GERMAN RAILWAY HOHER STEIN, DE

Transcription

GERMAN RAILWAY HOHER STEIN, DE
,
,
GERMAN RAILWAY HOHER
STEIN, DE
GERMAN RAILWAY HOHER STEIN
,
,
German Railway Hoher Stein
Dresden Werdau
/
2012
DB Netz AG, South-East Region
Dr. Spang Ingenieurgesellschaft für Bauwesen, Geologie und Umwelttechnik
Due to the terrain, a change in alignment of over 30° was required near the
midpoint of fence IV. Usually, this is done using intermediate retaining ropes.
However, as the ground falls away almost vertically down to the Weisseritz river
where it meets the fence, a standard solution was not an option. The solution was
to use a strut. What made this situation unique was the height (5m) and absorption
energy (1,500kJ) of the fence. The strut length had to be modified due to the
characteristics of the terrain so as not to prevent the fence from functioning
properly (dynamic system). In addition, the posts had to be flown in by helicopter
as the construction site was difficult to access.
Railway
RXI-100, RXI-150
( )
1000 kJ
3.0 m, 4.0 m, 5.0 m
30 m - 70 m
,
,
| German Railway Hoher Stein, DE
2/4
,
,
| German Railway Hoher Stein, DE
3/4
:
Eberhard Gröner
Project Manager North-West Germany, Regional Manager UK
: +41 71 466 81 57
: +41 79 421 17 01
[email protected]
Geobrugg AG
Aachstrasse 11 | 8590 Romanshorn |
[email protected] | www.geobrugg.com