CITY OF HEWITIJ
CITY ENGINEER'S REPO i"li
May 17,2010
2009 PROJECTS
I
3rd Street - Street, Drainage & Water Improveme ts
It does not appear we will be able to advertise for bibs this merth as there are some
unexpected right of way issues that are going to haJe to be resolved. We do not want to go
out for bids until all issues that would delay the startl of constJ~.lccltion
are cleared.
West Warren Street - Choctaw Trail to Ci
Limits - Street}~
Design is 100% complete. We feel it would be best if we bid
advantage of a larger bid package.
rovements
is project with 3rd Street to take
I
II
2010 - 2011 PROJECTS
Bull Hide Creek WMARSS - Sewer System Conversion
We are working on the final design for the changes to flow a Wge portion of the wastewater to
the proposed WMARSS Bull Hide Creek interceptor sewer. I r~el we will bid this project in the
early Spring of 2011, dependent upon WMARSS constructior schedule.
We have the opportunity to obtain the easements anp land to p'0nstruct an extension of the
interceptor sewer along Castleman Creek and build a new li~ ~tation at Castleman Creek,
thereby deleting the existing Old Temple Road lift station. Tti~f would follow our master plan
for the system that was developed in the late 1960's and woJICl save considerable cost
duplication in the future by not having to rebuild the Old TemWe Road lift station now.
I
FM-1695 Widening - Utility Adjustments
The majority of construction is complete and is to be completetl no later than July 9,2010.
2010 Street Micro-Seal Project
Bids will be opened on June 2,2010 and presented to the Council for award on June 7,2010.
I
Lift Station No. 6 Removal
Bids will be opened on May 25,2010
I
and presented to the Council for award on June 7, 2010.
Mobile Home Park Water & Sewer Line Replacement
Construction plans are approximately 25% complete.
I
Sun Valley Waterline Replacement (Hewitt Dr. to Sapphirre Blvd.)
Construction plans are approximately
10% comPlete·1
III
Ritchie Road Water Plant - 2.5 Million Gallon Concrete GrrO.undStorage Tank
The location plan is approximately 85% complete and as soo'~1as the exact location for the
tank is confirmed, a geotechnical engineering firm will make fest borings of the soil and advise
as to the maximum bearing capacity for the foundation desigH.
Page 1 of2
Duff Consulting Engineers, Inri.
Texas Registered EngineeHng Firm
1-400
II
CITY OF HEWITT
CITY ENGINEER'S REPORt
May 17, 2010
FUTURE PROJECTS
New Water Supply & Elevated Storage for Inside City Limits
The City needs to obtain additional water supply and construct' a new elevated storage as
soon as possible, The system is already exceeding 85% utilization of the existing wells and
is required by TCEQ to plan for additional supply,
/7
c,..
'/ ",
~L
)
I
""~""*,,~..
--~ ~"''''''''''
OF l~-t.:\,
."'\
•.:·"~p.~,
..,...
X
,
~
'.
~,
. r--
.
EAt
W'II'
I lam
, son,
Nan
"
...•
. ','~
~*r:
~eEf"wjLliAM'ftAS'ToN"'~
PE
. t:..~...........................•• ,
' .
'~'.
'~',
34823
t.o.(:.:5'~~~""~
,\~"
vf~
-
;''....
,
,.:
:"
..~"
••9IST. E~..·;.~ •••.
\U$I·
•..•... "'~
•••lIP
\,ONAlr;.
__-
","" .••.....••
A. Turner, E.I.T.
Page 2 of2