NOteS tO the ACCOuNtS - Lembaga Pelabuhan Bintulu
Transcription
NOteS tO the ACCOuNtS - Lembaga Pelabuhan Bintulu
isi kandungan contents Profil Korporat / Corporate Profile 2-3 Visi, Misi dan Objektif Korporat / Corporate Vision, Mission and Objectives 4-5 Ahli-Ahli Lembaga Pengarah / Board of Directors 6-7 Pengurusan / Management 9 Struktur Organisasi / Organisation Structure 10-11 Perutusan Pengerusi / Chairman’s Statement 12-14 Prestasi Keseluruhan / Overall Performance 15-22 Pencapaian Prestasi / Performance Achievements 23 Statistik / Statistics 24-25 Diari Korporat / Corporate Diary 26-29 Penyata Kewangan / Financial Statements 32-69 2 Laporan Tahunan 2010 Annual Report profil korporat Lembaga Pelabuhan Bintulu ditubuhkan pada 15hb Ogos 1981 di bawah Akta Lembaga Pelabuhan Bintulu 1981 yang merupakan sebuah Badan Berkanun Persekutuan di bawah Kementerian Pengangkutan Malaysia. Tanggungjawab Lembaga Pelabuhan Bintulu meliputi pembangunan, pentadbiran, pemasaran dan pembekalan perkhidmatan pelabuhan yang lengkap dan cekap dengan matlamat untuk menjadikan Pelabuhan Bintulu sebagai pusat pengangkutan dan pengedaran yang terbesar dan paling efisien di rantau BIMP-EAGA. Pelabuhan Bintulu memulakan operasinya pada 1hb Januari 1983. Pelabuhan Bintulu merupakan sebuah pelabuhan antarabangsa yang mempunyai kedudukan yang strategik di Timur Laut Sarawak iaitu di dalam laluan di antara Timur Jauh dengan Eropah. Ia juga merupakan laluan utama ekspot gas asli cecair (LNG) dari Malaysia. Di samping itu, Pelabuhan Bintulu juga menawarkan kemudahan dan peralatan yang moden serta canggih untuk pengendalian kontena, kargo pukal cecair dan kering serta kargo am. Mulai 1hb Januari 1993, operasi perkhidmatan Pelabuhan Bintulu telah diswastakan di bawah Akta PelabuhanPelabuhan (Penswastaan) 1990 sejajar dengan dasar penswastaan kebangsaan. Dengan penswastaan tersebut, Lembaga Pelabuhan Bintulu telah melesenkan sebuah syarikat pengendali pelabuhan iaitu Bintulu Port Sdn Bhd (BPSB) untuk menjalankan operasi perkhidmatan pelabuhan dan yang berkaitan dengannya di Pelabuhan Bintulu. Syarikat Bintulu Port Sdn Bhd telah ditubuhkan pada 23hb Disember 1992 dan seterusnya memulakan operasinya pada 1hb Januari 1993. Berikutan penswastaan operasi Pelabuhan Bintulu pada tahun 1993, Lembaga Pelabuhan Bintulu telah disusun semula agar sejajar dengan fungsi utamanya sebagai Badan Kawalselia. Dengan ini, Lembaga Pelabuhan Bintulu telah dipertanggungjawabkan untuk melaksanakan fungsi kawalselia dalam mengawasi segala aktiviti pelabuhan termasuk penggunaan kemudahan dan operasi pelabuhan oleh pengendali pelabuhan berlesen yang bertindak sebagai pemilik kepada aset hartanah, bertindak selaku fasilitator perdagangan, perancang dan pembangunan Pelabuhan. Lembaga Pelabuhan Bintulu juga akan bertanggungjawab untuk mengawasi dan mempastikan keselamatan operasi pelabuhan. Laporan Tahunan 2010 Annual Report 3 corporate profile Bintulu Port Authority was inaugurated on 15th August 1981 under the Bintulu Port Authority Act 1981 with responsibilities covering the development, administration, marketing and provision of adequate and efficient port services. This is aimed at making Bintulu Port the largest and most efficient transport and distribution centre in the BIMP-EAGA region. Bintulu Port began its operations on 1st January 1983. Bintulu Port Authority is a Federal Statutory Body under the Ministry of Transport Malaysia. Bintulu Port is an international port which is strategically located in North-East Sarawak along the route between the Far East and Europe. Bintulu Port is the main gateway for export of liquefied natural gas (LNG) from Malaysia. Besides, Bintulu Port also offers modern and state-of-the art facilities and equipment for the handling of containers, liquid and dry bulk cargo, and general cargo. As from 1st January 1993, the operations of Bintulu Port have been privatised under the Ports (Privatisation) Act, 1990 in line with the national privatisation policy. With the said privatisation, Bintulu Port Authority has licensed a port operation company, Bintulu Port Sdn Bhd. (BPSB) to carry out port operation services and related functions at Bintulu Port. Bintulu Port Sdn. Bhd. was incorporated on 23rd December 1992 and began its operations on 1st January 1993. Following the privatisation of Bintulu Port operations in 1993, Bintulu Port Authority was restructured and in line with its main functions as a regulatory body, Bintulu Port Authority is entrusted to play its role in overseeing all activities at the port including the use of port facilities and operations by licensed port operators, owner of port properties, acts as trade facilitator, planning and development of the Port. Bintulu Port Authority also oversees and ensures the safety and security in port operations. 4 Laporan Tahunan 2010 Annual Report Visi Dan Misi Korporat Sebagai Pihak Berkuasa dan Badan Kawalselia Pelabuhan, Visi dan Misi LPB untuk menjadikan Pelabuhan Bintulu pelabuhan yang paling efisien, selamat dan menguntungkan di rantau ini. Untuk merealisasikan visi tersebut, LPB telah merangka misi berikut: ➢ Memastikan pengendalian operasi pelabuhan oleh pihak swasta berjalan dengan lancar ➢ Memastikan pengguna pelabuhan mendapat perkhidmatan yang berkualiti setanding dengan pelabuhan-pelabuhan utama di rantau ini; ➢ Mengambil tindakan segera terhadap aduan dan mengambil kira pandangan orang awam mengenai perkhidmatan dan kemudahan di pelabuhan; ➢ Melahirkan tenaga kerja professional, mahir dan terlatih untuk meningkatkan lagi mutu perkhidmatan dan produktiviti; ➢ Memastikan pengguna pelabuhan mematuhi segala garis panduan pelabuhan dan menjalankan kerjakerja pengendalian mengikut perundangan dan peraturan LPB; ➢ Memajukan dan menggalakkan perkembangan, pembangunan dan infrastruktur pelabuhan untuk kemudahan penggunanya; ➢ Mewujudkan kemudahan pelabuhan yang lengkap dan termoden dalam pengendalian gas asli cecair (LNG) serta berusaha menjadikan Pelabuhan Bintulu sebagai pelabuhan utama dalam bidang tersebut di pasaran dunia. Objektif ➢ Menjalankan aktiviti pengawalseliaan perkhidmatan pelabuhan yang berkualiti dan mampu berdaya saing setanding dengan pelabuhanpelabuhan utama di rantau ini. ➢ Memastikan sistem penyampaian perkhidmatan pelabuhan menepati kehendak pelanggan. ➢ Memastikan pembangunan infrastruktur selari dengan kehendak pengguna dari masa ke semasa. Laporan Tahunan 2010 Annual Report Corporate Vision and Mission As the Authority and the Regulatory Body of the Port, Bintulu Port Authority is committed in realising its vision and mission to make Bintulu Port one of the most efficient, safe and profitable ports in the region. To turn this vision into reality, Bintulu Port Authority has identified the following missions: ➢ To be responsible in ensuring that port operations by the private sector is carried out smoothly. ➢ To ensure all port users received quality services on par with other major ports in the region. ➢ To take immediate actions following any complaints and to consider all the views of the public regarding the services and facilities provided by the port. ➢ To provide a professional, skilled and well-trained work force in order to improve the quality of services and increase productivity. ➢ To ensure that all port users abide by all the guidelines of the port and carry out operations according to the laws and regulations of Bintulu Port Authority. ➢ To encourage expansion and development of the port by providing the best facilities possible to all the port users. ➢ To provide complete and modern port facilities in the handling of liquefied natural gas (LNG) and to position Bintulu Port as the premier port in LNG operation in the world market. Objectives ➢ To regulate the port activities to ensure quality and competitive services on par with other major ports in the region. ➢ To ensure the delivery system for port services meet customers’ expectation. ➢ To ensure the port infrastructure development is in line with customers’ needs from time to time. 5 6 Laporan Tahunan 2010 Annual Report Ahli-Ahli Lembaga Pengarah/Board of Directors PENGERUSI/CHAIRMAN Y. Bhg. Dato’ Long See Wool Ketua Setiausaha Kementerian Pengangkutan Malaysia / Secretary General Ministry of Transport Malaysia (Bermula 26hb Januari 2010/ From 26th January 2010) TIMBALAN PENGERUSI/DEPUTY CHAIRMAN Tuan Hj. Hamdan Bin Hj. Abdul Hamid Pengurus Besar Lembaga Pelabuhan Bintulu / General Manager Bintulu Port Authority Ahli-Ahli/Board Members Cik Lim Yuk Hua Wakil Ketua Setiausaha, Kementerian Pengangkutan Malaysia / Representing the Secretary General, Ministry of Transport Malaysia Y.Bhg. Datu Haji Ismawi bin Haji Ismuni Wakil Pejabat Setiausaha Kerajaan Negeri Sarawak / Representing Sarawak State Secretary’s Office Y.Bhg. Datu Hj. Mohidin bin Hj. Ishak Pengurus Besar Lembaga Kemajuan Bintulu / General Manager Bintulu Development Authority Laporan Tahunan 2010 Annual Report 7 Ahli-Ahli/Board Members Cik Lim Yuk Hua Wakil Ketua Setiausaha, Kementerian Pengangkutan Malaysia / Representing the Secretary General, Ministry of Transport Malaysia Encik Abdul Rahim Bin Abu Bakar Wakil Ketua Setiausaha, Kementerian Kewangan Malaysia / Representing Secretary General, Ministry of Finance Malaysia Y.Bhg. Datu Hj. Ismawi Bin Hj. Ismuni Wakil Pejabat Setiausaha Kerajaan Negeri Sarawak / Representing Sarawak State Secretary’s Office Encik Ahmad Husni Bin Hussain Wakil Ketua Pengarah, Unit Perancang Ekonomi Jabatan Perdana Menteri / Representing Director General, Economic Planning Unit, Prime Minister’s Department Y.Bhg. Datu Hj. Mohidin Bin Hj. Ishak Pengurus Besar Lembaga Kemajuan Bintulu / General Manager Bintulu Development Authority Y.B. Senator Pau Chiong Ung Ahli Dewan Negara / Member of Parliament Y.Bhg. Dato’ Jamilah Md Jan Ahli Bebas/ Independent Member 8 Laporan Tahunan 2010 Annual Report Laporan Tahunan 2010 Annual Report Pengurusan/Management PENGURUS BESAR/ GENERAL MANAGER Tuan Haji Hamdan Bin Haji Abdul Hamid, P.P.B., K.M.N. PEN. PENGURUS BESAR (OPERASI)/ ASST. GENERAL MANAGER (OPERATION) (Kosong/ Vacant) PEN. PENGURUS BESAR (KORPORAT)/ ASST. GENERAL MANAGER (CORPORATE) (Kosong/ Vacant) PENGURUS KOMERSIL & PERANCANGAN/ COMMERCIAL & PLANNING MANAGER Anuar Bin Aikne PENGURUS PENGURUSAN/ MANAGEMENT MANAGER Hida Binti Jerman PENGURUS KEJURUTERAAN/ ENGINEERING MANAGER Ir. Mohd. Zawawi Bin Kipli PEGAWAI TADBIR/ ADMINISTRATIVE OFFICER Khatizah Binti Hanapi PENGURUS KESELAMATAN, KESIHATAN & ALAM SEKITAR/ SAFETY, HEALTH & ENVIRONMENT MANAGER Henry Nabau Limbai, A.B.K. AKAUNTAN (ASET)/ ACCOUNTANT (ASSET) Siti Aida Supinah Binti Karim PENGURUS OPERASI/ OPERATION MANAGER Kapten Zakhir Khan Bin Yusof PEGAWAI UNDANG-UNDANG/ LEGAL OFFICER Norkartiny Binti Nawawi JURUAUDIT DALAM/ INTERNAL AUDITOR Khartina Binti Abu Bakar AKAUNTAN/ ACCOUNTANT Rajunawati Binti Abdul Rajid PENGUASA BOMBA/ FIRE SUPERINTENDENT Awang Jahmari Bin Awang Junaidi KETUA POLIS PELABUHAN/ PORT CHIEF OF POLICE Dzulkarnain Abbas Bin Abdullah PEGAWAI LAUT/ MARINE OFFICER Muhammad Yoshikatriezan Bin Abeng PEGAWAI TEKNOLOGI MAKLUMAT/ INFORMATION TECHNOLOGY OFFICER Azmat Bin Annuar 9 10 Laporan Tahunan 2010 Annual Report Struktur Organisasi/Organisation Structure Jawatankuasa Audit Audit Committee Jawatankuasa Perkhidmatan Services Committee Jawatankuasa Perunding Pelabuhan Port Consultative Committee Pengerusi dan Ahli Lembaga Pengarah Chairman & Board of Directors Pengurus Besar General Manager Lembaga Tender Tender Board Jawatankuasa Kewangan dan Perancangan Finance & Planning Committee Jawatankuasa Pemaliman Pilotage Committee Laporan Tahunan 2010 Annual Report Unit Safety, Health dan Environment (SHE) Safety, Health and Environment Unit Unit Audit Dalaman Internal Audit Unit Unit Keselamatan dan Bomba Bahagian Operasi Operation Division Fire and Safety Unit Unit Kejuruteraan Engineering Unit Unit Kawal Selia Regulatory Unit Unit Teknologi Maklumat Information Technology Unit Bahagian Korporat Corporate Division Unit Undang-Undang Legal Unit Unit Komersil Dan Perancangan Commercial & Planning Unit Unit Pengurusan Sumber Manusia Human Resource Management Unit Unit Pentadbiran dan Kewangan Finance and Administrative Unit 11 12 Laporan Tahunan 2010 Annual Report Perutusan Pengerusi/Chairman’s Statement Bagi pihak Lembaga Pengarah, saya dengan sukacitanya membentangkan Laporan Tahunan dan Penyata Kewangan Lembaga Pelabuhan Bintulu bagi tahun kewangan berakhir 31hb Disember 2010. Ekonomi global pada tahun 2010 mengalami proses pemulihan yang berterusan bermula dari separuh kedua tahun 2009. Sejajar dengan itu, Malaysia turut mencatatkan pertumbuhan positif melalui peningkatan aktiviti dalam negeri yang lebih kukuh di mana ekonomi Negara telah kembali mencatatkan pertumbuhan yang menggalakkan pada tahun 2010 dengan peningkatan sebanyak 7.2%. Seiring dengan pertumbuhan ekonomi yang lebih kukuh, prestasi Pelabuhan Bintulu turut mencatatkan peningkatan yang menggalakkan. Jumlah pengendalian kargo untuk tahun ini telah mencatatkan pertumbuhan sebanyak 5.7% atau 40.6 juta tan berbanding 38.4 juta tan dalam tahun 2009. Kargo eksport masih merupakan kargo dominan dengan catatan 35.8 juta tan berbanding 4.8 juta tan untuk kargo import. Sebahagian besar kargo eksport yang merangkumi 58.0% daripada jumlah kargo yang dikendalikan merupakan kargo Gas Asli Cecair (LNG). Pada masa yang sama, pengendalian kontena turut mencatatkan peningkatan dengan kenaikan 1.2% dengan catatan sebanyak 251,296 TEUs pada tahun 2010 berbanding 248,390 TEUs pada tahun 2009. Rentetan daripada ini, bilangan persinggahan kapal turut menunjukkan peningkatan 1.2% atau 7,601 singgahan sepanjang tahun 2010 berbanding 7,514 singgahan dalam tahun 2009. Peningkatan dalam jumlah singgahan kapal ini turut disumbangkan oleh peningkatan dalam trafik perkapalan terutamanya kapal membawa kayu balak, kontena dan kargo pukal kering. On behalf of the Board of Directors, I am pleased to present the Annual Report and Financial Statements of Bintulu Port Authority for the year ended 31st December 2010. e year 2010 has experienced the continuos recovery of global economy which started from the second half of 2009. Malaysia’s economy also recorded a positive growth in which domestic demand has rebounded to a strong growth in 2010 with an increase of 7.2%. Along with stronger economic growth, the performance of Bintulu Port Authority has recorded an encouraging increase. Total cargo throughput for this year showed a growth of 5.7% or 40.6 million tons compared to 38.4 million tons in 2009. Export cargo is still the dominant contributed with a record of 35.8 million tons compared to 4.8 million tons for the import cargo. Liquefied Natural Gas (LNG) is still the largest cargo export which consist of 58.0% of the total cargo throughput at Bintulu Port. At the same time, container throughput has also increased to 1.2% which recorded 251,296 TEUs in 2010 compared to 248,390 TEUs in 2009. In line with this development, ship calls showed an increase of 1.2% or 7,601 calls for the whole year of 2010 compared to 7,514 calls in 2009. An increase in ship calls was due to an increase in shipping traffic, particularly ships carrying timber, container and dry bulk cargo. Laporan Tahunan 2010 Annual Report Dalam pada itu, Lembaga Pelabuhan Bintulu terus mencatatkan prestasi kewangan yang memuaskan untuk tahun kewangan berakhir 31 Disember 2010. Walaupun pendapatan untuk tahun 2010 susut 1.2% dengan catatan RM139.44 juta berbanding RM141.15 juta pada tahun 2009, namun Lembaga Pelabuhan Bintulu telah mencatatkan kenaikan keuntungan sebelum cukai sebanyak 2.1% dengan catatan RM74.34 juta berbanding RM72.82 juta pada tahun sebelumnya. Pada tahun ini juga, jumlah perbelanjaan telah menurun sebanyak 4.73% dengan catatan sebanyak RM65.09 berbanding RM68.33 pada tahun sebelumnya. Sehubungan ini, Lembaga Pelabuhan Bintulu berkeyakinan bahawa prestasi Pelabuhan Bintulu akan terus meningkat. Ini berdasarkan usaha-usaha yang giat dijalankan untuk memastikan mutu perkhidmatan dan daya saing Pelabuhan Bintulu terus ditingkatkan supaya para pengguna sentiasa mendapat perkhidmatan berkualiti yang diingini. Pada masa yang sama, Lembaga Pelabuhan Bintulu akan sentiasa memastikan operasi pelabuhan sentiasa mematuhi peraturan dan piawaian yang telah ditetapkan dengan melaksanakan pemantauan dan program pengauditan secara berkala. Bagi melaksanakan aktiviti ini dengan lebih berkesan, Lembaga Pelabuhan Bintulu telah mendapat pengiktirafan dari segi tata amalan dan pengurusan keselamatan dan kesihatan pekerjaan yang telah mencapai standard piawaian antarabangsa melalui persijilan ISO 14001:2004, OHSAS 18001:2007 dan MS 1772 bagi Pengurusan Keselamatan Dan Kesihatan Pekerjaan. Disamping itu, pembangunan infrastruktur pelabuhan akan diteruskan untuk memastikan keupayaan dan kemampuan pelabuhan bagi memenuhi keperluan pengguna yang semakin bertambah. Beberapa projek pembangunan telah dan sedang dilaksanakan antaranya pembesaran terminal kontena, terminal pengendalian minyak sawit serta pembangunan dan menaiktaraf terminal pelbagai guna dalam usaha meningkatkan kapasiti pengendalian kargo di Pelabuhan Bintulu. Kedudukan Pelabuhan Bintulu yang strategik di tengah perkembangan pesat koridor ekonomi Negeri Sarawak akan memastikan Pelabuhan Bintulu terus memainkan peranan yang penting bagi menyokong pembangunan pesat sektor perindustrian di kawasan hinterland Bintulu. Pelabuhan Bintulu akan turut menyumbang melalui perkhidmatan pelabuhan dan kemudahan operasi terminal untuk perkembangan Koridor Tenaga Diperbaharui Sarawak (SCORE) yang menyaksikan pembangunan beberapa kawasan perindustrian baru di sekitar Bintulu. 13 Bintulu Port Authority has registered a satisfactory financial performance for the year ended 31st December 2010. Although the income for the year 2010 decreased 1.2% with a record of RM139.44 million compared to RM141.15 million in 2009, Bintulu Port Authority has recorded an increase in the pre-tax profit by 2.1% with a record of RM74.34 million compared to RM72.82 million in the previous year. e total expenditure for this year has decreased by 4.73% with a record of RM65.09 million compared to RM68.33 million in the previous year. In line with this, the Authority is confident that Bintulu Port performance will continuosly increase. Efforts to enhance Bintulu Port’s services will assure the quality and competitiveness and Bintulu Port Authority will ensure that consumers always get a quality services as expected. In line with this progress, the Authority will continue to ensure the port operations will always comply with the standards set by implementing regular monitoring and audit programmes. Recognition has been given to Bintulu Port Authority in terms of Code of Practice and Management of Occupational Safety and Health with certification in International Standards for ISO 14001 : 2004, International OHSAS 18001 : 2007 and MS 1772 for Occupational Safety and Health Management. Besides that, the need for the continuous development of the port infrastructure is necessary to ensure that the port’s capacity and capability meet the growing needs of consumers. A number of projects have and are being implemented including the development and expansion of the container terminal, Palm Oil terminal and the development and upgrading of the multipurpose terminals as an effort to improve cargo handling capacity at Bintulu Port. Bintulu Port’s strategic position in the middle of the rapid development of economic corridors of the State of Sarawak will ensure that Bintulu Port continues to play an important role to support the rapid development of industrial sector in the Bintulu hinterland. Bintulu Port will also contribute in the provision of port and terminal operations facility for development of Sarawak Corridor of Renewable Energy (SCORE) which saw development of numerous industrial areas around Bintulu. 14 Laporan Tahunan 2010 Annual Report Sesungguhnya, tahun 2010 telah menunjukkan peningkatan dalam prestasi pelabuhan dengan adanya sokongan dan kerjasama daripada semua pihak. Saya ingin mengambil kesempatan mengucapkan setinggi-tinggi penghargaan kepada Kerajaan Persekutuan, Kerajaan Negeri Sarawak, semua agensi Kerajaan yang berkaitan, syarikat pengendali pelabuhan, semua pengguna pelabuhan dan pihak pengurusan dan kakitangan Lembaga Pelabuhan Bintulu di atas sokongan padu yang diberikan dalam memastikan Pelabuhan Bintulu terus berkembang maju. Akhir kata saya amat berharap agar melalui kerjasama dan bantuan yang tidak berbelah bagi yang diberikan serta pembangunan yang berterusan dijalankan akan dapat mencapai objektif untuk menjadikan Pelabuhan Bintulu sebagai sebuah pelabuhan LNG bertaraf dunia malah menjadi pusat pengangkutan dan pengedaran yang utama, terbesar serta paling efisien di rangkaian BIMP-EAGA. With the support and co-operation given, the year 2010 showed an increased in the Port’s performance. I would like to take this opportunity to convey my greatest appreciation and thanks to the Federal Government, Sarawak State Government, all the related government agencies, port operation company, all the port users, management and staff of Bintulu Port Authority for undivided strong support to ensure continued growth of Bintulu Port. Lastly, I hope with the co-operation and full assistance given and the continued development we will be able to achieve the objective of making Bintulu Port as the world class LNG’s port, the largest and most efficient transportation and distribution hub in the BIMP - EAGA region. Dato’ Long See Wool Pengerusi/Chairman Lembaga Pelabuhan Bintulu/Bintulu Port Authority Laporan Tahunan 2010 Annual Report 15 Prestasi Keseluruhan /Overall Performance Setelah berhadapan dengan krisis pada tahun 2009, ekonomi global kembali melalui fasa pemulihan yang berterusan bermula pada separuh kedua tahun 2009 dan berlanjutan sehingga tahun 2010. Kesan daripada pemulihan tersebut ekonomi Malaysia mencatat pertumbuhan yang kukuh dengan peningkatan sebanyak 7.2% yang disokong oleh aktiviti sektor swasta dan awam yang terus menyokong ekonomi dalam negeri melalui perlaksanaan program penambahbaikan infrastruktur negara serta sistem penyampaian sektor awam yang berterusan. Secara keseluruhannya prestasi Pelabuhan Bintulu pada tahun ini turut mencatatkan peningkatan yang memberansangkan hasil daripada pemulihan ekonomi global. Jumlah kargo yang dikendalikan dalam tahun 2010 telah mencatatkan peningkatan sebanyak 5.7% dengan catatan 40.6 juta tan dan pengendalian kontena turut naik sebanyak 1.2% dengan catatan 251,296 TEUs. Trafik perkapalan mencatatkan peningkatan 1.2% dengan 7,601 singgahan kapal berbanding tahun sebelumnya. Pengendalian Kargo Pelabuhan Bintulu telah mencatatkan pengendalian kargo sebanyak 40.6 juta tan untuk sepanjang tahun 2010, peningkatan sebanyak 5.7% berbanding 38.4 juta tan yang dicatatkan dalam tahun sebelumnya. Kargo LNG kekal After facing 2009 economic crisis, the global economy recovered and the continual recovery phase began in the second half of 2009 and carried on until 2010. A positive effect of the recovery, the Malaysian economy registered a strong growth, increasing by 7.2% supported by private and public sector activities that encouraged the domestic economy through the implementation of the national infrastructure improvement program and the public sector delivery system. Overall performance of Bintulu Port had also increased as an encouraging result from the global economic recovery. Total cargo handled in 2010 recorded an increase of 5.7% with a record of 40.6 million tonnes and container throughput increased by 1.2% with a record 251,296 TEUs. In term of vessel calls, it recorded an increased of 1.2% with 7,601 ship calls compared to the previous year. Cargo roughput Bintulu Port recorded a cargo throughput of 40.6 million tonnes for 2010, an increase of 5.7% compared to 38.4 million tonnes recorded in the previous year. LNG remained Perbandingan Data Statistik Pengendalian Kargo Mengikut Jenis Bagi Tahun 2009 dan 2010/ Statistic Data Comparison of Cargo Handling according to Cargo types for the year 2009 and 2010 Jenis Cargo/Cargo Type Y2009 Y2010 %+(-) Gas Asli Cecair/LNG 22.239 23.415 5.31 Kargo Cecair Lain/Other Liquid Cargo 7.785 7.758 -0.35 Kargo Pukal Kering/Dry Bulk Cargo 1,839 2.19 19 Kargo Pukal/Breakbulks 1.734 1.699 -2.02 Kontena/Containers 3.731 4.183 12.11 Balak/Logs 1.116 1.381 23.7 38.444 40.626 5.67 Jumlah/Total **juta tan/million tonnes 16 Laporan Tahunan 2010 Annual Report menerajui pengendalian kargo dengan 57.6% daripada jumlah keseluruhan kargo yang dikendalikan dengan peningkatan sebanyak 5.3% daripada 22.24 juta tan pada tahun 2009 kepada 23.42 juta tan pada tahun 2010. Ini disusuli oleh kargo pukal cecair yang lain dengan 19.2% daripada jumlah keseluruhan pengendalian kargo dan diikuti kargo kontena sebanyak 10.3%. Beberapa kargo utama yang dikendalikan telah mencatatkan pertumbuhan yang ketara dalam tahun ini dengan komoditi baja mendahului dengan kenaikan sebanyak 108.1% berbanding tahun sebelumnya, diikuti dengan isirong kelapa sawit (+38.9%), kayu balak (+23.7%), klinker (+19.7%), minyak kelapa sawit (+19.6%), kargo berkontena (+12.1%) dan sebagainya. Secara keseluruhannya, peningkatan dalam pengendalian kargo dalam tahun ini disebabkan permintaan pasaran dunia terutamanya daripada Asia Timur dan India telah menyumbang kepada peningkatan eksport terutamanya LNG, minyak kelapa sawit dan juga kayu balak. Pemulihan ekonomi juga turut memberi kesan terhadap permintaan untuk produk petroleum berikutan meningkatnya aktiviti perkilangan di dalam industri berasaskan kayu. Kargo am yang lain turut mencatatkan peningkatan terutamanya kargo untuk projek dan simen kampit berikutan beberapa projek pembangunan yang sedang dilaksanakan di kawasan hinterland, sekitar Bintulu. Namun begitu beberapa jenis kargo mencatatkan penurunan termasuklah LPG (-16.2%), minyak mentah (-10.1%), ammonia (-49.3%), pasir & kerikil (-48.4%), papan lapis (-22.2%) dan veneer (-39.0%). Penurunan dalam eksport untuk beberapa komoditi seperti papan lapis dan “veneer” adalah disebabkan kurang permintaan daripada pengimport tradisional seperti Jepun, Korea Selatan dan Filipina serta turut disebabkan oleh kejatuhan harga produk tersebut di pasaran. the leading with 57.6% of the total cargo throughput increased by 5.3% from 22.24 million tonnes in 2009 to 23.42 million tonnes in 2010. is was followed by other liquid bulk cargo with 19.2% of the total cargo throughput and container cargo, 10.3%. Some of the other main cargo being handled has recorded significant growth this year with fertilizers commodity ahead with the increase of 108.1% from the previous year, followed by palm kernel (+38.9%), timber (+23.7%), clinker (+19.7%), palm oil (+19.6%), containerised cargo (+12.1%) and others. Overall, the increase in cargo throughput in 2010 is because of the world markets demand, particularly from East Asia and India that have contributed to the increased in the exports volume, especially LNG, palm oil and timber commodity. Economic recovery also affected the demand for petroleum products due to the increased in wood based manufacturing sector. roughput of other general cargo also increased, mainly for projects cargo and bagged cement as numerous of development projects are taking place in the Bintulu hinterland. However, some cargo types recorded a decline including LPG (-16.2%), crude oil (-10.1%), ammonia (-49.3%), sand and gravel (-48.4%), plywood (-22.2%) and veneer (- 39.0%). e significant decline in exports volume for some commodities such as plywood and veneer is due to less demand from traditional importers such as Japan, South Korea and the Philippines, and also due to the decline in market prices for such products. Laporan Tahunan 2010 Annual Report 17 Pengendalian Kontena 2009 dan 2010/2009 and 2010 Container Handling Jenis Cargo / Cargo Type Y2009 Y2010 Import / Import 66,830 73,127 Eksport / Export 65,974 71,608 Pindah Kapal / Transhipment 115,586 106,561 Jumlah / Total 248,390 251,296 **teus Pengendalian Kontena Container roughput Pada tahun ini, pengendalian kontena telah meningkat sebanyak 1.2% kepada 251,296 TEUs daripada 248,390 TEUs yang dicatatkan pada tahun sebelumnya. Peningkatan ini adalah kesan daripada aktiviti syarikat-syarikat perkapalan utama yang telah meningkatkan jumlah eksport ke perdagangan Intra Asia. is year, container throughput increased by 1.2% to 251,296 TEUs from 248,390 TEUs recorded in the previous year. e increase was the result of increased export activities by the major shipping companies into the Intra Asia trade. Namun begitu, kontena pindah kapal telah menyusut daripada 46.5% pada tahun 2009 kepada 42.4% pada tahun ini. Penurunan ini juga didorong oleh persaingan daripada pengendali yang menyebabkan perkhidmatan feeder mengurangkan frekuensi singgahan kapal. Daripada keseluruhan kontena yang dikendalikan, kontena domestik mencatatkan 144,735 TEUs meningkat 9.0% berbanding 132,804 TEUs yang dicatatkan dalam tahun sebelum ini. Sementara itu kontena pindah kapal mencatatkan 106,561 TEUs berbanding 115,586 TEUs dalam tahun sebelumnya. Singgahan Kapal Pelabuhan Bintulu telah mencatatkan sebanyak 7,601 singgahan kapal sepanjang tahun ini, meningkat sebanyak 87 singgahan berbanding tahun sebelumnya. Kapal kontena telah mencatatkan peningkatan ketara dengan 9.7% diikuti kapal pengangkut kayu balak sebanyak 8.4%, kapal kargo pukal kering sebanyak 5.4% sementara kapal LNG mencatatkan peningkatan 1.1%. Bagaimanapun, singgahan bagi kapal However, container transhipment declined from 46.5% in 2009 to 42.4% this year. e decline was driven by competition from operators that cause the feeder service to reduce the frequency of feeder vessels calls. From the total container traffic, domestic container recorded 144,735 TEUs, a 9.0% increase from 132,804 TEUs. Meanwhile, transhipment cargo recorded 106,561 TEUs compared to 115,586 TEUs in the previous year. Vessel Calls Bintulu Port recorded a total of 7,601 ships calls throughout the year, an increase of 87 calls from the previous year. Containerships have seen a surge of 9.7%, followed by timber carrier vessels with 8.4%, dry bulk cargo vessels with 5.4%, while LNG increased by 1.1%. However, vessel calls for liquid 18 Laporan Tahunan 2010 Annual Report kargo pukal cecair dan kargo am menurun sebanyak 1.8% dan 1.2% masing-masingnya berikutan penurunan jumlah pengendalian untuk dua jenis kargo tersebut. bulk cargo and general cargo decreased by 1.8% and 1.2% respectively, following a decline in the total throughput for these two types of cargo. Peningkatan trafik perkapalan adalah didorong oleh penambahan kapal kargo berikutan peningkatan jumlah kargo yang dikendalikan sepanjang tahun ini terutamanya daripada kapal pengangkut kayu balak, kapal kargo pukal kering dan kapal kontena. e increased shipping traffic is driven by the accumulation of cargo vessel due to the increase in volume of cargo throughput throughout the year mainly for timber carrier vessels, dry bulk cargo vessels and containerships. Daripada keseluruhan singgahan kapal dalam tahun ini, 40.3% merupakan kapal-kapal foreign going manakala selebihnya merupakan kapal-kapal domestik. Jumlah pertanan kasar berdaftar (GRT) bagi singgahan kapal pada tahun 2010 mencatatkan tanej perkapalan sebanyak 61.6 juta tan. Pembangunan Modal Insan Pengurusan sentiasa berusaha untuk memastikan perancangan dan pembangunan modal insan terus dilaksanakan dengan efektif dan berkesan untuk melahirkan kakitangan yang profesional, kompeten, berintegriti, berdaya saing bagi meletakkan Pelabuhan Bintulu di antara pelabuhan antarabangsa yang terunggul di rantau ini. Dengan itu, pertambahan kakitangan yang berkelayakan adalah penting untuk memastikan Lembaga Pelabuhan Bintulu dapat melaksanakan tanggungjawab yang diamanahkan dalam memastikan kelancaran pengurusan dan operasi Pelabuhan Bintulu. From the total ship calls this year, 40.3% were foreign going vessel and the rest is domestic vessel. Total Gross Registered Tonnage (GRT) of vessels in 2010 recorded 61.6 million tonnes. Human Capital Development BPA strives to ensure that the planning and development of human capital continue to be implemented effectively and efficiently to produce professional, competent, high integrity and competitive workforces to position Bintulu Port among the best of international ports in the region. us, the increase in qualified personnel is essential to ensure BPA can discharge the responsibilities entrusted to ensure the smooth management and operation of Bintulu Port. Laporan Tahunan 2010 Annual Report Dalam tahun 2010, Lembaga Pelabuhan Bintulu telah mendapat kelulusan untuk pertambahan 38 perjawatan baru daripada hanya 45 perjawatan dalam tahun sebelumnya. Dengan jumlah keseluruhan sebanyak 83 perjawatan sehingga hujung tahun 2010, sebanyak 72 jawatan telah diisi. Pecahan kategori kakitangan Lembaga Pelabuhan Bintulu adalah seorang dalam Kumpulan Pengurusan Tertinggi, 22 orang dalam Kumpulan Pengurusan dan Profesional sementara selebihnya seramai 49 orang dalam Kumpulan Sokongan. Selain daripada kakitangan tetap, Lembaga Pelabuhan Bintulu turut mempunyai 24 orang kakitangan kontrak yang diperlukan di dalam Unit Keselamatan untuk memastikan keselamatan di sekitar pelabuhan terus terjamin. Selaras dengan pertambahan kakitangan, pengurusan terus berusaha untuk melahirkan tenaga kerja yang berkualiti, kompeten dan mahir untuk bersama-sama memikul tanggungjawab yang yang telah diamanahkan. Pengurusan Lembaga Pelabuhan Bintulu sentiasa memastikan setiap pegawai dan kakitangannya diberi pendedahan melalui program serta latihan yang berterusan supaya mereka berupaya memberi perkhidmatan yang cemerlang. Program Team Building turut diadakan untuk semua kakitangan termasuk kakitangan kontrak untuk melahirkan tenaga kerja yang dapat berkerjasama tidak kira yang lama atau yang baru serta mengeratkan hubungan bagi mencapai objektif kecemerlangan organisasi. Selain itu, program lawatan ke pelabuhan-pelabuhan atau tempat-tempat di luar Bintulu diadakan untuk mendedahkan kakitangan mengenai perkembangan dan pembangunan pelabuhan-pelabuhan lain di Malaysia. Selain itu, program-program untuk mendapat persijilan kualiti terus diusahakan. Dalam tahun ini Lembaga Pelabuhan Bintulu berjaya mendapat Persijilan ISO 19001:2008 dan ISO EMS 14001:2004 daripada IEC di bawah Jabatan Standard Malaysia dan turut mendapat BS EN ISO 14001:2004 daripada UKAS untuk “Regulating e Handling of Petroleum Products, LNG, Loose Bulk Cargoes and Industrial Products at Bintulu Port”. Lembaga juga telah menerima Persijilan “Statement of Compliance (SOC) ISPS Code” daripada Jabatan Laut Malaysia untuk tempoh 5 tahun. Dengan persijilan ini, Unit Sekuriti akan memastikan operasi Pelabuhan Bintulu berjalan dengan lancar serta menitikberatkan aspek keselamatan dan kemudahan pelabuhan. 19 In 2010, BPA received approval to increase staff acquisition to fill 38 new posts from only 45 staffing in the previous year. With a total of 83 posts as at the end of 2010, a total of 72 posts were filled. e breakdown of staff categories was one in Top Management Group, 22 personnel in Management and Professional group, 49 personnel in the Support Group. In addition to the permanent staff, BPA also has 24 contract employees mainly in security units who are required primarily to ensure security around the port. Consistent with increased number of the staff, BPA continues to produce a quality workforce, competent and skilled to jointly assume the responsibilities entrusted. BPA ensures all officers and staff are exposed through continuous training programs and that they are able to provide excellent services. Team Building Program was held for all staff including contract staff to create a workforce that can team up irrespectively of existing or new staff in achieving organizational excellence. As well visits to other ports or places outside Bintulu were held to provide an exposure to the staff on the progress and development of other ports in Malaysia. Furthermore, continuous programs to obtain quality certification will still be organized. In the year 2010, the Authority managed to obtain ISO 19001:2008 and ISO EMS 14001:2004 from the IEC under the Department of Standards Malaysia and also received BS EN ISO 14001:2004 from UKAS for "Regulating e Handling of Petroleum Products, LNG, Loose Bulk Cargoes and Industrial Products at Bintulu Port”. e Authority also received a certification, “Statement of Compliance (SOC) ISPS Code” from the Marine Department of Malaysia for a period of 5 years. With this certification, Security Unit will ensure that operations at Bintulu Port will run smoothly as well as emphasizing safety and port facilities. 20 Laporan Tahunan 2010 Annual Report ‘Program Hari Bersama Pelanggan’ terus diadakan setiap bulan bagi memastikan kemudahan dan perkhidmatan yang disediakan dapat memenuhi keperluan pelanggan disamping sebagai jalan untuk menyelesaikan masalah-masalah yang timbul serta memperbaiki perkhidmatan yang sedia ada untuk memastikan perkhidmatan yang diberi adalah cemerlang dan bermutu. Program ini memberi peluang kepada pelanggan pelabuhan untuk menyuarakan permasalahan mereka, disamping mendekatkan Lembaga Pelabuhan Bintulu dengan pelanggan bersesuaian dengan konsep “Mesra Pelanggan”. Kebajikan Dan Tanggungjawab Sosial Dalam aspek kebajikan, pengurusan Lembaga Pelabuhan Bintulu terus berusaha untuk menjaga kebajikan kakitangannya dengan menyediakan pelbagai kemudahan asas seperti rawatan perubatan dan subsidi pengangkutan untuk tenaga kerja dan juga bantuan persekolahan untuk anak-anak kakitangan yang layak. Disamping itu, perjumpaan Pengurus Besar dengan kakitangan diadakan secara berkala untuk mendengar permasalahan yang dihadapi oleh kakitangan. Pelbagai aktiviti sukan dan riadah diadakan melalui Kelab Sukan dan Rekreasi Kakitangan LPB untuk merapatkan hubungan kekeluargaan dan silaturrahim di antara keluarga kakitangan. Setiap tahun, aktiviti-aktiviti seperti rumah terbuka, sukan in-door, sukan antara agensi dan badan berkanun serta hari keluarga diadakan, disamping aktiviti seperti ceramah agama, program motivasi dan sebagainya untuk meningkatkan nilai-nilai positif modal insan di kalangan kakitangan. Pelaksanaan tanggungjawab sosial kepada masyarakat setempat turut diberi keutamaan oleh pengurusan Lembaga Pelabuhan Bintulu. Untuk tujuan itu, Lembaga Pelabuhan Bintulu telah memperuntukan sumbangan kepada mereka yang kurang bernasib baik dan memerlukan. Sumbangan telah disalurkan kepada pesakit-pesakit di hospital Bintulu, fakir miskin serta balu daripada Kampung Baru, rumah anak-anak yatim serta masjid dan surau untuk aktiviti keagamaan sempena musim perayaan. Sebagai badan korporat yang prihatin, Lembaga turut menyumbang peralatan perubatan di Hospital Bintulu untuk kegunaan dan keperluan penduduk setempat. "Hari Bersama Pelanggan” is continuously held every month to ensure that facilities and services provided meet customer needs as well as ways to improve existing services in order to ensure the port providing an excellent and of quality services. is program provides an opportunity for customers to voice out any problem and to build a closer relationship between BPA with their customers in line with the concept of being “customer friendly”. Welfare and Social Responsibility BPA continues to take care of staff welfare by providing basic facilities such as medical care and transportation subsidies to workers and aid for children of employees who are eligible. Furthermore, meetings by the General Manager with staff were held regularly to listen to the problems faced by employees. Various sports and recreational activities also provided through the Staff Sports and Recreation Club to foster family ties and a closer relationship among the staff. Each year, activities like open house, indoor sports, sports among agencies and statutory bodies as well as family day were held. Beside that, activities such as religious talks, motivational programs and others to enhance positive values of human capital among employees. Social responsibility to the local community was also given priority by BPA. For this purpose, BPA has allocated contributions to those less fortunate and needy. Contributions have been distributed to Hospital Bintulu patients, the poor and the widows of the Kampung Baru, orphanages as well as mosques and suraus for religious activities during the festive occasions. As a caring corporate body, BPA also contributed medical equipments to the Bintulu Hospital for the use and fulfill the needs of local residents. Laporan Tahunan 2010 Annual Report 21 Prestasi Kewangan Financial Performance Prestasi kewangan Lembaga Pelabuhan Bintulu bagi tahun berakhir 31 Disember 2010 mencatatkan jumlah pendapatan sebanyak RM139.44 juta berbanding dengan RM141.15 juta dalam tahun 2009 iaitu penurunan sebanyak 1.2%. Penurunan ini disebabkan oleh penurunan dalam pengutipan pendapatan lain-lain. Bintulu Port Authority's financial performance for the year ended December 31, 2010 recorded a total income of RM139.44 million compared with RM141.15 million in the year 2009, a decrease of 1.2%. e decrease was due to a decline in other income collection. Jumlah perbelanjaan tahun 2010 menurun sebanyak 4.73% daripada RM68.33 juta pada tahun 2009 kepada RM65.09 juta tahun 2010. Ini berikutan peningkatan dalam perbelanjaan emolumen dan kesan daripada susutnilai aset. Total expenditure in 2010 decreased by 4.73% from RM68.33 million in 2009 to RM65.09 million in 2010. is is due to an increase in the emoluments and the effect of depreciation of assets. Selepas mengambil kira peruntukan untuk cukai, Lembaga Pelabuhan Bintulu mencatatkan Keuntungan Selepas Cukai sebanyak RM57.33 juta untuk tahun kewangan berakhir 31 Disember 2010 berbanding RM39.63 juta pada tahun sebelumnya. After taking into account the provision for taxes, Bintulu Port Authority recorded a Profit After Tax of RM57.33 million for the year ended December 31, 2010 compared to RM39.63 million in the previous year. Pembangunan Pelabuhan Pada tahun ini beberapa projek pembangunan pelabuhan terus dilaksanakan di antaranya Penambahbaikkan Terminal Dermaga Pelbagaiguna 500M, Penambahan keluasan laman kontena di BICT serta Projek Pembangunan 950M. Projekprojek ini dijangka siap dalam tahun ini. Dalam pada itu, terdapat juga beberapa projek yang masih dalam perancangan dan perlaksanaan. Perlaksanaan untuk membangunkan pelabuhan serta meningkatkan perkhidmatannya terus diusahakan untuk memenuhi keperluan semasa pengguna pelabuhan yang semakin bertambah disamping untuk meningkatkan daya saing Pelabuhan Bintulu. Projek-projek pembangunan ini dirancang dan dilaksanakan dalam usaha meningkaatkan keupayaan dan kapasiti pelabuhan dalam mengendalikan pelbagai jenis kargo. Faktor ini membolehkan Pelabuhan Bintulu menjadikan sebuah pelabuhan yang berdaya saing tinggi dengan kemudahan teknologi terkini yang pastinya akan memberi kelebihan dan nilai tambah kepada tahap kecekapan operasi Pelabuhan Bintulu. Port Development is year, several port development projects continue to be implemented and among them-Improvements of the Multipurpose Wharf Terminal 500M, Increasing the Container Yard in BICT and Development Project at 950M Wharf . ese projects are expected to be completed this year. In the meantime, there are several projects still in the planning and implementation stage. Exercises to develop the port and enhance its services continue to be undertaken to meet the current needs of the growing port users as well as to enhance the competitiveness of Bintulu Port. Development projects are planned and implemented as an effort to increase the ability and port capacity in the handling of various type of cargoes. is factor allows Bintulu Port to become a highly competitive port with the latest technological facilities which would give an advantage and added value to the level of operational efficiency of Bintulu Port. 22 Laporan Tahunan 2010 Annual Report Prospek Prospect Selepas melalui fasa pemulihan yang memberansangkan pada tahun 2010, ekonomi Malaysia dijangka mencatat pertumbuhan positif berikutan momentum pertumbuhan mantap dengan permintaan dalam negeri yang disokong daripada aktiviti sektor swasta. Pertumbuhan diunjurkan sebanyak 5%-6% dengan prestasi yang lebih baik pada separuh kedua tahun 2011. Perlaksanaan Program Transformasi Ekonomi oleh kerajaan turut mengukuhkan lagi pertumbuhan positif ekonomi negara disamping keyakinan pelaburan dari swasta menggalakkan lagi peningkatan positif tersebut. After the encouraging recovery phase in 2010, the Malaysian economy is expected to register a positive growth momentum with a strong growth in domestic demand which supported by the activities of the private sector. e projected growth is 5% - 6% with better performance at the second half of 2011. Implementation of the Government’s Economic Transformation Programme also strengthens the economy as well as the positive growths of private investment confidence further promote the positive improvement. Semua sektor ekonomi dijangka terus berkembang pada tahun 2011 di sokong oleh pertumbuhan permintaan dalam negeri yang semakin meningkat dan aktiviti eksport yang memberansangkan. Seiring dengan pertumbuhan yang kukuh dalam sektor pertanian serta pembangunan infrastruktur yang rancak di sekitar hinterland Pelabuhan Bintulu, ianya berupaya untuk mengukuhkan lagi momentum perkembangan ekonomi seterusnya meyumbang kepada kerancakkan aktiviti di Pelabuhan Bintulu. All sectors of the economy are expected to expand further in 2011, supported by growth domestic demand and stimulating export activities. Along with fast growth in agriculture and infrastructure around the hinterland of Bintulu Port, the momentum of further economic development activities is able to further strengthen and will contribute to the rapid development of Bintulu Port. Dalam usaha untuk menyediakan perkhidmatan yang lebih menyeluruh untuk menampung aktiviti pelabuhan yang semakin berkembang, Pelabuhan Bintulu terus melaksanakan pelbagai projek pembangunan di pelabuhan dalam meningkatkan kapasiti untuk menampung keperluan pengguna. Di antaranya adalah projek pembangunan Kawasan Penyimpanan Terbuka Kontena yang dijangka siap pada 2011, disamping projek-projek lain yang akan menyusul untuk memastikan Pelabuhan Bintulu menjadi sebuah pelabuhan yang lengkap serta memenuhi kehendak pelanggan. Perkembangan positif ini diharap memberi kelebihan kepada Pelabuhan Bintulu untuk terus cemerlang dan gemilang dalam kelasnya tersendiri serta mampu menjadikan Pelabuhan Bintulu sebagai sebuah pelabuhan bertaraf dunia serta pelabuhan utama di rangkaian BIMP-Eaga. In order to provide more comprehensive services to cater for the needs of increasing port activities, Bintulu Port continued to implement various development projects in the port to enhance capacity to meet the needs. Among them are the development of Open Yard for Container which is expected to be completed in 2011, while other projects will follow to ensure that Bintulu Port become a comprehensive port and meet customer needs. ese positive developments are expected to give an added advantage to Bintulu Port to continue to excel in its own class and is able to make Bintulu Port a world-class port and a main port in BIMP-EAGA. Laporan Tahunan 2010 Annual Report 23 Pencapaian Prestasi / Performance Achievements BUTIRAN/DetAiLS PENCAPAIAN/ ACHieVementS % + (-) 2010 2009 40,625,427 38,444,325 5.67 251,296 248,390 1.17 7,601 7,514 1.16 35,792,494 34,323,469 4.28 4,832,933 4,120,855 17.28 349,137,511 274,686,405 27.10 46,524,035 44,318,000 4.98 OPERASI / OPERATIONS 1. Jumlah Kargo Dikendalikan (FWT)/ Total Cargo roughput (FWT) 2. Jumlah Kontena dikendalikan (TEUs)/ Total Container roughput (TEUs) 3. Bilangan Singgahan Kapal/ Total Vessel Calls 4. Jumlah Kargo Eksport (FWT)/ Total Export Cargo (FWT) 5. Jumlah Kargo Import (FWT) Total Import Cargo (FWT) KEWANGAN / FINANCE 1. Aset Semasa / Current Asset 2. Liabiliti Semasa / Current Liability 3. Aset Semasa Bersih / Net Current Asset 302,613,476 230,368,405 31.36 4. Jumlah Pendapatan / Total Income 139,439,999 141,146,710 (1.21) 5. 6. Jumlah Perbelanjaan / Total Expenditures Keuntungan / Kerugian Sebelum Cukai / Profit (Loss) Before Tax 65,095,069 68,329,096 (4.73) 74,344,930 72,817,614 2.10 (17, 010,572) (33,187,603) 48.74 57,334,358 39,630,011 44.67 7. Cukai Tahun Semasa / Current Year Tax 8. Keuntungan Selepas Cukai / Profit After Tax 24 Laporan Tahunan 2010 Annual Report Statistik / Statistics Laporan Tahunan 2010 Annual Report 25 26 Laporan Tahunan 2010 Annual Report Diari Korporat 2010 / Corporate Diary 2010 26 - 28 Januari / 26 - 28 January Kursus Budaya Kerja Pencapaian Diutamakan. Bilik Kuala Tatau, Menara Kidurong The Priority of Work Achievement Culture course, Kuala Tatau Room, Menara Kidurong 19 Februari / 19 February Taklimat dan Latihan Penggunaan Sistem ARcGIS, Bilik Mesyuarat Tingkat 8, Menara Kidurong Briefing and Training of ARcGIS, System User, Meeting Room, 8th Floor, Menara Kidurong 11 Mac / 11 March Taklimat mengenai “Port Environment Management” oleh ESI Consultant Sdn. Bhd. Bilik Kuala Tatau, Menara Kidurong Briefing on “Port Environment Management” by ESI Consultant Sdn. Bhd. Kuala Tatau Room, Menara Kidurong 16 - 18 Mac / 16 - 18 March Kursus Pengurusan Masa oleh INTAN Cawangan Sarawak. Bilik Kuala Tatau, Menara Kidurong Time Management Course by INTAN Sarawak Branch’s. Kuala Tatau Room, Menara Kidurong 26 - 27 April / 26 - 27 April Drill Tsunami 2010 Bilik Kuala Tatau, Menara Kidurong Tsunami Drill 2010 Kuala Tatau Room, Menara Kidurong Laporan Tahunan 2010 Annual Report 10 Mei / 10 May Kursus Pengenalan ISO 14001 EMS dan OHSAS 18001 oleh Syarikat CAI Technologies Sdn. Bhd., Bilik Mesyuarat Tingkat 8, Menara Kidurong ISO 14001 EMS and OHSAS 18001 Introduction Course by Syarikat CAI Technologies Sdn Bhd., Meeting Room, 8th Floor, Menara Kidurong 17-18 Mei / 17-18 May Kursus Pengenalan dan Perlaksanaan Sistem Pengurusan Keselamatan dan Kesihatan Pekerjaan OHSAS 18001:2007. Bilik Semanuk, Menara Kidurong Introduction of Occupational Health & Safety Management System Implementation OHSAS 18001:2007. Semanuk Room, Menara Kidurong 27 13 Mei / 13 May Lawatan Kerja JICA. Tingkat 10 Menara Kidurong JICA Working Visit. 10th Floor, Menara Kidurong 21-23 Jun / 21-23 June Kursus Pembangunan Diri dan Peningkatan Motivasi Siri 1/2010 oleh INTAN Cawangan Sarawak. Bilik Kuala Tatau, Menara Kidurong Motivation and Self Development Course 1/2010 by INTAN Sarawak Branch, Kuala Tatau Room, Menara Kidurong 5 Julai / 5 July Program Bersama Agensi Anti Dadah Kebangsaan di Bilik Kuala Tatau, Menara Kidurong Collaboration Programme with National Drug Agency at Kuala Tatau Room, Menara Kidurong 28 Laporan Tahunan 2010 Annual Report 2-4 Julai / 2-4 July Pameran Senada Sejiwa anjuran Jabatan Ketua Menteri Sarawak di Lapangan Terbang Lama Bintulu Senada Sejiwa Exhibition Organised by Sarawak Chief Minister Department at Bintulu (old) Airport 9 Ogos / 9 August Lawatan sambil belajar ke Suruhanjaya Pelabuhan Pulau Pinang Working Visit to Pulau Pinang Port Commissioner 28-30 Ogos / 28-30 August Penyampaian Hamper Hari Raya Aidilfitri kepada pesakit Hospital Bintulu Hari Raya Aidilfitri Hampers presentation to Hospital Bintulu’s patient 28-30 Ogos / 28-30 August Penyampaian Sumbangan Hari Raya Aidilfitri kepada balu dan fakir miskin Kampung Baru Hari Raya Aidilfitri Donation presentation to widows and the poors at Kampung Baru 30 September / 30 September Majlis Ramah Tamah anjuran bersama Lembaga Pelabuhan Bintulu dan Bintulu Port Sdn. Bhd. di Menara Kidurong Hari Raya Gathering celebration jointly organised with Bintulu Port Sdn. Bhd. at Menara Kidurong 13 Oktober / 13 October Majlis Akujanji dan Ikrar Perkhidmatan untuk Kakitangan baru Tingkat 10 Menara Kidurong New Staff Service Declaration and Oath Ceremony at 10th Floor, Menara Kidurong Laporan Tahunan 2010 Annual Report 31 Oktober -1 November / 31 October - 1 November Lawatan Kerja pegawai-pegawai Unit Kerjasama Agensi Swasta Working Visit of the officers of Public Private Partnership Unit 8 Disember / 8 December Hari Keluarga Lembaga Pelabuhan Bintulu, Stadium Bintulu Bintulu Port Authority Family Day, Bintulu Stadium 18 Disember /18 December Senamrobik sempena Program Anti Dadah di Perkarangan Rumah Kelab LPB Aerobic Excercise in conjunction with Anti-Drug Programme at Rumah Kelab LPB 29 5-7 November / 5-7 November Program Team Building di Eastwood Valley Golf & Country Club, Miri Team Building Program at Eastwood Valley Golf & Country Club, Miri. 9 Disember / 9 December Taklimat Ujian E-psikologi dan Program Modul LPB 2010 Jabatan Perkhidmatan Awam dan Kementerian Pengangkutan Bilik Kuala Tatau 2, Menara Kidurong Public Services Department and Ministry of Transport E-psycology Examination Briefing and Modul LPB 2010 Programme at Kuala Tatau 2 Room, Menara Kidurong 30 Disember /30 December Penyampaian derma untuk Surau Kampung Jabai Donation presentation for Surau Kampung Jabai Laporan Tahunan 2010 Annual Report Penyata Kewangan 31 32 Laporan Tahunan 2010 Annual Report PeNyAtA PeNgeruSi DAN SeOrANg Ahli leMbAgA PeNgArAh leMbAgA PelAbuhAN biNtulu Laporan Tahunan 2010 Annual Report PeNgAkuAN Oleh PegAwAi utAMA yANg bertANgguNgJAwAb ke AtAS PeNguruSAN kewANgAN leMbAgA PelAbuhAN biNtulu PESURUHJAYA SUMPAH No. 69, 1st Floor, Medan Sentral Commercial Centre, Jalan Tanjung Kidurong, 97000 Bintulu, Sarawak. 33 Laporan Tahunan 2010 Annual Report leMbArAN iMbANgAN PADA 31 DiSeMber 2010 35 36 Laporan Tahunan 2010 Annual Report PeNyAtA PeNDAPAtAN bAgi tAhuN berAkhir 31 DiSeMber 2010 Laporan Tahunan 2010 Annual Report PeNyAtA PerubAhAN ekuiti bAgi tAhuN berAkhir 31 DiSeMber 2010 37 38 Laporan Tahunan 2010 Annual Report PeNyAtA AlirAN tuNAi bAgi tAhuN berAkhir 31 DiSeMber 2010 Laporan Tahunan 2010 Annual Report NOtA-NOtA kePADA PeNyAtA kewANgAN bAgi tAhuN berAkhir 31 DiSeMber 2010 39 40 Laporan Tahunan 2010 Annual Report NOtA-NOtA kePADA PeNyAtA kewANgAN bAgi tAhuN berAkhir 31 DiSeMber 2010 Laporan Tahunan 2010 Annual Report NOtA-NOtA kePADA PeNyAtA kewANgAN bAgi tAhuN berAkhir 31 DiSeMber 2010 41 42 Laporan Tahunan 2010 Annual Report NOtA-NOtA kePADA PeNyAtA kewANgAN bAgi tAhuN berAkhir 31 DiSeMber 2010 Laporan Tahunan 2010 Annual Report NOtA-NOtA kePADA PeNyAtA kewANgAN bAgi tAhuN berAkhir 31 DiSeMber 2010 43 44 Laporan Tahunan 2010 Annual Report NOtA-NOtA kePADA PeNyAtA kewANgAN bAgi tAhuN berAkhir 31 DiSeMber 2010 Laporan Tahunan 2010 Annual Report NOtA-NOtA kePADA PeNyAtA kewANgAN bAgi tAhuN berAkhir 31 DiSeMber 2010 45 46 Laporan Tahunan 2010 Annual Report NOtA-NOtA kePADA PeNyAtA kewANgAN bAgi tAhuN berAkhir 31 DiSeMber 2010 Laporan Tahunan 2010 Annual Report NOtA-NOtA kePADA PeNyAtA kewANgAN bAgi tAhuN berAkhir 31 DiSeMber 2010 47 48 Laporan Tahunan 2010 Annual Report NOtA-NOtA kePADA PeNyAtA kewANgAN bAgi tAhuN berAkhir 31 DiSeMber 2010 Laporan Tahunan 2010 Annual Report NOtA-NOtA kePADA PeNyAtA kewANgAN bAgi tAhuN berAkhir 31 DiSeMber 2010 49 Laporan Tahunan 2010 Annual Report Financial Statement 51 52 Laporan Tahunan 2010 Annual Report StAteMeNt by DireCtOrS We, DAtO’ lONg See wOOl and hJ. hAMDAN biN hJ. AbDul hAMiD, the Chairman and Member of the Board of Directors of BINTULU PORT AUTHORITY, do hereby state that in the opinion of the Directors, the accompanying Balance Sheets, Statements of Income, Statement of Changes In Equity and Cash Flow Statement together with the notes thereto, have been properly drawn up so as to give the true and fair view of the state of affairs of Bintulu Port Authority as at 31 December 2010. On behalf of the board DAtO’ lONg See wOOl Chairman hJ. hAMDAN biN hJ. AbDul hAMiD General Manager Date: Laporan Tahunan 2010 Annual Report StAtutOry DeClArAtiON I, ANuAr biN AikNe, being the officer primarily responsible for the financial management and the accounting records of biNtulu POrt AuthOrity, do solemnly and sincerely declare that the accompanying Balance Sheets, Statements of Income, Statement of Changes In Equity and Cash Flow Statement for the year ended, together with the notes thereto, are to the best of my knowledge and belief correct, and I make this solemn declaration conscientiously believing the same to be true and by virtue of the provisions of the Statutory Declaration Act, 1960. Subscribed and solemnly declared by ANuAr biN AikNe at Bintulu in the State of Sarawak on 08 August 2011 ) ) ) ) ANUAR BIN AIKNE (650130-13-5339) Before me, Commissioner for Oaths No. 69, 1st Floor, Medan Sentral Commercial Centre, Jalan Tanjung Kidurong, 97000 Bintulu, Sarawak. 53 54 Laporan Tahunan 2010 Annual Report Laporan Tahunan 2010 Annual Report bAlANCe SheetS FOr the yeAr eNDeD 31 DeCeMber 2010 Note ASSetS Property, plant and equipment Construction in progress CurreNt ASSetS Trade debtors Other debtors Short-term investments Fixed deposits Cash and bank balances with bank CurreNt liAbilitieS Other creditors Short-term loans Net CurreNt ASSetS FiNANCeD by: Goverment Grants Accumulated Profit lONg-terM liAbilitieS Loan Deferred Taxation The accompanying notes are an integral part of these accounts 55 56 Laporan Tahunan 2010 Annual Report iNCOMe StAteMeNt FOr the yeAr eNDeD 31 DeCeMber 2010 Note iNCOMe Income Other income tOtAl iNCOMe exPeNDiture Emolument Services and supplies Contributions and fixed payments Repayment and written off Depreciation/Amortization Financial Cost Other expenses tOtAl exPeNDiture PrOFit beFOre tAx tAx bAlANCe brOught FOrwArD The accompanying notes are an integral part of these accounts Laporan Tahunan 2010 Annual Report StAteMeNt OF ChANgeS iN equity FOr the yeAr eNDeD 31 DeCeMber 2010 grants Accumulated Profit bAlANCe At 31 DeCeMber 2008 Amortization of Grants Net profit for the year bAlANCe At 31 DeCeMber 2009 Amortization of Grants Net profit for the year bAlANCe At 31 DeCeMber 2010 The accompanying notes are an integral part of these accounts total 57 58 Laporan Tahunan 2010 Annual Report CASh FlOw StAteMeNt FOr the yeAr eNDeD 31 DeCeMber 2010 CASh FlOw FrOM OPerAtiNg ACtivitieS Cash received from customer Cash paid to suppliers and employees Cash generated from operations Interest Paid Income Tax - Payment - Rebate Net cash from operating activities CASh FlOw FrOM iNveStMeNt ACtivitieS Proceeeds from sale of assets Interest Received Dividend Received Purchase of property, plant and equipment Net Cash from investment activities CASh FlOw FrOM FiNANCiNg ACtivitieS Payment of finance lease liabilities Net cash from financing activities (Decrease) in cash and cash equivalents Cash and cash equivalents at beginning of year Cash and cash equivalents at end of year CASh AND CASh equivAleNtS CONSiSt OF; Cash and bank balances with bank Short-term investments Fixed deposit The accompanying notes are an integral part of these accounts Laporan Tahunan 2010 Annual Report NOteS tO the ACCOuNtS FOr the yeAr eNDeD 31 DeCeMber 2010 1. PriNCiPAl ACtivitieS Bintulu Port Authority was incorporated under Act 243, of the Bintulu Port Authority Act 1981. Bintulu Port Authority is the regulatory body of Bintulu Port, Sarawak. 2. SigNiFiCANt ACCOuNtiNg POliCieS (a) basis of Accounting The accounts have been prepared under the historical cost convention and in compliance with the approved standards. (b) recognition of income and expenditure Income and Expenditure is acknowledged upon accrual basis. (c) Property, Plant and equipment Property, plant and equipment are stated at cost less accumulated depreciation and impairment losses. Construction in progress, no depreciation allocated. Leasehold land is depreciated for the entire period of lease. Provision for depreciation of property, plant and equipment is stated at cost on a straight-line method over the course of their estimated useful lives. The principal annual depreciation rates are as follows: Leasehold land Buildings and port structures Office equipments and others Motor vehicles Furnitures and Fixtures (d) For 99 years 2% 10-33% 20% 10% Deferred taxation Deferred taxation liability is fully acknowledged using the liability method for all material timing differences arise from the provision for assets and liabilities for tax purposes and the amount in the financial statements. Deferred taxation assets is acknowledged until possibilities of future taxable profit that can be deducted from timing differences. (e) Cash and Cash equivalents Cash and cash equivalents consists of cash-in-hand, bank balance, short-term investments, fixed deposits and bank overdrafts. 59 60 Laporan Tahunan 2010 Annual Report NOteS tO the ACCOuNtS FOr the yeAr eNDeD 31 DeCeMber 2010 2. SigNiFiCANt ACCOuNtiNg POliCieS (continue) (f) impairment of Assets As at the balance sheet date, carrying value of assets will be reviewed to determine indication of impairment losses on the assets. If any indication exists, the net book value is determined by comparing the value of the asset and realizable value of the asset. Total obtainable values are the highest total between the net selling price and usage value, which is measured by referring to the brought forward discounted cash flow. Total amount receivable from the assets is estimated on every asset or its cash realizable value of that category of asset. Impairment losses will be charged to the income statement immediately. Any impairment losses for revalued assets are realized as decline in revaluation up to the level of realized proceed in re-valuation of the same assets. Proceeds on loss in net book value recognized in the previous year is recorded should there be any sign of loss on net book value taken up for the nonexistent asset or decline in value. Proceeds can only be recognized after the value of the asset is determined after the loss in net book value is recognized. Proceed is recognized in the income statement immediately. (g) Construction in Progress Cost for construction in progress are identified if it is relevant in bringing better economic value in the future. Construction cost will be transferred to property, plant and equipment when the assets are completed and ready to be used. (h) loan with interest Loan with interest is recorded at total received, minus transaction cost. All loan costs are identified as expenditure in the Financial Statement at the time it occurs. (i) Financial instrument The financial instrument stated in the Balance Sheet includes fixed deposits, loan with interest, bank and cash balance, debtors, creditors and loans. Realization method used is stated in the accounting policy related to each item involved. Financial instrument is classified as liability or equity in line with the content of contract agreement, interest, profit and loss related to financial instrument which are classified as liability, stated as expenditure or income. Distributions to financial instrument holders are adjusted when the Authority has lawful rights to offset the amount acknowledged, to settle either on net basis or to realise the assets and settle the liability simultaneously. Laporan Tahunan 2010 Annual Report 61 NOteS tO the ACCOuNtS FOr the yeAr eNDeD 31 DeCeMber 2010 2. SigNiFiCANt ACCOuNtiNg POliCieS (continue) (i) Financial instrument (continue) (i) Marketable Securities Marketable securities are carried at the lowest price between the cost and market value, which is determined based on aggregate basis. Market value is determined based on quoted market value. Increases or decreases in the carrying amount of marketable securities will be credited or charged to the Income Statement. On disposal of marketable securities, the difference between net disposal proceeds and the carrying amount is charged or credited to the income statement. (ii) trade Debtors Trade debtors are carried at anticipated realisable values. Bad debts are written off when identified. (iii) trade Creditors Trade creditors are stated at cost, which is fair value for the purchase to be paid for goods and services receivable. (j) grants Government grants on capital expenditure are capitalised and brought into financial statement on a straight-line method over the course of their estimated useful lives except those grants for incomplete projects. 3. PrOPerty, PlANt AND equiPMeNt Cost Leasehold land Buildings and port structures Office equipment and others Motor vehicles Furniture and fixtures balance at 1.1.2010 rM Additions rM transfer rM write-Offs rM balance at 31.12.2010 rM 62 Laporan Tahunan 2010 Annual Report NOteS tO the ACCOuNtS FOr the yeAr eNDeD 31 DeCeMber 2010 3. PrOPerty, PlANt AND equiPMeNt (continued) Accumulated Depreciation balance at 1.1.2010 rM Depreciation rM transfer rM write-Offs rM balance at 31.12.2010 rM balance at 1.1.2009 rM Additions rM transfer rM write-Offs rM balance at 31.12.2009 rM write-Offs rM balance at 31.12.2009 rM Leasehold land Buildings and port structures Office equipment and others Motor vehicles Furniture and fixtures Cost Leasehold land Buildings and port structures Office equipment and others Motor vehicles Furniture and fixtures Accumulated Depreciation Leasehold land Buildings and port structures Office equipment and others Motor vehicles Furniture and fixtures balance at 1.1.2009 rM Depreciation rM transfer rM Laporan Tahunan 2010 Annual Report NOteS tO the ACCOuNtS FOr the yeAr eNDeD 31 DeCeMber 2010 3. PrOPerty, PlANt AND equiPMeNt (continue) Net book value Leasehold land Buildings and port structures Office equipment and others Motor vehicles Furniture and fixtures 4. CONStruCtiON iN PrOgreSS Expenditure as at 1st January Current exependiture Less: Capitalised of Asset Expenses for purchase of assets General expenses Adjustment Expenditure as at 31st December 63 64 Laporan Tahunan 2010 Annual Report NOteS tO the ACCOuNtS FOr the yeAr eNDeD 31 DeCeMber 2010 5. trADe DebtOrS 950 metres wharf Leasehold debtors Debtors Surcharge Rental debtors for BPA Building Rental debtors for rooms The arrears due from Bintulu Port Sdn Bhd (BPSB) of RM 45,458,033.29 (2009 : RM19,736,594.38) is an outstanding lease amount for facilities and land in the non-demised area. As of December 31, 2010, the lease agreement is yet to be finalised by both parties. BPSB is in the process of appealing for a reduction on the lease rates charged by BPA. Starting 2009, BPSB paid only 70% of the invoiced amount of the lease. 6. Other DebtOrS Fuel deposit Water deposit Electrical deposit Receivable Interest Other debtors Inland Revenue Department Loan deposit 7. ShOrt-terM iNveStMeNt Shares quoted at cost Provision for diminution in short-term investment Short-term deposit Quoted shares at market value 8. FixeD DePOSitS Fixed deposits with: Licensed Banks Licensed financial institution Laporan Tahunan 2010 Annual Report 65 NOteS tO the ACCOuNtS FOr the yeAr eNDeD 31 DeCeMber 2010 9. CreDitOrS Deposit received Tender and quotation deposit Advance Income received Rental deposit received Supplies creditors Service creditors 10. lOAN Maturity of Loan Within 1 year More than 1 year and less than 2 years More than 2 years and less than 5 years A substantial portion of the construction cost of the LNG 3 jetty at Bintulu Port amounting RM100 million is loaned from the Malaysian Government. The loan period is twelve years effective from the date the loan is made. Period of postponement is four year effective from the date the loan is made on 13 December 2000. During the period of postponement, an interest rate of 4% is charged and capitalized. The period of repayment is eight years effective from the first day after the end of the postponed period on 12 December 2005 until 12 December 2012. This loan is charged at an interest rate of four per cent per annum. The non-mortgaged loan of RM114.7 million from Bank Pembangunan Malaysia Berhad (BPMB) at an interest of 5.26% per annum is for the construction of 2nd Inner Harbour. Repayment of the principal sum is made by 16 instalments, which begins on 30 June 2007 until 30 December 2014. The first instalment is on 30 June 2007 and subsequent instalments are due every 6 months until the full amount of the loan has been settled. 66 Laporan Tahunan 2010 Annual Report NOteS tO the ACCOuNtS FOr the yeAr eNDeD 31 DeCeMber 2010 11. gOverNMeNt grANtS At the beginning of the financial year Released to Income Statement At the end of the financial year 12. DeFerreD tAxAtiON At beginning of financial year Charged to Income Statement At the end of the financial year Deferred taxation liability Deferred taxation asset 13. reveNue License and permit Rental Interests and dividends 14. Other iNCOMe Gain on disposal of assets Amortization of Grant Gain on disposal of shares Recovery of diminution in short-term investment Others Laporan Tahunan 2010 Annual Report NOteS tO the ACCOuNtS FOr the yeAr eNDeD 31 DeCeMber 2010 15. PrOFit beFOre tAx The following amount has been charged to/(credited to) determine profit from normal activity before tax:- Directors’ allowance Assets written off Financial cost Losses from sales of investments Rental Depreciation of property, plant & equipment Audit Fees Rental receipts Dividends income Interest income Gain on disposal of assets Amortization of grant Recovery of impairment in short-term investment Profit from sales of investments 16. tAxAtiON Tax on current year profit Deferred tax (Over)/under provision of tax for previous year Profit from normal activities before tax: Tax calculated based on taxation rate of 25% Deferred taxation asset unrecognized in current year Non-taxable income Expenditure disallowed for tax purposes (Over)/under provision for previous year 17. CAPitAl COMMitMeNtS Approved capital expenditure not provided in the accounts:- Contracted 67 68 Laporan Tahunan 2010 Annual Report NOteS tO the ACCOuNtS FOr the yeAr eNDeD 31 DeCeMber 2010 18. huMAN reSOurCe For the year 2010, Bintulu Port Authority has 71 (2009:42) officers and staff. Details of staff categories are as follows:- Managements and Professional Group Support Group 19. FiNANCiAl iNStruMeNt (a) Objective and Financial risk Management Policy The Authority’s approach to risk management is to minimize the effects of its exposure to interest rate risk, credit risk and liquidity risk. (b) interest rate risk The Authority’s income is influenced by the changes in interest rate due to the impact such changes have on interest income from cash and short-term deposit. (c) Credit risk Other than the amount owed by Bintulu Port Sdn. Bhd., the Authority does not encounter any significant credit risk. Credit risk is minimized and controlled through credit limit and monitoring the related procedures. (d) liquidity risk The Authority’s holding of cash and short-term deposit are expected to be sufficient to meet its working capital. (e) Fair value The fair value for each class of financial instrument is as follow: (i) Cash and cash equivalents, trade debtors, debtors and creditors The carrying amounts approximated their fair value due to relatively short-term maturity of these financial instruments. (ii) Marketable Securities The fair value for quoted investment is determined by reference to the market price at stock exchange at the closing of business on the date of balance sheet. 69 Laporan Tahunan 2010 Annual Report NOteS tO the ACCOuNtS FOr the yeAr eNDeD 31 DeCeMber 2010 20. PriOr yeAr ADJuStMeNt Comparative figures in the Income Statement and Changes Of Statements In Equity, the Financial Statements of December 31, 2010 have been restated as follow: Pro-forma 2010 2009 2010 2009 rM rM restated (a) iNCOMe StAteMeNt Income Services and supplies Depreciation / Amortization Surplus before income tax Accumulated surplus carried forward (b) StAteMeNt OF ChANgeS iN equity Accumulated surplus 21. CurreNCy All amounts are stated in Ringgit Malaysia. restated .