ADDENDUM # 4
DATE:
07/14/2014
TO:
All Qualified Bidders
FROM:
Webcor/Obayashi Joint Venture
BID DUE DATE:
August 21, 2014 at 2 p.m.
COMMUNICATION WITH WEBCOR/OBAYASHI JOINT VENTURE
At no time during the bid process (defined as the time between issuance of the IFB until award of Subcontract
to Trade Subcontractor) shall Bidders contact any person(s) or staff of the TJPA, TJPA Program
Management/Program Controls (PMPC) team, Webcor/Obayashi Joint Venture, CM Oversight (CMO), or
other TJPA Consultants regarding the IFB. The only contact is for submission of questions using the contact
directions as described in Exhibit A, Section III. “Communication with Webcor Obayashi Joint Venture”.
The QBD submission time frame expires on Friday, July 25, 2014 at 2:00 p.m.
Bids are due on Thursday, August 21, 2014 at 2:00 p.m.
Reference the Project Bidding Manual, Section III.B.1 regarding document availability and how to obtain the
documents.
MODIFIED DOCUMENTS PER ADDENDUM # 4
ADDENDUM #4
07/14/2014
Page 1 of 2
Trade Package TG10.4- Electrical, Communications, Security
and Integrated Networks
TRANSBAY TRANSIT CENTER PROJECT
San Francisco, CA
The items listed below make up the TG10.4 – Electrical, Communications, Security and Integrated Networks
Bid Package Addendum # 4. This Addendum shall supersede all previously issued Bidding Documents. All
other conditions and requirements remain unchanged.
a. Exhibit A – Trade Subcontractor Bid Package Manual and Forms – Subcontracts #301001004,
dated 07/14/2014.
1) Revised Section I. “Bidder Qualification Process”
2) Revised Section II. “Key Dates for Bidding Process”
3) Revised Section IV. “Scope of the Package and Bid Item Information”
4) Revised Section V. “Construction Schedule”
5) Revised Section VI. “Insurance and Bonding Requirements”
6) Revised Section VII. “Contract Document List”
7) Revised Attachment 1 “Bid Form And Schedule Of Bid Prices”
8) Revised Attachment 2 “Logistics”
b. Project Bidding Manual Revision 25, dated 07/10/2014
c. Exhibit H – Site Specific Safety Program, dated 07/10/2014
d. ASI 117 - MEP/TE/SE/VT Addendum 3 Plans and Specifications prepared for the Transbay Joint
Powers Authority, dated 06/27/2014
e. ASI 118 - MEP/TE/SE/VT Addendum 4 Plans and Specifications prepared for the Transbay Joint
Powers Authority, dated 06/30/2014
f.
ASI 119 – VE for Addendum 4 and VE for Secondary Mitigation Round 2 Plans and
Specifications prepared for the Transbay Joint Powers Authority, dated 07/02/2014
g. Field Order T-00029 - Transbay Main Power Electrical Supply IFB Set