU TriCities and other WSU facilities statewide rely upon local law enforcement to
provide for their needs. Increased demands on in-house personnel and
reliance on local law enforcement may be inadequate in some circumstances.
Ideas for Implementation
Increase police forces at the two campuses that have them. Study whether the
other campuses would benefit from either their own police forces or
contracted security services. Determine the best methods of providing
security personnel to other WSU locations that demonstrate a need for
additional security.
Coordinating Organization
The Office of Business and Finance is the logical coordinating organization
for this project.
Internal Partners
Campus and unit administrators, WSU police department, Criminal Justice
Department, other internal security services, CAHNRS, and WSU Extension
are all logical internal partners.
External Partners
Local law enforcement offices, WASPC, and private security contractors,
DOJ, and DHS are logical external partners.
Possible Time Line
This project will be most appropriate after the completion of the previously
noted system-wide security analysis and development of a WSU
comprehensive security plan. Funding will also need to be sought for this
project from a variety of sources.
Plan Goal Addressed
Enhance emergency preparedness, response and recovery capabilities at all
institutional locations.
3.5 Improve security at all crucial and vulnerable facilities by the addition of closed-circuit
security camera systems
Rationale
Depending on the results of the security analysis the most cost-effective
mitigation strategy for increasing security at vulnerable locations around the
ƒ‰‡ͶǤ͵ͺ
”‡’ƒ”‡†›ǣˆˆ‹…‡‘ˆ—•‹‡••ƒ†‹ƒ…‡
†–Š‡‹˜‹•‹‘‘ˆ
‘˜‡”‡–ƒŽ–—†‹‡•ƒ†‡”˜‹…‡•
state may be to invest in technology solutions, including closed-circuit
security camera systems.
Ideas for Implementation
Identify which resources may best increase security capability through the
use of security camera systems rather than security personnel. Whether the
systems are monitored 24/7, or utilized as un-manned recording systems,
they can provide a cost-effective solution to increasing security especially at
remote locations.
Coordinating Organization
Campus police, security or CAHNRS/WSU Extension management
personnel at each location statewide are logical coordinating organizations.
Internal Partners
Office of Business and Finance, CAHNRS and WSU Extension Deans and
Directors are logical internal partners.
External Partners
External partners include local law enforcement, and local security
contractors.
Possible Time Line
This project needs to tie with the other security enhancement projects and,
depending upon the situation and the security issues identified in the security
analysis, may be a higher or lower priority.
Plan Goal Addressed
Enhance emergency preparedness, response and recovery capabilities at all
institutional locations.
3.6 Support emergency response capabilities at each campus and facility by development of
Campus Emergency Response Team (CERT) of trained volunteers capable of assisting in
response to disasters
Rationale
Increasing the emergency response capability at each campus and location
will be extremely expensive if professional staff is required for this purpose.
Development of a trained cadre of volunteer university personnel to respond
to basic emergencies and provide support to on or off campus professional
responders during emergencies is a cost-effective mitigation strategy.
ƒ‰‡ͶǤ͵ͻ
ƒ•Š‹‰–‘–ƒ–‡‹˜‡”•‹–›ʹͲͲͺ
”‡Ǧ‹•ƒ•–‡”ŽŽǦƒœƒ”†•‹–‹‰ƒ–‹‘Žƒ
Ideas for Implementation
Developing a Campus Emergency Response Team (CERT) at each location
would be relatively inexpensive. Effective training protocols and procedures
have been established by FEMA and other colleges and universities
throughout the country. An adequately trained CERT can enhance many
aspects of campus and locality emergency response, from first aid through
basic search and rescue. CERT can act independently or provide support to
professional emergency responders, and can act as the first on-scene
responders to provide emergency care, evacuation, and minor fire
suppression until professional responders arrive.
Coordinating Organization
The WSU Emergency Management Office is the logical coordinating
organization for this project.
Internal Partners
Office of Business and Finance, campus police and/or security at each
campus, Environmental Health and Safety, Human Resource Services,
student government at campus locations, deans and directors for CAHNRS,
as well as WSU Extension.
External Partners
Local law enforcement departments, local fire/EMS/Haz-Mat response
departments, Citizen Corp, and DHS are each a logical external partner.
Possible Timeline
This is a longer term project. Receiving funding support from Citizen Corp
may take even longer. This should be completed by the end of the five year
cycle.
Plan Goal Addressed
Enhance emergency preparedness, response and recovery capabilities at all
institutional locations.
3.7 Expand emergency response capabilities at each Research Center, Extension Office and
Learning Center by instituting an Extension Disaster Preparation and Response Program
Rationale
WSU Extension has recognized the need to expand its involvement in
emergency management as a mitigation strategy for both its own facilities
around the state, and by providing information to the public as a mitigation
education process for part of its mission in outreach and education for the
state of Washington.
ƒ‰‡ͶǤͶͲ
”‡’ƒ”‡†›ǣˆˆ‹…‡‘ˆ—•‹‡••ƒ†‹ƒ…‡
†–Š‡‹˜‹•‹‘‘ˆ
‘˜‡”‡–ƒŽ–—†‹‡•ƒ†‡”˜‹…‡•
Ideas for Implementation
Provide support to Extension with information and resources to expand WSU
mitigation strategies to their offices and centers throughout the state. Work
with them to develop mitigation education tools to educate the public on
various structural and non-structural mitigation methods in order to reduce
the impact of potential emergencies.
Coordinating Organization
WSU Emergency Management Office in cooperation with the Extension
Disaster Preparedness Committee.
Internal Partners
Logical internal partners include the WSU Extension administration
(statewide), the Environmental Health and Safety, and the WSU police.
External Partners
Logical external partners include the local law enforcement agencies, local
fire/EMS agencies, as well as the local CERT programs.
Possible Time Line
This will be a long term project with the expectation of implementation by
the third year of the five year cycle. This may be accelerated depending on
support funding availability.
Plan Goal Addressed
Enhance emergency preparedness, response and recovery capabilities at all
institutional locations.
4.1 Integrate an awareness campaign for all students, faculty, and staff regarding the natural and
man-made hazards identified in the HIVA and what they can do to reduce their risk at each
campus or facility location, statewide.
Rationale
The education and outreach component of the plan is a vital element to drive
changes and recognition of the value of mitigation in reducing personal and
institutional risks posed by the hazards identified in the plan HIVA.
Ideas for Implementation
Develop a variety of educational materials as well as prepare and present
programs on mitigation and what can be done to reduce risk throughout the
WSU system. Encourage and support individual and unit efforts to mitigate
specific risks.
ƒ‰‡ͶǤͶͳ
ƒ•Š‹‰–‘–ƒ–‡‹˜‡”•‹–›ʹͲͲͺ
”‡Ǧ‹•ƒ•–‡”ŽŽǦƒœƒ”†•‹–‹‰ƒ–‹‘Žƒ
Coordinating Organization
WSU Emergency Management Office in close coordination with the
University Relations Office.
Internal Partners
The leaders of each campus and administrative unit, Residence Life for the
Pullman Campus, the Associated Students Government of each campus,
campus police/security, and the Environmental Health and Safety.
External Partners
External partners include local emergency management offices, local law
enforcement, and local fire/EMS services.
Possible Time Line
This project should commence at the beginning of the five year cycle and
continue through to the end.
Plan Goal Addressed
Increase awareness through enhanced and engaged communication
throughout WSU and with our stakeholders to promote risk reductions
through the education and outreach programs of the university.
4.2 Develop an outreach and education strategy for faculty and staff on reducing the risk to
personal spaces, work spaces, intellectual property and animals involved in research or in
the care of the institution (e.g. non-structural mitigation strategies and practices)
Rationale
Faculty/staff working in labs, with animals and with research materials, that
could be easily lost or damaged due to common events like power outages,
have special vulnerabilities that need to be addressed with specific mitigation
strategies. Important data and research materials could easily be lost due to a
minor incident if appropriate steps are not taken in advance in order to
address this risk.
Ideas for Implementation
Develop specific educational materials and programs to stress the need for
faculty and staff to protect themselves and their work from minor and major
emergencies through planning and preparedness activities.
Coordinating Organization
WSU Office of Environmental Health and Safety is currently responsible for
developing policy and procedures for most hazardous materials on campuses
ƒ‰‡ͶǤͶʹ
”‡’ƒ”‡†›ǣˆˆ‹…‡‘ˆ—•‹‡••ƒ†‹ƒ…‡
†–Š‡‹˜‹•‹‘‘ˆ
‘˜‡”‡–ƒŽ–—†‹‡•ƒ†‡”˜‹…‡•
and at research stations. The Radiation Safety Office is responsible for
managing radioactive materials used in academic and research programs.
The Office of Research Assurances is responsible for monitoring and
managing biological materials used in research. The Office of intellectual
Property Administration and the Office of the Campus Veterinarian also
would play a significant role. WSU Police would advise on security issues.
Internal Partners
The Provost’s Office, The Office of Research, WSU Emergency
Management Office, the administrators of each campus and unit, statewide,
campus police and/or security, Human Resource Services.
External Partners
Logical external partners include federal and state regulatory agencies, local
emergency management offices, local law enforcement, and local fire/EMS
services.
Possible Time Line
This project should commence at the beginning of the five year cycle and
continue through to the end.
Plan Goal Addressed
Increase awareness through enhanced and engaged communication
throughout WSU and with our stakeholders to promote risk reductions
through the education and outreach programs of the university.
4.3 Develop training and outreach materials as well as provide training to institutional decision
makers (President, Senior Staff, Deans, Directors and Department Heads) on integrating
mitigation into all campus and unit practices throughout WSU
Rationale
The leaders and decision makers for WSU need to be fully aware of the
purpose and goals of this plan and how to integrate hazard risk mitigation
into all campus and unit operations, planning and practices.
Ideas for Implementation
Develop specific educational materials and programs to show campus leaders
what mitigation is all about and how WSU can benefit with a comprehensive
process of integrating mitigation into all appropriate aspects of the
university.
ƒ‰‡ͶǤͶ͵
ƒ•Š‹‰–‘–ƒ–‡‹˜‡”•‹–›ʹͲͲͺ
”‡Ǧ‹•ƒ•–‡”ŽŽǦƒœƒ”†•‹–‹‰ƒ–‹‘Žƒ
Coordinating Organization
The WSU Emergency Management Office in coordination WSU Office of
Environmental Health and Safety , the Radiation Safety Office, the Office of
Research Assurances and WSU Police.
Internal Partners
The President’s Office, the Provost’s Office, campus/unit leaders and
administrators.
External Partners
Logical external partners include local emergency management offices, local
law enforcement agencies, and local fire/EMS services.
Possible Time Line
This project should commence at the beginning of the five year cycle and
continue through to the end.
Plan Goal Addressed
Increase awareness through enhanced and engaged communication
throughout WSU and with our stakeholders to promote risk reductions
through the education and outreach programs of the university.
4.4 Develop an outreach and education strategy for visitors of all types to WSU focusing on
what they should do if an emergency occurs while they are on campus or at a WSU facility,
what emergency resources are available to them and what actions they can take to mitigate
the effect of a disaster on them while at WSU facilities (campus visitations, athletic events,
camps, cultural or entertainment events, etc.)
Rationale
WSU hosts many thousands of visitors each year for a variety of programs
and events. These guests need to be aware of the resources and services
available to them and what is expected of them if a serious emergency occurs
during their visit.
Ideas for Implementation
Prepare educational materials that can be distributed with registration packets
for camps, conferences, student visitations etc. Prepare specialized materials
to be provided to guests attending athletic, cultural or entertainment
programs. Develop web sites and web materials that can be linked to other
university web sites with the appropriate information on how these guests
and visitors can mitigate the effects of hazards while on WSU property.
ƒ‰‡ͶǤͶͶ
”‡’ƒ”‡†›ǣˆˆ‹…‡‘ˆ—•‹‡••ƒ†‹ƒ…‡
†–Š‡‹˜‹•‹‘‘ˆ
‘˜‡”‡–ƒŽ–—†‹‡•ƒ†‡”˜‹…‡•
Coordinating Organization
The WSU Visitor Center in coordination with the WSU Emergency
Management Office would manage this project.
Internal Partners
WSU Emergency Management Committee, the leaders and administrators of
each campus/unit, campus police/security, Environmental Health and Safety,
Residence Life, Conference and Institutes Office, Athletic Department,
Multi-cultural Student Services, Student Affairs, Alumni Foundation,
CAHNRS, WSU Extension and all departments that host camps.
External Partners
Local emergency management offices, local law enforcement agencies, local
fire/EMS services, and local media outlets are logical external partners.
Possible Time Line
This project should commence at the beginning of the five year cycle and
continue through to the end.
Plan Goal Addressed
Increase awareness through enhanced and engaged communication
throughout WSU and with our stakeholders to promote risk reductions
through the education and outreach programs of the university.
4.5 Develop an outreach and education strategy for WSU Extension to provide mitigation
education to the residents of the state of Washington as part of the Extension’s mission of
service to the state
Rationale
As an integral part of the universities services to the state, WSU Extension is
uniquely placed to aid in making the residents of the state aware of what
mitigation is and can mean to them in planning, preparing and recovering
from emergencies caused by the various natural and man-made hazards
within the state.
Ideas for Implementation
WSU Extension would utilize its personnel, resources and experience in
developing outreach programs and educational materials for the residents of
the state on the subject of mitigation, mitigation activities and how
mitigation can make a difference in making people and their property less
vulnerable to common hazards.
ƒ‰‡ͶǤͶͷ
ƒ•Š‹‰–‘–ƒ–‡‹˜‡”•‹–›ʹͲͲͺ
”‡Ǧ‹•ƒ•–‡”ŽŽǦƒœƒ”†•‹–‹‰ƒ–‹‘Žƒ
Coordinating Organization
WSU Extension administration and Disaster Preparedness Committee would
be the coordinating organization for this project.
Internal Partners
Division of Governmental Studies and Services, CAHNRS, University
Relations would be logical internal partners.
External Partners
The state of Washington EMD, local emergency management offices, local
law enforcement offices, local fire/EMS services, and Extension Disaster
Education Network would be logical external partners.
Possible Time Line
This project should be started within the first two years of the five year cycle
and be an on-going project.
Plan Goal Addressed
Increase awareness through enhanced and engaged communication
throughout WSU and with our stakeholders to promote risk reductions
through the education and outreach programs of the university.
5.1 Develop a system-wide strategy to implement risk reduction practices into all existing and
future campus renewal and development projects
Rationale
Cost effective mitigation efforts can best be incorporated into new structural
projects while they are still in the development stage. For existing structures
and facilities, mitigation can best be addressed when modifications or
remodeling and updating of buildings and facilities takes place.
Incorporation of mitigation analysis and review for all new or renewal
projects should become an institutional standard.
Ideas for Implementation
Develop guidelines for incorporating mitigation analysis and review as a
standard aspect of development of all new and renewal structural projects for
WSU, statewide.
Coordinating Organization
Capital Planning and Development as the construction management and
planning unit of the university would manage this project.
ƒ‰‡ͶǤͶ͸
”‡’ƒ”‡†›ǣˆˆ‹…‡‘ˆ—•‹‡••ƒ†‹ƒ…‡
†–Š‡‹˜‹•‹‘‘ˆ
‘˜‡”‡–ƒŽ–—†‹‡•ƒ†‡”˜‹…‡•
Internal Partners
Hazard Mitigation Sub-Committee, Office of Business and Finance,
Facilities Operations.
External Partners
External partners include FEMA, and the state of Washington EMD.
Possible Time Line
This project should be started within the first two years of the five year cycle
and be an on-going project.
Plan Goal Addressed
Increase awareness through enhanced and engaged communication
throughout WSU and with our stakeholders to promote risk reductions
through the education and outreach programs of the university.
5.2 Include mitigation practices and requirements in the WSU Comprehensive Emergency
Management Plan as well as all College, Division, Department or Unit emergency response
plans as appropriate
Rationale
For mitigation to become a regular part of all WSU emergency management
activities, all levels of emergency planning should include information on the
benefits and purpose of mitigation activities and the requirement for
implementing non-structural mitigation practices as a standard guideline for
all units to accomplish.
Ideas for Implementation
Develop templates and guidelines for incorporating mitigation activities for
all levels of emergency planning and preparedness for the university.
Coordinating Organization
The WSU Emergency Management Office would be the coordinating
organization.
Internal Partners
The Hazard Mitigation Sub-Committee, Office of Business and Finance,
President’s and Provost’s Offices, the leaders and administration of all
campuses and units.
External Partners
External partners include FEMA, the state of Washington EMD, and other
federal and state agencies.
ƒ‰‡ͶǤͶ͹
ƒ•Š‹‰–‘–ƒ–‡‹˜‡”•‹–›ʹͲͲͺ
”‡Ǧ‹•ƒ•–‡”ŽŽǦƒœƒ”†•‹–‹‰ƒ–‹‘Žƒ
Possible Time Line
This project should be started within the first two years of the five year cycle
and be an on-going project.
Plan Goal Addressed
Increase awareness through enhanced and engaged communication
throughout WSU and with our stakeholders to promote risk reductions
through the education and outreach programs of the university.
5.3 Include mitigation practices and requirements as an element of all business operations for
the university as appropriate
Rationale
The business operations of the university are critical to the functioning of the
institution. Incorporating mitigation strategies into business operations will
prevent critical operational systems from being vulnerable to natural and
technological hazards and prevent excessive downtime and the associated
problems that could cause problems to the university, staff and faculty, and
the vendors who provide goods and services to WSU.
Coordinating Organization
Business Services in close coordination with the WSU Emergency
Management Office.
Internal Partners
The Hazard Mitigation Sub-Committee, Office of business and Finance,
Finance Officers for all WSU units, all Business Services units, Internal
Audit Office, leaders and administrators of all campuses and units.
External Partners
External partners include the State Auditor’s Office, State Office of Financial
Management, and vendors of goods and services to WSU.
Possible Time Line
This project should be started within the first two years of the five year cycle
and be an on-going project.
Plan Goal Addressed
Increase awareness through enhanced and engaged communication
throughout WSU and with our stakeholders to promote risk reductions
through the education and outreach programs of the university.
ƒ‰‡ͶǤͶͺ
”‡’ƒ”‡†›ǣˆˆ‹…‡‘ˆ—•‹‡••ƒ†‹ƒ…‡
†–Š‡‹˜‹•‹‘‘ˆ
‘˜‡”‡–ƒŽ–—†‹‡•ƒ†‡”˜‹…‡•
5.4 Include non-structural risk reduction and mitigation practices and requirements in routine
university inspections requirements
Rationale
Many different types of regular inspections take place within WSU of
facilities and operations. These inspections are performed by several
different units within WSU including the Fire Marshal, Environmental
Health and Safety, Research Compliance Office and the Office of the
Campus Veterinarian.
Ideas for Implementation
Compliance with and development of risk reduction and mitigation practices
could be added to these inspection processes and monitored along with other
regulatory issues.
Coordinating Organization
WSU Office of Environmental Health and Safety , the Radiation Safety
Office, WSU Police, Fire Marshal, Office of the Campus Veterinarian and
the Office of Research Assurances.
Internal Partners
All units within WSU who have regulatory authority and require inspections
of facilities and operational aspects of the university, Capital Planning and
Development, the Hazard Mitigation Sub-Committee, Office of Business and
Finance.
External Partners
All federal and state regulatory agencies, local fire marshals, local building
inspectors, local law enforcement, and local fire/EMS services are ideal
external partners.
Possible Time Line
This project should be started within the first two years of the five year cycle
and be an on-going project.
Plan Goal Addressed
Increase awareness through enhanced and engaged communication
throughout WSU and with our stakeholders to promote risk reductions
through the education and outreach programs of the university.
ƒ‰‡ͶǤͶͻ
ƒ•Š‹‰–‘–ƒ–‡‹˜‡”•‹–›ʹͲͲͺ
”‡Ǧ‹•ƒ•–‡”ŽŽǦƒœƒ”†•‹–‹‰ƒ–‹‘Žƒ
5.5 Include non-structural risk reduction and mitigation practices and requirements in
operational and emergency plans specific to large athletic and entertainment events on
campus where large numbers of people will gather
Rationale
WSU maintains several specialized venues for large scale social, cultural,
athletic or entertainment events. These facilities host large numbers of nonWSU personnel that will be unfamiliar with the facilities and emergency
services for the campuses, in general. Because of the nature of these facilities
and the concentrations of people that will occupy them, additional
consideration toward non-structural mitigation practices and requirements
that increase the safety of these facilities and lessen the potential impact of
hazards should be addressed.
Ideas for Implementation
These facilities should be inspected by a team to include managers of the
facilities, the Fire Marshal, WSU Police and/or security, Facilities
Operations personnel and Environmental Health and Safety personnel. A
mitigation strategy will be developed from the inspection report.
Coordinating Organization
The Fire Marshal in close coordination with Environmental Health and
Safety and Facilities Operations would manage this project.
Internal Partners
Internal partners include WSU Athletic Department, Beasley Coliseum
management, CUB staff, University Recreation staff, Dining Services staff,
and Campus Involvement staff, as well as the Hazard Mitigation SubCommittee.
External Partners
Local law enforcement agencies, local fire/EMS services, and the County
Health Department are logical external partners.
Possible Time Line
This project should be started within the first two years of the five year cycle
and be an on-going project.
Plan Goal Addressed
Increase awareness through enhanced and engaged communication
throughout WSU and with our stakeholders to promote risk reductions
through the education and outreach programs of the university.
ƒ‰‡ͶǤͷͲ
”‡’ƒ”‡†›ǣˆˆ‹…‡‘ˆ—•‹‡••ƒ†‹ƒ…‡
†–Š‡‹˜‹•‹‘‘ˆ
‘˜‡”‡–ƒŽ–—†‹‡•ƒ†‡”˜‹…‡•
6.1 Establish a Hazard Mitigation Sub-Committee of the WSU Emergency Management
Committee to oversee mitigation activities on the WSU-Pullman campus and to provide
advice and assistance to the regional campuses and other units throughout the state in
overseeing their mitigation activities per the action items identified in this document
Rationale
This plan identifies a need for a specific group to manage mitigation
activities within the WSU system.
Ideas for Implementation
Establish a Hazard Mitigation Sub-Committee of the WSU Emergency
Management Committee to oversee the implementation of this plan for the
WSU system, statewide.
Coordinating Organization
Office of Business and Finance would manage this project.
Internal Partners
Internal partners include the Emergency Management Committee, the
Chancellor’s Office at each regional campus, CAHNRS and WSU Extension
leaders.
External Partners
External partners are local emergency management offices.
Possible Time Line
This action item should be accomplished by the first year of the five year
cycle.
Plan Goal Addressed
Establish and maintain accountability methods including benchmarks to
ensure plan implementation progress and further development of mitigation
practices at all university campuses and unit sites.
6.2 Appoint or hire an Emergency Management Coordinator for each campus or major facility
to coordinate all emergency management and mitigation efforts with the Emergency
Management Office at the WSU-Pullman campus
Rationale
Each campus or facility statewide has unique issues and different needs in
relation to managing risk and mitigation of potential hazards. Local
personnel at each location, tasked with emergency management as part of
ƒ‰‡ͶǤͷͳ
ƒ•Š‹‰–‘–ƒ–‡‹˜‡”•‹–›ʹͲͲͺ
”‡Ǧ‹•ƒ•–‡”ŽŽǦƒœƒ”†•‹–‹‰ƒ–‹‘Žƒ
their job function, can coordinate their efforts with the main campus to
ensure all relevant issues are being addressed.
Ideas for Implementation
Initially, each campus or unit could designate a person to serve in this
capacity and to coordinate with the Emergency Management Office in
Pullman. The designee from each of the regional campuses would serve on
the university’s Emergency Management Committee and the Hazard
Mitigation Sub-committee. CAHNRS and WSU Extension would have
representatives as well. As the regional campuses expand and the need
increases, a specific Emergency Manager could be hired.
Coordinating Organization
Office of Business and Finance would coordinate this project.
Internal Partners
Chancellor’s Office at each regional campus, CAHNRS administration, and
WSU Extension administration.
External Partners
None identified.
Possible Time Line
This action item should be accomplished by the third year of the five year
cycle.
Plan Goal Addressed
Establish and maintain accountability methods including benchmarks to
ensure plan implementation progress and further development of mitigation
practices at all university campuses and unit sites.
6.3 Hire a Business Continuity and Resumption Specialist to coordinate all continuance of
operations planning efforts for WSU, statewide, within the Emergency Management Office
at the WSU-Pullman campus
Rationale
Business continuity planning is a key element for mitigation of the effects on
the institution of natural and man-made hazards. The ability to maintain
mission-critical operations through well-crafted and implemented business
continuity plans will have a significant impact on the reduction of costs the
university would face after a major emergency, as well as maintaining the
academic continuity of the institution. Business continuity, while an aspect
of emergency management, requires specialized skills and experience.
ƒ‰‡ͶǤͷʹ
”‡’ƒ”‡†›ǣˆˆ‹…‡‘ˆ—•‹‡••ƒ†‹ƒ…‡
†–Š‡‹˜‹•‹‘‘ˆ
‘˜‡”‡–ƒŽ–—†‹‡•ƒ†‡”˜‹…‡•
Ideas for Implementation
A trained and certified business continuity specialist would be hired to assist
WSU units throughout the state in developing business continuity plans and
procedures as part of the hazard mitigation process.
Coordinating Organization
Office of Business and Finance would coordinate this project.
Internal Partners
President’s Office, Provost’s Office, Chancellor’s Office at each regional
campus, CAHNRS, and the WSU Extension would be logical internal
partners.
External Partners
Washington State Office of Information Systems Business Continuity Office
would be an external partner.
Possible Time Line
This action item should be accomplished by the second year of the five year
cycle.
Plan Goal Addressed
Establish and maintain accountability methods including benchmarks to
ensure plan implementation progress and further development of mitigation
practices at all university campuses and unit sites.
6.4 Begin discussions with other state colleges and universities regarding jointly hiring a
Mitigation Specialist to advise and direct each of the campuses on mitigation activities as
well as to identify sources of funding for mitigation projects and assist institutions in
applying for such funds for projects
Rationale
While the ideal situation would be to have a Mitigation Specialist at each
college or university campus throughout the state, this would be prohibitively
expensive. A less ideal, but acceptable, alternative would be for all state
colleges and universities to work together to establish a Mitigation Specialist
position within the state of Washington EMD to assist all campuses in
developing mitigation strategies and seeking grant or other funding to
support mitigation initiatives.
Ideas for Implementation
Propose the concept and work with the campuses and other state agencies
involved to make this concept happen as quickly as possible.
ƒ‰‡ͶǤͷ͵
ƒ•Š‹‰–‘–ƒ–‡‹˜‡”•‹–›ʹͲͲͺ
”‡Ǧ‹•ƒ•–‡”ŽŽǦƒœƒ”†•‹–‹‰ƒ–‹‘Žƒ
Coordinating Organization
Office of Business and Finance would coordinate this project.
Internal Partners
President’s Office, the Chancellor’s Offices at each regional campus,
CAHNRS and WSU Extension leaders.
External Partners
External partners include the leaders of the other state colleges and
universities, State Higher Education Board, Washington State EMD.
Possible Time Line
This action item should be accomplished by the fourth year of the five year
cycle.
Plan Goal Addressed
Establish and maintain accountability methods including benchmarks to
ensure plan implementation progress and further development of mitigation
practices at all university campuses and unit sites.
6.5 Identify sources for service learning opportunities to provide training on implementing and
maintaining the WSU All-Hazards Mitigation Plan
Rationale
As part of WSU’s educational mission, learning opportunities for students of
the institution should be provided whenever possible. Students in a number
of fields could get experience by participating with university personnel in
managing the mitigation process for the institution.
Ideas for Implementation
Meet with various units within the university to explain the mitigation plan
and strategies for the university and identify ways that students from a
number of disciplines could become involved in assisting the university to
accomplish these goals.
Coordinating Organization
Hazard Mitigation Sub-Committee working closely with the Center for Civic
Engagement would manage this project.
Internal Partners
The Emergency Management Committee, Provost’s Office ,Chancellor’s
office at each regional campus, CAHNRS and WSU Extension leaders,
ƒ‰‡ͶǤͷͶ
”‡’ƒ”‡†›ǣˆˆ‹…‡‘ˆ—•‹‡••ƒ†‹ƒ…‡
†–Š‡‹˜‹•‹‘‘ˆ
‘˜‡”‡–ƒŽ–—†‹‡•ƒ†‡”˜‹…‡•
Appropriate Academic Units and Internship Coordinators (e.g. Foley
Institute).
External Partners
FEMA, Washington State EMD, and local emergency management offices
would be external partners.
Possible Time Line
This action item should be accomplished by the first year of the five year
cycle.
Plan Goal Addressed
Establish and maintain accountability methods including benchmarks to
ensure plan implementation progress and further development of mitigation
practices at all university campuses and unit sites.
7.1 Enhance partnerships with other state colleges and universities in Washington; local City
and County Hazard Mitigation Planning entities; the State of Washington EMD Hazard
Mitigation Planning Office; FEMA Hazard Mitigation Planning Offices and other local
emergency management agencies to work collaboratively on mitigation planning, project
and activities throughout the state
Rationale
WSU will be served best by building on the efforts and experience other
agencies throughout the state have in the area of mitigation. Collaborative
efforts wherever possible will also be more cost effective.
Ideas for Implementation
Once this plan is approved, contact all relevant mitigation agencies in the
areas served by WSU to establish a working dialogue and to share
information on mitigation strategies, goals and objectives.
Coordinating Organization
The WSU Emergency Management Office would manage this project.
Internal Partners
The President’s Office, the Hazard Mitigation Sub-Committee of the
Emergency Management Committee, Chancellor’s office at each regional
campus, CAHNRS and WSU Extension leaders, Extension Directors and
Disaster Preparedness Committee.
External Partners
Other state colleges and universities; local City and County Hazard
Mitigation Planning entities; the State of Washington EMD Hazard
ƒ‰‡ͶǤͷͷ
ƒ•Š‹‰–‘–ƒ–‡‹˜‡”•‹–›ʹͲͲͺ
”‡Ǧ‹•ƒ•–‡”ŽŽǦƒœƒ”†•‹–‹‰ƒ–‹‘Žƒ
Mitigation Planning Office; FEMA Hazard Mitigation Planning Offices and
other local emergency management agencies.
Possible Time Line
This action item should be accomplished within the first year of the five year
cycle.
Plan Goal Addressed
Continue to establish and enhance external partnerships with local, state, and
federal government and private entities to further mitigation efforts.
ƒ‰‡ͶǤͷ͸
”‡’ƒ”‡†›ǣˆˆ‹…‡‘ˆ—•‹‡••ƒ†‹ƒ…‡
†–Š‡‹˜‹•‹‘‘ˆ
‘˜‡”‡–ƒŽ–—†‹‡•ƒ†‡”˜‹…‡•
Section 5
Plan Oversight
This section explains the oversight structure of the plan. To ensure that the plan is
responsive to the needs of the entire university community, many university units must
be involved in its maintenance and implementation. A clear oversight structure will
help coordinate these groups and ensure that the plan is implemented.
Plan Adoption
To ensure that all levels of the university administration are satisfied with the mitigation
strategies proposed within this document, multiple levels of review and approval will
take place. The first level of review and approval will occur within the HMPC. After
the HMPC has approved the plan, it will advance to the University Emergency
Management Committee for review and approval. The next level of review and
approval will take place at the executive level of the university. After the plan is
reviewed by the President and the Senior Staff, with appropriate input from the
Chancellors of the regional campuses, the plan will go to the WSU Board of Regents
for review and adoption by resolution. WSU will next be responsible for submitting it
to the State Hazard Mitigation Officer at Washington Military Department, Emergency
Management Division. The State Emergency Management Division will then submit
the plan to FEMA–Region X for review. This review will address the federal criteria
outlined in FEMA Interim Final, Rule 44 CFR Part 201. Upon acceptance by FEMA,
WSU will gain eligibility for the Pre-Disaster Mitigation Grant Program and Hazard
Mitigation Grant Program funds.
Oversight Structure
The proposed oversight for the WSU All-Hazard Mitigation Plan into an integrated
university-wide emergency management program is divided into four key components
(Figure 5-1). The WSU President and Senior Staff will provide institutional oversight
and guidance. The Emergency Management Committee with representatives from
emergency response, administrative areas, auxiliary units and regional campuses, will
ensure that the plan is integrated into existing university planning, long-term strategies,
policies, and programs. Working groups will be established to make certain that the
plan is implemented and carry out the actions defined in the plan, specific to each
campus, research station, or other WSU facility. The Emergency Management
Coordinator will serve as day-to-day manager and staff to the advisory committee and
ƒ‰‡ͷǤ1
ƒ•Š‹‰–‘–ƒ–‡‹˜‡”•‹–›ʹͲͲͺ
”‡Ǧ‹•ƒ•–‡”ŽŽǦƒœƒ”†•‹–‹‰ƒ–‹‘Žƒ
working groups providing essential coordination, communications, and technical
oversight on all elements of the program.
WSU President and Senior Staff
EMERGENCY MANAGEMENT
COMMITTEE
Emergency Management
Coordinator
Selected representatives from response units,
administration, auxiliary services and
regional campuses
Working
Group
Working
Group
Working
Group
Working
Group
MITIGATION RESPONSE RECOVERY PREPAREDNESS
Figure 5-1: Plan Oversight Structure
WSU President and Senior Staff
The WSU President and Senior Staff in their role as the Executive Emergency
Management Team (EEMT) provide leadership for the university during an emergency
situation. This group is responsible for making decisions about full or partial closure of
the university, other critical policy decisions and for coordinating and communicating
with elected officials from other government agencies during the emergency. The
EEMT will provide high level oversight and guidance for the implementation of all
emergency management related plans. On a regular basis, the Chair of the Emergency
Management Committee will brief the EEMT about emergency management activities
on campus and the implementation of pertinent plans.
ƒ‰‡ͷǤʹ
”‡’ƒ”‡†›ǣˆˆ‹…‡‘ˆ—•‹‡••ƒ†‹ƒ…‡
†–Š‡‹˜‹•‹‘‘ˆ
‘˜‡”‡–ƒŽ–—†‹‡•ƒ†‡”˜‹…‡•
Emergency Management Committee
The Emergency Management Committee (EMC) is responsible for oversight, guidance,
and implementation of the mitigation plan. This committee, comprised of response unit
leaders (representatives from key administrative areas, academic colleges, and the
Provost’s office), reports to the EEMT through the Vice-President of Business and
Finance. Additionally, the EMC will include a representative from the city of Pullman
Fire Department representing fire and emergency medical services, as well as
emergency management issues of the city, as part of the committee. For some specific
discussions related to the All-Hazards Mitigation Plan, a representative from Capital
Planning and Development will be asked to participate. The WSU Office of Business
and Finance will appoint all members to this group.
Committee Responsibilities
The roles and responsibilities of the EMC include:
x
Report to the Executive Emergency Management Team through the
Chair and the Vice-President of Business and Finance;
x
Oversight and periodic evaluation and update on current university
emergency management plans (e.g. Comprehensive Emergency
Management Plan and All-Hazards Mitigation Plan) in accordance with
the prescribed maintenance schedule defined in each plan;
x
Oversight on the development of other emergency management plans
for campus (e.g. business continuity plan, post disaster recovery plan,
etc);
x
Prioritize and implement plan action items;
x
Develop and coordinate ad hoc and/or standing working groups as
needed;
x
Recommend funding for hazard risk reduction projects, and;
x
Serve as the campus evaluation committee for funding programs such as
Pre-Disaster Mitigation Grant Program and the Hazard Mitigation Grant
Program funds.
The EMC will meet monthly to perform its duties and will enlist the help of other
university staff to serve on working groups to implement projects as needed.
ƒ‰‡ͷǤ3
ƒ•Š‹‰–‘–ƒ–‡‹˜‡”•‹–›ʹͲͲͺ
”‡Ǧ‹•ƒ•–‡”ŽŽǦƒœƒ”†•‹–‹‰ƒ–‹‘Žƒ
Members
- Senior Associate Vice-President of Business and Finance-Chair
- Emergency Management Coordinator
- Facilities Operations
- WSU Police
- Environmental Health and Safety
- Informational Technology
- Radiation Safety Office
- Business Services/Controller
- University Relations/ WSU News Bureau/PIO
- Provost’s Office
- Student Affairs
- Office of Internal Audit
- College of Veterinary Medicine
- College of Agriculture, Human and Natural Resource Sciences
- College of Business
- Office of the Campus Veterinarian
- Nuclear Radiation Center
- City of Pullman Fire Department/Emergency Management
- Regional Campus Representatives
The Office of the Vice-President of Business and Finance is the supervisory body for
this committee; schedules meetings and sets agendas for all meetings of the EMC.
Business and Finance manages any funding that may become available for emergency
management or hazard mitigation projects, pre- or post-disaster events. The Emergency
Management Coordinator, as directed by the Senior Associate Vice-President of
Business and Finance will develop meeting agendas, as well as all materials and
information for EMC briefings.
Working Groups
Whereas the EMC provides oversight and guidance on the plans, the working groups
are responsible for carrying out the plans' defined action items, plan updates and
development, training and plan drills, and outreach activities. EMC members will
appoint staff to the working groups on an "as needed" basis to carry out specific
projects.
ƒ‰‡ͷǤͶ
”‡’ƒ”‡†›ǣˆˆ‹…‡‘ˆ—•‹‡••ƒ†‹ƒ…‡
†–Š‡‹˜‹•‹‘‘ˆ
‘˜‡”‡–ƒŽ–—†‹‡•ƒ†‡”˜‹…‡•
University Emergency Management Coordinator
The proposed operational and management structure will not be implemented without
campus-wide support, and a specific person or group assigned to coordinate and ensure
its implementation. The Emergency Management Coordinator will complete the
following tasks:
x
Convene the EMC meetings and coordinate dates, times, locations,
agendas, and member notification;
x
Document outcomes of committee meetings;
x
Serve as a communication conduit between the EMC and key plan
stakeholders, internal and external to the university;
x
Identify emergency management related funding sources for hazard
mitigation projects;
x
Tie mitigation, response and recovery benchmarking to other campus
benchmarking, such as sustainability;
x
Collaborate with other universities to share best practices;
x
Conduct outreach and awareness campaigns for students, staff, faculty,
and the administration;
x
Document successes and lessons learned, and;
x
Develop grant proposals for implementation of the plans' action items.
ƒ‰‡ͷǤ5
ƒ•Š‹‰–‘–ƒ–‡‹˜‡”•‹–›ʹͲͲͺ
”‡Ǧ‹•ƒ•–‡”ŽŽǦƒœƒ”†•‹–‹‰ƒ–‹‘Žƒ
Section 6
Plan Implementation & Maintenance
This section details the formal plan implementation and maintenance process. Proper
maintenance of the plan will ensure that it remains an active and relevant document,
and maximizes the university’s efforts to reduce risks posed by natural and man-made
hazards.
Implementation and Maintenance Meetings
The WSU Emergency Management Committee (EMC) will be responsible for
maintaining and updating the plan through a series of meetings (Table 6-1):
x
x
x
Monthly meetings
Annual meetings
5-Year review meetings
Monthly
Meetings
Review current
actions
Prioritize action items
Identify new issues and
needs
Annual Meetings
Review updates of
vulnerability assessment
5-Year Review
Meetings
Review plan
update questions
Discuss methods of
continued public/campus
involvement
Document successes and
lessons learned
Update plan sections as
necessary
Develop funding
proposals
Table 6-1: Plan Implementation & Maintenance Meeting Schedule
ƒ‰‡͸Ǥ1
ƒ•Š‹‰–‘–ƒ–‡‹˜‡”•‹–›ʹͲͲͺ
”‡Ǧ‹•ƒ•–‡”ŽŽǦƒœƒ”†•‹–‹‰ƒ–‹‘Žƒ
Monthly Meetings
The EMC will meet on a monthly basis to:
x
x
x
x
Review existing action items in order to determine appropriateness for
funding;
Identify issues that may not have been identified when the plan was
developed;
Prioritize potential mitigation projects using the methodology described
in the process below, and;
Assist in development of funding proposals for priority action items.
The EMC will be responsible for documenting the outcome of the monthly and annual
maintenance meetings. The process the EMC will use to prioritize mitigation projects is
detailed under the "Action Items Prioritization Process" heading below.
Annual Meetings
The EMC will meet annually to review updates of the vulnerability assessment data and
findings, discuss methods of continued public involvement, and document successes
and lessons learned, based on actions that were accomplished during the previous year.
The EMC will be responsible for documenting the outcomes of the annual meeting.
The plan’s format allows the university to review and update sections when new data
becomes available. New data can be easily incorporated, resulting in an All-Hazards
Mitigation Plan that remains current and relevant to WSU.
Five-Year Review of Plan
The All-Hazards Mitigation Plan will be updated every five years, in accordance with
the update schedule outlined in the DMA 2000. During the plan update, certain
questions should be addressed in order to determine what actions should be taken in
revising the plan. WSU Business Affairs will be responsible for assembling the EMC
with questions that are outlined below:
x
x
x
x
x
x
x
x
Are the plan goals still applicable?
Do the plan’s priorities align with city and state priorities?
Are there new partners that should be brought to the table?
Are there new local, regional, state, or federal policies influencing
hazards that should be addressed?
Has the university successfully implemented any mitigation activities
since the plan was last updated?
Have new issues or problems related to hazards been identified within
the university?
Do existing actions need to be reprioritized for implementation?
Are the actions still appropriate, given current resources?
ƒ‰‡͸Ǥʹ
”‡’ƒ”‡†›ǣˆˆ‹…‡‘ˆ—•‹‡••ƒ†‹ƒ…‡
†–Š‡‹˜‹•‹‘‘ˆ
‘˜‡”‡–ƒŽ–—†‹‡•ƒ†‡”˜‹…‡•
x
x
x
x
Have there been any changes in development patterns that could
influence the effects of hazards?
Are there new studies or data available that would enhance the
vulnerability assessment?
Has the university been affected by any disasters?
Did the plan accurately address the impacts of this event?
Continued Public/ Campus Input
WSU is dedicated to involving the campus directly in the continual reshaping and
updating of the All-Hazard Mitigation Plan. Therefore, portions of the plan will be
placed on the university web-site, allowing WSU community members to view the plan
and provide feedback. The success of the plan implementation partially relies on the
public’s interest and willingness to become involved in the All-Hazard Mitigation Plan.
Their willingness relies on the visibility and understanding of the issue before any
behavioral change happens. To date, four action items directly related to public
involvement have been included in the plan. They are:
1. Develop a public awareness information campaign for incoming and
current students. The campaign should focus on pertinent information
regarding hazards, the campus, and what students can do to reduce their
own risks;
2. Develop an outreach strategy for educating faculty and staff on ways
they can reduce risk to personal spaces and intellectual property (i.e.,
non-structural mitigation practices for offices, and data back-up
practices);
3. Provide outreach and training to decision makers (i.e., Academic Deans,
Department Heads, and the Executive Council) to educate them about
ways to integrate mitigation into everyday practices throughout campus,
and;
4. Develop an awareness strategy targeted at visitors (i.e., camps, sporting
events).
Action Items Prioritization Process
Potential mitigation opportunities will often come from a variety of sources. Therefore,
an action item prioritization process needs to be flexible. Establishing and
implementing one is important because it is a required element of the DMA 2000, it can
assist EMC in making decisions about how to move forward, and the process can assist
in directing the effective use of limited mitigation dollars.
Prioritization and Submission of Proposed Mitigation Initiatives
In order to most effectively allocate the limited resources available for implementation
of mitigation actions in the WSU community, all initiatives proposed for incorporation
into the plan will be prioritized in accordance with the common methodology as
ƒ‰‡͸Ǥ3
ƒ•Š‹‰–‘–ƒ–‡‹˜‡”•‹–›ʹͲͲͺ
”‡Ǧ‹•ƒ•–‡”ŽŽǦƒœƒ”†•‹–‹‰ƒ–‹‘Žƒ
established by the EMC. Each unit proposing an initiative is responsible for use of this
methodology.
Upon completion of the identification, characterization, and prioritization of a
mitigation initiative proposed for incorporation into the strategy, the participating unit
will submit the proposal to the EMC for review and coordination along with all other
proposed mitigation initiatives. The submittal will occur on a specified timeline and be
in a format established by the EMC for this purpose.
Review and Coordination of Proposed Mitigation Initiatives
The EMC is responsible for ensuring inter-organizational review and coordination of
proposed mitigation initiatives. To accomplish this task, the EMC will do the following:
x
x
x
x
x
x
x
Establish a schedule for the units to submit proposed mitigation
initiatives to be considered for incorporation into the newest edition of
the WSU All-Hazard Mitigation Plan;
Ensure the use of established methodology by all participating units in
WSU for the identification, characterization and prioritization of
proposed mitigation initiatives;
Distribute the guidance, training, or information as developed for the
process as needed to facilitate complete and accurate submittals by the
units;
Review each proposed mitigation initiative received for completeness,
adherence to the prescribed methodology, validity of the
characterization information and data used by the unit, and the
likelihood that the proposal will actually mitigate any hazards or
vulnerabilities of concern;
Compare proposed mitigation initiatives with others already
incorporated into the plan, or being submitted during the current
planning period, to ensure an absence of conflict or redundancy in
purpose;
If needed, return the proposed mitigation initiatives to the submitting
WSU unit for additional information or analysis and re-submittal, and;
Prepare a recommendation for action by the EMC to incorporate the
proposed mitigation initiative into the WSU All-Hazard Mitigation
Plan.
Incorporation of Proposed Mitigation Initiatives into the Strategy
The EMC will hold a meeting after receiving a recommendation for incorporating a
proposed mitigation initiative from one of its coordinators. The EMC will then review
and act upon that recommendation. The EMC may either agree or disagree with the
recommendation made by the coordinator. If agreed, the EMC will vote to incorporate
or refuse to incorporate the proposed mitigation initiative into the strategy, as
recommended by the coordinator.
ƒ‰‡͸ǤͶ
”‡’ƒ”‡†›ǣˆˆ‹…‡‘ˆ—•‹‡••ƒ†‹ƒ…‡
†–Š‡‹˜‹•‹‘‘ˆ
‘˜‡”‡–ƒŽ–—†‹‡•ƒ†‡”˜‹…‡•
In the event that the EMC refuses to incorporate the proposed mitigation initiative into
the mitigation plan, a full explanation for the action will be provided to the unit
submitting the proposal and suggestions made regarding corrective actions that should
be taken to enable the proposal's incorporation. The proposing WSU unit would then be
responsible for taking such actions and resubmitting the proposal for incorporation into
the strategy.
In the event the EMC disagrees with a recommendation made by the coordinator, it will
inform the coordinator of the points of disagreement and suggest steps to be taken in
order to make the recommendation acceptable for action. The coordinator will
implement these steps as soon as time allows.
No proposed mitigation initiative will be considered as incorporated into the plan until
it is given an affirmative majority vote by the EMC.
Resolving Conflicts
In the event that a mitigation initiative proposed by a WSU unit is determined by the
coordinator to be in conflict with one or more other initiatives in the plan and/or
submitted by other units, the coordinator will take action to resolve the conflict. This
will be done in the following manner:
x
x
x
x
x
The participants proposing the conflicting mitigation initiatives will be
notified of the findings of the coordinator and requested to make any
such modifications to the proposals needed to resolve the conflicts;
Should the participants be initially unwilling or unable to make such
modifications to their proposed mitigation initiatives, the coordinator
will schedule and hold a detailed discussion of the matter, and involve
both units as well as any other interested parties;
In the event that such detailed discussions do not result in voluntary
action on the part of the participants making the proposals, the
coordinator will formulate a recommendation to resolve the conflict. In
making this recommendation, in its discretion, the coordinator may
either give preference to the proposal already incorporated into the
strategy; give it to the unit which first submitted a proposal to the
committee for review; and/or give preference to the proposal achieving
the highest priority score in accord with the established methodology;
The coordinator’s recommendation will be transmitted for action to the
EMC, and;
The EMC will review the recommendation and take any such action as
deemed appropriate to reconcile the conflict prior to incorporation of the
proposal(s) into the next edition.
ƒ‰‡͸Ǥ5
ƒ•Š‹‰–‘–ƒ–‡‹˜‡”•‹–›ʹͲͲͺ
”‡Ǧ‹•ƒ•–‡”ŽŽǦƒœƒ”†•‹–‹‰ƒ–‹‘Žƒ
Incomplete Processing of Proposed Mitigation Initiatives
If proposed mitigation initiatives are submitted to the coordinator after the deadline
established for that purpose, in his/her discretion, the coordinator may decline to
process such proposed initiatives for the next edition of the plan. The coordinator will,
however, retain the submissions, and review and process the initiatives in accord with
this procedure for purposes of incorporating them into the subsequent edition of the
plan. These unprocessed mitigation initiatives will be termed “pending” mitigation
initiatives, and may be listed in the published edition of the plan under that term.
Pending mitigation initiatives will not be eligible for funding or resources made
available through the EMC in the same manner as would proposed initiatives that are
fully processed, prioritized and incorporated into the strategy. The participating WSU
units may separately, at their discretion, pursue implementation of pending mitigation
initiatives at any time.
Implementation of Proposed Mitigation Initiatives
Following its incorporation into the WSU All-Hazard Mitigation Plan, appropriate and
specified departments within WSU are responsible for attempting to secure the funding,
resources, or other approvals and permits necessary to implement the proposed
mitigation initiative. The EMC will provide such support to a department as time
allows. The department itself, however, maintains the administrative responsibility for
implementation of the proposed action within the administrative framework of the
university.
Upon request of the unit attempting to implement an approved mitigation initiative, the
EMC will certify to any identified party that the proposed mitigation initiative was
subjected to the EMC review and coordination process, and that it has been approved
for incorporation into the strategy. If desired, this certification and documentation of an
initiative’s incorporation into the plan may be delegated by the EMC to its coordinator.
Monitoring of Implementation of Mitigation Initiatives
The coordinator will be responsible for monitoring the status of implementation of
proposed mitigation initiatives incorporated into the All-Hazard Mitigation Plan. On an
annual basis, the participating WSU unit will make information available to identify if
one or more of the following actions have been accomplished by the WSU unit
proposing the initiative:
x
Initial actions to obtain funding, permits, approvals or other resources
needed to begin implementation of the initiative;
ƒ‰‡͸Ǥ͸
”‡’ƒ”‡†›ǣˆˆ‹…‡‘ˆ—•‹‡••ƒ†‹ƒ…‡
†–Š‡‹˜‹•‹‘‘ˆ
‘˜‡”‡–ƒŽ–—†‹‡•ƒ†‡”˜‹…‡•
x
x
x
x
Any necessary design or development actions have been initiated or
completed, or if funding has been obtained;
Complete implementation of the mitigation initiative;
If the agency or organization proposing the initiative no longer intends
to implement the initiative, and/or;
Additional information or analysis has been developed that would
modify the priority originally assigned to the initiative upon its
incorporation into the strategy.
In monitoring the implementation status of the mitigation initiatives incorporated into
the WSU All-Hazard Mitigation Plan, the coordinator will evaluate the continued
priority for implementation to be afforded each initiative integrated into the strategy.
This determination will be made with consideration of the following factors:
x
x
x
x
The proposed initiative’s relationship to current or more recent hazard
identification and risk assessment evaluations conducted by the EMC;
Recent experience with hazard events at WSU facilities and the
relevance to the proposed initiative to mitigating any vulnerabilities to
those hazards;
The initiative’s predicted current and/or continuing acceptance to the
university for implementation, and;
The current probability of receiving funding for implementation from
all-hazard, state or federal sources and its consistency with current allhazard, state and federal program priorities.
On an annual basis, and for preparation of the next updated edition of the plan, the
coordinator will recommend to the EMC that an initiative be designated as priority for
initiation, continued at its currently designated priority, or deferred for future action.
The coordinator will also advise the EMC when an initiative is being implemented,
removed from the plan, or whether the proposing unit or organization has terminated
action on its initiative, requesting its removal from the plan.
The EMC will consider and act on the coordinator's recommendation in order to finalize
the list of approved proposed mitigation initiatives to be incorporated into the next
updated edition of the WSU All-Hazard Mitigation Plan.
Approval and Issuance of the Washington State University All-Hazard
Mitigation Plan
On an annual cycle, the WSU EMC will approve and issue an update of the Mitigation
Plan. To complete the revision, the EMC will, by affirmative majority vote, allow
ƒ‰‡͸Ǥ7
ƒ•Š‹‰–‘–ƒ–‡‹˜‡”•‹–›ʹͲͲͺ
”‡Ǧ‹•ƒ•–‡”ŽŽǦƒœƒ”†•‹–‹‰ƒ–‹‘Žƒ
release of the updated version of the strategy, which will contain at least the following
information:
x
x
x
x
x
x
The currently approved listing of the mitigation initiatives proposed by
participating WSU units;
A statement of the EMC goals and objectives for initiative
implementation for the upcoming planning period;
Updated information regarding the findings of the hazard identification,
vulnerability assessment and evaluation of policies, plans and
regulations except for any information deemed to be sensitive or with
security implications;
Progress on implementation of the mitigation initiatives previously
incorporated into the strategy;
A listing of the currently participating units and the status of their
participation; and,
The current revisions or additions of the EMC operating procedures.
The updated plan will contain any proposed and approved or pending mitigation
initiatives processed by the EMC during the preceding planning period. It will also
include the approved proposed mitigation initiatives listed in any previous editions of
the plan, unless they are recommended for removal by the coordinator and the EMC.
Each unit participating in the mitigation planning process may have a separate section
of the plan document, specifically intended to list the findings of any analyses done for
that unit. This separate section will also contain the complete list of mitigation
initiatives proposed by that WSU unit.
Many of the WSU All-Hazards Mitigation Plan’s recommendations are consistent with
the goals and objectives of the university’s existing plans and policies. Where possible,
WSU should implement the All-Hazards Mitigation Plan’s recommended actions
through existing plans and policies, such as WSU Master Plans. Plans and policies
already in existence have support from campus departments, administration, and
decision makers. Many campus plans, and strategic plans get updated regularly, and can
adapt easily to changing conditions and needs. Implementing the All-Hazards
Mitigation Plan’s action items through such plans and policies increases their likelihood
of being supported and implemented.
The Office of University Relations will be asked to assist the EMC in announcing the
completion, approval, and release of the plan. Prior to, or concurrent with, formal action
to release the plan, the EMC may determine that a public hearing or public forum is
necessary or required to allow the university an opportunity to review and comment on
the strategy. Upon such a determination, the EMC will take the necessary actions to
plan, conduct and document the hearing process.
The EMC will also take such actions as feasible to make the WSU All-Hazard
Mitigation Plan readily available to members of the public and other interested
ƒ‰‡͸Ǥͺ
”‡’ƒ”‡†›ǣˆˆ‹…‡‘ˆ—•‹‡••ƒ†‹ƒ…‡
†–Š‡‹˜‹•‹‘‘ˆ
‘˜‡”‡–ƒŽ–—†‹‡•ƒ†‡”˜‹…‡•
organizations and agencies. At a minimum, a full copy of the plan will be available to
each WSU unit.
Upon release of the WSU All-Hazard Mitigation Plan, the EMC will request the leaders
of each participating unit to take action to adopt approve and/or endorse their
designated section of the plan. It is not necessary for individual units to take any action
concerning the portions of the plan pertaining to another unit. Upon approval of their
portion of the WSU All-Hazard Mitigation Plan, the participating unit will notify the
EMC. In the event that their portion of the plan is rejected or disapproved in whole or in
part, the EMC will be notified of the reasons for the rejection or disapproval. The
representatives of that jurisdiction or organization will then be requested to work with
the coordinator to address and resolve the impediments interfering with receipt of
approval or endorsement by the participating jurisdiction or organization.
Approval of Supplements to the Plan
When indicated, the EMC may, in its sole discretion, elect to approve issuance of a
supplement to the currently approved mitigation plan. This supplement may contain one
or more proposed mitigation initiatives that have been fully processed by the
coordinator and EMC in accord with this procedure. Upon its issuance, the supplement
and the mitigation initiatives contained therein are considered to be an integral part of
the WSU All-Hazard Mitigation Plan, pending the approval of the supplement by the
governing body of the jurisdiction or organization that proposed the initiatives.
Cost-Benefit Analysis and Assistance with Initiative Funding and
Implementation
Depending on the type of project and the funding source, either a quantitative or
qualitative assessment of cost effectiveness will be completed. If the activity is seeking
federal funding for a structural project, the committee will use a FEMA-approved costbenefit analysis tool to evaluate the appropriateness of the activity. A project must have
a benefit cost ratio of greater than one (1) to be eligible for FEMA funding. For FEMAfunded non-structural projects, or projects funded through entities other than FEMA, a
qualitative assessment will be completed to determine the project’s cost effectiveness.
Appropriate departments within WSU are responsible for implementation of the
mitigation initiatives contained within the WSU All-Hazard Mitigation Plan when the
necessary resources, funding, authorities and/or authorizations to do so become
available. The EMC will, nevertheless, offer assistance and support to the participating
agencies and organizations in implementing their proposed mitigation initiatives as
appropriate opportunities arise.
The coordinator will, during each planning cycle, attempt to obtain information
regarding upcoming state and federal programs which may offer opportunities for
participating agencies and organizations to receive funding for initiative
ƒ‰‡͸Ǥ9
ƒ•Š‹‰–‘–ƒ–‡‹˜‡”•‹–›ʹͲͲͺ
”‡Ǧ‹•ƒ•–‡”ŽŽǦƒœƒ”†•‹–‹‰ƒ–‹‘Žƒ
implementation. The coordinator will assess the proposed mitigation initiatives listed in
the current approved edition of the WSU All-Hazard Mitigation Plan for all
jurisdictions and organizations, and identify the proposed mitigation initiatives
matching the funding requirements and/or limitations of the applicable state and federal
program. The coordinator will then select the proposed initiatives in descending order
of priority ranking and, in turn, notifying the appropriate unit within WSU of the
potential availability of funding for initiative implementation. If it wished to apply for
the funding available, the applicable unit would be responsible for then agreeing to
complete the necessary application forms, provide any matching funds, and other
requisite paperwork. If the department was unable or unwilling to undertake the
application process, the coordinator would notify the agency or organization with the
next highest ranked proposed mitigation initiative listed in the current strategy. In the
event that two or more proposed mitigation initiatives listed in the plan were eligible for
the funding opportunity and had the same priority ranking, the coordinator would
simultaneously notify the proposing units.
This action by the coordinator is only intended to facilitate implementation of the
various initiatives listed in the WSU All-Hazard Mitigation Plan. Nothing in this
procedure of the EMC is intended to prohibit, interfere with, or discourage any
participating unit from seeking the funding, resources, or authorities at any time to
implement proposed mitigation initiatives listed in the WSU All-Hazard Mitigation
Plan.
Assessment of Recent Disaster Events
Within 60 days following a significant disaster or emergency event impacting WSU or
any of its units, the coordinator will conduct an analysis of the event to capture any
“lessons learned” for the purpose of continuing development of the Mitigation Plan.
The coordinator will classify the event based on the hazard category and assess the
magnitude of the event, as well as the university’s reaction to it. The direct and indirect
damage, response, and recovery costs will also be gathered or estimated.
Any mitigation techniques in place at the impacted areas would be assessed for their
apparent effectiveness in decreasing damages. The type and extent of the damages
would also be evaluated to determine which mitigation initiative should be incorporated
into the plan in order to avoid similar losses in the future. Based on this assessment, the
coordinator would recommend to one or more of the participating units that they
propose appropriate mitigation initiatives for incorporation into the next edition of the
plan. In its discretion, the unit could then propose such an initiative and transmit it to
the coordinator for processing.
ƒ‰‡͸ǤͳͲ
”‡’ƒ”‡†›ǣˆˆ‹…‡‘ˆ—•‹‡••ƒ†‹ƒ…‡
†–Š‡‹˜‹•‹‘‘ˆ
‘˜‡”‡–ƒŽ–—†‹‡•ƒ†‡”˜‹…‡•
Washington State University
APPENDICES
Pre-Disaster All-Hazards Mitigation Plan
2008
ƒ•Š‹‰–‘–ƒ–‡‹˜‡”•‹–›ʹͲͲͺƒ‰‡Ǧͳ
”‡Ǧ‹•ƒ•–‡”ŽŽǦƒœƒ”†•‹–‹‰ƒ–‹‘Žƒ
Appendices Table of Contents
Appendix A – HIVA Charts …………………………………………………………A-2
Appendix B – County Plan Comparison Charts ……………………………………..B-1
Appendix C – HIVA Questionnaire ………………………………………………….C-1
Appendix D – SESRC Survey Report ………………………………………………..D-1
Appendix E – Hazard Rating Chart …………………………………………………..E-1
Appendix F – Major WSU Facility Maps and Photographs ………………………….F-1
ƒ•Š‹‰–‘–ƒ–‡‹˜‡”•‹–›ʹͲͲͺƒ‰‡Ǧʹ
”‡Ǧ‹•ƒ•–‡”ŽŽǦƒœƒ”†•‹–‹‰ƒ–‹‘Žƒ
ƒ•Š‹‰–‘–ƒ–‡‹˜‡”•‹–›ʹͲͲͺƒ‰‡Ǧ͵
”‡Ǧ‹•ƒ•–‡”ŽŽǦƒœƒ”†•‹–‹‰ƒ–‹‘Žƒ
Appendix A
WSU Locations Including Number of (people) and facilities]
By Homeland Security Region and County:
Region 1:
Island County – County Extension Office (5), [1]
San Juan County –County Extension Office (7), [1]
Skagit County –County Extension Office (13), [1];
Learning Center (2), [1]; Research and Extension Center (17),
[2]; Program for Rural Improvement (1), [1]
Snohomish County – County Extension Office (16), [1]
Whatcom County – County Extension Office (14), [1]
Region 1 Totals: People (75), Facilities [9]
Region 2:
Clallam County – County Extension Office (6), [1];
Jefferson County – County Extension Office (10), [1]; Learning
Center (11), [1]
Kitsap County – County Extension Office (8), [1]
Region 2 Totals: People (35), Facilities [4]
Benton County – County Extension Office (6), [10];
Research and Extension Center
(150), [79]; WSU Tri-Cities (1,144), [8]
Franklin County – County Extension Office (7), [1]
Klickitat County Extension (3), [1]; Learning Center (2), [1]
Walla Walla County – County Extension Office (6), [1];
Learning Center (1), [1]; Program for Rural Improvement
(1), [1]
Yakima County – County Extension Office (15), [1];
Learning Center (2), [2]; Program for Rural Improvement
(1), [1]
Region 8 Totals: People (1,338), Facilities [106]
Region 4:
Clark County – WSU Vancouver (1,961), [11]; Clark County
Extension Office (7), [21]
Cowlitz County – County Extension Office (9), [2]; Learning
Center (3), [1]
Skamania County – County Extension Office (3), [2]
Wahkiakum County – County Extension Office (6), [1]
Region 4 Totals: People (1,989 ), Facilities [38 ]
Region 5:
Pierce County – County Extension Office (25), [1]; Learning
Center (3), [1]; Research and Extension Center (125), [70]
Region 5 Totals: People (153 ), Facilities [72]
Region 6:
King County – County Extension Office (5), [1]; WSU West
(32), [1]
Region 6 Totals: People (37), Facilities [2]
Region 7:
Chelan County – County Extension Office (12), [1];
Research and Extension Center (20), [10]; Learning
Center (4), [1]
Douglas County – Douglas County Extension (8), [1]
Grant County – County Extension Office (12), [2]
Kittitas County – County Extension Office (7), [2]
Okanogan County – County Extension Office (7), [1];
Extension Reservation Program (1), [1]
Region 7 Totals: People (71), Facilities [19]
Region 8:
Region 3:
Grays Harbor County – County Extension Office (16), [1],
Learning Center (3), [1]; Program for Rural Improvement Office
(1), [1]
Lewis County – County Extension Office (7), [1]; Extension
Reservation Program (1), [1]
Mason County – County Extension Office (10), [1]
Pacific County – County Extension Office (4), [1]; Research and
Extension Center (7), [4]
Thurston County – County Extension Office (14), [1]; Extension
Energy Program (57), [1]
Region 3 Totals: People (120 ), Facilities [13]
Region 9:
Adams County – County Extension Office (9), [1];
Research and Extension Center (9), [4]
Asotin County – County Extension Office (3), [1]
Columbia County – County Extension Office (2), [1]
Ferry County – County Extension Office (5), [1]
Garfield County – County Extension Office (3), [1];
Lincoln County – County Extension Office (7), [1]
Pend Oreille County – County Extension Office (5), [1]
Spokane County – County Extension Office (38), [1]; WSU
Spokane (1,535), [5]; Program for Rural Improvement (1),
[1]; Extension Energy Program (3), [1]
Stevens County – County Extension Office (4), [1];
Learning Center (1), [1]
Whitman County – County Extension Office (4), [1]; WSU
Pullman (18,690), [547]
Region 9 Totals: People (20,319 ), Facilities [569]
ƒ•Š‹‰–‘–ƒ–‡‹˜‡”•‹–›ʹͲͲͺƒ‰‡ǦͶ
”‡Ǧ‹•ƒ•–‡”ŽŽǦƒœƒ”†•‹–‹‰ƒ–‹‘Žƒ
WSU Locations Including Number of (people) and [facilities]
By Homeland Security Region and County:
Regions Vulnerable to Drought
Region 7:
Chelan County
Douglas County
Grant County
Kittitas County
Okanogan County
Region 8:
Benton County
Franklin County
Klickitat County
Yakima County
Region 9:
Adams County
WSU Locations Including Number of (people) and [facilities]
By Homeland Security Region and County:
Regions Vulnerable to Earthquake
Region 1:
Whatcom
Skagit
Snohomish
Island
San Juan
Region 2:
Clallam
Jefferson
Kitsap
Region 3:
Grays Harbor
Mason
Thurston
Pacific
Lewis
Region 4:
Wahkiakum
Cowlitz
Clark
Region 5:
Pierce
Region 6:
King
Region 7:
Chelan
Kittitas
Region 8:
Yakima
Benton
Walla Walla
Region 9:
Spokane
WSU Locations Including Number of (people) and [facilities]
By Homeland Security Region and County:
Regions Vulnerable to Flooding
Region 1:
Whatcom
Skagit
Snohomish
Region 3:
Grays Harbor
Mason
Thurston
Pacific
Lewis
Region 5:
Pierce
Region 6:
King
Region 4:
Cowlitz
Clark
ƒ•Š‹‰–‘–ƒ–‡‹˜‡”•‹–›ʹͲͲͺƒ‰‡Ǧͷ
”‡Ǧ‹•ƒ•–‡”ŽŽǦƒœƒ”†•‹–‹‰ƒ–‹‘Žƒ
WSU Locations Including Number of (people) and [facilities]
By Homeland Security Region and County:
Regions Vulnerable to Landslide
Region 1:
Whatcom
Skagit
Snohomish
Island
San Juan
Region 2:
Clallam
Jefferson
Kitsap
Region 3:
Grays Harbor
Mason
Thurston
Pacific
Lewis
Region 4:
Cowlitz
Clark
Skamania
Region 5:
Pierce
Region 6:
King
Region 7:
Okanogan
Chelan
Kittitas
Region 8:
Yakima
Klickitat
Walla Walla
Region 9:
Stevens
Ferry
Lincoln
Columbia
Garfield
Asotin
along
waterways
only
WSU Locations Including Number of (people) and [facilities]
By Homeland Security Region and County:
Regions Vulnerable to Wildland Fire
Region 1:
Whatcom
Skagit
Snohomish
San Juan
Island
Region 2:
Clallam
Jefferson
Kitsap
Region 3:
Mason
Thurston
Lewis
Pacific
Region 4:
Wahkiakum
Clark
Skamania
Region 5:
Pierce
Region 6:
King
Region 7:
Okanogan
Chelan
Kittitas
Region 8:
Yakima
Klickitat
Benton
Walla Walla
Region 9:
Ferry
Stevens
Pend Oreille
Lincoln
Spokane
Adams
Whitman
Columbia
Garfield
Asotin
ƒ•Š‹‰–‘–ƒ–‡‹˜‡”•‹–›ʹͲͲͺƒ‰‡Ǧ͸
”‡Ǧ‹•ƒ•–‡”ŽŽǦƒœƒ”†•‹–‹‰ƒ–‹‘Žƒ
WSU Locations Including Number of (people) and [facilities]
By Homeland Security Region and County:
Regions Vulnerable to High Winds
Region 1:
Whatcom
Skagit
Snohomish
San Juan
Island
Region 2:
Clallam
Jefferson
Kitsap
Region 3:
Grays Harbor
Mason
Thurston
Lewis
Pacific
Region 4:
Wahkiakum
Cowlitz
Clark
Region 5:
Pierce
Region 6:
King
Region 7:
Kittitas
Region 8:
Yakima
Benton
Walla Walla
Region 9:
Columbia
WSU Locations Including Number of (people) and [facilities]
By Homeland Security Region and County:
Regions Vulnerable to Severe Thunderstorm
Region 7:
Okanogan
Chelan
Douglas
Kittitas
Grant
Region 8:
Yakima
Klickitat
Benton
Franklin
Walla Walla
Region 9:
Ferry
Pend Oreille
Lincoln
Spokane
Adams
Whitman
Columbia
Garfield
Asotin
ƒ•Š‹‰–‘–ƒ–‡‹˜‡”•‹–›ʹͲͲͺƒ‰‡Ǧ͹
”‡Ǧ‹•ƒ•–‡”ŽŽǦƒœƒ”†•‹–‹‰ƒ–‹‘Žƒ
WSU Locations Including Number of (people) and [facilities]
By Homeland Security Region and County:
Regions Vulnerable to Winter Storm
Region 1:
Skagit
Snohomish
Region 3:
Mason
Thurston
Region 4:
Cowlitz
Clark
Skamania
Region 5:
Pierce
Region 6:
King
Region 7:
Okanogan
Douglas
Grant
Kittitas
Region 8:
Yakima
Franklin
Walla Walla
Region 9:
Spokane
Garfield
WSU Locations Including Number of (people) and [facilities]
By Homeland Security Region and County:
Regions Vulnerable to Blizzard
Region 1:
Whatcom
Region 4:
Skamania
Clark
Region 8:
Walla Walla
Region 9:
Ferry
Stevens
Pend Oreille
Lincoln
Adams
Whitman
Garfield
Asotin
Region 7:
Okanogan
Douglas
Kittitas
Grant
WSU Locations Including Number of (people) and [facilities]
By Homeland Security Region and County:
Regions Vulnerable to Dust Storm
Region 7:
Douglas
Grant
Region 8:
Yakima
Benton
Franklin
Walla Walla
Region 9:
Lincoln
Spokane
Adams
Whitman
Columbia
ƒ•Š‹‰–‘–ƒ–‡‹˜‡”•‹–›ʹͲͲͺƒ‰‡Ǧͺ
”‡Ǧ‹•ƒ•–‡”ŽŽǦƒœƒ”†•‹–‹‰ƒ–‹‘Žƒ
WSU Locations Including Number of (people) and [facilities]
By Homeland Security Region and County:
Regions Vulnerable to Coastal Flooding
Region 1:
Whatcom
Skagit
Snohomish
Island
San Juan
Region 2:
Clallam
Jefferson
Kitsap
Region 5:
Pierce
Region 6:
King
Region 3:
Grays Harbor
Thurston
Pacific
WSU Locations Including Number of (people) and [facilities]
By Homeland Security Region and County:
Regions Vulnerable to Tornado
Region 1:
Snohomish
Region 3:
Grays Harbor
Pacific
Region 4:
Cowlitz
Clark
Region 5:
Pierce
Region 6:
King
Region 7:
Okanogan
Grant
Region 8:
Yakima
Klickitat
Benton
Franklin
Walla Walla
Region 9:
Stevens
Pend Oreille
Lincoln
Spokane
Adams
Whitman
Columbia
Garfield
Asotin
ƒ•Š‹‰–‘–ƒ–‡‹˜‡”•‹–›ʹͲͲͺƒ‰‡Ǧͻ
”‡Ǧ‹•ƒ•–‡”ŽŽǦƒœƒ”†•‹–‹‰ƒ–‹‘Žƒ
ƒ•Š‹‰–‘–ƒ–‡‹˜‡”•‹–›ʹͲͲͺƒ‰‡Ǧ
ͳͲ
”‡Ǧ‹•ƒ•–‡”ŽŽǦƒœƒ”†•‹–‹‰ƒ–‹‘Žƒ
40
28
25
Severe Winter Storm
Crime
Loss of Electrical
Service
Island
Island
Island
1
Island
Island
County
1
1
1
Island County - REGION 1
All of Island County, like all of western Washington, is vulnerable to
damage and injuries from a large earthquake. The risk of an earthquake
occurring and impacting Island County is high. Oak Harbor and Langley
are both very close to known faults. Washington ranks second in the
nation after California among states susceptible to earthquake loss
according to a Federal Emergency Management Agency (FEMA) study.
The study predicts an annualized loss of $228 million. Seattle is seventh
and Tacoma is 22nd on a list of cities with more than $10 million in
annualized losses. Due to its location and proximity to Seattle, Island
County is likely to closely share Seattle’s probability of a major quake and
the resultant level of damage. Only Island County’s more rural economy
and lack of large buildings (more than two stories) and large population
concentrations would militate against catastrophic damage.
All of Island County remains vulnerable to severe rain, and high winds.
Past severe storms have adversely impacted island services and the
economy as well as causing large private property losses. Due to the
yearly risk of severe storms, local jurisdiction emergency plans should
address the warning and notification of the public, prioritization of roads
and streets to be cleared, provision of emergency services, mutual aid
with other public entities, procedures for requesting state and federal
assistance if needed. To prepare for severe local storms, local
jurisdictions should provide public information on emergency
preparedness and self-help.
HS
Region
Notes from County HazMit Plan
ƒ•Š‹‰–‘–ƒ–‡‹˜‡”•‹–›ʹͲͲͺƒ‰‡Ǧͳ
”‡Ǧ‹•ƒ•–‡”ŽŽǦƒœƒ”†•‹–‹‰ƒ–‹‘Žƒ
44
HazMit
20/20 Event
Rating
Earthquake
Event/Hazard
Appendix B – County Plan Comparison Charts
20
18
12
Telecommunication
System Failure
Civil Disturbance
Economic Crisis
The potential for civil disturbance exists in the county, but the risk of
occurrence is very low. There are no major population centers, large
government offices, large residential colleges, or penitentiaries. There
are no cities with large union memberships, capabilities for hosting world
venues, or large ethnic groups. There are no major sports teams. The
county jail is not large and is not currently overcrowded. The existence of
radical racial groups remains but their activity level is low. Therefore the
impact of any civil disturbance in the county would be considered low.
The west coast of Whidbey Island is vulnerable to an ocean or Puget
Sound tsunami. Camano Island and the east coast of Whidbey are
vulnerable to sieches. The risk or likelihood of a tsunami impacting on
Island County is considered low. Some predictions indicate that a
tsunami generated in Puget Sound would only produce a tsunami wave
height of seven feet, impacting only the tidal portions of Island County.
Many coastal areas of Island County are vulnerable to tidal flooding when
conditions are right. The risk of a flood occurring in any one year is high
while the magnitude of the flood will be restricted by the geography of the
islands. Floods cause loss of life and damage to structures, crops, land,
flood control structures, roads, and utilities. Flood damages in
Washington State exceed damages by all other natural hazards.
Developments within flood plains should be limited to non-structures such
as parks, golf courses, and farms. These facilities have the least potential
for damage, but maximize land use. The continued growth of Island
County makes it imperative to enact and enforce strong building
restrictions in likely flood areas.
Notes from County HazMit Plan
ƒ•Š‹‰–‘–ƒ–‡‹˜‡”•‹–›ʹͲͲͺƒ‰‡Ǧʹ
”‡Ǧ‹•ƒ•–‡”ŽŽǦƒœƒ”†•‹–‹‰ƒ–‹‘Žƒ
20
HazMit
20/20 Event
Rating
21
Storm surge,Tsunami
Flooding
Event/Hazard
Appendix B – County Plan Comparison Charts
1
1
1
1
1
HS
Region
Island
Island
Island
Island
Island
County
10
10
9
8
Radiological Incident
Hazardous Material
Event
Key Employer Crisis
Lightning
Island County is vulnerable to hazardous material spills and releases as
well as the effects of illegal dumping and disposal. Numerous hazardous
material incidents are reported every year although their magnitude and
impact have not been large. Aside from bulk fuel trucks, Island County
Does not face the HAZMAT dangers experienced in other counties with
railroad transport, major highways, and large ship port facilities.
Island County is vulnerable to wildland and interface fires. There is a
yearly risk of wildland fire, but most fires that due occur are small and
have little economic or safety impact to the county. However, the
continued building of new residences in Island County, many of which are
in forested areas with little or no separation from the surrounding forests,
increases the probability of interface fire and loss of property.
Notes from County HazMit Plan
ƒ•Š‹‰–‘–ƒ–‡‹˜‡”•‹–›ʹͲͲͺƒ‰‡Ǧ͵
”‡Ǧ‹•ƒ•–‡”ŽŽǦƒœƒ”†•‹–‹‰ƒ–‹‘Žƒ
11
HazMit
20/20 Event
Rating
12
Major Fire - Wildland
Loss of Water Service
Event/Hazard
Appendix B – County Plan Comparison Charts
1
1
1
1
1
1
HS
Region
Island
Island
Island
Island
Island
Island
County
4
4
2
Hail
Loss of Sewer Service
Loss of Gas Service
Island County is vulnerable to volcanic induced hazards. The risk of a
volcanic eruption in the Puget Sound area, while not zero is considered
low. Due to the relative locations of the Cascade volcanoes, Island
County, and the prevailing winds, the impact on Island County from
volcanic ash or other erupted material is considered to be low. However,
ash and chemical products in the Skagit River would contaminate a main
water supply to Oak Harbor and Whidbey Island Naval Air Station. Also
of concern, would be volcanic related earthquakes or tsunamis. Volcanic
eruption consequences to surrounding counties would also cause severe
impacts in Island County. That is, transportation interruptions, power
transmission interruptions, telecommunications outages, interruption of
deliveries of essential foods, medical services, and police coverage
would adversely impact Island County even if it was spared the direct
damage of volcanic activity.
Notes from County HazMit Plan
ƒ•Š‹‰–‘–ƒ–‡‹˜‡”•‹–›ʹͲͲͺƒ‰‡ǦͶ
”‡Ǧ‹•ƒ•–‡”ŽŽǦƒœƒ”†•‹–‹‰ƒ–‹‘Žƒ
7
HazMit
20/20 Event
Rating
8
Infestation, Diseases
Volcano Activity
Event/Hazard
Appendix B – County Plan Comparison Charts
Island
Island
1
1
Island
Island
Island
County
1
1
1
HS
Region
0
0
0
Landslide, Erosion
High Winds
Major Fire - Urban
Subsidence/Expansiv
e Soils
Island County is increasingly vulnerable to urban fires and the transition
to interface fire. Urban or residence fires occur frequently. While the
personal and economic impact at the scene of the fire is high, urban fires
due not represent a high overall impact on the county as a whole.
* The risk of a landslide occurring in the county in any one year is high
even if the size of most previous slides has been limited. Land stability
cannot be absolutely predicted with current technology. The best design
and construction measures are still vulnerable to slope failure. The
amount of protection, usually correlated to cost, is proportional to the
level of risk reduction. Debris and vegetation management is integral to
prevent landslide damages. Corrective measures help, but still leave the
property vulnerable to risk. By studying the effects of landslides in slideprone areas, we can plan for the future. More needs to be done to
educate the public and to prevent development in vulnerable areas.
* The least expensive and most effective landslide loss reduction
measure is avoidance. The next most economical solution is mitigation
using qualified expertise with an investigation report review process. The
most costly is repair of landslide damages. The cost of proper mitigation
is about one percent of the costs otherwise incurred through losses and
litigation.
Notes from County HazMit Plan
ƒ•Š‹‰–‘–ƒ–‡‹˜‡”•‹–›ʹͲͲͺƒ‰‡Ǧͷ
”‡Ǧ‹•ƒ•–‡”ŽŽǦƒœƒ”†•‹–‹‰ƒ–‹‘Žƒ
HazMit
20/20 Event
Rating
1
Event/Hazard
Appendix B – County Plan Comparison Charts
1
1
1
1
HS
Region
Island
Island
Island
Island
County
NR
HazMit
20/20 Event
Rating
0
* In every drought, agriculture is adversely impacted, especially in nonirrigated areas such as dry land farms and rangelands. Droughts impact
individuals (farm owners, tenants, and farm laborers), the agricultural
industry, and other agriculture-related sectors. Lack of snow pack has
decreased Cascade hydroelectric generating capacity and raised
electricity prices impacting Island County. There is also increased danger
of wildland and interface fires.
* Most areas of the county except Oak Harbor and NASWI depend on
well water. Oak Harbor and NASWI obtain some 92% of their water by
pipeline from the Anacortes water system that in turn gets it by pipeline
from the Skagit River. Drought conditions increase pressure on aquifers
and increased pumping can result in saltwater intrusion into fresh water
aquifers and reductions in, or restrictions on economic growth and
development.
* History suggests a high probability of drought occurrence and
reoccurrence with a probability of moderate drought conditions being
present 5 to 10% of the time.
Island County is vulnerable to terrorism. While the county has few of the
structures or activities that attract political terrorists the risk remains high.
Many terrorist targets are related to urban settings or other built up areas.
Island County’s largely rural setting, low population concentration, and
lack of significant governmental (except Whidbey Island NAS) or cultural
sites makes it less attractive to most terrorists, but does not eliminate the
threat of some type of terrorist activity or threat. Of more significance to
the county as a whole is the effect of cyberterrorism which presents a
constant risk and could seriously impact county services and economy.
For this reason, the impact of terrorism on the county cannot be rated at
less than moderate.
Notes from County HazMit Plan
ƒ•Š‹‰–‘–ƒ–‡‹˜‡”•‹–›ʹͲͲͺƒ‰‡Ǧ͸
”‡Ǧ‹•ƒ•–‡”ŽŽǦƒœƒ”†•‹–‹‰ƒ–‹‘Žƒ
Terrorism
Drought
Event/Hazard
Appendix B – County Plan Comparison Charts
1
1
HS
Region
Island
Island
County
44
HazMit
20/20 Event
Rating
NR
All of Island County, like all of western Washington, is vulnerable to
damage and injuries from a large earthquake. The risk of an earthquake
occurring and impacting Island County is high. Oak Harbor and Langley
are both very close to known faults. Washington ranks second in the
nation after California among states susceptible to earthquake loss
according to a Federal Emergency Management Agency (FEMA) study.
The study predicts an annualized loss of $228 million. Seattle is seventh
and Tacoma is 22nd on a list of cities with more than $10 million in
annualized losses. Due to its location and proximity to Seattle, Island
County is likely to closely share Seattle’s probability of a major quake and
the resultant level of damage. Only Island County’s more rural economy
and lack of large buildings (more than two stories) and large population
concentrations would militate against catastrophic damage.
* Maritime: The Puget Sound makes Island County vulnerable to
recreational, commercial boating and ferry accidents. A ferry accident
could result in a mass rescue or casualty situation.
* Air: At this time there is no commuter airline to or from Whidbey or
Camano Islands. The number of private airplane accidents in recent
years is remarkable for the fact that there have been no injuries on the
ground or serious property damage. The crash of a military aircraft with
fuel, munitions, or classified material requires the support of explosive
ordinance disposal or military security. An airplane crash in a remote
area of the county or in the water creates a search and rescue situation.
Notes from County HazMit Plan
ƒ•Š‹‰–‘–ƒ–‡‹˜‡”•‹–›ʹͲͲͺƒ‰‡Ǧ͹
”‡Ǧ‹•ƒ•–‡”ŽŽǦƒœƒ”†•‹–‹‰ƒ–‹‘Žƒ
Earthquake
Transportation
Event/Hazard
Appendix B – County Plan Comparison Charts
1
1
HS
Region
Island
Island
County
25
24
Severe Winter Storm
Crime
All of Island County remains vulnerable to severe rain, and high winds.
Past severe storms have adversely impacted island services and the
economy as well as causing large private property losses. Due to the
yearly risk of severe storms, local jurisdiction emergency plans should
address the warning and notification of the public, prioritization of roads
and streets to be cleared, provision of emergency services, mutual aid
with other public entities, procedures for requesting state and federal
assistance if needed. To prepare for severe local storms, local
jurisdictions should provide public information on emergency
preparedness and self-help.
The west coast of Whidbey Island is vulnerable to an ocean or Puget
Sound tsunami. Camano Island and the east coast of Whidbey are
vulnerable to sieches. The risk or likelihood of a tsunami impacting on
Island County is considered low. Some predictions indicate that a
tsunami generated in Puget Sound would only produce a tsunami wave
height of seven feet, impacting only the tidal portions of Island County.
Many coastal areas of Island County are vulnerable to tidal flooding when
conditions are right. The risk of a flood occurring in any one year is high
while the magnitude of the flood will be restricted by the geography of the
islands. Floods cause loss of life and damage to structures, crops, land,
flood control structures, roads, and utilities. Flood damages in
Washington State exceed damages by all other natural hazards.
Developments within flood plains should be limited to non-structures such
as parks, golf courses, and farms. These facilities have the least potential
for damage, but maximize land use. The continued growth of Island
County makes it imperative to enact and enforce strong building
restrictions in likely flood areas.
Notes from County HazMit Plan
ƒ•Š‹‰–‘–ƒ–‡‹˜‡”•‹–›ʹͲͲͺƒ‰‡Ǧͺ
”‡Ǧ‹•ƒ•–‡”ŽŽǦƒœƒ”†•‹–‹‰ƒ–‹‘Žƒ
28
HazMit
20/20 Event
Rating
33
Storm surge,Tsunami
Flooding
Event/Hazard
Appendix B – County Plan Comparison Charts
1
1
1
1
HS
Region
Island
Island
Island
Island
County
12
12
Economic Crisis
Drought
* In every drought, agriculture is adversely impacted, especially in nonirrigated areas such as dry land farms and rangelands. Droughts impact
individuals (farm owners, tenants, and farm laborers), the agricultural
industry, and other agriculture-related sectors. Lack of snow pack has
decreased Cascade hydroelectric generating capacity and raised
electricity prices impacting Island County. There is also increased danger
of wildland and interface fires.
* Most areas of the county except Oak Harbor and NASWI depend on
well water. Oak Harbor and NASWI obtain some 92% of their water by
pipeline from the Anacortes water system that in turn gets it by pipeline
from the Skagit River. Drought conditions increase pressure on aquifers
and increased pumping can result in saltwater intrusion into fresh water
aquifers and reductions in, or restrictions on economic growth and
development.
* History suggests a high probability of drought occurrence and
reoccurrence with a probability of moderate drought conditions being
present 5 to 10% of the time.
The potential for civil disturbance exists in the county, but the risk of
occurrence is very low. There are no major population centers, large
government offices, large residential colleges, or penitentiaries. There
are no cities with large union memberships, capabilities for hosting world
venues, or large ethnic groups. There are no major sports teams. The
county jail is not large and is not currently overcrowded. The existence of
radical racial groups remains but their activity level is low. Therefore the
impact of any civil disturbance in the county would be considered low.
Island County is increasingly vulnerable to urban fires and the transition
to interface fire. Urban or residence fires occur frequently. While the
personal and economic impact at the scene of the fire is high, urban fires
due not represent a high overall impact on the county as a whole.
Notes from County HazMit Plan
ƒ•Š‹‰–‘–ƒ–‡‹˜‡”•‹–›ʹͲͲͺƒ‰‡Ǧͻ
”‡Ǧ‹•ƒ•–‡”ŽŽǦƒœƒ”†•‹–‹‰ƒ–‹‘Žƒ
21
HazMit
20/20 Event
Rating
24
Civil Disturbance
Major Fire - Urban
Event/Hazard
Appendix B – County Plan Comparison Charts
1
1
1
1
HS
Region
Island
Island
Island
Island
County
8
8
6
6
Lightning
Infestation, Diseases
Hail
Subsidence/Expansiv
e Soils
Island County is vulnerable to volcanic induced hazards. The risk of a
volcanic eruption in the Puget Sound area, while not zero is considered
low. Due to the relative locations of the Cascade volcanoes, Island
County, and the prevailing winds, the impact on Island County from
volcanic ash or other erupted material is considered to be low. However,
ash and chemical products in the Skagit River would contaminate a main
water supply to Oak Harbor and Whidbey Island Naval Air Station. Also
of concern, would be volcanic related earthquakes or tsunamis. Volcanic
eruption consequences to surrounding counties would also cause severe
impacts in Island County. That is, transportation interruptions, power
transmission interruptions, telecommunications outages, interruption of
deliveries of essential foods, medical services, and police coverage
would adversely impact Island County even if it was spared the direct
damage of volcanic activity.
Island County is vulnerable to hazardous material spills and releases as
well as the effects of illegal dumping and disposal. Numerous hazardous
material incidents are reported every year although their magnitude and
impact have not been large. Aside from bulk fuel trucks, Island County
Does not face the HAZMAT dangers experienced in other counties with
railroad transport, major highways, and large ship port facilities.
Notes from County HazMit Plan
ƒ•Š‹‰–‘–ƒ–‡‹˜‡”•‹–›ʹͲͲͺƒ‰‡ǦͳͲ
”‡Ǧ‹•ƒ•–‡”ŽŽǦƒœƒ”†•‹–‹‰ƒ–‹‘Žƒ
9
10
Volcano Activity
Key Employer Crisis
10
HazMit
20/20 Event
Rating
11
Radiological Incident
Hazardous Material
Event
Event/Hazard
Appendix B – County Plan Comparison Charts
Island
Island
Island
Island
Island
1
1
1
Island
Island
Island
County
1
1
1
1
1
HS
Region
4
4
1
1
High Winds
Landslide, Erosion
Loss of Gas Service
Major Fire - Wildland
Island County is vulnerable to wildland and interface fires. There is a
yearly risk of wildland fire, but most fires that due occur are small and
have little economic or safety impact to the county. However, the
continued building of new residences in Island County, many of which are
in forested areas with little or no separation from the surrounding forests,
increases the probability of interface fire and loss of property.
* The risk of a landslide occurring in the county in any one year is high
even if the size of most previous slides has been limited. Land stability
cannot be absolutely predicted with current technology. The best design
and construction measures are still vulnerable to slope failure. The
amount of protection, usually correlated to cost, is proportional to the
level of risk reduction. Debris and vegetation management is integral to
prevent landslide damages. Corrective measures help, but still leave the
property vulnerable to risk. By studying the effects of landslides in slideprone areas, we can plan for the future. More needs to be done to
educate the public and to prevent development in vulnerable areas.
* The least expensive and most effective landslide loss reduction
measure is avoidance. The next most economical solution is mitigation
using qualified expertise with an investigation report review process. The
most costly is repair of landslide damages. The cost of proper mitigation
is about one percent of the costs otherwise incurred through losses and
litigation.
Notes from County HazMit Plan
ƒ•Š‹‰–‘–ƒ–‡‹˜‡”•‹–›ʹͲͲͺƒ‰‡Ǧͳͳ
”‡Ǧ‹•ƒ•–‡”ŽŽǦƒœƒ”†•‹–‹‰ƒ–‹‘Žƒ
4
HazMit
20/20 Event
Rating
5
Loss of Water Service
Loss of Electrical
Service
Event/Hazard
Appendix B – County Plan Comparison Charts
1
1
1
1
1
1
HS
Region
Island
Island
Island
Island
Island
Island
County
NR
Transportation
* Maritime: The Puget Sound makes Island County vulnerable to
recreational, commercial boating and ferry accidents. A ferry accident
could result in a mass rescue or casualty situation.
* Air: At this time there is no commuter airline to or from Whidbey or
Camano Islands. The number of private airplane accidents in recent
years is remarkable for the fact that there have been no injuries on the
ground or serious property damage. The crash of a military aircraft with
fuel, munitions, or classified material requires the support of explosive
ordinance disposal or military security. An airplane crash in a remote
area of the county or in the water creates a search and rescue situation.
Island County is vulnerable to terrorism. While the county has few of the
structures or activities that attract political terrorists the risk remains high.
Many terrorist targets are related to urban settings or other built up areas.
Island County’s largely rural setting, low population concentration, and
lack of significant governmental (except Whidbey Island NAS) or cultural
sites makes it less attractive to most terrorists, but does not eliminate the
threat of some type of terrorist activity or threat. Of more significance to
the county as a whole is the effect of cyberterrorism which presents a
constant risk and could seriously impact county services and economy.
For this reason, the impact of terrorism on the county cannot be rated at
less than moderate.
Notes from County HazMit Plan
ƒ•Š‹‰–‘–ƒ–‡‹˜‡”•‹–›ʹͲͲͺƒ‰‡Ǧͳʹ
”‡Ǧ‹•ƒ•–‡”ŽŽǦƒœƒ”†•‹–‹‰ƒ–‹‘Žƒ
NR
0
HazMit
20/20 Event
Rating
0
Terrorism
Telecommunication
System Failure
Loss of Sewer Service
Event/Hazard
Appendix B – County Plan Comparison Charts
1
1
1
1
HS
Region
Island
Island
Island
Island
County
25
24
Loss of Electrical
Service
Major Fire -Wildland
Island County is vulnerable to wildland and interface fires. There is a
yearly risk of wildland fire, but most fires that due occur are small and
have little economic or safety impact to the county. However, the
continued building of new residences in Island County, many of which are
in forested areas with little or no separation from the surrounding forests,
increases the probability of interface fire and loss of property.
The west coast of Whidbey Island is vulnerable to an ocean or Puget
Sound tsunami. Camano Island and the east coast of Whidbey are
vulnerable to sieches. The risk or likelihood of a tsunami impacting on
Island County is considered low. Some predictions indicate that a
tsunami generated in Puget Sound would only produce a tsunami wave
height of seven feet, impacting only the tidal portions of Island County.
All of Island County, like all of western Washington, is vulnerable to
damage and injuries from a large earthquake. The risk of an earthquake
occurring and impacting Island County is high. Oak Harbor and Langley
are both very close to known faults. Washington ranks second in the
nation after California among states susceptible to earthquake loss
according to a Federal Emergency Management Agency (FEMA) study.
The study predicts an annualized loss of $228 million. Seattle is seventh
and Tacoma is 22nd on a list of cities with more than $10 million in
annualized losses. Due to its location and proximity to Seattle, Island
County is likely to closely share Seattle’s probability of a major quake and
the resultant level of damage. Only Island County’s more rural economy
and lack of large buildings (more than two stories) and large population
concentrations would militate against catastrophic damage.
Notes from County HazMit Plan
ƒ•Š‹‰–‘–ƒ–‡‹˜‡”•‹–›ʹͲͲͺƒ‰‡Ǧͳ͵
”‡Ǧ‹•ƒ•–‡”ŽŽǦƒœƒ”†•‹–‹‰ƒ–‹‘Žƒ
32
HazMit
20/20 Event
Rating
40
Storm surge,Tsunami
Earthquake
Event/Hazard
Appendix B – County Plan Comparison Charts
1
1
1
1
HS
Region
Island
Island
Island
Island
County
20
18
High Winds
Flooding
Many coastal areas of Island County are vulnerable to tidal flooding when
conditions are right. The risk of a flood occurring in any one year is high
while the magnitude of the flood will be restricted by the geography of the
islands. Floods cause loss of life and damage to structures, crops, land,
flood control structures, roads, and utilities. Flood damages in
Washington State exceed damages by all other natural hazards.
Developments within flood plains should be limited to non-structures such
as parks, golf courses, and farms. These facilities have the least potential
for damage, but maximize land use. The continued growth of Island
County makes it imperative to enact and enforce strong building
restrictions in likely flood areas.
* The risk of a landslide occurring in the county in any one year is high
even if the size of most previous slides has been limited. Land stability
cannot be absolutely predicted with current technology. The best design
and construction measures are still vulnerable to slope failure. The
amount of protection, usually correlated to cost, is proportional to the
level of risk reduction. Debris and vegetation management is integral to
prevent landslide damages. Corrective measures help, but still leave the
property vulnerable to risk. By studying the effects of landslides in slideprone areas, we can plan for the future. More needs to be done to
educate the public and to prevent development in vulnerable areas.
* The least expensive and most effective landslide loss reduction
measure is avoidance. The next most economical solution is mitigation
using qualified expertise with an investigation report review process. The
most costly is repair of landslide damages. The cost of proper mitigation
is about one percent of the costs otherwise incurred through losses and
litigation.
Notes from County HazMit Plan
ƒ•Š‹‰–‘–ƒ–‡‹˜‡”•‹–›ʹͲͲͺƒ‰‡ǦͳͶ
”‡Ǧ‹•ƒ•–‡”ŽŽǦƒœƒ”†•‹–‹‰ƒ–‹‘Žƒ
20
HazMit
20/20 Event
Rating
22
Telecommunication
System Failure
Landslide, Erosion
Event/Hazard
Appendix B – County Plan Comparison Charts
1
1
1
1
HS
Region
Island
Island
Island
Island
County
10
10
7
6
6
Crime
Lightning
Hail
Loss of Water Service
Infestation, Diseases
Radiological Incident
Hazardous Material
Event
Volcano Activity
Loss Sewer Service
Island County is vulnerable to volcanic induced hazards. The risk of a
volcanic eruption in the Puget Sound area, while not zero is considered
low. Due to the relative locations of the Cascade volcanoes, Island
County, and the prevailing winds, the impact on Island County from
volcanic ash or other erupted material is considered to be low. However,
ash and chemical products in the Skagit River would contaminate a main
water supply to Oak Harbor and Whidbey Island Naval Air Station. Also
of concern, would be volcanic related earthquakes or tsunamis. Volcanic
eruption consequences to surrounding counties would also cause severe
impacts in Island County. That is, transportation interruptions, power
transmission interruptions, telecommunications outages, interruption of
deliveries of essential foods, medical services, and police coverage
would adversely impact Island County even if it was spared the direct
damage of volcanic activity.
Island County is vulnerable to hazardous material spills and releases as
well as the effects of illegal dumping and disposal. Numerous hazardous
material incidents are reported every year although their magnitude and
impact have not been large. Aside from bulk fuel trucks, Island County
Does not face the HAZMAT dangers experienced in other counties with
railroad transport, major highways, and large ship port facilities.
Notes from County HazMit Plan
ƒ•Š‹‰–‘–ƒ–‡‹˜‡”•‹–›ʹͲͲͺƒ‰‡Ǧͳͷ
”‡Ǧ‹•ƒ•–‡”ŽŽǦƒœƒ”†•‹–‹‰ƒ–‹‘Žƒ
HazMit
20/20 Event
Rating
16
15
12
12
Event/Hazard
Appendix B – County Plan Comparison Charts
1
1
1
1
Island
Island
Island
Island
Island
Island
1
1
Island
Island
Island
County
1
1
1
HS
Region
3
3
3
0
Economic Crisis
Loss of Gas Service
Key Employer Crisis
Major Fire - Urban
Island County is increasingly vulnerable to urban fires and the transition
to interface fire. Urban or residence fires occur frequently. While the
personal and economic impact at the scene of the fire is high, urban fires
due not represent a high overall impact on the county as a whole.
The potential for civil disturbance exists in the county, but the risk of
occurrence is very low. There are no major population centers, large
government offices, large residential colleges, or penitentiaries. There
are no cities with large union memberships, capabilities for hosting world
venues, or large ethnic groups. There are no major sports teams. The
county jail is not large and is not currently overcrowded. The existence of
radical racial groups remains but their activity level is low. Therefore the
impact of any civil disturbance in the county would be considered low.
All of Island County remains vulnerable to severe rain, and high winds.
Past severe storms have adversely impacted island services and the
economy as well as causing large private property losses. Due to the
yearly risk of severe storms, local jurisdiction emergency plans should
address the warning and notification of the public, prioritization of roads
and streets to be cleared, provision of emergency services, mutual aid
with other public entities, procedures for requesting state and federal
assistance if needed. To prepare for severe local storms, local
jurisdictions should provide public information on emergency
preparedness and self-help.
Notes from County HazMit Plan
ƒ•Š‹‰–‘–ƒ–‡‹˜‡”•‹–›ʹͲͲͺƒ‰‡Ǧͳ͸
”‡Ǧ‹•ƒ•–‡”ŽŽǦƒœƒ”†•‹–‹‰ƒ–‹‘Žƒ
4
5
HazMit
20/20 Event
Rating
5
Subsidence/Expansiv
e Soils
Civil Disturbance
Severe Winter Storm
Event/Hazard
Appendix B – County Plan Comparison Charts
1
Island
Island
Island
1
1
Island
Island
Island
Island
County
1
1
1
1
HS
Region
NR
HazMit
20/20 Event
Rating
0
* In every drought, agriculture is adversely impacted, especially in nonirrigated areas such as dry land farms and rangelands. Droughts impact
individuals (farm owners, tenants, and farm laborers), the agricultural
industry, and other agriculture-related sectors. Lack of snow pack has
decreased Cascade hydroelectric generating capacity and raised
electricity prices impacting Island County. There is also increased danger
of wildland and interface fires.
* Most areas of the county except Oak Harbor and NASWI depend on
well water. Oak Harbor and NASWI obtain some 92% of their water by
pipeline from the Anacortes water system that in turn gets it by pipeline
from the Skagit River. Drought conditions increase pressure on aquifers
and increased pumping can result in saltwater intrusion into fresh water
aquifers and reductions in, or restrictions on economic growth and
development.
* History suggests a high probability of drought occurrence and
reoccurrence with a probability of moderate drought conditions being
present 5 to 10% of the time.
Island County is vulnerable to terrorism. While the county has few of the
structures or activities that attract political terrorists the risk remains high.
Many terrorist targets are related to urban settings or other built up areas.
Island County’s largely rural setting, low population concentration, and
lack of significant governmental (except Whidbey Island NAS) or cultural
sites makes it less attractive to most terrorists, but does not eliminate the
threat of some type of terrorist activity or threat. Of more significance to
the county as a whole is the effect of cyberterrorism which presents a
constant risk and could seriously impact county services and economy.
For this reason, the impact of terrorism on the county cannot be rated at
less than moderate.
Notes from County HazMit Plan
ƒ•Š‹‰–‘–ƒ–‡‹˜‡”•‹–›ʹͲͲͺƒ‰‡Ǧͳ͹
”‡Ǧ‹•ƒ•–‡”ŽŽǦƒœƒ”†•‹–‹‰ƒ–‹‘Žƒ
Terrorism
Drought
Event/Hazard
Appendix B – County Plan Comparison Charts
1
1
HS
Region
Island
Island
County
This plan assumes that after an emergency or disaster has occurred that:
a safe location can be found for coordination of response and recovery
activities; resources are available; and trained personnel exist to
establish command and control and to implement plans and procedures.
Infestation, Disease
ƒ•Š‹‰–‘–ƒ–‡‹˜‡”•‹–›ʹͲͲͺƒ‰‡Ǧͳͺ
”‡Ǧ‹•ƒ•–‡”ŽŽǦƒœƒ”†•‹–‹‰ƒ–‹‘Žƒ
This plan assumes that after an emergency or disaster has occurred that:
a safe location can be found for coordination of response and recovery
activities; resources are available; and trained personnel exist to
establish command and control and to implement plans and procedures.
Earthquake
Skagit County - REGION 1
This plan assumes that after an emergency or disaster has occurred that:
a safe location can be found for coordination of response and recovery
activities; resources are available; and trained personnel exist to
establish command and control and to implement plans and procedures.
* Maritime: The Puget Sound makes Island County vulnerable to
recreational, commercial boating and ferry accidents. A ferry accident
could result in a mass rescue or casualty situation.
* Air: At this time there is no commuter airline to or from Whidbey or
Camano Islands. The number of private airplane accidents in recent
years is remarkable for the fact that there have been no injuries on the
ground or serious property damage. The crash of a military aircraft with
fuel, munitions, or classified material requires the support of explosive
ordinance disposal or military security. An airplane crash in a remote
area of the county or in the water creates a search and rescue situation.
Notes from County HazMit Plan
This plan assumes that after an emergency or disaster has occurred that:
a safe location can be found for coordination of response and recovery
activities; resources are available; and trained personnel exist to
establish command and control and to implement plans and procedures.
HazMit
20/20 Event
Rating
NR
Storm surge, Tsunami
High Winds
Transportation
Event/Hazard
Appendix B – County Plan Comparison Charts
1
1
1
1
1
1
HS
Region
Skagit
Skagit
Skagit
Skagit
Island
Skagit
County
This plan assumes that after an emergency or disaster has occurred that:
a safe location can be found for coordination of response and recovery
activities; resources are available; and trained personnel exist to
establish command and control and to implement plans and procedures.
This plan assumes that after an emergency or disaster has occurred that:
a safe location can be found for coordination of response and recovery
activities; resources are available; and trained personnel exist to
establish command and control and to implement plans and procedures.
This plan assumes that after an emergency or disaster has occurred that:
a safe location can be found for coordination of response and recovery
activities; resources are available; and trained personnel exist to
establish command and control and to implement plans and procedures.
This plan assumes that after an emergency or disaster has occurred that:
a safe location can be found for coordination of response and recovery
activities; resources are available; and trained personnel exist to
establish command and control and to implement plans and procedures.
This plan assumes that after an emergency or disaster has occurred that:
a safe location can be found for coordination of response and recovery
activities; resources are available; and trained personnel exist to
establish command and control and to implement plans and procedures.
Key Employer Crisis
Civil Disturbance
Crime
Loss of Sewer Service
Radiological Incident
ƒ•Š‹‰–‘–ƒ–‡‹˜‡”•‹–›ʹͲͲͺƒ‰‡Ǧͳͻ
”‡Ǧ‹•ƒ•–‡”ŽŽǦƒœƒ”†•‹–‹‰ƒ–‹‘Žƒ
This plan assumes that after an emergency or disaster has occurred that:
a safe location can be found for coordination of response and recovery
activities; resources are available; and trained personnel exist to
establish command and control and to implement plans and procedures.
Economic Crisis
Notes from County HazMit Plan
This plan assumes that after an emergency or disaster has occurred that:
a safe location can be found for coordination of response and recovery
activities; resources are available; and trained personnel exist to
establish command and control and to implement plans and procedures.
HazMit
20/20 Event
Rating
Severe Winter Storm
Event/Hazard
Appendix B – County Plan Comparison Charts
1
1
1
1
1
1
1
HS
Region
Skagit
Skagit
Skagit
Skagit
Skagit
Skagit
Skagit
County
This plan assumes that after an emergency or disaster has occurred that:
a safe location can be found for coordination of response and recovery
activities; resources are available; and trained personnel exist to
establish command and control and to implement plans and procedures.
This plan assumes that after an emergency or disaster has occurred that:
a safe location can be found for coordination of response and recovery
activities; resources are available; and trained personnel exist to
establish command and control and to implement plans and procedures.
This plan assumes that after an emergency or disaster has occurred that:
a safe location can be found for coordination of response and recovery
activities; resources are available; and trained personnel exist to
establish command and control and to implement plans and procedures.
This plan assumes that after an emergency or disaster has occurred that:
a safe location can be found for coordination of response and recovery
activities; resources are available; and trained personnel exist to
establish command and control and to implement plans and procedures.
This plan assumes that after an emergency or disaster has occurred that:
a safe location can be found for coordination of response and recovery
activities; resources are available; and trained personnel exist to
establish command and control and to implement plans and procedures.
Loss of Electrical
Service
Loss of Gas Service
Hazardous Materials
Event
Subsidence/Expansiv
e Soils
Major Fire - Wildland
ƒ•Š‹‰–‘–ƒ–‡‹˜‡”•‹–›ʹͲͲͺƒ‰‡ǦʹͲ
”‡Ǧ‹•ƒ•–‡”ŽŽǦƒœƒ”†•‹–‹‰ƒ–‹‘Žƒ
This plan assumes that after an emergency or disaster has occurred that:
a safe location can be found for coordination of response and recovery
activities; resources are available; and trained personnel exist to
establish command and control and to implement plans and procedures.
Loss of Water Service
Notes from County HazMit Plan
This plan assumes that after an emergency or disaster has occurred that:
a safe location can be found for coordination of response and recovery
activities; resources are available; and trained personnel exist to
establish command and control and to implement plans and procedures.
HazMit
20/20 Event
Rating
Telecommunications
System Failure
Event/Hazard
Appendix B – County Plan Comparison Charts
1
1
1
1
1
1
1
HS
Region
Skagit
Skagit
Skagit
Skagit
Skagit
Skagit
Skagit
County
This plan assumes that after an emergency or disaster has occurred that:
a safe location can be found for coordination of response and recovery
activities; resources are available; and trained personnel exist to
establish command and control and to implement plans and procedures.
This plan assumes that after an emergency or disaster has occurred that:
a safe location can be found for coordination of response and recovery
activities; resources are available; and trained personnel exist to
establish command and control and to implement plans and procedures.
This plan assumes that after an emergency or disaster has occurred that:
a safe location can be found for coordination of response and recovery
activities; resources are available; and trained personnel exist to
establish command and control and to implement plans and procedures.
Major Fire - Urban
Volcano Activity
Flooding
ƒ•Š‹‰–‘–ƒ–‡‹˜‡”•‹–›ʹͲͲͺƒ‰‡Ǧʹͳ
”‡Ǧ‹•ƒ•–‡”ŽŽǦƒœƒ”†•‹–‹‰ƒ–‹‘Žƒ
Snohomish County - REGION 1
This plan assumes that after an emergency or disaster has occurred that:
a safe location can be found for coordination of response and recovery
activities; resources are available; and trained personnel exist to
establish command and control and to implement plans and procedures.
Drought
10
This plan assumes that after an emergency or disaster has occurred that:
a safe location can be found for coordination of response and recovery
activities; resources are available; and trained personnel exist to
establish command and control and to implement plans and procedures.
Hail
High Winds
This plan assumes that after an emergency or disaster has occurred that:
a safe location can be found for coordination of response and recovery
activities; resources are available; and trained personnel exist to
establish command and control and to implement plans and procedures.
Landslide, Erosion
Notes from County HazMit Plan
This plan assumes that after an emergency or disaster has occurred that:
a safe location can be found for coordination of response and recovery
activities; resources are available; and trained personnel exist to
establish command and control and to implement plans and procedures.
HazMit
20/20 Event
Rating
Lightning
Event/Hazard
Appendix B – County Plan Comparison Charts
1
1
1
1
1
1
1
1
1
HS
Region
Skagit
Snohomish
Snohomish
Skagit
Skagit
Skagit
Skagit
Skagit
Skagit
County
10
Crime
Major Fire - Wildland
Hazardous Materials
Event
Telecommunications
System Failure
1
Since 1979 Snohomish County has experience only 2 forest fires of 100
acres or more, a 750 acre fire in Marblemount area during the El Nino
summer of 1997 was attributed to a lengthened growing season, warmer
than usual temps and heavy windfalls from previous years storms.
Washington State Dep't of Natural Resources has records of 845
wildland fires dating back to 1970, the federal gov. has records of 210
fires in federal forests in Snohomish County since 1987. Warning time in
Mt Baker - Snoqualmie National Forest is reasonably rapid. Reliable
National Weather Service lightning warnings are available on avg 24 - 48
hours prior to a significant electrical storm. Forest Service is to eliminate
fire watch towers in the area due to the rapid spread of two way radios
and cell phones.
The most significan source of severe weather include, freezing rain,
severe local storms, snowstorms, thunderstorms, tornado, and
windstorms. At this time, the frequency of major snow storms are
typically one every 10 years, Ice Storms are also infrequent, but have a
higher degree of probability than snowstorms. Windstorms, can usually
be predicted more accurately than other local storms. Snohomish
County can expect to experience at least one windstorm each year. The
probability of a severe storm occurring in Snohomish County is very likely
during any season depending on localized pressure differences and
larger air mass movements aloft. Secondary hazards include landslides
from floods, downed power lines, flooding from severe snowmelt.
Notes from County HazMit Plan
ƒ•Š‹‰–‘–ƒ–‡‹˜‡”•‹–›ʹͲͲͺƒ‰‡Ǧʹʹ
”‡Ǧ‹•ƒ•–‡”ŽŽǦƒœƒ”†•‹–‹‰ƒ–‹‘Žƒ
Loss of Water Service
5
10
Severe Winter Storm
1
HazMit
20/20 Event
Rating
10
Event/Hazard
Appendix B – County Plan Comparison Charts
1
1
1
1
1
1
HS
Region
Snohomish
Snohomish
Snohomish
Snohomish
Snohomish
Snohomish
County
0
2
2
1
1
1
Lightning
Economic Crisis
Infestation, Disease
Drought
Hail
Flooding
Human activities and settlements tend to use floodplains, frequently
interfering with the natural processes, and suffering inconveniences or
catastrophe as a result. Human activities, encroach upon floodplains,
affecting the distribution and timing of drainage, thereby increasing flood
problems. This increases flood potential in two ways 1) it reduces the
stream's capacity to contain flows, and 2) increases flow rates
downstream.
The Puget Sound area, including Snohomish County, I sin a higher -risk
area, with a 2% probability in a 50 year period of ground shaking from a
subduction zone event exceeding 70% of gravity. A subduction zone
earthquake could produce an earthquake with a magnitude as large as
an 8.5 in Snohomish County. Although the amount of information known
about possible earthquake locations, little is known about how to predict
the time, day or month in which an earthquake will occur at any given
place.
Notes from County HazMit Plan
ƒ•Š‹‰–‘–ƒ–‡‹˜‡”•‹–›ʹͲͲͺƒ‰‡Ǧʹ͵
”‡Ǧ‹•ƒ•–‡”ŽŽǦƒœƒ”†•‹–‹‰ƒ–‹‘Žƒ
1
Major Fire - Urban
10
2
Key Employer Crisis
Earthquake
1
HazMit
20/20 Event
Rating
1
Loss of Sewer Service
Loss of Electrical
Service
Event/Hazard
Appendix B – County Plan Comparison Charts
Snohomish
Snohomish
Snohomish
Snohomish
1
1
1
1
Snohomish
Snohomish
Snohomish
Snohomish
Snohomish
Snohomish
Snohomish
County
1
1
1
1
1
1
1
HS
Region
1
2
0
Civil Disturbance
Radiological Incident
Landslide, Erosion
The cool, rainy PNW climate ensures that soil moisture levels remain
high throughout most of the year, and are often at or near saturation
during the wetter winter months. The regions topography reflects glacial
carving, and differential erosion of weaker sediments. The most active
erosive processes during this period has been mass wasting. This is the
action of landslides and mudslides. The vulnerable natural setting is
being invaded by human residential, agriculture, commercial and
industrial development and the infrastructure that supports it. Mass
movement can occur suddenly or slowly. Methods used to monitor mass
movement can provide an idea of type of movement and amount of time
prior to failure.
Three major Cascade volcanoes are relatively close to Snohomish
County. Mount Rainer is 60 miles South, Mt St. Helens is 110 miles
South, and Mt Baker is 35 miles North. Mt Adams is 110 miles south of
the county on the east side of the Cascade range, and Mt Hood (N.
Oregon) pose a lower threats because of the distance and direction of
prevailing winds. Constant monitoring of all active volcanoes means that
there will be more than adequate time for evacuation before an event.
Since 1980, Mt St. Helens has settled into a pattern of intermittent,
moderate and generally non-explosive activity, the severity of tephra,
explosions, and lava flows have diminished. Since volcanic episodes
have been fairly predictable in the recent past, there is probably not as
much concern about loss of life, but there is more concern with loss of
property, infrastructure and severe environmental impacts.
Notes from County HazMit Plan
ƒ•Š‹‰–‘–ƒ–‡‹˜‡”•‹–›ʹͲͲͺƒ‰‡ǦʹͶ
”‡Ǧ‹•ƒ•–‡”ŽŽǦƒœƒ”†•‹–‹‰ƒ–‹‘Žƒ
2
HazMit
20/20 Event
Rating
1
Subsidence/Expansiv
e Soils
Volcano Activity
Event/Hazard
Appendix B – County Plan Comparison Charts
Snohomish
Snohomish
1
1
Snohomish
Snohomish
Snohomish
County
1
1
1
HS
Region
0
Infestation Disease
Floods are the most common of natural disasters in Whatcom County.
Flooding may be experienced after prolonged or heavy rains, snow
thawing, dam failure. Most typically, river flooding occurs in association
with a rain-on-snow event. Whatcom County is also vulnerable to
avalanches and glacial melt. Homes in the flood plain areas can have
had several inches of water in their basements as a result of groundwater
seepage through basement walls even without deep floodwaters.
Electrocution, structural collapse, hazardous materials leaks, and fire are
secondary hazards associated with flooding and flood cleanup.
Whatcom County - REGION 1
Should a tsunami occur, the affected area would be below the 70-foot
contour line, the estimate based on estimations from the Washington
Dept. of Natural Resources. The most vulnerable population would be
the elderly and very young that are located near beaches, low lying
areas, tidal flats, and river deltas that empty into oceans going waters.
Notes from County HazMit Plan
ƒ•Š‹‰–‘–ƒ–‡‹˜‡”•‹–›ʹͲͲͺƒ‰‡Ǧʹͷ
”‡Ǧ‹•ƒ•–‡”ŽŽǦƒœƒ”†•‹–‹‰ƒ–‹‘Žƒ
4
Loss of Sewer Service
10
Flooding
8
20
15
Crime
Telecommunications
System Failure
Loss of Water Service
25
0
HazMit
20/20 Event
Rating
0
Loss of Electrical
Service
Loss of Gas Service
Storm surge, Tsunami
Event/Hazard
Appendix B – County Plan Comparison Charts
1
1
1
Whatcom
Whatcom
Whatcom
Whatcom
Whatcom
1
1
Whatcom
Whatcom
Snohomish
Whatcom
Snohomish
County
1
1
1
1
1
HS
Region
0
0
0
0
0
0
0
Economic Crisis
Civil Disturbance
Key Employer Crisis
Major Fire - Urban
Earthquake
Landslide, Erosion
Subsidence/Expansiv
e Soils
Whatcom County’s steep mountainous terrain, its complex geology, its
high precipitation, both as rain and snow, its abundance of
unconsolidated glacial sediments and its geographic position astride the
earthquake zone that surrounds the Pacific Ocean, all combine to make
the county susceptible to landslide activity.
Earthquakes present complex challenges. The lifelines of the county are
dependent on many components operating together to make the system
functional. Failures of the highway system make immediate rescue of
injured and fire fighting difficult. Without roads, needed supplies are
difficult to obtain. Access to areas where roads are damaged may be
essential. As an example, if freeway overpasses were down it would be
possible to use on and off ramps to cross the downed area.
Notes from County HazMit Plan
ƒ•Š‹‰–‘–ƒ–‡‹˜‡”•‹–›ʹͲͲͺƒ‰‡Ǧʹ͸
”‡Ǧ‹•ƒ•–‡”ŽŽǦƒœƒ”†•‹–‹‰ƒ–‹‘Žƒ
0
HazMit
20/20 Event
Rating
0
0
0
Hail
High Winds
Hazardous Materials
Event
Radiological Incident
Event/Hazard
Appendix B – County Plan Comparison Charts
1
1
1
Whatcom
Whatcom
Whatcom
Whatcom
Whatcom
1
1
Whatcom
Whatcom
Whatcom
Whatcom
1
1
1
1
Whatcom
Whatcom
County
1
1
HS
Region
0
Loss of Gas Service
The Cascade Range of the Pacific Northwest has more than a dozen
potentially active volcanoes. Cascades volcanoes can erupt explosively,
an average of two eruptions per century. The most recent were Mount St.
Helens, Washington (1980-1986) and Lassen Peak, California (19141917). There are five active volcanoes in Washington State (Mount
Baker, Glacier Peak, Mount Rainier, Mount Adams and Mount St.
Helens).
Those most vulnerable initially would be those nearest the pyroclastic,
mud, and lava flows, or heavy ash and rock fall during the eruption.
Those people in this recreational area of forests and wildlife may be
impossible to locate and rescue. Baker Lake and its dams are vulnerable
and, if impacted, could cause extensive loss of property and lives
downstream in Skagit County.
Mount Baker is an active volcano that last erupted in 1843, produced a
lahar that traveled 6 miles and covered 1 square mile in 1891, and
showed signs of increasing activity in 1975. Numerous small avalanches
and intermittent steam activity continues. When magmatic activity does
recur, all the drainage’s of Mount Baker will be at risk from lahars, and
upstream areas will be at risk from pyroclastic flows and lava flows.
Glacier Peak also presents risks and should be considered in disaster
planning. Ash fall from Glacier Peak could disrupt traffic on Interstate 5
and Highway #20.
Whatcom County is vulnerable to all types of weather except hurricanes,
although the windstorms are sometimes equal in their fury and
destruction. Western Whatcom County is affected by its position on the
water, and by its shelter in the lee of the Olympic Mountains and the
Vancouver Island Range. This sheltering can also generate locally
accelerated winds. Channeling and funneling of strong winds typically
double prevailing wind speeds in the San Juan and Bellingham Channels
and in Hale Passage when the winds are from the north or south.
Notes from County HazMit Plan
ƒ•Š‹‰–‘–ƒ–‡‹˜‡”•‹–›ʹͲͲͺƒ‰‡Ǧʹ͹
”‡Ǧ‹•ƒ•–‡”ŽŽǦƒœƒ”†•‹–‹‰ƒ–‹‘Žƒ
0
HazMit
20/20 Event
Rating
0
Severe Winter Storm
Volcano Activity
Event/Hazard
Appendix B – County Plan Comparison Charts
1
1
1
HS
Region
Whatcom
Whatcom
Whatcom
County
0
Drought
Entire population of the county is vulnerable to drought. Risks range from
inconvenience of water conservation to severe water shortage. Drought
has far reaching effect impacting hydroelectric power to other states, and
increased electricity rates to industry, businesses, and private homes in
Whatcom County, causing loss of industries and jobs in 2001.
Some sports parks and complexes such as soccer fields, football fields,
baseball fields and golf courses are without adequate shelters for
participants and spectators. Lightening may cause transformers to short,
power outages, forest fires, hazards to boaters, outdoor workers and
sports participants.
The Northwest United States has experienced several disastrous fire
seasons. Although Whatcom County has had several fires, with the
exception of the Whatcom Creek Incident, there have been no major
conflagrations of county forests or grasslands in recent years.
The fire season runs from mid-May through October. Dry periods can
extend the season. The possibility of a wildland fire depends on fuel
availability, topography, the time of year, weather, and activities such as
debris burning, land clearing, camping, and recreation.
Notes from County HazMit Plan
ƒ•Š‹‰–‘–ƒ–‡‹˜‡”•‹–›ʹͲͲͺƒ‰‡Ǧʹͺ
”‡Ǧ‹•ƒ•–‡”ŽŽǦƒœƒ”†•‹–‹‰ƒ–‹‘Žƒ
0
HazMit
20/20 Event
Rating
0
Lightning
Major Fire - Wildland
Event/Hazard
Appendix B – County Plan Comparison Charts
1
1
1
HS
Region
Whatcom
Whatcom
Whatcom
County
32
Infestation Disease
Clallam County - REGION 2
* The most recent earthquake event that caused damage in Clallam
County was the 2001 Nisqually Earthquake.
* The probability of future occurrence of seismic-related hazard events is
moderate
Whatcom County has several areas that are particularly vulnerable to
tidal overflow. Winter storms with westerly or northwesterly winds at high
tide can create tidal flooding and storm surge conditions along the
beachfront areas at Sandy Point, Birch Bay, or Blaine. Damage at Village
Point and Lane Spit
Alaska averages a tsunami every 1.75 years and a damaging event
every 7 years. The West Coast experiences a damaging tsunami every
18 years on average. Whatcom County waterside areas are more likely
to experience a seiche from underwater landslide or massive slope
landslide than destruction from tsunamis. Geologic evidence shows that
the Cascadia Subduction Zone has generated great earthquakes, and
that the most recent one was about 300 years ago. Large earthquakes
also occur at the southern end of the Cascadia Subduction Zone in
Northern California and near the Oregon border. Any of these may
generate a large tsunami.
Notes from County HazMit Plan
ƒ•Š‹‰–‘–ƒ–‡‹˜‡”•‹–›ʹͲͲͺƒ‰‡Ǧʹͻ
”‡Ǧ‹•ƒ•–‡”ŽŽǦƒœƒ”†•‹–‹‰ƒ–‹‘Žƒ
32
HazMit
20/20 Event
Rating
0
Earthquake
Storm surge, Tsunami
Event/Hazard
Appendix B – County Plan Comparison Charts
2
2
1
2
HS
Region
Clallam
Clallam
Whatcom
Clallam
County
24
20
20
Loss of Water Service
Severe Winter Storm
Drought
* Damages with the highest consequence, either related to the value of
repair or by the impact on human activities,
* The probability of future occurrence of severe storm hazard events is
high
Not included in plan:
Drought is a condition of climatic dryness that causes a reduction in soil
moisture and water below the threshold necessary to sustain plant,
human and animal life. Drought can affect industry, Clallam County
Hazard Mitigation Plan
II-3 December 2004 agriculture and individual consumers. The ability to
fight fires may be affected. Additionally, hydroelectric power generation is
impacted, potentially creating power shortages and temporary outages
(King County, 2001 [Emergency Preparedness).
While significant droughts have impacted the Puget Sound area since
1900, the study area is considered to have a low susceptibility to damage
from drought for the following reasons: (1) the economic base is not
agricultural or industrial; and (2) no prior losses have been reported as a
result of drought. Therefore, drought is not considered a key hazard
within the study area.
The County, or portions of it, can be essentially isolated during disaster
events. Citizens and emergency responders need reliable utilities and
communications systems, or have backup systems in place, during a
disaster event. The County received a $5,765,100 grant from the U.S.
Department of Homeland Security (DHS) in October 2003 to fund Phase I
of the Olympic Peninsula Safety Communications Alliance Network
(OPS-CAN) Project. This project will increase the interoperability
between emergency responders. Over 40 local, state, tribal and federal
partners will collaborate on communication (DHS Press Release, October
7, 2003). This grant should lead to more reliable communication during
disaster events
Notes from County HazMit Plan
ƒ•Š‹‰–‘–ƒ–‡‹˜‡”•‹–›ʹͲͲͺƒ‰‡Ǧ͵Ͳ
”‡Ǧ‹•ƒ•–‡”ŽŽǦƒœƒ”†•‹–‹‰ƒ–‹‘Žƒ
Loss of Electrical
Service
HazMit
20/20 Event
Rating
24
Event/Hazard
Appendix B – County Plan Comparison Charts
2
2
2
2
HS
Region
Clallam
Clallam
Clallam
Clallam
County
15
8
High Winds
Storm surge, Tsunami
The County, or portions of it, can be essentially isolated during disaster
events. Citizens and emergency responders need reliable utilities and
communications systems, or have backup systems in place, during a
disaster event. The County received a $5,765,100 grant from the U.S.
Department of Homeland Security (DHS) in October 2003 to fund Phase I
of the Olympic Peninsula Safety Communications Alliance Network
(OPS-CAN) Project. This project will increase the interoperability
between emergency responders.
Over 40 local, state, tribal and federal partners will collaborate on
communication (DHS Press Release, October 7, 2003). This grant should
lead to more reliable communication during disaster events.
Notes from County HazMit Plan
ƒ•Š‹‰–‘–ƒ–‡‹˜‡”•‹–›ʹͲͲͺƒ‰‡Ǧ͵ͳ
”‡Ǧ‹•ƒ•–‡”ŽŽǦƒœƒ”†•‹–‹‰ƒ–‹‘Žƒ
15
HazMit
20/20 Event
Rating
16
Telecommunication
System Failure
Loss of Sewer Service
Event/Hazard
Appendix B – County Plan Comparison Charts
Clallam
Clallam
Clallam
2
Clallam
County
2
2
2
HS
Region
* The City of Forks is vulnerable to fires because of its location near
multiple east-west river valleys. Large fires are likely to start in the east
and burn down the valley, toward Forks. Since the 1990s, many forest
service roads have been reclaimed or are out of use. The system of
roads available from the 1950s to 1980s for fighting wildland fires has
diminished considerably since the 1990s. Additionally, in the event of a
large fire, local fire crews are no longer available. Fire crews likely would
be mobilized from outside the County (or even the State), resulting in a
delay in fighting large fires.
* About 40 percent of Clallam County’s population lives within urban
areas; the remainder lives outside the urban areas.
* The Port Angeles Fire Department indicated many of the fire damages
represent commercial structures, with a large portion in any year
representing a single large fire. As recently as December 2003, the City
of Port Angeles experienced a significant fire at the Elks Naval lodge, one
of the City’s largest structures located in the downtown core.
* The probability of future occurrence of urban fire hazard events is
moderate
Notes from County HazMit Plan
ƒ•Š‹‰–‘–ƒ–‡‹˜‡”•‹–›ʹͲͲͺƒ‰‡Ǧ͵ʹ
”‡Ǧ‹•ƒ•–‡”ŽŽǦƒœƒ”†•‹–‹‰ƒ–‹‘Žƒ
4
2
2
7
Hazardous Materials
Event
Civil Disturbance
Lightning
Crime
Major Fire - Urban
HazMit
20/20 Event
Rating
7
Event/Hazard
Appendix B – County Plan Comparison Charts
2
2
2
2
2
HS
Region
Clallam
Clallam
Clallam
Clallam
Clallam
County
1
HazMit
20/20 Event
Rating
1
Not included in plan:
Potential volcanic sources in western Washington include the large
composite volcanoes of the Cascade Range: Mount St. Helens, Mount
Rainier, Glacier Peak and Mount Baker. Many minor volcanic centers
also are scattered throughout the Cascade Range. It is unlikely that
activity at any existing or newly formed volcanic vent will affect the study
area. Since the Puget Sound separates the Olympic Peninsula, where
Clallam County is located, from the Cascade Range, there is no risk of
impacts from volcanic debris flows, mudflows or volcanic-related flooding
in Clallam County. Because of the long distance (approximately 70 miles)
to the nearest volcanic center, the only anticipated impacts to the study
area from volcanic activity would be related to airfall volcanic ash.
Clallam County was included in the May 1980 Presidentially declared Mt.
St. Helens eruption; however, damage was a result of ashfall and was
minimal.
Volcanoes are not considered a potential key hazard for the study area.
* The damages with the highest consequence, either related to the value
to repair or by the impact on human activities, include slides that have
closed U.S. Highway 101 and slides in Port Angeles.
* Most of the slope and bluff erosion issues in the last 15 years have
affected single-family residences. Bluff erosion and/or ravine erosion has
damaged or threatens residences in developments located in Clallam
Bay-Sekiu, Port Angeles, and in the County east of Port Angeles. In the
past, some houses have been moved or removed; commonly, no
mitigation action is taken.
* The probability of future occurrence of landslide and erosion hazard
events is high.
Notes from County HazMit Plan
ƒ•Š‹‰–‘–ƒ–‡‹˜‡”•‹–›ʹͲͲͺƒ‰‡Ǧ͵͵
”‡Ǧ‹•ƒ•–‡”ŽŽǦƒœƒ”†•‹–‹‰ƒ–‹‘Žƒ
Volcano Activity
Landslide Erosion
Event/Hazard
Appendix B – County Plan Comparison Charts
2
2
HS
Region
Clallam
Clallam
County
0
0
0
Economic Crisis
Subsidence/Expansiv
e Soils
Radiological Incident
Hail
Flooding
Kitsap County - REGION 2
* The most damage to life or property has occurred from flooding of the
Bogachiel River, and flooding of the Kinkade Island and River’s End
segments of the Dungeness River.
* The probability of future occurrence of hazard events (in terms of low,
moderate or high) is high for flooding and moderate for erosion from
channel migration.
*
* Wildland fires destroy forests, brush, field crops and grasslands, and
may be caused by nature or humans. The wildland fire season extends
from mid-May through October. The largest fires occur after three or four
summers of extended dry weather, even when the intervening winters are
wet.
* The probability of future occurrence of wildland fire hazard events is
moderate
Notes from County HazMit Plan
ƒ•Š‹‰–‘–ƒ–‡‹˜‡”•‹–›ʹͲͲͺƒ‰‡Ǧ͵Ͷ
”‡Ǧ‹•ƒ•–‡”ŽŽǦƒœƒ”†•‹–‹‰ƒ–‹‘Žƒ
4
0
0
0
Key Employer Crisis
Earthquake
Drought
0
Loss of Gas Service
5
0
Major Fire - Wildland
Infestation, Disease
HazMit
20/20 Event
Rating
1
Event/Hazard
Appendix B – County Plan Comparison Charts
2
2
2
2
2
Kitsap
Kitsap
Kitsap
Clallam
Kitsap
Clallam
Clallam
Clallam
2
2
2
Clallam
Clallam
Clallam
Clallam
County
2
2
2
2
HS
Region
0
0
0
0
0
0
Key Employer Crisis
Civil Disturbance
Economic Crisis
Crime
High Winds
Radiological Incident
Flooding is the most common hazard occurring in Kitsap County. Kitsap
County issued disaster or emergency declarations for flooding in 1990,
1994, 1995, 1996, 1997, 1999, and 2003. Historically, flooding occurs to
some extent in Kitsap County every year. Hood Canal and Puget Sound
beaches are often affected by flood tides compounded by heavy rainfall
and high tides.
Mitigation involves flood plain planning and management coordinated by
local, state and federal agencies.
Notes from County HazMit Plan
ƒ•Š‹‰–‘–ƒ–‡‹˜‡”•‹–›ʹͲͲͺƒ‰‡Ǧ͵ͷ
”‡Ǧ‹•ƒ•–‡”ŽŽǦƒœƒ”†•‹–‹‰ƒ–‹‘Žƒ
0
0
HazMit
20/20 Event
Rating
0
Hail
Telecommunication
System Failure
Flooding
Event/Hazard
Appendix B – County Plan Comparison Charts
Kitsap
Kitsap
Kitsap
Kitsap
Kitsap
Kitsap
2
Kitsap
2
2
2
2
2
2
Kitsap
Kitsap
County
2
2
HS
Region
0
0
Loss of Electrical
Service
Lightning
Kitsap County, like other rural communities, is vulnerable to energy
emergencies. By adhering to rationing rules and implementing
emergency plans, the effects on the public during such an emergency
could be reduced.
Kitsap County is subject to landslide or soil erosion due to wind, water
and flooding at all times of the year.
Kitsap County continues to be impacted by landslides and erosion issues
with each new winter storm. Soil erosion continues to occur, especially at
steep slopes and construction
sites during wind and rain storms.
The most significant effects of landslides are injury or death, disruption of
transportation and the destruction of property.
However, the County needs to conduct more public education concerning
construction of single-family structures in slide hazard areas and to
reduce efforts to develop these areas.
Farming must conform to established erosion control practices to
conserve topsoil.
Notes from County HazMit Plan
ƒ•Š‹‰–‘–ƒ–‡‹˜‡”•‹–›ʹͲͲͺƒ‰‡Ǧ͵͸
”‡Ǧ‹•ƒ•–‡”ŽŽǦƒœƒ”†•‹–‹‰ƒ–‹‘Žƒ
0
HazMit
20/20 Event
Rating
0
Loss of Water Service
Landslide, Erosion
Event/Hazard
Appendix B – County Plan Comparison Charts
2
2
2
2
HS
Region
Kitsap
Kitsap
Kitsap
Kitsap
County
0
0
HazMit
20/20 Event
Rating
0
Although Kitsap County is vulnerable to minimal ash fall, the
transportation routes to the County could be severely impacted.
Evacuation from Pierce and Thurston Counties might also impact Kitsap
County should Mt. Rainier erupt.
Volcanoes in Washington State have a history of eruption and will
continue to erupt. Volcanic ash fall is one of the serious consequences of
volcanic eruption. The possibility of significant ash fall on Kitsap County
is considered small. An eruption of the closest dormant volcano, Mount
Rainier, is possible, but the actual effect on Kitsap County would likely be
minor.
* A major spill of a bulk chemical stored in Kitsap County could cause
major loss of life, injuries and property damage. The most significant
danger connected with small amounts of unregulated substances,
however, is improper disposal of material connected with automobiles.
Major amounts of hazardous chemicals are moved on highways and
railways.
* The only trained Class A Hazardous Material Tactical Response Teams
in Kitsap County are located on two military installations, Puget Sound
Naval Shipyard and Submarine Base Bangor. Each jurisdiction has
limited response capability through fire districts, the Washington State
Patrol, and the Department of Ecology. Washington State Patrol is
Incident Commander for hazardous materials incidents in selected areas
of Kitsap County not otherwise designated.
Notes from County HazMit Plan
ƒ•Š‹‰–‘–ƒ–‡‹˜‡”•‹–›ʹͲͲͺƒ‰‡Ǧ͵͹
”‡Ǧ‹•ƒ•–‡”ŽŽǦƒœƒ”†•‹–‹‰ƒ–‹‘Žƒ
Subsidence/Expansiv
e Soils
Volcano Activity
Hazardous Materials
Event
Event/Hazard
Appendix B – County Plan Comparison Charts
2
2
2
HS
Region
Kitsap
Kitsap
Kitsap
County
0
0
0
Storm surge, Tsunami
Loss of Gas Service
Loss of Sewer Service
* Much of Kitsap County is surrounded by water, from the Puget Sound to
the Hood Canal. With so much shoreline in the county, a tsunami, high
waves, or a seiche would have a devastating affect on Kitsap County
residents. Flooding would occur, property damage would be sustained
and residents would be displaced.
* Port facilities, naval facilities, ferry terminals, fishing fleets, and public
utilities are frequently the backbone of the economy of the affected areas,
and these are the very resources that generally receive the most severe
damage. Until debris can be cleared, wharves and piers rebuilt, utilities
restored, and the fishing fleets reconstituted, communities may find
themselves without fuel, food, transportation and employment. Wherever
water transport is a vital means of supply, disruption of coastal systems
caused by tsunamis can have far reaching economic effects. Damage
from a tsunami or a seiche may range from insignificant to catastrophic.
Kitsap County's forests will remain vulnerable to forest and wild land
fires. The probability of forest and wild land fires will continually change
depending on variables such as drought effects, lightning strikes,
careless campers, etc.
High winds have caused extensive damage through the County in past
years. The main effects of local storms include disruption of electrical
power, accidents and transportation problems, flooding and landslides
and damage to residences and other buildings. Schools may close for
several days.
Kitsap County remains highly vulnerable to the effects of rain, snow and
windstorms.
Notes from County HazMit Plan
ƒ•Š‹‰–‘–ƒ–‡‹˜‡”•‹–›ʹͲͲͺƒ‰‡Ǧ͵ͺ
”‡Ǧ‹•ƒ•–‡”ŽŽǦƒœƒ”†•‹–‹‰ƒ–‹‘Žƒ
0
HazMit
20/20 Event
Rating
0
Major Fire - Urban
Severe Winter Storm
Event/Hazard
Appendix B – County Plan Comparison Charts
2
2
2
2
2
HS
Region
Kitsap
Kitsap
Kitsap
Kitsap
Kitsap
County
42
40
35
33
30
Volcano Activity
Major Fire - Urban
Loss of Electrical
Service
Flooding
Lightning
Four types of flooding occur in Thurston County: river or stream building
floods, flash floods, tidal floods, and groundwater flooding.
Historically, flooding occurs along one or more of the county's waterways
every year, suggesting a high probability of occurrence. Because of the
relative land area and population affected, the county is exposed to
moderate vulnerability. On a jurisdictional basis, an exception is the Town
of Bucoda, which has a high vulnerability to flooding due to its location
within a 100-year floodplain. Although the vulnerability is moderate, the
frequency of flooding, the potential for simultaneous flooding events, plus
the historical record of recurrent flooding and cumulative costs, all
suggest the assignment of a high risk rating.
Thurston County - REGION 3
History suggests a high probability of occurrence of another damaging
earthquake sometime in the next 25 years. With the 2001 Nisqually
earthquake still fresh in the region's memory, it is important to note that it
was not the largest earthquake event possible in the Puget Sound region.
Damage from the 1949, 1965, and 2001 earthquakes indicate that a large
earthquake could have a catastrophic impact on Thurston County
suggesting high vulnerability. Accordingly, the county has assigned a
high risk rating.
Notes from County HazMit Plan
ƒ•Š‹‰–‘–ƒ–‡‹˜‡”•‹–›ʹͲͲͺƒ‰‡Ǧ͵ͻ
”‡Ǧ‹•ƒ•–‡”ŽŽǦƒœƒ”†•‹–‹‰ƒ–‹‘Žƒ
52
HazMit
20/20 Event
Rating
0
Earthquake
Major Fire - Wildland
Event/Hazard
Appendix B – County Plan Comparison Charts
3
3
Thurston
Thurston
Thurston
Thurston
3
3
Thurston
Thurston
Kitsap
Thurston
County
3
3
2
3
HS
Region
16
15
12
10
8
8
6
5
5
5
4
4
2
Economic Crisis
High Winds
Key Employer Crisis
Hazardous Materials
Civil Disturbance
Loss of Gas Service
Radiological Incident
Crime
Hail
Loss of Water Service
Drought
Storm surge, Tsunami
Major Fire _ Wildland
Storms are frequent in Thurston County. Between 1972 and 1997
Thurston County dealt with the impact of 15 severe storms, 12 of them
leading to federal disaster declarations. The majority of these were
combination events with high winds, heavy rain, snow or ice, and
subsequent flooding. Storm history suggests a high probability of
occurrence. Historical damage and cumulative costs of destructive
storms suggest high vulnerability. Accordingly, the county has assigned a
high risk rating.
Notes from County HazMit Plan
ƒ•Š‹‰–‘–ƒ–‡‹˜‡”•‹–›ʹͲͲͺƒ‰‡ǦͶͲ
”‡Ǧ‹•ƒ•–‡”ŽŽǦƒœƒ”†•‹–‹‰ƒ–‹‘Žƒ
20
HazMit
20/20 Event
Rating
20
Severe Winter Storm
Telecommunications
System Failure
Event/Hazard
Appendix B – County Plan Comparison Charts
Thurston
3
Thurston
Thurston
Thurston
3
3
3
Thurston
Thurston
Thurston
Thurston
3
3
3
3
Thurston
Thurston
Thurston
3
3
3
Thurston
Thurston
Thurston
Thurston
County
3
3
3
3
HS
Region
Clark County - REGION 4
Despite its proximity to active stratovolcanoes Mt. Saint Helens (to the
north) and Mt. Hood (to the south), Clark County has relatively low
vulnerability to the direct effects of a volcanic eruption. The blast from a
St. Helen’s eruption is most likely to occur on the north face of the
mountain, away from Clark County. An eruption from Mt. Hood is distant
enough to have little effect on the county. Due to active monitoring of
volcanoes in the Cascade Mountain region, an eruption is unlikely to
occur as a surprise. Human life should be adequately protected from
such an event.
Thurston County has a history of landslides and their numbers seem to
be increasing, suggesting a high probability of occurrence. Although
there are exceptions, such as the Carlyon Beach landslide, landslides
tend to occur in isolated, sparsely developed areas threatening individual
structures and remote sections of the transportation, energy, and
communications infrastructure suggesting low vulnerability. Because of
the high probability of occurrence and the trend to more frequent
landslides, the county has assigned a moderate risk rating.
Notes from County HazMit Plan
ƒ•Š‹‰–‘–ƒ–‡‹˜‡”•‹–›ʹͲͲͺƒ‰‡ǦͶͳ
”‡Ǧ‹•ƒ•–‡”ŽŽǦƒœƒ”†•‹–‹‰ƒ–‹‘Žƒ
52
Major Fire - Urban
0
Subsidence/Expansiv
e Soils
60
1
Landslide, Erosion
Volcano Activity
1
HazMit
20/20 Event
Rating
2
Infestation, Disease
Loss of Sewer Service
Event/Hazard
Appendix B – County Plan Comparison Charts
4
4
3
4
3
3
3
HS
Region
Clark
Clark
Thurston
Clark
Thurston
Thurston
Thurston
County
30
HazMit
20/20 Event
Rating
44
The two main types of earthquakes that would affect Clark County
include the Cascadia Subduction Zone and Portland Hills Fault Zone
earthquakes. Surface ruptures from the known faults within the
northeastern portion of the county are assumed to be very remote. The
more widely damaging and more likely Cascadia event would cause
broad, regional shaking lasting 2 to 4 minutes at a magnitude of as high
as 9.0 on the Richter scale as a result of slipping between the two
overlapping plates. Several different types of vulnerabilities exist as a
result of this. One of the major concerns is the Port of Vancouver and the
Port of Camas and Washougal. Another is infrastructure such as
transportation routes, communications systems and necessary facilities.
Capabilities Include:
* Revised building codes
* NEHRP Soil Maps
* Home retrofitting
* Outreach
* Earthquake Damage Reduction Informations
* Small Business Loan Program
* Support following a presidential declaration
* Washington State Growth Mgmt Act
* Flood Insurance Study
Notes from County HazMit Plan
ƒ•Š‹‰–‘–ƒ–‡‹˜‡”•‹–›ʹͲͲͺƒ‰‡ǦͶʹ
”‡Ǧ‹•ƒ•–‡”ŽŽǦƒœƒ”†•‹–‹‰ƒ–‹‘Žƒ
Loss of Electrical
Service
Earthquake
Event/Hazard
Appendix B – County Plan Comparison Charts
4
4
HS
Region
Clark
Clark
County
HazMit
20/20 Event
Rating
24
Because they are in steep areas, roads may be difficult to navigate when
snowy or icy. Forest vegetation may block roadways after high winds.
Perhaps most importantly, because these homes are outside of an
organized fire district, response times during an emergency may be
lengthened. A total of 7540 residential units meet the criteria described
above. Another specific population of concern is the elderly. A notable
portion of the population is elderly; approximately 32,800 people (nearly
10% of all residents of Clark County) are over 65 years of age. In
general, these populations may be more likely to require medical or other
emergency attention as a result of isolation. Elderly populations seem to
be distributed relatively evenly throughout the county.
Priority routes for snow removal are in existence throughout the county.
These roads are cleared first to assure that navigable routes through and
between jurisdictions exist. In the areas most subject to isolation (the
intermix areas described above), people are generally quite selfsufficient. Because they experience severe storms and the
accompanying isolation with relative frequency, they are accustomed to
listening for warnings and tend to have a 72-hour supply of food and
water on hand. Many also own generators. County or regional
emergency command centers can be activated to coordinate incoming
emergency calls.
Notes from County HazMit Plan
ƒ•Š‹‰–‘–ƒ–‡‹˜‡”•‹–›ʹͲͲͺƒ‰‡ǦͶ͵
”‡Ǧ‹•ƒ•–‡”ŽŽǦƒœƒ”†•‹–‹‰ƒ–‹‘Žƒ
Severe Winter Storm
Event/Hazard
Appendix B – County Plan Comparison Charts
4
HS
Region
Clark
County
20
20
Loss of Water Service
Crime
Clark County is similar to many areas in Western Washington in its
topography and fuel loading. Its slopes are steep in the eastern part of
the county, and a wet springtime climate assures that fuel loading is
relatively heavy. These are the static conditions, which do not change
significantly from year to year, that increase fire risk. However, the
dynamic conditions, which may change moment to moment, such as
weather, in the county greatly increase the proportional risk.
The most vulnerable areas in Clark County are the intermix areas. Clark
County has experienced extensive growth in its intermix areas, a trend
which is likely to continue. The amount of warning that people will have
before a Clark County fire threatens is variable, but is generally sufficient
for evacuation to occur in most, but not all, developed or developing
areas.
Notes from County HazMit Plan
ƒ•Š‹‰–‘–ƒ–‡‹˜‡”•‹–›ʹͲͲͺƒ‰‡ǦͶͶ
”‡Ǧ‹•ƒ•–‡”ŽŽǦƒœƒ”†•‹–‹‰ƒ–‹‘Žƒ
20
HazMit
20/20 Event
Rating
24
Telecommunication
System Failure
Major Fire - Wildland
Event/Hazard
Appendix B – County Plan Comparison Charts
4
4
4
4
HS
Region
Clark
Clark
Clark
Clark
County
12
10
HazMit
20/20 Event
Rating
14
Hazardous materials releases in Clark County originate from both fixed
sites (facilities that hold hazardous materials on-site) and transit-related
operations (referring to releases that occur during the transportation of
hazardous materials). In Clark County, hazardous materials are
transported by air, rail, truck, ship, and pipeline. All fixed site locations
are reported as Tier II facilities. In Clark County, paper mills, high-tech
industry, medical facilities, schools, metal plating and finishing, utility
companies, cold storage facilities, fuel-related industries, communication
industry, and chemical distributors are all among the Tier II reporters. The
most significant concentration of hazardous materials in Clark County is
in the industrial areas near the Ports of Vancouver, Camas and
Washougal. A hazardous material incident will generally impact a
relatively small area, but if that area is a high-density urban location or a
critical wildlife habitat, the vulnerabilities could be significant. As Clark
County continues to grow and attract new high tech industry to the area,
the amount of hazardous materials at both fixed sites and in transit will
increase. As such, hazardous materials incidents may also increase.
Notes from County HazMit Plan
ƒ•Š‹‰–‘–ƒ–‡‹˜‡”•‹–›ʹͲͲͺƒ‰‡ǦͶͷ
”‡Ǧ‹•ƒ•–‡”ŽŽǦƒœƒ”†•‹–‹‰ƒ–‹‘Žƒ
Civil Disturbance
High Winds
Hazardous Materials
Event
Event/Hazard
Appendix B – County Plan Comparison Charts
4
4
4
HS
Region
Clark
Clark
Clark
County
9
Landslide Erosion
Landslides have become more predominant in recent years and may be
attributed to the rapid population growth and development combined with
the intense rainfall and storms that occur in this area. In Clark County
landslides occur as a secondary hazard to heavy rain and winter storms
and as a result of new development. They also can be secondary
hazards to wildfires that clear slopes of vegetation thereby creating
greater exposure to severe storms. Such landslides can occur several
years after the fire. Landslides can also be a secondary hazard to
earthquakes; however geologists agree that large rotational landslides
are not likely to occur as a result of a major earthquake in Clark County.
It is likely, however, that shallow debris slides could occur after a quake.
Clark County Municipal Code requires that developments and
construction follow certain guidelines that help to locate development in
areas safe from potential geologic hazards. The County Code designates
‘Landslide Protection Areas’ which provide development regulations for
steep slope hazard areas to prevent potential landslide damage.
Four types of flooding occur in Clark County
* Flooding resulting from overflow from Columbia River, Riverine flooding
occurring mostly in the floodplains, Shallow Flooding or ponding in "sink
areas", and Isolated Flooding may result from clogged or overflowing
storm drainage.
In 1995, Clark County experienced severe flooding. A total of 30 people
were evacuated from their property, 35 homes were flooded and 20
roadways were closed. All rivers in the County including the Columbia
River were affected. The event additionally resulted in shallow flooding in
areas distant from rivers and streams.
Following a presidential disaster declaration, there is considerable
support for risk
reduction. These programs and their implications are often not taken
advantage of before permanent repairs are made.
Notes from County HazMit Plan
ƒ•Š‹‰–‘–ƒ–‡‹˜‡”•‹–›ʹͲͲͺƒ‰‡ǦͶ͸
”‡Ǧ‹•ƒ•–‡”ŽŽǦƒœƒ”†•‹–‹‰ƒ–‹‘Žƒ
Flooding
HazMit
20/20 Event
Rating
9
Event/Hazard
Appendix B – County Plan Comparison Charts
4
4
HS
Region
Clark
Clark
County
4
4
1
0
0
0
0
0
80
70
Key Employer Crisis
Economic Crisis
Infestation Disease
Storm surge, Tsunami
Drought
Lightning
Hail
Loss of Gas Service
Severe Winter Storm
High Winds
Pierce County - REGION 5
Many parts of the country receive a great deal more snow than the Pierce
County lowlands. However, it is this lack of regular snow that causes
many of the problems encountered during the winter here. If snow were
an annual winter problem, the County would be much better prepared to
handle it. The purchase and maintenance of snow removal equipment
would have a much higher priority than it does today. A contributing
factor is that the snow that falls in the Pierce County lowlands has a
higher water content and easily creates ice when driven on.
Notes from County HazMit Plan
ƒ•Š‹‰–‘–ƒ–‡‹˜‡”•‹–›ʹͲͲͺƒ‰‡ǦͶ͹
”‡Ǧ‹•ƒ•–‡”ŽŽǦƒœƒ”†•‹–‹‰ƒ–‹‘Žƒ
6
6
HazMit
20/20 Event
Rating
8
Subsidence/Expansiv
e Soils
Radiological Incident
Loss of Sewer Service
Event/Hazard
Appendix B – County Plan Comparison Charts
Pierce Co
Pierce Co
Clark
Pierce Co
4
5
5
5
Clark
Clark
Clark
Clark
Clark
4
4
4
4
4
Clark
Clark
Clark
Clark
Clark
County
4
4
4
4
4
HS
Region
80
70
15
50
Flooding
Crime
Hail
Lightning
* Several factors impact vulnerability to flooding. As communities and
businesses continue development along the scenic river valleys and
other flood prone areas, the amount of infrastructure at risk of flooding
steadily increases. New structures are required to be elevated above the
100-year floodplain elevation shown on the FEMA Flood Insurance Rate
Maps. But fast moving floodwater may still damage structures, even if
they are properly elevated.
* Some of th+C267e factors contributing to flood vulnerability are:
vegetation and wetland encroachment; sedimentation in the river beds
(which reduces the flood carrying capacity); disposal of yard waste into
streams and rivers; and continued growth into flood prone areas.
* The primary types of energy usage in Pierce County are electrical,
petroleum based distillates and natural gas. All areas of the County are
susceptible to shortages.
* Pierce County is vulnerable to many localized, short-term energy
emergencies, brought about by numerous disasters such as wind and ice
storms. Most of these emergencies are handled by the affected industry,
with support provided by the county or state as requested. The county is
also vulnerable to major energy shortages.
* Future shortages are likely to occur due to numerous uncontrollable
factors. The Washington State Energy Office developed a Petroleum
Products Contingency Plan and an Electricity Load Curtailment Plan for
managing major shortages of energy. These plans should be widely
disseminated among local agencies.
Notes from County HazMit Plan
ƒ•Š‹‰–‘–ƒ–‡‹˜‡”•‹–›ʹͲͲͺƒ‰‡ǦͶͺ
”‡Ǧ‹•ƒ•–‡”ŽŽǦƒœƒ”†•‹–‹‰ƒ–‹‘Žƒ
80
HazMit
20/20 Event
Rating
80
Loss of Water Service
Loss of Electrical
Service
Event/Hazard
Appendix B – County Plan Comparison Charts
5
5
5
5
5
5
HS
Region
Pierce Co
Pierce Co
Pierce Co
Pierce Co
Pierce Co
Pierce Co
County
80
60
Infestation, Disease
Hazardous Materials
Event
Hazardous chemicals are prevalent throughout our society. While
industry is the primary user and maintainer of hazardous chemicals, we
also have them in our homes, in our cars, at our places of work and
frequently where we recreate. They move through our society on our
highways, rail lines, pipelines, and by ship and barge in Puget Sound.
Major transportation routes are utilized by our trucking industry to
transport chemicals to not only manufacturing plants but also businesses
and retail outlets. It is safe to say that nearly every one of the over
700,000 residents of Pierce County is vulnerable to the effects of a
hazardous chemical spill.
* Clandestine drug labs and illegal dumping present yet another concern.
Over the past few years Pierce County has seen a dramatic growth in the
number of clandestine drug labs and drug lab dump sites in the County.
Each of these has to be treated as a chemical hazard site and
decontaminated before the property can be used again. Illegal drug labs
can be set up in homes, apartments, vacant buildings, shacks in the
forest or even in a van parked on the street. Illegal dumping continues to
be a concern throughout the County.
* It is difficult to identify a part of the community that is not vulnerable to
an earthquake. People, buildings, emergency services, hospitals,
transportation systems, pipelines, and water and wastewater utilities are
susceptible to the effects of an earthquake. In addition, electric and
natural gas utilities and dams have potential to be damaged.
* Effects of a major earthquake in the Puget Sound basin area could be
catastrophic, providing the worst case disaster short of war. Thousands
of persons could be killed and many tens of thousands injured or left
homeless.
Notes from County HazMit Plan
ƒ•Š‹‰–‘–ƒ–‡‹˜‡”•‹–›ʹͲͲͺƒ‰‡ǦͶͻ
”‡Ǧ‹•ƒ•–‡”ŽŽǦƒœƒ”†•‹–‹‰ƒ–‹‘Žƒ
80
HazMit
20/20 Event
Rating
80
Earthquake
Telecommunications
System Failure
Event/Hazard
Appendix B – County Plan Comparison Charts
5
5
5
5
HS
Region
Pierce Co
Pierce Co
Pierce Co
Pierce Co
County
50
50
Economic Crisis
Key Employer Crisis
* The effects of a hazardous materials incident depend largely on the
nature of the spill, location of the spill, local weather conditions, and area
of incidence.
Notes from County HazMit Plan
ƒ•Š‹‰–‘–ƒ–‡‹˜‡”•‹–›ʹͲͲͺƒ‰‡ǦͷͲ
”‡Ǧ‹•ƒ•–‡”ŽŽǦƒœƒ”†•‹–‹‰ƒ–‹‘Žƒ
60
HazMit
20/20 Event
Rating
Radiological Incident
Event/Hazard
Appendix B – County Plan Comparison Charts
Pierce Co
Pierce Co
Pierce Co
5
County
5
5
HS
Region
60
Major Fire - Urban
* As Pierce County’s population and industries continue to grow so does
the demand for water. As usage approaches the limit of available water,
any decrease in the normal flow will tend to exacerbate past problems.
The county does not need a full-blown drought to experience a water
shortage.
* Drought mitigation can take many forms including, but not limited to:
energy and water conservation programs aimed at convincing the public
to use less electricity and water; increase energy efficiency for homes
and other buildings; create new pipelines to tap into unutilized
watersheds; and stricter irrigation methods such as drip irrigation. A longterm mitigation would be increasing storage capacity of water, either
through the construction of new dams or the raising of existing dams.
* Urban/wildland interface fires occur naturally (lightning strikes) or by
people. Naturally occurring interface fires, especially those caused by
lightning, are rare in western Washington. People’s carelessness and
lack of fire knowledge are common causes of interface fires. “West-side”
people start 67% of the wildland fires that occur in eastern Washington.
The criminal act of arson is another cause.
* The urban/wildland interface fire vulnerability can be created from the
actions and decisions of people or by the area’s vegetation and
topography.
* The topography of the Cascade foothills creates a seasonal event
commonly called the “east winds”. These high winds result as an attempt
to equalize off-coast low pressures with the higher pressured air
funneling off the mountains. Winds exacerbate the speed in which fire
spreads. The Greenwater and the Bonney Lake areas of Pierce County
are prone to these high winds.
Notes from County HazMit Plan
ƒ•Š‹‰–‘–ƒ–‡‹˜‡”•‹–›ʹͲͲͺƒ‰‡Ǧͷͳ
”‡Ǧ‹•ƒ•–‡”ŽŽǦƒœƒ”†•‹–‹‰ƒ–‹‘Žƒ
Drought
HazMit
20/20 Event
Rating
60
Event/Hazard
Appendix B – County Plan Comparison Charts
5
5
HS
Region
Pierce Co
Pierce Co
County
15
HazMit
20/20 Event
Rating
30
* The degree of hazard vulnerability is dependent on numerous variables.
Those variables include but are not limited to: the type and size of the
event; time of day; amount of warning time; size of population in harm’s
way; special needs populations (physically or mentally impaired); weather
conditions; transportation availability; emergency response capabilities;
and type of warning methods.
* In studying Mount Rainier’s active eruptive history, volcanologists and
geologists know that it will erupt again. Since the exact type and scale of
the eruption(s) cannot be predicted, emergency planning and preparation
must not be postponed. Pierce County identifies this risk to be significant
and has taken measure to lessen the negative impact on residents and
business communities located in the river valleys. The county
spearheads evacuation planning and route identification projects,
maintains a lahar warning system for the Carbon and Puyallup River
valleys, coordinates evacuation route signage installation, and advocates
and sometimes provides weather radios for the communities in the upper
valleys.
The more urbanized portions of Pierce County have the greatest potential
for racial tension, labor strife, organized demonstrations, and riots. Large
cities are the most highly vulnerable areas for civil unrest and civil
disturbances. In Pierce County, this includes Lakewood, Puyallup and
Tacoma. However, as other cities grow, their vulnerability also increases.
Demonstrations, strikes, riots or other forms of civil disturbance could
disrupt the commerce of Pierce County. Highways and other portions of
the infrastructure could be adversely affected. Businesses could be
forced to close, and the economic impact to the region could be severely
affected. A longshoreman's strike could cripple the Port of Tacoma, and
affect the local economy for years.
* History has shown that overcrowding in prisons or jails is the main
cause of prison uprisings. This should not be the case with any of the
very small facilities. However the possibility could arise within the larger
facilities. The Pierce County jail has for years had a problem with
overcrowding. This has led to the construction of the Pierce County Jail
Annex, a temporary facility, and then to the construction of a new 1,000
Notes from County HazMit Plan
ƒ•Š‹‰–‘–ƒ–‡‹˜‡”•‹–›ʹͲͲͺƒ‰‡Ǧͷʹ
”‡Ǧ‹•ƒ•–‡”ŽŽǦƒœƒ”†•‹–‹‰ƒ–‹‘Žƒ
Civil Disturbance
Volcano Activity
Event/Hazard
Appendix B – County Plan Comparison Charts
5
5
HS
Region
Pierce Co
Pierce Co
County
5
Subsidence/Expansiv
e Soils
bed facility next door to the current jail. This should alleviate the
overcrowding in the largest of the correction facilities in the County.
Notes from County HazMit Plan
ƒ•Š‹‰–‘–ƒ–‡‹˜‡”•‹–›ʹͲͲͺƒ‰‡Ǧͷ͵
”‡Ǧ‹•ƒ•–‡”ŽŽǦƒœƒ”†•‹–‹‰ƒ–‹‘Žƒ
0
80
HazMit
20/20 Event
Rating
Loss of Gas Service
Loss of Sewer Service
Event/Hazard
Appendix B – County Plan Comparison Charts
5
5
5
HS
Region
Pierce Co
Pierce Co
Pierce Co
County
5
HazMit
20/20 Event
Rating
5
* As the demand for a “home with a view” and industrialization continues
to grow, the potential for damage or destruction, and life-loss grows.
Landslide vulnerability is largely dependent on slope, material, and water
saturation. Water saturation is most prevalent during the rainy season of
the winter and spring months. An unequivocal predictor of landslide
vulnerability is the occurrence of previous landslides in the same area.
* Mitigation efforts include, but are not limited to: obtaining maps that
provide a technically sound identification of landslide hazards, an
inventory of historic landslides; strengthening and enforcing regulatory
standards particularly through the Growth Management Act critical areas
requirements; consistent building and grading code enforcement; and the
expanded requirement and review of geotechnical assessments and
reports.
* Urban/wildland interface fires occur naturally (lightning strikes) or by
people. Naturally occurring interface fires, especially those caused by
lightning, are rare in western Washington. People’s carelessness and
lack of fire knowledge are common causes of interface fires. “West-side”
people start 67% of the wildland fires that occur in eastern Washington.
The criminal act of arson is another cause.
* The urban/wildland interface fire vulnerability can be created from the
actions and decisions of people or by the area’s vegetation and
topography.
* The topography of the Cascade foothills creates a seasonal event
commonly called the “east winds”. These high winds result as an attempt
to equalize off-coast low pressures with the higher pressured air
funneling off the mountains. Winds exacerbate the speed in which fire
spreads. The Greenwater and the Bonney Lake areas of Pierce County
are prone to these high winds.
Notes from County HazMit Plan
ƒ•Š‹‰–‘–ƒ–‡‹˜‡”•‹–›ʹͲͲͺƒ‰‡ǦͷͶ
”‡Ǧ‹•ƒ•–‡”ŽŽǦƒœƒ”†•‹–‹‰ƒ–‹‘Žƒ
Landslide, Erosion
Major Fire - Wildland
Event/Hazard
Appendix B – County Plan Comparison Charts
5
5
HS
Region
Pierce Co
Pierce Co
County
Pierce County is however vulnerable to local tsunamis created by
submarine landslides, landslides from the bluffs along the waterways of
Pierce County, and potentially by large crustal earthquakes on faults
underlying portions of Puget Sound, such as the Seattle Fault or the
hypothesized Tacoma Fault. At risk are the people and property on
beaches, at low-lying areas of Pierce County, those near tidal flats, or
those near the mouth of the
Puyallup River.
* Tsunamis resulting from earthquakes cannot be prevented. This is also
true of tsunamis generated by many bluff and submarine landslides,
although these types of tsunamis can sometimes be triggered by
construction and other activities. In Pierce County, tsunami mitigation
efforts take the form of land use management along the County’s
shoreline, encouraging the development of preparedness plans, and
educating the public on the shoreline hazards.
Notes from County HazMit Plan
Pierce County - Salishan L. Ctr - REGION 5
HazMit
20/20 Event
Rating
0
ƒ•Š‹‰–‘–ƒ–‡‹˜‡”•‹–›ʹͲͲͺƒ‰‡Ǧͷͷ
”‡Ǧ‹•ƒ•–‡”ŽŽǦƒœƒ”†•‹–‹‰ƒ–‹‘Žƒ
High Winds
Storm surge, Tsunami
Event/Hazard
Appendix B – County Plan Comparison Charts
5
5
5
HS
Region
Pierce Co
Pierce /
Salishan
Pierce /
Salishan
County
ƒ•Š‹‰–‘–ƒ–‡‹˜‡”•‹–›ʹͲͲͺƒ‰‡Ǧͷ͸
”‡Ǧ‹•ƒ•–‡”ŽŽǦƒœƒ”†•‹–‹‰ƒ–‹‘Žƒ
Infestation, Disease
* It is difficult to identify a part of the community that is not vulnerable to
an earthquake. People, buildings, emergency services, hospitals,
transportation systems, pipelines, and water and wastewater utilities are
susceptible to the effects of an earthquake. In addition, electric and
natural gas utilities and dams have potential to be damaged.
* Effects of a major earthquake in the Puget Sound basin area could be
catastrophic, providing the worst case disaster short of war. Thousands
of persons could be killed and many tens of thousands injured or left
homeless.
Earthquake
Notes from County HazMit Plan
Pierce County is however vulnerable to local tsunamis created by
submarine landslides, landslides from the bluffs along the waterways of
Pierce County, and potentially by large crustal earthquakes on faults
underlying portions of Puget Sound, such as the Seattle Fault or the
hypothesized Tacoma Fault. At risk are the people and property on
beaches, at low-lying areas of Pierce County, those near tidal flats, or
those near the mouth of the
Puyallup River.
* Tsunamis resulting from earthquakes cannot be prevented. This is also
true of tsunamis generated by many bluff and submarine landslides,
although these types of tsunamis can sometimes be triggered by
construction and other activities. In Pierce County, tsunami mitigation
efforts take the form of land use management along the County’s
shoreline, encouraging the development of preparedness plans, and
educating the public on the shoreline hazards.
HazMit
20/20 Event
Rating
Storm surge, Tsunami
Event/Hazard
Appendix B – County Plan Comparison Charts
5
5
5
HS
Region
Pierce /
Salishan
Pierce /
Salishan
Pierce /
Salishan
County
HazMit
20/20 Event
Rating
The more urbanized portions of Pierce County have the greatest potential
for racial tension, labor strife, organized demonstrations, and riots. Large
cities are the most highly vulnerable areas for civil unrest and civil
disturbances. In Pierce County, this includes Lakewood, Puyallup and
Tacoma. However, as other cities grow, their vulnerability also increases.
Demonstrations, strikes, riots or other forms of civil disturbance could
disrupt the commerce of Pierce County. Highways and other portions of
the infrastructure could be adversely affected. Businesses could be
forced to close, and the economic impact to the region could be severely
affected. A longshoreman's strike could cripple the Port of Tacoma, and
affect the local economy for years.
* History has shown that overcrowding in prisons or jails is the main
cause of prison uprisings. This should not be the case with any of the
very small facilities. However the possibility could arise within the larger
facilities. The Pierce County jail has for years had a problem with
overcrowding. This has led to the construction of the Pierce County Jail
Annex, a temporary facility, and then to the construction of a new 1,000
bed facility next door to the current jail. This should alleviate the
overcrowding in the largest of the correction facilities in the County.
Many parts of the country receive a great deal more snow than the Pierce
County lowlands. However, it is this lack of regular snow that causes
many of the problems encountered during the winter here. If snow were
an annual winter problem, the County would be much better prepared to
handle it. The purchase and maintenance of snow removal equipment
would have a much higher priority than it does today. A contributing
factor is that the snow that falls in the Pierce County lowlands has a
higher water content and easily creates ice when driven on.
Notes from County HazMit Plan
ƒ•Š‹‰–‘–ƒ–‡‹˜‡”•‹–›ʹͲͲͺƒ‰‡Ǧͷ͹
”‡Ǧ‹•ƒ•–‡”ŽŽǦƒœƒ”†•‹–‹‰ƒ–‹‘Žƒ
Crime
Civil Disturbance
Key Employer Crisis
Economic Crisis
Severe Winter Storm
Event/Hazard
Appendix B – County Plan Comparison Charts
5
5
5
5
5
HS
Region
Pierce /
Salishan
Pierce /
Salishan
Pierce /
Salishan
Pierce /
Salishan
Pierce /
Salishan
County
HazMit
20/20 Event
Rating
* The primary types of energy usage in Pierce County are electrical,
petroleum based distillates and natural gas. All areas of the County are
susceptible to shortages.
* Pierce County is vulnerable to many localized, short-term energy
emergencies, brought about by numerous disasters such as wind and ice
storms. Most of these emergencies are handled by the affected industry,
with support provided by the county or state as requested. The county is
also vulnerable to major energy shortages.
* Future shortages are likely to occur due to numerous uncontrollable
factors. The Washington State Energy Office developed a Petroleum
Products Contingency Plan and an Electricity Load Curtailment Plan for
managing major shortages of energy. These plans should be widely
disseminated among local agencies.
Notes from County HazMit Plan
ƒ•Š‹‰–‘–ƒ–‡‹˜‡”•‹–›ʹͲͲͺƒ‰‡Ǧͷͺ
”‡Ǧ‹•ƒ•–‡”ŽŽǦƒœƒ”†•‹–‹‰ƒ–‹‘Žƒ
Hazardous Materials
Event
Subsidence/Expansiv
e Soils
Loss of Gas Service
Loss of Electrical
Service
Loss of Water Service
Telecommunications
System Failure
Radiological Incident
Loss of Sewer Service
Event/Hazard
Appendix B – County Plan Comparison Charts
5
5
5
5
5
5
5
5
HS
Region
Pierce /
Salishan
Pierce /
Salishan
Pierce /
Salishan
Pierce /
Salishan
Pierce /
Salishan
Pierce /
Salishan
Pierce /
Salishan
Pierce /
Salishan
County
HazMit
20/20 Event
Rating
* As the demand for a “home with a view” and industrialization continues
to grow, the potential for damage or destruction, and life-loss grows.
Landslide vulnerability is largely dependent on slope, material, and water
saturation. Water saturation is most prevalent during the rainy season of
the winter and spring months. An unequivocal predictor of landslide
vulnerability is the occurrence of previous landslides in the same area.
* Mitigation efforts include, but are not limited to: obtaining maps that
provide a technically sound identification of landslide hazards, an
inventory of historic landslides; strengthening and enforcing regulatory
standards particularly through the Growth Management Act critical areas
requirements; consistent building and grading code enforcement; and the
expanded requirement and review of geotechnical assessments and
reports.
* Urban/wildland interface fires occur naturally (lightning strikes) or by
people. Naturally occurring interface fires, especially those caused by
lightning, are rare in western Washington. People’s carelessness and
lack of fire knowledge are common causes of interface fires. “West-side”
people start 67% of the wildland fires that occur in eastern Washington.
The criminal act of arson is another cause.
* The urban/wildland interface fire vulnerability can be created from the
actions and decisions of people or by the area’s vegetation and
topography.
* The topography of the Cascade foothills creates a seasonal event
commonly called the “east winds”. These high winds result as an attempt
to equalize off-coast low pressures with the higher pressured air
funneling off the mountains. Winds exacerbate the speed in which fire
spreads. The Greenwater and the Bonney Lake areas of Pierce County
are prone to these high winds.
Notes from County HazMit Plan
ƒ•Š‹‰–‘–ƒ–‡‹˜‡”•‹–›ʹͲͲͺƒ‰‡Ǧͷͻ
”‡Ǧ‹•ƒ•–‡”ŽŽǦƒœƒ”†•‹–‹‰ƒ–‹‘Žƒ
Hail
Landslide, Erosion
Lightning
Major Fire - Wildland
Event/Hazard
Appendix B – County Plan Comparison Charts
5
5
5
5
HS
Region
Pierce /
Salishan
Pierce /
Salishan
Pierce /
Salishan
Pierce /
Salishan
County
HazMit
20/20 Event
Rating
* As Pierce County’s population and industries continue to grow so does
the demand for water. As usage approaches the limit of available water,
any decrease in the normal flow will tend to exacerbate past problems.
The county does not need a full-blown drought to experience a water
shortage.
* Drought mitigation can take many forms including, but not limited to:
energy and water conservation programs aimed at convincing the public
to use less electricity and water; increase energy efficiency for homes
and other buildings; create new pipelines to tap into unutilized
watersheds; and stricter irrigation methods such as drip irrigation. A longterm mitigation would be increasing storage capacity of water, either
through the construction of new dams or the raising of existing dams.
* Urban/wildland interface fires occur naturally (lightning strikes) or by
people. Naturally occurring interface fires, especially those caused by
lightning, are rare in western Washington. People’s carelessness and
lack of fire knowledge are common causes of interface fires. “West-side”
people start 67% of the wildland fires that occur in eastern Washington.
The criminal act of arson is another cause.
* The urban/wildland interface fire vulnerability can be created from the
actions and decisions of people or by the area’s vegetation and
topography.
* The topography of the Cascade foothills creates a seasonal event
commonly called the “east winds”. These high winds result as an attempt
to equalize off-coast low pressures with the higher pressured air
funneling off the mountains. Winds exacerbate the speed in which fire
spreads. The Greenwater and the Bonney Lake areas of Pierce County
are prone to these high winds.
Notes from County HazMit Plan
ƒ•Š‹‰–‘–ƒ–‡‹˜‡”•‹–›ʹͲͲͺƒ‰‡Ǧ͸Ͳ
”‡Ǧ‹•ƒ•–‡”ŽŽǦƒœƒ”†•‹–‹‰ƒ–‹‘Žƒ
Major Fire - Urban
Drought
Event/Hazard
Appendix B – County Plan Comparison Charts
5
5
HS
Region
Pierce /
Salishan
Pierce /
Salishan
County
30
HazMit
20/20 Event
Rating
King County - REGION 6
* The degree of hazard vulnerability is dependent on numerous variables.
Those variables include but are not limited to: the type and size of the
event; time of day; amount of warning time; size of population in harm’s
way; special needs populations (physically or mentally impaired); weather
conditions; transportation availability; emergency response capabilities;
and type of warning methods.
* In studying Mount Rainier’s active eruptive history, volcanologists and
geologists know that it will erupt again. Since the exact type and scale of
the eruption(s) cannot be predicted, emergency planning and preparation
must not be postponed. Pierce County identifies this risk to be significant
and has taken measure to lessen the negative impact on residents and
business communities located in the river valleys. The county
spearheads evacuation planning and route identification projects,
maintains a lahar warning system for the Carbon and Puyallup River
valleys, coordinates evacuation route signage installation, and advocates
and sometimes provides weather radios for the communities in the upper
valleys.
* Several factors impact vulnerability to flooding. As communities and
businesses continue development along the scenic river valleys and
other flood prone areas, the amount of infrastructure at risk of flooding
steadily increases. New structures are required to be elevated above the
100-year floodplain elevation shown on the FEMA Flood Insurance Rate
Maps. But fast moving floodwater may still damage structures, even if
they are properly elevated.
* Some of th+C267e factors contributing to flood vulnerability are:
vegetation and wetland encroachment; sedimentation in the river beds
(which reduces the flood carrying capacity); disposal of yard waste into
streams and rivers; and continued growth into flood prone areas.
Notes from County HazMit Plan
ƒ•Š‹‰–‘–ƒ–‡‹˜‡”•‹–›ʹͲͲͺƒ‰‡Ǧ͸ͳ
”‡Ǧ‹•ƒ•–‡”ŽŽǦƒœƒ”†•‹–‹‰ƒ–‹‘Žƒ
Radiological Incident
Flooding
Volcano Activity
Event/Hazard
Appendix B – County Plan Comparison Charts
6
5
6
5
HS
Region
King
Pierce /
Salishan
King
Pierce /
Salishan
County
20
20
20
20
Severe Winter Storm
Loss of Gas Service
Loss of Sewer Service
Telecommunication
System Failure
Loss of Water Service
* Accordingly, rainfall in King County varies widely from city to city and
area to area. The City of Seattle has an average of 37 inches annually;
while Enumclaw has an annual average of 55 inches and
Snoqualmie/North Bend has 61 inches of precipitation. The majority of
this precipitation occurs as rain in the lowlands between October and
early May with substantial snow packs in the Cascades during the same
time frames.
* One of the most common impacts from severe weather is the loss of
commercial power. Since many other services rely on power for critical
functions, providing backup power capabilities has long been a favored
strategy for mitigating damages from winter storms. Many police
precincts, fire stations, emergency operations centers, hospitals, service
providers and major employers have already introduced this capability.
Notes from County HazMit Plan
ƒ•Š‹‰–‘–ƒ–‡‹˜‡”•‹–›ʹͲͲͺƒ‰‡Ǧ͸ʹ
”‡Ǧ‹•ƒ•–‡”ŽŽǦƒœƒ”†•‹–‹‰ƒ–‹‘Žƒ
HazMit
20/20 Event
Rating
21
Event/Hazard
Appendix B – County Plan Comparison Charts
6
6
6
6
6
HS
Region
King
King
King
King
King
County
15
13
12
10
Hail
Earthquake
High Winds
Volcano Activity
King County is geographically located in an area known as the Pacific
Ring of Fire. The same geological events that result in volcanic activity
also generate notable earthquakes. Washington State is framed by the
Pacific, North American, and Juan de Fuca plates.
* A significant number of active fault lines or cracks in that crust have
been identified in the central Puget Sound area including Seattle and
King County. On an annual basis, thousands of minor earthquake events
occur in the greater Puget Sound Region.
* In the City of Seattle, there are over 3000 facilities with hazardous
materials regulated under the fire code. Other areas with high
concentrations of hazardous materials usage include Harbor Island, the
Duwamish Corridor, Redmond and the Kent Valley. Business types that
commonly use hazardous materials locally include: hospitals, schools,
metal plating and finishing, the aircraft industry, public utilities, cold
storage companies, the fuel industries, the communication industry,
chemical distributors, research, and high technology firms. Each of these
facilities is required to maintain plans for warning, notification, evacuation
and site security under various regulations. The majority of releases that
occur during the course of regular commerce happen at fixed facilities.
* Efforts continue to increase the compliance rate and education level of
local facilities. In excess of 300 hazardous materials events require
response in King County annually; however, many events are not
reported or go undetected.
Notes from County HazMit Plan
ƒ•Š‹‰–‘–ƒ–‡‹˜‡”•‹–›ʹͲͲͺƒ‰‡Ǧ͸͵
”‡Ǧ‹•ƒ•–‡”ŽŽǦƒœƒ”†•‹–‹‰ƒ–‹‘Žƒ
20
HazMit
20/20 Event
Rating
20
Loss of Electrical
Service
Hazardous Material
Event
Event/Hazard
Appendix B – County Plan Comparison Charts
6
6
6
6
6
6
HS
Region
King
King
King
King
King
King
County
8
HazMit
20/20 Event
Rating
10
Flooding in King County occurs primarily when large wet and warm
weather systems occur in the Cascade Mountains and after snow packs
have accumulated. The combination of melting snow runoff and added
precipitation can fill rivers within hours but usually build over one to three
days. For this reason most flooding occurs in the winter months. The
majority of this precipitation occurs as rain in the lowlands between
October and early May with substantial snow packs in the Cascades
during the same time frames. Thanksgiving weekend has often been
noted as the beginning of flood season in King County.
* King County Water and Land Resources Division (KCW&LRD) is
nationally known for its work on flooding mitigation. In 1978
unincorporated King County entered the National Flood Insurance
Program (NFIP). The NFIP, administered by FEMA, enables residents in
participant communities to purchase discounted flood insurance. The
amount of discount each community receives is contingent upon its
Community Rating System (CRS) rating corresponding to the extent of its
floodplain management efforts. For its extensive services in this respect –
the implementation of programs such as buyouts for properties
experiencing repeated flooding, maintenance of levees along pertinent
rivers, and annual public meetings with affected communities, the County
has earned a Class 4 rating, making it the highest rated community of
any county in the nation. The result of this has been a 30 percent annual
savings to flood insurance policy holders in unincorporated King County.
Notes from County HazMit Plan
ƒ•Š‹‰–‘–ƒ–‡‹˜‡”•‹–›ʹͲͲͺƒ‰‡Ǧ͸Ͷ
”‡Ǧ‹•ƒ•–‡”ŽŽǦƒœƒ”†•‹–‹‰ƒ–‹‘Žƒ
Flooding
Major Fire - Urban
Event/Hazard
Appendix B – County Plan Comparison Charts
6
6
HS
Region
King
King
County
0
Civil Disturbance
The economic impact to urban areas during civil unrest and following
such events can be profound. Direct impacts include looting and
smashed windows as well as endangering shop owners and customers.
Indirect economic impacts result from the loss of business when potential
customers do not approach businesses for extended periods of time.
Customer impressions and habits can change from the experience of a
single threatening event. In Seattle, WTO resulted in the closure of
several small businesses in the downtown core, resulting in a cry from
shop owners to visibly increase protection of their properties. Largely,
Mayor lost re-election based of the City’s handling of the event.
Lake Washington, Lakes Sammamish and Union have many watercrafts,
houseboats, docks, piers, houses and buildings located on or close to
their waterfronts. Our area floating bridges may also be at risk for seiche
damage. Additional vulnerabilities to seiche in King County include water
storage tanks and containers of liquid hazardous materials, which could
be affected by the rhythmic motion of a “sloshing” seiche
* Elliott Bay and Puget Sound are shallow, there is less water to displace;
therefore, a resulting tsunami would be slower and have less volume
than those generated in the deep ocean. Puget Sound's steeply sloping
seabed tends to increase the chance that a tsunami will break on the
shore, thus potentially enhancing a tsunami's destructiveness. Finally,
the shape of Elliott Bay could increase damage by funneling waves
together, increasing wave height. The net result is unclear, as the depth
versus shape relationship of Elliot Bay is relatively unknown.
Notes from County HazMit Plan
ƒ•Š‹‰–‘–ƒ–‡‹˜‡”•‹–›ʹͲͲͺƒ‰‡Ǧ͸ͷ
”‡Ǧ‹•ƒ•–‡”ŽŽǦƒœƒ”†•‹–‹‰ƒ–‹‘Žƒ
0
HazMit
20/20 Event
Rating
3
Key Employer Crisis
Storm surge, Tsunami
Event/Hazard
Appendix B – County Plan Comparison Charts
6
6
6
HS
Region
King
King
King
County
0
0
HazMit
20/20 Event
Rating
* On a worldwide basis, explosive and small arms remain the primary
method of aggression. Domestically, this theme was evident in the shoe
bomber incident (Richard Reid),2 Washington, D.C. shootings, Twin
Trade Towers, University of Washington School of Horticulture bombing,
Atlanta Olympics bombing, and Atlanta abortion clinic bombing. Officials
are increasingly concerned about the use of weapons of mass
destruction on U.S. soil.
* While some legislation and operational countermeasures have existed
for some time, the events of September 11, 2001 have accelerated
terrorism mitigation efforts. Broadly, grants have been awarded to local
first responders since 1998 for the purchase of important response
equipment; national and local exercises of plans a procedures
conducted; powers given or broadened for law enforcement regarding
surveillance; and the consolidation of several agencies into the U.S.
Department of Homeland Security have been completed. Capabilities
related to bioterrrorism have received increasing attention.
Notes from County HazMit Plan
ƒ•Š‹‰–‘–ƒ–‡‹˜‡”•‹–›ʹͲͲͺƒ‰‡Ǧ͸͸
”‡Ǧ‹•ƒ•–‡”ŽŽǦƒœƒ”†•‹–‹‰ƒ–‹‘Žƒ
Economic Crisis
Crime
Event/Hazard
Appendix B – County Plan Comparison Charts
6
6
6
HS
Region
King
King
King
County
0
HazMit
20/20 Event
Rating
0
While drought isn’t typically thought of as a King County hazard, the
historical record demonstrates that it is important to consider drought
conditions as a potential impact to the region.
* In Washington State, the statutory criteria for drought is a water supply
below 75% of normal and a shortage expected to create undue hardship
for some water users.
* Assessing the probability of drought conditions in King County can be
challenging, due to the temperate weather nature of our region. As a
result, current long-range forecasts of drought have limited reliability.
Meteorologists do not believe that reliable forecasts are attainable any
more than a season in advance. If historic patterns repeat themselves,
dry conditions occur approximately every decade. Probability of Drought
conditions is Moderate – the potential Impact from Drought conditions is
Moderate.
* Drought conditions occurring in King County can have an impact on the
economic viability of agriculture- and power-related industries as well as
water- and snowrelated recreational activities. Drought conditions would
impact the amount of water available for crops grown for commercial and
domestic use, and could also reduce
the snow pack available in our local mountain passes, which could have
a negative result on area winter sports tourism.
King County is becoming more vulnerable to the effects of wildland/urban
interface fires due to increased building, living and recreating in forested
areas. The effects of interface fires can be the combined affects of both
structure and wildland fires.
Notes from County HazMit Plan
ƒ•Š‹‰–‘–ƒ–‡‹˜‡”•‹–›ʹͲͲͺƒ‰‡Ǧ͸͹
”‡Ǧ‹•ƒ•–‡”ŽŽǦƒœƒ”†•‹–‹‰ƒ–‹‘Žƒ
Major Fire - Wildland
Drought
Event/Hazard
Appendix B – County Plan Comparison Charts
6
6
HS
Region
King
King
County
70
0
0
0
HazMit
20/20 Event
Rating
0
Chelan County - REGION 7
Chelan County has not seen many urban fires, most have been limited to
single structures.
* The County plan puts the responsibility on each of the citizens to be
mindful of common sense things such as keeping matches out of reach
of children, heaters 36" from anything that can burn, attention in the
kitchen while cooking, and fire safety is practiced at home and at work.
Landslide events in King County are most often associated with either
unusually heavy seasonal rains or local earthquake activity.
* The slopes of Magnolia, West Seattle, Burien, Des Moines, Vashon
Island, Newcastle, Federal Way and many areas of Bellevue have long
been developed for their magnificent views of Mount Rainier, the
Cascade and Olympic Mountains, and Puget Sound. Three major factors
that contribute to landslide activity and possible impacts to structures
include soil type, slope angle, and precipitation levels.
* Landslides have been a significant problem in the Puget lowland areas
for many years, and several landslides occur every year during the rainy
season.
Notes from County HazMit Plan
ƒ•Š‹‰–‘–ƒ–‡‹˜‡”•‹–›ʹͲͲͺƒ‰‡Ǧ͸ͺ
”‡Ǧ‹•ƒ•–‡”ŽŽǦƒœƒ”†•‹–‹‰ƒ–‹‘Žƒ
Major Fire - Urban
Lightning
Subsidence/Expansiv
e Soils
Infestation, Disease
Landslide, Erosion
Event/Hazard
Appendix B – County Plan Comparison Charts
7
Chelan
King
Chelan
King
6
6
7
King
King
County
6
6
HS
Region
35
35
Loss of Water Service
Severe Winter Storm
* Most typical severe storms include: high wind, winter storm, blizzard,
dust storm, severe storm, tornado, coastal
* Primary effects vary with intensity of storm, they include transportation
accidents from accumulation of snow, ice, hail, or dust from
accompanying winds. Other effects include loss of life and injury from
accompanying flash floods, fires, and avalanches.
* Physical damage to facilities can occur from accumulation of snow, ice,
hail or dust from accompanying winds.
* Secondary effects include severe wind erosion of dry soils, overtaxing
of agricultural damages created from inflated prices, and finally
temporary shortages of necessities in the storm impacted areas.
* Two types of flooding: Flash flooding and stage flooding.
* Stage flooding has been more common in the last 15 years, the last two
episodes taking place in 1990 and 1995.
* Flash flooding has caused deaths in the area and is a threat to local
populated areas due to the topographical makeup of the county. Severe
thunderstorms or rapid snowmelt pose constant threats of extensive
damage and death.
* Primary flooding season is during the spring melt from March to June.
Although flash flooding has primarily been seen in July and August, but
can occur anytime of the year. Threat is increased in areas where the
area has experienced Wildland fires.
Notes from County HazMit Plan
ƒ•Š‹‰–‘–ƒ–‡‹˜‡”•‹–›ʹͲͲͺƒ‰‡Ǧ͸ͻ
”‡Ǧ‹•ƒ•–‡”ŽŽǦƒœƒ”†•‹–‹‰ƒ–‹‘Žƒ
35
35
HazMit
20/20 Event
Rating
18
Crime
Telecommunication
System Failure
Flooding
Event/Hazard
Appendix B – County Plan Comparison Charts
7
Chelan
Chelan
Chelan
7
7
Chelan
Chelan
County
7
7
HS
Region
24
Subsidence/Expansiv
e Soils
Landslide Erosion
* Typically occur following severe storms, wildfires, earthquakes or
construction activity.
* Extensive landslides occurred in the slide-prone shorelines of the
Columbia River.
* Most ground fissures occurred in the following areas: East end of Lake
Chelan, Chelan landing / Chelan falls area, on the East side of the
Columbia River.
* Increased development in or near the mountains and narrow valleys
bring added exposure to people and their structures. More are
recreating, working and building in potentially hazardous areas with little
caution or preparation.
* Effects from slides include: partial damages or destruction of significant
portions of highways and railroads, utility lines, private and public
property, as well as loss of natural resources and the cost of debris
removal.
* Typical occurrences of power outages in Chelan County are the result
of a storm, auto accident, or human error. This is typically a temporary
outage in isolated portions of the County and is of relatively short
duration.
* Long term shortages of petroleum products will impact the entire
County and effect the US at large
* In a large scale energy emergency, local government would also be
involved with public education programs on energy conservation and
establishing priorities for restoration of energy resources at vital facilities.
* Typically small magnitudes from 3 - 6 on the Richter scale. But shallow
so producing more aftershocks.
* Damage has been low in the county.
* Higher risk areas are Lake Chelan vicinity and Entiat. Lake Chelan is
the most active area for earthquakes with over 23 since 1900, and 17 in
Entiat.
Notes from County HazMit Plan
ƒ•Š‹‰–‘–ƒ–‡‹˜‡”•‹–›ʹͲͲͺƒ‰‡Ǧ͹Ͳ
”‡Ǧ‹•ƒ•–‡”ŽŽǦƒœƒ”†•‹–‹‰ƒ–‹‘Žƒ
24
30
30
HazMit
20/20 Event
Rating
33
Lightning
Loss of Electrical
Service
Earthquake
Event/Hazard
Appendix B – County Plan Comparison Charts
7
7
7
7
7
HS
Region
Chelan
Chelan
Chelan
Chelan
Chelan
County
4
2
0
0
Civil Disturbance
Volcano Activity
Key Employer Crisis
Drought
* Since the 1920's there have been approx. 13 droughts, which have
impacted agriculture, forestry, and hydroelectric interest, particularly nonirrigated farms, range and forest land uses.
* Primary effects include loss of fruit, dry land crops, loss of range and
domestic animals, wildlife, and wildlife habitat, and extreme increase of
risk of wildland fires.
* Secondary effects are social and economic hardships due to crop
losses, energy curtailment, temporary unemployment, domestic and
municipal water shortages,
Low to non-existent risk, and impacts if there was one would be minimal.
* Chelan is the center of a major transportation route as well as a large
agricultural based economy, incidents involving hazardous materials can
occur at any time or place within the county. Statistically, the majority of
the statewide incidents involving hazardous substances have been
transportation related spills, as has been in the case in Chelan County.
* Hazardous material seen in the county include: Anhydrous Ammonia,
Chlorine, Methyl Bromide, Ag Chemicals, Compressed gasses, Liquefies
petroleum gas, Hydrogen peroxide, and molten sulfur.
* As population increases so does the demand for products. The county
at this time is not prepared to quickly handle a large scale problem
should it arise.
Notes from County HazMit Plan
ƒ•Š‹‰–‘–ƒ–‡‹˜‡”•‹–›ʹͲͲͺƒ‰‡Ǧ͹ͳ
”‡Ǧ‹•ƒ•–‡”ŽŽǦƒœƒ”†•‹–‹‰ƒ–‹‘Žƒ
15
12
HazMit
20/20 Event
Rating
20
16
Hail
Hazardous Materials
Event
High Winds
Radiological Incident
Event/Hazard
Appendix B – County Plan Comparison Charts
Chelan
Chelan
7
7
Chelan
Chelan
Chelan
Chelan
Chelan
7
7
7
7
7
Chelan
County
7
HS
Region
0
0
0
0
Major Fire - Wildland
Economic Crisis
Infestation Disease
Loss of Sewer Service
Loss of Gas Service
* Short term loss caused by a wildland fire can include destruction of
timber, wildlife, habitat, scenic vistas, and watersheds; vulnerability to
flooding increased due to the destruction of watersheds. Long-term
effects include smaller timber harvests, reduced access to affected
recreational areas, and destruction of cultural and economic resources
and community infrastructure.
* Chelan contains several urban interface communities that are
considered to be at high risk to wildland fires as designated by the State
Forester, including the cities of Cashmere, Entiat, Leavenworth, and
Wenatchee and the rural villages of Stehekin, Peshastin, and Manson.
* 1981 - 1990 there were a total of 639 fires in the forest within Chelan
county. 404 (63%) were lightning caused and 235 (37%) were human
caused. Thunderstorms of late July early August brings dry lightning.
* Prolonged periods of low precipitation presents a potentially dangerous
problem. In Chelan County the probability of a wildland fire starting at a
particular location depends on fuel conditions and topography, time of
year, weather conditions, and the level of human activities occurring that
day; however, wildland fires have occurred in almost every month of the
year. Drought, snow pack, and local weather conditions can expand the
length of the fire season. The early and late shoulders of the fire season
are associated with human caused fires, with the peak period of July,
August, and early September related to thunderstorms and lightning
strikes.
Notes from County HazMit Plan
ƒ•Š‹‰–‘–ƒ–‡‹˜‡”•‹–›ʹͲͲͺƒ‰‡Ǧ͹ʹ
”‡Ǧ‹•ƒ•–‡”ŽŽǦƒœƒ”†•‹–‹‰ƒ–‹‘Žƒ
HazMit
20/20 Event
Rating
0
Event/Hazard
Appendix B – County Plan Comparison Charts
7
Chelan
Chelan
Chelan
7
7
Chelan
Chelan
Chelan
County
7
7
7
HS
Region
NR
**Terrorism /
Sabotage
27
15
Kittitas County - REGION 7
*Hazard Potential - Chelan County is vulnerable - various activities in the
county can assemble an excess of 100K people for a weekend event and
gatherings of 25K people in a 3-block area. These assemblies could be
potential terrorist targets.
* Mitigation should include training of response personnel and elected
officials and the development of policies and procedures relating to the
response to suspected terrorist acts.
* There are many older dams in Chelan County. Most of the earths dams
which are fifty years and older can be considered potentially hazardous
during certain climatological situations or during / after an earthquake.
* State Department of Ecology, Dam Safety Division is responsible for
inspecting private and non-federal dams for safety conditions.
Notes from County HazMit Plan
ƒ•Š‹‰–‘–ƒ–‡‹˜‡”•‹–›ʹͲͲͺƒ‰‡Ǧ͹͵
”‡Ǧ‹•ƒ•–‡”ŽŽǦƒœƒ”†•‹–‹‰ƒ–‹‘Žƒ
Flooding
Crime
NR
HazMit
20/20 Event
Rating
0
**Dam Failure
Storm surge, Tsunami
Event/Hazard
Appendix B – County Plan Comparison Charts
7
7
7
7
7
7
HS
Region
Chelan
Kittitas
Kittitas
Kittitas
Chelan
Chelan
County
9
5
High Winds
Major Fire - Urban
* The occurrence of a major disaster could destroy or damage portions of
the county’s energy and utility systems and disrupts petroleum supplies.
* The transportation, media and telecommunications infrastructures will
be affected.
* Delays in the productions, refining, and delivery of petroleum based
products occur as a result of transportation infrastructure problems and
loss of commercial power.
* The electric power within Kittitas County is organized by the Kittitas
County Public Utility District (PUD) and Puget Sound Energy both using
the Northwest Power Pool. Many end users with high reliability needs
(e.g., hospitals, and public safety) have their own in-house generations
sources.
* Emergency Management will coordinate with energy, utility, and
petroleum providers and government officials so that information
regarding the proper use of these services can made to the public.
Notes from County HazMit Plan
ƒ•Š‹‰–‘–ƒ–‡‹˜‡”•‹–›ʹͲͲͺƒ‰‡Ǧ͹Ͷ
”‡Ǧ‹•ƒ•–‡”ŽŽǦƒœƒ”†•‹–‹‰ƒ–‹‘Žƒ
Loss of Electrical
Service
HazMit
20/20 Event
Rating
10
Event/Hazard
Appendix B – County Plan Comparison Charts
Kittitas
Kittitas
Kittitas
7
County
7
7
HS
Region
4
3
Earthquake
Storm surge, Tsunami
* In a major disaster situation, the Kittitas County Emergency Operations
Center has a 24 hours emergency alerting and communications
capability for contacting response personnel at the various local, state
and federal levels of government. Communications resources and their
backup capabilities include two way public agency radio networks with
public safety agency paging ability, ACCESS, National Warning Alert
System and commercial telephone services. The Emergency Operations
Center which is located in Kittcom Facility, is designated as the primary
communications center for Kittitas County, in the event of a major
incident.
* During localized emergency situations, a mobile Command Post may
be utilized to establish communications from agencies involved at the
scene. In more extreme circumstances, the mobile Command Post may
also be used to link field units with the decision makers stationed at the
Emergency Operations Center.
* Upon receipt of warning information the receiving agency will ensure
that the information is disseminated to the necessary support agencies
and that all primary agencies are alerted to the information.
Notes from County HazMit Plan
ƒ•Š‹‰–‘–ƒ–‡‹˜‡”•‹–›ʹͲͲͺƒ‰‡Ǧ͹ͷ
”‡Ǧ‹•ƒ•–‡”ŽŽǦƒœƒ”†•‹–‹‰ƒ–‹‘Žƒ
4
4
HazMit
20/20 Event
Rating
5
Volcano Activity
Loss of Water Service
Telecommunication
System Failure
Event/Hazard
Appendix B – County Plan Comparison Charts
Kittitas
Kittitas
Kittitas
Kittitas
Kittitas
7
7
7
County
7
7
HS
Region
1
1
1
1
1
1
Landslide, Erosion
Infestation, Diseases
Lightning
Severe Winter Storm
Economic Crisis
Hail
Hazardous materials are transported through the Kittitas County area
daily via rail, highway and air routes, creating a relatively high exposure
to potential Haz-Mat incidents. Local response to these incidents is
limited in scope by both financial and training constraints.
* it is not feasible for Kittitas County to have and maintain a full Haz-Mat
response team and equipment. For this reason in the event of a major
Haz-Mat incident beyond the capabilities of local responders, the only
actions that will be taken will be consistent with their capabilities at the
operational level. Defensive actions will be the highest level of response
by local responders.
The primary agency is the Washington State Patrol, as local Haz-Mat
incident command agency. The response to a Hazardous Materials
incident will follow the concepts of the Incident Command System,
establishing Unified Command, as appropriate.
* The Ellensburg Telephone Company serves most of Ellensburg and
Kittitas County . The company has plans for restoring service. The first
priority is restoration of company capability then emergency services. All
Departments can expect a delay in telephone communications due to a
major outage during a disaster.
Notes from County HazMit Plan
ƒ•Š‹‰–‘–ƒ–‡‹˜‡”•‹–›ʹͲͲͺƒ‰‡Ǧ͹͸
”‡Ǧ‹•ƒ•–‡”ŽŽǦƒœƒ”†•‹–‹‰ƒ–‹‘Žƒ
2
2
HazMit
20/20 Event
Rating
3
Civil Disturbance
Loss of Sewer Service
Hazardous Materials
Events
Event/Hazard
Appendix B – County Plan Comparison Charts
Kittitas
Kittitas
Kittitas
Kittitas
Kittitas
7
7
7
7
7
Kittitas
Kittitas
7
7
Kittitas
Kittitas
County
7
7
HS
Region
0
0
0
0
36
25
12
Major Fire - Wildland
Key Employer Crisis
Loss of Gas Service
Drought
Flooding
High Winds
Telecommunication
System Failure
Grant County - REGION 7
Based upon the historical record of flooding in the Columbia River and
Crab Creek the impacts flood events have had on the citizens of Grant
County, there is a MODERATE PROBABILITY of future flooding and a
MODERATE RISK for the people, businesses, and infrastructure located
within the floodway and the floodplain of the Columbia River and Crab
Creek..
Possible hazards or problems may be loss of power and phone lines,
danger of fire and electrocution. Toppled trees, broken limbs, collapsed
barns, damage to residential and commercial structures as well as
damage to cars, trucks and trailers. Multiple vehicle accidents with
injuries and deaths may occur from blowing dust. Extremely violent wind
storms could cause damage to large areas of the agricultural lands
resulting in economic losses.
Notes from County HazMit Plan
ƒ•Š‹‰–‘–ƒ–‡‹˜‡”•‹–›ʹͲͲͺƒ‰‡Ǧ͹͹
”‡Ǧ‹•ƒ•–‡”ŽŽǦƒœƒ”†•‹–‹‰ƒ–‹‘Žƒ
0
HazMit
20/20 Event
Rating
0
Subsidence/Expansiv
e Soils
Radiological Incident
Event/Hazard
Appendix B – County Plan Comparison Charts
7
7
7
7
7
7
7
7
7
7
HS
Region
Grant
Grant
Grant
Kittitas
Kittitas
Grant
Kittitas
Kittitas
Kittitas
Kittitas
County
Based on historical evidence, there is a MODERATE PROBABILITY of a
large wildland or wildland-urban interface fire occurring in Grant County
and a MODERATE RISK to people and property as a result of a large
wildland or wildland-urban interface fire.An increasing number of homes
being built in the urban/rural fringe (known as the wildland-urban
interface.) Due to a growing population and the desire of some persons
to live in rural or isolated areas or on hillsides with scenic views,
development continues to expand further and further into traditional open
space lands. Wildland fires occur primarily in undeveloped areas; these
natural lands contain dense vegetation such as grasslands or agricultural
croplands. Because of their distance from firefighting resources and
personnel, these fires can be difficult to contain and can cause a great
deal of destruction. Lightning and human carelessness are the primary
causes of wildland fires.
Most fire fighters in Grant County are volunteers, large fire events could
significantly affect not only their lives but their source of employment
should economic impacts continue.
Notes from County HazMit Plan
ƒ•Š‹‰–‘–ƒ–‡‹˜‡”•‹–›ʹͲͲͺƒ‰‡Ǧ͹ͺ
”‡Ǧ‹•ƒ•–‡”ŽŽǦƒœƒ”†•‹–‹‰ƒ–‹‘Žƒ
8
10
Loss of Electrical
Service
Loss of Sewer Service
10
HazMit
20/20 Event
Rating
12
Loss of Water Service
Major Fire - Urban
Event/Hazard
Appendix B – County Plan Comparison Charts
7
7
7
7
HS
Region
Grant
Grant
Grant
Grant
County
0
0
0
0
Crime
Key Employer Crisis
Economic Crisis
Infestation Disease
Based on the past, there is a LOW PROBABILITY of a radiological event
occurring in Grant County. While the probability for such an event is low,
there is a MODERATE RISK associated with this hazard due to the fact
that parts of Grant County fall within the ingestion planning zone.
Grant County averages approximately twenty hazardous materials spills
per year. Based on past incidences of hazardous materials spills and
releases, there is a HIGH PROBABILITY for future hazardous materials
accidents. Also contributing to the probability of hazardous material
releases are natural disasters including but not limited to high winds,
fires, seismic activity and flooding. Due to the location of transportation
systems, farms and industrial facilities in close proximity to people and
property, there is also a MODERATE RISK to those nearby, depending
on the closeness of the source. As industry grows in our area, more
incidences may be expected.
Notes from County HazMit Plan
ƒ•Š‹‰–‘–ƒ–‡‹˜‡”•‹–›ʹͲͲͺƒ‰‡Ǧ͹ͻ
”‡Ǧ‹•ƒ•–‡”ŽŽǦƒœƒ”†•‹–‹‰ƒ–‹‘Žƒ
1
HazMit
20/20 Event
Rating
2
Radiological Incident
Hazardous Materials
Event
Event/Hazard
Appendix B – County Plan Comparison Charts
Grant
Grant
Grant
Grant
Grant
7
7
7
Grant
County
7
7
7
HS
Region
0
Subsidence/Expansiv
e Soils
Volcano Activity
* Based on historical evidence, there is a HIGH PROBABILITY of a
drought occurring in Grant County but a MODERATE RISK associated
with such an event due to the typical duration of the historical droughts
and the susceptibility of the agricultural community to the direct and
indirect effects of a drought in Grant County. The agricultural industry is
the most vulnerable to the impacts of a drought event in Grant County. A
severe drought may result in a moderate number of wells going dry. The
potable water supply for much of Grant County cities comes from
municipal water systems.
* A drought lasting for more than one season would most likely reduce
the annual snow-pack normally accumulated in the Canadian mountains
thereby reducing normal river flows in the Columbia River and hence the
Columbia Basin Irrigation Project footprint. A substantial reduction in river
flow could severely impact the generation of electricity from the hydroelectric dams located on the Columbia River. A severe drought could
cause reduced river flows thereby creating a major impact on local
salmon runs due to potentially warmer waters and low water levels.
Recreational use of the lakes and rivers in Grant County would suffer as
well.
There is a LOW PROBABILITY and a MODERATE RISK associated with
earthquakes in Grant County. Major earthquakes in the region occur in
hundreds to thousands of years and the amount of bedrock areas in
Grant County may reduce the severity of damages sustained. Land use
planners may be able to mitigate the risk through zoning.
Notes from County HazMit Plan
ƒ•Š‹‰–‘–ƒ–‡‹˜‡”•‹–›ʹͲͲͺƒ‰‡ǦͺͲ
”‡Ǧ‹•ƒ•–‡”ŽŽǦƒœƒ”†•‹–‹‰ƒ–‹‘Žƒ
0
0
HazMit
20/20 Event
Rating
0
Earthquake
Drought
Event/Hazard
Appendix B – County Plan Comparison Charts
7
7
7
7
HS
Region
Grant
Grant
Grant
Grant
County
0
0
0
Severe Winter Storm
Major Fire - Wildland
Hail
Lightning
Hazard areas may be sports venues and complexes such as soccer
fields, football fields, baseball fields and golf courses that are without
adequate shelter for participants and spectators. Lighting may cause
electrical transformers to short resulting in power outages and/or fires in
trees located near power lines. Boaters and those persons working
outdoors are also vulnerable to lightning strikes. Lightning can also start
fires in grassland areas.
Based on historical evidence, there is a MODERATE PROBABILITY of a
large wildland or wildland-urban interface fire occurring in Grant County
and a MODERATE RISK to people and property as a result of a large
wildland or wildland-urban interface fire.An increasing number of homes
being built in the urban/rural fringe (known as the wildland-urban
interface.) Due to a growing population and the desire of some persons
to live in rural or isolated areas or on hillsides with scenic views,
development continues to expand further and further into traditional open
space lands. Wildland fires occur primarily in undeveloped areas; these
natural lands contain dense vegetation such as grasslands or agricultural
croplands. Because of their distance from firefighting resources and
personnel, these fires can be difficult to contain and can cause a great
deal of destruction. Lightning and human carelessness are the primary
causes of wildland fires.
Most fire fighters in Grant County are volunteers, large fire events could
significantly affect not only their lives but their source of employment
should economic impacts continue.
Based on past events, there is a HIGH PROBABILITY of a severe storm
event occurring in Grant County. While the probability of such an event is
high, there is a MODERATE RISK associated with this hazard due to the
relatively short duration and localized impacts of such events.
Severe storms, especially severe wind storms are common in Grant
County during the spring and fall months and all areas of Grant County
are vulnerable to the impacts of severe storms.
Notes from County HazMit Plan
ƒ•Š‹‰–‘–ƒ–‡‹˜‡”•‹–›ʹͲͲͺƒ‰‡Ǧͺͳ
”‡Ǧ‹•ƒ•–‡”ŽŽǦƒœƒ”†•‹–‹‰ƒ–‹‘Žƒ
HazMit
20/20 Event
Rating
0
Event/Hazard
Appendix B – County Plan Comparison Charts
7
7
7
7
HS
Region
Grant
Grant
Grant
Grant
County
0
0
Civil Disturbance
Storm surge,Tsunami
Douglas County - REGION 7
Summary of Hazard Probability and Frequency rates this as High
Grant County does not host global meetings nor does it have a state
university. The major sports
teams are located in Seattle. There are, however, many activities which
bring in tourists and
vacationers to the area each year. There is a MODERATE
PROBABILITY and a
MODERATE RISK concerning civil disturbances in Grant County. This
hazard is more of a
risk to certain parts of the county than others and to apply the hazard to
the county as a whole
may be disproportionate.
There is a MODERATE PROBABILITY and a LOW RISK associated with
landslides in Grant County. While some areas experience movement
following heavy rains, this type of precipitation is not as prevalent in the
eastern part of the state as it is in the coastal region. Some wheat fields
in the northeastern region of Grant County have problems with heavy
runoff. However, these situations typically do not apply to the county as a
whole.
Notes from County HazMit Plan
ƒ•Š‹‰–‘–ƒ–‡‹˜‡”•‹–›ʹͲͲͺƒ‰‡Ǧͺʹ
”‡Ǧ‹•ƒ•–‡”ŽŽǦƒœƒ”†•‹–‹‰ƒ–‹‘Žƒ
High Winds
Storm surge, Tsunami
0
HazMit
20/20 Event
Rating
0
Loss of Gas Services
Landslide, Erosion
Event/Hazard
Appendix B – County Plan Comparison Charts
Grant
Douglas
Douglas
Douglas
7
Grant
Grant
Grant
County
7
7
7
7
7
7
HS
Region
Summary of Hazard Probability and Frequency rates this as Low
This particular hazard was considered to be minor, but possible in the
communities. The focus of civil disturbance that was considered was in
the form of demonstrations or civil disobedience. There are numerous
different ethnic groups and working groups that could potentially be a
source, given conditions, such as poor working environments, economic
strife or discrimination that may institute this hazard.
Summary of Hazard Probability and Frequency rates this as Medium
The local economies in most of the communities focus on agriculture,
both the orchard industry and dry land farming. In addition, many of the
communities depend on the hydroelectric power generating industry, both
federal and local government owned, and have other linked economic
development, such as fish, wildlife and other outdoor recreation.
Changes to either of these two industries, agriculture and hydropower,
can have dramatic affects to the communities that depend on them.
ƒ•Š‹‰–‘–ƒ–‡‹˜‡”•‹–›ʹͲͲͺƒ‰‡Ǧͺ͵
”‡Ǧ‹•ƒ•–‡”ŽŽǦƒœƒ”†•‹–‹‰ƒ–‹‘Žƒ
Civil Disturbance
Economic Crisis
Key Employer Crisis
Severe Winter Storm
Summary of Hazard Probability and Frequency rates this as High
Infestation, Disease
Notes from County HazMit Plan
Summary of Hazard Probability and Frequency rates this as Medium
Washington State is situated near a tectonic collision boundary where the
oceanic Juan de Fuca plate dives beneath the continental North
American plate. The plate boundary is the Cascadia Subduction Zone
which lies about fifty miles offshore, extending from near Vancouver
Island to northern California. These plates are converging at a rate of 1 to
1 ½ inches per year.
Mitigation actions are headed up by the Douglas County Transportation
and Land Services.
HazMit
20/20 Event
Rating
Earthquake
Event/Hazard
Appendix B – County Plan Comparison Charts
7
7
7
7
7
7
HS
Region
Douglas
Douglas
Douglas
Douglas
Douglas
Douglas
County
Summary of Hazard Probability and Frequency rates this as Low
Summary of Hazard Probability and Frequency rates this as Medium
Communities focused on phone and computer communications,
particularly where emergency services may be inaccessible during storm
or other events.
Summary of Hazard Probability and Frequency rates this as High
Loss of sewer and water service was primarily considered in the urban
environments in the County and cities. The focus was on health risks to
the communities and the losses that could occur, especially long-term.
These risks range from minor inconvenience to potential loss of life, as
related to disease or catastrophic loss of the infrastructure.
Summary of Hazard Probability and Frequency rates this as High
Electrical service is vital to all communities, but especially to essential
services, such as hospitals. The remote communities have an inherently
higher risk because of location from sources of power. Most natural and
social hazards can cause loss of electrical power and the communities
have identified these as such. Long-term loss of service could occur from
severe terrorist activities, especially since most of the power is generated
by a single source, Douglas County Public Utilities District (Wells Dam),
but risks have been and are continually reviewed and mitigated for by the
PUD.
Radiological Incident
Telecommunications
System Failure
Loss of Water Service
Loss of Electrical
Service
ƒ•Š‹‰–‘–ƒ–‡‹˜‡”•‹–›ʹͲͲͺƒ‰‡ǦͺͶ
”‡Ǧ‹•ƒ•–‡”ŽŽǦƒœƒ”†•‹–‹‰ƒ–‹‘Žƒ
Summary of Hazard Probability and Frequency rates this as High
Loss of Sewer Service
Notes from County HazMit Plan
Summary of Hazard Probability and Frequency rates this as High
Crime has many forms, such as burglary, illegal drug manufacturing,
assaults with weapons that may occur in the communities. Any one type
can be a hazard for the community, and some may pose additional risks,
such as illegal drug manufacturing that also poses a hazardous chemical
risk.
HazMit
20/20 Event
Rating
Crime
Event/Hazard
Appendix B – County Plan Comparison Charts
7
7
7
7
7
7
HS
Region
Douglas
Douglas
Douglas
Douglas
Douglas
Douglas
County
Summary of Hazard Probability and Frequency rates this as High
Summary of Hazard Probability and Frequency rates this as High
Landslides vary greatly in size and composition: from a thin mass of soil
a few yards wide to deep-seated bedrock slides miles across. The travel
rate of a landslide can range from a few inches per month to many feet
per second depending on the slope, type of materials, and moisture
content.
Mitigation actions are headed up by the Douglas County Transportation
and Land Services
ƒ•Š‹‰–‘–ƒ–‡‹˜‡”•‹–›ʹͲͲͺƒ‰‡Ǧͺͷ
”‡Ǧ‹•ƒ•–‡”ŽŽǦƒœƒ”†•‹–‹‰ƒ–‹‘Žƒ
Hail
Lightning
Landslide, Erosion
Summary of Hazard Probability and Frequency rates this as High
Subsidence/Expansiv
e Soils
Major Fire - Wildland
Summary of Hazard Probability and Frequency rates this as High
Summary of Hazard Probability and Frequency rates this as Low
Hazardous materials include chemicals used in manufacturing,
household chemicals, crude oil and petroleum products, pesticides,
herbicides, fertilizers, paints, medical wastes, radioactive materials and a
host of other substances. Their manufacture, transport, storage, use and
disposal place the public property and environment at risk from their
inadvertent or intentional release.
Hazardous Materials
Event
Notes from County HazMit Plan
Summary of Hazard Probability and Frequency rates this as Low
There are two types of gas service, natural gas and bottled and delivered
propane gas. The assessment of Douglas County only examined natural
gas service, although that service is limited to the East Wenatchee area.
Currently, few businesses and homes use gas exclusively, but those that
heat and cook could suffer economic and/or personal loss should service
stop.
HazMit
20/20 Event
Rating
Loss of Gas Service
Event/Hazard
Appendix B – County Plan Comparison Charts
Douglas
Douglas
Douglas
Douglas
7
7
Douglas
Douglas
Douglas
County
7
7
7
7
7
HS
Region
Summary of Hazard Probability and Frequency rates this as Low
Though there are no volcanoes within Douglas County, active volcanoes
exist throughout the Cascade Mountain Range to the west, which
includes Mt. Rainier, Mt. St. Helens, Glacier Peak, Mt. Adams and Mt.
Baker.
Volcano Activity
ƒ•Š‹‰–‘–ƒ–‡‹˜‡”•‹–›ʹͲͲͺƒ‰‡Ǧͺ͸
”‡Ǧ‹•ƒ•–‡”ŽŽǦƒœƒ”†•‹–‹‰ƒ–‹‘Žƒ
Summary of Hazard Probability and Frequency rates this as High
Although severe, multi-structure fires are rare, there are locations that,
under the right conditions, a larger urban fire could occur, such as the
commercial and industrialized areas or residential structures along the
urban-wildland interfaces that all the communities have. Single structure
fires occur, but due to improvements in building codes and fire protection
services, these too are uncommon.
Mitigation actions are headed up by the Douglas County Transportation
and Land Services
Major Fire - Urban
Notes from County HazMit Plan
Summary of Hazard Probability and Frequency rates this as High
Droughts are a natural part of the climate cycle. In the past century,
Washington State has experienced a number of drought episodes,
including several that lasted for more than a single season – 1928 to
1932, 1992 to 1994, and 1996 to 1997. Unlike most states, Washington
has a statutory definition of drought (Revised Code of Washington
Chapter 43.83B.400). According to state law, an area is in a drought
condition when: • The water supply for the area is below 75 percent of
normal. • Water uses and users in the area will likely incur undue
hardships because of the water shortage.
Mitigation actions are headed up by the Douglas County Transportation
and Land Services.
HazMit
20/20 Event
Rating
Drought
Event/Hazard
Appendix B – County Plan Comparison Charts
7
7
7
HS
Region
Douglas
Douglas
Douglas
County
80
HazMit
20/20 Event
Rating
Summary of Hazard Probability and Frequency rates this as High
Of all natural hazards that affect Douglas County, flooding from storm
events is the most common. The most serious of floods have occurred as
rain-on-snow events, compounded many times with frozen ground.
Secondarily, storm water flooding from downpours has caused damage,
particularly within the Greater East Wenatchee Area. Both of these types
of events could be considered flash flood events, much as those seen in
other areas of the arid portions of the western United States. These
events do not coincide with spring runoff events that occur in more
mountainous regions to the east and west of Douglas County, although
those events may affect some citizens indirectly (in adjacent Chelan and
Okanogan Counties). All of the communities have been affected by the
major events, anywhere from cutting off transportation routes from
floodwaters, damage or debris, major crop losses (economic), home and
business damages and other infrastructure (utilities, services etc.)
Mitigation actions are headed up by the Douglas County Transportation
and Land Services.
Benton County - REGION 8
Areas exposed to wildfires are those undeveloped areas with natural
vegetation, including rangeland, natural areas, undeveloped hillsides, etc.
The development of homes and other structures is encroaching onto
adjacent agricultural and natural areas and is continually expanding the
wildland-urban interface. There are large areas of Benton County that are
subject to wildfire. All of the municipalities are exposed to wildfire at their
wildland-urban interfaces. The risk from wildfire is high in the interface
and intermix communities at the growing boundaries of the cities and
urban areas and medium in the occluded communities within the cities
and urban growth areas. The wildfire risk to the remainder of the
exposed areas of the County is medium. In addition, drought conditions
and/or strong winds can raise the risk to high for all of Benton County.
Notes from County HazMit Plan
ƒ•Š‹‰–‘–ƒ–‡‹˜‡”•‹–›ʹͲͲͺƒ‰‡Ǧͺ͹
”‡Ǧ‹•ƒ•–‡”ŽŽǦƒœƒ”†•‹–‹‰ƒ–‹‘Žƒ
Major Fire - Wildland
Flooding
Event/Hazard
Appendix B – County Plan Comparison Charts
8
7
8
HS
Region
Benton
Douglas
Benton
County
75
70
65
60
Major Fire - Urban
High Winds
Severe Winter Storm
Radiological Incident
A vulnerability assessment that describes the number of lives or amount
of property exposed to elements of severe winter storms has not yet
been conducted for Benton County. However, severe winter storms can
cause power outages, transportation and economic disruptions, and pose
a high risk for injuries and loss of life. Existing mitigation activities
include current mitigation programs and activities that are being
implemented by local, regional, state, or federal agencies or
organizations.
Benton County and the surrounding area are famous for receiving strong
winds. Some of these strong wind events can become very intense and
last for several hours. The most damaging types of wind events typically
last over longer durations and occur over the winter months.
Limiting Exposure by removing existing development within the area of
hazard and / or restricting future development within the area of hazard.
As well as limiting vulnerability by providing structural defenses against
the impacts of the hazard, providing nonstructural defenses against the
impacts of the hazard, providing hazard mitigation education to affected
communities and the general public, ensuring that plans, procedures,
facilities, equipment, and trained personnel are available to provide for
adequate hazard response and recovery.
Notes from County HazMit Plan
ƒ•Š‹‰–‘–ƒ–‡‹˜‡”•‹–›ʹͲͲͺƒ‰‡Ǧͺͺ
”‡Ǧ‹•ƒ•–‡”ŽŽǦƒœƒ”†•‹–‹‰ƒ–‹‘Žƒ
HazMit
20/20 Event
Rating
Event/Hazard
Appendix B – County Plan Comparison Charts
8
8
8
8
HS
Region
Benton
Benton
Benton
Benton
County
44
40
Landslide Erosion
Crime
Benton County is vulnerable to landslide hazards under the proper
conditions, especially in the steeper slope areas. Due to the unique
problems inherent in development in steeply sloping areas, special care
must be exercised in the planning and development of such areas.
Benton County’s Comprehensive Plan Land Use Map identifies lower
rural densities for steeply sloping areas and the Critical Areas Protection
Ordinance applies performance standards to development within these
areas. While not prohibiting development, the ordinance does require
that the nature and severity of the hazard be identified and that the siting,
design and engineering for development directly respond to the identified
hazards, so that long term structural integrity can be reasonably assured.
Mitigation strategies for landslide hazards have not yet been developed
as part of this Hazard Mitigation Plan.
Benton County is vulnerable to drought, despite its proximity to the
Yakima and Columbia River system and extensive irrigation networks.
Approximately 68 percent of the county land is in agricultural use, and 79
percent of that is dry cropland and rangeland. The principal effects of
drought are economic losses due to the impact on agricultural
businesses. Farm owners, tenants, and workers are affected by reduced
crop yield and feed for range animals.
The State Drought Contingency Plan focuses on water supply impacts
resulting from hydrological, rather than meteorological, drought. Water
supply monitoring and forecasting responsibilities are given to the Water
Supply Availability Committee (WSAC). Washington’s Drought
Contingency Plan addresses two important issues: pre-drought
preparation and post-drought recovery and evaluation. Mitigation
strategies are still TBD.
Notes from County HazMit Plan
ƒ•Š‹‰–‘–ƒ–‡‹˜‡”•‹–›ʹͲͲͺƒ‰‡Ǧͺͻ
”‡Ǧ‹•ƒ•–‡”ŽŽǦƒœƒ”†•‹–‹‰ƒ–‹‘Žƒ
60
55
50
HazMit
20/20 Event
Rating
Drought
Civil Disturbance
Lightning
Event/Hazard
Appendix B – County Plan Comparison Charts
8
8
8
8
8
HS
Region
Benton
Benton
Benton
Benton
Benton
County
26
Earthquake
Major flood damage is typically caused by high-magnitude winter floods.
Eighteen of the 24 largest Yakima River floods were winter floods. Flood
related damages have been concentrated in the low-lying areas between
Benton City and the Richland-West Richland area. Flooding problems in
the Horse Heaven Hills are relatively infrequent, but can cause significant
wide spread damage to county roads when flash floods occur. Most of
the residential developments subject to flooding are located outside city
boundaries in the unincorporated areas of the County. Older homes in
the Yakima River floodplain, constructed prior to their community’s
participation in NFIP, typically lack flood proofing and have a higher risk
of incurring flood damage. The likely trend is for the frequency and
magnitude of floods within the lower reaches of the Yakima River to
increase as the upper water shed continues to urbanize and its natural
storage capacity is diminished. Flooding in the Yakima River valley could
cause property and infrastructure damage, evacuation of residents, and
contamination of wells. Ongoing flood management and mitigation
approaches used by the municipalities of Benton County typically follow
FEMA requirements
Since a complete vulnerability assessment has not been completed, it is
not possible at this time to describe the types and number of existing and
future buildings, infrastructure, and critical facilities that are located within
potential earthquake hazard areas, nor to estimate the potential dollar
losses to vulnerable structures. At risk of damage from future
earthquakes are water, sewer, and natural gas pipelines, roads, power
lines and infrastructure, buildings, and private property located within the
county.
Benton County requires that design criteria from the 1997 Unified
Building Code (UBC) be used for new buildings and structures within the
county. The 1997 UBC places the county within Seismic Zone IIB which
requires seismic design criteria of 0.20g peak ground acceleration plus
site-specific response spectra.
Notes from County HazMit Plan
ƒ•Š‹‰–‘–ƒ–‡‹˜‡”•‹–›ʹͲͲͺƒ‰‡ǦͻͲ
”‡Ǧ‹•ƒ•–‡”ŽŽǦƒœƒ”†•‹–‹‰ƒ–‹‘Žƒ
33
HazMit
20/20 Event
Rating
35
Flooding
Hail
Event/Hazard
Appendix B – County Plan Comparison Charts
8
8
8
HS
Region
Benton
Benton
Benton
County
20
20
16
16
16
16
12
Infestation Disease
Telecommunication
System Failure
Loss of Sewer Service
Hazardous Materials
Event
Volcano Activity
Loss of Water Service
Economic Crisis
Benton County has been impacted by volcanic ash fall from the eruption
of several volcanoes in the Cascade Range of Washington and Oregon
over the last 15,000 years. A volcanic eruption in the Cascade Range
could impact Benton County with volcanic ash fall if the wind is blowing in
the prevailing easterly direction. However, any volcanic eruption in the
Cascade Range that affects regional infrastructure, air traffic, bridges, or
Interstates 90, 84, or 82 will have both direct and indirect impacts on the
county.
A mitigation strategy has not been completed at this time.
Communities located near chemical manufacturing plants, or other
industrial facilities that use or store large quantities of hazardous
chemicals are particularly at risk. However, given that hazardous
materials are routinely and frequently transported on local roadways,
railways, and waterways, all areas of Benton County are potentially
exposed. Specific mitigation action strategies and/or potential mitigation
measures have not been determined.
Notes from County HazMit Plan
ƒ•Š‹‰–‘–ƒ–‡‹˜‡”•‹–›ʹͲͲͺƒ‰‡Ǧͻͳ
”‡Ǧ‹•ƒ•–‡”ŽŽǦƒœƒ”†•‹–‹‰ƒ–‹‘Žƒ
25
HazMit
20/20 Event
Rating
Loss of Electrical
Service
Event/Hazard
Appendix B – County Plan Comparison Charts
8
8
8
8
8
8
8
8
HS
Region
Benton
Benton
Benton
Benton
Benton
Benton
Benton
Benton
County
ƒ•Š‹‰–‘–ƒ–‡‹˜‡”•‹–›ʹͲͲͺƒ‰‡Ǧͻʹ
”‡Ǧ‹•ƒ•–‡”ŽŽǦƒœƒ”†•‹–‹‰ƒ–‹‘Žƒ
Subsidence/Expansiv
e Soils
Severe storms, especially severe wind storms are common during the
Spring and Fall months. They include High Wind, Lightning, Snow and
Ice, Hail, Tornado, Dust Storm. There is a high probability of a severe
storm event. However there is a moderate risk associated with this
hazard due to the relative short duration and localized impacts of such
events.
Franklin County - REGION 8
4
Storm surge, Tsunami
Crime
Severe Winter Storm
8
Loss of Gas Service
8
8
8
8
8
8
8
10
HS
Region
8
Notes from County HazMit Plan
12
HazMit
20/20 Event
Rating
Key Employer Crisis
Subsidence/Expansiv
e Soils
Event/Hazard
Appendix B – County Plan Comparison Charts
Franklin
Franklin
Benton
Franklin
Franklin
Benton
Benton
Benton
County
HazMit
20/20 Event
Rating
Within Franklin County approximately 85% of the land area is used for
agricultural purposes. All of these areas are vulnerable to wildland fires
or wildland-urban interface fires. The potential of large wildland fires in
Franklin County can be termed as moderate risk. In the event of a large
wildland or wildland-urban interface fire, additional resources could be
requested through activation of the tri-county fire mutual aid agreement,
southeastern Washington regional fire mobilization plan and/or
washington state fire mobilization plan, in addition to other state and
federal fire resources. Should a large wildland or wildland-urban interface
fire occur in Franklin County, the effects of such an event would not be
limited to just the loss of valuable rangeland, wildlife habitats, and rec.
areas. The loss of large amounts of vegetation on steep slopes of
watersheds would increase the risk of landslides and mudslides during
the winter months and depositing large amounts of mud and debris in
streams, rivers and irrigation channels could threaten the fish habitat and
watershed usage.
When a drought begins, the agricultural sector that depends heavily on
water that is stored in the soil, such as dry land wheat farmers, are
usually the first sector to experience the effects of a drought. The
agricultural industry is the most vulnerable to the impact of a drought
event in Franklin County, due to its reliance on consistent and ample
water supply. Based on historical evidence there is a high probability but
a moderate risk associated with drought. Should a severe, long term
drought occur, it will be vital that local elected officials and gov agencies
work cooperatively with Washington State Dept. of Health and
Washington State Dept of Agriculture and the Washington State Dept of
Ecology to ensure efforts are made to protect public water supplies, aid
agriculture and local industry and safeguard fish and river flows
Notes from County HazMit Plan
ƒ•Š‹‰–‘–ƒ–‡‹˜‡”•‹–›ʹͲͲͺƒ‰‡Ǧͻ͵
”‡Ǧ‹•ƒ•–‡”ŽŽǦƒœƒ”†•‹–‹‰ƒ–‹‘Žƒ
Drought
Major Fire - Wildland
Event/Hazard
Appendix B – County Plan Comparison Charts
8
8
HS
Region
Franklin
Franklin
County
HazMit
20/20 Event
Rating
The location of structures on soils of concern adds to the likelihood of
damaging effects. Liquiefaction of these soils as the result of a large
earthquake is a concern. In addition, all commercial and residential
buildings, government infrastructure, transportation system,
communication systems, utilities, and ultimately the overall economy of
Franklin County are vulnerable to the effects of a large earthquake.
There is a low probability for a potentially damaging earthquake to occur
that would resutl in many people being injured or killed, however there is
a moderate risk to the citizens, infrastructure and economy of Franklin
County should such an earthquake occur. The adoption and
enforcement of building codes, land use planning, public awareness
programs, school training, community emergency response team,
education and training are just part of the answer to mitigation. Future
population increase and urband development will require that Franklin
County continually re-assess this hazard. In addition each business and
citizen must accept responsiblity to take the necessary actions and
prepare
All persons, property, and businesses located within the floodway and
floodplain of the Columbia River or Esquatzel Coulee are directly or
indirectly vulnerable to major flood events. Based on historical record, the
Columbia River and Esquatzel Coulee flood event impacts to have a high
probability and a moderate risk is associated to the people, businesses,
and infrastructure located within the floodway and floodplain. Those who
choose to live and or work in flood hazard areas need to recognize that
government is not able to totally protect them from the impacts of a flood.
Franklin County participates in the National Flood Insurance Program,
however unless otherwise noted by the lender of the property purchased
flood insurance is not required. Flood devices are in place to control
much of the flood threat to Franklin County jurisdictions, these devices
have also contributed to the vulnerability of the citizens and buisnesses
located within these floodplains.
Notes from County HazMit Plan
ƒ•Š‹‰–‘–ƒ–‡‹˜‡”•‹–›ʹͲͲͺƒ‰‡ǦͻͶ
”‡Ǧ‹•ƒ•–‡”ŽŽǦƒœƒ”†•‹–‹‰ƒ–‹‘Žƒ
Hail
Flooding
Earthquake
Event/Hazard
Appendix B – County Plan Comparison Charts
8
8
8
HS
Region
Franklin
Franklin
Franklin
County
HazMit
20/20 Event
Rating
There are no volcanic peaks within Franklin County, however it can be
affected by Tephra associated with a volcanic eruption from the Cascade
Range volcanoes. All other hazards associated with Volcanoes
(pyroclastic flow, lahars, lateral blast, lava flow, etc) are too remote to be
considered a serious threat to Franklin County. There is a low probability
but a moderate risk to persons, property and the environment in the
county should an eruption occur.
Infestation was not selected because it was determined that a more
extensive study would need to be conducted to adequately profile this
hazard in the time available. It is the Planning committees intent to
recommend that it be included in the next regular plan update.
Notes from County HazMit Plan
ƒ•Š‹‰–‘–ƒ–‡‹˜‡”•‹–›ʹͲͲͺƒ‰‡Ǧͻͷ
”‡Ǧ‹•ƒ•–‡”ŽŽǦƒœƒ”†•‹–‹‰ƒ–‹‘Žƒ
Telecommunication
System
Failure
Loss of Water Service
Civil Disturbance
Economic Crisis
Loss of Sewer Service
Key Employer Crisis
Hazardous Materials
Event
Volcano Activity
Major Fire - Urban
Radiological Incident
High Winds
Infestation, Diseases
Event/Hazard
Appendix B – County Plan Comparison Charts
Franklin
Franklin
Franklin
8
Franklin
8
8
8
Franklin
Franklin
Franklin
Franklin
Franklin
Franklin
Franklin
Franklin
Franklin
County
8
8
8
8
8
8
8
8
8
HS
Region
20
15
Crime
Telecommunications
System Failure
Walla Walla County - REGION 8
Homes, businesses, schools, hospitals, roads, bridges, and other
infrastructure located on or near previous slide areas, steep slopes, or
alluvial fans are most vulnerable to the impacts of landslides, debris
flows, or mudflows. Property and lives may be lost and transportation
routes as well as utility infrastructure may be damaged. Based on
historical evidence, there is a Moderate Probability of a destructive
landslide occurring in Franklin County. There however is a Low Risk
associated with this hazard during the majority of the year, increasing to
Moderate during the times when irrigation systems are up and operating;
typically mid-March - October.
Notes from County HazMit Plan
ƒ•Š‹‰–‘–ƒ–‡‹˜‡”•‹–›ʹͲͲͺƒ‰‡Ǧͻ͸
”‡Ǧ‹•ƒ•–‡”ŽŽǦƒœƒ”†•‹–‹‰ƒ–‹‘Žƒ
25
HazMit
20/20 Event
Rating
Loss of Electrical
Service
Lightning
Landslide, Erosion
Loss of Gas Service
Loss of Electrical
Service
Event/Hazard
Appendix B – County Plan Comparison Charts
Walla Walla
Walla Walla
Walla Walla
8
Franklin
Franklin
Walla Walla
Franklin
Franklin
County
8
8
8
8
8
8
8
HS
Region
4
0
0
0
0
0
0
Loss of Sewer Service
Infestation Disease
Hail
High Winds
Hazardous Materials
Event
Radiological Incident
Economic Crisis
Although there is little likelihood that such an event will occur, the
economic consequences will be high. The overall risk rating for this
hazard is rated at MEDIUM.
History, plus the transport of hazardous materials into and through the
county, suggests a high probability of occurrence. A hazardous material
spill generally impacts a relatively small area, but if that area is a highdensity urban area or a critical wildlife habitat the impact could be
significant, suggesting moderate vulnerability. Because of the magnitude
of the potential risk posed by the transport of hazardous materials, a
MEDIUM risk rating is assigned.
Flash flooding can occur anywhere in Walla Walla County. Since most of
Walla Walla County is relatively arid, many large areas forming a
watershed flowing into a single small stream are at risk. In these cases,
even modest rainfall can swell these streams to dangerous proportions
very quickly. The central region of Walla Walla County is more often hit
by flash floods than other areas of the county.
The total population of the county is not directly exposed to this hazard
the effect of the hazard will affect all residents indirectly, but not to the
same degree. A worse case scenario of river flooding is Walla Walla
County is likely to create a disaster of moderate to major, but not
catastrophic, proportions. A MEDIUM vulnerability rating is assigned.
Notes from County HazMit Plan
ƒ•Š‹‰–‘–ƒ–‡‹˜‡”•‹–›ʹͲͲͺƒ‰‡Ǧͻ͹
”‡Ǧ‹•ƒ•–‡”ŽŽǦƒœƒ”†•‹–‹‰ƒ–‹‘Žƒ
8
HazMit
20/20 Event
Rating
10
Loss of Water Service
Flooding
Event/Hazard
Appendix B – County Plan Comparison Charts
8
8
8
8
8
8
8
8
8
HS
Region
Walla Walla
Walla Walla
Walla Walla
Walla Walla
Walla Walla
Walla Walla
Walla Walla
Walla Walla
Walla Walla
County
0
Major Fire - Urban
Walla Walla County is becoming more and more vulnerable because of
increased building, living, and recreating in urban areas. Walla Walla’s
large population of elderly citizens increases the vulnerability of the area
to deaths caused by urban fire. A limited area or segment of population,
property, commerce, infrastructure or service is exposed to the effects of
this hazard. In a worse case scenario there could be a disaster of minor
to moderate proportions. The vulnerability for Walla Walla County is rated
as LOW.
Any large disturbance would most likely affect local government or
college administration. Under an extreme scenario, there may be some
looting, arson, and rioting that could approach the Walla Walla downtown
area. There is little likelihood of significant impact elsewhere in the
County.
The vulnerability of Walla Walla County residents to a civil disturbance is
LOW. A limited area or segment of population, property, commerce,
infrastructure or service would be exposed to the effects of a civil
disturbance. In a worse case scenario there could be a disaster of minor
to moderate proportions.
Notes from County HazMit Plan
ƒ•Š‹‰–‘–ƒ–‡‹˜‡”•‹–›ʹͲͲͺƒ‰‡Ǧͻͺ
”‡Ǧ‹•ƒ•–‡”ŽŽǦƒœƒ”†•‹–‹‰ƒ–‹‘Žƒ
0
HazMit
20/20 Event
Rating
0
Key Employer Crisis
Civil Disturbance
Event/Hazard
Appendix B – County Plan Comparison Charts
8
8
8
HS
Region
Walla Walla
Walla Walla
Walla Walla
County
0
0
0
0
0
0
0
0
Landslide, Erosion
Subsidence/Expansiv
e Soils
Volcano Activity
Severe Winter Storm
Loss of Gas Service
Major Fire - Wildland
Lightning
Drought
The probability is HIGH and our vulnerability is LOW, so a risk rating of
MEDIUM is assigned. There is moderate potential for a wildfire disaster
of less than major proportions during the next 25 years.
Walla Walla County is moderately vulnerable to ash fall from several
volcanoes in the Cascade Mountains because prevailing winds would
likely carry tephra to the east of these volcanoes. Tephra fallout produced
by future eruptions of Cascade Mountains poses little threat to life or
structures in Walla Walla County.
The entire population, property, commerce, infrastructure and services of
Walla Walla County are vulnerable to an earthquake. The scope of
damage is a function of the earthquake magnitude and level of
preparedness. Damage could range from minimal to high loss of life and
destruction of property. The level of preparedness is assessed at very
low in Walla Walla County. Most residents are unprepared for an
earthquake. Little mitigation has occurred.
The ratio of population, property, commerce, infrastructure and services
at risk is rated at a MEDIUM vulnerability. An important segment of
population, property, commerce, infrastructure or service is exposed to
the effects of a hazard. In a worse case scenario there could be a
disaster of moderate to major, though not catastrophic, proportions.
Notes from County HazMit Plan
ƒ•Š‹‰–‘–ƒ–‡‹˜‡”•‹–›ʹͲͲͺƒ‰‡Ǧͻͻ
”‡Ǧ‹•ƒ•–‡”ŽŽǦƒœƒ”†•‹–‹‰ƒ–‹‘Žƒ
Earthquake
HazMit
20/20 Event
Rating
0
Event/Hazard
Appendix B – County Plan Comparison Charts
8
8
8
8
8
8
8
8
8
HS
Region
Walla Walla
Walla Walla
Walla Walla
Walla Walla
Walla Walla
Walla Walla
Walla Walla
Walla Walla
Walla Walla
County
50
50
32
30
High Winds
Severe Winter Storm
Radiological Incident
Major Fire - Urban
Urban fire is a common event in urbanized areas. However, given
modern building and fire codes, the potential for fire is not as great as
wildland fires. The older residential and commercial areas of the Cities of
Spokane and Spokane Valley have the greatest potential for urban fire.
Prevention is a simple solution to reduce destructive fires. It is incumbent
upon each citizen to take the responsibility for his or her family and
individual safety and to practice fire and burn prevention.
All areas of Spokane County are vulnerable to the severe local storms.
The affects are generally transportation problems and loss of utilities.
Spokane County - REGION 9
The state developed and adopted standardized hazardous materials
emergency response training. Training and supporting materials are
available to all public emergency responders. Spokane County’s LEPC
conducted commodity flow studies from 1997 through 1999 with funding
from Hazardous Materials Emergency Preparedness Grants. The
Washington State Departments of Ecology, Health, Transportation, and
the Washington State Patrol maintain hazard identification, vulnerability
analysis, and risk analysis documentation and databases for hazardous
materials incident. Hazardous materials incidents are possible throughout
the county and the two cities depending upon the movement of materials
and location. Identification of specific losses is difficult given this
widespread potential.
Notes from County HazMit Plan
9
9
9
9
9
8
9
HS
Region
ƒ•Š‹‰–‘–ƒ–‡‹˜‡”•‹–›ʹͲͲͺƒ‰‡ǦͳͲͲ
”‡Ǧ‹•ƒ•–‡”ŽŽǦƒœƒ”†•‹–‹‰ƒ–‹‘Žƒ
64
HazMit
20/20 Event
Rating
0
Hazardous Materials
Events
Storm surge, Tsunami
Event/Hazard
Appendix B – County Plan Comparison Charts
Spokane
Spokane
Spokane
Spokane
Spokane
Walla Walla
Spokane
County
20
20
20
20
20
20
Volcano Activity
Loss of Gas Service
Telecommunications
System Failure
Loss of Sewer Service
Crime
Key Employer Crisis
A major eruption would affect all areas of the county including
unincorporated Spokane County and the Cities of Spokane and Spokane
Valley as it did in 1980. These would include coping with the medical
affects of ash, ash clean-up and recovery and potential accommodation
of evacuees from other areas of the state.
The potential for a severe earthquake in Spokane County is low.
However, the County’s people, buildings, emergency services, hospitals,
transportation, dams, and electric, natural gas, water and sewer utilities
are susceptible to an earthquake. Although there is the possibility of an
earthquake as severe as 5.5 on Richter scale in Spokane County, the
probability is low. The higher probability of earthquakes in Western
Washington makes it likely that Spokane County could serve as a place
for holding casualties as well as migrants from the west. Thus, it is
important to not only prepare for the possible occurrence of an
earthquake but also be prepared for repercussions from earthquakes in
other locations within the state.
Notes from County HazMit Plan
Spokane
Spokane
Spokane
9
Spokane
Spokane
Spokane
Spokane
Spokane
County
9
9
9
9
9
9
9
HS
Region
ƒ•Š‹‰–‘–ƒ–‡‹˜‡”•‹–›ʹͲͲͺƒ‰‡ǦͳͲͳ
”‡Ǧ‹•ƒ•–‡”ŽŽǦƒœƒ”†•‹–‹‰ƒ–‹‘Žƒ
25
HazMit
20/20 Event
Rating
26
Loss of Electrical
Service
Earthquake
Event/Hazard
Appendix B – County Plan Comparison Charts
12
12
Lightning
Major Fire - Wildland
* The probability of wildland fire is high in Spokane County. The highest
risk is in the wildland urban interface zones in the unincorporated forest
and grassland areas of the County. However, small wildfires are also
possible in certain areas within the both of the major cities. As the
demand for scenic homes increases the potential for loss also increases.
Development standards for access, fire resistant construction and the
maintenance of clear spaces around structures are imperative.
* The fire season runs from mid-May through October. Dry periods can
extend the season. The possibility of a wildland fire depends on fuel
availability, topography, the time of year, weather, and activities such as
debris burning, land clearing, camping, and recreation. In Washington,
wildland fires start most often in lawns, fields, or open areas,
transportation areas, and wooded wildland areas. They are usually
extinguished while less than one acre, but can spread to over 100,000
acres and may require thousands of firefighters several weeks to
extinguish. In Washington State, wildland fire protection is provided by
federal, state, county, city, and private fire protection agencies and
private timber companies.
Preparing for public health threats is a high priority at the Spokane
Regional Health District. Concerns about pandemic influenza have led
health officials around the globe to recommend that each community plan
to minimize the affects of a future pandemic.
* Tiered mitigation plan and owners in plan
Notes from County HazMit Plan
9
9
9
9
HS
Region
ƒ•Š‹‰–‘–ƒ–‡‹˜‡”•‹–›ʹͲͲͺƒ‰‡ǦͳͲʹ
”‡Ǧ‹•ƒ•–‡”ŽŽǦƒœƒ”†•‹–‹‰ƒ–‹‘Žƒ
16
HazMit
20/20 Event
Rating
20
Infestation Disease
Loss of Water Service
Event/Hazard
Appendix B – County Plan Comparison Charts
Spokane
Spokane
Spokane
Spokane
County
9
4
Flooding
Hail
Flooding is a natural feature of the climate, topography, and hydrology of
Washington State and of Spokane County. A flood results from bodies of
water overflowing their banks; structural failure of dams and levees;
accumulation of runoff surface water; and erosion of a shoreline. Two
major planning concerns are flash flood and flood elevation in relation to
topography and structures.
* The City of Spokane, the City of Spokane Valley and Spokane County
participate in the National Flood Insurance Program and have developed
local ordinances to better regulate and direct development in flood plain
areas. These local ordinances regulate planning, construction, operation,
and maintenance of any works, structures, and improvements, private or
public. They work to insure that these works are properly planned,
constructed, operated, and maintained to avoid adversely influencing the
regimen of a stream or body of water or the security of life, health, and
property against damage by floodwater.
While Spokane County does experience droughts, on the whole, they are
mild and do not cause damage to the area. Thus, the likelihood of severe
hardship do to drought in Spokane County is small. Crop losses would
more than likely be isolated to the southern and western portions of the
county.
* Tiered mitigation plan and owners in plan
Spokane County, the City of Spokane and the City of Spokane Valley are
all vulnerable to terrorist activity. Spokane is identified within the group of
110 cities nationwide with the greatest probability to be the object of a
terrorist incident. Terrorists go to great lengths to ensure there actions
result in disproportionate impact, even if it means destroying an entire
structure or killing and wounding thousands of persons proximate to the
intended target. Commercially available materials and agents can be
developed into WMD.
Notes from County HazMit Plan
9
9
9
9
HS
Region
ƒ•Š‹‰–‘–ƒ–‡‹˜‡”•‹–›ʹͲͲͺƒ‰‡ǦͳͲ͵
”‡Ǧ‹•ƒ•–‡”ŽŽǦƒœƒ”†•‹–‹‰ƒ–‹‘Žƒ
10
HazMit
20/20 Event
Rating
10
Drought
Civil Disturbance
Event/Hazard
Appendix B – County Plan Comparison Charts
Spokane
Spokane
Spokane
Spokane
County
0
0
1
HazMit
20/20 Event
Rating
2
Whitman County - REGION 9
* Due to population density and desire of people to have a home with a
view, an increasing number of structures are built on top of or below
slopes subject to land sliding. Inconsistent slope mapping and land use
regulations in landslide areas make the public unaware of the risk
associated in building in potentially vulnerable areas. Land is not stable
indefinitely. People believe that if a bluff has remained stable for the last
50 years, it will remain so for the next 50 years regardless of the
development or maintenance.
* The least expensive and most effective landslide loss reduction
measure is by avoidance. The next most economical solution is
mitigation using qualified expertise with an investigation report review
process. The cost of proper mitigation is about one percent of the costs
otherwise incurred through losses and litigation. The most costly is repair
of landslide damages.
Notes from County HazMit Plan
Spokane
Spokane
Spokane
Whitman
9
9
Spokane
County
9
9
9
HS
Region
ƒ•Š‹‰–‘–ƒ–‡‹˜‡”•‹–›ʹͲͲͺƒ‰‡ǦͳͲͶ
”‡Ǧ‹•ƒ•–‡”ŽŽǦƒœƒ”†•‹–‹‰ƒ–‹‘Žƒ
Subsidence/Expansiv
e Soils
Economic Crisis
Storm surge, Tsunami
Landslide, Erosion
Event/Hazard
Appendix B – County Plan Comparison Charts
25
25
25
High Winds
Telecommunications
System Failure
Lightning
Whitman County can periodically experience the effects of
thunderstorms, dust storms, tornadoes and blizzards. Past events have
shown that severe weather is typically not a major problem in Whitman
County; the secondary hazards, such as flooding from heavy rain, cause
most damage during and after a severe weather event. Severe weather
is infrequent in Whitman County. The County experiences about one hail
event each year, but damage is usually insignificant. The County may
experience one tornado about every 20 years.
The most common problems associated with severe storms are
immobility and loss of utilities. Roads may become impassable due to ice
or snow or from a secondary hazard such as a landslide. Power lines
may be downed due to high winds, and other services, such as water or
phone, may not be able to operate without power. Severe weather cannot
be prevented, but measures can be taken to mitigate the effects. Critical
infrastructure and utilities can be hardened to prevent damage during an
event. The secondary effects of flooding can be addressed through
decreasing runoff and water velocity and measures outlined in the
Firewise program, sponsored by the National Wildfire Coordinating
Group, can reduce the impact of flashy brush fires on developments.
Notes from County HazMit Plan
Whitman
Whitman
Whitman
Whitman
9
9
Whitman
Whitman
Whitman
County
9
9
9
9
9
HS
Region
ƒ•Š‹‰–‘–ƒ–‡‹˜‡”•‹–›ʹͲͲͺƒ‰‡ǦͳͲͷ
”‡Ǧ‹•ƒ•–‡”ŽŽǦƒœƒ”†•‹–‹‰ƒ–‹‘Žƒ
25
30
39
HazMit
20/20 Event
Rating
50
Infestation Disease
Hazardous Materials
Event
Loss of Electrical
Service
Severe Winter Storm
Event/Hazard
Appendix B – County Plan Comparison Charts
20
20
Landslide, Erosion
Hail
Eastern Washington (including Whitman County) is experiencing a
change in climate, as is much of the world. Research conducted by the
Climate Impacts Group at the UW indicates that the temp. of the region is
increasing. As temperatures increase there will be less water stored as
ice and snow. It may not result in a net change in annual precipitation,
but will result in lower late spring and summer river flows. There will be
increased competition between power, sport fishing and
environmentalists, and farmers dependent on irrigation.
Whitman County does not experience vulnerability to drought that other
central and eastern Washington counties face. The County also has a
low population and does not expect much growth, so there is not
expected to be a significant increase in domestic demand for water.
Whitman County farmers are generally resilient but not immune to
drought. Crop insurance has provided the cushion to mitigate the most
adverse impacts of drought in the County. As the effects of regionally
based changes in climate begin to be felt, the County may consider
building structures that compensate for the expected reduction in natural
storage and enhance aquifer recharge.
Notes from County HazMit Plan
9
9
9
HS
Region
ƒ•Š‹‰–‘–ƒ–‡‹˜‡”•‹–›ʹͲͲͺƒ‰‡ǦͳͲ͸
”‡Ǧ‹•ƒ•–‡”ŽŽǦƒœƒ”†•‹–‹‰ƒ–‹‘Žƒ
Drought
HazMit
20/20 Event
Rating
24
Event/Hazard
Appendix B – County Plan Comparison Charts
Whitman
Whitman
Whitman
County
14
HazMit
20/20 Event
Rating
15
The principal cause of flooding in Whitman County is heavy rainfall
brought in with warm Chinook winds, usually in combination with
snowmelt over a frozen impermeable ground during the winter or early
spring. The sudden increase in runoff overwhelms rivers and creeks,
which typically overtop.
The rivers that have caused the greatest flood damage are the South
Fork Palouse, the North Fork Palouse, Paradise Creek and Pine Creek.
Union Flat Creek may also experience flooding. Although these streams
can overtop anywhere, they typically cause damaging flooding in the
communities that have development and infrastructure in the floodplains.
The most severe flooding, in terms of economic cost and damage, occurs
in Pullman, the largest city in the County.
Planning for proactive mitigation of a hazard requires a good gage of the
hazard’s extent and location. Accurate hazard identification is a key
element to hazard mitigation in that it allows your to accurately reflect the
benefits of a proposes initiative which can be crucial when prioritizing an
action plan. Future enhancements and revisions to this plan should focus
on utilizing or obtaining the best available science and technology to
accurately identify the flood hazards within Whitman County.
Notes from County HazMit Plan
9
9
HS
Region
ƒ•Š‹‰–‘–ƒ–‡‹˜‡”•‹–›ʹͲͲͺƒ‰‡ǦͳͲ͹
”‡Ǧ‹•ƒ•–‡”ŽŽǦƒœƒ”†•‹–‹‰ƒ–‹‘Žƒ
Radiological Incident
Flooding
Event/Hazard
Appendix B – County Plan Comparison Charts
Whitman
Whitman
County
10
10
10
5
5
Crime
Major Fire - Urban
Major Fire - Wildland
Loss of Water Service
Economic Crisis
Whitman County has a low risk of wildfires. It is not as exposed as other
counties in the region nor is it as vulnerable. This is due to the fact that
76 percent of the land is cultivated for crops and another 5 percent is
urbanized. The County has few trees, and where they do exist, they are
located along the eastern border near Idaho where the County receives
more precipitation. The County is exposed and somewhat vulnerable to
brush fires.
Communities located in the dryer western portions of the County should
participate in National Wildfire Coordinating Group’s Firewise program,
which emphasizes appropriate uses in the wildland/urban interface to
mitigate the wildland fire hazard.
Earthquakes in the Eastern Washington are typically shallow, crustal
type, and are the least understood of all earthquake types. The Columbia
Plateau of Eastern Washington contains many minor faults. Generally
speaking, Whitman County is located in one of the least hazardous
earthquake areas in the state.
More research needs to be conducted to determine the exposure and
vulnerability of Whitman County and the Columbia Plateau region to
earthquakes. The County and its communities should inventory and
assess older structures and seek ways to retrofit those that are
determined most likely to be damaged during an earthquake. Until
additional data on the impacts of events typical for this region are
developed, nonstructural retrofitting techniques should be considered and
promoted by the partnership.
Notes from County HazMit Plan
9
9
Whitman
Whitman
Whitman
Whitman
9
9
Whitman
Whitman
County
9
9
HS
Region
ƒ•Š‹‰–‘–ƒ–‡‹˜‡”•‹–›ʹͲͲͺƒ‰‡ǦͳͲͺ
”‡Ǧ‹•ƒ•–‡”ŽŽǦƒœƒ”†•‹–‹‰ƒ–‹‘Žƒ
Earthquake
HazMit
20/20 Event
Rating
13
Event/Hazard
Appendix B – County Plan Comparison Charts
1
0
0
Loss of Gas Service
Storm surge, Tsunami
Subsidence/Expansiv
e Soils
Volcano Activity
Whitman County is only moderately exposed to an eruption of a volcano.
The County is generally downwind of four volcanoes, and could
experience the impacts of a tephra fall from any of these. Using the latest
eruption of Mount St. Helens as an indicator, a tephra fall in Whitman
County would be anywhere from a half-inch to an inch. Nonetheless,
some people, property, and the environment are vulnerable to the effects
of a tephra fall, as discussed below.
Presently, volcanic eruptions are not a major hazard issue in Whitman
County. Proper warning time and awareness mechanisms are in place.
The major issues that would come about, as with other disaster events,
are cleanup costs.
Notes from County HazMit Plan
9
9
9
9
Whitman
Whitman
Whitman
Whitman
Whitman
Whitman
9
9
Whitman
County
9
HS
Region
ƒ•Š‹‰–‘–ƒ–‡‹˜‡”•‹–›ʹͲͲͺƒ‰‡ǦͳͲͻ
”‡Ǧ‹•ƒ•–‡”ŽŽǦƒœƒ”†•‹–‹‰ƒ–‹‘Žƒ
0
4
HazMit
20/20 Event
Rating
5
5
Loss of Sewer Service
Civil Disturbance
Key Employer Crisis
Event/Hazard
Appendix B – County Plan Comparison Charts
ƒ•Š‹‰–‘–ƒ–‡‹˜‡”•‹–›ʹͲͲͺƒ‰‡ǦͳͳͲ
”‡Ǧ‹•ƒ•–‡”ŽŽǦƒœƒ”†•‹–‹‰ƒ–‹‘Žƒ
Appendix C – HIVA Questionnaire
Washington State University
Hazard Mitigation Planning Project – Preliminary Questionnaire
The WSU Emergency Management Coordinator and the Office of Business Affairs, in conjunction with the
Division of Governmental Studies and Services, is engaged in a project to create a Washington State
University Hazard Mitigation Plan. This plan will cover WSU locations and operations throughout the State
of Washington. In order to complete the planning process, it is necessary to have information about WSU
locations and operations, a general understanding of the hazards that might impact each WSU location, and
an estimate of the level of risk which is posed by these hazards. This questionnaire is intended to be
completed with hazard identification and risk evaluation information that is readily available, as well as the
knowledge and judgment of the individuals such as you who participate in the completion of the
questionnaire.
The information gathered by means of this questionnaire will be used to create a descriptive profile for each
WSU site. The questions are grouped into three broad areas of concern: buildings & structures, WSU
operations (e.g. research, volunteer programs, teaching), and people. Your responses will serve as starting
points for the WSU Hazard Mitigation Planning Group to identify potential vulnerabilities to future disasters
as the University’s planning process continues in the future. Compilation of information based on responses
will also assist WSU in serving as a contributing member to emergency planning at the statewide and local
community levels. Thank you in advance for your assistance with this important project. We ask that you
please respond by October 27th.
________________________________________________________________________________
SECTION ONE (A) AREA/LOCATION/OPERATION PROFILE
(Information about your area and specific WSU location)
1.
Please provide the following location/operation identifier information:
WSU Organization or Unit: __________________________ County: __________________________
Facility Name: ____________________ Parent College/Dept: ________________________________
Contact Name: ______________________________________________________________________
Physical Address: ____________________________________________________________________
Mailing Address (if different): ___________________________________________________________
ƒ•Š‹‰–‘–ƒ–‡‹˜‡”•‹–›ʹͲͲͺƒ‰‡Ǧͳ
”‡Ǧ‹•ƒ•–‡”ŽŽǦƒœƒ”†•‹–‹‰ƒ–‹‘Žƒ
Phone: _____________________________ Fax: ________________ E-Mail:____________________
2.
Person(s) completing this questionnaire (if different from above):
Name: ______________________________________________________________________________
Address: ____________________________________________________________________________
Phone: _________________
E-Mail: __________________________
Zip: _________________
SECTION ONE (B) GENERAL LOCATION/OPERATION INFORMATION
3.
Location Category: (Check only one category)
WSU-owned
Other-owned
If the location is other-owned, please identify the owner:
____________________________________________________________________
What occupancy arrangement (lease, cooperative agreement, etc) exists?
____________________________________________________________________
4.
Please indicate the current land use categories (by approximate percentages) of your surrounding
geographic area (estimates from your personal knowledge or observation will suffice):
Agricultural
Commercial
Developed with mixed uses
Industrial
Institutional (education, health care,
etc.)
Parks/restricted wild land/wildlife
refuge
%
%
%
%
Residential
Transportation or utility right-of-way
Vacant/unused-government ownership
Vacant/unused-private ownership
%
%
%
%
% Waterway/lake/wetland
%
% Other land use (please specify below)
%
________________________________________________________________________________
ƒ•Š‹‰–‘–ƒ–‡‹˜‡”•‹–›ʹͲͲͺƒ‰‡Ǧʹ
”‡Ǧ‹•ƒ•–‡”ŽŽǦƒœƒ”†•‹–‹‰ƒ–‹‘Žƒ
5.
In order that we understand the formal policies/codes and restrictions which cover your
location, please place a check mark in the box next to each of the following policy or operational
guidelines which apply to your location/operation:
County Building Code
Court Judgment
Disaster Redevelopment Plan
Economic Development Plan
Emergency Plan
Environmental Regulation
Flood Plain Ordinance
Growth Management Plan
Other – please specify below:
Hazard Specific Ordinance
Land Use Code/Plan/Ordinance
County or Local Mitigation Plan
Natural Resources Development Plan
Critical Areas Ordinance
Policies by Local Elected Officials
Zoning Regulation/Ordinance
RCW or WAC
________________________________________________________________________________
6.
Please provide explanation(s) or comments as appropriate, for your answers above.
Use additional pages, if necessary.
________________________________________________________________________________
________________________________________________________________________________
________________________________________________________________________________
________________________________________________________________________________
SECTION TWO (A) THREATS AND VULNERABILITY--TERRORISM
Hazard Identification & Risk Estimation
Terrorism Vulnerability Assessment – Please help us assess your location/operation’s vulnerability by
answering the questions below regarding the possibility of terrorist (foreign or domestic) attack. Use the
answer scale provided to select and circle the best answer for each question.
How does the Visibility of your location/operation impact its vulnerability as a terrorist target?
7.
circle
0
1
2
Invisible/
Classified Location
8.
(Please
one)
3
4
Medium Visibility/
Existence Known
5
Very High Visibility/
Existence is Obvious
What is the Value of your location/operation as a target for a Potential Terrorism Event?
0
None
1
2
3
Medium
4
(Please circle one)
5
Very High
ƒ•Š‹‰–‘–ƒ–‡‹˜‡”•‹–›ʹͲͲͺƒ‰‡Ǧ͵
”‡Ǧ‹•ƒ•–‡”ŽŽǦƒœƒ”†•‹–‹‰ƒ–‹‘Žƒ
9.
What is the Ease of Access for your location/operation as a target for a Potential Terrorism Event?
0 = Fenced, guarded, protected air/consumable entry, controlled access by pass only; no
vehicle parking w/in 50 feet
1 = Guarded, protected air/consumable entry, controlled access of visitors and non-staff
personnel; no vehicle parking w/in 50 feet
2 = Protected air/consumable entry, controlled access of visitors and non-staff personnel; no
unauthorized vehicle parking w/in 50 feet
3 = Controlled access of visitors, unprotected air/consumable entry; no unauthorized vehicle
parking w/in 50 feet
4 = Open access to all personnel, unprotected air/consumable entry; no unauthorized vehicle
parking w/in 50 feet
5 = Open access to all personnel, unprotected air/consumable entry; vehicle parking w/in 50
feet
10. What is the situation with regards to potential WMD (Weapons of Mass Destruction, includes: any
explosive, poison, gas, radiological or biohazard material, or materials that could readily be converted to
such a material or device) Materials at your location/operation?
0 = No potential WMD materials present
1 = Potential WMD materials present in moderate quantities, under positive control, and in
secured locations
2 = Potential WMD materials present in moderate quantities and controlled
3 = Major concentrations of potential WMD materials that have established control features
and are secured in the site
4 = Major concentrations of potential WMD materials that have moderate control features
5 = Major concentrations of potential WMD materials that are accessible to non-staff
personnel
11. Please provide approximate population figures for your location. If there are significant variations in this
number, what is the largest daily population and when is that experienced?
A. Average Daily Population (Please circle one)
0 = zero 1 = 1-50 2 = 51-250 3 =251-500 4 =501-1000 5 = 1001-2000 6 =2001 – 5000 7 = >5000
B. Largest Daily Population (Please circle one)
0 = zero 1 = 1-50 2 = 51-250 3 =251-500 4 =501-1000 5 = 1001-2000 6 =2001 – 5000 7 = >5000
C. Please describe when your largest daily population is experienced:
________________________________________________________________________________
________________________________________________________________________________
ƒ•Š‹‰–‘–ƒ–‡‹˜‡”•‹–›ʹͲͲͺƒ‰‡ǦͶ
”‡Ǧ‹•ƒ•–‡”ŽŽǦƒœƒ”†•‹–‹‰ƒ–‹‘Žƒ
SECTION TWO (B) THREATS AND VULNERABILITY - NATURAL HAZARDS
Hazard Identification & Risk Estimation
12. What is the likelihood of occurrence for each of the following hazards at your location? (In other words,
what is the risk that each of the following hazards might happen?) Please use the following scale to
approximate your answer:
1
2
Extremely
Rare Occurrence
3
Rare but
Anticipated
Drought
Earthquake
Flooding
Hail
High Winds
Infestation/Disease
Landslide/Erosion
Once Per
100 Years
4
Occurrence Every
25 Years or Less
5
Occurrence Once a
Year or More
Lightning
Storm Surge/Tsunami
Urban Fire
Wildfire
Winter Storm
Volcanic Activity
Subsiding or Expanding Soils
13. For each question please enter the approximate percentage of your location/operation that would be
impacted, and the approximate number of people who would be put at risk, (i.e. 10% structure/5 people),
for each of the hazards listed.
A. To what extent would your facility be impacted by:
% of operation/
location impacted
Drought
Earthquake
Flooding
Hail
High Winds
Infestation/Disease
Landslide/Erosion
approximate #
of people at risk
% of operation/
location impacted
approximate #
of people at risk
Lightning
Storm Surge/Tsunami
Urban Fire
Wildfire
Winter Storm
Volcanic Activity
Subs/Exp. Soils
Comments: ___________________________________________________________________________
_____________________________________________________________________________________
_____________________________________________________________________________________
_____________________________________________________________________________________
_____________________________________________________________________________________
ƒ•Š‹‰–‘–ƒ–‡‹˜‡”•‹–›ʹͲͲͺƒ‰‡Ǧͷ
”‡Ǧ‹•ƒ•–‡”ŽŽǦƒœƒ”†•‹–‹‰ƒ–‹‘Žƒ
B. To what extent would you expect health and safety consequences due to:
% of operation/
location impacted
approximate #
of people at risk
Drought
Earthquake
Flooding
Hail
High Winds
Infestation/Disease
% of operation/
location impacted
approximate #
of people at risk
% of operation/
location impacted
approximate #
of people at risk
% of operation/
location impacted
approximate #
of people at risk
Lightning
Storm Surge/Tsunami
Urban Fire
Wildfire
Winter Storm
Volcanic Activity
Subsiding or
Expanding Soils
Landslide/Erosion
C. To what extent would you expect property damage due to:
% of operation/
location impacted
approximate #
of people at risk
Drought
Earthquake
Flooding
Hail
High Winds
Infestation/Disease
Lightning
Storm Surge/Tsunami
Urban Fire
Wildfire
Winter Storm
Volcanic Activity
Subsiding or
Expanding Soils
Landslide/Erosion
D. To what extend would you expect environmental damage due to:
% of operation/
location impacted
Drought
Earthquake
Flooding
Hail
High Winds
Infestation/Disease
Landslide/Erosion
approximate #
of people at risk
Lightning
Storm Surge/Tsunami
Urban Fire
Wildfire
Winter Storm
Volcanic Activity
Subsiding or
Expanding Soils
ƒ•Š‹‰–‘–ƒ–‡‹˜‡”•‹–›ʹͲͲͺƒ‰‡Ǧ͸
”‡Ǧ‹•ƒ•–‡”ŽŽǦƒœƒ”†•‹–‹‰ƒ–‹‘Žƒ
E. To what extent would you expect direct or indirect disruption of your operation due to:
% of operation/
location impacted
approximate #
of people at risk
% of operation/
location impacted
Drought
Earthquake
Flooding
Hail
High Winds
Infestation/Disease
approximate #
of people at risk
Lightning
Storm Surge/Tsunami
Urban Fire
Wildfire
Winter Storm
Volcanic Activity
Subsiding or
Expanding Soils
Landslide/Erosion
Comments:
___________________________________________________________________________________
___________________________________________________________________________________
___________________________________________________________________________________
___________________________________________________________________________________
___________________________________________________________________________________
___________________________________________________________________________________
SECTION TWO (C) THREATS AND VULNERABILITY
TECHNOLOGICAL HAZARDS
Hazard Identification & Risk Estimation
14. What is the likelihood of occurrence for each of the following hazards at your location? (In other words
what is the risk that each of the following hazards might happen?) Please use the following scale to
approximate your answer:
1
2
Extremely
Rare Occurrence
Rare but
Anticipated
3
4
Once per
100 years
Occurrence every
25 years or less
Hazardous Materials
Event
Telecommunications
System Failure
Gas Service Loss
Radiological Incident
Power Loss
Sewer Service Loss
5
Occurrence once
a year or more
Water Service Loss
15. For each hazard listed, please enter the approximate percentage of your location/operation that would be
impacted, and the approximate number of people who would be put at risk, (i.e. 10% of structure/5
people), for each of the hazards listed.
ƒ•Š‹‰–‘–ƒ–‡‹˜‡”•‹–›ʹͲͲͺƒ‰‡Ǧ͹
”‡Ǧ‹•ƒ•–‡”ŽŽǦƒœƒ”†•‹–‹‰ƒ–‹‘Žƒ
A. To what extent would your facility be impacted by:
% of operation/
location impacted
approximate #
of people at risk
Hazardous Materials
Event
Gas Service Loss
Power Loss
Water Service Loss
% of operation/
location impacted
approximate #
of people at risk
Telecommunications
System Failure
Radiological Incident
Sewer Service Loss
B. To what extent would you expect health and safety consequences due to:
% of operation/
location impacted
approximate #
of people at risk
Hazardous Materials
Event
Gas Service Loss
Power Loss
Water Service Loss
% of operation/
location impacted
approximate #
of people at risk
% of operation/
location impacted
approximate #
of people at risk
% of operation/
location impacted
approximate #
of people at risk
Telecommunications
System Failure
Radiological Incident
Sewer Service Loss
C. To what extent would you expect property damage due to:
% of operation/
location impacted
approximate #
of people at risk
Hazardous Materials
Event
Gas Service Loss
Power Loss
Water Service Loss
Telecommunications
System Failure
Radiological Incident
Sewer Service Loss
D. To what extend would you expect environmental damage due to:
% of operation/
location impacted
Hazardous Materials
Event
Gas Service Loss
Power Loss
Water Service Loss
approximate #
of people at risk
Telecommunications
System Failure
Radiological Incident
Sewer Service Loss
ƒ•Š‹‰–‘–ƒ–‡‹˜‡”•‹–›ʹͲͲͺƒ‰‡Ǧͺ
”‡Ǧ‹•ƒ•–‡”ŽŽǦƒœƒ”†•‹–‹‰ƒ–‹‘Žƒ
E. To what extent would you expect direct or indirect disruption of your operation due to:
% of operation/
location impacted
Hazardous Materials
Event
Gas Service Loss
Power Loss
Water Service Loss
approximate #
of people at risk
% of operation/
location impacted
approximate #
of people at risk
Telecommunications
System Failure
Radiological Incident
Sewer Service Loss
Comments: ___________________________________________________________________________
_____________________________________________________________________________________
_____________________________________________________________________________________
_____________________________________________________________________________________
_____________________________________________________________________________________
_____________________________________________________________________________________
_____________________________________________________________________________________
_____________________________________________________________________________________
ƒ•Š‹‰–‘–ƒ–‡‹˜‡”•‹–›ʹͲͲͺƒ‰‡Ǧͻ
”‡Ǧ‹•ƒ•–‡”ŽŽǦƒœƒ”†•‹–‹‰ƒ–‹‘Žƒ
SECTION TWO (D) THREATS AND VULNERABILITY - SOCIETAL HAZARDS
Hazard Identification & Risk Estimation
16. What is the likelihood of occurrence for each of the following hazards at your location? (In other words
what is
the risk that each of the following hazards might happen?) Please use the following scale to
approximate your
answer:
1
2
Extremely
Rare Occurrence
Rare but
Anticipated
3
4
Once per
100 years
Crime
Economic Crisis
5
Occurrence every
25 years or less
Occurrence once
a year or more
Civil Disorder
Employment Crisis
17. For each hazard listed, please enter the approximate percentage of your location/operation that would be
impacted, and the approximate number of people who would be put at risk, (i.e. 10%/5 people), for each
of the hazards listed.
A. To what extent would your facility be impacted by:
% of operation/
location impacted
approximate #
of people at risk
Crime
Economic Crisis
% of operation/
location impacted
approximate #
of people at risk
Civil Disorder
Employment Crisis
B. To what extent would you expect health and safety consequences due to:
% of operation/
location impacted
approximate #
of people at risk
Crime
Economic Crisis
% of operation/
location impacted
approximate #
of people at risk
% of operation/
location impacted
approximate #
of people at risk
% of operation/
location impacted
approximate #
of people at risk
Civil Disorder
Employment Crisis
C. To what extent would you expect property damage due to:
% of operation/
location impacted
approximate #
of people at risk
Crime
Economic Crisis
Civil Disorder
Employment Crisis
D. To what extent would you expect environmental damage due to:
% of operation/
location impacted
Crime
Economic Crisis
approximate #
of people at risk
Civil Disorder
Employment Crisis
ƒ•Š‹‰–‘–ƒ–‡‹˜‡”•‹–›ʹͲͲͺƒ‰‡ǦͳͲ
”‡Ǧ‹•ƒ•–‡”ŽŽǦƒœƒ”†•‹–‹‰ƒ–‹‘Žƒ
E. To what extent would you expect direct or indirect disruption of your operation due to:
% of operation/
location impacted
Crime
Economic Crisis
approximate #
of people at risk
% of operation/
location impacted
approximate #
of people at risk
Civil Disorder
Employment Crisis
Comments: ___________________________________________________________________________
_____________________________________________________________________________________
_____________________________________________________________________________________
_____________________________________________________________________________________
_____________________________________________________________________________________
ƒ•Š‹‰–‘–ƒ–‡‹˜‡”•‹–›ʹͲͲͺƒ‰‡Ǧͳͳ
”‡Ǧ‹•ƒ•–‡”ŽŽǦƒœƒ”†•‹–‹‰ƒ–‹‘Žƒ
SECTION THREE (A) BUILDING PROFILE(S)
18. Individual Building Details: Please provide the requested information for each building at your
location which is owned, occupied, or controlled by WSU.
To help you determine if a building is a critical facility, please use the following definition: A “Critical
Facility” is one which houses personnel, functions, research, data or other operations which are essential
to the continuity or function of WSU, and which, if destroyed or terminated would result in significant
negative impact to WSU continuity of operations beyond the cost of the structure. If you have more
than 10 buildings at your location, please copy this page or attach additional pages as needed. Estimates
from your personal knowledge or observation will suffice.
BUILDING
Number
BUILDING Name or
Identifier
Primary Use
Daily
Population
Is this
BUILDING
a Critical
Facility?
1
2
3
4
5
6
7
8
9
10
ƒ•Š‹‰–‘–ƒ–‡‹˜‡”•‹–›ʹͲͲͺƒ‰‡Ǧͳʹ
”‡Ǧ‹•ƒ•–‡”ŽŽǦƒœƒ”†•‹–‹‰ƒ–‹‘Žƒ
19. Utility Service Details
Using the Building Numbers from item 18 on page 9, please indicate all services that are applicable.
Estimates
from your personal knowledge or observation will suffice.
BUILDING
BUILDING
Utility
Description
Number(s)
Utility
Description
Number(s)
Above grade
Below grade
electric
electric
Power
Power
Community
Individual
system
water well
Water
Water
Community
Individual
sewer
septic
Sewer
Sewer
Above grade
Below grade
telephone
telephone
Phone
Phone
TV, satellite
Communications and/or radio
Communications Cable TV
Natural gas
pipeline
Propane/LPG
Gas
Gas
20. Access and Travel Details – to help us understand how accessible your facility is.
Please place the building numbers for buildings identified in item 18 on page 9, in the column to the
right of
the entry which best describes the access for each building.
BUILDING
BUILDING
BUILDING
Number(s)
Number(s)
Number(s)
Single
Roadway
Access
Multiple
Roadway
Access
No Direct
Roadway
Access
Limited Access
Foot/Boat/Plan
e
Dependent
on Private
Vehicles
Dependent
on Public
Transit
21. Access Limitations
Are there potential access limitations in the event of an emergency or disaster? Which of the following apply?
Access Limitations
Damage to Bridge, Culvert or
Overpass
Heavy Rainfall or Localized
Flooding
BUILDING
Number(s)
Access Limitations
BUILDING
Number(s)
Tree Fall
Avalanche or Landslide
Wildfire
Other – Define
below
Snow & Ice
None
ƒ•Š‹‰–‘–ƒ–‡‹˜‡”•‹–›ʹͲͲͺƒ‰‡Ǧͳ͵
”‡Ǧ‹•ƒ•–‡”ŽŽǦƒœƒ”†•‹–‹‰ƒ–‹‘Žƒ
Please provide explanation(s) or comments as appropriate, for your answers above. Use additional
pages if necessary.
___________________________________________________________________________________
___________________________________________________________________________________
SECTION THREE (B) CRITICAL FACILITY PROFILE
22. For each building identified as a critical facility for item 18 on page 9, please indicate its
PRIMARY FUNCTION by placing its “Building Number” in the appropriate space below.
___________ Communications Centers/Facilities ________ Medical/Health Care Offices
___________ Emergency Operations Center ____________ Museum/Cultural Center/Historic Site
___________ Energy Facility or System
____________ Transportation Facility
___________ Hazardous Materials Facility
____________ Water System Facility
___________ Lab/Animal/Plant Research Facility ________ Computer Information Technology Center
___________ Other Research Facility
_________ Other Critical Facility or Operation
(Please define below)
_________________________________________________________________________________
_________________________________________________________________________________
_________________________________________________________________________________
23. Please indicate the Operational Requirements for each critical facility by placing its “Building
Number” in the appropriate space below. To help you determine Operational Requirements, if
power or access is jeopardized for this facility, how critical is it to the restoration or maintenance
of operational capability? (Please choose only one category per critical facility):
______________ Can maintain operational capability with power/access unavailable, exceeding 72 hours.
______________ Must be operationally capable within 24 to 72 hours.
______________ Must be operationally capable within 24 hours or less.
______________ Must not lose operational capability.
24. Does each critical facility that requires operational capability continuity have adequate standby
power? Enter the critical facility’s “Building Number(s)” in the appropriate space below:
Bldg #’s: ____________________________ Yes Bldg #’s: ____________________________ No
____________________________________
______________________________________
ƒ•Š‹‰–‘–ƒ–‡‹˜‡”•‹–›ʹͲͲͺƒ‰‡ǦͳͶ
”‡Ǧ‹•ƒ•–‡”ŽŽǦƒœƒ”†•‹–‹‰ƒ–‹‘Žƒ
25. Please provide a short description of the primary reason for your answers above.
________________________________________________________________________________
________________________________________________________________________________
________________________________________________________________________________
________________________________________________________________________________
________________________________________________________________________________
SECTION FOUR – Repetitive Loss
26.
Please provide information on any repetitive losses your location has experienced. Please include
relevant information such as approximate dates, type of event and a detailed description of the
damage.
Attach additional pages as needed.
_____________________________________________________________________________________
_____________________________________________________________________________________
_____________________________________________________________________________________
_____________________________________________________________________________________
_____________________________________________________________________________________
_____________________________________________________________________________________
_____________________________________________________________________________________
_____________________________________________________________________________________
_____________________________________________________________________________________
_____________________________________________________________________________________
_____________________________________________________________________________________
_____________________________________________________________________________________
_____________________________________________________________________________________
_____________________________________________________________________________________
_____________________________________________________________________________________
_____________________________________________________________________________________
_____________________________________________________________________________________
ƒ•Š‹‰–‘–ƒ–‡‹˜‡”•‹–›ʹͲͲͺƒ‰‡Ǧͳͷ
”‡Ǧ‹•ƒ•–‡”ŽŽǦƒœƒ”†•‹–‹‰ƒ–‹‘Žƒ
SECTION FIVE – Mitigation
27. Please provide information below on the strategies or projects you think would be most successful
at mitigating the impacts of some of the hazards you have identified in the previous sections.
(Examples: [1]
You have determined that a hazard to your location is power failure which would
result in the destruction of
frozen research samples. Your suggested strategy for mitigating the impacts of
that hazard might be purchasing
adequate generators to maintain the current temperature for research
sample storage. Or, [2] An additional exit road should be built based on the likelihood that the current exit
route(s) would be unavailable in the event of a
flood.) Where appropriate please include building
numbers used in the table on page 4. Use additional pages as
needed.
_____________________________________________________________________________________
_____________________________________________________________________________________
_____________________________________________________________________________________
_____________________________________________________________________________________
_____________________________________________________________________________________
_____________________________________________________________________________________
_____________________________________________________________________________________
_____________________________________________________________________________________
_____________________________________________________________________________________
_____________________________________________________________________________________
_____________________________________________________________________________________
_____________________________________________________________________________________
_____________________________________________________________________________________
_____________________________________________________________________________________
28. Please indicate whether or not your location has a plan in place that addresses issues of emergency
preparedness/hazard mitigation. If your location does have such a plan, or is included in the plan
of another agency (e.g. county), please provide information on how our office could access that plan.
(e.g. website address, name and phone number of a contact person, attached copy).
Plan in place:
Yes
No
_____________________________________________________________________________________
_____________________________________________________________________________________
_____________________________________________________________________________________
ƒ•Š‹‰–‘–ƒ–‡‹˜‡”•‹–›ʹͲͲͺƒ‰‡Ǧͳ͸
”‡Ǧ‹•ƒ•–‡”ŽŽǦƒœƒ”†•‹–‹‰ƒ–‹‘Žƒ
29. Do you have access to current hazard mapping information for your area from local, county, state
or federal sources, and if so, please provide copies or information as to where that information could
be found.
_____________________________________________________________________________________
_____________________________________________________________________________________
_____________________________________________________________________________________
ƒ•Š‹‰–‘–ƒ–‡‹˜‡”•‹–›ʹͲͲͺƒ‰‡Ǧͳ͹
”‡Ǧ‹•ƒ•–‡”ŽŽǦƒœƒ”†•‹–‹‰ƒ–‹‘Žƒ
ƒ•Š‹‰–‘–ƒ–‡‹˜‡”•‹–›ʹͲͲͺƒ‰‡Ǧͳͺ
”‡Ǧ‹•ƒ•–‡”ŽŽǦƒœƒ”†•‹–‹‰ƒ–‹‘Žƒ
Appendix D – SESRC Survey Report
DATA REPORT 07-28
WSU Hazard Mitigation Survey
An Online Survey
of WSU Staff, Faculty and Students
Spring 2007
Prepared for
Chris Tapfer
University Emergency Management Coordinator
Senior Associate Vice President for Business Affairs
Washington State University
Michael Gaffney
Assistant Director
Division of Governmental Studies
Governmental Studies and Services
Washington State University
-andChristina Sanders
Research Coordinator
Governmental Studies and Services
Washington State University
Submitted by
.
John Tarnai, PhD.
and
Thom Allen
SESRC
Social & Economic Sciences Research Center (SESRC)
P.O. Box 644014
Washington State University
Pullman, Washington 99164-4014
Telephone: (509) 335-1511
Fax: (509) 335-0116
ƒ•Š‹‰–‘–ƒ–‡‹˜‡”•‹–›ʹͲͲͺƒ‰‡Ǧͳ
”‡Ǧ‹•ƒ•–‡”ŽŽǦƒœƒ”†•‹–‹‰ƒ–‹‘Žƒ
WSU Hazard Mitigation Survey
SESRC Data Report 07-28
SESRC PROJECT PROFILE
Title:
Washington State University Hazard Mitigation Survey.
Project Summary:
The Social and Economic Sciences Research Center (SESRC)
implemented an Internet survey of WSU faculty, staff and students in
the spring of 2007, concerning the hazards faced at working and
attending school at the university. Investigator: John Tarnai, Study
Director: Thom Allen.
Results:
From a starting sample of 12,607 with valid email addresses, a total of 2,786 WSU
faculty and staff and 1,494 WSU students from all campuses completed the survey.
This resulted in a 34% rate of response.
Timeframe:
April 2007 to May 2007.
Contract with:
Chris Tapfer
University Emergency Management Coordinator
Senior Associate Vice President for Business Affairs
Washington State University
Contract Number:
N/A
Funding Source:
WSU Department of Governmental Studies and Services
Contract Amount:
$14,098
SESRC Acronym:
FEMA
Data Report Number:
07-28
SESRC Number:
na
Deliverables:
Data Report; SPSS Data set; frequency listing; open-ended remarks file; and a copy of
the final Internet questionnaire.
i
WSU Hazard Mitigation Survey
SESRC Data Report 07-28
Project Accountability
SESRC is committed to high quality and timely delivery of project results. The following list
identifies the SESRC team members responsible for particular elements of this project.
WASHINGTON STATE UNIVERSITY HAZARD MITIGATION SURVEY
Staff Member
Areas of Accountability
Elements of Project
John Tarnai,
Ph.D.
Principal Investigator
Assurance of survey research
protocol, sample design, project and
instruments design, project
management and coordination of
survey tasks, data report preparation,
final report for the contract.
Rita Koontz
Administration Services
Manager
Administration of contract with
Washington State University
Thom Allen
Study Director
Questionnaire and sample design,
project management, report writing.
Nikolay
Ponomarev
Programmer
Web page templates, JavaScript and
ASP code
Vincent Kok
Network Administrator
SQL Server management, Network
operations
ii
WSU Hazard Mitigation Survey
SESRC Data Report 07-28
SESRC Professional Staff
All of the work conducted at the Social & Economic Sciences Research Center is the
result of a cooperative effort made by a team of dedicated research professionals. The
research in this report could not have been conducted without the efforts of interviewers
and part-time personnel not listed.
Principal Investigators and Study Directors
John Tarnai, Ph.D.
Don A. Dillman, Ph.D.
Danna L. Moore, Ph. D.
Rose Krebill-Prather, Ph. D.
Alan Hardcastle, Ph.D.
Dave Pavelchek, M.P.A.
Paul Stern, M.A.
Kent Miller, M.A.
Thom Allen, B.A.
Director, SESRC
Deputy Director for Research & Development
Research Coordinator
Research Associate
Research Associate, Olympia
Research Manager, Olympia
Research Associate, Seattle
Study Director
Study Director/Web Programmer
Administrative Support
Rita Koontz
Lisa Brooks, B.A.
Sandy Johnson
Julie Nielsen, B.A.
Department Administrative Manager
Office Manager, Olympia
Fiscal Specialist
Accountant
Data Collection and Interviewer Supervision
Marion K. Landry, M.A.
Justin Jorgensen, A.A.
Lyndsey Wilson
Pat Slinkard
Data Collection Manager
Research Survey Supervisor
Research Survey Supervisor
Survey Assistant
Data Management, Analysis, and Network Support
Margaret Card, B.S.
Larry Nelson, M.Ed.
Bruce Austin, M.S.
Leona Ding, M.S.
Vincent Kok, B.A.
Nikolay Ponomarev. Ph.D.
David Schultz, B.S.
Dan Vakoch, M.S.
Research & Fiscal Analyst, Olympia
Research Analyst, Olympia
Data Analyst
Data Analyst
Network Administrator
Programmer
Data Analyst
Scientific Programmer
iii.
WSU Hazard Mitigation Survey
SESRC Data Report 07-28
Table of Contents
I. SURVEY ADMINISTRATION AND DESIGN ........................................................................................ 1
Project Background and Objectives........................................................................................................ 1
Description of Population and Sample ................................................................................................... 1
Interview design .................................................................................................................................... 1
Web Survey ............................................................................................................................................ 1
II. SURVEY IMPLEMENTATION AND PROCEDURES .......................................................................... 3
Project Planning..................................................................................................................................... 3
The Online Survey Instrument .............................................................................................................. 3
Site Security ........................................................................................................................................... 4
Error Checking ....................................................................................................................................... 4
Partially Completed Data........................................................................................................................ 4
Data Validation Steps ............................................................................................................................. 5
Respondent Review ................................................................................................................................ 5
Database ................................................................................................................................................. 5
Data Management................................................................................................................................... 6
Mailings.................................................................................................................................................. 6
III. CASE DISPOSITION AND RESPONSE RATES .................................................................................. 6
RESPONSE RATES ............................................................................................................................. 6
SAMPLE ERROR ................................................................................................................................. 8
IV. DESCRIPTION OF THE DATA ............................................................................................................. 9
Compact Disc ......................................................................................................................................... 9
Missing Values ....................................................................................................................................... 9
Open-Ended Remarks............................................................................................................................. 9
V. FREQUENCY LISTING......................................................................................................................... 10
APPENDIX A: SURVEY INSTRUMENTS – Respondent Letters.............................................................. 2
Advance Letter ....................................................................................................................................... 2
First Email Follow-up............................................................................................................................. 4
v.
WSU Hazard Mitigation Survey
SESRC Data Report 07-28
Section I: Survey Administration and Design
I. SURVEY ADMINISTRATION AND DESIGN
Project Background and Objectives
In March of 2007 the Social and Economic Sciences Research Center (SESRC)
negotiated with the WSU Department of Governmental Studies and Services to design
and implement an Internet survey of WSU staff, faculty and students. The purpose of the
survey was to better understand the levels of awareness within the WSU community of
emergency preparedness plans and what threats to health and safety are considered most
important to address. In addition, the survey provided a place for respondents who were
interested in helping out with WSU Hazard Mitigation projects to give their names and
contact information. Identifying information like this was at all times kept separate from
survey response data.
Description of Population and Sample
For this survey, a list of all 7,142 WSU faculty and staff, and a random sample of 8,003 students
was drawn from the WSU Data Warehouse in March of 2007. The list was drawn from all WSU campuses
and locations.
Interview design
The SESRC worked in collaboration with the Department of Governmental Studies and Services
to produce the final interview script used for this study. One script, consisting of 21 questions was
developed for WSU faculty and staff, and another script with 20 questions was constructed for students.
Both scripts included an additional page where respondents could give their contact information if they
were interested in assisting with the project in the future.
Web Survey
The final questionnaire was formatted into an online version of the survey that could be accessed
via the World Wide Web. Screenshots of these survey web pages are found in Section V: Frequency
Listing of this report. All potential respondents were sent e-mail letters describing the study and letting the
respondent know how to access the Internet survey. Each respondent was assigned a unique access number
1
WSU Hazard Mitigation Survey
SESRC Data Report 07-28
Section I: Survey Administration and Design
that could be used to gain entry to the Internet survey. The letter also gave the URL, or website address,
where the survey could be found.
2
WSU Hazard Mitigation Survey
SESRC Data Report 07-28
Section III: Case Disposition and Response Rates
II. SURVEY IMPLEMENTATION AND PROCEDURES
Project Planning
On March 5, 2007, SESRC staff produced the project’s finalized Scope of Work. This document clarified
the tasks involved with the project and gave an initial timeline for each task.
Washington State University’s Human Subjects Review Board approved the draft survey script (IRB File#
9656) on March 9 2007.
The Online Survey Instrument
The online survey instrument and the resulting hosted web site was designed using Macromedia
Dreamweaver MX software. The pages were coded using a combination of standard HTML 4.01, JavaScript for
client-side controls and ASP (Active Server Pages) technology for server side controls. The instrument was deployed
to SESRC’s web server and connected to a SQL Server database.
The layout of each screen was designed using TDM (Tailored Design Method) protocols for maximizing
respondent comprehension and ease of navigation with online forms. Each page was designed to include between
one and five questions in order to reduce the need for vertical scrolling.
All screens were constructed with HTML tables using proportional widths in order to maintain the visual
aspect of the screen regardless of individual user window sizes. In addition, font size and style were automatically
adjusted using CSS (Cascading Style Sheets) to accommodate differing user screen resolutions.
Programming began on the survey site on March 12, 2007 with a first draft available for testing online that
same day. Testing of the site with some changes and adjustments were made for the following week with a final
version achieved on April 4, 2007.
The first respondents to access the site began completing surveys on April 6, 2007 and data was continually
collected until May 5, 2007. A total of 2,786 faculty and staff and 1,494 WSU students completed or partially
completed the survey during this survey period.
3
WSU Hazard Mitigation Survey
SESRC Data Report 07-28
Section III: Case Disposition and Response Rates
Site Security
Internet access to sites at Washington State University is monitored via firewalls at the
university hub and at the SESRC server to reduce undesirable access to survey pages. In addition,
steps were taken to minimize the chances of the survey site being listed on Internet search engines
as access to the site was only intended for project researchers and those selected for the survey –
not for the public-at-large.
Each survey respondent was given a unique access code that could be entered at the
survey homepage in order to gain access to the survey, itself. These numbers were non-sequential
with a random interval. Once a survey was completed, that access code would no longer be
available and further access to the survey using that code would be denied. Any attempts to log
on with an access code that had already been used, or using an access code that had not been
authorized or attempts to enter the survey without a valid access code would result in the user
being redirected to a “help page”. This page informed the user that their code was not acceptable
and gave the user contact information in order to reach research staff.
Error Checking
On occasion, survey respondents may have encountered an error accessing a page or
writing to the database. These errors were rare, but could occur due to heavy Internet traffic or
browser incompatibilities. All errors were recorded and monitored using SESRC’s server logs. If
a user encountered an error, the SESRC server redirected the respondent to a standard error
explanation page.
The page apologized for the error and gave a link back to the survey
homepage, instructing the respondent to re-enter their access code. The server would then take
them back to the point in the survey where the error occurred.
If the problem persisted, the
respondent could then contact research staff via email or a toll-free 1-800 number.
Partially Completed Data
The online survey instrument allowed the respondent to exit the survey at any time and return to complete it
at their leisure. Upon returning to the survey homepage, the respondent could re-enter their access code and pick up
where they had left off.
4
WSU Hazard Mitigation Survey
SESRC Data Report 07-28
Section III: Case Disposition and Response Rates
Responses to the survey were completely voluntary. No response was required in order to
complete the survey; hence, each question field in the database has some degree of item nonresponse associated with it.
315 out of the 4280 respondents who started the survey, left the survey before reaching the
very last question and did not return to finish it. All 315 partially completed surveys are included
in the final dataset.
Data Validation Steps
The SESRC minimizes the use of data validation steps in online surveys, because these
can cause problems for respondents. Browser incompatibility with client-side scripting and
respondent confusion when presented with validation requests can lead to both item non-response
and overall survey break-off. This survey instrument used very few data validation steps:
Respondent Review
The survey instrument allowed respondents to review their individual survey responses by clicking on a
specialized “back” button. The instrument would load-in the respondent’s answers to each survey item if the
respondent navigated backwards through the survey instrument. A respondent could change the value of any item as
often as they wished. An historical record of each change was maintained in the database. It should be noted that if a
respondent exited the survey and then re-entered at a later date, backward progress and review of the previous
session’s responses was still possible.
Database
All data submitted to the SESRC SQL Server were stored in a relational database.
Separate tables existed to house sample information, survey responses and client-side paradata.
Data was stored in a vertical database architecture in which each line of the database represented
each individual response. Each line held the respondent ID number, variable field name, value of
response and date and time of response. The data could then be extracted to an MS Access
database and unduplicated using SAS scripting. In all cases, the last response made to each
individual survey item was used for the final dataset.
After the dataset was unduplicated, SPSS was used to reformat the dataset structure into a horizontal format.
Value labels and formats were then applied.
5
WSU Hazard Mitigation Survey
SESRC Data Report 07-28
Section III: Case Disposition and Response Rates
Data Management
Intermediate datasets were made available to the research team via SESRC’s project management website.
The site is only accessible to Internet Explorer browsers, and a double set of access codes and passwords were needed
to gain access to the site, which allowed project team members to view a real-time report of completed surveys and
partially completed surveys by date. Intermediate datasets could be downloaded from the site at any time.
Mailings
On April 6, 2007, an email was sent to all 5564 staff and faculty at WSU with a working email address, and
a random sample 7043 WSU students with working email addresses. The letter described the study and invited
respondents to participate in the online survey by providing them with the URL, or site address, of the survey and by
giving them their personal access code. This letter, and all other letters used in this study, is included in Appendix
A: Letters to Respondents of this report.
An email reminder was sent on April 21, 2007 to 3895 non-responding staff and faculty and to 6230 nonresponding students. On April 30, 2007, a final email was sent to 3041 non-responding staff and faculty and 5720
students.
III. CASE DISPOSITION AND RESPONSE RATES
RESPONSE RATES
The response rate is the ratio of completed and partially completed interviews to the total
eligible sample. This rate removes ineligible cases identified through email contacts. These
ineligible cases would include respondents no longer working in the position originally identified
or respondents who were misidentified in the original population list or cases were a respondent’s
name was duplicated in the sample frame.
For this study, no ineligible respondents were
identified. This formula is considered the industry standard for calculating response rates and
complies with AAPOR Standard Definitions (American Association for Public Opinion Research)
Response Rate. The formula is:
(CM + PC)
[(CM+PC) +RF+UI +UR]
6
WSU Hazard Mitigation Survey
SESRC Data Report 07-28
Section III: Case Disposition and Response Rates
where CM = number of completed interviews
PC= number of partially completed interviews
RF = number of refusals
UI, UR = number unable to interview, unable to reach
For the total fielded sample, 4280 respondents completed or partially the survey out of
12,607 valid names in the sample. The response rate for this study was 34.0%.
Table 3.1 Response Rates
#
%
3,965
26.2%
315
2.1%
0
0.0%
(D) Non-Response
8,327
55.0%
Subtotal 1 (included)
12,607
83.2%
(E) Ineligible – no email address
2,538
16.8%
(F) Ineligible – other
0
0.0%
Subtotal 2 (excluded)
2,538
16.8%
Total Sample
15,145
100%
(A) Completed Survey
(B) Partially Completed Survey
(C ) Refusals
Response Rate: (A+B)/(A+B+C+D)
7
34.0%
WSU Hazard Mitigation Survey
SESRC Data Report 07-28
Section III: Case Disposition and Response Rates
SAMPLE ERROR
Sample error is a measure of the degree to which a randomly selected sample of respondents represents
the population from which it is drawn. Sample error also is the basis upon which tests of statistical significance
are calculated. One formula for calculating the sample error for a proportion at the 95% confidence level is
presented below.
pq § N n ·
SE 2
¸
¨
(n 1) © N ¹
Where: SE= sample error
p = proportion of “yes” responses for a specific question
q = proportion of “no” responses for a specific question
n = sample size = number of completed interviews for a specific questions
N = population size for the survey
The approximate sample error for a survey of 1,494 WSU students from a population of approximately
23,000 is plus or minus 3%. The faculty version of the survey was administered to the entire population so no
sample error is calculated for that phase of the study.
8
WSU Hazard Mitigation Survey
SESRC Data Report 07-28
Section IV: Description of the Data
IV. DESCRIPTION OF THE DATA
Compact Disc
The data collected in the survey have been copied from permanently stored files maintained on SESRC’s
dedicated server at Washington State University to a compact disc. A compact disc (CD) containing this data in
an SPSS formatted dataset can be found attached to the back cover of this report. The CD also contains a copy of
this report.
Missing Values
Throughout the dataset, missing values occur only when a respondent skips a question or otherwise
leaves an answer without a response. For text data, missing values are represented as a blank “ “, while a period
“.” is used throughout the SPSS dataset to represent missing values for numeric type response fields.
Open-Ended Remarks
The remarks data corresponding to the open-ended questions in this survey are included in the Microsoft
Excel file FEMA_Open_Ends.xls on the CD included with this report. The remarks have been sorted by question
number and then by identification number. The SESRC identification number is the first number, followed by the
question number, the question alias, and then by the open-ended remarks. An example is shown in Figure 4.1.
In addition, the remarks have been included in the Section V. of this report, “Frequency Listing”. These
remarks appear in the order they appear in the questionnaire.
Figure 4.1. Generic Example of the Remarks Data
99999
THIS IS AN EXAMPLE OF THE OPEN-ENDED REMARK
99999
TEXT FORMAT THAT IS IN THE REMARKS DATA FILE
PLEASE NOTE: The remarks data has been only minimally edited. The file was run
through a spell check. For this study, references to individuals were not deleted. However, the
data should remain strictly confidential. The remarks data should be treated as confidential
information and printed for release only after careful review and necessary editing.
9
WSU Hazard Mitigation Survey
SESRC Data Report 07-28
Section IV: Description of the Data
V. FREQUENCY LISTING
The following section lists the screenshots from the web survey; a frequency listing displaying counts from the final
dataset for all variables and open-ended responses. Missing values are shown wherever they occur and column
totals reflect missing data. Open-ended responses are also included in this section wherever they were collected in
the survey.
Faculty and Staff Version
10
WSU 2007 Student Experience Survey
SESRC Data Report 07-32
Section V. Frequency Listing
Q01s Does your WSU office, Department or Unit have a current emergency
preparedness plan?
Valid
Missing
1 Yes
2 No
Total
-1 No answer
3 Don't know
Total
Total
Frequency
1865
123
1988
27
771
798
2786
Percent
66.9
4.4
71.4
1.0
27.7
28.6
100.0
Valid Percent
93.8
6.2
100.0
Cumulative
Percent
93.8
100.0
Q02sa What are the chances in the next 5 years this hazard or disaster could occur at
your WSU location: Drought
Valid
Missing
Total
1 Extremely Unlikely
2 Unlikely
3 Likely
4 Extremely Likely
Total
-1 No answer
Frequency
615
1004
932
144
2695
91
2786
11
Percent
22.1
36.0
33.5
5.2
96.7
3.3
100.0
Valid Percent
22.8
37.3
34.6
5.3
100.0
Cumulative
Percent
22.8
60.1
94.7
100.0
WSU 2007 Student Experience Survey
SESRC Data Report 07-32
Section V. Frequency Listing
Q02sb What are the chances in the next 5 years this hazard or disaster could occur at
your WSU location: Earthquake
Valid
Missing
Total
1 Extremely Unlikely
2 Unlikely
3 Likely
4 Extremely Likely
Total
-1 No answer
Frequency
599
1347
645
106
2697
89
2786
Percent
21.5
48.3
23.2
3.8
96.8
3.2
100.0
Valid Percent
22.2
49.9
23.9
3.9
100.0
Cumulative
Percent
22.2
72.2
96.1
100.0
Q02sc What are the chances in the next 5 years this hazard or disaster could occur at
your WSU location: Flooding
Valid
Missing
Total
1 Extremely Unlikely
2 Unlikely
3 Likely
4 Extremely Likely
Total
-1 No answer
Frequency
667
1213
699
117
2696
90
2786
Percent
23.9
43.5
25.1
4.2
96.8
3.2
100.0
Valid Percent
24.7
45.0
25.9
4.3
100.0
Cumulative
Percent
24.7
69.7
95.7
100.0
Q02sd What are the chances in the next 5 years this hazard or disaster could occur at
your WSU location: Hail
Valid
Missing
Total
1 Extremely Unlikely
2 Unlikely
3 Likely
4 Extremely Likely
Total
-1 No answer
Frequency
75
413
1358
851
2697
89
2786
12
Percent
2.7
14.8
48.7
30.5
96.8
3.2
100.0
Valid Percent
2.8
15.3
50.4
31.6
100.0
Cumulative
Percent
2.8
18.1
68.4
100.0
WSU 2007 Student Experience Survey
SESRC Data Report 07-32
Section V. Frequency Listing
Q02se What are the chances in the next 5 years this hazard or disaster could occur at
your WSU location: High Winds
Valid
Missing
Total
1 Extremely Unlikely
2 Unlikely
3 Likely
4 Extremely Likely
Total
-1 No answer
Frequency
26
106
1112
1462
2706
80
2786
Percent
.9
3.8
39.9
52.5
97.1
2.9
100.0
Valid Percent
1.0
3.9
41.1
54.0
100.0
Cumulative
Percent
1.0
4.9
46.0
100.0
Q02sf What are the chances in the next 5 years this hazard or disaster could occur at
your WSU location: Infestation/Disease
Valid
Missing
Total
1 Extremely Unlikely
2 Unlikely
3 Likely
4 Extremely Likely
Total
-1 No answer
Frequency
312
1342
867
165
2686
100
2786
Percent
11.2
48.2
31.1
5.9
96.4
3.6
100.0
Valid Percent
11.6
50.0
32.3
6.1
100.0
Cumulative
Percent
11.6
61.6
93.9
100.0
Q02sg What are the chances in the next 5 years this hazard or disaster could occur at
your WSU location: Landslide/Erosion
Valid
Missing
Total
1 Extremely Unlikely
2 Unlikely
3 Likely
4 Extremely Likely
Total
-1 No answer
Frequency
648
1275
630
148
2701
85
2786
13
Percent
23.3
45.8
22.6
5.3
96.9
3.1
100.0
Valid Percent
24.0
47.2
23.3
5.5
100.0
Cumulative
Percent
24.0
71.2
94.5
100.0
WSU 2007 Student Experience Survey
SESRC Data Report 07-32
Section V. Frequency Listing
Q02sh What are the chances in the next 5 years this hazard or disaster could occur at
your WSU location: Lightning
Valid
Missing
Total
1 Extremely Unlikely
2 Unlikely
3 Likely
4 Extremely Likely
Total
-1 No answer
Frequency
96
581
1296
716
2689
97
2786
Percent
3.4
20.9
46.5
25.7
96.5
3.5
100.0
Valid Percent
3.6
21.6
48.2
26.6
100.0
Cumulative
Percent
3.6
25.2
73.4
100.0
Q02si What are the chances in the next 5 years this hazard or disaster could occur at
your WSU location: Storm Surge/Tsunami
Valid
Missing
Total
1 Extremely Unlikely
2 Unlikely
3 Likely
4 Extremely Likely
Total
-1 No answer
Frequency
2141
469
67
24
2701
85
2786
Percent
76.8
16.8
2.4
.9
96.9
3.1
100.0
Valid Percent
79.3
17.4
2.5
.9
100.0
Cumulative
Percent
79.3
96.6
99.1
100.0
Q02sj What are the chances in the next 5 years this hazard or disaster could occur at
your WSU location: Urban Fire
Valid
Missing
Total
1 Extremely Unlikely
2 Unlikely
3 Likely
4 Extremely Likely
Total
-1 No answer
Frequency
353
1321
868
147
2689
97
2786
14
Percent
12.7
47.4
31.2
5.3
96.5
3.5
100.0
Valid Percent
13.1
49.1
32.3
5.5
100.0
Cumulative
Percent
13.1
62.3
94.5
100.0
WSU 2007 Student Experience Survey
SESRC Data Report 07-32
Section V. Frequency Listing
Q02sk What are the chances in the next 5 years this hazard or disaster could occur at
your WSU location: Wildfire
Valid
Missing
Total
1 Extremely Unlikely
2 Unlikely
3 Likely
4 Extremely Likely
Total
-1 No answer
Frequency
580
1137
764
217
2698
88
2786
Percent
20.8
40.8
27.4
7.8
96.8
3.2
100.0
Valid Percent
21.5
42.1
28.3
8.0
100.0
Cumulative
Percent
21.5
63.6
92.0
100.0
Q02sl What are the chances in the next 5 years this hazard or disaster could occur at
your WSU location: Winter Storm
Valid
Missing
Total
1 Extremely Unlikely
2 Unlikely
3 Likely
4 Extremely Likely
Total
-1 No answer
Frequency
28
168
1208
1299
2703
83
2786
Percent
1.0
6.0
43.4
46.6
97.0
3.0
100.0
Valid Percent
1.0
6.2
44.7
48.1
100.0
Cumulative
Percent
1.0
7.3
51.9
100.0
Q02sm What are the chances in the next 5 years this hazard or disaster could occur at
your WSU location: Volcanic Activity
Valid
Missing
Total
1 Extremely Unlikely
2 Unlikely
3 Likely
4 Extremely Likely
Total
-1 No answer
Frequency
1024
1097
487
86
2694
92
2786
15
Percent
36.8
39.4
17.5
3.1
96.7
3.3
100.0
Valid Percent
38.0
40.7
18.1
3.2
100.0
Cumulative
Percent
38.0
78.7
96.8
100.0
WSU 2007 Student Experience Survey
SESRC Data Report 07-32
Section V. Frequency Listing
Q02sn What are the chances in the next 5 years this hazard or disaster could occur at
your WSU location: Hazardous Material Spills
Valid
Missing
Total
1 Extremely Unlikely
2 Unlikely
3 Likely
4 Extremely Likely
Total
-1 No answer
Frequency
197
1067
1120
314
2698
88
2786
Percent
7.1
38.3
40.2
11.3
96.8
3.2
100.0
Valid Percent
7.3
39.5
41.5
11.6
100.0
Cumulative
Percent
7.3
46.8
88.4
100.0
Q02so What are the chances in the next 5 years this hazard or disaster could occur at
your WSU location: Terrorist Events
Valid
Missing
Total
1 Extremely Unlikely
2 Unlikely
3 Likely
4 Extremely Likely
Total
-1 No answer
Frequency
634
1424
546
95
2699
87
2786
Percent
22.8
51.1
19.6
3.4
96.9
3.1
100.0
Valid Percent
23.5
52.8
20.2
3.5
100.0
Cumulative
Percent
23.5
76.3
96.5
100.0
Q02sp What are the chances in the next 5 years this hazard or disaster could occur at
your WSU location: Radiological Incident
Valid
Missing
Total
1 Extremely Unlikely
2 Unlikely
3 Likely
4 Extremely Likely
Total
-1 No answer
Frequency
683
1426
514
73
2696
90
2786
16
Percent
24.5
51.2
18.4
2.6
96.8
3.2
100.0
Valid Percent
25.3
52.9
19.1
2.7
100.0
Cumulative
Percent
25.3
78.2
97.3
100.0
WSU 2007 Student Experience Survey
SESRC Data Report 07-32
Section V. Frequency Listing
Respondent comments for this question are in the file “FEMA Remarks.xls” included on the CD
at the back of this report.
Q03s Which ONE of these hazards do you feel poses the greatest risk for your WSU
location?
Valid
Missing
Total
1 Drought
2 Earthquake
3 Flooding
4 Hail
5 High Winds
6 Infestation/Disease
7 Landslide/Erosion
8 Lightning
9 Storm Surge/Tsunami
10 Urban Fire
11 Wildfire
12 Winter Storm
13 Volcanic Activity
14 Hazardous Material
Spills
15 Terrorist
16 Radiological
Total
-1 No answer
Frequency
78
198
59
20
636
171
4
41
7
75
61
798
39
Percent
2.8
7.1
2.1
.7
22.8
6.1
.1
1.5
.3
2.7
2.2
28.6
1.4
Valid Percent
3.0
7.5
2.2
.8
24.2
6.5
.2
1.6
.3
2.9
2.3
30.4
1.5
Cumulative
Percent
3.0
10.5
12.8
13.5
37.8
44.3
44.5
46.0
46.3
49.1
51.5
81.9
83.4
258
9.3
9.8
93.2
126
52
2623
163
2786
4.5
1.9
94.1
5.9
100.0
4.8
2.0
100.0
98.0
100.0
17
WSU 2007 Student Experience Survey
SESRC Data Report 07-32
Section V. Frequency Listing
Q05s Do you conduct or administer research?
Valid
Missing
Total
1 Yes
2 No
Total
-1 No Answer
Frequency
864
1788
2652
134
2786
Percent
31.0
64.2
95.2
4.8
100.0
Valid Percent
32.6
67.4
100.0
Cumulative
Percent
32.6
100.0
Respondent comments for this question are in the file “FEMA Remarks.xls” included on the CD
at the back of this report.
Respondent comments for this question are in the file “FEMA Remarks.xls” included on the CD
at the back of this report.
18
WSU 2007 Student Experience Survey
SESRC Data Report 07-32
Section V. Frequency Listing
Student Version
Q01 Are you aware of an emergency preparedness/disaster response plan for the
place where you live while attending Washington State University?
Valid
Missing
Total
1 Yes
2 No
Total
-1 No answer
3 Don't know
Total
Frequency
309
1014
1323
5
166
171
1494
Percent
20.7
67.9
88.6
.3
11.1
11.4
100.0
19
Valid Percent
23.4
76.6
100.0
Cumulative
Percent
23.4
100.0
WSU 2007 Student Experience Survey
SESRC Data Report 07-32
Section V. Frequency Listing
Q02a What are the chances in the next 5 years this hazard or disaster could occur at
your WSU location: Drought
Valid
Missing
Total
1 Extremely Unlikely
2 Unlikely
3 Likely
4 Extremely Likely
Total
-1 No answer
Frequency
266
569
526
82
1443
51
1494
Percent
17.8
38.1
35.2
5.5
96.6
3.4
100.0
Valid Percent
18.4
39.4
36.5
5.7
100.0
Cumulative
Percent
18.4
57.9
94.3
100.0
Q02b What are the chances in the next 5 years this hazard or disaster could occur at
your WSU location: Earthquake
Valid
Missing
Total
1 Extremely Unlikely
2 Unlikely
3 Likely
4 Extremely Likely
Total
-1 No answer
Frequency
308
650
404
80
1442
52
1494
20
Percent
20.6
43.5
27.0
5.4
96.5
3.5
100.0
Valid Percent
21.4
45.1
28.0
5.5
100.0
Cumulative
Percent
21.4
66.4
94.5
100.0
WSU 2007 Student Experience Survey
SESRC Data Report 07-32
Section V. Frequency Listing
Q02c What are the chances in the next 5 years this hazard or disaster could occur at
your WSU location: Flooding
Valid
Missing
Total
1 Extremely Unlikely
2 Unlikely
3 Likely
4 Extremely Likely
Total
-1 No answer
Frequency
382
627
374
59
1442
52
1494
Percent
25.6
42.0
25.0
3.9
96.5
3.5
100.0
Valid Percent
26.5
43.5
25.9
4.1
100.0
Cumulative
Percent
26.5
70.0
95.9
100.0
Q02d What are the chances in the next 5 years this hazard or disaster could occur at
your WSU location: Hail
Valid
Missing
Total
1 Extremely Unlikely
2 Unlikely
3 Likely
4 Extremely Likely
Total
-1 No answer
Frequency
19
120
622
671
1432
62
1494
Percent
1.3
8.0
41.6
44.9
95.9
4.1
100.0
Valid Percent
1.3
8.4
43.4
46.9
100.0
Cumulative
Percent
1.3
9.7
53.1
100.0
Q02e What are the chances in the next 5 years this hazard or disaster could occur at
your WSU location: High Winds
Valid
Missing
Total
1 Extremely Unlikely
2 Unlikely
3 Likely
4 Extremely Likely
Total
-1 No answer
Frequency
6
46
401
983
1436
58
1494
21
Percent
.4
3.1
26.8
65.8
96.1
3.9
100.0
Valid Percent
.4
3.2
27.9
68.5
100.0
Cumulative
Percent
.4
3.6
31.5
100.0
WSU 2007 Student Experience Survey
SESRC Data Report 07-32
Section V. Frequency Listing
Q02f What are the chances in the next 5 years this hazard or disaster could occur at
your WSU location: Infestation/Disease
Valid
Missing
Total
1 Extremely Unlikely
2 Unlikely
3 Likely
4 Extremely Likely
Total
-1 No answer
Frequency
230
700
433
78
1441
53
1494
Percent
15.4
46.9
29.0
5.2
96.5
3.5
100.0
Valid Percent
16.0
48.6
30.0
5.4
100.0
Cumulative
Percent
16.0
64.5
94.6
100.0
Q02g What are the chances in the next 5 years this hazard or disaster could occur at
your WSU location: Landslide/Erosion
Valid
Missing
Total
1 Extremely Unlikely
2 Unlikely
3 Likely
4 Extremely Likely
Total
-1 No answer
Frequency
226
635
477
102
1440
54
1494
Percent
15.1
42.5
31.9
6.8
96.4
3.6
100.0
Valid Percent
15.7
44.1
33.1
7.1
100.0
Cumulative
Percent
15.7
59.8
92.9
100.0
Q02h What are the chances in the next 5 years this hazard or disaster could occur at
your WSU location: Lightning
Valid
Missing
Total
1 Extremely Unlikely
2 Unlikely
3 Likely
4 Extremely Likely
Total
-1 No answer
Frequency
24
221
669
513
1427
67
1494
22
Percent
1.6
14.8
44.8
34.3
95.5
4.5
100.0
Valid Percent
1.7
15.5
46.9
35.9
100.0
Cumulative
Percent
1.7
17.2
64.1
100.0
WSU 2007 Student Experience Survey
SESRC Data Report 07-32
Section V. Frequency Listing
Q02i What are the chances in the next 5 years this hazard or disaster could occur at
your WSU location: Storm Surge/Tsunami
Valid
Missing
Total
1 Extremely Unlikely
2 Unlikely
3 Likely
4 Extremely Likely
Total
-1 No answer
Frequency
1024
355
43
15
1437
57
1494
Percent
68.5
23.8
2.9
1.0
96.2
3.8
100.0
Valid Percent
71.3
24.7
3.0
1.0
100.0
Cumulative
Percent
71.3
96.0
99.0
100.0
Q02j What are the chances in the next 5 years this hazard or disaster could occur at
your WSU location: Urban Fire
Valid
Missing
Total
1 Extremely Unlikely
2 Unlikely
3 Likely
4 Extremely Likely
Total
-1 No answer
Frequency
119
615
571
130
1435
59
1494
Percent
8.0
41.2
38.2
8.7
96.1
3.9
100.0
Valid Percent
8.3
42.9
39.8
9.1
100.0
Cumulative
Percent
8.3
51.1
90.9
100.0
Q02k What are the chances in the next 5 years this hazard or disaster could occur at
your WSU location: Wildfire
Valid
Missing
Total
1 Extremely Unlikely
2 Unlikely
3 Likely
4 Extremely Likely
Total
-1 No answer
Frequency
126
504
613
189
1432
62
1494
23
Percent
8.4
33.7
41.0
12.7
95.9
4.1
100.0
Valid Percent
8.8
35.2
42.8
13.2
100.0
Cumulative
Percent
8.8
44.0
86.8
100.0
WSU 2007 Student Experience Survey
SESRC Data Report 07-32
Section V. Frequency Listing
Q02l What are the chances in the next 5 years this hazard or disaster could occur at
your WSU location: Winter Storm
Valid
Missing
Total
1 Extremely Unlikely
2 Unlikely
3 Likely
4 Extremely Likely
Total
-1 No answer
Frequency
15
91
573
755
1434
60
1494
Percent
1.0
6.1
38.4
50.5
96.0
4.0
100.0
Valid Percent
1.0
6.3
40.0
52.6
100.0
Cumulative
Percent
1.0
7.4
47.4
100.0
Q02m What are the chances in the next 5 years this hazard or disaster could occur at
your WSU location: Volcanic Activity
Valid
Missing
Total
1 Extremely Unlikely
2 Unlikely
3 Likely
4 Extremely Likely
Total
-1 No answer
Frequency
765
440
183
51
1439
55
1494
Percent
51.2
29.5
12.2
3.4
96.3
3.7
100.0
Valid Percent
53.2
30.6
12.7
3.5
100.0
Cumulative
Percent
53.2
83.7
96.5
100.0
Q02n What are the chances in the next 5 years this hazard or disaster could occur at
your WSU location: Hazardous Material Spills
Valid
Missing
Total
1 Extremely Unlikely
2 Unlikely
3 Likely
4 Extremely Likely
Total
-1 No answer
Frequency
238
694
404
105
1441
53
1494
24
Percent
15.9
46.5
27.0
7.0
96.5
3.5
100.0
Valid Percent
16.5
48.2
28.0
7.3
100.0
Cumulative
Percent
16.5
64.7
92.7
100.0
WSU 2007 Student Experience Survey
SESRC Data Report 07-32
Section V. Frequency Listing
Q02o What are the chances in the next 5 years this hazard or disaster could occur at
your WSU location: Terrorist Events
Valid
Missing
Total
1 Extremely Unlikely
2 Unlikely
3 Likely
4 Extremely Likely
Total
-1 No answer
Frequency
542
666
193
42
1443
51
1494
Percent
36.3
44.6
12.9
2.8
96.6
3.4
100.0
Valid Percent
37.6
46.2
13.4
2.9
100.0
Cumulative
Percent
37.6
83.7
97.1
100.0
Q02p What are the chances in the next 5 years this hazard or disaster could occur at
your WSU location: Radiological Incident
Valid
Missing
Total
1 Extremely Unlikely
2 Unlikely
3 Likely
4 Extremely Likely
Total
-1 No answer
Frequency
469
717
209
47
1442
52
1494
25
Percent
31.4
48.0
14.0
3.1
96.5
3.5
100.0
Valid Percent
32.5
49.7
14.5
3.3
100.0
Cumulative
Percent
32.5
82.2
96.7
100.0
WSU 2007 Student Experience Survey
SESRC Data Report 07-32
Section V. Frequency Listing
Respondent comments for this question are in the file “FEMA Remarks.xls” included on the CD
at the back of this report.
Q03 Which ONE of these hazards do you feel poses the greatest risk for your WSU location?
Valid
Missing
Total
1 Drought
2 Earthquake
3 Flooding
4 Hail
5 High Winds
6 Infestation/Disease
7 Landslide/Erosion
8 Lightning
9 Storm Surge/Tsunami
10 Urban Fire
11 Wildfire
12 Winter Storm
13 Volcanic Activity
14 Hazardous Material
Spills
15 Terrorist
16 Radiological
Total
-1 No answer
Frequency
50
93
30
34
368
64
25
16
2
53
83
478
30
Percent
3.3
6.2
2.0
2.3
24.6
4.3
1.7
1.1
.1
3.5
5.6
32.0
2.0
Valid Percent
3.5
6.6
2.1
2.4
26.0
4.5
1.8
1.1
.1
3.7
5.9
33.7
2.1
Cumulative
Percent
3.5
10.1
12.2
14.6
40.6
45.1
46.8
48.0
48.1
51.8
57.7
91.4
93.5
27
1.8
1.9
95.4
47
18
1418
76
1494
3.1
1.2
94.9
5.1
100.0
3.3
1.3
100.0
98.7
100.0
26
WSU 2007 Student Experience Survey
SESRC Data Report 07-32
Section V. Frequency Listing
Respondent comments for this question are in the file “FEMA Remarks.xls” included on the CD
at the back of this report.
Contact information for those interested in helping are in the file “FEMA Addresses.xls”
included on the CD at the back of this report.
27
1
<ACCESS CODE>
Christopher Tapfer
Sincerely,
Thanks in advance for filling out the survey.
2
If you have any questions about the survey, or if you would like additional information please feel free to contact me at [email protected]
or 335-7471. If you have any difficulties gaining access to the survey, please contact SESRC at [email protected] or 335-1722 for assistance.
Your participation is voluntary and your responses will be kept confidential. The data will be compiled by WSU’s Social & Economic
Sciences Research Center and no one outside the SESRC will have access to your responses. When you access the website, you will need
to enter the Access Code listed above. However, no personally identifiable information will be associated with your responses. Please
take a few minutes to complete the questions in the survey. Every response is important!
Your Access Code for the Survey is:
http://www.opinion.wsu.edu/mitigation
We ask that you please help us by completing the questionnaire online at
WSU’s Division of Governmental Studies and Services is working with the WSU Hazard Mitigation Project to help make our campuses a
safer place for students, faculty and staff. This is a big task and we would like to ask for just a few minutes of your time to answer a
few questions about some potential hazards you may face at school, work and even at home.
Dear <NAME>,
Advance Letter
Sent to all respondents – 4996 faculty and staff & 7046 students
(Sent April 6, 2007)
APPENDIX A: SURVEY INSTRUMENTS – Respondent Letters
3
PS. This project has been reviewed and approved by the Washington State University Institutional Review Board. If you have any questions concerning your
rights about participating in this project, please contact 509-335-9661 and ask for the IRB Coordinator.
University Emergency Management Coordinator
Office of Business Affairs
French Ad 442
First Email Follow-up
Sent to all non-respondents – 3895 faculty and staff & 6230 students
(Sent April 21, 2007)
<ACCESS CODE>
4
If you have any questions about the survey, or if you would like additional information please feel free to contact me [email protected]. If
you have any difficulties gaining access to the survey, please contact SESRC at [email protected] or 335-1722 for assistance.
Your participation is voluntary and your responses will be kept confidential. The data will be compiled by WSU’s Social & Economic
Sciences Research Center and no one outside the SESRC will have access to your responses. When you access the website, you will need
to enter the Access Code listed above. However, no personally identifiable information will be associated with your responses. Please
take a few minutes to complete the questions in the survey. Every response is important!
Your Access Code for the Survey is:
http://www.opinion.wsu.edu/mitigation
If you haven’t had the chance to complete the survey, I’d like to ask you to take a moment and visit the
website listed below. The survey is very short – only 5 or 6 questions – and takes most people less than
two minutes to complete.
Two weeks ago, WSU’s Social and Economic Sciences Research Center sent an e-mail to 15,000 WSU
students, faculty and staff asking them to take part in a very short online survey regarding hazards at
work and school. In light of recent events on the Virginia Tech campus, your response to this survey is
even more important.
Dear <NAME>,
.
5
PS. This project has been reviewed and approved by the Washington State University Institutional Review Board. If you have any questions concerning your
rights about participating in this project, please contact 509-335-9661 and ask for the IRB Coordinator.
Christopher Tapfer
University Emergency Management Coordinator
Senior Associate Vice President for Business Affairs
French Ad 442
Sincerely,
Thank you.
Sent to all non-respondents – 3041 faculty and staff & 5720 students
(Sent May 1, 2007)
<ACCESS CODE>
6
PS. This project has been reviewed and approved by the Washington State University Institutional Review Board. If you have any questions concerning your
rights about participating in this project, please contact 509-335-9661 and ask for the IRB Coordinator.
Christopher Tapfer
University Emergency Management Coordinator
Senior Associate Vice President for Business Affairs
French Ad 442
Sincerely,
Thank you.
If you have any questions about the survey, or if you would like additional information please feel free to contact me at [email protected]
or 335-7471. If you have any difficulties gaining access to the survey, please contact SESRC at [email protected] or 335-1722 for assistance.
Your participation is voluntary and your responses will be kept confidential. The data will be compiled by WSU’s Social & Economic
Sciences Research Center and no one outside the SESRC will have access to your responses. When you access the website, you will need
to enter the Access Code listed above. However, no personally identifiable information will be associated with your responses. Please
take a few minutes to complete the questions in the survey. Every response is important!
Your Access Code for the Survey is:
http://www.opinion.wsu.edu/mitigation
We are about to close down our short survey concerning the hazards we face on campus at Washington
State University. If you have completed the survey already, please accept our most sincere thanks. If
you have not had the chance to finish the survey, we ask that you please take just a few minutes to do so
as we will be closing down the survey after May 4. The results of this survey are very important to
Washington State University.
Dear <NAME>,
Final Email Follow-up
Mason Co
Ext
Hazardous
Materials
Event
Okanogan
Co Ext
Major Fire Urban
NW WA
Res Ext
Economic
Crisis
Crime
Crime
Loss of
Electrical
Service
Island Co
Ext
Island Co
Camano
Ext
Island Co
Lighthouse
Ext
Loss of
Electrical
Service
Major Fire Urban
Major Fire
- Urban
Crime
Hazardous
Materials
Events
Radiological
Incident
Hazardous
Materials
Events
Loss of
Electrical
Service
Benton Co
Ext
Asotin Co
Ext
Adams Co
Ext
Prosser
Ag Res &
Ext
Jefferson
Co Ext
Telecommunication
System
Failure
Loss of
Water
Service
Crime
Major Fire
- Urban
Chelan Co
Ext
Skamania
Co Ext
1
Spokane
Co Ext
Hazardous
Materials
Events
Major Fire Urban
Loss of
Sewer
Service
Skagit,
Island &
San Juan
LC
Loss of
Electrical
Service
Loss of
Electrical
Service
Crime
Kittitas Co
Ext
Crime
Key
Employer
Crisis
Economic
Crisis
Colockum
Res & Ext
Loss of Gas
Service
Radiological
Incident
King Co Ext
Major Fire
- Urban
Loss of
Water
Service
Kitsap Co
Ext
Loss of
Electrical
Service
Clark Co
Ext
Loss of
Electrical
Service
Clallam Co
Ext
Major Fire Urban
Stevens Co
Ext
Klickitat Co
Ext
Loss of
Electrical
Service
Key
Employer
Crisis
Crime
Radiological
Incident
Columbia
Co Ext
Major Fire Urban
Thurston
Co Ext
Lewis Co
Ext
Hazardous
Materials
Event
Loss of
Electrical
Service
Major Fire Urban
Crime
Cowlitz Co
Ext
Tri Cities
Campus
Hazardous
Materials
Events
Economic
Crisis
Radiological
Incident
Crime
Lincoln Co
Ext
Hazardous
Materials
Event
Loss of
Electrical
Service
Major Fire Urban
Loss of
Electrical
Service
Ferry Co
Ext
Top Man Caused/Technological Hazards by WSU Location
Appendix E – Hazard Rating Charts
Vancouver
Res & Ext
Loss of
Electrical
Service
Lind
Dryland
Res Unit
Major Fire Urban
Grant Co
Ext
Telecommunication
System
Failure
Loss of
Water
Service
Wahkiakum
Ext Unit
Hazardous
Materials
Events
Loss of
Electrical
Service
Loss of
Water
Service
Crime
Long Beach
Res Unit
Ext
Crime
Radiological
Incident
Hazardous
Materials
Event
Grays Co
Ext
Hazardous
Materials
Event
Telecommunications
System
Failure
Loss of
Water
Service
Telecommunications
System
Failure
Loss of
Water
Service
Loss of
Electrical
Service
Crime
Major Fire
- Urban
Whatcom
Co Ext
Crime
Crime
Wenatchee
Tree Fruit
& Ext Ctr
Hazardous
Materials
Event
Crime
Loss of
Electrical
Service
Walla Walla
Co Ext
Major Fire Urban
North
Central
WA LC
Hazardous
Materials
Event
Loss of
Electrical
Service
Hazardous
Materials
Event
Whitman
Co Ext
Othello Unit
Puyallup
Res & Ext
Center
Telecommunications
System
Failure
Pierce Co
Ext
Loss of
Electrical
Service
Loss of
Water
Service
Spokane
Campus
2
Cooperative
Ext of San
Juan Co
Loss of
Electrical
Service
Loss of
Water
Service
Hazardous
Materials
Event
Vancouver
Campus
Major Fire Urban
Radiological
Incident
Hazardous
Materials
Event
Crime
Snohomish
Co Ext
Yakima
Academic
Center
Loss of
Electrical
Service
Crime
Telecommunications
System
Failure
Crime
Yakima Ag
Res Lab
Loss of
Electrical
Service
Loss of
Electrical
Service
Yakima Co
Ext Center
Loss of
Electrical
Service
Crime
Hazardous
Materials
Event
Loss of
Electrical
Service
Pullman
Campus
Major Fire Urban
Colville
Reservation
Ext
Telecommunications
System
Failure
Radiological
Incident
Crime
Loss of
Sewer
Service
Crime
Cowlitz &
Wahkiakum
LC
Telecommunications
System
Failure
Key
Employer
Crisis
Economic
Crisis
Garfield Co
Ext
Loss of
Electrical
Service
NW WA
Res Ext
High Winds
High Winds
Storm
surge,
Tsunami
Severe
Winter
Storm
Flooding
Mason Co
Ext
Flooding
Severe
Winter
Storm
Loss of
Electrical
Service
Earthquake
Earthquake
Severe
Winter
Storm
Major Fire Urban
Prosser Ag
Res & Ext
High Winds
Major Fire Urban
High Winds
Skamania
Co Ext
Hail
Severe
Winter
Storm
Okanogan
Co Ext
Flooding
Infestation,
Disease
Drought
Earthquake
Kitsap Co
Ext
Infestation,
Disease
Landslide,
Erosion
Skagit,
Island &
San Juan
LC
Severe
Winter
Storm
Severe
Winter
Storm
Flooding
King Co
Ext
Loss of
Electrical
Service
Severe
Winter
Storm
Earthquake
Major Fire Urban
Volcano
Activity
Clark Co
Ext
Earthquake
Storm
surge,
Tsunami
High Winds
Jefferson
Co Ext
Loss of
Electrical
Service
Severe
Winter
Storm
Infestation
Disease
Earthquake
Clallam Co
Ext
Major Fire Wildland
Storm
surge,
Tsunami
Earthquake
Island Co
Lighthouse
Ext
High Winds
Volcano
Activity
Loss of
Electrical
Service
Island Co
Ext
Major Fire Urban
Severe
Winter
Storm
High Winds
Island Co
Camano
Ext
Major Fire Urban
Major Fire Wildland
High Winds
Severe
Winter
Storm
Chelan Co
Ext
Benton Co
Ext
Asotin Co
Ext
Adams Co
Ext
Severe
Winter
Storm
1
High Winds
Spokane
Co Ext
Major Fire Urban
High Winds
Loss of
Electrical
Service
Flooding
Kittitas Co
Ext
Lightning
Major Fire Wildland
Colockum
Res & Ext
Major Fire Wildland
Stevens
Co Ext
Earthquake
Loss of
Electrical
Service
Drought
High Winds
Klickitat Co
Ext
Drought
Volcano
Activity
Lightning
Columbia
Co Ext
Earthquake
Thurston
Co Ext
Earthquake
Volcano
Activity
Flooding
Lewis Co
Ext
Earthquake
Major Fire Urban
High Winds
Cowlitz Co
Ext
Severe
Winter
Storm
Top Natural Hazards by WSU Location
Tri Cities
Campus
Severe
Winter
Storm
Lincoln Co
Ext
Earthquake
Major Fire Urban
Major Fire Wildland
Ferry Co
Ext
Loss of
Electrical
Service
Severe
Winter
Storm
Hail
Vancouver
Res & Ext
Lightning
Severe
Winter
Storm
Volcano
Activity
High Winds
Drought
Lind
Dryland
Res Unit
Major Fire Urban
High Winds
Flooding
Grant Co
Ext
High Winds
Wahkiakum
Ext Unit
Loss of
Electrical
Service
Storm
surge,
Tsunami
High Winds
Long
Beach Res
Unit Ext
Flooding
High Winds
Grays Co
Ext
Flooding
Walla
Walla Co
Ext
Loss of
Electrical
Service
Hail
Major Fire Urban
Severe
Winter
Storm
Lightning
High Winds
Flooding
Drought
Infestation,
Disease
Severe
Winter
Storm
Earthquake
Pierce Co
Ext
Severe
Winter
Storm
Loss of
Electrical
Service
High Winds
Hail
Severe
Winter
Storm
Earthquake
Lightning
Spokane
Campus
Hail
High Winds
High Winds
Severe
Winter
Storm
Drought
Othello
Unit
High Winds
Hail
Severe
Winter
Storm
Earthquake
Lightning
Puyallup
Res & Ext
Center
North
Central WA
LC
High Winds
Volcano
Activity
Whitman
Co Ext
Severe
Winter
Storm
Loss of
Electrical
Service
Drought
Major Fire Wildland
Earthquake
Infestation,
Diseases
Earthquake
Infestation
Disease
Earthquake
Severe
Winter
Storm
Severe
Winter
Storm
Loss of
Electrical
Service
Flooding
Infestation
Disease
Flooding
Whatcom
Co Ext
Loss of
Electrical
Service
Earthquake
Severe
Winter
Storm
Severe
Winter
Storm
Major Fire Wildland
Major Fire Urban
Wenatchee
Tree Fruit
& Ext Ctr
Flooding
2
Drought
Severe
Winter
Storm
High Winds
Cooperative
Ext of San
Juan Co
Volcano
Activity
Major Fire Wildland
Earthquake
Vancouver
Campus
Severe
Winter
Storm
Major Fire Urban
Severe
Winter
Storm
Major Fire Wildland
Severe
Winter
Storm
High Winds
Snohomish
Co Ext
Volcano
Activity
High Winds
Flooding
Earthquake
Major Fire Wildland
Yakima
Academic
Center
Loss of
Electrical
Service
Severe
Winter
Storm
Lightning
Loss of
Electrical
Service
Hail
Yakima Ag
Res Lab
Loss of
Electrical
Service
Volcano
Activity
High Winds
Severe
Winter
Storm
Earthquake
Yakima Co
Ext Center
Flooding
Major Fire Urban
Volcano
Activity
Major Fire Urban
Loss of
Electrical
Service
Severe
Winter
Storm
Loss of
Electrical
Service
Pullman
Campus
Major Fire Urban
Major Fire Wildland
Drought
Colville
Reservation
Ext
Severe
Winter
Storm
Major Fire Wildland
Earthquake
Cowlitz &
Wahkiakum
LC
Severe
Winter
Storm
Earthquake
Major Fire Wildland
Loss of
Electrical
Service
High Winds
Severe
Winter
Storm
Earthquake
High Winds
Garfield Co
Ext
Loss of
Electrical
Service
Earthquake
Severe
Winter
Storm
Major Fire
- Urban
#5
#8
#10
#6
20
14
10
15
#4
23
Crime
Hazardous
Material
Events
Volcano
Activity
#1
36
Sever
Winter
Storm
Loss of
Electrical
#2
Ranking
29
Frequency
High
Winds
Hazardous
Events
Hail
Storm
surge,Tsun
ami
Flooding
Loss of
Gas
Service
Infestation,
Disease
Drought
Lightning
Hazardous
Events
4
9
7
7
7
15
1
Frequency
#14
#14
#6
#22
#18
#11
#14
1
Ranking
Key
Employer
Crisis
Earthquake
Economic
Crisis
Loss of
Water
Service
Loss of
Sewer
Telecommunic
ation System
Failure
Hazardous
Events
2
9
8
3
26
4
Frequency
#20
#3
#18
#21
#11
#13
Ranking
Landslide
Erosion
Radiologic
al Incident
Major Fire Wildland
Hazardous
Events
#22
#14
7
1
#9
Ranking
13
Frequ
ency
Appendix F – Major WSU Facilities
WSU Pullman
1
1
WSU Spokane
2
WSU Tri-Cities
1
1
WSU Vancouver
1
1
Research and Extension Center – Puyallup
2
3
Research and Extensions Center – Mt. Vernon
4
StudentHousing
PublicEducation
&Extension
FacilityServices
Administrative
Offices,Labs
Classrooms
Mt.VernonPlanningPrecincts
ResearchFields
5
Tree Fruit Research and Extension Center – Wenatchee
6
7
Research and Extension Center -- Prosser
8
1