Water-Bike Ferry Improvements Architectural/Engineering Design
Transcription
Water-Bike Ferry Improvements Architectural/Engineering Design
ACKNOWLEDGEMENT REGARDING ERIE CANAL HARBOR DEVELOPMENT CORPORATION (ECHDC) BUFFALO, NEW YORK Water‐Bike Ferry Improvements Architectural/Engineering Design Services ADDENDUM NO. 1 Date: February 6, 2015 Please Sign and Return this sheet with the Proposal, as receipt verification of Addendum No. 1 for the above referenced project. Note: 1) Consultant shall also acknowledge receipt of this Addendum in the cover letter of the Proposal. Received By: (print name) (signature) Company Name: Date: Water‐Bike Ferry Improvements Page 1 of 2 Addendum No. 1 Water‐Bike Ferry Improvements Architectural/Engineering Design Services ADDENDUM NO. 1 February 6, 2015 This Addendum varies the Request for Proposals dated January 23, 2015 and titled: Water‐Bike Ferry Improvements This Addendum will form part of the Contract and is to be read, interpreted and coordinated with all other parts. To acknowledge receipt of this Addendum, Bidders must follow the instructions on the acknowledgement form (page 1). EXHIBITS ADD “Exhibit E ‐ Pre‐Proposal Meeting” QUESTIONS/ANSWERS Question 1: What is the ECHDC’s estimated construction budget for the project? Answer 1: ECHDC estimates a $300,000 ‐ $350,000 construction budget for this project. Question 2: Will a New York Power Authority permit be needed for this project? Answer 2: Yes. Question 3: Will lighting be needed on this project? Answer 3: The Water‐Bike Ferry runs seasonally during daylight hours, so lighting is not a consideration at this point. ECHDC expects a lighting plan in the schematic design phase and will make a final determination based on budget constraints. Question 4: Is survey available? Answer 4: Yes. A topographic survey in Autocad format is available. Refer to Exhibit C in the RFP. However, ECHDC expects additional survey needs for this project to be included in the Consultants fee. Question 5: Can you provide a list of interested firms? Answer 5: The Pre‐Proposal sign‐in sheets are included in Exhibit E. END OF ADDENDUM NO. 1 See Attachment Water‐Bike Ferry Improvements Page 2 of 2 Addendum No. 1 Exhibit E Pre‐Proposal Meeting Water‐Bike Ferry Improvements A/E Design Services Request for Proposal