Status of IBBelle
Transcription
Status of IBBelle
Status of IBBelle Requirements and IBBelle Overview Commissioning at CERN (ATLAS version) Software Control Ordering of Parts Location of IBBelle at KEK Schedule and Responsibilities C. Kiesling, 6th Belle II PXD/SVD Workshop and 17th Intl. Worshopp on DEPFET Detectors and Applications, Pisa, Oct. 1-3, 2014 1 VXD Cooling Requirements & Specs Minimize material in acceptance region SVD requirements: coolant temperature for APV25 @ -20°C for SNR improvement total dissipated power ~ 700 W PXD requirements: sensor temp. < 25°C, ASICs < 50°C : cooling block @ <-20°C dissipated power ~ 360 W Cooling power ~ 1.6 kW at VXD (incl. ~ 540 W parasitic heat influx) have to add heat loss through 15 m of transfer lines → ~ 2-3 kW Dry Volume (preferably nitrogen): dew point inside VXD volume: ~ -30 °C Outside of VXD: room temperature ( ~ 23°C) at the CDC may need a thermal enclosure towards CDC, well isolated C. Kiesling, 6th Belle II PXD/SVD Workshop and 17th Intl. Worshopp on DEPFET Detectors and Applications, Pisa, Oct. 1-3, 2014 2 CO2 System Overview Junction box BD016 PT116 / PT316 TT116 / TT316 ⅜” MV018 Dummy load (testing only) MV017 FL018 EH117 TT117 TS117 FL017 BD020 PT120 / PT320 TT120 / TT320 TTz20 (DCS) ⅜” HX036 MV036 ½” 10 AV017 Manifold box Transfer lines (~8m) 36 BD036 PT136 / PT336 TT136 / TT336 TTz36 (DCS) ¼” 20 ¼” 16 MV035 ⅜” nc ½” DN40 EH122 TS122 VP512 PT510 TT510 PT512 06 Vacuum system 08 nc MVa24 - MVn24 foam isol. EV608 10 04 12 EV508 DN40 vacuum DCS: TTa24 - TTn24 (FTa24 - FTn24) VP510 VP610 12 VP612 PT610 TT610 PT612 HX012 vacuum isol. Two-stage dry volume PXD / SVD 14 staves (a-g),(7 flow pairs) (10x BW flow / 4x FW flow) Flex lines ~15 m Cables and inter connection pipes CO2 Plant „IBBelle“ (IBL + Belle) C. Kiesling, 6th Belle II PXD/SVD Workshop and 17th Intl. Worshopp on DEPFET Detectors and Applications, Pisa, Oct. 1-3, 2014 3 IBBelle 12 10 Cold CO2 line Cold R404a line Warm service line (Cold lines require 32mm insulation) MV042 SV042 PT142 SV043 PT342 SV040 LT142 LT342 no BD108 PT108 TT108 Fill port System B MV041 bs PV108 8 EH142/143 TT142/143 TS142/143 PV144 FL144 AV308 PV344 nc ½” nc MV052 MV050 6 nc TT146 FT106 FL104 PT104 TT104 4 FL344 nc BD050 PT050 nc MV056 MV058 EV348 nc nc 48 HX150 PT149 TT149 PT349 TT349 50 50 CV149 nc Freon chiller A 200 Freon chiller B 400 46 MV306 nc TT346 FT306 HX348 48 BD150/ PT150/ TT150 BD304 PT304 TT304 TT148 HX350 CV349 FL304 4 LP301 nc LP101 50 ½” FL306 ½” HX148 TT148 Fill port 6 nc EV148 BD308 PT308 TT308 EH306 TT306 TS306 evacuate ¼” 46 LP101 EH101 / EH102 / EH103 TT101 / TT102 / TT103 TS101 / TS102 / TS103 PT101 / PT102 / PT103 nc MV054 8 nc 44 VP056 44 vent ⅜” PV308 EH342/143 TT342/143 TS342/143 nc MV106 nc MV310 nc AV108 EH106 TT106 TS106 FL106 PV310 no 42 ⅜” CO2 from experiment ¼” MV110 System A NV310 nc nc nc ½” CV342 CV142 ¼” 10 40 AC042 CO2 to experiment BD112 SV041 MV043 NV110 PV110 MV040 50 ½” BD350/ PT350/ TT350 EH301 / EH302 / EH303 TT301 / TT302 / TT303 TS301 / TS302 / TS303 PT301 / PT302 / PT303 Commissioning of IBBelle at CERN Installation at CERN (ATLAS Experiment): the “twin” of IBBelle Accum. rack Construction of IBBelle (ATLAS) is finished Commissioning with dummy heat load is mostly done Some problems getting down to -40°C (not important for the Belle version) Now testing all CO2 connections to IBL C. Kiesling, 6th Belle II PXD/SVD Workshop and 17th Intl. Worshopp on DEPFET Detectors and Applications, Pisa, Oct. 1-3, 2014 5 Control of Accumulator Loop uses PLC industrial standard (“Schneider”) programming done by CERN (MARCO and IBBelle) C. Kiesling, 6th Belle II PXD/SVD Workshop and 17th Intl. Worshopp on DEPFET Detectors and Applications, Pisa, Oct. 1-3, 2014 6 PVSS -> EPICS Remark: This is a desired option, not a necessity C. Kiesling, 6th Belle II PXD/SVD Workshop and 17th Intl. Worshopp on DEPFET Detectors and Applications, Pisa, Oct. 1-3, 2014 7 PVSS GUI for IBBelle Plant A PVSS sets operation points (T, CO2 flux) and monitors the operation Supervising layer (+GUI) will be re-written in EPICS / CSS (Michael, Bogdan, Thorsten) All critical control / operation functions are formulated in PLC and will not be touched C. Kiesling, 6th Belle II PXD/SVD Workshop and 17th Intl. Worshopp on DEPFET Detectors and Applications, Pisa, Oct. 1-3, 2014 8 Interlock CO2 <-> Detector The CO2 system can be in anyone of three operational states: (simplified scheme) DAQ only if in “Run” Mode States “Operation” “Stop” <-> “Run” (manual, automatic, interlock, swap) “Stand-by” “Stop” <-> “Run” (manual, automatic, interlock) “Maintenance” “Stop” (all actuators in “safe position”, all interlocks disabled, manual ) Transitions between states managed by sequencer (“recipes”) Alarms issued by sensors (temperature, flow, pressure) Actuators: control point (valves, motors, mass flow controllers, etc.) for each a “safe position” is defined C. Kiesling, 6th Belle II PXD/SVD Workshop and 17th Intl. Worshopp on DEPFET Detectors and Applications, Pisa, Oct. 1-3, 2014 9 Interlock CO2 <-> Detector Types of Interlock (unit or actuator) “Full Stop Interlock” (FS): Stop unit/actuator, wait for manual acknowl. “Temporary Stop Interlock (TS)”: stop unit/actuator, resume automatically when Interlock disappears “Start Interlock” (SI) prevent unit / actuator from starting Types of Alarms “Warning” “Alarm” message message, set appropriate interlock type Depending on interlock type, hardwired signal to “interlock box” (e.g. : “FS” leads to VXD power switch off) C. Kiesling, 6th Belle II PXD/SVD Workshop and 17th Intl. Worshopp on DEPFET Detectors and Applications, Pisa, Oct. 1-3, 2014 10 Documentation of the CO2 Plant Production drawings for the mechanics exist, part lists as well, but - Need to go through the drawings and tables to establish part list - MPI working on this: Sven Vogt - Status: Swagelok part list almost done, offers have been asked for waiting for definite quotes For the control side (PCLs etc), things are not too well documented: - MPI working on this: Reinhard Sedlmeyer already two visits at CERN to establish status in situ - First parts have been asked for quotes and are ordered through CERN Process of getting quotes and do the ordering will take till the end of year C. Kiesling, 6th Belle II PXD/SVD Workshop and 17th Intl. Worshopp on DEPFET Detectors and Applications, Pisa, Oct. 1-3, 2014 11 Construction and Commissioning IBBelle for VXD will be an EXACT copy of IBBelle (ATLAS) Variants possible in the transfer system from IBBelle to VXD (include results from Thermal Mockup) Up-to-date 3D CAD model and production drawings exist Ordering of parts according to lists established at MPI (based on material from CERN/Nikhef for ATLAS IBL) by MPI Construction at MPI starts in 2015 (workshop is prepared), including pressure tests, control electronics, etc. Commissioning will be done with the help of CERN/Nikhef crew (exact dates to be organized) by the end of 2015 at MPI, including engineers from DESY, KEK and SVD (tbd) Certification by TÜV (process being prepared at present) C. Kiesling, 6th Belle II PXD/SVD Workshop and 17th Intl. Worshopp on DEPFET Detectors and Applications, Pisa, Oct. 1-3, 2014 12 Location of the CO2 Plant at KEK More space than needed C. Kiesling, 6th Belle II PXD/SVD Workshop and 17th Intl. Worshopp on DEPFET Detectors and Applications, Pisa, Oct. 1-3, 2014 13 Location of the CO2 Plant at KEK C. Kiesling, 6th Belle II PXD/SVD Workshop and 17th Intl. Worshopp on DEPFET Detectors and Applications, Pisa, Oct. 1-3, 2014 14 Location of the CO2 Plant at KEK Space tight, but adequate Potential problem: Access to top of Belle II C. Kiesling, 6th Belle II PXD/SVD Workshop and 17th Intl. Worshopp on DEPFET Detectors and Applications, Pisa, Oct. 1-3, 2014 15 Location of the CO2 Plant at KEK C. Kiesling, 6th Belle II PXD/SVD Workshop and 17th Intl. Worshopp on DEPFET Detectors and Applications, Pisa, Oct. 1-3, 2014 16 Alternative Arrangement 40’ Container, to be placed outside of Tsukuba hall Advantage: unit can be assembled at MPI, no need to take it apart for transport, no reassembly Potential problems: need water/electricity outside hall Need to air condition the container C. Kiesling, 6th Belle II PXD/SVD Workshop and 17th Intl. Worshopp on DEPFET Detectors and Applications, Pisa, Oct. 1-3, 2014 17 Schedule for the CO2 Plant IBBelle at KEK in summer of 2016 C. Kiesling, 6th Belle II PXD/SVD Workshop and 17th Intl. Worshopp on DEPFET Detectors and Applications, Pisa, Oct. 1-3, 2014 18 Responsibilities, Operation at KEK Lead institute (main responsibility): MPI Munich Collaborating institutes: DESY + SVD (tbd) Installation at KEK: MPI, DESY, SVD (= “VXD”) Commissioning: VXD + KEK (Kimura-san, head of KEK cryo group visited IBBelle at CERN in April 2014, next meeting on October 6/7, 2014 ) Agreement with KEK (Nov. 13 B2GM meeting): KEK will operate and monitor IBBelle standard service tasks executed by KEK (e.g. filter cleaning, replacement of spare parts) major failures will require action by VXD crew C. Kiesling, 6th Belle II PXD/SVD Workshop and 17th Intl. Worshopp on DEPFET Detectors and Applications, Pisa, Oct. 1-3, 2014 19