Status of IBBelle

Transcription

Status of IBBelle
Status of IBBelle
Requirements and IBBelle Overview
Commissioning at CERN (ATLAS version)
Software Control
Ordering of Parts
Location of IBBelle at KEK
Schedule and Responsibilities
C. Kiesling, 6th Belle II PXD/SVD Workshop and 17th Intl. Worshopp on DEPFET Detectors and Applications, Pisa, Oct. 1-3, 2014
1
VXD Cooling Requirements & Specs
Minimize material in acceptance region
SVD requirements:
coolant temperature for APV25 @ -20°C for SNR improvement
total dissipated power ~ 700 W
PXD requirements:
sensor temp. < 25°C, ASICs < 50°C : cooling block @ <-20°C
dissipated power ~ 360 W
Cooling power ~ 1.6 kW at VXD (incl. ~ 540 W parasitic heat influx)
have to add heat loss through 15 m of transfer lines → ~ 2-3 kW
Dry Volume (preferably nitrogen):
dew point inside VXD volume: ~ -30 °C
Outside of VXD: room temperature ( ~ 23°C) at the CDC
may need a thermal enclosure towards CDC, well isolated
C. Kiesling, 6th Belle II PXD/SVD Workshop and 17th Intl. Worshopp on DEPFET Detectors and Applications, Pisa, Oct. 1-3, 2014
2
CO2 System Overview
Junction box
BD016
PT116 / PT316
TT116 / TT316
⅜”
MV018
Dummy load
(testing only)
MV017
FL018
EH117
TT117
TS117
FL017
BD020
PT120 / PT320
TT120 / TT320
TTz20 (DCS)
⅜”
HX036
MV036
½”
10
AV017
Manifold box
Transfer lines
(~8m)
36
BD036
PT136 / PT336
TT136 / TT336
TTz36 (DCS)
¼”
20
¼”
16
MV035
⅜”
nc
½”
DN40
EH122
TS122
VP512
PT510 TT510 PT512
06
Vacuum system
08
nc
MVa24 - MVn24
foam
isol.
EV608
10
04
12
EV508
DN40 vacuum
DCS:
TTa24 - TTn24
(FTa24 - FTn24)
VP510
VP610
12
VP612
PT610 TT610 PT612
HX012
vacuum isol.
Two-stage dry volume
PXD / SVD
14 staves (a-g),(7 flow pairs)
(10x BW flow / 4x FW flow)
Flex
lines
~15 m
Cables and inter connection pipes
CO2 Plant „IBBelle“
(IBL + Belle)
C. Kiesling, 6th Belle II PXD/SVD Workshop and 17th Intl. Worshopp on DEPFET Detectors and Applications, Pisa, Oct. 1-3, 2014
3
IBBelle
12
10
Cold CO2 line
Cold R404a line
Warm service line
(Cold lines require
32mm insulation)
MV042
SV042
PT142
SV043
PT342
SV040
LT142
LT342
no
BD108
PT108
TT108
Fill port
System B
MV041
bs
PV108
8
EH142/143
TT142/143
TS142/143
PV144
FL144
AV308
PV344
nc
½”
nc
MV052
MV050
6
nc
TT146
FT106
FL104
PT104
TT104
4
FL344
nc
BD050
PT050
nc
MV056
MV058
EV348
nc
nc
48
HX150
PT149
TT149
PT349
TT349
50
50
CV149
nc
Freon
chiller A
200
Freon
chiller B
400
46
MV306
nc
TT346
FT306
HX348
48
BD150/ PT150/ TT150
BD304
PT304
TT304
TT148
HX350
CV349
FL304
4
LP301
nc
LP101
50
½”
FL306
½”
HX148
TT148
Fill port
6
nc
EV148
BD308
PT308
TT308
EH306
TT306
TS306
evacuate
¼”
46
LP101
EH101 / EH102 / EH103
TT101 / TT102 / TT103
TS101 / TS102 / TS103
PT101 / PT102 / PT103
nc
MV054
8
nc
44
VP056
44
vent
⅜”
PV308
EH342/143
TT342/143
TS342/143
nc
MV106
nc
MV310
nc
AV108
EH106
TT106
TS106
FL106
PV310
no
42
⅜”
CO2 from experiment
¼”
MV110
System A
NV310
nc
nc
nc
½”
CV342
CV142
¼”
10
40
AC042
CO2 to experiment
BD112
SV041
MV043
NV110
PV110
MV040
50
½”
BD350/ PT350/ TT350
EH301 / EH302 / EH303
TT301 / TT302 / TT303
TS301 / TS302 / TS303
PT301 / PT302 / PT303
Commissioning of IBBelle at CERN
Installation at CERN (ATLAS Experiment): the “twin” of IBBelle
Accum.
rack
Construction of IBBelle (ATLAS) is finished
Commissioning with dummy heat load is
mostly done
Some problems getting down to -40°C
(not important for the Belle version)
Now testing all CO2 connections to IBL
C. Kiesling, 6th Belle II PXD/SVD Workshop and 17th Intl. Worshopp on DEPFET Detectors and Applications, Pisa, Oct. 1-3, 2014
5
Control of Accumulator Loop
uses PLC
industrial
standard
(“Schneider”)
programming done
by CERN
(MARCO and
IBBelle)
C. Kiesling, 6th Belle II PXD/SVD Workshop and 17th Intl. Worshopp on DEPFET Detectors and Applications, Pisa, Oct. 1-3, 2014
6
PVSS -> EPICS
Remark: This is a desired option, not a necessity
C. Kiesling, 6th Belle II PXD/SVD Workshop and 17th Intl. Worshopp on DEPFET Detectors and Applications, Pisa, Oct. 1-3, 2014
7
PVSS GUI for IBBelle
Plant A
PVSS sets operation
points (T, CO2 flux)
and monitors the
operation
Supervising layer
(+GUI) will be
re-written in
EPICS / CSS
(Michael, Bogdan,
Thorsten)
All critical control /
operation functions
are formulated in PLC
and will not be
touched
C. Kiesling, 6th Belle II PXD/SVD Workshop and 17th Intl. Worshopp on DEPFET Detectors and Applications, Pisa, Oct. 1-3, 2014
8
Interlock CO2 <-> Detector
The CO2 system can be in anyone of three operational states:
(simplified scheme)
DAQ only if in “Run”
Mode
States
“Operation”
“Stop” <-> “Run” (manual, automatic, interlock, swap)
“Stand-by”
“Stop” <-> “Run” (manual, automatic, interlock)
“Maintenance”
“Stop” (all actuators in “safe position”, all interlocks
disabled, manual )
Transitions between states managed by sequencer (“recipes”)
Alarms issued by sensors (temperature, flow, pressure)
Actuators: control point (valves, motors, mass flow controllers, etc.)
for each a “safe position” is defined
C. Kiesling, 6th Belle II PXD/SVD Workshop and 17th Intl. Worshopp on DEPFET Detectors and Applications, Pisa, Oct. 1-3, 2014
9
Interlock CO2 <-> Detector
Types of Interlock (unit or actuator)
“Full Stop Interlock” (FS): Stop unit/actuator, wait for manual acknowl.
“Temporary Stop Interlock (TS)”: stop unit/actuator, resume automatically
when Interlock disappears
“Start Interlock” (SI)
prevent unit / actuator from starting
Types of Alarms
“Warning”
“Alarm”
message
message, set appropriate interlock type
Depending on interlock type, hardwired signal to “interlock box”
(e.g. : “FS” leads to VXD power switch off)
C. Kiesling, 6th Belle II PXD/SVD Workshop and 17th Intl. Worshopp on DEPFET Detectors and Applications, Pisa, Oct. 1-3, 2014
10
Documentation of the CO2 Plant
Production drawings for the mechanics exist, part lists as well, but
-
Need to go through the drawings and tables to establish part list
-
MPI working on this: Sven Vogt
-
Status: Swagelok part list almost done, offers have been asked for
waiting for definite quotes
For the control side (PCLs etc), things are not too well documented:
-
MPI working on this: Reinhard Sedlmeyer
already two visits at CERN to establish status in situ
-
First parts have been asked for quotes and are ordered through CERN
Process of getting quotes and do the ordering will take till the end of year
C. Kiesling, 6th Belle II PXD/SVD Workshop and 17th Intl. Worshopp on DEPFET Detectors and Applications, Pisa, Oct. 1-3, 2014
11
Construction and Commissioning
IBBelle for VXD will be an EXACT copy of IBBelle (ATLAS)
Variants possible in the transfer system from IBBelle to VXD
(include results from Thermal Mockup)
Up-to-date 3D CAD model and production drawings exist
Ordering of parts according to lists established at MPI (based on material
from CERN/Nikhef for ATLAS IBL) by MPI
Construction at MPI starts in 2015 (workshop is prepared), including
pressure tests, control electronics, etc.
Commissioning will be done with the help of CERN/Nikhef crew (exact
dates to be organized) by the end of 2015 at MPI, including engineers
from DESY, KEK and SVD (tbd)
Certification by TÜV (process being prepared at present)
C. Kiesling, 6th Belle II PXD/SVD Workshop and 17th Intl. Worshopp on DEPFET Detectors and Applications, Pisa, Oct. 1-3, 2014
12
Location of the CO2 Plant at KEK
More space
than needed
C. Kiesling, 6th Belle II PXD/SVD Workshop and 17th Intl. Worshopp on DEPFET Detectors and Applications, Pisa, Oct. 1-3, 2014
13
Location of the CO2 Plant at KEK
C. Kiesling, 6th Belle II PXD/SVD Workshop and 17th Intl. Worshopp on DEPFET Detectors and Applications, Pisa, Oct. 1-3, 2014
14
Location of the CO2 Plant at KEK
Space tight, but adequate
Potential problem: Access to top of Belle II
C. Kiesling, 6th Belle II PXD/SVD Workshop and 17th Intl. Worshopp on DEPFET Detectors and Applications, Pisa, Oct. 1-3, 2014
15
Location of the CO2 Plant at KEK
C. Kiesling, 6th Belle II PXD/SVD Workshop and 17th Intl. Worshopp on DEPFET Detectors and Applications, Pisa, Oct. 1-3, 2014
16
Alternative Arrangement
40’ Container, to be placed outside of Tsukuba hall
Advantage: unit can be assembled at MPI, no need to
take it apart for transport, no reassembly
Potential problems:
need water/electricity outside hall
Need to air condition the container
C. Kiesling, 6th Belle II PXD/SVD Workshop and 17th Intl. Worshopp on DEPFET Detectors and Applications, Pisa, Oct. 1-3, 2014
17
Schedule for the CO2 Plant
IBBelle at KEK
in summer of
2016
C. Kiesling, 6th Belle II PXD/SVD Workshop and 17th Intl. Worshopp on DEPFET Detectors and Applications, Pisa, Oct. 1-3, 2014
18
Responsibilities, Operation at KEK
Lead institute (main responsibility): MPI Munich
Collaborating institutes: DESY + SVD (tbd)
Installation at KEK: MPI, DESY, SVD (= “VXD”)
Commissioning: VXD + KEK
(Kimura-san, head of KEK cryo group visited IBBelle at CERN in April 2014,
next meeting on October 6/7, 2014 )
Agreement with KEK (Nov. 13 B2GM meeting):
KEK will operate and monitor IBBelle
standard service tasks executed by KEK
(e.g. filter cleaning, replacement of spare parts)
major failures will require action by VXD crew
C. Kiesling, 6th Belle II PXD/SVD Workshop and 17th Intl. Worshopp on DEPFET Detectors and Applications, Pisa, Oct. 1-3, 2014
19